Jean Paul Baron Architecture Portfolio 2nd Edition
JEAN PAUL BARON
Architecture Portfolio 2010-2019 Selected Works email: jbaronpa@gmail.com
Born in Bad Soden ATS, Germany and raised in Colombia’s capital to a multi-cultural family. Growing up I have always been intruiged by various sketching methods and how it can help understand the physical built environment. Sketching not only helped me become more observant and interested in the surrounding urban fabric, but it also made me realize that architecture is a tool to help solve the many problems that we as a society face today. I graduated from The University of Tennessee College of Architecture and Design with a Bachelor of Architecture. I have worked in both Berlin and Washington D.C, contributing to the built work environment.
2
Contents
Curriculum Vitae
4
01 Professional Works
7
02 Academic Works
49
03 Sketches
77
04 Photography
85
3
Study Abroad Semester
WORK EXPERIENCE WORK EXPERIENCE
PERSONAL DETAILS Male PERSONAL DETAILS Bad MaleSoden, Germany 1992
German, Colombian Personal Details Bad Soden, Germany 1992
G: Male CONTACT German, Colombian C: German + Colombian Karl-Sattler-Str. 4B CONTACT D.O.B: 08.04.1992 63110 Rodgau Karl-Sattler-Str. 4B Contact jbaronpa@gmail.com 63110 Rodgau +1 561-267-1699 jbaronpa@gmail.com jbaronpa@gmail.com +1 561-267-1699 www.linkedin.com/in/jbaronpa in www.linkedin.com/in/jbaronpa www.linkedin.com/in/jbaronpa in issuu.com/jpbaron/docs issuu.com/jpbaron/docs/portfolio issuu.com/jpbaron/docs/portfolio
LANGUAGES Languages
English: Native Proficiency LANGUAGES Naitive Proficient English: German: Fluent German: Fluent NaitiveLanguage Proficient English: Native Spanish: Spanish: Native Tongue German: Fluent
Software + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +
Spanish: Native SKILLS Tongue AutoCAD AutoCAD SKILLS Archicad Rhino 3D Rhino AutoCAD Revit 2015 Revit Rhino2015 3D Pro SketchUp SketchUP Revit 2015 Pro Vray Vray Rendering SketchUp Pro Photoshop Vray Microsoft Office Illustrator Photoshop InDesign Photoshop Illustrator LightRoom Illustrator InDesign Premiere Pro InDesign LightRoom Microsoft Office Lightroom Premiere Pro with physical model making Experienced Premier MicrosoftPro Office
FOX Architects, Washington D.C.
Intern Architect
09.2015 - 07
FOX Architects, Washington D.C. 09.2015 - 07 + Worked Intern Architecton several projects through phases of design includin + + + + + + + + + + +
Concept Design, Schematic Design, Design Development an Worked on several projects through phases of design includin Construction Documents Concept Design, Schematic Design, Design Development an Assisted in creating 3D models and developed final rendering Construction Documents Created weekly design presentations for client meetings Assisted in creating 3D members models and developed final rendering Coordinated with team to create Schematic Design Created weekly design presentations for client meetings for “1333 New Hampshire Avenue” Coordinated withwith team members create Schematic docume Design Assisted teams creating and to editing construction for “1333 New Hampshire Avenue” Completed site visits and took field measurements Assisted teams with creating and editing construction docum Completed site visits and took field measurements
College of Architecture + Design
01.2015 - 0
Fabrication Lab Student Personnel
College of Architecture + Design 01.2015 - 0 + Assisted students with the process and construction of their Fabrication Lab Student Personnel designs for studio and elective courses + Ensured Assisted student’s students with thein process andofconstruction of their + safety operations the 3D Printers, Wo designs for studio and elective courses Shop tools, welding, CNC routers, Water Jet and other variou + equipment Ensured student’s safety in operations of the 3D Printers, Wo Shop tools, welding, CNC routers, Water Jet and other variou equipment UT Alumni Association 08.2013 - 12
+ Alumni a Contacted alumni to promote communication, participation UT Association 08.2013 - 12 raise university funds for the main and satellite campuses + Assited Contacted to promote a + thealumni University in raisingcommunication, over $300,000 participation in Alumni don raise university funds for the main and satellite campuses + Assited the University in raising over $300,000 in Alumni don
AWARDS
AWARDS Hnedak Bobo International Design Competition Merit Award 2015 for “Passages of History” projec Hnedak Bobo International Design Competition during study abroad semester Merit Award 2015 for “Passages of History” projec during study abroad semester Exhibition of Undergraduate Research and Creative Achievement (EUReCA) + Experienced with laser cutter, 3D printing Exhibition of Undergraduate Research and Creative + and Experienced with physical model making CNC Mill ORE Gold Award for Undergraduate Research in A Achievement (EUReCA) + Experienced Related Skills with laser cutter, 3D printing Architecture and Design, and Performing Arts for “ and CNC Mill ORE Studio” Gold Award for Undergraduate Research in A Oak project INTERESTS + Experienced with physical model making Architecture and Design, and Performing Arts for “ + Architecture, Drawing, Photography, + Exprienced with laser cutting Studio”Honor projectSociety Traveling,INTERESTS Music, Sports, Health, of Construction Documents Phi Sigma ThetaOak National + Experienced with production + Technology Architecture, Drawing, Photography, + Familiar with 3D model printing Traveling, Music, Sports, Health, Phi Sigma Theta National Honor Society + Familiar with CNC Mill Technology
Interests
Architecture Drawing Photography Traveling Music Sports Health Technology
4
Education EDUCATION EDUCATION
The University of Tennessee, Knoxville
Bachelor of Architecture, 5 Year Professional Degree
08.2010 - 05.2015
nnessee, Knoxville nnessee, Knoxville
08.2010 - 05.2015 The University 08.2010 - 05.2015
kansas Rome Center kansas Rome Center nnessee, Knoxville
01.2014 - 05.2014 01.2014 - 05.2015 05.2014 08.2010
shington D.C. shington WORKD.C. EXPERIENCE
design presentations to review with clients during the planning and construction 09.2015 - 07.2016 stages of residential projects and competitions 09.2015 - 07.2016
EDUCATION
of Arkansas Rome Center
Study Abroad Semester
01.2014 - 05.2014
07.2017 - 03.2019 Professional Arin l Burda Architekten, Berlin Design Architect Experience kansas Center 01.2014 - 05.2014 WORKRome EXPERIENCE WORK EXPERIENCE + Involved in the creation of conceptual designs, studio drawings, BIM modeling and
+ Creation of design development and design drawings to ensure compliance with ral projects through phases of design including applicable building codes and zoning requirements ,ralSchematic Design,phases DesignofDevelopment projects design including hington D.C.through 09.2015 - and 07.2016 + Performed construction material, system and building specification research ,cuments Schematic Design, Design Development and + Collaborated with various consultants, including architects and engineers to ing 3D models and developed final renderings ensure that the projects were heading in the right direction cuments al through of design including design for client meetings ingprojects 3D presentations models andphases developed final renderings + Regular on-site progress assessments to ensure proper construction was Schematic Design, Design Development andbook hdesign team members to create Schematic Design presentations for client meetings happening cuments Hampshire Avenue” h team members to create Schematic Design book ng 3D models and developed final renderings with creating and editing construction documents Hampshire Avenue” design presentations for client meetings visits and tookand fieldediting measurements with creating construction documents 09.2015 - 07.2016 teamand members to create Schematic Design FOX book Architects, Washington D.C. visits took field measurements Intern Architect ampshire Avenue” with creating and editing construction documents ure + Design 01.2015 - 05.2015 + Worked on several projects through various phases of design including Concept isits and took field measurements ure + Design 01.2015 - 05.2015 nt Personnel Design, Schematic Design, Design Development and Construction Documents nt Personnel + Assisted in creating 3D models and developed final renderings nts with the process and construction of their + Developed weekly design presentations for client meetings ON dio elective courses nts with the process and construction of their ureand + Design 01.2015 - 05.2015 + safety in operations dio and elective coursesof the 3D Printers, Wood Coordinated with team members to create Schematic Design book for “1333 New tt’sPersonnel ville 08.2010 05.2015 ding, CNCinrouters, Water Jet andPrinters, other various t’s safety operations of -the 3D Wood Hampshire Avenue” ts with the process and construction of their + Assisted teams with creating and editing construction documents ding, CNC routers, Water Jet and other various o and elective courses + Completed site visits and took field measurements Center 01.2014 05.2014 ’s safety in operations of -the 3D Printers, Wood tion CNC routers, Water Jet and 08.2013 - 12.2013 ding, other various 01.2015 - 05.2015 tion 08.2013 - 12.2013 Extracurricular College of Architecture + Design mni to promote communication, participation and Fabrication Lab Student Personnel Experience unds for the main and satellite campuses mni to promote communication, participation and RIENCE versity in raising over $300,000 in08.2013 Alumni -donations unds for the main and satellite campuses ion 12.2013 + Assisted students with the process and construction of their designs for studio and versity in raising over $300,000 in Alumni donations ni to promote communication, participation and elective courses 09.2015 - 07.2016 + Ensured student’s safety in operation of the 3D printers, Woodshop tools, Welding, unds for the main and satellite campuses CNC routers, Waterjet and other various equipment ersity in raising over $300,000 in Alumni donations AWARDS gh phases of design including AWARDS 2014 gn, Design Development and ational Design Competition Awards Hnedak Bobo International Design Competition 2014 2014 ational Design Competition Award 2015 for “Passages of History” project AWARDS nd developed final renderings gAward study abroad semester 2015 for “Passages of History” project Merit Award 2015 for “Passages of History” project during study abroad semester ons for client meetings g study abroad semester 2014 ational Design Competition to create Schematic Design book graduate Research and Creative 2015 Exhibition of Undergraduate Research and Creative Award 2015 for “Passages of History” project e” 2015 graduate Research and Creative Achievement gCA) study abroad semester editing construction documents CA) Gold Award for Undergraduate Research in Art,2015 d measurements tecture and Design, and Performing Arts for Gold Award for Undergraduate Research in “Green Art, ORE Gold Award for Undergraduate Research in Art, Architecture, Design and raduate Research and Creative Studio” project tecture and Design, and Performing Arts for “Green Performing Arts for “Green Oak Research Studio” project 2015 CA) Studio” project Gold Award Undergraduate Research in Art,2013 01.2015 - 05.2015 tional HonorforSociety ecture and Design, and Performing Arts for “Green 2013 tional Honor Society Studio” project ss and construction of their
5
6
01 Professional Works Dennewitzstrasse 36
8
Sebastianstrasse 16
18
Wangerooge Hotel Competition
24
1333 New Hampshire Avenue
30
1000 Maine Avenue
38
Society for Science and the public
42
7
Dennewitzstrasse 36
Size: 22,370 m² Program: Residential + Retail + Hotel Location: Berlin, Germany Status: Under construction Located in the heart of Berlin, the site sits adjacent to an up and coming urban state of the art park called “Dreieck Parkâ€?. The program calls for a residential and a hotel building as well as retail shops. The site is divided by the metro line that runs through it. The design idea is to create an urban living space that will connect the dense urban line of resident buildings with the new city park. WIith an S shape building, two courtyards are formed in order to create a place for gathering and peaceful living where residents can meander through public, semi public and orivate spaces. Each courtyard faces its respective inspiration, an urban courtyard facing the urban density and the park courtyard facing the green park. I was fully involved in the development of the schematic drawings, client presentations, detail drawigns and final construction level drawings (LPH 5). Ranging from the creation of the foundation plans all the way to the final detail drawings. As well as working on these internal studio drawings I was in charge of controlling all of the main drawings and documents arriving from the external collaboration firms and engineering firms in order to keep a steady and clear timeline of the construction of the project.
8
Maße sind vor Ort zu prüfen! Abweichungen sind umgehend der Bauleitung mitzuteilen.
Y
X
V
W
T
U
S
R
P
Q
N
O
f
e
d
c
b
a
14 S1
Dennewitzstraße 3 M
L
K
J
I
H
G
Anschluss Haus 2
Anschluss Haus 1
1 2
2
2
4
21,31 m2
1,68 BSR
5
Zimmer2 ca: 10,89 m2
rflur Unte em syst ungs sorg llent -Mü
6
(h=
1 2 3 4 5 6 7 8 9 10 11 12 13 14
7 3 x 335 x 135
1 2
Kleinküche o. Lager ca: 20,09 m2
9 5
2
1,54
1,54
19
G
Luftraum über Terrasse im Souterrain
8 7 6 5 4 3 2 1
12
BH 1,10
7
7
18
19
x 19
x 25
18
5
19 18
30
6
7 Küche ca: 4,96 m2
17
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
8 HWR ca: 2,34 m2
8
8
G
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Zimmer 1 ca: 15,98 m2
39.0.3 Lichtes Kabinenmaß 1,20 x 2,10 m
39.0.3
Flur ca: 9,73 m2
Bad ca: 5,76 m2
11
11
12
12 Zimmer 2 ca: 15,99 m2
Flur ca: 11,19 m2
12
17
12
Bad2 ca: 8,52 m2
Zimmer 3 ca: 33,39 m2
3,83
16
5
8
42
42
Anschluss Haus 2
465
1,325
Terrasse SN 12.2 Terrasse NGF: 4,78 m2
5,255
4,02
Garten
Garten
15
Garten SN 11.1
Garten SN 8.1
6,01
30
Garten
Garten SN 12.1
Notflucht Tür
f
e
d
c
b
a
Y
X
V
W
T
U
S
R
P
Q
N
O
L
M
K
J
I
H
G
40
40
10,20
40
40
9,60
83
1,645
4,51
Anschluss SNHaus 7.13
8 x 26 x 19
1,55
3,185
Garten
Garten SN 6.1
30 30
1,99
3,185
3,00
1,20 5
Garten
Terrasse NGF: 2,85 m2
Terrasse SN 11.2
AZSfs
Brücke
4,51
4,51
4,51
Garten
Garten SN 10.1
Notflucht Tür
Grundriss Erdgeschoss 000.01g_F
30 36 75
AZSfs
AZSfs
BrückeBrücke SN 8.2
Luftraum über Terrasse im Souterrain
Luftraum über Terrasse im Souterrain
AZSfs
785 1,64 5
1,90
3,185
3,185
Garten
30
3,185
4,51
2,84
8 x 26 x 19
DEN Haus2&3 Erdgeschoss G00
1,325
1,325
27
Garten
1,325
Brücke SN 7.2 BrückeBrücke SN 6.2
Luftraum über Terrasse im Souterrain
AZSfs
3,58
1,325
42 sse m2 Terra 5,93 F: NG
4,10
le
Rigo
Terrasse NGF: 2,89 m2
4,71
S20 AZSfs
26
Terrasse SN 10.2
4,10
Küche
Zimmer 4 ca: 13,88 m2
S20
AZSfs
3,16
Terrasse SN 9.2
Garten SN 9.1
12
12
1,325
S29
3,14
1,50
6,71
11 Zimmer 1 ca: 23,65 m2
Zimmer 1 ca: 19,48 m2
3,185
17
S29
7 Zimmer 1 ca: 19,92 m2
42
Zimmer 1 ca: 14,21 m2
6 Zimmer 1 ca: 19,62 m2
3,185
10 Zimmer 1 ca: 14,49 m2
1,325
fs
10 Zimmer 2 ca: 17,01 m2
4,51
S AZ
25
9
Zimmer2 ca: 24,23 m2
3,00
12
Bad ca: 3,83 m2
(h=22cm)
38c
Küche ca: 4,96 m2
17
Zimmer 2 11 ca: 16,16 m2
Flur 2 ca: 15,05 m2
WC ca: 2,90 m2
19
10
Flur ca: 3,08 m2
HWR ca: 2,34 m2
19 x 25 x 185
Lichtes Kabinenmaß 1,20 x 2,10 m
6
38b
19
19 x 25 x 185
6
Küche ca: 4,97 m2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
8
Flur 2 ca: 16,43 m2
18
38a
HWR ca: 2,33 m2
10
7 WC ca: 2,90 m2
19 x 25 x 185
0.1
54 5
24
n rte Ga
9
1,50
50
2
10
20 x 26 x 175
38.0.3
(h=22cm)
Flur 2 ca: 16,16 m2
6 WC ca: 2,91 m2
(h=22cm)
38.0.2
19 x 26 x 175
Küche 8,21
50
3 4 5 6
G
Haus 39
Glasfassade
8,21
50
Kochnische ca: 13,89 m2
(h=60cm)
Steigung 4%, Rampenlänge 5,00m
Brücke SN 8.3 Brücke
1,10
1,10
1,10
88
Vordach
2
4
9 8 7 6 5 4 3 2 1
HWR ca: 1,55 m2
10
9
2,63
(h=22cm)
38.0.1
Ankleide ca: 6,93 m2
Glasfassade
Glasfassade
38.0.1
Bad ca: 4,47 m2
9
Zimmer 3 ca: 14,73 m2
Brücke
6
1,35
cke Brü
15
5
3,29
Luftraum über Terrasse im Souterrain
5
Rohbau Deckenöffnung
5
23
Garten SN 5.1
50
2,68
3
17
fs
aum asse Luftr Terr in überSouterra im
2,00
Flur ca: 11,59 m2
9
2 1,72 2 Brücke SN 7.3
2
39.0.2
9
1,54
18 17 16 15 14 13 12 11 10
11 12 13 14 15 16 17 18 19
38.0.2
HWR ca: 2,03 m2
2
Brücke SN 6.3 Brücke
Luftraum über Terrasse im Souterrain
(h=22cm)
G
Bad 2 ca: 6,33 m2
Bad1 ca: 3,68 m2
9
Brücke SN 5.2
4,91
Steigung 10%, Rampenlänge 9,80m Ausrundung Radius 15m am Anfang und Ende
38c 38c
38b 38b
2
38.0.3
30
S AZ
22
50
38a 38a
2,68
BH 1,10
)
55 5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1,35
9
102
102
1
22cm
5
cke Brü
21
n rte Ga
Zimmer 2 ca: 19,15 m2
2
Glasfassade
Flur 2 ca: 17,63 m2
5
18
5 4 3 2 1
WC ca: 3,41 m2
102
17
79
(h=
17
2,01
fs
aum asse Luftr Terr in überSouterra im
S AZ
20
14
19
19 18
Kindertoilette ca: 7,82 m2
102
10
aum asse Luftr Terr in überSouterra im
e 2,64 sad s sfa Gla
Haus 38
1,0623
5
5x x2
Küche ca: 14,72 m2
Raum 2 ca: 26,86 m2
G 16
1,34
2,76
2
fs
19
5
5 Küche ca: 5,04 m2
7 x 26 x 17
2
30
S AZ
13
HWR ca: 2,27 m2
SN 1
Hoftreppe 7 x 26 x 17,14 1 SN 102.2
102 ca:
37a
37a
35
WC 5 ca: 3,36 m2
Büro ca: 6,59 m2
103
Garderobe Flur 15,87 m2
103
15
aum asse Luftr Terr in überSouterra im
de 2,61 ssa sfa Gla
) 22cm
5
cke Brü
18
12
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1,35
11
19
5
3,30
9
2 (h=
5
n rte
19 18
Brücke
4
18 5x x2
Terrasse NGF:
Terrasse NGF: 2,96 m2
WC Da. ca: 3,59 m2
18
37.
0 1,1
de ssa sfa Gla
5,00 aum asse Luftr Terr in überSouterra im
Ga 5
14
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
8
13
37 us Ha
2
17
12
2,42 BH
10
4
1,34
SN 103.1
WC Herr. ca: 6,42 m2
102 Raum 1 ca: 22,42 m2
Brücke SN 4.3
Flur 2 ca: 16,48 m2
Brücke SN 4.2 3,29
ca. 25 m2- Fläche kann von VPS benutzt werden
11
2 9 8 7 6 5 4 3 2 1
30
n rte
HWR ca: 2,27 m2
5
Zimmer 2 ca: 19,01 m2
37a
103
103
Kinderwagen ca: 6,51 m2
102
Zimmer1 ca: 25,52
20 x 26 x 175
40.0.1
13 x 26 x 18
7
1,54
11 12 13 14 15 16 17 18 19
) 22cm
5
17
WC ca: 3,36 m2
4
Brücke SN 3.2
8,21
x 26
Küche ca: 5,04 m2
3,30
36b
aum asse Luftr Terr in überSouterra im
de ssa sfa Gla
(h=
5
58 5
26
x 20
4
Garten SN 4.1
36b
2
1,35
x 17
4
4,91
19 18 17 16 15 14 13 12 11
10
aum asse Luftr Terr in überSouterra im
2,68
5
3
tes Lich maßm inen Kab x 2,10 1,20
42
G
10
8 x1
10 40.0.1
Vordach
1 2 3 4 5 6 7 8 9
2
0.1
1
6
1,54
37.
G
WC ca: 3,27 m2
8,21
50
50
36a
) 22cm
17
1,95
3
Flur 2 ca: 15,24 m2
Zimmer 3 ca: 32,17 m2
Garten SN 3.1
Haus 40
G
h rdac Vo
3
3,30
4,91 5
36a
5
HWR ca: 1,64 m2
5
50
1,34
18
3
8,21
50
Brücke
(h=
30 3,29
cke Brü
Ga
Garten SN 2.1
) 22cm
x 25
x 19
19 18
Brücke SN 2.2 5
51
1,34
Flur 2 ca: 16,73 m2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
55 5
aum asse Luftr Terr in überSouterra im
9
fs
S AZ
n rte
3,30
2
Zimmer 2 ca: 19,15 m2
Küche
(h=22cm)
WD 0,40/0,20 UK 3,00
Brücke SN 2.3
2
2
Küche ca: 5,04 m2
1,35
cke Brü
Ga
8,21
4,91
51
36b
(h=
5
8
5
WC ca: 3,36 m2
2
HWR ca: 2,27 m2
2
Brücke3,29SN 1.2
Garten SN 1.1
5
18
x 25
x 19
de ssa sfa Gla
17
2,01
fs
aum asse Luftr Terr in überSouterra im
S AZ
4,91 51
2
) 22cm
30
7
51
aum asse Luftr Terr in überSouterra im
6
19 18
Zimmer 2 ca: 19,01 m2
[ Stadtplatz ]
Brücke SN 1.3
1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1,50
5,60
5
1
Brücke
Flur 2 ca: 16,47 m2 ca: 16,47 m2
1
3,30
(h=
4
Küche ca: 5,04 m2
Garten
40.0.2
Lichtes Kabinenmaß 1,20 x 2,10 m
36a
1
HWR 1 ca: 2,27 m2
de ssa sfa Gla
x 18
tes Lich maßm inen Kab x 2,10 1,20
40.0.2
2,68
5
WC ca: 3,37 m2
ca. 89,00 m²
2 1,34
18
x 26
9
0.2
1,50
36.
11
10 9 8 7 6 5 4 3 2 1
x 26
x 21
1
4
1,1
) 22cm
16
3,005
Ladenfläche ca: 197,44 m2
Bad ca: 5,76 m2
G
BH
12 13 14 15 16 17 18 19 20
(h=
3 15,8
Garten SN 101
de ssa sfa Gla 0
G
0.2
Flur ca: 4,44
1
8
fs
S AZ
17,14
3
314,06 m2
36.
101
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
8,21
103
15 x 265 x 165
39.0.2
101
1 3
36 us Ha
) 22cm
h rdac Vo
HWR
Gewerbe, Laden, Nahversorger oä ca: 100,70 m2
Maße sind vor Ort zu prüfen! Abweichungen sind umgehend der Bauleitung mitzuteilen.
Y
X
V
W
T
U
S
R
P
Q
N
O
f
e
d
c
b
a
14 S1
Dennewitzstraße
Anschluss
Anschluss Haus 2
3 M
L
K
J
I
H
G
1
2
2
76 Balkon NGF: 2,55 m2
77 Loggia
2
NGF: 2,45
m2
4
64
Zimmer 2 ca: 14,14 m2
6 8
36.
Flur ca: 4,45 m2
Zimmer 2 ca: 12,67 m2
5
75
Bad ca: 4,4775 m2
11 8
37.
