JULIANA DALKIMIN
POR T F O L I O
ABOUT ME
JULIANA BAPTISTA D’ALKIMIN architect
In the course of my bachelor degree in University of São Paulo, I’ve confirmed that architecture is the field that I am definitely involved and passionate with all along. This feeling has only increased along the time and nowadays I have the chance to accomplish this passion by working as an architect in an office in Brazil. However, I have the ambition to progress in the field and learn as much as I can. With this letter I would like to express my interest in improving my knowledge and advance to the next phase of my career. In Brazil I had the chance to graduate in the best university of Architecture and Urbanism of the country, the University of São Paulo. During my graduation I obtained a scholarship to study abroad in Ireland where I studied for one year at University College Dublin. Through this program I had the opportunity to do a summer internship in an architecture office, called NDBA Associates. Since then, I have worked in several companies and gained experience in differents subjects within architecture and have been looking for a new opportunity to continue to develop myself.
C U R R I C U L U M
PERSONAL
CONTACT
Name
Juliana Dalkimin
Mobile
Birthday
28 July 1992 (26)
Email dalkimin.arquitetura@gmail.com
Nationality
Brazilian / Italian
Address
+55 (11) 98744-4725
621 Angelica Avenue, São Paulo - Brazil
LANGUAGES Portuguese Native English Fluent Spanish Basic
EDUCATION 201 1-17
U NIVERSITY O F SÃO PAU LO - Sã o Pau lo, Brazil BACHELOR DEGREE IN ARCHITECTURE AND URBANISM
2014 -1 5
U NIVERSITY CO LLEGE D U BLIN - D u b lin, Irelan d Occasional Engineering & Architecture Student Exchange Scholarship Programme - Science Without Borders
SOFTWARE SKILS AUTOCAD
3DS MAX
SKETCHUP
VRAY
PHOTOSHOP (CC)
RHINOCEROS + GRASSHOPPER
INDESIGN (CC)
VECTORWORKS
REVIT
LUMION
ARCHICAD
OFFICE
WORK EXPERIENCE 201 9
AR CH I T ECTU R AL PR OJECT CO O R D IN ATO R - Since April 2019
EXTRACURRICULAR ACTIVITIES 2014
R e search Programm e
MEIRELES + PAVAN, SÃO PAULO, SP, BRAZIL
UNIVERSITY COLLEGE DUBLIN - Dublin, Ireland
Promoted to Coordinate all the phases of the projected besides contributing with all the
How does the use of sustainable architecture affect new buildings design in Germany?
design concepts ideas and elaborating projects of high standard architecture and interior design. I produce and supervise all the technicals drawings in ARCHICAD, also doing weekly
2013
C NPQ Research Sch olarship Programm e UNIVERSITY OF SÃO PAULO - São Paulo, Brazil
technical visits to construction site and assisting the engineers on site. Used to work with
Reflections about the structural, formal and constructive conception: in the works of the
Fairbanks, Osborne and Ideazarvos. AR CH I T ECT - 2 months
architect engineer Santiago Calatrava.
MEIRELES + PAVAN, SÃO PAULO, SP, BRAZIL I participate and contribute with all the design concepts ideas elaborating projects of high standard architecture and interior design. I produce all the technicals drawings in ARCHICAD and also doing weekly technical visits to construction site and assisting in the planning permit applications. 201 8
J U N I OR A R CH I T ECT - 1 year ARCHSCAPE, SÃO PAULO, SP, BRAZIL
COMPLEMENTARY COURSES 2018
LABIDEIAS - São Paulo, Brazil
Architecture and Landscape Off ice As a Architect Collaborator I participate and contribuWte with all the design concepts ideas elaborating projects of architecture, landscape and interior design. I produce all the technicals
2018
I N T E R N A R CH I T ECT - 1 year and 8 months
2017 2016
201 5
I N T E R N A R CH I T ECT - 3 months STX REAL STATE DEVELOPER, SP, BRAZIL Real state Developer Off ice
2016
201 5
2015
Architecture Off ice
2015
site and assisting in the planning permit applications.
PHOTO GRAPHY FO R ARCHIT ECTU RE CO U RSE UNIVERSITY COLLEGE DUBLIN - Dublin, Ireland
2014
VECTO RWO RKS +IND ESIGN UNIVERSITY COLLEGE DUBLIN - Dublin, Ireland
Assisting in the design concepts of architecture and urban planning projects. Elaborating 3d models, render images e pós production on photoshop. Doing technical visits to construction
R HINO + GRASSHO PPER CO U RSE UNIVERSITY COLLEGE DUBLIN - Dublin, Ireland
I N T E R N A R CH I T ECT - 3 months NDBA ASSOCIATES, DUBLIN, IRELAND
R EVIT BASIC CO U RSE UNIVERSITY OF SÃO PAULO - São Paulo, Brazil
Assisting in the design concepts of architecture adequating to the current regulations, site analyses and supervising the construction.
R EVIT ADVANCED CO U RSE IMPACTA TECNOLOGIA - São Paulo, Brazil
Assisting in the design concepts of architecture and structure elaborating projects in Revit and AutoCAD and designing interior layout.
A RCHIT ECTU RE PRESENTAT IO N CO U RSE CURA - São Paulo, Brazil
TOWN HALL OF SÃO PAULO, SÃO PAULO, SP, BRAZIL Inf rastructure secretary
3 D S M AX CO U RSE LABIDEIAS - São Paulo, Brazil
drawings, 3d models, renders, layouts, and presentation. 201 7
A RCHICAD CO U RSE
2012
AUTO CAD UNIVERSITY OF SÃO PAULO - São Paulo, Brazil
SELECTED W O R K S
01
COOLAB
02
05
OVO HOTEL
JK HOUSE
06
CULTURE PLAZA
03
SM RESIDENCE
07
EMERGENCY MODULE
04
SF HOUSE
08
VMCA OFFICE
Office Building Final Thesis project USP
Countryside Residence by ARCHSCAPE
Urban Residence by Meireles Pavan
Countryside Residence by ARCHSCAPE
Luxury Hotel by Meireles Pavan
Public Plaza Landscape project (USP)
Classroom / studio for schools Archi. Industry project (USP)
Law Firm by ARCHSCAPE
COOLAB
Collaborative Office Building São Paulo, Brazil University of São Paulo Final Thesis project 2017 Supervisor: Prof. Antonio Carlos Barossi, PhD barossi@barossi.net Prof. Karina Oliveira Leitão, PhD koleitao@uol.com.br
This Final Thesis project approached the theme “Office and Nature” with the purpose of evidencing the importance of the interaction between nature and work in an office environment in order to restore the natural landscape in São Paulo city centre. Thinking on this relationship, the final developed product in this work was the building of a coworking office in the centre of São Paulo. It was thus proposed a sustainable collaborative work space of high density in the centre of São Paulo which is able to integrate the architectural façade with the landscape, mixing technology with nature, aiming to restore the lost landscape mainly in the metropolitan area and additionally articulating with the environment creating public spaces and permanence places with a free and collective appropriation.
*All visualization drawings and photographs have been done by myself unless otherwise stated.
environment The developed project had also the aim of potentializing the creativity and the transference of knowledge among different professionals, acting as a place where people can meet and interact . Therefore , it was sought the creation of collective environment of work and spaces for activities related to the use of startups of the creative industry, aimed at the articulation between researchers and entrepreneurs. The project is inserted in a place with a lack of public spaces and qualified green areas for the appropriation of the community. Thereby, my final thesis work had the ambition of finding solutions for a building that comprises work activities in an environment which is favorable to the innovation and interaction of the professional community contributing to the qualification of the surroundings.
