Joel Jassu ULI 2020 Team Competition Entry

Page 1

LIVING R

SPACES IN WHICH LIFE OCCURS AT ALL SCALES

MS

“Overlapping three distinct and diverse neighborhood fabrics within this urbanizing transit-oriented development, “Living Rooms” promotes bold new placemaking by preserving, enhancing and adding to these cultural fabrics through resilient public spaces and equitable density for Miami’s future.” PHASE I: ACTIVATING AN AXIS

PHASE III: REDEFINING LIVING

APARTMENT HOTEL RETAIL CONDO OFFICE

RESIDENTS WITH NEW MASS TRANSIT ACCESS

PUBLIC

TOD DEFINED BUILD-OUT

6&7

18

“Promoting resilience and equity in Miami’s diverse artistic districts by respecting and preserving character while promoting density surrounding an activated public realm supported Total Program 3,330,147 by massSFtransit.”

21

14 15 & 16

MURALS SAVED

4

10

LAND DISTRIBUTION PHASE I TOTAL: 716,721 SF Land Distribution Phase I

-

CENTRAL TO CULTURE AND ARTS DISTRICTS

99,968

113,824

130,664

90,676

Parking 18.23%

130,664

10,955

-

Parking 18.23%

99,968

85,262

90,676 23,000 50,219

906,750,000 GALLONS ANNUALLY

$2,700,000 $3,150,684

65% LTC Financing

65%

Developer Land Contribution Equity Contribution Project TIID (TIF) Bonds Developer Land Contribution Equity Contribution

LIHTC

LIHTC Stormwater Tax Allocation District

DENSITY + TRANSIT

NETWORK OF DENSE GRIDS

GREEN INFRASTRUCTURE

PEDESTRIAN SCALED

MULTI-MODAL TRANSIT

GREEN PUBLIC SPACES

Market Multifamily 0.00% Market Multifamily 0.00%

Market Multifamily 76.16% Market Multifamily 76.16%

Hotel 0.00%

Infrustructure

5%

11%

Vertical Construction

86%

$1,667,449,850

Financing Fees

Hotel 0.00% Condos 0.00%

Stormwater Tax Allocation District Forever Bond

1%

$1,667,449,850

Acquisition

1%

$2,090,880 Total Infrustructure Budget $96,005,444 $5,324,684

2

Connecting open spaces with resilient stormwater solutions integrated at scale, using permeable paving surfaces along the public realm. Extending the diagonal of Midtown Miami into this Transit-Hub

3

Pedestrian and cyclist circulation, promoting walkability around small urban blocks is central to this development.

$312,276,703

$217,836,139

2%

Walking Bridges

ACTIVATED LIVING ROOMS THE SOFA: PLAZA A seven-story community inspired mural and large screen anchor this programmed event & hang-out space

DIVERSE LIVING ACTIVITIES YEAR-ROUND EXHIBITION PLAZA Existing buildings become pavilions for exhibition and retailers with gallery programmed art studios

MIDTOWN STATION URBAN PARK Retail surrounds this edge of the midtown station along this streetscape, featuring a rain garden park central to the square

ALTERNATIVE ENERGY SOURCES Utilizing alternative energy such as solar and district power for sustainable resilience

PERFORMATIVE PUBLIC SPACES Green infrastructure solutions within public space capture and filter rainwater with a districtwide system to promote aquifer recharge

COMMUNITY PARTNERSHIPS Leveraging community leaders and local partnerships to continually program this central event space known as The Sofa

MIDTOWN ARTS TRANSIT CENTER Utilizing the NADER gallery building and generating public indoor/outdoor space at this multimodal transit hub

PEDESTRIAN ACCESS Providing two enclosed pedestrian bridges over the FECR rail lines for ease of access and safety

GREEN ROOFS Rainwater capture systems and alternative energy promote stormwater mitigation and climate resilience

28%

Forever Bond

1%

Stormwater Tax Allocation District Forever Bond

$88,589,880

STORMWATER TAX DISTRICT Tax on Impervious Area Annual Public Fund: Green Infrastructure Rainfall Capture & Aquifer Recharge

CURRENT

EXISTING CONTEXT Development fits within existing building context and urban fabric

Stormwater Tax Allocation District

LIHTC

BISCAYNE AQUIFER

TRANSIT IMPACTS ON LIVING

1%

$3,150,684

DRIVEN BY CONTEXT

TRANSIT ORIENTED DENSITY - MIDTOWN ARTS CENTER STATION

LIHTC

$217,836,139

OF SOUTH FLORIDA RELIES ON UNDERGROUND SOURCES FOR DRINKING WATER

PRESERVING AND COMPLIMENTING - VIEW DOWN EXHIBITION PLAZA

70%

Project TIID (TIF) Bonds

90%

Automobile friendly, districtparking provided at edges of TOD, with self-driving trolley system. Ground-level retail fronts all major pedestrian & car oriented streets alike.

