JUNG YURA works Volume 2013-2016


Name Nation Date of Birth Education Connect

Jung Yura Korea 10.16.1991 SeoulTech Architecture +82 - 10 - 9649 - 7576 than_x@naver.com instagram.com/jungyoura

experience 2016. 06 - 08

"홍릉 바이오 메디 클러스터" 조성 진행 연구원

2016. 03 - 05

2016 - 2035 Longterm Masterplan for Nonsan-City : Exhibition

2016. 01 - 02

국회 양천구 지역디자이너 활동

KOICA the Interim Report of Academi Partnership Program, Philippines 2016. 01 - 02

(Ulban Renewal Planning for Natural Disaster Prevention Responding to Climate Change)

2015. 08 - 12

International Internship - T.A.M Planners Company in Philippines

2015. 07 - 08

어반그라운드 디자이너 작가 활동

2014. 03 - 04

DDP UAUS Pavilion : Exhibition Internship - Mlnp arhcitects Office

achievements and awards 2016. 07

시각장애인협회 장애인 체험 수료증

2016. 05

국회 김기준 의원실 지역디자이너 표창장

2016. 02

"버스 서비스 개선" 공모전 서울특별시장상 장려상

2016. 02

의자 디자인특허 등록

2015. 12

"지역사회문제해결" 공모전 장려상

2015. 12

2015 코엑스 무역센터 환경부 업사이클 트리마을 전시

2015. 06

"디디피, 서울을 입다" 서울특별시건축사회상 우수상

program avility Visualizing Illustrator Photoshop Indesign V-ray Mental-ray Lumion

3D Modeling Revit Rhino Auto cad 3d max Sketchup T-spline Grasshopper

Document work Power Point Excel Word

Analysis Arc-GIS

Machine Laser Cutting 3D Print CNC Cutting


JUNG YURA works Volume 2013-2016 01 The Sounds of Silence Public Multi Experience in Bath 02 Private Opening Public Library in London 03 Senior Medical Care Complex The Hopital on Ureban Master Plan 04 On the Floor to the Walls Pavilion in the Forest 05 Twist Directional Properities Office Building in Tearung 06 Moving, Sharing, Changing Chaires Pavilion in DDP 07 Common Image Association Share Housing 08 Infinite Human Chain Memorial Station 09 For Urban - Waffle Spin Chair -Upcycling Christmas Tree 10 Extra Architecture Sketch



01 The Sounds of silence public multi experiencing bath in Hongneung, Dongdaemun-gu, Seoul August 2016

This site is a combination of factors are intersecting with each other. To a number of factors, including the intersection is history, culture, age groups but they don't have any place to stay with each other. The neighborhood is also necessary that the mediators associated with the villagers and Project 'Hongreung Bio Medicare Dlusters' that is planned in the future. The project main goal was to establish a building that holds the congestion of town in one of the areas of space. And yet at the same time, the building has to have a look around the square and open communication. Cross- walled attempt to move to one side to give birth to the structure of the parabolic hyperbolic. This structure helps to act as a pillar and communicate inside and outside. Hole caused by the building of this structure gives the feeling that if you were building a living breathing response.


Amusement

Apartment

Housing Ingredient

Retail

Research Installation & School

Site Area : 19,835.40 m2

The invisible footprint Range : Hoegiro44 Dongdaemun-gu, Seoul The building is the intersection of multiple programs around the lot. This building serves to prevent isolation of the various programs in character around and to make the fusion in that area.


Outdoor plaza where people can gather

Space for recycling bath water

Water is being supplied to the plants

Building that serves as a 24-hour square

The advantage of a variety of roles Square


+1.2m : SITE PLAN + LEVEL 1 PLAN With the large square in front of commercial establishments that shares the square and parking lot in the underground


Vertical Steel Reinforcement

Horizontal Steel Reinforcement

Concrete Floor Finish

0

33

760

4f : 2

2.0 m

3f:

C7_b

16.5

m C6_b

2f:

11.0

C1_b

m

tyical Reinforced Concrete Section

0 (M) 2

4 6 8 10 12 14

Low

16 18 20 22

Hight

Load Degree

1 Unit of Reinforced Concrete Structure


Way combination of modules Which produce space


Section

Lever 1 Plan

Way combination of modules

Lever 2 Plan


model making process


main model scale1 : 100


Grandfather overlooking the first floor showroom

정화조

유류저장고

발전기실

물탱크실 유황탕저수조

알칼리탕저수조

(250T)

(250T)

(13000X9000X1600)

전기/ 기계실

중앙감시설 시수저수조 (350T)

주차장 (주차대수 : 115대)

UNDERGROUND LEVEL PLAN


4

7

3

1

6

3

2

5

4 8

1. Core 2. Showroom 3. Shop 4. Cafe 5. Restaurant 6. Hall 7, Office 8. Outside deck

7

3

+1.2m First Floor Plan

0

2

4

10

20 (m)

2

4

10

20 (m)

+1.2m : LEVEL 1 PLAN

4

1

3 4 7

5

+6.7m 1. Core seconde Floor Plan 2. Yoga Sport Center 3. Meditation Space 4. Cafe 5. Semi - Botanical garden 7, Office

