758 N+
N +718
JUAN FELIPE HERRERA Q.
ARCHITECTURAL DESIGN _ SAMPLES OF WORK
01
OFFICE_ PROJECT_ USE_ POSITION _ YEAR_ LOCATION_ STATUS_
TAB - Arquitectos Architectural design Hotel and mall facilities Project Architect - plans - sections + diagrams - 2014 - 15 Cartagena - Colombia Under construction
HYATT REGENCY HOTEL & MALL - CARTAGENA _0.1 PROFFESIONAL_2014-15
Floor 14 - Pools & amenities
Vertical circulation diagram
Floor 12 - Ballroom
Floor 6 -10 - Parking and HITS
Evacuation diagram
Floor 1 -6 - Mall / B.O.H
Facade details
POST INDUSTRIAL
LOCAL RESOURCES
A NEW INDUSTRY
RE-STABLISHING INFRAESTRUCTURE
OFFICE_ PROJECT_ USE_ POSITION _ YEAR_ LOCATION_ STATUS_
RE-CONSTRUCTING THE BUILTENVIRONMENT
MSc. TAB -Assignment Arquitectos- UCL Urban designdesign Architectural Industrial Hotel andregeneration mall facilities Team - Plans + DiaProjectProject Architect - plans - secgrams 3d model- -2014 2015 tions ++diagrams Grimsby - UK Cartagena - Colombia Design Process Under construction
POST INDUSTRIAL DOCKLANDS - GRIMSBY _0.2 ACADEMIC_2015
The timeline
+ Industrial Framework
+ Ossification
Adding new uses
A new future
= Industrial framework ossifccation
A new future
suburban urban
A mixed vision collition? OFFICE_ PROJECT_ USE_ POSITION _ YEAR_ LOCATION_ STATUS_
MSc. Assignment - UCL Urban design Architectural & urban regeneration
Project Architect - Plans + Diagrams - 2015 London - UK Design Process
ROYAL DOCKS + MILLENNIUM MILLS REGENERATION - LONDON _0.3 ACADEMIC_2015
A green future
Site framming
CURRENT SITUATION - ABANDONED
Progressive landscape evolution
Valuable assets to work with
Valuable assets to work with
A community-led project
OFFICE_ PROJECT_ USE_ POSITION _ YEAR_ LOCATION_ STATUS_
TAB - Arquitectos Urban + Architectural design Institutional - New School Project Architect - Plans + Sections + details - 2013 Bogotรก - Colombia Built
ROCHESTER SCHOOL LAYOUT - BOGOTร _0.4 PROFFESIONAL_2013
Masterplan
Layout - Hubs/classroom clusters
Public realm Construction details
Layout - Audeteria
Architectural construction details
OFFICE_ PROJECT_ USE_ POSITION _ YEAR_ LOCATION_ STATUS_
TAB - Arquitectos Architectural design Institutional - Facilities Project Architect - Plans sections + diagrams - 2013 Bogotá - Colombia 2nd place
SANTAFÉ HOSPITAL EXTENSION - BOGOTÁ _0.5 Practitioners, students, patients and nurses
General visitors
PROFFESIONAL_2013 Oncology
Structural Proposal
Cardiology
Level -1
Structure over radiotherapy reactor Existing hospital
Facade Proposal
New inner promenade Observation rooms Type 2
Level 1,2 Surgery rooms
Observation rooms Type 1
Structure over radiotherapy reactor Gastrointesti- Restaurant & roof Garde nal area
Operation diagrams Level 3
Public promenade Garden
General location plan
Level 6
Intensive care
Underground parking
Sections
OFFICE_ PROJECT_ USE_ POSITION _ YEAR_ LOCATION_ STATUS_
TAB - Arquitectos Architectural design Hospital facilities Team Architect - plans - sections + diagrams - 2012 Bogotá - Colombia Under construction
EL BOSQUE UNIVERSITY HOSPITAL- BOGOTA _0.6 PROFFESIONAL_2012 Roof garden
Observation & Recovery Gastroentherology
Birth surgery
Operation rooms
Services
Outpatient surgery
Doctor’s officess
Intensive care
Imaging - x.r
Admin.
