hi!
JUAN ALCALA DESIGNER
Home Los Angeles, California 90019 Mobile 1 (619) 852-7679 Email alcala.jc@gmail.com Web http://issuu.com/juanalcala
“
Juan Alcala received his Bachelor of Architecture degree in 2010 from Woodbury University where he presided over CLEA (Latin-American Council of Architecture Students) and served as an Events Committee Officer in the student body. Professionally, Juan is experienced in Schematic Design, Construction Documentation, Interior Design, Landscape Design, 3D Modeling-Rendering, Presentation Graphics, Restoration/Remodel Proposals, and Physical Maquette Construction. Juan is committed to excelling in any challenging work environment that promotes professional development and supports his goal of architectural licensure.
“
La Esquina
Mixed-Use
Playa Del Oro
Restoration + Remodel
Tijuana Civic Center
Degree Project
Construction Documents
Mixed-Use
“My” Details
Skills + Experience + Education
In collaboration with De-Arc, I produced and managed the graphic presentation and physical maquette for La Esquina mixed-use project. I worked closely with Design Principal Hector Perez on the overall project presentation and was in-charge of designing the layout for the restaurant that will form part of the larger mixed-use professional/residential building. My resulting work was used for Community Presentation and subsequent bank loan meetings. The project is currently under construction.
A
B 2nd floor plan: three units
5’ 1’
15’
A
B ground plan: four units and small restaurant
5’ 1’
15’
Section A
1
2
4 3
1 Section B
3
4
5
5
2
Along with presentation boards, I constructed the physical maquette and participated in the presentation of the project to the Barrio Logan Community Board. The maquette includes the image of legendary civil-rights activist Cesar E. Chavez to honor the strong Mexican heritage of the Barrio Logan community. The mural will be laser edged onto the side of the actual building.
The rendered floor plan displays my final and most successful restaurant layout. Other layout possibilities explored kitchen and space adjacency schemes as well as patron traffic circulation. The watermelon mural in the back of the restaurant is a replica of Mexican muralist Rufino Tamayo’s work and intended to pay homage to the strong muralist history of Chicano Park, in the Barrio Logan Community of San Diego, California.
Playa Del Oro Restoration / Remodel
I created a comprehensive restorationremodel proposal for Playa Del Oro; a 1968 five story Modernist Apartment Building designed by legendary Modernist Architect Homer Delawie. The proposed improvements range from re-landscaping with drought tolerant and indigenous plants and materials, exterior wall and ground materials, colors and interior resurfacing of kitchens and bathrooms, as well as selection of lobby art and furniture.
PROPOSED LOBBY ENHANCEMENTS EXISTING
PROPOSED
Replace lobby art with appropriate mid 20th century art.
Reconfigure and clad base of mail-boxes in light birch plywood to accommodate out-going letter and package receptacle and to unify all functional and decorative elements. Replace visually cumbersome chair with refined classical modern Barcelona Chair. BOOMERANG
www.boomerangformodern.com 6 1 9 . 2 3 9 . 2 0 4 0
Remove lobby carpet, clean and repair terrazzo floor. Remove wall-paper from lobby to new color scheme. MARBLE LIFE
www.marblelife.com 8 5 8 . 6 8 9 . 8 3 3 8
Add Storage Enclosure
Remove Raise Planter
Add Roof Replace with Proper Replace with Proper to Storage Modern Chair Modern Table
EXISTING CONDITIONS
Reconfigure Perimeter Planter
Replace with Proper Modern Chair
Modify Concrete & Pavers
Replace with Proper Modern Table
Replace grass with Rock Garden
Remove Carpet Exposing Terrazzo Floor
Upgrade Wall Light Fixtures
Replace Existing Art with Proper Modern Art
Remove Plants away from walls
Create Proper Garbage Enclosure
Replace Grass with Stone Pathway
Replace Tile with Plynyl Tiles
Replace Hedges with Rocks & Native Plants
River Rock with Cordyline Accents Remove Lawn & Grind Concrete Replace Furniture Replace Remove Signage Curve Defects with Modern Bench Floor Mats
Replace Planting with Arch. Pottery
PROPOSED ENHANCEMENTS
Cedar Shed
American Floor Mats
Architectural Boulevard Pottery-Glazed Square Table
Bertoia Side Chair Terrazzo Floor
Concrete Pavers
Cedar Trash Shed
Succulent Accents
Tulip Side Table Pea Gravel Barcelona Chair Mondo Grass Accents
Plynyl Tiles
Decorative Rock Garden
American Floor Mats
Architectural Pottery-Glazed
Flag Stone Walkway
Mexican Pebble
River Rock Blue Oat Grass
Horse Tail
Nelson Platform Architectural Pottery Bench
Cordyline
NEEDS STORAGE ENCLOSURE Provide a new storage shed at north-east corner of patio to protect and store beach equipment and bicycles.