2

0

+6.7m : LEVEL 2 PLAN


Mister using bath facilities with plants


7

2

1

3

6

5

4

+17.7m 1. Core 2. Fitting room (woman) the forth Floor Plan 3. Bathing facilities 4. Cleaning facilities 5. Restroom 6. Theater 7, Massage Shop

0

2

4

10

20 (m)

2

4

10

20 (m)

+17.7m : LEVEL 4 PLAN

6

2

1

3

5

4

1. Core 2. Fitting room (man) 3. Bathing facilities 4. Cleaning facilities 5. Outdoor Spa 6. Management Center

+23.2m the fifthe Floor Plan

0

+23.2m : LEVEL 5 PLAN


outdoor facade view Columns of the curve that reminds the past Pantheon facade that extends to the solemn feeling of being at the center of the citizens life.


people using bath facilities







02 private Opening Public Library in London in London September 2015

This building is constructed beside city hall square. Library is should constructed in place that people in London are passing and gathering together often. The site used park originally. I want to do not ruin the memory of people about the park because of the new building. I took out half of site and made plaza still serves as park.Memories of people are shared at the place. But the plaza has function of library. From inside of building to plaza outside, library users can move free. Library has collision of geometry. Box of lower floor crash with 3 sphere of upper floor, so inside and outside spaces are formed. Upper floors have more private programs. Lower floors are public spaces, so they are open to noise. But there are mediate space because of the smaller scale, and reducing of noise in the sphere mass. Also it makes people feel like floating in the center of the city sky. The experience could refreshing them. It become a space cause desire to go up.


SITE PLANNING This building is constructed beside city hall square. Library is should constructed in place that people in London are passing and gathering together often. The site used park originally. I want to do not ruin the memory of people about the park because of the new building. I took out half of site and made plaza still serves as park.Memories of people are shared at the place. But the plaza has function of library. From inside of building to plaza outside, library users can move free.

Site Plan From inside of building to plaza outside, library users can move free


04 Visual Relation Surrounding the land is full of landmark buildings. To consider the elevation of buildings and skyline view from across the river . Pedestrians can feel the tightness between the high-rise buildings , and should give sufficient visual sense of freedom .

03 River Line Interface The site is facing the river. Consider the way along the river, and should be deployed to respond to the river.London Bridge over the river is also a landmark of London. To open up to that point of view to building the equivalent.

02 Landmark Building Relation Land to the west boundary is located office building and the east is residential form . But we need ideas for creating optimal conditions, as the head of the library , not cut off communication.

01 Urban Park The original land was the role of the park in the city center. If there will be heard while the building is losing green space in the park is disappearing people. Since only half of the land was used was allowed to serve the rest of the square.


Constantly changing pavilion that functions as a sculpture and chairs

As well as holding down a part of the interior space is lower sphere gaze down naturally touches can produce a calm area by placing a public staircase . The top of the slab leads to self- independent vertical circulation going to the top can enjoy a quiet and independent space. Square coming deep into the building can not serve as a more stable feeling and a better lawn . People sitting in the space opposite the building and get the feeling that it is an act corresponding to a building from the outside .


White Concrete

Lamella Dome Frame

Support Pillar

Support Pillar

Columes Truss Structure Beam

Cutain-wall Frame

Gate type ridged-frame

Solid Panel Glazing Core Structure

Structure System


+0.2m Plan level 1 - public area

0

2

4

10

Various function Room is space that people can roam freely. So magazine or newspaper are disposed in the space. People borrow a book from library at higher floor and descend, can read it in the space where they want.

20 (m)


Library has collision of geometry. Box of lower floor crash with 3 sphere of upper floor, so inside and outside spaces are formed. Upper floors have more private programs. Lower floors are public spaces, so they are open to noise.


I divide ROOM and AREA, so public space and private space have order of rank.

Level 5-10 From 5th floor, there are regular AREA space Existing volume is halved, and it makes the sky park. Also, volume of sphere is added and it has function each spheres. Therefore it emphasis territoriality. In the space, people can feel like staying afloat on the city. People can use library with natural view. The higher up, sphere is more getting narrow, and closer the space There are liberation from noise, and more silent. The supplementation of books is more intensified.

Level 3-4 People can have cultural life and heard some lecture in 3,4th floor. The public space is middle level, and it is open to only members. Children are play, and exhibiting some works in the place. There are also some space for computer. In 4th floor, there are vertical space to sphere mass directly. People can appreciate various exhibition area the bottom of sphere during go up escalator.

Level 1-2 From 1st floor to 2nd floor there are constituted Rooms. Various function Room is space that people can roam freely. So magazine or newspaper are disposed in the space. People borrow a book from library at higher floor and descend, can read it in the space where they want. It also divided offices for employees, and they can move efficiently in the space.

Space program planning


bottom of Sphere It is a vertical collision of the mass circulation of meeting space and a sphere like this depressed feeling down in the bottom part of the lower floors nine and a rise through the mass production of forms.

The vertical circulation By vertical circulation through the mass of the sphere to form a production rise.


