CONTENTS This booklet contains a selection of projects from my professional work as an assistant architect in Brazil & UK and as a student of Bachelors Architecture at University of Fortaleza (Brazil). The selected works were chosen to highlight the diverse scale, design and technical skills I have been involved in.
01
02
03
ANANDABAN HOSPITAL
SITTWE GENERAL HOSPITAL
AQUARELA CONDOMINIUM CLUB
NEW EARTHQUAKE RESISTANT TRAUMA CENTRE
HOSPITAL AND STAFF HOUSING MASTERPLAN
THREE TOWERS RESIDENTIAL BUILDING
Article 25
Article 25
Magis Incorporações
Lalitpur, Nepal
Sittwe, Myanmar
Fortaleza, Brazil
04
05
06
AMÉLIE RESTÔ
STUDENT HOUSING
“OCA VIVA”
RESTAURANT DESIGN
UNIVERITY THESIS PROJECT
COMPETITION PROJECT WINNER
Pochè Arquitetura Fortaleza, Brazil
University Project Redenção, Brazil
MD Concept Fortaleza, Brazil
PROPOSED MAIN ENTRANCE OF THE TRAUMA CENTRE
HOSPITAL BUILDING ANANDABAN HOSPITAL | NEW EARTHQUAKE RESISTANT TRAUMA CENTRE
Anandaban Hospital was established in 1957 and is the main leprosy referral hospital in Nepal. It provides vital free healthcare to people affected by leprosy. Anandaban aims to recover from the earthquake in 2015 and redevelop the hospital.
ARTICLE 25 The Leprosy Mission England & Wales + Nepal & Anandaban Hospital
On this project, I worked on stages 3+4 and took ownership of the internal detail design for Tender. This included wall, floor + ceiling packages as well as sanitary and internal partitions.
Stages: 3-4 Dates: 2016-on going Status: on site Location: Lele, Lalitpur | Nepal Consultants Team: Ramboll, Hoare Lea, JSA
I managed the coordination of the architecture elements with the MEP systems which involved attending regular meetings with the engineers and reporting comments to the tenderers and contractors.
EARTHQUAKE DAMAGE TO HOSPITAL BUILDINGS, 2015
PROVISIONAL HEALTHCARE FACILITIES BY UNICEF
EXISTING HILLY LANDSCAPE MAKES ACCESS DIFFICULT
SITE PLAN WITH PROPOSED + EXISTING BUILDINGS
ORGANISATIONAL DIAGRAM FOR CLINICAL FUNCTIONS
FIRST FLOOR PLAN
LONG SECTION
5
GL
300
65 Bumper raill + Handrail
Downstand Beam beyond
Cement-based adhesive secures AAC to shear wall Metal mesh to retain AAC Blocks
Downstand Beam beyond
110
740
Downstand Beam beyond
110mm Single course facade brickwork
60
Lift Shaft Downstand Beam beyond
External
RC Shear wall to Lift Shaft
50mm Styrofoam insulation
AAC Block cut to allow flush finish to corridor walls at columns
200
Corridor
RCC band
100
RCC band
100
100
RCC band
AAC Block 200mm Suspended ceiling varies. Refer to 1400 drawing series
Suspended ceiling varies. Refer to 1400 drawing series
Suspended ceiling. Refer to 1400 drawing series
GL
RC Column to SE Design
Internal
300
C
640
640
640
Suspended ceiling varies. Refer to 1400 drawing series
RC Column to SE Design
15mm Cement Plaster Finish 15mm Cement Plaster Finish
Cement Plaster Finish
65
Projection of Beam above Lintel RCC band
150
Finish Varies
Cement-based adhesive secures AAC to shear wall
1010
GL
Thick sand/cement mortar to level first course
Varies
1060
1060
1060
GL Thick sand/cement mortar to level first course
50mm Styrofoam insulation
RC Column to SE Design
Bumper Rail + Handrail Refer to drawings 8300
2x 8mm Horizontal bars placed every two courses of blocks
110
100
2x 8mm Horizontal bars placed every two courses of blocks
110mm Single course facade brickwork
60
RCC band
Thick sand/cement mortar to level first course
Plan Detail - Typical Column Junction to External Walls 1:10 @ A3
02 8211
Corridor
RCC band
2110
RCC band
Lift Shaft
1010
200mm Autoclaved Aerated Concrete Blockwork (AAC)
100
150mm Autoclaved Aerated Concrete Blockwork (AAC)
2x 8mm Horizontal bars placed every two courses of blocks
Autoclaved Aerated Concrete Blockwork (AAC) varies.
Plan Detail - Column at Lift Shaft 1:10 @ A3
01 8211
RC Shear wall to Lift Shaft
Finish Varies
2110
100
2110
1010
100mm Autoclaved Aerated Concrete Blockwork (AAC)
Projection of Beam above
AAC Blocks cut to allow flush finish to corridor walls at columns
3500
Finish Varies
Metal mesh to restrain blocks
AAC Block 200mm
200
Lintel RCC band
150
150
Lintel RCC band
150mm Vinyl coved skirting
Autoclaved Aerated Concrete Blockwork (AAC) varies.
