Centro de Estudios de Posgrado
Juan Goicoechea Álvarez Juan Goicoechea Álvarez portfolio
About me
Hi, my name is Juan Goicoechea. I studied my Bachelor’s Degree (Part III equivalent) in the University of Coruña. About my experience, I did a three month internship in a Polish design furniture workshop and I worked as architect the last four months in Trespes Arquitectos where I developed projects from the stage one until the completion of the same.
Personal Information Name Juan Goicoechea Phone number +44 (0)7821 829 v383 E-mail goicoechea8@gmail.com Address 52th Quick Rd. SW19 1EY Birth June of 1991
Education • •
San José de Cluny Vigo School. Bachelor’s degree in Architecture at Escuela Técnica Superior de Arquitectura de A Coruña, Spain.
Computer skills
Hello!
low medium proficient AutoCad Sketchup Artlantis Render Photoshop Illustrator InDesign Rihno+Grasshoper Revit (Autodesk certificate) Cura 3D Lumion
Languages and personal interests • • • • • • 2
Mother tongue Spanish Other languages English- B2.5 (Certificate) Galician, second language Driving license B Digital and analogic photograph 3D Printing, rostock 3D printer owner, knowledge of Cura software among others. Running and lecture.
Experience • • • •
Architect Intern at Trespes Arquitectos. I have been working with the studio since November 2017 until April. Where I have developed projects in all the stages (4 months). Internship on my ERASMUS year in a design furniture fabric, in a workshop in the city of Warsaw (3 months). Colaboration with the studio +48 Architektura on a contest participation (2 weeks). Link to portfolio and works, issuu.com/juangoicoecheaalvarez2
Studies • •
Bachelor’s degree in Architecture in the University of Coruña, at Escuela Técnica Superior de Arquitectura de A Coruña, 2017. ERASMUS in Warsaw, Poland, during the course 2014/15 at the Wyższa Szkoła Ekologii i Zarządzania.
Web Development (at the moment) Contest “Sahara Eco House”
Architecture Bachelor’s Degree (09/2017) Workshop “Cartografías Textís” (05/2017) Revit Course (04/2017) Contest “Perspectiva Natura” (11/2016) Photography course with Luis Carré (04/2016)
Contests • • •
Contest about an information point “Ideas Punto de Información de Confemadera” ETSAC. (05/2014) Contest about a cabin in the woods “Perspectiva Natura”, ETSAC. (11/2016) Contest reThinking, “Shahara Eco House” (12/2017)
Workshops • •
Workshop “Adaptive Systems”, in collaboration with Exexe Architects on the Lodz Design Festival, (18/10/2014) Workshop “Cartografías Textís”, with Rosario Belda, ETSAC. (05/2017)
Courses • • • • • •
“En el Centenario de los Maestros”, conference cycle, ETSAC. (2013) Digital Manufacture, ETSAC. (09/2015) Adobe Illustrator CS6. (02/2016) Photography course with Luis Carré, ETSAC. (04/2016) Revit Architecture, on the online platform 3D Cube, medium level, Autodesk Certificate. (04/2017) Introducing to Web Development, Google Actívate Platform. (at the moment)
Languages •
Architect Intern at Trespes Arquitectos (4 months)
Adobe Illustrator CS6 course. (02/2016) Digital Manufacture course. (09/2015) Collaboration with +48 Architektura Studio (2 weeks) Internship on a Design Furniture Fabric (3 months) Workshop “Adaptive Systems” (10/2014)
EASMUS, Warsaw, Poland (Course 2014/15)
Contest “Ideas punto de Información” (05/2014) B2 English, Centro de Linguas (12/2013) “En el centenario de los maestros” (11/2013) Start Architecture degree (2010)
English level B2.5 with the “Centro de linguas Universidade de a Coruña” certificate. 3
Projects made in collaboration with Trespes Arquitectos These are some of the projects I have had part, in some or all of the stages of development, since the urban analysis until the documentation to be approved and built. • • • • • •
Piano house extension in Oleiros, Nani’s house, A Coruña. Store refurbishment in Sanxenxo, Pontevedra. Office space in Lobios, in Lobios, Ourense. Richie’s house, rehabilitation of an old village construction in Cerceda, A Coruña. Hight residential houses for a family in Santa Cristina, A Coruña. Social housing competition in Cenlle, Ourense.