PROPOSED CEDAR STORAGE SHED
NORTH-EAST PATIO
NEEDS TRASH ENCLOSURE Properly enclose trash-bins with wooden envelope to reduce undesirable visual impact of trash-bins and ceiling pipes.
PROPOSED CEDAR TRASH SHED
PARKING LOT
PROPOSED UNIT ENHANCEMENTS EXISTING
PROPOSED
EXISTING
PROPOSED
Replace existing carpet with low-profile more resistant patterned and textured modular carpet. FLOR w w w . f l o r . c o m 8 6 6 . 9 5 2 . 6 6 5 8
Supply balconies with Architectural Pottery white or bisque 3 shapes.
Kitchen faucet with transitional high-arch design with exceptional ergonomics and functionality.
All cabinets to be re-covered with birch veneer (similar or to match existing doors) Enhance kitchen & Bathrooms with simple Aluminum pulls.
KOHLER www.us.kohler.com 8 0 0 . 4 5 6 . 4 5 3 7
VESSEL USA www.architecturalpottery.com 8 5 8 . 3 8 5 .1 9 6 0
Rest room faucet with fluid design lines for beauty and easy cleaning.
A simple hardware swap-out can have huge impact on the appearance of cabinetry.
KOHLER www.us.kohler.com 8 0 0 . 4 5 6 . 4 5 3 7
HOME DECOR HARDWARE www.homedecorhardware.com 8 7 7. 7 6 5 . 4 0 5 2
Replace existing Entry and Kitchen floor with a Scandinavian Natural Beech Trondheim woodlock flooring system. BALBOA FLOORING w w w. b a l b o a f l o o r i n g . c o m 8 5 8 . 2 7 8 . 3 7 4 5
Replace existing bathroom floor with Cork flooring. Cork is natural; warm to the touch, anti-microbial and great thermal insulator. BALBOA FLOORING www.balboaflooring.com 8 5 8 . 2 7 8 . 3 74 5
tijuana civic center TIJUANA, MEXICO Reclaim Rio Tijuana Rethink Civic Center Porosity Humanize Pedestrian Experience
thesis advisor: Stella Murphy-Robitaille semester: senior degree studio site: Tijuana, Mexico studio program: 1. re-claim Rio Tijuana 2. re-think civic center porosity 3. humanize pedestrian experience
Cathedral Residential
Night Clubs
Professional Governmental Cultural Center
Shopping Center
homeless
and
addicts
have made the tijuana river their home. Neighboring residents conceded one pedestrian bridge to the indigents out of concern for their own safety.
80 ยบ F 68
69
68
70
60 ยบ F 46
48
50
53
70 57
73 60
76
78
79
64
65
64
76
72
50 45
40 ยบ F
1 in 2 in 3 in 4 in
0.1
0
0.1
0.2
0.4
0.7 1.1
2.0
2.0
2.1
1.2
Ave. Precipitation
0.2
dec.
july
jan.
20 ยบ F
69
58
Ave. High/Low Temp.
100 ยบ F
the
high
temperature
and low precipitation in Tijuana make the concrete river bed an ideal and safe place to host new activities from May to October. Photo taken in the month of April.
polluted
city
runoff
flows into the Tijuana River creating an unpleasant sight and smell. This water eventually makes its way into the estuary on the US side of the border and exits just south of Imperial Beach CA polluting the local beach.
an opportunity
arises
to improve the indigent and pollution situation by removing 1/2 of the river bed and placing a wetland system that will filter some pollutants out of the water before it reaches the estuary in the US side.
going
over
the
san
diego convention center is possible after ascending, then descending, hundreds of steps. There is no direct access to the stairs from streets. Pedestrians diverge from their natural pathway just to reach stairs.
going under the david l. Lawrence convention center in Pittsburgh is possible after sharing a long tunnel with vehicular traffic. The tunnel has poor natural light, low air quality and high vehicular noise. This is an awkward space that may seem a bit claustrophobic.
not
going
anywhere
is the situation with the Jacob K. Jevits Convention Center in New York City. This is the worst offender of all three typologies. This type of convention center is not penetrable and it acts as a solid barrier to exterior pedestrian thru traffic.
