JUHYUN BYUN Undergraduate Architecture Portfolio 2009-2017 Selected works
Architectural Design Portfolio 2009-2017 Selected works designed by Juhyun Byun
ARCHITECT BYUN
For more information Mobile : +82 10 9591 2605 E-mail : nimblejh90@gmail.com
Copyright â“’ by Juhyun Byun all rights reserved
RESUME 변주현
JUHYUN BYUN
Personal Information Adress Mobile E-mail Nationality
: 75, Chorongmaeul-ro 3-gil, Gangseo-gu, Seoul, Republic of Korea : +82 10 9591 2605 : nimblejh90@gmail.com : Republic of Korea
Education
Award
2006.03 - 2009.02
Hwagok High School, Seoul, Korea
2013.10
The 6th Sustainable Architecture Design Competition Special Mention
2009.03 - 2018.02
Sejong University, Seoul, Korea Bachelor of Architecture
2013.10
The 1st Imagine Design Competition 2nd Prize
2015.01 - 2015.02
The Art University Bournmouth, UK Winter Short Course
2013.11
The 2th Sejong Univ. College of Engineering Forum 3rd Prize
2013.11
International Degin Competition for Youth Facility 2nd Prize
2014.10
The 5th Urban Design Competition Honorable Mention
Experience 2010.03 - 2011.12
Compulsary Military Service Geomedetic survey, Chulwon, Gangvwon-do, Korea
2014.11
2012.08 - 2017.08
SAGE Design team(2012-2014,2017) Graduate Exhibition Design team, Seoul, Korea
The 32nd Space Prize for International Students Selected Work
2015.05
Sejong Univ. Pavilion Competition for UAUS 2nd Prize
2012.12 - 2013.02
Winter Freeform Architecture Workshop Freeform School of Architecture, Seoul, Korea
2013.03 - Recent
Exhibition / Publication
FCSP, FC Sejong Football team member, Seoul, Korea
2012.09
Sejong Univ. Graduate/Exellent work Exhibition
2013.09
Sejong Univ. Graduate/Exellent work Exhibition
2013.10
2014.01 - 2014.02 Samsung R&D Centre in Gangnam Part-time job, Samoo Archirects & Engineering, Seoul, Korea
The Imagine Design Competition Prize-wining Works Exhibition in 63 Building
2013.11
The International Design Competition for Youth Faciliy Prize-wining Works Exhibition in Xii Galery
2015.02 - 2015.04
Museum in Yangpyeong Seoul Station 7017 Project Part-time job, Mass Studies, Seoul, Korea
2013.11
The Rookie’s Award for Architectural Students A Collection of Works
2014.09
Sejong Univ. Graduate/Exellent work Exhibition
2015.05 - 2015.06
Multi Complex Commecial Center Part-time job, HaeAhn Architecture, Seoul, Korea
2014.12
Space Magazine December 2014 Prize-wining Works Collection
2015.12 - 2017.01
Working Holiday Head chef, Butter restaurant, Sydney, Austrailia
2015.09
Sejong Univ. Graduate/Exellent work Exhibition
2016.03
Evolo Skyscrappers 3(Limited Edition Book) Selected work
2017.09
Sejong Univ. Graduate/Exellent work Exhibition Graduate work
2013.07 - 2013.08
Public Library in Gwanyang Research Student in Sejong Univ., Seoul, Korea
Skill 3D
Rhinoceros 5.0 / Grasshopper/ V-ray/ Sketch up 2015/ Max 2011/ Revit 2012/ Lumion 5.0
2D
AutoCAD 2015 / SpaceSyntax/ Ecotect/ MS Office Adobe Photoshop/ Illustrator/ Indesign/ Premier Pro
Language Korean : Native Speaker English : Intermediate High(TOFEL ibt 84)
4
CONTENTS 03/2012 - 11/2017
Academic Works
1.
Inverted Apartment
2.
Slow Sequence
2017 Studio 7 Graduate work / Renovation / Personal work
2014 Studio 6 / Multi Complex Commercial / Team work
P. 6
P. 24
Competition Works
3.
Drillship Dam
P. 38
4.
No war, No peace
P. 48
5.
Lend Experiences
P. 56
2015 eVolo Skyscrapper Competition / Re-used Skyscrapper / Team work / Top 100
2014 The 32nd Space Prize for International Students of Architectural design / Observation Platform / Team work / Selected work
2013 International Design Competition for Youth Facility / Youth Facility / Team work / 2nd Prize
Extra Works 1.
Design works
Winter Short Course / Pavilion
P. 70
2.
Working Experience
Part-time job / Research student
P. 78
3.
E.T.C
Physical model photo / Sketch
P. 84
5
Academic work .1
Inverted Apartment
2017 Studio 7 Graduate work / Apartment Renovation / Personal work Program
Housing expansion of Old Apartment community
Location
Silim-dong, Gwanak-gu,Seoul, Korea
Team
Personal project
Professor
Prof. PilJoon Jeon
Software
Rhinoceros 5.0/ V-ray/ AutoCAD 2015/ Adobe Photoshop/ Illustrator/ Indesign
Schedule
April - June, 2017
6
Photo by Washington Post
Prologue 한국은 ‘아파트 공화국’으로 지칭될만큼 주거유형의 상당부분을 아파트가 차지하고 있다. 특히, 산업화 시기와 함께 서울과 같은 대도시로의 인구유입은 기하급수적으로 늘 어났으며, 해당 시기 건설된 아파트가 다수 를 이룬다. 이러한 사회적 배경에 따라, 우리 나라 건축에서 아파트를 외면하기엔 상당히 중요한 역할을 하고있다. 그러나 아파트 관 련 사회적 문제에 대한 해결책은 미비한 현 실이다. 노후화와 함께 슬럼화 된 아파트 단 지, 정부 규제 및 경제적 손익의 문제로 주 거환경의 개선 없이 방치되는 산업화시대의 근대 아파트들 등 과거의 아파트들은 현대 인으로부터 외면받고있다. 우리나라의 중요 한 주거양식으로 자리잡은 만큼 사회적 문 제를 야기하는 아파트들에 대한 관심과 개 선의지가 필요한 시점이 도래했다. 이에따 라, 노후 아파트들에 대한 리모델링은 불가 피한 상황이다. 아파트 리모델링과 단지 주 거환경 향상을 위한 제안을 이 프로젝트의 주 안점으로 진행하고자 한다. 7
Yongsan-gu Apartment district
Gangnam-gu Apartment district
Yeoui-do Apartment district
Songpa-gu Apartment district
1. 회현 제 2 시범아파트
5. 삼각 맨션 아파트
2. 별장아파트
6. 동대문 아파트
3. 중산 시범아파트
7. 스카이 아파트
4. 서소문 아파트
8. 풍전 아파트
7 6
4 12
8 3
5
Photo by Choijoongwon, 2010 - 2012
Problem 급속한 근대화에 따라 정부 주도하에 건축된 시민아 파트들은 2017년 노후화 시점에 다달았으며, 재건 축 등 다양한 해결책들을 요한다. 이 아파트들은 서 울 도심 곧곧에 분포되어 사회문제를 야기하고, 슬 럼화의 표상이 되었다.