9
0 1,1
Zimmer 1 ca: 25,47 m2
73
15
) 22cm
10
16
Balkon38c1 NGF: 1,26 m2
38b
73
HWR ca: 1,86 m2
17
73 Bad2 ca: 3,83 m2
Zimmer 3 ca: 21,16 m2
73
Flur ca: 7,81 m2
(h=60cm)
9
BH 1,10 Rohbau Deckenöffnung
18 x 26 x 175
38.0.3
S AZ
fs
22
Ø52
23
Bad1 ca: 8,23 m2
15
69
8 7 6 5 4 3 2 1
71
Bad 2 ca: 3,83 m2 Bad 1 ca: 5,51 m2
70 Bad2 ca: 8,52 m2
70
Bad 1 ca: 3,83 m2
72
(h=22cm)
72
24 16
70
70 S AZ
fs
Zimmer 1 ca: 21,36 m2
25
S29
S29
Zimmer4 ca: 27,38 m2
Küche ca: 12,01 m2
Zimmer 3 ca: 34,09 m2 72
Zimmer 2 ca: 21,58 m2
Zimmer 3 ca: 23,72 m2
72
Zimmer 2 ca: 16,27 m2
72
Bad2 ca: 8,52 m2
Küche 71
69
Balkon 2 NGF: 1,26 m2
72
HWR ca: 1,99 m2
70
72
Balkon 1 NGF: 1,26 m2
72
Flur ca: 11,19 m2
71
71
72
Zimmer 1 ca: 16,26 m2
39.5.3 39.0.3
Flur ca: 18,51 m2
71
Bad 1 ca: 3,83 m2
G Lichtes Kabinenmaß 1,20 x 2,10 m
71
Flur ca: 12,07 m2
Zimmer 2 ca: 18,71 m2
Zimmer3 ca: 50,02 m2
(h=22cm)
Zimmer 3 ca: 19,33 m2
Zimmer 2 ca: 18,06 m2
HWR 70 ca: 1,54 m2
38.5.1
38.5.2
G (h=22cm)
69
70
70
38.0.1
ca: 12,65 m2
Küche
(h=22cm)
Zimmer 1 ca: 14,81 m2
39.0.2
69
38.0.2
21
69 Bad 2 ca: 3,83 m2 HWR ca: 2,28 m2 Flur 1
68
8 7 6 5 4 3 2 1
(h=22cm)
17 16 15 14 13 12 11 10
20
14
Zimmer3 ca: 19,62 m2
71
Lichtes Kabinenmaß 1,20 x 2,10 m
fs
10 11 12 13 14 15 16 17
69
39.5.1
BH 1,10
)
S AZ
19
Zimmer 4 ca: 15,02 m2
69
18 x 26 x 175 9
22cm
fs
S AZ
13
Zimmer 2 ca: 19,44 m2
Bad2 ca: 8,52 m2
Balkon 2 NGF: 4,34 m2
73
73
Balkon 1 NGF: 2,65 m2
70 68 (h=
18
12
Zimmer4 ca: 30,59 m2
68
Flur ca: 10,40 m2
Küche ca: 4,30 m2
Zimmer 4 ca: 25,86 m2
71
39.5.2
0.1
(h=
11
68 HWR ca: 1,40 m2
68
Zimmer 1 ca: 30,39 m2
S20
Küche
Zimmer 4 ca: 20,31 m2
17
71
72
S20
26
69
AZSfs
70
Balkon NGF: 12,81 m2
AZSfs
AZSfs
AZSfs
Balkon 2 NGF: 7,14 m2
69 27
AZSfs
AZSfs
70
Balkon 2 NGF: 4,43 m2
72 71
Balkon 3 NGF: 7,43 m2
AZSfs
Anschluss Haus 3
Anschluss Haus 2
Park f
e
d
c
b
a
Y
X
V
W
T
U
S
R
P
Q
N
O
M
L
J
K
I
H
G
Grundriss Erdgeschoss 000.01g_F
Loggia NGF: 2,87 m2
73
37a
10
68
38a
DEN Haus2&3 5. Obergeschoss G05
Loggia NGF: 2,78 m2
Zimmer 2 ca: 19,00 m2
Bad1 ca: 4,47 m2
73
Zimmer 1 ca: 14,04 m2
Küche
68
Küche
73
8 7 6 5 4 3 2 1
26
Bad1 ca: 3,69 m2
68
Zimmer 1 ca: 25,03 m2
9
7 x1
5.1
68
67
74
BH
) 22cm
G
78
74
Bad2 74 ca: 3,83 m2
74
14
10 11 12 13 14 15 16 17
(h=
tes Lich nmaßm bine 10 Ka x 2, 1,20
Zimmer1 ca: 24,52 m2
x 18
37.
78
74
13
) 22cm
Balkon NGF: 1,26 m2
5
5.2
Balkon NGF: 3,03 m2
HWR ca: 2,19 m2
12
(h=
9
67
37.
46
Küche
9
74
fs
S AZ
67
Flur ca: 7,88 m2
Küche
Zimmer1 ca: 25,52
18 x 26 x 175
Zimmer 3 ca: 30,64 m2
Flur ca: 9,64 m2
Zimmer 2 ca: 18,20 m2
74
Zimmer 3 ca: 15,16 m2
67
67
Zimmer 2 ca: 16,67 m2
7
36b
fs
Balkon 1 67 NGF: 1,26 m2
67
67
Balkon 2 NGF: 2,94 m2
78
Bad ca: 4,47 m2
74
Zimmer 3 ca: 17,38 m2
S AZ
8
Bad ca: 8,52 m2
WC 78 ca: 3,28 m2
Lichtes Kabinenmaß 1,20 x 2,10 m
G 40.5.1
) 22cm
7
HWR ca: 1,48 m2 Küche Zimmer 2 ca: 13,98 m2
Balkon NGF: 4,25 m2
Bad Flur 78 ca: 11,20 m2 ca: 5,76 m2
(h=22cm)
40.0.1
Bad2 ca: 8,52 m2
Küche
Flur ca: 9,61 46
Bad ca: 5,76 m2
78
40.5.4
40.0.2
74
66 Zimmer 3 ca: 23,75 m2
66
40.5.3
Küche
(h=
6
66
66
46
Küche
77
77 HWR Bad 2 ca: 1,52ca: m23,83 m
75
HWR ca: 1,35 m2
10
Zimmer 2 ca: 19,31 m2
Flur ca: 7,76 m2
Zimmer 1 ca: 19,67 m2
Zimmer2 ca: 19,71 m
17 16 15 14 13 12 11 10
6
Zimmer 1 ca: 17,62 m2 75
Balkon 75 NGF: 1,25 m2
HWR ca: 1,38 m2
66
65
36a
5
65
Zimmer 1 ca: 14,27 m2 66
66
Bad ca: 5,34 m2
[ Stadtplatz ]
66
) 22cm
Ankleide ca: 3,32 m2
75
(h=
4
65
5
17
9
5.1 36. tes Lich nmaßm bine 10 Ka x 2, 1,20 Bad2 ca: 3,69 m2
Zimmer 2 ca: 35,41 m2
x 26
8 7 6 5 4 3 2 1
3
G
65
65
9
4
) 22cm
x 18
0 1,1
5.3
BH
36.
5.2
(h=
Flur ca: 3,68 m2 65
77
HWR ca: 1,57 m2
0.2
65
65
Küche
36.
Balkon 2 NGF: 5,73 m2
76
76
Bad HWR 2 ca: 3,83 76 m ca: 1,52 m2
Küche
BH 1,10
Zimmer 3 ca: 12,38 m2
10 11 12 13 14 15 16 17
WC ca: 2,47 m2
3
64
64
HWR ca: 2,60 m2
fs
S AZ
Küche
64
Zimmer 1 ca: 24,99 m2 78
77
Flur ca: 6,48 m2
Flur ca: 6,27 m2
7
HWR ca: 2,27 m2
77
40.5.5
) 22cm
Bad 2 ca: 4,01 m2
64
76
Zimmer 1 ca: 24,38 m2
(h=
64
64
Balkon NGF: 2,53 m2
76
Zimmer 2 ca: 23,22 m2
Zimmer 1 ca: 18,10 m2
1 2 3 4 5 6 7 8
Balkon 1 NGF: 1,26 m2
64
Flur ca: 9,50 m2
Zimmer 1 ca: 42,87 m2
5
64
Zimmer 2 ca: 16,93 m2
40.5.2
Bad 1 ca: 5,76 m2
9
Alle Maße sind vor Ort zu prüfen! Abweichungen sind umgehend der Bauleitung mitzuteilen.
Alle Maße sind vor Ort zu prüfen! Abweichungen sind umgehend der Bauleitung mitzuteilen.
H2 S01 3
q
5
4 3
q
8
7
6 5
4
9
8
7
6
H2 S01
9
10
18
10
18
19
19
20
21
20
21
23
23
24
25
24
25
02 290 02 290 3,895
280 03
3,895
8.OG 25,50
22
OKRD 21,88
OKRD
2,80
7.OG
21,88
OKRD
21,62
17
2,88
2,88
2,50
18,62
18,40
2,455
12 12
445
12,50
4.OG
2,455
Küche OKFF
12,38
OKRD
22
12,16
12,50
UKRD 12,16
Flur
Flur OKRD
9,26
UKRD
9,04
Küche OKFF
9,38
3.OG 9,38
3.OG 445
9,26
UKRD 8,96
12
22
30 16 12
OKRD
OKFF 9,38
OKRD 9,26
9,38
Flur
OKRD
6,14
UKRD
5,92
2.OG Küche6,26
6,26
OKFF
2,455
Flur
Treppenhaus
Flur
UKRD 9,04
Küche
2,455
Flur
2,78
Flur
2,78
Treppenhaus
12
8,96
2,50
Flur
UKRD
2,50
16 8,595
445
22
30
34
8,595
UKRD 6,14
5,92
2.OG OKFF 6,26
OKRD 6,14
6,26
445
22 2,455
2,50
2,78
UKRD 5,92
2,80
OKBP
12 22
3,00 22
22
UKRD
-0,56
Flur 2,50
Flur
-0,34
OKFF
Bauherr:
KLARBAU GmbH & Co. Berlin KG Helmholtzstraße 2-9 D-10587 Berlin
-0,20
-0,30
2,61
Zimmer 4OKRD -0,70
UKRD -0,76
OKBP
UKRD
OKFF
-3,43
-3,30
OKBP
DEN36 Dennewitzstraße D - 10785 Berlin
Planung:
OKRD -0,34
OKFF -0,20
Bauherr:
Arin Burda Architekten Helmholtzstraße 2-9 10587-0,20 Berlin, Deutschland DEN36@arinburda.com
OKFF -0,30 OKRD -0,70
Garage
Projekt:
EG
22
2,01
22
60
Garage
Diese Zeichnung und dieser Entwurf sind durch Gesetze urheberrechtlich geschützt. Kein Teil dieses Plans darf ohne schriftliche Genehmigung vervielfältigt werden. Aufgrund der unterschiedlichen Skalierungen der Drucker dürfen nur die schriftlich vermerkten Abmessungen verwendet werden. Alle Maße sind auf der Baustelle zu prüfen. Diese Zeichnung muss in Verbindung mit den Vertragsfestlegungen und den diesbezüglichen Grundrissen und Zeichnungen gesehen werden. Es ist nicht für die bauliche Umsetzung zugelassen solange es nicht geprüft und freigegeben wurde.
DEN36 Dennewitzstraße D - 10785 Berlin
EG
OKFF -0,20
14
OKFF -0,20
Tiefgarage (Durchfahrt)
-3,30
3,14
KLARBAU GmbH & Co. Berlin KG Helmholtzstraße 2-9 D-10587 Berlin
Planungsphase:
Ausführungsplanung (LPH5)
Kinderwagen
Zeichnung:
UKRD -0,56
-3,30
OKFF
-3,17
Planung:
Haus2 - Schnitt 03
Arin Burda Architekten Helmholtzstraße 2-9 10587 Berlin, Deutschland DEN36@arinburda.com
13
-3,30
OKFF 3,14
-0,76 OKRD
Garage
Zimmer 4
OKRD
3,00
Treppenhaus
60 1,36
UKRD
Diese Zeichnung und dieser Entwurf sind durch Gesetze urheberrechtlich geschützt. Kein Teil dieses Plans darf ohne schriftliche Genehmigung vervielfältigt werden. Aufgrund der unterschiedlichen Skalierungen der Drucker dürfen nur die schriftlich vermerkten Abmessungen verwendet werden. Alle Maße sind auf der Baustelle zu prüfen. Diese Zeichnung muss in Verbindung mit den Vertragsfestlegungen und den diesbezüglichen Grundrissen und Zeichnungen gesehen werden. Es ist nicht für die bauliche Umsetzung zugelassen solange es nicht geprüft und freigegeben wurde.
1.OG OKRD 3,02
Projekt:
14
OKRD
Feuerwehrdurchfahrt UKRD
48
OKFF
-3,43
3,14 Küche
UKRD 2,80
-0,20
OKRD
2,15
14
2,15
62
-3,17 OKBP
OKFF
Kindertoilette
48 OKFF
-3,30
Garage
3,14 2,455
2,78
12
UKRD
OKFF
1,75
1,36
-0,40
Flur
OKFF -0,40
48
26
Garage
40
2,10
Freigegeben von:
OKFF -3,30
OKBP -3,43
Tiefgarage (Durchfahrt)
UKBP
UKsauber
13
65 UKBP
OKFF -3,17
OKBP -3,30
Geprüft von:
Planungsphase:
Gezeichnet von:
Zeichnung:
Ausführungsplanung (LPH5)
Kinderwagen
Haus2 - Schnitt 03 Entworfen von: Symbol
Freigegeben von:
4
5
6
7
8
9
UKsauber
UKBP -4,80
10
-3,95
UKsauber
UKBP -3,95
UKsauber
18
19
20
21
23
24
UKBP
el Hot
UKBP
3
3
s1 Hau
q
Geprüft von:
Dennewitzstraße us Ha
UKBP -3,95
UKsauber
UKsauber
-3,95 OKFF -3,30
OKBP -3,43
UKsauber
-4,80
Garage
Garage
Haus 2
UKsauber
-3,95
OKBP -3,30 UKBP
UKBP -3,95
UKBP
13
UKsauber
OKFF -3,17
Garage
-3,95
65
UKsauber
OKBP -3,30
UKBP
10
Garage
10
Garage
-3,95
2,01
UKBP
2,15
2,10
ELT
2,61
13
-1,20
KELLER
2,15
14
ELT -0,94
OKBP
UKRD
3,02
22 Feuerwehrdurchfahrt
OKRD
2,50
48
62
40
OKFF
-0,54
Flur 2,50
2,50
Kindertoilette
14
3,20
3,20
OKRD
OKRD -0,54 OKRD
OKRD
12
2,65
26
3,165
14
OKRD -0,94
UKRD -1,20
-3,30
Flur
155
Flur
22
Flur
3,60
-0,80
Küche
1,75
Treppenhaus
3,20
3,20
3,60
2,80
Laden
OKFF -0,80
Flur
2,50
Treppenhaus
3,14
Laden
-0,40
KELLER
Flur
2,78
12 155
Gemeinschaftlich genützte Freifläche
2,65
-0,40 OKFF
Flur
22
2,80
22
575
Treppenhaus
3,14
2,78
Flur
34
3,02
3,02
UKRD 3,165
EG
-3,30
2,78
2,78
2,50
Gemeinschaftlich genützte Freifläche
34
EG
UKRD
OKRD
12
3,14
3,14
OKRD 2,78
2,455
OKFF
Flur
1.OG
3,14
2,50
OKFF
Zimmer 1 575
02 230
12
02 230
3,14
1.OG
2,78
22
2,455
UKRD Zimmer 5,921
22
1.OG
445
34
12
OKRD
445
6,26
12
22
445
OKFF
6,26
22
34
Flur
12,50
2,455
Küche
2,78
Flur
2,455
2,78
Flur
Treppenhaus
2,50
Treppenhaus
HWR
2,50
HWR
Bad 1
Küche
12
12
Bad 1
Küche
Flur OKRD 9,26
4.OG
OKFF 12,50
445
12 UKRD
OKRD 12,38 445
22
12,38
Flur
34
22
445
2,455
Küche
Flur
5.OG 15,62
445
22
15,28
2,78
Flur
5.OG 15,62 OKFF 15,62
34
34 2,78
2,78
Flur
Flur
2,78
Flur
6,14
6.OG 18,74
2,455
2,78
12 Flur
Treppenhaus
HWR
2,78
Flur
2,50
Treppenhaus
HWR
Bad 1
Küche
2,50
2,78
Bad 1
Küche
UKRD 12,16
2,78
2,78
2,78
OKRD
12
6.OG 18,74
15,62
UKRD 15,28
Flur
9,04
9,04
6,26
Küche OKFF
22
34 2,78
2,78
2,78
2,78
2,78
2,455
Flur
Flur
9,26
230 152
Balkon 39.6.2.10
OKRD 15,50
UKRD 12,16
Zimmer 1
OKFF
18
OKFF 18,74 OKRD 18,62
15,50
OKRD
UKRD
OKRD 12,38
12,16
UKRD
Zimmer 1
24
UKRD 18,40
Küche
Flur
15,28
Flur
Flur
Flur
OKRD
OKRD
12 2,455
22
22 Flur
22
445
18,74
12
12
OKRD
UKRD
2,78
Flur
Treppenhaus
HWR
2,50
Flur
2,50
Treppenhaus
HWR
Bad 1
Küche
15,28
UKRD
Flur
12,38
9,26
OKRD
12
445
9,38
2,16
Balkon 39.6.2.10
34
34
2,78
2,78
34
12
22
445 2,455
12
12
UKRD
Flur
18
Küche
Küche
22
9,38
OKFF
6,26 2,455
24 24
2,16
230 152
UKRD
UKRD
Flur
OKRD 15,50
12,16
UKRD
2.OG
2.OG
Bad 1
Küche
Flur
UKRD
12,38
OKRD 22
445
Flur
UKRD
OKRD
Zimmer 1
Zimmer 1
OKFF
9,38
FlurFlur
OKRD 15,50
15,28
12,50
OKFF
Flur
Flur
15,50
Zimmer 1
Zimmer 1
445 2,455
9,38
Flur
15,28
UKRD
3.OG
Flur
UKRD 18,40
2,78
2,78 12
OKRD
UKRD
3.OG
Treppenhaus
Treppenhaus
OKFF
15,50
OKRD
OKFF 12,50
12,50
HWR
18,62
18,40
22
445 2,455
12,50
HWR
2,50
2,88
2,88
2,71
2,71
2,455
15,62
OKFF
4.OG
Bad 1
UKRD 18,40
Flur
OKFF 15,62
4.OG
Bad 1
OKRD OKRD18,62
Zimmer 1
15,62
15,62
Küche Küche
38
UKRD 21,62
21,62
UKRD
Flur Flur Flur Flur
2,455
UKRD UKRD 21,62
21,62
Flur
12
12
2,455
2,455
Zimmer 1
7.OG 22,00
22,00
2%
2%
38
UKRD
Flur
22
445
22
445
UKRD
UKRD 18,40
5.OG 5.OG
OKRD 21,67
21,67
2,455
UKRD 21,62
UKRD 21,45
Zimmer 1
OKFF 18,74OKFF 18,74 OKRD 18,62 OKRD 18,62
18,74
18,74
Zimmer 1
2,455
Balkon 40.6.4.6 Balkon 40.6.4.6
2,455
2,80
2,50
22,00
24
6.OG 6.OG
Dachterrasse 1
OKRD 21,88
36
26 17
21,45
21,88
OKFF
17
22
375
22
375
205
205
UKRD
230 162
OKRD
OKFF 22,00
21,88
445
2%
OKRD 21,67
OKRD 36
21,67
12
OKRD
12
OKFF 21,98
OKRD 21,88
26
21,98
2%
18
Dachterrasse 1
26
21,98
24 18
Zimmer 2 Zimmer 2
17
OKFF
24,80
24
Treppenhaus
2,50
2,82 2,82
Zimmer 2 Zimmer 2
Flur
21,98
230 162
UKRD
Treppenhaus
Flur Flur
Flur
465
22
UKRD 24,80
UKRD 24,80
2,80
Zimmer 2
2,80
7.OG
Zimmer 2
Dachterrasse 2
465
22
475
UKRD 24,80
24,80
UKRD 24,80
Dachterrasse 2
8.OG
25,02
22
22
UKRD
7.OG
25,58
8.OG
25,58
25,02
2%
OKRD 25,02
22
OKRD 25,02
2%
Dachterrasse 3
25,02
2,455
475
OKRD
280 03
Dachterrasse 3
25,50
OKRD 25,02
25,58
26
8.OG
25,58
Gezeichnet von: Entworfen von:
Parkanlage
25
Datum:
H2 S01
Symbol Maßstab: 0
4m
1:50, 1:72,30
Dennewitzstraße
q
3
4
5
6
7
8
9
10
H2 S01
18
19
20
21
23
24
25
DEN36_05_H2 _S003.01a_P
a
tel Ho
3
Zeichnungsnummer:
1 us Ha
us Ha
1189x910 (A0+ Q) DEN36 Haus2 Schnitt 03 H2_S003.01a_P
Haus 2
Blattgröße:
Parkanlage
Datum: Maßstab: 0
4m
1:50, 1:72,30
Blattgröße:
1189x910 (A0+ Q) DEN36 Haus2 Schnitt 03 H2_S003.01a_P
10
Zeichnungsnummer:
DEN36_05_H2 _S003.01a_P
a
Planung:
46
OKBP 0,00
Arin Burda Architekten Helmholtzstraße 2-9 10587 Berlin Tel. +49 30 689899060 mail@arinburda.com
8
-0,40 UKRD -0,60
Planungsphase:
Leistungsphase 05 2,62
Zeichnung:
KELLER
Haus2 - Schnitt 01
TIEFGARAGE
6
Ä-ID Änderung
OKBP -3,30
05
UKSauber
-4,05
10
Freigegeben von: Geprüft von: Gezeichnet von:
BJR Entworfen von: Symbol Dennewitzstraße
x
1
3
tel Ho
us Ha
us Ha
Haus 2
Parkanlage
Datum:
13.02.2019 Maßstab: 0
4m
1:50
Blattgröße:
91,0 x 150,0 cm Zeichnungsnummer:
DEN36_05_H2 _S001.01b_P
b
Alle Maße sind vor Ort zu pr Abweichungen sind umgehend der Baule mitzut
Sauberkeitsschicht - 10cm C20/25 Dämmung 12cm Elastomermatten 2,5cm PROJEKT 0,00 = üNHN 36,00 Wasserhöhe ~31,50 (-4,50) max. 32,40 (-3,60)
p
q
r
s
t
v
u
w
x
H2 S02
02 290
26,68
01 310
26,68
Solarpanele
Dachterrasse 3
8.OG
25,58
2%
OKRD
25,58
2%
25,02
8.OG
25,02
22
22
25,02
21,98
OKRD
21,88
UKRD
21,62
2,80
Bad 2 Flur
7.OG
Dachterrasse 1 OKFF
22,00 OKRD 21,88
21,98
2%
21,45
UKRD
21,62
UKRD 21,45
24
24
Zimmer 2
18,74
18,62
OKRD
18,62
UKRD
18,40
UKRD
18,40
01 310
6.OG
18,74
OKFF OKRD
1,41
18,74
Diese Zeichnung und dieser Entwurf sin urheberrechtlich geschützt. Kein Teil d ohne schriftliche Genehmigung verv Aufgrund der unterschiedlichen Sk Drucker dürfen nur die schriftl Abmessungen verwendet werden. Alle M Baustelle zu prüfen. Diese Zeich Verbindung mit den Vertragsfestlegu diesbezüglichen Grundrissen und Zeich werden. Es ist nicht für die baul zugelassen solange es nicht geprüft wurde.
04 310
445
22
12
22
12
18,74
42
Loggia 39.6.1.10
6.OG OKFF
1,17
2,455
Flur
2,71
2,50
Zimmer 1
2,455
2,88
1,51
375
UKRD 42
17
17
26
12
12
2%
2,92
Zimmer 1
22,00
OKFF
24,80
UKRD
26
Dachterrasse 2
24,80
2,50
2,92
7.OG
2,80
UKRD
Flur
Loggia 39.5.1.9
Zimmer 2
5.OG 15,62
15,62
15,50
OKRD
15,62
feuerhemmend feuerbeständig
15,62
15,50
Brandwand / BW-ersa
UKRD
15,28
UKRD
15,28
Wand in Bauart - Bran
Türen:
445
22
05 310
OKFF OKRD
5.OG 22
12
OKFF
Brandschutzanforderungen Wände:
2,455
Zimmer 1
2,50
2,455
2,78
230 Loggia 2-3
dt dts RS
dichtschließende Tür
dich- und selbsttschließ
Rauchdichte und selbs
Flur
Zimmer 2
4.OG 12,50
12,50
OKFF OKRD
12,38
OKRD
Außenwand StB mit Innenwand StB
4.OG
12,50
Trockenbauwand
12,50
12,38
Trockenbauwand m
22
12
OKFF
Erdreich
Loggia 39.4.1.10 2,455
Zimmer 1
2,50
2,455
2,78
Zeichnungslegende:
Einkofferung Trocke Unterzug
UKRD
12,16
445
22
UZ
UKRD
12,16
Fenster mit 1./2. Öff
Barrierefreiheit: Bewegungsfläche/D
3. OG
3.OG
OKFF OKRD
9,26
50
50
365 1,00
UK Träger 7,96
54 50
2,52
6,26
Parkplatz Kraftrad
BF NGF RU LRH S xx
50
2.OG
100
6,26
Bruttofläche Nettogrundfl Raumumfan Lichte Raum Schachtnr. x
Bemaßung von Roh
100
Bemaßung von Rau
1
Achsen Unterverteilung
LUFTRAUM ÜBER VPS
UV
UV
Heizkreisverteilung
HKV1
5,31
5,31
03 280
Wohnungsnummer
Rohbauöffnung / L 76 / 69 cm 885 / 82 cm 101 / 94 cm
1,34
2.OG
7,96
Haustrennlinie
P KRAD
8,46
Stahl- Verbundträger nach Vorgabe AL- Verbungträger GmbH
UK Träger
7,96
2,52
8,96
2,455
3,02
UKRD
Grenze Realteilung
9,38 37.4.2
30
Stahl- Verbundträger nach Vorgabe AL- Verbungträger GmbH
7,96
1,18
365 1,48
1,00
8,46
16
30 50
UKRD
8,96
Grundstücksgrenze
9,38
9,26
30
OKRD
1,385
9,38
12
OKFF
Oberkante Rohdeck
3.OG 30
9,38
Loggia 39.3.1.9
80
Flur
2,455
Zimmer 1
2,50
2,455
2,78
Oberkante Fertigfuß
Bereiche abgehängt Ausführungsplanung:
Die vorliegende Ausführungsplanung Ausführungsempfehlung. Gemäß Vertrag sind sämtliche Doku Leistungsphase 5 durch den GU zu verbessern und in eigener Verantwo freizugeben.