Project TIID (TIF) Bonds

$88,589,880 Stormwater Streets & Sidewalks

Investing in Living

CIRCULATION

4

$2,700,000 Public Incentives

6%

PERMEABLE PUBLIC SPACE

Retain and preserve existing buildings and murals in order to maintain character

PUBLIC INCENTIVES TOTAL: $312,276,703

Demolition

Financing Fees

Affordable Condos 0.33%

217,400

Stormwater Streets & Sidewalks 92%

Vertical Construction

Affordable Condos 0.33%

Hotel 6.66%

REDUCE USE OF WATER SUPPLY PUMP

1

HUMAN SCALED

1,057,920

Condos 3.00% Office 32%

217,400

Demolition

$88,589,880

PROPOSED T.A.D. TO MODEL RESILIENT DEVELOPMENT

GREEN INFRASTRUCTURE

Hotel 6.66%

1,057,920

$3,150,684

WATER SUPPLY PUMP

URBAN LAYERS

Retail 6.53%

Office 32% Retail 6.53%

Condos 3.00%

Walking Bridges

Equitable Development. Resilient Futures. Public Rooms.

A LIVING ROOM FOR THREE NEIGHBORHOODS

Parking 11.08%

Public Space 0.69%Multifamily 31.77% Affordable

1,065,771

Affordable Condos 0.00%

Infrustructure

1% 5%

Forever Bond

$156,672,126

8%

Public Space 0.69%

264,480

Affordable Multifamily 31.77%

TOTAL INFRASTRUCTURE BUDGET TOTAL: $96,005,444 $88,589,880

8%

Parking 11.08%

Market Multifamily 7.94% Market Multifamily 7.94%

Public Incentives $312,276,703

$2,700,000

Acquisition

11%

264,480

Condos 0.00% Office 6.82%1,065,771 Affordable Condos 0.00%

$5,324,684 952,128

$96,005,444

368,900 23,000

23,000

Retail 5.22%

Office 6.82% Retail 5.22%

Affordable Condos 0.80%

Total$10,702,066 Development Budget $1,950,671,791 $156,672,126

10,955

1,065,771

Affordable Multifamily 0.00%

952,128

Condos 7.33%

$96,005,444

Project TIID (TIF) Bonds

$1,267,936,664

Public Space 0.00% Multifamily 0.00% Affordable

TOTAL DEVELOPMENT BUDGET TOTAL: $1,950,671,791

$156,672,126

65% LTC Financing

$213,786,298

$156,672,126

Public Space 1.69% Multifamily 0.00% Affordable

Affordable Condos 0.80%

866,685

$10,702,066

368,900

Parking 11.80%

Condos 7.33%

866,685

3,330,147 SF

99,968

Public Space 0.00%

OVER-PUMPING OF SUPPLY ALLOWS SALTWATER IN

3

$213,786,298

WYNWOOD MIDTOWN EDGEWATER NEIGHBORHOODS

Parking 11.80%

Hotel 16.27%

Affordable Condos 0.00%

221,753

$2,090,880

$3,150,684 Capital Sources (Capital Stack) $88,589,880 $1,950,671,791 $2,700,000 $217,836,139 $1,267,936,664

$217,836,139

65,220

99,968

147,560

Total Infrustructure Budget Office 63.57% $96,005,444 Hotel 16.27%

Condos 0.00% Office 15.88%

Total Development Budget Condos 0.00% $1,950,671,791 Affordable Condos 0.00%

CAPITAL SOURCES (CAPITAL STACK) TOTAL: $1,950,671,791

$88,589,880

-

85,262

Office 63.57% Retail 3.68%

Hotel 0.00%

105,792

-

147,560

TOTAL PROGRAM TOTAL: 3,330,147 TotalSF Program

10,955

Retail 3.68%

Retail 14.23%

Office 15.88% Retail 14.23%

Capital Sources (Capital105,792 Stack) $1,950,671,791 264,480

1,250,170 SF

Affordable Multifamily 0.00%

Hotel 0.00%

STORMWATER T.A.D. CAPTURES:

25

Parking 6.65%

Affordable Multifamily 36.90%

264,480

24

Public Space 1.69%

221,753

Market Multifamily 14.76% Market Multifamily 14.76%

101,961

-

14

LAND DISTRIBUTION PHASE III TOTAL: 1,250,170 SF Phase III Land Distribution

65,220 Parking 6.65%

Public Space 0.00% Multifamily 36.90% 221,753 Affordable

-

22

13

1,363,256 SF

23,000

50,219

Public Space 0.00%

101,961

12

LAND DISTRIBUTION PHASE II TOTAL: 1,363,256 SF Phase II Land Distribution

10,955

716,721 SF

11

RAINFALL

A CENTER FOR REGIONAL TRANSIT CONNECTIONS

113,824

-

Land Distribution Phase III 1,250,170 SF

22,000 SF $318,000 906,750,000 Gallons

BAY + OCEAN

Land Distribution Phase I 716,721 SF2 & 3

URBAN SURFACE IS IMPERMEABLE

28

9

Land Distribution Phase II 1,363,256 SF

RECHARGE AQUIFERS WITH DEEP INJECTION

8

20

RAIN GARDENS & RAIN CAPTURE

1

19

BAY + OCEAN

45K

PHASE II: BRIDGING THE DIVIDE

BISCAYNE AQUIFER

PROPOSED

DISTRICT STORMWATER MANAGEMENT STRATEGY STORMWATER STRATEGIES In addition to performative rain gardens, public rights of way propose additional green infrastructure solutions for heavy rain events

EDGEWATER DENSITY Taking advantage of formbased zoning for density along Edgewater, promoting a mixture of housing options & Class A office space