Final Thesis Project

Page 1

!"#$%&'(#)'*+,$-'."/%(#( !"#$%&'()*"*&+,-.)/0

12345&6748&4&97:;53<;&=&!"#$%#&'&#()*(+,(-&././


!"##$"!

Final Thesis Project | Júlia Boix Gonzalez

!"#$%&'()*"'*+&"$,-$#)!".$ (/012/3$40567$(/8/31$

WINERY AND HOTEL SIURANA| September 2020

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


A#| +"$"(","-"%"."+"-"/"$"(

C#|

8"#$%%

3!+(#$.$%%%

3"#$%%

3+'=,+='25#3*5=+!*-

,"#$%%

,*-3+'=,+!<(#3*5=+!*-

!"#$%%

&!'(#)'*+(,+!*-#$.$/%#

8"#$%$

SITE PLAN

3"#$%$

EXPLODED AXONOMETRY

,"#$%$

ROOF FINISHES

!"#$%$

FIRE SECTORS $%&##

,"#$%0

PAVEMENT FINISHES

!"#$%0

FLOOR -1

,"#$%1

WALL FINISHES

!"#$%1

GROUNDFLOOR

,"#$%9

EXTERIOR MATERIALS

/"(","-")"*"*")"-"/"$"(",

F"#$%%

+G(#5*,2+!*-

F"#$%$

ORTOFOTO - FALSET

8"#0%%

&5**'#)52-3#$.0%%

F"#$%0

FALSET - EL PRIORAT

8"#0%$

FLOOR -1 PLAN

F"#$%1

FALSET - PANORAMIC IMAGE

8"#0%0

GROUNDFLOOR PLAN

3"#0%%

3+'=,='25#)52-3#$.$/%

,"#$%/

ROOF TYPES

!"#0%%

2,,(33!4!5!+6#$.$/%

F"#$%9

FALSET - IMAGES

8"#0%1

MAIN ROOF PLAN

3"#0%$

FOUNDATIONS PLAN

,"#$%:

PAVEMENT TYPES

!"#0%$

FLOOR -1

F"#$%/

ORTOFOTO - MAS SIURANA

8"#0%9

SECONDARY ROOF PLAN

3"#0%0

DECK PLAN

,"#$%D

WALL TYPES

!"#0%0

GROUND FLOOR

F"#$%:

MAS SIURANA - PLOT

3"#0%1

LEVEL -1 ROOF SLAB

,"#$%E

WALL TYPES

!"#0%1

ADAPTED ROOM - TOILET $%'#

F"#$%D

MAS SIURANA - PANORAMIC IMAGE

3"#0%9

GROUND LEVEL ROOF SLAB

F"#$%E

MAS SIURANA - IMAGES

3"#0%/

SECONDARY ROOF SLAB

,"#0%%

&5**'#)52-3#$.$/%

!"#1%%

7'2!-28(#$.$/%

,"#0%$

FLOOR -1 PLAN

!"#1%$

FOUL WATER DIAGRAM $%&##

!"#$$/

!&'()*#/

8"#1%%

+'2-3<('325#3(,+!*-3#$.0%%

!"#$$,#

!&'()*#,

F"#0%%

+G(#>!-(

8"#1%$

TRANSVERSAL SECTIONS 1 - 2

3"#1%%

3+'=,+='25#+'2-3<('325#3(,+!*-3#$.$/%

,"#0%0

GROUNDFLOOR PLAN

!"#1%0

RAINWATER DIAGRAM

F"#0%$

WINERIES - IMAGES

8"#1%0

TRANSVERSAL SECTIONS 3 - 4

3"#1%$

TRANSVERSAL SECTIONS 1 - 2

,"#0%1

MAIN ROOF PLAN

!"#1%1

SECONDARY ROOF

F"#0%0

WINE ELABORATION PROCESS

8"#1%1

TRANSVERSAL SECTION 5

3"#1%0

TRANSVERSAL SECTIONS 3 - 4

,"#0%9

SECONDARY ROOF PLAN

!"#1%9

ROOF FLOOR

F"#0%1

WINE AND THE TERRITORY

3"#1%1

TRANSVERSAL SECTION 5

!"#1%/

GROUND FLOOR

!"#$$.

!&'()*#.

F"#1%%

+G(#)'*H(,+

F"#1%$

WINERY AND HOTEL SIURANA - PROJECT

F"#1%0

DIAGRAMS

8"#9%%

5*-8!+=7!-25#3(,+!*-3#$.0%%

!"#$$%#

!&'()*#%

!"#1%:

8"#9%$

LONGITUDINAL SECTONS 6 - 7

3"#9%%

3+'=,+='25#5*-8!+=7!-25#3(,+!*-3#$.$/%

FLOOR -1

8"#9%0

LONGITUDINAL SECTIONS 8 - 9

3"#9%$

8"#9%1

LONGITUDINAL SECTION 10

3"#9%0

LONGITUDINAL SECTONS 6 - 7

,"#1%%

+'2-3<('325#3(,+!*-3#$.$%%

!"#9%%

2!'#,*-7!+!*-!-8#;#<(-+!52+!*-#$.$/%

LONGITUDINAL SECTIONS 8 - 9

,"#1%$

TRANSVERSAL SECTION 1

!"#9%$

CALCULATIONS

,"#1%0

TRANSVERSAL SECTION 2

!"#9%0

HVAC DIAGRAM $%&##

8"#/%%

(5(<2+!*-3#$.0%%

3"#/%%

3+'=,='25#7(+2!53#$.0/

,"#1%1

TRANSVERSAL SECTION 3

!"#9%1

FLOOR -1

8"#/%$

ELEVATIONS WEST - EAST

3"#/%$

METAL CONNECTION

,"#1%0

TRANSVERSAL SECTION 4

!"#9%9

GROUND FLOOR

8"#/%0

ELEVATIONS NORTH - SOUTH

3"#/%0

WOOD CONNECTIONS

,"#1%1

TRANSVERSAL SECTION 5

!"#9%/

ROOF FLOOR

3"#/%1

STAIRS START / LIFT PIT

3"#/%9

DECK CHANGE OF LEVEL

,"#9%%

5*-8!+=7!-25#3(,+!*-3#$.$%%

!"#/%%

(5(,+'!,!+6#3=))56#$.$/%

,"#9%$

LONGITUDINAL SECTON 6

!"#/%$

ELECTRICITY DIAGRAMS $%&##

,"#9%0

LONGITUDINAL SECTION 7

!"#/%0

FLOOR -1

,"#9%1

LONGITUDINAL SECTION 8

!"#/%1

GROUND FLOOR

,"#9%9

LONGITUDINAL SECTION 9

,"#9%/

LONGITUDINAL SECTION 10

!"#:%%

>2+('#3=))56#$.$/%

!"#:%$

WATER DIAGRAM $%&##

,"#/%%

,*-3+'=,+!<(#7(+2!53#$.0%

!"#:%0

FLOOR -1

,"#/%$

DETAIL 1

!"#:%1

GROUND FLOOR

,"#/%0

DETAIL 2

,"#/%1

DETAIL 3

,"#/%9

DETAIL 4

,"#/%/

DETAIL 5

,"#/%:

DETAIL 6

,"#/%D

DETAIL 7

,"#/%E

DETAIL 8

,"#:%%

+6)(#4(7'**F#$./%

,"#:%$

BEDROOM PLAN

,"#:%0

BEDROOM SECTIONS 1-2

,"#:%1

BEDROOM SECTIONS 3-4

,"#:%9

BEDROOM SECTIONS 5-6

!"#$$+#

!&'()*#+

!"##&"!

!&'()*#-

B#| ,"-"%"."+"-"."%"#

Final Thesis Project | Júlia Boix Gonzalez

!"#$$-

@#| '"#"("#"%")"*

WINERY AND HOTEL SIURANA| September 2020

?#| !"#"!"$"%"&


!"| !"#"!"$"%"&" !"#$$%" !&'()*#% #$"%&&" '()"*+,-'.+/ #$"%&% ORTOFOTO - FALSET

#$"%&6 MAS SIURANA - IMAGES #$"0&& '()"7./) #$"0&% WINERIES - IMAGES #$"0&0 WINE ELABORATION PROCESS #$"0&1 WINE AND THE TERRITORY !"#$$+" !&'()*#+ #$"1&& '()"89+:),' #$"1&% WINERY AND HOTEL SIURANA - PROJECT #$"1&0 DIAGRAMS

!"##$"!

#$"%&4 MAS SIURANA - PLOT #$"%&5"MAS SIURANA - PANORAMIC IMAGE

Final Thesis Project | Júlia Boix Gonzalez

#$"%&2 FALSET - IMAGES #$"%&3 ORTOFOTO - MAS SIURANA

WINERY AND HOTEL SIURANA| September 2020

#$"%&0 FALSET - EL PRIORAT #$"%&1"FALSET - PANORAMIC IMAGE


;$"&&%

!"#$%&'( '()#%&"*)+",$-#."/(0%*)*"1"%&'()'"*"'+,-+./+0"1#1#


)*&'+,-.)",/

Therefore, in the county of Priorat, the cultivation of the vineyard predominates, there is a large number of vineyards, wineries and wines among the whole territory. The administrative county of Priorat, counts with two prestigious winegrowing Designations of Origin: ‘Denominació d’Origen Qualificada Priorat’ and ‘Denominació d’Origen Montsant’. Both of them are remarkably recognized nationally and internationally for its exquisite high quality wines. The region has a total area of 498,6km2 and a total population of 9.245 inhabitants, divided within the 26 municipalities that compose the county. All characterized by being small, rural, and in which the most used building material is stone. The capital of el Priorat, is the town of Falset, where the project ‘Winery and Hotel Siurana’ is located.

#$"%&&

)*&'+,-.)",/ '()#%&"*)+",$-#."/(0%*)*"1"%&'()'"*"'+,-+./+0"1#1#

!"##2"!

El Priorat is located in the middle of the Catalan Coastal Range, between el Camp de Tarragona and Terres de l’Ebre. It is a region with a very rugged relief, without any plain and marked by the presence of the Montsant mountain range, occupying the northern sector of the region. The Priorat is characterized by its geography and orography; it is a mountainous region and with a very rugged terrain, which counts on a great number of mountain ranges in all the region, the Prades Mountains, the range of Llena or the Jover and Llaberia’s ranges, among others. Its mountains are defined by slate rocks, a dark and very old rocks type which comes from the Paleozoic era. This kind of terrain, and the characteristic climate of the county, is

what makes the cultivation of the land and agriculture the most popular and main economic activity in the whole Priorat territory - principally grapvines and fruit trees.

Final Thesis Project | Júlia Boix Gonzalez

In the southeast of the Autonomous Community of Catalonia, with an area of 6.300m2, we found what is called the Province of Tarrogona. Which agglutinates 181 municipalities and a total population of 804.664 inhabitants. The Province of Tarragona, with its capital in Tarragona, is made up of 10 counties, including el Priorat.

WINERY AND HOTEL SIURANA| September 2020

TARRAGONA - EL PRIORAT


#$"%&%

,%),!,),'0'!.+1&) '()#%&"*)+",$-#."/(0%*)*1"%&'()'"*"'+,-+./+0"1#1#


!.+1&)'0'&+'2%",%.) SURROUNDINGS

FALSET Falset is the administrative capital of the Priorat county, located in the southeast of the region, in the province of Tarragona. The city limits with Porrera to the north, with Pradell de la Teixeta to the east, with Marçà to the south, Masroig to the southwest, with Bellmunt del Priorat to the west and with Gratallops to the northwest. Falset is surrounded by the mountains of the Roca Roja, the Morral and the Serra de Llaberia, as well as the Serralada de les Obagues in the north. Falset is the most populated municipality in the region, with 2,838 inhabitants and has the greater number of shops, public services and facilities within the territory. HISTORY: Despite the existence of prehistoric settlements in the natural environment of the territory since the time of the Paleolithic interior -about 40 thousand years ago-, the town of Falset has its origins in the ‘Castell dels dels Comtes de Prades’ of the XIIth century -in medieval times-, which was the administrative headquarters of the ‘Baronia d’Entença’ and later of the ‘Comtat de Prades’, and saw the birth of two Catalan queens: Elionor de Prades, queen of Cyprus and Jerusalem, and Margarida de Prades, queen of Aragon and last queen of the dynasty of Barcelona, as the wife of Martí l’Humà. In this same castle, it was where, in modern times, there was the defeat of the Bourbon troops on August 30th 1714, in the fall of Barcelona during the War of the Spanish Succession; Colonel Anton Vidal i Talarn was killed in battle. Due to all these facts, since mid XIVth century, Falset started gaining protagonism around the country, and at all times, the town presents itself as a key element in the historic development of the South part of Catalonia. It is then, in the XVIIIth century, when the town experienced a significant demographic and economic growth that led to the town overcoming the medieval wall and beginning to expand. The internal wars of the XIXth centurym tough, strongly punished the town that in spite of everything, impelled an intense expansion of the vineyard, that suffered a strong crisis in the irruption of the plague of the phylloxera. CENTER OF FALSET: The old town of Falset is located between the church and the ‘Castell de Malanyet’, caracterized by a series of parallel streets that connect Carrer de Dalt and Carrer de Baix, crossing the

‘Plaça de la Quartera’. The village still preserves fragments of the medieval walls (‘Portal delBou’, ‘Carrer del Vall de les Moreres’ and its surroundings), as well as the modern fortification of which are preserved the two towers of the castle. Falset is characterized as well for the Plaça Vella (Plaça d’Àngel Marquès) in which it was formerly used as a stage for public executions by the gallows method, the Jewish quarter in Carrer del Lluc and Carrer de l’Escoleta and the ‘Església parroquial de Santa Maria de Falset’, with a Gothic floor plan with Baroque and Neoclassical elements. There is also the ‘Palau dels Comtes d’Azara’ of Gothic origin with many elements of the XVIIIth century and the Municipal Theater l’Artesana, a playful and recreational association. GEOGRAPHY AND LANDSCAPE Falset, is characterized by its geography; the south-eastern half of the district is a large plain, while in the north-eastern half begin the foothills of the mountains that mark the complex orography of the septentrional half of the county. The plain ranges between 300 and 380m altitude and is where two ravines start and leave the municipality of Falset to the southeast. The most mountainous area forms the small valley of the ‘Barranc de les Sentius’, which spreadxs to the north of the region and creates the river Coriella at the height of Porrera. The large landscape of el Priorat, is defined by slate rocks (licorella), in which the organic matter is missing. We find that 37% of the surface of the Priorat is cultivated land. Only 6% of the crop is irrigated, leavintg the rest dry. Out of this dry land, four crops stand out: vineyard, olive tree, hazelnut tree and almond tree. The most widespread is the vineyard with more than 7000Ha. COMMUNICATIONS Several roads cross the town of Falset, being the main one the N-420 highway, which goes from Tarragona to Córdoba and directly connects the town with Reus and Tarragona, on the one hand, and Morà d’Ebra and Gandesa on the other. ECONOMIC ACTIVITY The economy in Falset is based on agriculture -especially with hazelnuts, vineyards, olive trees, almond trees and even with cherries-, on livestock -with chickens, pigs and especially

#$"%&0

!.+1&)'0'&+'2%",%.) '()#%&"*)+",$-#."/(0%*)*"1"%&'()'"*"'+,-+./+0"1#1#

rabbits-, and on industry and services. The most abundant companies are dedicated to the agri-food sector, but there is also textiles, graphic arts, carpentry and plastic production. The construction is also present in the region and in the municipality. COOPERATIVE WINERY The Cooperative winery building in Falset is one of the Cathedrals of Wine designed by the architect Cesar Martinell, disciple of Antoni Gaudi. The building, finished on 1919, is a jewel of Modernism, an exponent of the architectural heritage of rural Catalonia from those dates. The conception of this imposing building combines the beauty of the forms with the functionality for which it was built. The structure of the cellar is reminiscnent of a basilica, with a central nave and two lateral ones. The two towers that flank the main façade of the building are a kind of reflection of the front of Falset Castle, the main point of reference in the town and visible from this spot, elevated above a hill. CLIMATE The climate is Mediterranean with maritime influence. The marinade clearly reaches it, but the set of mountains and groves parallel to the coast makes it difficult for humid and temperate sea air to enter the municipality. This arrangement of the relief makes the winter nights quite cold. The average annual temperature is around 15ºC, in the lowest areas and close to the Móra basin, and 12ºC on the upper slopes of the Montsant mountains and Prades mountains. Winters are quite cold in the northern half of the county with monthly averages of January below 5ºC, and 7ºC in the rest of the county. Summers are hot, with average monthly temperatures in July between 22 and 24ºC in much of the region. Temperatures are cooler on the upper slopes. Rainfall is rather sparse, averaging between 500 and 700mm per year. Being more abundant to the northeast, in the mountains of Prades. The wettest season is autumn, and the driest is summer. Wind is hardly noticeable, being the highest wind speed average of 15km/h in winters, coming either from the south or the west. Due to the orography of the territory, there are infinity of microclimates created in each different wineyard plot, but always favoring the cultivation of the vineyard and the wine production -always bringing good results and high quality wines.


1

2

3

4

5

6

7

8

1. FALSET MARÇÀ COOPERATIVE | 2. FALSET’S CASTLE | 3. LA QUARTERA’S SQUARE | 4. ARTESANA THEATRE | 5. PORTAL DEL BOU | 6. SANTA MARIA’S CHURCH | 7. COMTES D’AZARA’S PALACE | 8. ANTONI VILANOVA PUBLIC SCHOOL

#$"%&1

!.+1&)'0'2./,%.3"-'"3.#& '()#%&"*)+",$-#."/(0%*)*"1"%&'()'"*"'+,-+./+0"1#1#


1. SANTA MARIA’S CHURCH | 2. FALSET | 3. FALSET’S CASTLE | 4. PORTAL DEL BOU | 5. FALSET MARÇÀ COOPERATIVE

#$"%&2

!.+1&)'0'"3.#&1 '()#%&"*)+",$-#."/(0%*)*"1"%&'()'"*"'+,-+./+0"1#1#


#$"%&3

,%),!,),'0'3.1'1"$%./. '()#%&"*)+",$-#."/(0%*)*1"%&'()'"*"'+,-+./+0"1#1#


1")&'0'2+,) MAS SIURANA

LOCATION The plot is located in the center of Falset, Priorat region. It is accessed via the t-710 road that goes from Falset to Gratallops, taking a detour of 2km on the left. OROGRAPHY The plot of Mas Siurana has an area of 24.9ha. This is divided into two halves by a sudden slop filled with pines. In the southern half of the land, the slope is gentle and constant and is where the main cultivation areas and the existing buildings are located. In the northwest half is where the steep slope of the state begins, there is denser vegetation with pines and tress and also a vineyard cultivation area on terraces. PRE-EXISTENCES In the Mas Siurana estate we find a complex of three original main buildings. In the vineyard located to the west of the farmhouses there is a warehouse that houses all the cultivation machinery. The main farmhouse is the easternmost, square and compact. The auxiliary farmhouse, located to the west, has a variable geometry in plan and height. The tenant farmer’s house is the smallest of the three and is located between the two main buildings, delimiting the free space between them. From the main farmhouse, you can recognize several paths that connect all the different parts of the estate. VEGETATION Approximately 35% of the surface is dedicated to active rainfed crops. The main one is the cultivation of the vineyard but we also find a strong presence of olive trees. In the background there are some areas with almond trees as well. The area between the southern access and the farmhouses is a plantation of fruit trees. To the north of the plot, there is a large wooded area formed mainly by pines.

MAS SIURANA Mas del Siurana is a complex of three representative buildings from the end of the XIXth century, that meet the characteristics of the architecture of the time and is cataloged like cultural good of local interest (Bé Cultural d’Interès Local - BCIL). The high social position of the former owner, Enric Ciurana, led him to order the construction of the main farmhouse and the extension with an auxiliary farmhouse after making a fortune in Cuba. Ciurana’s design had as reference the model buildings which at the beginnings of the XXth century were being demolished to open the ‘Gran Via A’ or ‘Via Laietana de Barcelona’. He used his own design and had Montjuïc stone brought for construction, on uninterrupted car journeys. Eventually, the work was left unfinished, leaving the entire southern block where the library and music room should have been built. The main farmhouse housed the owners of the estate. It is a very compact building with a squared floor plan of approximately 16x16m dimensions. It consists of structural stone walls between 40 to 60cm thick and timber beams and ceramic tiles vaults slab. This house has a height of three levels: ground floor, first floor and basement. Two towers break the squared volume; the central tower is the one that contains the main staircase. The other tower, which has four levels and 13m height, is attached to one side of the east façade. This construction has completely different north and south facades. The north facade, located facing the slope and the fields, follows the pattern of the typical Catalan farmhouse, with a marked symmetry and small openings. The south-facing façade, on the other hand, has the desire to receive visitors and is solved with a neogothic style and many decorative elements such as carved stone busts. A unique porch with pointed arches on the ground floor welcomes the visitors. Between the north and south façade there is a change of level of 1.7m. The facades made of exposed stone with

#$"%&4

3.1'1"$%./.'0'2+,) '()#%&"*)+",$-#."/(0%*)*"1"%&'()'"*"'+,-+./+0"1#1#

minimal grouting. The roofs are sloped and finished with Arabic tiles. The auxiliary farmhouse had functions related to agriculture and livestock. The construction is characterized by being a totally fragmented volume, which solves a difference of 3m with a semi-underground floor. One fact to keep in mind is the variation of free height dimensions between slabs of the different volumes, generating level differences within the same path. The structure of the farmhouse is based on structural stone walls between 40 and 60 cm as well as some brick walls and pilasters. The semi-underground floor supports the upper floors by a row of badly damaged ridge vaults. The slabs are based on double ceramic tiles on timber beams, in very poor condition. The connection between beams and walls is resolved with embedding. The building consists of a north-facing central courtyard, which gives access to the crop fields, crowned by an almost squared tower of 4.3x4.9m dimensions, and a height of 11.5 m. All the façades of this auxiliary farmhouse are made of exposed stone with a minimum of grout. The roofs are sloped and finished with Arabic tile aswell. The third and smallest building is the farmhouse that housed the farmers. It is located between the two main buildings generating an intermediate controlled space where an olive tree is planted. The house is a compact two-storey building with a south-facing front porch and a gabled roof of Arabic tiles. It has a rectangular floor plan of 5x8.5m dimensions and a 6m height. The structure is also structural stone walls with timber beams and ceramic tile vault slabs. The facades are plastered with lime mortar. NOTES The people in charge of this farmhouse are the descendants of Enric Ciurana, who would like to be able to finish the work and dedicate it to some section of the Regional Museum.


1

2

3

4

6

5

7

1. T-710 ROAD | 2. N-420 HIGHWAY | 3. FALSET VILLAGE | 4. FALSET’S CHURCH | 5. NATURAL RESERVE OF LLABERIA | 6. MAS SIURANA | 7. MAS SIURANA’S FRUIT TREES | 8. MAS SIURANA’S VINEYARDS

#$"%&5

3.1'1"$%./.'0'2./,%.3"-'"3.#& '()#%&"*)+",$-#."/(0%*)*"1"%&'()'"*"'+,-+./+0"1#1#

8


1. MAS SIURANA SOUTH FACADE | 2. NORTH VINEYARDS | 3. ACTUAL STATE CELLAR LOCATION | 4. MAS SIURANA SOUTH FACADE | 5. MAS SIURANA NORTH FACADE

#$"%&6

3.1'1"$%./.'0'"3.#&1 '()#%&"*)+",$-#."/(0%*)*"1"%&'()'"*"'+,-+./+0"1#1#


)*&'4"/&

Since it was discovered that grapes could turn into wine, there have been special buildings in each era for wine production. Being considered the Ancient Greeks the founders of viniculture in the Mediterranean, it was the Romans who fostered extensive expansion of vineyards in their empire, and erected purpose-built, free-standing buildings for viniculture. They started designing wine villas characterized by being underground with the wine storage facing north. Afterwards, there started being many different types and styles of wineries and the evolution started.

The evolution of contemporary wine architecture has always been subject to varying influences in each country and region, not leaving the economic conditions which have certainly played a major role too. The transformation of wineries has now extended far beyond the limits of the profession; architecture has become increasingly significant to winemaking.

#$"0&&

)*&'4"/& '()#%&"*)+",$-#."/(0%*)*"1"%&'()'"*"'+,-+./+0"1#1#

!"#34"!

There started being wine cellars in castles and monasteries, ecclesiastic wineries with poetic names, then it appeared the château with a Neoclassical style. During the transition from Renaissance to the Baroque era, private residences started having majestic wine cellars. From the XVIth century on, rural architecture began increasingly to come under the staw of Classicism, specially Palladianism. Meanwhile, limestone rustic and contemporary wine cellars where being built in other wine-producing regions; grand mansions in a rustic version of the Baroque, Neoclassical or Empire styles. In the XIXth century, a new chapter in the architecture of wine began; in the wake of the Industrial Revolution, large-scale wine architecture occured. It was lastly in the XXth century, when the pioneers of the architecture of wine arrived with new design solutions.

Final Thesis Project | Júlia Boix Gonzalez

The world of wine is currently undergoing a profound transformation. The spread of new oenological techniques, the globalization of viniculture and of the international wine market, and the division of this market into luxury and mass-market segments, are just some of the examples of the significant change in this sector. In addition, a number of newly built, architecturally innovative production facilities are receiving more and more attention, and not only in the world of wine. It has now arised the new ‘wine architecture’, in which the architects interpret the way of wine production and convert it into a wine experience being an accessible, inviting, authentic and creative manner.

WINERY AND HOTEL SIURANA| September 2020

TRANSFORMATION OF WINERIES


1. MEDIEVAL LIMESTONE CELLAR CHAMPAGNE BOIZEL, EPERNAY

| 2. XIIIth CENTURY CELLAR | 3. BARROQUE STYLE WINERY | 4. RENAISSANCE REVIVAL SYLE WINERY | 5. XIXth CENTURY CELLAR EBERBACH ABBEY, ELTVILLE

SCHLOSS JOHANNISBERG

CHÂTEAU PICHON LONGUEVILLE, PAUILLAC

#$"0&%

4"/&%"&1'0'"3.#&1 '()#%&"*)+",$-#."/(0%*)*"1"%&'()'"*"'+,-+./+0"1#1#

CHÂTEAU LAFITE ROTHCHILD


!"#$%$&'()*'+")#%,*)-$.. WINEMAKING

Winemaking or vinification is the production of wine, starting with the selection of the fruit, its fermentation into alcohol, and the bottling of the finished liquid. While it is true that each winery produces wine in its own way, some processes concide: HARVESTING The first step in wine production is picking the grapes clusters from the grapevines, when the ideal ripening point is reached, mechanically or by hand - which is called harvesting. The grapes collected need to be the ones in better conditions and with best quality, as it will determine the quality of the wine afterwards. The grapes picked are transported by boxes that do not exceed the 25kg to the winery in the least agressive way possible so that the clusters don’t get damaged. Harvesting takes place between the beginning of September and mid October. COLLECTION AND SELECTION Once the grapes arrives to the winery, first it is analised to know about its conditions and the levels of acidity and sugar, and afterwards the grapes are poured in the reception tray, where the destemming process begins. DESTEMMING Destemming is the process of separating stems from the grapes. Depending on the winemaking procedure, this process may be undertaken before crushing with the purpose of lowering the development of tannins and vegetal flavors in the resulting wine.

HARVESTING GRAPEVINES

GRAPE PREPARATION

DESTEEMER AND CRUSHER

CRUSHING After separating stems from the grapes, it is time to squeeze the berries and break the skins to start to liberate the juice that contain the berries. The grapes pass between two rollers which squeeze the grapes enough to separate the skina dn pulp, but not so much as to cause excessive shearing or tearing of the skin tissues. In some cases, the grapes are left uncrushed. PRESSING Once these grapes are squeezed, it is time to extract the whole juice using a crushing machine, a press. White grapes are normally pressed before fermenting, by pressing, the stems exit at the end, while juice, skins and seeds exit the bottom. The lower the pressure of the pressing is, the better quality the wine will achieve. Red grapes are normally pressed after the primary fermentation. - This process can sometimes not be necessary. PRIMARY FERMENTATION - ALCOHOLIC Alcoholic fermentation is a complex biochemical process during which yeasts convert sugars to ethanol, taken place in oak or stainless steel vessel tanks. Yeast is normally already present on the grapes, visible as a powdery appearance of the grapes, but cultured yeast is often added to the must. During this primary fermentation, the yeast cells feed on the sugars in the must and multiply, producing CO2 gas, alcohol and heat. The temperature during the fermentation affects both the taste of the product, as well as the speed of the fermentation. For this fermentation, tanks which can regulate the temperature are used - high temperature

ALCOHOLIC FERMENTATION

STAINLESS STEEL / OAK TANKS

MALOLACTIC FERMENTATION OAK BARRELS

!"#$%$

!"#$%$&'()*'+")#%,*)-$.. !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

BOTTLING AND LABELLING BOTTLES

means long lasting wines, while low temperatures means more fruity taste and aromas. For red wines, the temperature is typically 22 to 25ºC, and for white wines 15-18ºC. SECONDARY FERMENTATION - MALOLACTIC Once the primary fermentation is done, and in some cases the wine is filtered to achieve a clear and neat wine, is time for the malolactic fermentation. Specific strains of bacteria, lactobacter, convert malic acid into the milder lactic acid and carbon dioxide. This process usually takes place in oak barrels; oxygen enters through the wood pores and improves the result of the wine: more gentle and less sour taste. This process can also be called ageing in barrels. For some wines, ageing can also be done in the bottle, which by placing the bottle horizontally for months, and due to the contact of the liquid and the cork cap, no oxygen can enter to the bottle and the wine gets certain tastes and aromas that improve the result. Depending on the type of wine, the ageing will last longer or shorter: -Crianza: 6 months in barrel + 18 in bottle. -Reserva: 12 months in barrel + 24 in bottle. -Gran reserva: 24 months in barrel + 36 in bottle. BOTTLING AND LABELLING After the ageing process, the wine just needs to be bottled and labelled to be out for expedition. This process takes place in a mechanical way. The wine bottles are sealed with cork caps and a top capsule for a tight seal. The regular bottles are 75cl.

BOTTLING AGING

WINE EXPEDITION


!"#$%'#/%+0$%+$**"+)*1 D.O. MONTSANT

From Escaldei to the Sindicat de Falset’s Winery, the history of the Priorat is linked to wine production. Since the XIIth century, the agricultural terraces of the Priorat have been populated by the vineyard that is still today the main economic asset of the region. The territory of Falset is represented by the two Designations of Origin (DO) that holds the ancient land of the Carthusians: the Priorat Qualified Designation of Origin (DOQ Priorat) and the Montsant Designation of Origin DO Montsant), both of recognized prestige within our borders. As for the territory of the project, it is limited by the two denominations of origin; the northern half of the plot with DOQ Priorat and the southern half with DO Montsant. The project is located in this lattest area. TERRITORY The territory is marked and healed by the cultivation of wine. From the Serra de les Obagues in the north to the Serra de LLaberia in the south, the grape crops spread throughout the Falset Valley, in the same way as it does inside the sectors with a Designation of Origin. The territory that makes up the DO Montsant is delimited by a semicircle of mountains that seen on a map, looks like a ring shape. This ring, contains inside the territory that makes up the DOQ Priorat. To the north, the complex is formed by the Montsant and LLena mountain ranges, which connect it with the leafy Muntanyes de Prades. To the east, the boundaries are marked by the pre-coastal mountain range of Argentera, Colldejou and Llaberia, which announce the near presence of the sea; on the opposite side of the west, we find the mountains of La Figuera and El Tormo. To the south, the territory becomes more open towards the river Ebre, where the rivers Siurana and Montsant flow to, which together with the Capçanes stream are the watercourses that irrigate our territory. The orography of the DO Montsant is varied, rugged and

steep in general, although it becomes smooth in some areas, especially to the south, where the site selected to build the new winery and hotel of Mas Siurana is located. It should also be noted that the Priorat has a very rare type of soil in the Iberian Peninsula. It is a type of slate from the Carboniferous period that occupies a large part of the center of the region and is called slate rock (licorella). This, despite its hard appearance, is a fragile stone, formed by several sheets that fall apart with relative ease. Despite this apparent fragility, it takes an enormous effort for the roots of the vines to make their way through this soil and find the water and food that they need to be able to offer a quality fruit. Due to its mineral content, the slate rocks create a fascinating visual effect when bathed in the sun; when the sun reaches these rocks, light and brightness characterize the mountains. For all this, the DO Montsant, along with other institutions, has promoted the Candidacy Priorat-Montsant-Siurana, Mediterranean mosaic, which has already been delivered to UNESCO for this institution to decide to inscribe the landscape of the region in the list of Heritage UNESCO World Cup. The aim of the candidacy is to recognize internationally the value of an agricultural model that has managed to harmonize the Mediterranean agricultural tradition still alive with innovation and creativity with a vision for the future. DO MONTSANT WINE The Montsant Designation of Origin has most of its production area in the Priorat region. It was born in 2001, made up of the municipalities and wineries that formed the Falset subzone of the Tarragona Designation of Origin. The DO Montsant has experienced a spectacular growth since then, currently the area of planted vineyards is about 2000ha and the production of grapes is around 7-9Mkg. The DO Montsant area is located between 200 and 700m of altitude and made up by currently 55 wineries in within 16 municipalities located mainly in the Priorat region and some of them in the Ribera d’Ebre: Cabacés, Capçanes, Cornudella

!"#$%&

!"#$%'#/%+0$%+$**"+)*1 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

de Montsant, Darmós, Els Guiamets, El Masroig, El Molar, Falset, La Bisbal de Falset, La Figuera, La Serra d’Almos, La Torre de Fontaubella, Marçà, Margalef, Pradell de la Teixeta y Ulldemolins. The Montsant wine tasting evokes the fragrances of its landscapes. The vineyards are, for the most part, old vines of black and white Garnatxa, Carinyena and Macabeo, although there are also more modern plantations with tempranillo, Cabernet Sauvignon, Merlot and Syrah, among others, which have adapted well to the whole territory. Red wines are the most common in the DO Montsant, although many types of wine are made in the wineries of the designation. Some of the authorized and recommended varieties of DO Montsant are: -White: Garnatxa blanca, Macabeu, Moscatell de gra petit, Pansal, Chardonnay -Red: Garnatxa negra, Garnatxa peluda, Samsó (Carinyena), Cabernet sauvignon, Merlot, Monastrell, Picapoll negre, Syrah, Ull de llebre. CLIMATE AND WINE It is very important to take into account the climate of the wine-growing areas, as the different climatological variables are involved in the development of the vine, in the genetic expression of the grapes and consequently in the character of the out coming wine. Of the four main climatological variables that define the climate of a region, three are unalterable by man -temperature, relative humidity, and solar radiation- while rainfall is the only variable that man can modify. In areas of low rainfall, the grower can provide water through irrigation, and thus have vegetative and quality control of the grapes. But in areas where the rain exceeds the needs of the plant, the producer does not have the capacity to remove excess water, so it becomes a limiting factor for the quality of grapes and wine. Thus, the climate of the Priorat, due to its characteristics, is favorable at the time of wine cultivation.


;$"&&0

!"#$%&'5 '()#%&"*)+",$-#."/(0%*)*"1"%&'()'"*"'+,-+./+0"1#1#


)*&'2%,6&-)

#$"1&&

)*&'2%,6&-) '()#%&"*)+",$-#."/(0%*)*"1"%&'()'"*"'+,-+./+0"1#1#

!"#35"!

Final Thesis Project | JĂşlia Boix Gonzalez

The project brief asked for the design of a winery in a plot situated on the outskirts of the town A winery opposed to a hotel with the objective of making the public feel comfortable, with the of Falset, about 2km from the town center. On an existing plot of about 24.9ha where there is maximum calm and silence possible, always overcoming the needs of the visitors. already a farmhouse built. This plot also has a number of existing vineyards and several fruit trees as well as part of a pine forest. As for the topography, in the northern half it is steep and Thus, in regard to the program, several rooms are requested depending on the use. The industrial part needs: a reception and selection room for the grapes to be sorted, an earthware sloped, while in the southern half the slope moderates. jar store, a barrel store, a barrel cleaning and reparation room, a bottling and labelling plant, The brief of the project asked for the design of not a conventional winery but a winery which an oenologist lab to check the conditions of the wine, an expedition storage for the finished incorporates a small boutique hotel; a building which must fullfill the functions of an in- bottle wines, machinery and regular storage rooms and cabinets, changing rooms and toilets dustrial winery and must as well allow guests and visitors to spend the night. The virtues for the workers and a vertical communications core. For the cellar and hotel is asked a recepof a hotel must coexist with the needs of a winery which produces about few thousands of tion area with a waiting room, a winetasting room, an area with a winebar and shop, 8 douwine bottles per year. An industrial building, which requires a solid construction with spe- ble rooms which include a sleeping area, living area, bathroom and small terrace, toilets for cial conditions, needs and integrating specific machinery while respecting wine and nature. the winery guests and visitors and vertical and horizonal communications. areas and terraces.

WINERY AND HOTEL SIURANA| September 2020

BRIEF AND PROGRAM


!"#$*1%'#/%0)+$&%."2*'#' PROJECT

The project is designed with the main objective of integrating the industrial world of wineries and the human world of cellar and hotels, always taking into account the respect for wine and nature. The building has a series of volumes with a correct interior distribution, managing to respond in the best possible way to the needs of the three so different uses that compose it. The materials used, help to understand the different volumes of each world. VOLUMES AND DISTRIBUTION The project, although perceived as a one single big volume, consists of 4 different smaller ones; three on the Ground Floor and one on the Semi-underground Floor. These are distinguished according to the activities and uses that take place inside. The three volumes located in the Ground Floor, are distributed in a way that separation terraces are created between them and that respond as well to the requirement of the program. Between the three volumes, a central porch is formed that serves as the main welcome entrance and where all the different accesses appear. Each of the volumes has its own main roof -a non-transitable gravel roof- as well a secondary roof, made of wood, which allows natural ventilation and light into several rooms of the building. This secondary roof is supported by three different reinforeced concrete communications cores; each volume has its own, going from the semi-underground floor all the way up to the secondary roof. In each core, is each core is where the vertical communications -such as stairs and elevators-, wet rooms and installation facilities are hidden. As for the Ground Floor, a large concrete, solid and opaque volume can be recognized. This volume in where the wine production area or industrial cellar is located. The inside organisation of spaces favors the winemaking process; a distribution corridor in the north facade gives

access to the different rooms, the main space is located in the center, with a double height room. On the Gound Floor there are also two smaller, light and wooden volumes, which receive the cellar visitors and the hotel guests. These volumes open to two exterior terraces that, facing south, enjoy the views of the vineyards and the farmhouse of the same plot, as well as the views towards Falset. In the lower floor, in contact with the ground, is where the part of the cellar and production with the need for more specific and constant thermal conditions is located. Following the distribution model design of the upper level, this semi-underground floor counts with the double height space in the center and the distribution corridor in the northern area. In the southern strip area of this floor -1, the hotel space is located; opened onto the landscape and the views, and receiving also natural light. This strip counts as well with a corridor that allows access to the rooms and at the same time serves as a dividing limit between the industrial winery part and the hotel.

in the left part of the volume, giving acces to the grapes to the reception and selection area, where the wine process starts. In the Ground-floor there is found as well the upper floor of the double space earth ware jar store, from where the grapes are poured into the tanks and the expedition storage, where the finished bottles are kept ready to be sent away.

WINERY - INDUSTRIAL The industrial winery area, as mentioned, is a solid construction of reinforce concrete in which the main and large volume is located in the floor -1, buried underground, taking advantage of the natural terrain. It has been designed in a way that visually shows within the whole building, where the industry is located and the wine is elaborated. The main structural material is reinforced concrete, while the partitions and carpentries are made of wood.

CELLAR AND HOTEL The human scale area has the main access through the entrance welcome porch as well, the main idea is that from one entrance point, the interior routes of the cellar and hotel can be achieved; once in the reception located in the southest volume of the ground-floor, there is the possiblity to arrive to three different spaces. The first one, to the waiting hall and winetasting room area ,opened to a large terrace with a pergola, facing south, with views to Falset and the vineyards of Mas Siurana. The second one, to the winebar and shop - which have a terrace as well facing south. There is access as well to the lower floor, where the hotel bedroom corridor gives access to the 8 bedrooms; each one with its own bathroom, living area and small terrace. The hotel corridor serves as well as the separation area between bedrooms and industral winery, being opened to the interior patio and having punctual openings for guests to see the wine process while going to their bedrooms.

The distribution of the industrial area, has mainly been organized following the grapes and wine route as for the wine elaboration process. In the ground floor, there are 2 main entrances, one for the wine and one for the workers and visitors of the winery; a wood door located in the central porche of the ground floor opens to and industrial corridor, which gives access to the industrial’s communications core. Meanwhile, a large industrial wooden door is placed

!"#&%'

!"#$*1%'#/%0)+$&%."2*'#'%3%,*)4$-+ !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

The level below, designed by the same expedition strategy is filled with the lower level of the earth ware jar store, the barrel storage, the bottling and labelling plant, an area for cleaning and repearing barrels, and the oenologist laboratory, which makes sure the wine has the right quality to be bottled. All these areas, except the earthware jar store, which needs ventilation, and the oenologist lab, which needs natural light and ventilation aswell, have no facades in contact with the exterior, so that the thermal conditions are always constant; the other two rooms, give to an interior patio which separates the industrial part with the hotel corridor.


GRAPES ACCESS WORKERS ACCESS

WOOD ROOF FLOOR WOOD SLAB t=92cm +5.42m

W03

MAIN ACCESS

INT-EXT OPENED SPACE

M03 WOOD BEAM 25X80CM M02

VIEWS

CELLAR

M04

M04

W05

WOOD BEAMS 15X45CM

M04 M01

R04

M03

C01

M02 CONSTANT Tยบ

R05

R05

INDUSTRIAL

M03

INDUSTRIAL

W04

W04

R03

N

NATURAL VENTILATION NATURAL LIGHT

HOTEL

INTERIOR CROSSED VIEWS

MAS SIURANA ACCESS

W

M01 M03

VIEWS

M02 S

The building is located in the turning point of the plot; on the north side, the pine forest with a remarkable slope is located, while to the south the slope is more moderated and where the grape vines are cultivated. To the south, there are views to Falset and to the farmhouse Mas Siurana with its vineyards and fruit trees plantations. Due to the orography, landscape and actual paths, three of the existing ways are maintained. The first one, at the right side of the plot, there is an existing mountain road which allows the access by car to the Winery and Hotel Siurana. Through the same access by taking the first deviation to the left, there is the existing farmhouse Mas Siurana. And last, connecting the Mas Siurana and the Winery and Hotel Siurana, there is an existing path, which crosses the grapevines from which the guests and visitors can see the plantations and in which the transportation of the grapes is done.

GROUNDFLOOR TERRACE REINF. CONCRETE SLAB t=30cm Volumes -0.05m connected with terraces

Two different levels, with completely separated uses. and a porche; that allow the building to take advantage of natural ventilation and natural light. The building has 3 main accesses, according to each volume; one for the grapes, one for the hotel and cellar guests and one for the visitors and winery workers. The internal distribution of the program is done taking into account the needs of the wine and the guests, around trhee different communication cores. Taking advantage of the constant temperature of the ground, the views and the direction of the solar radiation, the different areas have been placed. The wine industry is located in the north part, distributed in R04 the ground floor and the level underground depending on the wine process requirements. The cellar R03 is located in the ground floor and giving south, taking advantage of the views and the solar radiation. The hotel, more private part is locatedC03 in the floor -1, opening through the views and natural light.

#$"1&0

7".#%.31 '()#%&"*)+",$-#."/(0%*)*"1"%&'()'"*"'+,-+./+0"1#1#

E

ROOF FLOOR REINF. CONCRETE SL t=30cm +3.45m W03

W03

W04

W04

M03

HOTEL

W03

R05

REINF. CONCRETE WALL T= 25CM UNDERGROUND

W01

W02

M01

WOOD PERGOLA WOOD SLAB t=45cm +3.60m

ROOF FLOOR REINF. CONCRETE SLAB t=30cm +3.45m

REINF. METALLIC CONCRETE PILAR WALL T=25CM8CM

W04

WOOD BEAM 25X80CM

W03

W04

M04

W05

W05

CLT BOARD T= 12CM

WOOD BEAMS 15X45CM

WOOD JOIST 15X25CM

W04

METALLIC PILAR 8CM

REINF. CONCRETE WALL T= 25CM

INDUSTRIAL

INDUSTRIAL

CROSSED VIEWS

WOOD PERGOLA WOOD SLAB t=45cm +3.60m

NATURAL VENTILATION

CELLAR

WOODS VINEYARD

W01

GUEST AND VISITORS ACCESS

W02

W03

W04

W05

CLT BOARD T= 12CM

GRAPES ACCESS

WOOD JOIST 15X25CM

LIGHT SLOPE

VALLEY

STEEP SLOPE

MOUNTAIN

WOOD ROOF FLOOR WOOD SLAB t=92cm +5.42m

M01 M03 M02

GROUNDFLOOR TERRACE REINF. CONCRETE SLAB t=30cm

WINE ROUTE: -0.05m Grape Reception and Selectiron - Desteeming and Pressing - Earthware Jar Store Tank - Barrel Store - Bottling Plant - Hydraulic Platform - Expedition Storage - Bottles Exit WINERY VISITORS: Entrance Welcome Porch - Reception - Hall - Grape Reception and Selection - Earthware Jar Store - Industrial Staircase - Earthware Jar Store - Industrial Corridor - Barrel Store - Bottling Plant - Emergency Staircase - Entrance Welcome Porch - Winetasting Room R04 HOTEL GUESTS: Entrance Welcome Porch - Reception - Hotel Staircase - Hotel Corridor - Bedroom R03

BAR GUESTS: C03 Entrance Welcome Porch - Reception - Wine Bar - Cellar Shop

REINF. CONCRETE WALL T=25CM


!"| !"#"$"#"%"&"'"( #$"%&& '()*"%+%&& #$"%&%"SITE PLAN #$",&& -.//0"1.23'"%+,&& #$",&% FLOOR -1 PLAN #$",&,"GROUNDFLOOR PLAN

#$"4&, TRANSVERSAL SECTIONS 3 - 4 #$"4&4 TRANSVERSAL SECTION 5 #$"5&& ./3#()89(32."'*7)(/3'"%+,&& #$"5&% LONGITUDINAL SECTONS 6 - 7 #$"5&, LONGITUDINAL SECTIONS 8 - 9 #$"5&4 LONGITUDINAL SECTION 10 #$":&& *.*62)(/3'"%+,&& #$":&%"ELEVATIONS WEST - EAST #$":&,"ELEVATIONS NORTH - SOUTH

!"#$$"!

