portfolio2020
portfolio2020
jordanaugust architectural graduate PG Dip. Arch. / B Arch.
selected professional + academic works
02
jordanaugust
portfolio2020
jordanaugust
jordanaugust curriculumvitae +61 411 136 113 jordan.august@hotmail.com www.linkedin.com/in/jordan-august-b36b2080
Professional experience Architectural Graduate - Luke Fry Architecture and Interior Design Melbourne, Australia | Mar 2020 to Apr 2020 Key Roles & Duties: □ Assisted with sketch design of a penthouse refurbishment ($1.5m budget). □ General drafting of various single residential dwelling projects. Architectural Graduate - Morrison Design Partnership Architects Sydney, Australia | Jun 2018 to Feb 2020 Project: Marion ($30,000,000) Software used: Revit + AutoCAD (DWGs from consultants) Project Description: 6 storey 66 Unit Multi-Residential Development Key Roles & Duties: □ Assisted with planning and design development. □ Primary designer of landscaping, internal courtyard, and water feature. □ Produced photorealistic renders for design exploration and communication. □ Assisted with development application/tender documentation. □ Attended client presentation meetings and council meetings. □ General Revit modelling, family creation and documentation. Project: Norton ($16,970,000) Software used: Revit + AutoCAD (DWGs from consultants) Project Description: 6 storey 50 Unit Multi-Residential Development Key Roles & Duties: □ Assisted with planning and design development. □ Assisted with design of interior architecture - significant contributions to entry foyer; community clubroom; unit kitchens & bathrooms. □ Produced photorealistic renders for design exploration and communication □ Assisted with development application/tender documentation. □ Attended client presentation meetings. □ General Revit modelling, family creation and documentation.
portfolio2020
Project: Edinglassie ($30,000,000) Software used: Revit + AutoCAD (DWGs from consultants) Project Description: 3 storey 100 Bed Residential Aged Care Facility Key Roles & Duties: □ Assisted extensively with interior design and joinery. □ Produced photorealistic renders for design exploration and communication. □ Assisted with development application/tender documentation. □ Attended client presentation meetings. □ General Revit modelling, family creation and documentation. Project: St Columba ($37,000,000) Software used: Revit + AutoCAD (DWGs from consultants) Project Description: 3 storey 120 Bed Aged Care Facility Key Roles & Duties: □ Assisted with planning and design development. □ Produced photorealistic renders for design exploration and communication. □ Assisted with development application documentation. □ Attended client presentation meetings. □ General Revit modelling, family creation and documentation. Project: Independent Living Unit (ILU) Design Guide Software used: Revit Project Description: Multi-Residential Development Architectural Design Guide Key Roles & Duties: □ Sole creator of all documentation (plans, elevations, sections etc.) for client’s design guide to be used as a guide for all future multi-residential projects. □ Created FF&E/finishes schedules and tables in Revit. □ Compiled all information and drawings in to final document. Assistant Quantity Surveyor / Project Manager - Construction Consultants (QS) Sydney, Australia | May 2017 to Jun 2018 Key Roles & Duties: □ Measuring architectural drawings & preparing council QS reports. □ Preparing detailed bills of quantities and budget estimates for feasibility/tender. □ Inspecting building sites, assessing/certifying builder’s claims and preparing bank drawdown reports. □ Inspecting properties and preparing capital works funds assessments (sinking funds) for strata properties. □ Liaising with multiple stakeholders - architects, developers, builders, project managers, bank managers. □ Involvement in many construction developments, many upwards of $50m. Graphic Designer / Furniture Designer - Montage Interiors Porirua, New Zealand | 2015 to 2017 Key Roles & Duties: □ Using SketchUp to create 3D models of office furniture and office layout design. □ Creating brochures and web content for office furniture products.
jordanaugust
Education Post Graduate Diploma in Architecture Victoria University of Wellington, NZ (2016) Bachelor of Architectural Studies Victoria University of Wellington, NZ (2013-2015)
Awards Summer Research Scholarship Determining the Success Factors of Medium Density Housing in New Zealand Victoria University of Wellington, NZ (2016-2017) Alumni Appeal Scholarship Victoria University of Wellington, NZ (2014) Included on Dean’s List for Academic Excellence Victoria University of Wellington, NZ (2014) Victoria Achiever’s Scholarship Victoria University of Wellington, NZ (2013)
Technical skills Autodesk Revit Autodesk 3DS Max Autodesk AutoCAD Sketchup
Adobe Illustrator Adobe InDesign Adobe Photoshop Microsoft Office
Other Skills: Laser Cutting, Photography, Graphic Design, Drawing/Sketching
Interests & hobbies
Art & Design
History
Sport & Fitness
Music
Entrepreneurship
portfolio2020
Referees Professional Referees: □ Glen Ollerton Morrison Design Partnership Architects (Architect/Director) Ph: +61414 849 214 □ Markam Ralph Morrison Design Partnership Architects (Architect/Director) Ph: +61417 411 284 □ Rachel Story Morrison Design Partnership Architects (Architect) Ph: +61418 762 233 □ Tristan Ward Morrison Design Partnership Architects (Architectural Technician) Ph: +61422 242 924 □ Edward Dakhoul Construction Consultants (Manager) Ph: +612 9633 9233
Character Referee: □ Joe Sleiman Volleyball Coach Ph: +61417 241 516
jordanaugust
01
02
03
04
professional projects 01 marion 02 norton 03 edinglassie 04 st columba
01 - 12 13 - 24 25 - 34 35 - 40
Helpful tips when viewing digital PDF file: 1. Select a project image above to skip to a project (or select from the list above). 2. Select the ‘portfolio2020’ header on any page to return to contents page at any time. 3. Select the ‘jordanaugust’ header on any page to return to CV at any time.
contents
portfolio2020
06
07
08
09
academic projects 05 06 07 08
urban unification te pou new zealand school of music a submission of senses
41 - 58 59 - 70 71 - 88 89 - 98
All projects in this portfolio have been modelled using Autodesk Revit.
jordanaugust
01 marion Undertaken at Morrison Design Partnership Architects
Project Particulars Typology Location Estimated cost
Seniors Living Development Leichhardt, Sydney, Australia $30,000,000
Personal Contributions ++ ++ ++ ++ ++ ++
Assisted with planning and design development. Primary designer of landscaping, internal courtyard, and water feature. Produced photorealistic renders for design exploration and communication. Assisted with development application/tender documentation. Attended client presentation meetings and council meetings. General Revit modelling, family creation and documentation.
Project Description Marion is a base build Senior’s Living Development consisting of 1 basement parking level and 66 Individual Living Units (ILUs) within 2 x 6 storey towers. The ground floor contains a swimming pool, community lounge & kitchen, and multifunction room. The project is set in Leichhardt - a suburb known as the hub of Sydney’s Italian community. Leichhardt contains many restaurants, cafes, and boutique stores and is well-known for it’s vibrant street culture. The predominance of brick buildings in the area was a significant driver for the design of Marion. The architecture intends to sympathise with it’s surroundings whilst showcasing a number of subtle modern elements. Each tower comprises a primary brick box intersected by a white secondary box at each corner. The top 2 stories are recessed as a result of council controls, however this helps to reduce the apparent scale of the building from the street, and dark subdued cladding is used on these levels to enhance this recessed effect. Residents can access each building on foot via a street entry shelter. From the entry shelter a subtle ramp decline leads residents in to a lush landscaped central courtyard with seating, a water feature, outdoor BBQ and fireplace.
01
portfolio2020
Adjacent: Aerial view of central landscaped courtyard.
02
jordanaugust
A
GRID
B
FACADE
1200
35.28
OPENING
TF 37.3
5702
121195
OVERALL
C
5702 35.3
8238
35.32
492
1760 W102
1863
830
1760 W104
4590
35.29 484
1131
5125
7258 1858
56
1760 W103
35.345000
125
3800 W106
306
1858
1169
4770 W107
SHED APPROX. POSITION
35.92 TF 38.35
35.60 36.34
RETAINING PALING
WALL TF ON ADJOINING 36.56 38.5 FENCE 36.46
GARDEN
TF 38.6
35.84
BED
1 DP 984949
E
4590
11
23654 8181
2
4770 W101
D
ON
ADJOINING
84°42'50"
36.95 TF 38.9
36.7
3 A1302
36.2
A120 1
2 DP 908631
C
4
4
W106 T04 TERRACE 114-7
BED 1 114-4
RL 33400
3300
1:4
324 1188 W171
43.285
FH
38.35
A1451
36.28
FIRE STAIRS FS-03
HEAD
38.35 6m @ 1:19.6
A1302
HEAD
ES-04
9464
LDRY 117-6 D1172 DT05
ENTRY 117-1
(SAHF)
4
RDG 42.94
42.94
1 A1424
HEAD
6375
A1452
D1F3 DT07
FFL 35.84
37.29
36.51
HEAD
INTERCOM
FW
R
UNIT 111 (SAHF)
TUB-2
LIVING 112-3
W176 T02
TERRACE 117-7
W119 T02
DP
W118 T08
38.34
W117 T02
DP
TERRACE 112-7
LINE OF FLOOR ABOVE
HEAD
4 A1413a
LIVING 111-3
C
36900
A1427
37.6A1305 9
KITCHEN 111-2
C
W175 T55
7
1
ENTRY 111-1
BED 1 111-4
36056
36047
SILL
FW
W116 T08
DP 36900
1800mm WALL
DP
RAINWATER TANK BELOW
1300
2710
36029
LV
ELECTRICAL SUBSTATION
HV
PLANTER
1475 3300
126
6
KERB
126
KERB
EDGE OF
DP D1112 DT05
D1113 LDRY DT02u 111-6
BATH 111-5
R
38.55
BED 1 112-4
1:14.1 EDGE OF CONCRETE AWNING ABOVE
D1111 DT01e
D1114 DT02u
(SAHF)
BED 1 117-4
DP
C
W115 T10
SFL RL 36.900
TUB-2
KITCHEN 112-2
UNIT 112
LIVING 117-3
1:6.9
SILL
W114 T08m
W M/DRY
D1122 FW DT05 TUB-2 LDRY 112-6 D1123 ENTRY DT02u D1124 112-1 DT02u
BATH 112-5
R
WATER FEATURE
LIVING 116-3
C
CORRIDOR 11C-1
D1121 DT01e
SUBSTATION EASEMENT
OPENING
FACADE
OVERALL
GRID
35.53
NEW DRIVEWAY
CONCRETE
SP
VC
PARKING METER
3
LINE OF KERB
A1305
OVERALL
17
16
A1305
A1305
662 622 578 302
MARION
1020 D1F2
4020
PIT LID 37.29
VC
4601
13
1760 W119
13637
302
900
3100 W118
2389
1760 W117 9715
A1305
700
3100 W116
23352 5702
GRID
8238
1200 1200
4590
FLOOR PLAN - LEVEL 01 SCALE 1 : 100
Above: Ground floor general arrangement plan for Marion project - tender documentation.
03
37.14
14
STREET
A1305
SP
TK 37.18
TK 36.84
A1302
15
TEL 37.73
SP COMMS PIT
FACADE
264°42'50"
FOOTPATH
TG 42.39
OPENING
1
37.23
5440
TEL35.39
MAIN
1250
36011
TK 35.21
1
UNIT 116 KITCHEN 116-2
STORE 11C-10
D1C17 DT13
COMMUNAL SEATING
TERRACE 116-7 W113 T09
R
ENTRY 116-1
LINE OF FLOOR ABOVE
W112 T03m
F/P 11S-07
C
D1174 DT02u
36250
38.55
C
D1163 DT02u D1164 DT02u
WM/DRY
UNIT 117
HEAD
38.44
BED 1 116-4
(SAHF)
D1171 DT01e
C
BATH 116-5
D1162 DT05
D1C16 DT08 D11ST DT01
BATH 117-5
38.47
6375
D1173 DT02u
KITCHEN 117-2
UP
VEHICLE RAMP
1
WATER GAS 11S-06
W441 LT21
1:8
362 W441
5711
5711
38.35
D1161 DT01e
D11PL DT01
PLANT ROOMS 11C-4
2
2
RL 36900
COMMUNAL SEATING
DP W111 TERRACE T02m 115-14
a/c
D1F1 DT07
WM/DRY
2260
A1202
HEAD
5
UP FIRE STAIRS FS-01
FW
A1413a
W110 T11
D1154 DT02u
LDRY 116-6
D1C15 DT08
FW
2 A1305
RL 36900
W171 LT21
TUB-2
2102
38.32
CUPD 11S-04
1
BED 2 115-8
R
LDRY 115-6
BED 1 115-4
ELEC 11S-03 D1C14 DT08
LIFTS L-01
HEAD
R
FW
ENS 113-9
BED 1 113-4
HEAD
1390
5700
29938
W120 T11
STEEL ARBOUR STRUCTURE TO STRUCTURAL ENGINEERS DETAILS ABOVE SHOWN DASHED
ENS 115-9
D1C12 DT08 COMMS 11S-02 D1C13 DT08
TG
D1156 DT02u
MAILBOXES
2000 W120
36.34
D1153 DT02u
D1155 DT02u
HALL 115-11
TIERED PLANTER BEDS
298
798 467
1
38.32
4
LDRY 113-6
COMMUNAL SEATING
Lin
D1152 DT05
ENTRY 115-1
WATER/GAS 11S-01 D1C11 DT08
FW
W M/DRY
D1135 DT02u A1301
HEAD
BATH 113-5
D1151 DT01e
C
TUB-2
W.I.R. 113-13
38.40
DP KITCHEN 115-2
BATH 115-5
C
R
HEAD
3
D1146 DT05
114-1 LDRY C 114-6
R
BED 2 113-8
KITCHEN 114-2
WM/DRY
W121 T11
UNIT 115
UNIT 114 ENTRY
D1132 DT31
C
W108 T05
Lin
D1141 DT01e D1131 DT01e
ENTRY 113-1
D1133 DT02u
Lin
D1134 DT02u
DINING 115-10
C
2000 W121
HALL 113-11
D1136 DT02u
RECREATIONAL COURTYARD BY LANDSCAPE ARCHITECT
D1142 DT02u BATH 114-5
ENS 114-9
R
TG 38.82
HEAD
38.38
R
6527
RL 36900
1 A1452
969
6527
38.20
KITCHEN 113-2
D1137 DT04
STUDY 113-12
LIVING 115-3
R
D1143 DT02u
957 2000 W122
W122 T11
HEAD
a/c
D1145 DT02u
D1144 DT02u
WM/DRY
3 A1413b
W107 T01
DP
DINING 114-10
TUB-2
UNIT 113
BED 2 114-8
TUB-2
DINING 113-10
a/c
W104 T02
C
4225
3800 W123
36.32
HEAD
38.20
2
LIVING 113-3
W103 T02
DP
5625
DP
WM/DRY
W102 T02
TERRACE 115-7
LIVING 114-3
FW
W101 T01
W123 T04
W105 T02m
a/c
1200
1200
TERRACE 113-7
1958
1400
1
RL 36910
A1427
A1413
LINE OF FLOOR ABOVE
36.18
4
A
A1427
A1427
5125
7258
portfolio2020 Revision T1 T2 T3 T4
Date
Details
Initials Checked
2019-11-29 TENDER ISSUE 2019-12-05 DOOR HARDWARE COORD 2019-12-19 TENDER ADDENDUM ISSUE 2020-XX-XX
MDP VC MDP MDP
GO GO GO
SURVEY NOTES
F
G
H
I
J
36.97
Survey data included in this drawing is based on survey drawing and is provided for preliminary design purposes only. As this drawing is based on information supplied by others, reference must be made to original survey drawings verified against site conditions.
K
TF 38.25
1
36.41
DP 938373 1200
7258
1200
SHED
TW 39.5
36.8
36.68
REND.
GENERAL NOTES
36.45 5125
4590
5125
36.58
4590
5640 W151
895
TF 8238 39.0
23196
36.99
5244
5793
3540 W152
573
2444
1190 37.05
37.03
5244
6233
1190
BIM 360://3103 - Uniting Marion Street/3103-Uniting_Marion St (V20)_CC.rvt
CONDITIONS OF USE OF DOCUMENTATION
PROPERTY
3
01
ROOF 40.83
7800 W153
SMH APPROX PLOTTED FRO. POSITION M SYDNEY WA 37.08 TER RECOR DS LIMITED ACCESS ON ADJOINING
GARDEN BED ON ADJOINING TF TW 38.58 WALL39.58 37.08
Morrison Design Partnership Pty. Limited accept no responsability for the usability, completeness or accuracy of data transferred electronically. Recipients should when necessary request a hard copy version for verification. This drawing shall be read in conjunction with all architectural and other Consultants drawings and specifications and with such other written instructions as may be issued during the course of the contract. Figured dimensions shall be taken in preference to scaling. All level, datum points and dimensions on this drawing shall be verified by the builder on site. All discrepancies shall be referred to the architect for direction before proceeding with any works. DO NOT SCALE THIS DRAWING.
POOL
36.99
CONTRACTORS RESPONSIBILITY • THE PROVISION OF THESE DRAWINGS DOES NOT IN ANY WAY PRECLUDE THE CONTRACTORS RESPONSIBILITY TO COORDINATE, CHECK AND VERIFY ALL INFORMATION TO THE CONTRACTORS OWN SATISIFACTION INCLUSIVE OF: - BUILDING SETOUT - STRUCTURAL COORDINATION - SERVICES PENETRATIONS - SETDOWNS, HOBS, UPSTANDS AND THE LIKE - ALL OTHER ELEMENTS IMPACTING ON THE CONCRETE PROFILES PENETRATIONS • MORRISON DESIGN PARTNERSHIP DOES NOT IN ANY WAY WARRANT THAT ALL PENETRATIONS HAVE BEEN SHOWN ON THE CONCRETE PROFILE PLANS AND THE CONTRACTOR IS TO REVIEW, COORDINATE AND MAKE PROVISION TO SETOUT ALL PENETRATIONS REGARDLESS OF WHETHER OR NOT THEY ARE INDICATED ON THIS DOCUMENT
6 A1305
POOL FENCE
A1301
B
POOL GATE HARDWARE
A1421
26
PERGOLA OUTDOOR POOL SEATING AREA BY LANDSCAPE ARCHITECT
11 LINE OF AWNING ABOVE
A1427
RL 36910
W153 T14
LINE OF FLOOR ABOVE
1:24.5
TERRACE 121-7
D1213 DT02u D1212 D1214 DT02u DT05
R
A
a/c
(SAHF)
C
D1C26 DT08 WATER/GAS 21S-07
C
D1211 DT01e
1:14.4
W163 T10
EDGE OF CONCRETE AWNING ABOVE
F GLASS CANOPY ABOVE
D1232 DT05
FW
(SAHF)
BED 1 122-4
LIVING 122-3
A1420
W161 T08
TERRACE 123-7
36900
DP
3700 W154
5625
410 3700 W155
6527
SILL
41.86
SERV CORR 12SC
D12PE DT16
TENDER ISSUE
42.07 1
A1302
39.81
D1F22 DT07
2 A1453
D4189 DT33
SILL
A1453
POOL EQUIPMENT 12C-3
D4186 DT01
PLANT 12C-8
43.39
4
FW
FW
DP
ESCAPE PASSAGE 12C-24
FW POOL ROOM AIRCON 12C-6
HEAD
43.39 SILL
42.07 Client
D1F4 DT07 UP
HEAD
43.39
D4187 DT33
38900
450
HEAD
42.60 ESCAPE PASSAGE 12C-24
SILL
42.07 WATER SUPPLY AIR PLANT 12C-25
DP
36900 TERRACE 122-7
1800mm WALL
RL 36900
TENDER ISSUE - NOT FOR CONSTRUCTION
41.86
D12AR2 DT01
D12WS DT01
W160 T08m
A1305
SILL
C
W162 T02
1
8
SILL
41.86 HEAD 42.60
STORAGE 12C-14
HEAD
D1VIL DT01
VILLAGE MANAGER 12C-4
R
TIERED PLANTER BEDS
1:14.3
UNIT 122
HEAD
42.60
50.00
A1414
N
A1201
R
D1234 DT02u
ENTRY 122-1
C
STORAGE 117-8 D1VIL2 DT11
KITCHEN 122-2
AIRLOCK 12C-12
AIRLOCK 12C-9 D4181 DT01
COMMS 12C-7
D1C28 DT54
C
TUB-2
D1233 DT02u
SILL
HOT WATER PLANT
UNISEX CHANGE 12C-13
1
HEAD
41.86 2
FW
FH
SINGLE STOR EY BRICK BUILD ING TILE ROOF
A1301
42.60
POOL GATE HARDWARE
D12ST2 DT01
SILL
41.26
TG 43.73
LDRY 122-6
FIRE STAIRS FS-02
D12ST1 DT01
D1231 DT01e
HEAD
42.44
RL 36900
CORRIDOR 12C-1
W M/DRY
BATH 122-5
D1F2 DT07
D1C25 DT11 D1CON DT01
D12CH DT02
36900
UP
D4179 DT01
FIP 21S-06 D1C27 DT13
FW 37100
PFW
CONSULT 12C-5
UNIT 121
DP
D12PL2 DT01
D12PL1 DT01
CORRIDOR 12C-2
FHR
KITCHEN 121-2
LIVING 121-3
A1421
D4190 DT01
LDRY 121-6
1 A1441
W164 T08
LIFTS L-02
ELEC 12S-03 D1C24 DT10
STORAGE 12C-16
W165 T03
FW
A1453
TK 39.1
COMMS 12S-02 D1C23 DT08
BATH 121-5
BED 1 121-4
37230
D1C22 DT08
DP
2
2
W157 T10
D1CLN DT12
29938
A1203
STORAGE 12C-18
POOL GATE HARDWARE
FW
WATER/GAS 12S-01 D1C21 DT08
DP
TK 39.04
LINE OF AWNING ABOVE
SAHF DENOTES UNITS UNDER SOCIAL AND AFFORDABLE HOUSING FUND
5711
B A1414
W156 T15
CLNR 12C-10
NOTE:
6375
LOUNGE AREA/MULTI-FUNCTION 12C-17
W166 T18
RINSE SHOWERS
DP
TG 43.06
COMMUNAL SEATING
Sim
A1641
FIRE STAIRS FS-04
DP
Project Management
9 A1305
TK 39.397
38900
2925
D12ST3 DT11
C
FW
3700 W156
D12LD DT12 D12MU DT18
UP
PFW
1000 100 D12PL2 23563
SFL RL 36.900
35650
44.86
W167 T18
FW
MALE 12C-23
D12AR1 DT02
TK 39.38
RL 36900
W155 T15
POOL ROOM 12C-11
172°53'
LOUNGE/DINING 12C-15
FW
R
W168 T17
PFW
17587
DP
COURTYARD BY LANDSCAPE ARCHITECT
RL 36850
ACCESS FW WC 12C-22
D12FM DT02 D12AC DT02 AIRLOCK 12C-20 D12ML DT02
2991
FP
GENERALLY GLE STOREY BR DRAWINGS BUILD • THESE ICK SHALL BE READ IN CONJUNCTION WITH ING TILE RO THE COMPLETE ARCHITECTURAL DOCUMENTATION OF SPECIFICATION AND ALL OTHER CONSULTANTS DOCUMENTATION AND SPECIFICATIONS AND SCHEDULES. • PROVIDE CONTROL JOINTS AS PER THE STRUCTURAL ENGINEER'S DRAWINGS. • WHERE WALLS CROSS SLAB CONTROL JOINTS BREAK WALL STRUCTURE AND LINING EACH SIDE TO FORM A 15MM GAP. TREAT STRUCTURE IN ACCORDANCE WITH APPROVED DOCUMENTED INSTALLATION METHODS TO ACHIEVE REQUIRED FIRE, SMOKE AND SOUND RATINGS. fIT RONDO P35 JOINT CONTROLS TO WALLS. • INSTALL CONTROL JOINTS IN ALL FINISHED SURFACE MATERIALS IN ACCORDANCEWITH THE MANUFACTURERS DOCUMENTED REQUIREMENTS. • CONSTRUCTION OF ALL FIRE AND SMOKE WALLS AND ALL SERVICE PENOTRATIONS SHALL BE SEALED IN ACCORDANCE WITH APPROVED DOCUMENTED INSTALLATION METHODS.
3384
FP
COMMUNAL SEATING
RL 36910
W154 T15
FEMALE 12C-21
FW WASH/PREP AREA 12C-19
TV MOUNT ABOVE
SIN
A1305
FW
PFW
W169 T18
1199
7
BBQ AREA
W152 T13
DP
2925
W151 T12
5700
UNDER COVER OUTDOOR DINING
A A1414
1199
DP
39591
W158 T52
PLANTER
LINE OF FLOOR ABOVE
BUS STOP
FOOTPATH
PIT LID 39.29
HYD 38.24
4ELP
SP
12
PIT LID 39.44 PARKIN METER G
ELP
TK 39.00
1
A1202 268 442 758
1760 W162
1442
3100 W161
7258
3
11
10
A1305
A1305
15867
3100 W160
8325 2086
5244
4480 W158
23196 5125
4590
SP
VC
TK 39.84
This drawing is based on information supplied by others, and must not be relied upon unless checked against site conditions. PROJECT:
UNITING MARION STREET ILU's 15 - 17 MARION STREET LEICHHARDT NSW 2040 DRAWING:
1295 1190
8238
SP SP LINE OF KERB
A1301
986
758
©Copyright These drawings and designs and the copyright thereof are the property of Morrison Design Partnership Pty. Ltd. and must not be altered, used, retained, or copied wholy or in part without the written permission of Morrison Design Partnership Pty. Ltd. ACN 001 595 288.
39.77
39.20
GRID
100 CICL
TK 40.13 38.46
OVERALL
TEL 38.35
CONCRETE
39596
A1427
FACADE
38.26
A1305
11
FIRE SPRINKLER VALVE ASSEMBLY LOCATION
OPENING
PLANTER
N PEDESTRIAN ENTRY
LEVEL 01 PLAN
5244
PROJECT NO.
