INTERIOR DESIGN PORFOLIO
ANH
TRUONG
Interior
design,
much
more
affinity”than have to
never express
for
me,
a
is
pretty
“predestined
a
choice.
Althought
had
many
opportunities
myself
TA B L E O F C O N T E N T
through
I
ACADEMIC WORK UAH UNIVERSITY
more
holiday beach hotel - 2017 Da Nang
works until now, I hope that I will get a chance to create more projects and spaces
as
well
as
bring
inspiration
and joy for those people around me.
INTRO
PROFESSIONAL WORK BO DESIGN & CONSTRUCTION
ten ren tea house - 2018 Nguyen Thi Thap, Saigon ten ren tea house - 2019 D2, Saigon the coffee house- 2020 D1, Saigon the coffee house- 2020 Gardenia, Ha Noi other project
page. 02
ABOUT ME PERSONAL INFO truongdonguyetanh@gmail.com +1 (647) 545 - 5769 8 Shalom Crescent, Etobicoke, ON, M9V 4J4
EDUCATION BACKGROUND Sept 2012- Sept 2017
University of Architecture - HCMC Bachelor of Interior Design
Sept 2019- April 2021
Humber College Interior Decorating - Diploma
EXPERIENCE Jan 2018- Sept 2019
BO Design & Construction Planning & layout, 3D drawing, specification.
BODC company , 2019.
SOFTWARE SKILL sketchup | 3dmax-vray | autocad adobe photoshop | adobe illustration | adobe indesign
LANGUAGES vietnamese | english | french
ME
page. 03
A C A D E M I C
W O R K
GRADUATION FINAL PROJECT
LOBBY PERSPECTIVE
CATEGORY : HOSPITALITY PROJECT YEAR : 2017 WORK : CONCEPT | 2D | 3D DRAWING LOCATION : DA NANG, VIETNAM
H O L I D AY B E A C H H O T E L This project was chosen by me as a graduate project with the goal of completely redesigning 5 spaces: the lobby, restaurant, bedroom, and rooftop bar. The main concept is
based
on
the
extraction
of
the
details
of
seaweed,
which is also the symbol of this hotel.
page. 05
18500 1750
1700
1200
2800
C
D
4800 3950
4200
500
2560
1400
950 1000 1000 1000 1000400500605 1050 950 1000 1000 600500 905 1150200 SIDE ELEVATION
3020
500
2670
1240 255 1485 415 800
3300
2040
3010
8700
760150 3900
2990
13000
7200
1500
2545
3805
900
600
1940
905 500
8750
1400
2540
1260
3000 2000 600
1
4045
5200
660 600
710 3655
2940
7400 4400 13000 5600
2
A
21200 7250
3000
1570
3000
3' 3
B
2000
4190
4000
1430
1100
4510
13700
200MAIN
FLOOR PLAN 5100 5300
1000265
4200 6700 18500
235 1390
1310
2100 6500
2700
7245
5205
2550
4500
1500
6200
21200
page. 06
3000 4700
3000
500 1200 4700 5700 19540
350 350 300
5100 5950
200
F
E
4300
1500
200 750100 650
5700
2400
5700
2800
2000
400
2050 4050 2000
3600
150 850 600 400 1500 550
1800 5600 3800 200 RESTAURANT 1940 300 3500 100PLAN 1500 350 350 LAYOUT 300 2440 5450
G
17500 300
13000
1650 1050
2700
4200
900300 2400 2600 1200 2600
13000
5000 3800
H
300SIDE ELEVATION 3500 100560 1090 605 750 1200 2001200 2001200 450500 750 995 1005 1005 995 600300 3800
7100
2695
2010
1895
17500
page. 07
2400
2420
10000
2100 650 1445
C02
4175
2925
C01
600
2410
3800
1390
2
1855
5825
2300
1730 1200 1200
3900
1500
3
6200 705 1220
570
3'
1600
500 1205 570
800
SUITE BEDROOM LAYOUT PLAN 1
975 920 590
2935
2485
510 1200 4640
7125
C03
MẶT BẰNG B
TRÍ PHÒNG NG TL : 1/100
page. 08
P R O F E S S I O N A L B O
D E S I G N
&
W O R K
C O N S T R U C T I O N
LOGO CONSTRUCTION
CATEGORY : BEVERAGE STORE PROJECT YEAR : 2018 WORK : CONCEPT | 2D | 3D DRAWING FIELD : ARCHITECTURE AND INTERIOR LOCATION : NGUYEN THI THAP, HCMC
TEN REN TEA HOUSE This
is
one
opportunity
of to
more
than
perform
in
a
dozen
this
works
beverage
that
I
chain.
