YI ZHOU Portfolio 2015-2018
Contents 02
Public Appearances
08
Exact Form
10
The Wolf Head
20
Ghosts of The Abyss
28
Xinchuan Mixed-use Towers
34
Fenghui TiandiEnchanted Toy & Building
36
Xichang Jiangjunli Commercial District
40
Packed Inside A Building
48
Complex Morphologies
54
Enchanted Toy & Building
60
Coding Form
62
Furniture, Film, &Fotos
Manifesto For me, Architecture is a heritage of culture and spirit. Traditional Chinese architecture was designed and build by craftsmen. Handmade means tiring, slow, and stubborn. However behind these, it means focusing on skills and technics, the pursuing for perfection. And the experience summarized by long-time practice, which emphasizes on people’s lifestyle and quality of dwelling space. I do not believe architecture could save the world, however it makes it better. I might not be able to create something special, but I am able to heritage something I believe its worthy to do so. I want to keep those we cherish most and proud of most. Rather than talking about the doctrine of form and aesthetics. Focusing on scale, materials, and space. Researching on the behavior of architecture user. Sheltering, accommodating and inspiring the occupants.
PUBLIC APPERANCES { From Spaceinvader to Courthouse } Time: 2016 Dseign Studio Collaborator: Mohammad Soleimanifeijani, Yasamin Fathi Location: Los Angeles, United States Instructor: Tom Wiscombe
Rendering
2
A city is folded in the container and reflects a new type of interiority in which the user can't really define the elements of conventional interior space. The idea was to create strong figurative objects from space invaders and boolean them into architecture mass. The project aims to disorient the sense of scale by having the figure of a toy and the scale of a building. Study Models
Rendering
3
4
Section
Explosive Model
Typical Plan
5
Physical Model
6
Physical Model
7
EXACT FORM Time: 2016 Visual Study-Cocurriculum for Previous Design Studio Instructor: Alejandro Alcala
Rendering
8
This seminar is a cocurriculum of the previous studio, it explored a series of operations to create strong figurative objects, witch in return helped with the form finding process of the previous studio. Rather than using keyshot as a render software, this seminar explored the possibility of using it as design software. By assigning reflecting materials to the objects and projecting different figure on the object, we can have differert shadows. And we can articulate the object by tracing the shadows and create another reading of the mass.
Rendering
9
THE WOLF HEAD { Design Development } Time: 2016 Collaborator: Carol Kan, Hashim Barda, Lijun Zhong, Xinlei Li Instructor: Herwig Baumgartner, Brian Zamora
Mega Transfer Truss Bridge Structure
Concrete Core Stability Sysrem
REVISION NO.
Description
PROJECT:
6” Slab On Metal Deck Spans Between Steel Frame
U.S Federal Courthouse in Los Angeles
ADDRESS: 350 W 1st Street, Suite 4311 Los Angeles, CA 90013
CONSULTANTS: Structural Consultant: Matthew Melnyk Environmental Consultant: Jayme Lyzun
Envelope: Diagonal Grid Steel
Steels members in the diagonal grid system is designed to work in tension and compression, resisitng wind and other loads.
INSTRUCTORS: Herwig Baumgartner Brian Zamora
TERM MEMBER: Carol Kan Hashim Barda Lijun Zhong Xinlei Li Yi Zhou
DATE:
12/05/2016 DRAWING:
Facade: Insulating Glass
Insulating glass is used in the facade for its energy efficiencies and performances.
Aluminum Mullion Secondary Beam Structure
Structure Axo_1 12” Thick Concrete Slabs With Concrete Beam System
SCALE:
Primary Beam Structure
NOT TO SCALE SHEET:
A.5
Thick Mat Slab Foundation
Structure AXO
Floor Finish Concrete Slab Beam Structure Suspended Ceiling
AHU-d 1000 SQF Air Cooled Chiller
Boiler
REVISION NO.