Vinyl flooring
Cement Plaster Finish
Thick sand/cement mortar to level first course
Projection of Beam above
15mm Cement Plaster Finish
Projection of Beam above Floor finishes varies. Refer to 1300 drawing series
Floor finishes varies. Refer to 1300 drawing series
150
Floor finishes varies. Refer to 1300 drawing series
100
Autoclaved Aerated Concrete Blockwork (AAC) varies.
200
150 Concrete Floor Slab
Concrete Floor Slab
300
Concrete Floor Slab
65
Concrete Floor Slab
A-8210
074-A25-TC-ZZ-DR-
Screed
-
TENDER
1:20
Oct 2018
JM TP
15.03.18
Plan Detail - Typical Column Junction 1:10 @ A3 DRAWN
REV
A
Updated after Engineer input
09.04.18
JM
B
Draft Approval Drawings
04.05.18
JM
DATE
DRAWN
KEY
PARTNERS
-
TENDER
Oct 2018
JM
FOR MORE INFORMATION REFER TO THE FOLLOWING DRAWINGS:
Reinforced Concrete
-
Plain Concrete
1000 SERIES FOR GA PLANS + PARTITIONS MARK-UPS 8210 PARTITION TYPES
Brick
Anandaban Hospital Leprosy Mission
Internal Partitions Plan Details - Typical Junctions
A-8211
Insulation Autoclaved Aerated Cement Block (AAC)
074-A25-TC-ZZ-DR-
Screed
Article 25 One Canada Square, Canary Wharf London E14 5AB, United Kingdom Registered Charity No: 1112621 www.article-25.org
Do not scale from this drawing. All dimensions are in millimeters. All dimensions to be confirmed on site. This drawing and information within, is the copyright of Article 25. Article 25 should be notified immediately of any discrepancies.
Plan Detail - Typical Junction to External Walls 1:10 @ A3
04 8211
NOTE
JM
PROJECT
DATE
For Information
-
SCALE
Autoclaved Aerated Cement Block (AAC)
NOTE
-
TENDER
1:10
Oct 2018
DRAWN
Partitions Types Sections
Insulation
REV
DATE
Brick
03 8211
Anandaban Hospital Leprosy Mission
JM
CHECK
JM
Corridor Lining to Shear Wall 1:20 @ A3
TITLE
JM
Oct 2018
8210
1000 SERIES FOR GA PLANS + PARTITIONS MARK-UPS 8211 PARTITION JUNCTIONS 8300 BUMPER RAIL AND HANDRAIL DETAIL DRAWING
DWG NO.
04.05.18
TENDER
-
REV
Draft Approval Drawings
LT01
PARTNERS
FOR MORE INFORMATION REFER TO THE FOLLOWING DRAWINGS:
STATUS
Updated after Engineer input
-
8210
Reinforced Concrete Plain Concrete
JM
A B
Partition Type 03- 200mm 1:20 @ A3
PT03
KEY
SCALE
DRAWN
DRAWN
DATE
DATE
NOTE
REV
09.04.18
REV
JM
PROJECT
DRAWN
TITLE
8210
15.03.18
CHECK
Partition Type 02- 150mm 1:20 @ A3
PT02
DATE
For Comment
DWG NO.
8210
NOTE
-
STATUS
Partition Type 01- 100mm 1:20 @ A3
PT01
REV
TP
Article 25 One Canada Square, Canary Wharf London E14 5AB, United Kingdom Registered Charity No: 1112621 www.article-25.org
Do not scale from this drawing. All dimensions are in millimeters. All dimensions to be confirmed on site. This drawing and information within, is the copyright of Article 25. Article 25 should be notified immediately of any discrepancies.
