Julia Mello Portfolio

Page 1

SELECTED WORKS JULIA MELLO


JULIA MELLO juliamello.me@gmail.com +44 07956331613


CONTENTS This booklet contains a selection of projects from my professional work as an assistant architect in Brazil & UK and as a student of Bachelors Architecture at University of Fortaleza (Brazil). The selected works were chosen to highlight the diverse scale, design and technical skills I have been involved in.


01

02

03

ANANDABAN HOSPITAL

SITTWE GENERAL HOSPITAL

AQUARELA CONDOMINIUM CLUB

NEW EARTHQUAKE RESISTANT TRAUMA CENTRE

HOSPITAL AND STAFF HOUSING MASTERPLAN

THREE TOWERS RESIDENTIAL BUILDING

Article 25

Article 25

Magis Incorporações

Lalitpur, Nepal

Sittwe, Myanmar

Fortaleza, Brazil


04

05

06

AMÉLIE RESTÔ

STUDENT HOUSING

“OCA VIVA”

RESTAURANT DESIGN

UNIVERITY THESIS PROJECT

COMPETITION PROJECT WINNER

Pochè Arquitetura Fortaleza, Brazil

University Project Redenção, Brazil

MD Concept Fortaleza, Brazil


PROPOSED MAIN ENTRANCE OF THE TRAUMA CENTRE

HOSPITAL BUILDING ANANDABAN HOSPITAL | NEW EARTHQUAKE RESISTANT TRAUMA CENTRE

Anandaban Hospital was established in 1957 and is the main leprosy referral hospital in Nepal. It provides vital free healthcare to people affected by leprosy. Anandaban aims to recover from the earthquake in 2015 and redevelop the hospital.

ARTICLE 25 The Leprosy Mission England & Wales + Nepal & Anandaban Hospital

On this project, I worked on stages 3+4 and took ownership of the internal detail design for Tender. This included wall, floor + ceiling packages as well as sanitary and internal partitions.

Stages: 3-4 Dates: 2016-on going Status: on site Location: Lele, Lalitpur | Nepal Consultants Team: Ramboll, Hoare Lea, JSA

I managed the coordination of the architecture elements with the MEP systems which involved attending regular meetings with the engineers and reporting comments to the tenderers and contractors.


EARTHQUAKE DAMAGE TO HOSPITAL BUILDINGS, 2015

PROVISIONAL HEALTHCARE FACILITIES BY UNICEF

EXISTING HILLY LANDSCAPE MAKES ACCESS DIFFICULT

SITE PLAN WITH PROPOSED + EXISTING BUILDINGS

ORGANISATIONAL DIAGRAM FOR CLINICAL FUNCTIONS


FIRST FLOOR PLAN

LONG SECTION


5

GL

300

65 Bumper raill + Handrail

Downstand Beam beyond

Cement-based adhesive secures AAC to shear wall Metal mesh to retain AAC Blocks

Downstand Beam beyond

110

740

Downstand Beam beyond

110mm Single course facade brickwork

60

Lift Shaft Downstand Beam beyond

External

RC Shear wall to Lift Shaft

50mm Styrofoam insulation

AAC Block cut to allow flush finish to corridor walls at columns

200

Corridor

RCC band

100

RCC band

100

100

RCC band

AAC Block 200mm Suspended ceiling varies. Refer to 1400 drawing series

Suspended ceiling varies. Refer to 1400 drawing series

Suspended ceiling. Refer to 1400 drawing series

GL

RC Column to SE Design

Internal

300

C

640

640

640

Suspended ceiling varies. Refer to 1400 drawing series

RC Column to SE Design

15mm Cement Plaster Finish 15mm Cement Plaster Finish

Cement Plaster Finish

65

Projection of Beam above Lintel RCC band

150

Finish Varies

Cement-based adhesive secures AAC to shear wall

1010

GL

Thick sand/cement mortar to level first course

Varies

1060

1060

1060

GL Thick sand/cement mortar to level first course

50mm Styrofoam insulation

RC Column to SE Design

Bumper Rail + Handrail Refer to drawings 8300

2x 8mm Horizontal bars placed every two courses of blocks

110

100

2x 8mm Horizontal bars placed every two courses of blocks

110mm Single course facade brickwork

60

RCC band

Thick sand/cement mortar to level first course

Plan Detail - Typical Column Junction to External Walls 1:10 @ A3

02 8211

Corridor

RCC band

2110

RCC band

Lift Shaft

1010

200mm Autoclaved Aerated Concrete Blockwork (AAC)

100

150mm Autoclaved Aerated Concrete Blockwork (AAC)

2x 8mm Horizontal bars placed every two courses of blocks

Autoclaved Aerated Concrete Blockwork (AAC) varies.

Plan Detail - Column at Lift Shaft 1:10 @ A3

01 8211

RC Shear wall to Lift Shaft

Finish Varies

2110

100

2110

1010

100mm Autoclaved Aerated Concrete Blockwork (AAC)

Projection of Beam above

AAC Blocks cut to allow flush finish to corridor walls at columns

3500

Finish Varies

Metal mesh to restrain blocks

AAC Block 200mm

200

Lintel RCC band

150

150

Lintel RCC band

150mm Vinyl coved skirting

Autoclaved Aerated Concrete Blockwork (AAC) varies.