The project proposes a connection between the two streets that give access to the building, General Jardim Street and Major Sertรณrio Street, by doing that seeking to recover the value of the surroundings and rearrange the urban paths. Through this path and the visual permeability it is possible to transpose the urban barriers and reinforce the pedestrian path so that the public spaces have potential to stimulate and reinforce the social interaction.
fluxogram
The volume concept of the building was primarily focus on promoting spaces with open access to the public and also create green areas for leisure, and for thermal and environmental comfort. Therefore, for this to be possible, the building block was elevated to create the permeability of pedestrian flow in addition to introduce vegetation that has direct solar incidence and permeable soil.
north elevation
west elevation
south elevation
TÉRREO SUPERIOR
green balconies A cobertura seria de acesso livre ao público, se tornando um local de encontros e lazer não só para usuários do edifício mas também para outros profissionais e moradores da região, contendo um bar e restaurante mas também um terraço com espaço de descontração podendo funcionar como um local para trabalho ou lazer. O terraço inclui uma horta comunitária que abasteceria os cafés e restaurante do edifício. Na fachada norte, o brise de madeira se projeta para cima, formando área com pergolado, permitindo a que as vegetações trepadeira se espalhem ao longo da fachada.
structural system A large layer of soil would be required for the green balconies, which would cause a very large load on the structure. Thus it was proposed inverted beams of reinforced concrete, stiffening all the structure sufficiently to withstand the load. As a bracing was used metallic structure subjected to tensile stresses. The main advantage of this structural system is that they can overcome larger spans and withstand a greater amount of weight.
physical model
coll aborative workspaces The building counts with collaborative workspaces destined to activities for the use of startups, with environments for interaction and articulation between the researchers and the entrepreneurs, such as auditorium, cafe, meeting rooms, decompression rooms, games rooms and green balconies. Additionally it counts with office shops such as print shop, stationery and wood shop.
JK HOUSE
Countryside residence Itu, Brazil Professional project by ARCHSCAPE Role in the process: As a Architect Collaborator I participated and contributed with all the design concepts ideas and site analyses, making sketches and diagrams. I produced all the technicals drawings, 3d models, renders, layouts, and presentation. Architect Supervisor: Gustavo R. Mendes Garrido
The project is a summer residence design in the rural area of the city Itu in SĂŁo Paulo, in a private condominium. The building is currently under construction. The house its designed to be a place to spend the weekends and needed to attend all the basic needs of the family and be able to receive all the family members for holidays gathering. The design of the house was inspired on the Japanese culture and its material because of the family descendants.
*All visualization drawings and photographs have been done by myself unless otherwise stated.
3.45
4.17
2
3.23 -1.05
ELEVAÇÃO FRONTAL 1:50
Viga metálica W com pintura eletrostática preta
Revestimento de telha metálica trapezoidal cor grafite 0.60
Abrigo p/ ar condic. c/ grade metálica preta
Viga metálica W com pintura eletrostática preta
3.25
1.05
0.05(a)
1.05
1.05
0.00
-1.05
-1.05
site and surroundings
ELEVAÇÃO LATERAL DIREITA 1:50
The land is located near native green areas and preserved habitat with plenty of native trees. Also it has a great slope with a direct view of the artificial lake of the condominium. Because of this slope on the site, the house has three differents levels which all of them has a view to the landscape. Revestimento de telha metálica trapezoidal cor grafite
Revestimento de telha metálica trapezoidal cor grafite
2.67
2.67
Viga metálica W com pintura eletrostática preta
1.10
1.05
1.10
1.05
1.05
ELEVAÇÃO LATERAL ESQUERDA 1:50
Revestimento de telha metálica trapezoidal cor grafite
i = 10%
0.35
Revestimento de telha metálica trapezoidal cor grafite
i = 10%
REVISÕES
3.45
4.17
2.67
2.67
4.91
3.46
5.35
i = 10%
Abrigo p/ ar condic. c/ grade metálica preta
Viga metálica W com pintura eletrostática preta
5.38
0.60
Abrigo p/ ar condic. c/ grade metálica preta Revestimento de telha metálica trapezoidal cor grafite
Viga metálica W com pintura eletrostática preta
i = 10%
Porta embutida
Porta embutida
1.10
1.05
1.05
1.05
3.23
1.10
0.05
0.05(a)
0.05(a)
00 REVISÃO
30.08.18 Emissão inicial DATA
DESCRIÇÃO
NOME/ ENDEREÇO OBRA
1.10
RESIDÊNCIA JYK
-1.05
01 ELEVAÇÃO FUNDO
0.00
JULIANA DALKIMIN RESPONSÁVEL CLIENTE
JULIO KITAGUCHI
FOLHA
600
ELEVAÇÃO FRONTAL
-1.05
DATA INICIAL FASE
1:50
ASSUNTO
South elevation
ELEVAÇÕES GERAIS
30/08/2018 FASE DO PROJETO
EXECUTIVO
PROJETISTA
1:50
north elevation
1030-ARQ-PE-600-ELEV-GER-R00 ARQUIVO
c
Revestimento de telha metálica trapezoidal cor grafite 0.60
Abrigo p/ ar condic. c/ grade metálica preta
3.45
3.25
1.05
0.05(a)
0.00
1.05
04
0.00
0.35
03
0.05(a)
3.25
02
0.05
3.45
01
1.10
1.05
-1.05
-1.05
5
6
7
8
C
500
500
B
500
A
01
4
E
3
01
2
D
1
7.18
4.00
0.83
0.60
A
B03 B02
COZINHA 35.76 m² p.d. 2.35 m
1.60
CHURRASQUEIRA
0.60
2.80 B04
F
F
01
1.10
B01
ACESSO DE SERVIÇO
1.85
01
1.10
1.15
1.05
0.60
1.17
LAVABO 1.89 m² p.d. 2.50 m
B05
LAVANDERIA 5.65 m² p.d. 2.70 m
1.10 1.15
B06
0.10
1.05
0.60
0.05
s
1.10
s
C
2.98
ACESSO COZINHA 2.53 m² p.d. 2.10 m
s
MURO DE CONTENÇÃO GABIÃO
0.50
B
MURO DE CONTENÇÃO GABIÃO
0.05
G
G
01
01
SALA DE TV 27.68 m² p.d. 3.00 m