Description
Supply Air Duct
Return Air Duct
PROJECT: U.S Federal Courthouse in Los Angeles
ADDRESS: 350 W 1st Street, Suite 4311 Los Angeles, CA 90013
CONSULTANTS: Structural Consultant: Matthew Melnyk Environmental Consultant: Jayme Lyzun Lower Level Vertical Supply Air Duct
INSTRUCTORS: MECHANICAL SYSTEM AHU a,b,c =900 SQF TOTAL SQUARE FOOTAGE: 150,000 LOWER FLOORS (1-4) 3 RISERS EACH = 30 SQF EACH SUPPLY DUCT SIZE : 6’ x 5’
Herwig Baumgartner Brian Zamora
Lower Level Vertical Return Air Duct AHU-a 900SQF
TERM MEMBER: Carol Kan Hashim Barda Lijun Zhong Xinlei Li Yi Zhou
AHU d,e = 1000 SQF TOTAL SQUARE FOOTAGE: 125,000 UPPER FLOORS (5-9) 3 RISERS EACH = 40 SQF EACH SUPPLY DUCT SIZE : 8’ x 5’
DATE:
12/05/2016 DRAWING:
ELECTRICAL SYSTEM
HVAC
ELECTRICAL + IT = 1 PER EACH FLOOR DIVIDED INTO 3 PARTS = 1 PER CORE DIVISION ELECTRICAL a,b = 100 SQF IT ROOM 1
SCALE:
NOT TO SCALE
ELECTRICAL c = 100 SQF IT ROOM 2 ELECTRICAL d = 100 SQF IT ROOM 3
SHEET:
HVAC AXO
10
A.11
Envelope: GFRC Cladding
The majority of the exterior skin is cladded in black GFRC panels for its long spans and aesthetics.
REV
Secondary Beam Structure
NO.
Insulation Aluminum Mullion
PR
Roof: Photovoltaic Glass
Photovoltaic glass is used for the transparent envelop of the roof enabling the conversion of light into electricity and at the same time serves as solar shading.
U.S in Lo
AD
350 Los
CON
Stru Mat
Env Jaym
Courtroom & Cores: Reinforced Concrete Wall
The cores and courtrooms are enclosed with reinforced concrete wall to reduce the lateral movement.
Landscape
INS
Herw Bria
TER
Caro Hash Lijun Xinle Yi Zh
DAT
DRA Entrance
The sunken garden and ramps leads to the main entrance of the courthouse.
SCA
N 12� Thick Concrete Slab and Beam Frame
SHE
Thick Mat Slab Foundation
Mega Chunk
11
Photovoltaic Glass
PROS - Can be used in sun-facing facades or roofs - Suitable for movable louvres - Can generate electricity - Serve as solar shading for rooms behind them - Decarative - Environmentally friendly material CONS - Requires proper maintainance - High cost - low tensile strength
Insulating Glass PROS - The most energy efficient glass - Low u-value - High performance when used in combination with fiberglass
frame
- Safe - Extremely durable - Heavy weight makes it a stronger and longer lasting window CONS - weigh more than other glass - High cost
Aluminum Mullion
PROS - No rust - Very strong - Light weight - Impact resistant - Can be molded and shaped with relative ease - Cheap and abundant resource CONS - Requires proper maintenance and watertight frame
Reinforced Concrete Wall PROS - Good fire resistance - Versatile in form and shape - Different finishes are possible - Very durable and strong - Reduces vibration and sound transfer - Not likely to erode and decay overtime - Inexpensive CONS - Cracks may develop overtime due to shrinkage and loads - Limited recyclability
Glass Fiber Reinforced Concrete Cladding PROS - Long span is possible - Clean, bright, and smooth surfaces - High durability and flexibility - Minor damages can be repaired easily - Fire resistance - Can be clean easily and will not corrode or rust - Strong scratch resistance CONS - May diminish overtime allowing moisture in - May have toxic components - Heat deflection
12
Project Material Selection Description:
1. Photovoltaic glass and insulating glass would be the main material for glazing. These two kinds of material can provide energy-saving and safety as well as fulfill the aesth 2. Aluminum would be used for unitization of the facade system. Its light weight, strong property and durability make it an ideal material when under tight budget. 3. Reinforced concrete is mainly used for interior construction. Concrete is an ideal material for fire proofing and flexible shaping. 4. GFRC works as one of the main rain screen materials. It’s relatively cheap, widely available; it also allows for big sheets and glossy finish.