In all of these typologies, the exterior pedestrian flow is greatly diverted or in some cases interrupted altogether by a conglomerated building. These paradoxical typologies undermine the civic life they are attempting to celebrate because they obstruct the natural flow of exterior pedestrian traffic. Hence, a new design is in order; a design that is true to the celebration of civic life by promoting the natural flow of the pedestrian community through the building instead of around, over, or under it. While at first glance the conglomerated program may seem crucial, more can be done to liberate the interior program from the unnecessary envelope that houses it. Removing the “shell� will not only facilitate the flow of natural pedestrian circulation, but will re-proportion the civic center into an appropriate human scale that allows the civic center to form a more responsible and intimate part of the urban fabric.
A
Amphitheater Park
B
Residential Park
three access points were designed as park entrances with the goal of; reclaiming a portion of Rio Tijuana, reconnecting the bifurcated community through a porous civic center, and humanizing the pedestrian experience through parks that also cater to the adjacent residences, business, and cultural center.
B
C A
C
Cultural Park
Hall Space 34,345 sq. ft.
Conference/Theater 5,694 sq. ft.
Amphitheater Park 221,312 sq. ft.
Display Space 146,284 sq. ft.
Hall Space 40,278 sq. ft.
Water Install. Space 140,002 sq. ft.
Meeting Rooms 413 - 3,363 sq. ft. ea.
Cultural Park 72,820 sq. ft.
river & ground level
A 1
B 2 3
6
4 5
3
3
6
1. residential access 2. Boardwalk/River Access 3. Installation Space 4. Lake-Edge Boardwalk 5. Lake Installation Space 6. Wetland Filtration System 7. Civic Center Parking 8. Ramp to Loading Dock
50’ 200’ 100’
7
400’
8
section a
elevated program
A B 4
1 2
8
5
6 7
3
9
1. Hall Space 2. Hall Space 3. Hall Space 4. Theater/Conference 5. Hall Space 6. Hall Space 7. Meeting Rooms 8. Residential Park 9. Cultural Park 10. Amphitheater Pods 11. Vehicle Drop-off 12. Amphitheater
10 50’ 200’ 100’ 11
12
400’
11
section b
amphitheater park
riverbed
interior hall
exterior hall
CONSTRUCTION These Construction Documentation excerpts demonstrate my advanced proficiency in AutoCAD, my experience in construction documentation, and the adequate labeling of such.
DOCUMENTS
REVISIONS PL
1
6 A3.4
7 A3.5
8 A3.5
3
2
4'-0"
1'-0"
10'-0"
17'-0"
9 A3.6
10 A3.6
5
4
PL
6
5'-0"
7
15'-0"
8
10'-0"
9
5'-0"
15'-0"
10
2'-0"
OUTSIDE OF FINISH
9'-9 1/2"
5'-3 1/4"
4'-6"
7'-2 3/4"
20'-2 1/2"
10"
10"
1'-0"
TO EDGE OF PLANTER
5'-0" 15'-0"
18'-1 1/4" 4'-6"
TO EDGE OF CURB
PLANTER
PROPOSED PLANTER W/TREES TYP. SEE L/1.0
WALL OFFSET FROM PROPERTY LINE
3'-2"
9'-0"
9'-9 1/2"
10"
10"
2'-0"
3'-2"
9'-0"
2'-0"
3'-2"
9'-0"
2'-0"
3'-2"
9'-0"
2'-0"
2'-0"
4 A5.1
A PL
PL A
02
01
02
02
02
02
02
02
1 A3.2
LA ESQUINA
1 A5.1
01
UP
B
02
2 A3.2
2 A3.2
06
3 A5.1
6 1 A5.1 A5.1
3 A3.3
3 A3.3
PROFESSIONAL SERVICES
PROFESSIONAL SERVICES
PROFESSIONAL SERVICES
PROFESSIONAL SERVICES
01 A: 259.21 sq ft FF + 70.61'
02 / OFFICE A: 442.16 sq ft FF + 70.73'
03 / OFFICE A: 442.16 sq ft FF + 70.85'
04 / OFFICE A: 442.16 sq ft FF + 70.97'
05 / OFFICE A: 442.16 sq ft FF + 71.09'
30'-0"
RESTAURANT
30'-0"
5'-0"
3 A-3.7
4'-0"
3'-0"
2'-4"
3'-9 1/2"
11
4 A-3.7
E
S
BATHROOM A: 38.48' sq ft
03 05
03
5'-5 1/2" SEE 14/A5.2 FOR RAIL ATTACHMENT
11'-5 1/4"
LINE OF WINDOW/ DOOR COVERS (OPEN) TYP.
