ARCHITECTUREPORTFOLIO LLEGO joshua chris reyes
01 Professional Works Part
04
Activa Mixed-Use Development
08 10
16 27
[Architectural Thesis]
Balay Bakawan Development
25
[Building Technology 4]
Estimates
29
11
[Filinvest Land Inc.]
[Filinvest Land Inc.]
Mimosa Lifestyle Mall
Marian Chapel
[MICROCADD Institute]
Revit Architecture
[Architectural Interiors]
30
[Manual Drafting and Drawings]
Visual Techniques and Renderings
t
Contents
Architectural Interiors & Fitouts
Interior Design Works
Mid-Rise Building
03 Interests
Cebu Cyberzone Mixed-Use FCC Tower 3& 4
[MiscellaneousProjects.]
14
[Filinvest Land Inc.]
[Building Technology 3]
Part
13
[Filinvest Land Inc.]
32
[Grupo Kalinangan Org.]
Photography
02 Academic Works Part
Joshua Chris Reyes Llego Architectural Designer Cultural Worker
Trained in an architectural firm focusing on design industry, visual communciation, and presentation. His work ranges from corporate format that shaped him in translating conceptual ideas into technical drawings to volunteer works for communities with untapped cultural assets.
Fluent in preparing bid plans and construction drawings as well as presentation documents for clients, developers, and consultants. He also coordinates and connects different trades in resolving design issues to comply with codes and building laws and satisfy client’s brief. Parallel to his work, he volunteers in Grupo Kalinangan Inc. - a government-registered nonstock, non-profit cultural tech organization, duly recognized by the National Historical Commission of the Philippines.
“Architecture is the synthesis of diverse experience.”
-jcllego
About the Author
02
R. Villarosa Architects, Partners, and Associates
7A Strata 100 Building, F. Ortigas Jr. Road, Brgy. San Antonio, Ortigas Center, Pasig City 1550
631 - 2888 | 631 - 2878 rvillarosa.arch@gmail.com
Professional Work
For several years, R. VILLAROSA ARCHITECTS has been named as one of BCI Asia’s Top Ten Architects of the Philippines for the years 2005-2009, 2011 to 2013 and 2016-2017. This award is bestowed BCI Asia Publications in recognition of the market leaders in the design industry of the built environment.
03
R. VILLAROSA ARCHITECTS is an architectural firm engaged extensively in Design, Consultation, Construction support services and Construction Management. It was established in 1972 and from a modest one-man professional practice and has grown into a partnership with personnel currently numbering more than forty with a host of engineering/specialty consultants.Backed by twenty years of skills development and experience, thirty two years of expertise in professional practice and supported with comprehensive Engineering services, the firm has been engaged in a wide scope of projects ranging from simple structures for more complex projects such as Hotels, Townhouses, Multi-storey residential Development; Commercial and institutional Structures; Socio-cultural and community centers; Industrial, Resort and Complex sites.
Date Affiliated
2017 - Present
Position held Project-In-Charge Junior Architect CADD Production
03 11
12
[Filinvest Land Inc.]
Activa Mixed-Use Development
07
[Hacienda Sta. Elena]
Private Residential
15
[Filinvest Land Inc.]
Mimosa Lifestyle Mall
12
[Filinvest Land Inc.]
Cebu Cyberzone Mixed-Use FCC Tower 3& 4
[Scottland Inc.]
The Lind Coron
14
[Government Project]
AFP Cybersecurity Complex
[Miscellaneous Projects.]
Architectural Interiors & Fitouts
16
[MICROCADD Institute]
Revit Architecture Training
Arch. Roger G. Villarosa, pia, uap Founding Partner
Arch. Roy A. Villarosa, uap Managing Partner
AR-1006 TO AR-1010 AR-1013
AR-1006 TO AR-1010 AR-1013
20
13
11
15
19
17
21
23
21
25
26 26.1
52200
N
8
9 10
7
11
6
12
6550
13 5 STR OPEN - 34H2
12 13
2
MALE
7
4
10
3
11 OPEN
2
POOL DECK HPE3
25MM DEP.
P.CH
50MM DEP.
50MM DEP.
Aurora Blvd. Cor. EDSA, Cubao, Quezon City, Metro Manila
16
LEVEL 17
14900
50MM DEP.
13 15
DN TO 17TH FLR
J
12 14
1 25MM DEP.
50MM DEP.
RAISED PLANTER
RAISED PLANTER
SEATING AREA
RAISED PLANTER UP
8350
BAR
8350
ACTIVA Mixed-Use Development
9
6 5
HSE2/ FIREMEN'S LIFT
EE ROOM
[Filinvest Land Inc.]
8
FEMALE
50MM DEP.
P.CH
INFINITY LAP POOL
involvements
RAISED PLANTER
13 AR-1009 AR-1009
7100
LOWER ROOF DECK PLAN SCALE:
6900
6900
6900
Years Involved :
250
250
OVERFLOW
HOTEL TOWER
6900
6900
6900
3700
AR-1006 TO AR-1010 AR-1013
AR-1006 TO AR-1010 AR-1013
20
13
11
15
19
17
Components Handled: Hotel, Commercial, and Office (BPO)
21
23
21
25
26 26.1
52200 6900
6900
6900
Phases Covered : • Schematic Design Phase • Design Development Phase • Contract Document Phase • Bidding Phase • Mid-Construction Phase*
300 6900
6900
6900
3700
BEAM
250
N
250
7100
BEAM STR - H1
6550
7
9
6
10
5
11
8 9
4 OPEN
16
3
17 DN. TO LVL 16
1
HPE 1/ FIREMEN'S LIFT
EE
OPEN
12
19
UP TO POOL DECK LEVEL
6
11
18
2
7
10
FILTRATION ROOM FOR SWIMMING POOL
SURGE TANK
ME SPACE
HPE3
4 3
16
2
17
1
18 DN. TO 16TH FLOOR
5
15
UP TO LOWER ROOF DECK
19
P.CH
P.CH.
14900
Position Held | Role : a. IN-CHARGE OF HOTEL TOWER 1. Code Compliance Reports 2. Completion of Working Drawings R.VILLAROSA ARCHITECTS FOR CONSTRUCTIONfor Bidding and for Construction 3. Coordination with other Trades Sections and Consultants 4. Attend Meetings with other P R Consultants and Developers 1547 AR-1009R 17TH FLOOR PLAN 5. Answer RFI AND RFA LOWER ROOF DECK PLAN
ME SPACE
13
11
15
7th Floor, Strata 100 Building, F. Ortigas Jr. Road, Ortigas Center Pasig City, 1605 Metro Manila, Philippines Tel. Nos.: (632) 631-2878; (632) 631-2888 Fax: (632) 631-2806 PANELIZED
PRC No. IAPOA No. PTR No. Place
WATER TANK
STAIR - H2
STAIR - H2
EE
STAIR - H2
EE
SERVICE LIFT LOBBY
LIFT LOBBY
3300
L14 3300
L12
14TH FLOOR FINISH LEVEL
STAIR - H2
12TH FLOOR FINISH LEVEL
STAIR - H2
11TH FLOOR FINISH LEVEL
STAIR - H2
3300
L11
10TH FLOOR FINISH LEVEL
STAIR - H2
9TH FLOOR FINISH LEVEL
STAIR - H2
8TH FLOOR FINISH LEVEL
STAIR - H2
7TH FLOOR FINISH LEVEL
STAIR - H2
3300
EL.+46.85M
L10 3300
EL.+43.55M
L9 3300
EL.+40.25M
L8 3300
EL.+36.95M
L7 3300
EL.+33.65M
L6
8350
6550
PROJ. NO.:
6550
8350
DRAWN BY
WATER TANK
CHECKED BY
ROOF DECK
LIFT LOBBY MALE TOILET
POOL BAR
STAIR - H1
SHEET NO.:
8350
JCRL
DATE
06-19-18
MUV
ISSUED
06-19-18
POOL DECK
6TH FLOOR FINISH LEVEL
STAIR - H2
5TH MEZZANINE FINISH FLOOR LEVEL
STAIR - H2
LIFT LOBBY
LINE OF INFINITY POOL FILTRATION ROOM
SURGE TANK
ME SPACE
PAHU
PAHU
PAHU
EE
SERVICE LIFT LOBBY
LIFT LOBBY
1 KING
SHO.
SHO.
2 TWIN
3 KING
SHO.
SHO.
4 TWIN
5 KING
SHO.
SHO.
6 TWIN
7 KING
SHO.
SHO.
8 TWIN
9 SUITE
WC
EE
SERVICE LIFT LOBBY
LIFT LOBBY
1 KING
SHO.
SHO.
2 TWIN
3 KING
SHO.
SHO.
4 TWIN
5 KING
SHO.
SHO.
6 TWIN
7 KING
SHO.
SHO.
8 TWIN
9 SUITE
WC
EE
SERVICE LIFT LOBBY
LIFT LOBBY
1 KING
SHO.
SHO.
2 TWIN
3 KING
SHO.
SHO.
4 TWIN
5 KING
SHO.
SHO.
6 TWIN
7 KING
SHO.
SHO.
8 TWIN
9 SUITE
WC
EE
SERVICE LIFT LOBBY
LIFT LOBBY
1 KING
SHO.
SHO.
2 TWIN
3 KING
SHO.
SHO.
4 TWIN
5 KING
SHO.
SHO.
6 TWIN
7 KING
SHO.
SHO.
8 TWIN
9 SUITE
WC
EE
SERVICE LIFT LOBBY
LIFT LOBBY
1 KING
SHO.
SHO.
2 TWIN
3 KING
SHO.
SHO.
4 TWIN
5 KING
SHO.
SHO.
6 TWIN
7 KING
SHO.
SHO.
8 TWIN
9 SUITE
WC
EE
SERVICE LIFT LOBBY
LIFT LOBBY
1 KING
SHO.
SHO.
2 TWIN
3 KING
SHO.
SHO.
4 TWIN
5 KING
SHO.
SHO.
6 TWIN
7 KING
SHO.
SHO.
8 TWIN
9 SUITE
WC
EE
SERVICE LIFT LOBBY
LIFT LOBBY
1 KING
SHO.
SHO.
2 TWIN
3 KING
SHO.
SHO.
4 TWIN
5 KING
SHO.
SHO.
6 TWIN
7 KING
SHO.
SHO.
8 TWIN
9 SUITE
WC
EE
SERVICE LIFT LOBBY
LIFT LOBBY
1 KING
SHO.
SHO.
2 TWIN
3 KING
SHO.
SHO.
4 TWIN
5 KING
SHO.
SHO.
6 TWIN
7 KING
SHO.
SHO.
8 TWIN
9 SUITE
WC
EE
SERVICE LIFT LOBBY
LIFT LOBBY
1 KING
SHO.
SHO.
2 TWIN
3 KING
SHO.
SHO.
4 TWIN
5 KING
SHO.
SHO.
6 TWIN
7 KING
SHO.
SHO.
8 TWIN
9 SUITE
WC
EE SERVICE LIFT
LIFT LOBBY
1 KING (PWD ROOM)
PWD T&B
SHO.
2 TWIN
3 KING
SHO.
SHO.
4 TWIN
5 KING
SHO.
6 TWIN
7 KING
SHO.
LOBBY
SHO.
SHO.
8 TWIN
9 SUITE (PWD ROOM)
WC
INFINITY POOL
LINE OF POOL
STAIR - H1
MAF
M&E SPACE
STAIR - H1
STAIR - H1
STAIR - H1
STAIR - H1
STAIR - H1
STAIR - H1
STAIR - H1
STAIR - H1
STAIR - H1
LIFT LOBBY
CORRIDOR
LIFT LOBBY
CORRIDOR
LIFT LOBBY
CORRIDOR
LIFT LOBBY
CORRIDOR
LIFT LOBBY
CORRIDOR
LIFT LOBBY
CORRIDOR
LIFT LOBBY
CORRIDOR
LIFT LOBBY
CORRIDOR
LIFT LOBBY
CORRIDOR
LIFT LOBBY
STAIR - H1
CORRIDOR
M&E SPACE
2700
SERVICE LIFT LOBBY
CRAWL SPACE
T&B
TWIN 21
SUITE BEDROOM
T&B
TWIN 21
SUITE BEDROOM
T&B
HALLWAY
T&B
KING SIZED BEDROOM
T&B
TWIN 21
SUITE BEDROOM
T&B
HALLWAY
T&B
KING SIZED BEDROOM
T&B
TWIN 21
SUITE BEDROOM
T&B
HALLWAY
T&B
KING SIZED BEDROOM
T&B
TWIN 21
SUITE BEDROOM
T&B
HALLWAY
T&B
KING SIZED BEDROOM
T&B
TWIN 21
SUITE BEDROOM
T&B
HALLWAY
T&B
KING SIZED BEDROOM
T&B
TWIN 21
SUITE BEDROOM
T&B
HALLWAY
T&B
KING SIZED BEDROOM
T&B
TWIN 21
SUITE BEDROOM
T&B
HALLWAY
T&B
KING SIZED BEDROOM
T&B
TWIN 21
SUITE BEDROOM
T&B
HALLWAY
T&B
KING SIZED BEDROOM
T&B
TWIN 21
SUITE BEDROOM
T&B
HALLWAY
T&B
KING SIZED BEDROOM
WC
WC
WC
WC
WC
WC
WC
WC
WC
WC
SHO
SHO
SHO
SHO
SHO
SHO
SHO
SHO
SHO
SHO
T&B
HALLWAY
T&B
KING SIZED BEDROOM
3300
STAIR - H2
EL.+50.15M
14900
SHEET CONTENTS :
b. PRODUCTION - Commercial and Office (BPO) Component 1. Completion of Working Drawings for Bidding and for Construction 2. Update 3D Model
3300
15TH FLOOR FINISH LEVEL
EL.+53.45M
N
R
14900
3300
STAIR - H2
EL.+56.75M
R. VILLAROSA ARCHITECTS
1. STAKING OF COLUMNS, BEAMS, AND SLABS SHALL BE COORDINATED AND VERIFIED WITH ARCHITECTURAL PLANS AND DETAILS. DIMENSIONS SHOWN ON STRUCTURAL PLANS ARE FOR DESIGN PURPOSES ONLY. CONSTRUCTION LAYOUT SHOULD FOLLOW ARCHITECTURAL ALIGNMENTS. SHOULD CONFLICT OCCUR BETWEEN STRUCTURAL AND ARCHITECTURAL PLANS, REFER THE MATTER TO THE ARCHITECT FOR FINAL DECISION AND APPROVAL. 2. COORDINATE WITH OTHER TRADES. 3. VERIFY ACTUAL CONDITION ON SITE.
3300
3300
L15
DATE:
PROJECT-IN-CHARGE
50
16TH FLOOR FINISH LEVEL EL.+60.05M
JAN. 15, 2021 Date JULY 24, 2018 JAN. 15, 2020 107-321-379
ISSUE NO:
IMPORTANT NOTES:
P
BroadwayMalyan BM
300
3300
2700 3300
EL.+63.35M
L16
N
26 26.1 3700
3700
DESCRIPTION
OWNER :
6900
POOL DECK
EL.+66.05M
17TH FLOOR FINISH LEVEL
DATE
6900
3300
TOP OF ELEVATOR SHAFT
Validity OR No. 228591 Date TIN
25
6900
3200
EL.+71.65M
1150
1150600
FEMALE TOILET
5TH FLOOR FINISH LEVEL
L5
SERVICE LIFT LOBBY
LIFT LOBBY
M&E AREA
HOTEL LEVEL LOBBY
HALLWAY 01
M&E AREA
M&E AREA
QUE WORKS
ALL DAY DINING
MEETING ROOMS
STR - H1
STR - H1
STR - H1
HALLWAY
M&E AREA
HOTEL ELEV LOBBY
PART OF GARDEN
HHALLWAY 01
3000
SERVICE ROOM
M&E
KITCHEN
MEETING ROOM
PART OF GARDEN
SERVICE HALLWAY 05
MEETING ROOM
5500
EL.+22.50M
4TH FLOOR FINISH LEVEL
SERVICE ROOM
4850
4850
EL.+27.35M
EE RISER
L5M
EE CHASE
3000
EL.+30.35M
H-EE/AUX
Meinhardt
L17
PUMP ROOM
POOL DECK LEVEL
LPD
7799 04096-228591-072418 5490556 PASIG CITY
EL.+72.25M
4450
LRD
ROY A. VILLAROSA
SYMBOL
PROJECT TITLE :
6900
6900
DESCRIPTION
23
21 DESIGN CONSULTANT:
REGISTERED ARCHITECT
WATER TANK FLOOR LEVEL
Electrical, mechanical, Fire Pro Consultant
19 6900
DATE
6900
3300
3500
6900
4100
TWT
EL.+75.75M
SYMBOL
52200
6900
PARTNERS & ASSOCIATES
TOP OF WATER TANK
DESCRIPTION
17
R. VILLAROSA ARCHITECTS 7100
DATE
6900
3500
SYMBOL
6900
1150 600
DESCRIPTION
6900
3300
Plumbing and Sanitary Consultant
7100
3300
DATE
R
1:100M
3300
SYMBOL
SCALE:
1150 600 3500
IMMCE
17TH FLOOR PLAN
1850
HOTEL TOWER
12 AR-1009 AR-1009
250
Structural Consultant
250
8350
CRAWL SPACE BELOW SWIMMING POOL
4450
P
HPE2
6550
HSE1
8
2017 to 2020
300
1:100M
ARUP
CAD Works
BEAM
DN
R
Architect-of-Record
Landscape Architect
3700
OUTDOOR SHOWER
UP
R. Villarosa Architects
Crearis
6900
GYM
15 16
AR-1006 AR-1013 TO AR-1010
LEED Consultant
HPE2
14
DN TO 17TH
6900
LIFT LOBBY
AR-1006 AR-1013 TO AR-1010
19
Barone International
HSE1/ HPE1
SERVICE LIFT LOBBY
11
1 UP TO URD
and Complex sites.
Facade Consultant
6900
RAISED PLANTER
HOUSEKEEPING
19
Activa is strategically located in Aurora Blvd corner Edsa, Quezon City. It offers a multifaceted fun living right within the master planned. Homeowners will benefit from an upscale living experience that will uniquely cultivate personal interests and vibrant sensibilities in a home that’s simply a beat from Cubao’s busy urban landscape.Industrial, Resort
MAAP
300
6900
BEAM LANDING - 1
P
6900
250
mixed-use development of residential, commercial, office and hotel will be one of the most iconic residential and commercial complex.
6900
6550
Activa Cubao is a
250
7100
Render | Visualization by:
STR -H1
19 AR-1013 AR-1013
HOTEL TOWER
LONGITUDINAL SECTION SCALE:
PART OF RETAIL
PART OF RETAIL
PART OF RETAIL
1:150M
20 AR-1013 AR-1013
HOTEL TOWER
CROSS SECTION 1 SCALE:
1:150M
21 AR-1013 AR-1013
HOTEL TOWER
CROSS SECTION 2 SCALE:
1:150M
R.VILLAROSA ARCHITECTS
FOR CONSTRUCTION
ISSUE NO:
DATE:
PROJECT-IN-CHARGE
R. VILLAROSA ARCHITECTS
Broadway Malyan
Design Concept
Professional Work | Activa Mixed-Use Development
Sample Floor Plan
04
Annex Lot
Site Development Plan | Team Collaboration using Autodesk AutoCAD.
Project History Timeline
Contributed in Podium, BPO Tower and Hotel Tower component.
05
Major Plan & Design Revisions.
Since then, ACTIVA project gone through (2) two major revisions
Residential Tower
1. Activa Cubao with Annex
Developer acquired the adjacent lot prompting the re-planning of the floor plans to accommodate the additional lot.
Hotel Tower
SOHO Tower
ACTIVA Components | Team Collaboration
using SketchUp and Adobe Photoshop .
Contributed in Podium, BPO Tower and Hotel Tower component.
Podium | Mall
2017
Professional Work | Activa Mixed-Use Development
Conceptualization of ACTIVA Cubao started on 2014.
2014
Original Plan & Design
Office | BPO Tower
2. Activa Cubao with Annex New Facade
On the later part of 2017, the developer decided to revise the facade of the whole development prompting the architect-of-record to revise the working drawings affected.
Master Elevations ACTIVA Master Elevations | Team
Collaboration using SketchUp and Adobe Photoshop. Contributed in Podium, BPO Tower and Hotel Tower component.
Front Elevation
Right-Side Elevation
Left-Side Elevation
Rear Elevation
N
P
R
ROOF DECK
2200 EL.+70.50M
ROOF DECK LEVEL/ CATWALK LEVEL
30
4450
AR-8009R AR-8009R
2700
LPD
L17
MALE TOILET
AR-8009R AR-8009R
34 17TH FLOOR FINISH LEVEL
M&E SPACE
SUITE BEDROOM
29
KING SIZED BEDROOM
T&B
SECTION D 1:100M
Partial Cross Section showing the Upper Roof Deck of the Hotel Tower
PART OF CRAWL SPACE
POOL DECK TO REAR TO POOL OVERFLOW PLANTERS@@POOL POOLDECK DECK LEVEL LEVEL Hotel Diagrammatic 33 SPOT 30 DETAIL Section | Layout using SPOT DETAIL SCALE: 1:20M AR-8007R AR-8009RAR-8007R AR-8009RSCALE: Tabulation
00
PART OF POOL DECK
This diagram was used on showing the occupant load of the Hotel Tower. This was presented in a coordination meeting held with the other consultants and FLEXIBLE CEMENTITIOUS FLEXIBLE CEMENTITIOUS developer. MEMBRANE WATERPROOFING MEMBRANE WATERPROOFING 39 WITH 50MM THK. (MIN) CONCRETE TOPPING & 6"x6" WELDED WIRE
WITH 50MM THK. (MIN) CONCRETE TOPPING & 6"x6"AR-8009R WELDED WIRE AR-8009R
1150
1225 5010050
50
300
PART OF FILLETCRAWL SPACE
POOL DECKDECK TO TOILET POOL TO POOL @ POOL DECK LEVEL @ POOL DECK LEVEL
31 34 SPOT SPOT DETAIL DETAIL
SCALE: AR-8007R AR-8009R SCALE: AR-8007R AR-8009R
1:20M
1:20M 1:20M
Section details of Swimming Pool with floor Elevations, Finishes and Waterproofing. FLEXIBLE CEMENTITIOUS MEMBRANE WATERPROOFING WITH 50MM THK. (MIN) CONCRETE TOPPING & 6"x6" WELDED WIRE REINFORCEMENT
3538 255
FLEXIBLE CEMENTITIOUS MEMBRANE WATERPROOFING WITH 50MM THK. (MIN) CONCRETE TOPPING & 6"x6" WELDED WIRE
3028
255
PART OF WATER TANK
SELF-ADHERING WATERPROOFING MEMBRANE WITH 50MM THK. CONCRETE TOPPING & 4" X 4" WELDED WIRE REINFORCEMENT
255
CAD Works
SLOPE
PART OF CATWALK
SPOT
FLEXIBLE CE MEMBRANE W WITH 50MM T TOPPING & 6 REINFORCEM
R.C. WALL (VERIFY STRUC
06
ELASTOMERIC
300
FLEXIBLE CEMENTITIOUS MEMBRANE WATERPROOFING WITH 50MM THK. (MIN) CONCRETE TOPPING & 6"x6" WELDED WIRE REINFORCEMENT
Autodesk AutoCAD, using Microsoft Excel. References are National Building Code of the Philippines and Fire Code of the Philippines.