Future growth
Emergency rooms Post.
Recovery gardens
Emergency rooms Pre.
Layers & circulations
Surgery Imaging x.r Emergency
Level 1 - Emergency rooms
Level 2 - Operating rooms
Green corridors Plot
Programmatic scheme
Existing buildings Existing buildings
Proposed mass
General location plan Level 1 - Green corridors
OFFICE_ PROJECT_ USE_ POSITION _ YEAR_ LOCATION_ STATUS_
TAB - Arquitectos Architectural design Educational - University campus Team Architect - plans diagrams - 2012 Bogotá - Colombia 2nd place
LA SABANA UNIVERSITY POSTGRADUATE - BOGOTA _0.8 PROFFESIONAL_2012
Level -1
Level 2
Ground floor plan
Form strategies
Level 4
Section A-A’
Section B-B’
Constructive details
OFFICE_ PROJECT_ USE_ POSITION _ YEAR_ LOCATION_ STATUS_
DB - Arquitectos Architectural design Housing Team Architect - Plans - Diagrams + Renderings - 2011 Sao Paulo - Brasil Under construction
HABITACAO PARA TODOS - SAO PAULO _0.7 PROFFESIONAL_2011
Masterplan
Urban parameters
interior Block layout
Dwellings types
Renderings Square
Pedestrian routes
Court blocks
Alamedas
Blocks
Pocket parks
Public access
Communal facilities
Built & void
Urban components
OFFICE_ PROJECT_ USE_ POSITION _ YEAR_ LOCATION_ STATUS_
TAB - Arquitectos Architectural design Institutional - Industrial Facilities Team Architect - Renderings Details - 2011 Bogotรก - Colombia Under construction
HUNTER DOUGLAS HQ. - BOGOTร _0.9 PROFFESIONAL_2011
Plan and phasing opertion
Constructive details
OFFICE_ PROJECT_ USE_ POSITION _ YEAR_ LOCATION_ STATUS_
TAB - Arquitectos Architectural design Institutional - Facilities Team Architect - Sections + renderings - 2010 Bogotá - Colombia Under construction
COMPENSAR SUBA - BOGOTÁ _10 PROFFESIONAL_2010
Level -3 Pools
Level -1, -2 Parking
Section A-A’
Level 2,3 - Bowling
Level 4,5 - Medical serv.
Ground floor
Section B-B’
Level 6 - Gym
Level 4 - Roof terrace
Representative buildings section
OFFICE_ PROJECT_ USE_ POSITION _ YEAR_ LOCATION_ STATUS_
TAB - Arquitectos Architectural design Institutional - Invias facilities Team Architect - Sections + diagrams + Renders - 2011 Bogotรก - Colombia Competition - 2nd place
INVIAS MASTERPLAN & BUILDING - BOGOTA _11 PROFFESIONAL_2011
Structural diagrams
Operation diagrams
Plans
3d details
Sections Renderings
OFFICE_ PROJECT_ USE_ POSITION _ YEAR_ LOCATION_ STATUS_
OAB - Carlos Ferrater BCN Urban & Architecture design Hotel + Serv.Apt. + promenade Intern - 3D + Diagrams + Model 2008 Dubai, United Arab Emirates Competition - 2nd place.
THE EDGE - DUBAI _12 INTERNSHIP_2008
Sections
3d + Programme Diagrams
Model
OFFICE_ PROJECT_ USE_ POSITION _ YEAR_ LOCATION_ STATUS_
OAB - Carlos Ferrater BCN Urban & Architecture design Hotel + Serv.Apt. + promenade Intern - 3D + Diagrams + Model 2008 Dubai, United Arab Emirates Competition - 2nd place.
IMQ HOSPITAL - BILBAO _13 INTERNSHIP_2008 Location within Zorrozaure masteplan
Main urban relations
Parking and back of the house
Location and Sections
Circulation and progrmatic diagrams
Model
Public square
ARCHITECTURAL DETAILING _14 PRACTICE 2009-2015
Straigh Staircase
Facade
Curve Staircase
Bathrooms
HAND SKETCHING _15 PRACTICE_2009-2014