Graph analysis 주택보급률이 100%를 넘어서면서, 아파트 공실량 은 80만 호에 육박한다. 아파트는 우리나라 주거유 형의 50%가량을 차지하지만, 노후세대에 대한 대책 은 미비하다. 2017년 약 50만 가구에 달하는 완공 후 30년이 지난 노후아파트 가구 수가 10년 후 320 만 채로 늘어남에 따라 무분별한 재건축이 아닌 리 모델링 등의 지속가능한 다양한 해결책이 필요하다.
8
Other Apartments
Boramae Overbridge Guro digital station Line no. 2 Dorimcheon Stream
Site
Other Residential area
Gangnam Apartment 구로 디지털단지 주변 아파트 단지중 70년대에 건축 된 시민아파트로 안전 D등급 판정을 받아 재건축 직 전에 있지만 오랜시간 비워진 채 존치되어 현재 슬 럼화가 심각한 단지이다. 도림천 변을 따라 형성된 아파트 단지들의 시초격이였다. 이후 구로 디지털 단 지 주변 노후 아파트가 많아진 만큼 강남아파트 리 모델링은 주변 아파트 환경 개선에도 긍정적 영향 을 미칠것으로 보이며 동시대 시민아파트들의 해결 책이 될 것이다.
9
1BAY
2BAY
40평형
10평형
10평형
20평형
30평형
20평형
30평형
50평형
20평형
40평형
Original bay system 1core / 2houses
2bay type 8house / floor
강남아파트의 구조
6floor
계단식 아파트의 형 태로 두세대당 코어, Bay system에 의한 일률적 가구 구성과 그에 따라 기능적으로 추가된 발코니
1balcony / house
10
Apartment plan study, 2017
3BAY
50평형
4BAY
40평형
50평형
Bay system study 아파트 평면 분석 및 Bay system에 대한 분석 결 과, 남향의 거실과 그에 접한 방의 갯수에 따라 Bay 의 수가 정해지고 Bay system을 규정하였다. 또한, Bay system은 아파트 평형대를 막론하고 공간 구분 의 기준이 되었다. 아파트 형태 및 평면의 변형이 나 타나더라도 공간 구성은 Bay system을 크게 벗어나 지 않으며, 획일적인 구성을 갖는다 할 수 있다. 이 러한 일률적인 구성에서 유일하게 각기 다르게 나타 는 공간은 발코니 공간이였다. 발코니 공간은 주거 자의 개성을 나타내며, 주거의 확장공간으로 새로운 가능성을 갖고있다.
Inverted bay system Void
Elevator
Lobby & corridor Spatial system transforming Blurred floor
Balcony transforming
11
공간구조의 변화 발코니 공간의 확장, 형태의 다양화를 통 해 내부 공간의 구 조를 규정하며, 기존 Bay system을 탈피한 Balcony system으로 정의, Balcony의 형태 가 기존 아파트 공간 의 변화를 유도한다.
Interior perspective Balcony view
Reading Tea Dining
single
Bar Theater
horizontal double
Balcony transformation
+
Tea
Playing Pet Green
Original Balcony
vertical double
Program
Complex Balcony Module
Theater
기존 발코니는 다양한 기능 및 needs에 의해 사용 되고 있지만 그 형태와 형성 방법은 일률적이며, 획 일화 되어 있다. 따라서, 다양한 프로그램에 적용 가 능한 형태의 새로운 발코니 모듈을 제시한다. 또한, 단일 발코니의 규모만 커지는 것 뿐만 아니라, 모듈 간의 적층 및 연결을 통해 기존의 층간, 세대간 연결 Green 새로운 공간구성 방식을 Dining & Bar 을 유도하고 형성하게한다.
double Tea
Theater
Green
Dining & Bar
ex Pet
12
Reading
Playing
Limitation and Solution
Balcony 복층화 내부 계단 복층화 내력벽 구조의 고정성
수평적 평면 공용공간 추가 입체적 평면
비내력벽 내력벽 철거 개구부 보강
비효율적 코어와 구성 공간 구조 변형
void화
벽식구조의 해체
효율적 공용공간
지하 노후/노상 주차 elevator 추가
코어의 변형
지하 주차 구성
선큰과 지하공간 연계
지하공간의 변형
Balcony 복층화 내부 계단 복층화
공용공간 추가 입체적 평면
비내력벽 내력벽 철거 개구부 보강
공간 구조 변형
void화
벽식구조의 해체
코어의 변형
13
효율적 공용공간
elevator 추가
지하 주차 구성 지하공간의 변형
선큰과 지하공간 연계
Interior perspective Main lobby view
14
0m 1m
44450 3950
3100 VOID
3950
4000
3000
4000
1550 1550
Before
3950
3100
3950
0m 1m
44450 3950
3100
6m 3100 VOID
10m
4000
3000
3950
4000
3100
3950
3m
3950
VOID
3800
3950 4300 3000
After
VOID
3950
3m
3950
6m
10m 3950
3100
3800 4300 3000
1550 1550
3800
VOID
3950
0m 1m
44450
3100
3950
4000
3000
4000
3950
3100
3950
3m
3950
VOID
6m
3100
11000
10m
11000
3000 4300
3950
1550 1550
0m 1m
44450 3950
3100 VOID
3950
4000
3000
4000
3950
3100
3950
3m
3950
6m 3100 VOID
10m
3m
6m
VOID
10m
0m 1m
3m
VOID
11000
3950 4300 3000
1550 1550
0m1m
3800
6m
10m
3800 4300
11000
44450 3950
2nd Floor Plan
3100
3950
4000
3000
4000
3950
3100
3950
3950
3100
3000
3950
1550 1550
3800
0m 1m
3m
6m
10m
44450 3950
3950
3100
4000
3000
3000 4300
3950
4000
11000
3100
3950
3950
3950
3100
1550 1550
0m 1m
FL +0
3m
6m
10m 3800
11000
44450 0m1m
3m
6m
3950
10m
3100
3950
4000
3000
4000
3950
3100
3950
3950
3100
3950 4300 3000
1550 1550
0m1m
3m
6m
FL +0
FL -4200
10m
3800 4300
11000
FL -1200
3000 FL +0
3800
11000
FL -4200 0m1m
3m
6m
3000
10m
FL -1200
0m 1m
3m
6m
10m
FL -4200
44450 3950 0m1m
3m
6m
3100
3950
4000
3000
4000FL -1200 3950
3100
3950
3950
3100
3950
1550 1550
10m
1st Floor Plan
0m 1m
3m
6m
10m
3950 0m 1m
3m 3100 6m 3950 10m
44450 3950
3100
3950
4000
3000
4000
4300 3950
3100
3950
1550 1550 FL +0 0m1m
3m
6m
10m
3800
3950
3950
3100
4000
3000
4000
3950
3100
3950
3950
3950
3100
4300 3000
1550 1550 0m1m
3m
6m
11000
44450
10m
FL -1000
FL +0
3800 4300
11000