SELF-ADHERING WATERPROOFING MEMBRANE WITH 50MM THK. CONCRETE TOPPING & 4" X 4" WELDED WIRE REINFORCEMENT
0
WATERPROOFING MEMBRANE (WITH CONCRETE TOPPING WITH ANTI-ROOTS)
FILLET
PART OF CRAWL SPACE
1:100M
OVERFL @ POOL
FFL
300
SECTION D
PART OF MALE FILLET TOILET
0
LVL 17 TO URD
AR-8005R AR-8008RSCALE: TO AR-8007R
275
KING SIZED BEDROOM
50
T&B
FFL
PART OF POOL DECK
5025
300
29
HALLWAY
PART OF SWIMMING POOL
150
FFL T&B
296
254
CRAWL SPACE
EL.+63.35M
SUITE BEDROOM
25 PART OF SWIMMING POOL
250
M&E SPACE
OVERFLOW
300
17TH FLOOR FINISH LEVEL
FLEXIBLE CEMENTITIOUS MEMBRANE WATERPROOFING WITH 50MM THK. (MIN) CONCRETE TOPPING & 6"x6" WELDED WIRE REINFORCEMENT
50
OVERFLOW
PART OF POOL DECK
FLEXIBLE CEMENTITIOUS MEMBRANE WATERPROOFING WITH 50MM THK. (MIN) CONCRETE TOPPING & 6"x6" WELDED WIRE REINFORCEMENT
850
SWIMMING POOL
AR-8009R AR-8009R
FFL
50
34
PART OF POOL DECK
1079
AR-8009R AR-8009R
EL.+66.05M
FFL
SELF-ADHERING WATERPROOFING MEMBRANE WITH 50MM THK. CONCRETE TOPPING & 4" X 4" WELDED WIRE REINFORCEMENT
31
30
25
FLEXIBLE CEMENTITIOUS MEMBRANE WATERPROOFING WITH 50MM THK. (MIN) CONCRETE TOPPING & 6"x6" WELDED WIRE REINFORCEMENT
FLEXIBLE CEMENTITIOUS MEMBRANE WATERPROOFING MEMBRANE (WITH WATERPROOFING WITH CONCRETE50MM TOPPING ANTI-ROOTS) THK.WITH (MIN) CONCRETE TOPPING & 6"x6" WELDED WIRE REINFORCEMENT FLEXIBLE CEMENTITIOUS MEMBRANE WATERPROOFING WITH 50MM THK. (MIN) CONCRETE TOPPING & 6"x6" WELDED WIRE REINFORCEMENT
300
POOL DECK
PART OF CRAWL SPACE
AR-8007R AR-8009RSCALE:
30
POOL DECK FLOOR LEVEL
Detailing Works
LVL 17 TO URD
50
ROOF DECK LEVEL/ CATWALK LEVEL
4450
L17
HALLWAY
T&B
R
AR-8009R AR-8009R
LPD
CRAWL SPACE
AR-8005R AR-8008RSCALE: TO AR-8007R
EL.+70.50M
MALE TOILET
OVERFLOW
OVERFLOW
EL.+63.35M
ROOF DECK
2200
LRD
SWIMMING POOL
AR-8009R AR-8009R
150 50
P
SELF-ADHERING WATERPROOFING MEMBRANE WITH 50MM THK. CONCRETE TOPPING & 4" X 4" WELDED WIRE REINFORCEMENT
31
EL.+66.05M
Updates on 3D Model for Design Coordinations with Engineering Consultants, Clients and Developer.
N
POOL DECK
POOL DECK FLOOR LEVEL
FFL
Professional Work | Activa Mixed-Use Development
LRD
2700
S a m p l e Wo r k s f o r C o d e C o m p l i a n c e R e p o r t
SketchUp 3D Work
FLEXIBLE C PAR MEMBRANE
LEFT-SIDE ELEVATION SCALE:
A1-03 A1-03
1:100
MAXIMUM BUILDING HEIGHT LIMIT
F
F
F
F
300
F
1863
1863
A1-03 A1-03
SPTOB
3718
300
WALKWAY 01
GARDEN DOOR BY LANDSCAPE
LANDSCAPE AREA VRF ACCU
6350 GUESTROOM
6400 ENTRY PORCH
11100 SEMI-PRIVATE ZONE
9996 SERVICE ZONE
GROUND FLOOR LINE
GL WL
150
2259 DRYING YARD
3962 ACU EQUIPMENT / VEGETABLE GARDEN
2
WL
1
A1-03
J
Q
M
R
3025
S
1290
S'
2089
T
1908
U
T'
1592
2325
V
1625
X
3725
X'
4725
1425
Y
Y'
K
1 2
4457
2
1
1
A1-03 SERVICE ZONE ZONE ROOF APEX
3396
600
SERVICE ZONE TOP OF BEAM
X 9094 FAMILY VERANDA
1090 PART OF PORCH
7890 PART OF SERVICE HALLWAY
800
15600 GARAGE AREA
X
800
X
5000 GENSET
21
3725 PUMP ROOM
24
DB
8
8'
22
10 11
3675
A1-03
7
13 16 2700
1
1
F
21
F
1
A
SCALE:
A1-03 3675 A1-03 BREAKFAST NOOK
17
15
3563
SCALE:
1
X'
23F
F
F
10138 LIVING AREA
F
F
F
2278
F
F
F
F
F
F
F
F
F
F
WL
1925 TO GARAGE
5000 GENSET
3725 PUMP ROOM
2425 STAIRS TO STORAGE
3950 STAFF LOUNGE
F
3500 UTILITY ROOM
4000 MAID'S ROOM
ML
3379 AUXILIARY KITCHEN
4924 MAIN KITCHEN
1775 HALLWAY TO BREAKFAST NOOK
BASKETBALL PAVILION TOP OF BEAM
BPTOB
5300 BREAKFAST NOOK
VERANDA FLOOR LINE
GL
GL VL
SIDEWALK
GL
1 1
2
F
F
F
F
F
F
F
F
F
3P 1900
7799
VALIDITY:
PATHWAY CONNECTING POOLHOUSE GAZEBO MAIN TO BASKETBALL COURT
1900
3900
1950
2 1
BASKETBALL PAVILION TOP OF BEAM
BPTOB
PANTRY
PTR NO.:
6702522
DATE:
JAN. 11, 2021
PLACE:
PASIG CITY
TIN:
107-321-379
F
F
F
F
F
F
F
F
F
F
F
F
F
F
SCALE:
SCALE:
F
F
F
POOL SIDEWALK
PRC NUMBER : 12128 PTR NUMBER : 1473382
WL
3
2'
1277
2927
2
F
10138 LIVING AREA
F
F
F
1500 POOL SIDEWALK
1350 PLANTERS
FRONT ELEVATION SCALE: A1-03 A1-03
SCALE:
A1-03 A1-03
PRIVATE ZONE ROOF APEX
F
F
MEZZANINE TOP OF BEAM
F
F
F
F
F
F
1950
MTOB
F
5052 BEDROOM 1
F
1
BASKETBALL PAVILION TOP OF BEAM
BPTOB
ML
F
F
5870 MASTER'S BEDROOM
2100 LEFT VERANDA
VERANDA FLOOR LINE
GL
GL
VL
PL
MAIN HOUSE
REAR ELEVATION SCALE:
2
F
2100
F
5052 BEDROOM 2
F
F
F
F
F
F
F
PART OF BASKETBALL COURT
F
F
BASKETBALL PAVILION FLOOR LINE
3B
2B 2425
CS No. 06 GROUND FLOOR NEW YORK MANSIONS, MOTREAL STREET RODRIGUEZ, CUBAO QUEZON CITY Email: clme.montreal@gmail.com
SWIMMING POOL GAZEBO
LEFT-SIDE ELEVATION SCALE:
RIGHT-SIDE ELEVATION SCALE:
4192
PATHWAY CONNECTING MAIN HOUSE TO BASKETBALL COURT
SIDEWALK
SHEET CONTENTS
BASKETBALL PAVILION FLOOR LINE
MAIN HOUSE: FRONT ELEVATION RIGHT-SIDE ELEVATION LEFT-SIDE ELEVATION REAR ELEVATION
BASKETBALL PAVILION
REAR ELEVATION
8
1:100
SCALE:
A1-03 A1-03
BASKETBALL PAVILION ELEVATIONS POOL GAZEBO ELEVATIONS
1:100
REVISIONS
2P 1900
1P 3900
2
2
1 1800
1
POOL PAVILION TOP OF BEAM
PPTOB
DATE
DESCRIPTION
10000 MAXIMUM BUILDING HEIGHT LIMIT
BUILDING LINE SETBACK
PROPERTY LINE
ROOF LINE/ EAVES SETBACK
3P
1
POOL PAVILION TOP OF BEAM
0730832 01-07-21 QUEZON CITY
1
PATHWALK LINE
POOL PAVILION ROOF APEX
PPA
2
ISSUED AT
PROJECT MANAGER
4500
2
106 186 110
BASKETBALL PAVILION TOP OF BEAM
BPTOB
BASKETBALL PAVILION
PROPERTY LINE
ROOF LINE/ EAVES SETBACK
PA
BUILDING LINE SETBACK
PB
1
724
TIN
PTR
2
MAXIMUM BUILDING HEIGHT LIMIT
POOL PAVILION ROOF APEX
PPA
PRC
ISSUED ON
SANITARY ENGINEER
3375
2 1
PL
1800
MAXIMUM BUILDING HEIGHT LIMIT
10000 MAXIMUM BUILDING HEIGHT LIMIT
PROPERTY LINE
1800
1
PPTOB
9
1350 PLANTERS
PATHWALK LINE
PL
1:100
Facade Perspective | 3D Modelling in SketchUp, Rendering in Lumion
Render | Visualization by: R. Villarosa Architects
2100
POOL PAVILION FLOOR LINE
GL
PATHWALK LINE
PL
1200 SERVICE WALKWAY
10 A1-03 A1-03
SWIMMING POOL GAZEBO
LEFT-SIDE ELEVATION SCALE:
1:100
100
GL
5000 SWIMMING POOL
FRONT ELEVATION
3100
2100
POOL PAVILION FLOOR LINE
100
GL
SWIMMING POOL LINE
SWIMMING POOL GAZEBO SCALE:
PATHWAY
PL 1500 POOL SIDEWALK
PANTRY
POOL SIDEWALK
POOL PAVILION FLOOR LINE
PATHWALK LINE
1200 SERVICE WALKWAY
1350 PLANTERS
SWIMMING POOL
1500 POOL SIDEWALK
SWIMMING POOL LINE
11 A1-03 A1-03
5000 SWIMMING POOL
SWIMMING POOL GAZEBO
RIGHT-SIDE ELEVATION SCALE:
1:100
BATH HOUSE
POOL SIDEWALK
12 A1-03 A1-03
1500 LINE OF POOL BEHIND
SWIMMING POOL
POOL GAZEBO
PATHWAY
POOL SIDEWALK
1500 LINE OF POOL BEHIND
PATHWALK LINE
A1-03 A1-03
3100
3100 POOL SIDEWALK
POOL PAVILION FLOOR LINE
POOL GAZEBO
2100
PIZZA OVEN & BBQ AREA
100
PANTRY
BUILDING LINE SETBACK
ROOF LINE/ EAVES SETBACK
PROPERTY LINE
1962 VERANDA FLOOR LINE
1. STAKING OF COLUMNS, BEAMS, AND SLABS SHALL BE COORDINATED AND VERIFIED WITH ARCHITECTURAL PLANS AND DETAILS. DIMENSIONS SHOWN ON STRUCTURAL PLANS ARE FOR DESIGN PURPOSES ONLY. CONSTRUCTION LAYOUT SHOULD FOLLOW ARCHITECTURAL ALIGNMENTS. SHOULD CONFLICTS OCCUR BETWEEN STRUCTURAL AND ARCHITECTURAL PLANS, REFER THE MATTER TO THE ARCHITECT FOR FINAL DECISION AND APPROVAL. 2. COORDINATE WITH OTHER TRADES.
R.VILLAROSA ARCHITECTS
SWIMMING POOL GAZEBO
REAR ELEVATION SCALE:
PB
2076
GL
GL
VL
PL
F
PATHWALK LINE
BASK
RIG SCALE:
1:100
PA 4500
POOL PAVILION ROOF APEX
PPA
2
FOR PERMIT
3. VERIFY ACTUAL CONDITION ON SITE.
SHEET NO.
A1-03
1:100
POOL PAVILION ROOF APEX
PPA
2
1
PL
10
1B
MAXIMUM BUILDING HEIGHT LIMIT
BUILDING LINE SETBACK
2
POOL PAVILION TOP OF BEAM
PPTOB
3100 2100
PL
2 1
1
POOL GAZEBO
2100 LEFT VERANDA
PART OF BASKETBALL COURT
BASKETBALL PAVILION FLOOR LINE
MAXIMUM BUILDING HEIGHT LIMIT
GL
IMPORTANT NOTES
100
GL
PB 4500
POOL PAVILION ROOF APEX
PPA
2
POOL PAVILION TOP OF BEAM
PPTOB
ROOF LINE/ EAVES SETBACK
PROPERTY LINE
ROOF LINE/ EAVES SETBACK
BUILDING LINE SETBACK
PA
3P 1900
1800
10000 MAXIMUM BUILDING HEIGHT LIMIT
2P 3900
2
F
5870 MASTER'S BEDROOM
POOL GAZEBO
A1-03 A1-03
REVISIONS
1
F
F
F
1
POOL PAVILION TOP OF BEAM
POOL PAVILION TOP OF BEAM
PPTOB
POOL GAZEBO
POOL PAVILION FLOOR LINE
GL
PATHWALK LINE
PL
1200 SERVICE WALKWAY
BASKETBALL PAVILION ROOF APEX
BPA
GL
A1-03 A1-03
MAXIMUM BUILDING HEIGHT LIMIT
1P
F
F
PPTOB
POOL PAVILION FLOOR LINE
MAXIMUM BUILDING HEIGHT LIMIT
PATHWALK LINE
7
1:100
MAXIMUM BUILDING HEIGHT LIMIT
1900
2 1
2100
F
5900 PARENT'S ROOM
3900
AB
BASKETBALL PAVILION ROOF APEX
BPA
F
BB
1
PATHWALK LINE
CESAR L. MADRIAGA
CB
2
POOL PAVILION TOP OF BEAM
1:100
1:100
RA
DB
PB 4500
2 1
SWIMMING POOL LINE
4994
2100
75
F
6446 FOYER
4
POOL PAVILION ROOF APEX
5052 BEDROOM 1
PA
DATE ISSUED : 04JAN'2021 PLACE ISSUED : SAN JUAN CITY
PL
SWIMMING POOL
1
973
1
F
F
F
A1-03 A1-03
PPA
F
F
7
POOL PAVILION ROOF APEX
PPA MECHANICAL CONSULTANT
GL
PROPERTY LINE
3' 694
GROUND FLOOR LINE
6237 DINING AREA
F
1
BASKETBALL PAVILION TOP OF BEAM
BPTOB
ML
PROPERTY LINE
ENGINEERS
MARVIN A. CAPARROS STRUCTURAL ENGINEER
ELECTRICAL CONSULTANT
ROOF LINE/ EAVES SETBACK
4 2179
2
F
F
3675 BREAKFAST NOOK
F
F
MAXIMUM BUILDING HEIGHT LIMIT
Rm. 205 GRACE Bldg., Ortigas Ave., Greenhills, S.J., M.M. Tel. Nos. +632 8941-0420; 8941-1958; 8941-0492 Fax No. +632 8941-1535
PATHWAY
BUILDING LINE SETBACK
4' 2873
GROUND FLOOR LINE
WALKWAY LINE
F
2
A1-03 A1-03
2076
F
2100 150
GL
F
CB 1950
BASKETBALL PAVILION ROOF APEX
BPA
F
5052 BEDROOM 2
3100
F
F
F
DB MTOB
1:100 EDVIN SANTIAGO, ASLA PALA
BASKETBALL PAVILION SWIMMING POOL GAZEBO 6 LEFT-SIDE ELEVATION
9
1:100
2100
7 2873
3200
3960
F
F
RA
MEZZANINE TOP OF BEAM
REAR ELEVATION
200
7' 2179
MEZZANINE FLOOR LINE
F
PRIVATE ZONE ROOF APEX
GROUND FLOOR LINE
5000 SWIMMING POOL
FRONT ELEVATION
10000 MAXIMUM BUILDING HEIGHT LIMIT
9 694
1
F
F
4994
1
5900 PARENT'S ROOM
PART OF BASKETBALL COURT
POOL SIDEWALK
PATHWALK LINE
PL
PATHWALK LINE
10000 MAXIMUM BUILDING HEIGHT LIMIT
9' 1131
2
1
1 2100
2
F
PPTOB
PIZZA OVEN TO MAIN HOUSE & BBQ AREA
BASKETBALL PAVILION FLOOR LINE
GL
2076
9" 2873
2638
1
2 973
DATE: JUL. 23, 2021
OR NO.: 317019
R.S. CAPARROS ASSOCIATES & CO.
DB
2
3100
9"' 1202
PROPERTY LINE
2
2 1
2' 2927
ROOF LINE/ EAVES SETBACK
CB
1
1
200
10 1933
2 2
SERVICE ZONE TOP OF BEAM
GHTOB
11 2581
10000
12 1933
1962
13 3375
ROOF LINE/ EAVES SETBACK
15 3200
BUILDING LINE SETBACK
17 3563
1
PROPERTY LINE
2715
18 2837
700
BUILDING LINE SETBACK
ROOF LINE/ EAVES SETBACK
GREAT HALL ROOF APEX
GHRA
21 18' 2700
3 1277
1
JAN. 15, 2024
IAPOA NO.: 04096-317019-072321
CONSULTING
BASKETBALL PAVILION ROOF APEX
BPA
2
POOL PAVILION FLOOR LINE
MAXIMUM BUILDING HEIGHT LIMIT
22
3' 694
BUILDING LINE SETBACK
BB
F
BASKETBALL PAVILION
5 A1-03 A1-03
AB
MAXIMUM BUILDING HEIGHT LIMIT
3675
4 2179
2
SANITARY ENGINEER 24
4' 2873
1800
2P
2
POOL PAVILION TOP OF BEAM
PL
1:100
3B 3900
BASKETBALL PAVILION FLOOR LINE
PL
1P
2425
1
PATHWALK LINE
RIGHT-SIDE ELEVATION SCALE:
3375
2
POOL PAVILION ROOF APEX
PPA
PPTOB
MAIN HOUSE
3 A1-03 A1-03
5517
7 2873
1800
BASKETBALL PAVILION ROOF APEX
BPA
2B
F
GROUND FLOOR LINE
4150 DRIVER'S ROOM
SCALE:
3100
F
REAR GARDEN
1225 PATHWALK
FRO
2100
F
F
OPEN TO GARAGE
2100
F
VEGETABLE GARDEN
WALKWAY LINE
BASK
SWIMMING POOL LINE
11 A1-03 A1-03
SWIMMING POOL GAZEBO
RIGHT-SIDE ELEVATION SCALE:
1:100
100
F
F
4192
MTOB
3100
F
1B
2100
F
F
7' 2179
3100
MEZZANINE TOP OF BEAM
2638 F
9 694
MAXIMUM BUILDING HEIGHT LIMIT
RA
1
3200
F
F
PL
5
STRUCTURAL CONSULTANT
PROPERTY LINE
A 1600
2100
F
VL
SIDEWALK
BASKETBALL PAVILION FLOOR LINE
PATHWALK LINE
A1-03 A1-03
9' 1131
2100
PROPERTY LINE
A' 425
2
75
F
GL
GL
MAIN HOUSE
10000 MAXIMUM BUILDING HEIGHT LIMIT
B 1600
3350 3100
F
9" 2873
LANDSCAPE ARCHITECT
ROOF LINE/ EAVES SETBACK
C
GROUND FLOOR LINE
150
GL
F
9"' 1202
6446 FOYER
BUILDING LINE SETBACK
D 2000
1500 LINE OF POOL BEHIND
E 1900
1
F
VERANDA FLOOR LINE
INTERIOR DESIGNER
1:500
2076
G 2100
1
2
2278
10 1933
3100
G' 1300
MEZZANINE FLOOR LINE
3718
5300 BREAKFAST NOOK
MONICA SARMIENTO-BELEN
6237 DINING AREA
2100
G" 1775
3900
SERVICE ZONE TOP OF BEAM
SPTOB
1775 HALLWAY TO BREAKFAST NOOK
C
F
200
J
L 1025
PRIVATE ZONE ROOF APEX
2
11 2581
F
F
MAXIMUM BUILDING HEIGHT LIMIT
10000 MAXIMUM BUILDING HEIGHT LIMIT
L' 1662
1800
N 1717
3100
P 1911
2100
R 2089
100
S
1908
2 1
B
4924 MAIN KITCHEN
MEZZANINE FLOOR LINE
BUILDING LINE SETBACK
S'
1592
2325
10000 MAXIMUM BUILDING HEIGHT LIMIT
T
1625
PROPERTY LINE
T'
2425
ROOF LINE/ EAVES SETBACK
U
V
3725
2076
W
4725
3379 AUXILIARY KITCHEN
INTERIOR FDESIGNER F F
Y'
MAXIMUM BUILDING HEIGHT LIMIT
MAXIMUM BUILDING HEIGHT LIMIT
200
X
1425
F
LANDSCAPE ARCHITECT
10000 MAXIMUM BUILDING HEIGHT LIMIT
X'
775
F
25
1962
BUILDING LINE SETBACK
ROOF LINE/ EAVES SETBACK
SERVICE ZONE ZONE ROOF APEX
SRA
Y
725
F
1:100
12
PRC NO.:
4
MAXIMUM BUILDING HEIGHT LIMIT
Y'
F
ROY A. VILLAROSA
1:100
Elevations | Generate thru Revit Model Detailed 3425
F
R. VILLAROSA ARCHITECTS
1933
3375
A1-03 A1-03
Z
SCALE:
13
3200
LEFT-SIDE ELEVATION
A1-03 A1-03
6021
F
F
MAIN HOUSE
2
using Autodesk AutoCAD
F
RIGHT-SIDE ELEVATION
KEY PLAN
GROUND FLOOR LINE
F
GROUND FLOOR LINE
A1-03 A1-03
WALKWAY LINE
F
1
BASKETBALL PAVILION TOP OF BEAM
BPTOB
7th Floor, Strata 100 Building, F. Ortigas Jr. Road, Ortigas Center Pasig City, 1605 Metro Manila, Philippines Tel. Nos.: (632) 631-2878; (632) 631-2888 Fax: (632) 631-2806
2
Z
F
F
REGISTERED ARCHITECT
Y
F
2278
REAR GARDEN
4000 MAID'S ROOM
ARCHITECT
U
X
22
F
F
ML
BASKETBALL PAVILION ROOF APEX
BPA
PARTNERS & ASSOCIATES
W
2
2
1
F
WL
T
F
JENTAYU HOLDINGS
A1-03
S
T'
F
3500 UTILITY ROOM
P
S'
F
F
A1-03
3
L'
V
2
5
F
F
MAIN HOUSE
3 A1-03 A1-03
J
18 2837
700
A1-03
1B 2B 3B
3960
GL
F
F
3950 STAFF LOUNGE
E
R
21 18'
12 14
19 20
WL
1200 WALKWAY 01
2425 STAIRS TO STORAGE
G'
G"
A1-03 A1-03
GL
WALKWAY LINE
3300 DRIVER'S ROOM
F
1B 4192
MTOB
3100
13706 BEDROOM VERANDA
6
5
MEZZANINE TOP OF BEAM
2100
1000 PLANTERS
F
F
22
SERVICE ZONE TOP OF BEAM
GHTOB
3100 GROUND FLOOR LINE
150
75
SPTOB
VEGETABLE GARDEN
F
VERANDA FLOOR LINE
18
300
GROUND FLOOR LINE
VL
GHRA
3
2100
2600
F
2100
3200
REAR GARDEN
1863
F
GREAT HALL ROOF APEX
2100
F
2450
1863
150
MEZZANINE FLOOR LINE
300
15
RA
1
100
2638
SRA
BALCONY
F
9' 9'" 11 12
18'
N
BASKETBALL PAVILION
BB CB
6
A1-03
MEZZANINE CEILING LINE
F
17
1925 TO GARAGE
A1-03
24
AB
5517
3890
PROPERTY LINE
1962
900
13
L
8
M
Q
6193
3425
F
OWNER
MAXIMUM BUILDING HEIGHT LIMIT
Z
725
775
2
1
F
GL
W
2425
F
F
G
A1-03
A 1600
2
10000 MAXIMUM BUILDING HEIGHT LIMIT
3925
F
MAIN HOUSE
BUILDING LINE SETBACK
K 1975
ROOF LINE/ EAVES SETBACK
1925
9" 10
4150 DRIVER'S ROOM
7'
F
D
PROPERTY LINE
J
H 1330
2715
G' 1920
MAXIMUM BUILDING HEIGHT LIMIT
G 954
150
F 2873
41
ML
MAXIMUM BUILDING HEIGHT LIMIT
Professional Work | Residential at Hacienda Sta. Elena
C' 1048
2
MCL
07
C 1600
10000 MAXIMUM BUILDING HEIGHT LIMIT
B 425
PRIVATE ZONE ROOF APEX
ROOF LINE/ EAVES SETBACK
A' 1600
BUILDING LINE SETBACK
A
4'
9
H
MAXIMUM BUILDING HEIGHT LIMIT
RA
3'
7
F
A1-03 A1-03
G
G'
2
4 1225 PATHWALK
F
9
OPEN TO GARAGE
C'
F A1-03
A' 425
MEZZANINE FLOOR LINE
B
C
1:100
3 2'
B 1600
A1-03
A
A'
FRONT ELEVATION SCALE:
F
A1-03
4
GROUND FLOOR LINE
C
HACIENDA STA. ELENA
A1-03
11
POOL GAZEBO
PB
A1-03
MAIN HOUSE
1 A1-03 A1-03
PA
10
2278
WALKWAY LINE
D 2000
BUILDING LINE SETBACK
11750 FAMILY VERANDA 24200 PRIVATE ZONE
GL
WALKWAY LINE
SLOPE DN
6100 MASTER'S BEDROOM - WALK-IN-CLOSET
VERANDA FLOOR LINE
VL
12
VEGETABLE GARDEN
150
DRYING YARD
3100
LANDSCAPE AREA
2100
3200 2100
F
OPEN TO FOYER
GROUND FLOOR LINE
75
GL
F
GARDEN DOOR BY LANDSCAPE
OPEN TO FOYER
OPEN TO FOYER
E 1900
3100
F
G 2100
2100
F
G' 1300
1
ROOF LINE/ EAVES SETBACK
F
F
G" 1775
3900
STA. ELENA COUNTRY HOME
1
PROPERTY LINE
F
J
L 1025
1800
F
2
A1-03
1P 2P 3P
2100
F
L' 1662
PRIVATE ZONE ROOF APEX
3100
F
F
N 1717
200
SERVICE ZONE TOP OF BEAM
MEZZANINE FLOOR LINE
ML
P 1911
2
A1-03
2 1
SERVICE ZONE TOP OF BEAM
SPTOB
R
2089
2076
F
1908
1592
2325
3100
F
T TITLE /S' S PROJECT PROJECT LOCATION
1625
2100
3350
2638
F
T'
2425
200
SRA
1
U
V 3725
2638
2
W 4725
10000 MAXIMUM BUILDING HEIGHT LIMIT
2 1
X 1425
3200
1
SERVICE ZONE ZONE ROOF APEX
X' 775
2100
1
SERVICE ZONE ZONE ROOF APEX
SRA
Y 725
3425
75
6246
2825
2
MEZZANINE TOP OF BEAM
MTOB
1850
1962
1
2700
100
1
1700
25
2638
2
23
22
3200
875
21
2100
2
1325
3200
20
PROPERTY LINE
2500
19
ROOF LINE/ EAVES SETBACK
2000
2075
1933
18
17
BUILDING LINE SETBACK
2581
16
14
BUILDING LINE SETBACK
1933
13
16
2
4075
12
ROOF LINE/ EAVES SETBACK
2600
11
PROPERTY LINE
2800
10
3350
2800
2800
9"
10000 MAXIMUM BUILDING HEIGHT LIMIT
8'
PROPERTY LINE
2900
8
ROOF LINE/ EAVES SETBACK
6
BUILDING LINE SETBACK
5
3900
2100 BUILDING LINE SETBACK
1962
ROOF LINE/ EAVES SETBACK
PRIVATE ZONE ROOF APEX
PROPERTY LINE
5000
RA
3
2
10000
Y'
6021
1
75
Z
MAXIMUM BUILDING HEIGHT LIMIT
POOL PAVILION FLOOR LINE
PATHWALK LINE
0M
S 65D 31' W = 20.0
1P
ROOF EAVES SETBACK BUILDING SETBACK
3P
2P
A-01
1P-1P
A-01
3900
1912
BATH HOUSE
PIZZA OVEN
GRILLER
BARBECUE AREA SHOWER
SHOWER
TOILET
PA
A-01 A-01
PB
1:100
SWIMMING POOL
LOT AREA = 5533.02 SQ.M.