Vinyl flooring

Cement Plaster Finish

Thick sand/cement mortar to level first course

Projection of Beam above

15mm Cement Plaster Finish

Projection of Beam above Floor finishes varies. Refer to 1300 drawing series

Floor finishes varies. Refer to 1300 drawing series

150

Floor finishes varies. Refer to 1300 drawing series

100

Autoclaved Aerated Concrete Blockwork (AAC) varies.

200

150 Concrete Floor Slab

Concrete Floor Slab

300

Concrete Floor Slab

65

Concrete Floor Slab

A-8210

074-A25-TC-ZZ-DR-

Screed

-

TENDER

1:20

Oct 2018

JM TP

15.03.18

Plan Detail - Typical Column Junction 1:10 @ A3 DRAWN

REV

A

Updated after Engineer input

09.04.18

JM

B

Draft Approval Drawings

04.05.18

JM

DATE

DRAWN

KEY

PARTNERS

-

TENDER

Oct 2018

JM

FOR MORE INFORMATION REFER TO THE FOLLOWING DRAWINGS:

Reinforced Concrete

-

Plain Concrete

1000 SERIES FOR GA PLANS + PARTITIONS MARK-UPS 8210 PARTITION TYPES

Brick

Anandaban Hospital Leprosy Mission

Internal Partitions Plan Details - Typical Junctions

A-8211

Insulation Autoclaved Aerated Cement Block (AAC)

074-A25-TC-ZZ-DR-

Screed

Article 25 One Canada Square, Canary Wharf London E14 5AB, United Kingdom Registered Charity No: 1112621 www.article-25.org

Do not scale from this drawing. All dimensions are in millimeters. All dimensions to be confirmed on site. This drawing and information within, is the copyright of Article 25. Article 25 should be notified immediately of any discrepancies.

Plan Detail - Typical Junction to External Walls 1:10 @ A3

04 8211

NOTE

JM

PROJECT

DATE

For Information

-

SCALE

Autoclaved Aerated Cement Block (AAC)

NOTE

-

TENDER

1:10

Oct 2018

DRAWN

Partitions Types Sections

Insulation

REV

DATE

Brick

03 8211

Anandaban Hospital Leprosy Mission

JM

CHECK

JM

Corridor Lining to Shear Wall 1:20 @ A3

TITLE

JM

Oct 2018

8210

1000 SERIES FOR GA PLANS + PARTITIONS MARK-UPS 8211 PARTITION JUNCTIONS 8300 BUMPER RAIL AND HANDRAIL DETAIL DRAWING

DWG NO.

04.05.18

TENDER

-

REV

Draft Approval Drawings

LT01

PARTNERS

FOR MORE INFORMATION REFER TO THE FOLLOWING DRAWINGS:

STATUS

Updated after Engineer input

-

8210

Reinforced Concrete Plain Concrete

JM

A B

Partition Type 03- 200mm 1:20 @ A3

PT03

KEY

SCALE

DRAWN

DRAWN

DATE

DATE

NOTE

REV

09.04.18

REV

JM

PROJECT

DRAWN

TITLE

8210

15.03.18

CHECK

Partition Type 02- 150mm 1:20 @ A3

PT02

DATE

For Comment

DWG NO.

8210

NOTE

-

STATUS

Partition Type 01- 100mm 1:20 @ A3

PT01

REV

TP

Article 25 One Canada Square, Canary Wharf London E14 5AB, United Kingdom Registered Charity No: 1112621 www.article-25.org

Do not scale from this drawing. All dimensions are in millimeters. All dimensions to be confirmed on site. This drawing and information within, is the copyright of Article 25. Article 25 should be notified immediately of any discrepancies.

INTERNAL PARTITION DETAILS

ARCHITECT

3

ARCHITECT

4 Article 25, One Canada Square, London UK, E14 5AB Registered Charity No: 1112621 www.article-25.org

B

Article 25, One Canada Square, London UK, E14 5AB Registered Charity No: 1112621 www.article-25.org