#$"4&& )023'6*0'2."'*7)(/3'"%+,&& #$"4&% TRANSVERSAL SECTIONS 1 - 2

Final Thesis Project | Júlia Boix Gonzalez

!"#$$% !&'()*#%

WINERY AND HOTEL SIURANA | September 2020

#$",&4 MAIN ROOF PLAN #$",&5 SECONDARY ROOF PLAN


360

!"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

!"#$%$

!"#$%&'()%*%1:1000

6

5

4

3

2

1

A

355

340

345

350

365

370

375

380

385

390

B

C

D

E

F

G

H

I

360


B

C

D

E

S-5

S-4

S-3

S-2

S-1

A

F

G

H

I

1

INDUSTRIAL CORRIDOR S=37,05m2

INDUSTRIAL MACHINERY ROOM

STORAGE

HIDRAULIC PLATFORM

S=3,70m2

S=67,10m2

WATER PUMP'S ROOM

RAINWATER TANK'S MACHINERY ROOM

S=2,95m2

S=2,15m2

09

08

FFL -3.80m SSL -3.90m

TOILET

BOILER'S ROOM

RAINWATER TANK

S=3,15m2

S=12,35m2

S=5,55m2

HOT WATER STORAGE GIACOMINI BCI (Ø950mm, 1775mm)

BIOMASS BOILER ECO HK-90KW (0,75 x 1,24 x 1,61m)

12

13

14

15

16

17

18

19

20

21

22

INDUSTRIAL STAIRCASE S=15,05m2

BARREL CLEANING AND REPARATION

BARREL STORE S=146,90m2

S=49,10m2

BIOMASS STORAGE

11

07

10

06

05

04

03

02

01

00

S=11,40m2

23 STAIRS 28x16.9cm

S-10

RAINWATER TANK IN SITU 15.000L

2

FFL -3.80m SSL -3.90m

EMERGENCY STAIRCASE S=12,40m2

01

21

02

20

03

19

04

18

05 06

17 16 15

OENOLOGIST LAB

EARTHWARE JAR STORE

S=62,70m2

S=266m2

00

22

07 08

14

09

13

10

12

11

S-9

BOTTLING PLANT S=63,90m2

23 STAIRS 28x16.9cm

3

LAUNDRY ROOM

DRYER

WASHER

S=12,40m2

EXTERIOR UNIT (0,58x 1,10 x 1,58m)

EXTERIOR UNIT (0,58x 1,10 x 1,58m)

361

4

S-8

20

19

18

17

16

15

14

13

12

11

10

09

05

04

08

06

07

S=17,70m2

03

HOTEL STAIRCASE 02

S=2,80m2

S=2,80m2

21 STAIRS 28X16.6CM

FFL -3.40m SSL -3.50m

01

LIFT

00

INTERIOR COURTYARD

HOTEL CORRIDOR S=119,15m2

5 R101

R102

R103

R104

R105

R106

R107

R108

ADAPTED BEDROOM

TYPE BEDROOM

TYPE BEDROOM

TYPE BEDROOM

TYPE BEDROOM

TYPE BEDROOM

TYPE BEDROOM

TYPE BEDROOM

S=33,10m2

S=33,80m2

S=33,80m2

S=33,80m2

S=33,80m2

S=33,80m2

S=33,80m2

S=33,80m2

ADAPTED BEDROOM TERRACE

TYPE BEDROOM TERRACE

TYPE BEDROOM TERRACE

TYPE BEDROOM TERRACE

TYPE BEDROOM TERRACE

TYPE BEDROOM TERRACE

TYPE BEDROOM TERRACE

TYPE BEDROOM TERRACE

S=6,20m2

S=5,85m2

S=5,85m2

S=5,85m2

S=5,85m2

S=5,85m2

S=5,85m2

S=5,85m2

360

S-7

S-6

6

359

INDUSTRIAL -OENOLOGIST LAB -INDUSTRIAL MACHINERY ROOM -EARTHWARE JAR STORE -INDUSTRIAL CORRIDOR -BARREL CLEANING AND REPARATION -BOTTLING PLANT -BARREL STORE -TOILET -STORAGE -BOILER’S ROOM -WATER PUMP’S ROOM

62,70m2 67,10m2 266,00m2 37,05m2 49,10m2 63,90m2 146,90m2 3,15m2 3,70m2 12,35m2 2,95m2

-RAINWATER TANK’S MACHINERY ROOM -RAINWATER TANK HOTEL -HOTEL CORRIDOR -ADAPTED BEDROOM -ADAPTED TERRACE -TYPE BEDROOM (x7) -TYPE BEDROOM TERRACE (x7) -LAUNDRY ROOM

2,15m2 5,55m2 119,15m2 33,10m2 6,20m2 33,80m2 5,85m2 12,40m2

COMMUNICATIONS -HIDRAULIC PLATFORM

-INDUSTRIAL STAIRCASE -EMERGENCY STAIRCASE -HOTEL STAIRCASE -LIFT

15,50m2 12,40m2 17,70m2 2,80m2

EXTERIOR -INTERIOR COURTYARD TOTAL NET SURFACE -1: TOTAL GROSS SURFACE -1:

2,80m2 1.233,60m2 1.416,70m2

11,40m2

!"#$%&

!"#"!$%&$'!(()$*$1:200 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

358


A

B

C

D

E

S-5

S-4

S-3

S-2

S-1

365

F

G

H

I

364

1

INDUSTRIAL CORRIDOR

STORAGE

SHAFT

HIDRAULIC PLATFORM

S=3,70m2

S=68,80m2

ELECTRICITY ROOM

S=2,90m2

S=2,50m2

CGP

RECEPTION AND SELECTION

09

08

11

07

10

06

05

04

03

02

01

S=11,40m2

MACHINERY ROOM

FFL +0.10m SSL ±0.00m

S=10,30m2

ENTRANCE TERRACE S=109,85m2

CHANGING ROOMS 12

13

14

15

16

17

18

20

21

22

S=10,60m2

19

23

INDUSTRIAL STAIRCASE S=15,05m2

AFS

S=39,85m2

S-10

363 23 STAIRS 28x16.9cm

2

FFL +0.10m SSL ±0.00m

EMERGENCY STAIRCASE S=12,40m2

EXPEDITION STORAGE S=66,10m2

01

22

02

21

03

20

04

19

05

18

06

17

07

16

08

15

09

14

10

13

11

12

362

S-9

EARTHWARE JAR STORE

WINE SHOP

S=149,50m2

S=54,15m2

23 STAIRS 28x16.9cm

3

ADAPTED TOILET S=4,80m2

TOILET

FFL +0.11m SSL -0.05m

S=2,95m2

ENTRANCE PORCHE

TOILET

S=68,65m2

WINEBAR

S=2,95m2

S=82,35m2

361

4 FFL +0.10m SSL ±0.00m

LIFT S=2,80m2

20

19

18

17

16

15

14

09

12

13

11

07

08

06

10

05

04

02

01

03

HOTEL STAIRCASE S=38,60m2

S-8

RECEPTION

SHOP ENTRANCE

S=21,70m2

S=5,90m2

SHOP STORAGE S=3,10m2 5

FFL +0.11m SSL -0.05m

EVENTS TERRACE

WINETASTING ROOM

HALL

S=79,85m2

S=42,95m2

S=168,45m2

FFL +0.11m SSL -0.05m

BAR TERRACE

360

S-7

S=92,95m2

S-6

6

359

INDUSTRIAL -RECEPTION AND SELECTION -EXPEDITION STORAGE -EARTHWARE JAR STORE -INDUSTRIAL CORRIDOR -CHANGING ROOMS -STORAGE -ELECTRICITY ROOM -MACHINERY ROOM CELLAR -WINE SHOP -WINEBAR

68,80m2 66,10m2 149,50m2 39,85m2 10,60m2 3,70m2 2,50m2 10,30m2 54,15m2 82,35m2

-ADAPTED TOILET -TOILET (x2) -SHOP ENTRANCE -SHOP STORAGE -RECEPTION -HALL -WINETASTING ROOM

4,80m2 2,95m2 5,90m2 3,10m2 21,70m2 42,95m2 79,85m2

COMMUNICATION -HIDRAULIC PLATFORM -INDUSTRIAL STAIRCASE -EMERGENCY STAIRCASE -HOTEL STAIRCASE

11,40m2 15,50m2 12,40m2 38,60m2

-LIFT

2,80m2

EXTERIOR -ENTRANCE TERRACE -ENTRANCE PORCHE -BAR TERRACE

109,85m2 68,65m2 92,95m2

-EVENTS TERRACE

168,45m2

TOTAL NET SURFACE GF: TOTAL GROSS SURFACE GF:

1.172,65m2 1.416,70m2

!"#$%$

!"#$%&'()##"'*'1:200 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

358


E

F

G

H

S-5

D

S-4

C

S-3

B

S-2

S-1

A

I

1 FFL +3.60m SSL +3.45m

INDUSTRIAL ROOF

09

08

11

07

10

06

05

04

03

02

01

S=266,70m2

12

13

14

15

16

17

18

20

21

22

19

23

PRIMARY AIR HANDLING UNIT TKM 22

INSTALLATIONS MACHINERY

S-10 CHILLER AIRCON 1CHL-0160 (2,27 x 2,12 x 1,32m)

S=22,05m2

2 FFL +3.60m SSL +3.45m

BAR ROOF 01

22

02

21

03

20

04

19

05

18

06

17

07

16

08

15

09

14

10

13

11

12

S=153,20m2

S-9

3

INSTALLATIONS MACHINERY

PRIMARY AIR HANDLING UNIT TKM 65

S=22,05m2

4

19

18

17

14

13

16

15

12

11

10

09

05

08

04

07

06

03

02

01

S-8

5 FFL +3.60m SSL +3.45m

WINETASTING ROOF S=141,00m2 S-7

S-6

6

PRIMARY ROOF -BAR ROOF -WINETASTING ROOF

153,20m2 141,00m2

-INDUSTRIAL ROOF

266,70m2

TOTAL NET SURFACE R1: TOTAL GROSS SURFACE R1:

560,90m2 940,00m2

!"#$%&

!"#$%&''(%)%1:200 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././


E

F

G

H

S-5

D

S-4

C

S-3

B

S-2

S-1

A

I

1 FFL +3.60m SSL +3.45m

SECONDARY ROOF S=585,10m2

S-10

2 FFL +3.60m SSL +3.45m

S-9

3

4

S-8

5

FFL +3.60m SSL +3.45m S-7

S-6

6

SECONDARY ROOF -SECONDARY ROOF

585,10m2

TOTAL NET SURFACE R2: TOTAL GROSS SURFACE R2:

585,10m2 585,10m2

!"#$%&

!"#$%&'()*($$+*,*1:200 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././


!"#$$%

!"#$%&'( !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&'&#()*(+,(-&././


6

5

4

6

5

4

3

2

3

2

1

FFL +3.45m

EXPEDITION STORAGE S=66,10m2

RECEPTION AND SELECTION

1

S=68,80m2

EVENTS TERRACE

S=168,45m2

+3.45m FFL +0.10m

S=66,10m2

S=68,80m2 S=67,10m2

OENOLOGISTLAB

S=119,15m2

S=33,10m2

INDUSTRIAL RECEPTIONMACHINERY AND ROOM SELECTION

EXPEDITION STORAGE

HOTEL CORRIDOR

ADAPTED BEDROOM

S=62,70m2

EVENTS TERRACE

S=168,45m2 FFL -3.40m

FFL +0.10m FFL -3.80m

INDUSTRIAL MACHINERY ROOM

HOTEL CORRIDOR

ADAPTED BEDROOM S=33,10m2

S=67,10m2

OENOLOGISTLAB

S=119,15m2

S=62,70m2

FFL -3.40m FFL -3.80m

SECTION 1

6

5

4

3

2

1

INDUSTRIAL STAIRCASE S=15,05m2

5

4

S=149,50m2

3

2

23 STAIRS S=15,05m2 28x16.9cm

EARTHWARE JAR STORE EARTHWARE S=149,50m2 JAR STORE

S=39,85m2

S=3,70m2 S=3,70m2

HOTEL CORRIDOR

S=266m2

S=119,15m2

INTERIOR COURTYARD

EVENTS TERRACE

23 STAIRS 28x16.9cm

S=2,80m2

S=168,45m2 FFL -3.40m

FFL +0.10m +3.45m

STORAGE STORAGE

S=33,80m2

INDUSTRIAL CORRIDOR

INDUSTRIAL STAIRCASE

EVENTS TERRACE

S=168,45m2

TYPE BEDROOM

FFL +3.45m

S=3,70m2

6

STORAGE

EARTHWARE JAR STORE

INDUSTRIAL INDUSTRIAL CORRIDOR CORRIDOR S=39,85m2 S=37,05m2

FFL +0.10m

HOTEL CORRIDOR

S=3,70m2

S=33,80m2

STORAGE

FFL -3.80m

TYPE BEDROOM

EARTHWARE JAR STORE S=266m2

S=119,15m2

INTERIOR COURTYARD S=2,80m2

FFL -3.40m

11

09

07

08

10

06

03 20

05

02 21

04

01 22

23

13

12

15

14

18

19

17 16

CGP

AFS

S-2

FFL -3.80m

S-1

01 02

22 21 20 19

05

18

06

17

07

16

08

15

09

14

10

13

11

12

20

06

07

08

19

05

04

16

15

18

17

03

02

01

11

09 10

14

03 04

12 13

SECTION 2

!"#$%&

!"#$%&'"%#()%'*!+,$%)-).)/)0)1:200 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

INDUSTRIAL CORRIDOR S=37,05m2

1


6

5

3

4

2

HOTEL STAIRCASE

INSTALLATIONS MACHINERY

S=38,60m2

FFL +3.45m

1

S=22,05m2

2

MACHINERY ROOM S=10,30m2

HOTEL STAIRCASE FFL +0.10m FFL +3.45m

S=39,85m2

1

S=22,05m2

EARTHWARE JAR STORE EARTHWARE S=149,50m2 JAR STORE

HOTEL CORRIDOR

RAINWATER TANK S=5,55m2

MACHINERY ROOM

S=266m2

S=119,15m2

S=33,80m2

INDUSTRIAL CORRIDOR

INSTALLATIONS MACHINERY

S=38,60m2

TYPE WINETASTING ROOM BEDROOM S=79,85m2

S=2,50m2

3

4

S=10,30m2

INDUSTRIAL INDUSTRIAL CORRIDOR CORRIDOR

INDUSTRIAL CORRIDOR

S=2,50m2 S=2,15m2

5

S=79,85m2

ELECTRICITY RAINWATER TANK'S ROOM MACHINERY ROOM

WINETASTING ROOM

RAINWATER TANK'S MACHINERY ROOM

6

S=149,50m2

ELECTRICITY ROOM

EARTHWARE JAR STORE

S=37,05m2 S=39,85m2

FFL -3.40m FFL +0.10m FFL -3.80m

EARTHWARE JAR STORE

HOTEL CORRIDOR

RAINWATER TANK S=5,55m2

S=266m2

S=2,15m2

TYPE BEDROOM

S=119,15m2

S=33,80m2

S=37,05m2

FFL -3.40m FFL -3.80m

SECTION 3

6

5

4

3

2

1

4

3

2

1

RECEPTION S=21,70m2 FFL +3.45m

6

5

HALL S=42,95m2

RECEPTION S=21,70m2 FFL +0.10m FFL +3.45m

TYPE BEDROOM TERRACE HALL

S=5,85m2 S=42,95m2

TYPE BEDROOM

HOTEL CORRIDOR

ENTRANCE PORCHE

ENTRANCE TERRACE

S=68,65m2

S=109,85m2

BARREL CLEANING AND REPARATION

BOTTLING PLANT S=63,90m2

S=49,10m2

S=119,15m2

S=33,80m2

FFL -3.40m FFL +0.10m

ENTRANCE PORCHE

ENTRANCE TERRACE

S=68,65m2

S=109,85m2

FFL -3.80m

TYPE BEDROOM TERRACE S=5,85m2

TYPE BEDROOM

HOTEL CORRIDOR

BARREL CLEANING AND REPARATION

BOTTLING PLANT S=63,90m2

S=49,10m2

S=119,15m2

S=33,80m2

FFL -3.40m

11

09

07

08

10

06

03 20

05

02 21

04

01 22

23

13

12

15

14

19

18

S-4 CGP

AFS

S-3

FFL -3.80m

17 16

01 02

22 21 20 19

05

18

06

17

07

16

08

15

09

14

10

13

11

12

20

06

07

08

19

05

04

16

15

18

17

03

02

01

11

09 10

14

03 04

12 13

SECTION 4

!"#$%&

!"#$%&'"%#()%'*!+,$%)-).)/)0)1:200 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././


6

5

4

3

2

1

FFL +3.45m

WINEBAR

WINE SHOP

S=82,35m2

S=54,15m2

BAR TERRACE S=92,95m2

TYPE BEDROOM TERRACE S=5,85m2

TYPE BEDROOM

ENTRANCE TERRACE S=109,85m2

FFL +0.10m

HOTEL CORRIDOR

BARREL STORE S=146,90m2

S=119,15m2

S=33,80m2

FFL -3.40m FFL -3.80m

11

09

07

08

10

06

03 20

05

02 21

04

01 22

23

13

12

15

14

18

19

17 16

CGP

AFS

S-5

SECTION 5

01 02

22 21 20 19

05

18

06

17 16

08

15

09

14

10

13

11

12

20

06

07

08

19

05

04

16

15

18

17

03

02

01

11

09 10

14

12 13

03 04

07

!"#$%$

!"#$%&'"%#()%'*!+,$)-).)1:200 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././


A

B

C

D

A

B

C

D

E

F

G

H

I

E

F

G

H

I

G

H

I

G

H

I

FFL +3.45m

WINETASTING ROOM S=79,85m2

HALL S=42,95m2

364

EVENTS TERRACE

FFL +3.45m

BAR TERRACE

S=168,45m2

FFL +0.10m

S=92,95m2

WINETASTING ROOM

363

ADAPTED BEDROOM TERRACE

ADAPTED BEDROOM

S=6,20m2

S=33,10m2

TYPE BEDROOM TERRACE S=5,85m2

S=79,85m2

HALL

TYPE BEDROOM

S=42,95m2

S=33,80m2

362

BAR TERRACE

EVENTS TERRACE S=168,45m2

364 361

360 363

ADAPTED BEDROOM TERRACE

ADAPTED BEDROOM

S=6,20m2

S=33,10m2

TYPE BEDROOM TERRACE S=5,85m2

S=92,95m2

FFL +0.10m FFL -3.40m

TYPE BEDROOM S=33,80m2

362

361

FFL -3.40m

360

SECTION 6

A

B

C

D

A

B

C

D

E

F

E

F

FFL +3.45m

WINETASTING ROOM S=79,85m2

HALL S=42,95m2

EVENTS TERRACE

S=168,45m2

364

FFL +3.45m

BAR TERRACE

FFL +0.10m

S=92,95m2

WINETASTING ROOM S=79,85m2 363

HALL S=42,95m2

ADAPTED BEDROOM

TYPE BEDROOM

S=33,10m2

S=33,80m2

362

BAR TERRACE

EVENTS TERRACE

S=168,45m2

364 361

S=92,95m2

FFL +0.10m FFL -3.40m

363

ADAPTED BEDROOM

TYPE BEDROOM

S=33,10m2

S=33,80m2

362

361

FFL -3.40m

11

09

07

08

10

06

03 20

05

02 21

04

01 22

23

13

12

15

14

18

19

17 16

CGP

AFS

SECTION 7

01 02

22 21 20 19

05

18

06

17 16

08

15

09

14

10

13

11

12

20

06

07

08

19

05

04

16

15

18

17

03

02

01

11

09 10

14

12 13

03 04

07

S-7 S-6

!"#$%&

!"#$%&'(%#)!*+,-&%"#+**.*/*0*1*1:200 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././


A

B

C

D

E

F

G

H

I

H

I

H

I

RECEPTION S=21,70m2

SHOP ENTRANCE LIFT

S=2,80m2

S=5,90m2

HOTEL STAIRCASE

FFL +3.45m

S=17,70m2

WINEBAR A

B

C

D

E

F

S=82,35m2

G

RECEPTION S=21,70m2 364

LIFT

S=2,80m2

SHOP ENTRANCE

21 STAIRS 28X16.6CM

HOTEL STAIRCASE

S=5,90m2

FFL +0.10m FFL +3.45m

S=17,70m2

HOTEL CORRIDOR

363

WINEBAR

S=119,15m2

S=82,35m2

362

INTERIOR COURTYARD

361

S=2,80m2

FFL -3.40m

21 STAIRS 28X16.6CM

364

FFL +0.10m

HOTEL CORRIDOR

363

S=119,15m2 362

INTERIOR COURTYARD

361

S=2,80m2

FFL -3.40m

SECTION 8

A

B

C

D

E

F

G

EMERGENCY STAIRCASE S=12,40m2

EXPEDITION STORAGE S=66,10m2

A

WINE SHOP

S=149,50m2

B

C

D

E

F

S=54,15m2

G

ENTRANCE PORCHE S=68,65m2

364

23 STAIRS EMERGENCY 28x16.9cm STAIRCASE

S=12,40m2

BOTTLING PLANT

EARTHWARE JAR STORE 363

EXPEDITION STORAGE OENOLOGISTLAB S=66,10m2 S=62,70m2

FFL +3.45m

EARTHWARE JAR STORE

FFL +0.10m FFL +3.45m

BARREL STORE

S=63,90m2

S=266m2

EARTHWARE JAR STORE

S=146,90m2

S=149,50m2

ENTRANCE PORCHE S=68,65m2

BOTTLING PLANT

EARTHWARE JAR STORE 363

WINE SHOP S=54,15m2

362

364

S=63,90m2

S=266m2

23 STAIRS 28x16.9cm

FFL +0.10m -3.80m FFL

BARREL STORE S=146,90m2

OENOLOGISTLAB S=62,70m2

362

SECTION 9

10

11

06

09

07

05

08

03

04

02

01

21

22

12

20

13

23

15

17 16

18

14

19

CGP

AFS

FFL -3.80m

01 02 03 04

22 21 20 19

05

18

06

17

07

16

08

15

09

14

10

13

11

12

S-9

20

05

06

07

08

19

18

03

04

16

15

14

17

02

01

11

09 10

12 13

S-8

!"#$%&

!"#$%&'"%#()%'*!+,$)-).)-/)1:200 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

H

I


A

B

C

D

INDUSTRIAL STAIRCASE FFL +3.45m

S=15,05m2

E

F

S=11,40m2

MACHINERY ROOM

INDUSTRIAL MACHINERY ROOM S=67,10m2

S=10,30m2

CHANGING ROOMS

S=68,80m2

FFL +0.10m

H

HIDRAULIC PLATFORM

RECEPTION AND SELECTION

364

G

S=10,60m2

ENTRANCE TERRACE

23 STAIRS 28x16.9cm

S=109,85m2

BOILER'S ROOM

RAINWATER TANK

S=12,35m2

S=5,55m2

BARREL CLEANING AND REPARATION

TOILET

S=49,10m2

S=3,15m2

FFL -3.80m

09

10

11

05

06

07

08

03

04

02

01

21

22

20

23

12

15

13

17 16

14

18

19

CGP

AFS

SECTION 10

S-10 01 02

22 21 20 19

05

18

06

17 16

08

15

09

14

10

13

11

12

20

05

06

07

08

04

19

18

17

03

02

16

15

14

01

12 13

11

09 10

03 04

07

!"#$%&

!"#$%&'(%#)!*+,-&%"#*./*0*1:200 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

BARREL STORE S=146,90m2

I


1

2

3

4

5

6

1

2

3

4

5

6

WEST ELEVATION

6

5

4

3

2

1

6

5

4

3

2

1

11

09

07

08

10

06

03 20

05

02 21

04

01 22

23

13

12

15

14

18

19

17 16

CGP

AFS

E-E

E-W

EAST ELEVATION

01 02

22 21 20 19

05

18

06

17 16

08

15

09

14

10

13

11

12

20

06

07

08

19

05

04

16

15

18

17

03

02

01

11

09 10

14

12 13

03 04

07

!"#$%&

!"!#$%&'()*+!)%*,*!$)%-*1:200 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././


I

H

G

F

E

D

C

B

A

I

H

G

F

E

D

C

B

A 364

364

NORTH ELEVATION

A

B

C

D

E

F

G

H

I

A

B

C

D

E

F

G

H

I

364

363

362

361

360

364

363

SOUTH ELEVATION 362

361

360

08

09

10

11

05

06

04

03

07

02

01 23

12

21

13

22

14

20

15

18

19

17 16

CGP

AFS

E-N

01 02

22 21 20 19

05

18

06

17 16

08

15

09

14

10

13

11

12

20

07

08

05

06

04

16

19

18

17

03

02

01

15

14

12 13

11

09 10

03 04

07

E-S

!"#$%&

!"!#$%&'()*('+%,*-*)'.%,/*1:200 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././


!"| !"#"$"%"&"#"%"$"' #$"%&& #'()*)(+,"#-,)'.-/" #$"%&% EXPLODED AXONOMETRY !"#$$%" !&'()*#% #$"0&& #'()*)(+,"1,+/#"%2%3&

#$"0&3 SECONDARY ROOF SLAB #$"4&& #'()*')(+,"'(+/#67(#+,"#7*'.-/#"%2%3& #$"4&% TRANSVERSAL SECTIONS 1 - 2 #$"4&0 TRANSVERSAL SECTIONS 3 - 4 #$"4&4 TRANSVERSAL SECTION 5 #$"5&& #'()*')(+,",-/8.')9./+,"#7*'.-/#"%2%3& #$"5&% LONGITUDINAL SECTONS 6 - 7 #$"5&0 LONGITUDINAL SECTIONS 8 - 9 #$"3&& #'()*)(+,"97'+.,#"%203 #$"3&% METAL CONNECTION #$"3&0 WOOD CONNECTIONS #$"3&4 STAIRS START / LIFT PIT #$"3&5 DECK CHANGE OF LEVEL

!"#$%"!

#$"0&5 GROUND LEVEL ROOF SLAB

Final Thesis Project | Júlia Boix Gonzalez

#$"0&0 DECK PLAN #$"0&4 LEVEL -1 ROOF SLAB

WINERY AND HOTEL SIURANA | September 2020

#$"0&% FOUNDATIONS PLAN


!"#$%"$#&'(!)'$"*)+

!"#$%%

!"#$%"$#&'(!)'$"*)+ !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

0&/12&0

The structure, adapts and responds to the different needs and uses of the program. In the industrial part, a solid and heavy construction of load-bearing walls is used in order to give resistance and durability to this part of the building (load-bearing retaining walls are used in contact with the ground). For the hotel, a linear repetition of loadbearing walls in between bedrooms is designed, in order to achieve a “floating” edge at the south side; these walls serve as big-section counterweight concrete beams. The cellar, meanwhile, is mainly designed with frame structure, to give a more opened and flexible feeling to the different areas. Each of the three volumes counts with a reinforced concrete communications wall-box core that functions as the stabilization of the building and as the support of the secondary timber roof; formed by timber beams and joints and a CLT panel board. A wood pergola with timber beams and metallic pillars is constructed in the events terrace, and a metallic walkway made my metallic pilars and beams is located in the earthware jar store as well.

Final Thesis Project | Júlia Boix Gonzalez

The project is designed in order to comply with the requirements of the structure and provide a response to the horizontal and vertical actions that the building receives. For the horizontal actions, two types of structural systems and a box-stabilization strategy have been used. A wall system, which includes a heavy weight structure defined by linear and continuous elements of reinforced concrete load-bearing walls, and a frame structural system, which includes a linear structural system that defines a virtual plane and is composed by linear elements such as reinforced concrete and metallic pilars and timber beams. For the vertical actions, twoways reinforced concrete solid slabs and a CLT panel for the roof have been used; a floor structure formed by planes that distribute the load in two or more directions. To increase the stability of the structure and to distribute the horizontal and vertical loads to the earth, shallow foundations have been used; centered isolated footings for single-pilars and continuous strip footings for walls. All structural elements are dimensioned according to CTE and calculations.

WINERY AND HOTEL SIURANA | September 2020

WALL - FRAME STRUCTURE


WOOD ROOF FLOOR WOOD SLAB

+5.42m t=92cm

WOOD PERGOLA

CLT PANEL 0.12m

WOOD SLAB

CLT PANEL CLT PANEL 0.12m 0.12m WOOD BEAM WOOD BEAM 0.25x0.80cm 0.25x0.80cm WOOD JOIST WOOD JOIST 0.15x0.25cm 0.15x0.25cm

+3.60m t=45cm WOOD BEAM 0.25x0.80cm

ROOF FLOOR

WOOD JOIST 0.15x0.25cm

REINF. CONCRETE SLAB

+3.45m t=30cm

REINF. CONCRETE PILAR 25x50cm REINF. CONCRETE CLT PANEL LOAD-BEARING WALL t=36cm 0.12m CLT PANEL REINF. CONCRETE 0.12m WOOD BEAM RETAINING t=36cm 0.25x0.80cm CLT PANEL WOOD BEAM 0.12m REINF. CONCRETE 0.25x0.80cm WOOD JOIST LOAD-BEARING WALL t=25cm 0.15x0.25cm WOOD JOIST WOOD BEAM 0.15x0.25cm 0.25x0.80cm WOOD JOISTCONCRETE REINF. REINF. CONCRETE 0.15x0.25cm LOAD-BEARING WALL STRIP FOOTING PILAR REINF. CONCRETE 2x0.5m 25x50cm PILAR 25x50cm REINF. CONCRETE REINF. CONCRETE LOAD-BEARING WALL PILAR METALLIC BEAMS IPEt=36cm 300 REINF. CONCRETE METALLIC JOISTS IPEt=36cm 200 25x50cm LOAD-BEARING WALL REINF. CONCRETE RETAINING t=36cm REINF. CONCRETE METALLIC PILAR REINF. CONCRETE RETAINING t=36cm HEB 140 LOAD-BEARING WALL t=36cm REINF. CONCRETE REINF. CONCRETE LOAD-BEARING WALL t=25cm REINF. CONCRETE RETAINING t=36cm HYDRAULIC PLATFORM LOAD-BEARING WALL t=25cm PIT h=60cm REINF. CONCRETE REINF. CONCRETE LIFT PIT h=60cm LOAD-BEARING WALL WALL t=25cm LOAD-BEARING STRIP FOOTING REINF. CONCRETE LOAD-BEARING2x0.5m WALL STRIP FOOTING WOOD BEAMS 2x0.5m 0.15x0.45cm REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING METALLIC PILAR IPE 300 METALLIC BEAMS 2x0.5m 8cm METALLIC METALLIC JOISTS BEAMS IPE IPE 200 300 METALLIC JOISTS IPE 200 METALLIC PILAR HEB 140 IPE METALLIC BEAMS 300 METALLIC PILAR METALLIC JOISTS HEB 140 IPE 200 HYDRAULIC PLATFORM METALLIC PILAR PIT h=60cm HEB 140 HYDRAULIC PLATFORM PIT h=60cm LIFT PIT h=60cm

CLT PANEL 0.12m CLT PANEL 0.12m CLT PANEL WOOD BEAM CLT PANEL 0.12m 0.25x0.80cm WOOD 0.12m BEAM 0.25x0.80cm WOOD WOODBEAM JOIST WOOD 0.25x0.80cm 0.15x0.25cm WOOD BEAM JOIST 0.25x0.80cm 0.15x0.25cm WOOD JOIST WOOD JOIST 0.15x0.25cm 0.15x0.25cm REINF. CONCRETE PILAR REINF. CONCRETE 25x50cm PILAR REINF. CONCRETE REINF. CONCRETE 25x50cm PILAR REINF. CONCRETE PILAR 25x50cm LOAD-BEARING WALL t=36cm REINF. CONCRETE 25x50cm LOAD-BEARING WALL t=36cm REINF. REINF. CONCRETE CONCRETE REINF. CONCRETE LOAD-BEARING WALL t=36cm RETAINING t=36cm REINF. CONCRETE LOAD-BEARING WALL t=36cm RETAINING t=36cm CLT PANEL REINF. CONCRETE 0.12m REINF. CONCRETE RETAINING t=36cm CLTREINF. PANELCONCRETE RETAINING t=36cm LOAD-BEARING WALL t=25cm 0.12m REINF. CONCRETE WOOD BEAM LOAD-BEARING WALL t=25cm REINF. CONCRETE 0.25x0.80cmWALL t=25cm WOOD BEAM REINF. CONCRETE LOAD-BEARING 0.25x0.80cm LOAD-BEARING WALL t=25cm WOOD JOIST REINF. CONCRETE 0.15x0.25cm LOAD-BEARING WALL STRIP FOOTING WOOD JOIST REINF. CONCRETE 2x0.5m 0.15x0.25cm LOAD-BEARING WALL STRIP FOOTING REINF. CONCRETE REINF.2x0.5m CONCRETE LOAD-BEARING WALL STRIP FOOTING LOAD-BEARING WALL STRIP FOOTING 2x0.5m REINF. CONCRETE 2x0.5m METALLIC PILAR BEAMS IPE 300 REINF. CONCRETE METALLIC JOISTS 25x50cm METALLIC BEAMS IPE 300 IPE 200 PILAR METALLIC JOISTS BEAMS IPE 200 IPE 300 METALLIC 25x50cm METALLIC PILAR REINF. CONCRETE METALLIC BEAMS IPE 300 IPE 200 METALLIC JOISTS HEB 140 IPE 200 LOAD-BEARING WALL t=36cm METALLIC PILAR METALLIC JOISTS REINF. CONCRETE HEB 140METALLIC PILAR LOAD-BEARING WALL t=36cm REINF. CONCRETE METALLIC PILAR HEB 140 HYDRAULIC PLATFORM RETAINING t=36cm REINF. CONCRETE HEB 140 PITt=36cm h=60cm HYDRAULIC PLATFORM RETAINING PIT h=60cm HYDRAULIC PLATFORM REINF. CONCRETE LIFT PIT h=60cm HYDRAULIC PLATFORM PIT h=60cm LOAD-BEARING WALL t=25cm REINF. CONCRETE LIFTh=60cm PIT h=60cm PIT LOAD-BEARING WALL t=25cm LIFT PIT h=60cm WOOD BEAMS LIFT PIT h=60cm 0.15x0.45cm WOODREINF. BEAMS CONCRETE 0.15x0.45cm WOOD BEAMS LOAD-BEARING WALL STRIP FOOTING REINF. CONCRETE METALLIC PILAR WOOD BEAMS 0.15x0.45cm 2x0.5m LOAD-BEARING WALL STRIP FOOTING 8cm METALLIC PILAR 0.15x0.45cm 8cm2x0.5m METALLIC PILAR METALLIC8cm PILAR 8cm METALLIC BEAMS IPE 300 METALLIC METALLIC BEAMS JOISTS IPE 300 IPE 200 METALLIC JOISTS IPE 200 METALLIC PILAR HEB 140 METALLIC PILAR HEB 140 HYDRAULIC PLATFORM PIT h=60cm HYDRAULIC PLATFORM PIT h=60cm LIFT PIT h=60cm LIFT PIT h=60cm WOOD BEAMS 0.15x0.45cm WOOD BEAMS 0.15x0.45cm METALLIC PILAR METALLIC8cm PILAR 8cm

WOOD ROOF FLOOR WOOD ROOF WOODFLOOR SLAB +5.42m t=92cm ROOF FLOOR WOOD WOOD SLAB ROOF FLOOR +5.42m WOOD t=92cm WOOD SLAB WOOD PERGOLA +5.42m WOOD SLAB t=92cm WOOD PERGOLA WOOD SLAB +5.42m t=92cm +3.60m t=45cm PERGOLA WOOD WOOD SLAB PERGOLA +3.60m WOOD t=45cm WOOD SLAB +3.60m WOOD SLAB t=45cm +3.60m t=45cm ROOF FLOOR REINF. CONCRETE SLAB ROOF FLOOR +3.45m t=30cmFLOOR ROOF REINF. CONCRETE SLAB +3.45m ROOF t=30cmFLOOR REINF. CONCRETE SLAB REINF. CONCRETE SLAB +3.45m t=30cm +3.45m t=30cm INSTA. FLOOR REINF. CONCRETE SLAB INSTA. FLOOR +2.95m t=20cmFLOOR INSTA. REINF. CONCRETE SLAB +2.95m INSTA. t=20cm FLOOR REINF. CONCRETE SLAB GROUNDFLOOR REINF. CONCRETE SLAB +2.95m t=20cm WOOD ROOF FLOOR REINF. CONCRETE SLAB +2.95m GROUNDFLOOR t=20cm WOOD ROOF FLOOR WOOD SLAB ±0.00m t=35cm GROUNDFLOOR REINF. CONCRETE SLAB +5.42m t=92cm WOOD SLAB ±0.00m GROUNDFLOOR t=35cm REINF. CONCRETE SLAB +5.42m t=92cm REINF. CONCRETE SLAB ±0.00m t=35cm WOOD PERGOLA ±0.00m t=35cm WOOD WOOD PERGOLA SLAB +3.60m METALLIC WALKWAY t=45cm WOOD SLAB SLAB WALKWAY +3.60m METALLIC t=45cm METAL ±0.00 SLAB t=30cm METALLIC WALKWAY METAL ROOF FLOOR WALKWAY ±0.00 METALLIC t=30cm METAL SLAB REINF. CONCRETE SLAB ROOF ±0.00 FLOOR METAL SLAB t=30cm t=30cm REINF. CONCRETE SLAB ±0.00 +3.45m t=30cm +3.45m t=30cm GROUNDFLOOR TERRACE GROUNDFLOOR TERRACE REINF. CONCRETE SLAB INSTA. -0.05m CONCRETE t=30cm FLOOR GROUNDFLOOR REINF. SLAB TERRACE REINF. CONCRETE CONCRETE SLAB TERRACE INSTA. FLOOR -0.05m GROUNDFLOOR t=30cm REINF. SLAB +2.95m t=20cm -0.05m REINF. CONCRETE SLAB t=30cm BEDROOM FLOOR -1 -0.05m t=30cm +2.95m t=20cm REINF. CONCRETE DECK BEDROOM FLOOR -1 GROUNDFLOOR -3.50m CONCRETE t=15cmCONCRETE BEDROOM FLOORSLAB -1 REINF. DECK GROUNDFLOOR REINF. BEDROOM FLOOR -1 -3.50m ±0.00m t=15cm CONCRETE REINF. CONCRETE DECK t=35cm REINF. SLAB BEDROOMDECK FLOOR -1 REINF. t=15cm ±0.00m -3.50m t=35cmCONCRETE -3.50m BEDROOM t=15cm REINF. CONCRETE SLAB FLOOR -1 -3.50m CONCRETE t=30cm BEDROOM FLOOR -1 REINF. SLAB FLOOR -1 -3.50m BEDROOM t=30cm REINF. CONCRETE SLAB METALLIC WALKWAY INDUSTRIAL DECK -3.50m REINF. CONCRETE SLAB t=30cm METAL SLAB METALLIC WALKWAY DECK -3.50m INDUSTRIAL CONCRETE DECK t=30cm REINF. ±0.00 SLAB t=30cm METAL INDUSTRIAL DECK -3.90m t=15cm REINF. CONCRETE DECK ±0.00 t=30cm -3.90m INDUSTRIAL t=15cm REINF.DECK CONCRETE DECK REINF. CONCRETE DECK -3.90m t=15cm -3.90m t=15cm GROUNDFLOOR TERRACE GROUNDFLOOR TERRACE REINF. CONCRETE SLAB -0.05m t=30cm REINF. CONCRETE SLAB -0.05m t=30cm BEDROOM FLOOR -1 REINF. CONCRETE DECK BEDROOM FLOOR -1 -3.50m t=15cm REINF. CONCRETE DECK

-3.50m t=15cm

BEDROOM FLOOR -1 REINF. CONCRETE SLAB BEDROOM FLOOR -1 -3.50m t=30cm REINF. CONCRETE SLAB

-3.50m t=30cm

REINF. CONCRETE SLAB

WOOD WOODSLAB ROOF FLOOR +2.95m t=92cm t=20cm +5.42m WOOD SLAB +5.42m GROUNDFLOOR t=92cm WOODFLOOR PERGOLA WOOD ROOF

REINF. CONCRETE REINF. CONCRETE PILAR PILAR 25x50cm 25x50cm REINF. CONCRETE REINF. CONCRETE LOAD-BEARING WALL t=36cm LOAD-BEARING WALL t=36cm REINF. CONCRETE REINF. CONCRETE RETAINING t=36cm RETAINING t=36cm

REINF. CONCRETE SLAB

WOOD WOOD SLAB WOODSLAB PERGOLA ±0.00m t=35cm +5.42m +3.60m t=92cm t=45cm WOOD SLAB +3.60m t=45cm WOOD PERGOLA ROOF FLOOR WOOD SLAB SLAB +3.60m t=45cm REINF. METALLIC WALKWAY ROOF CONCRETE FLOOR +3.45m t=30cm METAL SLAB REINF. CONCRETE SLAB ±0.00 t=30cm +3.45m ROOF FLOOR REINF. CONCRETE SLAB INSTA. FLOOR +3.45m t=30cm REINF. CONCRETE SLAB INSTA. FLOOR +2.95m t=20cm GROUNDFLOOR REINF. CONCRETETERRACE SLAB REINF. +2.95m GROUNDFLOOR t=20cmCONCRETE SLAB INSTA. -0.05mFLOOR t=30cm REINF. CONCRETE SLAB REINF. CONCRETE SLAB GROUNDFLOOR ±0.00m t=35cm +2.95m t=20cm REINF. CONCRETE SLAB BEDROOM FLOOR -1 ±0.00m t=35cm GROUNDFLOOR REINF. CONCRETE DECK -3.50mCONCRETE t=15cm REINF. SLAB ±0.00m t=35cm METALLIC WALKWAY BEDROOM FLOOR -1 METAL SLABWALKWAY METALLIC REINF. CONCRETE SLAB ±0.00 t=30cm -3.50m METAL t=30cm SLAB ±0.00 t=30cm METALLIC WALKWAYDECK INDUSTRIAL

REINF. CONCRETE REINF. CONCRETE LOAD-BEARING WALL t=25cm LOAD-BEARING WALL t=25cm REINF. CONCRETE REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING PANEL LOAD-BEARING WALLCLT STRIP FOOTING 2x0.5m CLT PANEL 0.12m 2x0.5m 0.12m WOOD BEAM METALLIC BEAMS IPE 300 WOOD BEAM 0.25x0.80cm METALLIC BEAMS IPE 300 IPE 200 METALLIC JOISTS 0.25x0.80cm WOODIPE JOIST METALLIC JOISTS 200 WOOD JOIST 0.15x0.25cm METALLIC PILAR 0.15x0.25cm METALLIC PILAR HEB 140 HEB 140

METAL SLAB

REINF. CONCRETE DECK ±0.00 t=30cm GROUNDFLOOR TERRACE -3.90m t=15cm REINF. CONCRETETERRACE SLAB GROUNDFLOOR -0.05m t=30cm REINF. CONCRETE SLAB

-0.05m t=30cm GROUNDFLOOR TERRACE BEDROOM FLOOR -1 REINF. CONCRETE SLAB

CONCRETE BEDROOM FLOORDECK -1 -0.05m t=30cm REINF. -3.50m t=15cm REINF. CONCRETE DECK -3.50m t=15cm BEDROOM FLOOR -1 BEDROOM FLOOR -1 REINF. CONCRETE DECK SLAB REINF. CONCRETE BEDROOM FLOOR -1 -3.50m t=15cm -3.50m t=30cm REINF. CONCRETE SLAB -3.50mWOOD t=30cmROOF FLOOR INDUSTRIAL DECK BEDROOM FLOOR WOOD SLAB -1

REINF. CONCRETE SLAB REINF. CONCRETE +5.42m INDUSTRIAL DECKDECK t=92cm -3.50m t=30cm -3.90m t=15cm REINF. CONCRETE DECK CLT PANEL PERGOLA -3.90mWOOD t=15cm 0.12m INDUSTRIAL WOODDECK SLAB +3.60m REINF. CONCRETE DECK t=45cm WOOD BEAM -3.90m t=15cm

0.15x0.45cm LIFT PIT h=60cm WOOD BEAMS CLT PANEL 0.15x0.45cm 0.12m PILAR METALLIC 8cm METALLIC PILAR WOOD BEAMS WOOD BEAM 8cm 0.15x0.45cm 0.25x0.80cm METALLIC PILAR WOOD JOIST 8cm 0.15x0.25cm

WOOD ROOF FLOOR WOOD SLAB

+5.42m t=92cm

WOOD PERGOLA WOOD SLAB

+3.60m t=45cm

0.25x0.80cm

ROOF FLOOR WOOD JOIST 0.15x0.25cm REINF. CONCRETE SLAB +3.45m t=30cm

REINF. CONCRETE PILAR 25x50cm REINF. CONCRETE LOAD-BEARING WALL t=36cm REINF. CONCRETE RETAINING t=36cm REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE INSTA. FLOOR PILAR 25x50cm REINF. CONCRETE SLAB +2.95m t=20cm REINF. CONCRETE GROUNDFLOOR LOAD-BEARING WALL t=36cm REINF. CONCRETE SLAB ±0.00m t=35cm REINF. CONCRETE RETAINING t=36cm

ROOF FLOOR REINF. CONCRETE SLAB

+3.45m t=30cm INSTA. FLOOR REINF. CONCRETE SLAB

+2.95m t=20cm GROUNDFLOOR REINF. CONCRETE SLAB

±0.00m t=35cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm METALLIC WALKWAY

METAL SLAB ±0.00 t=30cm REINF. CONCRETE REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING LOAD-BEARING WALL STRIP FOOTING 2x0.5m 2x0.5m

METALLIC WALKWAY METAL SLAB

±0.00 t=30cm

WOOD ROOF FLOOR GROUNDFLOOR TERRACE WOOD SLAB +5.42mSLAB t=92cm REINF. CONCRETE

GROUNDFLOOR TERRACE REINF. CONCRETE SLAB

METALLIC BEAMS IPE 300 METALLIC JOISTS IPE 200

-0.05m t=30cm METALLIC BEAMS IPE 300 CLT PANEL METALLIC JOISTS IPE 200 0.12m

METALLIC PILAR HEB 140

METALLIC PILAR WOOD BEAM REINF. CONCRETE DECK HEB 140 0.25x0.80cm -3.50m t=15cm

HYDRAULIC PLATFORM PIT h=60cm LIFT PIT h=60cm WOOD BEAMS 0.15x0.45cm WOOD SLAB8cm

+5.42m t=92cm WOOD ROOF FLOOR WOOD SLABPERGOLA WOOD +5.42m t=92cm

CLT PANEL 0.12m

WOOD SLAB

+3.60m t=45cm WOOD PERGOLA

CLT PANEL WOOD BEAM 0.12m 0.25x0.80cm

WOOD JOIST 0.15x0.25cm REINF. CONCRETE PILAR 25x50cm REINF. CONCRETE PILAR REINF. CONCRETE 25x50cm LOAD-BEARING WALL t=36cm

REINF. CONCRETE REINF. CONCRETE RETAINING t=36cm LOAD-BEARING WALL t=25cm REINF. CONCRETE LOAD-BEARING WALL t=25cm REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 2x0.5m REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 2x0.5m METALLIC BEAMS IPE 300 METALLIC JOISTS IPE 200 +5.42m METALLIC IPE 300 CLT PANEL CLTBEAMS PANEL METALLIC PILAR JOISTS IPE 200 0.12m METALLIC 0.12m HEB 140 METALLIC PILAR WOOD BEAM WOOD BEAM HEB 140 HYDRAULIC PLATFORM 0.25x0.80cm 0.25x0.80cm PIT h=60cm WOOD JOIST WOOD JOIST 0.15x0.25cm 0.15x0.25cm HYDRAULIC LIFT PIT PLATFORM h=60cm PIT h=60cm LIFT WOOD PIT h=60cm BEAMS REINF. CONCRETE REINF. CONCRETE 0.15x0.45cm PILAR PILAR BEAMSPILAR METALLIC 25x50cmWOOD 25x50cm 0.15x0.45cm 8cm

+3.60m

+3.45m

+2.95m

REINF. CONCRETE REINF. CONCRETE METALLIC PILAR LOAD-BEARING LOAD-BEARING WALL t=36cm WALL t=36cm 8cm REINF. CONCRETE REINF. CONCRETE RETAINING t=36cm RETAINING t=36cm

±0.00m

REINF. CONCRETE REINF. CONCRETE LOAD-BEARING LOAD-BEARING WALL t=25cm WALL t=25cm

±0.00 REINF. CONCRETE REINF. CONCRETE LOAD-BEARING LOAD-BEARING WALL STRIP FOOTING WALL STRIP FOOTING 2x0.5m 2x0.5m

METALLIC BEAMS METALLIC IPE 300BEAMS IPE 300 METALLIC JOISTS METALLIC IPE 200JOISTS IPE 200 METALLIC PILAR METALLIC PILAR HEB 140 HEB 140 HYDRAULIC PLATFORM HYDRAULIC PLATFORM PIT h=60cm PIT h=60cm LIFT PIT h=60cm LIFT PIT h=60cm WOOD BEAMSWOOD BEAMS 0.15x0.45cm 0.15x0.45cm

-0.05m

-3.50m

CLT PANEL 0.12m

-0.05m t=30cm

WOOD PERGOLA WOOD SLAB

BEDROOM +3.60m FLOOR -1 t=45cm

REINF. CONCRETE DECK -3.50m t=15cm

WOOD JOIST FLOOR -1 HYDRAULIC BEDROOM PLATFORM0.15x0.25cm PIT h=60cm REINF. CONCRETE SLAB -3.50m -3.50m t=30cm LIFT PIT h=60cm REINF. INDUSTRIAL DECKCONCRETE PILAR REINF. CONCRETE DECK WOOD BEAMS 25x50cm -3.90m -3.90m t=15cm 0.15x0.45cm

ROOF FLOOR BEDROOM FLOOR -1 REINF. CONCRETE SLAB +3.45mSLAB t=30cm REINF. CONCRETE t=30cm

INDUSTRIAL DECK INSTA. FLOOR REINF. CONCRETE DECK REINF. CONCRETE SLAB t=15cm +2.95m t=20cm

GROUNDFLOOR

REINF. CONCRETE LOAD-BEARING WALL t=36cm

REINF. CONCRETE SLAB

REINF. CONCRETE WOOD ROOF FLOOR RETAINING t=36cm WOOD SLAB +5.42m t=92cm REINF. CONCRETE LOAD-BEARING t=25cm WOODWALL PERGOLA

±0.00m t=35cm

METALLIC WALKWAY

METAL SLAB WOOD SLAB ±0.00 t=30cm +3.60m t=45cm WOOD ROOF FLOOR REINF. CONCRETE REINF. CONCRETE SLAB LOAD-BEARING WALL STRIP FOOTINGWOOD SLAB +5.42m t=92cm ROOF FLOOR +3.45m t=30cm 2x0.5m WOOD JOIST ROOF FLOOR GROUNDFLOOR TERRACE REINF. CONCRETE SLAB 0.15x0.25cm REINF. CONCRETE SLAB WOOD PERGOLA CLT PANEL +3.45m t=30cm REINF. CONCRETE SLAB +3.45m t=30cm 0.12m WOOD SLAB -0.05m t=30cm INSTA. FLOOR METALLIC BEAMS IPE 300 t=45cm +3.60m WOOD ROOF FLOOR REINF. CONCRETE SLAB METALLIC JOISTS IPE 200 REINF. CONCRETEWOOD BEAM INSTA. FLOOR WOOD SLAB +2.95m t=20cm BEDROOM FLOOR -1 INSTA. FLOOR 0.25x0.80cm PILAR +5.42m SLAB t=92cmFLOOR REINF. CONCRETE DECK METALLICREINF. PILARCONCRETE ROOF REINF. CONCRETE SLAB GROUNDFLOOR WOOD JOIST 25x50cm +2.95m -3.50m t=15cm HEB 140 t=20cm REINF. +2.95m t=20cm 0.15x0.25cm WOODCONCRETE PERGOLA SLAB REINF. CONCRETE SLAB CLT PANEL +3.45m t=30cm GROUNDFLOOR REINF. CONCRETE ±0.00m t=35cm 0.12m WOOD SLAB WOOD ROOF FLOOR GROUNDFLOOR BEDROOM FLOOR -1 LOAD-BEARING WALL t=36cm REINF. CONCRETE +3.60m SLAB HYDRAULIC PLATFORM t=45cm WOOD ROOF WOODFLOOR SLAB REINF. CONCRETE SLAB REINF. CONCRETE SLAB ±0.00m t=35cm WOOD BEAM PIT h=60cm WOOD +5.42mSLAB REINF. CONCRETE t=92cm ±0.00m t=35cm REINF. CONCRETE INSTA. FLOOR-3.50m t=30cm 0.25x0.80cm +5.42m t=92cm RETAINING t=36cm PILAR LIFT PIT h=60cm REINF. SLAB ROOF CONCRETE FLOOR WOOD PERGOLA WOOD JOIST CLT PANEL INDUSTRIAL DECK METALLIC WALKWAY 25x50cm +2.95m CLT t=20cm REINF. CONCRETE SLAB WOOD PERGOLA PANEL 0.15x0.25cm 0.12m WOOD SLAB REINF. CONCRETE METAL SLAB REINF. CONCRETE DECK +3.45m0.12m t=30cm WOOD +3.60mSLAB WOOD BEAMS t=45cm METALLIC WALKWAY GROUNDFLOOR ±0.00 t=30cm LOAD-BEARING WALL t=25cm REINF. CONCRETE -3.90m t=15cm METALLIC WALKWAY +3.60m t=45cm WOOD BEAM 0.15x0.45cm METAL SLAB LOAD-BEARING WALL t=36cm REINF. CONCRETE SLAB METAL SLAB WOOD BEAM ±0.00 t=30cm t=35cm 0.25x0.80cm ±0.00 t=30cm REINF. CONCRETEMETALLIC PILAR ±0.00m0.25x0.80cm REINF. CONCRETE INSTA. FLOOR ROOF FLOOR WOOD JOIST 8cm REINF. CONCRETERETAINING ROOF FLOOR PILAR t=36cm REINF. CONCRETE SLAB REINF. CONCRETE SLAB WOOD JOIST GROUNDFLOOR TERRACE WALL STRIP FOOTING 0.15x0.25cm LOAD-BEARING 25x50cm REINF. SLAB +2.95m0.15x0.25cm t=20cm +3.45mCONCRETE t=30cm REINF. ROOF CONCRETE SLAB 2x0.5m WOOD ROOF WOOD FLOOR FLOOR +3.45m t=30cm REINF. CONCRETE GROUNDFLOOR TERRACE -0.05m t=30cmSLAB TERRACE GROUNDFLOOR REINF. CONCRETE GROUNDFLOOR WOOD SLAB WOOD METALLIC WALKWAY LOAD-BEARING WALL t=25cm SLAB LOAD-BEARING WALL t=36cm REINF. CONCRETE METAL REINF. SLAB CONCRETE SLAB +5.42m t=92cm t=92cm REINF. CONCRETE SLAB REINF. CONCRETE INSTA. FLOOR -0.05m t=30cm ±0.00m t=35cmCONCRETE -0.05m t=30cm ±0.00 REINF. INSTA. FLOOR t=30cm BEDROOM FLOOR -1 METALLIC BEAMS IPE PILAR 300 CONCRETE REINF. REINF. CONCRETE SLAB WOOD PERGOLA WOOD PILAR 25x50cm REINF. SLAB REINF. PERGOLA CONCRETE DECKMETALLIC JOISTS IPE 200 CONCRETE RETAINING t=36cm +2.95mCONCRETE t=20cm REINF. WOOD SLAB BEDROOM FLOOR25x50cm -1 -3.50m WOOD +2.95m t=20cm t=15cmSLAB LOAD-BEARING WALL STRIP FOOTING BEDROOM +3.60m t=45cm t=45cm FLOOR -1 GROUNDFLOOR REINF. CONCRETE DECK REINF. CONCRETE METALLIC PILAR REINF.2x0.5m CONCRETE REINF. CONCRETE DECK GROUNDFLOOR REINF. CONCRETE -3.50m t=15cm GROUNDFLOOR TERRACE LOAD-BEARING WALL t=36cm REINF. CONCRETE SLAB BEDROOM FLOOR -1 HEB 140 METALLIC WALKWAY LOAD-BEARING WALL t=25cm -3.50m t=15cm LOAD-BEARING WALL t=36cm REINF. SLAB ±0.00mCONCRETE t=35cm REINF. CONCRETE SLAB REINF.FLOOR CONCRETE SLAB METAL SLAB REINF. CONCRETE ROOF FLOORROOF ±0.00m t=35cm t=30cm BEDROOM-0.05m FLOOR -1CONCRETE -3.50m t=30cm ±0.00 REINF. t=30cm RETAINING t=36cm BEDROOM FLOOR -1 SLAB HYDRAULIC PLATFORM REINF. CONCRETE REINF. SLAB CONCRETE METALLIC BEAMS IPE 300 REINF. CONCRETE SLAB t=36cm RETAINING PIT h=60cm +3.45m REINF. CONCRETE t=30cm t=30cm REINF. CONCRETEDECK SLAB METALLIC JOISTS IPE 200 INDUSTRIAL -3.50m t=30cm BEDROOM FLOOR -1 -3.50m t=30cm LOAD-BEARING WALL STRIP FOOTING REINF. CONCRETE REINF. CONCRETE DECK LIFT PIT h=60cm REINF. CONCRETE METALLIC WALKWAY 2x0.5m CONCRETE DECK LOAD-BEARING WALL t=25cm METALLIC PILAR INDUSTRIAL DECKREINF. -3.90m t=15cm DECK GROUNDFLOOR TERRACE METALLIC WALKWAY LOAD-BEARING WALL t=25cm INDUSTRIAL -3.50m t=15cm METAL SLAB HEB 140 INSTA. FLOOR INSTA. FLOOR REINF. CONCRETE DECK METAL REINF. CONCRETE SLAB ±0.00SLAB t=30cm REINF. CONCRETE DECK REINF. CONCRETE REINF. SLAB CONCRETE SLAB WOOD BEAMS -3.90m t=15cm ±0.00 t=30cm -0.05m BEDROOM t=30cm -3.90m t=15cm FLOOR -1 0.15x0.45cm +2.95m t=20cm t=20cm REINF. CONCRETE METALLIC BEAMS IPE 300 HYDRAULIC PLATFORM REINF. CONCRETE REINF. CONCRETE SLAB LOAD-BEARING WALL STRIP FOOTING METALLIC JOISTS IPE 200 METALLIC PILAR PIT h=60cm GROUNDFLOOR GROUNDFLOOR LOAD-BEARING WALL STRIP FOOTING -3.50m t=30cm 2x0.5m BEDROOM FLOOR -1 8cm GROUNDFLOOR TERRACE REINF. CONCRETE REINF. SLAB CONCRETE SLAB 2x0.5mCONCRETE DECK LIFT PIT h=60cm REINF. METALLIC PILAR GROUNDFLOOR TERRACESLAB DECK t=35cm ±0.00m t=35cm REINF. CONCRETE -3.50m INDUSTRIAL t=15cm HEB 140 REINF. SLAB -0.05mCONCRETE t=30cm REINF. CONCRETE DECK -0.05m t=30cm METALLIC BEAMS IPE 300 WOOD BEAMS t=15cm -3.90m BEDROOM FLOOR -1IPE 200 METALLIC BEAMS IPE 300 METALLIC JOISTS 0.15x0.45cm HYDRAULIC PLATFORM REINF. CONCRETE METALLIC JOISTS IPE 200SLAB BEDROOM FLOOR -1 PIT h=60cm BEDROOM FLOOR -1 METALLIC PILAR -3.50m t=30cm METALLIC WALKWAY METALLIC WALKWAY REINF. CONCRETE DECK METALLIC PILAR 8cmPIT h=60cm REINF. DECK METALLIC PILAR LIFT -3.50mCONCRETE METAL SLAB METAL SLAB t=15cm HEB 140 INDUSTRIAL DECK -3.50m t=15cm HEB 140 t=30cm ±0.00 t=30cm REINF. CONCRETE DECK BEDROOM FLOOR -1 HYDRAULIC PLATFORM WOOD BEAMS BEDROOM FLOOR -1 -3.90m t=15cm REINF. CONCRETE SLAB HYDRAULIC PLATFORM PIT h=60cm 0.15x0.45cm REINF. SLAB -3.50mCONCRETE t=30cm PIT h=60cm -3.50m t=30cm GROUNDFLOOR GROUNDFLOOR TERRACE TERRACE METALLIC PILAR LIFT PIT h=60cm LIFT PIT h=60cm INDUSTRIAL DECK 8cm REINF. CONCRETE REINF. SLAB CONCRETE SLAB INDUSTRIAL DECK t=30cm-0.05m t=30cm REINF. CONCRETE DECK WOOD BEAMS REINF. DECK -3.90mCONCRETE t=15cm WOOD BEAMS 0.15x0.45cm -3.90m t=15cm BEDROOM FLOOR BEDROOM -1 FLOOR -1 0.15x0.45cm METALLIC PILAR REINF. CONCRETE REINF. DECK CONCRETE DECK METALLIC PILAR 8cm t=15cm-3.50m t=15cm 8cm WOOD SLAB