GARAGEM
DECK
0.05
0.10
0.05
0.00
SALA DE ESTAR / JOGOS 90.82 m² p.d. 4.10 m ACESSO PRINCIPAL
ACESSO QUARTOS 6.10 m² p.d. 2.10 m 0.10
MURO DE CONTENÇÃO GABIÃO
-0.95
vidro fixo
0.00
s
vidro fixo
D
E
MURO DE CONTENÇÃO GABIÃO
CORREDOR 10.07 m² p.d. 2.80 m
-0.95
0.35
SUÍTE 01 18.50 m² p.d. 2.80 m
0.50
H
BANHO 01 4.77 m² p.d. 2.80 m
B09
0.50
BANHO 02 4.77 m² p.d. 2.80 m
DORMITÓRIO 02 11.46 m² p.d. 2.80 m
-1.05
0.50
H
BANHO 03 4.77 m² p.d. 2.80 m
01
01
E
01
500
C
500
B
500
D
F
A
DIREITOS AUTORAIS RESERVADOS CONFORME ARTIGO 184 DO CÓDIGO PENAL, LEI 5988 DO CÓDIGO CIVIL E RESOLUÇÃO CAU 67/2013
01
TAM A0 - 1188 x 840mm
DORMITÓRIO 01 11.46 m² p.d. 2.80 m
1.05
1.05 B08
PENA COR ESP. 1 7 0,10 2 7 0,20 3 7 0,30 4 7 0,40 5 7 0,50 6 7 0,60 7 7 0,70 8 7 1,00 9-255 9-255 0,20
SUÍTE 02 18.50 m² p.d. 2.80 m
B10
1.05
-1.05
0.35
B07
0.70
0.50
groundfloor plan 01
PLANTA DE LAYOUT 1:50
*Physical model was made by a hired third-party, Arthur Silva
Viga metálica caixão Telha metálica trapezoidal Calha c/ viga metálica W c/ pintura eletrostática preta
0.35 Forro inclinado de MDF ripado
Forro inclinado de MDF ripado
0.85
1.15(a) 1.10(o)
1.10(a)
COZINHA
1.05
0.10
ACESSO DE SERVIÇO
0.90
1.10(a)
1.05
0.05
0.20
0.80
Forro inclinado de MDF ripado
Thermal comfort The JYK house was designed to provide thermal comfort for the family in hot summer days, thus it was proposed openings to promote crossventilation and a big area of shadow provided by CORTE FF the roof. 01 1:50
2
1
3
4
5
6
7
Viga metálica caixão Laje de concreto impermeabilizada
0.20 0.35
Forro inclinado de MDF ripado
0.15
0.35
0.23
Forro inclinado de MDF ripado
Mureta de concreto
3.05
2.85
3.00
Pergolado com ripas de madeira
1.15(a)
1.10(a)
1.05
2.10
3.05
0.16
0.35
3.32(a) 3.27(o)
Calha c/ viga metálica W c/ pintura eletrostática preta
0.37
Pingadeira metálica
Viga metálica W com pintura eletrostática preta
Telha metálica trapezoidal
0.00
GARAGEM
0.05(a)
SALA DE TV
0.10(a) 0.05(o)
0.10(a) 0.05(o)
SALA DE ESTAR / JOGOS
SALA DE ESTAR / JOGOS
DECK
0.05(a)
0.00
section gg 02
CORTE GG 1:50
4
5
6
7
8
front view - entrance
3.00
3.22
2.10
1.10
0.10(a) 0.05(o)
SALA DE TV
0.05(a)
0.00
0.10
0.05
0.05
3.10 1.05
1.05
Muro de contenção gabião -1.05
A
B
C
D
E
F
Viga metálica caixão Telha metálica trapezoidal
Viga metálica W com pintura eletrostática preta
i = 10%
Laje de concreto impermeabilizada Forro inclinado de MDF ripado
0.35
0.50
0.10
4.80
i = 10%
4.10
0.00
1.60
SALA DE ESTAR / JOGOS
2.10
0.10(a) 0.05(o)
2.80
2.10
2.90
Forro de gesso tabicado
E
F
F
E
D
C
B
A
Viga metálica caixão
1.25
Forro de gesso tabicado
0.30 2.10
2.70
0.85
0.85
3.35
CORREDOR
1.15(a) 1.10(o)
COZINHA
LAVANDERIA
1.05
2.80
0.10
SALA DE ESTAR / JOGOS
2.10
1.60
2.88
2.88
2.80
1.60
0.10(a) 0.05(o)
-1.05
0.50
REVISÕES -1.05
0.60
DORMITÓRIO 01
-0.95(a) -1.00(o)
-0.95(a) -1.00(o)
00 REVISÃO
JULIANA DALKIMIN
30.08.18 Emissão inicial DATA
DESCRIÇÃO
RESPONSÁVEL CLIENTE
NOME/ ENDEREÇO OBRA
JULIO KITAGUCHI
RESIDÊNCIA JYK
section bb
FOLHA
section dd
500
DATA INICIAL FASE
30/08/2018
ASSUNTO
1:50
FASE DO PROJETO
EXECUTIVO
PROJETISTA
F
E
D
C
Viga metálica caixão
0.20 0.35
CHURRASQUEIRA
0
4.85
0.35
Telha metálica trapezoidal
ARQUIVO
Telha metálica trapezoidal Forro inclinado de MDF ripado
Viga metálica caixão
1030-ARQ-PE-500-COR-GER-R00 A
B
Viga metálica W com pintura eletrostática preta
5
01
CORTES GERAIS
CORTE DD
Calha c/ c/ pintura el
Forro inclinado de MDF ripado
30
-0.95(a) -1.00(o)
0.00
-0.95(a) -1.00(o)
0.90
1.50
SALA DE ESTAR / JOGOS
0.10(a) 0.05(o)
2.10
0.10(a) 0.05(o)
2.80
0.60
2.10
0.30
0.30
Forro de gesso tabicado
Calha c/ c/ pintura el
Forro inclinado de MDF ripado
2.85
0.50 4.80
0.50 4.10
ACESSO QUARTOS
BANHO 01
SUÍTE 01
2.10
1.15(a) 1.10(o)
Telha metálica trapezoidal
Forro inclinado de MDF ripado
i = 10%
2.85
COZINHA
Abrigo p/ ar condic. c/ grade metálica preta Pingadeira metálica
Viga metálica caixão
Telha metálica trapezoidal
ACESSO QUARTOS
2.10
2.10
0.85
2.30
2.35
2.85
Forro de gesso tabicado
1.05
Viga metálica caixão
Pingadeira metálica
0.50
Abrigo p/ ar condic. c/ grade metálica preta
0.35
Forro inclinado de MDF ripado Forro inclinado de MDF ripado
Telha metálica trapezoidal
Laje de concreto impermeabilizada
Laje de concreto impermeabilizada i = 10%
Viga metálica caixão
Viga metálica W com pintura eletrostática preta
Viga metálica W com pintura eletrostática preta
i = 10%
2.85
Telha metálica trapezoidal
0.60
D
2.30
C
1.15
B
2.35
A
-1.05
0.20
0.10
-0.95(a) -1.00(o)
0.60
0.05 0.50
0.10
0.10(a) 0.05(o)
0.05
2.10
2.50 0.90
0.10
COZINHA
Calha c/ viga metálica W c/ pintura eletrostática preta
SUÍTE 01
0.30
0.55 2.85
0.50
2.10
Telha metálica trapezoidal
ACESSO QUARTOS
1.05
0.85
1.15
2.30
2.35
0.60
0.30
1.15(a) 1.10(o)
1.05
Viga metálica caixão
Pingadeira metálica
Laje de concreto
0.12
Forro inclinado de MDF ripado
Abrigo p/ ar condic. c/ grade metálica preta
2.88
i = 10%
SM RESIDENCE Residence SĂŁo Paulo, Brazil Professional project by Meireles Pavan Role in the process: As a Architectural Project Coordinator I participated and contributed with all the design concepts ideas and site analyses, making sketches and diagrams. I produced all the technicals drawings, and also coordinate with engineers, architects and suppliers to ensure that plans and designs were according to the project. And also talked directly with clients to ensure their needs. Architect Supervisor: Brunno Meireles
The project is a residence in one of the most expensive neighborhood of SĂŁo Paulo. The building is currently under construction, and I am coordinating the project in site. The house it was design for a family with childrens, to accommodate leisure and safety in a urban area. The design of the house was inspired on a Mediterranean aesthetics, to create a refuge in the city.