5'-6 3/4"
1 A5.1
03 03
04
03
04 6'-3/4"
4'-10 1/4"
03
04 4'-1"
4'-1"
03
04 4'-10 1/4"
CLEAR
03
04 6'-3/4"
3'-1/4"
2 A5.1
03
03
04 6'-3/4"
4'-10 1/4"
03
04 4'-1"
4'-0"
03 C
04 4'-10 1/4"
6'-3/4" EDGE OF STAIR ABOVE
4'-1"
1'-0" 3'-6"
D
5"
4'-3 3/8"
ELEC. & GAS METERS
LINE OF CURB
9'-10"
9'-10"
8'-0"
Dearc
LOCATION OF PORTABLE FIRE EXTINGUISHER
28 RISERS @ 7" 27 TREADS @ 1' UP
MAIL ENCLOSURE
REFUSE & RECYCLE MATERIAL STORAGE AREA A: 84.00 sq ft FF = 70.11'
5 A3.4
1 11 A5.1 A5.0
NOT TO BE OCCUPIED
FLOOR DRAIN
HECTOR PEREZ
UP
5 A3.4
8111 CAMINO DEL ORO #L
0'-2"
6 5/8"
5"
SIM
10'-0"
6"
2'-6"
5'-0"
3'-0" BACKFLOW PREVENTION DEVICE
28 RISERS @ 7" 27 TREADS @ 1'
14'-0"
CURB TO PROPERTY LINE
5'-0"
4 A3.3
5'-0"
S
2'-2 1/2"
2 A-3.7
2'-6"
W
1'-4 1/2"
01
5'-0"
6'-11 1/4"
4 A3.3
CLEAR
11
N
N
10'-0"
11
15'-0"
11
5'-0"
CLEAR
1'-6"
KITCHEN A: 171.03' sq ft
01
LA JOLLA
4'-0"
11 A5.0
11 A5.0
WALL OFFSET FROM PROPERTY LINE
17'-0"
35'-3 1/2"
5'-8 1/2"
6'-0"
9'-0"
CONC. STAIR
E PL
0'-2"
PL E
1'-0"
2222 LOGAN AVE. SAN DIEGO CA 92113
EDGE OF BUILDING ABOVE
5'-0"
5'-0"
1 A3.2
4 RISERS @ 6" 3 TREADS
INSIDE EDGE OF EXIST. SIDEWALK
3'-7"
CALIFORNIA 92037
WALL OFFSET FROM PROPERTY LINE
GALVANIZED MTL. STAIR
PH. (619) 889-2760
24'-4 5/16"
PLAN LEGEND
2
6 A3.4
7 A3.5
8 A3.5
9 A3.6
10 A3.6
9 PL
PL 2x4 STUD CONSTRUCTION 2x6 STUD CONSTRUCTION
N
2x6 STUD CONSTRUCTION - ONTOP OF 3'-6" CONCRETE STEM WALL POURED IN PLACE CONCRETE WALL & STAIR INDICATES 1 HOUR CONSTRUCTION
INDICATES ADA CLEARANCE
1
FIRST FLOOR PLAN
1/4" = 1'- 0"
01
WINDOW-SEE SCHEDULE - A 1.0
03
DOOR-SEE SCHEDULE - A 1.0
DATE:
12-16-10
REVISIONS
6 A3.4
7 A3.5
8 A3.5
9 A3.6
10 A3.6
PL
PL
1
2
3
5
4
6
7
8
9
10
1'-0" 4'-0"
17'-0"
10'-0"
5'-0"
15'-0"
10'-0"
5'-0"
15'-0" 1 A3.2
A DOWNSPOUT (SERVES 908 SF. OF ROOF AREA)
09
09
9 A5.1
12 A5.2
10 A5.1
09
09
09
16 A5.1
PL
2 A3.2
LA ESQUINA
09
5'-0"
DOWNSPOUT (SERVES 908 SF. OF ROOF AREA)
9 11 A5.1 A5.1
B SIM
7 A5.1
VA
LLEY
LL EY
VA
VA
2 A5.0
8 A5.1
LLEY
LL EY
14 A5.1
VA
2 A3.2
2'-0" DECK
DECK A: 446 sq ft
A: 446 sq ft
1 1/2"
06
07 / OFFICE A: 525.00 sq ft FF + 88.17'
10
08
PROF. SERVICES
06
08 / OFFICE A: 525.00 sq ft FF + 88.17'
30'-0"
PROF. SERVICES
RIDGE
7'-6"
08
RIDGE SLOPE
SLOPE SLOPE
10
SLOPE
1 1/2"
06
06 / OWNER OCCUPIED OFFICE A: 595.00 sq ft FF + 88.17'
1/4" PER 12" CLASS 'A' ASSEMBLY (TPO)
PROFESSIONAL SERVICES
1/4" PER 12" CLASS 'A' ASSEMBLY (TPO)
08
F
10
3 A3.3
2 A5.0
F
F
3 A3.3
WOOD SURF. TYP.