Mega Transfer Truss Bridge Structure
Concrete Core Stability Sysrem
REVISION NO.
Description
REVISIO
Dia-Grid Steel Envelope
NO.
6” Slab On Metal Deck Spans Between Steel Frame
PROJEC
PROJECT:
U.S Federa in Los Ang
U.S Federal Courthouse in Los Angeles
ADDRE
ADDRESS:
350 W 1st Los Angele
350 W 1st Street, Suite 4311 Los Angeles, CA 90013
CONSUL
CONSULTANTS:
Structural Matthew M
Structural Consultant: Matthew Melnyk
Environme Jayme Lyz
Environmental Consultant: Jayme Lyzun
INSTRU
INSTRUCTORS:
Herwig Ba Brian Zam
Herwig Baumgartner Brian Zamora
TERM M
TERM MEMBER:
Carol Kan Hashim Ba Lijun Zhon Xinlei Li Yi Zhou
Carol Kan Hashim Barda Lijun Zhong Xinlei Li Yi Zhou
DATE:
12/05/2016
DATE:
12/
12” Thick Concrete Slabs With Concrete Beam System
DRAWIN
DRAWING:
Struct
Material Selection
Thick Mat Slab Foundation
SCALE:
SCALE:
NOT
NOT TO SCALE
SHEET:
Vertical concrete core supports the vertical load columns on the vertical plane of floor to allow for open column free floor plates.
SHEET: Steel framing is chosen because lightweight and long span allowing for column free spaces for greater flexibility because
A
column floor height was not a concern. There was enough space for steel framing.
A.3
hetic requirement.
And in addition a number of cantilever floors which are attached to the cores. Basement construction is concrete, concrete is durable and allows for finished interior.
Material Selection
Structure System
13
SOUTH 1
2
3
5
4
6
PARKING ENTRY
-10'-2"
OFFICE UP
OFFICE
MULTIMEDIA ROOM
OFFICE
DOWN
-8'-3 1/4" MEETING ROOM
±0.00
-24'-4 1/4"
R.A S.A
WEST 1st STREET
I.T Room
MECH
STORAGE
UP
CORRIDOR
ENTRY
RESEARCH ROOM
DOWN
DOWN
OFFICE
UP
OFFICE
OFFICE
MECH
I.T Room
S.A R.A
LIBRARY
OFFICE
OFFICE
MULTIMEDIA ROOM MEETING ROOM
MEETING ROOM
+8'-3 1/2"
PARKING ENTRY
N COMPASS
14
H
BROADWAY 7
9
8
10
H
"
REVISION NO.
Description
G MECH
UP
ENTRY
R.A
S.A
PROJECT:
-37'-4 1/4"
U.S Federal Courthouse in Los Angeles
I.T Room
F
ADDRESS:
OVERHANG
350 W 1st Street, Suite 4311 Los Angeles, CA 90013
DOWN DOWN
±0.00
DOWN
E
DOWN
ENTRY
-11'-4 1/4"
MECH
UP
R.A
S.A
D
CAFE
KITCHEN
I.T Room
±0.00
ATRIUM
HILL STREET
WEST 2nd STREET
-11'-4 1/4"
CONSULTANTS: Structural Consultant: Matthew Melnyk Environmental Consultant: Jayme Lyzun
INSTRUCTORS: Herwig Baumgartner Brian Zamora
TERM MEMBER:
CAFE
C
ENTRY
Carol Kan Hashim Barda Lijun Zhong Xinlei Li Yi Zhou
DATE:
B
12/05/2016
+4'-9 5/8"
DRAWING:
ENTRY
Ground Floor Plan
A
SCALE:
3/32" = 1'
SHEET:
A.16 Ground Floor Plan
15
1
2
3
5
4
6
7
8
9
WAITING ROOM
R.A MECH
S.A UP
I.T Room HOLDING ROOM
SECURITY
JUDGE'S CHAMBER
COURT ROOM
ELEVATOR
UP
MECH
I.T Room
S.A R.A
COURT ROOM
HOLDING ROOM
MEETING ROOM
N COMPASS
16
10
1
2
3
4
5
6
7
8
9
10
REVISION + 296' 6"
H
H
Descriptio
+ 296' 6"
GFRC Panel
Photovoltaic Glass
Level 12
REVISION NO.