STADTPLATZ
1.OG
1.OG 3,14
Nullpunkt des Gebäudes: ±0,00 =
3,14 2,65
OKRD KITA
Projekt:
DEN36 Dennewitzstraße D - 10785 Berlin
FEUERWEHRDURCHFAHRT
EG EG
Bauherr:
KLARBAU GmbH & Co. Berlin KG Helmholtzstraße 2-9 D-10587 Berlin
GRÜNER HOF
0,80
Planung:
OKBP 0,00
46
STADTPLATZ
varriert
Arin Burda Architekte Helmholtzstraße 2-9 1 Berlin Tel. +49 30 6898 mail@arinburda.com
12
-0,84
-0,40
Brandschutzvorhang
UKRD
-0,60
8
60
8
3 60
15
OKBP
17
-0,40 OKFF -0,40
Planungsphase:
2,06 1,50
Rampe 1,6° -3,70
-3,50
135
-3,61
OKBP
295
Rampe 6°
725
OKBP
-3,58
KELLER OKBP
Haus2 - Schnitt 01
TIEFGARAGE
6
OKBP -3,30
6%
Zeichnung:
2,62
2,31
73
OKBP
755
2,05
KELLER
TIEFGARAGE Rinne 30x4
-1,44
2,28
UKRD
45
Leistungsphase 05
8
8
w
Ä-ID Änderung
-3,30
1,6°
UKSauber
05
-4,73
UKSauber
-4,905
UKBP
-4,05 Freigegeben von:
10
UKBP
-4,80
Geprüft von: Gezeichnet von:
H2 S02
BJR Entworfen von: Symbol
p
q
r
s
t
u
v
w
Dennewitzstraße
x
1 us Ha
3 us Ha
Haus 2
11
Parkanlag
Datum:
13 Maßstab: 0
DEN36 Haus2
4m
Blattgröße:
91,0
C C
DRAUFSICHT BALKONPLATTE/HORIZONTALSCHNITT IM 35 35
1,10 1,10
18
3,85
VORDERKANTE FASSADE
30
3,85
30
LAGEPLAN BALKONPLATTE SCHNITT B-B LAGEPLAN BALKONPLATTE SCHNITT B-B
4,30 4,06 4,30
24 12 14 12 814 24 8
8
24
12 10 12
DN 75
24 8
10
18
10 10
18
DEN36 DEN36 Balkon 37.3.1.9 Balkon 37.3.1.9 D119Aa_V D119Aa_V
5
7
515
7
C C
20 20
30 30 50 50
6 6 28 286 6
10
GEFÄLLE GEFÄLLE
GELÄNDER GELÄNDER AUFKANTUNG AUFKANTUNG 6cm VERSPRUNG UK BALKONPLATTE 6cm VERSPRUNG UK BALKONPLATTE
ACHSE HALFENSCHIENE
ACHSE HALFENSCHIENE
ACHSE HALFENSCHIENE
ACHSE HALFENSCHIENE
SEITENANSICHT SEITENANSICHT WEST WEST
A A
VORDERKANTE FASSADE
AUSSENKANTE BALKONPLATTE AUSSENKANTE BALKONPLATTE
GEFÄLLE GEFÄLLE
24 8
B B
10 10
2,00 2,00
B SEITENANSICHT SEITENANSICHT OST OST B ACHSE HALFENSCHIENE
ACHSE HALFENSCHIENE
4,15
3
4,15
316
15
SSADE
35 SSADE 35
12
1212 14148 8 2424
Dennewitzstra DEN36 D - 10785 Berl Dennewitzstra D - 10785 Berl Bauherr:
Bauherr: KLARBAU Gmb Helmholtzstraß KLARBAU Gmb D-10587 Berlin Helmholtzstraß D-10587 Berlin Planung:
Planung: Arin Burda Arch Helmholtzstraße Arin Burda 10587 BerlinArch Helmholtzstraße Germany 10587 Berlin Tel. +49 30 6898 Germany mail@arinburda Tel. +49 30 6898 Planungsphase: mail@arinburda
34 34 6 6
18
VORDERKANTE FASSADE 1,10 1,10
DN 75 DN 100
Ausführungsp1 Planungsphase: 1 Zeichnung:
15 Ausführungsp Balkon 37.3.1. 15
Zeichnung: Balkon 37.3.1. Änderungen:
30.10.18: Positione Änderungen:
ANSICHT ANSICHT
Ostseite aktualisier 30.10.18: Positione Ostseite aktualisier
16
DRAUFSICHT BALKONPLATTE/HORIZONTALSCHNITT IM BEREICH AUSSENWAND DRAUFSICHT BALKONPLATTE/HORIZONTALSCHNITT IM BEREICH AUSSENWAND 53
7 7
DEN36 Projekt:
20 12 10 12
5 5 15 15
DRAUFSICHT DRAUFSICHT
35
1,30
35
DN 100
18
8
1,501,50
50 50 18 1824 24 60 60
A A
VORDERKANTE FASSADE VORDERKANTE FASSADE
20
b
6
b
4,06
12 12 38 38 10 108
628 28 2 42 4
2
2
8
C C24
ISOKORB o. DÄMMUNG 24 ENTSPRECHEND STATIK ISOKORB o. DÄMMUNG VORDERKANTE FASSADE 24 VORDERKANTE ENTSPRECHEND STATIK FASSADE35 1,30 35
B B
Diese Zeichnung und diese urheberrechtlich geschützt ohne schriftliche Genehm Diese Zeichnung und diese Aufgrund der unterschi urheberrechtlich Drucker dürfengeschützt nur ohne schriftliche Genehm Abmessungen verwendet w Aufgrund der unterschi Baustelle zu prüfen. D Drucker nur Ve Verbindungdürfen mit den Abmessungen verwendet w diesbezüglichen Grundrisse Baustelle D werden. Eszu istprüfen. nicht fü Verbindung solange mit denesVe zugelassen n diesbezüglichen Grundrisse wurde. werden. Es ist nicht fü zugelassen solange es n wurde. Projekt:
1,10 1,10
12
VORDERKANTE FASSADE
6
18
18 18 24 24
2 12
SCHÖCK SCHÖCK ISOKORB ISOKORB o.glw. o.glw.
EPLAN EPLAN
12
2
3,73
50 50 60 60
OK BETONWERKSTEINPLATTEN
B B
6
OK BETONWERKSTEINPLATTEN
GEFÄLLE
4
GEFÄLLE
8 8
24 8 24 8
12
+3,14 = OKF 1.OG +3,14 = OKF 1.OG
2
18
24
A A
TYP 119A TYP 119A
6 28 28 6
3,73
VORDERKANTE FASSADE
24
TT C-C TT C-C
30 30
BALKONPLATTE ANSICHT SCHNITT C-C C-C BALKONPLATTE SCHNITT ANSICHT
TT A-A TT A-A
30
1,76 1,76 2,06 2,06
6 28 6
TK TK
30
18 18
28 6
24 2 2
18
6
12
34 34 6 6
2
4
BALKON 38.2.2.9
30
12 12
15 15
b b
VORDERKANTE FASSADE
30 12
3° 3°
24
12
24 24
2,00 2,00
1,50 1,50
22 22 18 18 12
TK TK 1 1
VORDERKANTE FASSADE VORDERKANTE FASSADE
6 6
SEITENANSICHT SEITENANSICHT OST OST ANSCHLUSS SIEHE BALKON ANSCHLUSS 38.2.2.9 SIEHE
1,30 1,30
6 6 28 282 2 4 4
SCHÖCK SCHÖCK ISOKORB ISOKORB o.glw. o.glw.
HT HT WEST WEST
1,30 1,30 KNICKPUNKT FASSADE KNICKPUNKT FASSADE
BALKONPLATTE BALKONPLATTE SCHNITT SCHNITT A-A A-A
10 10
2,00 2,00
53 53
4,07 4,07
22
1,30 18 12 1,30 18 12
8 8
34 34 6 6
24 24
34 34 6 6
22 22 44
1,6% GEFÄLLE 1,6% GEFÄLLE
VORDERKANTE FASSADE VORDERKANTE FASSADE
66
35 35
E FASSADE E FASSADE
22 22
2222 1818 3434 6 6
2222 1212
32 32
6 6 2828 6 6
ANSCHLUSS 4,03 5 12 SIEHE 7 4,15 SIEHE 4,03 5 12 BALKON 7 4,15 +3,14 = 12 BALKON 38.2.2.9 = +3,14 12 OK BETONWERKSTEINPLATTEN 1.OG OKF 38.2.2.9 15 OK BETONWERKSTEINPLATTEN OKF 1.OG 15 2° 2° DRAUFSICHT BALKONPLATTE/HORIZONTALSCHNITT IM
ABWEICHUNGEN SIND UMGEHEND DER BAULEITUNG MITZUTEILEN.
1,30
1,30
1,05
53 KNICKPUNKT FASSADE 1,30
1,30
1,05
Genehmigt von: Genehmigt von: Geprüft von:
5
7
C
4,15
3
15
16
DRAUFSICHT BALKONPLATTE/HORIZONTALSCHNITT IM BEREICH AUSSENWAND
ADE
Genehmigt von:
53
35
1,30
1,30
1,05 Geprüft von:
KNICKPUNKT FASSADE
ocb Gezeichnet von: SCHÖCK ISOKORB o.glw.
hf Entworfen von:
1,10
1,10
aba Symbol Dennewitzstraße
Haus 3 Haus 2
28 6
34 6 12
10
Parkanla
Datum: Maßstab:
18
16
15
Papiergröße:
42 x
BALKON 37.3.1.9 & 37.5.1.9
TYP 119A
ANSICHT
OST
Zeichnungsnummer:
DEN36_05_D119Aa
ALLE MASSE SIND VOR ORT ZU PRÜFEN!
V
30 12
18
6
2°
34 6
2
18 6
OK BETONWERKSTEINPLATTEN
6
6
22 34
22
+3,14 = OKF 1.OG
ANSCHLUSS SIEHE BALKON 38.2.2.9
4
1,6% GEFÄLLE
12
2
22
12
32
4,03
28
ABWEICHUNGEN SIND UMGEHEND DER BAULEITUNG MITZUTEILEN.
24
8
18
TK
12
4,07
12
V
18
BALKONPLATTE SCHNITT A-A
VORDERKANTE FASSADE
5. OG
30 1,50
1,76 2,06
+18,74
+15,62
8
24
12 14 8
6
6. OG
b
24
C
28 2 4
3°
2
7. OG +21,98
24
2,00
22 18
6
A
12
18
BALKONPLATTE SCHNITT C-C
4. OG +12,50
24 8
3. OG
10
24
+9,38
2. OG
18
+6,26
1. OG
18 50 60
+3,14
EG
LAGEPLAN
-0,40
B 5
7
C
15 1
2
3
4
5
6
7
8
9
10
O
N
M
L
K
J
I
DRAUFSICHT BAL 13 VORDERKANTE FASSADE
53
2 Stelzlager 3 Abdichtung AlleAlle Maße Ort zuprüfen! prüfen! Maßesind sind vorLoggia Ort zu 4 vor Betonplatte Abweichungen sind umgehend umgehend der Bauleitung mitzuteilen. Abweichungen sind der Bauleitung mitzuteilen. 5 Ablaufrinne 6 Dreifachverglasung 1 Betonwerkstein 600x600x40 mm 7 Fensterflügel 1 2 Betonwerkstein 600x600x40 mm Stelzlager 8 Fensterrahmen 2 3 Stelzlager Abdichtung 9 Fensterprofilverlängerung 3 4 Abdichtung 12 Loggia Betonplatte 10 trittfeste Dämmung 035 13 Ablaufrinne 4 5 Loggia Betonplatte 11 Isokorb gemäß Statik 30 Dreifachverglasung 5 6 Ablaufrinne 12 Dämmung 035 160 mm 14 Fensterflügel 6 7 Dreifachverglasung 8 Fensterrahmen 13 AussenPutz 10 mm 2 1615 24 7 9 Fensterflügel Fensterprofilverlängerung 16 14 Konsole gemäß Statik 12 8 10Fensterrahmen trittfeste Dämmung 035 17 2 16 13 15 Putzträger 18 9 11Fensterprofilverlängerung Isokorb gemäß Statik 30 19 12 16 Sonnenschutzmarkisolettenkasten Dämmung 035 160 mm 14 1012trittfeste Dämmung 035 13 17 Dämmung 035 30 mm AussenPutz 10 mm 15 1113Isokorb gemäß Statik 30 16 18 gemäß Revisionsöffnung Sonnenschutz 14 Konsole Statik 12 Dämmung 035 160 mm 14 17 15 Putzträger 19 Putzabschlußprofil 18 1316AussenPutz 10 mm 15 19 Sonnenschutzmarkisolettenkasten Außen 15 Kpmpriband 16 1417Konsole gemäß Dämmung 035 30Statik mm 3 11 3 16 Randdämmstreifen 17 1518Putzträger Revisionsöffnung Sonnenschutz 18 17 Zweischicht Stabparkett 13mm 19 Putzabschlußprofil 1619Sonnenschutzmarkisolettenkasten auf Verklebung 2 mm Außen 15 Kpmpriband 17 Dämmung 035 30 mm 3 11 18 Zementheizestrich Randdämmstreifen 1816Revisionsöffnung Sonnenschutz 17 Zweischicht Stabparkett 13mm mit 19 Verlegenoppenmatte 19 Putzabschlußprofil auf Verklebung 2 mm Fußbodenheizung (vor dem Fenster Außen 1518Kpmpriband Zementheizestrich Verdichtung der Heizschleifen) 1619Randdämmstreifen Verlegenoppenmatte mit 20 Haltwinkel dieFenster Markisolettenschiene Fußbodenheizung (vorfür dem 17 Zweischicht Stabparkett 13mm 21 Holzleiste Verdichtung der 2 Heizschleifen) auf Verklebung mm 22 Randdämmstreifen Haltwinkel für die Markisolettenschiene 1820Zementheizestrich 21 Holzleiste 23 Zweischicht Stabparkett 13mm auf 1922Verlegenoppenmatte mit Randdämmstreifen Verklebung 2 mm (vor13mm dem Fenster 23Fußbodenheizung Zweischicht Stabparkett 24 Zementheizestrich auf Verdichtung Verklebung 2 der mm Heizschleifen) mit Fußbodenheizung 25 Verlegenoppenmatte Zementheizestrich 2024Haltwinkel für die Markisolettenschiene (vor dem Fenster Verdichtung der Heizschleifen) 25 Verlegenoppenmatte mit Fußbodenheizung 21 Holzleiste 26 Trittschaldämmung (vor dem Fenster Verdichtung der Heizschleifen) 2226Randdämmstreifen Trittschaldämmung 27 Stahlbodendecke 2327Zweischicht Stabparkett 13mm auf Stahlbodendecke 28 Spachtlung + Anstricht Verklebung mm 28 Spachtlung 2 + Anstricht 29 Kompriband Kompriband 2429Zementheizestrich 30 Neoprenstreifen Neoprenstreifen 2530Verlegenoppenmatte mit Fußbodenheizung (vor dem Fenster Verdichtung der Heizschleifen) 26Die Trittschaldämmung Ausführung ist den Ausführungsdetails des Außen Die Ausführung ist den Ausführungsdetails des Außen 27Herstellers Stahlbodendecke anzupassen. Herstellers anzupassen. 28Dämmstoffdicken Spachtlung + und Anstricht -klassen sind nach Angaben der Dämmstoffdicken und -klassen sind nach Angaben der 29Fachplanung Kompriband auszuführen. Fachplanung auszuführen. Maße sind vom GU vor Ort zu überprufen. 30Alle Neoprenstreifen 1
14
16
1
24
14
1
A
24
1
1
5
2
14
A
35
115
3
1
Blech
A
Putz
Innen
A
5
Blech
Putz
5
5
Innen
3
A
Blech
Putz
Alle Maße sind vom GU vor Ort zu überprufen.
1
werden. Es ist nicht für die bauliche Umsetzung zugelassen solange es nicht geprüft und freigegeben wurde.
Projekt:
Projekt:
Diese Zeichnung und dieser Entwurf sind durch Gesetze urheberrechtlich geschützt. Kein Teil dieses Plans darf ohne schriftliche Genehmigung vervielfältigt werden. Aufgrund der DEN36 unterschiedlichen Skalierungen der Drucker dürfen nur die Dennewitzstraße schriftlich 36-44 vermerkten Abmessungen verwendet werden. Alle D - 10785 Berlin Maße sind auf der Baustelle zu prüfen. Diese Zeichnung muss in Verbindung mit den Vertragsfestlegungen und den Bauherr: Bauherr: diesbezüglichen Grundrissen und Zeichnungen gesehen werden. Es ist nicht für die bauliche Umsetzung zugelassen KLARBAU GmbHsolange & Co.es nicht geprüft und freigegeben wurde.
KLARBAU GmbH & Co. Berlin KG Helmholtzstraße 2-9 Helmholtzstraße 2-9 DEN36 D-10587 Berlin D-10587 Berlin Dennewitzstraße 36-44 Planung: D - 10785 Berlin
Putz
1
7 Außen 8
2 3 4 5
6
9
4
7 8 9
12
11
Ausführungsplanung (LPH5)Berlin D-10587
4 8
622
2 3 4 5
6
22
2%
21 22 23 24 25 26 27 22
8
11
7
Unterzug höhe ist unterschiedlich in jederGeschoss: 1OG-5OG 66,5 cm 6OG 80,5 cm Staffel 112,5 cm
445 1
2%
14
1
1
22
10 11
1
15 16
115
1
Freigegeben von: Entworfen von:
1
12 13 14
Dennewitzstraße
Unterzug höhe ist unterschiedlich in jederGeschoss: 1OG-5OG 66,5 cm 6OG 80,5 cm Staffel 112,5 cm
5
2 20
Innen
5
17 18 19 5 4
3
Blech
25
Putz
Außen
25 1
14
1
115
1
3
115
Hotel
Gezeichnet von:
4m
Blattgröße:
Haus 3 Haus 2
Haus 1
Parkanlage
1:10
Symbol Datum: 297x420 (A3 H) Dennewitzstraße
DEN36_05_D311.21
Maßstab:
3
0
2 20
Dennewitzstraße
Entworfen von:
Zeichnungsnummer:
25 25
Haus 1
Maßstab:
Innen
5
17 18 19 5 4
Geprüft von: Symbol
Parkanlage
0
5
Außen
Haus 3 Haus 2
Datum:
Blech Putz
15 16
14
14
445
25
2 20
DEN36 Häuser Balkonfenster D311.21
Häuser Gezeichnet - Balkonfenster von:
Symbol
25
13 14
Zeichnung:
22
12 5
28
9
17 18 19 5 4
Ausführungsplanung (LPH5) Geprüft von:
Unterzug höhe ist unterschiedlich in jederGeschoss: Entworfen von: 1OG-5OG 66,5 cm 6OG 80,5 cm Staffel 112,5 cm
6
13 14 15 16
Planungsphase:
5
12
Ausführungsplanung (L Häuser - Balkonfenster Planung: Zeichnung: Arin Burda Architekten Freigegeben von: Häuser2-9 - Balkonfens Helmholtzstraße 10587 Berlin, Deutschland Geprüft von: DEN36@arinburda.com Freigegeben von: Gezeichnet von:
12
22
10 11
4
28
7 8 9
445
28
1
9
DEN36 Häuser Balkonfenster D311.21
12
11
6
5
Putz
10 11
Planungsphase:
Zeichnung:
7
9
Helmholtzstraße 2-9 DEN36@arinburda.com
Planungsphase:
8
5
2%
Projekt:
Planung: Arin Burda Architekten Bauherr: Helmholtzstraße 2-9 Arin Burda Architekten 21 22 23 24 25 26 27Berlin, Deutschland KLARBAUHelmholtzstraße GmbH & Co. 10587 2-9 Innen DEN36@arinburda.com Berlin KG10587 Berlin, Deutschla
21 22 23 24 25 26 27
6
DEN36 Dennewitzstraße 36-44 D - 10785 Berlin
Innen Berlin KG
Innen
Putz
2 3 4 5
A
Diese Zeichnung und dieser Entwurf sin urheberrechtlich geschützt. Kein Teil dieses schriftliche Genehmigung vervielfältigt werd unterschiedlichen Skalierungen der Drucke Diese Zeichnung und dieser Entwurf sind durch Gesetze urheberrechtlich geschützt. Kein Teil dieses Plans darf ohne schriftlich vermerkten Abmessungen verwen schriftliche Genehmigung vervielfältigt werden. Aufgrund dersind auf der Baustelle zu prüfen. Diese Maße unterschiedlichen Skalierungen der Drucker dürfen nur die in Verbindung mit den Vertragsfestlegu schriftlich vermerkten Abmessungen verwendet werden. Alle diesbezüglichen Grundrissen und Zeichn Maße sind auf der Baustelle zu prüfen. Diese Zeichnung muss werden. in Verbindung mit den Vertragsfestlegungen und den Es ist nicht für die bauliche Umse solange es nicht geprüft und freigegeben wu diesbezüglichen Grundrissen und Zeichnungen gesehen
7
Die Ausführung ist den Ausführungsdetails des Herstellers anzupassen. Dämmstoffdicken und -klassen sind nach Angaben der Fachplanung auszuführen. Alle Maße sind vom GU vor Ort zu überprufen.
Innen
Haus 3 Haus 2
Haus 1
Hotel
4m
Blech
Parkanlage
Putz
Außen
Blattgröße:
5
Innen
297x4 Datum: Maßstab: 0
Zeichnungsnummer:
DEN36_05_D311.21 4m
1:10
Alle Maße sind vor Ort zu prüfen! Abweichungen sind umgehend der Bauleitung mitzuteilen.
25 20
12
Unterzug höhe ist unterschiedlich in jederGeschoss: 1OG-5OG 66,5 cm 6OG 80,5 cm Staffel 112,5 cm
445
2 21
1
3
5 4
6
A
7
445
85
55
4 8
25
1 55 25 20
4
5
445
55
85
Innen
15
14
18 19 20 5 4
Innen
Außen
Aus
Zeichn
15
Häus
16 17
B
18 19 20 5 4
14
Freige
25
115
Geprü
2 21 9 10
16 17
5
24
5
Blech Putz
16
Planu 9 10
Gezei Putz
25
Außen 1
115
Entwo
Symb
1
3
8
115
2
Blech Putz
1
25
35
1
25
1
3
Arin 16 Helm 105 DEN
25
14
Außen
5% 115
61
16 17
7
Unterzug höhe ist 185 unterschiedlich in jederGeschoss: 5% 1OG-5OG 66,5 cm 6OG 80,5 cm Staffel 112,5 cm
2
445
5 4
7
14
35
Planu
5
4
24
A
18 19 20
3
5%
13 14
25
22
18 16
16 17
115
KLA Ber Helm D-1
Blech
22
75
15
5%
6 7 8 9 10 11
25 20
9 10
61
45
25 20
1 55
38 11
65
55
12
85
25
2
Blech
5
5
Bauhe
1
12
4
175
5%
1
13 14 Putz
24
Innen
Außen
5
14
185
5%
22 23 24 25 26 27 28 29
11
3
DEN Den D-
7
Innen
6 7 8 9 2 10 11
2 21
17
5
16
Außen
18 19 20
Putz
1 2
2
5
18 19 20 5 4
22 Blech 5
5
16 17
45
3
5%
22 23242526 2728 29
7
12
55
22
7
Außen
75
115
17 Projek
4
15
25
1
61
35
1
12
2
12
65
55
14
11
85
Innen
16
3 9 10
5%
Putz
Blech
Diese urheber schriftlic untersch schriftlic Maße s in Ver 24 diesbez werden. Putz solange
1
Blech
175
7
2 21
17
65
1 55
12
65
11
45
22 5 4
Unterzug höhe ist unterschiedlich in jederGeschoss: 1OG-5OG 66,5 cm2728 29 22 23242526 6OG 80,5 cm Staffel 112,5 cm
17
25
1 55
18 19 20
25 20
18
6 7 8 9 10 11
16 17
2
Putz
445
38
5
15
25
13 14
24
12
6
15
18
Außen
5%
16
4
38
A
Innen 75
Außen
2 3
9 10
B
6 7 8 9 10 11
25
11
85
55
1 55 25 20
6 7 8 9 10 11
9 10
Putz
185
7
5%
1
2 21
A
5
5
5%
6
DEN36 Häuser Französischesfenster I D311.19
Blech
5%
2
12
B
22 23 24
4
175
7
17
3
Blech 6
12
2
22 23242526 2728 29
5
Putz
1 17
45
12
4
26 Verlegenoppenmatte mit Fußbodenheizung
e Ausführung ist den Ausführungsdetails des rstellers anzupassen. mmstoffdicken und -klassen sind nach A gaben der Fachplanung auszuführen. e Maße sind vom GU vor Ort zu überprufen.