Front Perspective | Model in SketchUp 3D, Rendered in Lumion 1
2
3
2'
2100
3'
3900
4
4'
7
A-01 A-01
7'
7-7
5052
1970
9
9'
9"
5052
9'" 10
11 A-01
13
12
10-10
A-01
5900
1933
2581
15
1933
18
17
3375
3200
18' 21
3200
22
3200
24
A-01
3400
3675
13-13
A-01 186
2100
1613
250 1151 75 MM DEP.
1100
250
1900
750 A
750 A
1112 X
750 A
DINING AREA
POCKET DOOR
1112 X
POCKET DOOR
1112 X 4450 4X 1112 X
750 A 1112 X
UR
WC
MAIN KITCHEN
SWING SEAT
AUXILIARY KITCHEN
700
2100 2800
700
2100 2800
700
2100 2800
700
2100
6
8
8'
1717
LAVATORY UP
1000
5
INCLINED LADDER
SHOWER 50 MM DEP.
3
T&B
700
MAID'S ROOM
CLOSET 50 MM DEP.
6428 2075
13
6000
LA 1516 ND IN G
12
14
16
LINE OF STORAGE ABOVE
16
5
11
3200
UTILITY STO.
89
43
1900
U
DRYING YARD UP TO STORAGE LEVEL
2000
SLOPE DN
MANHOLE
600
1836
TANK 1
LINE OF STORAGE ABOVE
2000 10% SLOPE (1:10) 5850
11
63
72
15
27758 1% SLOPE DOWN TO SIDEWALK
40
3B
38
68
SLOPE DN
GENSET
SLOPE DN
X 2000 2200
DRIVER'S LOUNGE
2000
596
LAV
T&B
FOR PERMIT
R.VILLAROSA ARCHITECTS
272 3279
3278
27
93
LANDING 00
322
RAMP UP
42
6
2000 EAVES SETBACK 3000 BLDG SETBACK
3000
PROPERTY LINE
7320 24FT 18288 60FT
100 MM DEP.
1577
321
GUARD HOUSE
3000
FOOTBALL GOAL
1423
22
RAMP UP
LOT
OUTDOOR SINK
VEGETABLE GARDEN
Y' Z
WALKWAY 01
ROOF EAVES
VEGETABLE GARDEN
100 MM DEP.
875
N 69D 08' E = 52.64M ROAD
STO.
SHOWER
2.00M WALL
8277
11277 10% SLOPE
5485 18'
RAMP UP
ROOF EAVES SETBACK 2440 8FT
5000 BLDG SETBACK 3000 EAVES SETBACK
4691
4691
BUILDING SETBACK
Y
SLOPE DN
WATER CLOSET
6
10969 36FT
DRIVER'S ROOM
1700
19 20
1
2700
21
5
N 67D 23' E = 10.09M
1850
22
2825
23
25
4
3000 EAVES SETBACK 5000 BLDG SETBACK
UP
225
MP
22
GOAL AREA
X'
3000
2291
00 G 15 DIN N LA
3425
RA
12
100 MM DEP.
2063
FOOTBALL
ROOF EAVES
300
225
100 MM DEP.
LANDING 01
800
5485 18'
38
68
PENALTY AREA
725
2B
00
60
W
VRF UNITS
TRENCH FOR AC EQUIPMENT
10
1:100
DN
3725
600
P
100 MM DEP.
4725
300
DRIVEWAY
MANHOLE
POTABLE WATER TANK Cap. 155 cu.m. 4 - CAR GARAGE
600
PUMP ROOM 600
RAMP UP
LANDING 02
1950
6-6
SLOPE DN
RAINWATER TANK Cap. 24 cu.m.
P
A-01 A-01 15 LAND15 ING
P
RAMP UP
3900
8334
5850
6543
PAVILION
FLOOR PLAN
SCALE:
8.33 60 % 01 SL OPE
V
LINE OF STORAGE ABOVE
TANK 2
TRENCH FOR AC EQUIPMENT
60 35 ING ND
LA
2000 10% SLOPE (1:10)
CB
1B
Foyer, Interior Perspective | Model in SketchUp 3D, Rendered in Lumion
T'
STAIRS
DN
DB
T FRUIT BEARING TREES
SLOPE DN
STAFF LOUNGE
100 MM DEP.
RAMP UP
BASKETBALL PAVILION
BB
300
A1-01 A1-01
51
FRONT GARDEN
S'
225
800
REF CLOSET
100 MM DEP.
SLOPE DN
1625
TOILET
MUD ROOM
225
26 2689
A-01 A-01
AB
REF
3668
2B-2B
6000
6012 8.33% SLOPE
DN
2425
3375
3200
1790
6000
DRYER
IRONING
1B-1B
S
LAUNDRY TUB
WASHING MACHINE
UTILITY ROOM
A-01 A-01
R
5700
2 94
10
4210 PORTE COCHERE
8.3
BASKETBALL COURT
2000
1908
1933
1592
2581
LINE OF STORAGE ABOVE
1933
3700
4837 OPE SL 3%
P 1911
WATER CLOSET
100 MM DEP.
2100 2900
2.00M WALL
2325
DN
LAUNDRY SINK
KITCHEN SINK
REF
FREEZER
2089
700
700
550 150
700
N
50MM DEP.
PORCH COUNTER
Q
L'
1662
WC
SHO
WRITING DESK
CONNECTED TO POOL WALKWAY
1800
1:100
3025
700
75 MM DEP.
VERANDA
SWING SEAT
COUNTER
RANGE
T&B
M
J
L
SERVICE HALLWAY
RANGE LAV
GUESTROOM
G' G"
1775
LADDER TO ACU ACCESS
LAV
PWDR. RM - F
WC
50 MM DEP.
G
2425
WALK-IN-CLOSET
KITCHEN SINK
CL
PWDR. RM - M
CLOSET QUEEN SIZE BED
E
FOOD / CHINA STORAGE
LINEN CABINET
CCTV/E.E. ROOM
3925
PANTRY
CHILLER
TV
D
REF
FREEZER
RIGHT CORRIDOR
LEFT CORRIDOR
FAMILY AREA
75 MM DEP.
2000
1150
1150
1150 800
LINE OF ACU ACCESS ABOVE
800 Y
SHELVES UP TO MEZZANINE LEVEL
WATER CLOSET
75 MM DEP.
75 MM DEP.
LIVING AREA
LAV SHOWER
1100
1112 X
2108 793
75 MM DEP.
WC SHELVES
LAV
MASTER'S BEDROOM - T&B
K
FOYER
CLOSET
1500mm TURNING RADIUS
3300 3Z
T&B
WC
STAIRS
DESK
LAV
2100
250
800
LAV
T&B LAV
1975
MAIN HOUSE
GROUND FLOOR PLAN
SCALE:
J
1100
1100 Z
SHO
T&B WC
75 MM DEP.
1100 Z POCKET DOOR
DESK
WALK-INCLOSET
LAV
75 MM DEP.
2100
1100 Z
A-01 A-01
H
1100
800 Y
2100 773
G'
2100
75 MM DEP.
SHO
WALK-INCLOSET
1925
A1-01 A1-01
3250
SHO
MASTER'S BEDROOM
1-1
1100
RIGHT VERANDA
250
LINE OF MEZZANINE FLOOR ABOVE
SWING BENCH
PARENT'S KING SIZE BED ROOM
TOYS STORAGE CAB
G
2100
100 MM DEP.
BEDROOM 2
LINE OF MEZZANINE FLOOR ABOVE
2100 773 954
STUDY DESK
1100
250
773
BEDROOM 1
2100
100 MM DEP.
QUEEN SIZE BED KING SIZE BED
N 22D 37' W = 90.96M
F
BOOKSHELF
LOFT BED
3921
C'
75 MM DEP.
SWING
250
C
EAST GARDEN
LINE OF MEZZANINE FLOOR ABOVE
LINE OF BALCONY ABOVE
75 MM DEP.
75 MM DEP.
LINE OF BALCONY ABOVE
793 2100
1600
B
2100
1918
1300
2100
3900
773
1025
2100
TO POOL AREA WALKWAY 04
773
LEFT VERANDA
2025
A'
S 20D 52' E = 89.95M
2100
800
773 LINE OF BALCONY ABOVE
1150
2100
750
1918
3000 4A
186
BREAKFAST NOOK
2100
TO POOL AREA WALKWAY 03
773
750 A
2100
750 A
786
A
2000 EAVES SETBACK 3000 BLDG SETBACK
PROJECT TITLE / PR
7799
H
04096-317019-0
CO
6702522
OWNER
PASIG CITY
H
PRC NO.:
A
IAPOA NO.:
R
PTR NO.:
ARCHITECT
PLACE:
INTERIOR DESIGNER
MON
LANDSCAPE ARCHIT
EDV
R.S. CAPARR
CONSULTING
STRUCTURAL CONS
MAR STR
Rm. 205 GRACE Bl Tel. Nos. +632 8941-0420
PRC NUMBER : 12128 PTR NUMBER : 14733
MECHANICAL CONS
ELECTRICAL CONSU
SANITARY ENGINEE
SANIT
CESAR
CS No. 06 GROUND FLOOR NEW YOR STREET RODRIGUEZ, CUBAO QUEZO Email: clme.montreal@gmail.com
PROJECT MANAGER
GR MEZ
SHEET CONTENTS
DATE
BASKETB POOL
REVISIONS
REVISIONS
IMPORTANT NOTES
1. STAKING OF COLUMN VERIFIED WITH ARCHIT STRUCTURAL PLANS LAYOUT SHOULD FOLL OCCUR BETWEEN ST MATTER TO THE ARCHI
2. COORDINATE WITH OTH
A
3. VERIFY ACTUAL CONDI
SHEET NO.
Rear Perspective | Model in SketchUp 3D, Rendered in Lumion
Professional Work | Residential at Hacienda Sta. Elena
POOL GAZEBO
4500
2P-2P
BUILDING SETBACK ROOF EAVES SETBACK
GAZEBO
FLOOR PLAN
SCALE:
ROOF EAVES SETBACK BUILDING SETBACK
3000 BLDG SETBACK 2000 3 EAVES SETBACK
2000 EAVES SETBACK 3000 BLDG SETBACK
2
LINE
S 69D 08' W = 40.00M PROPERTY
A1-01 A1-01
3000 BLDG SETBACK 2000 EAVES SETBACK
3000 BUILDING SETBACK 2000 EAVES 1 SETBACK
08
MAIN HOUSE
F
F
F
5052 BEDROOM 1
BUILDING LINE SETBACK
ROOF LINE/ EAVES SETBACK
PROPERTY LINE
2076 3100 2100
2100 75
10000
2076 3100
5.60sqm.
700
3B
2B
700
2100
3
5
6 FRONT GARDEN
2425
3375
8
8' 10
1933
12
2075
13
2000
14
16
2000
T' 1625
60.16sqm.
STAIRS
2000
6.38sqm.
V
P
600
PUMP ROOM
0
600
P
600
TANK 1
SLOPE DN
GENSET
X
ZONE BUILDING AREA (FOOTPRINT)
2000
DRIVER'S ROOM 18.24sqm.
T&B
VEGETABLE GARDEN
STO.
10.25sqm.
AREA
% 21.01%
SWIMMING POOL
206.00sqm 26.95sqm
GREEN ZONE
3075.51sqm
55.58%
BASKETBALL COURT
251.75sqm
OUTDOOR PAVED AREA
1,172.37sqm
21.19%
VRF UNITS
32.81sqm
OUTDOOR STRUCTURES
122.40sqm
2.21%
%
TOTAL
5533.02sqm 100%
BUILDING SETBACK
Y
SLOPE DN
9.84sqm.
111.96sqm.
WATER CLOSET
1,162.75sqm
X'
3000
2.05sqm.
725
800
300
2200
2000
DRIVER'S LOUNGE
Y'
OUTDOOR SINK
SHOWER
1:400
32.81sqm.
14.25sqm.
FOOTBALL GOAL
REAR VERANDA
1,172.37sqm
SLOPE DN
BUILDING SETBACK
103.09sqm.
W
VRF UNITS
TRENCH FOR AC EQUIPMENT
ROOF EAVES
300
RAINWATER TANK Cap. 24 cu.m. MANHOLE
600
SLOPE DN
448.14sqm.
251.75sqm.
MANHOLE
POTABLE WATER TANK Cap. 155 cu.m. 4 - CAR GARAGE
3725
6-6 DRIVEWAY
4725
P
2.16sqm.
SLOPE DN
600
TANK 2
AREA TABULATION SUMMARY
146.56sqm
U
DRYING YARD UP TO STORAGE LEVEL
LINE OF STORAGE ABOVE
DB
225
60.16sqm
1900
T FRUIT BEARING 32.73sqm. TREES
SLOPE DN
26.81sqm.
CB
%
2100 1300 1775 1717
S'
STAFF LOUNGE
Z
WALKWAY 01 21.12sqm.
ROOF EAVES SETBACK VEGETABLE GARDEN
2.00M WALL
448.14sqm
S
SLOPE DN
3425
%
3900 1662
26 89
A-01 A-01
BASKETBALL 3X3 COURT
122.40sqm
DRYER
20.90sqm.
REF
5-5
BASKETBALL PAVILION
WASHING MACHINE
UTILITY ROOM
4.20sqm.
6000
54.13sqm.
R
LAUNDRY TUB
LINE OF STORAGE ABOVE
16 UTILITY STO.
WALKWAY 02
3.95sqm
SUBTOTAL
19.69sqm.
5700
300
51.52sqm 12.80sqm
TO P OOL ARE A WALKWAY 04
MAID'S ROOM CLOSET
A-01 A-01
2581
11
8.57sqm.
LAVATORY
4-4
50 MM DEP.
1933
33.73sqm.
54.13sqm
P
2.00M WALL
T&B
6.60sqm.
50.00sqm.
GAZEBO
KITCHEN SINK
REF
FREEZER
WATER CLOSET
SHOWER
REF
BB
N
50MM DEP.
21.29sqm.
41.35sqm.
700
CLOSET
2.38sqm.
55.42sqm.
AUXILIARY KITCHEN
PORCH SHOWER
2100 2800
1911
2100 2800
12 A1-03 A1-03
2089
700
L L'
1908
2100 2800
GUARD HOUSE 3.95sqm.
6
2000 EAVES SETBACK 3000 BLDG SETBACK
5000 SWIMMING POOL
J
1592
700
G"
2325
1B-1B
COUNTER COUNTER
RANGE
2.85sqm.
2100 2900
TOILET
A-01 A-01
BATH HOUSE
2000 EAVES SETBACK 3000 BLDG SETBACK
ROOF LINE/ EAVES SETBACK RANGE
50 MM DEP.
A-01 A-01
800
37.71sqm.
A-01 A-01
COUNTER
1B
1150 750 A
MAIN KITCHEN 34.77sqm.
SERVICE HALLWAY
3-3
LAV
LAV
DRYING YARD
SUBTOTAL
750 A
750 A
5.60sqm.
50 MM DEP.
T&B
7.00sqm.
OUTDOOR SEATING AREA
VERANDA
KITCHEN SINK
1025
5.00sqm.
WATER CLOSET
35.74sqm.
COUNTER
REF
FREEZER
0.96sqm.
PWDR. RM - F
PWDR. RM - M
CLOSET
BED
GUESTROOM 27.00sqm.
SWIMMING POOL
G'
8.83sqm.
CL
LADDER TO ACU ACCESS
1:100
E G
FOOD / CHINA STORAGE
NICHE
63.09sqm.
SWING SEAT
AB
OUTDOOR STRUCTURES :
GUARD HOUSE
153.26sqm
DRIVEWAY
SCALE:
15.48sqm.
25.35sqm.
OUTDOOR PAVED AREA :
WALKWAY
TO POO L AR EA WALKWAY 03 1112 X 1112 X 4450 4X LINE OF ACU ACCESS ABOVE
RIGHT CORRIDOR
11.72sqm.
FAMILY AREA
1500 POOL SIDEWALK
1112 X
WATER CLOSET
LEFT CORRIDOR
SITTING AREA
700
D
1350 PLANTERS
2425
23.48sqm.
POOL SIDEWALK
1100
CONNECTED TO POOL WALKWAY
WALK-IN-CLOSET
2100
1200 SERVICE WALKWAY
1112 X
67.06sqm.
REF
WATER CLOSET
A-01 A-01
M
1100
750
100
LIVING AREA
58.04sqm.
6.80sqm.
2100
A-01 A-01
2,893.09sqm
3,075.51sqm
1100
PATHWALK LINE
PL
12.44sqm.
SHOWER
2100
RIGHT VERANDA
EL.+0.00M 875
N 69D 08' E = 52.64M ROAD
LOT
1
19 20
1700
2700
21
5
N 67D 23' E = 10.09M
1850
22
2825
23
25
4
3000 EAVES SETBACK 5000 BLDG SETBACK
SUBTOTAL
FOYER
CLOSET
1500mm TURNING RADIUS
LAV
SHELVES
3675
LINE OF STORAGE ABOVE
VEGETABLE GARDEN
WATER CLOSET
24
13-13
A-01
34.00sqm.
UP TO MEZZANINE LEVEL
RIGHT-SIDE ELEVATION
1,162.75sqm
T&B
9.23sqm.
LAV
T&B
7.65sqm.
STAIRS 6.46sqm.
2-2
POOL PAVILION FLOOR LINE
1100
5850
OPEN GREEN AREA
29.15sqm
SHOWER
5.62sqm.
T&B
WATER CLOSET
2100
GL
SITTING AREA
WALK-INCLOSET
SHELVES
1100
42.34sqm.
SHELVES
7.65sqm.
K
147.51sqm
26.95sqm.
225
PLANTERS
SHOWER
LAV
WRITING DESK
LAV
MASTER'S BEDROOM - T&B
Q
PAVILLION
SHELVES
22
A-01
3400
IRONING
%
SHELVES
5.62sqm.
SWIMMING POOL GAZEBO
2021 MAY 24 UPDATED AREA TABULATION SUMMARY AREA (sqm.)
TV
PARENT'S ROOM
WRITING DESK
SHOWER
WALK-INCLOSET
2100
BED
39.50sqm.
SITTING AREA
SITTING AREA
58.82sqm.
A-01 A-01
J
2B-2B
ROOM / AREA
SITTING AREA
MASTER'S BEDROOM
1-1
H
FLOOR AREA BREAKDOWN
GREEN ZONE :
BEDROOM 2
39.50sqm.