15'-0"
GRAVEL SURFACE TYP.
5 A-3.7
SIM
5'-0"
3'-8"
20 A5.2
POCKET DOOR CAVITY TYP.
SIM
19 A5.2
04
04
07
5'-0"
4'-2 7/8"
A: 257.51 sq ft FF + 88.17'
EY
METAL GUARDRAIL W/INLAID WOODEN PANELS SEE 18/A5.2
10'-0"
SLOPE
HECTOR PEREZ
5'-0"
LLEY
DECK
5 A3.4
13'-2"
IPE 4" WOODEN DECKING PER FINISH SCHED. TYP.
SLOPE
VA
LL
Dearc
D
SLOPE
EY
VA
C
5'-0"
EGRESS BALCONY
3'-0"
LL EY
11'-0" GALVANIZED MTL. STAIR
DOWNSPOUT (SERVES 577 SF. OF ROOF AREA)
51'-6"
VA
SLOPE
14'-10"
9'-9 1/4"
DOWNSPOUT (SERVES 577 SF. OF ROOF AREA)
1'-9 3/8"
7'-4"
EY
5 A3.4
E
S
08 8 A5.1
LOCATION OF PORTABLE FIRE EXTINGUISHER
LL
1/4" PER 12" CLASS 'A' ASSEMBLY (TPO)
A-3.7
07
SIM
6 A5.0
VA
LL
12 A5.1
08
6
W
09
VA
EY LL
07
LLEY
LLEY
VA
VA
VA
10
09
07 N
12 A5.2
09
1'-8"
4 A3.3
07
10'-0"
FLOOR DRAIN TYP.
04
2222 LOGAN AVE. SAN DIEGO CA 92113
A
1 A3.2
OUTSIDE OF FINISH
PL
PLANTER TYP. SEE L/1.1
A: 227 sq ft
8111 CAMINO DEL ORO #L
WALL OFFSET FROM PROPERTY LINE
41'-0"
5'-3/4"
6'-0" CONC. STAIR (BELOW)
9'-0" GALVANIZED MTL. STAIR
0'-2"
E
2 3/4"
LA JOLLA PL
3'-7"
E
PL
CALIFORNIA
WALL OFFSET FROM PROPERTY LINE
92037
LANDING
PH. (619) 889-2760
22'-3/4"
PLAN LEGEND
2 PL
2x4 STUD CONSTRUCTION
9 6 A3.4
7 A3.5
8 A3.5
9 A3.6
10 A3.6
PL
2x6 STUD CONSTRUCTION
N
2x6 STUD CONSTRUCTION - ONTOP OF 3'-6" CONCRETE STEM WALL POURED IN PLACE CONCRETE WALL & STAIR GRAVEL SURFACE OVERTOP CLASS 'A' ASSEMBLY (TPO) WOODEN DECKING INDICATES 1 HOUR CONSTRUCTION
2
SECOND FLOOR PLAN
1/4" = 1'- 0"
01
WINDOW-SEE SCHEDULE - A 1.0
02
DOOR-SEE SCHEDULE - A 1.0
DATE:
12-16-10
REVISIONS
6 A3.4
7 A3.5
8 A3.5
9 A3.6
10 A3.6
PL
PL
1
2
3
5
4
6
7
8
9
10
1'-0"
104.88' HIGH POINT
104.4' LOW POINT
15'-0"
10'-0"
104.4' LOW POINT
104.88' HIGH POINT
20'-0"
2'-0"
16 A5.0
104.88' HIGH POINT
104.4' LOW POINT
A
OUTLINE OF BUILDING ENCLOSURE BELOW
OUTLINE OF BUILDING ENCLOSURE BELOW
CLASS 'A' ASSEMBLY BUILT-UP ROOFING (GREEN)
CLASS 'A' ASSEMBLY BUILT-UP ROOFING (GREEN)
SLOPE 1/4" PER 12"
2 A3.2
15 A5.0
OUTLINE OF BUILDING ENCLOSURE BELOW
CLASS 'A' ASSEMBLY BUILT-UP ROOFING (GREEN)
SLOPE 1/4" PER 12"
SLOPE 1/4" PER 12"
2 A3.2
13 A5.0
VA