exterior facade
*All drawings and photographs have been done by myself unless otherwise stated. *render was made by a hired third-party
front exterior elevation
front view - entrance
*render was made by a hired third-party
E
D
C
E-04
-13
Sauna A: 6 m2
70
9
8
10 11
7
sala de tv
12 6
A: 3 m2
5
Adega
Escada A: 12 m2
-100
13
A: 13 m2
lavabo
-10 14
A: 3 m2
4 15 3
A
A
16
E-15
2
10
piscina
1
sobe
deck lavatório A: 2 m2
Sala de estar
E-01
E-03
A: 48 m2
±0
hall social
4
A: 16 m2 ±0
20
Torre
Sala de jantar A: 22 m2
Despensa
hall de entrada
A: 4 m2
A: 4 m2 ±0 -50
Cozinha
Dorm. serviço
B
A: 15 m2
A: 9 m2
B -25
MSR
Lavanderia Banho serviço
A: 6 m2
MLR
Passeio calçada
R02 churrasqueira A: 17 m2 -10
pl. layout - térreo 1:50
R01 R00
D
E-02
E
Revisão
C
Lardo do Infante
A: 3 m2
groundfloor plan
Cliente: Local:
Cód. do Projet Assunto:
Nome do Arqu
interior view - linving room
*render was made by a hired third-party
35 7
67
forro de gesso
forro de gesso
255
50
+632,0 (p.a)
36
69
78
forro de gesso
58
forro de gesso
47
30
5
248
210
4
25
+632,0 (p.a)
5
10
+632,0 (p.a)
Conferir todas as med Obs.: Cotas medid
5
+922,0 (p.a)
80
90
100
223
198
280
sections +922,0 (p.a.) cobertura +632,0 (p.a.) 2 pav.
Conferir todas as m Obs.: Cotas med
+922,0
+922,0 (p.a.) cobertura
forro de gesso
257
207
171 50
12
80
35
79
30
277
318,8
275
277
78,8
25
25
+135,0 (p.a)
228
285
275
305
5
-25,0 (p.a)
10
±0,0 (p.a.)
forro de gesso
305
80
642 563
597
30
±0,0 (p.a)
275
305
288
245
318,8
+135,0 (p.a.)
5
+340,0 (p.a.)
30
667
+454,4 (p.a)
30
5
305
275
245
257
245
275 210
275
367
50
forro de gesso
215
±0,0 (p.a)
forro de gesso
+340,0 (p.a.) 30
667
657
30
30
63
30
34
5
+340,0 (p.a.)
forro de gesso
forro de gesso
±0,0 (p.a.) térreo
90
45
5
+632,0 (p.a)
30
30
657
189
223
100 5
+632,0 (p.a)
forro de gesso forro de gesso
35
245
+454,4 (p.a)
+632,0 (p.a)
+340,0 (p.a)
+340,0 (p.a.) 1 pav.
290
281
265
257
257
229
257
367
+632,0 (p.a)
+632,0 (p.a.) 2 pav. +340,0 (p.a.) 1 pav.
271
56
forro de gesso
±0,0 (p.a.)
liberado para
±0,0 (p.a.)
-10,0 (p.a)
5
25
±0,0 (p.a.) térreo
15
-50,0
C CORTE CC 1:50
D CORTE DD 1:50
-100,0 (p.a)
liberado o Conferirpara todas as 35 7
67
forro de gesso
09/10/19
R00
20/05/19
Revisão
Data
248
re
R00
20/05/19
em
Revisão
Data
36
78
50
pr
09/10/19
207
245
171
forro de gesso
100
265
223
922
22/11/19
R01
280 56
69
+454,4 (p.a)
365
257
+632,0 (p.a)
12
80
30
Rua Francisco Pinhe São Paulo - S Tel: +55 11 3 contato@meirele brunno@meireles
257
forro de gesso
367
173
30
63
667
+340,0 (p.a.) 35
+340,0 (p.a.)
forro de gesso
50
34
12
5 30 245
forro de gesso
forro de gesso
Rua Lard
P93 Rua Francisco L CORTES Pinheiro São Paulo - SP 191129-C Nome do Arquivo: Tel: +55 11 303 contato@meirelesp 20/05/201 Início do Projeto: brunno@meirelesp
277
Assunto:
25
Sergio Matt P93-Casa
Local: Revisão:
Rua Lardo R01
Cód. do Projeto: Coordenador:
P93 Brunno M
Assunto: Desenho:
CORTES Juliana D
Nome do Arquivo: Escala:
191129-CA Indicada
Início do Projeto: Data:
20/05/2019 09/12/19
Fase:
Anteprojeto
-50,0
D CORTE DD 1:50
P93-Casa S
R01 para liberado
Revisão:
CRT
Coordenador: Desenho:
CORTEEE CC ECCORTE 1:50 1:50
Anteproje
Cliente: Cód. Interno:
Cód. Interno:
±0,0 (p.a)
10
5
±0,0 (p.a)
20
25
-10,0 (p.a) 15
82
90
190
275
305
275
90
±0,0 (p.a.) térreo
±0,0 (p.a)
Sergio M
Local:
Fase:
10
50
±0,0 (p.a.)
25
-25,0 (p.a)
5 277
280
80
65
forro de gesso
±0,0 (p.a)
318,8
305
275
35
277
318,8
277
50
305
12
forro de gesso
±0,0 (p.a) ±0,0 (p.a.) -25,0 (p.a.) 190
±0,0 ±0,0 (p.a.) térreo (p.a) térreo
+135,0 (p.a.)
Cliente:
Cód. do Projeto:
30
215
657
30
5
305
275
+340,0 (p.a)
275 210
302
+340,0 (p.a.) 1 pav.
275
50
355
forro de gesso
+340,0 (p.a.)
657
5 30
+340,0 (p.a)
30
597
30
35
657
+340,0 +340,0 (p.a.) 1 pav. (p.a) 1 pav.
667
50
90
30
35
257
171
257
+632,0 (p.a)
R02
47
25
5 30
+632,0 (p.a)
forro de gesso
5
50
229
257
365
367
+632,0 (p.a.) 2 pav.
22/11/19
R01 255
198 210
223 5 30
+632,0 (p.a)
forro de gesso
248
36
215
forro de gesso
290
58
5
10
+632,0 (p.a.)
17
50
+632,0 (p.a.) +632,0 (p.a)
80
90
100
+922,0
+632,0 +632,0 (p.a.) 2 pav. (p.a) 2 pav.
R02
forro de gesso
280
280
280
215
forro de gesso
189
A CORTE AA 1:50
+922,0 (p.a.) cobertura
Obs.: Cotas m
+922,0
+922,0 (p.a.)
+922,0 +922,0 (p.a.) cobertura (p.a) cobertura
Escala: Data:
Brunno Me
Juliana Da Indicada
09/12/19
INterior
view - living room
*render was made by a hired third-party
right exterior elevation
exterior view - pool lounge
*render was made by a hired third-party
Cozinha A: 15 m2
tpl.elayout chn icals drawings - térreo 1:20
Prever torre para equipamentos eletrodomésticos
115 264 63 251
74
63
74
4
63
275
Bancada em madeira maciça rústica contornando ilha h=70cm
5
77
com Gavetão ernas int com Gavetão ernas gavetas int gavetas
40
leira
Gavetão
Gavetão
10
Armário baixo sob bancada
Base de alvenaria seguindo acabamento do piso granilite h=10cm
70 60
Prever corte para sifão 10
10 60
Cuba dupla de embutir Prever lava louças embutida
*Prever prateleira no centro de cada abertura das portas
Prever forno embutido Base alvenaria rev. de placa de agregado h=10cm
amp 01 cozinha 1:20
GSPublisherVersion 0.0.100.100
amp 02 ilha cozinha 1:20
10
70
79
Prate
80
40
leira
Prate
3
77 197
90
275
91
Nicho acabamento em granilite
Fechamento lateral MDF em folha natural Carvalho
92
Armário alto MDF em folha natural Carvalho com portas fecho toque
4
63
interior
view - kitchen
*render was made by a hired third-party
SF HOUSE Countryside residence Itu, Brazil Professional project by ARCHSCAPE Role in the process: As a Architect Collaborator I participated and contributed with all the design concepts ideas and site analyses, making sketches and diagrams. I produced all the technicals drawings, 3d models, renders, layouts, presentation and also coordinate with engineers, architects and suppliers to ensure that plans and designs were according to the project. And also talked directly with clients to ensure their needs. Architect Supervisor: Gustavo R. Mendes Garrido
The project is a summer residence design in the rural area of the city Araçoiaba da Serra in São Paulo, in a private condominium. The building is currently under construction. The house its designed to be a place to spend the weekends and needed to attend all the basic needs of the family and be able to receive all the family members for holidays gathering. The design of the house was inspired on the brazilian modern architecture aesthetic, with powerful material such as concrete and metal alongside natural materials like native wood.