INTERNAL PARTITION DETAILS
ARCHITECT
3
ARCHITECT
4 Article 25, One Canada Square, London UK, E14 5AB Registered Charity No: 1112621 www.article-25.org
B
Article 25, One Canada Square, London UK, E14 5AB Registered Charity No: 1112621 www.article-25.org
PARTNERS
1000
LF 31 Accessible Bathroom 5.9 sqm
PARTNERS
150
LF 32 Disposal Hold 6.4 sqm
1820
1560.50FFL
150
2%
Fire Hose Cabinet
1695
320
320
1560.51FFL REV
NOTE
-
Draft Approval Drawings
JM
04.05.18
-
TENDER
DRAWN
JM
Oct 2018
DATE
Water resistant cement board ceiling
REV
NOTE
-
Draft Approval Drawings
JM
04.05.18
-
TENDER
DRAWN
JM
Oct 2018
DATE
500
500
160
200
600
700
100
600
250
AAC Block partition wall. Refer to drawing 8210 65
LF 29 Bathroom Female
400
Services Riser
800
480 1360
KEY
KEY
1035
160
750
450
260
600
Insulation Autoclaved Aerated Cement Block (AAC) Screed
120
Brick Bats Filling
1000
1795
L0 750
680
5101
480
Circulation Area +1560.51 FFL
800
850
5101
750
Plain Concrete
750 50
320
2%
150
1840
320
L0
1560.50FFL
5102
LF 29 Bathroom Female 2.8 sqm
LF 27 Accessible Bathroom 5.9 sqm
1560.50FFL
505
1560.50FFL 405
Brick Bats Filling
2%
01 5101
800
1270
635
830
LF 28 Bathroom Male 3.7 sqm
Brick
Tiles up to 1800mm high on walls
Screed
150
Brick Insulation Autoclaved Aerated Cement Block (AAC)
400
375
Reinforced Concrete
Fire Resistance: Walls = 60 Minutes | Doors = 30 Minutes
600
Plain Concrete
160
2690 65
Fire Resistance: Walls = 120 Minutes | Doors = 60 Minutes
Reinforced Concrete
1980
200
1800
600
295
150
Tiles up to 1800mm high on walls
100
750
650
Bathroom +1560.50 FFL
400
600
500
250
2185
500
2%
1560.50FFL
LF 27 Accessible Bathroom
2% 1305
LF 30 Bathroom Male 2.9 sqm
750
300x300x8mm thick fully vitrified ceramic tile Floor level 10mm below adjoining circulation area
635
LF 28 Bathroom Male
AAC Block partition wall Refer to drawing 8210
800
410
400
365
C
PROJECT TITLE
074-A25-TC-L0-DR-
A- 5101 1:25
SCALE
TENDER
Oct 2018
DRAWN
-
DATE
TP
Do not scale from this drawing. All dimensions are in millimeters. All dimensions to be confirmed on site. This drawing and information within, is the copyright of Article 25. Article 25 should be notified immediately of any discrepancies.
1000mm
JM
CHECK
JM
REV
SCALE
DRAWN
1:25 Oct 2018
500mm
Anandaban Hospital Leprosy Mission
Sanitary Details Lower Ground Floor - Section 01
DWG NO.
0
FLOOR BUILD UP: 300x300x8 mm thick fully vitrified Ceramic Tile 25-30mm Screed 75mm thick Plain Cement Concrete Brick Bats Filling 135mm Floor Slab
Section 01 - Lower Ground Sanitary Block 1 1:25 @ A3
A- 5100 DATE
TENDER
CHECK
-
01 5101
STATUS
PROJECT
074-A25-TC-L0-DR-
REV
Plan Detail - Lower Ground Sanitary Block 01 1:25 @ A3
1000mm
TITLE
500mm
Anandaban Hospital Leprosy Mission
Sanitary Details Lower Ground Floor - Plan Details
STATUS
01 5100
4
5102
DWG NO.
0
1560.51FFL
01
3
TP
Do not scale from this drawing. All dimensions are in millimeters. All dimensions to be confirmed on site. This drawing and information within, is the copyright of Article 25. Article 25 should be notified immediately of any discrepancies.
SANITARY DETAIL DRAWINGS
Riser
LF 28 Bathroom Male 3.7 sqm
PFE
LT-01
E 01 Elevator 20 Persons 7.7 sqm
PT-02
PT-02
LF 27 Accessible Bathroom 5.9 sqm
A
ST 01 Stairs 35.7 sqm
PT-03
E 02 Empty Lift Shaft
PT-02
LF 02 Pre Delivery 37.3 sqm
LF 18 Paediatric Ward 44.0 sqm
PT-02
LF 22 Staff Base 7.9 sqm
LF 21 Private Room 12.1 sqm
LF 19 Children En-Suite 3.3 sqm
PT-02
6 PARTNERS
Paint finish
Location of Handrail + Bumper Rail Refer to Drawing 8300
300x300mm Ceramic Tiles up to 1800mm height+ Hygienic paint finish above
Untreated
50x50 Mild Steel Corner Guards
Epoxy Resin skirting with Hygienic paint above. Skirting to 150mm height, except in the OTs (1350mm height)
1.0mm Lead sheet on thick wall + Heavy duty emulsion paint
Do not scale from this drawing. All dimensions are in millimeters. All dimensions to be confirmed on site. This drawing and information within, is the copyright of Article 25. Article 25 should be notified immediately of any discrepancies.