Other projects: • • • • • • • • •
Building facade reconditioning in San Lázaro, Ourense. Industrial warehouse in Vilanova de Arousa, Pontevedra. Flat in San Diego Tower, flat renovation in A Coruña, with building visits. Beauty clinic in Oleiros, A Coruña. Dressing room extension in a house in Bascuas, Pontevedra. Accessibility refurbishment in Marina building, in Portonovo. Accessibility refurbishment in Honduras building, in A Coruña. Building facade reconditioning in Progreso Street, Sanxenxo. Baltar’s flat renovation in Sanxenxo, Pontevedra.
Trespes work examples:
“Elviña House”
“Maceda swimming pool”
“Campusteiro”
5
Nani’s house Expansion project
Cu04
Cu05
Cu06
Cuberta Cu01 Canalón de cobre Ø110mm. Cu02 Tella cerámica máis fibrocemento. Cu03 Illamento térmico. XPS poliestireno extrusionado, e=40mm. Cu04 Losa de hormigón armado de 20+5cm. Cu06 Enrastrelado de madeira de piñeiro, 40x60mm. Cu07 Rastrel de piñeiro 10x100mm.
5,06
6,20 Cu03
2,33
Cu07
Cu02 Cu03
2,33
Cu06 Cu07 Cu05
Cerramento Ce01 Sistema SATE, e=4+1, enfoscado. Ce02 Bloque de hormigón 150mm. Ce03 Rastrel de madera de piñeiro, 40x60mm. Ce04 Lana de rocha, e=60mm. d:70kg/m³ Ce05 Xeotextil de color negro. Ce06 Rastrel de piñeiro 10x100mm. Ce07 Fiestra de PVC. Ce08 Goterón. Ce09 Vierteaugas. Ce10 Dintel.
Cu03 Cu02 Cu01
Cu04
Cu04
Cu04
Ce01 Ce10 Ce08
3,74
3,74
Ce01 Ce02 Ce03 Ce04 Ce05 Ce06 Ce02
F05
Ci04 Ci05 Ci03
F01
F02
F03
F04
F05
2,09
F04
2,19
F03
Ce06 Ce05 Ce04 Ce03 Ce01 Ce02 Ci04 Ci05 Ci03
2,01
F02
2,09
0,87
F01
2,90
1,22
2,09
2,09
2,09
Ce07 Ce09
Forxado F01 Tarima flotante, e=20mm. F02 Recrecido de cemento, e=100mm. F03 Hormigón armado. F04 Cavity.
Ci01
Ci02 Ci06
Cimentación Ci01 Terreno compactado. Ci02 Zapata corrida de hormigón armado. Ci03 Recrecido de grava para mejora de drenaje. Ci04 Panel de nódulos. Ci05 Tubería de hormigón poroso para drenaje perimetral. Ci06 Hormigón de limpieza.
1:75
The expansion project its about to build a garage space which will turn into a comfortable and conditioned space to hold a piano enjoyed by the owners. I have participated detailing the construction methods and materials. The interior wood and the indirect lightning proposed was the very best way to create an appropriate environment.
6
Store refurbishment in Sanxenxo Refurbishment
5,55
3,00
1,37
3,00 5,55
1,37
1,38
3,00
3,37
1,37
0,90 2,20
3,00
2,81
3,00
1,38
3,00
3,67
3,00
1,37
3,00
3,00
3,37
3,00
2,81
2,20
3,67
1,02
1,20
3,67
1,02
1,02
VE 01 Sup. ilum.: 10,73 m² Sup. vent.: 9,44 m²
1,20
3,67
1,37
VE 04 Sup. ilum.: 14,48 m² Sup. vent.: 0,00 m²
VE 05 Sup. ilum.: 3,05 m² Sup. vent.: 0,00 m²
5,55
1,37
2,81
VE 02 Sup. ilum.: 9,33 m² Sup. vent.: 0,00 m²
1,37
5,55
VE 03 Sup. ilum.: 6,99 m² Sup. vent.: 0,00 m²
VE 02 Sup. ilum.: 9,33 m² Sup. vent.: 0,00 m²
VE 01 Sup. ilum.: 10,73 m² Sup. vent.: 9,44 m²
VE 03 Sup. ilum.: 6,99 m² Sup. vent.: 0,00 m²
VE 04 Sup. ilum.: 14,48 m² Sup. vent.: 0,00 m²
VE 05 Sup. ilum.: 3,05 m² Sup. vent.: 0,00 m²
VE 06 Sup. ilum.: 3,15 m² Sup. vent.: 2,87 m²
0,90
VE 07 Sup. ilum.: 3,05 m² Sup. vent.: 0,00 m²
1,37
VE 06 Sup. ilum.: 3,15 m² Sup. vent.: 2,87 m²
VE 07 Sup. ilum.: 3,05 m² Sup. vent.: 0,00 m²
1:150
1,79
0,93
0,12
2,10
0,93
2,10
0,93
0,93 PI02 725
1,79
PI03 825 2,10
PI01825
0,12
2,10
1,02
2,81
2,10
1,02
2,10
1,02
PI01825
PI02 725
PI03 825
Conditioning of an empty space to be comfortable and became a shop space, planning the accessibility, illumination, ventilation and the complete documentation to be approved by the administration. My fist completed project on the studio to get along with all the process and the bureaucracy of all the drawings and memories necessaries to deliver it to the council. Here you can find the details of the storefront and access doors.