3103
DRAWING NO.
A1102 SCALE:
REVISION NO.
T4
As indicated @ B1DRAWN:
DATE: 12.07.2019 PROJECT ARCHITECT: G.OLLERTON
04
jordanaugust
K
J
I
H
G
F
E
BOUNDARY
PROPOSED DEVELOPMENT
1200
MAX BUILDING HEIGHT 57500
500
ROOF 56300 LEVEL 6 FCL 2700 55800
2700
W620 T49
LEVEL 6 53100
W619 T49
W617 T37
W618 T01
W616 T43
W606 T43
W616 T43
W606 T43
3100
W528 T05 W527 T02
W525 T03
W526 T37
3100
W422 T21
W421 T24
W420 T23
3100
W323 T20
W322 T21
W321 T24
W320 T23
W240 T20
W239 T21
W238 T24
W237 T23
W418 T34
20600
W423 T20
3100
LEVEL 5 50000
LEVEL 4 46900
W235 T25
W318 T34
LEVEL 3 43800
W234 T34
LEVEL 2 40700
3800
W125 T15
W124 T14
W123 T13
LEVEL 1 36900
LEVEL 0 33400
NORTH ELEVATION
SCALE 1 : 100
H
G
FROOF
2
1
E
D
B
W625 T55
3100
W616 T43
W533 T01
W606 T43
W624 T55
A
Survey data included in this drawing i provided for preliminary design purpo As this drawing is based on informatio must be made to original survey draw conditions.
3100
W503 T03
W326 T12
3100
W249 T12
W235 T25
LEVEL 2 40700
W245 T32
W304 T34
W204 T25
W244 T32
LEVEL 1 36900
W402 T24
W400 T20
W303 T23
W302 T24
W300 T20
W203 T23
W202 T24
W200 T20
W248 T02
W205 T34
3500
W234 T34
W124 T14
W123 T13
LEVEL 0 33400
Top & bottom: Northern elevations of Marion project - tender documentation.
2
W103 T02
W105 T04
PROPOSED DEVELOPMENT
W102 T02
W101 T02
W241 T41
CONTRACTORS RESPONSIBILITY • THE PROVISION OF THESE DRAWIN PRECLUDE THE CONTRACTORS RE COORDINATE, CHECK AND VERIFY CONTRACTORS OWN SATISIFACTIO - BUILDING SETOUT - STRUCTURAL COORDINATION - SERVICES PENETRATIONS - SETDOWNS, HOBS, UPSTANDS AN - ALL OTHER ELEMENTS IMPACTIN PROFILES PENETRATIONS • MORRISON DESIGN PARTNERSHIP WARRANT THAT ALL PENETRATIO THE CONCRETE PROFILE PLANS A REVIEW, COORDINATE AND MAKE PENETRATIONS REGARDLESS OF ARE INDICATED ON THIS DOCUMEN
GENERALLY • THESE DRAWINGS SHALL BE READ THE COMPLETE ARCHITECTURAL D SPECIFICATION AND ALL OTHER CO DOCUMENTATION AND SPECIFICAT • PROVIDE CONTROL JOINTS IN EXT AS PER THE STRUCTURAL ENGINE • FIRE SEAL ALL EXTERNAL CONTRO MATERIALS PRECOLOURED TO MA ADJACENT TO THE JOINT. • INSTALL CONTROL JOINTS IN ALL E MATERIALS IN ACCORDANCEWITH DOCUMENTED REQUIREMENTS. SEAL ALL EXTERNAL CONTROL JO FLEXIBLE MATERIALS PRECOLOUR FINISHED FABRIC ADJACENT TO THE • ALL EXTERNALLY MOUNTED SERV FITTINGS SHALL BE PAINT FINISHE
W100 T01
EAST ELEVATION
SCALE 1 : 100
TENDER ISSUE CONSTRU
1 BOUNDARY
3
2
W106 T01
W243 T32
W242 T27
W246 T42
W325 T02
3800
W318 T34
Morrison Design Partnership Pty. Limite the usability, completeness or accura electronically. Recipients should when necessary req verification. This drawing shall be read in conjunc other Consultants drawings and spec written instructions as may be issued d Figured dimensions shall be taken in p All level, datum points and dimension by the builder on site. All discrepancies shall be referred to t proceeding with any works. DO NOT S
BIM 360://3103 - Uniting Marion Street (V20)_CC.rvt
W501 T02
W403 T23
W404 T34
W529 T03
GENERAL NOTES
CONDITIONS OF USE O
W425 T02
W502 T37 W250 T30
LEVEL 3 43800
W418 T34
W530 T03
W601 T49
W500 T05 W606 T43 24100
W526 T37
W531 T02
W603 T01 W426 T12
W428 T54
LEVEL 4 46900
W616 T43
W525 T03
Details
SURVEY NOTES
W622 T50
W623 T06
W532 T02
W604 T37
3100
W617 T37
Date
2019-10-04 FOR INFORMATION
DP
C
LEVEL 6 53100
LEVEL 5 50000
P1
PROPOSED DEVELOPMENT
2700
LEVEL 6 FCL 2700 55800 PROPOSED DEVELOPMENT
Revision
BOUNDARY
3
500
56300
4
DP
1200
MAX BUILDING HEIGHT 57500
5
BOUNDARY
6
BOUNDARY
1
PROG ISS
DP
W622 T50
Client
W530 T03
W529 T03
05 Project Management
portfolio2020
Revision T1
Date
Details
Initials Checked
2019-11-29 TENDER ISSUE
T2 Revision Date 2019-12-19 Details TENDER ADDENDUM ISSUE Revision Date Details T1 2019-11-29 TENDER ISSUE T1 2019-11-29 TENDER ISSUE T2 2019-12-19 TENDER ADDENDUM ISSUE T2 2019-12-19 TENDER ADDENDUM ISSUE
MDP
GO
MDP GO Initials Checked Initials Checked MDP GO MDP GO MDP GO MDP GO
SURVEY NOTES Survey data included in this drawing is based on survey drawing and is
provided for preliminary design purposes only. SURVEY NOTES SURVEY NOTES As this drawing is based on information supplied by others, reference
Survey data included intothis drawing is based on survey drawing and mustdata be made original survey drawings against site isand is Survey included in this drawing is basedverified on survey drawing provided for preliminary design purposes only. conditions. provided for preliminary design purposes only. As this drawing is based on information supplied by others, reference As this drawing is based on information supplied by others, reference NOTES must be GENERAL made to original survey drawings verified against site must be made to original survey drawings verified against site conditions. Morrison Design Partnership Pty. Limited accept no responsability for conditions. the usability, completeness or accuracy of data transferred GENERAL NOTES GENERAL NOTES electronically. MorrisonRecipients Design Partnership Pty. Limited accept no a responsability for should when necessary request hard copy version for Morrison Design Partnership Pty. Limited accept no responsability for the usability, completeness or accuracy of data transferred theverification. usability, completeness or accuracy of data transferred electronically. This drawing shall be read in conjunction with all architectural and electronically. Recipients should when necessary request a hard copyand version for other Consultants drawings andrequest specifications with suchfor other Recipients should when necessary a hard copy version verification. written instructions as may be issued during the course of the contract. verification. This drawing shall be read in conjunction with all architectural and dimensions shallinbe taken in preference to scaling. and ThisFigured drawing shall be read conjunction with all architectural other Consultants drawings and specifications and with such other All Consultants level, datum points and dimensions on this drawing shallother be verified other drawings and specifications and with such written instructions as may be issued during the course of the contract. by the builder on written instructions assite. may be issued during the course of the contract. Figured dimensions shall be taken in preference scaling.for direction before All discrepancies shall betaken referred to the to architect Figured dimensions shall be in preference to scaling. All level,proceeding datum points and dimensions thisSCALE drawing shall be verified any works. DOon NOT THIS DRAWING. All level, datum with points and dimensions on this drawing shall be verified by the builder on site. by the builder on site. All discrepancies shall be referred to theStreet/3103-Uniting_Marion architect for direction before BIM 360://3103 - Uniting Marion All discrepancies shall be referred to the architect for directionSt before proceeding with any works. DO NOT SCALE THIS DRAWING. (V20)_CC.rvt proceeding with any works. DO NOT SCALE THIS DRAWING.
BIM 360://3103 - Uniting Marion Street/3103-Uniting_Marion St BIM 360://3103 - Uniting Marion Street/3103-Uniting_Marion St (V20)_CC.rvt (V20)_CC.rvt
Covered Walkway - Long Section A SCALE Covered Walkway - Long Section - Long Section A A Covered Walkway SCALE SCALE Covered Walkway - Short Section B SCALE Covered Walkway - Short Section - Short Section B B Covered Walkway SCALE SCALE
2 A1422
3
2 2 A1422 A1422
E
OUTLINE OF TOUGHENED GLASS PANELS OVER
4
OUTLINE OF CONCRETE AWNING OVER OUTLINE OF CONCRETE AWNING OVER
LANDING 37220 LANDING LANDING 37220 37220
RAMP 1:14 MAX RAMP 1:14 1:14 MAXMAX RAMP
W115 W115 T10 T10
G G
OUTLINE OF CONCRETE AWNING OVER
OUTLINE OF TOUGHENED GLASS PANELS OVER OUTLINE OF TOUGHENED GLASS PANELS OVER
LANDING 36900 LANDING LANDING 36900 36900
W115 T10 3 A1423 3 4 A1423 A1423 A1423
G
3 3 A1422 A1422
F F
OUTLINE OF CONCRETE AWNING OVER OUTLINE OF CONCRETE AWNING OVER OUTLINE OF CONCRETE AWNING OVER
3
A1422
F
E E
RAMP 1:14 MAX RAMP 1:14 1:14 MAXMAX RAMP PAV-2
PAV-2
4
A1423 A1423
PAV-2
PAV-2 PAV-2
PAV-2
PAV-2 PAV-2
8 8
NORTH FALL TO CONCRETE AWNING BEYOND FOR WATER RUN OFF NORTH FALL TO CONCRETE NORTH FALL TO CONCRETE AWNING BEYOND FOR AWNING BEYOND FOR WATER RUN OFF CONCRETE ENTRY WATER RUN OFF CANOPY TO ENG DETAILS. CR-01 FINISH. CONCRETE ENTRY CONCRETE ENTRY CANOPY TO ENG DETAILS. CANOPY TO ENG DETAILS. CR-01 FINISH. CR-01 FINISH.
COVERED WALKWAY - PLAN SCALE 1 : 20
WALKWAY - PLAN COVERED WALKWAY - PLAN 1COVERED SCALE 1 : 20 SCALE 1 : 20
LEVEL 2 SFL 40700 LEVEL 2 SFL LEVEL 2 SFL 40700 40700
105
PLANTER
PLANTER
PLANTER PLANTER
11
1
A1421
TENDER ISSUE - NOT FOR TENDER ISSUE - NOT FOR CONSTRUCTION TENDER ISSUE - NOT FOR CONSTRUCTION CONSTRUCTION
105 105
PLANTER PLANTER PLANTER
5 5
1
W163 W163 T10 T10
PAV-2 PAV-2
36900 LANDING LANDING 36900 36900
A1421 A1421
105
PLANTER PLANTER
A1421 A1421
LANDING
8
105 105
PLANTER
5
W163 T10
PAV-2
PAV-2 PAV-2
A1421
PAV-2 PAV-2
11
PLANTER PLANTER
FALL
TENDER TENDER TENDER ISSUE ISSUE ISSUE
Sim NORTH FALL TO CONCRETE AWNING BEYOND FOR WATER RUN OFF
A1421 Sim Sim
11
NORTH FALL TO CONCRETE NORTH FALL TO CONCRETE AWNING BEYOND FOR AWNING BEYOND FOR 200x100 WATER RUN OFF STRUCTURAL WATER RUN OFF STEEL BEAM TO STRUCTUAL ENGINEERS DETAILS 200x100 STRUCTURAL 200x100 STRUCTURAL STEEL BEAM TO STRUCTUAL STEEL BEAM TO STRUCTUAL ENGINEERS DETAILS ENGINEERS DETAILS
A1421 A1421
LEVEL 2 SFL 40700 LEVEL 2 SFL LEVEL 2 SFL 40700 40700
9 A1421
9
9
A1421 A1421
FALL SPIDER BRACKET
FALLFALL
FALLFALL
Client
SPIDER BRACKET SPIDER BRACKET
Client Client
GLASS AS SELECTED
LEVEL 1 FCL 39900
CONCRETE BEAM TO STRUCTURAL ENGINEER'S DETAILS - CR-01 FINISH CONCRETE BEAM TO CONCRETE BEAM TO STRUCTURAL ENGINEER'S STRUCTURAL ENGINEER'S DETAILS - CR-01 FINISH DETAILS - CR-01 FINISH
LEVEL 1 FCL LEVEL 1 FCL 39900 39900
HB-01
Project Management Project Management Project Management
STRUCTURAL COLUMN BEYOND. CR-01 FINISH
HB-01
STRUCTURAL COLUMN STRUCTURAL COLUMN BEYOND. CR-01 FINISH BEYOND. CR-01 FINISH SIGNAGE BY OTHERS
HB-01
HB-01 HB-01
GLASS AS SELECTED GLASS AS SELECTED
LEVEL 1 FCL 39900 LEVEL 1 FCL LEVEL 1 FCL 39900 39900
HB-01 HB-01
HB-01
HB-01 HB-01
BUILDING 2 ENTRY BEYOND BUILDING 2 ENTRY BEYOND
SIGNAGE BY OTHERS SIGNAGE BY OTHERS
BUILDING 1 ENTRY BEYOND
HB-01 HB-01
BUILDING 2 ENTRY BEYOND
BUILDING 1 ENTRY BEYOND BUILDING 1 ENTRY BEYOND ALUMINIUM SCREEN SANDSTONE CAPPING
©Copyright These drawings and designs and the copyright thereof are the property of ©Copyright Morrison Design Partnership Pty. Ltd. and must not be altered, used, ©Copyright These drawings and designswholy and the thereof are the property retained, or copied or copyright inthe part without the written of These drawings and designs and copyright thereof arepermission the property of of Morrison Design Partnership Pty. Ltd. ACN 001 595 288. Morrison Design Partnership Pty. Ltd. and must not be altered, used, Morrison Design Partnership Pty. Ltd. and must not be altered, used, retained,This or drawing copied wholy or inon part without the writtenby permission of must is based supplied others, and retained, or copied wholy orinformation in part without the written permission of Morrisonnot Design Partnership Pty. Ltd. ACN 001 595 288. beDesign relied upon unless checked against site288. conditions. Morrison Partnership Pty. Ltd. ACN 001 595
ST-01
ALUMINIUM SCREEN ALUMINIUM SCREEN SANDSTONE CAPPING
SANDSTONE CAPPING SANDSTONE CAPPING CORE FILLED MASONRY BLOCK WALL. ST-01 SANDSTONE CLADDING AS CORE FILLED MASONRY SPECIFIED. CORE FILLED MASONRY BLOCK WALL. ST-01 BLOCK WALL. ST-01 SANDSTONE CLADDING AS SANDSTONE CLADDING AS SPECIFIED. COMPACTED F.C.R AS SPECIFIED. REQUIRED TO ACHIEVE FINISHED LEVEL COMPACTED F.C.R AS COMPACTED F.C.R AS REQUIRED TO ACHIEVE REQUIRED TO ACHIEVE FINISHED LEVEL FINISHED LEVEL SAND BEDDING
ST-01 ST-01
SANDSTONE CAPPING SANDSTONE CAPPING
ST-01 ST-01 ST-01
This drawing is based on information supplied by others, and must ThisPROJECT: drawing is based on information supplied by others, and must not be relied upon unless checked against site conditions. not be relied upon unless checked against site conditions.
UNITING MARION UNITING MARION STREET ILU's UNITING MARION STREET ILU's STREET ILU's
PAV-2, PAVERS AS SPECIFIED.
SAND BEDDING SAND BEDDING PAV-2, PAVERS AS SPECIFIED. PAV-2, PAVERS PAV-2, PAVERS AS SPECIFIED. CONC SLAB TO AS SPECIFIED. ENG DOCUMENTS CONC SLAB TO CONC SLAB TO ENG DOCUMENTS ENG DOCUMENTS
PROJECT: PROJECT:
PAV-2, PAVERS AS SPECIFIED. SAND BEDDING PAV-2, PAVERS AS SPECIFIED.
CORE-FILLED BLOCKWORK. CR-01 FINISH CORE-FILLED CORE-FILLED BLOCKWORK. BLOCKWORK. CR-01 FINISH CR-01 FINISH
CORE FILLED MASONARY BLOCK WALL. ST-01 SANDSTONE CLADDING AS CORE FILLED MASONARY SPECIFIED. CORE FILLED MASONARY BLOCK WALL. ST-01 BLOCK WALL. ST-01 SANDSTONE CLADDING AS SANDSTONE CLADDING AS SPECIFIED. SPECIFIED.
CORE FILLED BLOCKWORK CR-01 FINISH
COMPACTED F.C.R AS REQUIRED SAND BEDDING SAND TOBEDDING ACHIEVE FINISHED LEVEL
15 - 17 MARION STREET LEICHHARDT 15 -15 17NSW 2040 STREET -MARION 17 MARION STREET LEICHHARDT LEICHHARDT NSWNSW 20402040
CORE FILLED BLOCKWORK CORE FILLED BLOCKWORK CR-01 FINISH CR-01 FINISH
COMPACTED F.C.R ASTO REQUIRED CONC SLAB COMPACTED F.C.R ENG AS REQUIRED TO ACHIEVE FINISHED LEVEL DOCUMENTS TO ACHIEVE FINISHED LEVEL
DRAWING:
CONC SLAB TO ENG CONC SLAB TO ENG DOCUMENTS DOCUMENTS
COVERED PODIUM COVERED PODIUM WALKWAY DETAILS SHEET COVERED PODIUM WALKWAY DETAILS SHEET 1 WALKWAY DETAILS SHEET 1 1 3103 DRAWING: DRAWING:
LEVEL 1 SFL 36900 LEVEL 1 SFL LEVEL 1 SFL 36900 36900
LEVEL 1 SFL 36900 LEVEL 1 SFL LEVEL 1 SFL 36900 36900
PROJECT NO.
PROJECT NO. PROJECT NO. DRAWING
3103
2
A1422
COVERED WALKWAY - SECTION 1 SCALE 1 : 20
WALKWAY - SECTION 1 COVERED WALKWAY - SECTION 2COVERED
A1422 A1422
SCALE 1 : 20 SCALE 1 : 20
3
A1422
SCALE 1 : 20
WALKWAY - SECTION 2 COVERED WALKWAY - SECTION 3COVERED
A1422 A1422
1
SCALE 1 : 20 SCALE 1 : 20
REVISION NO.
T2 T2T2
REVISION NO. REVISION NO. NO.
3103 A1422 A1422 A1422
DRAWING NO. DRAWING NO. 1 : 20 @ B1 SCALE:
COVERED WALKWAY - SECTION 2
3
2
DRAWN: Author
DATE: 12.07.2019 1 : 20 @ B1 SCALE: DRAWN: Author 1 : 20 @ B1 SCALE: DRAWN: Author PROJECT ARCHITECT: G.OLLERTON DATE: 12.07.2019 DATE: 12.07.2019
2
PROJECT ARCHITECT: G.OLLERTON PROJECT ARCHITECT: G.OLLERTON
Revision T1 T2
E
F
G
Date
Details
Initials Checked
2019-11-29 TENDER ISSUE 2019-12-19 TENDER ADDENDUM ISSUE
MDP MDP
GO GO
SURVEY NOTES Survey data included in this drawing is based on survey drawing and is provided for preliminary design purposes only. As this drawing is based on information supplied by others, reference must be made to original survey drawings verified against site conditions.
SPIDER BRACKET
200 SHS TO STRUCTUAL ENGINEERS DETAIL
200x100 STRUCTUAL BEAMS TO STRUCTUAL ENGINEERS DETAIL
GENERAL NOTES
200 SHS TO STRUCTUAL ENGINEERS DETAIL
TOUGHENED GLASS AS SELECTED
Morrison Design Partnership Pty. Limited accept no responsability for the usability, completeness or accuracy of data transferred electronically. Recipients should when necessary request a hard copy version for verification. This drawing shall be read in conjunction with all architectural and other Consultants drawings and specifications and with such other written instructions as may be issued during the course of the contract. Figured dimensions shall be taken in preference to scaling. All level, datum points and dimensions on this drawing shall be verified by the builder on site. All discrepancies shall be referred to the architect for direction before proceeding with any works. DO NOT SCALE THIS DRAWING.
LEVEL 2 SFL 40700
BIM 360://3103 - Uniting Marion Street/3103-Uniting_Marion St (V20)_CC.rvt
12 A1421
CR-01
LEVEL 1 FCL 39900
SIGNAGE BY OTHERS
200 SHS TO STRUCTUAL ENGINEERS DETAIL
CR-01
SIGNAGE BY OTHERS
200 SHS TO STRUCTUAL ENGINEERS DETAIL
HB-01 HB-01 CR-01
WATER FEATURE BEYOND PAV-2, PAVERS AS SPECIFIED.
ST-01
ST-01
RL 37.700
SAND BEDDING COMPACTED F.C.R AS REQUIRED TO ACHIEVE FINISHED LEVEL
CR-01 RL 37.300
RL 37.220
CR-01
CONC SLAB TO ENG DOCUMENTS
LEVEL 1 SFL 36900
3
A1422
RAMP SECTION 5
SCALE 1 : 20
G
F
200 SHS
BUILDING ENTRY CANOPY TO ENGINEER'S DOCUMENTS WHITE PAINT FINISH
E
200x100 STRUCTUAL BEAMS TO STRUCTUAL ENGINEERS DETAIL
SPIDER BRACKET
200 SHS TO STRUCTUAL ENGINEERS DETAIL
TENDER ISSUE - NOT FOR CONSTRUCTION
BUILDING ENTRY CANOPY TO ENGINEER'S DOCUMENTS WHITE PAINT FINISH
LEVEL 2 SFL 40700
105
TENDER ISSUE
105
LEVEL 1 FCL 39900
12
Sim
Client
A1421
Project Management
ST-01, SANDSTONE CLADDING
RENDERED BLOCK WALL
S/S HANDRAIL
200 SHS
200 SHS
S/S HANDRAIL
CORE-FILLED BLOCK WALL. RENDERED AND PAINTED FINISH - WHITE
ST-01, SANDSTONE CLADDING
HB-01
HB-01
PAV-2, PAVERS AS SPECIFIED. SAND BEDDING COMPACTED F.C.R AS REQUIRED TO ACHIEVE FINISHED LEVEL
ST-01 CR-01
ST-01
CONC SLAB TO ENG DOCUMENTS
CR-01
©Copyright These drawings and designs and the copyright thereof are the property of Morrison Design Partnership Pty. Ltd. and must not be altered, used, retained, or copied wholy or in part without the written permission of Morrison Design Partnership Pty. Ltd. ACN 001 595 288. This drawing is based on information supplied by others, and must not be relied upon unless checked against site conditions. PROJECT:
Top & bottom: Details of covered walkway for Marion project - tender T2 documentation.
UNITING MARION STREET ILU's
LEVEL 1 SFL 36900
15 - 17 MARION STREET LEICHHARDT NSW 2040 DRAWING:
COVERED PODIUM WALKWAY DETAILS SHEET 2 4
A1422
PROJECT NO.
3103
RAMP SECTION 6
SCALE 1 : 20
DRAWING NO.
A1423 SCALE:
1 : 20 @ B1
DATE: 12.07.2019
REVISION NO.
DRAWN: Author
PROJECT ARCHITECT: G.OLLERTON
06
jordanaugust
COLORBOND FINISH METAL ROOFING ON 9mm CFC SHEET UNDER ROOF SHEET, CEILING SPACE MIN 200mm, 150mm CEILING INSULATION, 2 LAYERS OF 16mm FYRCHEK PB. INTERTENANCY WALLS TO PROJECT A MIN 100mm ABOVE CEILING
9
2
RIDGE CAPPING
92mm STEEL WALL FRAMING
75mm THERMAL INSULATION WALL CLADDING AS SPECIFIED ALUMINIUM WINDOW
2
HANDRAIL AS SPECIFIED
LEVEL 5 SFL 50000 TERRACE 623-7
1067
BALUSTRADE CONNECTION DETAIL TO ENGINEERS DOCUMENTS
CF-OF, SKIM COAT AND PAINT FINISH AS SPECIFIED
LIVING 623-3
ALUMINIUM DOOR
CONC SLAB TO ENG DOCUMENTS
ALUMINIUM ANGLE AS SPECIFIED FLOOR FINISH AS SPECIFIED BY INTERIOR DESIGNER
RWO
MEMBRANE AS SPECIFIED CONC SLAB TO ENG DOCUMENTS PAV-1, PAVERS AS SPECIFIED ON PEDESTAL SUPPORT
CORE FILLED BLOCKWORK UPSTAND
SHELF ANGLE TO ENGINEERS DOCUMENTS
DEFLECTION HEAD BUILDING WRAP AS SPECIFIED
GO GO GO
SURVEY NOTES Survey data included in this drawing is based on survey drawing and is provided for preliminary design purposes only. As this drawing is based on information supplied by others, reference must be made to original survey drawings verified against site conditions.
GENERAL NOTES Morrison Design Partnership Pty. Limited accept no responsability for the usability, completeness or accuracy of data transferred electronically. Recipients should when necessary request a hard copy version for verification. This drawing shall be read in conjunction with all architectural and other Consultants drawings and specifications and with such other written instructions as may be issued during the course of the contract. Figured dimensions shall be taken in preference to scaling. All level, datum points and dimensions on this drawing shall be verified by the builder on site. All discrepancies shall be referred to the architect for direction before proceeding with any works. DO NOT SCALE THIS DRAWING.