PARTNERS

1000

LF 31 Accessible Bathroom 5.9 sqm

PARTNERS

150

LF 32 Disposal Hold 6.4 sqm

1820

1560.50FFL

150

2%

Fire Hose Cabinet

1695

320

320

1560.51FFL REV

NOTE

-

Draft Approval Drawings

JM

04.05.18

-

TENDER

DRAWN

JM

Oct 2018

DATE

Water resistant cement board ceiling

REV

NOTE

-

Draft Approval Drawings

JM

04.05.18

-

TENDER

DRAWN

JM

Oct 2018

DATE

500

500

160

200

600

700

100

600

250

AAC Block partition wall. Refer to drawing 8210 65

LF 29 Bathroom Female

400

Services Riser

800

480 1360

KEY

KEY

1035

160

750

450

260

600

Insulation Autoclaved Aerated Cement Block (AAC) Screed

120

Brick Bats Filling

1000

1795

L0 750

680

5101

480

Circulation Area +1560.51 FFL

800

850

5101

750

Plain Concrete

750 50

320

2%

150

1840

320

L0

1560.50FFL

5102

LF 29 Bathroom Female 2.8 sqm

LF 27 Accessible Bathroom 5.9 sqm

1560.50FFL

505

1560.50FFL 405

Brick Bats Filling

2%

01 5101

800

1270

635

830

LF 28 Bathroom Male 3.7 sqm

Brick

Tiles up to 1800mm high on walls

Screed

150

Brick Insulation Autoclaved Aerated Cement Block (AAC)

400

375

Reinforced Concrete

Fire Resistance: Walls = 60 Minutes | Doors = 30 Minutes

600

Plain Concrete

160

2690 65

Fire Resistance: Walls = 120 Minutes | Doors = 60 Minutes

Reinforced Concrete

1980

200

1800

600

295

150

Tiles up to 1800mm high on walls

100

750

650

Bathroom +1560.50 FFL

400

600

500

250

2185

500

2%

1560.50FFL

LF 27 Accessible Bathroom

2% 1305

LF 30 Bathroom Male 2.9 sqm

750

300x300x8mm thick fully vitrified ceramic tile Floor level 10mm below adjoining circulation area

635

LF 28 Bathroom Male

AAC Block partition wall Refer to drawing 8210

800

410

400

365

C

PROJECT TITLE

074-A25-TC-L0-DR-

A- 5101 1:25

SCALE

TENDER

Oct 2018

DRAWN

-

DATE

TP

Do not scale from this drawing. All dimensions are in millimeters. All dimensions to be confirmed on site. This drawing and information within, is the copyright of Article 25. Article 25 should be notified immediately of any discrepancies.

1000mm

JM

CHECK

JM

REV

SCALE

DRAWN

1:25 Oct 2018

500mm

Anandaban Hospital Leprosy Mission

Sanitary Details Lower Ground Floor - Section 01

DWG NO.

0

FLOOR BUILD UP: 300x300x8 mm thick fully vitrified Ceramic Tile 25-30mm Screed 75mm thick Plain Cement Concrete Brick Bats Filling 135mm Floor Slab

Section 01 - Lower Ground Sanitary Block 1 1:25 @ A3

A- 5100 DATE

TENDER

CHECK

-

01 5101

STATUS

PROJECT

074-A25-TC-L0-DR-

REV

Plan Detail - Lower Ground Sanitary Block 01 1:25 @ A3

1000mm

TITLE

500mm

Anandaban Hospital Leprosy Mission

Sanitary Details Lower Ground Floor - Plan Details

STATUS

01 5100

4

5102

DWG NO.

0

1560.51FFL

01

3

TP

Do not scale from this drawing. All dimensions are in millimeters. All dimensions to be confirmed on site. This drawing and information within, is the copyright of Article 25. Article 25 should be notified immediately of any discrepancies.

SANITARY DETAIL DRAWINGS

Riser

LF 28 Bathroom Male 3.7 sqm

PFE

LT-01

E 01 Elevator 20 Persons 7.7 sqm

PT-02

PT-02

LF 27 Accessible Bathroom 5.9 sqm

A

ST 01 Stairs 35.7 sqm

PT-03

E 02 Empty Lift Shaft

PT-02

LF 02 Pre Delivery 37.3 sqm

LF 18 Paediatric Ward 44.0 sqm

PT-02

LF 22 Staff Base 7.9 sqm

LF 21 Private Room 12.1 sqm

LF 19 Children En-Suite 3.3 sqm

PT-02

6 PARTNERS

Paint finish

Location of Handrail + Bumper Rail Refer to Drawing 8300

300x300mm Ceramic Tiles up to 1800mm height+ Hygienic paint finish above

Untreated

50x50 Mild Steel Corner Guards

Epoxy Resin skirting with Hygienic paint above. Skirting to 150mm height, except in the OTs (1350mm height)

1.0mm Lead sheet on thick wall + Heavy duty emulsion paint

Do not scale from this drawing. All dimensions are in millimeters. All dimensions to be confirmed on site. This drawing and information within, is the copyright of Article 25. Article 25 should be notified immediately of any discrepancies.