PT xx
Partition Type Wall number
WALL & FLOOR FINISHES
0
1m
2m
5m
7
074-A25-TC-L0-DR-
TENDER
Article 25 One Canada Square, Canary Wharf London E14 5AB, United Kingdom Registered Charity No: 1112621 www.article-25.org
5500
1
Anandaban Hospital The Leprosy Mission
Lower Ground Floor Proposed Wall Finishes
A-1500 1:100
DRAWN
5
150mm high Vinyl coving with Hygienic Paint above
SCALE
4
KEY
B
3
5520
JM
DATE
JM
1560.50 FFL
LF 21 Private Room 12.1 sqm
LF 22 Staff Base 7.9 sqm
LF 19 Children En-Suite 3.3 sqm
Oct 2018
TP
B
LF 20 En-suite 3.5 sqm
5500
2
REV
NOTE
DATE
DRAWN
-
For comment
24.01.18
LB
A
For information
31.01.18
LB
B
Draft Approvals Drawing
04.05.18
LB
-
TENDER
Oct 2018
JM
REV
NOTE
3 DATE
DRAWN
5500
4
5520
5
Lower Ground Floor Entrance
6 PARTNERS
Non-slip PVC Vinyl flooring with 150mm coved skirting
Non-slip Ceramic Tiles (Stairs) with 100mm ceramic tiling skirting
300x300mm non-slip sanitary Ceramic Tiles up to 1800mm high
Untreated
FOR MORE INFORMATION REFER TO THE FOLLOWING DRAWINGS: -
1000 SERIES FOR SLAB RECESS 3000 SERIES FOR SLAB CHANGE
7
Anandaban Hospital The Leprosy Mission
Lower Ground Floor Proposed Floor Finishes
A-1300
074-A25-00-L0-DR-
Entrance Matting
Do not scale from this drawing. All dimensions are in millimeters. All dimensions to be confirmed on site. This drawing and information within, is the copyright of Article 25. Article 25 should be notified immediately of any discrepancies.
D
5500
KEY
Non-slip, anti electro static, self-leveling Epoxy Flooring. Coved Skirting to 150mm height, except in the OTs (1350mm).
LF 18 Paediatric Ward 44.0 sqm
1560.50 FFL
D
CHECK
DRAWN
PROJECT
DATE
LF 03 Post Delivery 44.0 sqm
5520
DWG NO.
JM
Oct 18
C
Nurse's Desk LF 23 Corridor 17.5 sqm
LF 02 Pre Delivery 37.3 sqm
5500
A 9 risers 174/270
1560.51 FFL
1560.51 FFL
LF 20 En-suite 3.5 sqm
REV
04.05.18
TENDER
5500 Lower Ground Floor Entrance
1562.81 FFL
ST 01 Stairs 35.7 sqm
E 02 Empty Lift Shaft
LF 01 Porch 8.7 sqm
DWG
2
Draft Approval Drawings
E 01 Elevator 20 Persons 7.7 sqm
14 risers 174/270 1560.51 FFL
1560.50 FFL
PT-02
STATUS
1 NOTE
-
LF 27 Accessible Bathroom 5.9 sqm
1560.50 FFL
PT-02 PT-02
5500
LF 26 Corridor 47 sqm
Riser
LF 28 Bathroom Male 3.7 sqm
1560.50 FFL
C
D
-
1560.50 FFL
LF 29 Bathroom Female 2.8 sqm
LF 24 Corridor 30.1 sqm
D
5500
LF 30 Bathroom Male 2.9 sqm
LF 04 Nurse Station 8.6 sqm
LF 05 Neonatal / ICU 13.6 sqm
LF 16 CSSD Sterile Zone 24.0 sqm
B
LF 32 Disposal Hold 6.4 sqm
1560.50 FFL
PT-02
PT-02
LF 01 Porch 8.7 sqm
LF 31 Bathroom Female 5.9 sqm
PT-02
LT-01
LF 23 Corridor 17.5 sqm
LF 03 Post Delivery 44.0 sqm
5520
Sub-waiting Area
A
C
PT-02
PT-02
LF 17 Scrub 5.0 sqm
PT-01
PT-03
LF 24 Corridor 30.1 sqm
PT-02
B
PT-03
LF 15 CSSD Clean Zone 19.2 sqm
0
1m
2m
5m
-
TENDER
Article 25 One Canada Square, Canary Wharf London E14 5AB, United Kingdom Registered Charity No: 1112621 www.article-25.org
1:100
DRAWN
LF 26 Corridor 47 sqm
LF 14 CSSD Soiled Zone 11.7 sqm
LF 13 IT/Electrical Room 12.5 sqm
SCALE
C
PT-02
PT-02
LF 12 Store 10.9 sqm
LB
DATE
PT-01
B
LF 32 Disposal Hold 6.4 sqm
4850
LF 30 Bathroom Male 2.9 sqm
LF 29 Bathroom Female 2.8 sqm
PT-02
PT-01
6535
4850
LF 31 Bathroom Female 5.9 sqm
Fire Hose Cabinet
PT-01
LF 11 Clean Utility 9.1 sqm
1560.51 FFL
LF 25 Corridor 32.0 sqm
LF 06 Delivery Room 21.1 sqm
PT-02
LF 04 Nurse Station 8.6 sqm
LF 05 Neonatal / ICU 13.6 sqm
REV
note: allow for ceiling mounted OT lights
LF 16 CSSD Sterile Zone 24.0 sqm
PT-02
Sub-waiting Area
6535
PT-02
PAINTED SCREED FINISH FLOOR
LF 10 Dirty Utility 8.3 sqm
LF 08 Scrub 6.1 sqm
Oct 2018
CHECK
LF 25 Corridor 32.0 sqm
PT-02
A
LF 17 Scrub 5.0 sqm
PT-02
7
A
LF 09 Preparation Room 6.1 sqm
LF 07 Emergency Delivery / C-Section 30 sqm
PT-02
PT-01
PT-02
Fire Hose Cabinet
B
A
LF 15 CSSD Clean Zone 19.2 sqm
PT-02
B
LF 14 CSSD Soiled Zone 11.7 sqm
LF 13 IT/Electrical Room 12.5 sqm
6
PROJECT
PT-02
5
DWG
LF 12 Store 10.9 sqm
4
DWG NO.