BIM 360://3103 - Uniting Marion Street/3103-Uniting_Marion St (V20)_CC.rvt
1 LAYER 13mm PB SUSPENDED CEILING FINISH AS SPECIFIED BY INTERIOR DESIGNER
WALL TYPE - EW1b
DPC / CAVITY FLASHING & WEEPER COURSE
75 SETDOWN
RONDO P50 STOPPING ANGLE AS SPECIFIED
LINTEL TO ENG DOCUMENTS SUB HEAD
5
FALL
LEVEL 4 FCL 49600
75MM CONC UPSTAND PAV-1, PAVERS AS SPECIFIED ON PEDESTAL SUPPORTS.
SPITTER AS PER ENGINEERS DOCUMENTS
DRAINAGE CELL AS SPECIFIED
BRICK TIES TO ENGINEERS DOCUMENTS
RONDO P50 STOPPING ANGLE AS SPECIFIED
BAL-01 VERTICAL ALUMINIUM BALUSTRADE AS SPECIFIED
RENDER WALL AND PAINT FINISH AS SPECIFIED TO CORE FILLED BLOCKWORK
TERRACE 524-7 PAV-1
FB-01 FACE BRICK AS SPECIFIED
A1438
MDP MDP MDP
REMOVABLE INSPECTION CAP
SLOTTED UPSTAND PIPE AND GEOTEXTILE FABRIC AS SPECIFIED
2 LAYERS OF 16mm FYRCHEK PB SUSPENDED CEILING. FINISH AS SPECIFIED BY INTERIOR DESIGNER
HEAD FLASHING
Initials Checked
GEOTEXTILE FABRIC AS SPECIFIED
WEEPER COURSE AND CAVITY FLASHING
1067
FLEXIBLE SEALANT COL-01 12mm CFC SHEET AS SPECIFIED
Details
2
BRICK TIES TO ENGINEERS DOCUMENTS
CEILING ZONE
Date
2019-11-29 TENDER ISSUE 2019-12-19 TENDER ADDENDUM ISSUE 2020-02-14 DESIGN AND CONSTRUCT TENDER ISSUE
A1440
PLANTER
FB-01 FACE BRICK ON EDGE AS SPECIFIED
EDGEBEAM TO ENG DOCUMENTS
C1, ALUMINIUM SOFFIT CLADDING AS SPECIFIED
T1 T2 T3
5 A1438
COLORBOND BARGE FLASHING
COLORBOND BARGE FLASHING
Revision
K
Sim
A1437
ALUMINIUM CURTAIN WALL
4
A1436
DEFLECTION HEAD
FLEXIBLE SEALANT 12mm CFC SHEET AS SPECIFIED WALL CLADDING AS SPECIFIED HEAD FLASHING
CEILING ZONE
75mm THERMAL INSULATION 1 LAYER 13mm PB SUSPENDED CEILING FINISH AS SPECIFIED BY INTERIOR DESIGNER
P01 STOPPING BEAD ALUMINIUM CURTAIN WALL
WALL TYPE - EW3
1067
COLOURBACK GLASS
3
LIVING 524-3
Sim
A1435
75mm THERMAL INSULATION 92mm STEEL WALL FRAMING 13mm PLASTERBOARD WALL LINING. SKIRTING AS SPECIFIED BY INTERIOR DESIGNER. FLOOR FINISH AS SPECIFIED BY INTERIOR DESIGNER
ALUMINIUM DOOR
LEVEL 4 SFL 46900
ALUMINIUM ANGLE AS SPECIFIED FLOOR FINISH AS SPECIFIED BY INTERIOR DESIGNER
80 SETDOWN
LIVING 427-10
WALL BEYOND
RONDO P50 STOPPING ANGLE AS SPECIFIED
FIRE STOP COLOURBACK GLASS
CEILING ZONE
LEVEL 3 FCL 46500
1 LAYER 13mm PB SUSPENDED CEILING FINISH AS SPECIFIED BY INTERIOR DESIGNER RONDO P50 STOPPING ANGLE AS SPECIFIED
ALUMINIUM CURTAIN WALL P01 STOPPING BEAD
1067
LIVING 327-3 75mm THERMAL INSULATION 92mm STEEL WALL FRAMING 13mm PLASTERBOARD WALL LINING.
COLOURBACK GLASS
SKIRTING AS SPECIFIED BY INTERIOR DESIGNER. FLOOR FINISH AS SPECIFIED BY INTERIOR DESIGNER
LEVEL 3 SFL 43800
FIRE STOP COLOURBACK GLASS CEILING ZONE
LEVEL 2 FCL 43400
1 LAYER 13mm PB SUSPENDED CEILING FINISH AS SPECIFIED BY INTERIOR DESIGNER RONDO P50 STOPPING ANGLE AS SPECIFIED
ALUMINIUM CURTAIN WALL
NOT FOR CONSTRUCTION
WALL BEYOND P01 STOPPING BEAD
SUB SILL DPC / CAVITY FLASHING & WEEPER COURSE
1067
LIVING 227-3 TP-1
DESIGN AND CONSTRUCT TENDER ISSUE
75mm THERMAL INSULATION BUILDING WRAP AS SPECIFIED
92mm STEEL WALL FRAMING
BRICK TIE
13mm PLASTERBOARD WALL LINING.
WALL TYPE - EW1
COLORBOND METAL ROOFING ON VAPOUR BARRIER COLORBOND BARGE FLASHING
6 A1435
LEVEL 2 SFL 40700 FALL
Sim
DPC / CAVITY FLASHING & WEEPER COURSE CF-OF, SKIM COAT AND PAINT FINISH AS SPECIFIED
RL 40.599
FC-1, FC SHEET SOFFIT LINING AS SPECIFIED
RAFTER TO ENGINEERS DOCUMENTS
CEILING ZONE Client
LEVEL 1 FCL 39900
BOX GUTTER TO ENGINEERS DOCUMENTS
ALUMINIUM DOOR CONC SLAB TO ENG DOCUMENTS
LEVEL 1 SFL 36900 1K
1A
2A
2L
2J
A1401
A1406
A1410
A1410
CEILING ZONE
P01 STOPPING BEAD
SUB-HEAD
WALL BEYOND
A1405
FLOOR FINISH AS SPECIFIED BY INTERIOR DESIGNER
FALL
FLASHING
RONDO P50 STOPPING ANGLE AS SPECIFIED
1H
SKIRTING AS SPECIFIED BY INTERIOR DESIGNER.
EDGEBEAM TO ENG DOCUMENTS COLORBOND BARGE FLASHING
A1404
75mm CONC UPSTAND
SUSPENDED CEILING LINED WITH FINISH AS SPECIFIED BY INTERIOR DESIGNER COLUMN BEYOND
POOL ROOM 12C-11 CT-9
PAV-1, PAVERS AS SPECIFIED ON PEDESTAL SUPPORTS.
Project Management
STRIP DRAIN AS SPECIFIED WET EDGE GRATE
FLEXIBLE JOINT
FINGER GRIP
RL 36855
WATER LEVEL
POOL GUTTER CERAMIC TILE
2K A1409
1200
2B
POOL MEMBRANE
2H
A1406
A1409
CONC SLAB TO ENG DOCUMENTS
2C
POOL BASE
A1407 A1401 2D 2E
A1407
COLUMN BEYOND TO ENGINEERS DOCUMENTS
A1408
1F
SUBFLOOR AREA BC-15 CONC-SL
A1403
Sim
1
1E
1D
1C
2F
A1403
A1402
A1402
A1408
KEY PLAN
Adjacent: Wall section from Marion project tender documentation.
This drawing is based on information supplied by others, and must not be relied upon unless checked against site conditions. PROJECT:
1B
1G A1404
©Copyright These drawings and designs and the copyright thereof are the property of Morrison Design Partnership Pty. Ltd. and must not be altered, used, retained, or copied wholy or in part without the written permission of Morrison Design Partnership Pty. Ltd. ACN 001 595 288.
BASEMENT LEVEL 33400
CONC SLAB TO ENG DOCUMENTS WATERPROOFING MEMBRANE OVER SAND BLINDING TO ENG DOCUMENTS
UNITING MARION STREET ILU's 15 - 17 MARION STREET LEICHHARDT NSW 2040 DRAWING:
WALL SECTIONS 2H, 2K PROJECT NO.
3103
SCALE 1 : 450
DRAWING NO.
A1409 2H
FACADE SECTION 2H SCALE 1 : 20
07
SCALE:
REVISION NO.
T3
As indicated @ B1DRAWN: Author
DATE: 12.07.2019 PROJECT ARCHITECT: G.OLLERTON
portfolio2020
92
50
90
Revision
92
PLASTERBOARD WALL LINING FINISH AS SPECIFIED (DIRECT STICK)
2 90mm STUD WALL A1413a
KITCHEN 115-2
BOX FRAME SECTION
3
3
TERRACE 115-14
KITCHEN BENCH BELOW
50
90
KITCHEN BENCH BELOW
200
50
200
4
5
200
50
90mm STUD FRAME
90mm BLOCK 50mm CAVITY
90mm STUD FRAME
90mm STUD FRAME
DP SARKING AS SPECIFIED
90 DEGREE PLASTERBOARD STOPPING BEAD
SARKING AS SPECIFIED
BLOCK VENEER CLADDING (EW2a)
CORRIDOR 11C-1
90mm BLOCK
92
13mm PBOARD LINING
50
90
90mm BLOCK T1
Details
Initials Checked
50mm CAVITY
2020-02-14 DESIGN AND CONSTRUCT TENDER ISSUE
MDP
GO
92 3
PLAN DETAIL 8
A1413a
OARD STOPPING
E
ALUMINIUM WINDOW
2
92
200
C
50
D
LIVING 511-3
a/c a/c
D
E
200
BED 1 111-4LIVING 117-3
LIVING 111-3 BED 1 117-4
C
90mm BLOCK
D
BED 17 112-4
A1413a
5
3
TERRACE CONCRETE COLUMN LIVING TO STRUCT 511-7 ENG'S DETAILS 111-3
6
6
A1413a
7
50mm CAVITY
A1413a
2
5
8
ENTRY 111-1
A1413a
90 STUD FRAME
TOWER 1 L1 PLAN - SOUTH
46
46
A1102
PLAN DETAIL 8
TOWER 1 L1 PLAN - EAST
3
A1413a
1
STORM MOULDING
6
SCALE 1 : 5
50
46
PLAN DETAIL 10
Project Management Project Management
SCALE 1 : 5
SARKING AS SPECIFIED BLOCK VENEER CLADDING (EW2a)
90mm STUD FRAME
DP SARKING AS SPECIFIED
SCALE 1 : 5 SARKING AS SPECIFIED
BLOCK VENEER CLADDING (EW2a) 90mm BLOCK
90mm STUD FRAME
BLOCK VENEER CLADDING (EW2a)
92
90mm BLOCK
50
©Copyright These drawings and designs and the copyright thereof are the property of Morrison Design Partnership Pty. Ltd. and must not be altered, used, retained, or copied wholy or in part without the written permission of Morrison Design Partnership Pty. Ltd. ACN 001 595 288.
90
50mm CAVITY
5
A1413a LIVING 117-3
ALUMINIUM SLIDING DOOR1 : 5 SCALE
CORRIDOR 11C-1
LEVEL 5 DETAIL 3
FLOOR PLAN - LEVEL 01 - WEST-B - Callout 4 SCALE 1 : 5
LIVING 117-3
90 DEGREE PLASTERBOARD STOPPING BEAD
3
A1413a
SCALE 1 : 5 90mm STUD FRAME
B
PLAN DETAIL 11
92
SCALE 1 : 5
50
7
90
A1413a
ALUMINIUM WINDOW
PLAN DETAIL 11
SCALE 1 : 5
TERRACE 51C-2
90 DEGREE PLASTERBOARD STOPPING BEAD
A1413a
90 DEGREE PLASTERBOARD STOPPING BEAD
EXTERNAL CORNER FLASHING
92
90 DEGREE PLASTERBOARD STOPPING BEAD
8
PLASTERBOARD WALL LINING FINISH
4
SCALE 1 : 5
ALUMINIUM SLIDING DOOR
SEALANT
90
FLOOR PLAN - LEVEL 01 - WEST-C - Callout 3
8
A1413a
15 - 17 MARION STREET LEICHHARDT NSW 2040
50
90
12 CFC SHEETING AS SPECIFIED
PLASTERBOARD WALL LINING FINISH INTERNAL CORNER EXT - (DIRECT STICK) ASFLASHING SPECIFIED BED 1 111-4
ENG'S DETAILS PROPRIENTARY END TRIM
B
C
PLANTER WALL
6 LIVING A1413a 117-3
BED 1 117-4
EW3
LIVING 111-3 BED 1
112-4
90mm BLOCK
D LIVING 112-3
50mm CAVITY
BED 1 511-4
6
E
90
50
BED 1 CONCRETE COLUMN TO STRUCT LIVING 111-4 111-3 ENGINEERS DOCUMENTS
7
A1413a
BLOCK VENEER CLADDING (EW2a) DP
90
90 DEGREE PLASTERBOARD STOPPING BEAD
SARKING AS SPECIFIED
INTERNAL CORNER EXT FLASHING BACKING PLATE FLASHING
90mm BLOCK
Project Management
DP
BLOCK VENEER CLADDING (EW2a)
6
90
50mm CAVITY
50
46
A1413a
46
BLOCK VENEER CLADDING (EW2a) PLASTERBOARD WALL LINING FINISH AS SPECIFIED (DIRECT STICK)
2x13 PLASTERBOARD WALL LINING FINISH AS SPECIFIED
90mm STUD FRAME
This drawing is based on information supplied by others, on andinformation must This drawing is based supplied by others, and must not be relied upon unless checked siteupon conditions. not against be relied unless checked against site conditions.
90mm BLOCK
PROJECT:
50mm CAVITY
LIVING 117-3
PLAN DETAIL 11
SCALE 1 : 5
FIRE STAIR SHAFT
HORIZONTAL DOMINION CLADDING COLOURBOND WALL CLADDING AS SPECIFIED ON 40MM STEEL BATTENS (EW3) EXTERNAL CORNER FLASHING
7
SEALANT
SCALE 1 : 5
A1413a
8
A1413a
PLAN DETAIL 11
6
90 DEGREE PLASTERBOARD STOPPING BEAD
SEALANT
PROJECT:
UNITING MARION UNITING MARION STREET ILU's STREET ILU's 15 - 17 MARION STREET 15 - 17 MARION STREET LEICHHARDT LEICHHARDT NSW 2040 DRAWING:
13 PLASTERBOARD WALL LINING FINISH AS SPECIFIED (DIRECT STICK)
HORIZONTAL DOMINION CLADDING COLOURBOND WALL CLADDING AS SPECIFIED ON 40MM STEEL BATTENS
PLASTERBOARD WALL LINING FINISH NSW 2040 AS SPECIFIED (DIRECT STICK)
LEVEL 5 FACADE PLAN DETAILS 1 LEVEL 1 FACADE PLAN DRAWING:
PROJECT NO.
5
PROPRIENTARY END TRIM
LEVEL 5 DETAIL 13
CONCRETE COLUMN TO STRUCT ENGINEERS DOCUMENTS
TERRACE 514-7
90 DEGREE PLASTERBOARD STOPPING BEAD 90mm STUD FRAME
7
SCALE 1 : 5
©Copyright These drawings and designs and the copyright thereof are the property These drawings and designs and the copyright thereof are the property of of Design Partnership Pty. Ltd. and must not be altered, used, Morrison Design Partnership Pty.Morrison Ltd. and must not be altered, used, retained, orthe copied or in of part without the written permission of retained, or copied wholy or in part without writtenwholy permission Design Partnership Pty. Ltd. ACN 001 595 288. Morrison Design Partnership Pty.Morrison Ltd. ACN 001 595 288.
BED 2 514-8
90 DEGREE PLASTERBOARD STOPPING BEAD
A1413a
PLAN DETAIL 10
©Copyright
SARKING AS SPECIFIED
LIVING 117-3
3
A1417
STORM MOULDING
A1417
FLOOR PLAN - LEVEL 01 - WEST-C - Callout 3 SCALE 1 : 5
3103
ALUMINIUM SLIDING DOOR
LEVEL 5 DETAIL 12
SCALE 1 : 5
ALUMINIUM SLIDING DOOR
SCALE 1 : 5
STORM MOULDING
TERRACE 117-7
DRAWING NO.
A1417 SCALE:
DETAILS 2
REVISION NO.
T13103
PROJECT NO.
DRAWING As indicated @ B1DRAWN: Author NO.
DATE: 12.07.2019
Adjacent: Plan details for Marion project - tender T1 documentation. 6
REVISION NO.
As indicated @ B1DRAWN: Author
ALUMINIUM SLIDING DOOR
DATE: 12.07.2019
PROJECT ARCHITECT: G.OLLERTON
8
A1413a
08
FLOOR PLAN - LEVEL 01 - WEST-C - Callout 3 SCALE 1 : 5
90 DEGREE PLASTERBOARD STOPPING BEAD
A1413a
SCALE: PROJECT ARCHITECT: G.OLLERTON
TERRACE 117-7
T1
BLOCK VENE (EW2a)
90mm BLOCK
PROJECT ARCHITECT: G.OLLERTON
EW14d
STOPPING HORIZONTAL DOMINION CLADDINGBEAD COLOURBOND WALL CLADDING AS SPECIFIED ON 40MM STEEL 90mm BATTENS STUD FRAME
COMMUNITY TERRACE 51C-2
Client
SARKING AS
REVISION NO.
As indicated @ B1DRAWN:
DATE: 12.07.2019
Project Management
50mm CAVITY
90 DEGREE PLASTERBOARD STOPPING BEAD
90 DEGREE PLASTERBOARD
SCALE:
DP
90mm BLOCK
SCALE 1 : 100
DRAWING NO.
Client
6
SCALE 1 : 5
A1417
7
TENDER ISSUE
13 PLASTERBOARD WALL LINING FINISH AS SPECIFIED
90 STUD FRAME
PLAN DETAIL 10
3103
A1413a 50mm CAVITY
ALUMINIUM AWNING WINDOW DATE: 12.07.2019
20 CAVITY
DP
HORIZONTAL DOMINION CLADDING COLOURBOND WALL CLADDING AS SPECIFIED ON 40MM STEEL BATTENS
PROJECT NO.
CONCRETE COLUMN TO STRUCT ENG'SMOULDING DETAILS STORM
DESIGN AND CONSTRUCT DESIGN AND TENDER ISSUE CONSTRUCT
90mm STUD FRAME
TOWER 1 L1 PLAN - SOUTH
5
90
T1
DRAWING NO.
HORIZONTAL DOMINION CLADDING COLOURBOND WALL CLADDING AS SPECIFIED ON 40MM STEEL BATTENS
LIVING 111-3
6 SARKING AS SPECIFIED
PLANTER A1413a
4
A1413a
46
CONCRETE COLUMN TO STRUCT ENG'S DETAILS
12 CFC SHEETING AS SPECIFIED
A1102
46
PLASTERBOARD WALL LINING FINISH AS SPECIFIED (DIRECT STICK)
A1413a
8
3103
PROJECT ARCHITECT: G.OLLERTON
2x13 PLASTERBOARD WALL LINING FINISH AS SPECIFIED
13 PLASTERBOARD WALL LINING FINISH AS SPECIFIED (DIRECT STICK)
SARKING
6
50
BLOCK VENEER CLADDING (EW2a)
CONCRETE COLUMN TO STRUCT
7 A1413a
200
SARKING AS SPECIFIED
BACKING PLATE FLASHING
LIVING 111-3
STORM MOULDING
90 DEGREE PLASTERBOARD STOPPING BEAD
DRAWING:
LEVEL 1 FACA DETAILS 2
A1413a PLASTERBOARD WALL LINING FINISH TERRACE AS SPECIFIED (DIRECT STICK) As indicated @ B1DRAWN: Author 117-7
90 DEGREE PLASTERBOARD STOPPING BEAD SCALE:
51 STUD FRAME
2x13 PLASTERBOARD WALL LINING FINISH AS SPECIFIED
HORIZONTAL DOMINION CLADDING COLOURBOND WALL CLADDING AS SPECIFIED ON 40MM STEEL BATTENS
E
15 - 17 MARION STREET LEICHHARDT NSW 2040
90 DEGREE PLASTERBOARD STOPPING BEAD
REVISION NO. LIVING 90mm STUD FRAME 111-3 ALUMINIUM SLIDING DOOR
PROJECT NO.
NOT FOR CONSTRUCTION
SARKING
6
UNITING MAR STREET ILU'
LEVEL 1 FACADE PLAN 6 DETAILS 2 NOT FOR CONSTRUCTION
50mm CAVITY
190 FIRE RATED WALL
SCALE 1 : 5
90 STUD FRAME SARKING
D
90mm BLOCK
FLOOR PLAN - LEVEL 01 - WEST-C - Callout 3
50
200
SEALANT
BLOCK VENEER CLADDING (EW2a)
EW3
90 DEGREE PLASTERBOARD STOPPING BEAD
B
PROJECT:
SCALE 1 : 5
SARKING AS SPECIFIED
STORM MOULDING
TERRACE 117-7
200
A1413a
50
CONCRETE COLUMN TO STRUCT ENG'S DETAILS
This drawing is based on information not be relied upon unless checked
90
FLOOR PLANSTREET - LEVEL 01 -ILU's WEST-B - Callout 4
DRAWING:
6 FIRE STAIRS FS-01
FIRE RATED DOOR 90mm STUD FRAME
50
UNITING MARION
5
RENDERED FIRE RATED PRECAST AS SPECIFIED (DIRECT STICK) WALL
ALUMINIUM AWNING WINDOW
EW14D STORM MOULDING
©Copyright These drawings and designs and the of Morrison Design Partnership Pty. Ltd. retained, or copied wholy or in part Morrison Design Partnership Pty. Ltd.
50
7
A1413a
LIVING 111-3 COMMUNITY
92
PROJECT:
PLASTERBOARD WALL LINING FINISH AS SPECIFIED (DIRECT STICK)
PLAN DETAIL 9
SCALE 1 : 5
50mm CAVITY
This drawing is based on information supplied by others, and must not be relied upon unless checked against site conditions.
B
TERRACE 511-7
Client
DP
A1413a
46
PLASTERBOARD WALL LINING FINISH AS SPECIFIED (DIRECT STICK)
A1413a
DESIG CONST TENDER
STICK)
50mm CAVITY
A1417
90mm STUD FRAME
PLAN DETAIL 9
PLAN DETAIL 8
NOT FOR CO
50mm CAVITY
Client
50
90mm BLOCK
3
SARKING AS SPECIFIED
SCALE 1 : 5
2
90 DEGREE PLASTERBOARD STOPPING BEAD
6
CORRIDOR 11C-1
LEVEL 5 DETAIL 1
90 A1417 DEGREE PLASTERBOARD STOPPING BEAD 90mm STUD FRAME
90mm BLOCK
DESIGN AND CONSTRUCT TENDER ISSUE
50mm CAVITY
DP
90
50mm CAVITY
SCALE 1 : 100
SCALE 1 : 5
BLOCK VENEER CLADDING (EW2a)
ALUMINIUM WINDOW
50mm CAVITY
90 DEGREE PLASTERBOARD 90mm BLOCK STOPPING BEAD
13mm PBOARD LINING
TERRACE 116-7 SARKING AS SPECIFIED
NOT FOR CONSTRUCTION
BIM 360://3103 - Uniting Marion Street/3103-Uniting_Marion St (V20)_CC.rvt
90mm BLOCK
200
90mm STUD FRAME BLOCK VENEER CLADDING 6 (EW2a) A1413a 90mm BLOCK
DP
(EW2a)
90mm STUD WALL
1
2
LIVING 111-3
BLOCK VENEER CLADDING (EW2a)
FACE BRICKWORK BELOW
90mm STUD FRAME
STORM MOULDING
Morrison Design Partnership Pty. Limited accept no responsability for PLASTERBOARD WALL LINING FINISH 50mm CAVITY the usability, completeness or accuracy of data transferred AS SPECIFIED (DIRECT STICK) electronically. Recipients should when necessary request a hard copy version for verification. This drawing shall be read in conjunction with all architectural and other Consultants drawings and specifications and with such other written instructions as may be issued during the course of the contract. Figured dimensions shall be taken in preference to scaling. All level, datum points and dimensions on this drawing shall be verified by the builder on site. PLASTERBOARD WALL LINING All discrepancies shall be referred to the architect for direction before proceeding with any works. DO NOT SCALE THIS DRAWING. FINISH AS SPECIFIED (DIRECT
SARKING AS SPECIFIED
DINING PLAN DETAIL 10 512-10
50
50mm CAVITY
2x13 PLASTERBOARD WALL LINING BLOCK VENEER CLADDING FINISH AS SPECIFIED
SCALE 1 : 100
A1413a
WINDOW SILL BELOW
ENG'S DETAILS 90mm BLOCK GENERAL NOTES
SEALANT 90 DEGREE PLASTERBOARD STOPPING BEAD ALUMINIUM AWNING WINDOW
FACE BRICKWORK BELOW
CONCRETE COLUMN TO STRUCT ENG'S DETAILS
90 DEGREE PLASTERBOARD STOPPING BEAD
90 DEGREE PLASTERBOARD STOPPING BEAD
KITCHEN 111-2
6
90
ALUMINIUM SLIDING DO
90 DEGREE PLASTERBOARD STOPPING BEAD
Checked
provided for preliminary design purposes only. As this drawing is based on information supplied by others, reference must be made to original survey drawings verified against site CONCRETE COLUMN TO STRUCT conditions.