NO.
Level 13
Level 13
Level 12
+ 253' 6"
+ 253' 6"
REVISION
Description
NO.
PROJECT:
U.S Federal Courthou in Los Angeles
Description
GFRC Panel
ADDRESS: Level 11
Level 11
Level 10
Level 10
+ 192' 6"
+ 174' 6"
G
G
+ 174' 6"
Level 9
Level 9
Level 8
Level 8
Level 7
Level 7
PROJECT:
U.S Federal Courthouse Level 4 in Los Angeles
U.S Federal Courthouse in Los Angeles
+ 102' 6"
Level 5 + 84' 6"
+ 66' 6"
GFRC Panel
350 W 1st Street, Suite 4311 Los Angeles, CA 90013
350 W 1st Street, Suite 4311 Los Angeles, CA 90013
+ 12' 6"
1
CONSULTANTS:
2
3
Structural Consultant: Matthew Melnyk
Environmental Consultant: 1 Jayme Lyzun
2
INSTRUCTORS: D
INSTRUCTORS:
Herwig Baumgartner Level 13 Brian Zamora Level 12
TERM MEMBER:
Carol Kan Hashim Barda Lijun Zhong Level 11 Xinlei Li Yi Zhou Level 10
Carol Kan Hashim Barda Lijun Zhong Xinlei Li Yi Zhou
+ 253' 6"
C
+ 192' 6"
12/05/201
+ 12' 6"
DRAWING:
ELEVATION
5
6
7
8
9
3/32”=1
10
Elevation 5
6
7
8
9
1
+ 296' 6"
+ 253' 6"
PROJECT:
U.S Federal Courthou in Los Angeles
Level 11
ADDRESS:
+ 192' 6"
350 W 1st Street, Sui Los Angeles, CA 9001
Level 10
CONSULTANTS:
Level 9
+ 156' 6"
+ 156' 6"
DATE:
12/05/2016 B + 120' 6"
Structural Consultant Matthew Melnyk
Level 8 + 138' 6"
12/05/2016
Level 7
Environmental Consu Jayme Lyzun
Level 7 + 120' 6"
INSTRUCTORS:
Level 6
Level 6
+ 102' 6"
Herwig Baumgartner Brian Zamora
+ 102' 6"
Level 5
Level 5
+ 84' 6"
+ 84' 6"
DRAWING:
DRAWING:
Level 4 + 66' 6"
Upper Floor Plan + 48' 6"
TERM MEMBER
Level 4 + 66' 6"
Upper Floor Plan
Level 3
Carol Kan Hashim Barda Lijun Zhong Xinlei Li Yi Zhou
Level 3 + 48' 6"
Level 2
Level 2 + 30' 6"
+ 30' 6"
Level 1
Level 1
+ 12' 6"
DATE:
12/05/201
+ 12' 6"
SCALE:
Level -1 - 11' 6"
3/32" = 1'
Level 0 ± 0' 0"
DRAWING:
3/32" = 1'
Level -2 - 24' 6"
Level -3 - 37' 6"
Section
Level -4
SCALE:
- 50' 6"
SHEET:
3/32“=1‘
SHEET:
A.17 1
Upper Floor Plan
Descriptio
Level 12
Level 9
+ 138' 6"
A.19 NO.