RIDGE
ROOF
RIDGE
ROOF
11
A:709 sq ft
11
3 A3.3
30'-0"
A:709 sq ft
15'-0"
11
1 A3.2
13 A5.0
LL EY
LL EY VA
LL EY VA
RIDGE
A:709 sq ft
PL
1'-10"
14 A5.0
ROOF
A
B
SIM
3 A3.3
5'-0"
1 A3.2
17 A5.0
5'-0"
PL
5'-0"
LA ESQUINA
10'-0"
VA EY LL
EY LL
EY LL
VA
VA
CRICKET ROOF
CRICKET ROOF
CRICKET ROOF
PLUMBING VENT FROM WH./KIT./BATH
PLUMBING VENT FROM WH./KIT./BATH
2222 LOGAN AVE. SAN DIEGO CA 92113
17'-0"
OUTSIDE OF FINISH
4'-0"
PLUMBING VENT FROM WH./KIT./BATH
4 A3.3
10'-0"
VENT SHAFT FROM UNIT #1 RESTAURANT HOOD
4 A3.3
ROOF VENT FROM BATHROOM FAN BELOW
C 16 A5.0
Dearc
D
OUTLINE OF BUILDING BELOW
HECTOR PEREZ
5 A3.4
5 A3.4
8111 CAMINO DEL ORO #L LA JOLLA
PL
E
E
CALIFORNIA
PL
92037 PH. (619) 889-2760 6 A3.4
PLAN LEGEND 01
7 A3.5
8 A3.5
9 A3.6
10 A3.6
2
9
L CLASS -A- ASSEMBLY, BUILT-UP ROOFING P
PL
WINDOW-SEE SCHEDULE - A 1.0
DATE:
3
ROOF PLAN
1/4" = 1'- 0"
12-16-10
REVISIONS SKYLIGHT TYP.
PL
9
8
10 A3.6
7
9 A3.6
6
8 A3.5
5
7 A3.5
3
4
6 A3.4
2
1
PL TOP OF ROOF ELEV. 104.88'
BOTTOM OF ROOF ELEV. 104.4'
DOWNSPOUT TYP.
11 A5.2
2 A5.2
SIM
METAL RAILING
12 A5.0
SIM
3'-6"
10 A5.2
10 A5.2
SIM
3'-0"
1 A5.2
9 A5.2
9'-0"
SIM
2 A5.2
73.3' (E) GRADE
AWNING SHUTTERS W/CEDAR SIDING TO MATCH EXIST. BEYOND
13 A5.2 SIM
1 A5.2
FIRST FLOOR F.F. RESTAURANT
ELEV. 70.61'
FINISHED GRADE BEYOND
6'-0"
1
NORTH (STOREFRONT) ELEVATION
ON GRADE PLANTING TYP. (SEE L/1.0)
CONC. STEM WALL
8'-11 1/4"
SIDEWALK CAFE
CLEAR PATH
1/4" = 1'- 0"
E
5 A3.4
D
4 A3.3
C
SKYLIGHT
PL
3 A3.3
2 A3.2
B
1 A3.2
EXIST. GRADE ELEV. 69.7' (LOT LOW POINT)
10 5/8"
1 A5.2
ON GRADE PLANTING (SEE L/1.0)
17'-3/4"
CEDAR SIDING W/4" REVEAL FINISH PER SCHEDULE
LA ESQUINA
TOP OF SUB FLOOR
ELEV. 87.67'
2222 LOGAN AVE. SAN DIEGO CA 92113
SECOND FLOOR
34'-10 7/8" MAXIMUM BUILDING HEIGHT
34'-1/4"
CESAR CHAVEZ MURAL (LASER ETCHED ON WOOD SHEATING)
PLANTER TYP. (SEE L1.1)
16'-11 1/2"
EXTERIOR GRADE M.D.O. PER FINISH SCHEDULE
A PL TOP OF ROOF ELEV. 104.4'
SECOND FLOOR TOP OF SUB FLOOR
1'-6"
6 A5.2
METAL GUARDRAIL
16'-11 1/2"
ELEV. 71.09'
ASPHALT SHINGLES PER. FIN. SCHEDULE
8 A5.2 6 A5.2
33'-6 1/4"
SECOND FLOOR TOP OF SUB FLOOR