SARKING AS SPECIFIED
90
90mm BLOCK
13 PLASTERBOARD WALL LINING FINISH AS SPECIFIED (DIRECT STICK)
6
50
GENERAL NOTES Initials
2020-02-14 DESIGN AND CONSTRUCT TENDER ISSUE Morrison Design
LIVING 116-3 LIVING 90mm STUD FRAME BLOCK VENEER CLADDING BIM 360://3103 - Uniting Marion Street/3103-Uniting_Marion St 111-3 (EW2a) (V20)_CC.rvt
FINISH AS SPECIFIED (DIRECT STICK)
STORM MOULDING
SARKING AS SPECIFIED PLASTERBOARD WALL LINING FINISH BLOCK VENEER CLADDING AS SPECIFIED (DIRECT STICK) SARKING AS SPECIFIED (EW2a) CONCRETE COLUMN TO STRUCTBLOCK VENEER CLADDING 90mm BLOCK ENG'S DETAILS (EW2a)
A1413a
PLASTERBOARD WALL LINING FINISH AS SPECIFIED (DIRECT STICK)
LIVING 111-3
50
90
Details
MDPPty. Limited GO Partnership accept no responsability for the usability, completeness or accuracy of data transferred electronically. Recipients should when necessary request a hard copy version for verification. This drawing shall be read in conjunction with all architectural and other Consultants drawings and specifications and with such other written instructions as may be issued during the course of the contract. Figured dimensions shall be taken in preference to scaling. All level, datum points and dimensions on this drawing shall be verified by the builder on site. SURVEY NOTES shall be referred to the architect for direction before SARKING AS SPECIFIED All discrepancies Survey data included in this drawing is based with on survey drawing and is SCALE THIS DRAWING. proceeding any works. DO NOT
ALUMINIUM COVERPLATE TO MATCH WINDOW
200
50
T1
90 DEGREE PLASTERBOARD STOPPING BEAD PLASTERBOARD WALL LINING FINISH AS SPECIFIED (DIRECT STICK)
METAL WALL SILL BELOW (DOMONION)
200
BED 2 511-8
200
CONCRETE COLUMN TO STRUCT ENG'S DETAILS LIVING BED 1 112-3 111-4
A1413a
A1417
OARD
TERRACE 512-7
Date
TERRACE 116-7
CONCRETE COLUMN TO STRUCT ENG'S DETAILS
90 DEGREE PLASTERBOARD STOPPING BEAD
90
E
PLASTERBOARD WALL LINING FINISH AS SPECIFIED (DIRECT STICK)
50mm CAVITY LIVING 116-3
DINING 512-10
LIVING 512-3
50
KITCHEN BENCH BELOW
SURVEY NOTES
provided for preliminary design purposes only. As this drawing is based on information supplied by others, reference must be made to original survey drawings verified against site conditions.
Revision
90mm STUD FRAME
DP
90mm STUD FRAME
4
90 DEGREE PLASTERBOARD STOPPING BEAD
50mm CAVITY
BLOCK VENEER CLADDING (EW2a)
90
SCALE 1 : 5
BED 2 PLASTERBOARD WALL LINING FINISH 115-8 SPECIFIED PLASTERBOARDASWALL LINING (DIRECT STICK)
ALUMINIUM AWNING WINDOW
PAVERS ON PEDESTALS
FINISH AS SPECIFIED
HORIZONTAL DOMINION CLADDING COLOURBOND WALL CLADDING AS SPECIFIED ON 40MM STEEL BATTENS (EW3)
E
B
90
BLOCK VENEER CLADDING (EW2a)
STUD FRAME CONCRETE COLUMN90TO STRUCT ENG'S DETAILS 2x13 PLASTERBOARD WALL LINING
12 CFC SHEETING AS SPECIFIED
SARKING AS SPECIFIED
LINING FINISH STICK)
50
SARKING AS SPECIFIED
90 DEGREE PLASTERBOARD STOPPING BEAD
SARKING
TERRACE 116-7
O STRUCT
92
90mm BLOCK
A1413a 90 DEGREE PLASTERBOARD STOPPING BEAD
a/c
LIVING 111-3
ALUMINIUM SLIDING DOOR
2
TERRACE 115-14
90
SEALANT
90mm STUD WALL
90 STOPPING BEAD
3
DP
50
STORM MOULDING
FLOOR PLAN - LEVEL 01 - WEST-B - Callout 4 Survey data included in this drawing is based on survey drawing and is
5
A1413a
BOX FRAME SECTION
90 DEGREE PLASTERBOARD
50
92
ALUMINIUM SLIDING DOOR
90 DEGREE PLASTERBOARD STOPPING BEAD
DINING 115-10
PLASTERBOARD WALL LINING FINISH AS SPECIFIED (DIRECT STICK)
BED 2 115-8
HEN BENCH BELOW
BED 2 115-8
SEALANT
90 DEGREE PLASTERBOARD STOPPING BEAD EXTERNAL CORNER FLASHING
90
SCALE 1 : 5
LIVING 116-3
HORIZONTAL DOMINION CLADDING COLOURBOND WALL CLADDING AS SPECIFIED ON 40MM STEEL BATTENS (EW3)
A1413a
KITCHEN 115-2
3
BOX FRAME SECTION
TERRACE 511-7
50
FLOOR PLAN - LEVEL 01 - WEST-B - Callout 4 5 PLAN A1413a DETAIL 9 SCALE 1 : 5
3
A1413a
PLASTERBOARD WALL LINING FINISH AS SPECIFIED (DIRECT STICK)
ALUMINIUM SLIDING DOOR
2
92
90
SCALE 1 : 5
BOX FRAME SECTION
90mm STUD WALL
50
PLAN DETAIL 9
SCALE 1 : 5
200
A1413a
90
2
DINING 115-10
200
SCALE 1 : 5
90
PLAN DETAIL 8
50
PLASTERBOARD WALL LINING FINISH AS SPECIFIED (DIRECT STICK)
2
BED 1 511-4
Date
SCALE 1 : 100
A1413a
02
BLOCK VENEER CLADDING (EW2a) Revision
200
A1102
TOWER 1 L1 PLAN - EAST
50
1
50mm CAVITY
90
NING
BIM 360://3103 - Uniting Marion Stree (V20)_CC.rvt
90 DEGREE PLASTERBOARD STOPPING BEAD
50
CORRIDOR 11C-1
90mm STUD WALL
Morrison Design Partnership Pty. Lim the usability, completeness or accur electronically. Recipients should when necessary r verification. This drawing shall be read in conjun other Consultants drawings and spe written instructions as may be issued Figured dimensions shall be taken in All level, datum points and dimensio by the builder on site. All discrepancies shall be referred to proceeding with any works. DO NOT
BIM 360://3103 - Uniting Marion Street/3103-Uniting_Marion St (V20)_CC.rvt
DP
KITCHEN 111-2
GENERAL NOTES
TERRACE 116-7
50mm CAVITY
5 ENTRY 111-1
Survey data included in this drawing provided for preliminary design purp As this drawing is based on informat must be made to original survey dra conditions.
Morrison Design Partnership Pty. Limited accept no responsability for
BLOCK VENEER CLADDING (EW2a)
PLASTERBOARD WALL LINING FINISH 50mm CAVITY AS SPECIFIED (DIRECT STICK)
TERBOARD
SURVEY NOTES
SARKING AS SPECIFIED
BLOCK VENEER CLADDING (EW2a) CONCRETE COLUMN TO STRUCT ENG'S DETAILS 90mm BLOCK
A1413a
WALL LINING FINISH RECT STICK)
STORM MOULDING
90mm BLOCK
90mm STUD FRAME SARKING AS SPECIFIED
LIVING 116-3
MN TO STRUCT
Details
PLASTERBOARD WALL LINING FINISH AS SPECIFIED (DIRECT STICK)
90 DEGREE PLASTERBOARD CONCRETE COLUMN TOSTOPPING STRUCT BEAD ENG'S DETAILS
90
Date
2020-02-14 DESIGN AND CONSTRU
ALUMINIUM SLIDING DOOR
usability, completeness or accuracy of data transferred LIVINGthe electronically. should when necessary request a hard copy version for 116-3 Recipients verification.
SEALANT
50mm CAVITY
DP CONCRETE COLUMN TO STRUCT ENG'S DETAILS
200
Revision
GO
This drawing shall be read in conjunction with all architectural and other Consultants drawings and specifications and with such other written instructions as may be issued during the course of the contract. Figured dimensions shall be taken in preference to scaling. All level, datum points and dimensions on this drawing shall be verified by the builder on site. All discrepancies shall be referred to the architect for direction before proceeding with any works. DO NOT SCALE THIS DRAWING.
PLASTERBOARD WALL LINING SARKING AS SPECIFIED FINISH AS SPECIFIED (DIRECT STICK) BLOCK VENEER CLADDING (EW2a)
90mm BLOCK DP
TERRACE 116-7
MDP
GENERAL NOTES
TERRACE 116-7
BED 2 115-8
90 DEGREE PLASTERBOARD STOPPING BEAD SARKING AS SPECIFIED PLASTERBOARD WALL LINING FINISH BLOCK VENEER CLADDING AS SPECIFIED (DIRECT STICK) (EW2a)
PLASTERBOARD WALL LINING FINISH AS SPECIFIED (DIRECT STICK)
a/c
Initials Checked
90 DEGREE PLASTERBOARD STOPPING SURVEY BEAD NOTES
STORM MOULDING
LIVING 116-3
SEALANT
90 DEGREE PLASTERBOARD STOPPING BEAD
A1413a
ALUMINIUM SLIDING DOOR
ALUMINIUM SLIDING DOOR
BED 2 115-8
2
Details
Survey data included in this drawing is based on survey drawing and is provided for preliminary design purposes only. As this drawing is based on information supplied by others, reference must be made to original survey drawings verified against site conditions.
ALUMINIUM SLIDING DOOR 90mm STUD WALL
BED 2 115-8
Date
2020-02-14 DESIGN AND CONSTRUCT TENDER ISSUE
T1
90 DEGREE PLASTERBOARD STOPPING BEAD
90 DEGREE PLASTERBOARD STOPPING BEAD
2
T1
DINING 115-10 BOX FRAME SECTION
2
TERBOARD STOPPING
90
PLASTERBOARD WALL LINING FINISH AS SPECIFIED (DIRECT STICK)
DINING 115-10
E
50
STORM MOULDING
jordanaugust
Clockwise from top left: North-west corner of building; pedestrian entry ramp; pedestrian entry shelter, water feature.
09
portfolio2020
10
jordanaugust
11
portfolio2020
Adjacent: View of east tower from street.
12
jordanaugust
02 norton Undertaken at Morrison Design Partnership Architects
Project Particulars Typology Location Estimated cost
Mixed-use Seniors Living Development/Retail Leichhardt, Sydney, Australia $16,970,000
Personal Contributions ++ Assisted with planning and design development. ++ Assisted with design of interior architecture - significant contributions to entry foyer; community clubroom; unit kitchens & bathrooms. ++ Produced photorealistic renders for design exploration and communication ++ Assisted with development application/tender documentation. ++ Attended client presentation meetings. ++ General Revit modelling, family creation and documentation.
Project Description Norton is a base build 6 storey mixed-use development comprising 50 Individual Living Units (ILUs), 1 retail tenancy, and a clubroom. Norton is located just around the corner from Marion in Leichhardt - the ‘Little Italy’ of Sydney. The external architecture of Norton went through many design iterations, with early explorations testing an exposed brick facade. The final design consists of a fully rendered facade, and as with Marion, has adopted the strategy of using dark, recessed cladding for the upper levels so as to better integrate in to the surrounding context. During the tender phase, our office was also engaged to develop the interior design of the major ground floor internal spaces, kitchens, and bathrooms. The client’s brief asked for a gallery-like entry and interiors that promote a sense of ‘exclusivity’. Our response included a high degree of articulation to the walls and ceilings to create back-lit alcoves for seating and the displaying of art. A rectangular pendant light is repeated throughout, and the selection of dark and light tiling was adopted to add visual interest, relate to the external architecture of the building, and enhance the sense of exclusivity to the entry. The clubroom interiors follow a similar language to the entry gallery with a number of recessed alcoves functioning as TV spaces and built-in storage units. A centrepiece kitchen with a rounded waterfall bench top is crowned by the same pendant light used throughout the entry, tying together the two spaces.
13
portfolio2020
Adjacent: Entry foyer central seating area with skylight.
14
1
SCALE 1 : 100
REFLECTED CEILING PLAN - LEVEL 03
PB-13
CH2700
BED 2 R3-607
LIV. R3-602
PB-13
CH2700
BALC. R3-612
PB-13
STUDY R3-608
CH2700
CH2400
LDRY R3-609 MR-PB-13
PB-13
PB-13
CH2400
BALC. R3-511
BED 1 R3-510
R3-604
CH2400
PB-13
BED 1 R3-610
MR-PB-13
CH2100
ENS. R3-606 MR-PB-13
CH2700
CH2100
MR-PB-13
CH2400
ENTRY R3-112
MR-PB-13
LDRY R3-111
MR-PB-13
CH2400
MR-PB-13 BATH R3-203
CH2100
PB-13
CH2400
MR-PB-13
PB-13
BED 1 R3-701
CH2700
PB-13
CH2400
WIR R3-702
CH2100
MR-PB-13
MR-PB-13
CH2400
ENS. R3-703
KIT. R3-502
CH2400
MR-PB-13
PB-13
CH2400
CH2100
BATH R3-507
CH2100
MR-PB-13
CH2400
PB-13
CH2400
PB-13
PB-13
BED 2 R3-706
CH2700
STUDY R3-407
ENTRY R3-406
E
C
CH2700
BALC. R3-712
PB-13
PB-13
CH2400
CIRC. 2 R3-009
LOBBY R3-004
PB-13
CH2400
PB-13
CH2700
BALC. R3-312
ENTRY R3-308
KIT. R3-710
LIV. R3-711
UNIT 3-7
DIN. R3-709
PB-13 BED 2 R3-505
CH2700
ENTRY R3-504
PB-13
BED 2 R3-405
CIRC. 1 R3-001
CH2400
LDRY R3-307
PB-13
CH2400
KIT. R3-305
MR-PB-13
CH2700
PB-13
CH2400
HYD
STUDY R3-503
ENTRY R3-708
CH2400
HALL R3-705
LDRY R3-707
MR-PB-13
CH2100
PB-13
KIT. R3-207
CH2400
MR-PB-13
KIT. CH2400 R3-409 PB-13
MR-PB-13
BATH R3-404
CH2400
MR-PB-13 CH2400 BATH R3-704 MR-PB-13
MR-PB-13
LDRY R3-508
LDRY R3-209
CH2400
CH2700
LIV. R3-206
UNIT 3-2
PB-13
CH2700
MR-PB-13
DIN. R3-408
DIN. R3-506
UNIT 3-5
PB-13
CH2700
CH2400
ENTRY R3-605
MR-PB-13
CH2100
ENS. R3-509
LIV. R3-410
PB-13
CH2400
DIN. R3-205
ENTRY R3-208
MR-PB-13
CH2400
LDRY R3-403
PB-13
UNIT 3-4
MR-PB-13 ENS. CH2400 R3-402 MR-PB-13
CH2100
MR-PB-13
CH2400
MR-PB-13 BATH R3-110
CH2100
LIV. R3-501
CH2400 BATH
MR-PB-13
PB-13
CH2700
CH2700
BED 1 R3-401
PB-13
CH2400
BALC. R3-411
KIT. R3-603
UNIT 3-1
UNIT 3-6
DIN. R3-601
BALC. R3-611
LIV. R3-108
PB-13
CH2700
DIN. R3-107
KIT. R3-109
MR-PB-13
MR-PB-13
CH2400
ENS. R3-202
CH2100
MR-PB-13
PB-13
BED 2 R3-204
CH2700 CH2400
BALC. R3-210
A6
PB-13
BED 1 R3-801
CH2700
PB-13
CH2400
WIR R3-802
CH2100
MR-PB-13
MR-PB-13
ENS. R3-886
CH2400
LIFT 2 RB-010
LIFT 1 RB-009
PB-13
STUDY R3-310
CH2700
DIN. R3-306
UNIT 3-3
LIV. R3-301
? ?
PB-13
CH2400
MR-PB-13 R3-804
CH2400 BATH
CH2100
ENTRY R3-901
PB-13
BED 2 R3-806
CH2700
CH2400
CH2400
MR-PB-13 ENTRY R3-808
CH2100
MR-PB-13
PB-13
LDRY R3-807
HALL R3-805
MR-PB-13
FIRE STAIR R3-005
PB-13
CH2700
BED 2 R3-311
PB-13
CH2400
MR-PB-13
CH2100
MR-PB-13
CH2400
MR-PB-13
CH2400
ENS. R3-304
PB-13
WIR R3-303
CH2400
BATH R3-309
PB-13
CH2700
A7
B1
B2
B3
B4
B5
B6
Above: Level 03 reflected ceiling plan for Norton project - tender documentation.
C11
C10
C9
C8
C7
C6
C5
C4
C3
TERRACE R3-113
CH2100
MR-PB-13
PB-13
CH2700 CH2400
PB-13
CH2400
WIR R3-105
ENS. R3-106
HALL R3-104
PB-13
BED 1 R3-201
CH2700
PB-13
BED 1 R3-102
CH2700
BED 3 / STUDY R3-103
PB-13
PB-13
C2
PB-13
CH2400
CH2400
CH2400
PB-13
PB-13
PB-13
CH2400
BED 2 R3-101
CH2400
PB-13
PB-13
CH2700
PB-13
CH2400
CH2400 CH2400
A5
PB-13
CH2400
A4
PB-13
CH2400
BALC. R3-812
B7
PB-13
CH2700
LIV. R3-811
UNIT 3-8
DIN. R3-809
KIT. R3-810
CH2400
PB-13
BED 1 R3-906
CH2700
MR-PB-13
CH2100
MR-PB-13
ENS. R3-905
PB-13
CH2400
KIT. R3-902
PB-13
A3
CH2400
A2
BATH R3-907
CH2400
B8
BALC. R3-909
MR-PB-13
LDRY R3-911
DIN. R3-904 MR-PB-13
CH2400
PB-13
CH2700
UNIT 3-9
LIV. R3-903
PB-13
15 CH2400
C1
A1
PB-13
BED 2 R3-908
CH2700
TERRACE R3-910
B9 E:\Revit Local Files\3051- Uniting Norton St (V20)_Daniel@mdpa.com.au.rvt
COORDINATION • THE RCPS SHOW THE ARCHITECTURAL INTENT OF FINISHES AND HEIGHTS ONLY • CEILING FIXTURES, FITTINGS AND PENETRATIONS ARE ONLY SHOWN INDICATIVELY • THE BUILDER IS TO COORDINATE AND SETOUT ALL ITEMS FOR SUBMISSION TO THE SUPERINTENDENT PRIOR TO PROCEEDING WITH THE WORKS. • BUILDERS COORDINATION AND SETOUT IS TO INCLUDE: - MECH SERVICES - ELECTRICAL SERVICES - WET / DRY FIRE SERVICES. - COMMUNICATIONS, NURSE CALL AND SECURITY ITEMS - ACCESS PANELS - ALL OTHER FITXTURES AND FITTINGS AS REQUIRED. - COORDINATE SETOUT OF ALL CEILING FITTMENTS TO ENSURE COMPLIANCE WITH NCC REQUIREMENTS.
GENERALLY • SEE GENERAL NOTES ON PREVIOUS SHEETS. • FULLY SOUND WRAP AND ENCASE ALL HYDRAULIC SERVICES ABOVE BEDROOM CEILINGS (SOUs) AND IN WALLS TO ACHIEVE Rw 45 RATINGS. • FULLY ACOUSTIC SEAL ALL PENETRATIONS AND BULKHEADS TO CEILING / SLAB SOFFITES. • ALL REQUIRED SOUND RATED WALLS SHALL BE EXTENDED TO AND FULLY ACOUSTICALLY SEALED AGAINST SLAB SOFFITES OR ROOF CLADDING. • ALL REQUIRED SOUND RATED WALLS THAT ARE NOT FULLY ACOUSTICALLY SEALED TO SLAB SOFFITES OR ROOF SHALL HAVE ACOUSTIC INSULATION INSTALLED TO THE ENTIRE CEILING AND TO EXTEND 1000 BEYOND THE UNSEALED WALLS. • CEILING ACOUSTIC INSULATION IS TO ACHIEVE THE SAME INSULATION VALUE REQUIRED BY THE WALLS. • NO SERVICE ACCESS PANELS ARE TO BE PROVIDED IN BEDROOMS. • PROVIDE AND INSTALL ALL TRIMIND AND INDEPENDANT SUPPORT STRUCTURE FOR ALL CEILING MOUNTED SERVICES, FIXTURES AND FITTINGS. • ALLOW TO CO-ORDINATE WITH F.E.B.Q. AND ACOUSTIC REPORT
CONTRACTORS RESPONSIBILITY • THE PROVISION OF THESE DRAWINGS DOES NOT IN ANY WAY PRECLUDE THE CONTRACTORS RESPONSIBILITY TO COORDINATE, CHECK AND VERIFY ALL INFORMATION TO THE CONTRACTORS OWN SATISIFACTION INCLUSIVE OF: - BUILDING SETOUT - STRUCTURAL COORDINATION - SERVICES PENETRATIONS - SETDOWNS, HOBS, UPSTANDS AND THE LIKE - ALL OTHER ELEMENTS IMPACTING ON THE CONCRETE PROFILES PENETRATIONS • MORRISON DESIGN PARTNERSHIP DOES NOT IN ANY WAY WARRANT THAT ALL PENETRATIONS HAVE BEEN SHOWN ON THE CONCRETE PROFILE PLANS AND THE CONTRACTOR IS TO REVIEW, COORDINATE AND MAKE PROVISION TO SETOUT ALL PENETRATIONS REGARDLESS OF WHETHER OR NOT THEY ARE INDICATED ON THIS DOCUMENT.
CONDITIONS OF USE OF DOCUMENTATION Date
Details
2019-04-30 TENDER ISSUE 1 2019-05-17 TENDER ADDENDA 1 2019-10-03 TENDER ADDENDA 3
MDP MDP DT
Initials
GO GO GO
Checked
SMOKE WALLS
OFF FORM CONCRETE
3200mm CEILING/ BULKHEAD - PB-13
3000mm CEILING/ BULKHEAD - FR-PB-(2x)16
3000mm CEILING/ BULKHEAD - PB-13
2700mm CEILING/ BULKHEAD - FR-PB-(2x)16
2700mm CEILING/ BULKHEAD - PB-13
3000mm CEILING ACOUSTIC PANEL - ACP
2400mm CEILING/ BULKHEAD - MR-FR-(2x)16
2400mm CEILING/ BULKHEAD - MR-PB-13
2400mm CEILING/ BULKHEAD - FR-PB-(2x)16
2400mm CEILING/ BULKHEAD - PB-13
2235mm CEILING/ BULKHEAD - FR-PB-(x2)16
2100mm CEILING/ BULKHEAD - MR-FR-(2x)16
2100mm CEILING/ BULKHEAD - MR-PB-13
2000mm CEILING/ BULKHEAD - MR-PB-13
T3
REVISION NO.
PROJECT ARCHITECT: G.OLLERTON
DATE: 2018-05-17
SCALE: As indicated @ A1 DRAWN: Author
A1146
DRAWING NO.
3051
PROJECT NO.
REFLECTED CEILING PLAN - LEVEL 03
DRAWING:
168 NORTON ST, LEICHHARDT, 2040.
Uniting Norton St ILU's
PROJECT:
This drawing is based on information supplied by others, and must not be relied upon unless checked against site conditions.
©Copyright These drawings and designs and the copyright thereof are the property of Morrison Design Partnership Pty. Ltd. and must not be altered, used, retained, or copied wholy or in part without the written permission of Morrison Design Partnership Pty. Ltd. ACN 001 595 288.
Project Management
Client
TENDER ISSUE - NOT FOR CONSTRUCTION
NOTE: CEILING PENETRATIONS SHALL BE SEALED IN ACCORDANCE WITH THE REQUIMENTS OF THE ACOUSTIC CONSULTANT.
TYPE 3 (LEVEL 4 ONLY): CEILING LINING AS SHOWN. 150mm ROCKWOOL (14kg/m3) BATTS OVERLAYING ENTIRE CEILING.
TYPE 2: 2 X 13MM CSR SOUNDCHEK WITH MIN. 50mm GLASSWOOL (11kg/m3) BATTS OVERLAYING ENTIRE CEILING. PENETRATIONS FOR ACCESS PANELS AND RECESSED LIGHTING ETC. TO BE Rw35 ACOUSTIC RATED.
TYPE 1: 13MM CSR SOUNDCHEK WITH MIN. 50mm GLASSWOOL (11kg/m3) BATTS OVERLAYING ENTIRE CEILING. PENETRATIONS FOR ACCESS PANELS AND RECESSED LIGHTING ETC. TO BE Rw30 ACOUSTIC RATED.
ACOUSTIC INSULATION NOTES
OFC
LEGEND:
Morrison Design Partnership Pty. Limited accept no responsability for the usability, completeness or accuracy of data transferred electronically. Recipients should when necessary request a hard copy version for verification. This drawing shall be read in conjunction with all architectural and other Consultants drawings and specifications and with such other written instructions as may be issued during the course of the contract. Figured dimensions shall be taken in preference to scaling. All level, datum points and dimensions on this drawing shall be verified by the builder on site. All discrepancies shall be referred to the architect for direction before proceeding with any works. DO NOT SCALE THIS DRAWING.
GENERAL NOTES
Survey data included in this drawing is based on survey drawing and is provided for preliminary design purposes only. As this drawing is based on information supplied by others, reference must be made to original survey drawings verified against site conditions.