PT-02
3
REV
LF 11 Clean Utility 9.1 sqm
2
STATUS
PT-02
PT-02
LF 06 Delivery Room 21.1 sqm
1
PT-02
LF 10 Dirty Utility 8.3 sqm
LF 08 Scrub 6.1 sqm
PT-02
PT-03
7
A
LF 09 Preparation Room 6.1 sqm PT-01
6535
LF 07 Emergency Delivery / C-Section 30 sqm
6
6535
A
5
Fire Hose Cabinet
4
3
Fire Hose Cabinet
2
B
1
TP
PROPOSED NORTHERN ENTRANCE AREA
PROPOSED SOUTHERN ENTRANCE AREA
GL
TYPICAL FACADE ELEVATION & SECTION
ARCHITECT
Article 25, O Registered C
TENDER
NOTE
PARTNERS
-
500mm
Screed
Autoclav
Rigid Ins
Brick
Plain Co
Reinforc
REV
250m
Anandaban The Leprosy
Typical F Rendere
-
TE
074-A25-
KEY
0
PROJECT
DWG
DWG NO.
REV
Do not scale from this dr confirmed on site. This d Article 25 should be notif
STATUS
AERIAL VIEW OF MASTERPLAN PROPOSALS
HOSPITAL MASTERPLAN MASTERPLAN FOR SITTWE GENERAL HOSPITAL SITTWE, RAKHINE STATE|MYANMAR ARTICLE 25 Rangoon General Hospital Reinvigoration Trust (RGHR) & UNOPS Stages: 0-2 Dates: july 2018 - october 2018 Status: Completed Location: Sittwe, Rakhine | Myanmar Consultants Michael Hadi, Hoare Lea, Clark Bond
Article 25 were engaged to lead a design team in the evaluation of the existing Sittwe General Hospital, and devising proposals for its long term development into a 500 bed facility with staff housing on site. I worked on a series of site analysis and proposal drawings for the Masterplan, using my AutoCad experience to help design and manage the CAD workflow. It was provided a phased proposal to enable the hospital’s development as well as recommendations for immediate improvements on the existing facilities and infrastructure at SGH. The challenging deadline for delivering a strong and buildable proposal was one of the major challenges of this project, but the determination to improve the current situation of the population has led myself immensely.
ORGANISATIONAL DIAGRAM OF HOSPITAL PROPOSALS
18
OutlinePhase Cost Outline Estimate $24-26m $24-26m 3 Phase Cost3 Estimate Construct new A&E and OTB,3-4 Building and new WardC.Building C. Expected Time Frame 3-4 years Construct new A&E OT Building and newB,Ward Building Expected Timeand Frame years Outline Cost Estimate$24-26m $24-26m Outline Cost Estimate Expected Time Frame3-4 years 3-4 years Expected Time Frame
34
6
PHASE 3
PARTNERS
1
34 34
OutlinePhase Cost Outline Estimate $1.5-2m 4 Phase Cost4 Estimate $1.5-2m Demolish original blocks,Services completeZone Services Zoneworks and civil works to site. Expected Time Frame 1-2 years Demolish outstanding original ward blocks, complete and civil to site. Expected Timeoutstanding Frame 1-2ward years
34
KEY
PROJECT
34
Phase 4 Phase 4 Demolish outstanding wardoriginal blocks, ward complete Services Zone and civilZone works site.works to site. Demolish original outstanding blocks, complete Services andtocivil
Outline Cost Estimate$1.5-2m $1.5-2m Outline Cost Estimate Expected Time Frame1-2 years 1-2 years Expected Time Frame
KEY
KEY
1 1
6
NOTE
NOTE REVISION REVISION
6
C
0
0 10m
2
SittweH Sittwe General Hospital SiteHospital Masterpla Si Phasing Summary Phasing Su
087
A
Hospit Hospital Site Ma Phasin Phasing Summa A25-ST-ZZ-DR-A 087 A25
DWG NO.
34
1 6
C
20m10m
Sittwe General Hospita Sittwe Gen
DWG
34
10m 0
0
C
PROJECT
34
A
A
C
DWG
C
B
B
A
PROJECT
C
B
087 087Masterplan A25-ST-ZZ A M
STATUS
Phase 3 Phase 3 Construct new A&E andnew OTA&E Building new Ward C. Building C. Construct and B, OTand Building B, andBuilding new Ward
18
JOB NO.
6
A
F
DWG NO.