3000 FL +0
3800
FL -1000 0m1m
3m
6m
FL -1000
10m
3000
0m 1m
3m
6m
10m
0m 1m
3m
6m
10m
0m 1m
3m
6m
10m
FL -1000
FL -1000
FL -1000 0m1m
3m
6m
10m
B1 Floor Plan
15
11000
Interior perspective Duplex type view
16
Before
After 44450 3950
3100
3950
4000
3000
4000
3950
3100
3950
3950
3100
3950
3950
3100
3950
3950
3100
3950
1550 1550 44450 3950
3100
3950
4000
3000
4000
1550 1550 VOID
VOID
4300
44450 3950
VOID 3100
3950
4000
3000
4000
3950
4000
3000
4000
3950
3100
3950
3950
VOID 3100
3950
3950
3100
3950
3950
VOID 3100
3950
4300 11000 3800
1550 1550
44450 3950
VOID 3100
3000 3800
11000
4300
1550 1550
3000 0m1m
3m
6m
0m 1m
10m
3m
6m
10m 3800
VOID
6th Floor Plan
3950
3100
VOID
44450 3950
4000
3000
4000
3950
3100
3950
0m 1m 3950
4300
3m 3100 6m 3950 10m 3000
1550 1550 44450 3950
3100
11000
3950
4000
3000
3950
4000
3100
3950
1550 1550
3950
0m 1m
VOID
3m
VOID
3800
3950
3100
6m
10m
11000
4300 3000
44450 3950
VOID 3100
3950
4000
3000
4000
3950
3100
3950
3950
VOID 3100
3950
1550 1550
0m 1m 0m1m
3m
6m
3m
6m
10m
4300 11000 3800
10m
44450 3950
VOID 3100
3950
4000
3000
4000
3000 3800 3950
3100
3950
3950
VOID 3100
3950
11000
4300
1550 1550
3000
0m 1m
3m
6m
10m
44450 3950 0m1m
3m
6m
VOID 3100
3950
4000
3000
4000
3950
4000
3000
4000
3800 3950
3100
3950
3950
3100
3950
1550 1550
10m
3950
0m 1m
VOID 3100
3m
3950
6m
10m
44450
5th Floor Plan 0m1m
3m
6m
3950
3100
3000 3950
3100
3950
1550 1550
3800
VOID
10m
VOID
0m 1m
3m
6m
10m
44450 3950
VOID 3100
3950
4000
3000
4000
3950
4000
3000
4000
3950
3100
3950
3950
3100
3950
3950
3950
VOID 3100
0m 1m
3m
6m
10m 3000 3800
3950
VOID 3100
3950
3m
6m
10m
3000
0m 1m
44450 3950
VOID 3100
3950
4000
3000
4000
3100
3950
3100
3950
4000
3000
4000
3950
0m 1m
44450 3950
3m
6m
10m 3800
3950
1550 1550
VOID 3100
3m
3950
6m
4300 3000
3950
3100
3950
3950
3100
3950 3800
VOID
0m1m
3m
3m
6m
6m
VOID
10m
10m
0m 1m
44450
4th Floor Plan
3950
VOID 3100
3950
4000
3000
4000
3m
10m 3000
3950
3100
3950
3950
0m 1m
44450 3950
3100
3950
4000
3000
VOID 3100
3950
4300 11000 3800
3m
6m
10m 3000 3800
3950
4000
11000
4300
6m
1550 1550
VOID
11000
10m
1550 1550
0m1m
11000
4300
1550 1550 0m1m
4300
4300 11000 3800
44450 VOID 3100
11000
3000
1550 1550
3950
11000
4300
3100
3950
3950
3950
3100 VOID
11000
4300
1550 1550
3000
0m 1m
44450 3950
VOID 3100
3950
4000
3000
4000
3m
6m
3100
3950
3950
3100
3950
4000
3000
4000
3950
0m 1m
44450
10m
6m
10m 3800
3950
1550 1550 0m1m
3m VOID 3100
3m
3950
6m
4300
10m 3000
3950
3100
3950
3950
3100
3950
1550 1550
3800
VOID
VOID
0m 1m
44450 3950
VOID 3100
3950
4000
3000
4000
3m
3m
6m
10m 3000
3950
3100
3950
3950
0m 1m
10m
44450
3rd Floor Plan 0m1m
3m
6m
3950
3100 VOID
3950
4000
3000
4000
VOID 3100
3950
4300 11000 3800
3m
6m
10m 3000 3800
3950
3100
3950
3950
3100
3950
VOID
11000
4300
1550 1550
10m
11000
4300
6m
1550 1550
0m1m
11000
3000
0m 1m VOID
3950
3100
17
3950
3m
3000
4000
10m 3800
44450 4000
6m VOID
3950
3100
3950
1550 1550
3950
0m 1m
3m
3100
6m
3950
11000
4300
10m 3000
44450 3950
3100
3950
4000
3000
4000
3950
3100
3950
3950
3100
3950
3800
1550 1550
0m 1m 0m1m
3m
6m
10m
3m
6m
10m
4300
11000
Site plan Scale : 1/1000
Section B Roof FL GL +19200
A
A’
6th FL GL +16200 5th FL GL +13200 B’
4th FL GL +10200
0m
2m
5m
10m
3rd FL GL +7200 2nd FL GL +4200 1st FL GL +1200 B1 FL GL -1800
A
A’
B
B’ D
Roof FL GL +19200 6th FL GL +16200
C’
C
5th FL GL +13200 D’
4th FL GL +10200 0m
2m
5m
10m
3rd FL GL +7200 2nd FL GL +4200 1st FL GL +1200
B1 FL GL -3000
C
C’
18
D
D’
Composition
Reinforce Structure Grid
Balcony Module
Lobby
Interior Stair Elevator
Core void
Sunken Basement community
19
Physical model Photo, 2017
20
Physical model Photo, 2017
Size : 600mm x 300mm Scale : 1/100 Material : Mdf / Bass wood / Acryle
21
Perspective 연장되어 공간화된 발코니공간의 활용, 건물 그리드의 연장에 의해 생성된 썬큰 공간과 지하공 간의 연계, 지상 공간의 녹지화 모습을 볼 수 있다.