SURVEY NOTES
T1 T2 T3
Revision
jordanaugust
16
B1
TERRACE R3-113 PAV-1
A2
BED 2 R3-607 CPT-1
LIV. R3-602 TP-1
DIN. R3-601 TP-1
BALC. R3-611 PAV-1
B2
BALC. R3-612 PAV-1
STUDY R3-608 CPT-1
LDRY R3-609 CT-4
BALC. R3-511 PAV-1
BALC. R3-411 PAV-1
ENS. R3-606 CT-6
BATH R3-604 CT-6
ENS. R3-202 CT-6
BED 1 R3-610 CPT-1
BED 1 R3-510 CPT-1
BED 1 R3-401 CPT-1
KIT. R3-109 TP-1
ENS. R3-106 CT-6
WIR R3-105 CPT-1
BED 1 R3-102 CPT-1
KIT. R3-603 TP-1
UNIT 3-1
HALL R3-104 TP-1
UNIT 3-6
LIV. R3-108 TP-1
DIN. R3-107 TP-1
BED 3 / STUDY R3-103 CPT-1
BED 2 R3-101 CPT-1
A3
B3
BATH R3-203 CT-6
ENTRY R3-605 TP-1
ENS. R3-509 CT-6
BATH R3-704 CT-6
LDRY R3-508 CT-4
BED 2 R3-706 CPT-1
HALL R3-705 TP-1
LDRY R3-707 CT-4
BATH R3-507 CT-6
KIT. R3-502 TP-1
KIT. R3-409 TP-1
BATH R3-404 CT-6
LDRY R3-209 CT-4
HYD
KIT. R3-305 TP-1
ENTRY R3-708 TP-1
E
C
B5
BALC. R3-712 PAV-1
LIV. R3-711 TP-1
ENTRY R3-308 TP-1
CIRC. 2 R3-009 CPT-2
LOBBY R3-004 CPT-2
KIT. R3-710 TP-1
UNIT 3-7
DIN. R3-709 TP-1
CIRC. 1 R3-001 CPT-2
LDRY R3-307 CT-4
BED 2 R3-405 CPT-1
ENTRY R3-504 TP-1
BED 2 R3-505 CPT-1
STUDY R3-503 CPT-1
STUDY R3-407 CPT-1
ENTRY R3-406 TP-1
KIT. R3-207 TP-1
BED 1 R3-801 CPT-1
WIR R3-802 CPT-1
ENS. R3-886 CT-6
STUDY R3-310 CPT-1
DIN. R3-306 TP-1
UNIT 3-3
LIV. R3-301 TP-1
LIV. R3-206 TP-1
A6
BALC. R3-312 PAV-1
A5
BALC. R3-210 PAV-1
UNIT 3-2
B4
DIN. R3-408 TP-1
DIN. R3-506 TP-1
UNIT 3-5
BED 1 R3-701 CPT-1
WIR R3-702 CPT-1
LDRY R3-403 CT-4
DIN. R3-205 TP-1
ENTRY R3-208 TP-1
BED 2 R3-204 CPT-1
UNIT 3-4
LDRY R3-111 CT-4
ENTRY R3-112 TP-1
ENS. R3-703 CT-6
LIV. R3-501 TP-1
LIV. R3-410 TP-1
ENS. R3-402 CT-6
BATH R3-110 CT-6
BED 1 R3-201 CPT-1
A4
B6
BATH R3-804 CT-6
FIRE STAIR R3-005 CONC-SL
A7
BED 2 R3-806 CPT-1
HALL R3-805 TP-1
ENTRY LDRY R3-901 R3-807 TP-1 CT-4
BATH R3-309 CT-6
ENS. R3-304 CT-6
WIR R3-303 CPT-1
BED 2 R3-311 CPT-1
? ? ?
Above: Level 03 floor finishes plan for Norton project - tender documentation.
C11
C10
C9
C8
C7
C6
C5
C4
C3
C2
C1
A1
ENTRY R3-808 TP-1
KIT. R3-810 TP-1
B7
BALC. R3-812 PAV-1
LIV. R3-811 TP-1
UNIT 3-8
DIN. R3-809 TP-1
BED 1 R3-906 CPT-1
ENS. R3-905 CT-6
KIT. R3-902 TP-1
B8
BALC. R3-909 PAV-1
BATH R3-907 CT-6
LDRY R3-911 CT-4
DIN. R3-904 TP-1
BED 2 R3-908 CPT-1
UNIT 3-9
LIV. R3-903 TP-1
TERRACE R3-910 PAV-1
B9
E:\Revit Local Files\3051- Uniting Norton St (V20)_Daniel@mdpa.com.au.rvt
W-PROOF MEMBRANE
VIN-1
TP-1
PLANTER
PEBBLES
PAV-1
CT-EXT.
CT-8
CT-6
CT-4
CT-1
CPT-2
CPT-1
CONC-SL
CONC-BR
C-7
FLOOR FINISHES LEGEND Date
Details
2019-04-30 TENDER ISSUE 1 2019-05-17 TENDER ADDENDA 1
MDP MDP
Initials GO GO
Checked
T2
REVISION NO.
PROJECT ARCHITECT: G.OLLERTON
DATE: 2018-05-17
SCALE: As indicated @ A1 DRAWN: Author
A1156
DRAWING NO.
3051
PROJECT NO.
FLOOR FINISHES PLAN LEVEL 03
DRAWING:
168 NORTON ST, LEICHHARDT, 2040.
Uniting Norton St ILU's
PROJECT:
This drawing is based on information supplied by others, and must not be relied upon unless checked against site conditions.
©Copyright These drawings and designs and the copyright thereof are the property of Morrison Design Partnership Pty. Ltd. and must not be altered, used, retained, or copied wholy or in part without the written permission of Morrison Design Partnership Pty. Ltd. ACN 001 595 288.
Project Management
Client
TENDER ISSUE - NOT FOR CONSTRUCTION
GENERALLY • THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE COMPLETE ARCHITECTURAL DOCUMENTATION SPECIFICATION AND ALL OTHER CONSULTANTS DOCUMENTATION AND SPECIFICATIONS. • CONTRACTOR SHALL VERIFY AND CONFIRM ALL RELEVANT SITE AND DRAWING INFORMATION ON SITE PRIOR WORKS COMMENCE. • ANY DISCREPANCIES BETWEEN THE DRAWINGS AND SITE SHALL BE REPORTED TO THE SUPERINTENDENT FOR CLARIFICATION PRIOR TO UNDERTAKING ANY FINAL POURS AND CONSTRUCTION. • CONTRACTOR SHALL REFER TO ALL RELEVENT CONSULTANT DRAWINGS TO VERIFY ALL PENETRATION OPENING SIZES INCLUSIVE OF COLLARS, BRACKETS SEPERATION AND ANY OTHER REQUIREMENTS SPECIFIED IN THE DOCUMENTATION. • THE CONTRACTOR IS TO ENSURE THAT THE POSITION OF ALL PENETRATIONS ARE CORRECTLY LOCATED SUCH THAT THE POSITION OF THE FIXTURES/FITTINGS & THE LIKE IS AS PER THE ARCHITECTURAL PLANS.
CONTRACTORS RESPONSIBILITY • THE PROVISION OF THESE DRAWINGS DOES NOT IN ANY WAY PRECLUDE THE CONTRACTORS RESPONSIBILITY TO COORDINATE, CHECK AND VERIFY ALL INFORMATION TO THE CONTRACTORS OWN SATISIFACTION INCLUSIVE OF: - BUILDING SETOUT - STRUCTURAL COORDINATION - SERVICES PENETRATIONS - SETDOWNS, HOBS, UPSTANDS AND THE LIKE - ALL OTHER ELEMENTS IMPACTING ON THE CONCRETE PROFILES
CONDITIONS OF USE OF DOCUMENTATION
Morrison Design Partnership Pty. Limited accept no responsability for the usability, completeness or accuracy of data transferred electronically. Recipients should when necessary request a hard copy version for verification. This drawing shall be read in conjunction with all architectural and other Consultants drawings and specifications and with such other written instructions as may be issued during the course of the contract. Figured dimensions shall be taken in preference to scaling. All level, datum points and dimensions on this drawing shall be verified by the builder on site. All discrepancies shall be referred to the architect for direction before proceeding with any works. DO NOT SCALE THIS DRAWING.
GENERAL NOTES
Survey data included in this drawing is based on survey drawing and is provided for preliminary design purposes only. As this drawing is based on information supplied by others, reference must be made to original survey drawings verified against site conditions.
SURVEY NOTES
T1 T2
Revision
portfolio2020
FG
FG
FG
CG
CG
1840
2810
FG
FG
CG
40 449
FG
WT44
WT36
FG
2720
WT09
200
FG
FG
CG
WT26
FG
1000
1301
WT15
5850
FG
FG
310
CG
FG
50
FG
4000
FG
920
50
WT37
2810
FG
2055
WT27
FG
FG
FG
WT45
2656
FG
WT10
3400
FG
FG
2656 2539
FG
FG
2674 1000
WT16
4780
WT28
CG
FG
WT03
1608
FG
2250
50
FG
FG
CG
WT38
FG
FG
FG
874
2716
310 2406
50
GL FG
CG
2436
50
2656
FG
875
WT29
CG
FG
590
WT11
3490
FG
875
50
FG
FG
GL
FG
FG
WT04
3010
2701
280
2450
450
3200
874
50
GL FG
FG
9295
920
875
610
FG
FG
CG
CG
WT49
FG
FG
FG
FG
WT50
WT51
WT52
50
1380
FG
FG
WT12
2700
WT05
FG
2245
874
DT43
AUTODOOR MECHANISM
FG
GL FG
GL FG
875
50
WT46
50
WT39
50
WT30
CG
FG
2674 1000
WT17
3450
FG
FG
FG
1550
50
GL FG
2686 875
WT31
CG
FG
1000
50
FG
GL
2706 1003
50
WT18
875
FG
300 2406 3016
2421
300
2364
300
310 2364
310 2364
2600 3460
3016
Above: Window schedule for Norton project - tender documentation.
40
WT25
FG
FG
550
FG
FG
2724
3200
2664
2664
1750
4350
2710
300 2356
300 2356
FG
3200
2710
610 2406
WT02
FG
3010
2364
275
725
750
950
600
2100 / 2610 LG
950
3460
467
293
2700
300
1800
900
300
1500
900
310
1600
800
WT01
725
2475
FG
FG
GL
FG
FG
874
2700
300 2356 2010 1000
600 810 600 1000 2101
FG
FG
WT06
2150
50
WT32
CG
FG
550
1393
FG
FG
2340
610
FG
FG
FG
CG
CG
FG
FG
3024
FG
FG
CG
CG
WT33
FG
2000
FG
2414
FG
WT40
WT19
FG
FG
FG
WT13
4780
2690
FG
2710
970
WT47
4890
WT20
FG
WT07
3400
2656
CG
FG
FG
300 1608
WT41
2356
610
2406
600
2100
600 2100
600 1460 950
2414
800
2400
447 313 2700
600 1460 950
FG
2333
2095
FG
636
200 2400
348 2338
300 1600 810
3060
2642
310 1450 950
300 1600 800
2676
2700
600 2100 2700
338 2338
600 2100
363 1600 727
FG
300 1600 800
1750
3200
WT34
CG
FG
685
WT21
1600
3024 3076
610 2414 4150
FG
FG
FG
WT14
394 2683
600
850
2288
WT35
CG
1000
WT22
FG
FG
3490
WT08
FG
CG
FG
CG
WT48
FG
3530
FG
WT42
1810 285 1640 785
610 1400 1000
2920
3200
2450
203
2134
665 1685 850
2710 300 2450 450
590
WT23
FG
355 405
2750
3460
17
2700
FG
FG
530
CG FG
WT43
920
CG
FG
WT24
1116
E:\Revit Local Files\3051- Uniting Norton St (V20)_Daniel@mdpa.com.au.rvt
50
950 1740 / 1800
2750
Date
Details 2019-04-30 TENDER ISSUE 1 2019-05-17 TENDER ADDENDA 1
MDP MDP
Initials
GO GO
Checked
FIXED GLASS COLOURBACK GLASS GLASS LOUVRES
T2
REVISION NO.
PROJECT ARCHITECT: G.OLLERTON
DATE: 2018-05-17
SCALE: As indicated @ A1 DRAWN:
A1810
DRAWING NO.
3051
PROJECT NO.
WINDOW SCHEDULE
DRAWING:
168 NORTON ST, LEICHHARDT, 2040.
Uniting Norton St ILU's
PROJECT:
This drawing is based on information supplied by others, and must not be relied upon unless checked against site conditions.
©Copyright These drawings and designs and the copyright thereof are the property of Morrison Design Partnership Pty. Ltd. and must not be altered, used, retained, or copied wholy or in part without the written permission of Morrison Design Partnership Pty. Ltd. ACN 001 595 288.
Project Management
Client
TENDER ISSUE - NOT FOR CONSTRUCTION
FG CG GL
NOTES:
1. THE WINDOW CONTRACTOR SHALL DETERMINE AND INSTALL ALL WINDOW / DOOR COMPONENTS TO FULLY COMPLY WITH THE SITE TERRAIN EXPOSURE CATEGORY. 2. ALL GLAZING, FABRICATION AND INSTALLATION SHALL BE IN ACCORDANCE WITH AS 1288 AND AS/NZS 4667. EXTERNAL GLAZING TO BE IN ACCORDANCE WITH SECTION "J" SCHEDULE REQUIREMENTS. ALL INTERNAL GLASS TO BE LAMINATED TYPE 'A' SAFETY GLASS. 3. EXTERNAL WINDOWS AND SCREENS TO BE AWS COMMERCIAL SERIES AS SPECIFIED, COMPLETE WITH SUB HEAD AND SILLS. ANODISED FIN. 4. ALLOW FOR VISUAL INDICATING BARRIER TO FULLHEIGHT GLAZING PANELS AS REQUIRED UNDER THE NCC AND AS1428.1 5. FRAMES TO BE FULLY SEALED TO SURROUNDING BUILDING FABRICK ON INSIDE AND OUTSIDE. 6. REFER TO THE SELECTION SCHEDULE FOR THE WINDOW AND ALUMINIUM DOOR FRAMING SYSTEMS. 7. HINGED GLAZED ALUMINIUM DOORS TO BE AWS COMMERCIAL SERIES AS SPECIFIED AND FITTED WITH STAINLESS STEEL BALL BEARING HINGES. ANODISED FIN. 8. AUTOMATIC ALUMINIUM FRAMED SLIDING DOORS SHALL BE DORMA EL-301 LOW PROFILE SERIES. 9. ALL EXTERNAL DOORS ARE TO BE FITTED WITH RAVEN WEATHER- ENERGY SEALING SYSTEMS. FIT RP8 Si SEALS INSIDE BASE OF DOOR FRAMES AND RP95 THRESHOLD PLATES BENEATH DOORS. FIT RP10 DOOR PERIMETER SEALS. 10. FIT "CRIMSAFE" SCREENS TO ALL DOORS TO TERRACES. 11. FIT FLYSCREENS TO ALL WINDOWS. 12. ALL WINDOWS AND DOORS TO BE LOCKABLE. DOORS TO BE KEYED TO THE FACILITY SECURITY BROACHING. 13. ALL WINDOW SILLS FOUR METRES OR GREATER ABOVE THE FINISHED GROUND LEVELS SHALL HAVE THE OPENING SASHES PERMINANTLY RESTRICTED TO A 120MM MAX. OPENING. 14. DOOR OPENINGS NOMINATED ON THE WINDOW SCHEDULE SHALL BE CLEAR UNOBSTRUCTED WIDTH AS PER DIAGRAM. 15. ALL DIMENSIONS ARE TO BE VARIFIED ON SITE PRIOR TO SHOP DRAWINGS BEING PRODUCED AND ANY FABRICATION TAKING PLACE. 16. SEE PLANS AND ELEVATIONS FOR DOOR SWINGS AND SLIDING SASH POSITIONS. 17. ALLOW TO CO-ORDINATE WITH THE F.E.B.Q. AND THE ACOUSTIC REPORT.
NOTES
Morrison Design Partnership Pty. Limited accept no responsability for the usability, completeness or accuracy of data transferred electronically. Recipients should when necessary request a hard copy version for verification. This drawing shall be read in conjunction with all architectural and other Consultants drawings and specifications and with such other written instructions as may be issued during the course of the contract. Figured dimensions shall be taken in preference to scaling. All level, datum points and dimensions on this drawing shall be verified by the builder on site. All discrepancies shall be referred to the architect for direction before proceeding with any works. DO NOT SCALE THIS DRAWING.
GENERAL NOTES
Survey data included in this drawing is based on survey drawing and is provided for preliminary design purposes only. As this drawing is based on information supplied by others, reference must be made to original survey drawings verified against site conditions.
SURVEY NOTES
T1 T2
Revision
jordanaugust
18
WEST ELEVATION
SCALE 1 : 100
FBK-01
B1
W212 CW09
ACR-02
FBK-01
ACR-02
WG35 WT58
W113 WT65
A1
ACR-01
ACR-01
A2
WG36 WT08
W174 WT11
W275 WT32
BAL1
LOV1
BAL1
LOV1
FBK-01
W363 WT06
WG41 WT59
W276 WT31
W453 W454 WT18 WT32
B2
BAL1
LOV1
BAL1
WB-01
W277 WT32
LOV1
WG42 WT23
W181 WT29
W364 WT06
W455 WT24
A3
LOV1
WG43 WT02
LOV1
W182 WT01
W365 WT06
W456 WT18
ACR-01
ACR-01
W281 WT33
W457 WT31
LOV1
B3
W458 WT31
BAL1
LOV1
FT1
WL11 WT20
ACR-02
WG45 WT58
ACR-01
LOV1
W371 WT06
A4
WL12 WT20
B4
W285 WT33
WG51 WT58
W372 WT06
DT06
WL14 WT01
WB-01
DT06
BAL1
WG52 CW02
BAL1
LOV1
W286 WT34
W373 WT35
WB-01
ACR-02
WL22 WT20
LOV1
ACR-01
WG53 WT02
FBK-01
A6
LOV1
ACR-01
W192 WT01
LOV1
W291 WT33
W374 WT01
WL21 WT20 ACR-02
LOV1
A5 B5
Above: West material elevation for Norton project - tender documentation.
1
BASEMENT 2 25200
LEVEL 04 FCL 47900
ROOF LEVEL 48900
MAX BUILDING HEIGHT 50400
1500
1000
WL24 WT01
WG55 WT58
WT01
W1101LOV1
WG61 WT02
WL31 WT01
ACR-01
FT1
W382 WT01
W295 CW07
WL33 CW01
BAL1
WG62 CW03
BAL1
BAL1
A7
W294 WT01
ACR-01
LOV1
ACR-02
LOV1
LOV1
ACR-01
ACR-02
W293 WT04
W381 WT01
B6
W383 WT35
WG63 WT58
W296 WT33
WL34 WT27
WB-01
ACR-02
FBK-01
W384 WT01
B7
WG71 WT58
W2101 WT33
FT1
BAL1
BAL1
WL42 CW01
BAL1
WG72 LOV1 CW04
W1111 CW08
LOV1
W205 CW10
LOV1
W391 WT01
WG73 WT02
W1112 WT01
W2103 WT01
ACR-01
LOV1
ACR-01
LOV1
ACR-01
B8
W1121 WT64
DT17
ACR-01
WG81 WT38
WB-01
W392 WT32
ACR-02
WLW1 WT36
WG82 WT36
W1122 WT64
KEY PLAN
ACR-01
FBK-01
W394 WT35
ACR-01
ACR-01
LOV1
B9
1
A1214
Date
Details 2019-04-30 TENDER ISSUE 1 2019-05-17 TENDER ADDENDA 1 2019-10-03 TENDER ADDENDA 3
GENERALLY • THESE DRAWINGS SHALL BE READ IN CONJUNCTION THE COMPLETE ARCHITECTURAL DOCUMENTATION SPECIFICATION AND ALL OTHER CONSULTANTS DOCUMENTATION AND SPECIFICATIONS AND SCHED • PROVIDE CONTROL JOINTS IN EXTERNAL STRUCTU AS PER THE STRUCTURAL ENGINEER'S DRAWINGS. • FIRE SEAL ALL EXTERNAL CONTROL JOINTS WITH F MATERIALS PRECOLOURED TO MATCH THE FINISHE ADJACENT TO THE JOINT. • INSTALL CONTROL JOINTS IN ALL EXTERNAL FINISH MATERIALS IN ACCORDANCEWITH THE MANUFACTU DOCUMENTED REQUIREMENTS. SEAL ALL EXTERNAL CONTROL JOINTS WITH COMP FLEXIBLE MATERIALS PRECOLOURED TO MATCH TH FINISHED FABRIC ADJACENT TO THE JOINT. • ALL EXTERNALLY MOUNTED SERVICES, FIXTURES A FITTINGS SHALL BE PAINT FINISHED.
CONTRACTORS RESPONSIBILITY • THE PROVISION OF THESE DRAWINGS DOES NOT IN PRECLUDE THE CONTRACTORS RESPONSIBILITY T COORDINATE, CHECK AND VERIFY ALL INFORMATIO CONTRACTORS OWN SATISIFACTION INCLUSIVE OF: - BUILDING SETOUT - STRUCTURAL COORDINATION - SERVICES PENETRATIONS - SETDOWNS, HOBS, UPSTANDS AND THE LIKE - ALL OTHER ELEMENTS IMPACTING ON THE CONCR PROFILES PENETRATIONS • MORRISON DESIGN PARTNERSHIP DOES NOT IN AN WARRANT THAT ALL PENETRATIONS HAVE BEEN S THE CONCRETE PROFILE PLANS AND THE CONTRA REVIEW, COORDINATE AND MAKE PROVISION TO SE PENETRATIONS REGARDLESS OF WHETHER OR NO ARE INDICATED ON THIS DOCUMENT
CONDITIONS OF USE OF DOCUM
Morrison Design Partnership Pty. Limited accept no res the usability, completeness or accuracy of data transfe electronically. Recipients should when necessary request a hard cop verification. This drawing shall be read in conjunction with all archit other Consultants drawings and specifications and wit written instructions as may be issued during the course Figured dimensions shall be taken in preference to scal All level, datum points and dimensions on this drawing by the builder on site. All discrepancies shall be referred to the architect for d proceeding with any works. DO NOT SCALE THIS DRAWI
GENERAL NOTES
Survey data included in this drawing is based on surve provided for preliminary design purposes only. As this drawing is based on information supplied by oth must be made to original survey drawings verified agai conditions.
SURVEY NOTES
T1 T2 T3
Revision
A1214
DRAWING NO.
3051
PROJECT NO.
T3
REVISION NO.
WEST MATERIAL ELEVATION - LANE
DRAWING:
168 NORTON ST, LEICHHARDT, 2040.
Uniting Norton St IL
PROJECT:
This drawing is based on information supplied by others not be relied upon unless checked against site conditi
©Copyright These drawings and designs and the copyright thereof of Morrison Design Partnership Pty. Ltd. and must not be al retained, or copied wholy or in part without the written Morrison Design Partnership Pty. Ltd. ACN 001 595 288.
Project Management
Client
TENDER ISSUE - NO CONSTRUCTIO
portfolio2020
jordanaugust
BEAM TO ENGINEERS DOCUMENTS. INFILL FRAMING AS REQUIRED. PURLINS TO ENGINEERS DOCUMENTS. COLORBOND METAL ROOFING AS SPECIFIED OVER SARKING AND 9mm COMPRESSED FIBRE CEMENT LINING.
PLASTER TO LANDSCAPE ARCHITECTS DETAILS
ACRYLIC RENDER AND PAINT FINISH AS SPECIFIED.
PAVERS ON PEDESTAL SUPPORT
WATERPROOF MEMBRANE BALC. R3-812
CONCRETE SLAB AND UPSTAND TO ENGINEERS DOCUMENTS
5
ANTI-CON ROOF BLANKET ON SUPPORT MESH AS SPECIFIED.
Sim
CEILING ZONE
RESILIENT CEILING SUSPENSION SYSTEM AS SPECIFIED.
A1410
ACOUSTIC INSULATION AS SPECIFIED
RL 48.200
PAINT FINISH TO SOFFIT
16mm (2x) FYRECHEK PLASTERBOARD CEILING LINING. FINISH AS SPECIFIED.
DRIP GROOVE
2x 13mm PLASTERBOARD WALL LINING ON STEEL WALL FRAMING. FINISH AS SPECIFIED. TIMBER REVEAL LINING AND ARCHITRAVE. FINISH AS SPECIFIED.
ALUMINUM SUB-HEAD
LIV. R4-401
DOUBLE GLAZED WINDOW SUITE AS SPECIFIED.
1
A1403
NOTE: FINISHES / LININGS AND TRIMS AS SCHEDULED
SECTION DETAIL - BALCONY SLAB EDGE SCALE 1 : 10
5
A1403
PRECAST PAVERS ON PEDESTAL PADS.
ALUMINIUM SCREENS FIXED TO BALUSTRADE
BALC. R2-911
6
WATERPROOF MEMBRANE
SECTION DETAIL - EAVES PROJ SCALE 1 : 10
Sim
A1419
5
Sim
A1410 DRIP GROOVE PAINT FINISH AS SPECIFIED TO SOFFIT BRICK VENEER AS SPECIFIED
CEILING ZONE
WEEPHOLE LINTEL TO ENGINEERS DOCUMENTS
FFL 38000
RENDER AND PAINT FINISH AS SPECIFIED.
CONCRETE SLAB AND UPSTAND TO ENGINEERS DOCUMENTS.
SEALANT WINDOW SUITE AS SELECTED
ALUMINIUM BOX SECTION WINDOW SURROUND
2
A1403
SECTION DETAIL WINDOW HEAD/SLAB EDGE SCALE 1 : 10
WINDOW SUITE AS SCHEDULED 150x50 BOX FRAME SECTION
LEVEL 04 FCL 47900 ALUM. SUB-HEAD
SUB-SILL SEALANT WEEPER COURSE CAVITY FLASHING CONCRETE HOB BED 1 RG-509
METAL FLASHING
NOTE: FINISHES / LININGS AND TRIMS AS SCHEDULED
WEEPER COURSE
LIV. R4-401
RENDER AND PAINT FINISH AS SPECIFIED.
DRIP GROOVE
Sim
5 A1410
Adjacent: Slab edge section details for Norton project - tender documentation.