+ 174' 6"
Level 8
SHEET:
REVISION
Level 13
+ 174' 6"
SCALE:
DATE:
SCALE:
4
Environmental Consultant: 3 4 Jayme Lyzun
TERM MEMBER:
A
Level 2
Level 1
Herwig Baumgartner Brian Zamora
+ 296' 6"
A
Carol Kan Hashim Barda Lijun Zhong Xinlei Li Yi Zhou
+ 30' 6"
ADDRESS:
Level 1
B
Level 3
+ 66' 6"
+ 48' 6"
ADDRESS:
DATE:
TERM MEMBER
+ 84' 6"
Level 4
Photovoltaic Glass
+ 30' 6"
C
Level 5
+ 48' 6"
Level 2
D
+ 102' 6"
Level 3
Structural Consultant: Matthew Melnyk
Herwig Baumgartner Brian Zamora
Level 6
PROJECT:
E CONSULTANTS:
Environmental Consu Jayme Lyzun
INSTRUCTORS:
+ 120' 6"
Level 6
E
Structural Consultant Matthew Melnyk
+ 138' 6"
+ 120' 6"
F
CONSULTANTS:
+ 156' 6"
+ 156' 6"
+ 138' 6"
F
350 W 1st Street, Sui Los Angeles, CA 9001
+ 192' 6"
2
A.17 3
4
5
6
7
8
9
SHEET:
1
Section
17
A.18
Glazing Facet
Fastener Black GFRC Cladding
Hidden Gutter Membrane
Sheathing
Thermal Insulation Secondary Beam Structure
18
Aluminum Mullion
Granite Floor F A.22 Gutter Detail
Glazing Facet
REVISION NO.
Silicon Bead
Description
PROJECT: U.S Federal Courthouse in Los Angeles
Secondary Support Steel GFRC Cladding Extension
ADDRESS:
Roofing Batten
350 W 1st Street, Suite 4311 Los Angeles, CA 90013
Snow Fence Gutter Penetration
CONSULTANTS:
Fastener
Structural Consultant: Matthew Melnyk
Metal Return
Environmental Consultant: Jayme Lyzun
INSTRUCTORS: Black Aluminum Mullion
Herwig Baumgartner Brian Zamora
Corrogated Steel Sheet Support
TERM MEMBER: Carol Kan Hashim Barda Lijun Zhong Xinlei Li Yi Zhou
Waterproofing Membrane Gutter Liner Fiberglass Insulation
DATE:
12/05/2016
Black GFRC Cladding Sprayed on Fireproofing
DRAWING:
REVISION A.23 Roof Corner Detail
NO.
Description
GUTTER DETAIL SCALE:
Waterproofing Membranes
NOT TO SCALE SHEET:
Gymsum Board (Fireproofing)
Beam Connector Bracket
A.22
Gutter Detail Primary Beam Structure
PROJECT:
Insulated Aluminum Panel Thermal Insulation
U.S Federal Courthouse in Los Angeles Glass Glue Sealing
REVISION
Fastener Aluminum Mullion
NO.
Description
Wateproof Membrane Panel Liner
ADDRESS: 350 W 1st Street, Suite 4311 Los Angeles, CA 90013
PROJECT: U.S Federal Courthouse in Los Angeles
Glass Glazing
ADDRESS: 350 W 1st Street, Suite 4311 Los Angeles, CA 90013
Mullion Bracket
CONSULTANTS:
CONSULTANTS:
Structural Consultant: Matthew Melnyk
Structural Consultant: Matthew Melnyk
Environmental Consultant: Jayme Lyzun
INSTRUCTORS:
Environmental Consultant: Jayme Lyzun
Aluminum Mullion
Herwig Baumgartner Brian Zamora Primary Beam Structure
Beam Support Post
TERM MEMBER: Carol Kan Hashim Barda Lijun Zhong Xinlei Li Yi Zhou
INSTRUCTORS: Herwig Baumgartner Brian Zamora
DATE:
11/28/2016 DRAWING:
Roof Corner Detail
TERM MEMBER: Carol Kan Hashim Barda Lijun Zhong Xinlei Li Yi Zhou
Finish
SCALE:
NOT TO SCALE SHEET:
A.23
Roof Corner Detail
DATE:
12/05/16
Cast in Place Concrete
Glass Glazing
DRAWING:
Steel Profiled Sheeting
REVISION
ROOF DETAIL Fastener
Beam
NO.