Exterior perspective south sunken view
Academic work .2
Slow Sequence
2014 Studio / Muilti Complex Commercial Center / Team work Program
Outdoor Muilti Complex Commercial Center & Distribution center
Location
Sinjeong-dong, Yangcheon-gu,Seoul, Korea
Team
Team project
Professor
Prof. Donghyun Kim
Software
Rhinoceros 5.0/ V-ray/ AutoCAD 2015/ Adobe Photoshop/ Illustrator/ Indesign
Schedule
Sep - Dec, 2014
24
Conceptual Photo collage, 2014
Prologue 이 프로젝트는 상업시설을 계획하는 프로젝 트로서 서울 물류계획의 일부를 담당했던 강서지역 물류센터, 서부트럭 터미널에 위 치하게 된다. 따라서 기존 물류센터의 기능 을 일부 수용하여 물류 센터와 함께 계획해 야했으며, 기존 상업시설과는 다른 계획조 건을 갖게 하였다. 이러한 조건 하에 상업 적 효율성은 갖추되 이용자의 입장에서 차 별화를 느낄 수 있는 계획이 필요하였다. 복 합 상업시설을 계획함에 있어서, 기존 대규 모 복합단지가 차용하던 전형적 형태에서 탈피하고자 하였다. 기존 상업시설은 거대 한 매스들과 높은 밀도의 건물구성으로 과 밀화 된 도시 내에서 삭막함을 조성하였다. 따라서, 기존과 다른 휴먼 스케일의 공간구 성을 유도하고자 하였으며, 휴먼 스케일의 공간과 오픈스페이스의 연계로 상업적 효율 성과 차별성을 부여하고자 하였다. 같은 맥 락에서 친근하며 오래 머물 수 있는 상업시 설을 위해 ‘느림’이라는 키워드로 프로젝 트를 구성하였다. 25
3 Nambu Beltway
Yangcheon-gu
Other Multi-plex 1
Sinjeong-ro Site
2
Problem
1. Times Square
2. D cube city
3. Lotte mall
서울 서부, 다수의 복합 상업시설이 존재한다. 그러 나 상업공간을 제외한 외부공간에 대한 계획은 부족 한 것으로 보인다. 이는 밀도 높은 도심에 사는 시 민들에게 오픈스페이스에 대한 욕구를 높이는 요소 로 작용하며, 여가를 위한 상업공간의 필요성을 제 시한다.
Site analysis site의 주변으로 녹지 및 주거단지가 구성되어 있으 며, site에 가까워질수록 건물의 매스가 크고 오픈스 페이스가 넓어진다. 또한, 건물의 밀도는 낮아져 이 러한 도시적 흐름을 이어, 작고 큰 매스의 조합, 다 양한 오픈스페이스의 적용이 유리할 것으로 보인다. site의 동측으로 사거리가 위치해 가장 활발한 node 의 역할을 할 것으로 보여진다.
26
Node Slow street
Distribution
Commercial
Slow mall
Commercial Distribution
Node
Distribution Commercial
Phase 1
Bigger mass
Phase 2
Phase 3
Concept Strategy site의 주요 노드를 직선이 아닌 곡선으로 연결하여 마주칠 수 있는 시퀀스의 변화를 주며 직선보다 더 많은 면적의 상업시설을 유저로 하여금 경험할 수 있게한다. 이를 Slow street이라 하며, 그 주변의 건 물은 스케일을 작게하여 휴먼스케일의 공간을 제공 한다. 뿐만 아니라, 건물간 공간에 휴식의 공간을 형 성, 오래 머물기에 친근한 공간들을 구성한다.
Sequence1
Street mall
Sequence2
Plaza street
27
Sequence3
Slow plaza
28
Masterplan Site의 각 node에 진출입구가 위치하며, 물류센터와 의 동선은 분리된다. 차량 진입부는 물류센터 후면 과 이면도로 두 부분에 위치한다. 주 출입구를 시작 으로 구성된 중심부 휴먼스케일의 스트릿 몰 거리와 광장의 구성을 볼 수 있으며, 그 흐름이 오피스 빌딩 까지 이어지도록 설계하였다. 모든 빌딩의 주 출입 부는 중앙 스트릿에 면해있어, 모든 동선의 교차와 머물 수 있는 공간의 형성을 유도한다.
29
Exterior perspective Street mall view
Section A-A’ Living
7th FL GL +25000 6th FL GL +21000 5th FL GL +17000 4th FL GL +13000 3rd FL GL +9000 2nd FL GL +5000 1st FL GL +0
30
A
Exterior perspective Slow plaza view
Slow Street
Handmade Mall
Theater
Entertainment
A’
Handmade Mall
A
Furniture
A’
31
1
2
4
3
5
7
6
8
10
9
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
258000
DN
UP
UP DN DN DN
UP
7 UP UP
UP
DN
UP
DN
DN
UP
n a
UP
m
UP
UP DN
DN
6
DN
l
DN
UP DN DN
UP UP
5
UP
144000
UP
DN
UP
k
9600 9600 9600 9600 9600 9600 9600 9600 9600 9600 9600 9600 9600 9600 9600
UP
DN
j
UP
DN
i
4
UP
h
DN
UP
UP
g
UP
UP
DN
DN
f
UP
3
DN
1
DN
e
DN
DN
UP
d
UP
DN
UP
DN
c
DN
2
DN
b
UP
DN
o
p
9600 9600 9600 9600 9600 9600 9600 9600 9600 9600 8400 9600 9600 9600 9600 9600 9600 9600 9600 9600 9600 9600 9600 9600 9600 9600 9600
0m5m 15m
2nd Floor Plan
30m
50m
1. Handmade mall 2. Furniture 3. S.P.A mall 4. Department 5. Food court 6. Kids cafe 7. Premium mall
Section B-B’
Food & Bever
B’
B
4th FL GL +13000 3rd FL GL +9000 2nd FL GL +5000 1st FL GL +0
32
B
2
3
4
5
6
7
8
10
9
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
258000
UP DN UP
UP DN
DN DN UP
DN
UP
4
a
144000
DN
3
UP
9600 9600 9600 9600 9600 9600 9600 9600 9600 9600 9600 9600 9600 9600 9600
n m l k j i h g
DN
UP
DN
f
UP
DN
UP
e
2
UP
d
UP
1
DN
c
DN
UP
b
UP
DN
o
p
9600 9600 9600 9600 9600 9600 9600 9600 9600 9600 8400 9600 9600 9600 9600 9600 9600 9600 9600 9600 9600 9600 9600 9600 9600 9600 9600
DN
& rage
1
0m5m 15m
3rd - 4th Floor Plan
1. 2. 3. 4.
Whole food Market
Premium Mall
Slow Street
Street Mall
Department Young plaza
B’
33
30m
50m
Living Department Theater Toy store
Physical model Photo, 2014
34
Physical model Photo, 2014
Size : 800mm x 500mm Scale : 1/1000 Material : Formex / Craft paper / Acryle / White form
35
Perspective 스트릿 몰 형태의 소규모 상점들로 이뤄진 진입부분의 몰의 모습으로, 오픈된 상업공간의 프로 토 타입을 제시하며 휴먼스케일의 상업공간을 형성한다.