front view - entrance
*All drawings and photographs have been done by myself unless otherwise stated.
fluxogram
ÁREA INTIMA
05
ROCHELLE STREET
ELEVAÇÃO FRONTAL 1:100
SOCIAL AREA
1:100
POOL LOUNGE
06
CORTE BB 1:100
ELEVAÇÃO FRONTAL
07
CORTE BB 1:100
CORTE AA 1:100
groundfloor plan
exterior view - gourmet
exterior view - pool lounge
right exterior elevation
exterior facade
phsycal model
*Physical model was made by a hired third-party, Arthur Silva
exterior view - back
OVO HOTEL Luxury Hotel Fernando de Noronha, Brazil Project for a constest by Meireles Pavan Role in the process: As a Architect Collaborator I participated and contributed with all the design concepts ideas and site analyses, making sketches and diagrams. I produced all the technicals drawings, 3d models, renders, layouts, and presentation. Architect Supervisor: Brunno Meireles
This is a project of a Luxury hotel in Fernando de Noronha, one of the most beautiful of the world. The concept of the project was inspired by the exuberant nature and fauna that is distinct from Fernando de Noronha.The choice of the structural materials and the constructive systems was the result of awareness of sustainability, in addition to aesthetic quality. By result it was chosen a wooden structure and mud walls, that is a traditional construction technique.These materials are considered sustainable because they combine natural and biodegradable elements.
Interior
view - reception
*All drawings and photographs have been done by myself unless otherwise stated.
LOCATION
Forte N S dos Remédios
Terreno
Museu do Tubarão
Terreno
Aeroporto
Fernando de Noronha
Pernambuco
Localização
topfloor
view - pool lounge
Implantação
Áreas Gerais
top view plan
área do terreno = 7.578 m2 área de bangalôs = 1.377 m2 (9 bangalôs) hotel = 2.465 m2 (37 quartos) área ocupada = 1.530 m2 taxa de ocupação = 20%
privete bungalows
gardens bar + breakfast lounge
pool lounge restaurant entrance
exterior view - bar
de Usos Planta Hotel - Térreo
DIAGRAMS
Área Construída
de Usos
amb. pav. 1º pav. entrada
área (m2)
lounge
160
recepção e adm
50
15 quartos
480
55
745 m2 2º pav. 22 quartos
704 704 m2
cob. bar e lounge
269
cozinha
65
piscina
189
w.c
18 541 m2
total
2.465 m2
adm 18m2
espelho d’água entrada A: 55 m2
quarto 32m2
quarto
quarto
A: 32 m2
A: 32 m2
quarto 32m2
recepção 32m2
quarto
quarto 32m2
recepção
A: 32 m2
quarto 32m2
quarto
A: 32 m2 8
quarto 32m2
9
A: 32 m2
11
quarto
10
quarto 32m2
14
A: 32 m2
13
quarto
A: 32 m2
12
quarto 32m2
quarto
15
quarto 32m2
quarto
A: 32 m2
A: 32 m2
quarto 32m2 quarto A: 32 m2
7
6
16 5
17 4
18 3
19 2
20 1
S
Planta Hotel - Primeiro Pavimento quarto 32m2
quarto 32m2
quarto
quarto
A: 33 m2
A: 32 m2
quarto 32m2 quarto A: 32 m2
quarto 32m2
quarto 32m2
quarto
quarto
A: 32 m2
A: 32 m2
Área Construída quarto 32m2
espelho d’água
quarto A: 32 m2
amb. lounge pav. 160m2 1º pav. entrada
área (m2)
lounge A: 160 m2
55
lounge
160
recepção e adm
50
15 quartos
480 745 m2
2º pav. 22 quartos
704 704 m2
ADMINISTRATIVE
Serviço - 10%
Serviço - 10%
HOTEL ROOMS
cob. bar e lounge
269
cozinha
65
piscina
189
w.c
18
GROUNDFLOOR PLAN
Quartos - 50%
Quartos - 50%
541 m2 total
2.465 m2
2
quarto quarto A: 32 m 32m2
quarto quarto A: 32 m 32m2
2
2
quarto quarto A: 32 m 32m2 2
9
quarto quarto A: 32 m 32m2
quarto quarto A: 32 m 32m2 2
8
2
11
quarto quarto A: 32 m 32m2
2
10
quarto quarto A: 32 m 32m2
Quartos - 50%
14
Quartos - 50%
13
Serviço - 10%
15
Serviço - 10%
12
GSPublisherVersion 0.0.100.100
quarto quarto A: 32 m 32m2
quarto quarto A: 32 m 32m2
2
2
quarto quarto A: 32 m 32m2
quarto quarto A: 32 m 32m2
2
2
quarto quarto A: 32 m 32m2 2
7
6 16 5 17 4 18 3 19 2 20 1 S
Planta Hotel - Solarium / Piscina quarto quarto A: 33 m 32m2
quarto quarto A: 32 m 32m2
2
2
quarto quarto A: 32 m 32m2 2
quarto quarto A: 32 m 32m2
Área Construída
quarto quarto A: 32 m 32m2
2
quarto quarto A: 32 m 32m2
2
quarto quarto A: 32 m 32m2
2
vazio
2
quarto quarto A: 32 m 32m2 2
amb. pav. 1º pav. entrada quarto quarto A: 32 m lounge 32m2 2
área (m2)
55 quarto quarto A: 33 160 m 32m2 2
recepção e adm
50
15 quartos
480 745 m2
2º pav. 22 quartos
704 704 m2
cob. bar e lounge
269
cozinha
65
piscina
189
w.c
18
FIRST FLOOR PLAN 541 m2 total
2.465 m2
w.c 18m2
w.c.
w.c.
A: 9 m2
A: 9 m2
9
8
11
10
12
15
65m2
14
A: 65 m2
13
cozinha cozinha GSPublisherVersion 0.0.100.100 7
6
bar e lounge bar/lounge A: 269 m 269m2 2
16 5 17 4 18 3 19 2 20 1
SOCIAL AREA
restaurante
MAIN BUILDING
lounge A: 490 m 2
piscina piscina 189m2
A: 189 m2
TOPFLOOR PLAN
Social - 40%
Social - 40%
Social - 40%
Social - 40%
Todos
Todos
Todos
Todos GSPublisherVersion 0.0.100.100
Interior
view - entrance
16
15
14
11
12
13
9
8
7
6
5
4
3
10
2
TOPFLOOR PLAN GSPublisherVersion 0.0.100.100
A: 54 m2 54m2
lounge cobertura lounge
área externa técnica área
GSPublisherVersion 0.0.100.100
piscina piscina A: 37 m2 37m2
quarto quarto A: 26 m2 26m2
A: 2525m2 m2
área externa área externa
Planta Bangalô Térreo
15
12 13
1
Planta Bangalô Cobertura
16
14
9
8
7
6
5
4
3 10
2 11
1
TOPFLOOR VIEW S
GROUNDFLOOR PLAN
11
A:11m2 11 m2
w.c w.c.
total
cob. lounge
143 m2
54 m2
54
99 m2
37
26 w.c piscina
25 quarto
área (m2)
amb. pav. 1º pav. entrada
Área Construída
exterior
view - bungalow
Planta Quartos Hotel
Área Construída amb.