18' 21 3200
POCKET DOOR
BEDROOM 1
WRITING DESK
18
3200
PATHWAY
TV
BED
TV
G'
12-12
A-01
3200
BED 1100
G
109.47sqm
SUBTOTAL
109.47sqm
17
3375
5.30sqm.
LINE OF MEZZANINE FLOOR ABOVE
TV
8.00sqm.
F
SCALE:
15
1933
TRENCH FOR AC EQUIPMENT
A1-03 28.25sqmA1-03
13
11-11
A-01
2581
ROOF EAVES SETBACK
43.89sqm
STORAGE 02
12
10-10
A-01
2.09sqm.
GRAND TOTAL
11
STORAGE 01
11 1933
1613
MUD ROOM
337.32sqm
VERANDA AND CANOPY
14.35sqm
9'" 10
2100
5.04sqm.
299.00sqm
SERVICE ZONE - MEZZANINE
22.98sqm
186
225
147.94sqm
1:100
SERVICE ZONE
SERVICE ZONE (MEZZANINE FLOOR): ACU SERVICE LOFT
9"
1918
800
PUBLIC ZONE
SWIMMING POOL LINE
MAID'S ROOM LOFT
LEFT-SIDE ELEVATION PRIVATE ZONE - MEZZANINE
337.32sqm
SUBTOTAL
2100
LEFT VERANDA
BED
GARDEN
C'
6.38sqm
9'
9-9
5900
773
5850
SWIMMING POOL GAZEBO
378.92sqm
9.84sqm
2100
77.77sqm.
B
CEAST
PATHWALK LINE
9
8-8+
A-01
773
13.00sqm.
225
AREA (sqm.)
PRIVATE ZONE - GROUND FLOOR
A'
7'
7-7
5052
2100
CCTV/E.E. ROOM
GL
7
A-01
5052
773 LINE OF BALCONY ABOVE
250
GARAGE STORAGE
4'
2100
1150
147.51sqm
26.81sqm
4
1918
A
POOL GAZEBO
14.25sqm
POOL PAVILION FLOOR LINE
186
250
GENSET
3' 1970
2100
A-01
1000
STAFF LOUNGE
773
4210 PORTE COCHERE
35.74sqm
3
2' 3900
2100
A-01
3100
2
786
A-01
2100
1
A-01 A-01
800
37.71sqm
A-01
1150
11.27sqm
POOL PAVILION TOP OF BEAM
PPTOB A-01
800
34.00sqm
FRONT VERANDA
1800
LOT AREA = 5533.02 SQ.M.
750 A
1
2.05sqm
PUMP ROOM
BUILDING SETBACK LINE SETBACK SETBACK EAVES ROOF BUILDING
PPA
2
28.49sqm
SERVICE HALLWAY
SUMMARY (BUILDING AREA/ ROOFED)
SCALE:
2 1
POOL PAVILION TOP OF BEAM
PPTOB
STAIRS TO STORAGE MEZZ. PL
10
5.04sqm
POOL PAVILION ROOF APEX
800 Y
RIGHT VERANDA
SUBTOTAL
A1-03 A1-03
206.00sqm.
1100 Z POCKET DOOR
77.77sqm
PATHWALK LINE
1200 SERVICE WALKWAY
SWIMMING POOL
2100
POOL GAZEBO
20.18sqm
26.29sqm
DRIVER'S ROOM W/ T&B DRIVER'S LOUNGE
PA 4500
3300 3Z
VERANDA : LEFT VERANDA
147.94sqm
POOL PAVILION FLOOR LINE
AREA (sqm.)
PPA
MAID'S ROOM W/ T&B E.E. & CCTV ROOM
PB
1100 Z
ACU ACCESS
ROOM / AREA
25.35sqm
299.00sqm
2.09sqm 103.09sqm
POOL PAVILION ROOF APEX
1100 Z
43.40sqm
1
GARAGE
250
84.36sqm
2
SUBTOTAL
34.77sqm
1151
ROOF LINE/ EAVES SETBACK
PROPERTY LINE
PROPERTY LINE
MEZZANINE FLOOR
2 RIGHT CORRIDOR
MUD ROOM
250
1
16.25sqm
LINE OF BALCONY ABOVE
MAIN KITCHEN
PRIVATE ZONE (MEZZANINE FLOOR):
BALCONY
PB
4500
3000 4A
4.20sqm
GREAT ROOM / LIVING AREA BREAKFAST NOOK
16.25sqm.
UTILITY STORAGE
PA
750 A
67.06sqm
58.37sqm
PB
POCKET DOOR
20.90sqm
BREAKFAST NOOK
LAUNDRY / UTILITY ROOM
750 A
44.98sqm
LINE OF STORAGE ABOVE
DINING AREA
11.27sqm.
52.77sqm
A-01 A-01
PROPERTY LINE
0.96sqm
40.00sqm.
250
8.83sqm
LADDER TO ACU ACCESS
POOL GAZEBO
1150
FOOD / CHINA STORAGE
5.60sqm
2P-2P
250
5.60sqm
POWDER ROOM 2
11.52sqm.
TOILET
1112 X
POWDER ROOM 1
52.77sqm
BARBECUE AREA SHOWER
PA
44.98sqm.
23.48 sqm
GRILLER
DINING AREA
21.29sqm
PIZZA OVEN
12.80sqm.
SHOWER
1:10
2021 MAY 24
1912
1112 X
AUXILIARY KITCHEN
2000 EAVES SETBACK
3P
1P-1P
A-01
27758 1% SLOPE DOWN TO SIDEWALK
1:100
2000 EAVES SETBACK 3000 BLDG SETBACK
SCALE: 2P
A-01
4500
41.35sqm
ZONE
FRONT ELEVATION
4
N 67D 23' E = 10.09M
S 65D 31' W = 20.00M
PROPERTY LINE
PORCH
5000 SWIMMING POOL
F
HACIENDA ELEVATION STA. ELENA 3 RIGHT-SIDE SANTA ROSA, LAGUNA
2
800 Y
1350 PLANTERS
F
BLDG SETBACK BASKETBALL PAVILION UY RESIDENCE
A1-03 A1-03
6000
1500 POOL SIDEWALK
F
PATHWALK LINE
3900
BUILDING LINE SETBACK
12.44 sqm
BUILDING LINE SETBACK
MASTER'S BEDROOM - T&B
SWIMMING POOL LINE
SWIMMING POOL GAZEBO SCALE:
7.83sqm
SUBTOTAL
PL
MAXIMUM BUILDING HEIGHT LIMIT
PANTRY
A1-03 A1-03 GL
PL
1
NICHE
9 A1-03 A1-03
SWIMMING POOL
PATHWAY
F
F
5
2689
PATHWALK LINE
POOL SIDEWALK
F
F
700
1:100
VL
LINE OF MEZZANINE FLOOR ABOVE
1:100 1500 LINE OF POOL BEHIND
POOL SIDEWALK
F
BATH HOUSE
LINE OF BALCONY ABOVE
PIZZA OVEN & BBQ AREA
GL
700
REAR ELEVATION
PART OF BASKETBALL GUARD COURT
N 69D 08' E = 52.64M PAVILION FLOOR LINE GL ROAD LOT
1P
1800
PANTRY
F
N 22D 37' W = 90.96M
PL
12
SWIMMING GAZEBO SWIMMING POOLPOOL GAZEBO 12 REAR ELEVATION
FOR PERMIT FOR PERMIT
SERVICE ZONE:
MAXIMUM BUILDING HEIGHT LIMIT
58.04sqm
PARENT'S ROOM
PPTOB
1
ROOF EAVES SETBACK
S 69D 08' W = 40.00M
700
5000 SWIMMING POOL
A1-03 A1-03 A1-03 A1-03 SCALE: SCALE:
PUBLIC ZONE :
AREA (sqm.)
ROOM / AREA
FOYER
GUESTROOM 1. STAKING OF COLUMNS, BEAMS, AND SLABS SHALL BE COORDINATED AND 39.00sqm 1. STAKING OF COLUMNS, BEAMS, AND SLABS SHALL BE COORDINATED AND VERIFIED WITH ARCHITECTURAL PLANS AND DETAILS. DIMENSIONS SHOWN ON VERIFIED WITH ARCHITECTURAL PLANS AND DETAILS. DIMENSIONS SHOWN ON FAMILY AREA 63.09sqm STRUCTURAL PLANS ARE FOR POOL DESIGN PAVILION PURPOSES ONLY. CONSTRUCTION STRUCTURAL PLANS ARE FOR DESIGN ROOF PURPOSES ONLY. CONSTRUCTION APEX LAYOUT SHOULD FOLLOW ARCHITECTURAL ALIGNMENTS. SHOULD CONFLICTS PPA LAYOUT SHOULD FOLLOW ARCHITECTURAL ALIGNMENTS. SHOULD CONFLICTS LEFT CORRIDOR OCCUR BETWEEN STRUCTURAL AND ARCHITECTURAL PLANS, REFER THE 11.72sqm OCCUR BETWEEN STRUCTURAL AND ARCHITECTURAL PLANS, REFER THE MATTER TO THE ARCHITECT FOR FINAL DECISION AND APPROVAL. STAIRS (TO MEZZANINE) MATTER TO THE ARCHITECT FOR FINAL DECISION AND APPROVAL. 6.46sqm 2. COORDINATE WITH OTHER TRADES. 2. COORDINATE WITH OTHER TRADES. 378.92sqm SUBTOTAL 3. VERIFY ACTUAL CONDITION ONPOOL SITE. PAVILION 3. VERIFY ACTUAL CONDITION ON SITE. TOP OF BEAM
SHEET NO.SHEET NO.
2
BASKETBALL PAVILION TOP OF BEAM
7
2025
POOL GAZEBO
POOL PAVILION FLOOR LINE
R.VILLAROSA ARCHITECTS R.VILLAROSA ARCHITECTS
VRF UNITS
HOUSE
793
SWIMMING POOL
SWIMMING POOL
AB 1900
2
BPTOB
3000 BUILDING SETBACK 2000 EAVES 1 SETBACK
1600
1500 POOL SIDEWALK
POOL SIDEWALK
BB 3900
1
ML
VERANDA FLOOR LINE
2100
1200 1350 1200 1350 WALKWAY PLANTERS 1500 SERVICE SERVICE WALKWAY PLANTERS POOL SIDEWALK
POOL SIDEWALK
1
2100 LEFT VERANDA
CB 1950
BASKETBALL PAVILION ROOF APEX
BASKETBALL
GROUND FLOOR LINE
773
2
POOL SIDEWALK
6
3921
POOL SIDEWALK
BATH HOUSE
AREA (sqm.)
ROOM / AREA
58.82sqm
BEDROOM 02
1:100
3000
MASTER'S BEDROOM
BEDROOM 01
SCALE:
BUILDING SETBACK
3900
2
AREA (sqm.)
1800
1
BATH HOUSE
ROOF EAVES/LINE
PATHWAY CONNECTING MAIN HOUSE TO BASKETBALL COURT
FRONT ELEVATION
DB
MTOB
BPA
2000 EAVES SETBACK 3000 BLDG SETBACK
ROOF EAVES/LINE SETBACK
2021 MAYAND 24 UPDATED AREA TABULATION PARTNERS ASSOCIATES (MAIN HOUSE)
MASTER'S BEDROOM - WALK-IN CLOSET
3100
PATHWAY
3100
GL
100
1:100
2100
SIDE ELEVATION E ELEVATION 1:100
PANTRY
5870 MASTER'S BEDROOM
F
1:400
1:100
2100
PATHWAY POOL PAVILION FLOOR LINE
SCALE:
IMPORTANT IMPORTANT NOTES NOTES PANTRY
5000 SWIMMING POOL
GAZEBO LPOOL GAZEBO
1
1
1500 LINE OF POOL BEHIND
PATHWALKLLINE
2
2
3P
PATHWALK LINE
1962
BUILDING SETBACK
5052 BEDROOM 2
PRIVATE ZONE :
1900
2100
P
100
G
DESCRIPTION DATE DESCRIPTION
100
3100
2P 3900
1500 LINE OF POOL BEHIND
PL
POOL PAVILION TOP OF BEAM
PPTOB
POOL PAVILION FLOOR LINE L
1P
1P
10000 MAXIMUM BUILDING HEIGHT LIMIT
1800
1800 3100 2100
GL
100
POOL PAVILION ROOF APEX
1800
10000 MAXIMUM BUILDING HEIGHT LIMIT
1P
PPA
2 1
1
3900
3900
ROOF LINE/ 10000 EAVES SETBACK MAXIMUM BUILDING HEIGHT LIMIT
2P 1900
BUILDING LINE SETBACK
3P2P
POOL PAVILION TOP OF BEAM
PPTOB
PPTOB
REAR ELEVATION REVISIONS DATE
F
FLOOR AREA BREAKDOWN R. VILLAROSA ARCHITECTS
REVISIONS REVISIONS MAIN HOUSE
REVISIONS
L E G E N D :
F
F
BASKETBALL PAVILION
DRIVEWAY
MEZZANINE TOP OF BEAM
MEZZANINE FLOOR LINE
F
PROPERTY LINE
ROOM / AREA 3P
F
F
10000 MAXIMUM BUILDING HEIGHT LIMIT
BUILDING LINE SETBACK
ROOF LINE/ EAVES SETBACK
A1-03 A1-03
2
POOL PAVILION TOP OF BEAM
3200
F
F
3000 EAVES SETBACK 5000 BLDG SETBACK
F
F
F
F
RA
2100
F
PRIVATE ZONE ROOF APEX
BASKETBALL COURT 3X3
SUBDIVISION REQUIREMENT
1:100
4 BUILDING LINE SETBACK
PROPERTY LINE
ROOF LINE/ EAVES SETBACK
PROPERTY LINE
ROOF LINE/ EAVES SETBACK
PROPERTY LINE
PROPERTY LINE
PP
PAVILION
200
F
F
F
F
4994
2100
3200
F
F
PATHWALK LINE
2100
F
6446 5900 BASKETBALL PAVILION ELEVATIONS PARENT'S FOYER ROOM POOL GAZEBO ELEVATIONS POOL GAZEBO ELEVATIONS
10138 LIVING AREA
A1-03 A1-03 A1-03 A1-03 SCALE:
POOL PAVILION ROOF APEX
POOL PAVILION ROOF APEX A
973
2100
REAR ELEVATION REAR ELEVATION SCALE: 1:100
1900
PPA
2927
F
SETBACKS AND OPEN AREAS BASKETBALL PAVILION ELEVATIONS
MAXIMUM BUILDING HEIGHT LIMIT MAXIMUM BUILDING HEIGHT LIMIT
MAXIMUM BUILDING HEIGHT LIMIT
1277
F
MAXIMUM BUILDING HEI
773
BASKETBALL PAVILION BASKETBALL PAVILION
F
SCALE:
2D to 3D Works
694
3.7.5 OUTSIDE OF ROOF AND/OR EAVES, INCLUDING PORTE-COCHERE OR ANY CANOPY OF THE BUILDINGS MUST BE AT LEAST 3 METERS FROM A PROPERTY LINE FRONTING THE STREET AND 2 METERS FROM THE PROPERTY LINES NOT FRONTING A STREET.
MAIN HOUSE: F F MAIN HOUSE: ELEVATION FRONT FRONT ELEVATION RIGHT-SIDE ELEVATION RIGHT-SIDE ELEVATION LEFT-SIDE ELEVATIONF LEFT-SIDE ELEVATION REAR ELEVATION REAR ELEVATION
F
F
PL
SIDEWALK
1962
2179
THE MINIMUM BUILDING LINE SETBACKS ARE AS FOLLOWS: F F A. SIDES FRONTING A STREETS 5.00meters B. SIDES NOT FRONTING A STREET 3.00meters
F
SHEET CONTENTS SHEET CONTENTS F
GL
VL
2638
QUEZON CITY
AT LEAST 30% OF THE TOTAL LOT AREA SHALL BE USED EXCLUSIVELY FOR GREEN SPACE. GREEN SPACE SHALL MEAN AN OPEN SPACE THAT IS PLANTED WITH GRASS, PLANTS, OR TREES AND MAY INCLUDE PARKS, THE PLANTED AREAS OF FRONT, REAR, AND SIDE SETBACKS 2 2 BUT SHALL NOT INCLUDE PAVED 1DRIVEWAYS, PAVED WALKWAYS, PAVED PARKING AND SWIMMING POOLS.1 THE LOT-OWNER SHALL ALSO ENDEAVOR TO PLANT TEN (10) TREES FOR EVERY CAR/VEHICLE OWNED.
SIDEWALK
SIDEWALK
F
GL
ROOF LINE/ EAVES SETBACK
ISSUED AT
694 2873 2873 2179 2873 1131(PAGE ISSUED AT QUEZON CITY 3.4 1202 REQUIRED GREEN SPACE 005, CHAPTER 3 - RESTRICTIONS, SUB-PARAGRAPH 3.4)
1
BASKETBALL PAVILION FLOOR LINE
A1-03 A1-03
LINE OF MEZZANINE FLOOR ABOVE
SANITARY ENGINEER 2581 SANITARY ENGINEER
PROJECT PROJECT MANAGERMANAGER
2
BASKETBALL PAVILION TOP OF BEAM
BPTOB
5
954
1:100
1:100 PRC 724 WATER, AND PRC 724OTHER UTILITIES AS MAY BE NEEDED. THE TOTAL AREA TO BE DEVOTED TO BUILDINGS AND OTHER ROOFED STRUCTURES SHALL NOT EXCEED 30% OF THE AREA OF THE LOT, MEASURED ON THE BASIS OF THE AREA ACTUALLY COVERED BY ROOFS (INCLUDING TIN 106 186 110 TIN 106 186 110 EAVES). SEPARATE CARPORT, GARAGE, GAZEBO, SERVANTS' QUARTERS, OR OTHER SIMILAR STRUCTURES MAY BE BUILT PROVIDED THE AFORESAID PTR 30% RESTRICTION IS NOT EXCEEDED. THE REMAINING 70% OF LOT AREA SHALL BE USED EXCLUSIVELY FOR OPEN SPACE AND 0730832 PTR CONSISTS 0730832 OF A MINIMUM OF FIVE (5) METERS ON THE SIDES FRONTING A STREET AND A MINIMUM OF THREE (3) METERS ON SIDES SHALL NOT FRONTING ISSUED ONA STREET. 01-07-21 ON 01-07-21 10 ISSUED9"' 9" 9' 9 7' 7 4' 4 3' 3 2' 2 1
L. MADRIAGA CESAR L.CESAR MADRIAGA 1933
3B 2425
MAIN HOUSE
3.7 BUILDING ENVELOPE AND SETBACK (PAGE 006, CHAPTER 3 - RESTRICTIONS, SUB-PARAGRAPH 3.7.2)
PATHWALK LINE
8
2638
10000 MAXIMUM BUILDING HEIGHT LIMIT
PROPERTY LINE
ROOF LINE/ EAVES SETBACK
BUILDING LINE SETBACK
ROOF LINE/ EAVES SETBACK
BUILDING LINE SETBACK
11
F
2 1
3.3 REQUIRED OPEN SPACE (PAGE 004, CHAPTER 3 - RESTRICTIONS, SUB-PARAGRAPH 3.4)
CS No. 06 GROUND FLOOR NEW YORK MANSIONS, MOTREAL MOTREAL YORK MANSIONS, NEWRODRIGUEZ, CS No. 06 GROUND FLOOR QUEZON CITY CUBAO STREET QUEZON CITY STREET RODRIGUEZ, CUBAO Email: clme.montreal@gmail.com Email: clme.montreal@gmail.com
12
BPA
2100
A1-03 A1-03 A1-03 A1-03 SCALE:
6237 DINING AREA
VERANDA FLOOR LINE
3250
3675 BREAKFAST NOOK
5300
COMPLIANT 71.30% BREAKFAST NOOK
773
WL
RIGHT-SIDE ELEVATION RIGHT-SIDE ELEVATION SCALE: 1:100
1,033.64sqm 1775 3,945.33sqm HALLWAY TO BREAKFAST NOOK
GROUND FLOOR LINE
BASED ON "HACIENDA STA. ELENA'S MANUAL OF REGULATIONS ON DEED RESTRICTIONS, ARCHITECTURAL AND ENGINEERING DESIGN GUIDELINES, AND ADMINISTRATIVE AND CONSTRUCTION GUIDELINES"
SCALE:
F
8
4924 MAIN KITCHEN
18.68%
REAR GARDEN
2108
7
WALKWAY LINE
BASKETBALL PAVILION BASKETBALL PAVILION
TOTAL AREA
COMPLIANT
1925
7
3379 AUXILIARY KITCHEN
52.62%
793
150
GL
2,911.69sqm
COMPLIANT
1
F
ML
BASKETBALL PAVILION ROOF APEX
REMARKS F F
1975
P
F
GREEN AREA (UNPAVED) note: at least 30% of total area or at least 1,659.91sqm
F PERCENTAGE F F (%) F
4192
BASKETBALL PAVILION FLOOR LINE BASKETBALL PAVILION FLOOR LINE L
PATHWALKLLINE
F
AREA (sqm)
RIGHT-SIDE THE ELEVATION LOT-OWNER MUST PROVIDE OPEN SPACES FOR THE PURPOSES OF LANDSCAPING, PARKING, AND EASEMENT FOR DRAINAGE, SEWAGE,
1933
3375
OPEN SPACES F
F
OUTDOOR PAVED AREA includes pool, driveway, walkway, vrf units, basketball court
SANITARYSANITARY ENGINEERENGINEER
2100
PL
F
3925
F
COMPLIANT
3025
F
F
4000 MAID'S ROOM
1
1
PATHWAY CONNECTING PATHWAY CONNECTING MAIN HOUSE TO MAIN HOUSE TO BASKETBALL COURT BASKETBALL COURT
G
COMPLIANT
1900
F
GL
0.07% 28.69%
2B 3375
1950
F
F
F
2278
F
3500 UTILITY ROOM
13
2
2
3.95sqm 1,587.69sqm
S 20D 52' E = 89.95M
F
PATHWALK LINE
GROUND FLOOR LINE
F
MAIN HOUSE
3
4192
2
1
COMPLIANT
1B 4192
MTOB
NICHE
2
1.42%
GAZEBO
SWIMMING POOL
MEZZANINE TOP OF BEAM
ROOF EAVES SETBACK BUILDING SETBACK
F
F
3950 STAFF LOUNGE
1B
1B
3375
3375
COMPLIANT
5000 BLDG SETBACK 3000 EAVES SETBACK
F
200
3960
P
PATHWALKLLINE
2 1 BASKETBALL PAVILION TOP OF BEAM 1BASKETBALL PAVILION BPTOP OF BEAM
3200
2B
1.62%
3000 BLDG SETBACK 2000 EAVES SETBACK
F
1
15
2425
89.43sqm
5000 BLDG SETBACK 3000 EAVES SETBACK
F
10000 MAXIMUM BUILDING HEIGHT LIMIT
2425 STAIRS TO STORAGE
2100
F
F
F
BASKETBALL PAVILION FLOOR LINE BASKETBALL PAVILION FLOOR LINE L
G
2
3100
F
2B
BP
2100
PART OF BASKETBALL COURT
F
TOB
200
PART OF BASKETBALL COURT
3B
RA
1
1800
F
BPTOB
F
F
F
1:100
2425
COMPLIANT
2100
F
3563
25.58%
MAXIMUM BUILDING HEIGHT LIMIT
F
2
F
F
PART OF BASKETBALL COURT
PART OF BASKETBALL COURT
17 3B
PRIVATE ZONE ROOF APEX
MEZZANINE FLOOR LINE
A1-03 A1-03
2837
1600
2
REMARKS
1,415.57sqm
78.74sqm
GAZEBO ROOF AREA
TOTAL AREA
LEFT-SIDE ELEVATION LEFT-SIDE ELEVATION 1:100
BASKETBALL PAVILION ROOF APEX BASKETBALL PAVILION ROOF APEX A
BPA
PAVILION ROOF AREA
GUARDHOUSE AREA
BASKETBALL PAVILION BASKETBALL PAVILION
18
700
PRC NUMBER : 12128 DATE ISSUED : 04JAN'2021 PRC NUMBER : 12128 DATE ISSUED : 04JAN'2021 PLACE ISSUED : SAN JUAN CITY PTR NUMBER : 1473382 PLACE ISSUED : SAN JUAN CITY PTR NUMBER : 1473382
PERCENTAGE (%)
1
MAINHOUSE ROOF AREA
ELECTRICAL CONSULTANT ELECTRICAL CONSULTANT
6
425
OPEN SPACES area shall be less than or equal to 3,873.114 sqm.