Exterior perspective Enterance street mall
Competition work .1
Drillship Dam
2015 eVolo Skyscrapper Competition / Re-used Skyscrapper / Team work / Top100 Program
Sustainable Dam & Water Cleaning Tower
Location
The Mekong River, South-East Asia
Team
Team project
Professor
Prof. Donghyun Kim
Software
Rhinoceros 5.0/ V-ray/ AutoCAD 2015/ Adobe Photoshop/ Illustrator/ Indesign
Schedule
Dec - Jan, 2015
38
Jack up Rig drilling ship, Photo by Metroedu, 2016
Prologue 2006년 영국 국방장관은 “지구 온난화 로 지구 곳곳에서 사막화가 진행되고 있어 20~30년 안에 물을 둘러싼 폭력적이고 정 치적인 충돌이 일어날 것”이라고 경고했 다. 최근 지구 온난화와 관련해 국제사회에 서 물의 중요성이 높아졌고, 이와 관련한 국 가간의 정치적 분쟁들이 벌어지고 있는데 그 중심에 국제하천이 있다. 국제하천의 분 쟁은 상류에 있는 나라가 댐을 건설하여 하 류에 있는 나라의 유량이 줄고 분쟁이 발생 하는 경우가 대부분이며 이로 인한 환경오 염, 생태계 변화, 질병의 증가 등 2차적인 문 제가 발생한다. 이 분쟁을 해결하기 위해 국 제하천 분쟁의 근본적 원인인 댐을 없애고 인류가 요구하는 댐의 기능을 대체 할 수 있 는 새로운 형태의 댐을 제안 하고자 한다. 이 에 석유를 시추하고 수명을 다한 세계 곳곳 의 수 천 개에 달하는 석유 시추선을 이용 하고자한다. 우리는 이 시설을 Drilling ship Dam이라 부르고, 자연친화적 시스템의 댐 이 될 수 있도록 계획하였다. 39
Number of international conflict that broke out in 1998 between 2008 More than 127 cases 41~126 cases 16~40 cases 4~15 cases 1~3 cases
40
1990’s mekong river
2009’s mekong river
Issue & Site 전세계적으로 국제하천과 관련한 분쟁이 끊이지 않 고있다. 상류층 국가의 댐건설에 의해 하류층 국가 수질 및 수량의 저하와 생태계 파괴 등의 문제가 발생한다. The Mekong river는 동남아시아 6개국 이 공유하는 하천으로 위와 같은 문제점이 두드러 지게 나타난다.
Exterior perspective Mekong river, birdeye view
2000
Abandoned Oil Rig in the Gulf
Abandoned oil rigs
1000
Oil wells : workable to drilling
500
Strategy
200 100 50 20
Abandoned Oil Rig
0 1940
2000
2080
2200
시추선은 수상에서 이동이 가능하며, 석유의 시추 및 저장, 운반 기능을 수행한다. 이 시추선들은 점차 수 명을 다해가며, 버려지는 시추선의 수가 증가하는 실 정이다. 따라서, 이 시추선들을 활용하여 기존 기능 을 반영한 댐으로 리모델링 하고자 한다.
Concept Remodeling Oil Rig : Drilling ship Dam
Traditional Dam
Replace the dam to drilling ship dam
41
Exterior perspective Upper deck view
Application of Drillingship dam
Circulation system
Short Water Quantity
1st step precifitation
Slow Water Flow Worsening Water Quality Before : Affect of Traditional Dam
2nd step water purification and storage 3rd step storage, discharge and water purification
Water Quantity Increase
Water Purification
국제하천의 특성상 오염된 수질의 문제가 심각하기 때문에 물의 저장기능을 비롯하여 정수 시스템을 적 용한다. 기본적인 정수시스템과 함께 저장 후 수량 조절을 위한 배출 시 낙수를 통해 산소 공급 및 재정 화 단계를 거친다.
Nature Greening After : Affect of Drilling ship Dam
42
Water Purification and Storage system
Temperature 30 20 10 0 -10 -20 -30
Precipitation
Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov.Dec.
south-east asia climate
Oxygen Supply and Water Storage system
Existing Facilities of Drilling ship
discharge
Remodeling Existing Oil Tank
Storage
Water Purification Tank
Composition
Storage Type
기존 시추선의 구조체역할을 하는 트러스 구조를 활용하여 추가적인 시스템을 설치한다. 각 시스템은 탈 부착이 가능하여 기존 높이조절이 가능한 시추선의 기능을 유지한다. 기존 시추봉의 기능을 이용한 물 의 시추 후 상층부 정화 탱크를 거쳐 기존 오일 저장탱크와 하단부 추가 탱크에 저장 후 건기, 우기 등 상황에 따라 이용된다.
평균적으로 건기와 우기의 강수량의 차가 매우 심한 열대온순기후의 메콩강 유역 환경적 영향을 고려하 여 각각의 계절에 맞춰 수량의 배출에 따른 타입이 달라질 수 있다.
43
System section
1. Purification
2. Residence
3. Filtering
4. Storage
5. Drilling pipe
44
River Water
Purification system
Water intake
Air supply fan Air drain net
물을 채취하여 정수하는 시설로 침전과정이 이루어 지는 곳이다. 침전은 물을 정화하는 과정중에 가장 초기단계로써 물속에 있는 오염된 분비물들을 가라 앉히며 다량의 산소를 포화시키고 자외선을 통한 uv 소독이 이루어지는 과정이다. 시설의 높이를 높게 위 치시켜 산소와 자외선에 강하게 노출시킬 수 있다. 침전물은 건조장치를 통해 고체화 한후 이를 화력발 전의 연료로 사용할 수 있다. 침전을 통해 얻은 물은 파이프를 통해 여과시설로 이동하게 된다.
Water settling tank Sediment collector Purificated water offlet
Fresh Water
Residential space
Type 1
Type 3
Type 2
Temporary residence
Type 4
Water pipe type1
댐을 관리하는 최소의 인원을 수용하기위한 임시 주 거시설을 기존 시추선의 주거공간을 활용하여 구성 한다. 이는 더불어 메콩강에 의한 자연재해민을 수 용할 수 있는 공간으로의 활용 가능성을 갖게된다. 따라서 가족단위의 재해민까지 수용할 수 있는 4가 지 타입을 구성하게 된다.
Filtering system
Root of plants
Water pipe type 2 Soil Pebbles
Discharge
Storage
여과가 이루어지는 시설로 기존에 시추선에서 바닷 물을 저장하는 공간이다. 여과의 과정은 미세한 입 자들을 여러번 통과하면서 이루어 지는데 이때 필 요한 공간이 매우 넓어야하기 때문에 이 공간은 매 우 적절하다. 자갈과 흙, 식물의 뿌리를 이용한 여과 를 통해 오염물질이 제거된 상태로 여과된 물을 얻 을 수 있다.