ELEV. 71.09'
34'-10 7/8"
7 A5.2
PLANTER BEYOND
3'-6"
1'-6"
8 A5.2
6'-6"
7 A5.2
Dearc HECTOR PEREZ
8111 CAMINO DEL ORO #L LA JOLLA
CEDAR SIDING W/4" REVEAL PER. FIN. SCHEDULE
16'-6 11/16"
CALIFORNIA
FIRE WALL (1 HR)
ON GRADE PLANTING (BEYOND) (SEE L/1.0)
92037 PH. (619) 889-2760
72.97' (E) GRADE
73.3' (E) SIDEWALK
FIRST FLOOR F.F. OFFICE # 5
1'-4 5/8"
SIDEWALK (EXIST)
CONC. STEM WALL
ELEV. 71.09'
70.5' (E) GRADE
2
EAST ELEVATION
71.05' (E) GRADE EXIST. GRADE (BEYOND) ELEV. 69.7' (LOT LOW POINT)
1/4" = 1'- 0"
DATE:
12-16-10
REVISIONS 1
2 PL
6 A3.4
7 A3.5
8 A3.5
3
9 A3.6
6
10 A3.6
7
9
SKYLIGHT TYP. 12"
1'-1/4"
1/4"
1'-1 1/2"
12"
PROFESSIONAL SERVICES
TRANSLUCENT CHANNEL GLASS WALL PER WINDOW SCHEDULE
13 A5.0
PROFESSIONAL SERVICES
OFFICE 07
OFFICE 08
2 A5.0
POCKET DOOR PER SCHEDULE
R-19 EXT. WALL INSULATION TYP. 6&7 A5.2
WOOD DECKING
SOUND INSULATION TYP.
1'-2 3/4" 15'-10"
17'-3/4"
CEDAR SIDING W/4" REVEAL FINISH PER SCHEDULE
RESTAURANT SHELL
PROFESSIONAL SERVICES
01
PROFESSIONAL SERVICES
OFFICE 02
PROFESSIONAL SERVICES
OFFICE 03
PROFESSIONAL SERVICES
OFFICE 04
OFFICE 05
ROLL UP DOOR SEE 12/A5.0
6 A5.1
10 5/8"
3'-6"
METAL RAILING
FIRST FLOOR
8 A5.1
6'-0"
SECTION
SIDEWALK CAFE
1/4" = 1'- 0"
1
2 PL
6 A3.4
7 A3.5
3
4
6
10 A3.6
7
8
9 PL 12"
1/4"
PROFESSIONAL SERVICES
PROFESSIONAL SERVICES
OWNER OCCUPIED OFFICE 06
3'-10"
ASPHALT SHINGLES PER. FIN. SCHEDULE
VENT SHAFT FOR RESTAURANT HOOD
PROFESSIONAL SERVICES
OFFICE 07
OFFICE 08
R-19 EXT. WALL INSULATION TYP.
15'-10"
6&7 A5.2
6'-6"
8'-0"
SHOWER TILE PER FINISH SCHED. TYP.
WOOD DECKING
3'-6" 34'-0 1/4"
BOTTOM OF ROOF ELEV. 104.4'
1/4"
R-30 ROOF INSULATION TYP.
4'-0"
1'-1 1/2"
12"
EXTERIOR GRADE M.D.O. FINISH PER SCHEDULE
16'-11 1/2"
9 A3.6
SKYLIGHT TYP.
TOP OF ROOF ELEV. 104.88'
GRAVEL TYP.
SECOND FLOOR
SOUND INSULATION TYP.
TOP OF SUB FLOOR
1'-2 3/4"
ELEV. 87.67'
RESTAURANT SHELL
PROFESSIONAL SERVICES
01
OFFICE 02
PROFESSIONAL SERVICES OFFICE 03
PROFESSIONAL SERVICES OFFICE 04
8111 CAMINO DEL ORO
PROFESSIONAL SERVICES OFFICE 05
#L LA JOLLA
15'-10"
AWNING SHUTTERS W/CEDAR SIDING TO MATCH EXIST.