+3.60m t=45cm ROOF FLOOR

WOOD JOIST WOOD BEAM 0.15x0.25cm 0.25x0.80cm

BEDROOM FLOOR -1

METALLIC PILAR 8cm

METALLIC PILAR WOOD ROOF FLOOR

REINF. CONCRETE REINF. CONCRETE RETAINING t=36cm LOAD-BEARING WALL t=36cm

INDUSTRIAL DECK INDUSTRIAL REINF.DECK CONCRETE DECK -3.90m t=15cm REINF. CONCRETE DECK

-3.90m t=15cm

LIFTPLATFORM PIT h=60cm HYDRAULIC PIT h=60cm WOOD BEAMS

INSTA. ROOF FLOORFLOOR WOOD

WOOD BEAM 0.25x0.80cm

BEDROOM FLOOR BEDROOM -1 FLOOR -1 REINF. CONCRETE REINF. SLAB CONCRETE SLAB

-3.50m t=30cm-3.50m t=30cm

INDUSTRIAL DECK INDUSTRIAL DECK REINF. CONCRETE REINF. DECK CONCRETE DECK

-3.90m t=15cm-3.90m t=15cm

METALLIC PILAR METALLIC PILAR 8cm 8cm

!"#$%$

!"#$%&!&'("%)%*!+,!"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

REINF. CONCRETE HYDRAULIC PLATFORM REINF. PILAR HYDRAULIC PLATFORM PITCONCRETE h=60cm PIT PILAR h=60cm 25x50cm LIFT PIT h=60cm 25x50cm LIFT PIT h=60cm REINF. CONCRETE REINF. CONCRETE LOAD-BEARING WALL t=36cm WOODWALL BEAMS LOAD-BEARING t=36cm CONCRETE WOODREINF. BEAMS 0.15x0.45cm REINF. CONCRETE RETAINING t=36cm 0.15x0.45cm METALLIC PILAR CLT PANEL RETAINING t=36cm METALLIC PILAR 8cm CLT PANEL 0.12m REINF. CONCRETE 8cm 0.12m REINF. CONCRETE LOAD-BEARING WALL t=25cm WOOD BEAM LOAD-BEARING WALL t=25cm WOOD BEAM 0.25x0.80cm 0.25x0.80cm WOOD JOIST REINF. CONCRETE WOOD JOIST 0.15x0.25cm REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 0.15x0.25cm LOAD-BEARING WALL STRIP FOOTING 2x0.5m 2x0.5mCLT PANEL 0.12m CLT PANEL REINF. CONCRETE 0.12m REINF. CONCRETE PILAR METALLIC WOODBEAMS BEAM IPE 300 PILAR 25x50cm METALLIC BEAMS IPE 300 IPE 200 METALLIC JOISTS 0.25x0.80cm WOOD BEAM 25x50cm METALLIC JOISTS IPE 200 0.25x0.80cm WOOD JOIST REINF. CONCRETE METALLIC PILAR 0.15x0.25cm WOOD JOIST REINF. CONCRETE LOAD-BEARING WALL t=36cm METALLIC PILAR HEB 140 0.15x0.25cm LOAD-BEARING WALL t=36cm HEB 140 REINF. CONCRETE REINF. CONCRETE RETAINING t=36cm HYDRAULIC PLATFORM RETAINING t=36cm HYDRAULIC PLATFORM REINF. CONCRETE PIT h=60cm PIT REINF. h=60cm PILAR CONCRETE REINF. CONCRETE LIFT25x50cm PIT h=60cmWALL t=25cm PILAR REINF. CONCRETE LOAD-BEARING LIFT25x50cm PIT h=60cm LOAD-BEARING WALL t=25cm REINF. CONCRETE WOOD BEAMS LOAD-BEARING WALL t=36cm REINF. WOODCONCRETE BEAMS REINF. CONCRETE 0.15x0.45cm LOAD-BEARING WALL t=36cm 0.15x0.45cm REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING REINF. CONCRETE METALLIC PILAR LOAD-BEARING WALL STRIP FOOTING 2x0.5m RETAINING t=36cm REINF. CONCRETE METALLIC PILAR 8cm 2x0.5m RETAINING t=36cm 8cm REINF. CONCRETE LOAD-BEARING WALL REINF. CONCRETE METALLIC BEAMS IPEt=25cm 300 LOAD-BEARING WALL t=25cm METALLIC BEAMS IPE 300 IPE 200 METALLIC JOISTS METALLIC JOISTS IPE 200 METALLIC PILAR REINF. CONCRETE CLT PANEL METALLIC PILAR HEB 140 LOAD-BEARING WALL STRIP FOOTING REINF. CONCRETE 0.12m PANEL HEBCLT 140 2x0.5m LOAD-BEARING WALL STRIP FOOTING 0.12m 2x0.5m HYDRAULIC PLATFORM WOOD BEAM HYDRAULIC PLATFORM PIT h=60cm 0.25x0.80cm WOOD BEAM PIT0.25x0.80cm h=60cm METALLIC BEAMS WOOD JOIST IPE 300 LIFT PIT h=60cm METALLIC JOISTS METALLIC BEAMS IPE 300 IPE 200 0.15x0.25cm LIFT PIT h=60cm WOOD JOIST METALLIC JOISTS IPE 200 0.15x0.25cm METALLIC PILAR WOOD BEAMS 140 METALLIC PILAR WOODHEB BEAMS 0.15x0.45cm HEB 140 0.15x0.45cm REINF. CONCRETE METALLIC PILAR PILAR REINF. CONCRETE HYDRAULIC PLATFORM METALLIC PILAR 8cm PILAR 25x50cm HYDRAULIC PLATFORM 8cm PIT h=60cm 25x50cm PIT h=60cm LIFT PIT h=60cm REINF. CONCRETE LOAD-BEARING WALL t=36cm LIFT PIT h=60cm REINF. CONCRETE LOAD-BEARING WALL t=36cm REINF. CONCRETE WOOD BEAMS RETAINING t=36cm REINF. 0.15x0.45cm WOODCONCRETE BEAMS RETAINING t=36cm 0.15x0.45cm METALLIC PILAR REINF. CONCRETE 8cm METALLIC PILAR LOAD-BEARING WALL t=25cm REINF. CONCRETE 8cm LOAD-BEARING WALL t=25cm REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING REINF. CONCRETE 2x0.5m LOAD-BEARING WALL STRIP FOOTING 2x0.5m METALLIC BEAMS IPE 300 METALLIC METALLIC BEAMS JOISTS IPE 300 IPE 200 METALLIC JOISTS IPE 200 METALLIC PILAR HEB 140 METALLIC PILAR HEB 140 HYDRAULIC PLATFORM PIT h=60cm HYDRAULIC PLATFORM PIT h=60cm LIFT PIT h=60cm LIFT PIT h=60cm WOOD BEAMS 0.15x0.45cm WOOD BEAMS 0.15x0.45cm METALLIC PILAR METALLIC 8cm PILAR 8cm

WOOD ROOF FLOOR WOOD ROOF WOODFLOOR SLAB WOOD SLAB +5.42m t=92cm +5.42m t=92cm WOOD PERGOLA WOOD PERGOLA WOOD SLAB WOOD SLAB +3.60m t=45cm +3.60m t=45cm ROOF FLOOR ROOF FLOOR REINF. CONCRETE SLAB REINF. CONCRETE SLAB +3.45m t=30cm

+3.45m t=30cm

INSTA. FLOOR INSTA. FLOOR REINF. CONCRETE SLAB REINF. CONCRETE SLAB +2.95m t=20cm +2.95m t=20cm GROUNDFLOOR GROUNDFLOOR REINF. CONCRETE SLAB REINF. CONCRETE SLAB ±0.00m t=35cm ±0.00m t=35cm

METALLIC WALKWAY METALLIC WALKWAY METAL SLAB WOOD ROOF FLOOR METAL ±0.00 SLAB WOOD ROOF t=30cmFLOOR WOOD SLAB ±0.00 +5.42m t=30cm WOOD SLAB t=92cm +5.42m t=92cm WOOD PERGOLA WOOD PERGOLA GROUNDFLOOR TERRACE WOOD SLAB GROUNDFLOOR TERRACESLAB WOOD SLAB +3.60m t=45cm REINF. CONCRETE +3.60m REINF. t=45cm SLAB -0.05mCONCRETE t=30cm -0.05m t=30cm ROOF FLOOR BEDROOM FLOORSLAB -1 ROOF FLOOR REINF. CONCRETE BEDROOM FLOOR -1 REINF. CONCRETE DECK REINF. CONCRETE SLAB +3.45m t=30cm DECK -3.50mCONCRETE t=15cm +3.45m REINF. t=30cm -3.50m t=15cm BEDROOM FLOOR -1 INSTA. FLOOR BEDROOM FLOOR -1 REINF. CONCRETE SLAB INSTA. FLOOR REINF. CONCRETE SLAB REINF. SLAB -3.50mCONCRETE t=30cm REINF. CONCRETE SLAB +2.95m t=20cm -3.50m t=30cm +2.95m t=20cm INDUSTRIAL DECK GROUNDFLOOR WOOD ROOF FLOOR INDUSTRIAL DECK GROUNDFLOOR REINF. CONCRETE DECK SLAB WOODREINF. ROOF FLOOR WOODCONCRETE SLAB DECK -3.90m t=15cm REINF. SLAB ±0.00m t=35cm +5.42m WOODCONCRETE SLAB t=92cm -3.90m t=15cm ±0.00m +5.42m t=35cm t=92cm WOOD PERGOLA WOOD PERGOLA WOOD SLAB +3.60m WOOD METALLIC SLAB t=45cm WALKWAY +3.60m METALLIC t=45cmMETAL WALKWAY SLAB METAL ±0.00 SLAB t=30cm WOOD ROOF FLOOR ROOF FLOOR ±0.00 t=30cm WOOD ROOF FLOOR WOOD ROOF FLOOR REINF. SLAB CONCRETE SLAB +5.42m t=92cm WOOD REINF. SLAB CONCRETE SLAB +3.45m t=30cm +5.42m +3.45m t=92cm t=30cm GROUNDFLOOR TERRACE WOOD PERGOLA GROUNDFLOOR TERRACE WOOD REINF. PERGOLA SLAB WOODCONCRETE SLAB INSTA. FLOOR REINF. CONCRETE SLAB -0.05m t=30cm +3.60m t=45cm WOOD INSTA.SLAB FLOOR REINF. CONCRETE SLAB -0.05m t=30cm +3.60m t=45cm REINF. CONCRETE SLAB +2.95m t=20cm FLOOR -1 +2.95m t=20cmBEDROOM ROOF FLOOR GROUNDFLOOR BEDROOM FLOOR -1 REINF. ROOF FLOOR REINF.CONCRETE CONCRETEDECK SLAB GROUNDFLOOR REINF. CONCRETE SLAB REINF. CONCRETE DECK -3.50m t=15cm +3.45m REINF. CONCRETE SLAB t=30cm -3.50m t=15cm REINF. CONCRETE SLAB ±0.00m t=35cm +3.45m t=30cm ±0.00m t=35cmBEDROOM FLOOR -1 BEDROOM FLOOR -1 REINF. CONCRETE SLAB INSTA. FLOOR REINF. SLAB -3.50m t=30cm INSTA. CONCRETE FLOOR CONCRETE SLAB -3.50m t=30cm REINF. METALLICSLAB WALKWAY +2.95m t=20cm REINF. CONCRETE INDUSTRIAL DECK METALLIC WALKWAY METAL SLAB +2.95m INDUSTRIAL t=20cm DECK GROUNDFLOOR ±0.00 REINF. METAL SLAB t=30cmCONCRETE DECK REINF. DECK SLAB t=15cm GROUNDFLOOR ±0.00 -3.90m t=30cmCONCRETE REINF. CONCRETE -3.90m REINF. t=15cm ±0.00mCONCRETE t=35cm SLAB ±0.00m t=35cm GROUNDFLOOR TERRACE GROUNDFLOOR TERRACE REINF. CONCRETE SLAB -0.05m CONCRETE REINF. SLAB t=30cm ROOF METALLIC WALKWAY WOOD FLOOR -0.05m t=30cm METALLIC WALKWAY WOOD ROOF FLOOR METAL SLAB WOOD SLAB ±0.00 SLAB t=30cm +5.42m METAL t=92cm BEDROOM FLOOR -1 WOOD SLAB ±0.00 t=30cm BEDROOM FLOOR -1 +5.42m t=92cm REINF. CONCRETE DECK WOOD -3.50m CONCRETE REINF. DECK t=15cm PERGOLA -3.50m WOOD WOOD SLAB t=15cm PERGOLA +3.60m GROUNDFLOOR TERRACE t=45cm WOOD SLAB BEDROOM FLOOR -1 TERRACE +3.60m GROUNDFLOOR t=45cm REINF. CONCRETE SLAB BEDROOM FLOOR -1 REINF. CONCRETE SLAB -0.05m t=30cm REINF. SLAB -3.50mCONCRETE REINF. CONCRETE SLAB t=30cm ROOF FLOOR -0.05m -3.50m t=30cm t=30cm ROOF FLOOR REINF. CONCRETE INDUSTRIAL DECKSLAB BEDROOMSLAB FLOOR -1 +3.45m t=30cm REINF. CONCRETE INDUSTRIAL DECK REINF. CONCRETE DECK FLOOR -1 REINF. CONCRETE DECK +3.45m BEDROOM t=30cm REINF. CONCRETE DECK -3.90mCONCRETE t=15cm -3.50m t=15cm REINF. DECK -3.90m t=15cm t=15cm -3.50m INSTA. FLOOR BEDROOM FLOOR -1 INSTA. FLOOR REINF. CONCRETE SLAB BEDROOM FLOOR -1 REINF. CONCRETE SLAB +2.95m t=20cm REINF. CONCRETE SLAB -3.50mCONCRETE t=30cm SLAB +2.95m REINF. t=20cm -3.50m t=30cm GROUNDFLOOR INDUSTRIAL DECKSLAB GROUNDFLOOR REINF. CONCRETE INDUSTRIAL DECK t=35cm ±0.00m REINF. CONCRETE REINF. CONCRETE SLAB DECK -3.90mCONCRETE t=15cm DECK ±0.00m REINF. t=35cm -3.90m t=15cm METALLIC WALKWAY METALLIC WALKWAY METAL SLAB ±0.00 SLAB t=30cm METAL

±0.00 t=30cm

GROUNDFLOOR TERRACE GROUNDFLOOR TERRACE REINF. CONCRETE SLAB -0.05m t=30cm REINF. CONCRETE SLAB -0.05m t=30cm BEDROOM FLOOR -1 BEDROOM FLOOR -1 REINF. CONCRETE DECK -3.50m t=15cm REINF. CONCRETE DECK -3.50m t=15cm BEDROOM FLOOR -1 BEDROOM FLOOR -1 REINF. CONCRETE SLAB -3.50m t=30cm REINF. CONCRETE SLAB -3.50m t=30cm INDUSTRIAL DECK INDUSTRIAL REINF.DECK CONCRETE DECK t=15cm -3.90m REINF. CONCRETE DECK -3.90m t=15cm


!"#$$%

!"#$%&'( !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././


F

G

H

S-5

E

S-4

D

S-3

C

S-2

B

S-1

A

I

50,36 48,8 6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

1

RW01 REINF. CONCRETE RETAINING WALL t=36cm

HYDRAULIC PLATFORM PIT h=60cm

1

REINF. CONCRETE LOAD-BEARING WALL t=25cm

RAINWATER TANK

W16

W15

REINF. CONCRETE WALL t=16cm

METALLIC PILAR HEB 140

START OF STAIR FOOTING 0.6x0.5cm

REINF. CONCRETE ISOLATED FOOTING 1.3x2m / h=0.5m

METALLIC PILAR HEB 140

REINF. CONCRETE ISOLATED FOOTING 0.9x0.9m / h=0.5m

REINF. CONCRETE ISOLATED FOOTING 0.9x0.9m / h=0.5m REINF. CONCRETE BRACING BEAM 30x30cm

SW02 REINF. CONCRETE WALL t=25cm START OF STAIR FOOTING 0.8x0.5m

W20

REINF. CONCRETE RETAINING WALL t=25cm

REINF. CONCRETE ISOLATED FOOTING 2x2.3m / h=0.6m

PC07 REINF. CONCRETE PILAR 25x50cm

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 0.8x0.6m

S-7

W24

W22 1,5

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 0.9x0.5m

W23

REINF. CONCRETE LOAD-BEARING WALL t=25cm

2 3,75

REINF. CONCRETE RETAINING WALL t=25cm

LIFT PIT h=50cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

RW02

4

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.5x0.5m

REINF. CONCRETE LOAD-BEARING WALL t=25cm

W19

REINF. CONCRETE BRACING BEAM 30x30cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

PM08

METALLIC PILAR HEB 140

REINF. CONCRETE PILAR 25x50cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

PM07 REINF. CONCRETE BRACING BEAM 40x40cm

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.5x0.5m

3,33

REINF. CONCRETE LOAD-BEARING WALL t=25cm

5,75

REINF. CONCRETE RETAINING WALL t=36cm

RW05

-4.20m

PC05

REINF. CONCRETE PILAR 25x50cm

27,34

REINFORCED CONCRETE FOOTINGS h=50cm / h=60cm

REINF. CONCRETE BRACING BEAM 40x40cm

REINF. CONCRETE LOAD-BEARING WALL t=15cm

PC04

REINF. CONCRETE PILAR 25x50cm

28,05

W06

REINF. CONCRETE BRACING BEAM 40x40cm

PC03

5,5

REINF. CONCRETE ISOLATED FOOTING 2x2.3m / h=0.6m

REINF. CONCRETE ISOLATED FOOTING 1.1x1.9m / h=0.5m

REINF. CONCRETE RETAINING WALL t=36cm

PM06

METALLIC PILAR HEB 140 3,33

2,98

SW02

REINF. CONCRETE ISOLATED FOOTING 0.9x0.9m / h=0.5m

PM05

S-8

REINF. CONCRETE PILAR 25x50cm

REINF. CONCRETE BRACING BEAM 30x30cm

REINF. CONCRETE ISOLATED FOOTING 0.9x0.9m / h=0.5m

FOUNDATIONS LEVEL

REINF. CONCRETE BRACING BEAM 40x40cm

PC01

REINF. CONCRETE BRACING BEAM 30x30cm

2,17

2,52

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 2x0.5m

5,5

REINF. CONCRETE LOAD-BEARING WALL t=25cm REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.5x0.5m

3

RW03

W05 REINF. CONCRETE LOAD-BEARING WALL t=25cm

RW06

W04

REINF. CONCRETE ISOLATED FOOTING 2x2.3m / h=0.6m

W21

2

S-9

REINF. CONCRETE LOAD-BEARING WALL t=15cm

W13

START OF STAIR FOOTING 0.6x0.5cm

W14

3,05

REINF. CONCRETE LOAD-BEARING WALL t=15cm

REINF. CONCRETE WALL t=16cm

REINF. CONCRETE LOAD-BEARING WALL t=15cm

SW01

REINF. CONCRETE LOAD-BEARING WALL t=25cm

W12

W03

W11

6

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE LOAD-BEARING WALL t=15cm

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.9x0.6m

RW04

REINF. CONCRETE RETAINING WALL t=25cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

W30

W31

W32

REINF. CONCRETE LOAD-BEARING WALL t=25cm

W28

W29

REINF. CONCRETE LOAD-BEARING WALL t=25cm

W26

-3.95m

S-6

W27

REINFORCED CONCRETE FOOTINGS h=50cm / h=60cm

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.8x0.5m

7,3

FOUNDATIONS LEVEL

REINF. CONCRETE LOAD-BEARING WALL t=25cm

5,71

5

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 0.9x0.5m

6

!"#$%&

!"#$%&'("$)*+,&$*-*1:150 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././


B

C

D

E

F

S-5

S-4

S-3

S-2

S-1 A

G

H

I

49,26 48,8 6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

1

RW01

2

1

W03

3,5

REINF. CONCRETE LOAD-BEARING WALL t=25cm

SW01

REINF. CONCRETE LOAD-BEARING WALL t=25cm

W16

W15

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE LOAD-BEARING WALL t=15cm

W05

REINF. CONCRETE LOAD-BEARING WALL t=25cm

PC01

S-8

REINF. CONCRETE PILAR 25x50cm

2,17

2,52

W04

W14

3,05

REINF. CONCRETE LOAD-BEARING WALL t=15cm

REINF. CONCRETE LOAD-BEARING WALL t=15cm

S-9

REINF. CONCRETE WALL t=16cm

W11

-3.90m -4.15m

REINF. CONCRETE LOAD-BEARING WALL t=25cm

W02 4,28

W13

INDUSTRIAL DECK REINFORCED CONCRETE DECK t=15cm

W12

6

REINF. CONCRETE LOAD-BEARING WALL t=25cm

1,75

REINF. CONCRETE LOAD-BEARING WALL t=15cm

REINF. CONCRETE RETAINING WALL t=36cm

SW02

PM05

PM06

METALLIC PILAR HEB 140

METALLIC PILAR HEB 140

3,33

2,98

5,5

REINF. CONCRETE WALL t=16cm

W06 REINF. CONCRETE LOAD-BEARING WALL t=15cm

PC04

PC03

REINF. CONCRETE PILAR 25x50cm

W23

W22

SW02 REINF. CONCRETE WALL t=25cm

REINF. CONCRETE RETAINING WALL t=36cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

W21

REINF. CONCRETE RETAINING WALL t=25cm

PC07 REINF. CONCRETE PILAR 25x50cm

S-7

W24

REINF. CONCRETE LOAD-BEARING WALL t=25cm

2 3,75

REINF. CONCRETE LOAD-BEARING WALL t=25cm

RW02

REINF. CONCRETE LOAD-BEARING WALL t=25cm

W19

METALLIC PILAR HEB 140

REINF. CONCRETE LOAD-BEARING WALL t=25cm

PM08

METALLIC PILAR HEB 140

W20

3,33

REINF. CONCRETE LOAD-BEARING WALL t=25cm

5,75

REINF. CONCRETE RETAINING WALL t=36cm

RW05

28,05

28,75

5,5

PM07

4

W09

REINF. CONCRETE RETAINING WALL t=25cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

1,5

RW03

PC05

REINF. CONCRETE PILAR 25x50cm

REINF. CONCRETE PILAR 25x50cm

RW06

3

5

RW04

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

W30

W31

W32

REINF. CONCRETE LOAD-BEARING WALL t=25cm

W28

W29

REINF. CONCRETE LOAD-BEARING WALL t=25cm

W27

-3.50m -3.75m

REINF. CONCRETE LOAD-BEARING WALL t=25cm

BEDROOM FLOOR -1 REINFORCED CONCRETE DECK t=15cm

W26

7,3

5,71

S-6

REINF. CONCRETE RETAINING WALL t=25cm

BEDROOM FLOOR -1 REINFORCED CONCRETE SLAB t=30cm 6

-3.50m -3.90m

!"#$%$

!"#$%&'()%*%1:150 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././


A

B

C

D

E

F

G

H

I

49,26 48,8 6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

1

RW01

GROUNDFLOOR TERRACE

REINF. CONCRETE RETAINING WALL t=36cm

0,9

1

REINF. CONCRETE LOAD-BEARING WALL t=25cm

S01

1

W17

W16

0,78

REINF. CONCRETE LOAD-BEARING WALL t=15cm

1,12

1

WATER TANK

2,76

W05

0,72

W04 REINF. CONCRETE

W15

3,05

W14

REINF. CONCRETE LOAD-BEARING WALL t=15cm

0,18

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE STAIR SLAB t=16cm

W12

±0.00m -0.35m 2

-0.05m -0.35m

3,42

INSTALLATIONS SHAFT

W03

REINF. CONCRETE LOAD-BEARING WALL t=15cm

GROUNDFLOOR REINFORCED CONCRETE SLAB t=35cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm 3,5

W02 4,28

W13

6

REINF. CONCRETE LOAD-BEARING WALL t=25cm

1,75

REINF. CONCRETE LOAD-BEARING WALL t=15cm

REINFORCED CONCRETE SLAB t=30cm

PC01

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE PILAR 25x50cm

5,5

METALLIC BEAMS IPE 300 METALLIC JOISTS IPE 200

METALLIC WALKWAY

W06 REINF. CONCRETE LOAD-BEARING WALL t=15cm

PC04

PC03

LOAD-BEARING WALL t=25cm

W23

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE PILAR 25x25cm

W22

PC17

REINF. CONCRETE PILAR 25x25cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm 2

PC16

REINF. CONCRETE PILAR 25x25cm

1,63

PC15

S03 REINF. CONCRETE STAIR SLAB t=25cm

W09 1,5

1,88

WALL GRID 4 - SEE SECTION 7

REINF. CONCRETE RETAINING WALL t=36cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

4,75

INSTALLATIONS SHAFT

RW05

W07 REINF. CONCRETE

1,98

W20

1,35

W24

0,25

W21

0,72

0,72

METALLIC PILAR HEB 140

4

3,75

REINF. CONCRETE LOAD-BEARING WALL t=25cm

PM08

METALLIC PILAR HEB 140

REINF. CONCRETE PILAR 25x50cm

0,75

PM07 METALLIC BEAMS IPE 300 METALLIC JOISTS IPE 200

REINF. CONCRETE LOAD-BEARING WALL t=25cm

1,48

PC05

REINF. CONCRETE PILAR 25x50cm

REINF. CONCRETE PILAR 25x50cm

0,72

W19

S02

2,98 3,13

METALLIC PILAR HEB 140

±0.00m -0.30m

WALL GRID B - SEE ELEVATION 5,75 2,97

PM06

METAL SLAB t=30cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE RETAINING WALL t=36cm

RW05

28,05

28,75

5,5

3

PM05 METALLIC PILAR HEB 140

REINF. CONCRETE STAIR SLAB t=16cm

0,72

0,72

2,52

LOAD-BEARING WALL t=25cm

W08 REINF. CONCRETE LOAD-BEARING WALL t=25cm

GROUNDFLOOR TERRACE REINFORCED CONCRETE SLAB t=30cm

-0.05m -0.35m

REINF. CONCRETE LOAD-BEARING WALL t=25cm

5

GROUNDFLOOR TERRACE REINFORCED CONCRETE SLAB t=30cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

W31

W32

W33

REINF. CONCRETE LOAD-BEARING WALL t=25cm

W28

W30

REINF. CONCRETE LOAD-BEARING WALL t=25cm

W27

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

W26

W29

REINF. CONCRETE LOAD-BEARING WALL t=25cm 6

W25

7,3

7,76

-0.05m -0.35m

!"#$%&

!"#"!$%&$'(()$*!+,$-$1:150 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././


A

B

C

D

E

F

G

H

I

49,26 48,8 6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

1,45

1

REINF. CONCRETE LOAD-BEARING WALL t=36cm

3,5

HYDRAULIC PLATFORM ROOF t=20cm

2,76

INSTALLATIONS FLOOR REINFORCED CONCRETE SLAB t=20cm

+2.95m +2.75m

2,51

REINF. CONCRETE LOAD-BEARING WALL t=25cm

10,03

W05

PC01

PC02

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE PILAR 25x50cm

REINF. CONCRETE PILAR 25x50cm

PC05

PC06

REINF. CONCRETE PILAR 25x50cm

REINF. CONCRETE PILAR 25x50cm

PC07

PC08

REINF. CONCRETE PILAR 25x50cm

REINF. CONCRETE PILAR 25x50cm

PC09

PC10

REINF. CONCRETE PILAR 25x50cm

REINF. CONCRETE PILAR 25x50cm

5,5

W04

1,27

W17

W15

REINF. CONCRETE LOAD-BEARING WALL t=15cm

W14

2

4,62

REINF. CONCRETE LOAD-BEARING WALL t=25cm

+4.50m +4.30m

2,55

REINF. CONCRETE LOAD-BEARING WALL t=25cm

3,42

INSTALLATIONS SHAFT 0,9

1

W03

W12

+3.45m +3.15m

REINF. CONCRETE LOAD-BEARING WALL t=25cm

W02 4,28

REINF. CONCRETE LOAD-BEARING WALL t=15cm 3,05

ROOF FLOOR REINFORCED CONCRETE SLAB t=30cm

W13

6

REINF. CONCRETE LOAD-BEARING WALL t=25cm

1,75

REINF. CONCRETE LOAD-BEARING WALL t=15cm

W01

W06 REINF. CONCRETE LOAD-BEARING WALL t=15cm 3

PC03

15,67

+2.95m +2.75m

INSTALLATIONS FLOOR

REINFORCED CONCRETE SLAB t=20cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

W19

4,75

REINF. CONCRETE LOAD-BEARING WALL t=36cm

W18

28,05

28,75

5,5

REINF. CONCRETE PILAR 25x50cm

W07 1,98

REINF. CONCRETE LOAD-BEARING WALL t=25cm

LIFT PIT t=20cm

1,72 2

W09

REINF. CONCRETE LOAD-BEARING WALL t=25cm

W22

+3.60m +3.15m

W24

REINF. CONCRETE LOAD-BEARING WALL t=25cm

3,75

+4.50m +4.30m

5

W10

W11 REINF. CONCRETE LOAD-BEARING WALL t=25cm

18,77

7,51

7,3

REINF. CONCRETE LOAD-BEARING WALL t=25cm

WOOD BEAMS 0.15x0.45cm

PC11

PC12

PC13

PC14

REINF. CONCRETE PILAR 25x50cm

REINF. CONCRETE PILAR 25x50cm

REINF. CONCRETE PILAR 25x50cm

REINF. CONCRETE PILAR 25x50cm

6

PM01

PM02

PM03

PM04

METALLIC PILAR 8cm

METALLIC PILAR 8cm

METALLIC PILAR 8cm

METALLIC PILAR 8cm

!"#$%&

!"#$%&'()*)('"##+',(-.'/'1:150 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

REINF. CONCRETE LOAD-BEARING WALL t=25cm

2,03

W21

2,03

4,5

2,03

REINF. CONCRETE LOAD-BEARING WALL t=25cm

2,03

W20

2,03

REINF. CONCRETE LOAD-BEARING WALL t=25cm

2,03

W23

2,03

1,75

2,03

WOODEN PERGOLA WOOD SLAB t=45cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

4


A

B

C

D

E

F

G

H

I

49,26 48,8 6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

1

W02

REINF. CONCRETE LOAD-BEARING WALL t=25cm

1,13

29,18 6,1

6,1

2,53

1,13

2

REINF. CONCRETE LOAD-BEARING WALL t=25cm

W17

W15

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE LOAD-BEARING WALL t=15cm

W14

W05

REINF. CONCRETE LOAD-BEARING WALL t=25cm

5,5

1,41

1,41

W04

REINF. CONCRETE LOAD-BEARING WALL t=15cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

W03 REINF. CONCRETE LOAD-BEARING WALL t=25cm

W12

1,4

1,4

6

1,13

1,4

PW05 WOOD PILAR 25x15cm

1,41

W06 REINF. CONCRETE LOAD-BEARING WALL t=15cm

CLT PANEL 0.12m

WOOD PILAR 25x15cm

WOOD PILAR 25x15cm

1,41

W07

REINF. CONCRETE LOAD-BEARING WALL t=25cm

W20

1,41

PW07

W21

28,05

28,75

5,5

WOOD JOIST 0.15x0.25cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

WOOD BEAM 0.25x0.80cm REINF. CONCRETE LOAD-BEARING WALL t=25cm

1,41

PW06

1,41

20,05

3

REINF. CONCRETE LOAD-BEARING WALL t=25cm

W23 W09

W24

REINF. CONCRETE LOAD-BEARING WALL t=25cm

W22

1,88

REINF. CONCRETE LOAD-BEARING WALL t=25cm

WOOD PILAR 25x15cm

3,75

1,88

PW08

REINF. CONCRETE LOAD-BEARING WALL t=25cm

4

1,12

5

W10

REINF. CONCRETE LOAD-BEARING WALL t=25cm

WOOD ROOF FLOOR WOOD SLAB t=92cm

7,3

+5.42m +4.50'5m

6

!"#$%&

!"#$%&'()*($$+*!,'-*.*1:150 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

W11 REINF. CONCRETE LOAD-BEARING WALL t=25cm

6,1


5

6

4

3

2

1

28,05 7,3

3,75

5,5

WOOD PERGOLA

WOOD BEAMS 0.15x0.45cm

+3.45m

PM02

REINF. CONCRETE SLAB t=30cm

W19

METALLIC PILAR 8cm

3,15

6

ROOF FLOOR

WOOD SLAB t=45cm

0,45

+3.60m

5,5

REINF. CONCRETE LOAD-BEARING WALL t=25cm

5

6

4

3

2

1

28,05 7,3

5,5

-0.05m +3.60m

REINF. SLAB WOOD CONCRETE SLAB t=30cm t=45cm

W26 REINF. CONCRETE PM02LOAD-BEARING WALL t=25cm

REINF. CONCRETE PILAR 25x25cm

REINF. CONCRETE REINF. CONCRETE DECK RETAINING WALLt=25cm t=15cm

-3.95m

RW03

W07

0,4

REINF. CONCRETE RETAINING WALL RW04 t=25cm

BEDROOM FLOOR -1 -3.50m

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.9x0.6m

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 2x0.5m

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.9x0.6m

INDUSTRIAL DECK -3.90m

REINF. CONCRETE DECK t=15cm

REINF. CONCRETE RETAINING WALL t=36cm

REINF. CONCRETE SLAB t=30cm

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 2x0.5m

RW01

BEDROOM FLOOR -1

-3.50m

GROUNDFLOOR INDUSTRIAL DECK REINF. CONCRETE SLAB REINF. CONCRETE DECK ±0.00m t=35cm -3.90m t=15cm -4.20m

REINF. CONCRETE LOAD-BEARING WALL t=25cm

0,350,4

W07 PC16

REINF. CONCRETE REINF. CONCRETE PILAR LOAD-BEARING25x25cm WALL STRIP FOOTING 0.9x0.5m

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.8x0.5m

3,15

REINF. CONCRETE RETAINING WALL REINF. CONCRETE W26t=25cm RW04 LOAD-BEARING WALL t=25cm

BEDROOM FLOOR -1 REINF. CONCRETE REINF. CONCRETE DECK GROUNDFLOOR TERRACE -3.50m REINF. t=15cmCONCRETE SLAB RETAINING WALLt=25cm -0.05m t=30cm -3.95m RW03

RW01

3,153,15

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE RETAINING WALL t=36cm

W19

BEDROOM FLOOR -1 REINF. CONCRETE SLAB t=30cm

6

PC16

METALLIC PILAR 8cm

-3.50m

5,5

GROUNDFLOOR REINF.FLOOR CONCRETE SLAB ROOF ±0.00m REINF. t=35cmCONCRETE SLAB +3.45m t=30cm

GROUNDFLOOR WOOD PERGOLATERRACE

WOOD BEAMS 0.15x0.45cm

0,45 0,35

3,75

-4.20m REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.8x0.5m

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 0.9x0.5m

SECTION 1

5

6

4

3

2

1

28,05 7,3

3,75 1,88

5,5 1,88

1,41

1,41

5,5 1,41

1,41

1,41

1,41

6 1,41

1,41

1,4

1,4

WOOD ROOF FLOOR 0,12 0,8

WOOD JOIST 0.15x0.25cm

WOOD BEAM 0.25x0.80cm

+4.50m

ROOF FLOOR INSTA. FLOOR 5

4

3

7,3

3,75 1,41

1,41

INDUSTRIAL DECK REINF. CONCRETE DECK

-3.90m t=15cm

PM06

REINF. CONCRETE RETAINING RW02 WALL t=25cm

INDUSTRIAL DECK REINF. CONCRETE DECK

-3.90m t=15cm

METALLIC PILAR HEB 140 REINF. CONCRETE REINF. CONCRETE LOAD-BEARING WALL STRIP LOAD-BEARING WALL STRIP FOOTING 1.5x0.5m FOOTING 1.5x0.5m

REINF. CONCRETE RETAINING WALL t=36cm

METALLIC PILAR HEB 140 REINF. CONCRETE REINF. CONCRETE REINF. CONCRETE LOAD-BEARING WALL STRIP BRACING BEAM ISOLATED FOOTING FOOTING 1.5x0.5m 30x30cm 0.9x0.9m / h=0.5m

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.9x0.6m

RW01

PM08 -4.20m

METALLIC BEAMS IPE 300 METALLIC JOISTS IPE 200

REINF. CONCRETE RETAINING WALL t=36cm

+2.95m

W04

W07

S03

±0.00

REINF. CONCRETE RETAINING RW02 WALL t=25cm

INSTA. FLOOR

RW01

METALLIC PILAR HEB 140 REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE STAIR SLAB t=25cm

PM06

METALLIC PILAR HEB 140

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE DECK t=15cm

-3.95m

1,4

REINF. CONCRETE SLAB t=20cm

PM08

METALLIC WALKWAY

W07

BEDROOM FLOOR -1 -3.50m

1,4

+4.50m

METAL SLAB t=30cm

-4.20m REINF. CONCRETE REINF. CONCRETE REINF. CONCRETE LOAD-BEARING WALL STRIP BRACING BEAM ISOLATED FOOTING FOOTING 1.5x0.5m 30x30cm 0.9x0.9m / h=0.5m

S-2

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.8x0.5m

S-1

0,4

1,41

METALLIC BEAMS IPE 300 METALLIC JOISTS IPE 200

±0.00

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE SLAB t=30cm

REINF. CONCRETE RETAINING WALL RW04 t=25cm

1,41

METALLIC WALKWAY METAL SLAB t=30cm

REINF. CONCRETE STAIR SLAB t=25cm

BEDROOM FLOOR -1

-3.50m

1,41

WOOD JOIST 0.15x0.25cm

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.8x0.5m

3,15

REINF. CONCRETE LOAD-BEARING WALL t=25cm

1,41

WOOD ROOF FLOOR

S03

0,350,4

REINF. CONCRETE RETAINING WALL RW04 t=25cm W29

BEDROOM FLOOR -1 GROUNDFLOOR REINF. CONCRETE DECK -3.50m REINF. t=15cmCONCRETE SLAB ±0.00m t=35cm -3.95m

REINF. CONCRETE LOAD-BEARING WALL t=25cm

BEDROOM FLOOR -1

W10

3,15 3,15

PC12 REINF. CONCRETE REINF. CONCRETE LOAD-BEARING WALL t=25cm PILAR 25x50cm

REINF. CONCRETE SLAB t=30cm

1,41

WOOD SLAB

W29

-3.50m

1,41

+5.42m t=92cm

W10

t=35cmCONCRETE SLAB ±0.00m REINF. +3.45m t=30cm

1

6

W04

0,8 3,15 0,12

WOOD BEAM 0.25x0.80cm

0,9

1,88

5,5

CLT PANEL 0.12m

GROUNDFLOOR REINF.FLOOR CONCRETE SLAB ROOF

0,45 0,35

1,88

REINF. CONCRETE SLAB t=20cm

+2.95m

5,5

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE PILAR 25x50cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

PC12

SECTION 2

2

28,05

W03

REINF. CONCRETE SLAB t=30cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

+3.45m

6

W03

0,9 0,45

WOOD SLAB +5.42m t=92cm

CLT PANEL 0.12m

!"#$%&

!"#$%&'"%#()%'*!+,$%)-).)/))0)1:150 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

REINF. CONCRETE REINF. CONCRETE LOAD-BEARING WALL STRIP LOAD-BEARING WALL STRIP FOOTING 1.5x0.5m FOOTING 1.5x0.5m

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.9x0.6m


1,88

1,88

1,41

1,41

1,41

1,41

1,41

1,41

1,41

1,41

1,4

1,4

WOOD ROOF FLOOR

0,8

0,12

CLT PANEL 0.12m WOOD BEAM 0.25x0.80cm

WOOD SLAB t=92cm

WOOD JOIST 0.15x0.25cm

+4.50m

ROOF FLOOR

0,9

+3.45m

6

REINF. CONCRETE SLAB t=30cm

5

3

4

2

1

28,05 7,3

3,75

REINF. CONCRETE PILAR 25x50cm

1,88

5,5 1,88

1,41

1,41

0,8 3,15 0,12

WOOD BEAM 0.25x0.80cm

0,9

1,41

1,41

1,41

1,41

1,41

1,4

1,4

+5.42m

WOOD SLAB t=92cm

WOOD JOIST 0.15x0.25cm

+4.50m

GROUNDFLOOR REINF. CONCRETE SLAB ROOF FLOOR

GROUNDFLOOR TERRACE

±0.00m t=35cm REINF. CONCRETE SLAB +3.45m t=30cm

0,45 0,35

1,41

6

WOOD ROOF FLOOR CLT PANEL 0.12m

W30

5,5

-0.05m

REINF. CONCRETE

REINF. CONCRETE SLAB t=30cm

W24

PC04

REINF. CONCRETE LOAD-BEARING WALL t=25cm

LOAD-BEARING WALL t=25cm PC13

W16

REINF. CONCRETE PILAR 25x50cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

3,153,15

REINF. CONCRETE PILAR 25x50cm

BEDROOM FLOOR -1

0,350,4

REINF. CONCRETE RETAINING WALL REINF. CONCRETE W30 t=25cm RW04 LOAD-BEARING WALL t=25cm

BEDROOM FLOOR -1 GROUNDFLOOR REINF. CONCRETE DECK -3.50m REINF. t=15cmCONCRETE SLAB ±0.00m t=35cm -3.95m

GROUNDFLOOR INDUSTRIAL DECKTERRACE

RW01

REINF. CONCRETE SLAB t=30cm

-3.50m

REINF.CONCRETE CONCRETEDECK SLAB REINF.

-0.05m t=30cm -3.90m t=15cm

W24

REINF. CONCRETE LOAD-BEARING REINF. CONCRETE WALL t=25cm LOAD-BEARING WALL STRIP FOOTING 0.9x0.5m

PC04

-4.20m

W16

REINF. CONCRETE PILAR REINF. CONCRETE 25x50cm ISOLATED FOOTING 1.1x1.9m / h=0.5m

REINF. CONCRETE LOAD-BEARING WALL REINF. CONCRETE t=25cm LOAD-BEARING WALL STRIP FOOTING 1.5x0.5m

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.9x0.6m

REINF. CONCRETE ISOLATED FOOTING 1.1x1.9m / h=0.5m

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.5x0.5m

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.9x0.6m

3,15

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.8x0.5m

BEDROOM FLOOR -1 REINF. CONCRETE SLAB t=30cm

BEDROOM FLOOR -1 REINF. CONCRETE DECK t=15cm

INDUSTRIAL DECK REINF. CONCRETE DECK

-3.90m t=15cm

-3.95m

REINF. CONCRETE RETAINING WALL RW04 t=25cm

RW01

-3.50m

0,4

-3.50m

REINF. CONCRETE RETAINING WALL t=36cm

PC13

REINF. CONCRETE RETAINING WALL t=36cm

0,45

+5.42m

-4.20m REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 0.9x0.5m

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.8x0.5m

SECTION 3

5

6

4

3

2

1

28,05 7,3

3,75 1,88

5,5 1,88

1,41

1,41

5,5 1,41

1,41

1,41

1,41

6 1,41

1,41

1,4

1,4

WOOD ROOF FLOOR

0,8

0,12

CLT PANEL 0.12m

WOOD BEAM 0.25x0.80cm

+5.42m WOOD JOIST 0.15x0.25cm

+4.50m W20

0,9

REINF. CONCRETE LOAD-BEARING WALL t=25cm

GROUNDFLOOR ±0.00m

REINF. CONCRETE SLAB t=35cm

1,41

1,41

1,4

1,4

GROUNDFLOOR TERRACE -0.05m

REINF. CONCRETE SLAB t=30cm

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.8x0.5m

W07

REINF. CONCRETE RETAINING WALL t=25cm RW02

REINF. CONCRETE STAIR SLAB t=16cm

-2.04m

GROUNDFLOOR ±0.00m

REINF. CONCRETE SLAB t=35cm

SW02

REINF. CONCRETE WALL t=16cm START OF STAIR FOOTING 0.6x0.5cm

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.5x0.5m

REINF. CONCRETE STAIRS LOAD-BEARING WALL23 STRIP FOOTING 28x16.9cm 1.5x0.5m

3,15

-2.04m

GROUNDFLOOR INDUSTRIAL DECKTERRACE REINF.CONCRETE CONCRETEDECK SLAB REINF.

-0.05m t=15cm t=30cm -3.90m -4.20m

REINF. CONCRETE S01 LOAD-BEARING WALL STRIP FOOTING REINF. CONCRETE 1.5x0.5m STAIR SLAB t=16cm

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.9x0.6m

REINF. CONCRETE SLAB t=30cm

REINF. CONCRETE DECK t=15cm

REINF. CONCRETE RETAINING WALL t=25cm RW02

REINF. CONCRETE WALL t=16cm START OF STAIR FOOTING 0.6x0.5cm

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.5x0.5m

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.5x0.5m

S-4

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.8x0.5m

INDUSTRIAL DECK

SW02

-3.95m

S-3

0,4

REINF. CONCRETE RETAINING WALL RW04 t=25cm

BEDROOM FLOOR -1 -3.50m

!"#$%&

!"#$%&'"%#()%'*!+,$%)-).)/)0)1:150 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

REINF. CONCRETE DECK

-3.90m t=15cm

RW01

BEDROOM FLOOR -1

-3.50m

REINF. CONCRETE RETAINING WALL t=36cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

t=15cmCONCRETE SLAB REINF. t=30cm

W11

BEDROOM FLOOR -1 REINF. CONCRETETERRACE DECK GROUNDFLOOR

REINF. CONCRETE LOAD-BEARING WALL t=25cm

3,15 3,15

REINF. CONCRETE RETAINING WALL REINF. CONCRETE W31 t=25cm RW04 LOAD-BEARING WALL t=25cm

-3.50m -0.05m -3.95m

S01

23 STAIRS 28x16.9cm

RW01

+2.95m

REINF. CONCRETE SLAB t=30cm

-3.50m

REINF. CONCRETE SLAB t=20cm

REINF. CONCRETE RETAINING WALL t=36cm

W31 REINF. CONCRETE

BEDROOM FLOOR -1

SECTION 4

1,41

W05

+4.50m

1,41

REINF. CONCRETE LOAD-BEARING WALL t=25cm

1,41

W05

1,41

WOOD SLAB t=92cm

6

INSTA. FLOOR LOAD-BEARING WALL t=25cm

0,350,4

1,41

WOOD ROOF FLOOR +5.42m

1

5,5

W06

W07

W20

REINF. CONCRETE LOAD-BEARING WALL t=25cm

1,41

2

REINF. CONCRETE LOAD-BEARING WALL t=15cm

0,45 0,35

-0.05m

REINF. CONCRETE SLAB t=30cm

1,88

REINF. CONCRETE LOAD-BEARING WALL t=25cm

0,9

GROUNDFLOOR TERRACE

5,5

WOOD JOIST 0.15x0.25cm

W11

0,8 3,15 0,12

WOOD BEAM 0.25x0.80cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

1,88

CLT PANEL 0.12m

3

REINF. CONCRETE SLAB 28,05 t=20cm

+2.95m 3,75

REINF. CONCRETE LOAD-BEARING WALL t=25cm

INSTA. FLOOR

4

7,3

REINF. CONCRETE LOAD-BEARING WALL t=15cm

5

6

W06

0,45

WOOD SLAB t=92cm

-4.20m REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.5x0.5m

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.9x0.6m


5

6

4

3

2

1

28,05 7,3

3,75

5,5

5,5

6

ROOF FLOOR 0,45

+3.45m PC09

REINF. CONCRETE SLAB t=30cm

PC05

PC07

REINF. CONCRETE PILAR 25x50cm

REINF. CONCRETE PILAR 25x50cm

PC01 REINF. CONCRETE PILAR 25x50cm

3,15

REINF. CONCRETE PILAR 25x50cm

GROUNDFLOOR

GROUNDFLOOR TERRACE 0,35

-0.05m

REINF. CONCRETE SLAB

REINF. CONCRETE SLAB t=30cm

±0.00m t=35cm

W32 REINF. CONCRETE

REINF. CONCRETE DECK t=15cm

-3.95m

INDUSTRIAL DECK -3.90m

REINF. CONCRETE RETAINING WALL t=25cm RW02

REINF. CONCRETE DECK t=15cm

REINF. CONCRETE RETAINING WALL t=36cm

0,4

REINF. CONCRETE RETAINING WALL RW04 t=25cm

BEDROOM FLOOR -1 -3.50m

RW01

REINF. CONCRETE SLAB t=30cm

W07

BEDROOM FLOOR -1

-3.50m

REINF. CONCRETE LOAD-BEARING WALL t=25cm

3,15

LOAD-BEARING WALL t=25cm

-4.20m REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 0.9x0.5m

REINF. CONCRETE ISOLATED FOOTING 2x2.3m / h=0.6m

REINF. CONCRETE ISOLATED FOOTING 2x2.3m / h=0.6m

S-5

SECTION 5

!"#$%$

!"#$%&'"%#()%'*!+,$)-)).)1:150 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

REINF. CONCRETE ISOLATED FOOTING 2x2.3m / h=0.6m

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.9x0.6m


0,12

0.12m

0,8

WOOD JOIST 0.15x0.25cm

0,9

A WOOD BEAMS

W11 ROOF FLOOR

WOOD SLAB t=45cm B

0.15x0.45cm

C

D

E

F

+3.45m

W10

6,1

6,1

6,1

6,1

+5.42m WOOD JOIST 0.15x0.25cm

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.8x0.5m

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.8x0.5m

W33

RW06 REINF. CONCRETE RETAINING WALL t=36cm

W33

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.9x0.6m

RW06 REINF. CONCRETE RETAINING WALL t=36cm

RW06

WALL t=36cm

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.8x0.5m

REINF. CONCRETE PILAR 25x50cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.8x0.5m

-3.95m

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.8x0.5m

PC10

REINF. CONCRETE LOAD-BEARING WALL t=25cm

W32

REINF. CONCRETE PILAR 25x50cm

RW06

W31

REINF. CONCRETE DECK t=15cm

PC09

REINF. CONCRETE LOAD-BEARING WALL t=25cm

W31

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

-3.50m

RW05 REINF. CONCRETE RETAINING

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.9x0.6m

REINF. CONCRETE PILAR 25x50cm

W11

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.8x0.5m

BEDROOM FLOOR -1

W30

W29

W28

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.8x0.5m

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.8x0.5m

REINF. CONCRETE LOAD-BEARING WALL t=25cm

BEDROOM FLOOR -1 GROUNDFLOOR REINF. CONCRETE DECK -3.50m REINF. t=15cmCONCRETE SLAB ±0.00m t=35cm -3.95m

W30

W29

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

W28

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.8x0.5m

W27

W25

W10

REINF. CONCRETE LOAD-BEARING WALL t=25cm

W27

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.8x0.5m

W26

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.9x0.6m

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.8x0.5m REINF. CONCRETE LOAD-BEARING WALL t=25cm

W25

REINF. CONCRETE SLAB -0.05m t=30cm RW05 REINF. CONCRETE RETAINING WALL t=36cm

W26

REINF. CONCRETE LOAD-BEARING WALL t=25cm

GROUNDFLOOR TERRACE

PC10

WOOD SLAB t=92cm

GROUNDFLOOR REINF. CONCRETE SLAB ROOF FLOOR ±0.00m t=35cm REINF. CONCRETE SLAB +3.45m t=30cm

REINF. CONCRETE SLAB WOOD SLAB -0.05m +3.60m t=30cm t=45cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

0,9

WOOD BEAMS 0.15x0.45cm

REINF. CONCRETE PILAR 25x50cm

6,1

+4.50m

GROUNDFLOOR TERRACE WOOD PERGOLA

0,45 0,35

I

PC09

W32

0,8 3,15 0,12

WOOD BEAM 0.25x0.80cm

3,153,15

H

6,1

WOOD ROOF FLOOR

CLT PANEL 0.12m

0,350,4

G

REINF. CONCRETE LOAD-BEARING WALL t=25cm

6,1

REINF. CONCRETE LOAD-BEARING WALL t=25cm

3,15

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE SLAB t=30cm

48,8 6,1

0,4

t=92cm

+4.50m

WOOD PERGOLA +3.60m

0,45

+5.42m

WOOD BEAM 0.25x0.80cm

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.8x0.5m

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.8x0.5m

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.8x0.5m

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.9x0.6m

SECTION 6

A

B

C

D

E

F

G

H

I

48,8 6,1

6,1

0,12 0,8

WOOD BEAM 0.25x0.80cm

0,9

6,1

A WOOD BEAMS

LIFT ROOF t=20cm

WOOD PILAR 25x15cm B

C

D

RW02 E

F

REINF. CONCRETE SLAB t=30cm

6,1

6,1

6,1

6,1

H

I

WOOD ROOF FLOOR

+3.60m WOOD BEAMS 0.15x0.45cm

WOOD SLAB t=45cm

+5.42m WOOD JOIST 0.15x0.25cm

REINF. CONCRETE PILAR 25x50cm

+4.50m GROUNDFLOOR

PW08

LIFT ROOF t=20cm

WOOD PILAR 25x15cm

RW02

REINF. CONCRETE SLAB ROOF FLOOR ±0.00m t=35cm REINF. CONCRETE SLAB +3.45m t=30cm

REINF. CONCRETE RETAINING WALL t=25cm

REINF. CONCRETE STAIR SLAB t=25cm

-3.00m

BEDROOM FLOOR -1 GROUNDFLOOR REINF. CONCRETE DECK -3.50m REINF. t=15cmCONCRETE SLAB ±0.00m t=35cm -3.95m

W24

REINF. CONCRETE

SW03 WALL t=25cm

S03

REINF. CONCRETE STAIR SLAB t=25cm

21 STAIRS 28X16.6CM

-3.00m SW03 WALL t=25cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE ISOLATED FOOTING 2x2.3m / h=0.6m

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 0.8x0.6m

BEDROOM FLOOR -1

W24

REINF. CONCRETE

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.5x0.5m

-3.50m

REINF. CONCRETE PILAR 25x50cm

RW06

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.9x0.6m

RW06

REINF. CONCRETE LOAD-BEARING WALL t=25cm

W23

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE DECK -3.90m t=15cm

W22

INDUSTRIAL DECK

REINF. CONCRETE LOAD-BEARING WALL t=25cm

3,15

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.9x0.6m

START OF STAIR FOOTING 0.8x0.5m

PC10

REINF. CONCRETE RETAINING WALL t=36cm

W08 LIFT PIT h=50cm

RW05

REINF. CONCRETE PILAR 25x50cm

RW06

S03 21 STAIRS 28X16.6CM

PC09

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

W23

REINF. CONCRETE LOAD-BEARING WALL t=25cm

W22

3,153,15

REINF. CONCRETE DECK -3.90m t=15cm

REINF. CONCRETE PILAR 25x50cm

WOOD SLAB t=92cm

W08

INDUSTRIAL DECK

PC10

6,1

REINF. CONCRETE RETAINING WALL t=36cm

0,8 3,15 0,12 0,9

WOOD PERGOLA

PC09

6,1

REINF. CONCRETE RETAINING WALL t=36cm

6,1

-4.20m

0,4

+3.45m

G

48,8

WOOD BEAM 0.25x0.80cm

REINF. CONCRETE RETAINING WALL t=36cm

WOOD SLAB t=92cm

ROOF FLOOR

REINF. CONCRETE RETAINING WALL t=25cm

CLT PANEL 0.12m

REINF. CONCRETE RETAINING WALL t=36cm

6,1

+4.50m

PW08

WOOD SLAB t=45cm

0.15x0.45cm

RW05

SECTION 7

6,1

WOOD ROOF FLOOR

REINF. CONCRETE LOAD-BEARING WALL t=25cm

0,45

6,1

+5.42m WOOD JOIST 0.15x0.25cm

WOOD PERGOLA

6,1

0,45 0,35

6,1

CLT PANEL 0.12m

+3.60m

0,350,4

6,1

REINF. CONCRETE DECK t=15cm

RW06

REINF. CONCRETE RETAINING WALL t=36cm

-3.95m

-4.20m LIFT PIT h=50cm REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.9x0.6m

START OF STAIR FOOTING 0.8x0.5m

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.5x0.5m

S-7 S-6

!"#$%&

!"#$%&'(%#)!*+,-&%"#+*.*/*0*1*1:150 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

REINF. CONCRETE ISOLATED FOOTING 2x2.3m / h=0.6m

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 0.8x0.6m

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.9x0.6m


0,12

0.12m

0,8

WOOD JOIST 0.15x0.25cm

A

B

+3.45m

+4.50m W05

W04

ROOF FLOOR

0,9

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE SLAB t=30cm

REINF. CONCRETE LOAD-BEARING WALL

C

D

E

G t=25cm

F

H

I

48,8 6,1

6,1

6,1

PC01

6,1

WOOD SLAB t=92cm

CLT PANEL 0.12m

W19

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE REINF. CONCRETE RETAINING LOAD-BEARING WALL t=36cm WALL t=36cm

W18 RW05

METAL SLAB t=30cm

PC02 REINF. CONCRETE PILAR 25x50cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

METAL SLAB t=30cm INDUSTRIAL DECK ±0.00 REINF. CONCRETE DECK -3.90m t=15cm

METALLIC BEAMS IPE 300 METALLIC JOISTS IPE 200

REINF. CONCRETE SLAB

PC01 REINF. CONCRETE PILAR 25x50cm

W05

±0.00

METALLIC WALKWAY GROUNDFLOOR ±0.00m t=35cm

REINF. CONCRETE PILAR 25x50cm

RW06

±0.00m t=35cm REINF. CONCRETE SLAB +3.45m t=30cm

PC02

REINF. CONCRETE PILAR 25x50cm

+4.50m METALLIC WALKWAY

W04

METALLIC BEAMS IPE 300 REINF. CONCRETE METALLIC JOISTS IPE 200 LOAD-BEARING WALL t=25cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

W18

GROUNDFLOOR ROOF FLOOR REINF. CONCRETE SLAB

6,1

+5.42m WOOD JOIST 0.15x0.25cm

W21

WOOD BEAM 0.25x0.80cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE LOAD-BEARING WALL t=36cm

0,8 3,15 0,12 0,9

6,1

WOOD ROOF FLOOR

0,45 0,35 3,15 3,15 0,35 0,4

6,1

REINF. CONCRETE RETAINING WALL t=36cm

6,1

W20

0,45

+5.42m

WOOD BEAM 0.25x0.80cm

REINF. CONCRETE BRACING BEAM 40x40cm

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.9x0.6m

RW06

REINF. CONCRETE ISOLATED FOOTING 2x2.3m / h=0.6m

REINF. CONCRETE RETAINING WALL t=36cm

REINF. CONCRETE DECK

W21

INDUSTRIAL DECK -3.90m t=15cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.5x0.5m

W20

W19

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE RETAINING WALL t=36cm

RW05

3,15 0,4

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.5x0.5m

REINF. CONCRETE LOAD-BEARING WALL t=25cm

-4.20m REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 2x0.5m

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.9x0.6m

-4.20m REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 2x0.5m

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.9x0.6m

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.5x0.5m

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.5x0.5m

REINF. CONCRETE ISOLATED FOOTING 2x2.3m / h=0.6m

REINF. CONCRETE BRACING BEAM 40x40cm

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.9x0.6m

SECTION 8

A

B

C

D

E

F

G

H

I

48,8 6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

WOOD ROOF FLOOR 0,12

CLT PANEL 0.12m

0,8

WOOD BEAM 0.25x0.80cm

WOOD JOIST 0.15x0.25cm

A

B

+3.45m

REINF. CONCRETE SLAB t=30cm

WOOD SLAB t=92cm

+4.50m

ROOF FLOOR

0,9 0,45

+5.42m

C

D

HYDRAULIC PLATFORM ROOF t=20cm

INSTA. FLOOR REINF. CONCRETE ESLAB t=20cm

REINF. CONCRETE LOAD-BEARING WALL t=36cm

6,1

G

6,1

6,1

H

6,1

I

6,1

WOOD ROOF FLOOR

WOOD BEAM 0.25x0.80cm

W18

0,8 3,15 0,12

6,1

CLT PANEL 0.12m

+5.42m WOOD JOIST 0.15x0.25cm

WOOD SLAB t=92cm

+4.50m GROUNDFLOOR

HYDRAULIC PLATFORM ROOF t=20cm

ROOF FLOOR +3.45m

0,45 0,35

0,9

6,1

F

48,8

+2.95m 6,1

REINF. CONCRETE SLAB t=30cm

GROUNDFLOOR TERRACE

REINF. CONCRETE SLAB t=35cm ±0.00m FLOOR INSTA.