Water storage system
Water control structure Fluid
여과된 물을 저장 및 배출하는 시설로 댐의 역할 중 가장 중요한 저장과 배출의 과정이 이루어지는 곳이 다. 기존의 댐과는 달리 물을 지속적으로 순환시키기 위해 배출을 일정부분 유지하면서 저장또한 담당하 는 곳이다. 각 모듈안에는 물을 강제 순화시키는 동 력이 있으며 평균 수량을 분석해 알맞은 양의 물을 배출함으로써 하천의 기본 수량을 유지하고 홍수나 가뭄등 수량의 변화가 필요한 경우 유동적으로 저장 및 배출을 할 수 있다.
Water storage tank Water circulating fan Drought Water control structre Discharge
45
Perspective 메콩강의 건기와 우기 시, 강의 수량조절과 정화작업을 수행하는 Drilling ship dam의 모습을 표현하였다
Exterior perspective The mekong river view
Competition work .2
No war, No peace
2014 The 32nd Space Prize for International Students of Architectural design / Team work / Selected work Program
Obsevation platform
Location
D.M.Z in Korea
Team
Team project
Professor
Prof. Donghyun Kim
Software
Rhinoceros 5.0/ V-ray/ AutoCAD 2015/ Adobe Photoshop/ Illustrator/ Indesign
Schedule
Sep - Nov, 2014
48
Korean DMZ #51, Photo by Jongwoo Park
Prologue 한민족의 뼈아픈 역사를 품고있지만, 평화 의 땅이라 일컬어지는 공간, DMZ는 우리나 라에 존재하는 가장 역설적인 공간임에 틀 림없다. 이런 DMZ에서 평화의 플랫폼은 어 떤 의미를 가져야 하는가? 라는 의문에서 이 프로젝트는 시작된다. DMZ라는 땅은 부 정적 역사와 군사적 대치를 이루고있는 현 재, 긍정적 미래상이 공존하는 역설적인 땅 이다. DMZ라는 땅이 다양한 함의를 가지 게 됨으로써, 이 땅위의 평화의 플랫폼은 그 자체로 역설적인 의미를 내포하게 될 것이 다. 고로, 이 플랫폼을 통해 평화라는 이상 과 현재의 땅을 오롯이 느낄 수 있어야 한 다. 따라서 우리의 평화를 위한 플랫폼은 단 순 평화를 지향하는 구조가 아닌, 평화와 반 대되는 의미의 공간으로 구성됨으로써 평화 의 필요성을 경험하게 한다. 평화의 플랫폼 에 갈등의 공간을 구성함으로써 공간적 역 설을 표현하며, DMZ라는 땅이 갖는 의미를 이용자로 하여금 직접적으로 느낄 수 있게 유도한다. 49
platform in DMZ
platform for experiencing conflict
ideal of peace in conflict
platform & dmz for sharing the same ideal
Platform logic
cause of peace
conflict for peace
우리는 평화라는 인간의 이상에서 전망의 근본을 찾 고자 한다. 평화라는 인간의 이상은 인간의 갈등에 대한 상대적 개념으로써 인간은 갈등을 겪음으로 인 해 평화라는 이상을 추구하게 된다. 따라서 우리는 관람자로 하여금 평화를 추구할 수 있도록 인간간 의 갈등을 겪게 되는 공간을 플랫폼으로서 제시하 고자 한다.
DMZ DMZ는 평화를 염원하는 땅으로서 생태계의 본존 태가 우수하고, 현재 남한과 북한의 정전 협정을 재하는 위치에 있는 땅 이라고 정의 할 수 있다. 지만 DMZ는 내면에 인간의 갈등에 의해 발생한 쟁의 뼈아픈 역사를 품고있는 땅이다.
상 중 하 전
Gaeseong industrial comple North Korea
DMZ
Gaeseong
South Korea Seoul
50
A
cm
C
A’ B’
C’
B
A
A’
3.6m social distance
B
B’
3.6m social distance
A
C
1.2m personal distance
B
C’
1.2m personal distance
C
C’
1.2m conflict distance
A’
B’
0.6m conflict distance
Human distance & conflict 사람은 타인과의 거리에 따라 본인의 사적영역과 사 회적영역을 본능적으로 구분하며, 사적영역을 침범 당했을 시 불쾌감과 갈등을 일으킬 수 있다. 이 이 론을 플랫폼 설계의 기준으로 하고, 각기 다른 영역 을 구성한다.
Four elements of space 건축의 공간을 구성하는 요소들에 의해 갈등의 공간 을 구성한다. 각각의 요소들은 유형 또는 무형의 공 간을 그들의 요소를 통해 형성한다.
Panmoon station
Platform of Sound
Platform of Hierarchy
Border line
ex
cm
Platform of Light Platform of Volume
Dorasan station
51
PLATFORM OF HIERARCHY
Exterior perspective 16 1.2 space of hierarchy 8 hierarchy by stairs
Interior perspective
의도적으로 계획된 어깨폭 600mm의 성인 두 명이 간신히 지나갈 수 있는 1200mm의 간 격 안에서 약 16000mm의 좁은 길을 통과하게 된다. 이 공간에서는 동선이 언덕을 거치며 다른 레벨의 공간에서 서로가 맞닿게 되는데 그러한 공간 레벨의 위계 속에서 개인의 친밀 혹은 갈등의 영역이 겹쳐지며 공간적 갈등을 경험하게 된다.
52
PLATFORM OF VOLUME
Exterior perspective space of volume
3.6
3.6
3.6
Interior perspective
사회적 거리인 3.6m를 한 변으로 가지는 큐브 안에서 애매하게 놓인 의자와 그에 따라 구 획된 공간 안에서 개인은 의자와 큐브의 강제적 규모에 의해 서로의 영역을 침범하는 갈 등이 나타난다. 사회적 거리로 제한된 공간에서 애매한 위치에 놓인 의자와 그 외 공간에 서 친밀 혹은 갈등의 영역이 겹쳐지며 공간적 갈등을 경험하게 된다.
53
PLATFORM OF SOUND
Exterior perspective speaker 10
3.6 space of sound
space of sound
Interior perspective
지름 10m인 원통형 건물 안에서 스피커로 퍼지는 소리에 의해 임의로 형성되는 파장의 공 간은 3.6m로 형성되며 사람들은 이곳에 비목적성을 가진 채 모이게 된다. 어떠한 소리에 반 응하는 음파들로 구성되는 공간은 사람들을 끌어들이고 그 공간 안의 사람들 개인적인 영 역과 사회적인 영역이 혼합, 적층되며 공간적 갈등을 경험한다.
