PROFESSIONAL
PORTFOLIO
YULIIA POLTAVSKA
YULIIA POLTAVSKA ARCHITECT EDUCATION
PERSONAL INFORMATION
2015 - 2016 : Master of Architecture (diploma with honours) Lviv Polytechnic National University (Lviv, Ukraine)
date of birth: 27.03.1995 location: Kyiv, Ukraine email: juliarch19@gmail.com phone: +38 093 357 62 07
2013 - 2015 : Bachelor of Architecture (diploma with honours) Lviv Polytechnic National University (Lviv, Ukraine) 2009 - 2013 : Junior Specialist of Architecture (diploma with honours) Chernivtsi Polytechical College (Chernivtsi, Ukraine) WORK EXPIRIENCE 2020 : 2019 - 2020 : 2019 - 2019 : 2017 - 2019 :
Chief Specialist of the Architectural Department Team Leader Architect Lead Architect Architect Kyivmertoproject LTD. (Kyiv, Ukraine) - projects of metro stations
2018 :
CAD Drafter GMP Architecture LLC (Itasca, Illinois, USA) - workshop drawings of precast concrete panels
2016 - 2017 : Architectural Engineer UkrZakhidUrbanizatsiya LTD (Lviv, Ukraine) - projects of residential quarters - projects of single-family houses 2013 :
Internship Architect Boyko Architect Group (Chernivtsi, Ukraine) - pre-diploma research
CERTIFICATION 2020 : 2017 : 2017 :
Architect’s qualification certificate (National Union of Architects of Ukraine) Building Information Modelling (BIM Academy) Autodesk Revit Architecture certificate of completion (Autodesk ATC)
PROFICIENCY Autodesk AutoCAD, Revit, 3dsmax (+VRay), Image Modeller, ArchiCAD, SketchUP, Adobe PhotoShop, InDesign, Illustrator, Lightroom, LumionPro, Rhinoceros INTERESTED IN metro stations design/renovation, objects of transport infrastructure, urbanism, sustainability, concepts, buildings renovation, multifunctional public buildings, residential quarters, public spaces LANGUAGES Ukrainian - native Russian - fluent English - upper-intermediate (B2) Polish - intermediate (B1) HOBBIES/INTERESTS running, reading, cycling, music, movies, theatre, street-art, painting, Polaroid photography, philosophy, plants, guitar, enology, psychology, art exhibitions, travelling, exploring
STUDENTS MASTERPLAN
Project stage: Master’s diploma project Project year: 2016 Location: Lviv, Ukraine Size: 9 690 sq.m. Work done: Master’s thesis “Research of architecture formation peculiarities of students activity centers”, design concept, CAD drawings, 3D-modelling, 3D-renders of exterior, working with masterplan Project team: Yuliia Poltavska (student) Mykola Gabrel (Master’s thesis teacher) Vyacheslav Yakubovskyy (project teacher) Alma Mater: “Lviv Polytechniс” National University
AC
TIVITY
CENTER
WEST ELEVATION
NORTH ELEVATION
EAST ELEVATION
LONGITUDINAL SECTION 3D-FUNCTIONAL SCHEME WC research labs
terrace assembly hall
library co-working service rooms
student activities
bookstore copycenter exhibition kitchen & servery cafe CROSS SECTION
info entrance guard room
stairs
underground parking
4TH FLOOR PLAN
3RD FLOOR PLAN
2ND FLOOR PLAN EXTERIOR RENDER
1ST FLOOR PLAN
UNDERGROUND PARKING PLAN
EXTERIOR RENDER
EXTERIOR RENDER
RETHINKING Project stage: urbanistic workshop in the context of “Street for all” project Project year: 2016 Location: Lviv, Ukraine Project team: Yulian Chapliskyy (Chief architect of Lviv city) Demian Danyliuk (Lviv city hall representative) Oleksandr Shutyuk (Lviv city hall representative, Lviv) Serhii Fialkovskyy (transport specialist, Lviv) Ihor Mohyla (transport specialist, Lviv) Ihor Krupa (city planner, Lviv) Yurii Stolyarov (city planner, Lviv) Stefan Gabi (city planner, Leipzig) Iris Gleichmann (city planner, Dresden) Kees van Ruyven (city planner, Amsterdam) Anton Kolomyeytsev (architect, Lviv) Yuliia Poltavska (student) Petro Buchok (student) Vasyl Savchuk (student) Lyudmyla Shchur (student) Context: The project “Street for All” is run by the City of Lviv in cooperation with the City of Leipzig and with support from the German Ministry for Economic Cooperation and Development. Its aim is to contribute to the strengthening of Good Governance approaches (here: participatory planning) in the city-administration of Lviv. Taking one of Lviv’s inner-city-streets as an example, a planning-process will be organized, which is characterized by the early involvement and active cooperation with all relevant stakeholders. The design solution elaborated in this way shall be inplemented. Experience gathered in the framework of the project shall be documented and like this available for future projects. Motivation: The project is focused on Bandery street. The aim is to look on this street from different perspectives. First urbanistic workshop gathered architects and urban planners, who attemped to figure out their points of view on Bandery street and its surrounding.