F
3725 PUMP ROOM
1600
MAXIMUM BUILDING HEIGHT
A
7.83sqm.
F
2000
A'
OPEN SPACES 70%
F
F F
AREA2 (sqm)
BUILDING / ROOFED STRUCTURE
F
F F F
B
PANTRY
F F
1900
C
550 150
F
D
PROPERTY LINE
F F
E
BUILDING/ROOFED STRUCTURES area shall be less than or equal to 1,659.906 sqm.
A. CAPARROS MARVINMARVIN A. CAPARROS STRUCTURAL STRUCTURAL ENGINEERENGINEER
3100
F
1025
G
S 20D 52' E = 89.95M
F
F
2076
1
1
F
1662
TOTAL LOT AREA = 5,533.02sqm J G" G' BUILDING / ROOFED 30% 1775 STRUCTURES 1300 2100 3900
L
3100
2700
2
2
F
1717
MECHANICAL CONSULTANT MECHANICAL CONSULTANT
200
2715
3100
2100
3100
F
1911
2089
ENGINEERS
L'
ROOF EAVES SETBACK BUILDING SETBACK
F
F
21 18'
AB
2
F
1908
1592
CONSULTING CONSULTING Rm. 205 GRACE Bldg.,
N
ROOF LINE/ EAVES SETBACK
F
F F
F
MAXIMUM BUILDING HEIGHT LIMIT MAXIMUM BUILDING HEIGHT LIMIT
SERVICE ZONE TOP OF BEAM
GHTOB
2100
3675 1900
1 F
P
100
F
F
A1-03 A1-03 A1-03 A1-03 SCALE: SCALE:
2076
2076
BPTOB
R
BUILDING LINE SETBACK
F
5000 GENSET
10000 MAXIMUM BUILDING HEIGHT LIMIT
1
1
1900
PROPERTY LINE
10000
2076
MAXIMUM BUILDING HEIGHT LIMIT
3200 2100
2
2
GREAT HALL ROOF APEX
GHRA
BASKETBALL PAVILION TOP OF BEAM BASKETBALL PAVILION TOP OF BEAM
200
GLGL V LP L
VL
F
6
10000 MAXIMUM BUILDING HEIGHT LIMIT 10000 MAXIMUM BUILDING HEIGHT LIMIT
BP
BBAB
BB
3900
3900
1
1
TO MAIN HOUSE
1925 TO GARAGE
22
5517 BUILDING LINE SETBACK
BASKETBALL PAVILION ROOF APEX BASKETBALL PAVILION ROOF APEX A
MBP L TOB
75
GL
2
PATHWALK LINE
P
1:100
CB 1950
ROOF LINE/ EAVES SETBACK
1962 2638
10000
2638
DBCB
S
PROPERTY LINE
3100
G
FRONT ELEVATION FRONT ELEVATION 1:100
1950
BPA
ML
F
BASKETBALL PAVILION BASKETBALL PAVILION
24
1950
BASKETBALL PAVILION FLOOR LINE BASKETBALL PAVILION FLOOR LINE L
PATHWALKLLINE
PL 4150 DRIVER'S ROOM
2100
TO MAIN HOUSE
200
GL
1
1950
200
PATHWAY CONNECTING PATHWAY CONNECTING MAIN HOUSE TO MAIN HOUSE TO BASKETBALL COURT BASKETBALL COURT
1225 PATHWALK
5
S'
R.S. CAPARROS ASSOCIATES & CO. R.S. CAPARROS ASSOCIATES & CO.ENGINEERS
2325
DB
2
F
F
3900
3900
CBDB
BPTOB
3100
F
F
1900
2
CB
1
1
2076
2076
ROOF LINE/ EAVES SETBACK
BUILDING LINE SETBACK F
WALKWAY LINE
T
1625
BASKETBALL PAVILION TOP OF BEAM BASKETBALL PAVILION TOP OF BEAM
2100
PROPERTY LINE
10000 MAXIMUM BUILDING HEIGHT LIMIT
BUILDING LINE SETBACK
ROOF LINE/ EAVES SETBACK
BUILDING LINE SETBACK
PROPERTY LINE
2076
3350 150
2
OPEN TO GARAGE
2100
200
200
F
BB
2
F
VEGETABLE GARDEN
DB
3200
BUILDING LINE SETBACK
F
F
STRUCTURAL CONSULTANT STRUCTURAL CONSULTANT
T'
2425
MAXIMUM BUILDING HEIGHT LIMIT
MTOB
MTOB
2100
75
F
RA
RA
MEZZANINE TOP OF BEAM
ROOF LINE/ EAVES SETBACK
BUILDING LINE SETBACK
F
F
BP
BPTOB
10000 MAXIMUM BUILDING HEIGHT LIMIT
PRIVATE ZONE ROOF APEX
09
F
BASKETBALL PAVILION ROOF APEX BASKETBALL PAVILION ROOF APEX A
MAXIMUM BUILDING HEIGHT LIMIT MAXIMUM BUILDING HEIGHT LIMIT
VERANDA FLOOR LINE VERANDA FLOOR LINE
1
GL
F
ABBB 1900
2278
A1-03 A1-03 A1-03 A1-03 SCALE: SCALE:
GROUND FLOOR LINE GROUND FLOOR LINE
2
1
GROUND FLOOR LINE
5
MEZZANINE FLOOR LINE MEZZANINE FLOOR LINE
PA
PL
F
F
3725
4725
AB
BPA
PATHWALK LINE
P
PATHWALKLLINE
WL
1962
PROPERTY LINE
MEZZANINE TOP OF BEAM
SIDEWALK
SIDEWALK
BASKETBALL PAVILION FLOOR LINE BASKETBALL PAVILION FLOOR LINE L
G
F
F
1425
U
V
DRESSER
Professional Work | Residential at Hacienda Sta. Elena PROPERTY LINE
ROOF LINE/ EAVES SETBACK
PRIVATE ZONE ROOF APEX
2 1
3718
W
N 22D 37' W = 90.96M
4994
GL
1
2425
2
1
F
3100
2100
VL
VL
2 1
X
775
2
3B
3B
2425
2
SERVICE ZONE TOP OF BEAM
3100 2100
3100
3200
GL
75
GL
3375
3375
2B
BPTOB
BPTOB
2100
3200 2100 75
GROUND FLOOR LINE GROUND FLOOR LINE
2B
X'
Ortigas Ave., Greenhills, S.J., M.M. Rm. 205 GRACE Bldg., Ortigas Ave., Greenhills, S.J., M.M. Tel. Nos. +632 8941-0420; 8941-1958; 8941-0492 Fax No. +632 8941-1535 Tel. Nos. +632 8941-0420; 8941-1958; 8941-0492 Fax No. +632 8941-1535
BASKETBALL PAVILION TOP OF BEAM BASKETBALL PAVILION TOP OF BEAM
SPTOB
VERANDA FLOOR LINE VERANDA FLOOR LINE
4192
725
3425
1B
1B
Y
10000 MAXIMUM BUILDING HEIGHT LIMIT
ML
2076
2638
ML
BP
BPA
MEZZANINE FLOOR LINE MEZZANINE FLOOR LINE
4192
BASKETBALL PAVILION ROOF APEX BASKETBALL PAVILION ROOF APEX A
Y'
6021
1962 10000 MAXIMUM BUILDING HEIGHT LIMIT 2638
MTOB
MTOB
SERVICE ZONE ZONE ROOF APEX
SRA
10000 MAXIMUM BUILDING HEIGHT LIMIT
1962 MEZZANINE TOP OF BEAM
REAR GARDEN
ROOF LINE/ EAVES SETBACK
RA
RA
MEZZANINE TOP OF BEAM
PROPERTY LINE
PRIVATE ZONE ROOF APEX
PRIVATE ZONE ROOF APEX
Z
2000 EAVES SETBACK 3000 BLDG SETBACK
2021 MAY 24 AREA TABULATION REQUIRED OPEN SPACE AND GREEN SPACE
LANDSCAPE ARCHITECT LANDSCAPE ARCHITECT
MAXIMUM BUILDING HEIGHT LIMIT MAXIMUM BUILDING HEIGHT LIMIT
S 65D 31' W = 20.00M
200
EDVIN SANTIAGO, ASLA PALA EDVIN SANTIAGO, ASLA PALA MAXIMUM BUILDING HEIGHT LIMIT MAXIMUM BUILDING HEIGHT LIMIT
MAXIMUM BUILDING HEIGHT LIMIT
2
S 69D 08' W = 40.00M
3000 BLDG SETBACK 2000 3 EAVES SETBACK
BUILDING SETBACK ROOF EAVES SETBACK
SUBDIVISION REQUIREMENTS
3000 BUILDING SETBACK 2000 EAVES 1 SETBACK
10000 MAXIMUM BUILDING HEIGHT LIMIT
1:100
75
CAD Works
SCALE:
A1-03 A1-03
3000 BLDG SETBACK 2000 EAVES SETBACK
LEFT-SIDE ELEVATION
2
2000 EAVES SETBACK 3000 BLDG SETBACK
Z 19 20
22
21 MAXIMUM BUILDING HEIGHT LIMIT
J
L
SCALE:
A1-04 A1-04
6315
650
KEY PLAN
R
3900
23
ROOF TILES
1:500
0
65
MONICA SARMIENTO-BELEN 50
TOP CHORD / RAFTER
1100
DRAIN
1126
STRUCTURAL CONSULTANT
CAPARROS DRYING R.S. AREA CONSULTING
8800 FOYER
6290 PORCH
1000 SIDEWALK
6390 DRIVEWAY
3290 PLANTERS
CROSS-SECTION 10-10 SCALE:
1
2
1:100
9' 694
9"
9"'
1131
10
2873
Sketches to Digital Drawings
11
1202
2581
SERVICE ZONE TOP OF BEAM
SLOPE DN
Sample Sections
2588
2213
2100
BDRM 02 T&B
3100
300
F
F
F
1F
F
F
F
F
VERIFY STRUCTURAL
F
F
F
F
F
300
LIVING AREAF F
F
F
F
F
STORAGE AREA 01
SERVICE CATWALK
SERVICE ZONE TOP OF BEAM
F
1863
FOYER REFRIGERANT LINE
1
VERIFY STRUCTURAL
FALSE BEAM BY I.D. CONSULTANT
SERVICE DOOR
1863
PARENT'S RM WALK-INCLOSET
PARENT'S RM T&B
SPTOB
1
F
1000
BUILDING LINE SETBACK
R. VILLAROSA ARCHITECTS UY RESIDENCE Section detail of Galvanized Iron Gutter PARTNERS AND ASSOCIATES HACIENDA STA. ELENA ELECTRICAL CONSULTANT SANTA ROSA, LAGUNA
as shown on the manual sketch. GH
2516
2
SERVICE ZONE TOP OF BEAM
1
F
FALSE BEAM BY I.D. CONSULTANT
F
F
F
F
F
F
F
SANITARY ENGINEER ROOF TILES
F
DINING AREA F F
F
CORRUGATED ROOF 06 GROUND FLOOR NEW YORK MANSIONS, MOTREAL CS No. UNDERSHEET STREET RODRIGUEZ, CUBAO QUEZON CITY
2 1
0
MANHOLE
150
ML
SUCTION PIT
DRAIN
QUEZON CITY
CEILING LINE
EL.+2.70M
BY INTERIOR DESIGN
CORBEL
PRECAST ARCH
3350 CLOSET AREA
MAIN HOUSE
1950 STAIRS
5900 FAMILY AREA
GL PL
POOL PAVILION FLOOR LINE
GL CATCH BASIN
PIZZA OVEN & BBQ AREA
3250 FAMILY VERANDA
SUNBATHING AREA
POOL SIDEWALK
PATHWALK LINE
5800 POOL GAZEBO
VL
3600 PIZZA OVEN & BBQ AREA
1500 POOL SIDEWALK
REAR GARDEN
LEFT VERANDA
GROUND FLOOR LINE
GL
REVISIONS OUTLINE OF ROOF DECK BEHIND
CEILING LINE BY I.D. CONSULTANT
VL TO LIVING AND DINING AREA
FOYER
OPEN TO SERVICE HALLWAY
1650 2049 LEFT VERANDA
POOL SIDEWALK
2200 REAR FOYER
1500 POOL SIDEWALK
2000
1126 200
PORCH
DRIVEWAY
TYP. RC. GUTTER
Section detail of Reinforced shown BAYConcrete SECTION Gutter asPROGRESS on the manual sketch 2021 APRIL 26 BAY SECTION SCALE:
8800 FOYER
SCALE:
6290 PORCH
R. VILLAROSA ARCHITECTS
1:20
1000 SIDEWALK
CAD Works
IMPORTANT NOTES
PARTNERS AND ASSOCIATES
SWIMMING POOL
SLOPE DN 600
A-01 A-01
SERVICE WALKWAY
VERANDA FLOOR LINE
DESCRIPTION
905
OUTLINE OF ROOF DECK BEHIND
400 VERIFY STRUCTURAL
DATE
430 150 477 600 431 CLERESTORY
BE
1877
OF
RO
IN
TL
OU
F EO
REVISIONS
3400 FOYER DOOR
2100
DRIVEWAY
1 VERIFY STRUCTURAL
D HIN
1300
925
300
VERIFY STRUCTURAL
2100
700
400
5058 FOYER CEILING HEIGHT
400
1
5256
337 FAMILY VERANDA
SLOPE DN
3100
4600 POOL PAVILION
1
POOL GAZEBO
2100
6400 KID'S BEDROOM
2
SLOPE DN
2725
PPTOB
FAMILY HALL
STAIRS
POOL GAZEBO
PATHWALK LINE
3100 BATH HOUSE
POOL PAVILION TOP OF BEAM
100
2000 LEFT VERANDA
2665
BATH HOUSE TOILET
2 700
TOB
VERIFY STRUCTURAL
FURNITURE LAYOUT BY I.D.
SLOPE DN
CATCH BASIN
ROOF DECK
300
CLOSET AREA
3P 1900
3100
KID'S BEDROOM 01
POOL PAVILION ROOF APEX
PPA
2400
LEFT VERANDA
435
3200 SLOPE TO DRAIN
2100
ROOF DECK
AC
2P
2650
300
1P
OF
1800
700
RO
3900
3200
1
MA
1
FOYER TOP OF BEAM
±381
10000 MAXIMUM BUILDING HEIGHT LIMIT
4100
2
OF
EXERCISE AREA
100
VERIFY STRUCTURAL
INE
IN
900
AC UNIT BEHIND WALL
200
2
1
1800
3209
PB
1500 LINE OF POOL BEHIND
POOL PAVILION FLOOR LINE
MEZZANINE FLOOR
0
450
0
100
700
650
PROPERTY LINE
1800 3200
PL
75 3100
2100
GL
REAR GARDEN
GROUND FLOOR LINE
2100
VL
MA
FURNITURE LAYOUT BY I.D.
SLOPE DN
300
REAR GARDEN
VERANDA FLOOR LINE
100
GL
OF
4500
POOL PAVILION TOP OF BEAM
PPTOB
INE
TL
OU
TL
800
PA
BALCONY
OF
RO
10000 MAXIMUM BUILDING HEIGHT LIMIT
BUILDING LINE SETBACK
ROOF LINE/ EAVES SETBACK
2638 POOL PAVILION MEZZANINE ROOF APEXFLOOR LINE
ML A PP
OU IN
FRA
This cross-section shows the F Bedroom to Family hall below and the balcony, mezzanine and high ceiling portion to better present the roof with dormer window.
1350 PLANTERS
1200 SERVICE WALKWAY
PART OF MASTER'S BEDROOM
BASKETBALL PAVILION SECTIONS SWIMMING POOL GAZEBO SECTIONS 2
2
FOYER ROOF APEX
75
1
2200
OF
RO
2600
MA
L 3900 PRECAST COLUMN
VERANDA
10000 MAXIMUM BUILDING HEIGHT LIMIT 3400 429 FOYER DOOR 2100 1300 627 600 CLERESTORY
OF
422
MEZZANINE TOP OF BEAM
MTOB
OU
500
1962
IN
INE
TL
VERIFY STRUCTURAL
900
500
1 300
J 5175
Drafting on Autocad
2
PROPERTY LINE
2
G 1900
Family Hall Section |
PRIVATE ZONE ROOF APEX
RA
E 2000
3050
D
3025
MAXIMUM BUILDING HEIGHT LIMIT
120
Q
M 5900
COLUMN BEHIND
2950
J 1925
ROOF LINE/ EAVES SETBACK
H 4204
BUILDING LINE SETBACK
F 5521
75
B 2025
1:100 MAXIMUM BUILDING HEIGHT LIMIT
1500 LINE OF POOL BEHIND
A MAXIMUM BUILDING HEIGHT LIMIT
SCALE:
MAIN HOUSE: LONGITUDINAL SECTION 1-1 LONGITUDINAL SECTION 6-6 CROSS-SECTION 7-7 R CROSS-SECTION 10-10 6315 CROSS-SECTION 13-13 LEFT
WALL LAMP
2782
A1-04 A1-04
MAXIMUM BUILDING HEIGHT LIMIT
LONGITUDINAL SECTION 6-6
2554 FLOOR TO CEILING HEIGHT
MAIN HOUSE
5
EL.+2.10M
SHEET CONTENTS
PRECAST MOULDING
0
65
VERIFY STRUCTURAL
WL
SLAB OF BALCONY BEHIND
26°
SUCTION PIT
RAINWATER TANK Cap. 24cu.m.
2000
1:100
RAINWATER TANK WATER LEVEL
300
POTABLE WATER TANK Cap. 155cu.m.
10 PROJECT MANAGER
300
SCALE:
A1-04 A1-04
GL
TRENCH DRAIN
600
POTABLE WATER TANK WATER LEVEL
ISSUED AT
G.I. FLASHING
SLOPE DN
01-07-21
ISSUED ON
0
SLOPE DN
0730832
600 CLERESTORY
P
TRENCH FOR REFRIGERANT LINE BEHIND
GROUND FLOOR LINE
300
P
LONGITUDINAL SECTION 1-1
1
WALKWAY LINE
MANHOLE
VRF ACCU
600
0
65
650
WALKWAY LINE
CESAR L. 5MADRIAGA 168 452 6 0 CONC. GUTTER SANITARY ENGINEER
LANDSCAPE AREA
LAUNDRY TUB
106 186 110
65
325
SLOPE DN
1075
724
TIN
PTR
BREAKFAST NOOK/ RAFTER TOP CHORD
600
600
0.10M
MAIN HOUSE TRENCH DRAIN
WL
This section was used in coordinating with the engineering consultants. It shows the Ground Level and Storage Mezzanine for Architectural and Structural Coordination. The Water Tank Level was also included for the Plumbing and Sanitary coordination .
LINE OF SIDEWALK
LINE OF DRIVEWAY 0.00M
600
WL
GROUND FLOOR LINE
1075
350
2100 150
WALKWAY LINE
1000 WALKWAY 01
GL
L
150
GROUND FLOOR LINE
DRYING YARD
PUMP ROOM
600
650
0 ±35 M A BE
Service Area Section | Drafting on Autocad G
SLOPE DN
LIVING AREA AND DINING AREA
GARAGE
PRC BREAKFAST NOOK
BATTENS
Email: clme.montreal@gmail.com
MOTORIZED GARAGE DOOR
RA
GHTOB
VERIFY STRUCTURAL
STEEL PURLINS
FOYER
LANDSCAPE AREA
APRIL 26
2600
PARENT'S ROOM
2100
VEGETABLE GARDEN
WALKWAY 01
KID'S BEDROOM 02
3100
KID'S BEDROOM 01
3100
MASTER'S BEDROOM
GREAT HALL ROOF APEX2021
TYP. RC GUTTER AND PRECAST
5690
2
2600
2050 LEFT VERANDA
2600
2600
2
CEILING HT. BY I.D. CONSULTANT
F
BDRM 02 WALK-INCLOSET
F
PROGRESS 2021 APRIL 26
1:20
1800
DRIVER'S ROOM CLOSET
2760 DRIVER'S ROOM
CEILING HT. BY I.D. CONSULTANT
F
SPTOB
CATCH BASIN
VERANDA FLOOR LINE
BDRM 01 WALK-INCLOSET
BDRM 01 T&B
2825
CEILING HT. BY I.D. CONSULTANT
1251
MASTER'S BEDROOM
PART OF MASTER'S BEDROOM
SRA
F
5822
SCALE:
2
VERIFY STRUCTURAL
CEILING HT. BY I.D. CONSULTANT
25
LEFT VERANDA
F
SERVICE ZONE ZONE ROOF APEX
3350
F
1850
BAY SECTION
900
2700
F
OUTLINE OF BALCONY RAILING
3200
F
3396
500
F
3396
300
2100
3120 2100 2350
A-01 A-01
1:20
3000
1700
25
CEILING HT. BY I.D. CONSULTANT
2725
SRA
10000 MAXIMUM BUILDING HEIGHT LIMIT
PROPERTY LINE
ROOF LINE/ EAVES SETBACK
SERVICE ZONE ZONE ROOF APEX
MEZZANINE FLOOR
23
22
TYP. G.I. GUTTER
24 3675
2100
21
VERIFY STRUCTURAL
FCU AND HEATER BEHIND CONCEALED DOOR
100
2638
BUILDING LINE SETBACK
OUTLINE OF BALCONY RAILING
3200
26°
1863
GROUND FLOOR LINE
75
22
2700 TYP. G.I. GUTTER
700
PROPERTY LINE
875
FCU AND HEATER BEHIND CONCEALED DOOR
CEILING HT. BY I.D. CONSULTANT
VERIFY STRUCTURAL
1240 DRIVER'S ROOM CLOSET
3200
10000 MAXIMUM BUILDING HEIGHT LIMIT
20
ROOF LINE/ EAVES SETBACK
6207
DRIVER'S ROOM T&B
18' 21
3200
BUILDING LINE SETBACK
3425
19
This plan was used on presentiong schemes for roof design. The Floor Plan was 2 superimposed in the roof design to better understand the floor plate vs. roof 1 scheme.
OPEN TO DRYING AREA
3200
MAXIMUM BUILDING HEIGHT LIMIT
CEILING HT. BY I.D. CONSULTANT
1
MEZZANINE FLOOR LINE
VL
18
17
3375
2041
2
1
Colored Roof Plan | Drafting on Autocad, Enhanced Color on Lightroom
GL
15
1933
2
E
IN AN ZZ ND ME H-E OF UT INE SO TL ON OU OF RO
VERIFY STRUCTURAL
ML
13
12
1933
SCALE:
Z
725
2179
MECHANICAL CONSULTANT
BAY SECTION
Y'
776
9
2873
2000
1424
7'
2873
1200 2204
MTOB
7
4' 2179
DATE ISSUED : 04JAN'2021 PLACE ISSUED : SAN JUAN CITY
SLOPE DN
450
Y
4 694
1277
113
4725
X'
MEZZANINE TOP OF BEAM
3'
2927
3000
X
973
BUILDING LINE SETBACK
1962
RA
3
2'
2100
ROOF LINE/ EAVES SETBACK
PROPERTY LINE
5035
PRC NUMBER : 12128 PTR NUMBER : 1473382
GL
MAXIMUM BUILDING HEIGHT LIMIT
PRIVATE ZONE ROOF APEX
MARVIN A. CAPARROS STRUCTURAL ENGINEER
MAIN HOUSE
A1-04 A1-04
PUMP ROOM
ENGINEERS
LAUNDRY TUB
ACCU
3
ASSOCIATES & CO.