-0.05m

REINF. CONCRETE SLAB t=20cm

REINF. CONCRETE SLAB t=30cm

HYDRAULIC PLATFORM PIT h=60cm REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.9x0.6m

START OF STAIR FOOTING 0.6x0.5cm

REINF. CONCRETE SLAB t=30cm

RW06

GROUNDFLOOR TERRACE -0.05m

REINF. CONCRETE RETAINING WALL t=36cm

W16

REINF. CONCRETE LOAD-BEARING WALL t=25cm

W15

REINF. CONCRETE LOAD-BEARING WALL t=15cm

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.9x0.6m

RW06

RAINWATER TANK

REINF. CONCRETE RETAINING WALL t=36cm

REINF. CONCRETE DECK

W16

INDUSTRIAL DECK -3.90m t=15cm

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.5x0.5m

W15

REINF. CONCRETE WALL t=16cm SW01

W14

REINF. CONCRETE STAIR SLAB t=16cm

W13

-2.04m

S01

REINF. CONCRETE LOAD-BEARING WALL t=15cm

-4.95m 23 STAIRS 28x16.9cm

REINF. CONCRETE LOAD-BEARING WALL t=15cm

W11

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE RETAINING WALL t=36cm

RW05

3,15 0,4

SECTION 9

START OF STAIR FOOTING 0.6x0.5cm

RAINWATER TANK

-4.20m

HYDRAULIC PLATFORM PIT h=60cm REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.9x0.6m

GROUNDFLOOR INDUSTRIAL DECK SLAB REINF. CONCRETE ±0.00m REINF. t=35cmCONCRETE DECK -3.90m t=15cm

REINF. CONCRETE LOAD-BEARING WALL t=15cm

W13

REINF. CONCRETE WALL t=16cm SW01

W14

-2.04m

REINF. CONCRETE STAIR SLAB t=16cm

REINF. CONCRETE LOAD-BEARING WALL t=15cm

23 STAIRS 28x16.9cm

S01

REINF. CONCRETE LOAD-BEARING WALL t=15cm

W11

REINF. CONCRETE LOAD-BEARING WALL t=25cm

REINF. CONCRETE REINF. CONCRETE RETAINING LOAD-BEARING WALL t=36cm WALL t=36cm

W18 RW05

0,350,4

3,15 3,15

+2.95m

-4.20m

-4.95m

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.5x0.5m

S-9 S-8

!"#$%&

!"#$%&'(%#)!*+,-&%"#+*.*/*0**1*1:150 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

REINF. CONCRETE LOAD-BEARING WALL STRIP FOOTING 1.9x0.6m


GROUNDFLOOR REINF. CONCRETE SLAB t=35cm ±0.00m

METALLIC WALKWAY METAL SLAB t=30cm ±0.00m

R04 R03

M06

METALLIC PILAR HEB 140

M05

M01

M02

M03

METALLIC BEAM IPE 300

C02 C01 INDUSTRIAL DECK REINF. CONCRETE DECK t=15cm -3.90m

0x M03 M02

WOOD W01- Cross-laminated timber (CLT) board, made by glueing together and perpendicullary oriented 5 layers of solid-wood (30-20-20-20-30mm). t=120mm W02- Lag screw every 30cm, to join the CLT board with the timber beams and joists. W03- Concealed bracket with holes by Rothoblaas. Timber-to-timber and timber-to-concrete shear joint. W04- Self-drilling dowels to fix the profile’s web with timber joist and beams. ø7,5x115mm W05- LBS screws to fix the profile’s glange with the timber beam. ø5x60mm CONCRETE C01- Shear nail; clean surface, rough and moistened before concrete work. C02- Polystyrene foam for expansion joint.

WELDED MESH

COMPACTED GROUND

REINFORCED CONCRETE DECK T=15CM

BLINDING CONCRETE T=10CM

COMPACTED GROUND

R01 SUPPORT WEDGES

SUPPORT WEDGES

R10

CONCRETE BASE T=50MM

R02

BACKFILL DRAINATGE DITCH WITH GRAVEL

-4.20m REINF. CONCRETE ISOLATED FOOTING 0.9X0.9M | H=0.5M

R09- Wire mesh. R10- Stirrups reinforcement.

C03- Raindrop. STEEL REINFORCEMENT R01- Lower footing reinforcement. R02- Upper footing reinforcement. R03- Lower slab reinforcement. R04- Upper slab reinforcement. R05- Wall reinforcement. R06- Stair footing reinforcement. R07- Lower stair reinforcement. R08- Upper stair reinforcement. R11- Steel connector for concrete union.

!"#$%&

!"#$%&'())"'#*()&+&,"#$*%&-&1:25 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

METAL M01- Steel base plate with holes, welded to metallic pilars and beams. M02- Levelling mortar Sika grout type or similar. M03- Anchor bolts for concrete M04- SKR self-drilling screw for concrete with chemical achor. M05- Gusset plate, welded to connect metallic beams and plate in slab. M06- Gusset plate welded to metallic beams in each pilar.


WOOD ROOF FLOOR WOOD SLAB t=92cm +5.42m

WOOD PERGOLA WOOD SLAB t=45cm +3.60m

ROOF FLOOR REINF. CONCRETE SLAB t=30cm +3.45m W03

W03

W04

W01

W02

W03

W04

W05

CLT BOARD T= 12CM

WOOD JOIST 15X25CM

W04

M04

W05

WOOD BEAMS 15X45CM

M04

METALLIC PILAR 8CM

M01

REINF. CONCRETE WALL T=25CM

R04

W04

R03

M03

C01

WOOD BEAM 25X80CM

R05

REINF. CONCRETE WALL T= 25CM

M02

M03 R05

M01 M03 M02

GROUNDFLOOR TERRACE REINF. CONCRETE SLAB t=30cm -0.05m

R04 R03 C03

WOOD W01- Cross-laminated timber (CLT) board, made by glueing together and perpendicullary oriented 5 layers of solid-wood (30-20-20-20-30mm). t=120mm W02- Lag screw every 30cm, to join the CLT board with the timber beams and joists. W03- Concealed bracket with holes by Rothoblaas. Timber-to-timber and timber-to-concrete shear joint. W04- Self-drilling dowels to fix the profile’s web with timber joist and beams. ø7,5x115mm W05- LBS screws to fix the profile’s glange with the timber beam. ø5x60mm CONCRETE C01- Shear nail; clean surface, rough and moistened before concrete work. C02- Polystyrene foam for expansion joint.

R09- Wire mesh. R10- Stirrups reinforcement.

C03- Raindrop. STEEL REINFORCEMENT R01- Lower footing reinforcement. R02- Upper footing reinforcement. R03- Lower slab reinforcement. R04- Upper slab reinforcement. R05- Wall reinforcement. R06- Stair footing reinforcement. R07- Lower stair reinforcement. R08- Upper stair reinforcement. R11- Steel connector for concrete union.

!"#$%&

!""#$%"&&'%()"&$*$#'(+),$-$1:25 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

METAL M01- Steel base plate with holes, welded to metallic pilars and beams. M02- Levelling mortar Sika grout type or similar. M03- Anchor bolts for concrete M04- SKR self-drilling screw for concrete with chemical achor. M05- Gusset plate, welded to connect metallic beams and plate in slab. M06- Gusset plate welded to metallic beams in each pilar.


WOOD ROOF FLOOR WOOD SLAB t=92cm +5.42m STAIR LANDING REINF. CONCRETE SLAB t=18cm -2.04m

WOOD PERGOLA WOOD SLAB t=45cm +3.60m

R08 R09

ROOF FLOOR REINF. CONCRETE SLAB t=30cm +3.45m

R07

W03 W03 R11

W04

W01

W02

W03

W04

W05

CLT BOARD T= 12CM

WOOD JOIST 15X25CM

W04

M04

W05

WOOD BEAMS 15X45CM

M04

METALLIC PILAR 8CM

REINF. CONCRETE WALL T=25CM

M01

W04 M03 WOOD BEAM 25X80CM REINF. CONCRETE WALL T= 25CM

R04 BEDROOM FLOOR -1 REINF. CONCRETE DECK t=15cm -3.50m

R03 C01 R05

M02

M03

INDUSTRIAL DECK REINF. CONCRETE DECK t=15cm -3.90m

R05

REINF. CONCRETE STAIR SLAB T=16CM

R11

-4.20m

REINF. CONCRETE WALL T=16CM

R05 C01 INDUSTRIAL DECK REINF. CONCRETE DECK t=15cm -3.90m

C02

R05

SUPPORT WEDGES BLINDING CONCRETE T=10CM

R01 SUPPORT WEDGES BLINDING CONCRETE T=10CM

R04

COMPACTED GROUND

R03

COMPACTED GROUND

WOOD W01- Cross-laminated timber (CLT) board, made by glueing together and perpendicullary oriented 5 layers of solid-wood (30-20-20-20-30mm). t=120mm W02- Lag screw every 30cm, to join the CLT board with the timber beams and joists. W03- Concealed bracket with holes by Rothoblaas. Timber-to-timber and timber-to-concrete shear joint. W04- Self-drilling dowels to fix the profile’s web with timber joist and beams. ø7,5x115mm W05- LBS screws to fix the profile’s glange with the timber beam. ø5x60mm CONCRETE C01- Shear nail; clean surface, rough and moistened before concrete work. C02- Polystyrene foam for expansion joint.

WELDED MESH

R06

C03

R09- Wire mesh. R10- Stirrups reinforcement.

C03- Raindrop. STEEL REINFORCEMENT R01- Lower footing reinforcement. R02- Upper footing reinforcement. R03- Lower slab reinforcement. R04- Upper slab reinforcement. R05- Wall reinforcement. R06- Stair footing reinforcement. R07- Lower stair reinforcement. R08- Upper stair reinforcement. R11- Steel connector for concrete union.

!"#$%&

!"#$%!&!"#%"&'&($)"&*$"&+&,-"#$(&.&1:25 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

METAL M01- Steel base plate with holes, welded to metallic pilars and beams. M02- Levelling mortar Sika grout type or similar. M03- Anchor bolts for concrete M04- SKR self-drilling screw for concrete with chemical achor. M05- Gusset plate, welded to connect metallic beams and plate in slab. M06- Gusset plate welded to metallic beams in each pilar.

SUPPORT WEDGES

R02

CONCRETE BASE T=50MM

-3.90m

GROUNDFLOOR TERRACE REINF. CONCRETE SLAB t=30cm -0.05m

BACKFILL DRAINATGE DITCH WITH GRAVEL

M02 REINF. CONCRETE LIFT PIT FOOTING 2.75X2.75M | H=0.5M

R10 R10

COMPACTED GROUND

WELDED MESH

REINFORCED CONCRETE DECK T=15CM

SUPPORT WEDGES

REINF. CONCRETE START OF STAIR FOOTING 0.6X0.5M

CONCRETE BASE T=50MM

BACKFILL DRAINATGE DITCH WITH GRAVEL

-4.20m

LIFT PIT H= 50CM -4.95m

COMPACTED GROUND

M01 REINF. CONCRETE RETAINING WALL T= 25CM M03

REINFORCED CONCRETE DECK T=15CM

C01


WOOD ROOF FLOOR WOOD SLAB t=92cm +5.42m

BEDROOM BEDROOM FLOOR -1 FLOOR -1 REINF. CONCRETE REINF. CONCRETE DECK DECK t=15cm t=15cm -3.50m -3.50m

C01

C01

C02

C02

WOOD PERGOLA WOOD SLAB t=45cm +3.60m

ROOF FLOOR REINF. CONCRETE SLAB t=30cm +3.45m W03

W01

W02

W03

W04

W05

BEDROOM FLOOR -1 BEDROOM FLOOR -1 REINF. CONCRETE DECK DECK REINF. CONCRETE t=15cm t=15cm -3.50m -3.50m

REINF. CONCRETE WALL T=25CM

R01

SUPPORT WEDGESWEDGES SUPPORT BLINDING BLINDING CONCRETE CONCRETE T=10CM T=10CM COMPACTED COMPACTED GROUNDGROUND

M01 M03 M02

GROUNDFLOOR TERRACE REINF. CONCRETE SLAB t=30cm -0.05m

R04 R03 C03

WOOD W01- Cross-laminated timber (CLT) board, made by glueing together and perpendicullary oriented 5 layers of solid-wood (30-20-20-20-30mm). t=120mm W02- Lag screw every 30cm, to join the CLT board with the timber beams and joists. W03- Concealed bracket with holes by Rothoblaas. Timber-to-timber and timber-to-concrete shear joint. W04- Self-drilling dowels to fix the profile’s web with timber joist and beams. ø7,5x115mm W05- LBS screws to fix the profile’s glange with the timber beam. ø5x60mm CONCRETE C01- Shear nail; clean surface, rough and moistened before concrete work. C02- Polystyrene foam for expansion joint.

R09- Wire mesh. R10- Stirrups reinforcement.

C03- Raindrop. STEEL REINFORCEMENT R01- Lower footing reinforcement. R02- Upper footing reinforcement. R03- Lower slab reinforcement. R04- Upper slab reinforcement. R05- Wall reinforcement. R06- Stair footing reinforcement. R07- Lower stair reinforcement. R08- Upper stair reinforcement. R11- Steel connector for concrete union.

!"#$%&

!"#$%#&'()"%*+%,"-",%.%!"/'0,%1%1:25 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

METAL M01- Steel base plate with holes, welded to metallic pilars and beams. M02- Levelling mortar Sika grout type or similar. M03- Anchor bolts for concrete M04- SKR self-drilling screw for concrete with chemical achor. M05- Gusset plate, welded to connect metallic beams and plate in slab. M06- Gusset plate welded to metallic beams in each pilar.

REINFORCED CONCRETE DECK T=15CM

R10

COMPACTED GROUND

R10 R01

SUPPORT WEDGES REINFORCED CONCRETE DECK T=15CM

R02

WELDED MESH COMPACTED GROUND

COMPACTED COMPACTED GROUNDGROUND

R02

CONCRETE BASE T=50MM

BLINDING CONCRETE BLINDING CONCRETE T=10CM T=10CM

-3.95m -3.95m REINF. CONCRETE REINF. CONCRETE LOAD-BEARING LOAD-BEARING WALL STRIP WALL FOOTING STRIP FOOTING 0.9X0.5M0.9X0.5M

CONCRETE BASE T=50MM WELDED MESH

M03 R05

SUPPORT SUPPORT WEDGESWEDGES

R04

R05

BACKFILL SUPPORT DRAINATGE WEDGES DITCH WITH GRAVEL

R01

M01

BACKFILL DRAINATGE DITCH WITH GRAVEL

R01

M04

R04

M02

CONCRETE BASE T=50MM

R10

REINF. CONCRETE WALL -4.20m -4.20m T= 25CM

BACKFILL DRAINATGE DITCH WITH GRAVEL

R10

R03

R04

C01

REINFORCED CONCRETE DECK T=15CM BACKFILL DRAINATGE DITCH WITH GRAVEL

R02

W05

R03

W04 M04

R03

WELDED MESH

R02

C01

M03

COMPACTED GROUND CONCRETE BASE T=50MM

REINF. CONCRETE REINF. CONCRETE LOAD-BEARING LOAD-BEARING WALL STRIP WALL FOOTING STRIP FOOTING 1.5X0.6M1.5X0.6M

C01

W04

WOOD BEAM 25X80CM

WELDED MESH COMPACTED GROUND

REINF. CONCRETE RETAINING REINF. CONCRETE RETAINING WALL WALL T= 25CMT= 25CM

WOOD BEAMS BEDROOM FLOOR -1 BEDROOM FLOOR -1 15X45CM REINF. CONCRETE SLAB REINF. CONCRETE SLAB t=30cm t=30cm METALLIC PILAR -3.50m -3.50m 8CM

C02

W04

SUPPORT WEDGES REINFORCED CONCRETE DECK T=15CM

R05

INDUSTRIAL DECK DECK INDUSTRIAL REINF. CONCRETE DECK DECK REINF. CONCRETE t=15cm t=15cm -3.90m -3.90m

SUPPORT WEDGES

R05

CLT BOARD T= 12CM

WOOD JOIST 15X25CM

W03 C02


!"| !"#"$"%"&"'"("!"&")"#"$ #$"%&& #'()*+,#*-./")'0,*-'( #$"%&% ROOF FINISHES #$"%&1 PAVEMENT FINISHES #$"%&2 WALL FINISHES #$"%&3 EXTERIOR MATERIALS #$"%&4 ROOF TYPES #$"%&5 PAVEMENT TYPES #$"%&6 WALL TYPES #$"%&7 WALL TYPES #$"1&& 80''+"90:()"%;%4& #$"1&% FLOOR -1 PLAN #$"1&1 GROUNDFLOOR PLAN #$"1&2 MAIN ROOF PLAN #$"1&3 SECONDARY ROOF PLAN #$"2&& *+:()./+):0")/#*-'()"%;%&& #$"2&% TRANSVERSAL SECTION 1 #$"2&1 TRANSVERSAL SECTION 2 #$"2&1 TRANSVERSAL SECTION 4 #$"2&2 TRANSVERSAL SECTION 5

!"#$$"!

!"#$$%" !&'()*#% #$"3&& 0'(<-*,=-(:0")/#*-'()"%;%&& #$"3&% LONGITUDINAL SECTON 6 #$"3&1 LONGITUDINAL SECTION 7 #$"3&2 LONGITUDINAL SECTION 8 #$"3&3 LONGITUDINAL SECTION 9 #$"3&4"LONGITUDINAL SECTION 10 #$"4&& #'()*+,#*-./"=/*:-0)"%;1& #$"4&% DETAIL 1 #$"4&1 DETAIL 2 #$"4&2 DETAIL 3 #$"4&3 DETAIL 4 #$"4&4 DETAIL 5 #$"4&5 DETAIL 6 #$"4&6 DETAIL 7 #$"4&7 DETAIL 8 #$"5&& *>9/"?/=+''@"%;4& #$"5&% BEDROOM PLAN #$"5&1 BEDROOM SECTIONS 1-2 #$"5&2 BEDROOM SECTIONS 3-4 #$"5&3 BEDROOM SECTIONS 5-6 !"#$$+" !&'()*#+

WINERY AND HOTEL SIURANA | September 2020 Final Thesis Project - Júlia Boix Gonzalez

#$"2&2 TRANSVERSAL SECTION 3


!"#$%&'!%()*+$",'%("#

The project, is designed in order to have a strong and cold visual effect in the industrial areas and the ones in contact with the ground, and a warm and homey effect for the cellar and hotel areas, attracting and welcoming the guests.

#$"%&&

!"#$%&'!%()*+$",'%("# *)$+',"-$."/#&+0"%)('-$-"1"%&'()'"*"'+,-+./+0"1#1#

!"#$2"!

Final Thesis Project | JĂşlia Boix Gonzalez

INDUSTRIAL WINERY The industrial area of the volume is characterized by being a reinforced concrete closed box, having punctual openings in strategic points and using wood as the secondary material for partitions and interior elements. The industrial volume of the project is as well characterized by having a central double height area underneath the secondary timber roof where the wine tanks are located. It is an easy construction, as the same reinforced concrete load-bearing walls are seen from both interior and exterior sides in most of the rooms; those which need specific thermal conditions and insulation, are internally coated with wood. The winery can be perceived from the exterior of the building as an industrial building due to the straight walls and enclosures as well as for the large dimensions of the volume.

CELLAR AND HOTEL For the warm and habitable areas of the cellar and hotel, a different construction and material strategy has been used. Wood is the main material used in these two volumes, a warm material which allows layered walls with insulation in between. All the areas which are in contact with the structure and need to be thermally insulated, are coated with wood to break the thermal bridge with the exterior. The facades, floors and false ceilings have mainly a wood finishing, having some habitable areas a white gypsum finish as well. Those areas which do not need to be air-conditioned, are left with a raw concrete structural finish as for the inside of the communications core

WINERY AND HOTEL SIURANA | September 2020

DESIGN

For the design of the building, different material and construction strategies are used giving a direct response to the different two primary uses of the building.


GRAVEL Protection layer with ø20-35mm gravel with rounded edge as the finishing of the flat non-trafficable inverted roof of the building.

PRECAST CONCRETE TILE Precast concrete pavement of non-slipping tiles of 120x120cm and 3cm thickness, supported by adjustable self-leveling supports, as the finish layer of the flat trafficable inverted roofs at the Ground Floor exterior terraces.

!"#$%$

!""#$#%&%'()' !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

ZINC For the finishing of the secondary roof, the light cross laminated timber roof, a zinc plate finishing of 0.6mm, with structure separation sheet is used.


WOOD PARQUET Pine-wood parquet flooring, made with panels of 20x120cm and 3cm thickness, fixed on wood battens with wool insulation in between. Used as the pavement in the habitable warm areas of the project: cellar and hotel rooms.

POLISHED CONCRETE Polished concrete paving lightened and with high resistance, rendered with quarz powder, cut and sealed every 5m for expansion. Used as the flooring of the communication cores of each volume.

EPOXY RESIN CERAMIC TILE Epoxy resin finishing of 1cm, with a dark grey colour and matt finish. Layered on top of polished Ceramic tile pavement with non-slipping porcelain stoneware 60x60cm tile, with a light grey finish. concrete paving, lightened and with high resistance. Epoxy resin is used in the industrial rooms due Used as the bathrooms’ and changing room’s flooring at the communication cores. to its high resistance and strength, impermeability and long durability.

!"#$%&

!"#$%$&'()*&*+,$+ !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././


WOOD Pine-wood finish boards of 120x300m and 2cm thick used as the exterior and interior wall finish of the habitable warm areas as well as for the partitions in the industrial areas. For the exterior, a wood treatment with oils and wax is used.

CONCRETE Structural reinforced concrete wall, with raw seen finish. Used for the industrial area, the exterior facades and for the communication cores walls. For the exterior seen concrete, specially for the horizontal areas, it is used a concrete with higher resistance, athicker coating and a waterproof treatment.

GLASS GYPSUM DRYWALL MICROCEMENT CLADDING Gypsum drywall white and matt finish, painted plain white is used in the hotel corridor and bed- On top of gypsum boards, a microcement coating of 3mm is applied. Used in the interior of the Insualting glass, with low emissive and vacuum chamber, with integrated acoustic insulation, used mainly in the cellar and hotel areas, and punctually in the industrial zone. Allows light and views rooms. bathrooms, toilets and changing rooms of the project. inside the building.

!"#$%&

!"##$%&'&()*( !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././


GRAPEVINES Large plantation of grapevines is cultivated in order to obtain grapes for making the wine, some of of the grapevines are already existing and other ones are planted while the construction of the building. The grapevines area is located in between the Winery and Hotel and the existing Mas Siurana farmhouse.

GRASS Compacted ground with grass layer is already existing in the site. Located in the exterior of the Ground Floor entrance terrace and the north side of the mountain where the pine forest is found and in the exterior of the lateral facades of the building.

SLATE ROCKS The slate rock or ‘licorella’ is a ypical material found in the terrains of the Priorat, always present in vineyards; found in the ground of the grapevines.

!"#$%&

!"#!$%&$'()#!$%)*+ !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

SOIL Compacted layer of already existing soil, taken from the site due to the earthworks. Used in the exterior of the Ground Floor entrance terrace.


R03.1 R03.2

R01.1 R01.3 R01.6

R01.5

R02.1

R01.2

R02.4

R01.4 R02.7

R01.7 R02.9

R01 FLAT NON-TRAFFICABLE INVERTED ROOF WITH GRAVEL FINISH R01.1- Protection layer with ø20-35mm gravel with rounded edge. R01.2- Protective polypropylene geotextile sheet R01.3- Rigid boards of extruded polystyrene thermal insulation. t=40mm R01.4- Modified bitumen waterproofing membrane for roofs. R01.5- Protective polypropylene geotextile sheet. R01.6- Slope formation with cellular concrete. ID:300kg/m3 R01.7- Vapor barrier.

R02.6

R03.4

R02.3 R02.2

R02.5

R03.7

R03.6

R03.3 R03.5

R02.8

R02 FLAT TRAFFICABLE INVERTED ROOF WITH PRECAST CONCRETE FLOATING FINISH R02.1- Finished floating pavement with non-slipping precast concrete tiles of 120x120cm. t=30mm R02.2- Adjustable self-leveling supports for floating pavement. R02.3- Protective polypropylene geotextile sheet. R02.4- Rigid boards of extruded polystyrene thermal insulation. t=40mm R02.5- Modified bitumen waterproofing membrane for roofs. R02.6- Protective polypropylene geotextile sheet. R02.7- Slope formation with cellular concrete. ID:300kg/m3 R02.8- Anti-impact sheet, placed on slab above bedrooms only. t=5mm R02.9- Vapor barrier.

!"#$%&

!""#$%&'() !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

R03 LIGHT WOODEN CLT ROOF WITH ZINC FINISH R03.1- Zinc plate finishing, with structured separation sheet. t=0.6mm R03.2- Oriented strand board (OSB), mechanically fixed to wooden battens. t=18mm R03.3- Ventilated chamber. t=20mm R03.4- Slope formation with wooden battens of variable height, following the roof slope. R03.5- Rigid boards of extruded polystyrene thermal insulation. t=80mm R03.6- Vapor barrier. R03.7- Cross-laminated timber (CLT) board, made from 5 glued together and perpendicullary oriented layers of solid-wood (30-20-20-20-30mm). t=120mm


P01.1

P02.1

P01.3

P03.2

P03.1

P01.2

P01 INTERIOR WOOD PAVEMENT P01.1- Pine wood parquet flooring, panels of 20x120cm. t=3cm P01.2- Pinewood battens of 5x7cm, in one direction, punctually fixed. (Anit-impact sheet t=5mm, placed under battens above bedroms). P01.3- Rock wool insulation between battens. t=7cm

P02 INTERIOR POLISHED CONCRETE FLOOR P02.1- Polished concrete paving lightened and with high resistance, rendered with quartz powder, cut and sealed every 5m for expansion. t=10cm

P04.1 P04.3

P05.1

P04.2

P03 INTERIOR CONCRETE FLOOR WITH EPOXY RESIN FINISH P03.1- Epoxy resin finishing, dark grey colour and matt finish. t=1cm P03.2- Polished concrete paving, lightened and with high resistance, cut and sealed every 5m for expansion. t=9cm

P05.1

P05.4 P05.3

P05.2

P04 INTERIOR CERAMIC PAVEMENT P04.1- Non-slipping porcelain stoneware tile, of 60x60cm. t=2cm. P04.2- Portland cement mortar bond coat. t=1cm. P04.3- Levelling screed layer. t=7cm.

P05 TEAKWOOD DECK FLOOR P05.1- Teakwood deck flooring with non-slipping treatment, made by 20x120cm panels. t=3cm. P05.2- Wooden battens of variable height, following the slab slope, punctually fixed on slab. P05.4- Two-layered bituminous impermeable membrane. t=3mm

!"#$%&

!"#$%$&'(')!$* !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

P05 TEAKWOOD DECK FLOOR P05.1- Teakwood deck flooring with non-slipping treatment, made by 20x120cm panels. t=3cm. P05.3- Wooden battens of 5x7cm, punctually fixed on slab.


W01.1

W02.1

W03.1 W02.2

W01.1

W03.2 W02.1

W03.1 W02.2

W03.2

W02.3

W03.3 W02.4

W03.4 W02.3 W02.5

W03.3 W02.4

W03.4 W02.5

W01 REINFORCED CONCRETE WALL W01.1- Structural in situ reinforced concrete wall, with raw seen finish. Dimensions according to structrure plans.

W02 REINFORCED CONCRETE WALL COATED WITH GYPSUM BOARD AND MICROCEMENT FINISH W02.1- Structural in situ reinforced concrete wall, with raw seen finish. Dimensions according to structure plans.

INDUSTRIAL | BOXES

W03 REINFORCED CONCRETE INTERIOR WALL COATED WITH GYPSUM BOARD W03.1- Structural in situ reinforced concrete wall, with raw seen finish. Dimensions according to structure plans. W03.2- Galvanized U shape steel profiles, placed in two directions every 60cm. t=4cm W03.3- Rock wool insulation placed between profiles. t=4cm W03.4- Double gypsum board. t=25mm

COMMUNICATIONS - BATHROOM

BEDROOM - BEDROOM

W05.3 W05.1 W05.2 W05.3

W05.4 W05.5

W04.1 W04.2

W05.1 W05.2 W05.7 W05.4 W05.5

W04.1

W05.7

W04.2 W05.6

W04.3

W05.8

W04.4 W04.3 W04.5

W05.9 W05.6 W05.10 W05.8

W04.4

W05.9 W05.10

W04.5

W04 REINFORCED CONCRETE INTERIOR WALL COATED WITH WOOD W04.1- Structural in situ reinforced concrete wall, with raw seen finish. Dimensions according to structure plans. W04.2- Wooden wall framing studs 4x4cm, placed in two directions every 60cm. W04.3- Rock wool insulation placed between studs. t=4cm (15cm in barrel store) W04.4- Oriented strand board (OSB), mechanically fixed to wooden studs. t=18mm W04.5- Pinewood interior finish board 120x300cm. t=20mm

W05 PINEWOOD VENTILATED FACADE W05.1- Exterior pinewood board 120x300m, treated with oils and wax. t=20mm W05.2 - Ventilated chamber. t=20mm W05.3- Wooden wall framing studs 2x4cm, placed every 60cm. W05.4 - Breathable membrane. W05.5- Oriented strand board (OSB), mechanically fixed to wooden studs. t=18mm W05.6 - Rock wool insulation placed between studs. t=10cm W05.7- Wooden wall framing studs 10x5cm, placed in two directions every 60cm. W05.8- Oriented strand board (OSB), mechanically fixed to wooden studs. t=18mm W05.9- Vapor barrier. W05.10- Pinewood interior finish board 120x300cm. t=20mm

WINERY - COMMUNICATIONS | INDUSTRIAL - COMMUNICATIONS

EXTERIOR - WINERY

!"#$%&

!"##$%&'() !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././


W06.1 W07.1 W06.2 W06.3

W07.2

W06.1 W06.4

W08.1

W07.3 W07.1

W08.2

W06.2 W06.3

W07.2 W06.4

W08.1

W07.3

W06.5

W08.2

W07.4 W06.6

W06.7

W08.3 W07.5

W06.5

W08.4 W07.4 W07.6

W06.6

W08.3

W06.7

W07.5

W08.4 W07.6

W06 PINEWOOD FACADE W06.1- Exterior pinewood board 120x300m, treated with oils and wax. t=20mm W06.2 - Breathable membrane. W06.3- Oriented strand board (OSB), mechanically fixed to wooden studs. t=18mm W06.4- Wooden wall framing studs 10x5cm, placed in two directions every 60cm. W06.5- Rock wool insulation placed between profiles. t=10cm W06.6- Vapor barrier. W06.7- Pinewood interior finish boards 120x300cm. t=20mm

W07 INTERIOR GYPSUM DRYWALL WITH MICROCEMENT AND PINEWOOD FINISH CORRIDOR WC BEDROOM W07.1- Microcement coating. t=3mm W07.2- Double waterproofed gypsum board. t=25mm W07.3- Galvanized U shape steel profiles, placed in two directions every 60cm. t=4cm W07.4- Rock wool insulation placed between profiles. t=10cm W07.5- Double gypsum board. t=25mm W07.6 - Pinewood interior finish board 120x300cm. t=20mm

EXTERIOR - BEDROOM

BATHROOM - CORRIDOR

W09.1

W10.1

W09.2

W08 INTERIOR GYPSUM DRYWALL PARTITION W08.1- Double gypsum board. t=25mm W08.2- Galvanized U shape steel profiles, placed in two directions every 60cm. t=4cm W08.3- Rock wool insulation placed between profiles. t=10cm W08.4- Double gypsum board. t=25mm BEDROOM - CORRIDOR

W10.2

W09.3

W10.3

W09.1

W10.1

W09.2

W10.2

W09.3

W10.3

W09.4

W10.4 W09.5

W10.5 W09.4 W09.6

W10.4 W10.6 W09.5

W10.5 W09.6

W10.6

W09 INTERIOR GYPSUM DRYWALL PARTITION WITH PINEWOOD FINISH W09.1- Pinewood interior finish board 120x300cm. t=20mm W09.2 - Double gypsum board. t=25mm W09.3 - Galvanized U shape steel profiles, placed in two directions every 60cm. t=4cm W09.4 - Rock wool insulation placed between profiles. t=10cm W09.5 - Double gypsum board. t=25mm W09.6- Pinewood interior finish board 120x300cm. t=20mm

W10 INTERIOR WOOD PARTITION W10.1- Pinewood interior finish board 120x300cm. t=20mm W10.2- Oriented strand board (OSB), mechanically fixed to wooden studs. t=18mm W10.3- Wooden wall framing studs 10x5cm, placed in two directions every 60cm. W10.4- Rock wool insulation placed between profiles. t=10cm (in air-conditioned rooms - 15cm in barrel store) W10.5- Oriented strand board (OSB), mechanically fixed to wooden studs. t=18mm W10.6- Pinewood interior finish board 120x300cm. t=20mm INDUSTRIAL ROOM - INDUSTRIAL CORRIDOR

BEDROOM - CORRIDOR

!"#$%&

!"##$%&'() !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././


C

B

D

E

S-5

S-4

S-3

S-2

S-1 A

F

G

H

I

49,05 48,8 6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

1

P03

W01

h=3.45m

CASEMENT DOOR

W10 W10 DOUBLE CASEMENT DOOR

S-10

W04

CASEMENT DOOR DOUBLE CASEMENT DOOR

W01

W01

RAINWATER TANK IN SITU 15.000L

CASEMENT DOOR

W10

W04

DOUBLE CASEMENT DOOR

HOT WATER STORAGE GIACOMINI BCI (Ø950mm, 1775mm)

W10

W07

W02

12

13

14

15

16

17

18

19

20

21

22

23 STAIRS 28x16.9cm DOUBLE CASEMENT DOOR

P02 h=3.45m

h=2.85m

h=3.25m

BIOMASS STORAGE

BIOMASS BOILER ECO HK-90KW (0,75 x 1,24 x 1,61m)

P02 h=3.45m

CASEMENT DOOR

FC1 P04

W10

09

11

08

07

10

06

05

04

03

02

01

00

6

CASEMENT DOOR

FFL -3.80m SSL -3.90m

2

FC2 P01

P03 h=3.45m

FFL -3.80m SSL -3.90m P02 h=3.45m

5,5

FC1 P01 h=2.90m

P03

P03

h=3.45m

h=3.45m

00

22

01

21

02

20

03

19

04

18 17

05 06

16

07 08

15 14

09

13

10

12

11 S-9

23 STAIRS 28x16.9cm

3

28,05

5,5

28,6

CASEMENT DOOR

FC1 P04

DRYER

WASHER

h=2.50m

EXTERIOR UNIT (0,58x 1,10 x 1,58m)

EXTERIOR UNIT (0,58x 1,10 x 1,58m)

FIXED WINDOW FIXED WINDOW

CASEMENT WINDOW

HOPPER WINDOW

HOPPER WINDOW

FIXED DOUBLE WINDOW

FIXED WINDOW

21 STAIRS 28X16.6CM

FFL -3.40m SSL -3.50m

CASEMENT DOOR FIXED WINDOW

4

W01

20

19

18

17

16

15

14

13

12

11

10

09

08

07

06

05

04

03

02

00

3,75

01

P02 h=7.95m

FIXED WINDOW

FIXED WINDOW

CASEMENT DOOR CASEMENT DOOR

CASEMENT DOOR

FIXED WINDOW

FC2 P01 h=2.85m

5

W07

W08

CASEMENT DOOR

W08

W07

W09

S-8

W08

W07

W09

W08

W07

W09

W08

W07

W09

W08

W07

W09

W08

W07

W09

W08

W07

W09

W09

W02

7,3

S-7

FC1 P01

FC1 P01

FC1 P01

FC1 P01

FC1 P01

FC1 P01

FC1 P01

FC1 P01

h=2.50m

h=2.50m

h=2.50m

h=2.50m

h=2.50m

h=2.50m

h=2.50m

h=2.50m

HOPPER WINDOW CASEMENT DOOR

FIXED WINDOW

P05 h=3.05m

FC1 P01

P05

FC1 P01

h=3.05m

h=2.85m

P05

FC1 P01

h=3.05m

h=2.85m

P05

FC1 P01

h=3.05m

h=2.85m

P05

FC1 P01

h=3.05m

h=2.85m

P05

FC1 P01

h=3.05m

h=2.85m

P05

FC1 P01

h=3.05m

h=2.85m

P05

FC1 P01

h=3.05m

h=2.85m

h=2.85m

ROOF R01: FLAT NON-TRAFFICABLE INVERTED ROOF WITH GRAVEL FINISH R02: FLAT TRAFFICABLE INVERTED ROOF WITH PRECAST CONCRETE FLOATING FINISH R03: LIGHT WOODEN CLT ROOF WITH ZINC FINISH PAVEMENTS P01: INTERIOR WOOD PAVEMENT P02: INTERIOR POLISHED CONCRETE FLOOR P03: INTERIOR CONCRETE FLOOR WITH EPOXY RESIN FINISH P04: INTERIOR CERAMIC PAVEMENT

P05: TEAKWOOD DECK FLOOR FALSE CEILINGS FC1: DRYWALL CEILING FC2: WOODEN FALSE CEILING: WALLS AND PARTITIONS W01: REINFORCED CONCRETE WALL W02: REINFORCED CONCRETE WALL COATED WITH GYPSUM BOARD AND MICROCEMENT FINISH W03: REINFORCED CONCRETE INTERIOR WALL COATED WITH GYPSUM BOARD

!"#$%&

!"##$%&'%(")*%+%1:150 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

W04: REINFORCED CONCRETE INTERIOR WALL COATED WITH WOOD W05: PINEWOOD VENTILATED FACADE W06: PINEWOOD FACADE W07: INTERIOR GYPSUM DRYWALL WITH MICROCEMENT AND PINEWOOD FINISH W08: INTERIOR GYPSUM DRYWALL PARTITION W09: INTERIOR GYPSUM DRYWALL PARTITION WITH PINEWOOD FINISH W10: INTERIOR WOOD PARTITION

W03

W06

W03

W06

W03

W06

W03

W06

W03

W06

W03

W06

W03

HOPPER WINDOW

W06

FIXED WINDOW

W03

6

W06

S-6


C

B

D

E

S-5

S-4

S-3

S-2

S-1 A

F

G

H

I

49,05 48,8 6,1

6,1

W01 P03

W01

W10

P02

09

11

08

10

07

06

05

04

03

02

01

12

W07

W05 CASEMENT DOOR

W01 FIXED WINDOW

P02 h=4.95m 22

01

21

02

h=3.05m

h=3.05m

20

04

19

05

18

06

17

07

16

08

15

09

14

10

13

11

12

23 STAIRS 28x16.9cm

W02

3

FC1 P04

FC1 P04 h=2.50m

FFL +0.11m SSL -0.05m

FC1 P04

R02 h=4.95m

W01

h=2.50m

FC2 P01

FC1 P01

h=2.50m

h=2.85m

W01

FC1 P01

P02

P02 h=4.95m

S-8

CASEMENT DOOR

W04

h=4.95m

20

19

18

17

16

15

14

13

12

09

11

08

10

05

07

04

06

03

02

01

h=4.40m 3,75

FIXED WINDOW

FIXED WINDOW

W0x

FFL +0.10m SSL ±0.00m

SLIDING DOOR

CASEMENT DOOR

21 STAIRS 28X16.6CM

SLIDING DOOR

28,05

5,5

28,6

h=2.50m

4

S-9

W04

P03

W01

FC1 P03

03

FIXED WINDOW

P05 h=4.40m

CASEMENT DOOR

FFL +0.10m SSL ±0.00m

FIXED WINDOW

DOUBLE CASEMENT DOOR

SLIDING DOOR

13

14

15

16

17

18

19

20

S-10

23 STAIRS 28x16.9cm

HOPPER WINDOW

W01

21

22

23

h=2.50m

W10 DOUBLE CASEMENT DOOR

CASEMENT DOOR

FC1 P04

W01

6

FIXED WINDOW

CASEMENT DOOR

W02

FFL +0.10m SSL ±0.00m P02

5,5

CGP

h=3.05m CASEMENT DOOR

2

6,1

AFS

h=3.05m

h=4.40m

6,1

CASEMENT DOOR

FIXED WINDOW

6,1

CASEMENT DOOR

CASEMENT WINDOW

6,1

CASEMENT DOOR

OVERHEAD DOUBLE DOOR

6,1

CASEMENT DOOR

6,1

1

5 CASEMENT DOOR

FC1 P01

FC2 P01

h=2.85m

h=2.50m

FFL +0.11m SSL -0.05m

S-7

R02

SLIDING DOOR

SLIDING DOOR

7,3

R02

CASEMENT DOOR

FFL +0.11m SSL -0.05m

CASEMENT DOOR

W04

S-6 FIXED WINDOW

FIXED WINDOW

W05

6

ROOF R01: FLAT NON-TRAFFICABLE INVERTED ROOF WITH GRAVEL FINISH R02: FLAT TRAFFICABLE INVERTED ROOF WITH PRECAST CONCRETE FLOATING FINISH R03: LIGHT WOODEN CLT ROOF WITH ZINC FINISH PAVEMENTS P01: INTERIOR WOOD PAVEMENT P02: INTERIOR POLISHED CONCRETE FLOOR P03: INTERIOR CONCRETE FLOOR WITH EPOXY RESIN FINISH P04: INTERIOR CERAMIC PAVEMENT

P05: TEAKWOOD DECK FLOOR FALSE CEILINGS FC1: DRYWALL CEILING FC2: WOODEN FALSE CEILING: WALLS AND PARTITIONS W01: REINFORCED CONCRETE WALL W02: REINFORCED CONCRETE WALL COATED WITH GYPSUM BOARD AND MICROCEMENT FINISH W03: REINFORCED CONCRETE INTERIOR WALL COATED WITH GYPSUM BOARD

!"#$%$

!"#$%&'(##")*(+%),)1:150 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

W04: REINFORCED CONCRETE INTERIOR WALL COATED WITH WOOD W05: PINEWOOD VENTILATED FACADE W06: PINEWOOD FACADE W07: INTERIOR GYPSUM DRYWALL WITH MICROCEMENT AND PINEWOOD FINISH W08: INTERIOR GYPSUM DRYWALL PARTITION W09: INTERIOR GYPSUM DRYWALL PARTITION WITH PINEWOOD FINISH W10: INTERIOR WOOD PARTITION


E

F

G

H

S-5

D

S-4

C

B

S-3

S-2

S-1

A

I

49,05 48,8 6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

1

FFL +3.60m SSL +3.45m

W01

09

HOPPER WINDOW

11

08

10

07

06

05

04

03

02

HOPPER WINDOW

01

W01

6

R01

HOPPER WINDOW

12

13

14

15

16

17

18

19

20

21

22

23

PRIMARY AIR HANDLING UNIT TKM 22

S-10 CHILLER AIRCON 1CHL-0160 (2,27 x 2,12 x 1,32m)

FIXED WINDOW

FIXED WINDOW

FIXED WINDOW

2

HOPPER WINDOW

FFL +3.60m SSL +3.45m R01

5,5

HOPPER WINDOW

HOPPER WINDOW

01

22

02

21

03

20

04

19

05

18

06

17

07

16

08

15

09

14

10

13

11

12

PRIMARY AIR HANDLING UNIT TKM 65

W01

HOPPER WINDOW

HOPPER WINDOW

28,05

5,5

28,6

3

FIXED WINDOW

FIXED WINDOW

S-9

FIXED WINDOW

4

FIXED WINDOW

FIXED WINDOW

FIXED WINDOW

HOPPER WINDOW

HOPPER WINDOW

W04

W04 HOPPER WINDOW

5

W04

19

18

17

14

16

13

15

10

12

09

11

08

05

07

04

06

03

02

W01

3,75

01

S-8

HOPPER WINDOW

FFL +3.60m SSL +3.45m R01

7,3

S-7

S-6

6

ROOF R01: FLAT NON-TRAFFICABLE INVERTED ROOF WITH GRAVEL FINISH R02: FLAT TRAFFICABLE INVERTED ROOF WITH PRECAST CONCRETE FLOATING FINISH R03: LIGHT WOODEN CLT ROOF WITH ZINC FINISH PAVEMENTS P01: INTERIOR WOOD PAVEMENT P02: INTERIOR POLISHED CONCRETE FLOOR P03: INTERIOR CONCRETE FLOOR WITH EPOXY RESIN FINISH P04: INTERIOR CERAMIC PAVEMENT

P05: TEAKWOOD DECK FLOOR FALSE CEILINGS FC1: DRYWALL CEILING FC2: WOODEN FALSE CEILING: WALLS AND PARTITIONS W01: REINFORCED CONCRETE WALL W02: REINFORCED CONCRETE WALL COATED WITH GYPSUM BOARD AND MICROCEMENT FINISH W03: REINFORCED CONCRETE INTERIOR WALL COATED WITH GYPSUM BOARD

!"#$%&

!"#$%&''(%)*"$%+%1:150 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

W04: REINFORCED CONCRETE INTERIOR WALL COATED WITH WOOD W05: PINEWOOD VENTILATED FACADE W06: PINEWOOD FACADE W07: INTERIOR GYPSUM DRYWALL WITH MICROCEMENT AND PINEWOOD FINISH W08: INTERIOR GYPSUM DRYWALL PARTITION W09: INTERIOR GYPSUM DRYWALL PARTITION WITH PINEWOOD FINISH W10: INTERIOR WOOD PARTITION


E

F

G

H

S-5

D

S-4

C

B

S-3

S-2

S-1

A

I

49,05 48,8 6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

1

FFL +3.60m SSL +3.45m R01

6

FFL +5.55m SSL +5.42m R03

S-10

2

FFL +3.60m SSL +3.45m

5,5

R01

S-9

28,05

5,5

28,6

3

4

3,75

S-8

5

FFL +3.60m SSL +3.45m S-7

7,3

R01

S-6

6

ROOF R01: FLAT NON-TRAFFICABLE INVERTED ROOF WITH GRAVEL FINISH R02: FLAT TRAFFICABLE INVERTED ROOF WITH PRECAST CONCRETE FLOATING FINISH R03: LIGHT WOODEN CLT ROOF WITH ZINC FINISH PAVEMENTS P01: INTERIOR WOOD PAVEMENT P02: INTERIOR POLISHED CONCRETE FLOOR P03: INTERIOR CONCRETE FLOOR WITH EPOXY RESIN FINISH P04: INTERIOR CERAMIC PAVEMENT

P05: TEAKWOOD DECK FLOOR FALSE CEILINGS FC1: DRYWALL CEILING FC2: WOODEN FALSE CEILING: WALLS AND PARTITIONS W01: REINFORCED CONCRETE WALL W02: REINFORCED CONCRETE WALL COATED WITH GYPSUM BOARD AND MICROCEMENT FINISH W03: REINFORCED CONCRETE INTERIOR WALL COATED WITH GYPSUM BOARD

!"#$%&

!"#$%&'()*($$+*,-'%*.*1:150 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

W04: REINFORCED CONCRETE INTERIOR WALL COATED WITH WOOD W05: PINEWOOD VENTILATED FACADE W06: PINEWOOD FACADE W07: INTERIOR GYPSUM DRYWALL WITH MICROCEMENT AND PINEWOOD FINISH W08: INTERIOR GYPSUM DRYWALL PARTITION W09: INTERIOR GYPSUM DRYWALL PARTITION WITH PINEWOOD FINISH W10: INTERIOR WOOD PARTITION