área (m2)
quarto
24
w.c
8 32 m2
w.c 8m2
quarto 32m2
HOTEL ROOM PLAN
GSPublisherVersion 0.0.100.100
EXTERIOR VIEW - HOTEL ROOM
C U LTU R E PLAZA Urban plaza SĂŁo Paulo, Brazil Academic project at University of SĂŁo Paulo 2017 (9th semester) Role in the process: Elaborating all the design concepts ideas and analyses, making sketches, drawings and diagrams. Producing all the technicals drawings, renders, layouts, and presentation. Supervisor: Prof. Paulo Pellegrino, PhD
The concept of the project is based in the diversity of appropriation both by the public and by the House of Culture of Butanta which is a place that offer Culture events for the community, such as concerts, workshop, courses, expositions and etcetera. The project aims to restore an empty and degraded backyard turning the space to an area of gathering and leisure open for the public as well as an area that can be used by the House of Culture for shows and events. The guidelines of the projects were inspired by four types of appropriation by its community. Therefore was proposed four main environment on the plaza: a space for concerts and events with a stage which has a direct access o the dressing room; a large field for leisure activities and to conduct recreation activities such as picnics, sports and games; spaces of contemplation and reading with bench under the shade of the trees; at last but not least a ludic space with blocks and sculpture that can be used by children as a playground and by young adults. The paths and walks are guided to the difference of floor pagination and vegetation.
exterior
view - ptio
*All drawings and photographs have been done by myself unless otherwise stated.
VEGETATION SPECIES
The choice of vegetation species for the project took into account the following criteria: they could not be invasive, they could not have superficial and aggressive roots, they could not be toxic and leave much waste. Thus were proposed besides the existing trees other natives species of tree of the site. For ground covers that are beyond existing shadows, it is proposed differents sun ground covers, to guide the path and to that could endure the heat.
MASTERPLAN OF SITE
AREA OF INTERVATION
GRANDSTAND
READING AREA PLAYGROUND
FIELD PATIO H O U S E O F C U LT U R E BUILDING
BICYCLE PARKING
parking
Due to the proximity of the subway that will be inaugurated close to the Culture Plaza it was proposed a bicycle parking so that the community could park their bicycles and take the public transportation to work. The bicycle parking is attached to a large parametric pergola forming a gate that invites the pedestrian to get into the centre of the plaza to the patio where the events and concerts take place.
Pilar de madeira Capa metรกlica envolvendo a base do pilar
0.50
parametric bicycle
Chapa metรกlica parafusada na base de concreto
Base de concreto
support detail
front elevation
isometric
view of bicycle parking
thermal comfort
On the edges of the plaza were proposed trees of medium to large port with dense crowns forming shadows and providing a natural landscape to the sidewalks, while in the centre of the plaza the vegetation will be taller and thinner, forming a large space that allow the solar incidence that will be partially filtered by the trees around. In this way it is possible to pass and stay in a thermally pleasant manner, controlling the thermal intensity for all seasons.
solar study
grandstand
The project has a grandstand of concrete and wood boards that serves as a transposition and integration with the reforest nursery of the site, maintaining a free access from the plaza to the community garden, as well as a place of permanence and a possible place to watch sports and events that may occurs on the field. The plaza will also feature a long concrete and wood board bench that serves as a restraining wall as well as a place of contemplation and relax under the shade of the native trees. As an design concept, the continuous bench is dismembering along the plaza to the grandstand integrating visually the two elements.
85.70
Pedra São Tomé Branca
85.65
Camada de terra para plantio
Pintura sobre massa ref: sulvinil selfcolor C166
Concreto ou madeira
0.50
Banco de alvenaria
Manta geotextil Cinasita Impermeabilização
0.05
Pedra São Tomé Branca
Proteção mecânica e regularização Estrutura de concreto Prever drenagem Argamassa de arremate de quina
bench detail
ludic playground
It is proposed a ludic playground with different shapes and sizes of blocks and red monochromatic sculptures in order to attract children and young adults encouraging creativity for their uses. A space that can be used by both children and adults in the centre of the plaza surrounded by sitting benches providing a sense of comfort and security.
areia lavada para assentamento
1.20
0.46
0.15
MURO DE DIVISA
GUIA
0.46 plantio
Plantio faixa de serviço Argamassa de assentamento Guia Sarjeta Asfalto
Jardim
Tento em pedra São Tomé espessura 2 cm 100.56
0.14
Mini guia (tento escondido)
Mini guia (tento escondido)
Faixa livre Piso Drenante Braston assentamento e tamanhos aleatórios
Assentar piso da borda e tento com argamassa Piso intertravado de concreto esp: 6 cm
Camada de areia Manta geotextil
Camada de terra compactada
DETALHE CALÇADA
paving details
playground view
EMERGENCY MODULE Clasroom/studio for schools São Paulo, Brazil Academic project at University of São Paulo 2014 (7th semester) Team Group: Juliana D., Larissa Fiorin and Marcos Saad Role in the process: Contributing as part of the group with the design concepts ideas, research and analyses, making sketches. Producing all the 3d models, renders, layouts, and presentation. Contributing with the technicals drawings. Supervisor: Prof. Lara Leite Barbosa, PhD
This project consists of the design concept of a classroom / atelier environment for the University of São Paulo community or other school in need of a temporary space to attend their activities, which should physically enable its function for a maximum of 5 years. This project aimed to investigate affordable materials and maximize the construction methods for future emergency. It was designed in order to provide the arbitrary balance between the emergency criteria (low cost, quick assembly) and the functional criteria considered as primordial for the this project. The project should provide thermal, acoustic and ergonomic comfort for teaching and learning. Thus, the choice of materials and their articulation in the building is based on these precepts.
*All drawings and photographs have been done by myself unless otherwise stated.
site and implementation
The implementation was based on in the daily graduation activities of the university, located between the main building and the lab studio. The project anticipate a possible expansion of the modules according to the necessity and demand of the university.
location module module expansion
Floorplan
THERMAL COMFORT
The openings of the project was designed to promote thermal comfort and minimize the global warming effects. The openings in the northeas and southwest facades provide cross-ventilation in conjunction with the height difference it promotes ventilation by chimney effect, ensuring good air renewal. Also it can be observed that in the East faรงade has lower incidence of sunlight because of the brise-soleil, promoting ventilation and also helps reduces the heat gain within the building by deflecting sunlight. The brises also allowed a greater use of natural illumination without the presence of glare.
Sunlight deflected by the brises
interior view
Southwest elevation Northeast elevation
STRUCTURE
The pillars of paper-tube-structured it is light and able to resist stress. It is fixed in the platform structure on the floor supporting the roof. The platform distributes the loads to the ground without the need for foundations that pierce the ground.
structural isometric
section aa
section bb
section cc
isometric
STRUCTURAL SYSTEM
The structural system was inspired on Shigeru Ban project that involved the construction of paper-tubestructured temporary classrooms in case of emergency. The structure uses paper tubes, which are cheap, recyclable, reusable, and readily available. The use of these material (paper-tube and wood plywood) makes it possible to overcome large gaps because it is light and able to resist stress. In addition this structure would facilitate the construction because it’s lighter, faster and easier to build than conventional building methods.