54
PLATFORM OF LIGHT
Exterior perspective 32
space of light 6
4
Interior perspective
3.6
55
폭 6m에 길이 32m, 높이 3.5m의 콘크리트 로 형성된 빛의 터널은 지름 1.2m로 만들 어진 천정의 비워진 부분으로 들어오는 빛 에 의해 3.6m의 빛의 공간을 형성한다. 빛 에 의해 형성된 공간으로 사람들은 모이게 되고 그곳에서 필연적으로 개인과의 거리 가 좁혀지고 서로의 영역을 침범함으로써 공간적 갈등을 경험한다.
Competition work .3
Lend Experiences
2013 International Design Competition for Youth Facility / Team work / 2nd Prize Program
Muilti purpose youth facility
Location
Magok-dong, Gangseo-gu, Seoul, Korea
Team
Team project
Professor
Prof. Jahyeon Sim
Software
Rhinoceros 5.0/ V-ray/ AutoCAD 2015/ Adobe Photoshop/ Illustrator/ Indesign
Schedule
Sep - Nov, 2013
56
Concept image collage, 2013
Prologue 우리나라 청소년들은 다른 나라에 비해 취 업 및 진로에 대한 경험이 현저히 낮은 상 황이다. 취업과 진로라는 것은 자신이 어떤 일을 하는 것에 재능이 있는지 혹은 자신이 좋아하는 일은 무엇인지 알아보고 자발적으 로 찾아가는 것이다. 그러나, 우리나라의 청 소년들은 학업만을 중시하는 사회적인 인식 때문에, 진로에 관한 경험 없이 진학을 고려 하며, 교과서를 공부하는 일에만 힘을 쏟고 있다. 위와 같은 이유로 청소년들은 오히려 진로에 대한 부담을 느끼게 됐다. 따라서, 우리는 다양하고 자발적인 경험을 제공하 는 것이 청소년 문화센터의 본질적인 역할 이라고 생각하고, 다채로운 공간으로 경험 을 제공하고자 한다. ‘경험을 대여하다’ 라는 컨셉을 통해, 청소년들이 마치 도서관 에서 책을 대여하고 물건을 대여하듯이 청 소년 문화센터에서 자신들이 원하는 여러가 지 경험들(프로그램)과 공간들을 자발적으 로 대여하고 미래를 설계할 수 있도록 하는 것을 목적으로 한다. 57
Interior perspective 1st floor counseling zone view
Han river
Park area
Residence area
Site
Site 마곡부지는 서울 내 마지막남은 미개발지였던 부지 로서, 현재 연구 개발단지로 조성됐다. 이런 흐름과 함께 주변 주거인 증가에 따른 청소년들의 수요를 충족시키고자 한다. 또한, 현재 다수의 중, 고등학교 가 위치해 청소년센터의 수요가 높다.
Industrial area Magok district
Section diagram common area
common area
common area
counsel
creative activity
58
creative activity
integration zone
core
진로 고민 지수
진로 경험 지수
Issue & Concept
한국 미국 일본 중국
한국 미국
일본 중국
horizontal composition of boxes
우리나라 청소년들의 진로 고민지수는 OECD국가 중 상위권으로 나타나지만, 직업 및 진로 체험의 경 험은 최하위권으로 나타난다. 이에 따라 우리나라 청 소년에게 공부에 국한된 선택지가 아닌 다양한 선택 지를 제시해줘야 한다는 것을 알 수 있다.
range of selection
vertical composition of boxes
Composition strategy
isolated spaces
connexted individual spaces with common area
일률적으로 배치된 공간구성 보다, 공간단위 수직적 혹은 수평적 다양성을 적용하여 시각적 공간적 경 험을 다양화한다. 이 공간구성은 다양한 프로그램과 그 성격에 맞게 구성된다. 또한, 각기 다양한 레벨로 구성된 공간들은 상호 연계되는 중간공간을 갖게되 며, 이는 공간적 연계성 뿐만 아니라, 프로그램적 연 계성을 제공한다.
common area sports zone
academy
59
core
academy
common area
Physical model Photo, 2013
위치 :서울시 강서구 마곡동 용도 :청소년시설 대지면적 :12,500 m2 건축면적 :6,564 m2 연면적 :14,674 m2 건폐율 :53.5 % 용적율 :118 %
60
Site plan 대상지는 마곡부지 계획안의 녹지축에 접해있으며, 교차축에 위치하여 효율적 접근성을 갖는다. 또한 진 출입부가 대상지의 노드에 위치해 내외부 연계성을 높였으며, 중심부 선큰으로의 접근이 용이하다. 유선 적 형태를 띔으로서, 기존 계획된 공원과의 활동적 맥락을 이어간다.
Plaza & Sunken 부지 중앙에 위차한 광장 및 선큰의 레벨 변화를 통 해 다양한 동선 및 뷰를 제공한다. 매스 상단 데크 진입부, 내부 출입구 등을 모두 광장에 연결시켜 공 간 인지에 용이하며, 이용자가 모이는 공간으로써 역할한다. Physical model Photo, 2013
61
Exterior perspective B1f central deck view
62
Interior perspective 2nd academy zone view
63
Interior perspective 2nd floor creative zone view
Physical model Photo, 2013
Section
64
Interior perspective 1st floor academy zone view
Physical model Photo, 2013
65
Physical model Photo, 2013
66
Physical model Photo, 2013
Size : 500mm x 500mm x 1700mm Scale : 1/200 Material : Colour formex / Bass wood / Acryle / Mdf / Craft paper
67
Perspective 건물 자체를 즐길수 있는 시설로 설계하여, 청소년의 방문이 잦아질 수 있도록 하였다. 또한, 주 변 공원과의 연계를 위해 데크를 주 마감재로 사용하였다.
68
Exterior perspective Deck top view
69
Extra work .1
A.U.B Bus Stop
Design work / 2015 Winter short couse at A.U.B / Team work Program
Bus stop
Location
Art University Bornemouth, Wallisdown, Poole, UK
Team
Team project
Professor
Prof. Simon
Software
Rhinoceros 5.0/ V-ray/ AutoCAD 2015/ Adobe Photoshop/ Illustrator/ Indesign
Schedule
Jan - Feb, 2015
Material model study1, 2015
Material model study2, 2015
Material model study3, 2015
Prologue 주어진 재료에 대한 고찰로 부터 시작한 이 프로젝트는 어떤 요소가 건축으로 구현되는 지에 대한 연구가 선행되었다. 각기 주어진 나무, 석고, 철, 돌 등의 재료를 활용해 구조 물 밑 공간을 구성하고, 이를 바탕으로 다른 재료와 구조물을 형성한 4명의 학생이 팀을 이뤄 또다른 구조물을 형성해 나갔다. 각기 재료가 갖는 성질을 이용해 바닥, 벽, 지붕 으로 형상화하고, 영역을 구성하는 과정을 거쳤다. 또한, 이들간의 조화를 고려한 배치 및 구성에 대해 깊이 고민해야했다. 이후 버 스 정류장이라는 프로그램이 주어짐과 동시 에 기존에 구성하였던 공간을 프로그램에 맞도록 변형하였으며, 구체적인 공간화 작 업을 행하였다. 더불어, 예술대학에 존속된 정류장으로, 예술적 프로그램들을 적용하였 다. 기존의 형태 및 공간을 확정한 후 재료 에 대한 고려를 하는 일반적인 건축의 구체 화 방법에서 벗어나, 정반대의 순서로 진행 되는 과정을 통해 다른 관점에서 건축에 대 한 고찰을 할 수 있는 계기가 되었다.