Rm. 205 GRACE Bldg., Ortigas Ave., Greenhills, S.J., M.M. Tel. Nos. +632 8941-0420; 8941-1958; 8941-0492 Fax No. +632 8941-1535
Professional Work | Residential at Hacienda Sta. Elena
LANDSCAPE ARCHITECT
10000 MAXIMUM BUILDING HEIGHT LIMIT
DRIVEWAY
2715
2950
PORCH
2100
2200 REAR FOYER
1200
3960
OPEN TO SERVICE HALLWAY
120 1650 2049 LEFT VERANDA
300
1300
200
3200
2200
FOYER
2000
LANDSCAPE ARCHITECT
S TOB
EDVIN SANTIAGO, ASLA PALA
3400 FOYER DOOR
TO LIVING AND DINING AREA
600
2100
2600
3400 FOYER DOOR
1300
5058 FOYER CEILING HEIGHT
627
CEILING LINE BY I.D. CONSULTANT
2100
430 150 477 600 431 CLERESTORY
OUTLINE OF ROOF DECK BEHIND
905
OUTLINE OF ROOF DECK BEHIND
VERIFY STRUCTURAL
INTERIOR DESIGNER
G.I. FLASHING
3050
OF
VERIFY STRUCTURAL
2782
429 600 CLERESTORY
INE
TL
OU
400
VERIFY STRUCTURAL
IND
EH
FB
O RO
1877
VERIFY STRUCTURAL
10000 MAXIMUM BUILDING HEIGHT LIMIT
1
±381
400
LEFT VERANDA
6
2
1
650
1
CORRUGATED ROOF UNDERSHEET STEEL PURLINS
2
650
2
BATTENS
2100
5175
107-321-379
150
G 1900
TIN:
PROPERTY LINE
E 2000
PASIG CITY
INTERIOR DESIGNER
ROOF LINE/ EAVES SETBACK
D
PLACE:
25
1. STAKING OF COLUMNS, BEAMS, AND SLABS SHALL BE COORDINATED AND VERIFIED WITH ARCHITECTURAL PLANS AND DETAILS. DIMENSIONS SHOWN ON STRUCTURAL PLANS ARE FOR DESIGN PURPOSES ONLY. CONSTRUCTION
MAIN HOUSE
6390 DRIVEWAY
10
UY RESIDENCE
HACIENDA STA. ELENA SANTA ROSA, LAGUNA 2021 APRIL 26
3290 PLANTERS
Mimosa Lifestyle Mall
is a mixed-use development of residential, commercial, office and hotel will be one of the most iconic residential and commercial complex.
[Filinvest Land Inc.]
Mimosa Lifestyle Mall
3-1
9000
9000
LLG
23500
SERVICE HALLWAY
1438
TOP OF PARAPET
TOP OF CLERESTORY ROOF
5500
SERVICE HALLWAY
SERVICE ELEVATOR LOBBY
SERVICE ELEVATOR LOBBY
FIRE TANK TOP OF
TOP OF CLERESTORY ROOF
PUMP ROOM
PARAPET
EL.+249.80M
EL.+249.20M
23500
2-J
3-8
4-C
4-F
4-G
4-6
4-G
4-5
4-H 4-H
4-J
4-4
4-J
4-K
2-G
±9310
2-E
4-2
4-1
CLERESTORY ROOF ±9000
RETAIL (LEASABLE)
4-D
4-C
2-10
2-11
±9321
7799 04096-296725-091120 5490556 PASIG CITY
PRC No. IAPOA No. PTR No. Place
4-B
4-3
4-K
4-L
4-2
4-L
4-1
±7372
Building Elevation and Section | Drafting on
4-A
6-6
2-9
±9345
±9006
ROOF DECK
19576 POWERHOUSE
PART OF HALLWAY
IDF 6A
RETAIL (LEASABLE)
PART OF HALLWAY
FEMALE TOILET 4A
PART OF HALLWAY
FEMALE TOILET 4A
OFFICE
PART OF EE 7A
PART RETAIL OF (LEASABLE) HALLWAY
PART OF EE 4A
PART RETAIL OF (LEASABLE) HALLWAY
PRC No. IAPOA No. PTR No. Place
3500
6000
LANDSCAPE
PART Validity OF OR No. HALLWAY Date
-
Autocad Submitted as part of the Permit Plan
6-5 6-4 6-3
F&B (LEASABLE)
-
6-2
IDF 4A
RETAIL (LEASABLE)
OFFICE
TIN
BRIDGEWAY NORTH
SOUTH ENTRANCE
6000 SOUTH ENTRANCE DROP-OFF DRIVEWAY
SOUTH LOBBY
RETAIL (LEASABLE)
RETAIL (LEASABLE)
IDF 2A
CLINIC
PART PWD FEMALE OF TOI.HALLWAYTOILET 2A
PART OF EE 2A
MAAP
Electrical, mechanical, Fire Pro Consultant
BUILDING C3 LOWEST ROOF APEX
L Facade Consultant
BUILDING C3 CANOPY PART
(HALLWAY)
F&B
PART OF BLDG. C
F&B (LEASABLE)
(LEASABLE)
1:600M
EL.+241.50M
ELEVATION OF (LEASABLE) HALLWAY EAST ELEVATION SOUTHEAST ELEVATION SOUTH ELEVATION WEST ELEVATION INNER F&B SPINE NORTHWEST ELEVATION
RETAIL (LEASABLE)
SCALE:
Meinhardt
6-1
Date -
SHEET CONTENTS : PART OF HALLWAY
A1-04 TO A1-08 A1-11
Plumbing and Sanitary Consultant BUILDING A - KEY PLAN
JAN. 15, 2020 Date SEP. 11 2020 JAN. 15, 2020 107-321-379
Validity OR No. 296725 Date TIN
ROOF DECK
PART OF HALLWAY
A0-04 TO A1-08 A1-11
PARTNERS & ASSOCIATES
2-F
4-4 ±12328
04 IMMCE 05
1:300 M
ROY A. VILLAROSA
2-H
4-5
4-6 ±7436
LINE OF SIDEWALK
PROPERTY LINE
5500
4-F
2-9 2-102-112-122-132-142-152-162-172-18
ARCHITECT-OF-RECORD:
1:300M.
BRIDGEWAY
28500 5500
UP
UP
2-F
3500 4650
PROPERTY LINE
±9073
5500
2500
TERRACE
EL.+378.70.M
LR
L
BUILDING C3 CA SECOND FLOOR FFL.
Crearis L
EL.+237.00M
BUILDING C3 BRIDGE FFL.
L2
EL.+236.85M
BR
Landscape Architect L
BUILDING C3 UPPER GROUND FFL. EL.+231.00M
UG
5000
6000
3-
4-E
2-E
LUG
5/F, Lincoln House, Taikoo Place, 979 King's Road, Quarry Bay, Hong Kong. Tel: +852 2250 7222 Fax: +852 2250 7333
SLOPE
3000 SIDEWALK
BASEMENT FIN. FLR. LINE (BUILDING A)
EL.+230.85M
OUTLINE OF BASEMENT
6000
6000
EL.-226.00 M
REVISIONS: REV. NO.
TELCO ROOMS
2150
BUILDING A WEST ELEVATION
TERRACE
3665 BRIDGE CONNECTING TO BRIDGE OF BLDG. C
6
1:300M.
TERRACE
3665 BRIDGE CONNECTING TO BRIDGE OF BLDG. C
TERRACE
5
BUILDING A A1-04 NORTHWEST ELEVATION TO A1-08
A1-04 TO A1-09 SCALE: A1-08
IMPORTANT NOTES:
DATE
DESCRIPTION
PROJECT NO.:
SHEET NO:
BUILDING A THROUGH MIMOSA DRIVE 3665 BRIDGE CONNECTING TO BRIDGE OF BLDG. C
TERRACE
CROSS SECTION 5-5
A1-11 SCALE:
1:300 M
1:300M.
1597B
IMPORTANT NOTES:
ALL DRAWINGS SHOWN HERE ARE ARCHITECT'S DESIGN INTENT ONLY. THE CONTRACTOR / MANUFACTURER / SUPPLIER TO SUBMIT SHOP DRAWINGS SHOWING THE RECOMMENDED COLORS, THICKNESS, CONNECTION DETAILS & OTHER NECESSARY DETAILS RELATIVE TO THE WHOLE ASSEMBLY FOR ARCHITECT'S / CONSULTANT'S / OWNER'S APPROVAL. THE CONTRACTOR / MANUFACTURER / SUPPLIER TO PROVIDE MOCK-UP SAMPLES INSTALLED AT SITE FOR ARCHITECT'S / CONSULTANT'S / OWNER'S APPROVAL PRIOR TO FABRICATION.
1.
2. 3.
STAKING OF COLUMNS, BEAMS, AND SLABS SHALL BE COORDINATED AND VERIFIED WITH ARCHITECTURAL PLANS AND DETAILS. DIMENSIONS SHOWN ON STRUCTURAL PLANS ARE FOR DESIGN PURPOSES ONLY. CONSTRUCTION LAYOUT SHOULD FOLLOW ARCHITECTURAL ALIGNMENTS. SHOULD CONFLICT OCCUR BETWEEN STRUCTURAL AND ARCHITECTURAL PLANS, REFER THE MATTER TO THE ARCHITECT FOR FINAL DECISION AND APPROVAL. COORDINATE WITH OTHER TRADES. VERIFY ACTUAL CONDITION ON SITE.
4-A
3-C
3-D
3-E
9000
9000
DRAWN BY CHECKED BY
RAT/JCL/JRB/ADL RAV
A1-09 DATE
11/14/2020
ISSUED
11/18/2020 REV.
3-F
3-G
3-10
3-11
Cadfile Name: CDP-MLMA-2020-AR009_ELEV.dwg Date: 11/18/2020
9000
9000
F&B
RETAIL
9000
5500
EL.+242.50 M
150 2885 TERRACE
LB1
F&B
F&B
F&B
F&B
F&B
RETAIL
BASEMENT (BUILDING A) FINISH FLOOR LINE
F&B
F&B
F&B
6
BUILDING A ALONG NEW MAIN LOBBY
CROSS SECTION 6-6
A1-04 A1-11 SCALE: TO A1-08
1260
Bridge Design | Model with SketchUp, Rendering in Lumion
Translating conceptual ideas and sketches into 3D models and renderings for presentation.
EL.+225.00 M
Design Concept
7000
MAIN LOBBY
1488
(BUILDING A) FINISH FLOOR LINE LOWER GROUND FLOOR
F&B VOID SPACE VERIFY FOUNDATION DETAILS
5000
EL.+230.00 M
EXIT HALLWAY 1000
EL.+231.00 M
30°
2731
PART OF BLDG C4
UPPER GROUND FLOOR (BUILDING A) FINISH FLOOR LINE
BENOY LLG
EXIT HALLWAY
EE/ AUX ROOM
EL.+237.00 M
Render | Visualization by: LUG
EXIT HALLWAY
30°
LEVEL 2 (BUILDING A) FINISH FLOOR LINE
F&B
DECK
2360
LEVEL 3 (BUILDING A) FINISH FLOOR LINE
ROOF 1500 GARDEN 100 2945
6000
L2
ROOF
EL.+248.00M
550
L3
ROOF DECK (BUILDING A) FINISH FLOOR LINE
5500
LRD
5500
EL.+250.25 M
3275
GLASS ROOF (BUILDING A) FFL.
6000
A1-04 TO A1-09 SCALE: A1-08
BUILDING C3 UPPER GROUND FFL.
3D Models of Entrance Canopy for Developer’s Approval
CROSS SECTION 4-4 SCALE:
MIMOSA DRIVE
EL.+231.00 M
3-
4-D
3D Models | Model with SketchUp
BUILDING A
ROOF DECK
UPPER GROUND FLOOR (BUILDING A) FINISH FLOOR LINE
4-D
R. Villarosa Architects
BUILDING A SOUTH ELEVATION
LEVEL 2 (BUILDING A) FINISH FLOOR LINE EL.+237.00 M
EL.+230.95M
LB
3-9 ±9000
CURB LINE OF MIMOSA DRIVE
L3
and Complex sites. 4-E
LBR
Architect-of-Record
4
EL.+248.00M
EL.+242.50 M
L2
2-J
SLOPE
LEVEL 3 (BUILDING A) FINISH FLOOR LINE
EL.+236.85M
3
3
2-K
EL.+253.50M
LRD
BUILDING C3 BRIDGE FFL.
DESIGN CONSULTANT:
A0-04 A1-11 TO A1-08
3-10
EL.+237.00M
4-B
2-G
GENSET ROOF DECK (BUILDING A) FINISH FLOOR LINE
ROOF DECK (BUILDING A) FINISH FLOOR LINE
UP
3
3
4-A
BUILDING C3 SECOND FLOOR FFL.
FILINVEST CYBERZONE MIMOSA, INC.
REGISTERED ARCHITECT
2-K
LLR
LCA
EL.+231.00M
UNASSIGNED ROOM
1425 2206 1425 3321
3420 BRIDGE CONNECTING TO BRIDGE OF BLDG. C
5
PART OF BLDG. C
TERRACE
PART OF F&B
EL.+378.70.M
3500 4650
2-17 9000
BUILDING C3 CANOPY
Mimosa Drive, Clark Freeport Zone, Clark, 2023 Pampanga
2-H
2-K
9000
BUILDING C3 LOWEST ROOF APEX
OWNER:
HEX ROOM
EL.+249.80M
EL.+249.20M
6-1
UP
ST-A-04
EL.+251.20M
6-2
LIFESTYLE MALL
PART OF F&B
1000 TOP OF STAIR ROOF
EL.+251.40M
5500 3400
2-16 9000
LOADING / UNLO ADING AREA
2-J
TOP OF
6-5 6-4 6-3
PART OF F&B
SERVICE ELEVATOR LOBBY
RETAIL
2-15
CORRIDOR 9000
4
SIGNAGE
1000
2-13
2-12
PART 3462 OF WALKWAY RETAIL
RAMP UP
SERVICE ELEVATOR LOBBY
RETAIL
RETAIL
9000
A1-04 TO A1-09 SCALE: A1-08
LUG
8956 LANDSCAPE
UP
100
600
2-11
RETAIL
RETAIL
EL.+230.00 M
3500
5500
2000
5500 6000 1000
PROPERTY LINE
2-10
RETAIL
LOWER GROUND FLOOR (BUILDING A) FINISH FLOOR LINE
5500
11
SERVICE ELEVATOR LOBBY
5500
EL.+231.00 M
LGRD
DN
UP
6000
UPPER GROUND FLOOR (BUILDING A) FINISH FLOOR LINE
L2
VENT SHAFT
TO A0-04 A1-0 A 1-1 8 1
6-6
4200 775 5850
LUG
SIGNAGE
SIGNAGE
ENGR'G OFFICE
EL.+237.00 M
2000
3000 PATHWALK
PART OF RETAIL
5500
BASEMENT FIN. FLR. LINE ROOF DECK (BUILDING A) (BUILDING A) FINISH FLOOR LINE EL.+248.00MEL.-225.00 M
LEVEL 2 (BUILDING A) FINISH FLOOR LINE
1200
2-J
PROJECT:
EL.+241.50M
EL.+253.50M
EL.+242.50 M
L2
TRANSFORMER ROOM LVSG
RETAIL
1:300M.
KIOSK
EL.+255.53M
LEVEL 3 (BUILDING A) FINISH FLOOR LINE
L3
A1-04 TO A1-09 SCALE: A1-08
MACHINE ROOM LANDSCAPE
6000
9000
2-A 9000
4200 775 5850
5500 5500 6000
2-H
9000
5500 4300
1200
UPPER GROUND FLOOR (BUILDING A) FINISH FLOOR LINE
EL.+231.00 M GENSET ROOF DECK (BUILDING A) FINISH FLOOR LINE
6000
LLRD B
2-9 9000
3500
Professional Work | Mimosa Lifestyle Mall
LGRD
34600 POWERHOUSE
28500 5500
LEVEL 2 (BUILDING A) FINISH FLOOR LINE EL.+237.00 M
5500
2025
7450
2-B
3800
UP
2-G
2-F
11250
2-C 11250
UP
2-E
11250
BUILDING A EAST ELEVATION
2
PART OF RETAIL
1:300M.
2-D
SIGNAGE
GENSET
EL.+242.50 M
LUG
a. PRODUCTION - BUILDING A & C 1. Permit Plans 2. Update 3D Model 11250
ROOF DECK (BUILDING A)
LEVEL 3 (BUILDING A) FINISH FLOOR LINE
2200 2000
3600
2-D 11250
MACHINE ROOM
LOWER GROUND FLOOR FINISH FLOOR LINE (BUILDING A) FINISH FLOOR LINE EL.+248.00M EL.+230.00 M
LLGLRD
5500
9000
EL.+231.00 M
3300
2-B 2-C
2-A
2-E 11250
(BUILDING A) FINISH FLOOR LINE
L2
Position Held | Role : a. PRODUCTION - BUILDING B & C 1. Completion of Working Drawings for Bidding and for Construction BUILDING A 2. Coordination with other Trades 3 SOUTH EAST ELEVATION and Consultants 3. Attend Meetings with other Consultants and Developers
A1-04 TO A1-09 SCALE: A1-08
LGRD UPPER GROUND FLOOR
LUG
9000
Phases Covered : • Design Development Phase • Contract Document Phase • Mid-Construction Phase*
2-F 7450
P
11384
2-G 9000
UP
9000
2-H 9000
GENSET ROOF DECK (BUILDING A) FINISH FLOOR LINE EL.+253.50M
L3
4-5
11378
LEVEL 2 (BUILDING A) FINISH FLOOR LINE EL.+237.00 M
2-J
CAD Works and 3D Models
1:300M.
Components Handled: Buildings B and C
9000
EL.+242.50 M
RAM
A1-04 TO A1-09 SCALE: A1-08
5500
LEVEL 3 (BUILDING A) FINISH FLOOR LINE
L2
Activa is strategically located in Aurora Blvd corner Edsa, Quezon City. It offers a multi3-B 3-C 3-D 3-E 3-F 3-G 3-H faceted fun living right 0 within the 3master planned. Homeowners will benefit from an upscale living experience that will uniquely cultivate personal interests and vibrant sensibilities in 2-A a home that’s simply a beat 4-A 2-B from Cubao’s busy urban 4-B 2-C 4-CIndustrial, Resort landscape. 2-D UP
NORTH ELEVATION
2019 to 2020
9000
350
BUILDING A Years Involved : 1
9000
550
involvements
9000
EL.+248.00M
L3 PART OF BLDG. C4
9000
750
ROOF DECK (BUILDING A) FINISH FLOOR LINE
LRD
9000
EL.+253.50M
5500
LGRD
9000
GENSET ROOF DECK (BUILDING A) FINISH FLOOR LINE
300
Aurora Blvd. Cor. EDSA, Cubao, Quezon City, Metro Manila
1000
9000
5500 3000
9000
1:300 M
R.VILLAROSA AR
FOR PE
A
100
L 10
[Filinvest Land Inc.]
4000
CCMU Tower 3&4 Lahug, Cebu City
01
PART OF BPO OFFICE
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17 17.A
131200 5200
8400
8400
8400
8400
8400
8400
8400
8400
8400
8400
8400
8400
8400
8400
6820
1580
2
A
EL.+53.49M
FIRE ESCAPE
FT
DN UP
UP
11200
DN
6100
D
DROP-OFF AREA
OPEN ABOVE
UP
5478
UP
UP
UP
DN
E
UP
DN
RETAIL G-27
RETAIL G-28
UP
1
2000
4000
STRUCTURAL COLUMN PAINTED FINISH
100
UP
A2-01 A2-01
1
KEY PLAN
1000
1200
SCALE : NOT TO SCALE
8TH FLOOR BPO OFFICE
L8
UP
150
PART OF BPO OFFICE
Phases Covered : • Design Development Phase • Contract Document Phase • Mid-Construction Phase*
UP
1582
8TH FLOOR BPO OFFICE
EL.+49.49M
EL.+49.49M
8TH FLOOR BPO OFFICE
4 MM THK. ALUMINUM COMPOSITE PANEL CLADDING "COLOR : DARK GRAY "
EL.+49.49M
EL.+45.99M
1400
3500
7TH FLOOR BPO PARKING 100 X 250mm WIDE VERTICAL ALUMINUM LOUVERS POWDER COATED FINISH " COLOR : MID GRAY "
2600
PARKING AREA
Position Held | Role : a. PRODUCTION - BUILDING A & C 1. Permit Plans 2. Update 3D Model
4TH FLOOR BPO PARKING
L4
8mm THK. X 50mm WIDE STEEL RAILING EPOXY PAINTED FINISH (BLACK)
1200
PART OF DRIVEWAY
6TH FLOOR BPO PARKING EL.+42.49M
4TH FLOOR BPO PARKING
EL.+35.49M
EL.+38.99M
4TH FLOOR BPO PARKING
4 MM THK. ALUMINUM COMPOSITE PANEL CLADDING "COLOR : DARK GRAY "
1400
3500
STRUCTURAL COLUMN PAINTED FINISH PARKING AREA 2600
1200
PART OF DRIVEWAY
EL.+35.49M
100 X 250mm WIDE VERTICAL ALUMINUM LOUVERS POWDER COATED FINISH " COLOR : MID GRAY "
50 37
3RD FLOOR BPO PARKING
L3
5TH FLOOR BPO PARKING
EL.+35.49M
8mm THK. X 50mm WIDE STEEL RAILING EPOXY PAINTED FINISH (BLACK)
300
3RD FLOOR BPO PARKING EL.+31.99M
1100
EL.+31.99M
150MM THK. CHB WALL PLASTER PAINTED FINISH
L2
2000
4400
850
LIGHTWELL
600
07 8400
08 8400
09
10
8400
8400
11 8400
12 8400
13 8400
14 8400
15 8400
16 8400
CEILING HEIGHT BY TENANT
17 17.A 6820
1580
CLEAR TEMPERED GLASS WITH ALUMINUM FRAMING
2
A
FT
FT
RAMP UP FROM B1
FT
RAMP DN TO B1
DN
6000
FIRE ESCAPE
UP
UP
UP
1
6100
C
5478
D
PROPOSED LOCATION OF SIGNAGE
DRIVEWAY
31078
DN
A2-06 A2-06
DROP-OFF AREA
OPEN ABOVE
UP UP
E
UP
DN
RETAIL G-27
PART OF RETAIL
RETAIL G-28
UP
1
UP
UP
UP
KEY PLAN LAMINATED GLASS CANOPY ON SPIDER FITTING WITH BUILT-UP STEEL SUPPORT
GROUND FLOOR RETAIL
GL
CLEAR TEMPERED GLASS WITH ALUMINUM FRAMING
TRENCH DRAIN WITH TILES AND S.S. METAL FRAME COVER SEE DETAIL
SCALE : NOT TO SCALE
10450
ARCADE
UP
UP
DN
EL.+26.49M
10525
2000 SETBACK
EL.+20.49M
PROPERTY OF I.T. PARK
3224 (+/-)
ARCADE LEVEL EXTERNAL
PLANTBOX
EL.+20.44M
WATER PROOFING REFER TO DETAIL
6000 DRIVEWAY
GROUND FLOOR RETAIL
GL
DRIVEWAY EL.+20.44M
300
EL.+20.49M
3300 WALKWAY
STRUCTURAL BEAM PAINTED FINISH
SLOPE : 1.515 %
GROUND FLOOR RETAIL
EL.+20.49M
EL.+20.49M
with Autodesk AutoCAD.