Außen
Putz
1 2 3
Revisionsöffnung Sonnenschutz (vor dem Fenster Verdichtung der 1 2 Putzabschlußprofil Heizschleifen) 3 Haltwinkel für die Markisolettenschiene 27 Trittschaldämmung 4 Holzleiste 5 28 Stahlbodendecke Randdämmstreifen 29 Spachtlung + Anstricht A B 6 Zweischicht Stabparkett 13mm auf 7 8 Verklebung 2 mm 9 Die Ausführung ist den Ausführungsdetails des 10 Zementheizestrich 11 Herstellers anzupassen. DEN36 Verlegenoppenmatte mit Fußbodenheizung Häuser Dämmstoffdicken und -klassen sind nach (vor dem Fenster Verdichtung der Französischesfenster I izschleifen) D311.19 Angaben der Fachplanung auszuführen. A B Trittschaldämmung Alle Maße sind vom GU vor Ort zu überprufen. Stahlbodendecke Spachtlung + Anstricht 1 55
Innen
Außen
85
1 Stahlgeländer 2 Sonnenschutzmarkisolettenschiene 3 Dreifachverglasung 4 Fensterflügel 5 Fensterrahmen 6 Fensterprofilverlängerung 7 vorgefertigtes Formteil 8 Dämmstreifen 035 25 mm Alle Maße sind vor Ort zu prüfen! 9 Neoprenstreifen Abweichungen sind umgehend der Bauleitung mitzuteilen. 10 Konsole gemäß Statik 1 Dämmung Stahlgeländer 11 035 160 mm 2 Insektenschutzgitter Sonnenschutzmarkisolettenschiene 12 3 Stahlschwert Dreifachverglasung 13 zur Geländerbefestigung 14 4 Kompriband Fensterflügel 15 10 mm 5 Aussenputz Fensterrahmen 16 6 Putzträger Fensterprofilverlängerung 17 7 Sonnenschutzmarkisolettenkasten vorgefertigtes Formteil 18 035 30035 mm25 mm 8 Dämmung Dämmstreifen Revisionsöffnung Sonnenschutz e sind vor Ort zu prüfen! 19 9 Neoprenstreifen ngen sind umgehend der 20 Bauleitung mitzuteilen. Putzabschlußprofil 10 Haltwinkel Konsole gemäß Statik 21 für die Markisolettenschiene Stahlgeländer 11 Dämmung 035 160 mm 22 Holzleiste Sonnenschutzmarkisolettenschiene 12 Randdämmstreifen Insektenschutzgitter 23 Dreifachverglasung 13 Stahlschwert zur Geländerbefestigung 24 Zweischicht Stabparkett 13mm auf Fensterflügel 14Verklebung Kompriband 2 mm Fensterrahmen 15 Zementheizestrich Aussenputz 10 mm 25 Fensterprofilverlängerung 26 mit Fußbodenheizung 16 Verlegenoppenmatte Putzträger vorgefertigtes Formteil(vor dem Fenster Verdichtung der 17 Sonnenschutzmarkisolettenkasten Dämmstreifen 035 Heizschleifen) 25 mm 18 Dämmung 035 30 mm Neoprenstreifen 27 19Trittschaldämmung Revisionsöffnung Sonnenschutz Konsole gemäß Statik 28 20Stahlbodendecke Putzabschlußprofil Dämmung 035 16029 mm Spachtlung + Anstricht 21 Haltwinkel für die Markisolettenschiene Insektenschutzgitter 22 Holzleiste Stahlschwert zur Geländerbefestigung Die Ausführung ist den Ausführungsdetails des 23 Randdämmstreifen Kompriband Außen Herstellers anzupassen. 24 Zweischicht Stabparkett 13mm auf Aussenputz 10 mmDämmstoffdicken und -klassen sind nach Verklebung 2 mm Putzträger Angaben der Fachplanung auszuführen. Sonnenschutzmarkisolettenkasten 25 Zementheizestrich Alle Maße sind vom GU vor Ort zu überprufen. Dämmung 035 30 mm
2 21
Blech Putz
5
Innen
Außen
B
Datum
Maßst 0
Blattg
chesfenster I
A
B
A
Zeichn
B
DE
15
26
+1 +1 ,9 0 O ,90 O K K M AU MAU E ER PA R PA R RK SE KSE ITIG ITIG
26
Brücke
3,75
26
3,75
Brücke
3,75
2
-0,5 -0,5 0O 0O KG KG EL EL ÄN ÄN DE DE 116° GAR GAR TE TE N N
C C
m m ,19 53,19 153 1
-0,50 (35,00) OK GELÄNDE GARTEN
3,75
-0,50 OK GELÄNDE GARTEN
2
-0,50 (35,00) OK GELÄNDE GARTEN
G x 18 ,65 26 9x x 18 ,65
Zimmer
26
DN 100
26
DN 100
DN 75
+1,0 +1,0 0 OK 0 OK GE G LÄ ELÄ ND N E P DE P AR AR K K
DN 75
DN 100
17
16
DN 100
DN 75
Zimmer
9x
17
16
14
15
14
13
DN 75
Zimmer
G
G
DIN 100 RR DIN 75 RR DIN 100 RR DIN 75 RR 15
13
11
8
12
7
11
8
6
12
7
5
10
6
10
5
4
9
4
3
9
3
A A
G
B B
DIN 100 RR DIN 75 RR DIN 100 RR DIN 75 RR
-0,5 -0,5 0 (3 0 (3 5,0 5,0 0 ) O 0) O KG KG EL E ÄN LÄN DE D GA E GA RT R EN TEN
DIN 100 RR DIN 75 RR DIN 100 RR DIN 75 RR
Zimmer
A A Zimmer
116°
-0,50 OK GELÄNDE GARTEN
PARKSEITIG RAMPE (HÖHE VARIIERT)
Zimmer
HEB #1 79
+1,90 OK MAUER PARKSEITIG
34,185
15,50
PARKSEITIG RAMPE (HÖHE VARIIERT)
34,185
15,50 14
15
16
13
14
15
16
DIMENSIONIERUNG RIGOLE ENTSPRECHEND SIWAH PLAN DIMENSIONIERUNG RIGOLE ENTSPRECHEND SIWAH PLAN
17
13
11
12
17
11
10
9
8
7
6
5
4
3
12
10
9
8
7
6
5
4
3
DIMENSIONIERUNG RIGOLE ENTSPRECHEND SIWAH PLAN DIMENSIONIERUNG RIGOLE ENTSPRECHEND SIWAH PLAN
HEB #1 79
+1,90 OK MAUER PARKSEITIG
C C
B B GRUNDRISS SÜD M 1:100
SCHNITT S
GRUNDRISS SÜD M 1:100
SCHNITT S
16
17
15
16
17
10
15
9
14
10
8
14
9
7
13
8
6
13
7
5
11
6
12
5
4
11
4
3
12
3
+2,53 (38,53) OK METALLZAUN 3 cm GEFÄLLE (3°) +2,53 (38,53) AUSSEN nach INNEN OK METALLZAUN 3 cm GEFÄLLE (3°) GRUNDSTÜCKSGRENZE AUSSEN +1,90 OK nach INNEN
25 20
0,0 (36,00)
60
25
3
VERBAUWAND MIT BETON VERFÜLLT
5
2,00
2,00
9
FUGE
10
ANSTIEG RAMPE PARKSEITIG
SCHNITT B-B M 1:50 3,99
3,265
1,70
14
12
32
50 15
2
2cm GEFÄLLE DIMENSIONIERUNG +1,90 RIGOLE AUSSEN NACH (37,90) INNEN (3°) ENTSPRECHEND SIWAH PLAN DIMENSIONIERUNG RIGOLE ENTSPRECHEND SIWAH PLAN
DETAIL SCH
Vorgaben Zaun entsprechend LOIDL "Flottwellpromenade Freinalagen BF N Planung vom 5.6.2013 Planzeichenlegende:
3 5
35 2cm GEFÄLLE AUSSEN NACH INNEN (3°)
+1,88 (37,88)
-0,30 OK GELÄNDE ACHSE P - X
DETAIL SCH
Alle Stahlteile DB 701 pulverbeschichtet. Ab 10cm OKG Ausführung der Mauer Hersteller Zaunanlage Metalco Elsner in Gm Sichtbeton Statik. Berlin Modelgem.Vorgaben "Discreto variant".
METALLZAUN DOPPELPFOSTEN 80/20 QUERRIEGEL 40/20 FÜLLSTAB 30/15
8 5
Wenn nicht anders angegeben: Ausführungsplanung: 1 - Füllstab Rechteckrohr 30/15 mm mit Die vorliegende Ausführungsplanung ist e Querriegel verschweißt, l=900 mm Ausführungsempfehlung. 2 - Querriegel 40/20Dokument mm mit F Gemäß VertragFlachstahl sind sämtliche und Pfosten verschweißt, l=1980 mm Leistungsphase 5 durch den GU zu prüfe 3 - Geländerpfosten, Flachstahl 80 x 20 m verbessern und in eigener Verantwortung Flanschplatte angeschweißt, l = 1190 mm freizugeben. 4 - Flanschplatte 200 x 200 x 12 mm, 4 S Bohrungen, Befestigung an bauseitiger Höhenbezugspunkte: Betonmauer mit 4 Stk FAZ II 12730 gem. Nullpunkt Gebäudes: ±0,00 = 36,00 Vorgaben des Statik
+1,90 (37,90)
MAUERKOPF M 1:10
1,70
1,70
1,70
1,70
B
FUGE - MITTIG ZWISCHEN HEB
HEB #188
HEB #187
14
30 10 4
15
HEB #186
HEB #185
SCHNITT C1-C1 M 1:50 8,48
SCHNITT M 1:50 3,87C-C 5
1,70
Blitzschutz: Alle Stahlteile DB 701 pulverbeschichtet. Planung, undMetalco Einbau Elsner erfolgt du HerstellerLieferung Zaunanlage Gm Generalunternehmer Berlin Model "Discreto variant".
1,70 116°
30
14
ABSTAND INNERER KNICKPUNKT MAUER - ACHSE 17
1,70
AUSSENKANTE MAUER ÜBER FUGE BELÜFTUNG GARAGE
+1,90 OK MAUER PARKSEITIG
10
13
32
30
-0,50 OK GELÄNDE GARTEN 1,70 1,70
B
FUGE
11
4,00
+1,00 OK PARKEBENE
-0,50 OK GARTEN
2,01
GRUNDSTÜCKS GRENZE
30 30 10 4
148°
Wenn nicht anders angegeben: 1 - Füllstab Rechteckrohr 30/15 mm mit Querriegel verschweißt, l=900 mm 2 - Querriegel Flachstahl 40/20 mm mit F und Pfosten verschweißt, l=1980 mm 3 - Geländerpfosten, Flachstahl 80 x 20 m Flanschplatte angeschweißt, l = 1190 mm 4 - Flanschplatte 200 x 200 x 12 mm, 4 S Bohrungen, Befestigung an bauseitiger Betonmauer mit 4 Stk FAZ II 12730 gem. Vorgaben Statik
1,90
1,70
HEB #191
HEB #192
FUGE
+1,07 OK MAUER PARKSEITIG
A
FUGE - MITTIG ZWISCHEN HEB
HEB #184
HEB #183
16
HEB #182
SCHNITT C2-C2 M 1:50
GRUNDSTÜCKSGRENZE
17
Grundleitungen: Planung, Lieferung und Einbau erfolgt du Planzeichenlegende: Generalunternehmer
5
HEB #181
HEB #180
Ausführungsplanung: Haustechnik: Die vorliegende Ausführungsplanung ist e Werkplanung, Lieferung und Einbau erfolg Ausführungsempfehlung. den Generalunternehmer Gemäß Vertrag sind sämtliche Dokument Leistungsphase 5 durch den GU zu prüfe verbessern und sind in eigener Alle Maße vorVerantwortung Ort zu prü freizugeben. Abweichungen sind umgehen
HEB #179
MAUERKOPF M 1:10 9,73
ANSTIEG RAMPE PARKSEITIG
2,00
FUGE
FUGE 90
9
10
ANSTIEG RAMPE PARKSEITIG 3,99
+1,07 OK MAUER (37,07) PARKSEITIG
11
12
1,705 2,01 48
13
14
FUGE - MITTIG ZWISCHEN HEB
HEB #188
3,875
4,00
1,70
1,70
1,70
1,70
HEB #187
15
1,70
1,70
HEB #186
HEB #185
1,70
FUGE - MITTIG ZWISCHEN HEB
HEB #184
1,70
FUGE 1,70
B MAUER PARKSEITIG HEB +1,90H EOK
16
#183
ANSTIEG RAMPE PARKSEITIG FUGE
FUGE
17
#182
GRUNDSTÜCKSGRENZE
8,48 120°
1,70
FUGE
GRUNDRISS OST 1 M 1:50
+0,00 (36,00) -0,50 GARTEN +2,53OK OK GELÄNDE METALLZAUN
+0,00 (36,00)
KNICK GRUNDSTÜCKSGRENZE 1,70
HEB #180
-0,50 +2,53OK OK GARTEN METALLZAUN
HEB #173
+1,18 FUGE (37,18)
1,70 97
1,82
13
9 x 26 x 18,65
B
2,79
1,48
14
C2
3,85
82
96
1,48
97
1,82
50 FUGE
3,35
H
ÖFFNUNG
FUGE KANTE MAUER
1,00
C1
C2
GARTENTRENNUNGSMAUER
-0,90 OK ROHBAU DECKE UG 4,20
15
1,67
16
2,60
4,30
L
M
GARTENTRENNUNGSMAUER
MAUER ZUM HAUS 2
4,07 ABSTAND INNERER KNICKPUNKT MAUER - ACHSE 17
+1,90 OK MAUER PARKSEITIG FUGE
17
28
+1,00 OK GELÄNDE PARK
FUGE
4,25
2,015
1,75
N O
P
GARTENTRENNUNGSMAUER
9 x 26 x 18,65NOTFLUCHTTÜR
3,85
82
I
2,01
FUGE
Q
1,67 FUGE
NOTFLUCHTTÜR
2,60
L
GARTENGARTENTRENNUNGSTRENNUNGS+2,53 OK METALLZAUN MAUER MAUER
-0,90 OK ROHBAU DECKE UG
FUGE
K
J
GARTENTRENNUNGSMAUER
+1,90 OK MAUER PARKSEITIG FUGE
FUGE
4,30
M
+1,00 OK GELÄNDE PARK
4,645
4,435
MAUER ZUM HAUS 2
FUGE
+1,90 OK MAUER PARKSEITIG
FUGE28
4,25
FUGE
N O
+1,00 OK GELÄNDE PARK
5
1,75
P
2,01
+0,00 (36,00)
4,395
-0,50 GARTEN +2,53OK OK GELÄNDE METALLZAUN
Q
20.7.2018, Fugen
Projekt:
-0,50 OK GARTEN
1,00
1,33
NOTFLUCHTTÜR KANTE MAUER
HEB #180
HEB #181
-0,50 OK GELÄNDE GARTEN
LÜFTUNGSSCHACHT C2
C2
GARTENTRENNUNGSMAUER FUGE
K
J
FUGE
+1,90 OK MAUER PARKSEITIG
HEB #182
HEB #183
4,30
FUGE
2,01
I 5
GARTENTRENNUNGSMAUER
9 87
LÜFTUNGSSCHACHT 1,38 63
ABSTAND FUGEN
C
90
HEB #179
HEB #184
-0,50 OKOKG GELÄNDE GARTEN VERBAUTRÄGER #179 -197 SIND AUF -0,10m RAMPE ZU KÜRZEN
C2
C2
+1,00 OK GELÄNDE PARK
17
16
d
Diese Zeichnung und dieser Entwurf sind dur urheberrechtlich geschützt. Kein Teil dieses Plan schriftliche Genehmigung vervielfältigt werden. A unterschiedlichen Skalierungen der Drucker dür schriftlich vermerkten Abmessungen verwendet w Maße sind auf der Baustelle zu prüfen. Diese Zeich in Verbindung mit den Vertragsfestlegungen diesbezüglichen Grundrissen und Zeichnunge werden. Es ist nicht für die bauliche Umsetzung solange es nicht geprüft und freigegeben wurde.
ANSTIEG RAMPE
25
1,70 1,48
H
-0,90C1 OK ROHBAU DECKE UG
1,33
+1,90 OK MAUER PARKSEITIG +1,00 OK GELÄNDE PARK
ABSTAND INNERER KNICKPUNKT MAUER - ACHSE 17
FUGE
HEB #185
HEB #186
HEB #187 1,00
35
12
C1
G
HEB #174
4,07
50
14
1,55
HEB #175
4,20
15
HEB #188
-0,50 OK GELÄNDE GARTEN
C1
4,30 FUGE
3
3
1,55
1,48
DEN36 Dennewitzstraße 36-44 D - 10785 Berlin Bauherr:
KLARBAU GmbH & Co. Berlin KG Helmholtzstraße 2-9 D-10587 Berlin
Diese Zeichnung und dieser Entwurf sind dur urheberrechtlich geschützt. Kein Teil dieses Plan schriftliche Genehmigung vervielfältigt werden. A unterschiedlichen Skalierungen der Drucker dür schriftlich vermerkten Abmessungen verwendet w Maße sind auf der Baustelle zu prüfen. Diese Zeich Planung: in Verbindung mit den Vertragsfestlegungen diesbezüglichen Grundrissen und Zeichnunge werden. Es ist nicht für die bauliche Umsetzung solange es nicht geprüft und freigegeben wurde.
Arin Burda Architekten Helmholtzstraße 2-9
10587 Berlin, Deutschland Projekt: DEN36@arinburda.com DEN36 Planungsphase: Dennewitzstraße 36-44
Ausführungsplanung (LPH D - 10785 Berlin Zeichnung: Bauherr:
Fassade - & Co. KLARBAUEG GmbH Berlin KG Umfassungsmauer_Bla Helmholtzstraße 2-9 Freigegeben von: D-10587 Berlin
Geprüft von: Planung:
Z
1,70
Arin Burda Architekten
AB
HEB #181
Gezeichnet von: Helmholtzstraße 2-9
10587 Berlin, Deutschland hf DEN36@arinburda.com
Entworfen von: Planungsphase:
R
1,70
15
+1,00 OK GELÄNDE PARK HEB HEB #177 #176
HEB #182
2,20
1,55
HEB #174
+1,00 OK GELÄNDE7,63 PARK HEB #178
1,70
HEB #183
90
1,55
HEB C
FUGE#175
72
1,40
11
25
10
55
NOTFLUCHTTÜR
FUGE
HEB #176
1,70
HEB #184
ANSTIEG RAMPE
HEB #189
FUGE
3,35
+1,00 OK GELÄNDE PARK
18
3
82
4,60 15 GARTENTRENNUNGSMAUER
1,00
9 x 26 x 18,65
2,79 FUGE
14
15
CC
B
9 87
35
1,82
+1,90 OK MAUER PARKSEITIG
16
C1
C1
1,33
FUGE
1,27
97
80
HEB #177
1,70
HEB #185
+0,00 (36,00)
965 HEB #190
5
+1,90 OK MAUER PARKSEITIG
1,70
OK MAUER PARKSEITIG VERBAUTRÄGER #179 -197 SIND AUF +1,90 -0,10m OKG RAMPE ZU KÜRZEN
63
13
2,00 2,00 4,605 15 HEB GARTENTRENNUNGSMAUER #191
+1,90 OK MAUER PARKSEITIG
G
+2,53 OK METALLZAUN
HEB #178
HEB #186
63
63 35
GRUNDRISS OST 1 M 1:50
HEB #179
1,70
HEB #187
FUGE
-0,90 OK ROHBAU DECKE UG 3,03 1,27 6,01
HEB KANTE #173 AUSSENWAND UG
-0,50 OK GELÄNDE GARTEN
1,70
HEB #188
18
HEB #174 1,55
+1,00 OK GELÄNDE PARK
116°
1,70 1,70
+2,53 OK METALLZAUN
-0,50 OK GELÄNDE GARTEN
10
HEB C #175 1,55
HEB #192
35
10
55
HEB #176 1,55 7,63
B
HEB #189
72
2,00
B H E 1,00 #193
9 HEB #177
1,55
12
50
2,00 1,82
4,30
A
8 HEB #178 1,40
48
ANSTIEG RAMPE
35
3
ANSICHT SÜD M 1:50
90
120° 1,38
82
50
97
C
HEB #194
1,27
11
1,57 80
HEB #195
FUGE
HEB #190
FUGE
14
7
HEB #179
4,27 +1,90 OK MAUER PARKSEITIG
6,01
10 FUGE
KANTE ANSTIEG RAMPE AUSSENWAND UG
1,27
20
6
1,425
1,705 1,70
2,00 2,00
HEB #191
3,03
9 x 26 x 18,65
585
Alle Maße sind vor Ort zu prü Abweichungen sind umgehen Bauleitung mitzuteilen!
OST 2 ANSCHLUSS ANSCHLUSS SIEHE SIEHE ANSICHT GRUNDRISS OST 2 OSTANSCHLUSS 2 SIEHE GRUNDRISS OST 2
HEB #192
9
HEB #196 -0,50 OK GELÄNDE GARTEN
116°
2,00 2,00
HEB #193
+0,00 (36,00) -0,50 OK GELÄNDE GARTEN
HEB #197
Haustechnik: Werkplanung, Lieferung und Einbau erfolg d Generalunternehmer 20.7.2018, Fugen den
+1,00 OK GELÄNDE PARK
HEB #179
ANSTIEG RAMPE
60
2,00 2,00
4,30
FUGE
60°
ANSICHT SÜD M 1:50 BEGINN RAMPE
2,00 2,00
HEB #194
A
8
+1,90 OK MAUER PARKSEITIG
1,53
+1,90 HEB #195 (37,90) +1,07 OK MAUER (37,07) PARKSEITIG 4,27
1,425
7
6
2,00ANSTIEG RAMPE
2,00 GARTEN -0,50 OK GELÄNDE
HEB #196
A
FUGE ANSTIEG RAMPE
35
20
2,00
585
Grundleitungen: Planung, Lieferung und Einbau erfolgt du Generalunternehmer
+2,53 OK METALLZAUN HEB #179
3
FUGE 1,57
FUGE
+0,00 (36,00)
HEB 54 #197
HEB #180
ANSTIEG RAMPE
FUGE
60°
885
1,70
HEB #181
9,73
GRUNDRISS SÜD M 1:50
KNICKPUNKT GRUNDSTÜCKSBEGINN GRENZE RAMPE
Blitzschutz: Planung, Lieferung und Einbau erfolgt du Generalunternehmer
1,70
KNICK GRUNDSTÜCKSGRENZE
+2,53 OK METALLZAUN 1,70 1,70 +1,90 OK MAUER PARKSEITIG
B
1,70
116°
1,70
63
ABSTAND INNERER KNICKPUNKT MAUER - ACHSE 17
1,70
60
2,00
Bauleitung mitzuteilen! Höhenbezugspunkte: Nullpunkt des Gebäudes: ±0,00 = 36,00
-0,50 OK GELÄNDE GARTEN 1,70 1,70
B B
3
2,00
FUGE
1,70
1,53
3,265
2,00
1,70
20
8 885
2,00 +1,07 OK MAUER PARKSEITIG
+1,90 GRUNDSTÜCKS GRENZE (37,90)
2,00 HEB #191
90
2,00
A A
54
2,00 HEB #192
3
885
HEB 2,00 #196 FUGE
2,00 HEB #193
3
25 30
HEB #197
2,00
HEB #194
HEB #195
HEB #190
KNICKPUNKT GRUNDSTÜCKSGRENZE
-0,50 OK GELÄNDE GARTEN 2,00
2,00
A
HEB #189
GRUNDRISS SÜD M 1:50 2,00 1,15
VO
SCHNITT A-A M88 1:50
2,00 HEB
VERBAUWAND MIT #193 BETON VERFÜLLT
24
SCHNITT C2-C2 M 1:50
-0,50 OK GARTEN
30
VERBAUWAND
8
2,00
HEB #194
RIGOLE
+0,70 OK GELÄNDE ÜBER TG
-0,30 OK GELÄNDE ACHSE P - X
-0,50 OK GARTENEBENE
1,00
25 30
40
HEB #195
HEB #196 FUGE
+1,00 OK PARKEBENE
14
SCHNITT C1-C1 M 1:50
SCHNITT C-C M 1:50
1,00
10 90
-0,50 OK GELÄNDE GARTEN 2,00
2,00
A
HEB400 PROFIL ENDET 10cm UNTER OK GARTEN
AUSSENKANTE MAUER ÜBER BELÜFTUNG GARAGE
HEB #190
2,00
HEB #197
715
25 30
50
+0,70 OK GELÄNDE ÜBER TG
2,395
+0.23 OK GELÄNDE PARK, VARIIERT
40
GRENZE +1,90 OK MAUER PARKSEITIG
15
+1,00 OK PARKEBENE
10
HEB #189
1,15
RIGOLE
88
125 14
1,495
10
14
8
Ab 10cm OKG Ausführung der Mauer in Sichtbeton gem.Vorgaben Statik.