Description
Mullion Bracket
Glass Glue Sealing Secondary Beam Structure
Duct Suspended Ceiling
PROJECT:
SCALE:
NOT TO SCALE
U.S Federal Courthouse in Los Angeles Primary Beam Structure
ADDRESS: 350 W 1st Street, Suite 4311 Los Angeles, CA 90013
Aluminum Mullion
CONSULTANTS:
Chunk Model
Structural Consultant: Matthew Melnyk
SHEET:
Environmental Consultant: Jayme Lyzun
Wateproof Membrane Panel Liner
Aluminum Closure Panel
A.21 Thermal Insulation
Mullion Bracket ground finish
5% Slope Weathering
INSTRUCTORS: Herwig Baumgartner Brian Zamora
Waterproof Membrane
TERM MEMBER:
Soil Compaction
Carol Kan Hashim Barda Lijun Zhong Xinlei Li Yi Zhou structure tranfer layer
DATE:
11/28/2016 DRAWING:
Wall Detail SCALE: column
NOT TO SCALE SHEET:
Wall Base Detail
A.24 19
GHOSTS OF THE ABYSS { Form Defined by Effects } Time: 2017 Dseign Studio Collaborator: Carol Kan Location: San Francisco, United States Instructor: Dwayne Oyler
20
https://youtu.be/qIVf07HuHm0 This studio builds on the idea of ghostly characteristics, with a specific interest in moving beyond the seductive nature of the image toward a more physical and teconic outcome. Increasingly skeptical of the seductive image as an architectural outcome, but admittedly enamored with them as a place to begin and as a thing to interrogate, this studio with them as a place to begin and as a thing to interrogate, this studio is charged with giving physicality to the idea by dealing directly with a set of key characteristics.
Physical Model
Physical Model
Assemblage Process
21
We were inspired by the Schullin Store Front in Vienna by Hans Infinity Mirrored Room by Yayoi Our research in the ghostly began by looking at images of topographic features in igneous rocks and natural landscapes. Hollein to achieve infinite depth in built architecture. aim to translate an infinite spac
Examination of effects through layering mirror and transparent Examination of effects through layering mirror and opaque materials. materials.
Experimentation of reflection th
Overall building: While the building may appear to be a simple
The interior spaces through a cu exterior is a simple prism volum
prism volume from the exterior...
...the underbelly reveals the ghostly figures blurring the relationship between the real and suggested object.
a framework of complexity.
22
Kusama best represents our ce effect to out building.
Examination of topology through depth of contours.
Examination of topology through depth of contours.
hrough mirrors.
Experimentation of creationg an infinite depth effect.
Site: pier of San Francisco. Restrained by the bridge, the building would depend interiority for a formal definition as an alternative to the exterior
urvilinear section: While the me, the interior is comprised of
Built with transparency, layering and carved patterns, the screen blurs between the figures.
The mirror enhances the effects of the interior depth and complexity of the linear framework.
Storyboard
23
Physical Model
24
Physical Model
25
26
Presentation Video Footage
27
XINCHUAN MIXED-USE TOWERS Time: 2018 MADA s.p.a.m. - Professional Practice Location: Chengdu, Sichuan, China
28
A parametric pixel cloud in the bottom. Flexible office space on the top floor of the annex. White boxes on top of the towers work as public space.
Form Development Diagram
Site Plan
Rendering
Rendering
29
大堂
大堂
大堂
大堂
30
大堂
大堂
大堂
大堂
大堂
大堂
Ground Floor Plan
4th Floor Plan
31
32
6000
4200
4200
4200
4200
4200
4200
4200
3600
3600
3600
3600
3600
3600
3600
3600
3600
3600
3600
3600
3600
3600
151400 3600
3600
3600
3600
3600
3600
3600
3600
3600
3600
3600
3600
3600
3600
3600
3600
3600
3600
3600
3200
6000
4200
4200
4200
4200
4200
4200
4200
3600
3600
3600
79400
3600
3600
3600
3600
3600
3600
3600
3600
3600
3600
3200
6th Floor Plan
Section
33
FENGHUI TIANDI Time: 2018 MADA s.p.a.m. - Professional Practice Location: Xi'an, Shaanxi, China
Rendering
34
The layout comes from classic European city square. Reolving tower. Flexible office space on the top floor of the annex. White boxes on top of the towers work as public space.