1
C
EF
E
Demolish
REV DWG NO. JOB NO.
1
C
F
DWG
B
FE
18
B
B
1
D
D
18
A 1
6
19
18
B
A
6
E
E
Demolished Bu De Upgrade
DE
18
B
6
19
18 18
A
E
D
Upgraded Build Up New Buil
PROJECT
D
D
19
A Building
New BuildingNe
DWG
19
19
A
JOB NO.
DE
Building A labels B
REV
D
18
A
Phase 2 Phase 2 Refurbish Main BuildingMain as OPD, andas construct newconstruct Ward Building A. Building A. Refurbish Building OPD, and new Ward
Outline Cost Estimate$12-14m $12-14m Outline Cost Estimate Expected Time Frame2-3 years 2-3 years Expected Time Frame
19 19
A
PHASE 2
OutlinePhase Cost Outline Estimate $12-14m $12-14m 2 Phase Cost2 Estimate Refurbish Building as OPD, andnew construct WardA.Building A. Expected Time Frame 2-3 yearsand Refurbish Main Building as OPD, construct Ward new Building Expected TimeMain Frame 2-3 years
Outline Cost Estimate$15-18m $15-18m Outline Cost Estimate Expected Time Frame2 years 2 years Expected Time Frame
19
34
34
6
STATUS
OutlinePhase Cost Outline Estimate $15-18m $15-18m 1 Phase Cost1 Estimate Establish Services and works to18. Building 18. Expected Time Frame 2 years Establish new Services Zone, and Zone, works to Building Expected Timenew Frame 2 years
34
STATUS REV
Phase 1 Phase 1 Establish newEstablish Servicesnew Zone, and works Building Services Zone,toand works18. to Building 18.
34
1
1
6 HOSPITAL CAMPUS PHASE 1
1
6
NOTES
A 1
6
NOTES
NOTES
A A
PARTNERS
18
18
A
PARTNERS
18
18
E
E
REVISION NOTE
18
18
E
D
D
PARTNERS
18
DE
19
19
E
E
D
NOTES
D
D
19
KEY
19
19
19
E
REVISION
DE
DWG NO.
D
JOB NO. STATUS
19
Ascale A Do Do not scale from this draw notMasterp f All dimensions in millim Allare dimension All dimensions to be confir All dimension PHASE 4 not sc This drawing, andDo informa drawing, Do notThis scale from th All dimen of Article -ofregistered Article 25ch -i All 25 dimensions are All dimen ArticleAll 25dimensions should be25 notifie Article tosho be Thisand draw discrepancies. discrepancies This drawing, in of -Article of Article 25 regist Article 25 Article 25 should be discrepan discrepancies. REV
19
PROPOSED MASTERPLAN
PARTNERS
48
Safe
59
63
Moderate Risk & under construction
45
Do not scale from this drawing. All dimensions are in millimetres. All dimensions to be confirmed on site. This drawing, and information within, is the copyright of Article 25 - registered charity no. 1112621. Article 25 should be notified immediately of any discrepancies.
47
NOTES
DATE BY
PROJECT
087
A25-ST-ZZ-DR-A-0011
SCALE
ad Ro
Staff housing block under construction
1:750 @A1 1:1500 @A3
-
Masterplan
DATE
in
Medical Superintendent Residence
DRAWN BY
Th
a
Nurses 46 Campus
45
DWG
Road Main
Dorm rooms with 4-6 beds per room 2 bedrooms per unit 2 units per block
75m
Existing Buildings Staff Accommodation Typologies
35
43
44
TP
30m
Sittwe General Hospital
29.06.18
DA
CHECKED BY
Sh
DA
Kh
1:750 @A1 1:1500 @A3 CHECKED BY
DATE
29.06.18
DRAWN BY
REV
Masterplan
u
Kh
46
-
STATUS
in
Th
44
36
42
TP
u
A25-ST-ZZ-DR-A-0007
SCALE
JOB NO.
ad
087
Each unit = 1 family 2 unit per block family size varies 2-4
0 5m 10m
37
41
a
Ro
d
May Yu Roa
JOB NO.
PROJECT
Existing Buildings Structural Analysis
35
43
75m
DWG
Main
42
30m
Sittwe General Hospital
DWG NO.
Road
36
38
39
40 0 5m 10m
37
41
Surveyed houses. Ref to drawing series A-9110
d
May Yu Roa
MS House Site
DWG NO.