have In
had
the
addition
to
designing the architecture as well as the interior of the building, I also
designed
guideline
for
brand
and
concept
development.
The
building is mainly a new luxurious color with other milk tea brands with white as the main color, and the dome is the main design form.
page. 10
AND
BO DESIGN & CONSTRUCTION
ADD: 68 HUYNH VAN BANH ST., WARD 15, PHU NHUAN DIST., HCMC www.bodc-sg.com
N
1200
PROJECT/ D
1200
ICE CUBE
ICE CUBE
BLENDER
SINK
CHILLER
KHU VỰC ĐỂ XE
220
NOTES/ GHI CH
SINK
FRIDGE
KIT
KIT
T
KTS
CASHIER
NG PH
C TU
CHECK BY/ KI M
KTS NGUY N UY VI N
BOIL WATER
BOIL WATER
5000
STAFF
ICE CUBE MAKER
WC
SINK
BLENDER
ICE CUBE
ICE CUBE
BLENDER
WC
SINK
CHILLER WORKSTATION 02
220 1300
WORKSTATION 03
QUẦY RA BILL
FRIDGE
CASHIER
SÂN SAU
DRAWING NAME/ T N B N V
TR COUNTER
WAITING CHAIR
790 DRAWING NO/ S
B NV
WAITING CHAIR
BO DESIGN & CONSTRUCTION
DATE/ NG Y
16/06/2018
ADD: 68 HUYNH VAN BANH ST., WARD 15, PHU NHUAN DIST., HCMC www.bodc-sg.com
REVISION/ L N CH NH S A
ICE CUBE
DESCRIPTION REVISION
DATE yy.mm.dd
PROJECT/ D
N
INDEX A
3309
BLENDER
A.401
TR COUNTER - TL: 1/40
220
4800
830
3910
400
1200
TR-NGUYEN THI THAP
278
7820
M T B NG B
C TU
SINK
1900
NG PH
DESIGN BY/ THI T K
MB B
2822
220
1740
TH
9600
11000
KTS LCD S
800
FRIDGE
CHIEF DESIGNER/ CH TR THI T K
KHAY ÂM ĐỂ LY NHỰA
2400
STATION
WORKSTATION 03
220
KIT
WORKSTATION 01
5. T t c các bi n pháp k thu t thi công u ph i có b n v SD và c kí xác nh n tr c khi ti n hành.
MENU LED
KHAY ÂM ĐỂ LY
2860
1. Không o tr c ti p trên b n v in
4. Trong tr ng h p có s khác nhau gi a các b n v ki n trúc, k t c u, MEP... nhà th u c n liên h C T ho c bên thi t k xác nh n, i u ch nh và b sung tr c khi ti n hành.
1900
1100
2200 MAIN3665 FLOOR 335 LAYOUT PLAN
10750
230
3800
220
5000
26200
18400
MẶT BẰNG BỐ TRÍ VẬT DỤNG TẦNG 1 - TL: 1/100
NOTES/ GHI CH
1200
1. Không o tr c ti p trên b n v in
2200
220
2. B n v này ph i c c và ph i h p v i b n v k t c u & MEP c a d án
4780
220
2810
220
2500
980
220
3. Trong tr ng h p có s khác nhau gi a các b n v thì u tiên b n v chi ti t h n (theo th t 1:10, 1:20, 1:50, 1:100...)
1750
100
880
100
220
4. Trong tr ng h p có s khác nhau gi a các b n v ki n trúc, k t c u, MEP... nhà th u c n liên h C T ho c bên thi t k xác nh n, i u ch nh và b sung tr c khi ti n hành.