PT xx

Partition Type Wall number

WALL & FLOOR FINISHES

0

1m

2m

5m

7

074-A25-TC-L0-DR-

TENDER

Article 25 One Canada Square, Canary Wharf London E14 5AB, United Kingdom Registered Charity No: 1112621 www.article-25.org

5500

1

Anandaban Hospital The Leprosy Mission

Lower Ground Floor Proposed Wall Finishes

A-1500 1:100

DRAWN

5

150mm high Vinyl coving with Hygienic Paint above

SCALE

4

KEY

B

3

5520

JM

DATE

JM

1560.50 FFL

LF 21 Private Room 12.1 sqm

LF 22 Staff Base 7.9 sqm

LF 19 Children En-Suite 3.3 sqm

Oct 2018

TP

B

LF 20 En-suite 3.5 sqm

5500

2

REV

NOTE

DATE

DRAWN

-

For comment

24.01.18

LB

A

For information

31.01.18

LB

B

Draft Approvals Drawing

04.05.18

LB

-

TENDER

Oct 2018

JM

REV

NOTE

3 DATE

DRAWN

5500

4

5520

5

Lower Ground Floor Entrance

6 PARTNERS

Non-slip PVC Vinyl flooring with 150mm coved skirting

Non-slip Ceramic Tiles (Stairs) with 100mm ceramic tiling skirting

300x300mm non-slip sanitary Ceramic Tiles up to 1800mm high

Untreated

FOR MORE INFORMATION REFER TO THE FOLLOWING DRAWINGS: -

1000 SERIES FOR SLAB RECESS 3000 SERIES FOR SLAB CHANGE

7

Anandaban Hospital The Leprosy Mission

Lower Ground Floor Proposed Floor Finishes

A-1300

074-A25-00-L0-DR-

Entrance Matting

Do not scale from this drawing. All dimensions are in millimeters. All dimensions to be confirmed on site. This drawing and information within, is the copyright of Article 25. Article 25 should be notified immediately of any discrepancies.

D

5500

KEY

Non-slip, anti electro static, self-leveling Epoxy Flooring. Coved Skirting to 150mm height, except in the OTs (1350mm).

LF 18 Paediatric Ward 44.0 sqm

1560.50 FFL

D

CHECK

DRAWN

PROJECT

DATE

LF 03 Post Delivery 44.0 sqm

5520

DWG NO.

JM

Oct 18

C

Nurse's Desk LF 23 Corridor 17.5 sqm

LF 02 Pre Delivery 37.3 sqm

5500

A 9 risers 174/270

1560.51 FFL

1560.51 FFL

LF 20 En-suite 3.5 sqm

REV

04.05.18

TENDER

5500 Lower Ground Floor Entrance

1562.81 FFL

ST 01 Stairs 35.7 sqm

E 02 Empty Lift Shaft

LF 01 Porch 8.7 sqm

DWG

2

Draft Approval Drawings

E 01 Elevator 20 Persons 7.7 sqm

14 risers 174/270 1560.51 FFL

1560.50 FFL

PT-02

STATUS

1 NOTE

-

LF 27 Accessible Bathroom 5.9 sqm

1560.50 FFL

PT-02 PT-02

5500

LF 26 Corridor 47 sqm

Riser

LF 28 Bathroom Male 3.7 sqm

1560.50 FFL

C

D

-

1560.50 FFL

LF 29 Bathroom Female 2.8 sqm

LF 24 Corridor 30.1 sqm

D

5500

LF 30 Bathroom Male 2.9 sqm

LF 04 Nurse Station 8.6 sqm

LF 05 Neonatal / ICU 13.6 sqm

LF 16 CSSD Sterile Zone 24.0 sqm

B

LF 32 Disposal Hold 6.4 sqm

1560.50 FFL

PT-02

PT-02

LF 01 Porch 8.7 sqm

LF 31 Bathroom Female 5.9 sqm

PT-02

LT-01

LF 23 Corridor 17.5 sqm

LF 03 Post Delivery 44.0 sqm

5520

Sub-waiting Area

A

C

PT-02

PT-02

LF 17 Scrub 5.0 sqm

PT-01

PT-03

LF 24 Corridor 30.1 sqm

PT-02

B

PT-03

LF 15 CSSD Clean Zone 19.2 sqm

0

1m

2m

5m

-

TENDER

Article 25 One Canada Square, Canary Wharf London E14 5AB, United Kingdom Registered Charity No: 1112621 www.article-25.org

1:100

DRAWN

LF 26 Corridor 47 sqm

LF 14 CSSD Soiled Zone 11.7 sqm

LF 13 IT/Electrical Room 12.5 sqm

SCALE

C

PT-02

PT-02

LF 12 Store 10.9 sqm

LB

DATE

PT-01

B

LF 32 Disposal Hold 6.4 sqm

4850

LF 30 Bathroom Male 2.9 sqm

LF 29 Bathroom Female 2.8 sqm

PT-02

PT-01

6535

4850

LF 31 Bathroom Female 5.9 sqm

Fire Hose Cabinet

PT-01

LF 11 Clean Utility 9.1 sqm

1560.51 FFL

LF 25 Corridor 32.0 sqm

LF 06 Delivery Room 21.1 sqm

PT-02

LF 04 Nurse Station 8.6 sqm

LF 05 Neonatal / ICU 13.6 sqm

REV

note: allow for ceiling mounted OT lights

LF 16 CSSD Sterile Zone 24.0 sqm

PT-02

Sub-waiting Area

6535

PT-02

PAINTED SCREED FINISH FLOOR

LF 10 Dirty Utility 8.3 sqm

LF 08 Scrub 6.1 sqm

Oct 2018

CHECK

LF 25 Corridor 32.0 sqm

PT-02

A

LF 17 Scrub 5.0 sqm

PT-02

7

A

LF 09 Preparation Room 6.1 sqm

LF 07 Emergency Delivery / C-Section 30 sqm

PT-02

PT-01

PT-02

Fire Hose Cabinet

B

A

LF 15 CSSD Clean Zone 19.2 sqm

PT-02

B

LF 14 CSSD Soiled Zone 11.7 sqm

LF 13 IT/Electrical Room 12.5 sqm

6

PROJECT

PT-02

5

DWG

LF 12 Store 10.9 sqm

4

DWG NO.