39
d
NOTE
Under Construction 66
38
May Yu Roa
REVISION
62
May Yu Roa
40
Assistant Doctors Nurses
Unassessed & under construction
d
General Workers
65
61
REV
33
Specialists
64
58 60
Very High Risk
28
26
66
Hospital Campus
57
ENT
High Risk
34
6
62
53
56
Moderate Risk
1 65
52
Main Housing 54 Campus 55
STATUS
29
DATE BY
Workers housing Family units
64
58
61
ad
Ro
Surgeon
Stra nd
57
60
i
wd
Ba
Roa d
23
22
NOTE
REVISION
24
2
KEY
55
32
7
Physician Specialist
d
27
50
51
Paediatrician
3
Roa
Road
10
19
49
Anaesthetist
Stra nd
18
Main
53
56
63
Assistant Doctors (women) 4 units
4
52
54
59
8
KEY
NOTES
11
5
ad
Ro
i
wd
Ba
25
17
20
Sh
51
9
13
12
21
49
Road
14
50
Kyaung Gyi Road
15
16
Main
48
PARTNERS
Assistant Doctors (men) 7 people, Individual rooms Sharing kitchen + bathroom
Kyaung Gyi Road
47
Do not scale from this drawing. All dimensions are in millimetres. All dimensions to be confirmed on site. This drawing, and information within, is the copyright of Article 25 - registered charity no. 1112621. Article 25 should be notified immediately of any discrepancies.
Matron + family 4 adults, 2 children in 2 bedrooms with 1 living room
EXISTING STRUCTURAL ANALYSIS
EXISTING STAFF ACCOMMODATION TYPOLOGIES
Generator New Water Towers with tank Disel tank for generator
PARTNERS
L OU
TFAL
L
PROPOSED UTILITIES & WASTE STRATEGY
NOTES
SH1
Do not scale from this drawing. All dimensions are in millimetres. All dimensions to be confirmed on site. This drawing, and information within, is the copyright of Article 25 - registered charity no. 1112621. Article 25 should be notified immediately of any discrepancies.
Proposed Traffic & Site Circulation Strategy
087
Masterplan
29.06.18
1:750 @A1 1:1500 @A3 JM
CHECKED BY
A25-ST-ZZ-DR-A-0111
DATE
-
DRAWN BY
ad Ro SH25
SCALE
35
SH24
TP
75m
PROJECT
SH23
30m
Sittwe General Hospital
DWG
0 5m 10m
36
JOB NO.
SH22
DATE BY
NOTE
REVISION
SH2
SH21
Road JM
SH3
SH5
d
Vehicular site entrance Pedestrian site entrance
REV
29.06.18
1:750 @A1 1:1500 @A3
Ambulance drop off Parking areas
New Port area under construction
d
May Yu Roa
DWG NO.
26
May Yu Roa
Drop off
STATUS
SH7
Internal staircase
Main Entrance
Th a
SCALE
A25-ST-00-DR-A-0112
Masterplan
KEY
Stra nd
6
Main 087
-
d
Road
DATE BY
PROJECT DWG
75m
JOB NO.
30m
Proposed Utilities & Waste Strategy
DWG NO.
Ro ad Th a Kh in Sh u
SH25 ASTA
SH6
Sittwe General Hospital
REV
35
R ATE DW TE EA ALL + TR UTF CE L O RFA STA SU COA TO
36
SH22 SH23
Vehicular traffic External pedestrian pathway
34
SH4
SH24
Buildings Sheltered / Internal pedestrian pathway
SH19
New surface water land drain
0 5m 10m
C
Kh in
SH1
SH5
B
A SH17
Existing Septic tank that will act as a second treatment tank
DATE
SH2
Emergency
1
DRAWN BY
SH3
SH15
SH20
CHECKED BY
SH4
SH14
Surface drains
New Port area under construction
d
SH21
Road
Ground tanks
Manholes
d
Main
New Water Tower with tank
34
May Yu Roa
18
SH13
ad
SH18
Water tank
Post Office
TO CO
Tube Wells
Septic tanks
26
New Clock Tower
Power poles
Septic tank for Building 34
F
Ro
SH16
Septic tank for Buildings B & C
STATUS
SH7
di
w Ba
Sh u
6
NOTE
REVISION
Stra nd
1
SH19
E
SH8
Roa d
C
A Septic tank for Building A
May Yu Roa
Refer to HOARE LEA and CLARKE BOND drawings for detailed utilities and waste strategy.
KEY
Road
SH15
L
Main
TFAL
SH12
SH17
SH20
Perimeter drain from Immediate Works to be kept as part of the complete design
L OU
B
Main
mm +500
SH14
SH18
Existing site perimeter drain needs to be upgraded
ASTA
18
SH13
D
SH9
TO CO
ad
SH16
SH6
F Perimeter drain to cross underneath road
Ro
Ba The centre of this site needs to be raised to form a ridge and force water to fall to the perimeter drains
SH11
SH8
SH12
i wd
E
Septic tank for Building 18
SH9
Existing site perimeter drain needs to be upgraded
Kyaung Gyi Road
19
SH10
D
NOTES
19
SH11
Hatched area raised to road level
Roa
Kyaung Gyi Road SH10
PARTNERS
Hydrant water storage tank
Septic tank for Services Zone
TP
Do not scale from this drawing. All dimensions are in millimetres. All dimensions to be confirmed on site. This drawing, and information within, is the copyright of Article 25 - registered charity no. 1112621. Article 25 should be notified immediately of any discrepancies.