1815
5. T t c các bi n pháp k thu t thi công u ph i có b n v SD và c kí xác nh n tr c khi ti n hành.
CHIEF DESIGNER/ CH TR THI T K
KTS
NG PH
C TU
KHO
DESIGN BY/ THI T K
NG PH
WC
C TU
4800
KTS NGUY N UY VI N
WC
4330 600
KTS
CHECK BY/ KI M
DRAWING NAME/ T N B N V
DATE/ NG Y
16/06/2018
1483
1200
1468
INDEX A
DESCRIPTION REVISION
DATE yy.mm.dd
10000
4150 REVISION/ L N CH NH S A
1200
PH I C NH 1
1915
PH I C NH
DRAWING NO/ S B N V
A.401
STATION
4000
CASHIER
2550
700
3. Trong tr ng h p có s khác nhau gi a các b n v thì u tiên b n v chi ti t h n (theo th t 1:10, 1:20, 1:50, 1:100...)
WORKSTATION 02
1900
6330
QUẦY RA BILL
4730
2. B n v này ph i c c và ph i h p v i b n v k t c u & MEP c a d án
WORKSTATION 01
1500
400
220
CASHIER
1030
4600
BLENDER
SINK
650
4600
100
400
1200
2200
MERCHANDISE
1200
3600
1400
ICE CUBE MAKER
26100 300
1330
BOIL WATER
BOIL WATER
KIT
650
KIT
800
1700
SINK KIT
1700
280
1000
5520
800
900
2026
FRIDGE
MERCHANDISE
2050
800
ICE CUBE
100
BLENDER
710
TR-NGUYEN THI THAP
7938
SINK
LAYOUT OF ELECTRONIC DEVICES AT BAR RECEPTION WAREHOUSES
2200 220 SECOND FLOOR LAYOUT4782 PLAN
220
2808
1590
1130 230
3800
220
17200
age. 11 MẶT BẰNG BỐ TRÍ VẬT DỤNG TẦNG 2 - TL:p1/100
page. 12
CATEGORY : BEVERAGE STORE PROJECT YEAR : 2018 WORK : CONCEPT | 2D | 3D DRAWING FIELD : ARCHITECTURE AND INTERIOR LOCATION : D2, HCMC
TEN REN TEA HOUSE page. 13
page. 14
THE COFFEE HOUSE D1 1:20, 1:50, 1:100...)
CATEGORY : BEVERAGE STORE PROJECT YEAR : 2019 WORK : CONCEPT | 2D | 3D DRAWING BO DESIGN & CONSTRUCTION
FIELD : ARCHITECTURE AND INTERIOR
ADD: 8/11 NGUYEN THIEN THUAT ST., WARD 24, BINH THANH DIST., HCMC www.bodc-sg.com
LOCATION : D2, HCMC 04/6/2019
THE COFFEE HOUSE D1
THE COFFEE HOUSE The
Coffee
INDEX A
house
is
DESCRIPTION REVISION
one
DATE yy.mm.dd
of
the
largest
coffee
shop
chains
in
Vietnam. Inspire from the rustic style and modern living style, the main concept using most of the raw material such as wood, metal, cement or concrete and even show off the building construction. 1:20, 1:50, 1:100...)
KTS
page. 15
page. 16
VILLA MUI NGHINH CATEGORY : RESIDENCE PROJECT YEAR : 2019
MUI NGHINH VILLA V U N G TAU Project Year: Work in Progress Area: 400 sqft Category: Residence Location: Thuy Van, Vung Tau
WORK : LANDSCAPE PLANNING LOCATION : THUY VAN, VUNG TAU
page. 17
page. 18
THANK YOU