Vorgaben Zaun entsprechend LOIDL "Flottwellpromenade Freinalagen BF N Planung vom 5.6.2013
35
+1,88 (37,88)
125 30
GELÄNDEANSTIEG
(35,50) -0,50 (35,50)
35
+1,90 OK MAUER PARKSEITIG
715
90
+1,00 OK GELÄNDE PARK
13 77
+0,00 (36,00)
1,90
90 1,495
1,00
96
SCHNITT B-B M 1:50
-0.25 OK GELÄNDE PARK
-0,50 OK GARTEN
VERBAUWAND MIT BETON VERFÜLLT
3,03
A-A M 1:50
-0,30 OK GELÄNDE ACHSE P-X GARTEN
GRUNDSTÜCKS GRENZE
8
AUSSENKANTE MAUER ÜBER BELÜFTUNG GARAGE
DIN 100 RR DIN 75 RR DIN 100PARK RR DIN 75 RR GRUNDSTÜCKS 148°
PARK 14
88
3 90
2,395
90 77 1,00 60
60 6 29
+1,90 OK MAUER PARKSEITIG
35
VERBAUWAND MIT BETON VERFÜLLT
3
30
60 6 29 3,03
3 1,57
10
63
90
80 3
3,03
1,57
-0,50 2cm GEFÄLLE (3°) OK GARTEN AUSSEN nach INNEN
+1,00 OK PARKEBENE
17
30
94 45
Haus 3
30
VERBAUWAND MIT BETON VERFÜLLT
METALLZAUN DOPPELPFOSTEN 80/20 QUERRIEGEL 40/20 FÜLLSTAB 30/15
8 5
24
17
-0,30 OK GELÄNDE ACHSE P-X GARTEN
+0,70 OK GELÄNDE ÜBER TG
16
20
GRUNDSTÜCKS GRENZE +1,90 OK MAUER PARKSEITIG
16
AUSSENKANTE BELÜFTUNGSSCHACHT
SPIELPLATZ NACHBARGRUNDSTÜCK
Haus 3
+1,00 OK PARKEBENE
15
24
15
55
8 25
VERBAUWAND GELÄNDEANSTIEG
5
14
8
14
40 1
8
+1,07 (37,07)
+1,90 OK MAUER PARKSEITIG
14
13
35
8
13
GRUNDSTÜCKSGRENZE +1,90 OK MAUER PARKSEITIG
1,12
43
-0,50 OK 3cm GEFÄLLE (3°) GARTENEBENE AUSSEN nach INNEN
13
35
RIGOLE
DIN 100 RR DIN 75 RR DIN 100 RRPARK DIN 75 RR GRUNDSTÜCKS GRENZE
GARTEN
+0,70 OK GELÄNDE ÜBER TG
11
HÖHE STÜTZWAND 2cm GEFÄLLE (3°) SPIELPLATZ NACHBARAUSSEN nach INNEN GRUNDSTÜCK HEB400 PROFIL ENDET 10cm UNTER +1,07 +1,00 OK OK GARTEN (37,07) GELÄNDE PARK VERBAUWAND MIT BETON VERFÜLLT
+1,00 OK PARKEBENE
12
55
9
1
8
RIGOLE
SCHNITT SÜD A-A M 1:100
11
13
7
8
40
6
10
12
DIN 100 RR GELÄNDEANSTIEG +0.23 OK GELÄNDE PARK, DIN 75 RR VARIIERT DIN 100 RR 3 cm GEFÄLLE (3°) AUSSEN nach INNEN DIN 75 RR
5
GRUNDSTÜCKSGRENZE
SCHNITT SÜD A-A M 1:100 DEN36 +1,07 (37,07) Fassade EG Süd Rigole DEN36 D210.16 Fassade EG Süd Rigole SCHNITT D210.16 -0,50
RIGOLE
GRUNDSTÜCKS GRENZE
AUSSENKANTE MAUER ÜBER BELÜFTUNG GARAGE
10
30
4
3
+0,00 (36,00) +2,53-0,50 (38,53) (35,50) OK METALLZAUN
96
10
20
-0.25 OK GELÄNDE PARK
2cm GEFÄLLE (3°) AUSSEN nach INNEN
+1,90 OK MAUER PARKSEITIG
9
GELÄNDEANSTIEG
8
5
+1,00 OK GELÄNDE PARK
7
25
6
4
1
8
-0,50 +2,53 (38,53) (35,50) OK METALLZAUN PARKSEITE
AUSSENKANTE BELÜFTUNGSSCHACHT
SPIELPLATZ NACHBARGRUNDSTÜCK
8
5
+1,07 (37,07)
+1,90 OK MAUER PARKSEITIG
-1,00 (35,00) OK RIGOLE
PARK
GARTEN
14
63
55
35
63
1
45
2
8
63 80
+1,00 OK GELÄNDE PARK
3
3,03
13
PARK
94
RIGOLE
GRUNDSTÜCKS GRENZE
50 50
HÖHE STÜTZWAND SPIELPLATZ NACHBARGRUNDSTÜCK +1,07 (37,07)
2cm GEFÄLLE (3°) AUSSEN nach INNEN
35
GARTEN
24
+1,00 OK 0,0 (36,00) -0,50 OK GELÄNDER PARK -1,00 (35,00) OK 0,0 (36,00) -0,50RIGOLE OK
485
GRUNDSTÜCKSGRENZE
+1,07 (37,07)
55
3cm GEFÄLLE (3°) AUSSEN nach INNEN
AUSSEN nach INNEN GRUNDSTÜCKSGRENZE
RIGOLE -1,00 (35,00)
PARK
1,12 43
RIGOLE 3 cm GEFÄLLE (3°) +2,53 (38,53) OK METALLZAUN
13
MAUER PARKSEITIG GRUNDSTÜCKSGRENZE +1,90 OK +1,00 OKPARKSEITIG MAUER GELÄNDER PARK
50 50
GARTEN
+2,53 (38,53) OK METALLZAUN PARKSEITE
RIGOLE -1,00 (35,00)
505 48
RIGOLE
-1,00 (35,00)
20
-0,50 (35,50)
-1,00 (35,00) -0,50 (35,50)
50
-0,83 (35,17)
-1,00 (35,00) 0,0 (36,00)
30
25
-0,50 (35,50)
-0,50 (35,50) -1,00 (35,00)
13
50
0,0 (36,00) -0,83 (35,17) 0,0 (36,00)
30
Ausführungsplanung (LPH
Symbol Zeichnung:
DENNEWITZSTRASSE
Fassade EG Umfassungsmauer_Bla 1 2 3 Freigegeben von:
LE PLAN
UK RIGOLE ENTSPRECHEND SIWAH PLAN a 26
,00 OK ELÄNDER PARK
0,0 (36,00) ÖHE 50 OK VARIIERT)
10
40 40
8
HEB #1 79
-0,50 (+35,50 üNN) OK GELÄNDE +1,90 OK MAUER PARKSEITIG GARTEN 34,185
-1,00 (35,00) OK RIGOLE
Arin Burda Architekten Helmholtzstraße 2-9 10587 Berlin, Deutschland DEN36@arinburda.com
GARTEN
-0,50 (35,50)
Rigole S
-1,00 (35,00)
30
13
GELÄNDEANSTIEG +0.23 OK GELÄNDE PARK, VARIIERT
EG
Planungsphase:
-1,50 (34,50)
Ausführungsplanung (LPH5)
VERBAUWAND MIT BETON VERFÜLLT
Zeichnung:
Fassade EG - Süd Rigole Terrasse
Zimmer
Freigegeben von: Geprüft von:
-2,70 (33,30)
UG
Gezeichnet von:
x 18 ,65
26
9x
17
16
15
14
50
1
2
3
UK RIGOLE ENTSPRECHEND SIWAH PLAN
H
a
B
LE PLAN
+1,00 OK GELÄNDE PARK
25
VO
50
13
11
12
-1,50 OK
SPIELPLATZ NACHBARGRUNDSTÜCK
Symbol
DIMENSIONIERUNG RIGOLE ENTSPRECHEND SIWAH PLAN
C
+1,90 OK MAUER PARKSEITIG
20
+0,00 (36,00)
Entworfen von:
-1,00 OK
Brücke
Planung:
jpb
RBAUWAND MIT TON VERFÜLLT
+1,07 (37,07)
KLARBAU GmbH & Co. Zimmer Berlin KG Helmholtzstraße 2-9 D-10587 Berlin
ZU G
26
116°
-0,50 OK GELÄNDE GARTEN
GRUNDSTÜCKSGRENZE
55
3,03
RUNDSTÜCKSGRENZE ,90 OK AUER PARKSEITIG
1
29
A
2
cm GEFÄLLE (3°) USSEN nach INNEN
VERBUNDBOHLEN SIND BIS AUF MIND. 1m UNTER GOK ZU ZIEHEN
GAR TE N
m ,19 153
10
-0,5 0O KG EL ÄN DE
C
+2,53 (38,53) OK METALLZAUN
+0,98 (36,98) OK RAMPE (VARIIERT)
3,75
Bauherr:
+1,0 0O K
5 50
GE LÄ ND EP AR K
Brücke
+0,98 (36,98) OK VERBAUWAND (VARIIERT)
DEN36 Dennewitzstraße 36-44 D - 10785 Berlin
6
DN 75
8
Projekt: 60
OK GE LÄ ND EG AR TE N 92
3
DN 100
1.OG
3 cm GEFÄLLE (3°) AUSSEN nach INNEN
+2,53 (38,53) OK METALLZAUN
R AB
-0,5 0 (3 5,0 0)
60
17
16
15
14
13
11
12
3cm GEFÄLLE AUSSEN NACH INNEN (3°)
Zimmer
Diese Zeichnung und dieser Entwurf sind durch Gesetze urheberrechtlich geschützt. Kein Teil dieses Plans darf ohne schriftliche Genehmigung vervielfältigt werden. Aufgrund der unterschiedlichen Skalierungen der Drucker dürfen nur die schriftlich vermerkten Abmessungen verwendet werden. Alle Maße sind auf der Baustelle zu prüfen. Diese Zeichnung muss in Verbindung mit den Vertragsfestlegungen und den diesbezüglichen Grundrissen und Zeichnungen gesehen werden. Es ist nicht für die bauliche Umsetzung zugelassen solange es nicht geprüft und freigegeben wurde.
G
G
55
1
8
DIN 100 RR DIN 75 RR
PA RK SE ITIG
B
a
+1,9 0O KM AU ER
SCHNITT SÜD B-B M 1:50
PARK
Datum: Maßstab: 4m 1:100, 1:20,
0
DETAIL SCHNITT C-C SÜD M 1:20
Blattgröße:
SCHNITT1:50 SÜD B-B M 1:50 910x594 (A1+ Q)
Zeichnungsnummer:
55
3 92 10
+2,53 (38,53) OK METALLZAUN 3 cm GEFÄLLE (3°) AUSSEN nach INNEN GRUNDSTÜCKSGRENZE +1,90 OK MAUER PARKSEITIG
50
0,0 (36,00)
-0,50 (35,50)
-1,00 (35,00)
-1,00 (35,00)
+1,00 OK GELÄNDER PARK 0,0 (36,00)
-0,50 OK -1,00 (35,00) OK RIGOLE
-1,00 OK
8
Planung:
Arin Burda Architekten Helmholtzstraße 2-9 10587 Berlin, Deutschland DEN36@arinburda.com Planungsphase:
Ausführungsplanung (LPH5) Zeichnung:
Fassade EG - Süd Rigole Freigegeben von: Geprüft von: Gezeichnet von: Entworfen von:
50
1
-1,50 OK
17
16
15
14
13
11
12
DIN 100 RR DIN 75 RR
40 40
KLARBAU GmbH & Co. Berlin KG Helmholtzstraße 2-9 D-10587 Berlin
Symbol
VERBAUWAND MIT BETON VERFÜLLT
Haus 3
10
DEN36 Dennewitzstraße 36-44 D - 10785 Berlin Bauherr:
jpb
50
RIGOLE
13
485
RIGOLE
50
-0,50 (35,50)
30
VERBUNDBOHLEN SIND BIS AUF MIND. 1m UNTER GOK ZU ZIEHEN
Projekt:
VO
25 20
-0,50 (+35,50 üNN) OK GELÄNDE GARTEN
+0,98 (36,98) OK RAMPE (VARIIERT)
Diese Zeichnung und dieser Entwurf sind durch Gesetze urheberrechtlich geschützt. Kein Teil dieses Plans darf ohne schriftliche Genehmigung vervielfältigt werden. Aufgrund der unterschiedlichen Skalierungen der Drucker dürfen nur die schriftlich vermerkten Abmessungen verwendet werden. Alle Maße sind auf der Baustelle zu prüfen. Diese Zeichnung muss in Verbindung mit den Vertragsfestlegungen und den diesbezüglichen Grundrissen und Zeichnungen gesehen werden. Es ist nicht für die bauliche Umsetzung zugelassen solange es nicht geprüft und freigegeben wurde.
G
60
17
16
15
14
13
11
12
5 50
+0,98 (36,98) OK VERBAUWAND (VARIIERT)
3cm GEFÄLLE AUSSEN NACH INNEN (3°)
ZU
1
8
AB
a
R
DEN36_05_D210.16
2
3
H
PARK
DIMENSIONIERUNG RIGOLE ENTSPRECHEND SIWAH PLAN
Datum: Maßstab: 4m 1:100, 1:20, 1:50
0
DETAIL SCHNITT C-C SÜD M 1:20
Blattgröße:
910x594 (A1+ Q) Zeichnungsnummer:
DEN36_05_D210.16
a
17
Sebastianstrasse 16 Size: 11,200 m² Program: Residential Location: Berlin, Germany Status: Completed in 2018
A brand new residential building located in a quiet street in the center of the city. With 20 new resident apartments, the project allows resident to have a series of loggias that face the street as well as french balconies that face a back garden. I collabortated with the project architect and team members to create the construction drawings of some apartments as well as the interiors of all the bathrooms.
18
19
20
21
22
23
Wangerooge Competition Size: 18,818 m² Program: Hotel Location: Wangerooge, Germany Status: In design development
Arin Burda Architekten was invited to participate in a private competition for a new Hotel project in the northern island of Wangerooge, Germany. The competition asked for at least 280 rooms with most having a view to the beach. The design idea is to allow each room to have its own balcony with a view. The response to this idea was to implement 2 core courtyards to act as a Zen garden for the visitors. By implementing 2 entrances on each of the main site streets, visitors can access the hotel in a more comfortable way as well as reach the beach while transitioning through the hotel. As one of the main designers I was fully involved in all design stages. I collaborated with other team members to create the client presentations, all presentation drawings and renderings of the competition.
24
25
EG 1 316,91 m2
2 Zirkulation
570,93 m2
Gastronomie Versorgungsgebiet Zimmer: 50 Garten
3 751,89 m2
1
Cafe
2
Restaurant
3
Lobby
4
Shop
4 65,63 m2
1.OG Zirkulation
1
Gastronomie Zimmer: 64 198,89 m2 Terrasse
1
Restaurant
2.OG Zirkulation Zimmer: 68
26
3.OG Zirkulation Zimmer: 64
DG Zirkulation Gastronomie Versorgungsgebiet
3
Pool Terrasse
1 898,81 m2
2
1
Restaurant
2
Pool Service Räume
3
Pool
198,39 m2
UG 1
2
3
313,38 m2
422,17 m2
201,50 m2 Zirkulation Gastronomie Versorgungsgebiet
4
Zimmer: 44
156,14 m2 Garten
4 149,22 m2
1
Lagerraum
2
KĂźchen
3
Personal
4
Konferenz
5
Technik
5 357,17 m2
27
28
29
1333
N e w
Schematic Design
1333
N e w
H am pshi r e
Av e nue
H am pshi r e
Av e nue
Schematic Design
1333 New Hampshire Avenue Size: 331,000 sq. ft / 30,750 sqm Program: Office Building Location: Downtown Washington DC Status: In design development phase
FOX Architects was contacted to fully explore design ideas of re-skinning an out of date cast in place concrete building in downtown D.C. The client wanted to seek out their design options with a budget in mind. A few full concept explorations were done which later were refined. A couple design options were selected to head into the Schematic phase. I worked on numerous drawings in the Schematic phases of this project, creating the preliminary renderings of the lobby options. In collaboration with the project members, we developed various lobby plans, lobby streetscape plans, lobby sections, core plans, bathroom designs and facade skin options. The last part of the schematic phase was to design various rooftop options. I created the model and rendered the rooftop plans as well as some of the perspective renderings.
The Schematic De
phase is to identify The Schematic De requirements. The phase is to identify alternative schem requirements. The a budget pricing e alternative schem information the pr a budget pricing e in greater detail, t information the pr 1333
N e w
H a m p s h ire
in greater detail, t
A v e nue
Schematic Design
Schematic Design Process ve eA hir ps m Ha w
uset
Ne
sach
ts Av
e
D
up
ont
Mas
uset
eA hir ps m Ha
16 th Street
Ave
w
e
18th Street
icut
nect
19th Street
Ne
ts Av
Con
O Street
sach
C irc l e
ve
P Street
20th Street
21st Street
Schematic Design
17th Street
Mas
18th Street
Schematic Design Process
Ave
A v e n u e
icut
H a m p s h i r e
nect
N e w
19th Street
Con
1 3 3 3
N Street
e
ut Av
ectic
Conn
N
Context Site Plan Feb ruary
8,
2016
F OX A rc hit e c t s 1121 14t h S t re e t , NW 3rd F l o o r W ashin gt o n , D C 20005 T 202.659.0929
Architecture:
Option 2 Perspective: Southwest Corner Scale: NTS
Option 2 Perspective: Southwest Corner 30
1
Opti
Bird’s Eye view of the lobby floor option
Proposed plan layout 31
11 - 11TH FLOOR 106' - 6 1/2"
1 3 3 3
N e w
11 - 11TH FLOOR 106' - 6 1/2"
H a m p s h i r e
A v e n u e
Schematic Design ---
D
Enlarged Section: East
C
BRONZE ALUMINUM
Option 2 Elevation: Key
Scale: 1/8” = 1’-0” 19' - 9"
10' - 0"
REFLECTIVE GLASS
13 - PENTHOUSE FLOOR 128' - 6 1/2"
12 - 12TH FLOOR 116' - 9 1/2"
9' - 0" 1' - 9"
12 - 12TH FLOOR 116' - 9 1/2"
8' - 6"
10' - 3"
CLEAR GLASS
10' - 3"
11' - 9"
CERAMIC FRIT @ 30"
11' - 9"
2' - 9"
13 - PENTHOUSE FLOOR 128' - 6 1/2"
25'
21 DUPONT CIRCLE
SIDE WAL K
30' SIDEWALK ADJACENT BUILDING LOADING DOCK SETB16' ACK
Avenue
11 - 11TH FLOOR 106' - 6 1/2"
11 - 11TH FLOOR 106' - 6 1/2" NE W
19TH STREET NW
Schematic Design
C
25' SETBACK
Hampshire
AV EN UE
New
HA MP SH IRE
1333
25'
21 DUPONT CIRCLE
SIDE WAL K
30' SIDEWALK ADJACENT BUILDING LOADING DOCK
AV EN UE
LOADING DOCK
Enlarged Section: East
Section Axon: East
Scale: 1/8” = 1’-0”
25' SETBACK
SETB16' ACK
A venue
Key: Site Plan
Scale: 1/8” = 1’-0”
1320 19th STREET
Feb ruary LOADING DOCK
Scale: NTS
1320 19th STREET
Architecture: 70
14
ALLEY/DRIVEWAY
RETAIL
LOADING
RETAIL
LOBBY
19' - 9" ---
D
ALLEY/DRIVEWAY
C
FCR
RETAIL
RETAIL
LOBBY
LOADING
Property Line
Enlarged Plan: East
Section Axon: East
Scale: 1/8” = 1’-0”
Scale: NTS
Fe brua ry
8 ,
2 0 1 6
FOX Archi tects 1121 14th S treet, NW 3rd Fl oor Washi ng ton, DC 20005 T 202.659.0929
FCR
Property Line
Architecture: 70
STAINLESS STEEL
GRATE COVERED
SEATING SPACE
3’ X 4’
BOLLARD AND
WITH PAVERS
BARRIER
GRANITE PAVERS
TRAFFIC ARM
AND CONDITIONED
STAINLESS STEEL
INSIDE
CANOPY ABOVE
GRATE COVERED
SEATING SPACE
3’ X 4’
BOLLARD AND
WITH PAVERS
BARRIER
GRANITE PAVERS
TRAFFIC ARM
AND CONDITIONED
Streetscape Plan: New Hampshire Avenue Scale: 1/16” = 1’ -0”
CANOPY ABOVE
2’ X 6’ GRANITE PAVERS
2’ X 6’ GRANITE PAVERS
4” X 4”’ GRANITE
EXISTING TREE
2’ X 3’ CONCRETE
COBBLE PAVERS
PLANTER TYP.
PAVERS
CUSTOM PLANTER
4” X 4”’ GRANITE
EXISTING TREE
2’ X 3’ CONCRETE
COBBLE PAVERS
PLANTER TYP.
PAVERS
CUSTOM PLANTER
N
INSIDE
Streetscape Plan: New Hampshire Avenue Scale: 1/16” = 1’ -0”
February
8,
2016
N
FOX Architects 1121 14th Street, NW 3rd Floor Washington, DC 20005 T 202.659.0929
F e b r u Architecture: a r y 8 , 270 1 6 FOX Ar c hi tec ts 1121 14th Str eet, NW 3r d Floor Washi n gton , DC 20005 T 202.659.0929
Architecture:
Top: Streetscape layout design. Bottom: Lobby entrance rendering with proposed canopy 32
2016
FOX Architects 1 1 2 1 1 4 t h S t r e e t , NW 3rd Floor Washington, DC 20005 T 202.659.0929
Key: Site Plan
Glass Facade details.