7
Lobios office Expansion project
+0,00
1:150
On the village of Loibos we planned to convert an useless garage into a multidisciplinary space and an open office. Since the beginning, we try to keep the stone walls and on the basis of them, we grow up to get the necessary hight. I have participated on the interior distribution and the final shape of the building, although thinking how it is going to be built.
8
Richie’s house Rehabilitation
1:100
Stone old house it is rebuilt and reconditioned keeping the exterior walls and giving a new wood structure for up level and the roof. Exploiting the little space of the construction, it is made a two bedroom, bathroom, living room and kitchen improving the distribution. The use of wood is elemental on this project to get the minimum slab section. I took part on the selection of the construction methods and materials, plus the drawing and memories of the project. Construction sections with details.
9
Oleiros houses High-end residential 50.45 48.68
49.24
50.06
49.40
45.64
Sup: 30,80 m²
Salón
Sup: 30,80 m²
Sup: 2,25 m²
Aseo
Sup: 22,92 m²
Cocina
Sup: 9,80 m²
Distribuidor 02
Sup: 22,92 m²
Cocina
Sup: 2,25 m²
Aseo
Distribuidor 02
Sup: 9,80 m²
Sup: 22,92 m²
Cocina
Aseo
Sup: 2,25 m²
Sup: 9,80 m²
Distribuidor 02
Cocina
Sup: 22,92 m²
Aseo
Sup: 2,25 m²
Sup: 9,80 m²
Distribuidor 02
46.77
Salón
Salón
Sup: 30,80 m²
Salón
Sup: 30,80 m²
12%
16%
49.35
48.20
48.35
48.20
48.47
48.54
48.73
48.65
48.57
48.80
48.92
48.83
49.00
49.07
49.20
Incli
nació
nm
áxim
a ve
rano
[72º
]
48.02
6º]
o [2
viern
a in
ínim
nm
nació
Incli
60.06
58.92
58.65 58.20
56.56
55.42 54.85
48.35
48.20
48.02
48.47
48.54
48.65
48.57
48.73
48.80
49.07
48.92
48.83
49.35
49.20
16%
12%
45.64
10.2%
45.35
45.35
3.5%
45.65
45.65
3.1%
45.92
45.92
45.92
1:400
The project consist in four buildings, one for each brother, connected on the underground and garage, with different configurations on the same exterior volume containing the requirements of each occupants. These volumes are optimized to catch the Sun, light and warm, in the winter and reflect and create shadow in summer. I have participated in the urbanization process, for the posterior house planning.
10
Social housing Competition
Terraza 01 Sup. útil: 6,80 m²
Terraza 02 Sup. útil: 6,30 m² Dormitorio 03 Sup. útil: 12,26 m²
Dormitorio 02 Sup. útil: 12,91 m²
Terraza 03 Sup. útil: 7,57 m²
Distribuidor 01 Sup. útil: 7,04 m² Aseo 01 Sup. útil: 3,71 m²
Aseo 02 Sup. útil: 2,70 m²
Dormitorio 04 Sup. útil: 8,17 m²
Escalera Sup. útil: 8,01 m²
1:150
As a social housing competition, the only requirement was to be built modularly. There is a module of 6,00x2,40m on where is built the structural frames and the adopted solutions of partitions and finishes. The idea of the project is to propose a good, fast and economic complete houses for limited resources people. We discussed about the distribution of the spaces, to be exploited to the maximum, creating an interesting and funny building.