280.00
酒店
2,110㎡,位于37层至62层 共26层,层高3.6m
大堂及公共空间
1,600㎡,位于32层至36层 共5层,层高3.6m 其中大堂层高7.2m
143.80 办公
2500㎡,位于1层至31层 共31层,层高4.2m
SOHO
1,696㎡ 共12层,层高3.6m
酒店式公寓
5,531㎡,位于1层至12层 共12层,层高3.6m 1,170㎡,位于12层至23层 共11层,层高3.6m
SHOU
1-1 剖面
0.00
Section
Program Diagram
1st Basement Plan
Rendering
Ground Floor Plan
35
XICHANG JIANGJUNLI COMMERCIAL DISTR Time: 2018 MADA s.p.a.m. - Professional Practice Location: Xihang, Schaun, China
36
RICT
Building blocks arranged according to a rectangle grid, Alleys are fromed between buildings. Remove some buildings to form open spaces. Water feature is introduced into the commercial area to form a “water promenade�.
Site Plan
Rendering
Rendering
37
Water Promenade AXO
Rendering
38
02 01 版本号 REV
Jiangjunli AXO
Elevation
建 设 单 CLIENT
设 计 单 DESIGN COR
地址:上海市 淮海 电话: 021传真: 021邮编: 20003 E-mail:OFFI
合 作 单 位 COLLABARAT
顾 问 单 位 COLLABARAT
审 定 人/日 AUTHORIZED
设 计 主 持 DESIGN PRI
项 目 建 筑 CHIEF ARCH
审 核 人/日 AUDITED BY
Rendering
39
校 对 人/日 CHECKED BY
专 业 负 责 DISCIPLINE
设 计 人/日 DESIGNED B
项 目 名 称 PROJECT
PACKED INSIDE A BUILDING { Sectional Space\ Sectional Object } Time: 2017 Graduation Thesis Location: Shenzhen, China Instructor: Andrew Zago
1-1 Section
40
In architecture, a proven strategy for uncoupling spatial effects from sculptural presence is to frame a sculptural object within a closely fitted enclosure. Like the musical instrument case, this sectional object approach raises questions regarding the degree of expression for the object, and the degree of fit for the enclosure. For example: there are music case that is just a simple rectangle box, and there are also boxes that just resembles the shape of the instrument. And there are other cases in between. This kind of in between relationship that neither total difference nor total resemblance of the enclosure and the object is the most important issue in my thesis. When the object and the case become as big as the scale of a building, the most important space becomes the sectional space.
Structure Diagram
41
42
Physical Model
Physical Model
Physical Model
43
2-2 Section
44
5th Floor Plan
45
South Elevation
West Elevation
46
1st Floor Plan
2nd Floor Plan
47
COMPLEX MORPHOLOGIES { Revisiting Transparancy } Time: 2015 Dseign Studio Collaborator: Siddardha Chalamala Location: Paris, France Instructor: M. Casey Rehm
48
https://youtu.be/-FTTXDQ-hrM Our project explores layering of planes and spatial locations and the simultaneous perception of these planes at various depths in space which leads to a suggested or implied form and spatial order instead of a clear figure.
Rendering
Rendering
Rendering
49
This studio engaged in acts of architectural speculation on how images and objects may coalesce in the production of architectural f photographic content, will be understood as a medium imbued with a deep reservoir of information.
On the one hand there is the pictorial information: shapes, grounds, places, things, etc, which can be understood as the “pieces” of t
of digital computation, these parts that can be either maintained or removed and combined together, become wholes of a new figure to produce architectural form. On the other there is the optical information: hue, saturation, brightness, specularity, depth-of-field, etc. Those can be understood as “moments”, qualities that cannot be removed from the objects that contain them.
Digital computation offers an array of ways to breakdown the data within an image and redeploy it for other purposes, like texture m
50
form.Images, in the form of
the image. Through the process
e, these information can be used
mapping.
Rendering
Progress Diagram
51
Progress Diagram
52
Progress Diagram
53
ENCHANTED TOY & BUILDING { A Medium for Informal Learning in The 21st Century } Time: 2016 Dseign Studio Group Work for Enchanted Toy Collaborator: Xinlei Li, Kun Wang Individual Work for Enchanted Building Location: Hawaii, United States Instructor: Michael Rotonti Toys, games, and electronic media are merging into a seamless blend of entertainment, information, learning, and play From music boxes, crying dolls, kaleidoscopes, and stereoscopes to electric trains, remote controlled vehicles, and robots, toys have always reflected the latest economically viable developments in science and technology. The enchanted objects of fairy tales and science fiction will enter real life, and slowly but surely into architecture. What does this mean? How will this impact architecture and architects? How will this improve our lives?