3
A1403
SECTION DETAIL - SILL/SLAB EDGE SCALE 1 : 10
DOUBLE GLAZING TO ACOUSTIC REQ. 100X50mm MIN. REBATE TO SUIT DOOR SUITE BED 1 RL-207 FLOOR FINISH AS SPECIFIED.
FLUSH ALUM. DOOR SILL
CEILING ZONE
PRECAST PAVERS ON PEDESTAL PADS.
TERRACE RL-208
WATERPROOF MEMBRANE
PLASTERBOARD CEILING LINING ON SUSPENSION SYSTEM AS SPECIFIED.
ALUM. SUB-HEAD BASEMENT 2 CARPARK RB-001
19
CONCRETE COLUMN/SLAB TO STRUCTURAL ENGINEERS DOCUMENTS
100X50mm MIN. REBATE TO SUIT DOOR SUITE FLOOR FINISH AS SPECIFIED.
CONCRETE SLAB TO ENGINEERS DOCUMENTS.
PAINT FINISH TO SOFFIT AS SPECIFIED.
ALUMINIUM FRAMED SLIDING DOOR SUITE. DOUBLE GLAZING TO ACOUSTIC REQUIREMENTS.
LIV. R3-501
portfolio2020
350
BOUNDARY
SLAB EDGE BELOW
150x50 ALUMINIUM BOX SECTION
FACE BRICK VENEER
BRICK VENEER. RENDER AND PAINT FINISH AS SPECIFIED.
BALUSTRADE WALL
150
SEALANT ON COMPRESSIBLE FOAM BACKING ROD.
SLAB EDGE BELOW
COLORBOND FLASHING
BRICK VENEER. RENDER AN PAINT FINISH AS SPECIFIED.
SARKING
BALUSTRADE WALL
GLASS BALUSTRADE AND HANDRAIL
GLASS BALUSTRADE AND HANDRAIL
DOUBLE GLAZED ALUMINIUM WINDOW SUITE
FACE BRICK VENEER
INSULATION
D WALL EL WALL
STEEL WALL FRAME
SEALANT ON COMPRESSIBLE FOAM BACKING ROD.
TIMBER / MDF REVEAL. MITRE JOINT. FINISH AS SPECIFIED.
CRETE NEERS
SARKING
PAVERS ON PEDESTAL SUPPORTS
PACKING AS REQUIRED.
PAVERS ON PEDESTAL SUPPORTS
DOUBLE GLAZED ALUMINIUM SLIDING DOOR SUITE
C1
C1 PLAN DETAIL - WALL / FACADE COLUMN LEVEL 1 / LEVEL 2
2
A1104
SCALE 1 : 5
BALC. R1-211
A5 9mm COMPRESSED FIBRE CEMENT CLADDING ON STEEL WALL FRAMING. FINISH AS SPECIFIED.
OW
EW5
RENDER AND SPECIFIED.
BALC. R1-308
ALL
INTUMESCENT SEALANT FACE BRICK VENEER
PAVERS ON PEDESTAL SUPPORTS
EW1a NON-COMBUSTIBLE SARKING
SEALANT ON COMPRESSIBLE FOAM BACKING ROD DOUBLE GLAZED ALUMINIUM SLIDING DOOR SUITE
3
A1104
16mm FYRECHEK WALL LINING
20 MAX.
PLAN DETAIL - COLUMN / LEVEL 1 / LEVEL 2 SCALE 1 : 5
PAVERS ON PEDESTAL SUPPORTS
ADE AND
INTUMESCENT SEALANT SEALANT ON COMPRESSIBLE FOAM BACKING ROD DOUBLE GLAZED ALUMINIUM SLIDING DOOR SUITE
INSULATION 13mm PLASTERBOARD ON STEEL WALL FRAMING.
LIV. R1-401
MPRESSIBLE ROD.
TIMBER ARCHITRAVE & REVEAL LINING. FINISH AS SPECIFIED. 16mm FYRECHEK PLASTERBOARD WALL LINING WRAPPED CONTINUOUSLY AROUND WALL. FINISH AS SPECIFIED.
INSULATION 13mm PLASTERBOARD ON STEEL WALL FRAMING. FINISH AS SPECIFIED.
5
A1104
ACOUSTIC INSULATION AS SPECIFIED.
BED 1 R1-302
EW6 MASTIC SEALANT ON COMPRESSIBLE FOAM BACKING ROD
Adjacent: Plan details for Norton project - tender documentation.
PLAN DETAIL - PARTY WALL JUNCTION LEVEL 1 / LEVEL 2
LIV. R1-510 INSULATION AS SPECIFIED.
SCALE 1 : 5
16mm FIRE RATED PLASTERBOARD WALL LINING ON STEEL WALL FRAMING. FINISH AS SPECIFIED.
KIT. R1-1202 ACOUSTIC INSULATION AS SPECIFIED.
BATH R1-1104
16mm FIRE RATED PLASTERBOARD WALL LINING ON STEEL WALL FRAMING IW1
6
A1103
PLASTERBOARD WALL LINING ON STEEL WALL FRAMING. FINISH AS SPECIFIED.
ACOUSTIC INSULATION AS SPECIFIED.
BRICK FINISHED PRE-C CONCRETE WALL TO ENGINEERS DOCUMEN
STEEL WALL FRAMING
B8
IW1b
C4
IW1b
TIMBER ARCHITRAVE & REVEAL LINING. FINISH AS SPECIFIED.
13mm PLASTERBOARD WALL LINING ON STEEL WALL FRAMING. FINISH AS SPECIFIED.
IW3 ACOUSTIC INSULATION AS SPECIFIED. 15mm PLYWOOD BLOCKING SUPPORT AS REQUIRED FOR JOINERY AND FIXTURES
16mm FIRE RATED PLASTERBOARD WALL LINING ON STEEL WALL FRAMING
6mm VILLABOARD FIBRE CEMENT SHEETING
2
TILE WALL FINISH AS SPECIFIED. WATERPROOFING MEMBRANE FLEXIBLE ANTI-MOULD WET AREA SEALANT. VERTICAL PVC CORNER FLASHING
A1417
20
DETA LEVE
jordanaugust
21
portfolio2020
Clockwise from top left: East elevation of building with main residential entry located at bottom left of image; corridor leading down to resident’s clubroom; central seating area of entry foyer; entry gallery viewed from main building entry.
22
jordanaugust
3051 CLUBROOM INTERIOR | TEXTURES, MATERIALS AND FINISHES
UNITING NORTON STREET LEICHHARDT
2019 10 17
3051 CLUBROOM INTERIOR | TEXTURES, MATERIALS AND FINISHES
UNITING NORTON STREET LEICHHARDT
2019 10 17
Top: Clubroom kitchen. Bottom: Clubroom sitting room. Opposite top: Typical unit kitchen. Opposite bottom: Clubroom private dining room.
23
portfolio2020
3051 PRIVATE DINING INTERIOR | TEXTURES, MATERIALS AND FINISHES
UNITING NORTON STREET LEICHHARDT
2019 10 17
24
jordanaugust
Adjacent: Ground floor community cafe.
25
portfolio2020
03 edinglassie Undertaken at Morrison Design Partnership Architects
Project Particulars Typology Location Estimated cost
Aged Care Facility Emu Plains, Sydney, Australia $30,000,000
Personal Contributions ++ ++ ++ ++ ++
Assisted extensively with interior design and joinery. Produced photorealistic renders for design exploration and communication. Assisted with development application/tender documentation. Attended client presentation meetings. General Revit modelling, family creation and documentation.
Project Description Edinglassie is a base build 3 storey, 100 bed aged care facility located in the far west Sydney suburb of Emu Plains. This project uses a ‘household’ model, whereby 20 bedrooms share a common living, dining and kitchen area, limiting the size of each household and promoting a sense of independence for the residents. Staff serve meals from each household kitchen, however residents are also encouraged to use these facilities whenever they desire. The ground floor of Edinglassie contains 1 household as well as a reception, cafe, hair salon, chapel, multi-function space, and various staff and back of house rooms. The top 2 floors contain 2 households each, bringing the total number of households to 5. The interior architecture of Edinglassie was a major focus for this project. The entry, reception, cafe and other community spaces all received a great deal of attention and detail to create a warm and welcoming facility. The household kitchens, living rooms, and dining rooms were all designed to meet the client’s design guide requirements, whilst also appearing modern and homely, so as to avoid the institutional look of many existing aged care facilities.
26
jordanaugust DG122 DT1b
0
CL
C
C
C
DG03 DT1
C
S
NOTE: ALL CORNER PROTECTION TO BE FULL HEIGHT AS PER DETAILS ON A1670
1752
EQ L EQ L EQ L EQ L EQ
C
C
C
DG122 DT1b
3300 C
C
C
C
C
C
C
EQ L EQ L EQ L EQ L EQ L EQ L EQ L EQ L EQ L EQ L EQ COS
FCL 3000 2700
800 SIGNAGE FFL
ALL BUTTONSCH-R
150
BULKHEAD
DG122 DT1b BULKHEAD
PB-6
ENTRY, RECEP
TV
GL
PB-5
DDO
DGPO
MATV
2400 TR-01
JOINERY
150
REV
DATE
T1
2018-09-27
1300 DGPO REFER A1604 FOR DIV-TIMB MATV/DDO DETAILS
CL
AMENDMENT
INITIALS
CHECK
TENDER ISSUE
GO
GO
CLIENT
PROJECT NO.
DRAWING NO.
3030
1 : 50
C
EQ L EQ
FCL 3000 2700
LIFT CALL BUTTONS FCL 2400
PB-1 PB-1
LOGO-01
PB-10
800
BULKHEAD
LOGO-02
PB-10
DGPO
DG127 DT10
CR CR
CP(B)
TV
GL
DIV-TIMB
DG122 DT1b
CL
1100 CR
BULKHEAD WT-5
C:\Users\glen\Documents\3030 - Uniting-Edinglassie Village_(V17)_mdpa1969.rvt
WT-5
DG122 DT1b
TR-01
DIV-TIMB FIXED TO CTR OF COFFERED CEILING PERIMETER
DDO
TR-01B
FFL
TR-01B
IFT CALL BUTTONS
3 DRAWING TITLE
ENTRY, RECEP
REBATE WINDOW FRAMES AND PB TRIM REVEALS
GL
MATV
GREY DARK TINTED GLASS WINDOWS WITH 152 152 RECESSED FRAMES CL CL
Adjacent: Interior drawings for entry/reception of Edinglassie project - tender documentation.
1300 DGPO MATV/DDO
GL-078 ENTRY 3
SCALE 1 : 50
REV
DATE
AMENDMENT
INITIALS
CHECK
T1
2018-09-27
TENDER ISSUE
GO
GO
PROJECT NO.
3030
SCALE
he copyright thereof are the property of Morrison Design Partnership Pty. Ltd. and must not be used retained or copied without the written permission of Morrison Design Partnership Pty. Ltd. ACN 001 595 288.
nts\3030 - Uniting-Edinglassie Village_(V17)_mdpa1969.rvt
27
1460
ENTRY, RECEP
© Copyright These drawings and designs and the copyright thereof are the property of Morrison Design Partnership Pty. Ltd. and must not be used retained or copied without the written permission of Morrison Design Partnership Pty. Ltd. ACN
1200 DGPO/DDO/MATV
PB-5
WESTERN HIGHWAY & EMERALD ST EMU PLAINS
DRAWING TITLE
Author
COFFERED BULKHEAD
REBATE STEEL DOOR FRAMES & TURN WT-5 INTO REVEALS
NGLASSIE RESIDENTIAL AGED CARE
T1
1 : 50 @ A3
G.OLLERTON PROJECT PRINCIPLE CNR OF GREAT WESTERN HIGHWAY & EMERALD ST EMU PLAINS 2018-04-24 2750 DATE
ht thereof are the property of Morrison Design Partnership Pty. Ltd. and must not be used retained or copied without the written permission of Morrison Design Partnership Pty. Ltd. ACN 001 595 288.
01
REVISION
A1602
SCALE PROJECT
UNITING EDINGLASSIE RESIDENTIAL AGED CARE
0 - Uniting-Edinglassie Village_(V17)_mdpa1969.rvt
FFL
EQ EQ EQ EQ EQ EQ EQ CSCALE CL CL CL CL CL CL 1CL: 50 CLCOSCL L
DRAWN
LIFT BY OTHERS
TR-01
LIFT CALL BUTTONS
GL-078 ENTRY EQ EQ EQ 3EQ CL
DG122
SIGNAGE: DT1b White back-lit acrylic box lettering to front. Side panels in pink acrylic to match "UNITING" brand collateral. Discrete fixing to screen. EPS file to provided by client.
TR-01B
DIV-TIMB
GREY DARK TINTED TR-01 GLASS WINDOWS WITH 152 152 RECESSED FRAMES CL CL
REBATE STEEL DOOR FRAMES & TURN WT-5 INTO REVEALS
COFFERED BULKHEAD
DG127 DT10
LOGO-01
TO LM-8LM-8 LM-8 LM-11SCREEN LM-11
REBATE WINDOW FRAMES AND PB TRIM REVEALS
LIFT BY OTHERS
PB-1
TR-01B
CL
STERN HIGHWAY & EMERALD ST EMU PLAINS
GL DG127 DT10
CR CR
DISP-GL
CP(B)
DIV-TIMB
FCL 2400
LOGO-02
1655 SIGNAGE
PB-10
3 GL-078 ENTRY 2 2 SCALE 1 : 50 GL-079 RECEP 1 1 SCALE
DRAWING TITLE
COFFERED BULKHEAD
BULKHEAD
LOGO-01
PB-10
FFL
LASSIE RESIDENTIAL AGED CARE
LIFT CALL BUTTONS
CL
FCL 3000 2700PB-1
FFL TV UNDER LOGO
FCL 3000 2700
BULKHEAD
1990 SIGNAGE WT-5
CP(B)
370 DISP-GLS 300 TROUGH 185
AB-R
PB-1
1100 CR
DG03 DT1
REFER LANDSCAPE ARCH DWGS FOR GREEN WALL DETAILS TR-01
PB-1
2100
RECEP GL-079
FLOOR BOX
BULKHEAD WT-5
FCL 2400
BULKHEAD
DG122 DT1b POWER / DATA
FF
NOTE: ALL CORNER PROTECTION TO BE TO CTR OF FULL HEIGHT AS PERDIV-TIMB DETAILSFIXED ON A1670 COFFERED CEILING PERIMETER
NG NI
6
LIFT BY OTHERS
TV UNDER LOGO
EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ CH-W CL C CL CL CLCOS CL CL CL CL CL CL DG02L WT1
E OP
R
REBATE STEEL DOOR FRAMES & TURN WT-5
FCL 2200INTO REVEALS
1100 CR
8
REFER A1604 FOR DIVTIMB DETAILS
DG127 DT10
REFER A1604 FOR DIV-TIMB DETAILS
150
FCL 3000 2700
CL
1
DIV-TIMB
EQ L EQ
FCL 3000 2700 FCL 2400
LOGO-02
5
RECEP GL-079
CALL BELL
C
LOGO-01
POWER / DATA FLOOR BOX
SCALE 1 : 50
C
LIFT CALL BUTTONS
FC SIGNAGE: White back-lit acrylic box lettering to front. Side panels in pink acrylic to match "UNITING" brand collateral. Discrete fixing to screen. EPS file to provided by client.
CH-R
CL
800 SIGNAGE
C
FC
GL-079 RECEP 1 1 SCALE 1 : 50 FLOOR PLAN - GROUND FLOOR
1460
C
EQ L EQ L EQ L EQ L EQ L EQ COS
REFER A1604 FOR DIVTIMB DETAILS
DG127 DT10
LOGO-02
200 2400
1460
LOGO-02
A
DG122 DT1b
COFFERED BULKHEAD
DG127 DT10 6
LOGO-01
ENTRY GL-078
CL
C
CONS-R
7
FV-1
CH-W
C
8
TAB-R
FFL
CL
1
LM-8 TO SCREEN TAB-COFJOINERY
CH-R
3300
LOGO-01 1655 SIGNAGE
BULKHEAD
CH-W TV UNDER LOGO
4
3
CRPT-01
2100
POWER / DATA FLOOR BOX
2
1350 150
FCL 2400
RECEP GL-079
1990 DIV-TIMB SIGNAGE
CL
5
GREEN WALL TROUGH AS PER ARCH DWGS
1200 DGPO/DDO/MATV
REFER A1604 FOR DIVTIMB DETAILS
DG127 DT10
200
01
DRAWING NO.
A1602 1 : 50 @ A3
DRAWN
Author
PROJECT PRINCIPLE
G.OLLERTON
DATE
2018-04-24
REVISION
T1
portfolio2020
215
1900 PIN
FCL 3000 2700
BULKHEAD (DOOR CONTROLLER) BULKHEAD BULKHEAD
FCL 2400 FCL 2200
1905 PIN
FCL 3000
INDICATIVE OUTLINE OF GREEN WALL POTS. REFER LANDSCAPE ARCH DWGS FOR FURTHER DETAILS
BULKHEAD
BULKHEAD
PB-1
PB-1
FCL 2200
PB-5 COFFERED BULKHEAD
PB-6
1135 PIN
PIN-1
DECAL
GL
GL
TR-01 LM-8 LM-11
TR-01
4640
FFL
DGPO
1000 DGPO
CL
GL-078 ENTRY 4
4
BULKHEAD (DOOR CONTROLLER)
FFL
4
GL
DR
865 PIN
6
1135 PIN 865 PIN
800
LM-3 TO FRONT FACES ST-1
FFL
150
FFL
LM-14
6
150
300
1800 PB-6
300
50
PB-1
BULKHEAD
300
50
NO CO
400
PROJECT
DRAWING TITLE
UNITING EDINGLASSIE RESIDENTIAL AGED CARE
ENTRY, RECEP ELEVATIONS
DR
DR
CL
LM-14 LM-14 ENTRY
REV
DATE
AMENDMENT
T1
2018-09-27
TENDER ISSUE
ST-1 INITIALS GO
ST-1
LM-8 LM-11
ST-1 ST-1
5
FFL
DRAWN PROJECT DATE
ST-1
LM-14 FFL
RECEPTION DESK 2
7 8
8
SCALE 1 : 20
RECEPTION DESK SCALE 1 :
RECEPTION DESK 3
NOTE: REFER CORNER PRO
SCALE 1 : 20
50
G EDINGLASSIE RESIDENTIAL AGED CARE DGPO RECESSED GREAT WESTERN HIGHWAY & EMERALD ST EMU PLAINS RECESSED DGPO
DRAWING TITLE NOTE: REFER TO A1670 FOR FULL HEIGHT PROTECTION DETAILS UNITING EDINGLASSIE CORNER RESIDENTIAL AGED CARE- CP(BENTRY, RECEP ELEVATIONS
PROJECT
ENTRY, RECEP ELEVATIONS
REV
DATE
ST-1 CNR OF GREAT WESTERN HIGHWAY & EMERALD ST EMU PLAINS PROJECT NO. DRAWING NO. REVISION 2750 AMENDMENT INITIALS CHECK
T1
2018-09-27
TENDER ISSUE
GO
3030
GO
A1603
T1
© Copyright As indicated @ A3 SCALE These drawings and designs and the copyright thereof are the property of Morrison Design Partnership Pty. Ltd. and must not be used retained or copied without the written permission of Morrison Design Partnership Pty. Ltd. ACN 001 595 288.
REV
DATE
AMENDMENT
INITIALS
CHECK
T1
2018-09-27
TENDER ISSUE
GO
GO
PROJECT NO.
3030
SCALE DRAWN PROJECT PRINCIPLE DATE
C:\Users\glen\Documents\3030 - Uniting-Edinglassie Village_(V17)_mdpa1969.rvt Author DRAWN
DGPO
designs and the copyright thereof are the property of Morrison Design Partnership Pty. Ltd. and must not be used retained or copied without the written permission of Morrison Design Partnership Pty. Ltd. ACN 001 595 288.
n\Documents\3030 - Uniting-Edinglassie Village_(V17)_mdpa1969.rvt
PROJECT PRINCIPLE
G.OLLERTON
DATE
2018-04-24
ST-1
ST-1
LM-14 ST-1
FFL
FFL
LM-14
7
RECEPTION DESK 2
GLASSIE RESIDENTIAL AGED CARE
ESTERN HIGHWAY & EMERALD ST EMU PLAINS
8
SCALE 1 : 20
Adjacent: Interior drawings for entry/reception of Edinglassie project - tender documentation.
RECEPTION DESK 3 SCALE 1 : 20
NOTE: REFER TO A1670 FOR FULL HEIGHT CORNER PROTECTION DETAILS - CP(B DRAWING TITLE
ENTRY, RECEP ELEVATIONS
right thereof are the property of Morrison Design Partnership Pty. Ltd. and must not be used retained or copied without the written permission of Morrison Design Partnership Pty. Ltd. ACN 001 595 288.
3030
SCALE
150
SCALE 1 : 20
DRAWING TITLE
PROJECT
ST-1
LM-14
RECEPTION DESK 1
CLIENT
CHECK
GO
C:\Users\glen\Documents\3030 - Uniting-Edinglassie Village_(V17)_mdpa1969.rvt
SCALE 1 : 50
FFL
RECEPTION
8
SCALE 1 : 20
DGPO DR
400
ST-1
SCALE 1 : 50
RECEPTION DESK 2
DR
SCALE 1 : 20
50
FFL
DR
GL-078
5
ST-1
LM-14
CL
DR
RECEPTION DESK 2
7
7
INDICATIVE OUTLINE OF GREEN WALL POTS. REFER LANDSCAPE ARCH DWGS FOR FURTHER DETAILS
PB-6
TR-01B
1000 DGPO
LM-8 LM-11
GL-078 ENTRY 5
5
LM-14
DR
PIN-1
DR
TR-01B
150
300
TR-01
FFL
DGPO
DGPO CNR OF GREAT WESTERN HIGHWAY & EMERALD ST EMU PLAINS ST-1 RECESSED 2750 RECESSED DR DGPO PB-6 DGPO © Copyright DG03 These are the property of Morrison Design Partnership Pty. Ltd. and must not be used retained or copied without the written permission of Morrison Design Partnership Pty. Ltd. ACN 001 595 288. DR drawings and designs and the copyright thereof DT1
DR
FFL
ST-1
ST-1
BULKHEAD
DG02 WT1
300
TR-01 LM-8 LM-11
ST-1
DR
185
GL
100
DR
PB-6
300 TROUGH
RECESSED PB-5 DGPO
DR
LM-8 LM-11
SCALE 1 : 20
DR
FFL
SCALE 1 : 50
CLIENT
DURESS DGPO BUTTON
ST-1
PB-6
PIN-1
1000 DGPO
ST-1
50 300 50 RECESSED DGPO
RECESSED DGPO
ST-1
DR
GL-078 ENTRY 5
PB-1
DECAL
PB-6 TR-01
ST-1
DG02 WT1
DGPO
RECESSED DGPO
DG03
DT1 TR-01 LM-8 LM-11
GL
LM-14
FCL 2200
ECAL
RECESSED PB-5 DGPO PB-6
4640
BULKHEAD
400
DECAL
DR DR
GL
DR
TR-01B
5
BULKHEAD
1905 RECEPTION DESK 1 PIN
PB-1
GL
DR
GL
DR
1000 SCALE 1 : 50 DGPO CL
215
BULKHEAD
PIN-1
GL-078 ENTRY 4
FCL 3000
PB-6
DECAL
DR
DGPO
150
OLLER)
DECAL
DR
DR
CL
PB-6
400
GL
INDICATIVE OUTLINE OF GREEN WALL POTS. REFER LANDSCAPE ARCH DWGS FOR FURTHER DETAILS
FCL 2200 50
300
1135 PIN 800
865 PIN
LM-3 TO FRONT FACES FFL
TR-01
DECAL
156
DGPO DR
300
PB-6
300
TR-01
PB-5
185
TR-01 LM-8 LM-11
DURESS BUTTON 185
1100 NC GL
100
GL
FFL
PB-6
300 TROUGH
PB-5
300 DGPO
DECAL
PIN-1 DG02 WT1 DR
GL
DG02 WT1
NC
GL
DECAL
GL
1800
50 PB-1
865 PIN
1135 PIN
GL
ST-1
1135 PIN
FCL 2200
RECESSED DGPO DG02 WT1
BULKHEAD
PB-1
PB-1
GL
INDICATIVE OUTLINE OF GREEN WALL POTS. REFER LANDSCAPE ARCH DWGS FOR FURTHER DETAILS
PB-5 COFFERED BULKHEAD
185
FCL 3000
BULKHEAD
PB-1
PB-1
100
FCL 2400 FCL 2200
BULKHEAD
BULKHEAD
300 TROUGH
BULKHEAD
BULKHEAD
BULKHEAD
300 TROUGH
D (DOOR CONTROLLER)
1905 PIN
FCL 3000
1905 PIN
300 TROUGH
215
CL
SCALE 1 : 50
215
1900 PIN
LM-8 LM-11
GL-078 ENTRY 5
5
SCALE 1 : 50
FCL 3000 2700
TR-01B
300
GL
TR-01
300
GL
PB-6
300
DECAL
865 PIN
DECAL
100
185
DGPO
DG02 WT1
185
DECAL
156
GL
PB-5
PB-5
865 PIN
1100 NC
300 DGPO
GL
DG02 WT1
NC PIN-1
FFL
GL
300 TROUGH
1135 PIN
GL
REV
DATE
AMENDMENT
INITIALS
CHECK
T1
2018-09-27
TENDER ISSUE
GO
GO
PROJECT NO.
3030
DRAWING NO.