!"#$$%

!"#$%&'( !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././


6

5

4

3

2

1

28,05 7,3

3,75

5,5

5,5

6

DETAIL DETAIL6 1

R01 FFL +3.60m SSL +3.45m

R02

W10

W01

USL+3.15m

P03

FFL +0.11m

FFL +0.10m SSL -0.05m

USL -0.35m

FC1 FCL -0.90m

FC1

FCL -0.55m

FC2 FCL -0.90m

W10

FCL -0.55m

W04

W09

USL -0.35m

SSL ±0.00m

FC1

P01 FFL -3.40m

SSL -3.50m

P01 FFL -3.80m USL -3.65m

SSL -3.90m

USL -3.80m

FALSE CEILINGS FC1: DRYWALL CEILING

!"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

01 02

20

05

06

07

08

19

04

16

15

14

18

17

03

02

01

11

03 04

09 10

11

06

09

07

08

10

03

05

02

04

01

21

20

22

23

13

12

15

17 16

14

CGP

AFS

!"#$%&

!"#$%&'"%#()%'*!+,$)-).)1:100

18

WALLS AND PARTITIONS W01: REINFORCED CONCRETE WALL W02: REINFORCED CONCRETE WALL COATED WITH GYPSUM BOARD AND MICROCEMENT FINISH W03: REINFORCED CONCRETE INTERIOR WALL COATED WITH GYPSUM BOARD W04: REINFORCED CONCRETE INTERIOR WALL COATED WITH WOOD W05: PINEWOOD VENTILATED FACADE W06: PINEWOOD FACADE W07: INTERIOR GYPSUM DRYWALL WITH MICROCEMENT AND PINEWOOD FINISH W08: INTERIOR GYPSUM DRYWALL PARTITION W09: INTERIOR GYPSUM DRYWALL PARTITION WITH PINEWOOD FINISH W10: INTERIOR WOOD PARTITION

12 13

PAVEMENTS P01: INTERIOR WOOD PAVEMENT P02: INTERIOR POLISHED CONCRETE FLOOR P03: INTERIOR CONCRETE FLOOR WITH EPOXY RESIN FINISH P04: INTERIOR CERAMIC PAVEMENT P05: TEAKWOOD DECK FLOOR

FC2: WOODEN FALSE CEILING

19

ROOF R01: FLAT NON-TRAFFICABLE INVERTED ROOF WITH GRAVEL FINISH R02: FLAT TRAFFICABLE INVERTED ROOF WITH PRECAST CONCRETE FLOATING FINISH R03: LIGHT WOODEN CLT ROOF WITH ZINC FINISH

S-1

USL -4.05m

22 21 20 19

05

18

06

17

07

16

08

15

09

14

10

13

11

12


6

5

4

3

2

1

28,05 7,3

3,75

DETAIL 4 2 DETAIL

DETAIL DETAIL5 3

5,5

5,5

6

R03 FFL +5.55m SSL ±5.42m

USL +5.30m

+4.50m

R01 FFL +3.60m

R02

P05

FFL +0.11m

FFL +0.10m SSL -0.05m

W10

W01

SSL +3.45m

23 STAIRS 28x16.9cm

SSL ±0.00m

USL -0.35m FCL -0.55m

FCL -0.55m

FC2 FCL -0.90m

FC1

W08

FC1

P01 FFL -3.40m

SSL -3.50m

P03

P02

FFL -3.80m USL -3.65m

FFL -3.80m

SSL -3.90m

USL -3.80m

FALSE CEILINGS FC1: DRYWALL CEILING

!"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

01 02

20

05

06

07

08

19

04

16

15

14

18

17

03

02

01

11

03 04

09 10

11

06

09

07

08

10

03

05

02

04

01

21

20

22

23

13

12

15

17 16

14

CGP

AFS

!"#$%&

!"#$%&'"%#()%'*!+,$)-).)1:100

18

WALLS AND PARTITIONS W01: REINFORCED CONCRETE WALL W02: REINFORCED CONCRETE WALL COATED WITH GYPSUM BOARD AND MICROCEMENT FINISH W03: REINFORCED CONCRETE INTERIOR WALL COATED WITH GYPSUM BOARD W04: REINFORCED CONCRETE INTERIOR WALL COATED WITH WOOD W05: PINEWOOD VENTILATED FACADE W06: PINEWOOD FACADE W07: INTERIOR GYPSUM DRYWALL WITH MICROCEMENT AND PINEWOOD FINISH W08: INTERIOR GYPSUM DRYWALL PARTITION W09: INTERIOR GYPSUM DRYWALL PARTITION WITH PINEWOOD FINISH W10: INTERIOR WOOD PARTITION

12 13

PAVEMENTS P01: INTERIOR WOOD PAVEMENT P02: INTERIOR POLISHED CONCRETE FLOOR P03: INTERIOR CONCRETE FLOOR WITH EPOXY RESIN FINISH P04: INTERIOR CERAMIC PAVEMENT P05: TEAKWOOD DECK FLOOR

FC2: WOODEN FALSE CEILING

19

ROOF R01: FLAT NON-TRAFFICABLE INVERTED ROOF WITH GRAVEL FINISH R02: FLAT TRAFFICABLE INVERTED ROOF WITH PRECAST CONCRETE FLOATING FINISH R03: LIGHT WOODEN CLT ROOF WITH ZINC FINISH

S-2

USL -4.05m

22 21 20 19

05

18

06

17

07

16

08

15

09

14

10

13

11

12

USL+3.15m


6

5

4

3

2

1

28,05 7,3

3,75

5,5

5,5

6

R03 FFL +5.55m SSL ±5.42m

USL +5.30m

+4.50m

R01 FFL +3.60m SSL +3.45m

P02 FFL +0.10m

SSL ±0.00m

21 STAIRS 28X16.6CM

P05 FFL +0.10m

USL -0.35m FCL -0.55m

FCL -0.55m

FC1

FC2 FCL -0.90m

FC1

W08

P01 FFL -3.40m

SSL -3.50m

P03 USL -3.65m

FFL -3.80m

SSL -3.90m

USL -3.80m

FALSE CEILINGS FC1: DRYWALL CEILING

!"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

01 02

20

05

06

07

08

19

04

16

15

14

18

17

03

02

01

11

03 04

09 10

11

06

09

07

08

10

03

05

02

04

01

21

20

22

23

12

13

17 16

15

CGP

AFS

!"#$%$

!"#$%&'"%#()%'*!+,$)-).)1:100

14

WALLS AND PARTITIONS W01: REINFORCED CONCRETE WALL W02: REINFORCED CONCRETE WALL COATED WITH GYPSUM BOARD AND MICROCEMENT FINISH W03: REINFORCED CONCRETE INTERIOR WALL COATED WITH GYPSUM BOARD W04: REINFORCED CONCRETE INTERIOR WALL COATED WITH WOOD W05: PINEWOOD VENTILATED FACADE W06: PINEWOOD FACADE W07: INTERIOR GYPSUM DRYWALL WITH MICROCEMENT AND PINEWOOD FINISH W08: INTERIOR GYPSUM DRYWALL PARTITION W09: INTERIOR GYPSUM DRYWALL PARTITION WITH PINEWOOD FINISH W10: INTERIOR WOOD PARTITION

12 13

PAVEMENTS P01: INTERIOR WOOD PAVEMENT P02: INTERIOR POLISHED CONCRETE FLOOR P03: INTERIOR CONCRETE FLOOR WITH EPOXY RESIN FINISH P04: INTERIOR CERAMIC PAVEMENT P05: TEAKWOOD DECK FLOOR

FC2: WOODEN FALSE CEILING

18

ROOF R01: FLAT NON-TRAFFICABLE INVERTED ROOF WITH GRAVEL FINISH R02: FLAT TRAFFICABLE INVERTED ROOF WITH PRECAST CONCRETE FLOATING FINISH R03: LIGHT WOODEN CLT ROOF WITH ZINC FINISH

S-3

USL -4.05m

19

W06

W10

W04

USL +2.75m

P01 FFL +0.10m

W01

SSL +2.95m

USL+3.15m FCL +2.95m

22 21 20 19

05

18

06

17

07

16

08

15

09

14

10

13

11

12


6

5

4

3

2

1

28,05 7,3

3,75

DETAIL DETAIL 24

DETAIL DETAIL3

5,5

5,5

6

5 R03 FFL +5.55m SSL ±5.42m

USL +5.30m FCL +5.05m

FC2 +4.50m

R01 FFL +3.60m

W04

SSL +3.45m

W05

USL+3.15m

FCL +2.95m

FC2

R02

P01

FFL +0.11m

SSL ±0.00m

O04

W01

W10

W07

USL -0.35m

SSL -0.05m

O05

FFL +0.10m

FCL -0.55m

FC2 FCL -0.90m

FC1

P05

P01

FFL -3.40m

FFL -3.40m

SSL -3.50m

P03 FFL -3.80m USL -3.65m

SSL -3.90m

USL -3.80m

FALSE CEILINGS FC1: DRYWALL CEILING

!"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

01 02

20

05

06

07

08

19

04

16

15

14

18

17

03

02

01

11

03 04

09 10

11

06

09

07

08

10

03

05

02

04

01

21

20

22

23

13

12

15

17 16

14

CGP

AFS

!"#$%&

!"#$%&'"%#()%'*!+,$)-).)1:100

18

WALLS AND PARTITIONS W01: REINFORCED CONCRETE WALL W02: REINFORCED CONCRETE WALL COATED WITH GYPSUM BOARD AND MICROCEMENT FINISH W03: REINFORCED CONCRETE INTERIOR WALL COATED WITH GYPSUM BOARD W04: REINFORCED CONCRETE INTERIOR WALL COATED WITH WOOD W05: PINEWOOD VENTILATED FACADE W06: PINEWOOD FACADE W07: INTERIOR GYPSUM DRYWALL WITH MICROCEMENT AND PINEWOOD FINISH W08: INTERIOR GYPSUM DRYWALL PARTITION W09: INTERIOR GYPSUM DRYWALL PARTITION WITH PINEWOOD FINISH W10: INTERIOR WOOD PARTITION

12 13

PAVEMENTS P01: INTERIOR WOOD PAVEMENT P02: INTERIOR POLISHED CONCRETE FLOOR P03: INTERIOR CONCRETE FLOOR WITH EPOXY RESIN FINISH P04: INTERIOR CERAMIC PAVEMENT P05: TEAKWOOD DECK FLOOR

FC2: WOODEN FALSE CEILING

19

ROOF R01: FLAT NON-TRAFFICABLE INVERTED ROOF WITH GRAVEL FINISH R02: FLAT TRAFFICABLE INVERTED ROOF WITH PRECAST CONCRETE FLOATING FINISH R03: LIGHT WOODEN CLT ROOF WITH ZINC FINISH

S-4

USL -4.05m

22 21 20 19

05

18

06

17

07

16

08

15

09

14

10

13

11

12


6

5

4

3

2

1

28,05 7,3

3,75

5,5

5,5

6

DETAIL 1

R01

DETAIL 6

FFL +3.60m SSL +3.45m

W05

USL+3.15m FCL +2.95m

FC1

R02

P01 FFL +0.10m

O04

O05

W07

SSL -0.05m

SSL ±0.00m

USL -0.35m

W04

FFL +0.11m

FCL -0.55m

FC2 FCL -0.90m

FC1

P05

P01

FFL -3.40m

FFL -3.40m

SSL -3.50m

USL -3.65m

P03 SSL -3.90m

FFL -3.80m

USL -3.80m

FALSE CEILINGS FC1: DRYWALL CEILING

!"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

01 02

20

05

06

07

08

19

04

16

15

14

18

17

03

02

01

11

03 04

09 10

11

06

09

07

08

10

03

05

02

04

01

21

20

22

23

13

12

15

17 16

14

CGP

AFS

!"#$%&

!"#$%&'"%#()%'*!+,$)-).)1:100

18

WALLS AND PARTITIONS W01: REINFORCED CONCRETE WALL W02: REINFORCED CONCRETE WALL COATED WITH GYPSUM BOARD AND MICROCEMENT FINISH W03: REINFORCED CONCRETE INTERIOR WALL COATED WITH GYPSUM BOARD W04: REINFORCED CONCRETE INTERIOR WALL COATED WITH WOOD W05: PINEWOOD VENTILATED FACADE W06: PINEWOOD FACADE W07: INTERIOR GYPSUM DRYWALL WITH MICROCEMENT AND PINEWOOD FINISH W08: INTERIOR GYPSUM DRYWALL PARTITION W09: INTERIOR GYPSUM DRYWALL PARTITION WITH PINEWOOD FINISH W10: INTERIOR WOOD PARTITION

12 13

PAVEMENTS P01: INTERIOR WOOD PAVEMENT P02: INTERIOR POLISHED CONCRETE FLOOR P03: INTERIOR CONCRETE FLOOR WITH EPOXY RESIN FINISH P04: INTERIOR CERAMIC PAVEMENT P05: TEAKWOOD DECK FLOOR

FC2: WOODEN FALSE CEILING

19

ROOF R01: FLAT NON-TRAFFICABLE INVERTED ROOF WITH GRAVEL FINISH R02: FLAT TRAFFICABLE INVERTED ROOF WITH PRECAST CONCRETE FLOATING FINISH R03: LIGHT WOODEN CLT ROOF WITH ZINC FINISH

S-5

USL -4.05m

22 21 20 19

05

18

06

17

07

16

08

15

09

14

10

13

11

12


A

C

B

D

E

F

H

G

I

48,8 6,1

6,1

6,1

6,1

6,1

6,1

R01 FFL +3.60m SSL +3.45m

USL +3.15m FCL +2.95m

FC1 FFL +2.60m

FC2

R02

P01

FFL +0.11m

FFL +0.10m SSL -0.05m

SSL ±0.00m

USL -0.35m

USL -0.35m

W06

W03

P05 FFL -3.40m

FCL -0.55m

FC1

P01 SSL -3.50m

FFL -3.40m

USL -3.80m

FALSE CEILINGS FC1: DRYWALL CEILING

!"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

01 02

22 21 20 19

05

18

06

17

07

16

08

15

09

14

10

13

11

12

20

08

05

06

04

07

19

18

17

03

02

12 13

16

15

14

01

03 04

11

09

10

11

05

06

04

07

03

08

02

01 23

21

12

22

13

20

14

15

CGP

AFS

!"#$%&

!"#$%&'(%#)!*+,-&%"#*.*/*1:100

17 16

WALLS AND PARTITIONS W01: REINFORCED CONCRETE WALL W02: REINFORCED CONCRETE WALL COATED WITH GYPSUM BOARD AND MICROCEMENT FINISH W03: REINFORCED CONCRETE INTERIOR WALL COATED WITH GYPSUM BOARD W04: REINFORCED CONCRETE INTERIOR WALL COATED WITH WOOD W05: PINEWOOD VENTILATED FACADE W06: PINEWOOD FACADE W07: INTERIOR GYPSUM DRYWALL WITH MICROCEMENT AND PINEWOOD FINISH W08: INTERIOR GYPSUM DRYWALL PARTITION W09: INTERIOR GYPSUM DRYWALL PARTITION WITH PINEWOOD FINISH W10: INTERIOR WOOD PARTITION

09 10

PAVEMENTS P01: INTERIOR WOOD PAVEMENT P02: INTERIOR POLISHED CONCRETE FLOOR P03: INTERIOR CONCRETE FLOOR WITH EPOXY RESIN FINISH P04: INTERIOR CERAMIC PAVEMENT P05: TEAKWOOD DECK FLOOR

FC2: WOODEN FALSE CEILING

18

ROOF R01: FLAT NON-TRAFFICABLE INVERTED ROOF WITH GRAVEL FINISH R02: FLAT TRAFFICABLE INVERTED ROOF WITH PRECAST CONCRETE FLOATING FINISH R03: LIGHT WOODEN CLT ROOF WITH ZINC FINISH

19

6,1

S-6

6,1


A

C

B

D

E

F

H

G

I

48,8 6,1

6,1

6,1

6,1

6,1

6,1

R01 FFL +3.60m SSL +3.45m

USL +3.15m FCL +2.95m

FC1 FCL +2.60m

FC2

R02

P01

FFL +0.11m

FFL +0.10m SSL -0.05m

SSL ±0.00m

USL -0.35m

USL -0.35m

FCL -0.90m

FC1

W03

P01 FFL -3.40m

SSL -3.50m

USL -3.65m

FALSE CEILINGS FC1: DRYWALL CEILING

!"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

01 02

22 21 20 19

05

18

06

17

07

16

08

15

09

14

10

13

11

12

20

08

05

06

04

07

19

18

17

03

02

12 13

16

15

14

01

03 04

11

09

10

11

05

06

04

07

03

08

02

01 23

21

12

22

13

20

14

15

CGP

AFS

!"#$%&

!"#$%&'(%#)!*+,-&%"#*.*/*1:100

17 16

WALLS AND PARTITIONS W01: REINFORCED CONCRETE WALL W02: REINFORCED CONCRETE WALL COATED WITH GYPSUM BOARD AND MICROCEMENT FINISH W03: REINFORCED CONCRETE INTERIOR WALL COATED WITH GYPSUM BOARD W04: REINFORCED CONCRETE INTERIOR WALL COATED WITH WOOD W05: PINEWOOD VENTILATED FACADE W06: PINEWOOD FACADE W07: INTERIOR GYPSUM DRYWALL WITH MICROCEMENT AND PINEWOOD FINISH W08: INTERIOR GYPSUM DRYWALL PARTITION W09: INTERIOR GYPSUM DRYWALL PARTITION WITH PINEWOOD FINISH W10: INTERIOR WOOD PARTITION

09 10

PAVEMENTS P01: INTERIOR WOOD PAVEMENT P02: INTERIOR POLISHED CONCRETE FLOOR P03: INTERIOR CONCRETE FLOOR WITH EPOXY RESIN FINISH P04: INTERIOR CERAMIC PAVEMENT P05: TEAKWOOD DECK FLOOR

FC2: WOODEN FALSE CEILING

18

ROOF R01: FLAT NON-TRAFFICABLE INVERTED ROOF WITH GRAVEL FINISH R02: FLAT TRAFFICABLE INVERTED ROOF WITH PRECAST CONCRETE FLOATING FINISH R03: LIGHT WOODEN CLT ROOF WITH ZINC FINISH

19

6,1

S-7

6,1


A

C

B

D

E

F

H

G

I

48,8 6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

R03 FFL +5.55m SSL ±5.42m

USL +5.30m FCL +5.03m

FC2

W04

+4.50m

R01

FFL +3.60m

FFL +3.60m SSL +3.45m

FCL +2.95m

FC1 FCL +2.60m

FC2

P02

21 STAIRS 28X16.6CM

FFL +0.10m

P01 FFL +0.10m

SSL ±0.00m

USL -0.35m

W01

FCL -0.55m

FC2

P01 FFL -3.80m

P03

SSL -3.90m

USL -4.05m

FALSE CEILINGS FC1: DRYWALL CEILING

!"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

01 02 03 04

22 21 20 19

05

18

06

17

07

16

08

15

09

14

10

13

11

12

20

08

05

06

04

07

19

18

17

03

02

12 13

16

15

14

01

S-8 11

09

10

11

05

06

04

07

03

08

02

01 23

21

22

12

20

13

15

14

17 16

CGP

AFS

!"#$%&

!"#$%&'(%#)!*+,-&%"#*.*/*1:100

18

WALLS AND PARTITIONS W01: REINFORCED CONCRETE WALL W02: REINFORCED CONCRETE WALL COATED WITH GYPSUM BOARD AND MICROCEMENT FINISH W03: REINFORCED CONCRETE INTERIOR WALL COATED WITH GYPSUM BOARD W04: REINFORCED CONCRETE INTERIOR WALL COATED WITH WOOD W05: PINEWOOD VENTILATED FACADE W06: PINEWOOD FACADE W07: INTERIOR GYPSUM DRYWALL WITH MICROCEMENT AND PINEWOOD FINISH W08: INTERIOR GYPSUM DRYWALL PARTITION W09: INTERIOR GYPSUM DRYWALL PARTITION WITH PINEWOOD FINISH W10: INTERIOR WOOD PARTITION

09 10

PAVEMENTS P01: INTERIOR WOOD PAVEMENT P02: INTERIOR POLISHED CONCRETE FLOOR P03: INTERIOR CONCRETE FLOOR WITH EPOXY RESIN FINISH P04: INTERIOR CERAMIC PAVEMENT P05: TEAKWOOD DECK FLOOR

FC2: WOODEN FALSE CEILING

19

ROOF R01: FLAT NON-TRAFFICABLE INVERTED ROOF WITH GRAVEL FINISH R02: FLAT TRAFFICABLE INVERTED ROOF WITH PRECAST CONCRETE FLOATING FINISH R03: LIGHT WOODEN CLT ROOF WITH ZINC FINISH

W05

W04

USL -3.15m


A

C

B

D

E

F

H

G

I

48,8 6,1

6,1

6,1

6,1

6,1

6,1

6,1

DETAIL DETAIL 77

6,1

R03

DETAIL 88 DETAIL

FFL +5.55m SSL ±5.42m

USL +5.30m

+4.50m

R01 FFL +3.60m SSL +3.45m

USL -3.15m FCL +2.95m

FC1 FCL +2.60m

W01

R02 FFL +0.11m

W04

FC2

23 STAIRS 28x16.9cm

SSL -0.05m

P01 FFL +0.10m

USL -0.35m

SSL ±0.00m

USL -0.35m FCL -0.55m

FC2 FCL -0.90m

FC1 P02 FFL -1.83m

SSL -1.93m

W04

W04

P03 FFL -3.80m

SSL -3.90m

USL -4.05m

FALSE CEILINGS FC1: DRYWALL CEILING

!"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

01 02

20

08

05

06

04

07

19

18

17

03

02

12 13

16

15

14

01

03 04

11

09

10

11

05

06

04

07

03

08

02

01 23

21

12

22

13

20

14

15

CGP

AFS

!"#$%$

!"#$%&'(%#)!*+,-&%"#*.*/*1:100

17 16

WALLS AND PARTITIONS W01: REINFORCED CONCRETE WALL W02: REINFORCED CONCRETE WALL COATED WITH GYPSUM BOARD AND MICROCEMENT FINISH W03: REINFORCED CONCRETE INTERIOR WALL COATED WITH GYPSUM BOARD W04: REINFORCED CONCRETE INTERIOR WALL COATED WITH WOOD W05: PINEWOOD VENTILATED FACADE W06: PINEWOOD FACADE W07: INTERIOR GYPSUM DRYWALL WITH MICROCEMENT AND PINEWOOD FINISH W08: INTERIOR GYPSUM DRYWALL PARTITION W09: INTERIOR GYPSUM DRYWALL PARTITION WITH PINEWOOD FINISH W10: INTERIOR WOOD PARTITION

09 10

PAVEMENTS P01: INTERIOR WOOD PAVEMENT P02: INTERIOR POLISHED CONCRETE FLOOR P03: INTERIOR CONCRETE FLOOR WITH EPOXY RESIN FINISH P04: INTERIOR CERAMIC PAVEMENT P05: TEAKWOOD DECK FLOOR

FC2: WOODEN FALSE CEILING

18

ROOF R01: FLAT NON-TRAFFICABLE INVERTED ROOF WITH GRAVEL FINISH R02: FLAT TRAFFICABLE INVERTED ROOF WITH PRECAST CONCRETE FLOATING FINISH R03: LIGHT WOODEN CLT ROOF WITH ZINC FINISH

19

P01 FFL -3.80m

W10

USL -2.12m

22 21 20 19

05

18

06

17

07

16

08

15

09

14

10

13

11

12

S-9


A

C

B

D

E

F

H

G

I

48,8 6,1

6,1

6,1

6,1

6,1

6,1

6,1

R03 FFL +5.55m SSL ±5.42m

USL +5.30m

+4.50m

SSL +3.05m

W07

FCL -2.50m

FC1

P04

23 STAIRS 28x16.9cm

R02

P02

FFL +0.10m

FFL +0.10m

SSL ±0.00m

FFL +0.11m SSL -0.05m

W10

W01

W10

USL -0.35m

W07

USL -0.35m

FC1

P04

P03 FFL -3.80m

SSL -3.90m

USL -4.05m

FALSE CEILINGS FC1: DRYWALL CEILING

!"#$%&

!"#$%&'(%#)!*+,-&%"#*./*0*1:100 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

02

20

08

05

06

04

07

19

18

17

03

02

12 13

16

15

14

03 04

01

11

S-10 01

11

09

10

05

06

04

07

03

08

02

01 23

21

22

20

12

15

13

17 16

14

18

19

WALLS AND PARTITIONS W01: REINFORCED CONCRETE WALL W02: REINFORCED CONCRETE WALL COATED WITH GYPSUM BOARD AND MICROCEMENT FINISH W03: REINFORCED CONCRETE INTERIOR WALL COATED WITH GYPSUM BOARD W04: REINFORCED CONCRETE INTERIOR WALL COATED WITH WOOD W05: PINEWOOD VENTILATED FACADE W06: PINEWOOD FACADE W07: INTERIOR GYPSUM DRYWALL WITH MICROCEMENT AND PINEWOOD FINISH W08: INTERIOR GYPSUM DRYWALL PARTITION W09: INTERIOR GYPSUM DRYWALL PARTITION WITH PINEWOOD FINISH W10: INTERIOR WOOD PARTITION

CGP

AFS

FC2: WOODEN FALSE CEILING

09 10

PAVEMENTS P01: INTERIOR WOOD PAVEMENT P02: INTERIOR POLISHED CONCRETE FLOOR P03: INTERIOR CONCRETE FLOOR WITH EPOXY RESIN FINISH P04: INTERIOR CERAMIC PAVEMENT P05: TEAKWOOD DECK FLOOR

FC2

FCL -0.95m

FFL -3.80m

ROOF R01: FLAT NON-TRAFFICABLE INVERTED ROOF WITH GRAVEL FINISH R02: FLAT TRAFFICABLE INVERTED ROOF WITH PRECAST CONCRETE FLOATING FINISH R03: LIGHT WOODEN CLT ROOF WITH ZINC FINISH

FCL -0.55m

22 21 20 19

05

18

06

17

07

16

08

15

09

14

10

13

11

12

W04

W02

USL +2.85m

W02

6,1


R02: FLAT TRAFFICABLE INVERTED ROOF WITH PRECAST CONCRETE FLOATING FINISH R02.1- Finished floating pavement with non-slipping precast concrete tiles of 120x120cm. t=30mm R02.2- Adjustable self-leveling supports for floating pavement. R02.3- Protective polypropylene geotextile sheet. R02.4- Rigid boards of extruded polystyrene thermal insulation. t=40mm R02.5- Modified bitumen waterproofing membrane for roofs. R02.6- Protective polypropylene geotextile sheet. R02.7- Slope formation with cellular concrete. ID:300kg/m3 R02.8- Anti-impact sheet, placed on slab above bedrooms only. t=5mm R02.9- Vapor barrier. R02.10- Linear reinforcement, self-protected impermeable membrane. R02.11- Polystyrene foam for expansion joint. t=10mm R03: LIGHT WOODEN CLT ROOF WITH ZINC FINISH R03.1- Zinc plate finishing, with structured separation sheet. t=0.6mm R03.2- Oriented strand board (OSB), mechanically fixed to wooden battens. t=18mm R03.3- Ventilated chamber. t=20mm R03.4- Slope formation with wooden battens of variable height, following the roof slope. R03.5- Rigid boards of extruded polystyrene thermal insulation. t=80mm R03.6- Vapor barrier. R03.7- Cross-laminated timber (CLT) board, made from 5 glued together and perpendicullary oriented layers of solid-wood (30-20-20-20-30mm). t=120mm R03.8- Lag screw every 30cm, to join the CLT board with the timber beams and joists. R03.9- Perimeter finish plate of galvanized steel, coated and fixed, leaving 2mm for expansion.

R01.10

R01.9

R01.8

R01.7

R01.6

R01.5

R01.4

R01.3

R01.2

R01.1

AS PER STRUCTURE PLANS

REINFORCED CONCRETE SLAB

ROOFS R01: FLAT NON-TRAFFICABLE INVERTED ROOF WITH GRAVEL FINISH R01.1- Protection layer with ø20-35mm gravel with rounded edge. R01.2- Protective polypropylene geotextile sheet R01.3- Rigid boards of extruded polystyrene thermal insulation. t=40mm R01.4- Modified bitumen waterproofing membrane for roofs. R01.5- Protective polypropylene geotextile sheet. R01.6- Slope formation with cellular concrete. ID:300kg/m3 R01.7- Vapor barrier. R01.8- Linear reinforcement, self-protected impermeable membrane. R01.9- Polystyrene foam for expansion joint. t=10mm R1.10- Galvanized steel plate for roof coping. t=1.5mm

SLOPE DIRECTION FFL +3.60m

PAVEMENTS P01: INTERIOR WOOD PAVEMENT P01.1- Pine wood parquet flooring, panels of 20x120cm. t=3cm P01.2- Pinewood battens of 5x7cm, in one direction, punctually fixed. (Anit-impact sheet t=5mm, placed under battens above bedroms). P01.3- Rock wool insulation between battens. t=7cm

TSL +3.45m

USL +3.15m

P02: INTERIOR POLISHED CONCRETE FLOOR P02.1- Polished concrete paving lightened and with high resistance, rendered with quartz powder, cut and sealed every 5m for expansion. t=10cm

RAINDROP O06

P03: INTERIOR CONCRETE FLOOR WITH EPOXY RESIN FINISH P03.1- Epoxy resin finishing, dark grey colour and matt finish. t=1cm P03.2- Polished concrete paving, lightened and with high resistance, cut and sealed every 5m for expansion. t=9cm

AS PER STRUCTURE PLANS

P05: TEAKWOOD DECK FLOOR P05.1- Teakwood deck flooring with non-slipping treatment, made by 20x120cm panels. t=3cm P05.2- Wooden battens of variable height, following the slab slope, punctually fixed on slab. P05.3- Wooden battens of 5x7cm, punctually fixed on slab. P05.4- Two-layered bituminous impermeable membrane. t=3mm FALSE CEILINGS FC1: DRYWALL CEILING FC1.1- Metallic fixation t=30mm, every 120cm. FC1.2- Galvanized steel profile, suspended from slab - pladur system. FC1.3- Gypsum board, pladur type, matt white finished with smooth texture. t=12.5mm FC1.4- Rock wool insulation fixed in slab. t=10cm

P03.1

P03.2

REINFORCED CONCRETE SLAB

P04: INTERIOR CERAMIC PAVEMENT P04.1- Non-slipping porcelain stoneware tile, of 60x60cm. t=2cm P04.2- Portland cement mortar bond coat. t=1cm P04.3- Levelling screed layer. t=7cm

FC2: WOODEN FALSE CEILING: FC2.1- Galvanized steel hidden profile, suspended from slab - rosound system. FC2.2- Pinewood boards 60x120cm. t=20mm FC2.3- Rock wool insulation fixed in slab. t=10cm OPENINGS - WALLS AND WINDOWS O01: Laminated pinewood window t=78mm, type 78 by Iscletec, with insulating glass, low emissive and vacuum chamber, with integrated acoustic insulation. Treated wood with oils and wax for exterior windows and doors. Types and dimensions per constructive plans, used in cellar and hotel.

FFL +0.10m

SSL ±0.00m

O02: Laminated pinewood window t=78mm, type 78 by Iscletec, with insulating glass, low emissive and vacuum chamber, with integrated acoustic insulation. Treated wood with oils and wax for exterior windows and doors. Types and dimensions per constructive plans, used in industrial rooms. USL -0.35m

O03: Fixed solar protection with pinewood 5x5cm slats, fixed with metallic Rothoblaas profiles to the slab.

REINFORCED CONCRETE RETAINING WALL AS PER STRUCTURE PLANS

O04: Dark grey exterior automatic roller blind. O05: Wooden wall above windows, made of exterior treated pinewood board, breathable membrane, rock wool insulation in between wooden studs, vapor barrier and interior finish of oriented strand board OSB. O06: Industrial overhead double wood door, treated with oils and wax for the exterior. WALLS AND PARTITIONS W01: REINFORCED CONCRETE WALL W02: REINFORCED CONCRETE WALL COATED WITH GYPSUM BOARD AND MICROCEMENT FINISH W03: REINFORCED CONCRETE INTERIOR WALL COATED WITH GYPSUM BOARD W04: REINFORCED CONCRETE INTERIOR WALL COATED WITH WOOD W05: PINEWOOD VENTILATED FACADE W06: PINEWOOD FACADE

W08: INTERIOR GYPSUM DRYWALL PARTITION

SEALING JOINT BETWEEN BUILDING MATERIALS

POLYSTYRENE FOAM FOR EXPANSION JOINT

P03.2

P03.1

W07: INTERIOR GYPSUM DRYWALL WITH MICROCEMENT AND PINEWOOD FINISH

W09: INTERIOR GYPSUM DRYWALL PARTITION WITH PINEWOOD FINISH W10: INTERIOR WOOL PARTITION

BACKFILL DRAINAGE DITCH WITH GRAVEL

1.8MM EPDM FILM WATERPROOFING, MECHANICALLY FIXED ON WALL

FFL -3.80m

HDPE NODULAR DRAINAGE SHEET, MECHANICALLY FIXED ON WALL

SSL -3.90m

HDPE NODULAR DRAINAGE SHEET WITH GEOTEXTILE FILM

160MM HDPE PERFORATED DRAINAGE PIPE USL -4.05m

BACKFILL WITH COMPACTED GROUND

REINFORCED CONCRETE DECK T=15CM

WELDED MESH

SUPPORT WEDGES

NATURAL TERRAIN

CONCRETE BASE T=50MM

IMPERMEABLE POLYETHYLENE SHEET 150µm

BACKFILL DRAINATGE DITCH WITH GRAVEL

COMPACTED GROUND

-4.20m

TRANSVERSAL SECTION 1

REINFORCED CONCRETE FOOTING AS PER FOUNDATION PLAN

BLINDING CONCRETE T=10CM

48,8 6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

!"#$%&

!"#$%&'(')'1:20 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././


ROOFS R01: FLAT NON-TRAFFICABLE INVERTED ROOF WITH GRAVEL FINISH R01.1- Protection layer with ø20-35mm gravel with rounded edge. R01.2- Protective polypropylene geotextile sheet R01.3- Rigid boards of extruded polystyrene thermal insulation. t=40mm R01.4- Modified bitumen waterproofing membrane for roofs. R01.5- Protective polypropylene geotextile sheet. R01.6- Slope formation with cellular concrete. ID:300kg/m3 R01.7- Vapor barrier. R01.8- Linear reinforcement, self-protected impermeable membrane. R01.9- Polystyrene foam for expansion joint. t=10mm R1.10- Galvanized steel plate for roof coping. t=1.5mm R02: FLAT TRAFFICABLE INVERTED ROOF WITH PRECAST CONCRETE FLOATING FINISH R02.1- Finished floating pavement with non-slipping precast concrete tiles of 120x120cm. t=30mm R02.2- Adjustable self-leveling supports for floating pavement. R02.3- Protective polypropylene geotextile sheet. R02.4- Rigid boards of extruded polystyrene thermal insulation. t=40mm R02.5- Modified bitumen waterproofing membrane for roofs. R02.6- Protective polypropylene geotextile sheet. R02.7- Slope formation with cellular concrete. ID:300kg/m3 R02.8- Anti-impact sheet, placed on slab above bedrooms only. t=5mm R02.9- Vapor barrier. R02.10- Linear reinforcement, self-protected impermeable membrane. R02.11- Polystyrene foam for expansion joint. t=10mm R03: LIGHT WOODEN CLT ROOF WITH ZINC FINISH R03.1- Zinc plate finishing, with structured separation sheet. t=0.6mm R03.2- Oriented strand board (OSB), mechanically fixed to wooden battens. t=18mm R03.3- Ventilated chamber. t=20mm R03.4- Slope formation with wooden battens of variable height, following the roof slope. R03.5- Rigid boards of extruded polystyrene thermal insulation. t=80mm R03.6- Vapor barrier. R03.7- Cross-laminated timber (CLT) board, made from 5 glued together and perpendicullary oriented layers of solid-wood (30-20-20-20-30mm). t=120mm R03.8- Lag screw every 30cm, to join the CLT board with the timber beams and joists. R03.9- Perimeter finish plate of galvanized steel, coated and fixed, leaving 2mm for expansion.

FFL +3.60m

GALVANIZED PROTECTIVE STEEL PLATE

PAVEMENTS P01: INTERIOR WOOD PAVEMENT P01.1- Pine wood parquet flooring, panels of 20x120cm. t=3cm P01.2- Pinewood battens of 5x7cm, in one direction, punctually fixed. (Anit-impact sheet t=5mm, placed under battens above bedroms). P01.3- Rock wool insulation between battens. t=7cm

WOOD BEAM 0.15X0.45CM AS PER STRUCTURE PLANS

P02: INTERIOR POLISHED CONCRETE FLOOR P02.1- Polished concrete paving lightened and with high resistance, rendered with quartz powder, cut and sealed every 5m for expansion. t=10cm

USL +3.15m

METALLIC BEAM

8CM

AS PER STRUCTURE PLANS

P03: INTERIOR CONCRETE FLOOR WITH EPOXY RESIN FINISH P03.1- Epoxy resin finishing, dark grey colour and matt finish. t=1cm P03.2- Polished concrete paving, lightened and with high resistance, cut and sealed every 5m for expansion. t=9cm

R02.1

R02.2

R02.3

R02.4

R02.5

R02.6

R02.7

R02.8

R02.9

R02.10

R02.11

GLAS CONTINUOUS RAILING

P05: TEAKWOOD DECK FLOOR P05.1- Teakwood deck flooring with non-slipping treatment, made by 20x120cm panels. t=3cm P05.2- Wooden battens of variable height, following the slab slope, punctually fixed on slab. P05.3- Wooden battens of 5x7cm, punctually fixed on slab. P05.4- Two-layered bituminous impermeable membrane. t=3mm

AS PER STRUCTURE PLANS

REINFORCED CONCRETE SLAB

P04: INTERIOR CERAMIC PAVEMENT P04.1- Non-slipping porcelain stoneware tile, of 60x60cm. t=2cm P04.2- Portland cement mortar bond coat. t=1cm P04.3- Levelling screed layer. t=7cm

FALSE CEILINGS FC1: DRYWALL CEILING FC1.1- Metallic fixation t=30mm, every 120cm. FC1.2- Galvanized steel profile, suspended from slab - pladur system. FC1.3- Gypsum board, pladur type, matt white finished with smooth texture. t=12.5mm FC1.4- Rock wool insulation fixed in slab. t=10cm FC2: WOODEN FALSE CEILING: FC2.1- Galvanized steel hidden profile, suspended from slab - rosound system. FC2.2- Pinewood boards 60x120cm. t=20mm FC2.3- Rock wool insulation fixed in slab. t=10cm FFL +0.11m

OPENINGS - WALLS AND WINDOWS O01: Laminated pinewood window t=78mm, type 78 by Iscletec, with insulating glass, low emissive and vacuum chamber, with integrated acoustic insulation. Treated wood with oils and wax for exterior windows and doors. Types and dimensions per constructive plans, used in cellar and hotel.

TSL -0.05m

O02: Laminated pinewood window t=78mm, type 78 by Iscletec, with insulating glass, low emissive and vacuum chamber, with integrated acoustic insulation. Treated wood with oils and wax for exterior windows and doors. Types and dimensions per constructive plans, used in industrial rooms.

72º

24º USL -0.35m

O01

O03: Fixed solar protection with pinewood 5x5cm slats, fixed with metallic Rothoblaas profiles to the slab.

O05

O04: Dark grey exterior automatic roller blind.

FCL -0.55m

O04

FC1.4

FC1.3

O06: Industrial overhead double wood door, treated with oils and wax for the exterior. FCL -0.85m

WALLS AND PARTITIONS W01: REINFORCED CONCRETE WALL W02: REINFORCED CONCRETE WALL COATED WITH GYPSUM BOARD AND MICROCEMENT FINISH

W04: REINFORCED CONCRETE INTERIOR WALL COATED WITH WOOD

POLYSTYRENE FOAM FOR EXPANSION JOINT

AS PER STRUCTURE PLANS

SEALING JOINT BETWEEN BUILDING MATERIALS

P01.3

REINFORCED CONCRETE SLAB

W03: REINFORCED CONCRETE INTERIOR WALL COATED WITH GYPSUM BOARD

P01.1

W05: PINEWOOD VENTILATED FACADE W06: PINEWOOD FACADE W07: INTERIOR GYPSUM DRYWALL WITH MICROCEMENT AND PINEWOOD FINISH W08: INTERIOR GYPSUM DRYWALL PARTITION W09: INTERIOR GYPSUM DRYWALL PARTITION WITH PINEWOOD FINISH W10: INTERIOR WOOL PARTITION

FFL -3.40m

TSL -3.50m

USL -3.65m

6,1

6,1

6,1

6,1

6,1

6,1

REINFORCED CONCRETE DECK T=15CM

6,1

COMPACTED GROUND

BLINDING CONCRETE T=10CM

48,8 6,1

WELDED MESH

AS PER FOUNDATION PLAN

SUPPORT WEDGES

REINFORCED CONCRETE FOOTING

CONCRETE BASE T=50MM

-3.95m

IMPERMEABLE POLYETHYLENE SHEET 150µm

USL -3.65m

BACKFILL DRAINATGE DITCH WITH GRAVEL

FC1.1

O05: Wooden wall above windows, made of exterior treated pinewood board, breathable membrane, rock wool insulation in between wooden studs, vapor barrier and interior finish of oriented strand board OSB. FC1.2

RAINDROP

TRANSVERSAL SECTION 2

!"#$%&

!"#$%&'(')'1:20 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././


ROOFS R01: FLAT NON-TRAFFICABLE INVERTED ROOF WITH GRAVEL FINISH R01.1- Protection layer with ø20-35mm gravel with rounded edge. R01.2- Protective polypropylene geotextile sheet R01.3- Rigid boards of extruded polystyrene thermal insulation. t=40mm R01.4- Modified bitumen waterproofing membrane for roofs. R01.5- Protective polypropylene geotextile sheet. R01.6- Slope formation with cellular concrete. ID:300kg/m3 R01.7- Vapor barrier. R01.8- Linear reinforcement, self-protected impermeable membrane. R01.9- Polystyrene foam for expansion joint. t=10mm R1.10- Galvanized steel plate for roof coping. t=1.5mm

TSL -5.42m

USL +5.30m

AS PER STRUCTURE PLANS

R02: FLAT TRAFFICABLE INVERTED ROOF WITH PRECAST CONCRETE FLOATING FINISH R02.1- Finished floating pavement with non-slipping precast concrete tiles of 120x120cm. t=30mm R02.2- Adjustable self-leveling supports for floating pavement. R02.3- Protective polypropylene geotextile sheet. R02.4- Rigid boards of extruded polystyrene thermal insulation. t=40mm R02.5- Modified bitumen waterproofing membrane for roofs. R02.6- Protective polypropylene geotextile sheet. R02.7- Slope formation with cellular concrete. ID:300kg/m3 R02.8- Anti-impact sheet, placed on slab above bedrooms only. t=5mm R02.9- Vapor barrier. R02.10- Linear reinforcement, self-protected impermeable membrane. R02.11- Polystyrene foam for expansion joint. t=10mm

4.50m

R03: LIGHT WOODEN CLT ROOF WITH ZINC FINISH R03.1- Zinc plate finishing, with structured separation sheet. t=0.6mm R03.2- Oriented strand board (OSB), mechanically fixed to wooden battens. t=18mm R03.3- Ventilated chamber. t=20mm R03.4- Slope formation with wooden battens of variable height, following the roof slope. R03.5- Rigid boards of extruded polystyrene thermal insulation. t=80mm R03.6- Vapor barrier. R03.7- Cross-laminated timber (CLT) board, made from 5 glued together and perpendicullary oriented layers of solid-wood (30-20-20-20-30mm). t=120mm R03.8- Lag screw every 30cm, to join the CLT board with the timber beams and joists. R03.9- Perimeter finish plate of galvanized steel, coated and fixed, leaving 2mm for expansion.

R01.10

AS PER STRUCTURE PLANS

CLT BOARD

WOOD JOIST 0.15X0.25CM

R03.8

R03.7

R03.6

R03.5

R03.3

R03.2

R03.1

O02

FFL +3.60m

GALVANIZED PROTECTIVE STEEL PLATE WOOD BEAM 0.15X0.45CM

PAVEMENTS P01: INTERIOR WOOD PAVEMENT P01.1- Pine wood parquet flooring, panels of 20x120cm. t=3cm P01.2- Pinewood battens of 5x7cm, in one direction, punctually fixed. (Anit-impact sheet t=5mm, placed under battens above bedroms). P01.3- Rock wool insulation between battens. t=7cm

AS PER STRUCTURE PLANS

P02: INTERIOR POLISHED CONCRETE FLOOR P02.1- Polished concrete paving lightened and with high resistance, rendered with quartz powder, cut and sealed every 5m for expansion. t=10cm

USL +3.15m

REINFORCED CONCRETE WALL AS PER STRUCTURE PLANS

P03: INTERIOR CONCRETE FLOOR WITH EPOXY RESIN FINISH P03.1- Epoxy resin finishing, dark grey colour and matt finish. t=1cm P03.2- Polished concrete paving, lightened and with high resistance, cut and sealed every 5m for expansion. t=9cm

AS PER STRUCTURE PLANS

METALLIC JOIST IPE200 P05.1

P05.3

AS PER STRUCTURE PLANS

R02.11

R02.10

R02.6

R02.5

R02.4

R02.3

R02.1

R02.2

REINFORCED CONCRETE SLAB

P04: INTERIOR CERAMIC PAVEMENT P04.1- Non-slipping porcelain stoneware tile, of 60x60cm. t=2cm P04.2- Portland cement mortar bond coat. t=1cm P04.3- Levelling screed layer. t=7cm

FFL +0.11m

OPENINGS - WALLS AND WINDOWS O01: Laminated pinewood window t=78mm, type 78 by Iscletec, with insulating glass, low emissive and vacuum chamber, with integrated acoustic insulation. Treated wood with oils and wax for exterior windows and doors. Types and dimensions per constructive plans, used in cellar and hotel.

SSL ±0.00m

-0.20m

R02.9

R02.8

R02.7

TSL -0.05m

RAINDROP

USL -0.55m

USL -0.35m

O05

O05

O01

O02

FALSE CEILINGS FC1: DRYWALL CEILING FC1.1- Metallic fixation t=30mm, every 120cm. FC1.2- Galvanized steel profile, suspended from slab - pladur system. FC1.3- Gypsum board, pladur type, matt white finished with smooth texture. t=12.5mm FC1.4- Rock wool insulation fixed in slab. t=10cm FC2: WOODEN FALSE CEILING: FC2.1- Galvanized steel hidden profile, suspended from slab - rosound system. FC2.2- Pinewood boards 60x120cm. t=20mm FC2.3- Rock wool insulation fixed in slab. t=10cm

FFL +0.10m

USL -0.35m

P05: TEAKWOOD DECK FLOOR P05.1- Teakwood deck flooring with non-slipping treatment, made by 20x120cm panels. t=3cm P05.2- Wooden battens of variable height, following the slab slope, punctually fixed on slab. P05.3- Wooden battens of 5x7cm, punctually fixed on slab. P05.4- Two-layered bituminous impermeable membrane. t=3mm

O02: Laminated pinewood window t=78mm, type 78 by Iscletec, with insulating glass, low emissive and vacuum chamber, with integrated acoustic insulation. Treated wood with oils and wax for exterior windows and doors. Types and dimensions per constructive plans, used in industrial rooms. O03: Fixed solar protection with pinewood 5x5cm slats, fixed with metallic Rothoblaas profiles to the slab. O04: Dark grey exterior automatic roller blind.

FC2.2

FC2.1

O05: Wooden wall above windows, made of exterior treated pinewood board, breathable membrane, rock wool insulation in between wooden studs, vapor barrier and interior finish of oriented strand board OSB. O06: Industrial overhead double wood door, treated with oils and wax for the exterior. WALLS AND PARTITIONS W01: REINFORCED CONCRETE WALL W02: REINFORCED CONCRETE WALL COATED WITH GYPSUM BOARD AND MICROCEMENT FINISH

W04: REINFORCED CONCRETE INTERIOR WALL COATED WITH WOOD

SEALING JOINT BETWEEN BUILDING MATERIALS

POLYSTYRENE FOAM FOR EXPANSION JOINT

P01.1

P01.3

P01.2

W03: REINFORCED CONCRETE INTERIOR WALL COATED WITH GYPSUM BOARD

W05: PINEWOOD VENTILATED FACADE W06: PINEWOOD FACADE W07: INTERIOR GYPSUM DRYWALL WITH MICROCEMENT AND PINEWOOD FINISH W08: INTERIOR GYPSUM DRYWALL PARTITION W09: INTERIOR GYPSUM DRYWALL PARTITION WITH PINEWOOD FINISH W10: INTERIOR WOOL PARTITION

TSL -3.50m

P03.2

P03.1

FFL -3.40m

USL -3.65m

REINFORCED CONCRETE FOOTING AS PER FOUNDATION PLAN

BLINDING CONCRETE T=10CM

IMPERMEABLE POLYETHYLENE SHEET 150µm

BACKFILL DRAINATGE DITCH WITH GRAVEL

REINFORCED CONCRETE DECK T=15CM

WELDED MESH

SUPPORT WEDGES

CONCRETE BASE T=50MM

COMPACTED GROUND

FFL -3.80m

SLATE ROCKS AND GRAPEVINES

SSL -3.90m

TOP SOIL TAKEN FROM EARTHWORKS ANTI-ROOT GEOTEXTILE LAYER REINFORCED CONCRETE RETAINING WALL

USL -4.05m

AS PER STRUCTURE PLANS

-4.20m

48,8 6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

TRANSVERSAL SECTION 2

!"#$%&

!"#$%&'(')'1:20 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././


AS PER STRUCTURE PLANS

R02: FLAT TRAFFICABLE INVERTED ROOF WITH PRECAST CONCRETE FLOATING FINISH R02.1- Finished floating pavement with non-slipping precast concrete tiles of 120x120cm. t=30mm R02.2- Adjustable self-leveling supports for floating pavement. R02.3- Protective polypropylene geotextile sheet. R02.4- Rigid boards of extruded polystyrene thermal insulation. t=40mm R02.5- Modified bitumen waterproofing membrane for roofs. R02.6- Protective polypropylene geotextile sheet. R02.7- Slope formation with cellular concrete. ID:300kg/m3 R02.8- Anti-impact sheet, placed on slab above bedrooms only. t=5mm R02.9- Vapor barrier. R02.10- Linear reinforcement, self-protected impermeable membrane. R02.11- Polystyrene foam for expansion joint. t=10mm R03: LIGHT WOODEN CLT ROOF WITH ZINC FINISH R03.1- Zinc plate finishing, with structured separation sheet. t=0.6mm R03.2- Oriented strand board (OSB), mechanically fixed to wooden battens. t=18mm R03.3- Ventilated chamber. t=20mm R03.4- Slope formation with wooden battens of variable height, following the roof slope. R03.5- Rigid boards of extruded polystyrene thermal insulation. t=80mm R03.6- Vapor barrier. R03.7- Cross-laminated timber (CLT) board, made from 5 glued together and perpendicullary oriented layers of solid-wood (30-20-20-20-30mm). t=120mm R03.8- Lag screw every 30cm, to join the CLT board with the timber beams and joists. R03.9- Perimeter finish plate of galvanized steel, coated and fixed, leaving 2mm for expansion.

R01.1

R01.2

R01.3

R01.4

R01.5

R01.6

R01.7

R01.8

R01.10

R01.9

REINFORCED CONCRETE SLAB

ROOFS R01: FLAT NON-TRAFFICABLE INVERTED ROOF WITH GRAVEL FINISH R01.1- Protection layer with ø20-35mm gravel with rounded edge. R01.2- Protective polypropylene geotextile sheet R01.3- Rigid boards of extruded polystyrene thermal insulation. t=40mm R01.4- Modified bitumen waterproofing membrane for roofs. R01.5- Protective polypropylene geotextile sheet. R01.6- Slope formation with cellular concrete. ID:300kg/m3 R01.7- Vapor barrier. R01.8- Linear reinforcement, self-protected impermeable membrane. R01.9- Polystyrene foam for expansion joint. t=10mm R1.10- Galvanized steel plate for roof coping. t=1.5mm

SLOPE DIRECTION FFL +3.60m

RAINDROP

TSL +3.45m

PAVEMENTS P01: INTERIOR WOOD PAVEMENT P01.1- Pine wood parquet flooring, panels of 20x120cm. t=3cm P01.2- Pinewood battens of 5x7cm, in one direction, punctually fixed. (Anit-impact sheet t=5mm, placed under battens above bedroms). P01.3- Rock wool insulation between battens. t=7cm

USL +3.15m

P02: INTERIOR POLISHED CONCRETE FLOOR P02.1- Polished concrete paving lightened and with high resistance, rendered with quartz powder, cut and sealed every 5m for expansion. t=10cm

W05.5

P03: INTERIOR CONCRETE FLOOR WITH EPOXY RESIN FINISH P03.1- Epoxy resin finishing, dark grey colour and matt finish. t=1cm P03.2- Polished concrete paving, lightened and with high resistance, cut and sealed every 5m for expansion. t=9cm

W05.7

W05.9

W05.4

W05.10

FCL +2.60m

P05: TEAKWOOD DECK FLOOR P05.1- Teakwood deck flooring with non-slipping treatment, made by 20x120cm panels. t=3cm P05.2- Wooden battens of variable height, following the slab slope, punctually fixed on slab. P05.3- Wooden battens of 5x7cm, punctually fixed on slab. P05.4- Two-layered bituminous impermeable membrane. t=3mm

P01.1

FALSE CEILINGS FC1: DRYWALL CEILING FC1.1- Metallic fixation t=30mm, every 120cm. FC1.2- Galvanized steel profile, suspended from slab - pladur system. FC1.3- Gypsum board, pladur type, matt white finished with smooth texture. t=12.5mm FC1.4- Rock wool insulation fixed in slab. t=10cm P01.3

W05.3

P04: INTERIOR CERAMIC PAVEMENT P04.1- Non-slipping porcelain stoneware tile, of 60x60cm. t=2cm P04.2- Portland cement mortar bond coat. t=1cm P04.3- Levelling screed layer. t=7cm

AS PER STRUCTURE PLANS

W05.8

REINFORCED CONCRETE SLAB

W05.2

FC2.2

W05.6

FC2.1

W05.1

FC2: WOODEN FALSE CEILING: FC2.1- Galvanized steel hidden profile, suspended from slab - rosound system. FC2.2- Pinewood boards 60x120cm. t=20mm FC2.3- Rock wool insulation fixed in slab. t=10cm OPENINGS - WALLS AND WINDOWS O01: Laminated pinewood window t=78mm, type 78 by Iscletec, with insulating glass, low emissive and vacuum chamber, with integrated acoustic insulation. Treated wood with oils and wax for exterior windows and doors. Types and dimensions per constructive plans, used in cellar and hotel.

