U[bPu; ?;RPru;
)/) ) 3!
zvx{Ãzvx
The competition’s challege was to design a mid-end cluster housing in an unspecified urban area which accomodates the daily lifestyle of urban residents. Our team decided to design a house which applies Indonesian traditions. We focused to improve family interraction, application of tropical cross-ventilation, and bringing the traditional shapes into modern design.
o) - ) - / W- ĂƒK N! ) Competition Entry Provident Development 2014 Collaboration with: Gerry Surbakti (ITB) Made Yudhistira (ITB)
@) - P ) High living cost in urban area. The house have to be comfortable and also low cost in maintenance. A house with room configuration which encourage interaction between its dwellers.
Local adaptation for modern design to give identitity and preserve Indonesian culture.
Exterior Perspective
Front Elevation
Rear Elevation
Second Floor Plan
Back Yard
v
zvv
|vv
~vv
Ground Floor Plan
v
zvv
|vv
~vv
Second Floor Plan
Open Area in Second Floor
= -/ - ` -/- -) r' )
u'#- / J/!! m/
The main goal of this assigment is to understand the complex system of mid-rise building, which includes building core system, waste water, clean water, and power system.
c ) c ) r' )
= -/ - ?! ) r' ) The core functions as a connector of each building levels from the basement to the top level. Most of the utilities that is connected through all levels is in the building core, including: water plumbing, electricity/power, internet/phone cabel, elevator, and emergency stair.
Greywater runs from each unit Plumbing shaft is connected in the second floor Fecal sludge is collected and processed in the septic tank
Greywater runs to city’s wastewater system.
?/) c ) r' ) Water  is  pumped  via  pumbling  shaft  in  each  unit.
0
5
10
20m
u'#- / u3! =) o!! u )) =) o!! J/!! m/
0
5
10
20m
u'#- / u3! =) o!! J/!! m/
Water is pumped to the swimming pool.
Septic Tank
Power Generator Room
R) ) Grey water
Ground Water Tank
m!3) r' ) Electricity  runs  from  the  power  panels  in  the  building  core  to  each  unit. Â
Electricity  from  the  city’s  power  system  is  first  stabilized  with  transformer  before  it  is  ran  to  each  unit.
Electricity Clean water
0
5
10
20m
u'#- / r -! o!! J/!! m/
u '! Š