PROPOSED TRAFFIC & SITE CIRCULATION STRATEGY
AQUARELA RESIDENCIAL CONDOMINIUM THREE TOWERS RESIDENCIAL CONDOMINUM MAGIS Stages: 0-7 Dates: under construction Status: First tower finished and two under construction Location: Fortaleza, Ceará - Brazil
Magis is one of the leading local contractor based in Ceará, Brazil with expertise in Residential Building. The Company is drawing on over 10 years experience in building, financing and developing great projects. With a major project participation, at Magis I´ve assist-managed a range of 4 different projects. Working closely with the contractors my role was to review the design and all the disciplines involved (services & structure) ensuring they were complete, unambiguous and fully understood by all parties. With good analytical thinking and influence decision-making, I’ve proven ability to deliver end-to-end property and construction solutions through three years I´ve worked in the company.
AMÉLIE RESTÔ RENOVATION + EXTENTION OF EXISTING BUILDING TO A RESTAURANT Pochè Arquitetura Stages: 0-7 Dates: 2013 Status: Completed Location: Fortaleza, Ceará - Brazil
Poché Arquitetura is a small multi-disciplinary practice that started in 2009. Poché in French means “pocket”. In architecture, it refers to plants or maps that have the cut out elements fully filled, widely used in archeology to better represent the geometry of the physical space by its contour. This restaurant project was a great fun to work with. The client had a very tight budged and a long scope where we were asked to do from design to logo. We embraced the challenge in a great relationship with the client and made the most out of the existing structure and materials on site. On a team of only the Project Architect and myself, I´ve developed the drawing package to be send contruction and joinery and participate on the logo brief, client meetings and construction site visits.
.63
.70
.70
.25
.40
4.00
2.80
1.93
2.45
2.80 .20
2.30
.20 .40
6.50
2.40
.55
.50
.20
3.40
.20
4.30
.80
2.40
7.90
.80
4.00
2.74 2.74
14.64
Â?
„ … † † ‡ „ ˆ ‰ Š … � … † „ ˆ ˆ †
ˆ ‹ ˆ
 ‹ † ‹ ˆ Œ �
ˆ ˆ † ˆ Ž ‘
UNIVET REFURBISHMENT OF A VET CLINIC Pochè Arquitetura Stages: 0-7 Dates: 2013 Status: Completed Location: Fortaleza, Cearå - Brazil
Â?
 �
‹ Â
„ �
Â?
 € ‚ €  ƒ
  �     � � �
Â?
Â?
At PochÊ we seek to print identity to all projects, respecting each phase of the process in order that the final result can convey all the necessary information in a clear way for its full implemenration and execution. The practice has a variety of projects; residential, duellings, comercial, interior design, renovations and masterplans. I´ve mainly worked on the comercial projects listed: restaurant, boulangerie, vet clinic and burgery. I had the opportunity to learn a lot working closely with the project architect and taking responsabilities and working without suppervision with confidence.
1
UNILAB STUDENT HOUSING PROPOSAL FOR A DEVELOPING UNIVERSITY TOWN. Academic project Dates: 2014 Status: Conception only Location: Redenção, Ceará- Brazil.
UNILAB is a public federal university located in Redenção, Ceará, Brazil. The city was chosen because it was the first Brazilian city to abolish slavery. Looking for international integration, 50% of the seats in the University are for international students from those countries. However the city is not developed enough to support all those international students coming from abroad and relying on the University Accommodation to support their studies. The University has currently 3 campuses in Ceará and a very rough terrain to develop the works of a series of classrooms, library and student housing. The proposal of this project aims to give a better and immediate solution for the student shelters with a modular, ventilated and pre-fabricated structure for the flats as well as a greater housing to attend their needs as foreigners, students and, most of all, sensitive individuals.
1
FACHADA 01-FRONTAL ESCALA 1:150
TRABALH
RES
ORIENTA
ANA CE
OCA VIVA WINNER OF EXHIBITION CASACOR CEARÁ 2009
MD CONCEPT Brazil Stages: 0-7 Dates: 2009 Status: Concluded Location: Fortaleza, Ceará - Brazil
WINNER OF CASACOR CEARÁ 2009, ONE OF THE GREATEST EXHIBITION IN SOUTH AMERICA.
CASACOR, America’s most important collective of interior design, architecture and landscape, is present through 20 yearly exhibitions in six Latin American countries and in the US. Sustentability was the exhibition main theme of the year and the Oca was a fusion of habitat & crafts in response. Shaped as a large basket of 13m high, the construction is a woven of vinyl fabrics, which represent the straw of the indigenous shrine. Highlight the water mirror with mirror-lined background that brings about 500 fish species native to Ceará and reflects the sky with an opening in the top of the Oca. On this project I´ve worked closely with the architect from brief to the end, developing the Oca model -experimenting the flexibility of the materials to be used- as well as helping to build on site in a three-week construction.
MAGAZINE REVIEW: “THE BEST OF CASA COR 2009”
THANK YOU!
JULIA MELLO
juliamello.me@gmail.com +44 7956331613