PT-02

3

REV

LF 11 Clean Utility 9.1 sqm

2

STATUS

PT-02

PT-02

LF 06 Delivery Room 21.1 sqm

1

PT-02

LF 10 Dirty Utility 8.3 sqm

LF 08 Scrub 6.1 sqm

PT-02

PT-03

7

A

LF 09 Preparation Room 6.1 sqm PT-01

6535

LF 07 Emergency Delivery / C-Section 30 sqm

6

6535

A

5

Fire Hose Cabinet

4

3

Fire Hose Cabinet

2

B

1

TP


PROPOSED NORTHERN ENTRANCE AREA

PROPOSED SOUTHERN ENTRANCE AREA


GL

TYPICAL FACADE ELEVATION & SECTION

ARCHITECT

Article 25, O Registered C

TENDER

NOTE

PARTNERS

-

500mm

Screed

Autoclav

Rigid Ins

Brick

Plain Co

Reinforc

REV

250m

Anandaban The Leprosy

Typical F Rendere

-

TE

074-A25-

KEY

0

PROJECT

DWG

DWG NO.

REV

Do not scale from this dr confirmed on site. This d Article 25 should be notif

STATUS


AERIAL VIEW OF MASTERPLAN PROPOSALS

HOSPITAL MASTERPLAN MASTERPLAN FOR SITTWE GENERAL HOSPITAL SITTWE, RAKHINE STATE|MYANMAR ARTICLE 25 Rangoon General Hospital Reinvigoration Trust (RGHR) & UNOPS Stages: 0-2 Dates: july 2018 - october 2018 Status: Completed Location: Sittwe, Rakhine | Myanmar Consultants Michael Hadi, Hoare Lea, Clark Bond

Article 25 were engaged to lead a design team in the evaluation of the existing Sittwe General Hospital, and devising proposals for its long term development into a 500 bed facility with staff housing on site. I worked on a series of site analysis and proposal drawings for the Masterplan, using my AutoCad experience to help design and manage the CAD workflow. It was provided a phased proposal to enable the hospital’s development as well as recommendations for immediate improvements on the existing facilities and infrastructure at SGH. The challenging deadline for delivering a strong and buildable proposal was one of the major challenges of this project, but the determination to improve the current situation of the population has led myself immensely.


ORGANISATIONAL DIAGRAM OF HOSPITAL PROPOSALS

18

OutlinePhase Cost Outline Estimate $24-26m $24-26m 3 Phase Cost3 Estimate Construct new A&E and OTB,3-4 Building and new WardC.Building C. Expected Time Frame 3-4 years Construct new A&E OT Building and newB,Ward Building Expected Timeand Frame years Outline Cost Estimate$24-26m $24-26m Outline Cost Estimate Expected Time Frame3-4 years 3-4 years Expected Time Frame

34

6

PHASE 3

PARTNERS

1

34 34

OutlinePhase Cost Outline Estimate $1.5-2m 4 Phase Cost4 Estimate $1.5-2m Demolish original blocks,Services completeZone Services Zoneworks and civil works to site. Expected Time Frame 1-2 years Demolish outstanding original ward blocks, complete and civil to site. Expected Timeoutstanding Frame 1-2ward years

34

KEY

PROJECT

34

Phase 4 Phase 4 Demolish outstanding wardoriginal blocks, ward complete Services Zone and civilZone works site.works to site. Demolish original outstanding blocks, complete Services andtocivil

Outline Cost Estimate$1.5-2m $1.5-2m Outline Cost Estimate Expected Time Frame1-2 years 1-2 years Expected Time Frame

KEY

KEY

1 1

6

NOTE

NOTE REVISION REVISION

6

C

0

0 10m

2

SittweH Sittwe General Hospital SiteHospital Masterpla Si Phasing Summary Phasing Su

087

A

Hospit Hospital Site Ma Phasin Phasing Summa A25-ST-ZZ-DR-A 087 A25

DWG NO.

34

1 6

C

20m10m

Sittwe General Hospita Sittwe Gen

DWG

34

10m 0

0

C

PROJECT

34

A

A

C

DWG

C

B

B

A

PROJECT

C

B

087 087Masterplan A25-ST-ZZ A M

STATUS

Phase 3 Phase 3 Construct new A&E andnew OTA&E Building new Ward C. Building C. Construct and B, OTand Building B, andBuilding new Ward

18

JOB NO.

