N
1
2
3
5
4
6
7
8
9
10
11 12
27399
199
5743
2527
A
REF. SHEET 08
2155
B
REF. SHEET 08
3202
C
3377
3772
1308
1984
1092
REF. SHEET 09
REF. SHEET 12
F
F
1598
9139
C
D REF. SHEET 10
E
REF. SHEET 11
D REF. SHEET 10
E
3745
D
REF. SHEET 11
PERIMETER DRAIN
BACK ALLEY
1790
B
JALAN HANG KASTURI
REF. SHEET 12
UP
2005
A
2041
E
A
REF. SHEET 07 08
B
REF. SHEET 08
C
REF. SHEET 09
1:50 1m
ARC1215
METHODS OF DOCUMENTATION AND MEASURED DRAWING 87,Jalan Hang Kasturi,75200 Melaka,Malaysia
ROOF PLAN
02-02-2017 19-03-2017 1:50 ONG TUN CHEIK PUAN HASMANIRA ONG TUN CHEIK
0
1m
2m
3m
4m
5m
2017/ARC1215/FWUCHANG/P06
06 25