VMCA OFFICE Law Firm SĂŁo Paulo, Brazil Professional project by ARCHSCAPE Role in the process: As a Architect Collaborator I participated and contributed with all the design concepts ideas making sketches and diagrams. I produced all the technicals drawings, 3d models, renders, layouts, and presentation. Helped managing the construction site with weekly visits supervising every detail. Architect Supervisor: Gustavo R. Mendes Garrido
This project was a design of a new office space for VMCA, a law firm with a profile in traditional markets and in the digital economy sectors, composed by young professionals. This characteristic guided the aesthetic, in order to blend the tradition of the modern school with the Scandinavian avant-garde ones, originating a personality based on the stripping, transparency and presence of vegetation,which is present in the reception, library and balconies. The office is located in a corporate building in SĂŁo Paulo.
*All drawings have been done by myself unless otherwise stated. *Photos taken by a hired third-party, Manuel de Sรก
FLOOR PLAN
The plan was organized in two main areas: the one of the directors, with private rooms and the other with open plan for the staff, both connected by the entrance in the reception. In this, two green walls were built from each side.
The pre-existing walls and ceiling was removed opening the space for light through glass curtains. This attribute was enhanced by the vinyl floor which gave the desired integrA T I O N . NOTAS NOTASGERAIS GERAIS 1.CONFERIR MEDIDAS EM OBRA. 1.CONFERIR MEDIDAS EM OBRA. 2.MEDIDAS EM METROS. 2.MEDIDAS EM METROS. 3.COTAS INTERNAS EM OSSO, EXTERNAS ACABADAS 3.COTAS INTERNAS EM OSSO, EXTERNAS ACABADAS 4.MUDANÇAS EM OBRA DEVERÃO SER APROVADAS PELO ARQUITETO RESPONSÁVEL 4.MUDANÇAS EM OBRA DEVERÃO SER APROVADAS PELO ARQUITETO RESPONSÁVEL 5.CONSULTAR MEMORIAL DE ACABAMENTOS. 5.CONSULTAR MEMORIAL DE ACABAMENTOS.
proj. viga existente proj. viga existente
Remoção de forro mineral Remoção de forro mineral 175 m² e 30 luminárias 175 m² e 30 luminárias
Remoção de carpete Remoção de carpete 175 m² 175 m²
Remoção de drywall portas Remoção de drywall portas
Remoção de bancadas Remoção de bancadas
1.46 1.46
no alihamento no alihamento Remoção Remoção de drywall de drywall
0.43 0.43
Remoção de Remoção de drywall e drywall e bancada bancada Retirada de Retirada de piso piso Vaso a Vaso a deslocar deslocar
1.26 1.26 demolir banheiro, demolir banheiro, deixando apenas shaft deixando apenas shaft (retirar vaso, bancada (retirar vaso, bancada e piso exietente) e piso exietente)
5.34 5.34
1.74 1.74
1.74 1.74
1.74 1.74
3.69 3.69
5.38 5.38
Retirada de Retirada de piso piso
Remoção Remoção de porta de porta de vidro de vidro
Retirada de Retirada de piso piso
Remoção de Remoção de bancada bancada
Reformar Reformar bancada bancada
Retirada de Retirada de piso piso
Retirada de Retirada de piso piso
Remoção de bancadas Remoção de bancadas
Retirada de Retirada de piso piso
Remoção de bancadas Remoção de bancadas
DEMOLIR DEMOLIR 01 01 1:50 1:50
Alinhar com o montante Alinhar com o montante Alinhar com o montante Alinhar com o montante
2.04 2.04
1.05 1.05
1.05 1.05
1.08 1.08
1.03 1.03 1.00 1.00
1.00 1.00
Bandeira de fechamento Bandeira de fechamento sobre porta sobre porta vão=2,50m vão=2,50m
Drywall até a laje Drywall até a laje
Proj. forro a construir Proj. forro a construir
Alinhar com o montante Alinhar com o montante Drywall até a laje Drywall até a laje
Bandeira de fechamento Bandeira de fechamento sobre porta sobre porta vão=2,50m vão=2,50m
Drywall até o forro Drywall até o forro
proj. viga existente proj. viga existente
proj. viga existente proj. viga existente
Drywall h=1,00m Drywall h=1,00m
Drywall até a laje Drywall até a laje
FOLHA FOLHA 1001 1001 1002 1002 1003 1003 1004 1004 1005 1005
LISTA LISTADE DEFOLHAS FOLHAS DESCRIÇÃO DESCRIÇÃO
DEMOLIR/CONSTRUIR DEMOLIR/CONSTRUIR ELÉTRICA/LUMINOTÉCNICA ELÉTRICA/LUMINOTÉCNICA FORRO/AR CONDICIONADO/HIDRÁULICA FORRO/AR CONDICIONADO/HIDRÁULICA ACABAMENTOS ACABAMENTOS ELETROCALHAS ELETROCALHAS
REVISÃO REVISÃO 04 04 04 04 04 04 04 04 04 04
REVISÕES REVISÕES
DATA DATA 09.05.18 09.05.18 09.05.18 09.05.18 09.05.18 09.05.18 09.05.18 09.05.18 09.05.18 09.05.18
1.13 1.13
Enchimento piso a teto Enchimento piso a teto 1.20 1.20
Bancada a Bancada a recolocar recolocar
TAM A1 - 840 x 594mm TAM A1 - 840 x 594mm
Distância a Distância a mover os pontos mover os pontos de hidráulica de hidráulica
0.40 0.40
Enhcimento piso teto Enhcimento piso teto 0.67 0.67
0.10 0.10
0.67 0.67
0.32 0.32
0.10 0.10
0.47 0.47
1.22 1.22
Enhcimento piso teto Enhcimento piso teto
0.64 0.64
2.29 2.29 0.55 0.55
Drywall até a laje Drywall até a laje 0.40 0.40
2.40 2.40
proj. forro novo proj. forro novo
Drywall até a laje Drywall até a laje
Proj. forro a construir Proj. forro a construir
1.63 1.63
Drywall até a laje Drywall até a laje
Drywall até a laje Drywall até a laje proj. viga existente proj. viga existente
0.91 0.91
Bandeira de fechamento Bandeira de fechamento sobre porta sobre porta vão=2,50m vão=2,50m
1.72 1.72
proj. viga existente proj. viga existente
Dry wall h=2,50 m Dry wall h=2,50 m Alinhar com o montante Alinhar com o montante
2.23 2.23
2.26 2.26
2.29 2.29
2.14 2.14 2.19 2.19