6

A

F

DWG NO.

1

C

EF

E

Demolish

REV DWG NO. JOB NO.

1

C

F

DWG

B

FE

18

B

B

1

D

D

18

A 1

6

19

18

B

A

6

E

E

Demolished Bu De Upgrade

DE

18

B

6

19

18 18

A

E

D

Upgraded Build Up New Buil

PROJECT

D

D

19

A Building

New BuildingNe

DWG

19

19

A

JOB NO.

DE

Building A labels B

REV

D

18

A

Phase 2 Phase 2 Refurbish Main BuildingMain as OPD, andas construct newconstruct Ward Building A. Building A. Refurbish Building OPD, and new Ward

Outline Cost Estimate$12-14m $12-14m Outline Cost Estimate Expected Time Frame2-3 years 2-3 years Expected Time Frame

19 19

A

PHASE 2

OutlinePhase Cost Outline Estimate $12-14m $12-14m 2 Phase Cost2 Estimate Refurbish Building as OPD, andnew construct WardA.Building A. Expected Time Frame 2-3 yearsand Refurbish Main Building as OPD, construct Ward new Building Expected TimeMain Frame 2-3 years

Outline Cost Estimate$15-18m $15-18m Outline Cost Estimate Expected Time Frame2 years 2 years Expected Time Frame

19

34

34

6

STATUS

OutlinePhase Cost Outline Estimate $15-18m $15-18m 1 Phase Cost1 Estimate Establish Services and works to18. Building 18. Expected Time Frame 2 years Establish new Services Zone, and Zone, works to Building Expected Timenew Frame 2 years

34

STATUS REV

Phase 1 Phase 1 Establish newEstablish Servicesnew Zone, and works Building Services Zone,toand works18. to Building 18.

34

1

1

6 HOSPITAL CAMPUS PHASE 1

1

6

NOTES

A 1

6

NOTES

NOTES

A A

PARTNERS

18

18

A

PARTNERS

18

18

E

E

REVISION NOTE

18

18

E

D

D

PARTNERS

18

DE

19

19

E

E

D

NOTES

D

D

19

KEY

19

19

19

E

REVISION

DE

DWG NO.

D

JOB NO. STATUS

19

Ascale A Do Do not scale from this draw notMasterp f All dimensions in millim Allare dimension All dimensions to be confir All dimension PHASE 4 not sc This drawing, andDo informa drawing, Do notThis scale from th All dimen of Article -ofregistered Article 25ch -i All 25 dimensions are All dimen ArticleAll 25dimensions should be25 notifie Article tosho be Thisand draw discrepancies. discrepancies This drawing, in of -Article of Article 25 regist Article 25 Article 25 should be discrepan discrepancies. REV

19


PROPOSED MASTERPLAN


PARTNERS

48

Safe

59

63

Moderate Risk & under construction

45

Do not scale from this drawing. All dimensions are in millimetres. All dimensions to be confirmed on site. This drawing, and information within, is the copyright of Article 25 - registered charity no. 1112621. Article 25 should be notified immediately of any discrepancies.

47

NOTES

DATE BY

PROJECT

087

A25-ST-ZZ-DR-A-0011

SCALE

ad Ro

Staff housing block under construction

1:750 @A1 1:1500 @A3

-

Masterplan

DATE

in

Medical Superintendent Residence

DRAWN BY

Th

a

Nurses 46 Campus

45

DWG

Road Main

Dorm rooms with 4-6 beds per room 2 bedrooms per unit 2 units per block

75m

Existing Buildings Staff Accommodation Typologies

35

43

44

TP

30m

Sittwe General Hospital

29.06.18

DA

CHECKED BY

Sh

DA

Kh

1:750 @A1 1:1500 @A3 CHECKED BY

DATE

29.06.18

DRAWN BY

REV

Masterplan

u

Kh

46

-

STATUS

in

Th

44

36

42

TP

u

A25-ST-ZZ-DR-A-0007

SCALE

JOB NO.

ad

087

Each unit = 1 family 2 unit per block family size varies 2-4

0 5m 10m

37

41

a

Ro

d

May Yu Roa

JOB NO.

PROJECT

Existing Buildings Structural Analysis

35

43

75m

DWG

Main

42

30m

Sittwe General Hospital

DWG NO.

Road

36

38

39

40 0 5m 10m

37

41

Surveyed houses. Ref to drawing series A-9110

d

May Yu Roa

MS House Site

DWG NO.