FFL +0.10m

SSL ±0.00m

O02: Laminated pinewood window t=78mm, type 78 by Iscletec, with insulating glass, low emissive and vacuum chamber, with integrated acoustic insulation. Treated wood with oils and wax for exterior windows and doors. Types and dimensions per constructive plans, used in industrial rooms.

72º

24º

RAINDROP

USL -0.35m

FC1.4

O03: Fixed solar protection with pinewood 5x5cm slats, fixed with metallic Rothoblaas profiles to the slab. O04: Dark grey exterior automatic roller blind. O05: Wooden wall above windows, made of exterior treated pinewood board, breathable membrane, rock wool insulation in between wooden studs, vapor barrier and interior finish of oriented strand board OSB.

O05

O06: Industrial overhead double wood door, treated with oils and wax for the exterior. O01

WALLS AND PARTITIONS W01: REINFORCED CONCRETE WALL

FC1.3

FC1.2

FC1.1

O03

W02: REINFORCED CONCRETE WALL COATED WITH GYPSUM BOARD AND MICROCEMENT FINISH W03: REINFORCED CONCRETE INTERIOR WALL COATED WITH GYPSUM BOARD W04: REINFORCED CONCRETE INTERIOR WALL COATED WITH WOOD

6,1

P01.3

W09: INTERIOR GYPSUM DRYWALL PARTITION WITH PINEWOOD FINISH 6,1

P01.1

6,1

W08: INTERIOR GYPSUM DRYWALL PARTITION

P05.4

6,1

W07: INTERIOR GYPSUM DRYWALL WITH MICROCEMENT AND PINEWOOD FINISH

P05.2

6,1

W06: PINEWOOD FACADE

P05.1

6,1

POLYSTYRENE FOAM FOR EXPANSION JOINT

6,1

SEALING JOINT BETWEEN BUILDING MATERIALS

48,8 6,1

AS PER STRUCTURE PLANS

REINFORCED CONCRETE SLAB

W05: PINEWOOD VENTILATED FACADE

W10: INTERIOR WOOL PARTITION

FFL -3.40m

SSL -3.50m

USL -3.65m

USL -3.80m 6,1

REINFORCED CONCRETE FOOTING AS PER FOUNDATION PLAN

BLINDING CONCRETE T=10CM

COMPACTED GROUND

6,1

REINFORCED CONCRETE DECK T=15CM

6,1

-3.95m

WELDED MESH

6,1

SUPPORT WEDGES

6,1

CONCRETE BASE T=50MM

6,1

BACKFILL DRAINATGE DITCH WITH GRAVEL

6,1

IMPERMEABLE POLYETHYLENE SHEET 150µm

48,8 6,1

TRANSVERSAL SECTION 4

48,8 6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

!"#$%&

!"#$%&'(')'1:20 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././


FFL +5.55m

TSL -5.42m

AS PER STRUCTURE PLANS

CLT BOARD

WOOD JOIST 0.15X0.25CM

AS PER STRUCTURE PLANS

R03.1

R03.2

R03.3

R03.5

FC2.2

FC2.1

O01

R03.6

R03.8

FCL +5.05m

R03.7

USL +5.30m

4.50m

ROOFS R01: FLAT NON-TRAFFICABLE INVERTED ROOF WITH GRAVEL FINISH R01.1- Protection layer with ø20-35mm gravel with rounded edge. R01.2- Protective polypropylene geotextile sheet R01.3- Rigid boards of extruded polystyrene thermal insulation. t=40mm R01.4- Modified bitumen waterproofing membrane for roofs. R01.5- Protective polypropylene geotextile sheet. R01.6- Slope formation with cellular concrete. ID:300kg/m3 R01.7- Vapor barrier. R01.8- Linear reinforcement, self-protected impermeable membrane. R01.9- Polystyrene foam for expansion joint. t=10mm R1.10- Galvanized steel plate for roof coping. t=1.5mm R02: FLAT TRAFFICABLE INVERTED ROOF WITH PRECAST CONCRETE FLOATING FINISH R02.1- Finished floating pavement with non-slipping precast concrete tiles of 120x120cm. t=30mm R02.2- Adjustable self-leveling supports for floating pavement. R02.3- Protective polypropylene geotextile sheet. R02.4- Rigid boards of extruded polystyrene thermal insulation. t=40mm R02.5- Modified bitumen waterproofing membrane for roofs. R02.6- Protective polypropylene geotextile sheet. R02.7- Slope formation with cellular concrete. ID:300kg/m3 R02.8- Anti-impact sheet, placed on slab above bedrooms only. t=5mm R02.9- Vapor barrier. R02.10- Linear reinforcement, self-protected impermeable membrane. R02.11- Polystyrene foam for expansion joint. t=10mm R03: LIGHT WOODEN CLT ROOF WITH ZINC FINISH R03.1- Zinc plate finishing, with structured separation sheet. t=0.6mm R03.2- Oriented strand board (OSB), mechanically fixed to wooden battens. t=18mm R03.3- Ventilated chamber. t=20mm R03.4- Slope formation with wooden battens of variable height, following the roof slope. R03.5- Rigid boards of extruded polystyrene thermal insulation. t=80mm R03.6- Vapor barrier. R03.7- Cross-laminated timber (CLT) board, made from 5 glued together and perpendicullary oriented layers of solid-wood (30-20-20-20-30mm). t=120mm R03.8- Lag screw every 30cm, to join the CLT board with the timber beams and joists. R03.9- Perimeter finish plate of galvanized steel, coated and fixed, leaving 2mm for expansion. PAVEMENTS P01: INTERIOR WOOD PAVEMENT P01.1- Pine wood parquet flooring, panels of 20x120cm. t=3cm P01.2- Pinewood battens of 5x7cm, in one direction, punctually fixed. (Anit-impact sheet t=5mm, placed under battens above bedroms). P01.3- Rock wool insulation between battens. t=7cm P02: INTERIOR POLISHED CONCRETE FLOOR P02.1- Polished concrete paving lightened and with high resistance, rendered with quartz powder, cut and sealed every 5m for expansion. t=10cm P03: INTERIOR CONCRETE FLOOR WITH EPOXY RESIN FINISH P03.1- Epoxy resin finishing, dark grey colour and matt finish. t=1cm P03.2- Polished concrete paving, lightened and with high resistance, cut and sealed every 5m for expansion. t=9cm

P05: TEAKWOOD DECK FLOOR P05.1- Teakwood deck flooring with non-slipping treatment, made by 20x120cm panels. t=3cm P05.2- Wooden battens of variable height, following the slab slope, punctually fixed on slab. P05.3- Wooden battens of 5x7cm, punctually fixed on slab. P05.4- Two-layered bituminous impermeable membrane. t=3mm FALSE CEILINGS FC1: DRYWALL CEILING FC1.1- Metallic fixation t=30mm, every 120cm. FC1.2- Galvanized steel profile, suspended from slab - pladur system. FC1.3- Gypsum board, pladur type, matt white finished with smooth texture. t=12.5mm FC1.4- Rock wool insulation fixed in slab. t=10cm

R02.1

R02.2

R02.3

R02.4

R02.5

R02.6

R02.7

R02.9

R02.10

R02.11

P01.3

P01.1

AS PER STRUCTURE PLANS

REINFORCED CONCRETE SLAB

P04: INTERIOR CERAMIC PAVEMENT P04.1- Non-slipping porcelain stoneware tile, of 60x60cm. t=2cm P04.2- Portland cement mortar bond coat. t=1cm P04.3- Levelling screed layer. t=7cm

FC2: WOODEN FALSE CEILING: FC2.1- Galvanized steel hidden profile, suspended from slab - rosound system. FC2.2- Pinewood boards 60x120cm. t=20mm FC2.3- Rock wool insulation fixed in slab. t=10cm FFL +0.11m

FFL +0.10m

OPENINGS - WALLS AND WINDOWS O01: Laminated pinewood window t=78mm, type 78 by Iscletec, with insulating glass, low emissive and vacuum chamber, with integrated acoustic insulation. Treated wood with oils and wax for exterior windows and doors. Types and dimensions per constructive plans, used in cellar and hotel.

SSL ±0.00m TSL -0.05m

O02: Laminated pinewood window t=78mm, type 78 by Iscletec, with insulating glass, low emissive and vacuum chamber, with integrated acoustic insulation. Treated wood with oils and wax for exterior windows and doors. Types and dimensions per constructive plans, used in industrial rooms. USL -0.35m

USL -0.35m

O03: Fixed solar protection with pinewood 5x5cm slats, fixed with metallic Rothoblaas profiles to the slab.

O05

O01

O04: Dark grey exterior automatic roller blind.

FCL -0.55m

FC2.2

FC2.1

O05: Wooden wall above windows, made of exterior treated pinewood board, breathable membrane, rock wool insulation in between wooden studs, vapor barrier and interior finish of oriented strand board OSB. O06: Industrial overhead double wood door, treated with oils and wax for the exterior. WALLS AND PARTITIONS W01: REINFORCED CONCRETE WALL W02: REINFORCED CONCRETE WALL COATED WITH GYPSUM BOARD AND MICROCEMENT FINISH W03: REINFORCED CONCRETE INTERIOR WALL COATED WITH GYPSUM BOARD W04: REINFORCED CONCRETE INTERIOR WALL COATED WITH WOOD W05: PINEWOOD VENTILATED FACADE W06: PINEWOOD FACADE

6,1

6,1

FFL -3.40m

TSL -3.50m

6,1

W09: INTERIOR GYPSUM DRYWALL PARTITION WITH PINEWOOD FINISH W10: INTERIOR WOOL PARTITION

48,8 6,1

6,1

6,1

6,1

6,1

6,1

P03.2

6,1

W08: INTERIOR GYPSUM DRYWALL PARTITION

P03.1

6,1

POLYSTYRENE FOAM FOR EXPANSION JOINT

6,1

SEALING JOINT BETWEEN BUILDING MATERIALS

P01.3

P01.1

P01.2

W07: INTERIOR GYPSUM DRYWALL WITH MICROCEMENT AND PINEWOOD FINISH

USL -3.65m FFL -3.80m

REINFORCED CONCRETE DECK T=15CM

WELDED MESH

SUPPORT WEDGES

CONCRETE BASE T=50MM

IMPERMEABLE POLYETHYLENE SHEET 150µm

BACKFILL DRAINATGE DITCH WITH GRAVEL

COMPACTED GROUND

48,8 6,1

6,1

6,1

6,1

SSL -3.90m

USL -4.05m

REINFORCED CONCRETE RETAINING WALL AS PER STRUCTURE PLANS

-4.20m

TRANSVERSAL SECTION 4

48,8 6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

REINFORCED CONCRETE FOOTING AS PER FOUNDATION PLAN

BLINDING CONCRETE T=10CM

!"#$%$

!"#$%&'(')'1:20 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././


AS PER STRUCTURE PLANS

R02: FLAT TRAFFICABLE INVERTED ROOF WITH PRECAST CONCRETE FLOATING FINISH R02.1- Finished floating pavement with non-slipping precast concrete tiles of 120x120cm. t=30mm R02.2- Adjustable self-leveling supports for floating pavement. R02.3- Protective polypropylene geotextile sheet. R02.4- Rigid boards of extruded polystyrene thermal insulation. t=40mm R02.5- Modified bitumen waterproofing membrane for roofs. R02.6- Protective polypropylene geotextile sheet. R02.7- Slope formation with cellular concrete. ID:300kg/m3 R02.8- Anti-impact sheet, placed on slab above bedrooms only. t=5mm R02.9- Vapor barrier. R02.10- Linear reinforcement, self-protected impermeable membrane. R02.11- Polystyrene foam for expansion joint. t=10mm

R01.1

R01.2

R01.3

R01.4

R01.5

R01.6

R01.7

R01.8

R01.10

R01.9

REINFORCED CONCRETE SLAB

ROOFS R01: FLAT NON-TRAFFICABLE INVERTED ROOF WITH GRAVEL FINISH R01.1- Protection layer with ø20-35mm gravel with rounded edge. R01.2- Protective polypropylene geotextile sheet R01.3- Rigid boards of extruded polystyrene thermal insulation. t=40mm R01.4- Modified bitumen waterproofing membrane for roofs. R01.5- Protective polypropylene geotextile sheet. R01.6- Slope formation with cellular concrete. ID:300kg/m3 R01.7- Vapor barrier. R01.8- Linear reinforcement, self-protected impermeable membrane. R01.9- Polystyrene foam for expansion joint. t=10mm R1.10- Galvanized steel plate for roof coping. t=1.5mm

SLOPE DIRECTION FFL +3.60m

TSL +3.45m

PAVEMENTS P01: INTERIOR WOOD PAVEMENT P01.1- Pine wood parquet flooring, panels of 20x120cm. t=3cm P01.2- Pinewood battens of 5x7cm, in one direction, punctually fixed. (Anit-impact sheet t=5mm, placed under battens above bedroms). P01.3- Rock wool insulation between battens. t=7cm

USL +3.15m

P02: INTERIOR POLISHED CONCRETE FLOOR P02.1- Polished concrete paving lightened and with high resistance, rendered with quartz powder, cut and sealed every 5m for expansion. t=10cm

72º

24º

RAINDROP

O01

O05 FCL +2.95m

FC1.4

P01.3

P01.1

FFL +0.11m

P03: INTERIOR CONCRETE FLOOR WITH EPOXY RESIN FINISH P03.1- Epoxy resin finishing, dark grey colour and matt finish. t=1cm P03.2- Polished concrete paving, lightened and with high resistance, cut and sealed every 5m for expansion. t=9cm

AS PER STRUCTURE PLANS

P04: INTERIOR CERAMIC PAVEMENT P04.1- Non-slipping porcelain stoneware tile, of 60x60cm. t=2cm P04.2- Portland cement mortar bond coat. t=1cm P04.3- Levelling screed layer. t=7cm

REINFORCED CONCRETE SLAB

FC1.3

FC1.2

R02.11

R02.10

R02.9

R02.8

R02.7

R02.6

R02.5

R02.4

R02.3

R02.2

R02.1

FC1.1

O04

R03: LIGHT WOODEN CLT ROOF WITH ZINC FINISH R03.1- Zinc plate finishing, with structured separation sheet. t=0.6mm R03.2- Oriented strand board (OSB), mechanically fixed to wooden battens. t=18mm R03.3- Ventilated chamber. t=20mm R03.4- Slope formation with wooden battens of variable height, following the roof slope. R03.5- Rigid boards of extruded polystyrene thermal insulation. t=80mm R03.6- Vapor barrier. R03.7- Cross-laminated timber (CLT) board, made from 5 glued together and perpendicullary oriented layers of solid-wood (30-20-20-20-30mm). t=120mm R03.8- Lag screw every 30cm, to join the CLT board with the timber beams and joists. R03.9- Perimeter finish plate of galvanized steel, coated and fixed, leaving 2mm for expansion.

P05: TEAKWOOD DECK FLOOR P05.1- Teakwood deck flooring with non-slipping treatment, made by 20x120cm panels. t=3cm P05.2- Wooden battens of variable height, following the slab slope, punctually fixed on slab. P05.3- Wooden battens of 5x7cm, punctually fixed on slab. P05.4- Two-layered bituminous impermeable membrane. t=3mm FALSE CEILINGS FC1: DRYWALL CEILING FC1.1- Metallic fixation t=30mm, every 120cm. FC1.2- Galvanized steel profile, suspended from slab - pladur system. FC1.3- Gypsum board, pladur type, matt white finished with smooth texture. t=12.5mm FC1.4- Rock wool insulation fixed in slab. t=10cm FC2: WOODEN FALSE CEILING: FC2.1- Galvanized steel hidden profile, suspended from slab - rosound system. FC2.2- Pinewood boards 60x120cm. t=20mm FC2.3- Rock wool insulation fixed in slab. t=10cm OPENINGS - WALLS AND WINDOWS O01: Laminated pinewood window t=78mm, type 78 by Iscletec, with insulating glass, low emissive and vacuum chamber, with integrated acoustic insulation. Treated wood with oils and wax for exterior windows and doors. Types and dimensions per constructive plans, used in cellar and hotel.

FFL FFL +0.10m

TSL SSL ±0.00m TSL -0.05m

O02: Laminated pinewood window t=78mm, type 78 by Iscletec, with insulating glass, low emissive and vacuum chamber, with integrated acoustic insulation. Treated wood with oils and wax for exterior windows and doors. Types and dimensions per constructive plans, used in industrial rooms. USL -0.35m

USL -0.35m

O03: Fixed solar protection with pinewood 5x5cm slats, fixed with metallic Rothoblaas profiles to the slab. O04: Dark grey exterior automatic roller blind.

FCL-0.55m

O05: Wooden wall above windows, made of exterior treated pinewood board, breathable membrane, rock wool insulation in between wooden studs, vapor barrier and interior finish of oriented strand board OSB.

W07.6

FC2.2

FC2.1

W07.5

W07.4

O06: Industrial overhead double wood door, treated with oils and wax for the exterior.

FCL -0.90m

TRANSLUCENT GLASS SHOWER SCREEN

WALLS AND PARTITIONS W01: REINFORCED CONCRETE WALL

W07.2

FC1.4

FC1.3

FC1.1

FC1.2

W07.3

W02: REINFORCED CONCRETE WALL COATED WITH GYPSUM BOARD AND MICROCEMENT FINISH

W07.1

W03: REINFORCED CONCRETE INTERIOR WALL COATED WITH GYPSUM BOARD 48,8 6,1

6,1

6,1

6,1

6,1

6,1

6,1

W04: REINFORCED CONCRETE INTERIOR WALL COATED WITH WOOD

6,1

W05: PINEWOOD VENTILATED FACADE W06: PINEWOOD FACADE W07: INTERIOR GYPSUM DRYWALL WITH MICROCEMENT AND PINEWOOD FINISH W08: INTERIOR GYPSUM DRYWALL PARTITION

P01.3

P01.2

P01.1

W09: INTERIOR GYPSUM DRYWALL PARTITION WITH PINEWOOD FINISH W10: INTERIOR WOOL PARTITION

48,8 6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

FFL -3.40m

TSL -3.50m

WELDED MESH

REINFORCED CONCRETE DECK T=15CM

SUPPORT WEDGES

CONCRETE BASE T=50MM

IMPERMEABLE POLYETHYLENE SHEET 150µm

BACKFILL DRAINATGE DITCH WITH GRAVEL

COMPACTED GROUND

USL -3.65m

48,8

TRANSVERSAL SECTION 5

!"#$%&

!"#$%&'(')'1:20 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././


FFL +5.55m

TSL -5.42m

USL +5.30m

WOOD JOIST 0.15X0.25CM

R03.8

R03.7

R03.6

CLT BOARD R03.5

R03.4

R03.3

R03.2

R03.9

R03.1

AS PER STRUCTURE PLANS

AS PER STRUCTURE PLANS

4.50m

SLOPE DIRECTION FFL +3.60m

R01.10

R01.9

R01.8

R01.7

R01.6

R01.5

R01.4

R01.3

R01.2

R01.1

AS PER STRUCTURE PLANS

REINFORCED CONCRETE SLAB

O02

ROOFS R01: FLAT NON-TRAFFICABLE INVERTED ROOF WITH GRAVEL FINISH R01.1- Protection layer with ø20-35mm gravel with rounded edge. R01.2- Protective polypropylene geotextile sheet R01.3- Rigid boards of extruded polystyrene thermal insulation. t=40mm R01.4- Modified bitumen waterproofing membrane for roofs. R01.5- Protective polypropylene geotextile sheet. R01.6- Slope formation with cellular concrete. ID:300kg/m3 R01.7- Vapor barrier. R01.8- Linear reinforcement, self-protected impermeable membrane. R01.9- Polystyrene foam for expansion joint. t=10mm R1.10- Galvanized steel plate for roof coping. t=1.5mm R02: FLAT TRAFFICABLE INVERTED ROOF WITH PRECAST CONCRETE FLOATING FINISH R02.1- Finished floating pavement with non-slipping precast concrete tiles of 120x120cm. t=30mm R02.2- Adjustable self-leveling supports for floating pavement. R02.3- Protective polypropylene geotextile sheet. R02.4- Rigid boards of extruded polystyrene thermal insulation. t=40mm R02.5- Modified bitumen waterproofing membrane for roofs. R02.6- Protective polypropylene geotextile sheet. R02.7- Slope formation with cellular concrete. ID:300kg/m3 R02.8- Anti-impact sheet, placed on slab above bedrooms only. t=5mm R02.9- Vapor barrier. R02.10- Linear reinforcement, self-protected impermeable membrane. R02.11- Polystyrene foam for expansion joint. t=10mm R03: LIGHT WOODEN CLT ROOF WITH ZINC FINISH R03.1- Zinc plate finishing, with structured separation sheet. t=0.6mm R03.2- Oriented strand board (OSB), mechanically fixed to wooden battens. t=18mm R03.3- Ventilated chamber. t=20mm R03.4- Slope formation with wooden battens of variable height, following the roof slope. R03.5- Rigid boards of extruded polystyrene thermal insulation. t=80mm R03.6- Vapor barrier. R03.7- Cross-laminated timber (CLT) board, made from 5 glued together and perpendicullary oriented layers of solid-wood (30-20-20-20-30mm). t=120mm R03.8- Lag screw every 30cm, to join the CLT board with the timber beams and joists. R03.9- Perimeter finish plate of galvanized steel, coated and fixed, leaving 2mm for expansion.

TSL +3.45m

PAVEMENTS P01: INTERIOR WOOD PAVEMENT P01.1- Pine wood parquet flooring, panels of 20x120cm. t=3cm P01.2- Pinewood battens of 5x7cm, in one direction, punctually fixed. (Anit-impact sheet t=5mm, placed under battens above bedroms). P01.3- Rock wool insulation between battens. t=7cm

USL +3.15m

P02: INTERIOR POLISHED CONCRETE FLOOR P02.1- Polished concrete paving lightened and with high resistance, rendered with quartz powder, cut and sealed every 5m for expansion. t=10cm P03: INTERIOR CONCRETE FLOOR WITH EPOXY RESIN FINISH P03.1- Epoxy resin finishing, dark grey colour and matt finish. t=1cm P03.2- Polished concrete paving, lightened and with high resistance, cut and sealed every 5m for expansion. t=9cm

AS PER STRUCTURE PLANS

P03.2

STAINLESS STEEL RAILING WITH 10x1CM POSTS AND 1X1CM BALUSTERS

P03.1

REINFORCED CONCRETE SLAB

P04: INTERIOR CERAMIC PAVEMENT P04.1- Non-slipping porcelain stoneware tile, of 60x60cm. t=2cm P04.2- Portland cement mortar bond coat. t=1cm P04.3- Levelling screed layer. t=7cm P05: TEAKWOOD DECK FLOOR P05.1- Teakwood deck flooring with non-slipping treatment, made by 20x120cm panels. t=3cm P05.2- Wooden battens of variable height, following the slab slope, punctually fixed on slab. P05.3- Wooden battens of 5x7cm, punctually fixed on slab. P05.4- Two-layered bituminous impermeable membrane. t=3mm FALSE CEILINGS FC1: DRYWALL CEILING FC1.1- Metallic fixation t=30mm, every 120cm. FC1.2- Galvanized steel profile, suspended from slab - pladur system. FC1.3- Gypsum board, pladur type, matt white finished with smooth texture. t=12.5mm FC1.4- Rock wool insulation fixed in slab. t=10cm FC2: WOODEN FALSE CEILING: FC2.1- Galvanized steel hidden profile, suspended from slab - rosound system. FC2.2- Pinewood boards 60x120cm. t=20mm FC2.3- Rock wool insulation fixed in slab. t=10cm OPENINGS - WALLS AND WINDOWS O01: Laminated pinewood window t=78mm, type 78 by Iscletec, with insulating glass, low emissive and vacuum chamber, with integrated acoustic insulation. Treated wood with oils and wax for exterior windows and doors. Types and dimensions per constructive plans, used in cellar and hotel.

FFL +0.10m

SSL ±0.00m

O02: Laminated pinewood window t=78mm, type 78 by Iscletec, with insulating glass, low emissive and vacuum chamber, with integrated acoustic insulation. Treated wood with oils and wax for exterior windows and doors. Types and dimensions per constructive plans, used in industrial rooms. USL -0.35m

O03: Fixed solar protection with pinewood 5x5cm slats, fixed with metallic Rothoblaas profiles to the slab. O04: Dark grey exterior automatic roller blind. O05: Wooden wall above windows, made of exterior treated pinewood board, breathable membrane, rock wool insulation in between wooden studs, vapor barrier and interior finish of oriented strand board OSB. O06: Industrial overhead double wood door, treated with oils and wax for the exterior. WALLS AND PARTITIONS W01: REINFORCED CONCRETE WALL W02: REINFORCED CONCRETE WALL COATED WITH GYPSUM BOARD AND MICROCEMENT FINISH W03: REINFORCED CONCRETE INTERIOR WALL COATED WITH GYPSUM BOARD W04: REINFORCED CONCRETE INTERIOR WALL COATED WITH WOOD W05: PINEWOOD VENTILATED FACADE W06: PINEWOOD FACADE W07: INTERIOR GYPSUM DRYWALL WITH MICROCEMENT AND PINEWOOD FINISH W08: INTERIOR GYPSUM DRYWALL PARTITION W09: INTERIOR GYPSUM DRYWALL PARTITION WITH PINEWOOD FINISH

P03.2

P03.1

W10: INTERIOR WOOL PARTITION

FFL -3.80m

SSL -3.90m

REINFORCED CONCRETE DECK T=15CM

WELDED MESH

SUPPORT WEDGES

CONCRETE BASE T=50MM

IMPERMEABLE POLYETHYLENE SHEET 150µm

BACKFILL DRAINATGE DITCH WITH GRAVEL

COMPACTED GROUND

USL -4.05m

LONGITUDINAL SECTION 9

!"#$%& 48,8

6,1

6,1

6,1

6,1

6,1

6,1

!"#$%&'(')'1:20 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

6,1

6,1


R01.9

R03: LIGHT WOODEN CLT ROOF WITH ZINC FINISH R03.1- Zinc plate finishing, with structured separation sheet. t=0.6mm R03.2- Oriented strand board (OSB), mechanically fixed to wooden battens. t=18mm R03.3- Ventilated chamber. t=20mm R03.4- Slope formation with wooden battens of variable height, following the roof slope. R03.5- Rigid boards of extruded polystyrene thermal insulation. t=80mm R03.6- Vapor barrier. R03.7- Cross-laminated timber (CLT) board, made from 5 glued together and perpendicullary oriented layers of solid-wood (30-20-20-20-30mm). t=120mm R03.8- Lag screw every 30cm, to join the CLT board with the timber beams and joists. R03.9- Perimeter finish plate of galvanized steel, coated and fixed, leaving 2mm for expansion.

R01.10

R01.8

R01.7

R01.6

R01.5

R01.4

R01.3

R01.2

AS PER STRUCTURE PLANS

R02: FLAT TRAFFICABLE INVERTED ROOF WITH PRECAST CONCRETE FLOATING FINISH R02.1- Finished floating pavement with non-slipping precast concrete tiles of 120x120cm. t=30mm R02.2- Adjustable self-leveling supports for floating pavement. R02.3- Protective polypropylene geotextile sheet. R02.4- Rigid boards of extruded polystyrene thermal insulation. t=40mm R02.5- Modified bitumen waterproofing membrane for roofs. R02.6- Protective polypropylene geotextile sheet. R02.7- Slope formation with cellular concrete. ID:300kg/m3 R02.8- Anti-impact sheet, placed on slab above bedrooms only. t=5mm R02.9- Vapor barrier. R02.10- Linear reinforcement, self-protected impermeable membrane. R02.11- Polystyrene foam for expansion joint. t=10mm

R01.1

REINFORCED CONCRETE SLAB

ROOFS R01: FLAT NON-TRAFFICABLE INVERTED ROOF WITH GRAVEL FINISH R01.1- Protection layer with ø20-35mm gravel with rounded edge. R01.2- Protective polypropylene geotextile sheet R01.3- Rigid boards of extruded polystyrene thermal insulation. t=40mm R01.4- Modified bitumen waterproofing membrane for roofs. R01.5- Protective polypropylene geotextile sheet. R01.6- Slope formation with cellular concrete. ID:300kg/m3 R01.7- Vapor barrier. R01.8- Linear reinforcement, self-protected impermeable membrane. R01.9- Polystyrene foam for expansion joint. t=10mm R1.10- Galvanized steel plate for roof coping. t=1.5mm

SLOPE DIRECTION FFL +3.60m

PAVEMENTS P01: INTERIOR WOOD PAVEMENT P01.1- Pine wood parquet flooring, panels of 20x120cm. t=3cm P01.2- Pinewood battens of 5x7cm, in one direction, punctually fixed. (Anit-impact sheet t=5mm, placed under battens above bedroms). P01.3- Rock wool insulation between battens. t=7cm

TSL +3.45m

USL +3.15m

P02: INTERIOR POLISHED CONCRETE FLOOR P02.1- Polished concrete paving lightened and with high resistance, rendered with quartz powder, cut and sealed every 5m for expansion. t=10cm

RAINDROP

O05 FCL +2.90m

P03: INTERIOR CONCRETE FLOOR WITH EPOXY RESIN FINISH P03.1- Epoxy resin finishing, dark grey colour and matt finish. t=1cm P03.2- Polished concrete paving, lightened and with high resistance, cut and sealed every 5m for expansion. t=9cm

O01

FC1.3

FC1.2

FC1.1

P04: INTERIOR CERAMIC PAVEMENT P04.1- Non-slipping porcelain stoneware tile, of 60x60cm. t=2cm P04.2- Portland cement mortar bond coat. t=1cm P04.3- Levelling screed layer. t=7cm

AS PER STRUCTURE PLANS

P05: TEAKWOOD DECK FLOOR P05.1- Teakwood deck flooring with non-slipping treatment, made by 20x120cm panels. t=3cm P05.2- Wooden battens of variable height, following the slab slope, punctually fixed on slab. P05.3- Wooden battens of 5x7cm, punctually fixed on slab. P05.4- Two-layered bituminous impermeable membrane. t=3mm FALSE CEILINGS FC1: DRYWALL CEILING FC1.1- Metallic fixation t=30mm, every 120cm. FC1.2- Galvanized steel profile, suspended from slab - pladur system. FC1.3- Gypsum board, pladur type, matt white finished with smooth texture. t=12.5mm FC1.4- Rock wool insulation fixed in slab. t=10cm

P01.3

P01.2

P01.1

REINFORCED CONCRETE SLAB

FC1.4

O03

FC2: WOODEN FALSE CEILING: FC2.1- Galvanized steel hidden profile, suspended from slab - rosound system. FC2.2- Pinewood boards 60x120cm. t=20mm FC2.3- Rock wool insulation fixed in slab. t=10cm OPENINGS - WALLS AND WINDOWS O01: Laminated pinewood window t=78mm, type 78 by Iscletec, with insulating glass, low emissive and vacuum chamber, with integrated acoustic insulation. Treated wood with oils and wax for exterior windows and doors. Types and dimensions per constructive plans, used in cellar and hotel.

FFL +0.10m

SSL ±0.00m

O02: Laminated pinewood window t=78mm, type 78 by Iscletec, with insulating glass, low emissive and vacuum chamber, with integrated acoustic insulation. Treated wood with oils and wax for exterior windows and doors. Types and dimensions per constructive plans, used in industrial rooms. USL -0.35m

O03: Fixed solar protection with pinewood 5x5cm slats, fixed with metallic Rothoblaas profiles to the slab.

FCL -0.55m

O04: Dark grey exterior automatic roller blind.

REINFORCED CONCRETE RETAINING WALL AS PER STRUCTURE PLANS

O05: Wooden wall above windows, made of exterior treated pinewood board, breathable membrane, rock wool insulation in between wooden studs, vapor barrier and interior finish of oriented strand board OSB.

FC2.2

FC2.1

W04.1

W04.5

O06: Industrial overhead double wood door, treated with oils and wax for the exterior.

W04.4

WALLS AND PARTITIONS W01: REINFORCED CONCRETE WALL

W04.3

W02: REINFORCED CONCRETE WALL COATED WITH GYPSUM BOARD AND MICROCEMENT FINISH

W04.2

W03: REINFORCED CONCRETE INTERIOR WALL COATED WITH GYPSUM BOARD W04: REINFORCED CONCRETE INTERIOR WALL COATED WITH WOOD W05: PINEWOOD VENTILATED FACADE W06: PINEWOOD FACADE

SEALING JOINT BETWEEN BUILDING MATERIALS

POLYSTYRENE FOAM FOR EXPANSION JOINT

P03.2

P03.1

W07: INTERIOR GYPSUM DRYWALL WITH MICROCEMENT AND PINEWOOD FINISH W08: INTERIOR GYPSUM DRYWALL PARTITION W09: INTERIOR GYPSUM DRYWALL PARTITION WITH PINEWOOD FINISH W10: INTERIOR WOOL PARTITION

BACKFILL DRAINAGE DITCH WITH GRAVEL

1.8MM EPDM FILM WATERPROOFING, MECHANICALLY FIXED ON WALL

FFL -3.80m

HDPE NODULAR DRAINAGE SHEET, MECHANICALLY FIXED ON WALL

SSL -3.90m

HDPE NODULAR DRAINAGE SHEET WITH GEOTEXTILE FILM 160MM HDPE PERFORATED DRAINAGE PIPE USL -4.05m

BACKFILL WITH COMPACTED GROUND

REINFORCED CONCRETE DECK T=15CM

WELDED MESH

SUPPORT WEDGES

NATURAL TERRAIN

CONCRETE BASE T=50MM

IMPERMEABLE POLYETHYLENE SHEET 150µm

BACKFILL DRAINATGE DITCH WITH GRAVEL

COMPACTED GROUND

-4.20m

LONGITUDINAL SECTION 9

REINFORCED CONCRETE FOOTING AS PER FOUNDATION PLAN

BLINDING CONCRETE T=10CM

!"#$%& 48,8

6,1

6,1

6,1

6,1

6,1

6,1

!"#$%&'(')'1:20 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

6,1

6,1


S-6

S-5

BATHROOM

FIXED WINDOW 1.20x2.85m

TYPE BEDROOM TERRACE S=5,85m2

BC2

BW6

BW7 BW8

S=8,10m2

BO3

BF2

BF1

BW1

BP2 h=3.05m

BP4

CORRIDOR

BW9

S=6,15m2

TYPE BEDROOM BC1

LIVING ROOM

BP1

S=10,15m2

BC1

BO3

h=2.50m

BP1 h=2.85m

BW5

BC3

FIXED WINDOW 1.80x2.85m

S=33,80m2 S-2

FFL -3.50m SSL -3.40m

BW2

BO1

CASEMENT DOOR 0.80x2.85m

CASEMENT DOOR 0.80x2.50m

BO1

S-1

BO2

HOOPPER WINDOW 0.80x2.85m

BW8

S-3

BO2

HOOPPER WINDOW 0.80x2.85m

BF3

BEDROOM S=9,40m2

BW4

BW2

S-4

BW3

BEDROOM PAVEMENT FINISHES BP1: Interior pine-wood parquet flooring fixed on wood battens with rock wool insulation in between. t=10cm BP2: Exterior teakwood deck flooring with non-slipping treatment, fixed on wood battens. t=10cm BP3: Exterior seen concrete finish, with higher resistance, thicker coating and with waterproof treatment. BP4: Non-slipping natural stone shower tray t=3.5cm BEDROOM CEILING FINISH BC1: Interior matt white gypsum board, finished with smooth texture, fixed in slab with galvanized profiles. BC2: Exterior seen concrete finish, with raindrop. BEDROOM WALL FINISHES BW1: Exterior pinewood board finish, treated with oils and wax, fixed on wood battens with rock insulation in between. t=6cm BW2: Bedroom facade, made by wooden wall framing studs, rock wool insulation in between, finished with exterior treated

pinewood board fixed on OSB, and pinewood board on the interior. BW3: Interior double white gypsum board, matt white finish with smooth texture on one side, fixed with galvanized Pladur profiles on structural wall. t=6.5cm BW4: Interior corridor-bedroom partition made of double white gypsum board, matt white finish with smooth texture on both sides, fixed with galvanized Pladur profiles, with rock wool insulation in between. t=15cm BW5: Interior corridor-bedroom partition of pinewood finish on both sides glued on OSB boards, fixed with galvanized Pladur profiles, with rock insulation in between. t=16.5cm BW6: Interior corridor-bathroom partition made of OSB boards and pinewood finish on the corridor side, and double gypsum board coated with microcement on the bathroom side, fixed with galvanized Pladur profiles, with rock insulation in between. t=0.16cm BW7: Interior seen concrete finish. BW8: Translucent glass shower screen. BW9: Interior partition of double gypsum boards fixed with Pladur profiles, coated with microcement.

!"#$%&

!"#$%%&'()*+','1:50 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

BW10: Wooden wall above windows, made of exterior treated pinewood board, breathable membrane, rock wool insulation in between wooden studs, vapor barrier and interior finish of oriented strand board OSB. BEDROOM OPENINGS BO1: Entrance pine-wood opaque door made by two solid-wood panels and rock wool insulation in between. BO2: Hopper laminated pinewood window, with double insulating glass. t=78cm BO3: Fixed laminated pinewood window, with double insulating glass. t=78cm BEDROOM FINISHES BF1: Stainless steel IPE profile as mirror support. t=2cm BF2: Exterior fixed solar protection with pinewood 5x5cm slats, fixed on wood battens. BF3: Interior pinewood 5x5cm slats, as separation between bedroom and living room, fixed with meatillic profiles. BF4: Dark grey exterior automatic roller blind.


SSL -0.05m

FCL -0.35m

USL -0.35m SSL -0.05m

BF1

BW10 BO2

BF2

HOOPPER WINDOWHOOPPER WINDOW 0.80x2.85m 0.80x2.85m

FCL -0.90m

BO2

BF2

BC1

BW7

BW6 BW8

BW6

USL -0.35m

BC1

BW8

FCL -0.90m

BC2

BF1

FCL -0.35m

BW1

BW8

BW10

BC2

BP1 FFL -3.40m

BP2

BP3

BP4

WELDED MESH WELDED MESH

REINFORCED CONCRETE DECK T=15CM REINFORCED CONCRETE DECK T=15CM

SUPPORT WEDGESSUPPORT WEDGES

COMPACTED GROUND COMPACTED GROUND

USL -3.80m

USL -3.65m

BP1 FFL -3.40m

CONCRETE BASE T=50MM CONCRETE BASE T=50MM

BP2

USL -3.80m

IMPERMEABLE POLYETHYLENE IMPERMEABLE SHEET POLYETHYLENE 150µm SHEET 150µm

BP3

BACKFILL DRAINATGE DITCH DRAINATGE WITH GRAVEL BACKFILL DITCH WITH GRAVEL

SSL -3.50m

BP4 SSL -3.50m

USL -3.65m

BC2

BW5

SSL -0.05m

USL -0.35m

BF1

BW8

BW9

BC1

BW5 BO1

FCL -0.90m

CASEMENT DOOR 0.80x2.85m FCL -0.55m

FIXED WINDOW 1.80x2.50m

BO1

BO1

BW2

FIXED WINDOW 1.80x2.50m

FIXED WINDOW 1.80x2.85m

BC1

BC1

FIXED WINDOW 1.80x2.85m

BF4 BF4

BO3 BW10

BC2

BO3 BW10

USL -0.35m SSL -0.05m FCL -0.55m

FCL -0.90m

BC1

BP1 FFL -3.40m

BP3

SSL -3.50m

USL -3.65m

BP1 BP3

USL -3.80m

FFL -3.40m SSL -3.50m

USL -3.65m USL -3.80m

BEDROOM PAVEMENT FINISHES BP1: Interior pine-wood parquet flooring fixed on wood battens with rock wool insulation in between. t=10cm BP2: Exterior teakwood deck flooring with non-slipping treatment, fixed on wood battens. t=10cm BP3: Exterior seen concrete finish, with higher resistance, thicker coating and with waterproof treatment. BP4: Non-slipping natural stone shower tray. t=3.5cm BEDROOM CEILING FINISH BC1: Interior matt white gypsum board, finished with smooth texture, fixed in slab with galvanized profiles. BC2: Exterior seen concrete finish, with raindrop. BEDROOM WALL FINISHES BW1: Exterior pinewood board finish, treated with oils and wax, fixed on wood battens with rock insulation in between. t=6cm BW2: Bedroom facade, made by wooden wall framing studs, rock wool insulation in between, finished with exterior treated

pinewood board fixed on OSB, and pinewood board on the interior. BW3: Interior double white gypsum board, matt white finish with smooth texture on one side, fixed with galvanized Pladur profiles on structural wall. t=6.5cm BW4: Interior corridor-bedroom partition made of double white gypsum board, matt white finish with smooth texture on both sides, fixed with galvanized Pladur profiles, with rock wool insulation in between. t=15cm BW5: Interior corridor-bedroom partition of pinewood finish on both sides glued on OSB boards, fixed with galvanized Pladur profiles, with rock insulation in between. t=16.5cm BW6: Interior corridor-bathroom partition made of OSB boards and pinewood finish on the corridor side, and double gypsum board coated with microcement on the bathroom side, fixed with galvanized Pladur profiles, with rock insulation in between. t=0.16cm BW7: Interior seen concrete finish. BW8: Translucent glass shower screen. BW9: Interior partition of double gypsum boards fixed with Pladur profiles, coated with microcement.

!"#$%&

!"#$%%&'(")*+%,('-'.'/'0'1:20 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

BW10: Wooden wall above windows, made of exterior treated pinewood board, breathable membrane, rock wool insulation in between wooden studs, vapor barrier and interior finish of oriented strand board OSB. BEDROOM OPENINGS BO1: Entrance pine-wood opaque door made by two solid-wood panels and rock wool insulation in between. BO2: Hopper laminated pinewood window, with double insulating glass. t=78cm BO3: Fixed laminated pinewood window, with double insulating glass. t=78cm BEDROOM FINISHES BF1: Stainless steel IPE profile as mirror support. t=2cm BF2: Exterior fixed solar protection with pinewood 5x5cm slats, fixed on wood battens. BF3: Interior pinewood 5x5cm slats, as separation between bedroom and living room, fixed with meatillic profiles. BF4: Dark grey exterior automatic roller blind.


SSL -0.05m

BC2

BW4

BF3

HOOPPER WINDOWHOOPPER WINDOW 0.80x2.85m 0.80x2.85m

BC1

USL -0.35m

FFL -0.90m

BC1 BW4

FFL -0.55m

BF3

BF4 BF4

BO2 BW10

BC2

BO2 BW10

USL -0.35m SSL -0.05m FFL -0.55m

BC1

BW4

FFL -0.90m

BC1

BP1 FFL -3.40m

BP3

REINFORCED CONCRETE DECK T=15CM REINFORCED CONCRETE DECK T=15CM

WELDED MESH WELDED MESH

SUPPORT WEDGESSUPPORT WEDGES

USL -3.65m

CONCRETE BASE T=50MM CONCRETE BASE T=50MM

USL -3.80m

IMPERMEABLE POLYETHYLENE IMPERMEABLE SHEET POLYETHYLENE 150µm SHEET 150µm

USL -3.80m

COMPACTED GROUND COMPACTED GROUND

BP3

BACKFILL DRAINATGE DITCH DRAINATGE WITH GRAVEL BACKFILL DITCH WITH GRAVEL

SSL -3.50m

BP1 FFL -3.40m

SSL -3.50m

USL -3.65m

SSL -0.05m

BC2

USL -0.35m SSL -0.05m

BC2

BW2

BW4

BC1

BF3

BW2

FFL -0.55m

USL -0.35m

BO1

BW8

BW9

BW4

BC1 BW4

BC1

FFL -0.90m

BF3

BW2

CASEMENT DOOR 0.80x2.85m FFL -0.55m

FFL -0.90m

BC1

BP1 FFL -3.40m

BP3 SSL -3.50m

USL -3.65m

BP3

USL -3.80m

BP1 FFL -3.40m

SSL -3.50m

USL -3.65m USL -3.80m

BEDROOM PAVEMENT FINISHES BP1: Interior pine-wood parquet flooring fixed on wood battens with rock wool insulation in between. t=10cm BP2: Exterior teakwood deck flooring with non-slipping treatment, fixed on wood battens. t=10cm BP3: Exterior seen concrete finish, with higher resistance, thicker coating and with waterproof treatment. BP4: Non-slipping natural stone shower tray. t=3.5cm BEDROOM CEILING FINISH BC1: Interior matt white gypsum board, finished with smooth texture, fixed in slab with galvanized profiles. BC2: Exterior seen concrete finish, with raindrop. BEDROOM WALL FINISHES BW1: Exterior pinewood board finish, treated with oils and wax, fixed on wood battens with rock insulation in between. t=6cm BW2: Bedroom facade, made by wooden wall framing studs, rock wool insulation in between, finished with exterior treated

pinewood board fixed on OSB, and pinewood board on the interior. BW3: Interior double white gypsum board, matt white finish with smooth texture on one side, fixed with galvanized Pladur profiles on structural wall. t=6.5cm BW4: Interior corridor-bedroom partition made of double white gypsum board, matt white finish with smooth texture on both sides, fixed with galvanized Pladur profiles, with rock wool insulation in between. t=15cm BW5: Interior corridor-bedroom partition of pinewood finish on both sides glued on OSB boards, fixed with galvanized Pladur profiles, with rock insulation in between. t=16.5cm BW6: Interior corridor-bathroom partition made of OSB boards and pinewood finish on the corridor side, and double gypsum board coated with microcement on the bathroom side, fixed with galvanized Pladur profiles, with rock insulation in between. t=0.16cm BW7: Interior seen concrete finish. BW8: Translucent glass shower screen. BW9: Interior partition of double gypsum boards fixed with Pladur profiles, coated with microcement.

!"#$%&

!"#$%%&'(")*+%,(''-'.'/'0'1:20 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

BW10: Wooden wall above windows, made of pinewood board, breathable membrane, rock wool insulation in between wooden studs, vapor barrier and interior finish of oriented strand board. BEDROOM OPENINGS BO1: Entrance pine-wood opaque door made by two solid-wood panels and rock wool insulation in between. BO2: Hopper laminated pinewood window, with double insulating glass. t=78cm BO3: Fixed laminated pinewood window, with double insulating glass. t=78cm BEDROOM FINISHES BF1: Stainless steel IPE profile as mirror support. t=2cm BF2: Exterior fixed solar protection with pinewood 5x5cm slats, fixed on wood battens. BF3: Interior pinewood 5x5cm slats, as separation between bedroom and living room, fixed with meatillic profiles. BF4: Dark grey exterior automatic roller blind.


SSL -0.05m

USL -0.35m SSL -0.05m

BC2 BW2

FFL -0.55m

BC1

FFL -0.35m

BW1

BW3

BW1

FFL -0.35m

USL -0.35m

BC2

BF2

BW3

BW2

FFL -0.55m

BC1

BO1

BW4

BF3

CASEMENT DOOR 0.80x2.50m

BP1

BP2

FFL -3.40m SSL -3.50m

BP1

BP2

FFL -3.40m

USL -3.80m SSL -3.50m

USL -3.80m

SSL -0.05m

USL -0.35m SSL -0.05m

BP01

USL -0.35m

BC1

BW9

BW8

BW8

BW7

FFL -0.90m

BO1

BW4

BF3

BP01

BW9

BW8

BW8

BW7

CASEMENT DOOR 0.80x2.50m FFL -0.90m

BC1

BP1 FFL -3.40m

BEDROOM CEILING FINISH BC1: Interior matt white gypsum board, finished with smooth texture, fixed in slab with galvanized profiles. BC2: Exterior seen concrete finish, with raindrop. BEDROOM WALL FINISHES BW1: Exterior pinewood board finish, treated with oils and wax, fixed on wood battens with rock insulation in between. t=6cm BW2: Bedroom facade, made by wooden wall framing studs, rock wool insulation in between, finished with exterior treated

WELDED MESH WELDED MESH

REINFORCED CONCRETE DECK T=15CM REINFORCED CONCRETE DECK T=15CM

SUPPORT WEDGES SUPPORT WEDGES

BP1

CONCRETE BASE T=50MM CONCRETE BASE T=50MM

BEDROOM PAVEMENT FINISHES BP1: Interior pine-wood parquet flooring fixed on wood battens with rock wool insulation in between. t=10cm BP2: Exterior teakwood deck flooring with non-slipping treatment, fixed on wood battens. t=10cm BP3: Exterior seen concrete finish, with higher resistance, thicker coating and with waterproof treatment. BP4: Non-slipping natural stone shower tray. t=3.5cm

COMPACTED GROUND COMPACTED GROUND

BP4

SSL -3.50m

IMPERMEABLE POLYETHYLENE IMPERMEABLE SHEET POLYETHYLENE 150µm SHEET 150µm

BACKFILL DRAINATGE DITCH WITH GRAVEL BACKFILL DRAINATGE DITCH WITH GRAVEL

BP4

USL -3.60m

FFL -3.40m SSL -3.50m

USL -3.60m

pinewood board fixed on OSB, and pinewood board on the interior. BW3: Interior double white gypsum board, matt white finish with smooth texture on one side, fixed with galvanized Pladur profiles on structural wall. t=6.5cm BW4: Interior corridor-bedroom partition made of double white gypsum board, matt white finish with smooth texture on both sides, fixed with galvanized Pladur profiles, with rock wool insulation in between. t=15cm BW5: Interior corridor-bedroom partition of pinewood finish on both sides glued on OSB boards, fixed with galvanized Pladur profiles, with rock insulation in between. t=16.5cm BW6: Interior corridor-bathroom partition made of OSB boards and pinewood finish on the corridor side, and double gypsum board coated with microcement on the bathroom side, fixed with galvanized Pladur profiles, with rock insulation in between. t=0.16cm BW7: Interior seen concrete finish. BW8: Translucent glass shower screen. BW9: Interior partition of double gypsum boards fixed with Pladur profiles, coated with microcement.

!"#$%&

!"#$%%&'(")*+%,('-'.'/'0'1:20 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

BW10: Wooden wall above windows, made of pinewood board, breathable membrane, rock wool insulation in between wooden studs, vapor barrier and interior finish of oriented strand board. BEDROOM OPENINGS BO1: Entrance pine-wood opaque door made by two solid-wood panels and rock wool insulation in between. BO2: Hopper laminated pinewood window, with double insulating glass. t=78cm BO3: Fixed laminated pinewood window, with double insulating glass. t=78cm BEDROOM FINISHES BF1: Stainless steel IPE profile as mirror support. t=2cm BF2: Exterior fixed solar protection with pinewood 5x5cm slats, fixed on wood battens. BF3: Interior pinewood 5x5cm slats, as separation between bedroom and living room, fixed with meatillic profiles. BF4: Dark grey exterior automatic roller blind.


!"#$$%

!"#$%&'( !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././


!"| !"#"$"%"&"'"'"&"%"!"("#"$ #$"%&& '#()"*(+,)-,#+."%/%0&" #$"%&% FIRE SECTORS !"#$$ #$"%&1 FLOOR -1 #$"%&2 GROUNDFLOOR #$"1&& 3--)44#5#6#,7"%/%0& #$"1&% FLOOR -1 #$"1&1 GROUND FLOOR #$"1&2 ADAPTED ROOM - TOILET !"%$ #$"2&& 8(3#.39)"%/%0& #$"2&% FOUL WATER DIAGRAM !"#$$

#$"2&; FLOOR -1 #$":&& 3#("-+.8#,#+.#.9"<"=).,#63,#+."%/%0& #$":&% CALCULATIONS #$":&1 HVAC DIAGRAM !"#$$ #$":&2"FLOOR -1 #$":&: GROUND FLOOR #$":&0 ROOF FLOOR #$"0&& )6)-,(#-#,7"4>**67"%/%0& #$"0&% ELECTRICITY DIAGRAMS !"#$$ #$"0&1 FLOOR -1 #$"0&2 GROUND FLOOR #$";&& ?3,)("4>**67"%/%0& #$";&% WATER DIAGRAM !"#$$ #$";&1 FLOOR -1 #$";&2 GROUND FLOOR

&'$()'&

#$"2&: ROOF FLOOR #$"2&0 GROUND FLOOR

Final Thesis Project | Júlia Boix Gonzalez

#$"2&2"SECONDARY ROOF

WINERY AND HOTEL SIURANA | September 2020

#$"2&1 RAINWATER DIAGRAM


!"#$%&#'($)("'* ACCORDING TO CTE DB - SI

#$"%&&

!"#$%&#'($)("'* )!#*+,"&#-".(%*'"$!/+&#&"0"*+,-.,'/',01203405'#$#$

&'$(6'&

Fire Extinguishers: Two types of fire extinguishers are placed in the building; dry poweder and CO2. Located next to evacuation exits and each 15m from every O.E. Need to be visible and accessible at located at a 1,7m height. | Fire Hose Reel’s System (BIE): Located next to evacuation exists and at <25m from any point in the building, need to be visible and accessible and with the center of the reel at 1.50m height above the floor. Manual Call Points: Placed next to evacuation exits, <25m from any point in the building, easily visible and accessible, beside fire hose reels. | Automatic Detectors: Smoke detector placed in the ceiling of each room. | Alarm System: Control Panel located in an accessible and protected place, and Siren located in each floor, zone and exteriors. Emergency Lighting: Located in a height of 2.5m above floor, following the evacuation route and above exit doors and near manual fire protection systems. | Fire Safety Signs: Located in evacuation routes and exits, near manual active fire protection system. Need to be visible and with dimensions according on the distance. | Smoke and Heat Exhaust Ventilation Systems: Protected stairs count with natural ventilation.

Final Thesis Project | JĂşlia Boix Gonzalez

PASSIVE SYSTEMS: According to CTE DB-SI, the Winery and Hotel Siurana is considered to be of Public Residential Use. The building is composed by -see I.101- one main sector which contemplates the building itself, sectorized elevators, different fire risk areas mainly located in the industrial volume, and protected serving as stairs. All these areas have the correct protection to fire design, following the regulations; the structural and constructive materials guarantee the resistance to fire, while the materials and finishes guarantee the reaction to it. According to the distribution, the distances within the volume and the occupation of each room and of the different areas of the building, at least two exits in each floor and two protected stairs have been placed in the building -see I.102 and I.103-. While for the facades, a resistance of > EI60 needs to be guaranteed in a distance of 2m between a protected stair and another zone, the windows in special fire risk need to be as well EI60, while for the roof, needs to be of the same fire resistance as the one the walls have, beeing though REI. All the elements that go through different sectors and special risk areas are correctly compartmented.