8,
19TH STREET NW
S c h e mElevation: a t i c D e sEast ign Enlarged
Ha mp shire
HA MP SH IRE
Ne w
NE W
1333
7
Enlarged Elevation: East 1 3=31’-0” 3 New Hampshire Avenue Scale: 1/8”
Enlarged Section: East Scale: 1/8” = 1’-0”
Schematic Design ---
D
C
BRONZE ALUMINUM
Option 2 Elevation: Key 19' - 9"
10' - 0"
H ampsh i r e
A v enu e
13 - PENTHOUSE FLOOR 128' - 6 1/2" 2' - 9"
13 - PENTHOUSE FLOOR 128' - 6 1/2"
CERAMIC FRIT @ 30" 9' - 0"
11' - 9"
14
C
8' - 6"
---
10' - 3"
CLEAR GLASS
D
11 - 11TH FLOOR 106' - 6 1/2"
Enlarged Plan: East
12 - 12TH FLOOR 116' - 9 1/2"
1' - 9"
12 - 12TH FLOOR 116' - 9 1/2"
19' - 9"
11' - 9"
New
Schematic Design
Section Axon: East
Scale: 1/8” = 1’-0”
10' - 3"
1333
REFLECTIVE GLASS
11 - 11TH FLOOR 106' - 6 1/2"
Scale: NTS
Enlarged Elevation: East
Enlarged Section: East
Scale: 1/8” = 1’-0”
Scale: 1/8” = 1’-0”
14
19' - 9"
D
---
C
Enlarged Plan: East
Section Axon: East
Scale: 1/8” = 1’-0”
Scale: NTS
F e b ru a ry
8 ,
2 0 1 6
FO X A rc h i tect s 1 1 2 1 1 4 th S t r eet , N W 3 rd Fl o o r W as h i ng to n , D C 2 0 0 0 5 T 202.659.0929
Architecture: 70
Option 2: West Elevation
Option 2 Pl
Scale: 1/32” = 1’-0”
Top: Redesigned elevation. Bottom: Lobby entrance rendering 33
1333
N e w
H a m ps hir e
A v e n u e
Schematic Design
Site Plan
Site Plan
Option 2: East Storefront Elevation Scale: 1/16” = 1’ -0” Section of First Floor and Cellar Floor
Option 2: East Storefront Elevation Scale: 1/16” = 1’ -0”
PARKING GARAGE ENTRANCE
RETAIL
LOBBY
RETAIL
ALLEY/DRIVEWAY
PARKING GARAGE ENTRANCE
RETAIL
LOBBY
RETAIL
ALLEY/DRIVEWAY
PROPERTY LINE
PROPERTY LINE
STAINLESS STEEL
Option 2: East Storefront Plan
CANOPY ABOVE
Febru
CANOPY ABOVE
Febr
GRATE BRIDGE
= 1’ -0” and Streetscape 1 3 3 Lobby 3Scale:N1/16” e w H a m ppaving s h idesign r e layout. A v e n u e Schematic Design
Option 2: East Storefront Plan
STAINLESS STEEL GRATE BRIDGE
Scale: 1/16” = 1’ -0”
21 DUPONT CIRCLE
45' - 0"
UP
NORTH
Facade Option 2: Typical Floor Plan Scale: 1/32” = 1’ -0”
Typical office floor layout 34
1320 19TH STREET
F
Scale: 1/8” = 1’ -0”
CEILING
CEILING
CERAMIC TILE WALL
PAINTED GWB
PAINTED GWB CERAMIC TILE WALL
WNLIGHT
WNLIGHT
METAL CEILING
PAINTED GWB
PAINTED GWB
1333
New
Hampshi r e
Elevation: West
CEILING
DRYWALL CEILING
Elevation: West
PERFORATED METAL CEILING
PERFORATED METAL CEILING
Scale: 1/8” = 1’ -0”
FULL-HEIGHT PARTITION
PARTITION TRIP COVE LIGHT
CEILING
CERAMIC TILE BASE
Scale: 1/8” = 1’ -0”
TRIP COVE LIGHT
TRIP COVE LIGHT
CERAMIC TILE BASE
Schematic Design
METAL CEILING
PARTITION TRIP COVE LIGHT
A v enue
CERAMIC T
TILE
TILE FULL-HEIGHT PARTITION
MIRROR BRONZE MIRROR FRAME
WALL COVERING
MARBLE VANITY MARBLE VANITY
MIRROR
PAINTED WALL
CERAMIC TILE WALL BRONZE MIRROR FRAME
WALL COVERING
MARBLE COUNTERTOP MIRROR
MARBLE VANITY PAINTED WALL
CERAMICTILE TILEWALL BASE CERAMIC
Elevation: North
Elevation: South
Scale: 1/8” = 1’ -0”
Scale: 1/8” = 1’ -0”
MARBLE COUNTERTOP
Elevations of Proposed Bathroom layout CERAMIC TILE BASE
Elevation: East
Scale: 1/8” = 1’ -0”
Elevation: East
Scale: 1/8” = 1’ -0”
WOMEN
F e b r u aPAINTED r y GWB 8 CEILING , 2 0 1 6
MARBLE COUNTERTOP
F O X Arch itects 1 1 21 14th Street, N W 3 rd Floor W as h ington, DC 20005 T 2 02.659.0929
F e b r uar y 1' x 2' CERAMIC TILE FLOOR
8 ,
2 0 1 6
RECESSED DOWNLIGHT Architecture: F O X Arch itects
PA
44
1 1 21 14th Street, N W 3 rd Floor W as h ington, DC 20005 T 2 02.659.0929
MARBLE COUNTER WITH UNDERCOUNTER LAVATORIES
Architecture: 44 PERFORATED METAL CEILING
-
-
-
-
-
-
CONTINOUS STRIP COVE LIGHT WOMEN
FULL HEIGHT PARTITION
MEN
BRONZE MIRROR FR CONTINOUS STRIP COVE LIGHT
MIR
CERAMIC TILE W -
MARBLE COUNTER
-
CERAMIC TILE B
PAINTED GWB CEILING
MEN
Floor Plans and RCP of Proposed Bathroom layout
Typical Floor Restroom: Plan
Scale: 1/8” = 1’ -0”
Typical Floor Restroom: RCP
Scale: 1/8” = 1’ -0”
35
EXTERIOR DECK
CONFERENCE WITH SKYFOLD PARTITION CAFE CONFERENCE LOUNGE SUPPORT SUPPORT
CONFERENCE/ FLEX SPACE
CAFE/DINING
EXTERIOR DECK LOUNGE
EXTERIOR DECK
SHARED Rooftop design layout.
DEDICATED
USABLE SF: 3,708
Option 1 Penthouse: Plan
Optio
Scale: 1/32” = 1’ -0”
Scale
South-West Birds Eye View 36
USABLE SF: 4,438
Scale: 1/16” = 1’ -0”
Option 1 Penthouse: West Elevation Scale: 1/16” = 1’ -0”
F e bru ary
Option 1 Penthouse: North/South Section
F OX 112 3r d Was T 2
Scale: 1/16” = 1’ -0”
1 3 3 3
N e w
H a m p s h i r e
A v e n u e
Schematic Design
P
Option 1 Penthouse: North Elevation Scale: 1/16” = 1’ -0”
Option 1 Penthouse: West Elevation Sections and Elevations Rooftop Scale: 1/16” = 1’ -0”
Option 1 Penthouse: North Elevation Scale: 1/16” = 1’ -0”
Rooftop Conference Room rendering 37
1000 Maine Avenue
Size: 275,553 sq. ft / 25,599 sqm Program: Office Building Location: Downtown Washington DC Status: Completed in 2018 1000 Maine is a new state of the art office building located on the southwest waterfront of The Wharf district of Washington DC. Designed by KPF Architects of NYC with FOX Architects being the architect of record. The new building provides 11 floors of new office space including terraces, ammenities and a penthouse floor. Designed to allow each floor to have views of the city as well as have enough valubale daylight. With a central core housing vertical circulation to each floor, the building also has an atrium on the west side that allows visitors and workers to have more open space. I worked in collaboration with the project architects on the BIM modeling, revisions and creation of the floor plans, building elevations, building sections and details for 100% Design Development deadlines.
5
4
3
RB1
RB1.5
20' - 0" 3' - 0"
RD1
28' - 0"
20' - 0"
6' - 0"
RD1.5
RE1
8' - 7 1/4"
28' - 0"
4' - 10 5/8" 5' - 1 3/8"
1
RF1
11' - 4 3/4"
RG1
20' - 0"
5' - 0"
5' - 0"
5' - 0"
5' - 0"
5' - 0"
5' - 0"
5' - 0"
RI1
20' - 0"
5' - 0"
5' - 0"
5' - 0"
RJ1
20' - 0"
5' - 0" 4' - 1 1/2"
11' - 9"
20' - 0" 2' - 5 1/8"
4' - 1 1/2" 5' - 9 1/4" 4' - 2 3/4"
122
122A
1
0"
128
129
12' - 6 7/8" 12' - 6 5/8" 1' - 3"
ELEV 103
132
100D 5' - 11 "
2 A4006
14' 11"
114
4' - 1"
5' - 0"
5' - 0"
5' - 0"
RD-6
5' - 0"
5' - 0"
CORRIDOR 112
5' - 0"
18
4' - 6"
2B
5' - 0"
5' - 0"
RETAIL 119
1
5' - 0"
2B
A4078
2 1/4" 6' - 4"
2B
115A
6' - 7"
RD-6
A2006
2' - 3
5' - 0"
8
2' - 3 1/4" 4' - 6 3/8"
11" 7' - 0
5/8"
RD-6
18
5' RD-6
2' - 8"
19
20' 0"
8' - 8"
A3001
G1
1 3/ 8" 5' -
1 2
A2005
A2005
10' 0"
A2002
1
1 3/ 8"
8' - 8"
F1
5' -
8' - 8"
20' 0"
1 3/ 8"
1
2' - 8"
19
115 1' - 4"
2' - 7"
7' - 5"
5' -
E1
5' -
8' - 8"
20' 0"
1 3/ 8"
8' - 8"
10' 0"
19
RD-6
5' - 0"
H1
1 3/ 8"
2' - 8"
20' 0"
1 3/ 8"
RETAIL 115
8' - 8"
D1
5' -
8' - 8"
5' - 0"
20' 0"
3
NEW 6" CONCRETE TOPPING SLAB W/ ADA RAMP. PROVIDE EPOXY SEALANT TO MATCH G1 CURB FINISHES.
4
42" STAINLESS STEEL BOLLARDS WITH INTEGRATED ADA PUSH BUTTON AND DOOR CONTROLS
5
PARCEL LINE
6
LINE OF CANOPY ABOVE
7
GARAGE RAMP NOT IN CONTRACT
8
FISH MARKET STAIR/ELEVATOR NOT IN CONTRACT
9
SEE WF SERIES DRAWINGS FOR FOUNTIAN DETAILS
10
STAIRWAY ABOVE
3
A20 06
Hoffman-Madison Waterfront
LINE OF CANOPY BELOW 1 HR RATED CURTIAN WALL WITH WATER CURTIAN ON OCCUPIED SIDE - SPRINKLERS TO BE @ 5' O.C. WITH BUFFERS @ MULLIONS
13
4" STICK PIN INSULATION AT UNDERSIDE OF TERRACE / RAMP SLABS
14
REFER TO LANDSCAPE DRAWINGS FOR MATERIALS AND LIGHT FIXTURE TYPES
15
CONTINUOUS HORIZONTAL L-7 LIGHT FIXTURE INTEGRATED INTO CURTIAN WALL MULLION
16
FIRE TEST CONNECTIONS
17
SIAMESE CONNECTIONS DASHED RETAIL PARTITIONS ARE N.I.C., TYP RETAIL STOREFRONT BY OTHERS
20
FURNITURE, N.I.C
21
4" SS BOLLARDS
23
1000 Maine Avenue, SW Washington, DC 20024
# 1
12
19
1000 Maine Ave C
11
18
PROJECT:
DATE DESCRIPTION 2016.07.01 ISSUE FOR 3RD PARTY REVIEW
B STAMP:
ROOF DRAIN
24
STICK PIN INSULATION AT UNDERSIDE OF SLAB ABOVE EXTENTS OF RAMPS
25
KE/DE SLOPE FROM 10TH FLOOR TO PENTHOUSE
5' -
20' 0"
GARAGE EXHAUST. SEE MECHANICAL DRAWINGS FOR MORE INFORMATION
5' - 0"
5' - 0"
4' - 2
6 1/ 8"
C1
18
131
NEW ELEVATOR PIT. PROVIDE DRAINAGE. SEE ENLARGED ELEVATOR PLANS FOR MORE INFORMATION
2
6' -
2' - 8"
1 3/ 8"
5' -
RETAIL 116
17' 4"
20' 0"
19
B
RETAIL 117
ELEV 001 (N.I.C.)
2' - 8"
19 B1
8
FISH MARKET LOBBY 131
8' - 8"
1
6' -
PROP ER 8' - 8" TY LIN E
2' - 6"
20' 0"
1 3/ 8"
131A 2' - 8"
19
7' - 6"
8' - 8"
5
8 5/ 8"
RETAIL 118
8' - 8"
A1
SHEET NOTES - FLOOR PLAN
5' - 0"
TRASH ROOM 114
A2006
5' - 0"
2' - 8"
112
19
100C
5' - 0"
ELEV 106
C
RD-6
1
10
3
10' - 0"
6
A2005
R1
1 A4001
5' - 0"
2 A7200
UP
14' 11"
2 A5101
5' - 0"
STAIR 1.3 132
5' - 0" 4' - 2 1/8" 6' - 8 3/4"
2' - 5 7/8"
D
5' - 0"
5/8" 11' 11
2' - 6"
44' 6"
UP
1 A7102
6
REFER TO FTG HORIZONTAL SET FOR ALL BELOW GRADE AREAS/ITEMS. BELOW GRADE AREAS ARE ALL N.I.C. U.O.N.
4
RD-6
4
ALL DIMENSIONS ARE TO FACE OF WALL OR CENTERLINE U.O.N.
F.
A2007
13B
9B
A2005
19
2' - 6 1/8" 1' - 10"
ELEV 104 13B
121
6' - 4"
5' - 0"
MAILROOM 126
A3000
17
E.
113 1' - 10" ELEC. ROOM 130
1
FIRE CONTROL ROOM 121
E
5' - 0"
13B
FURNITURE N.I.C U.O.N
8" 8 7/
100
ELEV 105
ELEVATOR LOBBY 101
100B 4
D.
130 ELEV 102
A3003
R2
FOR MORE INFORMATION ON PARTITION TYPES REFER TO ENLARGED PLANS
7' -
VESTIBULE TEL. ROOM 128 129
13B 100A
1
C.
1121 14th Street, NW, 3rd Floor Washington, DC 20005 T 202.659.0929 F 202.659.0928
4" 2 1/
11B
1"
1
ALL DAVIT BASES AND SAFTEY ANCHORS TO BE RECCESSED UNDER CONCRETE PAVERS, STONE OR WOOD DECKING ACCESS HATCHES, U.O.N.
5' -
7' - 6 3/4"
RD-6
113A
13B
126
3' - 9 1/8" 6' - 1 1/4"
STAIR ABOVE
5' -
2' - 1 1/2"
1B
108
ELEV 101
A4000
GARAGE LEVELS G2 AND G1 CORE AND SHELL NOT IN CONTRACT. REFER TO WHARF HORZONTAL SET FOR MORE INFORMATION.
B.
© 2015 FOX Architects LLC. All rights reserved worldwide
2B
SECURITY 104
0"
6' - 1 1/4" 4' - 5 7/8" 1' - 4"
JANITOR ROOM 105
5' -
28' - 0 1/4"
TOLIET 107
127
A.
www.fox-architects.com
12' - 9" T.O.S.
0"
UP 13B
1B
104
107 7A
120 STAIR 1.2 127
RETAIL 113
CORRIDOR 108
105A
5' -
STORAGE 109
DN
JANITOR CLOSET 105A
0"
ISSUE FOR 3RD PARTY REVIEW 2016.07.01
2B 105
5' -
2B 10
0"
2A
109
5' -
2A
10C
13B
007 A2
8484 Westpark Drive, Suite 620 McLean, Virginia 22102 T 703.821.7990 F 703.821.2270
GENERAL NOTES - FLOOR PLAN
3
A7100
13B
5
0"
R3
5' -
12' - 6 5/8"
0"
44' - 11 1/2"
5' -
D
0"
13A
TRASH ROOM 120
ARCHITECTS
UP
LOADING DOCK 122
17' - 0" T.O.S.
F
DOOR NUMBER
5' -
WATER WALL EQUIP. ROOM 123
13B
WINDOW TAG
EXISTING DOOR
12' - 9" T.O.S.
108A
1
STAIR 1.1 125
24 7
13' - 0" T.O.C.
0"
9
A3002
6
A2001
125
FD
1
#
5' -
EXIT PASSAGEWAY 124
108B
FD
R4
100
0"
1' - 2 3/4"
5' -
16
123
E
124A
DENOTES PARTITION TYPE EXISTING PARTITION TO REMAIN
16" 2 3/
R5
124
NEW MILLWORK
NEW PARTITION 1B
5' -
1' - 4" 2' - 2"
A4006
F
LEGEND - FLOOR PLAN
21
RH1
20' - 0"
/16" 0 13
1' - 9 7/8"
RC1 6' - 0"
6' -
6' - 7 1/2"
14' - 0"
1
2 21
RA1
5/8"
NORTH
DRAWN BY: FD
A
I1
A
20' 0"
GROUND FLOOR PLAN
FLOOR PLAN 1 GROUND 1/8" = 1'-0" 5
4
3
10720.00 DRAWING TITLE:
J1
38
FOX PROJECT NO:
2
1
DRAWING NUMBER
A1101
3
2 RD1
RD1.5
STAIR 1.2 127
13B
2
13B
2B
10C
5' - 1 3/4"
10A 3 A5300
ST-6
1' - 7 1/2"
3
WALL ANCHORED TO STEEL FRAME BEHIND
A4109
1
5' - 0"
1
TYP
A5300
6' - 4"
GL-3 REVOLVING DOOR
ELEV 101
2
10C 11B
ST-5
4
4
19 2
1' - 11 3/4"
13B
3
ITZ-1
3' - 6"
ELEV 103
10
10B
13B
5
A4109
A5300
5
1
ST-5 CLAD CORE
13B
ST-6
FIRE CONTROL ROOM 121
A5300
A4101
13B
A4101
5 1/4"
2
11' - 4 3/4"
9' - 3 1/4"
9' - 6 3/4"
1' - 2"
F.O. WALL
6
1' - 4"
11B 3
1
10
A5300
2
A4160
4
2' - 6"
FURNITURE N.I.C. UNLESS N
6 1/4"
2' - 3"
FACP IN AL-1 REVEAL
3' - 1
6
F.O. WALL
1/2"
6
SHEET NOTES
1' - 8"
8
A1
A4100
6
7
13B
5' - 3"
STAIR 1.3 132
1' - 0"
ST-6
2 1' - 2
1/2"
B1
5/8"
AL-1
10D
5
1/2"
TRASH ROOM 114
2' - 2
13B
13B
7
13' 8"
9B
13B
13B 2B
1
LOBBY AIR SUPPLY BELOW M
2
FIRE DEPARTMENTCONNECT
3
CONCRETE FILL TO EL +13.0
4
JOINT IN TERRAZZO (TYP)
5
JOINT IN TERRAZZO ALIGNS
6
LINE OF BRIDGE ABOVE
7
42" LED SCREENS (DIRECTOR
8
LINE OF MONUMENTAL STAI
9
LINE OF MONUMENTAL STAI
A5300
13B 13B 4' - 0
9
1' - 8"
1
AL-1
SEE SHEET A6020 FOR FINISH
F.
2
CUSTOM STONE (MARBLE) + METAL (AL-1) RECEPTION DESK, INCLUDING MILLWORK, BUILT IN DRAWERS, SHELVES, AND DOORS
ITZ-1
1 1/ 2" 1/2"
FOR TYP. NOTES AND DIMEN
E.
ELEVATOR LOBBY 101
MAILROOM 126
A4109
3
5' - 1
SEE CALLOUT REFERENCES F
D.
5' - 9"
19' - 5 1/2"
A4100
6' - 4" 3' - 9 1/8"
A4103
3' - 6"
9A ELEV 102
LOBBY 100
R3
1
13B
A4100
MAINTAIN 2HR RATING ABOV
C.
2' - 8 5/8"
1 MTL-4
R2
PROVIDE FIRE RETARDANT P
B.
10' - 6"
A4105
D
B
20' - 0" TYP.
16' - 2 5/8"
7' - 4"
9' - 6"
ITZ-1
2' - 6 1/2"
ISSUE FOR 3RD PARTY REVIEW 2016.07.01
10' - 6"
6
A.
10A
1A
E
C
9A
A4100
SS-1
10C
6' - 7 3/4"
5' - 0"
1' - 9 7/8"
JANITOR ROOM 105 1B
1A
10D
A4100
5' - 0"
6' - 6 1/2"
10C
13B
3
13B 5' - 7 5/8"
R4
2' - 3 1/2"
A4100
1 / A4001
F
13B
5
2 1/2"
A4008
8' - 2"
2' - 8 1/2" 1' - 0"
1
1' - 6"
13B
GENERAL NO
RF1
STORAGE 109
3' - 6"
13B
1' - 10"
RE1
5' - 10"
RC1
2' - 6 1/4" 2' - 8 3/4"
RB1.5
6' - 0 1/2"
4 RB1
3' - 0"
5 RA1
C1
10 GRILLES, KADEE OR SIMILAR
9B
11 DOOR PUSH BUTTON INTEG 5 D1
CORRIDOR 112
12 ALIGN JOINT WITH MULLION 2B
13 ADD EXTRA LAYER OF 1/2" G
14 FIRE TEST CONNECTIONS, S
15 INSULATED OVERHEAD COIL
E1
39
A1111 5
4
3
2
1
DRAWING NUMBER
1/8" = 1'-0" 1 PENTHOUSE FLOOR PLAN
PLAN PENTHOUSE FLOOR
J1
DRAWING TITLE:
A
I1
A
0" 20' -
10720.00 FOX PROJECT NO: FD DRAWN BY:
H1
0" 20' -
NORTH
0" 18' D
G1
0" 20' -
A3001
1
20'
P. C. TY - 0" O.
0" 22' 0" 20' -
1
D SA A2200
1
- '5
"0 - '5
NEW ELEVATOR PIT. PROVIDE DRAINAGE. SEE ENLARGED ELEVATOR PLANS FOR MORE INFORMATION
Washington, DC 20024 1000 Maine Avenue, SW
1000 Maine Ave PROJECT:
"0 - '01
'5
D A2007
"0 - '5
"0 - '5
PH04 ELECTRICAL
PH06 ROOM WOMEN'S
P04
PH01 LOBBY SERVICE
PH02 VESTIBULE
ELEV 101
PH08 MEN'S ROOM
P06
PH03 TEL
A2200
5' - 0"
TYP.
P09A
RD-3W
P22A 12' - 5"
P17
P15
6
P14
P22
PH15 EMR
"0 - '5
5' - 0"
FURNITURE N.I.C U.O.N
C.
FOR MORE INFORMATION ON PARTITION TYPES REFER TO ENLARGED PLANS
B.
ACCESS HATCHES, U.O.N. ALL DAVIT BASES AND SAFTEY ANCHORS TO BE RECCESSED UNDER CONCRETE PAVERS, STONE OR WOOD DECKING
A.
INFORMATION. GARAGE LEVELS G2 AND G1 CORE AND SHELL NOT IN CONTRACT. REFER TO WHARF HORZONTAL SET FOR MORE
E © 2015 FOX Architects LLC. All rights reserved worldwide
RD-3W
12' - 9"
143' - 0" T.O.F.F. RA
- '0 2
5' - 0"
ALL DIMENSIONS ARE TO FACE OF WALL OR CENTERLINE U.O.N.
D.
A2 007
3
PH09 ROOM AMENITY OFFICE
21' - 1"
D
www.fox-architects.com F 202.659.0928 T 202.659.0929 Washington, DC 20005 1121 14th Street, NW, 3rd Floor
GENERAL NOTES - FLOOR PLAN
F 703.821.2270 T 703.821.7990 McLean, Virginia 22102 8484 Westpark Drive, Suite 620
ARCHITECTS
'5
5' - 0"
PH14 ROOM MECH.
"0 -
5' - 0"
142' - 0" T.O.S. 143' - 0" T.O. BUILT UP SLAB
"8/ 56
"0 - '5
1
PH16 ROOM EMR. GEN.
REFER TO FTG HORIZONTAL SET FOR ALL BELOW GRADE AREAS/ITEMS. BELOW GRADE AREAS ARE ALL N.I.C. U.O.N.
E.
'5
A4005
P17A
F.
D
RD-5
SA
D
5' - 10"
"0 -
3' - 0"
5' - 0"
RA PH22 REFUGE AREA CORRIDOR/
DN
PH20 YARD TOWER COOLING
RD-5
P07
P05
RA
5
5' - 0"
PH07 VESTIBULE
A7200
7 RD-3B
P02
PH18 JANITOR
"01 - '31
"01 - '31
8
9' - 4 1/2"
RA
A2200
P08
P03
"01 - '91
"0 - '5
P00
P01
20' - 0" D
P18
A2200
"11 - '11
GARAGE EXHAUST. SEE MECHANICAL DRAWINGS FOR MORE INFORMATION
1
"4/3 5 - '51
"0 - '51
OPEN TO ABOVE
CAGE LADDER TO ROOF
"0 - '5
2
"2/1 11 - '44
"0 - '5
ELEV 102 PH13 STAIR 1.2
PH05 VESTIBULE
"0 - '5
2
"0 - '5
PH17 ROOM MECHANICAL
"0 - '5
A2200
'5
"2/1 11 - '44
42" STAINLESS STEEL BOLLARDS WITH INTEGRATED ADA PUSH BUTTON AND DOOR CONTROLS
DN
"0 -
1
C
PARCEL LINE
NEW 6" CONCRETE TOPPING SLAB W/ ADA RAMP. PROVIDE EPOXY SEALANT TO MATCH G1 CURB FINISHES.