39

d

NOTE

Under Construction 66

38

May Yu Roa

REVISION

62

May Yu Roa

40

Assistant Doctors Nurses

Unassessed & under construction

d

General Workers

65

61

REV

33

Specialists

64

58 60

Very High Risk

28

26

66

Hospital Campus

57

ENT

High Risk

34

6

62

53

56

Moderate Risk

1 65

52

Main Housing 54 Campus 55

STATUS

29

DATE BY

Workers housing Family units

64

58

61

ad

Ro

Surgeon

Stra nd

57

60

i

wd

Ba

Roa d

23

22

NOTE

REVISION

24

2

KEY

55

32

7

Physician Specialist

d

27

50

51

Paediatrician

3

Roa

Road

10

19

49

Anaesthetist

Stra nd

18

Main

53

56

63

Assistant Doctors (women) 4 units

4

52

54

59

8

KEY

NOTES

11

5

ad

Ro

i

wd

Ba

25

17

20

Sh

51

9

13

12

21

49

Road

14

50

Kyaung Gyi Road

15

16

Main

48

PARTNERS

Assistant Doctors (men) 7 people, Individual rooms Sharing kitchen + bathroom

Kyaung Gyi Road

47

Do not scale from this drawing. All dimensions are in millimetres. All dimensions to be confirmed on site. This drawing, and information within, is the copyright of Article 25 - registered charity no. 1112621. Article 25 should be notified immediately of any discrepancies.

Matron + family 4 adults, 2 children in 2 bedrooms with 1 living room

EXISTING STRUCTURAL ANALYSIS

EXISTING STAFF ACCOMMODATION TYPOLOGIES

Generator New Water Towers with tank Disel tank for generator

PARTNERS

L OU

TFAL

L

PROPOSED UTILITIES & WASTE STRATEGY

NOTES

SH1

Do not scale from this drawing. All dimensions are in millimetres. All dimensions to be confirmed on site. This drawing, and information within, is the copyright of Article 25 - registered charity no. 1112621. Article 25 should be notified immediately of any discrepancies.

Proposed Traffic & Site Circulation Strategy

087

Masterplan

29.06.18

1:750 @A1 1:1500 @A3 JM

CHECKED BY

A25-ST-ZZ-DR-A-0111

DATE

-

DRAWN BY

ad Ro SH25

SCALE

35

SH24

TP

75m

PROJECT

SH23

30m

Sittwe General Hospital

DWG

0 5m 10m

36

JOB NO.

SH22

DATE BY

NOTE

REVISION

SH2

SH21

Road JM

SH3

SH5

d

Vehicular site entrance Pedestrian site entrance

REV

29.06.18

1:750 @A1 1:1500 @A3

Ambulance drop off Parking areas

New Port area under construction

d

May Yu Roa

DWG NO.

26

May Yu Roa

Drop off

STATUS

SH7

Internal staircase

Main Entrance

Th a

SCALE

A25-ST-00-DR-A-0112

Masterplan

KEY

Stra nd

6

Main 087

-

d

Road

DATE BY

PROJECT DWG

75m

JOB NO.

30m

Proposed Utilities & Waste Strategy

DWG NO.

Ro ad Th a Kh in Sh u

SH25 ASTA

SH6

Sittwe General Hospital

REV

35

R ATE DW TE EA ALL + TR UTF CE L O RFA STA SU COA TO

36

SH22 SH23

Vehicular traffic External pedestrian pathway

34

SH4

SH24

Buildings Sheltered / Internal pedestrian pathway

SH19

New surface water land drain

0 5m 10m

C

Kh in

SH1

SH5

B

A SH17

Existing Septic tank that will act as a second treatment tank

DATE

SH2

Emergency

1

DRAWN BY

SH3

SH15

SH20

CHECKED BY

SH4

SH14

Surface drains

New Port area under construction

d

SH21

Road

Ground tanks

Manholes

d

Main

New Water Tower with tank

34

May Yu Roa

18

SH13

ad

SH18

Water tank

Post Office

TO CO

Tube Wells

Septic tanks

26

New Clock Tower

Power poles

Septic tank for Building 34

F

Ro

SH16

Septic tank for Buildings B & C

STATUS

SH7

di

w Ba

Sh u

6

NOTE

REVISION

Stra nd

1

SH19

E

SH8

Roa d

C

A Septic tank for Building A

May Yu Roa

Refer to HOARE LEA and CLARKE BOND drawings for detailed utilities and waste strategy.

KEY

Road

SH15

L

Main

TFAL

SH12

SH17

SH20

Perimeter drain from Immediate Works to be kept as part of the complete design

L OU

B

Main

mm +500

SH14

SH18

Existing site perimeter drain needs to be upgraded

ASTA

18

SH13

D

SH9

TO CO

ad

SH16

SH6

F Perimeter drain to cross underneath road

Ro

Ba The centre of this site needs to be raised to form a ridge and force water to fall to the perimeter drains

SH11

SH8

SH12

i wd

E

Septic tank for Building 18

SH9

Existing site perimeter drain needs to be upgraded

Kyaung Gyi Road

19

SH10

D

NOTES

19

SH11

Hatched area raised to road level

Roa

Kyaung Gyi Road SH10

PARTNERS

Hydrant water storage tank

Septic tank for Services Zone

TP

Do not scale from this drawing. All dimensions are in millimetres. All dimensions to be confirmed on site. This drawing, and information within, is the copyright of Article 25 - registered charity no. 1112621. Article 25 should be notified immediately of any discrepancies.