CALIFORNIA ACCESSIBLE BATH
92037
ACCESSIBLE BATH TYP.
PH. (619) 889-2760 8'-0"
CONC. STEM WALL
F.F. RESTAURANT
SIM
8 A5.1
3'-0"
FIRST FLOOR
3'-6"
METAL RAILING
10 5/8"
Dearc HECTOR PEREZ
CEDAR SIDING W/4" REVEAL FINISH PER SCHEDULE
17'-3/4"
34'-10 7/8" MAXIMUM BUILDING HEIGHT
8 A3.5
5
8'-0"
3
SIM
F.F. RESTAURANT
ELEV. 70.61'
EXIST. GRADE (FOREGROUND) ELEV. 69.7' (LOT LOW POINT)
LA ESQUINA
8 A5.1
ELEV. 87.67'
2222 LOGAN AVE. SAN DIEGO CA 92113
8 A5.1
TOP OF SUB FLOOR
A.F.F.
GRAVEL TYP.
SECOND FLOOR
3'-6"
SURFACE MOUNTED RECEPTACLE PER. ELECTRICAL TYP.
3'-6 1/2"
15'-10"
ASPHALT SHINGLES PER. FIN. SCHEDULE
3'-0"
OWNER OCCUPIED OFFICE 06
34'-0 1/4"
BOTTOM OF ROOF ELEV. 104.4'
1/4"
R-30 ROOF INSULATION TYP.
PROFESSIONAL SERVICES
34'-10 7/8" MAXIMUM BUILDING HEIGHT
PL
CRICKET ROOF (BEYOND)
TOP OF ROOF ELEV. 104.88'
16'-11 1/2"
8
ELEV. 70.61'
EXIST. GRADE (FOREGROUND) ELEV. 69.7' (LOT LOW POINT)
DATE:
4
SECTION
6'-0"
1/4" = 1'- 0"
SIDEWALK CAFE
12-16-10
WORK / LIFE BALANCE Work
Schematic Design Construction Documents 3D Modeling & Rendering Presentation Graphics Interior Design Landscape Design Restoration/Remodel Physical-Model Construction Data Entry & Computation
Balance
ME!
Life
Pencil Drawing Water Color Playing Soccer Ethnic Cuisine Photography Cooking Socializing Personal Development Architectural Events
WHY WE SHOULD WORK TOGETHER ! Excellent graphic, written, and verbal communication skills. Exceptional problem solver with outstanding competitive leadership skills. Brilliant multi-tasker who works great with others and individually. Meticulous organizational skills with superb attention to detail. Self-motivated individual with solid work ethic who takes the initiative. Terrific customer service skills with superior professionalism. Proficient in English and Spanish. Social media savvy such as LinkedIn, Facebook, Flickr, etc.
TECHNICAL SKILLS Proficient: AutoCAD, SketchUp, LayOut, Rhinoceros, VRay, Photoshop, Illustrator, InDesign, AcrobatPro, MS Office Suite, FTP. Basic: Revit
EXPERIENCE 2008 - 2011 Design Intern De-Arc (Design-Development Studio) Schematic Design and Construction Documentation phases for residential mixed-use project. Graphic presentations for restoration/remodel, residential mixed-use, and sustainable landscape projects. Schematic Design, Interior Design, and Graphic Presentation of restaurant-unit in mixed-use project. Presentation-quality physical wood-maquette for residential mixed-use project. Co-presented mixed-use project to a community board for community approval in San Diego, California. Digitalized and produced a PowerPoint presentation of the Design Principal’s career and artistic work. Graphical work has been used for bank loan meetings accomplishing successful results.
2010 - 2011 Radio Frequency Analyst Dtech Communications (Radio Frequency Engineering Firm) Drafted site diagrams of cellular phone-antennas. Data Entry & Computation using Microsoft Office Suite and additional Radio Frequency software. Phone receptionist for CEO and CFO, took messages when they were unavailable to come to the phone. Scheduled appointments between property managers and field technicians to gain access to antenna towers. Designed business cards and identification badges for employees. Performed additional office tasks as needed.
EDUCATION 2005 - 2010 Bachelor of Architecture Woodbury University (San Diego Campus) CLEA President (Latin-American Council of Architecture Students), Woodbury San Diego Chapter, 08’ Events Committee Officer -Student Forum, Woodbury San Diego, 08/09’ Woodbury Transfer Scholarship, Woodbury San Diego, 05’-10’
bye!