ACTIVE SYSTEMS: As mentioned, it includes those systems in charge of the supression or extinguishing, detection and alarma and emergency and evacuation - which can be by manual devices or automatic systems. The ones used in this building have been placed according to the CTE DB-SI4 and the RIPCI-93 regulations -see I.102 and i.103-.

WINERY AND HOTEL SIURANA | September 2020

The building is designed in order to accomplish the fire protection regulations; the design assures the protection of people and shelter them for safety, ensures that the building suffers the less possible and helps the fire fighters to access easily in case of fire. It embraces both passive and active systems. The passive systems count with the design of the buiding itself: compartmentation, evacuation and fire-figthers. While the active systems count with system installations: detection and alarm, extinguishing and emergency evacuations.


A

C

B

D

E

G

F

H

I

49,05 48,8 6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

LOW RISK AREA

FIRE SECTOR

AFS

1

ELECTRICITY ROOM

08

09

10

11 12

07

13

06

14

05

15

03

04

16

02

17

01

20

21

18

22

19

6

CGP

HYDRAULIC PLATFORM

23

FIRE SECTOR

PROTECTED AREA 2

BUILDING: WINERY-HOTEL USE: PUBLIC RESIDENTIAL S= 1.246m2 23 STAIRS 28x16.9cm

PROTECTED STAIRS LOW RISK AREA

LOW RISK AREA

PROTECTED AREA

EXPEDITION STORAGE

EARTHWARE JAR STORE

PROTECTED STAIRS 22

01

5,5

02

21

03

20

04

19

05

18

06

17

07

16

08

15

09

14

10

13

11

12

23 STAIRS 28x16.9cm

28,05

5,5

28,6

3

4

20

19

18

17

16

15

14

09

13

08

12

07

11

05

06

10

04

03

3,75

01

LIFT

02

21 STAIRS 28X16.6CM

FIRE SECTOR

7,3

5

6

A

B

C

D

E

F

G

H

I

49,05 48,8 6,1

6,1

6,1

6,1

6,1

6,1

6,1

1

LOW RISK AREA

BARREL STORE FIRE SECTOR

BIOMASS STORAGE

PROTECTED AREA

11

10

08

09

07

06

05

03

04

02

01

00

6

HYDRAULIC PLATFORM

PROTECTED AREA

PROTECTED STAIRS 2

12

13

14

15

16

17

18

20

21

22

19

BOILER'S ROOM

23 STAIRS 28x16.9cm

LOW RISK AREA

LOW RISK AREA

LOW RISK AREA

PROTECTED AREA

OENOLOGIST LAB

EARTHWARE JAR STORE

BOTTLING PLANT

PROTECTED STAIRS

5,5

00 22

01

21

02

20

03

19

04

18

05 06

17 16 15

09

13

10

12

11

23 STAIRS 28x16.9cm

DRYER

WASHER

28,05

5,5

28,6

3

4 21 STAIRS 28X16.6CM

FIRE SECTOR

LIFT

FIRE SECTOR 20

19

18

17

16

15

14

13

12

11

10

09

05

08

07

06

04

02

01

00 3,75

03

BUILDING: WINERY-HOTEL

7,3

5

6

!"#$%$

!"#$%&$'()#&%*%1:200 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

USE: PUBLIC RESIDENTIAL S= 1.246m2

07 08

14

6,1


A

C

B

D

E

F

G

H

I

49,05 48,8 6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

1

21.7m<25m

21.4m<25m

LOW RISK AREA EI 90 | R 90 DOORS: EI2 45 c5

09

15.1m < 50m

HOT WATER STORAGE GIACOMINI BCI (Ø950mm, 1775mm)

BIOMASS BOILER ECO HK-90KW (0,75 x 1,24 x 1,61m)

12

13

14

15

16

17

18

19

20

21

22

23 STAIRS 28x16.9cm

EXIT

22.9m <25m

EI 90 | R 90 DOORS: EI2 45 c5

EI 120 | R30 PORTA: EI2 60 c5

O.E.

RAINWATER TANK IN SITU 15.000L

LOW RISK AREA

LOW RISK AREA

LOW RISK AREA

EI 90 | R 90 DOORS: EI2 45 c5

EI 90 | R 90 DOORS: EI2 45 c5

EI 90 | R 90 DOORS: EI2 45 c5

LEVEL EXIT 10.4m < 25m

2

BIOMASS STORAGE

LOW RISK AREA

11

08

10

07

06

05

04

03

02

PROTECTED STAIRS

01

00

6

LEVEL EXIT

EI 120 | R30 DOORS: EI2 60 c5

5,5

PROTECTED STAIRS

00 22

01

21

02

20

03

19

04

18 17

05 06

16

07 08

15 14

09

13

10

12

11

23 STAIRS 28x16.9cm

28,05

19.7m < 25m

24.9m < 25m

5,5

28,6

11.8m<25m

24.9m < 25m

3

O.E.

O.E.

O.E. EXTERIOR UNIT (0,58x 1,10 x 1,58m)

DRYER

WASHER

O.E.

EXTERIOR UNIT (0,58x 1,10 x 1,58m)

4

20

19

18

17

16

15

14

13

12

11

10

09

08

07

05

04

06

03

02

01

3,75

00

21 STAIRS 28X16.6CM

OUTDOORS SAFE AREA

BUILDING EXIT

23.8m < 35m

BUILDING EXIT

22.2m < 35m

O.E.

5

7,3

O.E.

NATURAL VENTILATION

00.0m<00m O.E.

00.0m<00m

O.E.

O.E.

NATURAL VENTILATION

O.E.

O.E.

E

00.0m<00m NATURAL

00.0m<00m

NATURAL

E

E

FIRE EXTINGUISHER (DRY POWDER)

NATURAL

E

O.E.

VENTILATION

E

00.0m<00m O.E.

00.0m<00m

INDOOR SIREN NATURAL VENTILATION

OUTDOOR SIREN

E 1.50

E

LEVEL STOP VALVE FIXTURE STOP VALVE

1.50

!"##$%&'%(%1:150

1.50

1.50

!"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././ 1.50

1.50

1.50

1.50

2,5%

1.50

2,5%

1.50

2,5%

2,5%

EXIT

NATURAL VENTILATION

O.E.

!"#$%&

NATURAL

NATURAL VENTILATION

E

O.E. 00.0m<00m

AUTOMATIC FIRE DETECTOR

1.50

1.501.50

E

O.E. NATURAL

FIRE DECTION CONTROL PANEL

1.50

E

E

FIRE HOSE REEL’S SYSTEM (BIE) 1.50

1.50

E

MANUAL CALLVENTILATION POINT

00.0m<00m

NATURAL VENTILATION

VENTILATION EMERGENCY LIGHTING WITH SIGN

O.E. 00.0m<00m

O.E.

NATURAL VENTILATION

O.E.

O.E. VENTILATION BIE’S WATER DISTRIBUTION

VENTILATION O.E. FIRE EXTINGUISEHR CO2

00.0m<00m

E

BIE’S WATER DISTRIBUTION

NATURAL

VENTILATION O.E. 00.0m<00m REAL DISTANCE < ESCAPE ROUTE 1.50 MAX. DISTANCE

00.0m<00m

00.0m<00m

BUILDING BIE’S WATER MAIN PIPE UNDERGROUD NATURAL VENTILATION

NATURAL VENTILATION

00.0m<00m

E EVACUATION ROUTE

00.0m<00m

O.E.

ORIGIN OF EVACUATION

DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ DE REC TERRA

00.0m<00m

FOUL WATER DUCT

E

VENTILATION

NATURAL VENTILATION

NATURAL VENTILATION

E

E NATURAL

O.E.

00.0m<00m

1.50

00.0m<00m

NATURAL VENTILATION

2,5%

E

6

DISTRIBUCIÓ DE REC SOSTRE

EXIT

he= 3.90m

OUTDOORS SAFE AREA

u


OUTDOORS SAFE AREA A

C

B

D

E

F

G

H

I

49,05 48,8 6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

BUILDING EXIT

1

BUILDING EXIT

13.7m < 15m

09

BIE

11

08

07

10

06

05

04

03

02

01

6

CGP

EI 90 | R 90 DOORS: EI2 45 c5

EXIT

AFS

OUTDOORS SAFE AREA LOW RISK AREA

NATURAL VENTILATION

18.6m < 25m

44.1m < 50m

12

13

14

15

16

17

18

19

20

21

22

23

OUTDOORS SAFE AREA

NATURAL VENTILATION

PROTECTED STAIRS EI 120 | R30 DOORS: EI2 60 c5

LOW RISK AREA

LOW RISK AREA

EI 90 | R 90 DOORS: 2x EI2 45 c5

EI 90 | R 90 DOORS: 2x EI2 45 c5

BUILDING EXIT

BUILDING EXIT

EXIT

16.8m < 25m

O.E.

22

01

21

03

20

04

19

05

18

06

17

07

16

08

15

09

14

10

13

11

12

EI 120 | R30 DOORS: EI2 60 c5

PROTECTED STAIRS

02

5,5

16.2m < 50m

2

23 STAIRS 28x16.9cm

23 STAIRS 28x16.9cm

28,05

5,5

28,6

11.8m < 25m

3

24.9m < 25m

O.E.

NATURAL VENTILATION

O.E.

BULDING EXIT

4

20

19

18

17

16

15

14

13

12

09

11

08

10

05

07

04

06

03

02

3,75

01

21 STAIRS 28X16.6CM

O.E.

NATURAL VENTILATION

E

5

E

52.0m < 50m + 25%EXT.

25

.3m

<5

0m

+2

5%

EX

7,3

T.

NATURAL VENTILATION

00.0m<00m

37.0m < 50m

O.E.

O.E. O.E. 6

00.0m<00m

O.E.

O.E.

NATURAL VENTILATION

O.E.

NATURAL VENTILATION

BIE’S WATER DISTRIBUTION 00.0m<00m NATURAL

NATURAL

00.0m<00m

E

00.0m<00m

NATURAL

E

E

FIRE EXTINGUISHER (DRY POWDER)

NATURAL

E

O.E.

1.50

VENTILATION

O.E.

1.50

OUTDOOR SIREN

1.50

E

LEVEL STOP VALVE FIXTURE STOP VALVE

1.50

!"#$%&'(##")*)1:150 1.50

1.50

2,5%

1.50

2,5%

2,5%

EXIT

NATURAL VENTILATION

E

O.E.

!"#$%&

INDOOR SIREN NATURAL VENTILATION

NATURAL VENTILATION

00.0m<00m

1.50

NATURAL

!"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

1.50

2,5%

00.0m<00m E

1.50

1.50

E

O.E.

AUTOMATIC FIRE DETECTOR

1.50

1.501.50

E

O.E. NATURAL 00.0m<00m

FIRE DECTION CONTROL PANEL

E

E

FIRE HOSE REEL’S SYSTEM (BIE) 1.50

1.50

E

MANUAL CALLVENTILATION POINT

00.0m<00m

NATURAL VENTILATION

VENTILATION EMERGENCY LIGHTING WITH SIGN

O.E. 00.0m<00m

O.E.

NATURAL VENTILATION

O.E.

O.E. VENTILATION BIE’S WATER DISTRIBUTION

VENTILATION O.E. FIRE EXTINGUISEHR CO2

00.0m<00m

E

O.E.

00.0m<00m

BUILDING BIE’S WATER MAIN PIPE UNDERGROUD

VENTILATION O.E. 00.0m<00m REAL DISTANCE < ESCAPE ROUTE 1.50 MAX. DISTANCE

NATURAL VENTILATION

00.0m<00m

E EVACUATION ROUTE

00.0m<00m

O.E.

ORIGIN OF EVACUATION

DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ DE REC TERRA

00.0m<00m

FOUL WATER DUCT

E

VENTILATION

NATURAL VENTILATION

00.0m<00m

O.E.

E

E NATURAL

O.E.

NATURAL VENTILATION 1.50

00.0m<00m

NATURAL VENTILATION

2,5%

E

DISTRIBUCIÓ DE REC SOSTRE

EXIT

he= 3.90m

un


+))$,,"-"."(/ ACCORDING TO CTE SUA - 9

ADAPTED TOILET: The building counts with an acessible toilet on the public area, able to be of shared use for both sexes, and connected to the acessible route. This toilet, has an obstacle free diameter of ø1.5m and counts on support bars, mechanisms and chromatically differentiated accessories from the environment. The WC located at 45cm from the floor, has in both

height that the section can save is 2.2m, and the minimum width that should have is 1m. The landing, to be accessible needs to have at least the same width as the stairs. The handrail needs be in both sides when the width is >1.20m, and in between 0.90-1m height above the floor. Needs to be continuous, stable easy to grab and separated from the wall at least 4cm. According to the regulation 2.2 of SUA9, a visual and tactile strip of paving needs to be arranged on the beginning of the stairs and landing. ACESSIBLE LIFT evators, including disabled people. Cabinet of dimensons 1,10x1,40m, with one door. The buttons box, located at the left side of the exit direction, include characters in Braille and

ADAPTED BEDROOM: The project needs at least one adapted bedroom which guarantees the required characteristics of the adapted dwellings. The corridors need a free width of 1,10m while inside the main room and bedroom need a free ø1.5m of obstacles, one of the sides of the bed need a with of 90cm and a space of ø1.2m need to be free in front of doors. The bathroom, as the adapted toilet, counts on a ø1.5m inscription and has the same sanitary elements characteristics as the adapted toilet, with the specifications of the support bars. The bathroom counts as well with a shower, with the floor tray at the same level as the flooring parquet and a slope of 2%. There is a seat of dimensions 40x40cm and at a height of 50cm, hinged with a back. The terrace has a free diameter turn of 1.20m as well. -see I.203-.

#$"1&&

+))$,,"-"."(/ )!#*+,"&#-".(%*'"$!/+&#&"0"*+,-.,'/',01203405'#$#$

&'$(7'&

ACCESSIBLE STAIRS: Each straight section, needs to have at least 3 stairs, with a tread of at

SUPPORT BARS: Easy to grab, with a ø30-40mm, separated 4cm from wall, which support 1KN stress in each direction. The WC bars, hinged and with a 70cm lenght, are placed at a height of 70-75cm from floor, separated from each other 65-70cm. The shower bars are placed next to the seat, 2 horizontal ones at least at the two corner walls, and a vertical one at the back wall, placed at 60cm of the corner.

Final Thesis Project | Júlia Boix Gonzalez

ACCESSIBLE ITINERARY: The building should follow an acessible itinerary which doesn’t include changes of levels, should include inscriptions of ø1.5m in entrances, end of corridors and in front of elevators, and ø1.2m in corridors and on the two sides of doors. These should

WINERY AND HOTEL SIURANA | September 2020

The project is designed in order to meet the functional conditions and provide the accessible elements in order to facilitate the non-discriminatory, independent and safe access and use of buildings to people with disabilities.


A

C

B

D

E

F

G

H

I

49,05 48,8 6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

1,2

1,5

1

1

ACCESSIBLE STAIRS

23 STAIRS 28x16.9cm

1,2

HOT WATER STORAGE GIACOMINI BCI (Ø950mm, 1775mm)

08

BIOMASS STORAGE

BIOMASS BOILER ECO HK-90KW (0,75 x 1,24 x 1,61m)

07

15

09

06

16

11

05

17

12

04

18

10

03

19

13

02

20

14

01

21

00

22

6

ACCESSIBLE ELEVATOR

RAINWATER TANK IN SITU 15.000L

1

2

ACCESSIBLE STAIRS

5,5

00 22

01

21

02

20

03

19

04

18 17

05 06

16

07

15

08

14

09

13

10

12

11

23 STAIRS 28x16.9cm

DRYER

WASHER

28,05

5,5

28,6

3

EXTERIOR UNIT (0,58x 1,10 x 1,58m)

EXTERIOR UNIT (0,58x 1,10 x 1,58m)

4 21 STAIRS 28X16.6CM

ACCESSIBLE STAIRS

1,4

ACCESSIBLE ELEVATOR

19

18

20

17

16

15

14

13

12

11

10

09

08

07

05

04

06

02

01

03

1,5

2,1

1,5

1,5

3,75

00

1,4

5

1,5

1,2

7,3

1.5

1.5

ADAPTED ROOM

6

NATURAL VENTILATION

NATURAL 00.0m<00m VENTILATION O.E.

00.0m<00m

E

O.E. E

ACCESSIBLE ROUTE

0.00m 1.50

ACCESSIBLE TURNING RADIUS

!"#$%&

!"##$%&'%(%1:150 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././ 1.50

2,5%

DISTRIBUCIÓ DE REC SOSTRE


A

C

B

D

E

F

G

H

I

49,05 48,8 6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

1,2

1,2

1,5

1,2

1

AFS

ACCESSIBLE ENTRANCE

08

23

CGP

1,2

07

15

09

06

16

11

05

17

12

04

18

10

03 20

13

02 21

14

01 22

1

ACCESSIBLE STAIRS

19

6

ACCESSIBLE ELEVATOR

23 STAIRS 28x16.9cm

1,2

ACCESSIBLE STAIRS 1

1,2

2

22

01

21

5,5

02 03

20

04

19

05

18

06

17

07

16

08

15

09

14

10

13

11

12

23 STAIRS 28x16.9cm

3

1,2

28,05

5,5

28,6

1,5

0,8

ADAPTED TOILET

ACCESSIBLE ENTRANCE 4 21 STAIRS 28X16.6CM

ACCESSIBLE STAIRS

1,5

1,4

ACCESSIBLE ELEVATOR

20

19

18

17

16

15

14

13

12

09

11

08

10

05

07

04

06

03

02

1,2

1,2 1

1,2

1,5

3,75

01

1,4

7,3

1,2

1,2

1,2

1,2

1,2

5

6

NATURAL VENTILATION

NATURAL 00.0m<00m VENTILATION O.E.

00.0m<00m

E

O.E. E

ACCESSIBLE ROUTE

0.00m 1.50

ACCESSIBLE TURNING RADIUS

!"#$%$

!"#$%&'(##")*)1:150 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././ 1.50

2,5%

DISTRIBUCIÓ DE REC SOSTRE


CASEMENT DOOR

ADAPTED BEDROOM

0,4

0.55

S=33,10m2 2%

1.5

0,8

ADAPTED ROOM -CONNECTED TO THE ACCESSIBLE ROUTE. HOTEL ROOM THAT MEETS THE APPLICABLE AND REQUIRED CHARACTERISTICS IN ACCESSIBLE DWELLINGS FOR WHEELCHAIR USERS WITH HEARING IMPAREMENTS. -FREE WIDTH OF 1,10M IN CORRIDORS AND 0,80M MIN. IN DOORS. -OBSTACLE FREE ø1.5M INSIDE MAIN LIVING AREA AND BEDROOM. -FREE WIDTH OF 0.90M IN ONE OF THE LATERAL TRANSFER SPACES FROM BED. -OBSTACLE FREE ø1.20M IN FRONT OF MAIN DOOR ENTRANCE. -OBSTACLE FREE ø1.20M IN TERRACE. -ADAPTED BATHROOM WITH ø1.5M FREE.

1.5

0.7

1,5

ADAPTED BATHROOM -OBSTACLE FREE ø1.5CM INSIDE AND ACCESSIBLE DOOR. -WC WITH LATERAL TRANSFER SPACE OF 80CM WIDTH AND 75CM DEEP. HINGED SUPPORT BAR. -SINK WITH FREE INTERIOR SPACE OF 70CM HEIGHT AND 50CM DEPTH. LOCATED AT A MAX. HEIGHT OF 85CM. -SHOWER WITH TRAY AT SAME LEVEL OF BATHROOM FLOOR AND EVACUATION SLOPE OF 2%. -SHOWER SEAT, WITH BACK, 40X40CM DIMENSIONS AT A HEIGHT ABOVE FLOOR OF 50CM.

HOPPER WINDOW

0.7

1.45

0,8

FIXED WINDOW

CASEMENT DOOR

S=4,80m2

1,5

1,2

ADAPTED TOILET

FIXED WINDOW

HOPPER WINDOW

ADAPTED TERRACE S=6,20m2

!"#$%&

!"!#$%"&'(()&*&$(+,%$&-&1:50 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

0,8

1.05

0,8

0,9

ADAPTED TOILET

-CONNECTED TO THE ACCESSIBLE ROUTE. -OBSTACLE FREE ø1.5M INSIDE AND ACCESSIBLE DOOR. -WC TOILET WITH BOTH LATERAL TRANSFER SPACE OF 80CM WIDTH AND 75CM DEEP. -HINGED SUPPORT BARS, SEPARATED FROM EACH OTHER 65-70CM. LENGTH OF 70CM AND AT A HEIGHT OF 70-75CM. -SINK WITH FREE INFERIOR SPACE OF 70CM HEIGHT AND 50CM DEPTH, LOCATED AT A MAX HEIGHT OF 85CM.


0#+"*+1$ ACCORDING TO CTE DB HS5

RAINWATER The Winery and Hotel Siurana has 3 main roofs, from which rainwater accumulation will be

FOULWATER Foulwater coming from sanitary fixtures, electrical appliances and syphonic gullies in service’s chambers and industrial rooms need be evacuated. Vertical stacks are connected to horizontal drains in the false ceiling in order for the water to be evacuated outside the building until the septic tank. Each appliance or fixture has its own trap before being connected to a branch soil pipe, with an aprox. 4% to prevent the entrance of sewe gases from wet rooms. This branch is afterwards connected to the stack or drain, single traps are used in fixture of appliance as well. When stacks or drains change diameter, a clean-out is placed. The stacks which were able to arrive to the roof have primary ventilation, while the ones which do not reach thae roof level have an air admittance valve in the false ceiling.

#$"2&&

0#+"*+1$ )!#*+,"&#-".(%*'"$!/+&#&"0"*+,-.,'/',01203405'#$#$

&'!$#'&

gullies and the terraces of the GF -see I.305- has 7 gullies. Half of the water from these roofs is collected and stored in a rainwater tank built in situ in the Floor -1 and used for cleaning the different industrial rooms and exterior terraces. The other half of the water, is collected and evacuated outside the building in an underground tank for watering the grapevines and the exterior close exterior of the building.

Final Thesis Project | Júlia Boix Gonzalez

Traps, seals and ventilation are used to prevent sewer gases from entering habitable ares. All pipes and ducts are accessible for maintenance, there are placed clean outs and inspection chambers in the joints, diversions, change of directions and change of diameters of the stacks and drains. All of them changing compartment, have a fire collar due to fire protection.

removed by gullies. According to CTE DB HS5 table 4.6, the roof areas and geometry, and the design and distribution of the building, a total of 19 gullies are connected to stacks with primary ventilation -see I.302-. To achieve a good evacuation of the rainwater in the roofs, there are slopes formed, in between 1-5%, with the perimeter of the roof at the same level. WINERY AND HOTEL SIURANA | September 2020

The water drainage strategy follows a separative scheme and is collected according to the CTE regulations: rainwater from roofs is sent towards a rainwater tank and foul water from sanitary fixtures, electrical appliances and services’ chambers will end up in a septic tank. By using this system, aside from reducing the risk of smells due to the foul water, the water from the rain is used for cleaning the industrial rooms and watering the close exterior of the building. For this evacuation of waste water, it is needed a fast and easy disposal, using gravity as much as possible -see I.301 and I.302-; vertical stacks are used until the last possible level and then joint to a horizontal duct which directs water to the outside of the building. Building traps, one for each system, are placed just after the façade, inside inspection chambers, buried in the ground. By using a separative system and having two building traps, the ventilation needed can be through a direct and undiminished extension of the stacks over the roof achieveing a primary ventilation, with a height of 2m, and in the cases where the extension is not possible, an air admitance valve placed in the false ceiling is used.


FW3

FW4

FW5

FW6

FW7 PRIMARY VENTILATION

PRIMARY AIR HANDLNG UNIT PRIMARY AIR HANDLNG UNIT

INSTALLATIONS FLOOR

CHANGING ROOM

ADAPTED TOILET

TOILET

BAR

TOILET

FAN-COIL

SINK

SINK WC

SINK

SINK

WC

WC

SINK

SINK

WC FIXTURE

FW1

INDUSTRIAL CORRIDOR

FW2

EARTHWARE JAR STORE

GROUND FLOOR

BEDROOM x8

AIR ADMITTANCE VALVE

FAN-COIL

OENOLOGIST LAB SHOWER

WC INDUSTRIAL

FAN-COIL

CLEAN-OUT

BRANCH PIPES

LAUNDRY ROOM

FOUL WATER STACK SINK BATH TUB

SINK

SINK

SINK

WC

WASHER

DRYER

WC

INDUSTRIAL CORRIDOR FLOOR -1

SINK

EARTHWARE JAR STORE RAINWATER TANK ROOM

DRAIN CHANNEL

BOTTLING BARREL PLANT CLEANING AND REPARATION

SYPHONIC GULLY

BARREL STORE

DRAIN

INSPECTION CHAMBER FOULWATER BUILDING TRAP INSPECTION CHAMBER

CONNECTING PIPE

UNDERGROUND SEPTIC TANK

!"#$%&

!"#$%&'()*%+,'-*'.%/%1:200 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././


SECONDARY ROOF S=585.10m2 SECONDARY ROOF 1 S=292.55m2

RW5

SECONDARY ROOF

RW6

SECONDARY ROOF 2 S=292.55m2

RW7

RW11

INDUSTRIAL ROOF S=266.70m2 ROOF 4 S=107.6m2

RW4

ROOF

ROOF 3 S=107.60m2

RW3

ROOF 1 S=26.6m2

RW1

WINETASTING ROOF S=141m2 ROOF 2 S=24.9m2

RW2

CLEANING INDUSTRIAL GF STOP VALVE

ROOF 8 S=70.50m2

RW12

RW13

RW9

BAR ROOF S=153.20m2 ROOF 6 S=76.60m2

RW9

ROOF 5 S=76.60m2

RW8

EXTERIOR STOP VALVE

EARTHWARE EXPEDITION INDUSTRIAL JAR STORE STORAGE CORRIDOR

EVENTS TERRACE

BAR TERRACE

ENTRANCE TERRACE

BAR TERRACE S=92.15m2

ENTRANCE TERRACE S=99.90m2

EVENTS TERRACE S=180.15m2

GROUND FLOOR

ROOF 7 S=70.50m2

RW10

TERRACE 11 S=60.05m2

TERRACE 12 S=60.05m2

TERRACE 13 S=60.05m2

RW16

RW17

RW18

TERRACE 9 S=54.90m2

TERRACE 10 S=55.56m2

RW14

RW15

TERRACE 14 S=45.90m2

RW19

ROOF GULLY

CLEANING INDUSTRIAL -1 STOP VALVE

RW20

CLEAN-OUT

CLEANING INDUSTRIAL -1 STOP VALVE

PUMPING SET FIXTURE STOP VALVE

RAINWATER STACK

BOTTLING CLEANING AND BARREL PLANT REPEARING STORE

EARTHWARE ONEOLOGIST INDUSTRIAL JAR STORE LAB CORRIDOR

TERRACE 15 S=46.25m2

RAINWATER TANK IN SITU 15.000L

INSPECTION CHAMBER RAINWATER BUILDING TRAP

FLOOR -1

DRAIN

INSPECTION CHAMBER

CONNECTING PIPE

UNDERGROUND RAINWATER TANK FOR WATERING VINES

!"#$%&

!"#$%"&'!()#"*!"+(,(1:200 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././


A

C

B

D

E

F

G

H

I

49,05 48,8 6,1

6,1

6,1

6,1

6,1

6,1

6,1

1

6

SEC. ROOF 2 S=292.55m2

4%

4%

RW5

2

4%

RW6 RW7

2,5%

2,5%

2,5%

2,5%

2,5%

5,5

2,5%

3

28,05

5,5

28,6

SEC. ROOF 2 S=292.55m2

RW10 4

RW9

3,75

RW11

4%

4%

4%

NATURAL NATURAL VENTILATION VENTILATION

00.0m<00m 00.0m<00m O.E. O.E.

5

SECONDARY ROOF S=585,10m2

E

E

NATURAL NATURAL VENTILATION VENTILATION

00.0m<00m 00.0m<00m O.E. O.E. E

NATURAL NATURAL VENTILATION VENTILATION

00.0m<00m 00.0m<00m E

O.E. O.E. E E

7,3

1.50 1.50

NATURAL VENTILATION

00.0m<00m O.E.

NATURAL VENTILATION

E 1.50 1.50

O.E. 00.0m<00m

E

NATURAL O.E. VENTILATION

1.50

2,5% 2,5%

E

1.50

1.50

FOULDISTRIBUCIÓ WATER DISTRIBUCIÓDE DEREC RECSOSTRE SOSTRE DE FOULDISTRIBUCIÓ WATER STACK DISTRIBUCIÓ DEREC RECTERRA TERRA

E

FOUL WATER DRAIN UNDER

RAINWATER DRAIN ABOVE RAINWATER DRAIN UNDER

FOULFOUL WATER BUILDING TRAPDUCT WATER

FOUL WATER DUCT

FOUL WATER SIPHONIC GULLY

2,5%

2,5%

2,5%

DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ DE REC TERRA

DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ DE REC TERRA FOUL WATER DUCT external connection pipe

FOUL WATER DUCT

FOUL WATERDUCT DUCT

FOUL WATER RAINWATER STACK 2,5%

FOUL WATER DRAIN ABOVE

2,5%

RAINWATER

1.50

underground distribution pipe

NATURAL VENTILATION

DISTRIBUCIÓDE DEREC RECSOSTRE SOSTRE DISTRIBUCIÓ DISTRIBUCIÓDE DEREC RECTERRA TERRA DISTRIBUCIÓ 1.50

1.50

E

O.E. E

NATURAL VENTILATION

O.E. E

NATURAL VENTILATION

00.0m<00m

00.0m<00m

E

O.E.

1.50 1.50

O.E.

2,5% 2,5%

00.0m<00m

00.0m<00m

00.0m<00m

O.E. NATURAL VENTILATION

6

NATURAL VENTILATION

00.0m<00m

RAINWATERDE BUILDING DISTRIBUCIÓ RECTRAP SOSTRE RAINWATERDE ROOF GULLY DISTRIBUCIÓ REC external connection pipe TERRA

external connection pipe

underground DISTRIBUCIÓ DE REC distribution SOSTRE underground distributionpipe pipe distribution DISTRIBUCIÓ DEhw REC TERRA hw distribution hw backflow

hw backflow FOUL WATER DUCT

1.50

2,5% RAINWATER RECIRCULATION

1.50

RAINWATER DISTRIBUTION ABOVE DISTRIBUCIÓ DE REC

DISTRIBUCIÓ REC SOSTRE DISTRIBUCIÓ DEDE REC TERRA !"#$%&'()*($$+*,* 1:150

DISTRIBUCIÓ DE REC SOSTRE cold !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././ DISTRIBUCIÓ DE REC TERRA coldwater water external connection pipe rainwater FOULDISTRIBUCIÓ WATER DUCT rainwater DE REC TERRA FOUL WATER DUCT BIE BIEdistribuiton distribuiton

SOSTRE

external connection pipe UNDER DISTRIBUCIÓ DE REC TERRA RAINWATER DISTRIBUTION external connection pipe underground distribution pipe PUMPING SET underground distribution pipe 2,5% hw distribution LEVEL STOP VALVE hw distribution hwbackflow backflow hw 2,5% FIXTURE STOP VALVE FOUL WATER DUCT coldwater water 2,5% cold DISTRIBUCIÓ DE REC SOSTRE rainwater rainwater BIE distribuiton DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ DE REC SOSTRE BIE distribuiton !"#$%$

underground external connection pipe

underground distribution pipe

distribution pipe

FOUL WATER DUCT hw distribution hw backflow FOUL WATER DUCT

1:20

external connection pipe underground distribution pipe hw distribution hw backflow cold water rainwater external connection pipe BIE distribuiton

6,1


A

C

B

D

E

F

G

H

I

49,05 48,8 6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

1 IND. ROOF 1 S=26.6m2

INDUSTRIAL ROOF S=266.7m2

IND. ROOF 2 S=24.9m2

6

2,5%

4,5%

4,5%

FW3

RW1 09

RW2

11

08

10

07

06

05

04

03

02

01

5%

2,5%

PRIMARY AIR HANDLING UNIT TKM 22

12

13

14

15

16

17

18

19

20

21

22

3,5%

23

2%

CHILLER AIRCON 1CHL-0160 (2,27 x 2,12 x 1,32m)

RW3

3,5%

RW6

RW5 IND. ROOF 3 S=107.6m2

2

RW7

BAR ROOF S=153.2m2

22

01

21

02

5,5

BAR ROOF 5 S=76.6m2

03

20

04

19

05

18

06

17

07

16

08

15

09

14

10

13

11

12

4%

4%

2,5%

4%

3

5%

FW4 FW5

BAR ROOF 6 S=76.6m2

3,5% PRIMARY AIR HANDLING UNIT TKM 65

28,05

IND. ROOF 4 S=107.6m2

3,5%

5,5

28,6

2%

RW8

RW4

4%

FW6

RW9

4

4%

2,5%

RW10

RW11

19

18

17

14

16

13

15

10

12

09

11

08

05

07

04

06

03

02

3,75

01

4%

NATURAL NATURAL VENTILATION VENTILATION

00.0m<00m 00.0m<00m O.E. O.E.

5

E

WINETASTING ROOF 7 S=70.5m2

E

RW12

WINETASTING ROOF 8 S=70.5m2

RW13

NATURAL NATURAL VENTILATION VENTILATION

00.0m<00m 00.0m<00m O.E. O.E. E

5%

5%

NATURAL NATURAL VENTILATION VENTILATION

00.0m<00m 00.0m<00m E

O.E. O.E. 2,5%

4,5%

4,5%

2,5%

E E 7,3

1.50 1.50

NATURAL VENTILATION 3,5%

00.0m<00m O.E. E

00.0m<00m

O.E. NATURAL VENTILATION

O.E. 00.0m<00m

E

NATURAL O.E. VENTILATION

1.50 1.50

O.E.

2,5% 2,5%

00.0m<00m

00.0m<00m

NATURAL VENTILATION

00.0m<00m

1.50 1.50

6

3,5%

NATURAL VENTILATION

NATURAL VENTILATION

WINETASTING ROOF S=141m2

1.50

2,5% 2,5%

E

E

DISTRIBUCIÓDE DEREC RECSOSTRE SOSTRE DISTRIBUCIÓ DISTRIBUCIÓDE DEREC RECTERRA TERRA DISTRIBUCIÓ 2,5%

1.50

FOULDISTRIBUCIÓ WATER DISTRIBUCIÓDE DEREC RECSOSTRE SOSTRE 1.50

1.50

1.50

DE FOULDISTRIBUCIÓ WATER STACK DISTRIBUCIÓ DEREC RECTERRA TERRA FOUL WATER DRAIN UNDER

FOUL WATER DUCT

FOUL WATER SIPHONIC GULLY

2,5%

2,5%

2,5%

DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ DE REC TERRA

DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ DE REC TERRA FOUL WATER DUCT external connection pipe

FOUL WATER DUCT

RAINWATER RECIRCULATION 1.50

RAINWATER DISTRIBUTION ABOVE DISTRIBUCIÓ DE REC

RAINWATER DRAIN ABOVE RAINWATER DRAIN UNDER

FOULFOUL WATER BUILDING TRAPDUCT WATER 2,5%

FOUL WATERDUCT DUCT

FOUL WATER RAINWATER STACK 2,5%

FOUL WATER DRAIN ABOVE

1.50

RAINWATER

1.50

underground distribution pipe

NATURAL VENTILATION

O.E. E

O.E. E

E

00.0m<00m

00.0m<00m

E

O.E.

NATURAL VENTILATION

RAINWATERDE BUILDING DISTRIBUCIÓ RECTRAP SOSTRE RAINWATERDE ROOF GULLY DISTRIBUCIÓ external connectionREC pipe TERRA

external connection pipe underground DISTRIBUCIÓ DE REC distribution SOSTRE underground distributionpipe pipe distribution DISTRIBUCIÓ DEhw REC TERRA hw distribution hw hwbackflow backflow

FOUL WATER DUCT

2,5% 2,5% 2,5%

!"#$%&

FIXTURE STOP VALVE FOUL WATER

DUCT

coldwater water cold DISTRIBUCIÓ rainwater DE REC SOSTRE rainwater BIE distribuiton DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ DEdistribuiton REC SOSTRE BIE

!""#$#%""!$&$1:150 DISTRIBUCIÓ REC SOSTRE DISTRIBUCIÓ DEDE REC TERRA

DISTRIBUCIÓ DE REC SOSTRE !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././ cold DISTRIBUCIÓ DE REC TERRA coldwater water external connection pipe rainwater FOULDISTRIBUCIÓ WATER DUCT rainwater DE REC TERRA FOUL WATER DUCT BIE BIEdistribuiton distribuiton

underground external connection pipe

underground distribution pipe

SOSTRE

external connection pipe UNDER DISTRIBUCIÓ DE REC TERRA RAINWATER DISTRIBUTION external connection pipe underground distribution pipe PUMPING SET underground distribution pipe hw distribution LEVEL STOP VALVE hw distribution hwbackflow backflow hw

distribution pipe FOUL WATER DUCT hw distribution

1:20

external connection pipe underground distribution pipe hw distribution hw backflow cold water rainwater external connection pipe BIE distribuiton


A

C

B

D

E

F

G

H

I

49,05 48,8 6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

ENTRANCE TERRACE S=110.55m2

1

5%

FW3

09

RW2

3%

3%

3%

3%

11

08

10

07

06

05

04

03

02

01

6

RW1

CGP

AFS

5%

ENTRANCE TERRACE 9 S=54.90m2

23 STAIRS 28x16.9cm RW5

RW3

FW1

5%

12

13

14

15

16

17

18

20

21

22

19

23

5%

ENTRANCE TERRACE 10 S=55.56m2

RW6

RW14

RW15

2

RW7

22

01

21

5,5

02

20

04

19

05

18

06

17

07

16

08

15

09

14

10

13

11

12

23 STAIRS 28x16.9cm

RW4

3

03

RW8

28,05

FW4 FW5 5,5

28,6

FW2

FW6 RW9

FW7

4

RW11

WINE TASTING TERRACE 12 S=60.05m2

20

19

18

17

16

15

14

13

12

09

11

08

10

05

07

04

06

03

02

01

3,75

WINE TASTING TERRACE 11 S=60.05m2

RW10

21 STAIRS 28X16.6CM

WINE TASTING TERRACE 13 S=60.05m2

NATURAL NATURAL VENTILATION VENTILATION 5

RW17

RW16

00.0m<00m 00.0m<00m O.E. O.E.

RW18

E

3,5%

3,5%

NATURAL NATURAL VENTILATION VENTILATION

RW19 RW12

E

BAR TERRACE 14 S=45.90m2

E 5%

BAR TERRACE 15 S=46.25m2

3,5%

00.0m<00m 00.0m<00m O.E. O.E. 5%

RW20

RW13

NATURAL NATURAL VENTILATION VENTILATION

4%

4,5%

00.0m<00m 00.0m<00m E

5%

5%

5%

O.E. O.E.

5%

E E 5,5%

7,3

1.50 1.50

3,5%

3,5%

5,5%

5,5%

5,5%

NATURAL VENTILATION

3,5%

00.0m<00m O.E.

NATURAL VENTILATION

E

6

O.E. 00.0m<00m

E

NATURAL O.E. VENTILATION

1.50 1.50

O.E.

2,5% 2,5%

00.0m<00m

00.0m<00m

00.0m<00m

O.E. NATURAL VENTILATION

EVENTS TERRACE S=180.15m2

4%

2,5% 2,5%

E

DISTRIBUCIÓDE DEREC RECSOSTRE SOSTRE DISTRIBUCIÓ DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ DE REC TERRA 2,5%

1.50

FOULDISTRIBUCIÓ WATER DISTRIBUCIÓDE DEREC RECSOSTRE SOSTRE 1.50

1.50

1.50

DE FOULDISTRIBUCIÓ WATER STACK DISTRIBUCIÓ DEREC RECTERRA TERRA FOUL WATER DRAIN UNDER

RAINWATER RECIRCULATION 1.50

RAINWATER DISTRIBUTION ABOVE DISTRIBUCIÓ DE REC

RAINWATER DRAIN ABOVE RAINWATER DRAIN UNDER

FOULFOUL WATER BUILDING TRAPDUCT WATER

FOUL WATER DUCT

2,5%

FOUL WATERDUCT DUCT

FOUL WATER RAINWATER STACK 2,5%

FOUL WATER DRAIN ABOVE

1.50

RAINWATER

1.50

FOUL WATER SIPHONIC GULLY

2,5%

2,5%

2,5%

DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ DE REC TERRA

DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ DE REC TERRA FOUL WATER DUCT external connection pipe underground distribution pipe

BAR TERRACE S=92.15m2

E

O.E. 1.50

NATURAL VENTILATION

O.E. E

00.0m<00m

E

E

NATURAL VENTILATION

E

00.0m<00m NATURAL VENTILATION

O.E.

2,5%

RAINWATERDE BUILDING DISTRIBUCIÓ RECTRAP SOSTRE RAINWATERDE ROOF GULLY DISTRIBUCIÓ external connectionREC pipe TERRA

FOUL WATER DUCT

2,5%

1:20

2,5%

DISTRIBUCIÓ DE REC cold coldwater water rainwater FOULDISTRIBUCIÓ WATER DUCT rainwater DE REC TERRA BIE BIEdistribuiton distribuiton

SOSTRE

external connection pipe UNDER DISTRIBUCIÓ DE REC TERRA RAINWATER DISTRIBUTION external connection pipe underground distribution pipe PUMPING SET underground distribution pipe hw distribution LEVEL STOP VALVE hw distribution hwbackflow backflow hw

FIXTURE STOP VALVE FOUL WATER DUCT coldwater water cold DISTRIBUCIÓ rainwater DE REC SOSTRE rainwater BIE distribuiton DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ DE REC SOSTRE BIE distribuiton !"#$%& !"#$%&'()##"'*' 1:150 DISTRIBUCIÓ REC SOSTRE DISTRIBUCIÓ DEDE REC TERRA SOSTRE !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././ DISTRIBUCIÓ DE REC TERRA

external connection pipe underground DISTRIBUCIÓ DE REC distribution SOSTRE underground distributionpipe pipe distribution DISTRIBUCIÓ DEhw REC TERRA hw distribution hw hwbackflow backflow

4,5%

NATURAL VENTILATION

00.0m<00m

1.50 1.50

external connection pipe

underground external connection pipe

underground distribution pipe

FOUL WATER DUCT

distribution pipe FOUL WATER DUCT hw distribution

external connection pipe underground distribution pipe hw distribution hw backflow cold water rainwater external connection pipe BIE distribuiton


A

C

B

D

E

F

G

H

I

49,05 48,8 6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

1

PUMPING SET

FOULWATER STACK

FW3

23 STAIRS 28x16.9cm RW5

RW3

SYPHONIC GULLY

BIOMASS STORAGE

HOT WATER STORAGE GIACOMINI BCI (Ø950mm, 1775mm)

08

RW2

BIOMASS BOILER ECO HK-90KW (0,75 x 1,24 x 1,61m)

07

15

09

06

16

11

05

17

12

04

18

10

03

19

13

02

20

14

01

21

00

22

6

RW1

FW1

RAINWATER STACK

RAINWATER TANK IN SITU 15.000L

RW6

2

CLEANING INDUSTRIAL -1 STOP VALVE

RW14

RW15 RW7

FIXTURE STOP VALVE

5,5

00 22

01

21

02

20

03

19

04

18 17

05 06

16

07 08

15

09

13

10

12

11

23 STAIRS 28x16.9cm

RW4

3

14

FW4 FW5 DRAIN CHANNEL

DRYER

WASHER

28,05

RW8

5,5

28,6

FW2

FW6 EXTERIOR UNIT (0,58x 1,10 x 1,58m)

EXTERIOR UNIT (0,58x 1,10 x 1,58m)

RW9

4

RW11

20

19

18

17

16

15

14

13

12

11

10

09

08

07

05

04

06

03

02

01

3,75

00

FW7

RW10

21 STAIRS 28X16.6CM

RAIN WATER DRAIN

INSPECTION CHAMBER RAINWATER BUILDING TRAP

FOUL WATER DRAIN

5

RW17

RW16

CONNECTING PIPE

NATURAL NATURAL VENTILATION VENTILATION

RW18

00.0m<00m RW12 00.0m<00m O.E. O.E. E

RW19

RW13

RW20

E

NATURAL NATURAL VENTILATION VENTILATION

00.0m<00m 00.0m<00m O.E. O.E.

NATURAL NATURAL VENTILATION VENTILATION

00.0m<00m 00.0m<00m E

O.E. O.E.

7,3

E

E E 1.50 1.50

NATURAL VENTILATION

00.0m<00m O.E.

NATURAL VENTILATION

E

O.E. 00.0m<00m

E

NATURAL O.E. VENTILATION

1.50

E

DISTRIBUCIÓDE DEREC RECSOSTRE SOSTRE DISTRIBUCIÓ DISTRIBUCIÓDE DEREC RECTERRA TERRA DISTRIBUCIÓ

E

2,5% 2,5%

1.50

1.50

1.50

FOULDISTRIBUCIÓ WATER DISTRIBUCIÓDE DEREC RECSOSTRE SOSTRE DISTRIBUCIÓ DE REC FOUL WATER STACK DISTRIBUCIÓ DE RECTERRA TERRA

1.50

FOUL WATER DRAIN UNDER

FOUL WATER DUCT

FOUL WATER SIPHONIC GULLY

2,5%

2,5%

2,5%

RAINWATER DRAIN ABOVE

DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ DE REC TERRA

DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ DE REC TERRA FOUL WATER DUCT external connection pipe

RAINWATERDE BUILDING DISTRIBUCIÓ RECTRAP SOSTRE RAINWATERDE ROOF GULLYTERRA DISTRIBUCIÓ REC external connection pipe

external connection pipe underground distribution pipe DISTRIBUCIÓ DE REC SOSTRE underground distribution pipe !"#$%& hw DISTRIBUCIÓ DE REC TERRA1:150 !"##$%&'%(% hwdistribution distribution hw hwbackflow backflow

!"#$%&'(#)'*+,$-'."/%(#('0' !"#$%#&'&#()*(+,(-&././ FOUL WATER DUCT

2,5% 2,5%

DISTRIBUCIÓ DE REC SOSTRE cold coldwater water rainwater FOULDISTRIBUCIÓ WATER DUCT rainwater DE REC TERRA BIE BIEdistribuiton distribuiton

RAINWATER RECIRCULATION 1.50

RAINWATER DRAIN UNDER

FOULFOUL WATER BUILDING TRAPDUCT WATER 2,5%

FOUL WATERDUCT DUCT

FOUL WATER RAINWATER STACK 2,5%

FOUL WATER DRAIN ABOVE

2,5%

1.50

RAINWATER

1.50

NATURAL VENTILATION

O.E. E

NATURAL VENTILATION

O.E. E

E

NATURAL VENTILATION

00.0m<00m

00.0m<00m

E

O.E.

1.50 1.50

O.E.

2,5% 2,5%

00.0m<00m

00.0m<00m

00.0m<00m

O.E. NATURAL VENTILATION

6

NATURAL VENTILATION

00.0m<00m

1.50 1.50

DISTRIBUCIÓ DE REC RAINWATER DISTRIBUTION ABOVE

SOSTRE

externalconnection connection pipe DISTRIBUCIÓ DE REC TERRA RAINWATER DISTRIBUTION UNDER external pipe undergrounddistribution distribution pipe PUMPING SET underground pipe 2,5% hw distribution LEVEL STOP VALVE hw distribution hwbackflow backflow hw FIXTURE STOP VALVE FOUL WATER DUCT coldwater water cold DISTRIBUCIÓ DE REC SOSTRE rainwater rainwater BIEdistribuiton distribuiton DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ DE REC SOSTRE BIE

DISTRIBUCIÓ REC SOSTRE DISTRIBUCIÓ DEDE REC TERRA DISTRIBUCIÓ DE REC TERRA

external connection pipe

FOUL WATER DUCT

underground distribution pipe external connection pipe FOUL WATER DUCT hw distribution

external connection pipe underground distribution pipe hw distribution hw backflow cold water rainwater external connection pipe BIE distribuiton

UNDERGROUND TANK FOR VINES IRRIGATION UNDERGROUND SEPTIC TANK


!"#$%&'(")"&'"'*$!'($+,')"-!)"&'$

The main idea of the project, referring to the air conditioning and ventilatio, is based on a totally different strategy according to the different uses of the building. The industry does not have many comfort demands, while the cellar and hotel need to guarantee a comfortable stay

In the whole project, the air conditoning equipment such as Fan-Coils, are located in the fals ceiling of the rooms, always accessible and registrable, while the Primary Air Handling Units in charge of the ventilation, are located in an Installations Slab -see I.402-. All the machinery and ducts used have been dimensioned according to calculations and are correctly compartmented for fire protection.

!"#$%%

!"#$%&'(")"&'"'*$!'($+,')"-!)"&' !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

0&1/2&0

Taking into account the different orientations, uses at the different zones and the surfaces of the building in contact with the exterior, the building can be divided into different hygrothermal zones: the industrial part without climatization, the industrial part with climatization, the Ground-Floor Cellar and the Floor -1 bedrooms. Each zone will have the same ventilation element, while each of the rooms that compound them will have their own air conditoning element. Air conditioning is achieved due to a chiller located in the installations slab above the Ground Floor that supplies cold water and a woodchip biomass boiler in charge of producing hot water located in the level -1 -see diagram I.402-.

to the guests and visitors; three different methods have been integrated in the building. For the industrial areas which do not ask for air conditioning and ventilation, as well as for toilets, laundry rooms and installaitons rooms, natural systems and mechanical exhausts have been installed, for those areas such as the eonologist lab and the changing rooms, an installation with a Primary Air Handling Unit with an exchanger and a Fan Coil in each room are used. For the cellar in the Ground Floor, the same method is used; each room has its own Fan Coil to supply hot and cold air, and they have a common Primary Air Handling Unit with a heat exchanger which assures the right air quality. The bedrooms are designed with the same technique used in dwellings; each room has its own natural ventilation through openings in the facade for a fresh air inlet, while the exhaust is mechanical through a mechanical exhaust with fan in the bathroom. For the air conditioning of the bedrooms, hot and cold air is supplied by the Fan Coils located in the fals ceilings of the bathrooms. In addition, the wine tanks have a cooling syste, powered by two exterior units, in order to maintain the wine always at the right temperature.

Final Thesis Project | JĂşlia Boix Gonzalez

The building has been designed in ortder to accomplish the air quality requirements in the different areas of the buidling and an appropiate temperature in each time of the year according to RITE regulations; integrating passive strategies and active strategies a good air quality and the right temperature conditions are achieved. As passive strategies we count on cross ventilation, sunlight protection, public spaces with vegetation, natural lighting and a correct use of materials, while for the active systems we count on air conditioning and ventilation equipment which reach an optimal enviroment for the users.

WINERY AND HOTEL SIURANA | September 2020

ACCORDING TO RITE, CTE HS - 3 AND CTE HE 2


1 1 2 2

KW

35KW

opening opening

1

!"#$%&

!"#!$#"%&'() !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././


PRIMARY AIR HANDLING UNIT W/ EXCHANGER TKM 65 (4.2x1.2x0.78)

PRIMARY AIR HANDLING UNIT W/ EXCHANGER TKM 22 (3.5x0.8x0.5)

CHILLER 1CHL-0350 (2.25x2.12x1.32m) INSTALLATIONS FLOOR

MECHANICAL EXHAUST TOILETS

MECHANICAL EXHAUST EXPEDITION STORAGE

FAN COIL TFCU1 (0.52 x 0.48 x 0.22) CBS TBS-S-18M (1.30 x 1.25 x 0.35) SUPPLY 0.30x0.15m

RETURN RECIRCULATION 0.30x0.15m 0.25x0.10m

SUPPLY 0.20x0.10m

RETURN RECIRCULATION 0.30x0.15m 0.50x0.10m

SHOP Qc= 1237,25m3/h Qv=432,00m3/h

CHANGING ROOMS Qc= 135,30m3/h Qv= 86,40m3/h

WINEBAR Qc= 2247,50m3/h Qv=1152,00m3/h

GROUND FLOOR

MECHANICAL EXHAUST INDUSTRIAL CORRIDOR

EXTERIOR UNIT (0.58 x 1.10 x 1.58)

MECHANICAL EXHAUST LAUNDRY

MECHANICAL EXHAUST CLEANING AND REPARATION MECHANICAL EXHAUST BOTTLING PLANT

MECHANICAL EXHAUST BATHROOM

CBS TBS-S-27M (1.30 x 1.75 x 0.35)

MECHANICAL EXHAUST BARREL STORE

EXTERIOR UNIT (0.58 x 1.10 x 1.58)

MECHANICAL EXHAUST TOILET MECHANICAL EXHAUST WATER DEPOSIT

FLOOR -1

CBS TBS-S-18M (1.30 x 1.25 x 0.35)

CBS TBS-S-27M (1.30 x 1.75 x 0.35)

CBS TBS-S-27M (1.30 x 1.75 x 0.35)

SUPPLY 0.30x0.15m

CBS TBS-S-18M (1.30 x 1.25 x 0.35)

RECIRCULATION 0.55x0.35m RETURN RECIRCULATION 0.10x0.10m 0.10x0.10m

OENOLOGIST LAB Qc= 1825,60m3/h Qv=180,00m3/h

SUPPLY 0.10x0.10m

SUPPLY 0.30x0.20m

ADMISSION 25 l/s MICROVENTILATION DEVICE 100cm2

BIOMASS BOILER ECO HK 120KW (0,75x1,24x,1,61)

!"#$%&

!"#$%&'#()#*%+%1:200 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

NATURAL INLET OPENING

BEDROOM Qc= 1022,00m3/h Qv=57,60m3/h

x8

SUPPLY 0.35x0.10m

RETURN RECIRCULATION 0.20x0.15m 0.25x0.15m

RECEPTION-HALL Qc= 1477,50m3/h Qv=691,20m3/h

SUPPLY RETURN RECIRCULATION 0.20x0.15m 0.25x0.15m 0.40x0.25m

WINETASTING ROOM Qc= 2165,00m3/h Qv=1728,00m3/h

SUPPLY 0.40x0.15m


A

C

B

D

E

F

G

H

I

49,05 48,8 6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

1

APORTATION 0.10x0.10m

HOT WATER STORAGE GIACOMINI BCI (Ø950mm, 1775mm)

08

BIOMASS STORAGE

BIOMASS BOILER ECO HK-90KW (0,75 x 1,24 x 1,61m)

07

15

09

06

16

11

05

17

12

04

18

10

03

19

13

02

20

14

01

21

00

22

6

0.10x0.10 0.10x0.10

RETURN 0.10x0.10m

23 STAIRS 28x16.9cm

RAINWATER TANK IN SITU 15.000L

2

CBS TBS-S-27M (1.30 x 1.75 x 0.35) RECIRCULATION 0.10x0.10m

FALSE CEILING h= 50cm OENOLOGIST LAB Qc= 1825,60m3/h Qv=180,00m3/h

SUPPLY 0.10x0.10m

5,5

00 22

01

21

02

20

03

19

04

18 17

05 06

16

07

15

08

14

09

13

10

12

11

23 STAIRS 28x16.9cm

WASHER

28,05

5,5

28,6

3

3,75

O.E. 00.0m<00m E

O.E. 00.0m<00m

OPENINGS

5

1.50 E

O.E. 00.0m<00m

E 1.50

O.E.