Drain Line
This diagram shows the Bay Section cut through the Facade of the building
PART OF SUPERMARKET
IMPORTANT NOTE: FOR BASEMENT 1 PARKING LEVEL
STRUCTURAL COLUMN PAINTED FINISH
CONCRETE WALL PAINTED FINISH FOR DETAIL REFER TO STRUCTURAL DETAIL
STRUCTURAL COLUMN PAINTED FINISH
EL.+14.84M
STRUCTURAL BEAM PAINTED FINISH
EL.+20.44M
BASEMENT 1 SUPERMARKET
B1
BASEMENT 1 SUPERMARKET
EL.+14.99M
EL.+14.99M
5500
STRUCTURAL COLUMN PAINTED FINISH
GROUND FLOOR DROF-OFF AREA / RETAIL ENTRANCE
ARCADE LEVEL EXTERNAL
PROPOSED CLEAR HEIGHT
4500 CLEAR
2000
EXHAUST AIR FROM B1
Basic Plans | Drafting
5500
PART OF RETAIL ENTRANCE (INSIDE MALL)
PART OF DROP-OFF AREA (OUTSIDE MALL) 4000
6000
CLEAR TEMPERED GLASS WITH ALUMINUM FRAMING
This Bay Section is a part of A3 Series Facade details and bay Sections
710 (+/-)
06 8400
50
8400
900
05
8400
B
DROPWALL WITH STRUCTURAL STEEL FRAMING TO SUPPORT GLASS SHOPFRONT (2HR FIRE RATED)
2ND FLOOR RETAIL
04
8400
LINE
DROPWALL WITH STRUCTURAL STEEL FRAMING TO SUPPORT GLASS SHOPFRONT (2HR FIRE RATED)
ALUMINUM COMPOSETE PANEL , COLOR: DARK GRAY
400
03
131200
5500
400 mm DIA. STEEL COLUMN REFER TO STRUTURAL CONSULTANT FOR DETAIL
02 5200
2500 FIXED GLASS PANEL
01
2400 FRAMELESS DOOR HT.
CLEAR TEMPERED FLOAT GLASS LIGHTWELL
4000
CEILING LINE STEEL FRAMING REFER TO STRUTURAL CONSULTANT FOR DETAIL
8300
1100
LIGHTWELL
EL.+26.49M
LINE
EL.+31.99M
LIGHTWELL
2ND FLOOR RETAIL
PROPERTY
EL.+31.99M
Drafting with Autodesk AutoCAD.
EL.+26.49M
1100
3RD FLOOR BPO PARKING
STRUCTURAL COLUMN PAINTED FINISH
2ND FLOOR RETAIL
Basic Plans |
4900
DRIVEWAY
SETBACK
3500
800
3RD FLOOR BPO PARKING
L2
CLEAR TEMPERED GLASS WITH ALUMINUM FRAMING
PARKING AREA FALSE WINDOW GLASS PANEL 13000
L3
PART OF RETAIL
2400
700
ALUMINUM COMPOSITE PANEL (ACP) WITH METAL FRAMING SUPPORT " COLOR : DARK GRAY "
FIXED GLASS PANEL
ALUMINUM COMPOSETE PANEL , COLOR: DARK GRAY
SketchUp, rendered in Vray.
EL.+35.49M
4000
600
EL.+35.49M
WATER PROOFING REFER TO DETAIL
Perspective | 3D with
4TH FLOOR BPO PARKING
8400
11200
L4
5200
5500
4TH FLOOR BPO PARKING
350
FIXED GLASS PANEL
PROPOSED CEILING HEIGHT BY TENANT
PARKING AREA
PARKING AREA
6
RETAIL MAIN ENTRANCE BAY SECTION - 6
STRUCTURAL COLUMN PAINTED FINISH
1:50M
3650
A2-08 A2-10 SCALE:
BASEMENT 1 SUPERMARKET EL.+14.99M
FOR BASEMENT 1 PARKING LEVEL
DRIVEWAY 150
B1
FOR BASEMENT 1 PARKING LEVEL EL.+14.84M
EL.+14.84M
DESIGN DEVELOPMENT JULY 13, 2017
B2
BASEMENT 2 RETAIL PARKING
BASEMENT 2 RETAIL PARKING
EL.+11.34M
EL.+11.34M
1
ALONG GRID LINE 7 & 8 BAY SECTION - 1
A2-02 A2-02 SCALE:
1:50M
Professional Work | Cebu Cyberzone Mixed-Use Tower 3&4
DRIVEWAY
UP
C
involvements Years Involved : 2018
FT
RAMP DN TO B1
B
31078
100
L9
FT
RAMP UP FROM B1
8300
9TH FLOOR BPO PARKING
12
Professional Work | Architectural Interioirs 13
Deluxe Bedroom | Autodesk Autocad, and SketchUp 3D, and Adobe Photoshop
The Floor Plan was sketched on Autocad and rendered in Photoshop. The 3D Perspective was done in SketchUp 3D, rendered in Lumion, and enhanced in Lightroom.
Restaurant Perspective | SketchUp 3D, Lumion
Penthouse Floor Plan | Autodesk Autocad, and Adobe Photoshop
The Floor Plan was sketched on Autocad and rendered in Photoshop.
This perspective was modeled in SketchUp 3D, Rendered in Lumion, and enhance in Lightroom.
A
B
C
D
E A
B
C
6
6
A1
A1
D
N 86° 00' 00" E 17.53 m
E
Patio
Powder Room
T&B
-
-
2.85 m²
D 03
2.45 m²
4.98 m²
21
Maid's Room
Laundry Room
4.90 m²
4.30 m²
D 04
D 03
Lanai
D 06 D 06
10.84 m²
D 02
21
D 05
Kitchen
Dining Area
8.46 m²
21
21
Bedroom 1
21
21
21
35
2
D 03
30
T&B 3.06 m²
2
DN
Walk-In-Closet
6.73 m²
D 03
7
5.26 m²
Stairs UP
A1
11.17 m²
D 06
Living Area
21
31.46 m²
Entertainment Area
35
N 4° 00' 00" W 23.07 m
3
Master T&B
30
35
21
D 04 D 04
A1
11.73 m²
35
D 04
21
-
-
12.54 m²
13.45 m²
7
1
Bedroom 2
19.17 m²
20
21
3
Family Area
35
24.18 m²
Master Bedroom
EXTERIOR PERSPECTIVE
26.11 m²
4
D 01
4
D 07
Porch
35
35
21
9.10 m²
5
Play Room
35 D 07
Balcony 10.12 m²
21
6
21
1
GROUND FLOOR PLAN 1 : 100 MTS
2
5
21
17.38 m²
6
35
SECOND FLOOR PLAN
N 90° 00' 00" W 15.03 m
1 : 100 MTS
3 A
B
6
C
D
E
1
2
7
3
4
5
6
INTERIOR PERSPECTIVE
SITE DEVELOPMENT PLAN 1 : 100 MTS
1
2
A1
7 A1
3
4
5
6
B
C
D
E
6
-
A1
A
A1
---
Top of Roof Beam 6600 Bedroom 1
Master T&B
19.17 m²
Master Bedroom
6.73 m²
Master T&B
Balcony
6.73 m²
Walk-In-Closet 5.26 m²
Family Area 24.18 m²
10.12 m²
26.11 m²
Second Floor Level 3600 Powder Room
Dining Area
2.85 m²
13.45 m²
Living Area 31.46 m²
Stairs
Porch Living Area
9.10 m²
11.17 m²
31.46 m²
Ground Floor Level 300 Natural Grade Level 0
4
FRONT ELEVATION 1 : 100 MTS
5
LEFT SIDE ELEVATION
6
1 : 100 MTS
PROJECT DESIGNER:
LONGITUDINAL SECTION
7
1 : 100 MTS
PROJECT TITLE:
CROSS SECTION 1 : 100 MTS
SHEET CONTENTS:
SHEET NO:
FLOOR PLANS / ELEVATIONS / SECTIONS
JOSHUA CHRIS R. LLEGO
TWO - STOREY RESIDENCE
EXTERIOR AND INTERIOR PERSPECTIVES DATE: 8/31/2021 11:18:28 PM
CHECKED BY ENGR. JOSELL ARCILLA
A1
Microcadd Institute | Autodesk Revit Architecture
1
21
25
S 2° 00' 00" W 24.25 m
25
14
Batangas State University
Main I - Rizal Ave, Extension, Batangas City, 4200 Batangas Philippines
16
Main II - Golden Country Homes Subdivision, Alangilan, Batangas City, 4200 Batangas Philippines
(043) 425 7158 http://www.batstate-u.edu.ph/
27
[Architectural Thesis]
Balay Bakawan Development
25
[Building Technology 4]
Estimates
[Building Technology 3]
Mid-Rise Building
Bachelor of Science in Architecture 2012-2017
Affiliations:
United Architects of the Philippines Graduate Auxillary - Batangas Chapter Auditor, 2017-2018 Chapter Director for External Affairs, 2018-2019 Member, 2017-2019
United Architects of the Philippines Student Auxillary - BatSU Chapter Member, 2012-2017
Academic Works
Architecture, Interior Design, and Fine Arts Students Society
15
Business Manager, 2015- 2016 Member, 2012-2017
2
29
[Architectural Interiors]
Interior Design Works
30
[Manual Drafting and Drawings]
Visual Techniques and Renderings
Arch. Venecio P. Codia, uap, nampap, piep Department Head
Arch. Rommel L. Tubig, uap Thesis Adviser
Balay Bakawan Multi-Development Integrating Recreation, Education, and Environmental Awareness through Organic Architecture: A Proposed National Mangrove Museum with Symbiotic Development Studies Center and Resort Eco-adventure Park in Palsabangon Pagbilao, Quezon
The Philippines is considered to be one of the biodiversity hotspot in the world. It is a home for numerous ecotourism zones and areas. Consequently, this aspect is vital for raising environmental awareness and at the same time boosting economic growth. Tourists and researchers were definitely drawn to the country because of
its natural beauty and diversity. They are the top target market of the tourism and economic sector for establishing a strong financial foundation. But unfortunately, opportunities such as these are being lost because of the lack of physical facilities these spots could offer.
Furthermore, Pagbilao Mangrove Experimental Forest is one of the biodiversity hotspot the Philippines could be proud of. It is considered to be a Genetic Resources Area and National Training Site for Mangrove due to the number of mangrove species present on this. It is a haven for the academe and research industry for their studies and also an enticement for tourists who seeks for adventure and an escape with nature.
Yet, several problems are being encountered herein such as the absence of its marketability in terms of physical facilities it could offer and also lack of reinforcement in protecting the site.
However, to achieve both goals, there must be a balance to maintain the natural reserves while boosting economic aspects. It is intended to boost economic development and tourism without compromising the protection of second most diverse mangrove forest reserve in the world through organic architecture with emphasis on biomorphic approach.
Academic Works | Architectural Thesis
16
Academic Works | Architectural Thesis
17
Academic Works | Architectural Thesis 18
Museum Division
Front Elevation
Academic Works | Architectural Thesis
Ground Floor Plan
19
Left-Side Elevation
Rear Elevation Second Floor Plan
Floor Plans | Drafting with Autodesk
AutoCAD. (Right)
Right-Side Elevation Elevations| Drafting with Autodesk AutoCAD. (Left)
Third Floor Plan
Academic Works | Architectural Thesis 20
Academic Works | Architectural Thesis
Museum Division
21
Academic Works | Architectural Thesis 22
Single Cabana
Floor Plans | Drafting with Autodesk AutoCAD.
Academic Works | Architectural Thesis
This diagram was used on showing the occupant load of the Hotel Tower.
23
Family Cabana
Third Floor Plan
Second Floor Plan
Ground Floor Plan
Single and Family Cabana | Drafting with Autodesk AutoCAD, Manual Renderings, and Digital Rendering with Lumion enhanced in Photoshop
Main Hotel | Drafting with Autodesk AutoCAD, Manual Renderings, and Digital Rendering with Lumion enhanced in Photoshop It features a three-storey Main Hotel with a lap pool . The rooms available in this building are best for accommodating large groups such as company team building, field trips, and conventions.
Academic Works | Architectural Thesis
The single and family cabana caters solo to middle size group. It surrounds the swimming pool where all the guests can enjoy a dip on the pool at their own convenience.
24
MATERIALS ESTIMATE CEMENT HOLLOW BLOCKS INTERIOR WALLS: -LENGTH: -HEIGHT: *AREA1:
4.70m + 2.00m + 1.4250m = 8.125m 0.50m + 2.70m + 0.30m = 3.50m 8.125m x 3.50m = 28.4375sq.m
Academic Works | Building Technology 4 | Estimates
EXTERIOR WALLS:
25
A. FRONT ELEVATION: -LENGTH:9.80m -HEIGHT: 3.50m AREAA: 9.80m x 3.50m = 34.30sq.m B. REAR ELEVATION: -LENGTH:11.725m -HEIGHT: 3.20m AREAB: 11.725m x 3.20m = 37.52sq.m *AREA2: 34.30sq.m + 37.52sq.m = 71.82sq.m
FIREWALLS:
A. RECTANGULAR PART: -LENGTH:7.00m -HEIGHT: 3.6167m AREAA: 7.00m x 3.6167m = 25.3169sq.m B. TRIANGULAR PART: -BASE: 7.00m -HEIGHT: 0.5833m AREAB: = 2.04155sq.m AREAA + AREAB = 25.3169sq.m + 2.04155sq.m = 27.3583sq.m *AREA3: (27.3583sq.m) (2 identical side) = 54.7166sq.m
OPENINGS:
DOORS: -LENGTH: 0.90m + 0.80m + 0.60m +0.60m = 2.90m -HEIGHT: 2.10m AREAD: 2.90m x 2.10m = 6.09m WINDOWS: -W1: 1.60m x 1.80m = (2.88sq.m) (2sets) = 5.76sq.m -W2: 1.00m x 1.80m = (1.80sq.m) (1set) = 1.80sq.m -W3: 0.50m x 1.80m = (0.90sq.m) (3sets) = 2.70sq.m -W4: 0.50m x 0.50m = (0.25sq.m) (1set) = 0.25sq.m -W5: 1.20m x 1.00m = (1.20sq.m) (2sets) = 2.40sq.m AREAW: 5.76sq.m + 1.80sq.m + 2.70sq.m + 0.25sq.m +2.40sq.m = 12.91sq.m *AREA4: 6.09sq.m + 12.91sq.m = 19.00sq.m
FROM THE OFFICE OF:
-/
LLEGO
DESIGNERS, ARCHITECTS AND BUILDERS
PERLAS COMPOUND KUMINTANG ILAYA BATANGAS CITY joshuachrisllego@gmail.com https://m.facebook.com/jcllego20 09273052031
JOSHUA CHRIS R. LLEGO DESIGNER
P.R.C. REG. NO. : P.T.R. NO. : ISSUED ON :
IAPOA NO. : T.I.N. :
MATERIALS ESTIMATE
TOTAL AREA:
WALLS (CHB Reinforcements)
CLASS A: 40kg bag VOLUME= 0.80 x 0.80 x 0.25 = 0.16cu.m (6 sets of footing)(0.16cu.m) = 0.96cu.m CEMENT: 0.96cu.m x 9.00 = 8.64 say 9 bags SAND: 0.96cu.m x 0.50 = 0.48 say 0.50cu.m of sand GRAVEL: 0.96cu.m x 1.00 = 0.96 say 1cu.m of gravel
TOTAL AREA OF THE WALL:
*COLUMN
*CONCRETE SLAB FLOORING (rest on ground)
CLASS B: 40kg bag (Masters Bdrm.) (T&B) (Service Area) (Porch) (Living, Kitchen, Dining)
VOLUME1: 4.70 x 3.3250 x 0.25 = 3.906875cu.m VOLUME2: 1.2750 x 1.85x 0.20 = 0.47175cu.m VOLUME3: 1.3250x 1.9250 x 0.20 = 0.510125cu.m VOLUME4: 0.9250x 2.00 x 0.20 = 0.37cu.m VOLUME5: 1.6375cu.m + 3.34875cu.m + 1.02328125cu.m = 6.00953125cu.m VOLUME5.1: 2.00 x 3.2750 x 0.25 = 1.6375cu.m VOLUME5.2: 2.85 x 4.70x 0.25 = 3.34875cu.m VOLUME5.3: 2.775 x 1.4750 x 0.25 = 1.02328125cu.m TOTAL SLAB VOLUME= V1 + V 2 + V 4 + V 3 + V 5 =3.906875 + 0.47175 + 0.510125 + 0.37 + 6.00953125 TOTAL SLAB VOLUME= 11.26828125cu.m CEMENT: 11.26828125cu.m x 7.50 = 84.51210938 say 85 bags cement SAND: 11.26828125cu.m x 0.50 = 5.634140625 say 5.70cu.m of sand GRAVEL: 11.26828125cu.m x 1.00 = 11.26828125 say 11.30cu.m of gravel
PROJECT TITLE :
Net length: 0.70m + 0.20m = 0.90m 3 crosswise and 3 lengthwise 6 cut bars @ 0.9m long 6 Footings x 6 cut bars = 36 pcs. 36m + 6 = 6pcs. of 12mm Ø, 6mm steel bar
CLASS A: 40kg bag VOLUME= 0.20 x 0.40 x 3.50 = 0.28cu.m (6 sets of COLUMNS)(0.28cu.m) = 1.68cu.m CEMENT: 1.68cu.m x 9.00 = 15.12 say 16 bags SAND: 1.68cu.m x 0.50 = 0.84 say 0.90cu.m of sand GRAVEL: 1.68cu.m x 1.00 = 1.68 say 1.70cu.m of gravel
CONCRETE PROPORTION:
DRAWN BY : JC LLEGO
BEAM LATERAL TIES: (10mm Ø reinforcement bars)
CHB INTERIOR WALLS CHB Interior Walls= 32m 32m÷0.3m= 106.67m say 107pcs. Length of transverse bars= 0.40m+0.20(hook) = 0.60m 107 x 0.60m = 64.2m 64.2m÷6m= 10.7 say 11 pcs. 6m, 10mm Ø reinforcement bars
FROM THE OFFICE OF:
DRAWING NO.
-/
CHECKED BY : PROF. WMEDINA SHEET NO.
PROJECT LOCATION :
Total length of beams= 32m 32m x 6 = 192m 192m÷6m= 32pcs.of 6m, 10mm Ø reinforcement bars
TRANSVERSE BARS (spaced @0.30m)
78 bags of Class A cement 184 bags of Class B cement 31.3cu.m say 32cu.m SAND 19.9cu.m say 20cu.m GRAVEL 1700 pieces of cement hollow blocks (CHB)
REVISIONS
BEAM REINFORCEMENTS: (12mm Ø reinforcement bars)
CHB INTERIOR WALLS CHB Interior Walls= 32m 32m x 3pcs. = 96m 96÷6= 16 pcs. of 6m,12mm Ø reinforcement bars CHB FIREWALLS CHB Firewalls= 14m 14m x 3pcs. = 42m 42÷6= 7 pcs. of 6m,12mm Ø reinforcement bars
SUMMARY
MATERIALS ESTIMATE
DATE :
COLUMN LATERAL TIES: (12mm Ø reinforcement bars)
CONTINUOUS BARS
*BEAM
SHEET CONTENT :
Length: 3.75m x 6 = 22.5m per column 22.5m x 6 sets of columns = 135m 135m÷6m= 22.5 say 23 pcs. of 6m, 12mm Ø reinforcement bars
Spaced @ 0.20m: Length of stirrups= 1.20m 19 stirrups per column 19 x 1.20m = 22.8m 22.8 x 6 sets of columns = 136.6m 136.6m÷6m= 22.8 say 23 pcs. 6m, 10mm Ø reinforcement bars
WALL FOOTINGS:
CLASS A: 40kg bag VOLUME= 0.15 x 0.30 x 29.50= 1.3275cu.m CEMENT: 1.3275cu.m x 9.00 = 11.9475 say 12 bags SAND: 1.3275cu.m x 0.50 = 0. 66375 say 0.70cu.m of sand GRAVEL: 1.3275cu.m x 1.00 = 1.3275 say 1.40cu.m of gravel
STUDIO TYPE ROW HOUSE
COLUMN REINFORCEMENTS: (12mm Ø reinforcement bars)
COLUMN FOOTINGS:
CLASS A: 40kg bag VOLUME= 0.20 x 0.40 x 14.00 = 1.12cu.m CEMENT: 1.12cu.m x 9.00 = 10.08 say 11 bags SAND: 1.12cu.m x 0.50 = 0.56 say 0.60cu.m of sand GRAVEL: 1.12cu.m x 1.00 = 1.12 say 1.20cu.m of gravel
TYPE: CLASS B MIXTURE, 16mm THK PLASTER, 40kg bag Total area of the wall : 135.9741sq.m CEMENT: 135.9741sq.m x 0.192 = 26.1070272 say 27 bags SAND: 135.9741sq.m x 0.016= 2.1755856 say 2.20cu.m of sand
R.A. 9266 SEC. 33 ARCH. ACT OF 2004
582.08m÷6m= 97.013say 97pieces of 6m 10mm Ø reinforcement bars
*FIREWALL FOOTINGS
MORTAR for PLASTERING:
DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED OR SEALED, AS INSTRUMENTS OF SERVICE,ARE THE INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS.
HORIZONTAL REINFORCEMENTS: -@ every 3 layers: 136sq.m x 2.15= 292.4m long steel bars 289.68 + 292.4 = 582.08m
CLASS A: 40kg bag VOLUME= 0.20 x 0.55 x 29.50 = 3.245cu.m CEMENT: 3.245cu.m x 9.00 = 29.205 say 30 bags SAND: 3.245cu.m x 0.50 = 14.6025 say 14.70cu.m of sand GRAVEL: 3.245cu.m x 1.00 = 3.245 say 3.30cu.m of gravel
TYPE: CLASS B MIXTURE, 40 kg bags CHB SIZE: 10cm x 20cm x 40cm Total area of the wall : 135.9741sq.m CEMENT: 135.9741sq.m x 0.525 = 71.3864025 say 72 bags SAND: 135.9741sq.m x 0.0438= 5.95566558 say 6cu.m of sand
135.9741sq.m or 136sq.m
VERTICAL REINFORCEMENTS: -spaced @ 60cm: 136sq.m x 2.13= 289.68m long steel bars
*WALL FOOTINGS
CEMENT MORTAR:
CHB FIREWALLS CHB Interior Walls= 14m 14m÷0.3m= 46.67m say 47pcs. Length of transverse bars= 0.40m+0.20(hook) = 0.60m 47 x 0.60m = 28m 28m÷6m= 4.67say 5 pcs. 6m, 10mm Ø reinforcement bars
REINFORCEMENT BARS
*COLUMN FOOTINGS
=AREA1 + AREA2 + AREA3 - AREA4 =28.4375 + 71.82sq.m + 54.7166sq.m - 19.00sq.m TOTAL AREA = 135.9741sq.m 12.5 pcs. of CHB per sq.m 12.5 x 135.9741sq.m = 1699.67625 or 1700 pieces of cement hollow blocks
19
Note: by direct counting, there are 28 stirrups @ every beam TOTAL no. of Stirrups: 28x6= 168pcs. 168÷ 6= 28 pcs. 6m, 10mm Ø reinforcement bars
JOSHUA CHRIS R. LLEGO
LLEGO
DESIGNER
DESIGNERS, ARCHITECTS AND BUILDERS
PERLAS COMPOUND KUMINTANG ILAYA BATANGAS CITY joshuachrisllego@gmail.com https://m.facebook.com/jcllego20 09273052031
P.R.C. REG. NO. : P.T.R. NO. : ISSUED ON :
IAPOA NO. : T.I.N. :
R.A. 9266 SEC. 33 ARCH. ACT OF 2004 DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED OR SEALED, AS INSTRUMENTS OF SERVICE,ARE THE INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS.