STEPANA
BANDERY
STREET
MAIN 3D VIEW MARKET SQUARE 3D VIEW
MAIN 3D VIEW
MAGERIV
VILLAGE TOP VIEW
Project year: 2016 Location: Lviv region, Ukraine Work done: 3D-modelling of central part of the Mageriv village (19th century) Project team: Yuliia Poltavska (architect), Olga Medynska (architect), Khrystyna Famyliak (architect) Oksana Pyasetska (architect), Michael Gabrel (chief architect) Project organization: UkrZakhidUrbanizatsiya LTD Client: Mageriv Village Council
1st stage of construction PRAVDY AVENUE METRO STATION
3rd stage of construction MARSHALA HRECHKA METRO STATION
2nd stage of construction VYNOHRADAR METRO STATION
Project stage: ongoing Year of completion: 2021 (expected) - 1st stage of construction Location: M3 metro line, Kyiv, Ukraine Project team: Yaroslav Levandovskiy (chief architect), Yuliia Poltavska (architect), Ann Lepeshkova (architect), Evgeniya Tkachenko (architect). Mariia Murashevska (architect) Project organization: Kyivmetroproject LTD Developer: Kyivmetrobud PJSC Client: Municipal Enterprise “Kyiv Metro”
CONSTRUCTION OF KYIV M3 METRO LINE SECTION FROM SYRETS STATION TO VYNOHRADAR RESIDENTAL AREA Project includes 4 new stations on Syretsko-Pecherska metro line M3 in Kyiv, which will be built in 3 stages of construction. “Mostytska” and “Pravdy Avenue” metro stations - 1st stage of construction, “Vynohradar” metro station - 2nd stage of construction, “Marshala Hrechka” station and Metro Trains Depot - 3rd stage of construction. 1st stage of construction is expected to be finished in 2021. The location of the stations is determined with the masterplan of the city of Kyiv and the design task from client. The section of the designed metro line unites the four stations with a holistic architectural concept, which determines all the spatial and facing solutions. It was decided to choose the minimalistic style of stations. The general concept is the conciseness and modernity of the solution of the line as a whole, but the allocation of each station through the selection of unique materials. The interiors of the stations are designed by laconic architectural forms with using of durable materials. Architectural solutions are based on identifying the aesthetic qualities of structures and the expressiveness of facing materials. Natural stone (granite) was chosen as the main facing material at the stations; tempered glass - in exit pavilions; solid and perforated fiber-cement panels - for improving sound absorption at stations platforms.
1st stage of construction MOSTYTSKA METRO STATION
MOSTYTSKA METRO ST
METRO LINE M3 SCHEME (1st stage of construction - section from “Syrets” station to “Pravdy Avenue” station)
Project stage: ongoing Year of completion: 2021 (expected) Location: M3 metro line, Kyiv, Ukraine Size: 16 713 sq.m. Work done: design concept, CAD drawings, BIM-model development, 3D-renders of interior/exterior, working with masterplan/ landscaping plan, collaboration with technologists
Project team: Yuliia Poltavska (team leader architect), Yaroslav Levandovskiy (chief architect) Project organization: Kyivmetroproject LTD Developer: Kyivmetrobud PJSC Client: Municipal Enterprise “Kyiv Metro”
EXIT PAVILION RENDER
ATION
LANDSCAPING PLAN
STATION SCHEME
EXIT PAVILION RENDER
PASSENGERS VESTIBULE 3D-SECTION
EXIT PAVILION VIEW
LONGITUDINAL SECTION EMERGENCY EXIT 3D-SECTION
EXIT PAVILION VIEW
PASSENGERS VESTIBULE VIEW
PASSENGERS VESTIBULE VIEW
PASSENGERS VESTIBULE VIEW
MOSTYTSKA METRO
STATION 3D-SECTION
PASSENGERS PLATFORM RENDER
PASSENGERS VESTIBULE RENDER PASSENGERS VESTIBULE RENDER
PASSENGERS VESTIBULE RENDER
METRO LINE M3 SCHEME (1st stage of construction - section from “Syrets” station to “Pravdy Avenue” station)
PRAVDY AVENUE Project stage: ongoing Year of completion: 2021 (expected) Location: M3 metro line, Kyiv, Ukraine Size: 15 206 sq.m. Work done: design concept, CAD drawings, BIM-model development, 3D-renders of interior, working with masterplan/ landscaping plan, collaboration with technologists
METRO STATION Project team: Ann Lepeshkova (lead architect), Yuliia Poltavska (lead architect), Yaroslav Levandovskiy (chief architect) Project organization: Kyivmetroproject LTD Developer: Kyivmetrobud PJSC Client: Municipal Enterprise “Kyiv Metro”
LANDSCAPING PLAN
STATION SCHEME
PASSENGERS VESTIBULE 3D-SECTION
PASSENGERS PLATFORM VIEW
PASSENGERS VESTIBULE VIEW
PASSENGERS PLATFORM VIEW
PRAVDY AVENUE
METRO STATION 3D-SECTION
PASSENGERS VESTIBULE RENDER
PASSENGERS VESTIBULE RENDER
PASSENGERS PLATFORM RENDER
juliarch19@gmail.com +38 093 357 62 07