E

O.E. 00.0m<00m

NATURAL VENTILATION

1.50 E

O.E. 00.0m<00m

E

O.E. 00.0m<00m

NATURAL VENTILATION

NATURAL VENTILATION

20

19

18

17

16

15

14

13

12

11

10

09

08

07

NATURAL VENTILATION

00.0m<00m

NATURAL VENTILATION

1.50

O.E.

NATURAL VENTILATION

NATURAL VENTILATION

NATURAL CROSSED VENTILATION

00.0m<00m

E

1.50

NATURAL O.E. VENTILATION

00.0m<00m 1.50 E

O.E.

05

04

FALSE CEILING h= 18cm

06

NATURAL VENTILATION

E

O.E. 00.0m<00m

NATURAL VENTILATION

E

21 STAIRS 28X16.6CM

NATURAL VENTILATION

E

O.E. 00.0m<00m

O.E. E

NATURAL VENTILATION

E

O.E. 00.0m<00m

NATURAL VENTILATION

E

O.E. 00.0m<00m

00.0m<00m

NATURAL VENTILATION

E

O.E. 00.0m<00m

O.E. OPENINGS

NATURAL VENTILATION

03

O.E. 00.0m<00m

NATURAL CROSSED VENTILATION

EXTERIOR UNIT (0,58 x 1,10 x 1,58m)

E

00.0m<00m E

02

00.0m<00m

NATURAL VENTILATION

O.E.

NATURAL VENTILATION

00

EXTERIOR UNIT O.E.x 1,58m) (0,58 x 1,10

4

NATURAL VENTILATION

NATURAL CROSSED 00.0m<00m VENTILATION

NATURAL VENTILATION

01

NATURAL VENTILATION

00.0m<00m

DRYER

NATURAL VENTILATION

00.0m<00m

00.0m<00m

O.E.

ENATURAL

VENTILATION

O.E.

OPENING

NATURAL VENTILATION

FALSE CEILING h= 50cm

MECHANICAL EXHAUST

00.0m<00m

E 1.50

E

1.50E

E

O.E.

SUPPLY 0.30x0.20m

E 1.50

1.50

1.50

1.50

2,5%

BEDROOM Qc= 1022,00m3/h Qv=57,60m3/h

2,5%

1.50

1.50

1.50

1.50

2,5%

2,5%

CBS TBS-S-18M (1.30 x 1.25 x 0.35)

25 l/s

1.50

7,3

1.50

2,5%

1.50

2,5% 2,5% 2,5% 2,5%

2,5% 2,5% 6

1.50

1.50

2,5% 2,5%

DISTRIBUCIÓ DE REC SOSTRE 2,5% DISTRIBUCIÓ REC TERRA DISTRIBUCIÓ DEDE REC SOSTRE 2,5%

1.50

1.50

DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ REC TERRA DISTRIBUCIÓ DEDE REC SOSTRE

DISTRIBUCIÓ REC TERRA DISTRIBUCIÓ REC TERRA DISTRIBUCIÓ DEDE REC SOSTRE DISTRIBUCIÓ DEDE REC SOSTRE 2,5% DISTRIBUCIÓ REC TERRA DISTRIBUCIÓ DEDE REC SOSTRE DISTRIBUCIÓ REC TERRA DISTRIBUCIÓ DEDE REC SOSTRE 2,5% DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ REC SOSTRE FOUL WATER DUCT FOULDE WATER DUCT 2,5% DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ DE REC SOSTRE FOUL WATER DUCT FOUL WATER DUCT external connection pipe DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ REC SOSTRE DISTRIBUCIÓ REC SOSTRE FOULDE WATER DUCT FOULDE WATER DUCT underground distribution external connection pipe pipe DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ REC SOSTRE DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ REC SOSTRE FOULDE WATER DUCT FOULDE WATER DUCT hw distribution distribution external connection pipe pipe underground DISTRIBUCIÓ DE RECDUCT TERRA DISTRIBUCIÓ DE RECDUCT TERRA hw backflow FOUL WATER FOUL WATER FOUL WATER DUCT FAN COIL TFCU1 FOUL WATER DUCT SUPPLY DUCT FOUL WATER DUCT SUPPLY DUCT RECIRCULATION DUCT CBS TBS-S-27M SUPPLY DUCT RECIRCULATION DUCT

DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ DE RECDE TERRA DISTRIBUCIÓ REC SOSTRE

RECIRCULATION 0.55x0.35m

DISTRIBUCIÓ DE REC TERRA 2,5%

2,5%

2,5%

FOUL WATER 2,5% 2,5% DUCT

DISTRIBUCIÓ DE REC SOSTRE

DISTRIBUCIÓ DE REC TERRA FOUL WATER DUCT DISTRIBUCIÓ ADMISSION 25 l/s DE REC SOSTRE external connection pipe DISTRIBUCIÓ DEDISTRIBUCIÓ RECDE SOSTRE REC TERRA DISTRIBUCIÓ RECDE SOSTRE DISTRIBUCIÓ DE REC SOSTRE external connection underground distribution pipe pipe external connection pipe DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ DE DE REC TERRA NATURAL INLET DISTRIBUCIÓ REC TERRA MICROVENTILATION DEVICE 100cm2

hw distribution distribution OPENING underground pipe external connection pipe pipe FOUL WATER DUCT underground distribution hw backflow hw distribution external connection pipe FOUL WATER DUCT hw distribution distribution external connection pipe pipe underground hw backflow underground distribution pipe cold water FOUL WATER DUCT hw backflow external connection pipe hw distribution hw distribution external connection pipe pipe external connection pipe underground underground pipe DUCT rainwatercold water FOUL WATER hw distribution FOUL WATER DUCT hw backflow hw backflow cold water FOUL WATER DUCT external connection distribution pipehw backflow underground pipe cold water BIE distribuiton hw distribution hw distribution external connection pipe external connection pipe underground distribution pipe underground distribution pipe rainwater PRIMARY AHU W/ EXCHANGER TKM 22 COLD WATER TANKS DISTRIBUTION external connection pipe rainwater hw distribution rainwater underground distribution pipe hw backflow hw backflow FOUL WATER DUCT external connection pipe cold water cold water cold water BIE distribuiton hw distribution hw distribution hw backflow external connection pipe external connection pipe underground distribution pipe underground distribution pipe BIE distribuiton PRIMARY AHU W/ EXCHANGER TKM 65 RECIRCULATION WATER TANKS BIE distribuiton hw distribution underground distribution pipe rainwater rainwater rainwater hw backflow hw backflow FOUL WATER DUCT cold water cold water underground distribution pipe backflow cold water BIE distribuiton hw distribution hw distribution external connection pipe external connection pipe hwhw distribution underground pipe underground pipe APORTATION DUCT NATURAL VENTILATION BIE distribuiton BIE distribuiton rainwater rainwater rainwater cold water hwhw backflow hw backflow hw backflow distribution cold water cold water BIE distribuiton hw distribution distribution hw distribution external connection pipe external connection pipe underground pipe underground pipe RETURN DUCT SUPPLY DUCTS BIE distribuiton rainwater BIE distribuiton hw backflow cold water hw backflow hw backflow coldrainwater water coldrainwater water BIE distribuiton hw distribution hw distribution distribution underground pipe EXHAUST BATHROOMS underground pipe MECHANICAL RECIRCULATION DUCTS BIE distribuiton BIE distribuiton rainwater rainwater rainwater cold water hw backflow hw backflow cold water cold water BIE distribuiton hw distribution hw distribution MECHANICAL EXHAUST FAN BIE MECHANICAL distribuitonEXHAUST BEDROOMS BIE distribuiton rainwater hw backflow hw backflow coldrainwater water coldrainwater water BIE distribuiton MECHANICAL EXHAUST INDUSTRAL BOILER’S CHIMNEY BIE distribuiton BIE distribuiton rainwater rainwater cold water cold water EXTERIOR UNIT TANKS BIE distribuiton BIE distribuiton rainwater rainwater BIE distribuiton BIE distribuiton !"#$%& !"##$%&'%(%1:150

!"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

PRIMARY AIR HANDILNG UNITS


A

C

B

D

E

F

G

H

I

49,05 48,8 6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

1

NATURAL CROSSED VENTILATION

09

CGP

11

08

10

07

06

05

04

03

OPENINGS

02

01

NATURAL CROSSED VENTILATION

SUPPLY 0.10x0.05m

23 STAIRS 28x16.9cm

FAN COIL TFCU1

CHANGING ROOMS Qc= 135,30m3/h Qv= 86,40m3/h

RETURN 0.10x0.05m

12

13

14

15

16

17

18

19

20

21

23

APORTATION 0.10x0.05m

22

6

0.15x0.10 0.10x0.10

AFS

OPENINGS

2 FALSE CEILING h= 50cm

FALSE CEILING h= 50cm 01

5,5

02

FALSE CEILING h= 18cm

22 21

03

20

04

19

05

18

06

17

07

16

08

15

09

14

10

13

11

12

SHOP Qc= 1237,25m3/h Qv=432,00m3/h

SUPPLY 0.20x0.10m

CBS TBS-S-18M (1.30 x 1.25 x 0.35) 23 STAIRS 28x16.9cm

3

28,05

5,5

28,6

RECIRCULATION 0.25x0.10m

00.0m<00m

5

1.50 E

O.E. 00.0m<00m

E 1.50

O.E.

E

O.E. 00.0m<00m

NATURAL VENTILATION

1.50 E

O.E. 00.0m<00m

E

O.E. 00.0m<00m

NATURAL VENTILATION

E

NATURAL VENTILATION

20

19

18

17

16

15

14

13

12

09

11

08

10

05

RECEPTION Qc= 440,00m3/h Qv=115,20m3/h

NATURAL VENTILATION

1.50

O.E.

NATURAL VENTILATION

NATURAL VENTILATION

NATURAL O.E. VENTILATION

00.0m<00m

00.0m<00m

O.E.

NATURAL VENTILATION

ENATURAL

FALSE CEILING h= 50cm

VENTILATION

O.E.

E

1.50E

RECIRCULATION 0.50x0.10m

00.0m<00m

E

1.50

00.0m<00m

E 1.50

CBS TBS-S-27M (1.30 x 1.75 x 0.35)

00.0m<00m

NATURAL VENTILATION

1.50 E

O.E.

07

SUPPLY 0.35x0.10m

04

3,75

E

O.E. 00.0m<00m

NATURAL VENTILATION

E

O.E. 00.0m<00m

NATURAL VENTILATION

0.55x0.30

21 STAIRS 28X16.6CM

NATURAL VENTILATION

E

O.E. 00.0m<00m

NATURAL VENTILATION

E

O.E. 00.0m<00m

O.E. 00.0m<00m

NATURAL VENTILATION

E

O.E. 00.0m<00m

O.E. 00.0m<00m

O.E. E

NATURAL VENTILATION

E

0.45x0.30

06

O.E. 00.0m<00m

O.E. 00.0m<00m

NATURAL VENTILATION

E

00.0m<00m E

03

00.0m<00m

APORTATION 0.55x0.20m

NATURAL VENTILATION

O.E.

NATURAL VENTILATION

01

O.E.

4

NATURAL VENTILATION

00.0m<00m

NATURAL VENTILATION

02

NATURAL VENTILATION

00.0m<00m

WINEBAR Qc= 2247,50m3/h Qv=1152,00m3/h

RETURN 0.65x0.20m

NATURAL VENTILATION

E

O.E. E

1.50

1.50

1.50

2,5%

1.50

1.50

2,5%

1.50

1.50

2,5%

2,5%

WINETASTING ROOM Qc= 2165,00m3/h Qv=1728,00m3/h

1.50

SUPPLY 0.20x0.15m

1.50

7,3

1.50

2,5%

1.50

2,5% 2,5% 2,5% 2,5%

2,5% 2,5% 6

1.50

1.50

2,5% 2,5%

DISTRIBUCIÓ DE REC SOSTRE 2,5% DISTRIBUCIÓ REC TERRA DISTRIBUCIÓ DEDE REC SOSTRE 2,5%

SUPPLY DUCT RECIRCULATION DUCT CBS TBS-S-27M SUPPLY DUCT RECIRCULATION DUCT

CBS TBS-S-18M (1.30 x 1.25 x 0.35)

1.50

DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ REC TERRA DISTRIBUCIÓ DEDE REC SOSTRE

DISTRIBUCIÓ REC TERRA DISTRIBUCIÓ REC TERRA DISTRIBUCIÓ DEDE REC SOSTRE DISTRIBUCIÓ DEDE REC SOSTRE 2,5% DISTRIBUCIÓ REC TERRA DISTRIBUCIÓ DEDE REC SOSTRE DISTRIBUCIÓ REC TERRA DISTRIBUCIÓ DEDE REC SOSTRE 2,5% DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ REC SOSTRE FOUL WATER DUCT FOULDE WATER DUCT 2,5% DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ DE REC SOSTRE FOUL WATER DUCT FOUL WATER DUCT external connection pipe DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ REC SOSTRE DISTRIBUCIÓ REC SOSTRE FOULDE WATER DUCT FOULDE WATER DUCT underground distribution external connection pipe pipe DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ REC SOSTRE DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ REC SOSTRE FOULDE WATER DUCT FOULDE WATER DUCT hw distribution distribution external connection pipe pipe underground DISTRIBUCIÓ DE RECDUCT TERRA DISTRIBUCIÓ DE RECDUCT TERRA hw backflow FOUL WATER FOUL WATER FOUL WATER DUCT FAN COIL TFCU1 FOUL WATER DUCT SUPPLY DUCT FOUL WATER DUCT

DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ DE RECDE TERRA DISTRIBUCIÓ REC SOSTRE 1.50

DISTRIBUCIÓ DE REC TERRA

SUPPLY 0.40x0.15m

CBS TBS-S-27M (1.30 x 1.75 x 0.35)

2,5%

2,5%

HALL Qc= 1037,50m3/h Qv=576,00m3/h

2,5%

FOUL WATER 2,5% 2,5% DUCT

DISTRIBUCIÓ DE REC SOSTRE

RECIRCULATION DISTRIBUCIÓ DE REC TERRA FOUL WATER DUCT DISTRIBUCIÓ 0.25x0.15m DE REC SOSTRE external RECIRCULATION connection pipe 0.40x0.25m DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ REC TERRA DISTRIBUCIÓ DE SOSTRE RECDE SOSTRE DISTRIBUCIÓ DE REC external connection underground distribution pipe pipe external connection pipe DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ DE REC TERRA

hw distribution distribution pipe underground external connection pipe pipe FOUL WATER DUCT underground distribution hw backflow hw distribution external connection pipe FOUL WATER DUCT hw distribution distribution external connection pipe pipe underground hw backflow underground distribution pipe cold water FOUL WATER DUCT hw backflow external connection pipe hw distribution hw distribution external connection pipe pipe external connection pipe underground underground pipe DUCT rainwatercold water FOUL WATER hw distribution FOUL WATER DUCT hw backflow hw backflow cold water FOUL WATER DUCT external connection distribution pipehw backflow underground pipe cold water BIE distribuiton hw distribution hw distribution external connection pipe external connection pipe underground distribution pipe underground distribution pipe rainwater PRIMARY AHU W/ EXCHANGER TKM 22 COLD WATER TANKS DISTRIBUTION external connection pipe rainwater hw distribution rainwater underground distribution pipe hw backflow hw backflow FOUL WATER DUCT external connection pipe cold water cold water cold water BIE distribuiton hw distribution hw distribution hw backflow external connection pipe external connection pipe underground distribution pipe underground distribution pipe BIE distribuiton PRIMARY AHU W/ EXCHANGER TKM 65 RECIRCULATION WATER TANKS BIE distribuiton hw distribution underground distribution pipe rainwater rainwater rainwater hw backflow hw backflow FOUL WATER DUCT cold water cold water underground distribution pipe backflow cold water BIE distribuiton hw distribution hw distribution external connection pipe external connection pipe hwhw distribution underground pipe underground pipe APORTATION DUCT NATURAL VENTILATION BIE distribuiton BIE distribuiton rainwater rainwater rainwater cold water hwhw backflow hw backflow hw backflow distribution cold water cold water BIE distribuiton hw distribution distribution hw distribution external connection pipe external connection pipe underground pipe underground pipe RETURN DUCT SUPPLY DUCTS BIE distribuiton rainwater BIE distribuiton hw backflow cold water hw backflow hw backflow coldrainwater water coldrainwater water BIE distribuiton hw distribution hw distribution distribution underground pipe EXHAUST BATHROOMS underground pipe MECHANICAL RECIRCULATION DUCTS BIE distribuiton BIE distribuiton rainwater rainwater rainwater cold water hw backflow hw backflow cold water cold water BIE distribuiton hw distribution hw distribution MECHANICAL EXHAUST FAN BIE MECHANICAL distribuitonEXHAUST BEDROOMS BIE distribuiton rainwater hw backflow hw backflow coldrainwater water coldrainwater water BIE distribuiton MECHANICAL EXHAUST INDUSTRAL BOILER’S CHIMNEY BIE distribuiton BIE distribuiton rainwater rainwater cold water cold water EXTERIOR UNIT TANKS BIE distribuiton BIE distribuiton rainwater rainwater BIE distribuiton BIE distribuiton !"#$%$ !"#$%&'()##"'*'1:150

!"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

PRIMARY AIR HANDILNG UNITS


A

C

B

D

E

F

G

H

I

49,05 48,8 6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

1

NATURAL VENTILATION

09

11

08

10

07

06

05

04

03

02

01

6

OPENINGS

CHILLER AIRCON 1CHL-0160 (2,27 x 2,12 x 1,32m)

12

13

14

15

16

17

18

19

20

21

22

23

CLIMATITZADOR PRIMÀRI TKM 22

2

NATURAL VENTILATION OPENINGS

22

01

NATURAL CROSSED VENTILATION

21

02

5,5

OPENINGS

03

20

04

19

05

18

06

17

07

16

08

15

09

14

10

13

11

12

CLIMATITZADOR PRIMÀRI TKM 65

28,05

5,5

28,6

3

0.45x0.30

NATURAL VENTILATION 4

E

O.E. 00.0m<00m

5

1.50 E

O.E. 00.0m<00m

E 1.50

O.E.

E

O.E. 00.0m<00m

NATURAL VENTILATION

1.50 E

O.E. 00.0m<00m

E

O.E. 00.0m<00m

NATURAL VENTILATION

E

O.E. 00.0m<00m

NATURAL VENTILATION

E

NATURAL VENTILATION

E

O.E. 00.0m<00m

19

18

17

14

16

13

15

12

09

11

08

10

05

07

04

NATURAL VENTILATION

NATURAL VENTILATION

OPENINGS

NATURAL VENTILATION

00.0m<00m

NATURAL VENTILATION

1.50

O.E.

NATURAL VENTILATION

NATURAL VENTILATION

00.0m<00m

E

1.50

1.50 E

O.E.

06

03

E

NATURAL VENTILATION

E

O.E. 00.0m<00m

NATURAL VENTILATION

E

O.E. 00.0m<00m

O.E. 01

3,75

O.E. 00.0m<00m

00.0m<00m E

NATURAL VENTILATION

E

O.E. 00.0m<00m

NATURAL VENTILATION

O.E.

NATURAL VENTILATION

O.E. 00.0m<00m

NATURAL VENTILATION

E

O.E. 00.0m<00m

00.0m<00m

NATURAL VENTILATION

O.E. 00.0m<00m

NATURAL VENTILATION

NATURAL VENTILATION

02

NATURAL VENTILATION

00.0m<00m

0.55x0.30

00.0m<00m

NATURAL O.E. VENTILATION

00.0m<00m

00.0m<00m

O.E.

O.E.

NATURAL VENTILATION

NATURAL VENTILATION OPENINGS

ENATURAL

VENTILATION

00.0m<00m

E 1.50

E

1.50E

E

O.E. E

1.50

1.50

7,3

1.50

2,5%

1.50

1.50

2,5%

1.50

1.50

1.50

2,5%

2,5%

1.50

1.50

2,5%

1.50

2,5% 2,5% 2,5% 2,5%

6

2,5% 2,5%

1.50

1.50

2,5% 2,5%

DISTRIBUCIÓ DE REC SOSTRE 2,5% DISTRIBUCIÓ REC TERRA DISTRIBUCIÓ DEDE REC SOSTRE 2,5%

1.50

1.50

DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ REC TERRA DISTRIBUCIÓ DEDE REC SOSTRE

DISTRIBUCIÓ REC TERRA DISTRIBUCIÓ REC TERRA DISTRIBUCIÓ DEDE REC SOSTRE DISTRIBUCIÓ DEDE REC SOSTRE 2,5% DISTRIBUCIÓ REC TERRA DISTRIBUCIÓ DEDE REC SOSTRE DISTRIBUCIÓ REC TERRA DISTRIBUCIÓ DEDE REC SOSTRE 2,5% DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ REC SOSTRE FOUL WATER DUCT FOULDE WATER DUCT 2,5% DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ DE REC SOSTRE FOUL WATER DUCT FOUL WATER DUCT external connection pipe DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ REC SOSTRE DISTRIBUCIÓ REC SOSTRE FOULDE WATER DUCT FOULDE WATER DUCT underground distribution external connection pipe pipe DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ REC SOSTRE DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ REC SOSTRE FOULDE WATER DUCT FOULDE WATER DUCT hw distribution distribution external connection pipe pipe underground DISTRIBUCIÓ DE RECDUCT TERRA DISTRIBUCIÓ DE RECDUCT TERRA hw backflow FOUL WATER FOUL WATER FOUL WATER DUCT FAN COIL TFCU1 FOUL WATER DUCT SUPPLY DUCT FOUL WATER DUCT SUPPLY DUCT RECIRCULATION DUCT CBS TBS-S-27M SUPPLY DUCT RECIRCULATION DUCT

DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ DE RECDE TERRA DISTRIBUCIÓ REC SOSTRE DISTRIBUCIÓ DE REC TERRA 2,5%

2,5%

2,5%

FOUL WATER 2,5% 2,5% DUCT

DISTRIBUCIÓ DE REC SOSTRE

DISTRIBUCIÓ DE REC TERRA FOUL WATER DUCT DISTRIBUCIÓ DE REC SOSTRE external connection pipe DISTRIBUCIÓ DEDISTRIBUCIÓ RECDE SOSTRE REC TERRA DISTRIBUCIÓ RECDE SOSTRE DISTRIBUCIÓ DE REC SOSTRE external connection underground distribution pipe pipe external connection pipe DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ DE DE REC TERRA DISTRIBUCIÓ REC TERRA

hw distribution distribution pipe underground external connection pipe pipe FOUL WATER DUCT underground distribution hw backflow hw distribution external connection pipe FOUL WATER DUCT hw distribution distribution external connection pipe pipe underground hw backflow underground distribution pipe cold water FOUL WATER DUCT hw backflow external connection pipe hw distribution hw distribution external connection pipe pipe external connection pipe underground underground pipe DUCT rainwatercold water FOUL WATER hw distribution FOUL WATER DUCT hw backflow hw backflow cold water FOUL WATER DUCT external connection distribution pipehw backflow underground pipe cold water BIE distribuiton hw distribution hw distribution external connection pipe external connection pipe underground distribution pipe underground distribution pipe rainwater PRIMARY AHU W/ EXCHANGER TKM 22 COLD WATER TANKS DISTRIBUTION external connection pipe rainwater hw distribution rainwater underground distribution pipe hw backflow hw backflow FOUL WATER DUCT external connection pipe cold water cold water cold water BIE distribuiton hw distribution hw distribution hw backflow external connection pipe external connection pipe underground distribution pipe underground distribution pipe BIE distribuiton PRIMARY AHU W/ EXCHANGER TKM 65 RECIRCULATION WATER TANKS BIE distribuiton hw distribution underground distribution pipe rainwater rainwater rainwater hw backflow hw backflow FOUL WATER DUCT cold water cold water underground distribution pipe backflow cold water BIE distribuiton hw distribution hw distribution external connection pipe external connection pipe hwhw distribution underground pipe underground pipe APORTATION DUCT NATURAL VENTILATION BIE distribuiton BIE distribuiton rainwater rainwater rainwater cold water hwhw backflow hw backflow hw backflow distribution cold water cold water BIE distribuiton hw distribution distribution hw distribution external connection pipe external connection pipe underground pipe underground pipe RETURN DUCT SUPPLY DUCTS BIE distribuiton rainwater BIE distribuiton hw backflow cold water hw backflow hw backflow coldrainwater water coldrainwater water BIE distribuiton hw distribution hw distribution distribution underground pipe EXHAUST BATHROOMS underground pipe MECHANICAL RECIRCULATION DUCTS BIE distribuiton BIE distribuiton rainwater rainwater rainwater cold water hw backflow hw backflow cold water cold water BIE distribuiton hw distribution hw distribution MECHANICAL EXHAUST FAN BIE MECHANICAL distribuitonEXHAUST BEDROOMS BIE distribuiton rainwater hw backflow hw backflow coldrainwater water coldrainwater water BIE distribuiton MECHANICAL EXHAUST INDUSTRAL BOILER’S CHIMNEY BIE distribuiton BIE distribuiton rainwater rainwater cold water cold water EXTERIOR UNIT TANKS BIE distribuiton BIE distribuiton rainwater rainwater BIE distribuiton BIE distribuiton !"#$%& !""#$#%""!$&$1:150

!"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

PRIMARY AIR HANDILNG UNITS


$.$)(#")"(/%,2&&./

The electricity system starts with the connection to the urban network service, which is buried underground at the right side of the building; electricity arrives to the service fuse box located in the industrial facade at the entrance porch - to be accessed and registered by the company- by means of a three-phase cable, service connection, buried in the ground. From this fuse box, which is equipped with a fuse that protects the building main line, a three phase conductor as the main line enters the building to the general manoeuvre circuit breaker (IGM), placed in the electricity room in the ground floor -see I.503-. This electricity room, of approximately 3m2 and with natural ventilation, has emergency lighting, a fire extinguisher outside and drainage. Inside the electricity room, besides from the General Manoeuvre Circuit Breaker, there is the building’s meter (one as the building has just one user), a Security Fuse and the General Panel Board of the building. From this General Panel, the electric internal distribution starts by electricity trays hung from the slab and placed underground the pavement in the porch area.

Board as well, placed on the wardrobe wall. To prevent users from electrocution due to the direct contact with active parts of electrical equipment or indirect contact with elements that are electrically charged due to a current fault, and to protect both the installation and the equipment, a grounding system in the building is needed; grounding points and terminals are installed in the Metering Centralization, in the Service Fuxe Box and in the lifts pits which are connected to the ground. All the elements of the installation are non-propagators of fire flames, have low smoke emission and with their corresponding IP and IK protection indexes specified for each case ac(SERVICE FUSE BOX) cording to UNE-20324 and UNE-50102 standards respectively, as well as the ITC of the corresponding REBT for each element and its layout. (MAIN LINE)

(SERVICE FUSE BOX)

(MAIN LINE)

#$"0&&

$.$)(#")"(/%,2&&./ )!#*+,"&#-".(%*'"$!/+&#&"0"*+,-.,'/',01203405'#$#$

3

3

&'!!%'&

sures as well the fulfillment of the Technical Specific Regulations of the supplying company.

For each part or area of the building and for each room there is a Sub-Panel Board, being a total of 13 electricity sub-panel boards; the industrial volume has two, one on each floor (the one in the Ground Floor is placed in the electricity room, while the one in the -1 Floor is placed inside an Installations room). In the bar storage room there are 3 sub panels, one for the Cellar Area, one for the Hotel Area in the Level -1, and one for the Exterior Terraces of

Final Thesis Project | JĂşlia Boix Gonzalez

-

WINERY AND HOTEL SIURANA | September 2020

ACCORDING TO RD 842 - 2002


CLIMATITZADORS ROOF ENGINES

OUTLETS

GROUND FLOOR INDUSTRIAL

ENGINES

ELECTRICITY ROOM: -GENERAL PANEL BOARD -GENERAL MANOEUVRE CIRCUIT BREAKER (IGM) -METER -SUB-PANEL BOARD INDUSTRIAL GF -SECURITY-FUSE

OUTLETS

EMERGENCY LIGHTING

NATURAL VENTILATION

INDUSTRIALGF SUB-PANEL BOARD GROUND FLOOR CELLAR

GF CELLAR SUB-PANEL BOARD

MAIN LINE OUTLETS

SUPPL LINE

SERVICE FUSE BOX (CGP)

-1F HOTEL SUB-PANEL BOARD

EXTERIOR GF SUB-PANEL BOARD

ENGINES

SERVICE FUSE BOX (CGP)

EMERGENCY LIGHTING

METER

CIRCUIT BREAKER

SERVICE CONNECTION

ENGINES

SUPPL LINE

SUB-PANEL

EXTERIOR OUTLETS

INDUSTRIAL GF

CELLAR GF

GROUND FLOOR EMERGENCY LIGHTING

INTERNAL DISTRIBUTION

ENGINES FLOOR-1 INDUSTRIAL

OUTLETS R01 SUB-PANEL BOARD

INDUSTRIAL-1F SUB-PANEL BOARD

EMERGENCY LIGHTING

R02 SUB-PANEL BOARD

R03 SUB-PANEL BOARD

R04 SUB-PANEL BOARD

BOILER

FLOOR-1 HOTEL

ENGINES

OUTLETS

INDUSTRIAL -1 EMERGENCY LIGHTING

HOTEL -1F

FLOOR -1

ELEVATOR

GROUNDING SYSTEM CONNECTION HYDRAULIC PLATFORM

!"#$%&

!"!#$%&#&$'()&*+%*,-(.(1:200 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

R05 SUB-PANEL BOARD

R06 SUB-PANEL BOARD

R07 SUB-PANEL BOARD

R08 SUB-PANEL BOARD


A

C

B

D

E

F

G

H

I

49,05 48,8 6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

1

INDUSTRIAL -1F SUB-PANEL BOARD

09

11

08

10

07

06

05

04

03

02

01

6

12

14

15

16

17

18

19

20

21

22

O.E. 13

00

BIOMASS STORAGE

00.0m<00m

00.0m<00m O.E.

NATURAL VENTILATION

NATURAL VENTILATION

E

E

23 STAIRS 28x16.9cm

2

00

5,5

NATURAL VENTILATION

00.0m<00m

01

21

02

20

03

19

04

18 17

05 06

16

07

15

O.E. 1.50

1.50

22

08

14

09

13

10

12

11

E 23 STAIRS 28x16.9cm

WASHER

1.50

2,5%

2,5%

DRYER

28,05

5,5

28,6

3

4

3,75

HOTEL -1F R101 SUB-PANEL BOARD

HOTEL -1F R102 SUB-PANEL BOARD

HOTEL -1F R103 SUB-PANEL BOARD

HOTEL -1F R104 SUB-PANEL BOARD

5

20

19

18

17

16

2,5% 15

13

10

12

11

09

08

05

07

04

06

03

02

01

00

DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ DE REC TERRA

14

21 STAIRS 28X16.6CM

HOTEL -1F R105 SUB-PANEL BOARD

HOTEL -1F R106 SUB-PANEL BOARD

DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ DE REC TERRA

HOTEL -1F R107 SUB-PANEL BOARD

HOTEL -1F R108 SUB-PANEL BOARD

FOUL WATER DUCT FOUL WATER DUCT 7,3

external connection pipe external connection FOUL WATER DUCT pipe underground distribution pipe underground distribution pipe hw distributionhw distribution hw backflow hw backflow cold water cold water rainwater rainwater BIE BIE distribuiton distribuiton

6

connexió dentrada SERVICE CONNECTION

INTERNAL DISTRIBUTION THORUGH CEILING

!"#$%&

!"##$%&'%(%1:150 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

INTERNAL DISTRIBUTION THROUGH PAVEMENT

external connection pipe underground distribution pipe hw distribution hw backflow cold water rainwater BIE distribuiton


ELECTRICITY ROOM: A

C

B

D

-GENERAL PANEL BOARD -GENERAL MANOEUVRE CIRCUIT BREAKER (IGM) F -METER -SUB-PANEL BOARD INDUSTRIAL GF -SECURITY-FUSE

E 49,05

G

H

I

48,8 6,1

6,1

6,1

6,1

6,1

6,1

6,1

6,1

1

09

11

08

10

07

06

05

04

03

02

6

01

CGP

NATURAL VENTILATION

NATURAL VENTILATION

SUPPL LINE

SERVICE FUSE BOX (CGP) SERVICE CONNECTION

NATURAL VENTILATION

00.0m<00m

00.0m<00m

12

13

14

15

16

17

18

19

20

21

22

O.E. 23

O.E.

MAIN LINE

AFS

INDUSTRIAL GF SUB-PANEL BOARD

INTERNAL DISTRIBUTION

E

E 23 STAIRS 28x16.9cm

2

22

01

21

02

5,5

NATURAL VENTILATION

00.0m<00m O.E. 1.50

1.50

03

20

04

19

05

18

06

17

07

16

08

15

09

14

10

13

11

12

E 23 STAIRS 28x16.9cm

28,05

5,5

28,6

3

1.50

2,5%

2,5% 4

HOTEL -1F SUB-PANEL BOARD

CELLAR GF SUB-PANEL BOARD

DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ DE REC TERRA

5

EXTERIOR GF SUB-PANEL BOARD

20

19

18

17

16

2,5%

15

14

13

12

09

11

08

10

05

07

04

06

03

02

DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ DE REC TERRA 01

3,75

21 STAIRS 28X16.6CM

FOUL WATER DUCT FOUL WATER DUCT 7,3

external connection pipe external connection FOUL WATER DUCT pipe underground distribution pipe underground distribution pipe hw distributionhw distribution hw backflow hw backflow cold water cold water rainwater rainwater BIE BIE distribuiton distribuiton

6

connexió dentrada SERVICE CONNECTION

INTERNAL DISTRIBUTION THORUGH CEILING

!"#$%&

!"#$%&'()##"'*'1:150 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

INTERNAL DISTRIBUTION THROUGH PAVEMENT

external connection pipe underground distribution pipe hw distribution hw backflow cold water rainwater BIE distribuiton


3+($#%,2&&./

COLD WATER The cold water supply begins with the connection to the outside public water main, follows to a control valve and a building shut-off valve and then arrives to the water cabinet located in the facade. This cabinet has a water filter, the building stop valve, a backflow valve, a meter

HOT WATER As mentioned before, the Hot Water Supply inside the Winery and Hotel Siurana is only produced for the bedrooms, the cellar, the laundry room, the oenologist lab and the changing rooms. For this production it is used a woodchips biomass boiler, which needs to be refilled often (placed close to the hydraulic platform and with a biomass storage room to keep the woodchips). The biomass boiler produces hot water which stay accumulated in a hot water storage. When there is HW demand, from this point and through a closed circuit, the HW arrives to the fixture. As for the Cold Water, this system has an internal distribution through pipes in the ceiling, and each room and fixture has its own stop valve.

#$";&&

3+($#%,2&&./ )!#*+,"&#-".(%*'"$!/+&#&"0"*+,-.,'/',01203405'#$#$

&'!!('&

According to the building use and needs, the building counts with Cold Water and Hot Water production, as well as for a water system for the BIE’S -see I.100-. All the areas of the building: the industrial volume, the cellar and the hotel are supplied with cold water, while hot water is just produced for the winebar, the laundry room and the bedrooms and in the industrial part for the oenologist lab and the showers of the workers’ changing rooms. The hot water is produced due to a biomass boiler and is accumulated in a hot water storage. For the distribution, made through the ceiling, copper pipes are used.

as there is only one user and an outflow/backflow valve. From this point, the internal distribution starts; the distribution branches are the ones in charge of making the water arrive to the different rooms and fixtures or appliances. Each level and volume of the building has a stop valve, as well as every room and every fixture -see I.602 and I.603-. The advantages of having independent tubes and stop valves is that repairs and shut downs of the system can be done individually without putting the general system out of service. The system for the BIE’S have the same components as the ones for the Cold Water -see diagram I.601-.

Final Thesis Project | Júlia Boix Gonzalez

Water supply facilities are to be designed according to the water supply company specifications as it will be the company’s responsability to guarantee sufficient flow and pressure for the system to work correctly. The installation will fullfill the current CTE regulations as well as the company ones.

WINERY AND HOTEL SIURANA | September 2020

ACCORDING TO CTE - DB - HS4


CHILLER 1CHL-0350 (2.25x2.12x1.32m)

INSTALLATIONS FLOOR

BIE

BIE

BIE

COMMON WATER CABINET IN FACADE: SHOWER

WC

SINK

RISERS

BIE

COMMON WATER CABINET IN FACADE:

-FILTER -STOP VALVE -BACKFLOW VALVE -METER -OUTFLOW/BACKFLOW VALVE

BUILDING CONTROL SHUT-OFF VALVE VALVE

BUILDING MAIN PIPE

SINK WC

SINK WC

SINK WC

SHOWER

SHOWER

WATER MAIN

RISERS

EXTERNAL CONNECTION PIPE

-FILTER -STOP VALVE -BACKFLOW VALVE -METER -OUTFLOW/BACKFLOW VALVE

BUILDING CONTROL SHUT-OFF VALVE VALVE

BUILDING MAIN PIPE

WATER MAIN

EXTERNAL CONNECTION PIPE

CELLAR GF

INDUSTRIAL GF CHANGING ROOM

TOILETS

-BAR -TASTING ROOM -RECEPTION

-INDUSTRIAL CORRIDOR

BAR

GROUND FLOOR

LEVEL STOP VALVE

LEVEL STOP VALVE

ROOM STOP VALVE

CIRCUIT IN DRAINAGE SCHEME

FIXTURE STOP VALVE

PUMPING SET BIE

BIE

BIE

BIE

BIE

FIXTURE STOP VALVE SHOWER

SHOWER

SINK

WC SINK

WASHER

DRYER

BATH TUB

SINK

DW

SHOWER

INDUSTRIAL -1F OENOLOGIST LAB FLOOR -1

TOILET

BIOMASS BOILER ECO HK 120KW (0,75x1,24x,1,61)

HOT WATER STORAGE ECO HK 120KW (Ø95cm, 1.775m)

RAINWATER TANK IN SITU 15.000L

LAUNDRY

BEDROOM

x8

!"#$%&

!"#$%&'(")%"*+&,&1:200 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

-INDUSTRIAL CORRIDOR -CLEANING AND REPARATION -EARTHWARE JAR STORE

HOTEL -ROOMS CORRIDOR

BIE


COMMON WATER CABINET IN FACADE: A

C

B

D

-FILTER F -STOP VALVE -BACKFLOW VALVE -METER -OUTFLOW/BACKFLOW VALVE

E 49,05 48,8

6,1

6,1

6,1

6,1

6,1

G

H

6,1

6,1

I

6,1

1

CONTROL VALVE

BUILDING MAIN PIPE

09

11

08

10

07

06

05

04

03

02

01

6

CGP

BIE

LEVEL STOP VALVE

RISERS

AFS

SCW

BUILDING SHUT-OFF VALVE

12

13

14

15

16

17

18

19

20

21

22

23

FIXTURE STOP ROOM STOP VALVE VALVE

CHILLER

23 STAIRS 28x16.9cm

UPPER SLAB

2

01

5,5

02

22 21

03

20

04

19

05

18

06

17

07

16

08

15

09

14

10

13

11

12

23 STAIRS 28x16.9cm

28,05

5,5

28,6

3

4 21 STAIRS 28X16.6CM

NATURAL VENTILATION

00.0m<00m NATURAL VENTILATION O.E.

NATURAL VENTILATION

5

00.0m<00m

00.0m<00m

O.E.

O.E. E NATURAL VENTILATION

ER DUCT REC SOSTRE DUCT REC TERRA UCT

CT

O.E.

1.50

20

19

18

NATURAL VENTILATION

00.0m<00m O.E.

NATURAL VENTILATION

E

1.50

1.50

1.50

1.50

2,5%

E 7,3

17

E 1.50

00.0m<00m

E

00.0m<00m

1.50

16

O.E. NATURAL VENTILATION

E

O.E.

15

NATURAL VENTILATION

1.50

E

14

13

12

09

11

08

10

06

05

04

02

E

00.0m<00m

E

1.50

O.E.

2,5%

1.50

2,5% 1.50

DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ DE REC TERRA

2,5%

1.50

BUCIÓ DE REC SOSTRE BUCIÓ DE REC TERRA IÓ DE REC SOSTRE

WATER DUCT REC TERRA

E

E

NATURAL VENTILATION

E

E 00.0m<00m00.0m<00m O.E. O.E.

NATURAL VENTILATION

00.0m<00m O.E.

00.0m<00m

NATURAL VENTILATION

IÓ DE REC TERRA 2,5% DE REC SOSTRE DE REC TERRA REC SOSTRE

NATURAL VENTILATION NATURAL NATURAL VENTILATION VENTILATION

O.E.

NATURAL VENTILATION

NATURAL VENTILATION

01

3,75

00.0m<00m

03

O.E. E

NATURAL VENTILATION

NATURAL VENTILATION

00.0m<00m

O.E.

07

NATURAL VENTILATION

00.0m<00m

2,5% 2,5%

2,5% 2,5%

1.50

2,5%

DISTRIBUCIÓ DE REC SOSTRE 6

DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ DE REC TERRA

DISTRIBUCIÓ DE REC SOSTRE 2,5% FOULpipe WATER DUCT connection DISTRIBUCIÓ DEexternal REC TERRA FOULconnection WATER DUCT FOUL WATER underground distribution pipeDUCT external pipe DISTRIBUCIÓ DE REC SOSTRE hw distribution underground distribution external connection pipe pipe DISTRIBUCIÓ DE REC TERRA hw backflow hwdistribution distribution underground FOUL WATER DUCT external connection pipe pipe cold water hw backflow hwdistribution distributionpipe underground rainwater hw backflow cold water BIE distribuiton hw distribution rainwater externalhw connection pipe FOUL cold water WATER DUCT backflow BIE distribuiton rainwater pipe underground distribution cold BIE water distribuiton hw distribution rainwater hw BIEbackflow distribuiton cold water rainwater BIE distribuiton

2,5%

DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ DEDE REC TERRA DISTRIBUCIÓ REC SOSTRE DISTRIBUCIÓ DE REC SOSTRE FOUL WATER DUCT DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ DE REC TERRA

2,5%

DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ REC TERRA DISTRIBUCIÓ DEDE REC SOSTRE DISTRIBUCIÓ DE REC TERRA

FOUL WATER DUCT DISTRIBUCIÓ DE REC SOSTRE FOUL WATER external connectionDISTRIBUCIÓ pipe DE DUCT REC TERRA

external connection pipe

underground distribution pipe underground distribution external connection pipe pipe 2,5% hw distribution hwdistribution distributionpipe underground external connection pipe hw backflow hw backflow hw distribution FOUL WATER DUCT underground distribution pipe cold water cold water external connection hw backflow external connection pipe pipe DISTRIBUCIÓ DE REC SOSTRE rainwater hw distribution rainwater external connection underground distribution pipeDISTRIBUCIÓ DE REC TERRA cold waterpipe underground distribution pipe distribuiton hwBIE backflow BIE distribuiton rainwater underground distribution pipe hw distribution hw distribution cold distribuiton hwwater backflow hwconnection backflow hw BIE distribution external rainwater pipe hw backflow cold water colddistribuiton water BIE underground pipe INTERNAL CW DISTRIBUTION THROUGH CEILINGdistribution BIE’S FIXTURE STOP VALVE FOUL WATER DUCT rainwater cold water rainwater hw distribution BIE distribuiton distribuiton rainwater INTERNAL CW DISTRIBUTION THROUGH BIE PAVEMENT INTERNAL BIE’S WATER DISTRIBUTION external connection pipe hw backflow BIE distribuiton

FOUL WATER DISTRIBUCIÓ DEDUCT REC SOSTRE DISTRIBUCIÓ DE REC TERRA FOUL WATER DUCT FOUL WATER DUCT external connection pipe

external connection pipe underground distribution pipe FOUL WATER external connection pipe DUCT distribution undergroundunderground distribution hw pipe distribution pipe hw backflow hw distribution hw distribution connection pipe COLD external WATER hw backflow hw backflow cold water pipe rainwater CW underground BUILDING MAIN distribution PIPE cold water cold water BIE distribuiton hw distribution rainwater rainwater CW CONTROL VALVE connection pipe hw backflow external BIE distribuiton BIE distribuiton CW LEVEL STOPcold VALVEwater underground distribution pipe hw distribution rainwater CW ROOM STOP VALVE hw backflow BIE distribuiton CW FIXTURE STOP VALVE

1.50 1.50

cold water rainwater BIE distribuiton

BIE’S WATER

BIE’S BUILDING MAIN PIPE BIE’S CONTROL VALVE

RAINWATER

underground distribution pipe INTERNAL RW DISTRIBUTION THROUGH CEILING hw distribution hw backflow RW PUMPING SET

cold water rainwater BIE distribuiton

BIE’S LEVEL STOP VALVE

RW FIXTURE STOP VALVE

!"#$%&

!"##$%&'%(%1:150 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

cold water rainwater BIE distribuiton

HOT WATER HW ROOM STOP VALVE HW FIXTURE STOP VALVE INTERNAL HW DISTRIBUTION THROUGH CEILING INTERNAL HW RECIRCULATION THROUGH CEILING HW RECIRCULATION PUMPING SET

EXTERNAL CONNECTION PIPE

WATER MAIN


A

C

B

D

E

F

G

H

I

49,05 48,8 6,1

6,1

6,1

6,1

6,1

6,1

6,1

1

HOT WATER STORAGE GIACOMNI BCI (Ø950mm, 1775mm)

08

BIOMASS BOILER ECO HK-90KW (0,75 x 1,24 x 1,61m)

07

09

06

15

11

05

16

12

04

17

10

03

18

13

02

20

19

14

01

21

00

22

6

PUMPING SET BIOMASS STORAGE

23 STAIRS 28x16.9cm

RAINWATER TANK IN SITU 15.000L

2

5,5

00 22

01

21

02

20

03

19

04

18 17

05 06

16

07

15

08

14

09

13

10

12

11

23 STAIRS 28x16.9cm

DRYER

WASHER

28,05

5,5

28,6

3

EXTERIOR UNIT (0,58x 1,10 x 1,58m)

EXTERIOR UNIT (0,58x 1,10 x 1,58m)

4 21 STAIRS 28X16.6CM

3,75

00.0m<00m NATURAL VENTILATION

00.0m<00m NATURAL VENTILATION O.E.

NATURAL VENTILATION

5 NATURAL VENTILATION

00.0m<00m

00.0m<00m

O.E.

O.E. E NATURAL VENTILATION

ER DUCT REC SOSTRE DUCT REC TERRA UCT

CT

O.E.

1.50

19

18

20

NATURAL VENTILATION

00.0m<00m O.E.

NATURAL VENTILATION

E

1.50

1.50

1.50

1.50

2,5%

E 7,3

17

E 1.50

00.0m<00m

E

00.0m<00m

1.50

16

O.E. NATURAL VENTILATION

E

O.E.

15

NATURAL VENTILATION

1.50

E

14

13

12

11

10

09

07

05

04

06

02

01

03

E

00.0m<00m

E

1.50

O.E.

2,5%

1.50

2,5% 1.50

DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ DE REC TERRA

2,5%

1.50

BUCIÓ DE REC SOSTRE BUCIÓ DE REC TERRA IÓ DE REC SOSTRE

WATER DUCT REC TERRA

E

E

NATURAL VENTILATION

E

E 00.0m<00m00.0m<00m O.E. O.E.

NATURAL VENTILATION

00.0m<00m O.E.

00.0m<00m

NATURAL VENTILATION

IÓ DE REC TERRA 2,5% DE REC SOSTRE DE REC TERRA REC SOSTRE

NATURAL VENTILATION NATURAL NATURAL VENTILATION VENTILATION

O.E.

NATURAL VENTILATION

00

O.E. E

NATURAL VENTILATION

NATURAL VENTILATION

00.0m<00m

O.E.

08

NATURAL VENTILATION

00.0m<00m

2,5% 2,5%

2,5% 2,5%

1.50

2,5%

DISTRIBUCIÓ DE REC SOSTRE 6

DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ DE REC TERRA

DISTRIBUCIÓ DE REC SOSTRE 2,5% FOULpipe WATER DUCT connection DISTRIBUCIÓ DEexternal REC TERRA FOULconnection WATER DUCT FOUL WATER underground distribution pipeDUCT external pipe DISTRIBUCIÓ DE REC SOSTRE hw distribution underground distribution external connection pipe pipe DISTRIBUCIÓ DE REC TERRA hw backflow hwdistribution distribution underground FOUL WATER DUCT external connection pipe pipe cold water hw backflow hwdistribution distributionpipe underground rainwater hw backflow cold water BIE distribuiton hw distribution rainwater externalhw connection pipe FOUL cold water WATER DUCT backflow BIE distribuiton rainwater pipe underground distribution cold BIE water distribuiton hw distribution rainwater hw BIEbackflow distribuiton cold water rainwater BIE distribuiton

2,5%

DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ DEDE REC TERRA DISTRIBUCIÓ REC SOSTRE DISTRIBUCIÓ DE REC SOSTRE FOUL WATER DUCT DISTRIBUCIÓ DE REC TERRA DISTRIBUCIÓ DE REC TERRA

2,5%

DISTRIBUCIÓ DE REC SOSTRE DISTRIBUCIÓ REC TERRA DISTRIBUCIÓ DEDE REC SOSTRE DISTRIBUCIÓ DE REC TERRA

FOUL WATER DUCT DISTRIBUCIÓ DE REC SOSTRE FOUL WATER external connectionDISTRIBUCIÓ pipe DE DUCT REC TERRA

external connection pipe

underground distribution pipe underground distribution external connection pipe pipe 2,5% hw distribution hwdistribution distributionpipe underground external connection pipe hw backflow hw backflow hw distribution FOUL WATER DUCT underground distribution pipe cold water cold water external connection hw backflow external connection pipe pipe DISTRIBUCIÓ DE REC SOSTRE rainwater hw distribution rainwater external connection underground distribution pipeDISTRIBUCIÓ DE REC TERRA cold waterpipe underground distribution pipe distribuiton hwBIE backflow BIE distribuiton rainwater underground distribution pipe hw distribution hw distribution cold distribuiton hwwater backflow hwconnection backflow hw BIE distribution external rainwater pipe hw backflow cold water colddistribuiton water BIE underground pipe INTERNAL CW DISTRIBUTION THROUGH CEILINGdistribution BIE’S FIXTURE STOP VALVE FOUL WATER DUCT rainwater cold water rainwater hw distribution BIE distribuiton distribuiton rainwater INTERNAL CW DISTRIBUTION THROUGH BIE PAVEMENT INTERNAL BIE’S WATER DISTRIBUTION external connection pipe hw backflow BIE distribuiton

FOUL WATER DISTRIBUCIÓ DEDUCT REC SOSTRE DISTRIBUCIÓ DE REC TERRA FOUL WATER DUCT FOUL WATER DUCT external connection pipe

external connection pipe underground distribution pipe FOUL WATER external connection pipe DUCT distribution undergroundunderground distribution hw pipe distribution pipe hw backflow hw distribution hw distribution connection pipe COLD external WATER hw backflow hw backflow cold water pipe rainwater CW underground BUILDING MAIN distribution PIPE cold water cold water BIE distribuiton hw distribution rainwater rainwater CW CONTROL VALVE connection pipe hw backflow external BIE distribuiton BIE distribuiton CW LEVEL STOPcold VALVEwater underground distribution pipe hw distribution rainwater CW ROOM STOP VALVE hw backflow BIE distribuiton CW FIXTURE STOP VALVE

1.50 1.50

cold water rainwater BIE distribuiton

BIE’S WATER

BIE’S BUILDING MAIN PIPE BIE’S CONTROL VALVE

RAINWATER

underground distribution pipe INTERNAL RW DISTRIBUTION THROUGH CEILING hw distribution hw backflow RW PUMPING SET

cold water rainwater BIE distribuiton

BIE’S LEVEL STOP VALVE

RW FIXTURE STOP VALVE

!"#$%&

!"#$%&'()##"'*'1:150 !"#$%&'(#)'*+,$-'."/%(#('0'!"#$%#&'&#()*(+,(-&././

cold water rainwater BIE distribuiton

HOT WATER HW ROOM STOP VALVE HW FIXTURE STOP VALVE INTERNAL HW DISTRIBUTION THROUGH CEILING INTERNAL HW RECIRCULATION THROUGH CEILING HW RECIRCULATION PUMPING SET

6,1


!"#$%"!

Final Thesis Project | Júlia Boix Gonzalez

WINERY AND HOTEL SIURANA| September 2020


!"#$&"!

Final Thesis Project | Júlia Boix Gonzalez

WINERY AND HOTEL SIURANA| September 2020



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.