LINE OF TERRACE BELOW
"0 - '5
A3002
D
PH00 AREA REFUGE LOBBY / ELEVATOR
P13A
17' - 6"
PH19 ROOM STORAGE
3' - 1"
LINE OF CANOPY ABOVE
3
'02
4
5' - 0"
5' - 0"
5' - 0"
SA
5' - 0"
5' - 0"
5' - 0" A2200
SA
9
5' - 0"
5' - 0"
5' - 0"
D
RD-3W
5' - 0"
5' - 0"
5' - 0"
5' - 0"
RA RA
D
5' - 0"
D
D
D
R5
5' - 0"
3' -
14
7 3/ 4"
GL-5 & SS RAILING EXISTING DOOR
3' - 0 1/4"
RA
RA
- '0 2
3
5' - 0"
3' - 1 5/8"
A2200
SA D
4' - 1"
P09 5' - 0"
"5 - '01
SA
D
R-3A
F
P16
5' - 0"
"8/ 71
SA
5' - 0"
"6 - '81
5' - 0"
"2 - '31
"8/3 5 - '2
5' - 0"
'6
5' - 0"
"8 -
5' - 0"
"61/1 0 - '61
P20 RD-3B
6' - 0"
D
100
DOOR NUMBER
F
D
"5 - '4
EXISTING PARTITION TO REMAIN
GL-5 AND SS GATE
20' - 0" O.C. TYP. 14' - 6"
20' - 0" R-4
20' - 0"
R-3A
20' - 0"
23' - 0 1/2"
20' - 0"
20' - 0"
20' - 0"
20' - 0"
NEW PARTITION
20' - 0"
20' - 0"
RB1
RC1
RD1
5
RE1
RF1
RG1
4
5
RH1
RI1
RJ1
3
4
5 R3
NEW MILLWORK
1
2
3
WINDOW TAG
LEGEND - FLOOR PLAN
R-1
RA1
#
DENOTES PARTITION TYPE
1B 5' - 11 1/2"
FIXTURE, TYP. W-2 LIGHT
2016.07.01 ISSUE FOR 3RD PARTY REVIEW DATE DESCRIPTION
Waterfront Hoffman-Madison
'5
A2200
#
4
"0 -
1
6
15' - 3"
"0 - '5
5' - 0"
SERVICE LOBBY
A2001
GARAGE RAMP NOT IN CONTRACT
'5
SA
FISH MARKET STAIR/ELEVATOR NOT IN CONTRACT
7
"6 -
18' - 6" D
SEE WF SERIES DRAWINGS FOR FOUNTIAN DETAILS
8
'9
R4
STAIRWAY ABOVE
9
4
P19
SA
E
PH10 STAIR 1.1
ELEV 103
RD-3B
R-3A
10
1
23
"0 - '5
"8/3 5 - '2
5' - 0"
5/8"
"8/ 74 -
"4/1 0 - '82
6' - 0" 9' - 0"
LINE OF CANOPY BELOW
SHEET NOTES - FLOOR PLAN
"0 - '5
"0 - '5 10
SA
D
11
"0 - '5 P10
"0 - '5
R2
1
@ MULLIONS 1 HR RATED CURTIAN WALL WITH WATER CURTIAN ON OCCUPIED SIDE - SPRINKLERS TO BE @ 5' O.C. WITH BUFFERS
"6 - '71
'5 "0 '4 7"8/7
P23
P12
11A
A2200
A3003
4" STICK PIN INSULATION AT UNDERSIDE OF TERRACE / RAMP SLABS
12
A2006
P11
DN
SA
5' - 4 4" 18' -
228 TERRACE ROOF TOP
RD-3W
PH23 ROOM WOMEN'S
P13B
LINE OF ROOF ABOVE
REFER TO LANDSCAPE DRAWINGS FOR MATERIALS AND LIGHT FIXTURE TYPES
13
5
"0 - '5
PH21 VESTIBULE 11A
8A
D
A3000
CONTINUOUS HORIZONTAL L-7 LIGHT FIXTURE INTEGRATED INTO CURTIAN WALL MULLION
14
A2006
P00A
PH12 PANTRY
P21
8A
R3
15
STAMP:
B
"0 - '5
DN
SA
GL-5 & SS RAILING
"0 - '5
142' - 0" T.O.S. 143' - 0" T.O. BUILT UP SLAB
'5 "0 -
'81 "0 -
D
FIRE TEST CONNECTIONS
2
5' - 9"
P13
D
SIAMESE CONNECTIONS
16
D
1"2/1
"0 - '5 PH11 CENTER CONFERENCE
RD-3B
"0 - '5
'62 "6 -
'44 "6 -
" 9' - 10
RA
D
RD-3B
A2005
D
14
16' - 0"
P11A
'4 6"4/1 SA
3
1
5' - 1"
2" 10' -
'5 "0 -
A2005
4
5' - 0"
5' - 0"
5' - 0"
5' - 0"
5' - 0"
'5 "0 -
'02 "0 -
D
5' - 0"
5' - 0"
5' - 0"
5' - 0"
5' - 0"
4' - 3"
RETAIL STOREFRONT BY OTHERS
RA
"4 - '1
11 "2/1
SA
R1
5' - 0"
5' - 0"
5' - 0"
5' - 0"
7' - 7"
FURNITURE, N.I.C
DASHED RETAIL PARTITIONS ARE N.I.C., TYP
17
RD-3W
"0 - '5
'61 "5 -
SA
SA
5' - 0"
5' - 0"
5' - 0"
5' - 0"
5' - 0"
5' - 0" RD-3W
4" SS BOLLARDS
18
"0 - '5
D
D
5' - 0"
5' - 0"
5' - 0"
5' - 0"
ROOF DRAIN
21
19
'1 "6 -
143' - 0" T.O.F.F.
"0 - '5
SA
D
3
RA
'61 "2 -
'61 "0 -
0" 20' -
0" 20' -
5' - 0"
"0 - '5
SA
3/4" 5' - 10
STICK PIN INSULATION AT UNDERSIDE OF SLAB ABOVE EXTENTS OF RAMPS
23
20
06 A20
'22 "0 -
0" 20' '61 "6 -
B1
SA
"8/7 01 - '4
A2007
D
R-1
SA
0" 20' D
R-3A
SA
"11 -
10.70.6102 WEIVER YTRAP DR3 ROF EUSSI
2
D
D1
C1
C
D
A2007
R-3A
B
D
2' - 0"
KE/DE SLOPE FROM 10TH FLOOR TO PENTHOUSE
24 RA
D
2"2/1
E1 LIFELINE SYSTEM HORIZONTAL
A1
SA
0" 20' -
'02
F1
'71 "0 -
1
25
D
A2002
BASE, TYP. RECESSED DAVIT
GL-5 AND SS GATE
4
2
3
1
R4 R5
5
3
TC-1
12' - 2"
D
2 L-2
GL-3
13' - 0"
GL-1
2
GL-2
L-2
GL-2
ST-3GL-2
ST-3
SS-1
GL-2
AL-1
GL-3
13' - 0"
GL-3 TC-1
SS-1
12
TC-1
GL-2
ST-3
ST-3
SS-1
GL-2
AL-1
SHEET NOTES - ELEVATION 1
7
LIGHT FIXTURE
8
SIAMESE HEAD CONNECTIONS
SHEET NOTES - ELEVATION
OPTIONAL SIGN BAND BY OTHERS
3
OVERFLOW SCUPPERS
5
GL-4 GLASS RAILINGS ALIGN. JOINTS WITH CURTAIN WALL MODULE BELOW, TYP ALL GLASS RAILINGS 1 STOREFRONT BY OTHERS
6
L-2 LOUVER BAND. REFER TO MECHANICAL DRAWINGS FOR AIR INTAKE REQUIREMENTS 2 OPTIONAL SIGN BAND BY OTHERS
9
3 5
OVERFLOW SCUPPERS
AL-1 RETAIL AWNING
11
SS-1 RETAIL AWNING HANGERS
12
SS-1 POINT CONNECTION CURTAIN WALL FITTINGS
13
INSULATED OVERHEAD COILING DOOR
GL-4 GLASS RAILINGS ALIGN. JOINTS WITH CURTAIN WALL MODULE BELOW, TYP ALL GLASS RAILINGS
14' - 11" 12' - 2"
12' -12' 2" - 2" 12' -12' 2" - 2"
12' - 2" LEVEL 2 WEST T.O.S. 30' - 4"
2
AL-1
12' -12' 2" - 2"
LEVEL 6 T.O.S. 79' - 5" LEVEL 5 T.O.S. 67' - 3"
GL-1 LEVEL 5 T.O.S. 67' - 3" LEVEL 4PROJECT: T.O.S. 55' - 1"
1000 Maine Ave
DATE DESCRIPTION 2016.07.01 ISSUE FOR 3RD PARTY REVIEW
GL-1 GL-2
1000 Maine Avenue, SW Washington, DC 20024
LEVEL 4 T.O.S. 55' - 1" LEVEL 3 T.O.S. 42' - 11"
GL-2
C
Hoffman-Madison Waterfront
LEVEL 3 T.O.S. 42' - 11" LEVEL 2 WEST T.O.S. 30' - 4"
# 1
LEVEL 2 WEST T.O.S. 30' - 4"
DATE DESCRIPTION 2016.07.01 ISSUE FOR 3RD PARTY REVIEW
LEVEL 2 WEST T.O.S. 30' - 4"
ST-3
LEVEL 1 LEVEL 1 M.P. 13' - 0" M.P. 13' - 0"
L-2
ST-3
GL-2
GL-3
GL-1
SS-1
LEVEL 1 M.P. 13' - 0"
B
GL-2
GL-2
STAMP:
GL-2
GL-3
GL-3
ST-3
ST-3
LEVEL 1 M.P. 13' - 0"
ELEVATION - WEST12 WING - SOUTH FACADE SS-1 TC-1 L-2 3 EXT 1/8" = 1'-0"
GL-3
ST-3
ELEVATION - WEST WING - SOUTH FACADE 3 EXT 1/8" = 1'-0" A B
SEE ENLARGED ELEVATIONS FOR MATERIALS IN CALLOUT AREAS SEE FINISH SCHEDULE ON A6020 FOR MATERIAL INFORMATIONS
GL-2
GL-3
GL-1
GL-2
1
STOREFRONT BY OTHERS
2
OPTIONAL SIGN BAND BY OTHERS
STAMP:
OVERFLOW SCUPPERS
SS-1
ELEVATION - SOU 1 EXT 1/8" = 1'-0"
GENERAL NOTES - E 8
RETAIL SIGN BY OTHERS 5 GL-4 GLASS RAILINGS ALIGN. JOINTS WITH CURTAIN WALL MODULE BELOW, TYP ALL GLASS RAILINGS 1 STOREFRONT BY OTHERS SEE ENLARGED ELEVATIONS FOR MATERIALS IN CALLOUT AREAS 6 L-2 LOUVER BAND. REFER TO MECHANICAL DRAWINGS FOR AIR INTAKE REQUIREMENTS 2 OPTIONAL SIGN BAND BY OTHERS SEE FINISH SCHEDULE ON A6020 FOR MATERIAL INFORMATIONS SHADOW BOX (AL-1 BRAKE HTL BEHIND GL-1)
LIGHT FIXTURE
8
SIAMESE HEAD CONNECTIONS
9
ACCESS SS-1 BOLLARD
3
OVERFLOW SCUPPERS
AL-1 RETAIL AWNING
5
GL-4 GLASS RAILINGS ALIGN. JOINTS WITH CURTAIN WALLDESIGNATION MODULE BELOW, TYP ALL GLASS RAILINGS MATERIAL
9
10 7
11 GLASS 8 12 9
ELEVATION - SOU 1 EXT 1/8" = 1'-0"
SIAMESE HEAD CONNECTIONS
LEGEND - ELEVATION
A 7
B
B
LEVEL 1 M.P. 13' - 0"
ELEVATION - WEST WING - EAST FACADE 7 LIGHT FIXTURE 2 EXT 1/8" = 1'-0"
GLASS
SHEET NOTES - ELEVATION GENERAL NOTES - ELEVATION A
LEVEL 1 M.P. 13' - 0"
ELEVATION - WEST WING - EAST FACADE 2 EXT 1/8" = 1'-0"
SHEET NOTES LEGEND - ELEVATION - ELEVATION
3
10 A
12' - 2"14' - 11"
14' - 11" 12' -12' 2" - 2"
2
D
GL-3 LV-2
ST-3
ACCESS SS-1 BOLLARD
10
# 1 LEVEL 3 T.O.S. 42' - 11"
AL-1
GL-3 LV-2
STOREFRONT BY OTHERS
2
Hoffman-Madison Waterfront
GL-2 GL-1
2 GL-2
TC-1
C LEVEL 4 T.O.S. 55' - 1"
2 GL-2 3
1000 Maine Avenue, SW Washington, DC 20024
GL-1
LEVEL 3 T.O.S. 42' - 11" LEVEL 2 WEST LEVEL 2 WEST 30' - 4" T.O.S. 30'T.O.S. - 4"
GL-2
LEVEL 7 T.O.S. 91' - 7" LEVEL 6 T.O.S. 79' - 5"
1000 Maine Ave
LEVEL 5 T.O.S. 67' - 3"
GL-2 LV-2
AL-1
LEVEL 6 T.O.S. 79' - 5"
PROJECT:
GL-2 LV-2
GENERAL NOTES - ELEVATION
ELEVATION - SOUTH 1 EXT 1/8" = 1'-0"
3
2
D
TC-1
130' - 0"
12' - 2" 2 AL-1
B
ST-3
B
EVATION - SOUTH
40
GL-2 GL-1
GL-2 GL-1
LEVEL 7 T.O.S. 91' - 7"
LEVEL 4 T.O.S. 55' - 1" LEVEL 3 LEVEL 3 42' - 11" T.O.S. 42' -T.O.S. 11"
B
ST-3
12' - 2"
GL-1
C
GL-1
AL-1 TC-1
LEVEL 5 T.O.S. 67' - 3" LEVEL 4 LEVEL 4 55' - 1" T.O.S. 55' -T.O.S. 1"
GL-1
LEVEL 8 T.O.S. 103' - 9" LEVEL 7 T.O.S. 91' - 7"
TC-3 LEVEL 7 T.O.S. 91' - 7" LEVEL 6 LEVEL 6 79' - 5" T.O.S. 79' -T.O.S. 5"
LEVEL 6 T.O.S. 79' - 5" LEVEL 5 LEVEL 5 67' - 3" T.O.S. 67' -T.O.S. 3"
C
C
12' - 2"14' - 11"
12' - 2"
TC-3
GL-4
E
LEVEL 8 T.O.S. 103' - 9"
12' -12' 2" - 2"
GL-2
12' - 2"
AL-1 TC-1
D
TC-1
GL-4
LEVEL 9 T.O.S. 115' - 11" LEVEL 8 T.O.S. 103' - 9"
AL-1
TC-3
GL-3
1121 14th Street, NW, 3rd Floor Washington, DC 20005 T 202.659.0929 F 202.659.0928
LEVEL 9 T.O.S. 115' - 11"
LEVEL 8 T.O.S. 103' - 9" LEVEL 7 LEVEL 7 91' - 7" T.O.S. 91' -T.O.S. 7"
GL-2
T 703.821.7990 F 703.821.2270
LEVEL 10 T.O.S. 128' - 1" LEVEL 9 T.O.S.© 2015 115'FOX - 11" Architects LLC. All rights reserved worldwide
12' - 2"
GL-2
AL-1
LEVEL 10 T.O.S. 128' - 1"
TC-3 LEVEL 9 T.O.S. 115' - 11" LEVEL 8 LEVEL 8 103' - 9" T.O.S. 103'T.O.S. - 9"
TC-3
GL-3
LEVEL8484 10Westpark Drive, Suite 620 T.O.S.McLean, 128' Virginia - 1" 22102
www.fox-architects.com
12' - 2"
AL-1
E
TC-1
130' - 0"
TC-1
GL-2
ARCHITECTS
PENTHOUSE T.O. PARAPET 143' - 0"
TC-1
© 2015 FOX Architects LLC. All rights reserved worldwide
12' - 2"
GL-1
TC-3
PENTHOUSE T.O. PARAPET 143' - 0"
TC-1
A3015 1121 14th Street, NW, 3rd Floor Washington, DC 20005 T 202.659.0929 F 202.659.0928
PENTHOUSE T.O. PARAPET 143' - 0"
12' - 2"
TC-1
TC-3
LEVEL 10 T.O.S. 128' - 1" LEVEL 9 LEVEL 9 T.O.S. 115'T.O.S. - 11" 115' - 11"
TC-1
12' - 2"
TC-3 AL-1
TC-3
E
12' -12' 2" - 2"
GL-4
GL-1
12' - 2"
TC-1
1 A3015
8484 Westpark Drive, Suite 620 McLean, Virginia 22102I1 T 703.821.7990 F 703.821.2270 1
GL-1 TC-1
12' -12' 2" - 2"
TC-1 TC-3
F
I1
ARCHITECTS
www.fox-architects.com
LEVEL 10 LEVEL 10 128' - 1" T.O.S. 128'T.O.S. - 1"
12' - 2"
ISSUE FOR 3RD PARTY REVIEW 2016.07.01
E
D
A
GL-1 TC-1
12' - 2"
GL-3
GL-4
J1
PENTHOUSE MEZZ. T.O. ROOF 154' - 10"
J1
GL-1
PENTHOUSE T.O. PARAPET 143' - 0"
130' - 0"
GL-1
130' - 0" 12' -12' 2" - 2"
TC-1
14' - 11"
4 A3012
GL-1
12' -12' 2" - 2"
AL-2
12' -12' 2" - 2"
GL-4
GL-3
ISSUE ISSUE FORFOR 3RD3RD PARTY PARTY REVIEW REVIEW 2016.07.01 2016.07.01
GL-1
11' - 10"
PENTHOUSE PENTHOUSE T.O.143' PARAPET 143' - 0" T.O. PARAPET - 0"
14' - 11"
A3012
AL-2
E
F HIGH ROOF T.O. COPING 161' - 6" LOW ROOF T.O. COPING 159' - 0"
130' - 0"
4
R5
PENTHOUSE MEZZ. T.O. ROOF 154' - 10"
130' - 0"
1
A3002
12' -12' 2" - 2"
1 A3000
11' - 10"
1 A3003
F
GL-4
3
1
HIGH ROOF T.O. COPING 161' - 6" LOW ROOF T.O. COPING 159' - 0"
12' -12' 2" - 2"
4' - 2" 2' - 6"
R4
F
F
4
2
1 A3002
R3
12' - 2"
1 A3000
4' - 2" 2' - 6"
1 A3003
18' - 6"
4
18' - 6"
5
AL-1 RETAIL AWNING LIGHT FIXTURE
NORTH
DRAWN BY:
SEE ENLARGED ELEVATIONS FOR MATERIAL
B
SEE FINISH SCHEDULE ON A6020 FOR MATE
Author
A
SS-1 RETAIL AWNING HANGERS FOX PROJECT NO: SIAMESE HEAD CONNECTIONS
10720.00 SS-1 POINT CONNECTION CURTAIN WALL FITTINGS ACCESS SS-1 BOLLARD DRAWING TITLE:
SOUTH ELEVATION
SS-1 RETAIL AWNING HANGERS
A
SEE ENLARGED ELEVATIONS FOR MATERIAL
B
SEE FINISH SCHEDULE ON A6020 FOR MATE NORTH
DRAWN BY:
13 INSULATED OVERHEAD COILING DOOR AL-1 RETAIL AWNING RETAIL 10 SIGN BY OTHERS 11
A
GENERAL NOTES - E
ACCESS SS-1 BOLLARD
Author
A
FOX PROJECT NO:
2
1 2' - 11 1/2"
10 3/4"
1' - 3 1/2"
STRUCTURAL STEEL TUBE RIGID INSULATION
6"
3" 2 7/8" 1/8"
F
6"
1' - 1"
ARCHITECTS TERRA COTTA FIN 8484 Westpark Drive, Suite 620 McLean, Virginia 22102 T 703.821.7990 F 703.821.2270
ALUMINUM PANEL
1121 14th Street, NW, 3rd Floor Washington, DC 20005 T 202.659.0929 F 202.659.0928 www.fox-architects.com
POINT SUPPORTED CURTAIN WALL SYSTEM
© 2015 FOX Architects LLC. All rights reserved worldwide
E
STRUCTURAL RODS
5
4
3
1
2
ALUMINUM BACK PAN
- SOUTH LOBBY CURTAIN WALL - EAST END - TYPICAL 3 PLAN 1 1/2" = 1'-0"
2' - 9 3/4"
4 1/2"
1' - 3 1/2"
7 3/8"
7 3/8" 1"
11 7/8"
F
7 3/8"
F
D
1' - 6"
3/8"
R1
1121 14th Street, NW, 3rd Floor Washington, DC 20005 T 202.659.0929 F 202.659.0928
TERRA COTTA CURTAIN WALL FIN
1' - 5 1/2"
3 1/2"
ALUMINUM PANEL BEYOND
© 2015 FOX Architects LLC. All rights reserved worldwide
E
1/2"
1/2"
RIGID INSULATION
1/2"
3"
3 3/8"
ALUMINUM HORIZONTAL FIN BEYOND TERRA COTTA CURTAIN WALL FIN BEYOND
DATE DESCRIPTION 2016.07.01 ISSUE FOR 3RD PARTY REVIEW
1/2"
3' - 0 1/2"
1' - 3 3/4"
4 1/2" 11 7/8"
7 3/8" 1" 3" 7"
7"
# 1
PLAN - TYP. POINT SUPPORT SYSTEM - JOINT
2 - INSIDE CORNER - METAL PANEL 1 1/2" = 1'-0" 6 PLAN 1 1/2" = 1'-0"
1/4" 1"
10 1/2"
1 1/2"
7"
9 7/8"
- TERRA COTTA FIN - NICHE - 6TH-10TH FLOOR 3 PLAN 1 1/2" = 1'-0"
1/2"
Hoffman-Madison Waterfront
CURTAIN WALL SYSTEM
TERRA COTTA CURTAIN WALL FIN
ALUMINUM STRUCTURAL SUPPORT
1/2"
6 1/2"
9 7/8"
1/2"
1' - 6"
1/4" 1"
7"
1 1/2"
C
TERRA COTTA CURTAIN WALL FIN BEYOND
6 1/2"
10 1/2"
3"
ALUMINUM HORIZONTAL FIN BEYOND
1' - 6"
1/2"
1"
ALUMINUM VERTICAL FIN 3' - 0 1/2"
1000 Maine Avenue, SW Washington, DC 20024
STRUCTURAL RODS
ALUMINUM VERTICAL FIN
1/2"
1' - 3 3/4"
4 1/2"
11 7/8"
7 3/8"
1000 Maine Ave
1/2" 1' - 3
www.fox-architects.com
GLASS RAILING
1 3/4"
1' - 5 1/2"
3/4"
4"
ALUMINUM STRUCTURAL SUPPORT
PROJECT:
STAINLESS STEEL GLASS SUPPORT
TERRA COTTA CURTAIN WALL FIN
8484 Westpark Drive, Suite 620 McLean, Virginia 22102 T 703.821.7990 F 703.821.2270
RIGID INSULATION
4"
3" 2 1" 1/4"
1' - 6"
ARCHITECTS
ALUMINUM BACK PAN
R1
1/2"
2 1/4" 3"
3 3/8"1/2"
D
ALUMINUM HORIZONTAL FIN BEYOND TERRA COTTA CURTAIN WALL FIN BEYOND
- TERRA COTTA FIN - NICHE- 5TH FLOOR 2 PLAN 1 1/2" = 1'-0"
STRUCTURAL RODS 1' - 6" 7"
1/2"
PROJECT:
11 7/8" 6 1/2"
3"
1"
7 3/8"
POINT SUPPORTED CURTAIN WALL SYSTEM
4 1/2"
6"
1' - 1"
1000 Maine Ave
I1
1000 Maine Avenue, SW Washington, DC 20024
2' - 10" TERRA COTTA FIN
ALUMINUM BACK PAN
I1
2' - 4"
C
ALUMINUM BACK PAN
1' - 3 1/2"
B
EQ
Hoffman-Madison Waterfront
1/4"
EQ
STAMP:
RIGID INSULATION
4 1/2"
1/2"
ALUMINUM VERTICAL FIN
1 7/8"
1 7/8"
ALUMINUM HORIZONTAL FIN BEYOND
# 1
4 1/2"
6"
RIGID INSULATION
DATE DESCRIPTION 2016.07.01 ISSUE FOR 3RD PARTY REVIEW
11 7/8"
RIGID INSULATION
6 3/ 8"
CURTAIN WALL SYSTEM
1/4"
ALUMINUM VERTICAL FIN
10720.00 DRAWING TITLE:
7"
7"
2" 1/
EXTERIOR PLAN DETAILS
3"
ALUMINUM STRUCTURAL SUPPORT TERRA COTTA CURTAIN WALL FIN
2 1/4"
1
- TYP CORNER MULLION 5 PLAN 3" = 1'-0"
3 3/4"
- TYP MULLION - TERRA COTTA 4 PLAN 3" = 1'-0" 4
3
ALUMINUM HORIZONTAL FIN BEYOND
1/2"
FOX PROJECT NO:
1/2"
2
5
NORTH 1 1/2" 1"
10"
Author
A
1/2"
" 10
R2
DRAWN BY:
ALUMINUM HORIZONTAL FIN BEYOND
6 1/2"
1" 1 1/2"
- SOUTH LOBBY CURTAIN WALL - WEST END - TYPICAL 1 PLAN 1 1/2" = 1'-0"
CURTAIN WALL SYSTEM
B STAMP:
1/4"
TERRA COTTA CURTAIN WALL FIN
TERRA COTTA CURTAIN WALL FIN BEYOND
CURTAIN WALL SYSTEM
1' - 6"
6 1/2"
1/2" 1' - 6"
2" 1/
1' - 3
1' - 8"
3/16"
1/2"
STRUCTURAL STEEL TUBE
1 HOUR PARTITION TYPE 9B
ALUMINUM STRUCTURAL SUPPORT
1/8"
3/16"
ALUMINUM PANEL
3"
3" 2' - 4"
2" 1/4"
1"
1"
3' - 5"
7 3/8"
7 3/8"
2" 1/4"
11 7/8"
3 1/2"
B
A
ALUMINUM VERTICAL FIN
3' - 9
3" 1' - 11 7/8"
ALUMINUM STRUCTURAL SUPPORT
1' - 8"
C
6"
1 1/2" 1"
EQ EQ
ALUMINUM PANEL
E
D
POINT SUPPORTED CURTAIN WALL SYSTEM
10"
CURTAIN WALL SYSTEM ALUMINUM BACK PAN
RIGID INSULATION
1/8" 2 7/8" 3"
ISSUE FOR 3RD PARTY REVIEW 2016.07.01
3" 3"
1' - 6"
6 1/2" 1/2"
1' - 0"
7"
1' - 6"
3"
CURTAIN WALL SYSTEM
STAINLESS STEEL STRUCTURAL PLATE
3"
1/2"
TERRA COTTA CURTAIN WALL FIN BEYOND
2 1/4"
7 1/2"
TERRA COTTA CURTAIN WALL FIN BEYOND
3 3/4"
DRAWING NUMBER
A5101
NORTH
DRAWN BY: Author
A
FOX PROJECT NO: 10720.00
EXTERIOR 41 PLAN DETAILS
DRAWING TITLE:
- TYP MULLION 1 PLAN 3" = 1'-0" 2
1
DRAWING NUMBER
Society for Science and the Public
Size: 15,737 sq. ft / 1,462 sqm Program: Office Building Renovation and addition Location: Downtown Washington DC Status: In development Phase Society for Science and Public (SSP) is a non-profit organization that has their office space in 2 seperate buildings. Although these two buildings are next to each other, their floor elevations are different and they aren’t connected in any form. As the organization is growing they requiere more office space with the hope of it being in the same building. SSP contacted FOX Architects to conduct a concept design and required to connect the two buildings with a central “atrium” space. One of the main difficulties of this project was to create a design that allows the two unique buildings to connect to each other with ramps and stairs. I worked on the full concept phase and includeding team design work, concept diagrams, BIM modeling, production of building elevations, building sections and development of all renderings.