MATERIALS ESTIMATE WAINSCOATING:
PLUMBING: 4” Ø PVC Soil Pipe (6m) Length: 7.6m 7.6m÷6= 1.27 say 2 pcs.
TILES 30cmx30cm UNGLAZED CERAMIC TILES AREA: 2.3587m+2.5506m=4.9093sq.m 4.9093÷0.09sq.m= 54.55 say 55 pcs.
4”x4”Ø wye = 9pcs. 4”x4”Ø 45° = 2pcs. 3”x3”Ø 45° = 6pcs.
PAINTS
Brass P-trap= 2pcs. 3”x3” Ø Brass P-Trap Lead P-trap= 5pcs. 3”x3” Ø Lead P-Trap 25sq.m per gal. 136sq.mx2sides= 272
Flatwall Enamel Paint, White - 10.88gal. say 11gal. Quick Drying Enamel Paint, White - 10.88gal. say 11gal. Paint Thinner Acrylic Semi-gloss Latex Paint Concrete Neutralizer Acrylic Concrete Primer Sealer Latex Putty Acrylic Tinting Colors: Yellow Blue Brown Clear Gloss Lacquer Dead Flat Lacquer Clear Gloss Lacquer Wood Filler Paste Lacquer Thinner Red Lead Primer Roof Master Roof Paint
- 10.88gal. say 11gal. - 3 gal. -10.88gal. say 11gal. -10.88gal. say 11gal. -3gal. -5gal. -5gal. -8gal. -3gal. -3gal. -2gal. -1L can -1gal. -2gal. -2gal.
Sandpapers (Assorted) Clean Rags
-1doz. -1kl.
FROM THE OFFICE OF:
-/
LLEGO
DESIGNERS, ARCHITECTS AND BUILDERS
PERLAS COMPOUND KUMINTANG ILAYA BATANGAS CITY joshuachrisllego@gmail.com https://m.facebook.com/jcllego20 09273052031
JOSHUA CHRIS R. LLEGO DESIGNER
P.R.C. REG. NO. : P.T.R. NO. : ISSUED ON :
IAPOA NO. : T.I.N. :
WATER STEEL PIPE Length= 10m 10÷6m= 1.67 or 2pcs. 2”Ø steel pipe 10pcs. 2”Ø elbow 4pcs. 2”Ø tapped tee
STORM DRAINAGE DOWNSPOUT Length= 2.8@ 4 sets of downspout= 11.2 11.2÷6m= 1.87 or 2pcs. 3”Ø PVC Downspout 4pcs. 3”Ø elbow STORM DRAINAGE PIPE Length= 8.3m 8.3m÷6m= 1.38 or 2pcs. 4”Ø PVC Pipe
SEPTIC TANK
R.A. 9266 SEC. 33 ARCH. ACT OF 2004
CATCH BASIN CEMENT HOLLOW BLOCKS (4”) LENGTH: 2.00m DEPTH: 0.50m AREA: 1.00sq.mx2 sets of catch basin= 2.00sq.m 2x12.50= 25pcs of CHB MORTAR VOLUME: CEMENT: SAND:
2.00sq.mx.10m= 0.20cu.m 0.20x0.2088= 0.042 say 1 bag cement 0.20X.0112=0.00224 say 0.10cu.m of sand
REINFORCEMENT BARS LENGTH: 3.00m 3.00m÷6m= 0.50 say 1 pcs
ELECTRICAL
CEMENT HOLLOW BLOCKS (4”) LENGTH: 2.00m + 1.00m = 3.00m DEPTH: 1.80m AREA: 3.00x1.80m= 5.40sq.m 5.40sq.mx12.5= 67.50 say 68 pcs. CHB
DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED OR SEALED, AS INSTRUMENTS OF SERVICE,ARE THE INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS.
5.40sq.mx.10m= 0.54cu.m 0.54x0.2088= 0.113 say 1 bag cement 0.54X.0112=0.006 say 0.10cu.m of sand
REINFORCEMENT BARS HORIZONTAL BARS (10mm Ø reinforcement bars) 1.80 @13 layers= 23.40m 23.40m÷6m= 3.90 say 4 pcs. VERTICAL BARS (10mm Ø reinforcement bars) SLAB LENGTH: 2.00m DEPTH: 0.10m AREA: 0.02sq.m CEMENT: 0.02x0.75= 0.15 say 1 bag cement SAND: 0.02x0. 05= 0.01 say 0.10cu.m sand GRAVEL: 0.02x1.00= 0.02 say 0.10cu.m gravel
3” Ø PVC Soil Pipe (6m) Length: 7.6m 7.6m÷6= 1.27 say 2 pcs.
30cmx30cm GLAZED CERAMIC TILES (COLORED) AREA:15.6275m+21.9831m=37.6106sq.m 37.6106÷0.09sq.m= 417.90 say 418 pcs.
NOTE:
MORTAR VOLUME: CEMENT: SAND:
PROJECT TITLE :
STUDIO TYPE ROW HOUSE PROJECT LOCATION :
15mm Ø PVC Pipe Conduit Length: 16.5+23.5+3= 43m 43m, 15mmØ PVC pipe conduit 2- # 3.50sq.mm THHN WIRE Length= 43m 2-3 50sq.mm THHN wire 2- # 5.50sq.mm THHN WIRE Length= 3m 2-# 5.50sq.mm THHN wire
SHEET CONTENT : MATERIALS ESTIMATE
REVISIONS
DRAWN BY : JC LLEGO
DRAWING NO.
CHECKED BY : PROF. WMEDINA SHEET NO. DATE :
21
PROJECT TITLE :
STUDIO TYPE ROW HOUSE PROJECT LOCATION :
ROOFING MATERIALS: RAFTER (2”x5”x10' wood) 6.1m x 9pcs. = 54.9m 54.9m÷3m= 18.3 say 19pcs. PURLINS (2”x3”x12' wood) 9pcs. x 9.8 m = 88.2m 88.2m÷3m= 29.4 say 30pcs. FASCIA BOARD (1/2”x12”x12' wood) Length= 10m 10m÷3.66m= 2.73 say 3pcs. CEILING JOIST (2”x2”x10' wood, 0.40mx0.40m spacing) Ceiling area: 9.80mx4.70m= 46.06 say 46sq.m 46sq.mx6.417= 295.57bd.ft. or CEILING BOARD (6mm thick marine plywood) Ceiling area: 9.80mx4.70m= 46.06 say 46sq.m Plywood Area= 2.88sq.m 46sq.m÷2.88sq.m= 15.97 say 16 pcs. WOOD CORNICE (2”x5”x10' wood) 3.3250mx2= 6.56m 4.70mx2= 9.40m 6.325m+2.775m+3.275m+2.00m+1.2450m+2.85m+1.925m+1.475m= 21.87m TOTAL LENGTH: 6.56m+9.40m+21.87m= 37.83m 37.83m÷6m= 6.31 say 7 pcs. ROOFING SHEETS (#26 G.I. pre-painted) TOTAL AREA: 60sq.m ROOFING SHEET AREA: 3.12sq.m 60sq.m÷3.12sq.m= 19.23 say 20pcs. GUTTER ((#24 G.I. gutter) LENGTH: 10.00m 10m÷3= 3.33 say 4pcs. SIDE FLASHING (#24 Plain G.I. flashing) LENGTH: 14.00m 14÷3= 4.67 say 5 pcs.
SHEET CONTENT : MATERIALS ESTIMATE
REVISIONS
DRAWN BY : JC LLEGO
DRAWING NO.
CHECKED BY : PROF. WMEDINA SHEET NO. DATE :
20
QUANTITY
%
ADDED %
TOTAL
QUANTITY
I. MASONRY
%
ADDED %
TOTAL
1.60mx1.80m AWNING WINDOW
2
-
-
2
1
-
-
1
1. CEMENT HOLLOW BLOCKS
1793
10%
179.3
1973
1.00mx1.80m AWNING WINDOW
2. PORTLAND CEMENT (CLASS A)
78
10%
7.8
85.8
0.50mx1.80m AWNING WINDOW
3
-
-
3
2.A. PORTLAND CEMENT (CLASS B)
187
10%
18.7
206
0.50mx0.50m DOUBLE HUNG WINDOW
1
-
-
1
3. SAND
32.3
10%
3.23
36
1.00mx1.20m CASEMENT WINDOW
2
-
-
2
4. GRAVELS
20
10%
2
22
6m,12mm ø BAR
36
10%
3.6
40
1. #26 G.I. PRE-PAINTED ROOF
20
10%
2
22
6m,10mm ø BAR
201
10%
20.1
222
2. #24 G.I. GUTTER
4
10%
0.4
5
30kls.
10%
3
33
3. #24 PLAIN G.I. SHEET
5
10%
0.5
6
4. ROOFING NAILS
2000
10%
200
2200
1. ASSORTED NAILS
3kls.
10%
0.3
4
2. LOOSE PIN HINGE
12
10%
1.2
14
3. DOOR KNOBS
4
-
-
4
3
6. G.I. TIE WIRE #16 7. WAINSCOATING 30cmx30cm UNGLAZED CERAMIC TILES
55
10%
5.5
61
30cmx30cm GLAZED CERAMIC TILES (COLORED)
418
10%
41.8
460
II. CARPENTRY
IV. HARDWARE
1. RAFTER (2'x5"x10')
19
10%
1.9
21
2. PURLINS (2"x3"12')
30
10%
3
33
3. FASCIA BOARD (12"x12"x12')
3
10%
0.3
4
4. CEILING JOIST (2"x2"x10')
295.57bd.ft.
10%
29.557
326
1. 4" ø PVC SOIL PIPE
2
10%
0.2
5. CEILING BOARD (6mm THK)
16
10%
1.6
18
2. 3" ø PVC SOIL PIPE
2
10%
0.2
3
6. WOOD CORNICE
7
10%
0.7
8
3. 4"X4" ø WYE
9
10%
0.9
10
SCHEDULE OF DOORS AND WINDOWS
4. 4"X4" ø 45° BEND
2
10%
0.2
3
5. 3"X3" ø 45° BEND
6
10%
0.6
7
0.90mx2.10m PANEL DOOR WITH JAMB
1
-
-
1
6. 4"X4" ø BRASS P-TRAP
2
10%
0.2
3
0.80mx2.10m PANEL DOOR WITH JAMB
1
-
-
1
7. 3"X3" ø LEAD P-TRAP
5
10%
0.5
6
0.60mx2.10m FLUSH DOOR WITH JAMB
2
-
-
2
FROM THE OFFICE OF:
-/
V. PLUMBING
LLEGO
DESIGNERS, ARCHITECTS AND BUILDERS
PERLAS COMPOUND KUMINTANG ILAYA BATANGAS CITY joshuachrisllego@gmail.com https://m.facebook.com/jcllego20 09273052031
R.A. 9266 SEC. 33 ARCH. ACT OF 2004
JOSHUA CHRIS R. LLEGO
DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED OR SEALED, AS INSTRUMENTS OF SERVICE,ARE THE INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS.
DESIGNER
P.R.C. REG. NO. : P.T.R. NO. : ISSUED ON :
IAPOA NO. : T.I.N. :
QUANTITY
%
ADDED %
PROJECT TITLE :
STUDIO TYPE ROW HOUSE
SHEET CONTENT :
DRAWN BY : JC LLEGO
REVISIONS
MATERIALS ESTIMATE
DRAWING NO.
CHECKED BY : PROF. WMEDINA SHEET NO.
PROJECT LOCATION :
22
DATE :
TOTAL
QUANTITY
%
ADDED %
TOTAL
8. 2" ø STEEL PIPE
2
10%
0.2
3
CONVENIENCE OUTLET (REF)
1
10%
0.1
9. 2" ø ELBOW
10
10%
1
11
CONVENIENCE OUTLET (ACU)
1
10%
0.1
2
10. 2" ø TAPPED TEE
4
10%
0.4
5
UTILITY BOX PANEL BOARD
10
10%
1
11
1
-
11. 3" ø DOWNSPOUT
2
10%
0.2
3
12. 4" ø PVC PIPE
2
10%
0.2
3
WATER CLOSET
1
-
-
1
WALL HUNG LAVATORY
1
-
-
1
KITCHEN SINK
1
-
-
1
SHOWER HEAD
1
-
-
1
FAUCET
2
-
-
2
FLOOR DRAIN
3
-
-
3
-
2
1
VI. ELECTRICAL WORKS 15mm ø PVC PIPE CONDUIT
43
10%
4.3
2-3.50mm² THHN WIRES
43
10%
4.3
48
2-5.50mm² THHN WIRES
3
10%
0.3
4
48
SOCKET
10
10%
1
11
FLUORESCENT CIRCULAR BULB
4
10%
0.4
5
PINLIGHT
26
10%
2.6
29
1 GANG SWITCH
2
10%
0.2
3 2
2 GANG SWITCH
1
10%
0.1
3 GANG SWITCH
1
10%
0.1
2
CONVENIENCE OUTLET
10
10%
1
11
WALL LAMP
2
10%
0.2
3
FROM THE OFFICE OF:
-/
LLEGO
DESIGNERS, ARCHITECTS AND BUILDERS
PERLAS COMPOUND KUMINTANG ILAYA BATANGAS CITY joshuachrisllego@gmail.com https://m.facebook.com/jcllego20 09273052031
JOSHUA CHRIS R. LLEGO DESIGNER
P.R.C. REG. NO. : P.T.R. NO. : ISSUED ON :
IAPOA NO. : T.I.N. :
R.A. 9266 SEC. 33 ARCH. ACT OF 2004 DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED OR SEALED, AS INSTRUMENTS OF SERVICE,ARE THE INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF AND FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS.
PROJECT TITLE :
STUDIO TYPE ROW HOUSE PROJECT LOCATION :
SHEET CONTENT : MATERIALS ESTIMATE
REVISIONS
DRAWN BY : JC LLEGO
DRAWING NO.
CHECKED BY : PROF. WMEDINA SHEET NO. DATE :
23
Academic Works | Building Technology 4 | Estimates
III. TIN-SMITING WORKS
5. REBARS
26
floor plans
A A
B
D
C
E
F
H
G
J
J1
K
7.40
2.60
10.00
10.00
10.00
10.00
0.30 3.00
10.00
GENERAL STO
2
UTILITY AREA
COMMERCIAL 1
5
COMMERCIAL 2
COMMERCIAL 3
COMMERCIAL 4
COMMERCIAL 5
5.00
A
T
I
FEMALE TOILET
MALE TOILET
0.30 3.00
6
LOBBY 2
3.00
3.80
5.50
2.00
5.00
2.00
11.00
12.00
2.00
5.00
2.00
11.00
6.00
4.50
13.00
50.00
ROOFTOP FLOOR LINE
SIXTH FLOOR LINE
A
22.00
B
C
D
E
F
H
B
GROUND FLOOR PLAN D E F C G
G
J
J1
FIFTH FLOOR LINE
FOURTH FLOOR LINE
THIRD FLOOR LINE
SECOND FLOOR LINE CEILING LINE
7
3.00
0.20 4.00
3.20
K
FINISH FLOOR LINE NATURAL GRADELINE
Ground Floor Plan
A
SCALE
SCALE
H
J11
J
K
7
11
5
6
2
3
7.40
2.60
10.00
10.00
10.00
10.00
6.00
10.00
FIRE EXIT
1 FRONT ELEVATION 2 1 1 1
3
SCALE
5
7
6
1 5.00
10.00
elevations
Front Elevation
SCALE
87.00
1
K
J1
CEILING LINE
PWD
2.00
J
CEILING LINE
0.30
INFO DESK
6 7
H
CEILING LINE
5
up
O
0.30 3.00
3
SERVICE STAIRS
PWD
P
ELEV 4
0.30 3.00
5.00
SECURITY DESK
0.30 3.00
ELEVATOR LOBBY
3.00
A R E A
3.00
S E A T I N G
32.00
W A I T I N G /
ELEV 1 ELEV 2
G
CEILING LINE ELEV 3
7.30
15.00
VESTIBULE
3
F
CEILING LINE
INFO DESK
2
0.30
1.20
1 ELEC RM
MECH RM
up
ELEVATOR LOBBY
E
6.00
FIRE EXIT
2.32
1
10.00
D
C
11
89.00 2.00
B
PANTRY
I
C
E
5
32.00
PRIVATE OFFICE 2
5
up
SERVICE STAIRS
5.00
PWD
8.70
6
C
E
F
H
G
J
J1
Typical 2nd, 4th, and 6th Floor Plan 1
SCALE
2.60
10.00
10.00
10.00
6.00
10.00
FIRE EXIT
0.30 3.00
PANTRY
MECHANICAL & ELECTRICAL RM
K
SEATING/ WAITING AREA
CONFERENCE ROOM
O
P
E
N
O
F
F
I
C
E
ELEVATOR LOBBY
3
S
5
32.00
PRIVATE OFFICE 2
up
SERVICE STAIRS
5.00
PWD
6
6
FIFTH FLOOR LINE
8.70
0.30 3.00
GLASS WALL
C
D
7
22.00
E
F
G
H
J
J1
K
48.50
21.00
87.00
0.30 3.00 0.20 4.00
K
1
89.00
7.40
E
11
SCALE
1
SCALE
FIRE EXIT
FOURTH FLOOR LINE
THIRD FLOOR LINE
SECOND FLOOR LINE
14.80
3
[Building Technology 4]
32.00
3 7.00
5
dn
6
Office Building
5
Bonifacio Global City, Taguig City, Metro Manila
6
7
Rear Elevation
conceptual SCALE framework
2
14.70
2
7 50.00
B
C
D
23.00
E
F
G
H
J
J1
Office building for an up and coming tech-oriented start - up company. To design for young professional.
K
ROOF DECK Roof Deck Plan SCALE
SCALE
Years Involved : 2019 to 2020
C
B
A
SCALE
REAR ELEVATION
1 dn
A
D
CEILING LINE
B D E F H J J C G TYPICAL THIRD AND FIFTH FLOOR PLAN
SCALE
Right-Side Elevation
RIGHT-SIDE ELEVATION
CEILING LINE
Typical 3rd and 5th Floor Plan A
F
CEILING LINE
0.30 3.00
50.00
B
G
CEILING LINE
PWD
A
H
ROOFTOP FLOOR LINE
SIXTH FLOOR LINE
MALE TOILET
10.00
J
CEILING LINE
VESTIBULE
7
J
1
SCALE
5
INFO DESK
FEMALE TOILET
FINISH FLOOR LINE
CEILING LINE
SEATING/ WAITING AREA
7.00
5.00
TOI
PRIVATE OFFICE 1
SCALE
0.30 3.00
ELEVATOR LOBBY
3
2
0.30 3.00
15.00
PRIVATE OFFICE 3
0.30
PRINTING AND FILES STORAGE
GLASS WALL
5.00
2
0.30
LEFT-SIDE ELEVATION
1
up
INFO DESK
CEILING LINE
Left-Side Elevation
SCALE
10.00
SECOND FLOOR LINE
NATURAL GRADELINE
5.00
7.40
SECOND FLOOR LINE
1
87.00 10.00
THIRD FLOOR LINE CEILING LINE
CEILING LINE
A B D E F H J FLOOR J K C G TYPICAL SECOND, FOURTH, AND SIXTH PLAN 1 1
THIRD FLOOR LINE CEILING LINE
K
0.20 4.00
D
0.30 3.00
B
7
22.00
0.20 4.00
50.00
FOURTH FLOOR LINE CEILING LINE
CEILING LINE GLASS WALL
A
CEILING LINE
FOURTH FLOOR LINE
PWD
7
FIFTH FLOOR LINE
CEILING LINE VESTIBULE
MALE TOILET
10.00
SIXTH FLOOR LINE CEILING LINE
FIFTH FLOOR LINE
INFO DESK
FEMALE TOILET
6
ROOFTOP FLOOR LINE CEILING LINE
SIXTH FLOOR LINE CEILING LINE
SEATING/ WAITING AREA
7.00
5.00
TOI
PRIVATE OFFICE 1
ROOFTOP FLOOR LINE CEILING LINE
3
S
0.30 3.00
F
0.30 3.00
F
0.30 3.00
O
0.30 3.00
N
0.30 3.00
E
0.30 3.00
P
0.30 3.00
9.84
15.00
O
2
ELEVATOR LOBBY
0.30 3.00
CONFERENCE ROOM
5.00
Academic Works | Building Technology 3 27
PRIVATE OFFICE 3
ELEVATOR LOBBY
3
MECHANICAL & ELECTRICAL RM
54.58
5.00
SEATING/ WAITING AREA
10.54
2
PRINTING AND FILES STORAGE
GLASS WALL
0.30
up
INFO DESK
SCALE
[Building Technology 3]
Office Building
Bonifacio Global City Taguig City, Metro Manila
design brief
Office building for a tech-oriented start - up company. To design for young professional. i.e. Google, Youtube
Aside from the Technical Drawings, this particular plate requires an in-depth research and study on Alternative Building Construction Method. This Includes: 1. Thin Shell Construction 2. Tensile Structure 3. Low-E Glasses 4. Waffle Slabs 5. Exploring LED Lights as an alternative to traditional lighting system 6. New paint technology as advertised on commercial paint manufacturers
Software Used: Autodesk AutoCad | Lumion | Adobe Photoshop | Adobe Indesign 2015
Academic Works | Building Technology 3
Individual Work
28
Architectural Interiors Classes
Acaddemic Work | 29
Exterior Perspective | SketchUp 3D, Lumion, Lightroom Facade Perspective of the Coffee Shop situated on Second Floor. A signage with live wall greets the customers upon entering the establishment.
Interior Perspective | SketchUp 3D, Lumion, Lightroom Interior Perspective of a Coffee Shop with Al Fresco seating. The interior features a pastel-colored furniture and fixture with streaks of orange accent as a homage for the brand. Meanwhile, the al fresco seating features a tropical seats with planters as accents.
Visual Techniques 1 Vehicles | Pen and Ink 2012
Visual Techniques 2 Interior Perspective | Watercolor and Ink 2013
Architectural Design 3 Retreat House Site Development Plan Watercolor | Pen and Ink 2013
Architectural Design 3 Retreat House Mess Hall Elevation Watercolor | Pen and Ink 2013
Academic Works | Manual Drawings and Renderings
Architectural Design 3 Retreat House Site Analysis Watercolor | Pen and Ink 2013
30
Grupo Kalinangan Inc.
Unit 25D, 2nd Flr., Zeta II Bldg., 191 Salcedo St, Brgy. San Lorenzo, Makati, 1229 Metro Manila
(043) 425 7158 http://www.grupokalinangan.org/
Volunteer Engagement Committee 2020 - Present
Position:
Cultural Mapping Training Batch Particaipant February 2020 - April 2020
Taguig Cultural Mapping Volunteer February 2020
Cultural Mapping Training
Interests
Batch 11 Facilitator April 2021 - May 2020
31
32
[Cultural Mapping Photography]
Taguig Heritage District
3
32
Interests | Photography
Lego | 2020
Interests | Photography
Urban Heist | 2020
33
Future Gaze | 2020
Interests | Photography 34
An Architecture Portfolio of JOSHUA CHRIS R. LLEGO 0906-352-2792 joshuachrisllego@gmail.com joshua.llego@grupokalinangan.com
Adobe Photohop . Adobe InDesign . Adobe Lightroom . Autodesk Autocad . Autodesk Revit Architecture . SketchUp . V-ray . Lumion
2021