A1603
REVISION
T1
SCALE
As indicated @ A3
DRAWN
Author
PROJECT PRINCIPLE
G.OLLERTON
DATE
2018-04-24
030 - Uniting-Edinglassie Village_(V17)_mdpa1969.rvt
28
DRAWIN
A16
jordanaugust
GL-076 CAFE 2
x20 EQUAL BATTENS COS x20 EQUAL BATTENS COS 1062 50 350 50 530 50
PB-8 PB-8
DGPO DGPO
TAP-SNK
LM-11
FRZ 1350 BIN BIN
BWU
CDU
DW 2752 DGPO
DRW
50 BIN
PD
PB-1 TO BULKHEAD (SHOWN DASHED)
STRIP LIGHTING
CEILING BATTENS
ST-3
GL-076 CAFE 490 1 490
1
95
PB-8
ZONE FOR SIGNAGE
TAP-BWU WT-7 WT-8 TAP-SNK
OPEN
150
850
LM-8
DGPO
ST-3 ST-2
FFL
750
PB-8
CASH PB-8
COF-COM
LM-12 TO S OF BULKH
OPEN SHELVES RECESSED LED
700 150 50 700 655 5050 485 18 18 50
50
1110
PB-8
ELVES OPEN SH
PB-8
SB-3
20050 TR-01
50
BENCH MOUNTED PB-1 TO CEILING BULKHEAD GLASS CAKE DISPLAY BUTT JOINTED W/ SILICON SEALANT
COF-CO
WATERFALL EDGE TO CAFE RECEPTION (BOTH SIDES)
OPEN SLOT TO PUT HAND TOWELS IN BIN
ST-3
FFL 558
150
50
FFL
990
50
ST-3
630
655
120
PB-1
ST-3
18
EQ2 EQ2
750
PB-1
PB-8
SCALE 1 : 50
FCL 3000 2700
PB-8 PB-8 SB-3
GL-076 CAFE 3
485
LM-12 TO 'SUPAWOOD' CEILING BATTENS LM-12 TO SUPAWOOD CEILING BATTENS
507
OVERALL
EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ
PENDANT LIGHT (PD-3) LM-8
50
595
900
PB-1 TO BULKHEAD
950
523
355
50
LM-11
1847
3
SCALE 1 : 50
FCL 3000 2700
PB-1
LM-11
500
900
300 200
EQ1 EQ1 EQ1 750
558
2
LKHEAD
FFL
150
150
FFL
50
900
ST-3
630 SCALE 1 : 50 CL
840
GL
2
540 50
3
GL-076 CAFE 5
5
SCALE 1 : 50
SUPAWOOD CEILING BATTENS TO WRAP UP FRONT FACE OF CEILING BULKHEAD
75
FCL 3000 2700 PB-6 TO SIDE OF BULKHEAD
CNR OF GREAT WESTERN HIGHWAY & EMERALD ST EMU PLAINS 2750
CAFE ELEVATIONS 95
610
REV
DATE
AMENDMENT
INITIALS
CHECK
T1
2018-09-27
TENDER ISSUE
GO
GO
LM-8
95
BENCH MOUNTED GLASS CAKE © Copyright DISPLAY BUTT JOINTED W/ These drawings and designs and the copyright thereof are the property of Morrison Design Partnership Pty. Ltd. and must not be used retained or copied without the written permission of Morrison Design Partnership Pty. Ltd. ACN 001 595 288. ST-3 TO COUNTER SILICON SEALANT C:\Users\glen\Documents\3030 - Uniting-Edinglassie Village_(V17)_mdpa1969.rvt
DRAWING NO.
3030
A1609
655
Author
PROJECT PRINCIPLE
G.OLLERTON
DATE
2018-04-24
FRG-UB
ST-3
FRZ
850
ST-2
ST-3
FFL
150 200
4
T1
50
DRAWN
TR-01
FFL
REVISION
1 : 50 @ A3
SCALE
PB-1
120 485 630
PROJECT NO.
EQ2 EQ2
UNITING EDINGLASSIE RESIDENTIAL AGED CARE
LM-12 TO SUPAWOOD CEILING BATTENS
PB-1
750
PD-3
PB-1 TO CEILING BULKHEADTITLE DRAWING SHOWN DASHED
OP E NIN G
PROJECT
PB-1
800
1234
750
GL-076 CAFE 4
SCALE 1 : 50
x20 EQUAL BATTENS COS
FCL 3000 2700
LM-12 OF BU
355
FCL 3000 2700
RECESSED LED STRIP LIGHTING
PB-1 TO BULKHEAD
CLIENT
PROJECT
UNITING 1110
PB-1
SB-3 ST-3
CNR OF GREAT WESTERN HIGHWAY & EMERALD ST EMU PLAINS 2750
CAFE
COF
LM-11
20050
1
1350
2752
50
558
GL-076 CAFE 1
2
SCALE 1 : 50
SUPAWOOD CEILING BATTENS TO WRAP UP FRONT FACE OF CEILING BULKHEAD
ST-3
FFL
150
ST-3
900
WT-8
700
WT-7
ST-2
900
120
© Copyright These drawings and designs and the copyright thereof are the property of Morrison Design Partnership Pty. Ltd. and must not be used retained or copied without th
630 FFL
DRAWING
AGED CARE
WATERFALL EDGE C:\Users\glen\Documents\3030 - Uniting-Edinglassie Village_(V17)_mdpa1969.rvt ZONE FOR SIGNAGE TO CAFE RECEPTION (BOTH SIDES)
LM-8
150
G
75
FCL 3000 2700 PB-6 TO SIDE OF BULKHEAD
29
PB-1
LM-12 TO SUPAWOOD CEILING BATTENS
PB-1
LM-8
750
PD-3
PB-1 TO CEILING BULKHEAD SHOWN DASHED IN G
Adjacent: Interior drawings for cafe of Edinglassie project - tender documentation.
CASH
COF-COM
BENCH MOUNTED GLASS CAKE DISPLAY BUTT JOINTED W/ EDINGLASSIE RESIDENTIAL 95 SILICON SEALANT
50 485
PENDANT LIGHT (PD-3)
PB-1 TO BULKHEAD (SHOWN DASHED)
485
LM-12 TO 'SUPAWOOD' CEILING BATTENS
430
430
COFFERED BULKHEAD COFFERED BULKHEAD REFER TO RCP REFER TO RCP
CIRC CIRC GL-058 GL-058
2400
2400
PB-1PB-1
DIV-TIMB DIV-TIMB
PB-8PB-8
DIV-TIMB DIV-TIMB
REFER A1604A1604 FOR FOR REFER DIV-TIMB DETAILS DIV-TIMB DETAILS
FV-1 FV-1
150
FFL FFL
DG92 DG92 DT10DT10
CH-BTH CH-BTH
TR-01 TR-01
150
DIMS AS PER OPP. SIDE
LM-3LM-3
TER LANTER
DIMS AS PER OPP. SIDE
DIV-TIMB
DIV-TIMB . DIMS AS PER . OPP. SIDE
-1UP-1 UP-2UP-2
BTH CH-BTH
COSCOS EQ EQ EQ EQ EQ EQ EQ EQ
G NIN OPE G NIN
CC2CC2
COSCOS EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ
FCL FCL 3000 27003000 2700
OPE
T
DIV-TIMB
CH-SIT CH-SIT
DIV-TIMB . DIMS AS PER . OPP. SIDE
portfolio2020
01700
02100
22
BER DIVIDING SCREEN TIMBER DIVIDING SCREEN DETAILED REFER A1604 AS DETAILED REFER A1604
GL-090 SITTING 11 GL-090 SITTING
SCALE 1 : 50 SCALE 1 : 50
LT-IN BANQUETTE BUILT-IN BANQUETTE NOTE: NOTE: TING- REFER TO TO SEATINGREFER ALL CP(a) & CP(b) CORNER PROTECTION ALL CP(a) & CP(b) CORNER PROTECTION STRUCTION DRAWINGS CONSTRUCTION DRAWINGS TO BE HEIGHT AS PER DETAILS ON ON TOFULL BE FULL HEIGHT AS PER DETAILS
PLANTER
FP
CH-BTH
1700
430 2400
1700
DIV-TIMB CH-BTH
NO. NO. INITIALS CHECKCHECKPROJECT PROJECT INITIALS
REV
DATE DATE REV
T1
2018-09-27 TENDER ISSUE ISSUE T1 2018-09-27 TENDER
AMENDMENT AMENDMENT
GO
GO GO
GHWAY & EMERALD ST EMU PLAINS HIGHWAY & EMERALD ST EMU PLAINS
GO
3030 3030
BUILT-IN BANQUETTE DRAWING NO. NO. REVISION DRAWING REVISION SEATINGREFER TO A1612 T1 A1612 T1DRAWINGS CONSTRUCTION
SCALESCALE
FCL 3000
1 : 50 @ 1 :A3 50 @ A3
DRAWN DRAWN
Author Author
PROJECT PRINCIPLE PROJECT PRINCIPLE
G.OLLERTON G.OLLERTON
COFFERED BULKHEAD REFER TODATE RCPDATE
ertyproperty of Morrison DesignDesign Partnership Pty. Ltd. and must not be used or copied without without the written permission of Morrison Design Design Partnership Pty. Ltd. ACN 001 595 288. he of Morrison Partnership Pty. Ltd. and must not beretained used retained or copied the written permission of Morrison Partnership Pty. Ltd. ACN 001 595 288.
PB-8
1027
WT-5
PB-1
PB-8
COFFERED BULKHEAD REFER TO RCP STUD WALL TO MATCH STRUCTURAL COLUMN OPP. SIDE OF SITTING ROOM
UP-1
FFL
TR-01
TR-01
3
FP
UP-2
TR-01B
LM-11
LM-3
2400 DIV-TIMB
CH-BTH UP-1 UP-2 LM-11
TR-01
PB-8
DIV-TIMB
DIV
LM-3
PB-1
UP-1
CH-BTH FFL
TR-01
LM-11
Adjacent: Interior drawings for communal sitting room GL-090 SITTING of Edinglassie project -SCALE31 : 50 4 tender documentation.
GL-090 SITTING 2
SCALE 1 : 50
CLIENT
REFER A1604 FOR DIV-TIMB DETAILS
900 CH-BTH 900 T.O. FP
LM-3
LM-3
150
CH-BTH
DIV-TIMB
DIV-TIMB
LM-3
CO
EQ EQ EQ
EQ EQ EQ EQ
FCL 3000 2700
PB-1
DG92 DT10
SCALE 1 : 50
NOTE: ALL CP(a) & CP(b) CORNER PROTECTION TO BE FULL HEIGHT AS PER DETAILS ON A1670
PD-2
PB-1
GL-090 SITTING 1
2018-04-24 2018-04-24
PD-2
2700 FCL 2750
2
TIMBER DIVIDING SCREEN AS DETAILED REFER A1604
430
SCALE 1 : 50
PB-1
FFL
DG92 DT10
2100
44 SCALE 1 : 50 SCALE 1 : 50 FLOOR PLAN - GROUND FLOOR
DRAWING TITLE DRAWING TITLE
LM-3
PLANTER
2100 GL-090 SITTING 33 GL-090 SITTING
1
DIV-TIMB
TR-01 UP-1 TR-01 UP-2
UP-2
LM-3
. DIMS AS PER OPP. SIDE
OP EN ING OP EN ING
DIV-TIMB
TR-01 TR-01
LM-3
DIV-TIMB
FV-1
150
UP-2 UP-1 UP-2 LM-11 LM-11 CH-BTH
RESIDENTIAL AGED CARE LOUNGE E RESIDENTIAL AGED CARE CAFE CAFE LOUNGE
nglassie Village_(V17)_mdpa1969.rvt g-Edinglassie Village_(V17)_mdpa1969.rvt
2400
CRPT-01
CH-BTH CH-BTH
CIRC GL-058
CC2
PB-1PB-1
UP-1UP-1
150
DIV-TIMB
1027
2400
T.O. FP
FFL FFL
LM-3LM-3 LM-3
CH-SIT
COFFERED BULKHEAD COFFERED BULKHEAD REFER TO RCP REFER TO RCP
TAB-SIT
2400
DIV-TIMB
COS
DIV-TIMB 2400 DIV-TIMB
900 CH-BTH 900 900 CH-BTH T.O. 900FP
TR-01 TR-01
EQ EQ EQ EQ
LM-11 LM-11
150
UP-2UP-2
150
DIV-TIMB
DIV-TIMB
UP-1UP-1
CAFE LOUNGE DIV-TIMB DIV-TIMB GL-090
TAB-SIT DIV-TIMB DIV-TIMB
REFER A1604A1604 FOR FOR REFER DIV-TIMB DETAILS DIV-TIMB DETAILS
3
PB-1PB-1
G NIN
CH-BTH CH-BTH
STUD WALL TO MATCH STRUCTURAL COLUMN OPP.
CH-SIT
2
OPE
LM-3LM-3
4
PB-8PB-8
STUDSTUD WALLWALL TO MATCH TO MATCH STRUCTURAL COLUMN OPP. OPP. STRUCTURAL COLUMN SIDE SIDE OF SITTING ROOMROOM OF SITTING
LM-3LM-3
CH-SIT
CH-SIT
COFFERED BULKHEAD COFFERED BULKHEAD REFER TO RCP REFER TO RCP
COS EQ EQ EQ
FCL 3000 2700
. DIMS AS PER OPP. SIDE
COSCOS EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ 430
10271027 EQ EQ EQ EQ EQ EQ EQ EQ
150
PB-1PB-1
8PB-8
EQ EQ EQ EQ EQ
430
PD-2PD-2
430
FCL FCL 3000 27003000 2700
430
A1670 A1670
PROJECT
DRAWING TITLE
UNITING EDINGLASSIE RESIDENTIAL AGED CARE
CAFE LOUNGE
CNR OF GREAT WESTERN HIGHWAY & EMERALD ST EMU PLAINS 2750
© Copyright These drawings and designs and the copyright thereof are the property of Morrison Design Partnership Pty. Ltd. and must not be used retained or copied without the written permission of Morrison Design Partnership Pty. Ltd. ACN 001 595 288.
C:\Users\glen\Documents\3030 - Uniting-Edinglassie Village_(V17)_mdpa1969.rvt
30
REV
DATE
AMENDMENT
T1
2018-09-27
TENDER ISSUE
jordanaugust
Top & bottom: Main entry green wall and glass plaques displaying the history of the area. Top - opposite page: Ground floor community sitting room. Bottom - opposite page: Ground floor cafe.
31
portfolio2020
32
jordanaugust
33
portfolio2020
Clockwise from top left: Household living room; typical resident’s bedroom; household sitting room; household kitchen/ servery.
34
jordanaugust
04 st columba Undertaken at Morrison Design Partnership Architects
Project Particulars Typology Location Estimated cost
Aged Care Facility Lane Cove, Sydney, Australia $37,000,000
Personal Contributions ++ Assisted with planning and design development. ++ Produced photorealistic renders for design exploration and communication. ++ Assisted with development application documentation. ++ Attended client presentation meetings. ++ General Revit modelling, family creation and documentation.
Project Description St Columba is an aged care facility project involving the partial demolition of an existing facility and significant building additions, creating a total of 141 bedrooms (41 existing, 100 new). Located in the leafy suburb of Lane Cove, Sydney, the site is surrounded predominantly by stand alone dwellings, so the scale of this building was a major consideration. To reduce the apparent scale of the building, lighter materials were chosen for the lower 2 storeys to stand out against the top floor which is clad in a dark recessive material. Additionally the facade is articulated with a series of brick and rendered elements at varying transparencies and shades to avoid monotony and create a more domestic appearance to the building.
35
TE
51.01
L
TE
SP
'00" 42°17 2.665
SP
2°11 1.27'00" 5
51.19
L
L
TE
L
SP
HY D
GA R
DEN
SV
ELEC
HY D
51.40
1
PATH
51.79
51.97
50.94
TN
2H
RA VE L
TR
LP
2H
TR
T9
PA TH
51. 0.6D6 05 S1
T12
TR 52. 0.7D1 23 5S 15H
52.11
51. 0.6D6 05 S1
T11
SCALE 1 : 200
H
G
52. 0.6D6 20 S6
TR
51.88
TR
51. 0.6D6 05 S1
T10
50.87
36
51. 0.6D6 05 S1
2H
P
50.83
52.47
SP
TM H
T8 TR 52. 0.8D8 25 S1
LP
4H
BRICK WALL
52. 1D10S 75 12
TR
52.14
EXISTING CHURCH
2H
FOOTPATH
T13 TR
EL
H
TL 52. 98
52.44
52.68
SP
82
IC
K
W
52.78
TK
53. 20
T6
L AL
TRT7 0.3D6 S8H
BR
T14
BRICK WALL
52.63 TR0.2 52. D4S1 70 0H
53.08
GR 52. ATE 40
52.49
GARDEN
.435
52.50
PAVED COURTYARD
64°39'20" 62.615
TR1D TO
50. 12S 70 16
50.84
LP
TR
53. 2H 27
20H
51.37
TR08D 6S1
53. 0.9D1 25 0S
T5
T15
PIT
TW
TR 51. 0.4D8 42 S1 5H
51.42
TP
TJ
LP
53.50
GR 53. ATE 46
51.39
TI
TW
T16
TH
Y ENTR
NT
T3
51.60
FY HD BO
T21 OS TE R
51.60 51.69
GARDEN
TG
T4
54.21
13' 20 "
TE
54. 98
55.55
T26
V
T28
T29
EL
P TE
L
GA
17
SM
.540
CONCRETE
55.76
55.91
N WIT O H HIN YDR 10 ANT m RE S O ST R B RIC OO TIO ST 55.45 N Z ERS ON E
T1
WIT NO V HIN EN 6m TILA RE TIO ST N S RIC YS TIO TE IM N Z MS 3m U ON RE M 2 E ST HO 55.38 RIC UR TIO FIRLAWN LV NZ E ELE ON RAT SU CT E ED BS RIC TA A TIO L N H MIN
H
SM
H 51.46
COURTYARD
51.91
51.73
51.35
T60
T62
FOOTPATH
T32
64°39'20"
TR1
TC 56. 75
T61
56.61
56.43
VE
HI
56.51
56.44
T33
TW
T34
GRAV EL OSS
IN
DRIVEWAY
G
TX
TR
51. 0.5D6 78 S1
FOOTPATH
64°39'20"
0H
T35
SM
H 51.95
T57
N
T58
B 346 58
LAWN
T59
1
57.13
0.3 D6 55. S8H 89
T55
H
56.51
2020-02-13
ISSUED FOR INFORMATION
57.49
57.48
57.47
0.4 D6 S6
56.14
AMENDMENT
57.26
TR
T54
P11
T51
TR
T36
52.05
ELEC
REV DATE
LAWN
EXISTING HOUSE
DP
T56
TR 0.9 55. D15S 83 15H
55.83
T37
PROPOSED BUILDING
CONCRETE
CR
57.08
56.67 56.81
56.88
CONCRETE CLE
T31
EXISTING TREES TO BE REMOVED
52.63
TR0.8 D10S 10H
TW
51.78 CONCRETE APPROXIMATE POSITION OF SEWER FROM DBYD RECORDS
T30
P
LOG RETAINING WALL
T53
REF.
52.21
EL
INITIALS
CHECK
UP
15.170
DP
34 555 56
G.OLLERTON 27.10.2016
PROJECT PRINCIPLE DATE
2
56.89
64°46'00"
As indicated @ A1 DRAWN
m²
33 555 56 12 40
DP
56.51
POOL
T42
P11
57.02
FOOTPATH
TS
TR
52. 1D6S1 49 0H
55.54
REVISION
T41
52.51
56.32
REF.
2
55. TR 67 1.0 D1 0S 12H
55.67
DA064
SINGLE STOREY BRICK RESIDENCE TILE ROOF No5
56.32
0H
244°39'20" 15.240
DRAWING NO.
57.22
56.91
55.48
T42a
52. 0.5D6 75 S1
TR
T39
CONCRETE
64°39'20" 15.240
SCALE
57.42
57.22
T43
56.55
55.66
55.53
52.41
COURTYARD
52.40
3108
57.47
TW
56.61
56.27
UP
T52
55. TR 3 0.4 D8 S1 2H
52.29
SITE AREA
PROJECT NO.
COVERED CONCRETE AREA
TIMBER PERGOLA
57.43
57.48
TW
T38
2H
64°39'20"
TR
TR
52. 0.6D6 05 S1
EASEMENT FOR SEWAGE PURPOSES OVER EXISTING LINE OF PIPES DP 555562
BIM 360://3108 - Uniting St Columba Lane Cove/3108 - Uniting St Columbia CENTRAL(V20).rvt
55.17
T27
51.34
TR 0.3 51. D6S8 51 91 H .54 TR 0.3 51. D6S8 51.94 91
T25
PROPOSED SITE PLAN
DRIVEWAY
DRAWING TITLE
55.34
CONCRETE
TD
55.33
GARDEN 51 .93
51.92
0.3 D6 S8 51. H 91
BRICK GARAGE
© Copyright These drawings and designs and the copyright thereof are the property of Morrison Design Partnership Pty. Ltd. and must not be used retained or copied without the written permission of Morrison Design Partnership Pty. Ltd. ACN 001 595 288.
3°
T2
T23
TR 0.2 51. D6S1 78 2H
GARDEN
51.78
51.81
TR
334°39'20" 46.110
11-15 FIG TREE STREET, LANE COVE LOT 2 DP184731 LOTS A, B, C & D DP385033 LOTS 1, 2 & 3 DP339444
10
51.78
H
51.28
58.630
UNITING St COLUMBA'S
54. 47
TF
T22
51.74
1.2 D1 8S 15H
LP
T24
51.78
51. TR 78 0.3 D6 S8 LP
TR 0.3 51. D6S8 28.650 78 H
51.22
CENTENNIAL AVENUE 64°39'20"
51.76
51.79
FOOTPATH
51.72
TR
51.71
GARDEN
EXISTING BUILDING
T20
TR 0.5 51. D1 2S 60 15H
51.53 51.53
APPROXIMATE POSITION OF SEWER FROM DBYD RECORDS
TR 0.5 51. D1 60 2S15H
T19
TR 51. 1D18S 60 15H
51.00 CONCRETE
TR EE ST RE ET
93
53.82
TR0.5 D8S8 53. H
53.79
TW
LP
VE
50.97
T17
GARDEN
ELEC
DEN
LP
GA R
51.35
TQ
FIG
H
53.63
T18
GA SM WM WM WM TR TR 51.0.3D6 51.0.3D6 42 S8 TR 42 S8 H 0.3 H 51. D6 42 S8H
53.45 TR0.4 53.6353.65 D4S8
PROJECT
LP
PIT
0.3 D6 S8 51. H 42
GARDEN
TR
50.89
334°39'20"
CLIENT
PROPOSED SITE PLAN
51.04
CONCRETE
50.92
EXIT
50.75
TE
34.720
C EN ARP TR AR Y/E K XIT
50.75
STAIRS
.25
TW
D6S8 H
54.00
53. 34
T40 TR0.8
154°39'20" 45.720
56
TW
56.75
51.50
'00" 5°48 5 30 2.51
53.19
52.64 52.67
53.34
8120 m²
54.75
EXISTING TREES RETAINED
portfolio2020
154°34'20" 1.505
DRIVEWAY
Adjacent: Proposed site plan for St Columba project - development application documentation.
jordanaugust
C
UP
DA303 LIFTER STORE L2-18 3 m²
ENS L2-12 5 m²
BALC
D DA304 BED L2-106 19 m²
UP RL 60480 SITTING ROOM L2-104 33 m²
BALC
1
BED L2-112 28 m²
BED L2-110 19 m² ENS L2-109 5 m²
ENS L2-111 5 m²
L
CIRC
ENS L2-103 5 m²
LIFTER STORE L2-99 3 m²
ENS L2-101 5 m² BED L2-102 19 m²
FLOOR PLAN - LEVEL 02
BED L2-108 19 m²
ENS L2-107 5 m²
ENS L2-98 5 m²
BED L2-100 19 m²
BED L2-97 25 m²
SCALE 1 : 200
ENS L2-96 5 m²
BED L2-95 24 m²
BALC
0
2
4
6
8
10 m
1:200
Above: Level 02 floor plan for St Columba project - development application documentation. CLIENT
PROJECT
UNITING St COLUMBA'S 11-15 FIG TREE STREET, LANE COVE LOT 2 DP184731 LOTS A, B, C & D DP385033 LOTS 1, 2 & 3 DP339444
DRAWING TITLE
LEVEL 02
© Copyright These drawings and designs and the copyright thereof are the property of Morrison Design Partnership Pty. Ltd. and must not be used retained or copied without the written permission of Morrison Design Partnership Pty. Ltd. ACN 001 595 288.