2552.78 SF
Design Goals SOCIETY FOR SCIENCE & THE PUBLIC
2271.01 SF
2270.33 SF
1457.21 SF
1569.02 SF
549.26 SF
1509.11 SF
GROUND FLOOR F.A.R.
FIRST FLOOR F.A.R.
SECOND FLOOR F.A.R.
Design Goals
65' - 0" ZONING HEIGHT LIMIT
SOCIETY FOR SCIENCE & THE PUBLIC
1719 ROOF 50' - 10"
5' - 8"
12' - 0"
PROPOSED ROOF HEIGHT 57' - 2"
1719 ATTIC 45' - 2"
10' - 7"
1723 ROOF 42' - 4"
1719 3RD FLOOR 34' - 7"
8' - 9"
1723 PENTHOUSE FLOOR 38' - 3"
2' - 9"
1388.68 SF
2271.06 SF
4' - 1"
1723 PENTHOUSE ROOF 45' - 1"
11' - 10"
11' - 3"
1723 3RD FLOOR 29' - 6"
1719 2ND FLOOR 23' - 4"
11' - 3"
1723 2ND FLOOR 17' - 8"
10' - 4"
1423.35 SF
Design Goals SOCIETY FOR SCIENCE & THE PUBLIC
Proposed Plans
SIDEWALK 0' - 0" 1723 GROUND FLOOR -1' - 8"
1' - 4"
7' - 4"
PENTHOUSE F.A.R.
1719 GROUND 1' - 4" SIDEWALK 0' - 0"
1' - 8"
THIRD FLOOR F.A.R.
TOTAL BUILDING F.A.R. : 15,323 .87 SF
1719 1ST FLOOR 12' - 1"
10' - 9"
1723 1ST FLOOR 7' - 4"
ELEVATION ADDITIONAL AMENITY SF : 1,388.68 SF 6
SOCIETY FOR SCIENCE & THE PUBLIC 7
Northwest Bird’s Eye View 42
VIEW OF ROOF DECK
2270.33 SF CREATINGCREATING A PHYSICAL A PHYSICAL CONNECTION CONNECTION
VISUAL CONNECTION VISUAL CONNECTION THROUGHTHROUGH THE BUILDINGS THE BUILDINGS
1569.02 SF
CREATINGCREATING OPENNESS OPENNESS
A.R.
BUILDINGBUILDING ENTRY ENTRY
Design Design Goals Goals
Initial concept circulation and entrance diagrams
SECOND FLOOR F.A.R.
SOCIETY SOCIETY FOR SCIENCE FOR SCIENCE & THE&PUBLIC THE PUBLIC 65' - 0" ZONING HEIGHT LIMIT
1719 ROOF 50' - 10"
5' - 8"
12' - 0"
PROPOSED ROOF HEIGHT 57' - 2"
10' - 7"
1719 3RD FLOOR 34' - 7"
8' - 9"
1723 PENTHOUSE FLOOR 38' - 3"
1719 ATTIC 45' - 2"
2' - 9"
1723 ROOF 42' - 4"
4' - 1"
1723 PENTHOUSE ROOF 45' - 1"
11' - 10"
11' - 3"
1723 3RD FLOOR 29' - 6"
10' - 4"
11' - 3"
1723 2ND FLOOR 17' - 8"
1719 2ND FLOOR 23' - 4"
SIDEWALK 0' - 0" 1723 GROUND FLOOR -1' - 8"
1' - 8"
A.R.
1' - 4"
7' - 4"
10' - 9"
1723 1ST FLOOR 7' - 4"
1719 1ST FLOOR 12' - 1"
Building elevation showing the different floor elevations
SF
1719 GROUND 1' - 4" SIDEWALK 0' - 0"
ELEVATION
43
OPEN OFFICE
ELEVATOR
FACILITIES MANAGMENT BREAKOUT
MECHANCIAL
FIRST FLOOR EXAMPLE LAYOUT
STAIR OPEN OFFICE
UP
WOMEN'S RESTROOM
BREAKOUT
STAIR MEN'S RESTROOM
STAIR OFFICE
MEN'S RESTROOM
LIBRARY
MAIL ROOM
CONFERENCE
WOMEN'S RESTROOM
COFFEE / COPY
FIRST FLOOR OFFICE EXAMPLE LAYOUT 1' - 4"
FACILITIES MANAGMENT
MECHANCIAL
STAIR
3' - 7" 1' - 4"
OPEN OFFICE
STAIR
UP
MAIL 1' - 4" ROOM
OFFICE RECEPTION
UP
MEN'S RESTROOM
0' - 0"
-0' - 8" CONFERENCE
ELEVATOR
WOMEN'S RESTROOM -1' - 8"
1' - 4"
3' - 7"
-1' - 8"
BIKE STORAGE BREAKOUT 1' - 4"
UP
WOMEN'S MEN'S RESTROOM1' - 4"RESTROOM
COFFEE
RECEPTION
STAIR OPEN OFFICE
COFFEE 0' - 0"
-0' - 8"
OFFICE
STORAGE CONFERENCE -1' - 8"
LIBRARY
BREAKOUT
CONFERENCE
COFFEE / BIKE COPY STORAGE
OFFICE COFFEE
-1' - 8"
COFFEE
OPEN OFFICE CONFERENCE
STORAGE LIBRARY
ELEVATOR
CONFERENCE
OFFICE
GROUND FLOOR EXAMPLE LAYOUT THIRD FLOOR EXAMPLE LAYOUT
GROUND FLOOR 3D SECTION
Interior Space
GROUND FLOOR EXAMPLE LAYOUT
BREAKOUT
WOMEN'S RESTROOM
Interior Space OPEN
MEN'S RESTROOM
STAIR OFFICE
SOCIETY FOR SCIENCE & THE PUBLIC
OFFICE
SOCIETY FOR SCIENCE & THE PUBLIC BREAKOUT
COFFEE / COPY
12
OFFICE
THIRD FLOOR EXAMPLE LAYOUT
BREAKOUT
OPEN OFFICE WOMEN'S RESTROOM
OFFICE
MEN'S RESTROOM
STAIR OFFICE
ELEVATOR COFFEE / COPY
OFFICE
OPEN OFFICE
OFFICE
OPEN OFFICE
ELEVATOR
KITCHENETTE OPEN OFFICE
SECOND FLOOR EXAMPLE LAYOUT
KITCHENETTE
TYPICAL FLOOR 3D SECTION
Interior Space
SECOND FLOOR EXAMPLE LAYOUT
STORAGE
WOMEN'S RESTROOM
Interior Space
MEN'S STORAGE RESTROOM
SOCIETY FOR SCIENCE & THE PUBLIC WOMEN'S RESTROOM
MEN'S RESTROOM
STAIR
STAIR
SOCIETY FOR SCIENCE & THE PUBLIC
CONFERENCE / EVENT
13
CONFERENCE / EVENT
MECHANCIAL
ATTIC FLOOR EXAMPLE LAYOUT
MECHANCIAL
ATTIC FLOOR EXAMPLE LAYOUT
ATTIC FLOOR 3D SECTION
Interior Space SOCIETY FOR SCIENCE & THE PUBLIC 14
Interior Space SOCIETY FOR SCIENCE & THE PUBLIC
ROOF PLAN
ROOF PLAN
Floor plans with its corresponding diagram 44
Interior Space SOCIETY FOR SCIENCE & THE PUBLIC
ROOF 3D
FACILITIES MANAGMENT
MECHANCIAL
STA
MAIL ROOM
3' - 7" 1' - 4" 1' -
-1' - 8"
BIKE STORAGE
STORAGE LIBRARY
VIEW OF CONFERENCE ROOM
View of Conference Room
Interior Perspective SOCIETY FOR SCIENCE & THE PUBLIC
VIEW OF CONNECTOR
View of Connector
45
Interior Perspective
VIEW FROM N STREET
Exterior Perspectives View from North Street SOCIETY FOR SCIENCE & THE PUBLIC
View from Alley 46
Exterior Perspectives
SOCIETY FOR SCIENCE & THE PUBLIC
VIEW FROM ALLEY
ELEVATOR
Interior Space
47
SECTION D
OPEN OFFICE
BREAKOUT
THIRD FLOOR EXAMPLE LAYOUT
BREAKOUT
WOMEN'S RESTROOM
MEN'S RESTROOM
STAIR OFFICE
COFFEE / COPY
OFFICE
OPEN OFFICE
OFFICE
ELEVATOR
OPEN OFFICE
KITCHENETTE
SECOND FLOOR EXAMPLE LAYOUT
Interior Space
A cross section was important to understand the different floor levels and to see how the stairs would have to be designed in order to connect both floors SOCIETY FOR SCIENCE & THE PUBLIC
SOCIETY FOR SCIENCE & THE PUBLIC
Interior Space SECTION C
BREAKOUT
WOMEN'S RESTROOM
MEN'S RESTROOM
STAIR
COFFEE / COPY
OPEN OFFICE
ELEVATOR
OPEN OFFICE
BREAKOUT
LIBRARY
FIRST FLOOR EXAMPLE LAYOUT
FACILITIES MANAGMENT
MECHANCIAL
STAIR
UP
STAIR MEN'S RESTROOM
MAIL ROOM
CONFERENCE
WOMEN'S RESTROOM 1' - 4"
3' - 7"
RECEPTION
UP
1' - 4"
-0' - 8"
1' - 4"
0' - 0"
-1' - 8"
-1' - 8"
BIKE STORAGE
COFFEE COFFEE
STORAGE CONFERENCE
LIBRARY
CONFERENCE
GROUND FLOOR EXAMPLE LAYOUT
Interior Space SOCIETY FOR SCIENCE & THE PUBLIC
On both sides of the existing buildings lightwells were designed to allow light shine down.
SOCIETY FOR SCIENCE & THE PUBLIC
Interior Space
BREAKOUT
SECTION B
WOMEN'S RESTROOM
MEN'S RESTROOM
STAIR
COFFEE / COPY
OPEN OFFICE
ELEVATOR
OPEN OFFICE
BREAKOUT
LIBRARY
FIRST FLOOR EXAMPLE LAYOUT
FACILITIES MANAGMENT
MECHANCIAL
STAIR
UP
STAIR MEN'S RESTROOM
MAIL ROOM
CONFERENCE
WOMEN'S RESTROOM 1' - 4"
3' - 7"
RECEPTION
UP
1' - 4"
0' - 0"
-0' - 8"
1' - 4"
-1' - 8"
-1' - 8"
BIKE STORAGE
COFFEE COFFEE
STORAGE CONFERENCE
LIBRARY
CONFERENCE
GROUND FLOOR EXAMPLE LAYOUT
Interior Space SOCIETY FOR SCIENCE & THE PUBLIC
The section through the ramps and stairs was the most important one Interior Space to demonstrate how light shines SOCIETY FOR SCIENCE & THE PUBLIC down the whole building. BREAKOUT
WOMEN'S RESTROOM
MEN'S RESTROOM
STAIR
COFFEE / COPY
SECTION A
OPEN OFFICE
ELEVATOR
OPEN OFFICE
BREAKOUT
LIBRARY
FIRST FLOOR EXAMPLE LAYOUT
FACILITIES MANAGMENT
MECHANCIAL
STAIR
UP
STAIR MEN'S RESTROOM
MAIL ROOM
CONFERENCE
WOMEN'S RESTROOM 1' - 4"
3' - 7"
RECEPTION
UP
1' - 4"
0' - 0"
-0' - 8"
1' - 4"
-1' - 8"
BIKE STORAGE
-1' - 8"
COFFEE COFFEE
STORAGE CONFERENCE
LIBRARY
CONFERENCE
GROUND FLOOR EXAMPLE LAYOUT
Interior Space SOCIETY FOR SCIENCE & THE PUBLIC
A series of sections was created in order to understand the location of the atriums and how the floors respond to the light from them
48
02 Academic Works Knoxville Market Hall
50
UTC Living and Recreation
56
Medium Mega Superscape
62
Passages of History
68
Green Oak Initiative
72
49
Knoxville Market Hall Project: Urban Concept Location: Knoxville, Tennessee Program: Public Market + Culinary Institute Professor: James Rose Team: Thomas Agee
Located in the heart of Downtown Knoxville, the proposed market hall and the culinary institute enhance the atmosphere of Market Square, a significant public space of the city. The project design allows people to transition from the storefront flanked main streets to the inner plaza by freely passing through the market portion of the building at ground level. The green wall acts as a visually porous threshold between the outside and the interior. In the summer, when the vegetation is in full bloom, it provides shade for the building and Market Square. Alternately, during the winter the work and skill of the interior Culinary Institute is more clearly exhibited. This Integration Studio focuses on clear design development, principles of sustainability and building performance, as well as integration of the major component building systems.
50
Market 1. Market Stall 2. Culinary School 3. Amphitheater 4. Mechanical Room 5. Elevator 6. Bathrooms
Culinary School 7. Loading Dock 8. Market Walls 9. Krutch Park 10. 3’ x 10’ Concrete 11. Sitting Bench 12. Bike Racks
1. Culinary Lobby 2. Administrative Office 3. Lecture Hall 4. Main Teaching 5. Library 6. Lounge Space 7. Teaching Kitchen 8. Teaching Kitchen Storage
9. Classroom 10. Classroom Storage Space 11. Bathroom 12. Mechanical Room 13. Culinary School outdoor balcony 14. Shower 15. Mechanical Space 51
South West Elevation
Section through large Teaching Kitchen
White membrane roof moisture barrier 8” Insulation Board on Sloped Roof 6” one - way cast in place concrete slab
Kewneer Double Glazed Storefront system
2” Colton Sun - Shading operable louvers
Hardtop kitchen counter, Wooden center structure supported by metal bars on ends 14” Batt Insulation
12” Cast - in - Place Concrete Beam Reinforced concrete rebar Vierendeel Steel Truss 10” x 3” EcoMesh Panels W 6 x 22 typical Steel Column W 12 x 24 concrete cantilever
52
Culinary balcony
Market Hall
Cross Section showing market and teaching 53
Roof Vierendeel Truss System Trespa Composite Panel Roof Joists
2nd Floor Joists
Beams
Eco Mesh Paneling System Cast in Place Concrete Load-Bearing Wall Staggered from bellow Colton Sun-Shading operable louvers. Closes to connected surface for movie proyection Metal Truss supporting folded sheet metal planters
Load Bearing Walls
Market walkway entrance 18” x 18” Continuous footer retaining wall. Total 4’ depth for amphiteather 4” Slab on Grade Concrete Underlay Gravel
Variable Air Control HVAC System Plan - Culinary Floor
Reflected Ceiling Plan - Culinary Floor 2” x 4” Horizontal Wood Slats are placed on the ceiling of the hallway 54
Folded Sheet Metal Planters, spanning along truss Perforated Soil filter Vierendeel Steel Truss Metal Flashing Metal Stud Parapet Condition 8” Tapered Insulated Panel 6” Batt Insulation Board 6” one way cast in place Concrete Slab 3/8” Trespa Composite - Charcoal 14” x 28” Supply Duct
4’ Circulatory Copper Lighting Kewneer Storefront Glazing
Trespa Exterior Double insulated wall Interior finish Gypsum Board Concrete Pavered System Balcony Drain to Cistern Tapered Slope Drain to Cistern 14” Batt Insulation Fire Preventing Sprinkler
Night Perspective looking at the north east facade 55
UTC Living + Recreation Project: University Urban Concept Location: Chattanooga, Tennessee Program: Dormitory + Student Center Professor: James Rose Inspired by an abandoned baseball stadium, this project reinvigorates the site and repairs its historic connection with the city of Chattanooga. The site planning for the University of Tennesee at Chattanooga (UTC) Dormitory reuses the baseball field as an outdoor recreational facility for the students.The building itself accomodates a diverse group by providing a variety of student programs and ammenities under one roof. The proximity and access to downtown, Erlinger Hospital and the main University Campus, make the location of the site ideal. The goal for the studio was a comprehensive program and plan layout which was achieved through iterative analysis and investigation.
PLAY STORE SLEEP
WORKOUT
SLEEP
EAT COOK
COOK
INTERACT
WASH
PLAY
STORE WORKOUT
EAT
Bottom right: Analysis of the typical day of a student. This determined the hierearchy of the final program.
WASH
INTERACT
TRANSIT STUDY
A visual Program Layout was important to determine the various parts of the project. There are two main program layouts for students: private and public.
STUDY
TRANSIT
Opposite: Site analysis influenced what types of porgrams a typical student required. Dormitory and Recreation were primary.
Program Layout Public Area
Private Area Relax Sleep Wash Cook Storage
300 sq ft. 250 sq ft. 100 sq ft. 225 sq ft. 35 sq ft.
Lounge Study Dining Recreate Workout
CLASS 1800 sq ft. 700 sq ft. 750 sq ft. 600 sq ft. 875 sq ft.
STUDY RECREATE
56
SLEEP
UTC Campus Student Housing UTC Hospital Proposed Site
Access to Site
Access to Main Roads
5 - 10 - 15 Walk Access 57
Extrude
Match
Slice
Early facade sketch
North West perspective 58
Remove
Add
Views
Solar Gain
Play
Bedroom view sketch study
Perspective from the baseball field 59
Cross Sections
Early sketch of atrium light
Diagram showing open view from the atrium 60
Fourth Floor - Study Floor
Third Floor - Fitness Floor
Second Floor - Recreation Floor
Ground Floor - Dining Floor
61
Medium Mega Superscape Project: Digital Urban Concept Location: Knoxville, Tennessee Program: Multi Park Professor: Keith Kaseman Focusing on future possibilities that allow for new territories to be explored, Knoxville Medium Mega Superscape was an ambiguous explorative process that revealed ways in which architecture and people can connect in a new form. Through abstract models that represent spatial and programmatic potential, evidence of a new architecture and the realms of its possibilities are presented. After investigating a potential site for the “infection”, the project led to energize a part of Knoxville. A vision to create a space for the growing amount of cars and population of the city. The evidence of this super scape is to allow residence to park their car in this all in one structure.
Copper Wire soldered to create various forms. A 2’ by 2’ wood frame was built to create the boundaries.
62
Early moves began to take shape. These moves would help understand the model better.
Project’s Initial diagram exploration
Documentation of the models 63
Mapping iterations show evidence of unique spatial explorations that led to unique territory discoveries.
Mappings of Knoxville showing the major moves of the city.
Different areas of city densities. Bounded by movement roads 64
+
+
Investigation of possible areas of infections for a super scape
Copper model shown as if it were to land on site 65
Evidence that a Multi Park could eventually become a Medium Mega Super Scape with Knoxville as its ground.
66
67
Passages of History Project: Historic Preservation + Urban Location: Rome, Italy Program: Library Professors: Riccardo D’Aquino + Francesca Riccardo Award: Hnedak and Bobo Study Abroad Competition (Honorable Mention) Located on this site with centuries of history, the Library at Trajan’s Market addresses the problem of how to build upon ancient ruins. With several different structures built throughout history, the interaction of visitors with each layer was a unique opportunity to design for. Utilizing a system of walkways, visitors move between the ruins and the new building creating a strong understanding of old compared to new. Through this contrast, the ruins and their sense of the past is emphasized.
Ruins Program
Circulation
Ruins
Interior Perspective
Design Sequence 68
Cut
Remove
Add
Connect
Learn
East Section Perspective
69
a)
b)
a
a) Longitudinal Section b) Early Section Sketches c) Salita dell Grillo Elevation d) Early Facade Sketches Ruins Floor 70
c)
d)
Library Floor
Office Floor 71
Green Oak Initiative - Diploma Studio Project: Research + Design + Design Build Location: Clay County, Kentucky Program: Community Center Professor: Ted Shelton Team: Studio Class Award: UT EUReCA Research Award This project focus was interdisciplinary research that explores the potential of an underutilized byproduct of the U.S. hardwood industry as a sustainable building material. The white oak “cant” is the center cut of a milled log and is typically sold “green” or un‐dried due to characteristics that limit its usefulness as a traditional dry lumber product. Currently, cants are used in the manufacturing of shipping pallets, a low grade product with a short life. However, as cants are minimally processed, they could be used as a low cost building material with extremely low embodied energy. Yet, there are obstacles that prevent their introduction into the construction market, such as the lack of contemporary architectural and/or engineering knowledge about green oak in the building design field. The work consists of testing cants’ structural capacity, dimensional movement in assembled mockups, and weathering characteristics in exterior applications. a) Most to the “Green Oak” Lumber is produced in the east United States. Mostly found in the appalachia region of the country, White Oak is a result of 97% of all hardwood production. b) “Green Oak” is taken from the center of the milled log, since this is the part that has more limits than a regular lumber cut. c) The typical wood pallet cant d) “Green Oak” has 4 typical defects.
b)
e) Prefabricated bents consist of a 8’x8’ Modular System.
d)
c)
a) 72
e)
South Elevation
South Section 01
a)
b)
c)
Located in Clay County, Kentucky, the site is located next to housing dorms for visiting volunteers. The project designed by the whole studio, consists of a dormitory, a community space and a facilty space. a) Bike Path b) Urban Agriculture c) 2 Mini-Split HVAC System 73
Rain Water collection system
Mechanical room construction
Grey Water disposal into garden
Sitting Room construction
Bedroom construction
1) 2) 3)
4) 5)
Prefabricated wall panel assembly
74
1) Framed window assembly, extending 1 1/2” below plywood bottom edge 2) 2x8” shelf to provide nailing surface for furring strips and window framing 3) 1 1/2” lip to fasten plywood to oak with stainless steel screws 4) 7” rigid insulation trimmed to fit and bundled prior to shipping 5) 2x4” vertical furring strips at 4’ on center to pin insulation and provide rigidity
1)
2)
East Section 02
1) Solar Angle 2) Cross Ventilation
West Section 03
a)
a) Shipment of prefabricated wall panels b) Foundation poured c) Bedroom wing assembled d) Sitting space assembled e) Bathroom space assembled
b)
c)
d)
e) 75
76
03 Sketches
77
Sketches The following are some sketches that were done while living in Europe and in the United States. Sketching not only allows me to understand the physical aspect of objects but also the theoretical meaning behind some of the built environments.
Analysis drawing of Sagrada
Sagrada Familia 78
79
80
81
82
83
84
04 Architectural Photography
85
86
87
88
89
90
91
92
93
JEAN PAUL BARON
Architecture Portfolio 2010-2019 Selected Works jbaronpa@gmail.com