70
Exterior perspective waiting area view
Master Plan
Char
lotte
Art University Bournemouth
Cl Fern Barro w
G
ille
tt
Rd
Physical model Photo, 2015
71
Plan Art University Bournemouth A’
Art Stage Platform
Open Gallery Waiting Area B
Cafe & Toilet
Seats
B’
Pedestrian road
A
Section
A
A’
B
B’
72
Exterior perspective open gallery view
Physical model Photo, 2015
Size : 1200mm x 600mm Scale : none Material : Plaster / Wooden block / Gravel / Concrete block / Steel plate
73
Extra work .2
Puzzle of Seoul
Design work / 2015 U.A.U.S Pavilion / Team work Program
Temporary pavilion
Location
D.D.P, Seoul, Korea
Team
Team project
Software
Rhinoceros 5.0/ V-ray/ AutoCAD 2015/ Adobe Photoshop/ Illustrator/ Indesign
Schedule
Mar - Apr, 2015
Prologue 서울 DDP 광장에 설치될 건축과 대학연합 주최의 파빌리온에 대한 교내 공모전의 일 환으로 진행된 프로젝트이다. 파빌리온 전 시의 주제는 ‘서울을 입다’로서, 가장 서 울을 잘 나타내는 파빌리온이며, DDP라는 장소성을 반영해야 했다. 이에 따라 우리는 서울 자체가 갖는 특성을 다양성의 집합으 로 정의하였다. 또한, 다양성에 의해 형성된 하나의 문화로 존재한다는 것을 표현하기위 해 Puzzle이라는 매개체를 사용하였다. 각 기 다른 조각을 조합함으로써, 하나의 구조 체가 되도록 하는 Puzzle의 구성방식을 의 미와 결부시켰다. 다양한 사람, 문화의 집결 체가 서울이며 이를 구성하는 구성원이 바 로 관람객 본인임을 시사하기 위해 구조 모 듈의 일부에 거울을 부착하였다. 이는 관람 객 뿐만 아니라, 주변 대상지를 비춰 문화 를 대변하기도 한다. 위와 같이 파빌리온은 ‘Puzzle of Seoul’로 명명하였다.
74
Exterior perspective DDP plaza view
Elements of puzzle
Module
Structure
Design
Elements of Structure
Mass study
Module A
Module B
Prefabricated Structure
75
Experience
Interior perspective Chair view
Composition
76
Plan
Section A-A’
Section B-B’
B’ A
B
A’
77
Extra work .3
Multi Complex Commercial Center Working experience / Part-time job / HaeAhn Architecture Program
Multi complex commercial center
Location
Baegot, Siheung, Korea
Company
HaeAhn Architecture
Software
Rhinoceros 5.0/ AutoCAD 2015/ Physical model work
Schedule
May - Jun, 2015
Physical model Photo, 2015
78
Physical model Photo, 2015
Physical model Photo, 2015
Size : 1200mm x 800mm Scale : 1/500 Material : Form board / White form / OHP film / Pin / Colour film
Size : 840mm x 400mm Scale : 1/50 Material : Form board / White form / Punched plate / wire
79
Extra work .4
Seoul Station 7017 Project Working experience / Part-time job / Mass studies Program
Public park & plaza
Location
Seoul station, Seoul, Korea
Company
Mass studies
Software
Rhinoceros 5.0/ V-ray/ AutoCAD 2015/ Physical model work
Schedule
Feb - Apr, 2015
Physical model Photo, 2015
*Left Size : 1100mm x 800mm Scale : 1/1000 Material : White form / 3d printed plastic *Right Size : 300mm x 300mm x 4ea Scale : 1/500 Material : 3d printed plastic
80
Physical model Photo, 2015
Size : 1100mm x 800mm Scale : 1/1000 Material : White form / 3d printed plastic
Physical model Photo, 2015
Size : 300mm x 300mm x 4ea Scale : 1/500 Material : 3d printed plastic
81
Extra work .5
Gwanyang Public Library
Working experience / Research student / Sejong University Program
Public library
Location
Gwanyang-dong, Anyang-si, Korea
Professor
Junbum Kwon, Sejong university
Software
Rhinoceros 5.0/ V-ray/ AutoCAD 2015/ Illustrator
Schedule
Jul - Aug, 2013
Exterior perspective birdeye view
82
83
Extra work .6
Physical Model Photo
Physical model Photo, 2012
Ninesquare Project, Studio1, 2012 Size : 400mm x 400mm x 400mm Scale : 1/20 Material : Form board
84
Physical model Photo, 2012
Corporate Exhibition Hall, Studio2, 2012 Size : 800mm x 500mm x 150mm Scale : 1/200 Material : Formax / Arcrylic / White form
85
Extra work .6
Physical Model Photo
Physical model Photo, 2012
Housing Project, Studio1, 2012 Size : 840mm x 590mm x 200mm Scale : 1/100 Material : Form board / Bass wood / Soft arcrylic / White form / Steel frame
86
Physical model Photo, 2013
Renovation Project, Studio3, 2013 Size : 500mm x 500mm x 200mm Scale : 1/100 Material : Form board / Formax / Mdf / Soft acrylic
87
Extra work .6
Physical Model Photo
Physical model Photo, 2014
Complex Facility Project, Studio4, 2014 Size : 800mm x 500mm x 200mm Scale : 1/200 Material : White fom / Formax / Soft acrylic
88
Physical model Photo, 2014
P. to P., Competition, 2014 Size : 800mm x 500mm x 150mm Scale : 1/200 Material : Formax / Arcrylic / Bass wood / Craft paper
89
Extra work .7
Sketch
Size : 200mm x 150mm Material : Pen / Pencil
90
Size : 200mm x 150mm Material : Pen / Pencil
91
Extra work .7
Sketch
Size : 200mm x 150mm Material : Pen / Pencil
92
Size : 200mm x 150mm Material : Pen / Pencil
93
Copyright â“’ by Juhyun Byun all rights reserved For more information Mobile : +82 10 9591 2605 E-mail : nimblejh90@gmail.com