BIM 360://3108 - Uniting St Columba Lane Cove/3108 - Uniting St Columbia CENTRAL(V20).rvt
37
portfolio2020
B DA302
8400
A DA301
ROOF OUTLINE
BALC
BED L2-14 19 m²
BED L2-16 20 m²
BED L2-19 19 m²
ENS L2-15 5 m²
LOUNGE L2-23 24 m²
BED L2-21 19 m²
ENS L2-17 5 m² ENS L2-20 5 m²
SITTING ROOM L2-13 16 m²
DINING L2-24 44 m²
BED L2-25 19 m²
BED L2-29 20 m²
BED L2-27 19 m²
ENS L2-26 5 m²
ENS L2-22 5 m²
BED L2-31 19 m²
ENS L2-30 5 m²
ENS L2-28 5 m²
BED L2-34 19 m²
ENS L2-32 5 m²
ENS L2-35 5 m²
CIRC
ENS L2-10 5 m² BED L2-11 19 m²
BED L2-36 20 m²
ENS L2-37 5 m²
CIRC
ENS L2-08 5 m²
ENS L2-06 5 m² BED L2-07 21 m²
BED L2-09 20 m²
ENS L2-04 5 m²
ENS L2-02 5 m² BED L2-03 20 m²
BED L2-05 21 m²
ACC WC L2-49 6 m²
FOH KITCHEN L2-50 23 m²
CIRC L2-57 37 m²
BED L2-01 19 m²
CLEAN LINEN ST L2-51 3 m²
LINEN CHUTE
HW. L2-52 0 m²
RESIDENT LAUNDRY L2-48 12 m²
BED L2-41 20 m²
SITTING ROOM L2-38 17 m²
6400
ENS L2-42 5 m²
1 BED UNIT L2-39 21 m²
BULK STORE L2-54 10 m²
RL 60480
ROOF OUTLINE
EQUIP STORE L2-64 9 m²
FOH LOBBY L2-59 25 m²
BOH CORRIDOR L2-58 54 m² CLEAN LINEN ST L2-63 4 m²
CLINICAL TREATMENT L2-60 10 m² BALC
BED L2-43 20 m²
BED L2-45 19 m²
CLNR. L2-55 4 m²
DIRTY UTILITY L2-56 12 m²
ENS L2-46 5 m²
EDB L2-53 2 m²
ENS L2-40 5 m²
ENS L2-44 5 m²
EQUIP STORE L2-61 8 m²
BALC HW. L2-65 0 m²
BED L2-114 28 m²
ENS L2-113 5 m²
BED L2-116 19 m²
ENS L2-115 5 m²
LOUNGE L2-118 25 m²
DINING L2-119 48 m²
ENS L2-117 5 m²
STAFF WC L2-69 3 m²
COMS L2-67 4 m²
FOH KITCHEN L2-66 23 m²
ACC WC L2-68 5 m²
BULK STORE L2-71 8 m² BED L2-72 29 m²
RESIDENT LAUNDRY L2-70 12 m²
BALC
BED L2-74 19 m²
ENS L2-73 5 m²
ENS L2-75 5 m²
SITTING ROOM L2-76 7 m²
CIRC L2-120 97 m² REF.
ENS L2-92 5 m²
ENS L2-94 5 m² BED L2-93 19 m²
ENS L2-89 5 m²
UP SITTING ROOM L2-90 19 m²
BED L2-91 21 m²
D 5 ²
LIFTER STORE L2-85 3 m²
ENS L2-87 5 m² BED L2-88 19 m²
ENS L2-84 5 m²
BED L2-86 19 m² BED L2-83 25 m²
BALC
BALC
ENS L2-80 5 m² ENS L2-82 5 m²
ENS L2-78 5 m²
BED L2-79 19 m²
BED L2-77 40 m² BALC
BED L2-81 24 m²
BALC
BALC
ROOF OUTLINE
LEGEND AMENITIES BOH COMMUNAL EXTERNAL 1
GENERAL
DA305
MULTI-PURPOSE NONE POD 1 POD 2 POD 3 POD 4 SPECIALTY STAFF FACILITIES
BEDROOMS LEVEL GROUND FLOOR LEVEL 01 LEVEL 01 LEVEL 02 LEVEL 02 TOTAL BEDS
-SECOND FLOOR PLAN
N
REV DATE
AMENDMENT
P11
ISSUED FOR INFORMATION
2020-02-13
INITIALS
CHECK
38
CAREHOUSE POD 2 POD 2 POD 3 POD 2 POD 3
PROJECT NO.
DRAWING NO.
REVISION
3108
DA104
P11
SCALE
1 : 200 @ A1
DRAWN
Author
PROJECT PRINCIPLE
G.OLLERTON
DATE
27.10.2016
BED COUNT 20 20 20 20 20 100
jordanaugust
Above: North elevation viewed from street. Right: A corner of the new building displaying the 3 primary materials used - brick, render, and metal cladding.
39
portfolio2020
Below: Porte cochere on southern side of site, providing shelter to main pedestrian entry.
40
jordanaugust
Adjacent: Southern beachfacing facade.
41
portfolio2020
05 urban unification Undertaken at Victoria University of Wellington, NZ
Project Particulars Typology Location Project coordinator Assignment type Assignment date
Mixed-use Residential/Commercial/Retail Petone, Hutt City, New Zealand Chris McDonald Urban Planning + Building Design + Construction Drawings October 2016
Project Description Urban Unification was the final design project for the fourth year (of five) Master of Architecture program at Victoria University of Wellington, NZ. It involved architectural building design, urban planning, and detailed construction drawing. The building designed here takes in to consideration the Council’s desire for a more people friendly city. This mixed-use project offers ground floor retail/ business space, two levels of commercial office space, and one level of residential units. It is located on an important corner - opposite a popular beach to the south and across the road from a significant pre-european burial site to the east. As such, the external architecture of this building has been designed in response to these two distinct site features. On the southern elevation, the facade has been designed with a playful degree of articulation and greater transparency, embodying the nature of the beach to which it overlooks. In contrast, the eastern elevation has received a more formal and moderate facade treatment - a nod to the sacred space that lies opposite this side of the building. An intermediate timber screen stretches the length of the eastern facade to reduce excessive sunlight and add visual interest to the building. The screen wraps around the building’s corner, creating a cohesive interface between the 2 distinct languages of the building.
42
jordanaugust
Loc is S t
reet
hy S
treet
Arm idal e St ree
t
Nev
M M
M
des-
Rob
inso
Te P u
Rho
ni B
M
oule vard
M
n Ro
ad
M M
C
L
L
M
tree
de
t
C
lana
C
M Mixed-use inc. residential C Commercial L Light Industrial
Adjacent: Site plan.
43
thi S
Esp
Yas an
The
portfolio2020
1. An ‘L’ shaped building footprint is chosen for it’s ability to respond to two different aspects of the site - Te Puni Urupa (sacred burial site) and the Wellington Waterfront.
2. Vertical extrusion of the building footprint to create a building envelope and blank canvas for a building design.
3. To fulfil the desire for a mixed-use building program, four floors are allocated for retail, commercial, and residential spaces.
4. A key design move - the building volume is altered to create two distinct building volumes, and therefore, the ability to apply a formal and informal design language to the building exterior.
5. The two commercial floors of the taller building volume are transformed to create a smoother transition around the corner of the building and break-up the building facade.
6. The eastern facade receives a unifying timber louvre system, and the south facing facade of the shorter building volume receives checkered articulation, establishing a formal and informal character to the building, and exposing the steel structure behind.
Top: Diagrams depicting massing design development. Bottom: Site context diagram.
44
jordanaugust
l 04
e Lev
l ntia
ide
Res
ial
erc
mm
Co 3-
l0
e Lev
ial
erc
mm
Co 2-
l0
e Lev
ns
re -
ctu
Stru
m olu el C
&B
l 01
ms
e Lev
ea
e caf
ail/
Ret
Ste
Fac a
de
- Ti
mb
er L ouv
res
Adjacent: Exploded axonometric diagram of building make-up.
45
portfolio2020
2
01
01
06
05
03
1
05
02 01
04
Level 01 retail/cafe 01. 02. 03. 04. 05. 06.
Retail Stores Cafe Cafe back of house Entry foyer Lift/stair lobby Rubbish room
46
04
jordanaugust
2
04
1
02
01
03
01
Level 02/03 commercial 01. 02. 03. 04.
47
Meeting rooms Collaboration space Public access landing Conference room
portfolio2020
2
04
03
04 02 02 01
01
1
05
Level 04 residential 01. 02. 03. 04. 05.
Four bedroom family apartments Vestibule Three bedroom apartment Single bedroom apartment Three bedroom pent-suite
48
jordanaugust
Section 01 Te Puni Boulevard 01. 02. 03. 04. 05. 06. 07. 08. 09. 10.
Three bedroom family apartments Vestibule Three bedroom pent-suite Commercial office space Fire escape stair Retail Store Cafe/back of house Lift/stair lobby Te Puni Boulevard Te Puni Urupa/public space
01
01
04
04
05 04
04
06
07
49
02
portfolio2020
03
04
04
08
09
10
50
jordanaugust
01
02
04
03
04
04
06
51
04
06
06
07
portfolio2020
Section 02 The Esplanade 01. 02. 03. 04. 05. 06. 07. 08. 09. 10.
Fire escape stair Single bedroom apartment Three bedroom pent-suite Commercial office space Office rest/waiting space Retail store Public stair to first floor Cafe The Esplanade Beach
05
05
08
09
10
52
jordanaugust
53
portfolio2020
Adjacent: Eastern facade viewed from sacred preeuropean burial site.
54
jordanaugust
55
portfolio2020
Adjacent: Eastern and southern facades as seen from beach.
56
jordanaugust
Size to suit structure (min. 150mm max. 300mm)
Continuous fixing angle by Symonite 5° min. slope To suit
Factory fitted cleats at panel folds by Symonite Waterproofing membrane
18
50
Viking Enviroclad Waterproofing Membrane
High impact plastic packers by Symonite fixed w/ SS screws
30mm leg
1/100 gradient drop for water discharge
35mm min. clearance
50
Alpolic /fr Aluminium Composite Cladding System by Symonite
20mm Structural plywood roof deck
Air barrier wall underlay Drained and ventilated cavity
15
15
Open joint
High impact plastic packers by Symonite fixed w/ SS screws
SG8 H1.2 top plates as per engineers specifications
Alpolic /fr Aluminium Composite Cladding System by Symonite 51
Flashing tape or metal flashing by others
13mm GIB Fyreline® fixed to timber studs w/ 41mm x 6g GIB® Grabber® high thread drywall screws
High impaxt plastic packers by Symonite
15
Pink® Batts® Silencer 100mm Air barrier (wall underlay)
4mm intermittent spacer at fixings by Symonite 0.9 aluminium backfold support by Symonite
Drained and ventilated cavity
1
Detail - Roof Overhang 1:2
Project Details:
ARCI 421 - Integrated Technologies
Drawn by:
Name: ARCI 412 Design Project - Petone Gateways Location: Te Puni Rd / The Esplanade, Petone, Wellington, NZ Building Type: Mixed-use - retail, commercial, residential
Project 3 - Construction, Services and Structures Design of ARCI 412 Project
Jordan August | 300284443
200
An urban redevelopment of the Petone West Gateway
20
Sealant on PEF rod by Symonite
Flashing required where saddle flashing is fitted over a balcony above
"URBAN UNIFICATION"
8mm drain hole w/ grommets by Symonite
51
51
SG8 H1.2 roofing structure per engineers specifications
170
170mm deep vertical steel louvre support to allow timber Tutor: louvres to be fixed between flanges
Detail Region 2 cont. Upper Floor Facade
A104
200
150
Vegetation
Clean stone around aluminium strainer box w/ clampring dropper/outlet by Viking: Roofspec
Growth medium Viking MiraDrain G4
Louvres to extend up to base of level 4 following determined pattern as per architectural design drawings Parapet flush with cantilevered floor edge constructed of SG8 H1.2 timber framing and blocking as required
70mm min.
200
5° min. slope
Timber skirting Carpet tiles w/ underlay
200
GIB 10mm plasterboard w/ white paint finish
200
F100SF awning window by First Windows & Doors
DPC
130
Dimond Hibond Composite steel flooring w/ 168mm reinforced concrete topping for external edge of flooring
Vertical steel louvre support fixed to cantilevered floor edge w/ dbl angle connection bolt welded as per structural engineers specifications
Tapered steel cantilever beam terminated at point of wall above as per structural engineers specs.
15mm plywood substrate Cantilevered garden drainage piping concealed beyond soffit and carried back to line of primary structure
Soffit lining
Detail - Timber Louvre Base 2 Facade 1:5
Adjacent: Various construction details.
An urban redevelopment of the Petone West Gateway
1.5mm Viking Enviroclad Waterproofing Membrane
SmartSheet fascia panel by Architectural Metalformers
Dimond Hibond Composite steel flooring w/ 200mm reinforced concrete topping. Formwork to be created to provide 300mm window ledge integrated with topping concrete
"URBAN UNIFICATION"
150mm x 25mm timber louvre w/ black stain finish and waterproof coating from others fixed w/ end-caps to vertical steel support
Project Details:
ARCI 421 - Integrated Technologies
Drawn by:
Name: ARCI 412 Design Project - Petone Gateways Location: Te Puni Rd / The Esplanade, Petone, Wellington, NZ Building Type: Mixed-use - retail, commercial, residential
Project 3 - Construction, Services and Structures Design of ARCI 412 Project
Jordan August | 300284443
57
Tutor:
Detail Region 3 cont. Lower Floors Facade
A106
0.9 aluminium backfold support by Symonite 13mm GIB Fyreline® fixed to timber studs w/ 41mm x 6g GIB® Grabber® high thread drywall screws
1 A104
portfolio2020
Propietary soaker at panel joints by Symonite
Pink® Batts® Silencer 100mm
High impact plastic packers by Symonite
Air barrier (wall underlay) Drained and ventilated cavity
Pink® Batts® Silencer 100mm
Factory fitted cleats at panel folds by Symonite
13mm GIB Fyreline® fixed to timber studs w/ 41mm x 6g GIB® Grabber® high thread drywall screws
A 55
Alpolic /fr Aluminium Composite Cladding System by Symonite
Co an
3 A103
Detail - Window Sill
2
H1.2 SG8 timber window lintel as per engineers specs.
1:2
SS
2 A103
Alpolic /fr Aluminium Composite Cladding System by Symonite
13mm GIB Fyreline® fixed to timber studs w/ 41mm x 6g GIB® Grabber® high thread drywall screws
4
Pink® Batts® Silencer 100mm
51
30
30
Panel tack structural adhesive by Symonite
SG8 H1.2 bottom plates as per engineers specs. Timber skirting
Ventilation slots by Symonite 35mm min.
Tiled bathroom flooring to clients specifications Dimond Hibond Composite steel flooring w/ 200mm reinforced concrete topping. Refer to structural engineers drawings
"URBAN 3 UNIFICATION" An urban redevelopment of the Petone West Gateway
Drawn by: Jordan August | 300284443
Extruded aluminium retainer cap frame
Double acrylic domes
150mm min.
150mm min.
524
Skylight shaft
20mm plywood structural roof deck H1.2 170x45mm roof joist fixed to steel beam below per engineers specifications
Structural univeral beam beyond to structural engineers specifications Bradford Gold Ceiling R3.6 ceiling insulation
x2 13mm GIB Fyreline® fixed to framing w/ GIB® Grabber® drywall screws. 12mm min. penetration in to steel framing 13mm GIB standard plasterboard ceiling linings fixed to structure above via Rhondo battens or similar approved system
Gateways tone, Wellington, NZ rcial, residential
Tutor:
Condensation gutter
Roof membranes
Rondo® NZ18 perimeter channel, Rondo® clips @600mm max. ctrs.
1:2
ARCI 421 - Integrated Technologies
Lockable catch
Structural univeral beam beyond to structural engineers specifications
Detail - Window Head
Project 3 - Construction, Services and Structures Design of ARCI 412 Project
Assembly screw
H1.2 90x45mm SG8 blocking @ 400 crs to U/S of gutter
3
Viking Enviroclad Waterproofing Membrane
Detail - Facade Base 4 Clearance 1:2
Rubber draft seal
H1.2 SG8 roof joists per engineers specs.
W
Name: ARCI 412 Design Project - Petone Gateways Location: Te Puni Rd / The Esplanade, Petone, Wellington, NZ Building Type: Mixed-use - retail, commercial, residential
Extruded aluminium curb frame
8m gr
W ac
Project Details:
Vinyl glazing tape
Viking Enviroclad Waterproofing Membrane
10mm min.
Wall underlay dressed in to opening with flexible flashing tape installed over wrap to corners at head
ACM stiffener by Symonite
30
1 : 25
Drained and ventilated cavity
30
SG8 H1.2 framing for exterior flashing fixing
Detail Region 2 - Reference
16mm min.
Air barrier (wall underlay)
A103
1
W 23
Air seal
Direct fix 13mm plasterboard to trimmer rafters to trim out skylight reveal
Roof membranes Metal flashing to match roof colour
H1.2 trimmer to upstand to achieve 150mm min. upstand Pink® Batts® Silencer 100mm
Direct fix 13mm plasterboard to trimmer rafters to trim out skylight reveal Blocking for plasterboard corner
13mm GIB standard plasterboard ceiling linings fixed to structure above via Rhondo battens or similar approved system
2
Detail - Skylight
Adjacent: Various construction details.
1:5
ARCI 421 - Integrated Technologies
Drawn by:
Project 3 - Construction, Services and Structures Design of ARCI 412 Project
Jordan August | 300284443
Detail Region 1 - Roof and Skylights
A102
Tutor:
58
Detail Regi Floor Facad
A1
jordanaugust
06 te pou Undertaken at Victoria University of Wellington, NZ
Project Particulars Typology Location Project coordinator Assignment type Assignment date
Education + Conservation + Exhibition Owhiro Bay, Wellington, New Zealand Daniel K. Brown Narrative Building Design June 2016
Project Description Te Pou - the Maori term for ‘the post’ - is a physical manifestation of mythology and narrative, based on traditional Maori customs in New Zealand. It is an archival tower intended to store a collection of New Zealand’s native fauna and flora i.e. seeds, plants etc. The tower is positioned on a coastal site in a manner which echoes the traditional Maori welcoming ceremony - the Powhiri. Furthermore, in traditional Maori architecture, Pou are the central columns of a meeting house which support the roof structure and are usually decorated in great detail with carvings that depict ancestors of a Maori community. This symbolic gesture has been transplanted to this tower design and is intended to display a sense of guardianship.
WHARENUI
KAUMATUA
TANGATA WHENUA
KAIKARANGA
TE POU
Adjacent: Preliminary narrative arrangement concept diagram.
59
TANGATA WHENUA
portfolio2020
Adjacent: Looking out to the Cook Strait from behind Te Pou. The composition and arrangement of the building is intended to symbolise guardianship, since the building functions as a last-resort archive of New Zealand’s native vegetation; should a catastrophic event require such a collection.
60
jordanaugust
Sou t
d lan h Is Sou t
d th I slan Sou
d th I slan Sou
h Is lan Sou t e
Ridge Beam Lin
e
Ridge Beam Lin
h Is
lan
d
e
Ridge Beam Lin
Adjacent: Site plan showing significant site and building alignments.
d
e
Ridge Beam Lin
N
61
10.0m
portfolio2020
Observation room Head office
31 30
110,000.0
29 28 Offices
27 26 25 24 23 22 21 20
Archives
19 18 17 16 15
Plant/service rooms
14 13 12
Archives
11 10 9 8
Lecture/seminar space
28,000.0
7 6 5 4
Public exhibition/ Library/Reception
3 2 1
4000.0
Adjacent: Building elevation showing functions of levels.
62
jordanaugust
þ
æ
§
ç
Ä
Ä
¥
¥
27380
Ä
ß
ß
µ
µ
9500
Above: Level 01 - typical exhibition level.
63
portfolio2020
þ
æ
þ
ç
§
Ä
Ä
¥
¥ 31400
27380
Ä
ß
ß
µ
µ
26500
Above: Level 08 - typical lecture/seminar level.
64
jordanaugust
þ
ç
æ
§
ç
N
Ä
Ä
5°
¥ 23750
31400 ß
µ
15600
Above: Level 30 - head office level.
65
portfolio2020
Above: Building section with associated buildings in the background.
66
jordanaugust
Above: 3-dimensional building section showing the immediate site context.
67
portfolio2020
68
jordanaugust
Above: Perspective of site viewed from the sea.
69
portfolio2020
70
jordanaugust
07 nz school of music Undertaken at Victoria University of Wellington, NZ
Project Particulars Typology Location Project coordinator Assignment type Assignment date
Education + Cafe Te Aro, Wellington, New Zealand Andrew Charleson Program focussed building design October 2015
Project Description There are currently two separate buildings for the NZ School of Music. This project proposes a new, single building for this institution. Inspired by it’s local context, and by local Wellington architect Ian Athfield, this building incorporates both linear, and curvaceous design language to create a building that would hopefully appeal to users and passers-by alike. The suburb of Te Aro in Wellington, New Zealand, is characterized heavily by shed-like industrial and commercial buildings. This proposed NZ School of Music has thus been designed to reflect the shed-like character of its surroundings. A central outdoor courtyard leads visitors to the main entrance of the building. The entrance is on the central axis of the building, helping to make way-finding and circulation more efficient. A central spiral feature staircase ties the whole building together, and the stair shaft void penetrates the roof to form a chimneylike element - a famous characteristic of the architecture from the late Ian Athfield.
Opposite: Main entry courtyard.
71
portfolio2020
72
jordanaugust
Adjacent: Site plan displaying building within it’s city context.
73
portfolio2020
Building program Library/teaching/tutorials Storage/services Auditoria Cafe/common rooms WCs Vertical circulation Staff/post-grad offices
Adjacent: Exploded diagram depicting different functions within the building.
74
jordanaugust
Adjacent: Building form with circulation zones extracted (shown green).
75
portfolio2020
03 06 04 01
04
05
08
05
07
09
12 02
10
11
12 12
13
Basement floor plan 01. 02. 03. 04. 05. 06. 07. 08. 09. 10. 11. 12. 13.
Orchestra pit Rehearsal room Crew room VIP dressing room Dressing room Workshop Foyer WC Loading zone Lobby Recording studio Recording booth Underground carpark/services
76
12
jordanaugust
15
15
15
16
17 14 19 22
18
21
20
25
22
16
24 23
26
23
Ground floor plan 14. 15. 16. 17. 18. 19. 20. 21.
77
Main auditorium stage Staff office WC Meeting room Reception Crush space Library book collections Main entrance lobby
22. 23. 24. 25. 26.
Storage/services Computer lab Library Cafe Cafe outdoor seating
portfolio2020
05
01
02 04
03 04
06
07 10
05
08
08
08 09
08
08
Level 01 floor plan 01. 02. 03. 04. 05. 06. 07. 08.
Main auditorium stage Main auditorium (600 seats) Secondary auditorium (200 seats) Crush space WC Storage/services Lounge area Tutorial room
09. Keyboard lab 10. Staff offices
78
jordanaugust
14
11 13
12
13
15
16 19
14
17
17
20
17 18 17
17
Level 02 floor plan 11. 12. 13. 14. 15. 16. 17. 18.
Second tier seating (190 seats) Second tier seating (76 seats) Crush space WC Storage/services Lounge area Small teaching room Keyboard lab
79
19. Staff offices 20. Staff common room
portfolio2020
03
01
02
04
10 05
10
05
06
04
04 04
03 07 04
04
04
09
04
04
04
Level 03 floor plan 01. 02. 03. 04. 05. 06. 07. 08.
Third tier seating (72 seats) Control room WC Small teaching room Large teaching room Storage/services Student common room Post-grad offices
09. Post-grad common room 10. Crush space
80
08
jordanaugust
Building Section Transverse Library, teaching, tutorials Rehearsal room Reception / crush spaces Recording studio & booths
81
portfolio2020
82
jordanaugust
83
portfolio2020
Building Section Longitudinal Library, teaching, tutorials Rehearsal room Reception / crush spaces Recording studio & booths
84
jordanaugust
Adjacent: Library seating area.
85
portfolio2020
86
jordanaugust
Adjacent: Main entry foyer and spiral staircase providing central access to all levels.
87
portfolio2020
88
jordanaugust
08 a submission of senses Undertaken at Victoria University of Wellington, NZ
Project Particulars Typology Location Project coordinator Assignment type Assignment date
Museum/exhibition building + restaurant + lecture hall Wellington waterfront, Wellington, New Zealand Andrew Charleson Narrative building design August 2015
Project Description This project brief asked for a National Earthquake Museum for New Zealand in acknowledgement of the country’s prominent seismic history. A narrative design approach was taken for this building, intending to take visitors on a journey through the experience of an earthquake. Earthquakes are extremely unpredictable, thus a suspended walkway has been proposed that directs visitors haphazardly through an expansive exhibition space. Large, organic structural forms have been used to symbolise the strength and over-empowerment that earthquakes possess. The final narrative stage of this building sees visitors enter a small, dark room (opposite page) - a symbolic representation of what some unfortunate victims of past NZ earthquakes have encountered. This room is therefore designated as the memorial room, displaying the names of those who have lost their lives in NZ earthquakes throughout history.
89
portfolio2020
Adjacent: The final room before exiting the earthquake museum’s narrative journey - a memorial room in honour of past victims of New Zealand’s earthquakes.
90
jordanaugust
Adjacent: Preliminary concept sketches depicting development of repeating organic structure formation.
91
portfolio2020
Adjacent: Preliminary concept sketches depicting development of narrative/journey that visitors experience in the building.
92
jordanaugust
Railway station Shed 21
NZ Post EARTHQUAKE MUSEUM
Z Station Meridian Building
Adjacent: Site plan, showing earthquake museum’s location in the Wellington waterfront.
93
portfolio2020
Top: Exploded axonometric portraying narrative journey through the earthquake museum. Bottom: Massing development process of earthquake museum building.
03 02 01
General building mass on site
Division of building in to three areas:
Manipulation of form to facilitate different space requirements
94
Resulting program and massing of building
jordanaugust
02 01 03
04
05
02 06 10
09 11
07 12
08
Ground floor plan 01. 02. 03. 04. 05. 06. 07. 08.
95
Lecture theatre Toilets Lecture theatre concourse Grand exhibition hall Memorial walkway (above) Cafe Museum storage Entrance atrium
09. 10. 11. 12.
General storage Plant room Information desk Reception
portfolio2020
01
02 03
04
05
07 06
08
Mezzanine floor plan 01. 02. 03. 04. 05. 06. 07. 08.
Memorial garden Observation deck Memorial to victims Grand exhibition hall (below) Suspended memorial walkway Restaurant Kitchen Staff offices
96
jordanaugust
Adjacent: The intimidating view into the grand exhibition hall. Visitors are encouraged to venture on to the walkway suspended from the monolithic concrete forms - symbolising the immense power of an earthquake. This leads to the memorial room at the far side of the exhibition hall. Visitors may also descend the ramp to the exhibition floor and observe the numerous earthquake archives on display.
97
portfolio2020
98
Thank you for viewing my portfolio
Please do not hesitate to get in touch: +61411 136 113 jordan.august@hotmail.com www.linkedin.com/in/jordan-august-b36b2080