Dry wall h=2,50 m Dry wall h=2,50 m
Regularização Regularização
PENA COR ESP. PENA COR ESP. 1 7 0,10 1 7 0,10 2 7 0,20 2 7 0,20 3 7 0,30 3 7 0,30 4 7 0,40 4 7 0,40 5 7 0,50 5 7 0,50 6 7 0,60 6 7 0,60 7 7 0,70 7 7 0,70 7 8 1,00 7 8 1,00 9-255 9-255 0,20 9-255 9-255 0,20
2.84 2.84
Drywall até a laje Drywall até a laje Alinhar com o montante Alinhar com o montante
Alinhar com o montante Alinhar com o montante
1.93 1.93
1.93 1.93
1.61 1.61
enchimento h=janela enchimento h=janela
1.46 1.46
DIREITOS AUTORAIS RESERVADOS CONFORME ARTIGO 184 DO CÓDIGO PENAL, LEI 5988 DO CÓDIGO CIVIL E RESOLUÇÃO CAU 67/2013 DIREITOS AUTORAIS RESERVADOS CONFORME ARTIGO 184 DO CÓDIGO PENAL, LEI 5988 DO CÓDIGO CIVIL E RESOLUÇÃO CAU 67/2013
DEMOLITION
04 09.05.18 Revisão Paredes de Drywall 04 09.05.18 Revisão Paredes de Drywall 03 08.05.18 Revisão Paredes de Drywall, e bancadas banheiro 03 08.05.18 Revisão Paredes de Drywall, e bancadas banheiro 02 19.04.18 Retirada de piso em todos os banheiros 02 19.04.18 Retirada de piso em todos os banheiros 01 13.04.18 Acréscimo de bandeira sobre portas indicadas na planta 01 13.04.18 Acréscimo de bandeira sobre portas indicadas na planta 00 12.04.18 Emissão inicial 00 12.04.18 Emissão inicial REVISÃO DATA DESCRIÇÃO REVISÃO DATA DESCRIÇÃO CLIENTE/ ENDEREÇO OBRA CLIENTE/ ENDEREÇO OBRA
Ptos de Ptos de hidráulica hidráulica (confirmar (confirmar posição) posição)
VMCA VMCA
Juliana Juliana Juliana Juliana Juliana Juliana Guilherme Guilherme G.G G.G DESENHO DESENHO REPONSÁVEL REPONSÁVEL
Gustavo GustavoR. R.M. M.Garrido Garrido FOLHA
FOLHA RUA RUADR. DR.RAFAEL RAFAELDE DEBARROS, BARROS,210, 210,7o 7oANDAR, ANDAR,SÃO SÃOPAULO PAULO 1001 1001 DATA INICIAL FASE DATA INICIAL FASE
ASSUNTO ASSUNTO
PLANTA PLANTADE DEDEMOLIR DEMOLIR/ /CONSTRUIR CONSTRUIR
02/04/2018 02/04/2018 FASE DO PROJETO FASE DO PROJETO
EXECUTIVO EXECUTIVO
PROJETISTA PROJETISTA
02 02 S T R U C T I O N CON CONSTRUIR CONSTRUIR 1:50 1:50
1010-ARQ-PE-1001-DEM-R04 1010-ARQ-PE-1001-DEM-R04 ARQUIVO ARQUIVO
*Photos taken by a hired third-party, Manuel de Sá
2,30
2,50
2,50 2,40
Suporte regulador
0.0
0.25
2,50
Longarina - perfil principal
2,30
2,40 2,30 2,40
2,40
01
2,40 2,30
2,40
PLANTA - DET. FURO
CORT
02
1:10
1:10
2,50
2,30
2,30
2,40
AC1 18k
2,30
2,50
2,50
2,40
2,40 2,30 2,30
2,40
2,50
2,40
2,40
2,40
FORRO
PLANTA FUROS - SALA DE REUNIÃO
01
2,50
1:25
P
Sprinkler
Detector de fumaça
Eletrocalhas e instalações no forro
1
Iluminação
2
3 F LPLANTA OTIN G A COUSTIC PANELS FURO - STAFF 1:25
2,40
2,40
Início da grelha de modulação do forro
2,30
2,40
2,30 2,50
2,30
0.1252,50
2,40
2,30
2,50
2,50
2,40
2,40 2,50
2,40
0.125
PLANTA FORRO - SALA DE REUNIÃO MDF revestido 02 de 1:25 15mm
Suporte regulador
2,30
Longarina - perfil principal
Suporte Nivelador Longarina Perfil principal MDF revestido de 15mm
0.10 0.50
0,10
1:10
1.25
1.05
DET.
DETALHE - PLACAS E LONGARINAS 1:25
2,40
FORRO Sprinkler
06.06.18 Revisão forro sala de reunião e antesala
06
15.05.18 Revisão posição de ar condicionado
Suporte regulador
09.05.18 Revisão forros
04
09.05.18 Revisão sala de reunião interna
02
19.04.18 Relocação de sprinklers, dectores de fumaça, e placa acústicas
01
13.04.18 Acréscimo de pontos de água e esgoto nos muros verdes
00
12.04.18 Emissão inicial
Longarina - perfil principal DATA
DESCRIÇÃO
VMCA
01
1:25
03
07
REVISÃO
38 unidades de longarinas de 30cm (2 em cada placa) FIXAÇÃO 3 36 unidades de longarinas de 80cm (2 em cada placa) 18 unidades de longarinas de 105cm(2 em cada placa)
PLANTA FORRO - STAFF
2,50
MDF revestido de 15mm
CLIENTE/ ENDEREÇO OBRA
0.10 1.00
02
1:10
1:200
RUA DR. RAFAEL DE BARROS, 210, 7o ANDAR, SÃO PAU
CORTE2 0.80
0.10
1
0.30
PLANTA - DET. FURO
Parafuso menor de 14mm p/ não extravasar a placa
LOCALIZAÇÃO
REVISÕES
05
AC1 18k
S - SALA DE REUNIÃO
02
2,4001
2,30
0.50
TAM A1 - 840 x 594mm
2,40
2,40
03
0.10
0.10
2,40
2,50
2,50
AC8 9k
2,40
0.125
2,30
2,40
STAFF
0.125
2,30
2,40
4.MUDANÇAS EM OBRA DEVERÃO SER APROVADAS PELO ARQUITETO RES 5.CONSULTAR MEMORIAL DE ACABAMENTOS.
2,40
0.25
2,30
2,50
3.COTAS INTERNAS EM OSSO, EXTERNAS ACABADAS
5.CONSULTAR MEMORIAL DE ACABAMENTOS.
0.02
2,50 0.25
2,30
4.MUDANÇAS EM OBRA DEVERÃO SER APROVADAS PELO ARQUITETO D E T A IRESPONSÁVEL LS
2,30
0.25
2,30
2,30
EM METROS.
3.COTAS INTERNAS EM OSSO, EXTERNAS ACABADAS
2,40
2,40 2,30
2,40
1.CONFERIR MEDIDAS EM OBRA.
2,40 2.MEDIDAS
2,40
2,40
2,50
2,50
0.50
2,50
2.MEDIDAS EM METROS. 2,50
0.50
ESP. 0,10 0,20 0,30 0,40 0,50 0,60 0,70 1,00 0,20
1.CONFERIR MEDIDAS EM OBRA.
2,50
NOTAS GERAIS 2,30
Início da grelha de 2,40 modulação do forro
2,30
PENA COR 1 7 2 7 3 7 4 7 5 7 6 7 7 7 7 8 9-255 9-255
NOTAS GERAIS
2,30
0.02
2,30
2,50
2,50
2,50
5
2,30
0.125
2,30
2,40
2,50
2,40
2,30
AC8 9k
2,40
2,40
0.25
a de forro
2,30
AC1 18k
DIREITOS AUTORAIS RESERVADOS CONFORME ARTIGO 184 DO CÓDIGO PENAL, LEI 5988 DO CÓDIGO CIVIL E RESOLUÇÃO CAU 67/2013
2,40 2,30
0.125
01
PLACA ACÚSTICA Placa de mdf revestido em fórmica
ASSUNTO
PLANTA - DET. FURO 1:10
FORRO / PLACAS ACÚSTICAS PROJETISTA
02
CORT 1:10
*Photos taken by a hired third-party, Manuel de Sรก
PRIVATE OFFICES
*Photos taken by a hired third-party, Manuel de Sรก
C O N T A C T INFORMATION
Mobile
+55 (11) 98744-4725
dalkimin.arquitetura@gmail.com
Skype ju.dalkimin Address
621 Angelica Avenue,
São Paulo , SP - Brazil