PROPOSED TRAFFIC & SITE CIRCULATION STRATEGY


AQUARELA RESIDENCIAL CONDOMINIUM THREE TOWERS RESIDENCIAL CONDOMINUM MAGIS Stages: 0-7 Dates: under construction Status: First tower finished and two under construction Location: Fortaleza, Ceará - Brazil

Magis is one of the leading local contractor based in Ceará, Brazil with expertise in Residential Building. The Company is drawing on over 10 years experience in building, financing and developing great projects. With a major project participation, at Magis I´ve assist-managed a range of 4 different projects. Working closely with the contractors my role was to review the design and all the disciplines involved (services & structure) ensuring they were complete, unambiguous and fully understood by all parties. With good analytical thinking and influence decision-making, I’ve proven ability to deliver end-to-end property and construction solutions through three years I´ve worked in the company.



AMÉLIE RESTÔ RENOVATION + EXTENTION OF EXISTING BUILDING TO A RESTAURANT Pochè Arquitetura Stages: 0-7 Dates: 2013 Status: Completed Location: Fortaleza, Ceará - Brazil

Poché Arquitetura is a small multi-disciplinary practice that started in 2009. Poché in French means “pocket”. In architecture, it refers to plants or maps that have the cut out elements fully filled, widely used in archeology to better represent the geometry of the physical space by its contour. This restaurant project was a great fun to work with. The client had a very tight budged and a long scope where we were asked to do from design to logo. We embraced the challenge in a great relationship with the client and made the most out of the existing structure and materials on site. On a team of only the Project Architect and myself, I´ve developed the drawing package to be send contruction and joinery and participate on the logo brief, client meetings and construction site visits.



.63

.70

.70

.25

.40

4.00

2.80

1.93

2.45

2.80 .20

2.30

.20 .40

6.50

2.40

.55

.50

.20

3.40

.20

4.30

.80

2.40

7.90

.80

4.00

2.74 2.74

14.64

Â?

„ … † † ‡ „ ˆ ‰ Š … � … † „ ˆ ˆ †

ˆ ‹ ˆ

 Â‹ † ‹ ˆ ÂŒ Â?

ˆ ˆ † ˆ Ž ‘

UNIVET REFURBISHMENT OF A VET CLINIC Pochè Arquitetura Stages: 0-7 Dates: 2013 Status: Completed Location: Fortaleza, Cearå - Brazil

Â?

 �

‹ Â

„ �

Â?

­ € ‚ € ­ ƒ

  �     � � �

Â?

Â?

At PochÊ we seek to print identity to all projects, respecting each phase of the process in order that the final result can convey all the necessary information in a clear way for its full implemenration and execution. The practice has a variety of projects; residential, duellings, comercial, interior design, renovations and masterplans. I´ve mainly worked on the comercial projects listed: restaurant, boulangerie, vet clinic and burgery. I had the opportunity to learn a lot working closely with the project architect and taking responsabilities and working without suppervision with confidence.



1

UNILAB STUDENT HOUSING PROPOSAL FOR A DEVELOPING UNIVERSITY TOWN. Academic project Dates: 2014 Status: Conception only Location: Redenção, Ceará- Brazil.

UNILAB is a public federal university located in Redenção, Ceará, Brazil. The city was chosen because it was the first Brazilian city to abolish slavery. Looking for international integration, 50% of the seats in the University are for international students from those countries. However the city is not developed enough to support all those international students coming from abroad and relying on the University Accommodation to support their studies. The University has currently 3 campuses in Ceará and a very rough terrain to develop the works of a series of classrooms, library and student housing. The proposal of this project aims to give a better and immediate solution for the student shelters with a modular, ventilated and pre-fabricated structure for the flats as well as a greater housing to attend their needs as foreigners, students and, most of all, sensitive individuals.


1

FACHADA 01-FRONTAL ESCALA 1:150

TRABALH

RES

ORIENTA

ANA CE


OCA VIVA WINNER OF EXHIBITION CASACOR CEARÁ 2009

MD CONCEPT Brazil Stages: 0-7 Dates: 2009 Status: Concluded Location: Fortaleza, Ceará - Brazil

WINNER OF CASACOR CEARÁ 2009, ONE OF THE GREATEST EXHIBITION IN SOUTH AMERICA.

CASACOR, America’s most important collective of interior design, architecture and landscape, is present through 20 yearly exhibitions in six Latin American countries and in the US. Sustentability was the exhibition main theme of the year and the Oca was a fusion of habitat & crafts in response. Shaped as a large basket of 13m high, the construction is a woven of vinyl fabrics, which represent the straw of the indigenous shrine. Highlight the water mirror with mirror-lined background that brings about 500 fish species native to Ceará and reflects the sky with an opening in the top of the Oca. On this project I´ve worked closely with the architect from brief to the end, developing the Oca model -experimenting the flexibility of the materials to be used- as well as helping to build on site in a three-week construction.




MAGAZINE REVIEW: “THE BEST OF CASA COR 2009”


THANK YOU!

JULIA MELLO

juliamello.me@gmail.com +44 7956331613


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.