Rendering
54
Toy Structure Toy Stru
ech: A medium Toys and forTech: Inform A medium Learningfor forInform the 21st Learning Centuryfor the 21st Century Toys and Tech: A medium for Inform Learning for the 21st Century
Toy Structure
Toys and Tech: A medium for Inform Learning for the 21st Century
bers: Kun Team Wang, Members: Xinlei Li,Kun Yi Zhou Wang, Xinlei Li, Yi Zhou Team Members: Kun Wang, Xinlei Li, Yi Zhou
21 Processor
Signal Distributor
Motor
Odor Generator
Team Members: Kun Wang, Xinlei Li, Yi Zhou
Toy Diagram
55
24
Toy Structure
Toys and Tech: A medium for Inform Learning for the 21st Century
Toy Structure
Toys and Tech: A medium for Inform Learning for the 21st Century Sound Sensor
Light & Color Sensor
Wifi & BlueTooth Receiever
26
Team Members: Kun Wang, Xinlei Li, Yi Zhou
Toy Structure
A medium for Inform Learning for the 21st Century
Pressure Sensor
Temperature Sensor 25
Team Members: Kun Wang, Xinlei Li, Yi Zhou
Battery
Battery
Toys and Tech: A medium for Inform Learning for the 21st Century
Heating Wire
Signal Distributor
Valvular Conduit
Heat Generator
Chamber
Foam Lattice Structure
23
Kun Wang, Xinlei Li, Yi Zhou
LED Array
LED Light Array Signal Distributor
Team Members: Kun Wang, Xinlei Li, Yi Zhou
56
Toy Diagram
work space
llaborative ork space
informal learing
cool down
housing
space on the diagram
exercisemechanical
informal learing
library diagram
restaurent
shops
real space
restaurent
llaborative ork space
informal learing
clear boundary space
cool down
auditorium
restaurent
media lab
ion
cool down
library
space
media lab
Form Development:
sky bridge
Surface Condition:
library
clear boundary space
library
ambigous digital Fabrication labs
ambigous space
sky bridge
media lab
ion
restaurent
work
housing
library
housing
library
exercise
mechanical shops
digital Fabrication
space on the media lab diagram
labs clear boundary space
ce
space on the diagram
collaborative space on the work space diagram
real space
real space
real space
ambigous space work library
sky bridge
ce
sky bridge
housing
sky bridge
restaurent
auditorium
brary library informal learing
restaurent work
housing
library
housing
exercise
earing
cool down
collaborative work space
cool down informal learing
Concept Diagram
restaurent
mechanical shops
cool down
digital Fabrication labs
media lab library
space on the diagram
ambigous space
real space
sky bridge
Rendering
57
Level 4 + 35' 5"
Level 3 +25' 0"
Level 2 +14' 0"
Level 1 + 8' 0"
Level 0 Âą 0' 0"
Section
visitor entrance
012
5
20
10
UP
UP vending working (practiceing)
cafe UP
restroom
cool down
exhibition show stage (exhibition)
UP
UP
DOWN show stage (exhibition) mechanical shop & dugutal fabrication lab
Level 3 Plan
58
012
5 10
Workers Entrance
visitor entrance
media lab
cool d o wn
UP
vending
working (practiceing)
c a fe
show stage (exhibition)
restroom
working (learning)
mechanical shop & dugutal fabrication lab
VR
cool down
UP
library
auditorium
UP
UP
DOWN
sky bridge
exhibition
012
5
Level 2 Plan
10
59
CODING FORM Visual Study Instructor: Satoru Sugihara
Rendering
60
The assignment is to design tower structures, facade geometries and panelization using parametric design tools. The goal is to explore techniques and try to generate interesting structure geometries, and facade geometries (more important to be complex and interesting than realistical). Pursuing the complexity while avoiding simple chaos or singularity by bringing enough articulation.
Rendering
Grasshopper Screenshot
61
FURNITURE, Film, & Fotos Visual Study Instructor: Coy Howard
62
63