11
Academic works selection • • • • •
Residential housing in Warsaw Kindergarten in Warsaw Mortuary in Monte Alto, A Coruña Columbarium in San Amaro Post Graduate Study Center, degree final project
13
Residential Housing in Warsaw The project consist on the planning of some flat buildings in the Warsaw city. On the process we study the housing city rules and the urban plan.
Facade north east
Facade south east
Facade north east
Facade north west
Facade north east
Architectural Design 4
Juan Goicoechea Álvarez,
1:350
2st semester
Architectural Design 4
Juan Goicoechea Álvarez,
Architectural Design 4 4th course, ERASMUS
Facade north west
Architectural Design 4
Juan Goicoechea Álvarez,
14
2st semester
1:350
2st semester
1:350
15
Kindergarten Since the perspective of a child, I’m trying to create a comfortable and known space to let them spent their first years of the children’s life. The easy shape of the building and his transparency create an in-out unmatched space.
Facades
Kindergarten into the woods
1:100
North facade North facade
Kindergardten
East facade
Architectural Design 6 4th course, ERASMUS 16
It's made for kids of 2 till 5 years old. Tthe concept of this piazza is to keep the trees and make an semi-closed space for the childrens. The distribution of the space should fix all the issues of the kindergarden, also have the possibility of have a playground on this semi-closed space. The shape of the building will improove the interior insolation with sky lights, the materials used will be concrete, steel and glass, mixed with colors on the inside of te building to make it more enjoyable. The shape of the concrete and steel building provides the best insolation possible opening the roof on big skylights to chatch all this light on winter. The building is distributed in two wings, the classes one and the administration and kitchen. On the big hall all the childrens can leave their stuff at the
17
inspiratio
Projects 9 Mortuary in Monte Alto. The space since the public till the private, architecture of the respect.
Proyectos 9 san amaro
tanatorio, crematorio y columbario en el área de san amaro juan goicoechea álvarez -- andrea ricoy rajoy
vistas tanatorio
A07
Projects 9 5th course, A Coruña 18
vistas tanatorio
A07
Once in the Monte Alto localisation, we introduce on it a necessary equipment, a mortuary. Thanks to the location of the building, we planned an open view space, where you can play with the intimacy of the users and, at the same time, create a point of view of the sea since all the stays.
Transversal section
Proyectos 9 tanatorio, crematorio y columbario en el área de san amaro juan goicoechea álvarez -- andrea ricoy rajoy
A06 e_1:200
secciones
Longitudinal section Proyectos 9 tanatorio, crematorio y columbario en el área de san amaro juan goicoechea álvarez -- andrea ricoy rajoy
Proyectos 9 sección longitudinal
tanatorio, crematorio y columbario en el área de san amaro juan goicoechea álvarez -- andrea ricoy rajoy
A07 e_1:200
19
Columbarium in the Mortuary of San Amaro The intervention is an commemorative monument of the people death on the sea, open to the exterior with his fractures.
Proyectos 9
tanatorio, crematorio y columbario en el área de san am juan goicoechea álvarez -- andrea ricoy rajoy
Projects 9 5th course, A Coruña 20
The Mortuary building was needed to have some space to commemorate the people who dedicated so many years of their lives on the sea. We created a box, with the OĂza inspirations, which conquer the space and let you get under the ground or stay at the platform to observe the world and the life.
maro
vistas columbario
A10
21
Bachelor’s Degree Final Project ETSAC Postgraduate Courses Center in the University of Coruña. The building is a complex of classes and student spaces in the Elviña campus. It has some administrative departures as well teachers offices. On the upper floor we can find a place for the students independent of the rest of the building.
Final Project Universidad de a Coruña, Elviña campus 22
AxonometrĂa del edificio
Deployed axonometry
23
Project process Respecting the most the ground, it comes up the idea of the base as a mechanism to find the wanted point for the classes, all the other volumes became to appear on the back side creating a winding building.
24
Constructive section, e_1:100
Constructive axonometry of the classes, e_1:75 25
Communications space photomontage
26
Main facade, e_1:300
Thank you!