0

2

4

Section Plan A-a As well as holding down a part of the interior space is lower sphere gaze down naturally touches can produce a calm area by placing a public staircase . The top of the slab leads to self- independent vertical circulation going to the top can enjoy a quiet and independent space. Square coming deep into the building can not serve as a more stable feeling and a better lawn . People sitting in the space opposite the building and get the feeling that it is an act corresponding to a building from the outside .

10

20 (m)


+8.9m Plan level 3 - multiroom

0

2

4

10

20 (m)

0

2

4

10

20 (m)

+8.9m - Multi Room Plan

+12.6m Plan level 4 - Encounter area

+12.6m - Encounter Area Plan


0

Section Plan B-b Slender get that smashing a geometric sphere -shaped pillar through the lower floors are slabs. Directing the space between the slabs supported by columns, and people see that the end of the pillars leading to the lower spheres . A structural device that allows to have a desire to also be raised up from the inside.

2

4

10

20 (m)


+16.6m Plan level 5 - encounter area

0

2

4

10

20 (m)

0

2

4

10

20 (m)

+16.6m - Encounter Area Plan

+28.2m Plan level 8 - investigation

+28.2m - Investigation Room Plan


Stainless-steel rods

FDP bracket

Silicone Butt Joint

Stainless Steel Point Support

Fitting Joint

Spider Fitting above Structure Glass constituting the spherical shape are connected to each pipe and the spider . Each Spider connects to the wire is fixed to one of the four Spider- glass panels .

Joint

Connetion Support

Steel-pipe Structure

Steel Structure

Free Direction Bracket

Free Dirextion Bracket Glass constituting the spherical shape are connected to each pipe and the spider . Each Spider connects to the wire is fixed to one of the four Spider- glass panels .


Zoom in the Structure Structure supporting the glass for implementing the sphere





03 senior medical care complex urban desing in Nonsan city Jun 2016

Nonsan City's like a nickname for the home of filial piety, Nonsan-si, of the number of elderly people is increasing rapidly. The plan for the elderly to Geriatric of health complexes. Residential with the main hospital, the hospital facilities. Also, establishing a residential development for health care workers seeking jobs and population growth. With commercial facilities and cultural facilities around the infrastructure deployment to the establishment of residential development. Nonsan City area has a large number of population reduction rate is high elderly population, in particular, the north. It is the right to life set forth not located also been deteriorating economic activity area. Reservoirs and have the natural environment that best it has mountains high growth potential place. Here the senior professional medical complex in Nonsan surrounding towns with as well as exchanges and population flows.


Location information The diagram shows the transportation networks and major roads around the site and indcades the time that required by the car from the major station to the site.


Geographic information The site locates on where there is the mountain behind and water at the front. The village is located at the surrounded by mountain and reservoir. Natural scenery and consider the best advantage in design process. Hills's contour differences among the hills taking advantage of trails to form a hydration sphere.


Detail Program

Purpose Rate of use

Purpse of use

Residencial

Commercial

Medical

Main Program

Urban Design Thema

Extra Facility Residence Facility

28.4 % 10.7 %

Medital Facility 24.6 %

36.3 %

Commercial Facility

Purpose Rate of Use

Urban Space Program Nonsan City's like a nickname for the home of filial piety, Nonsan-si, of the number of elderly people is increasing rapidly. The plan for the elderly to Geriatric of health complexes. Residential with the main hospital, the hospital facilities. Also, establishing a residential development for health care workers seeking jobs and population growth. With commercial facilities and cultural facilities around the infrastructure deployment to the establishment of residential development.


Geographic deployment : Section The diagram shows dropped in the section of the earth the geographical location of each program. Scale and large hill just cantilevered have a reservoir. Earth is spared in the mountains include, as the back of the water front.


These datas indicate the research figures for the hospital and the number of my hospital in Nonsan- city. According to age population data graph, we can know that the highest number in his 50s in a number. Additionally, the data are low-traffic residential districts in northern parts represent gains and losses and total population, Nonsan-si, number of annual status.


Contour

Water

Paddy

Housing

Noseongs-mountain is located in the back of the site There are lots of agricultural paddys in around. Due to the Bungsa-reservoir, the site has the water front. The volume of housing is less as a whole around the site.


Senior General Hospital : outside view The hospital leds to the forest trail. The hospital is closely connected a residential facility that can drastically .

Senior General Hospital : inside view The hospital is big with a skylight in the atrium. To bring it with plenty of light through interior.


patient's room type - a

patient's room type - B 4th Level : Patient's rooms

3rd Level : Patient's rooms

A - Standard Type 1

B - Round Type 1 2nd Level : Annex a doctor's offices

Sub ENT.

1st Level : Outpatient clinics Main ENT.

A - Standard Type 2

Emergency medical station ENT.

B - Round Type 2

room NUMBEr For 5 beds x 44 = 220 beds For 1 bed x 14 = 14 beds For 1 bed x 34 = 34 beds

Total : 268 beds

Hospital Planning Diagram The hospital has the room that classified for five or one. The total number of hospital is considering relocating most 268 bath is ready. The masses of third and fourth floors lie on around slop. These arrangements can always go straight to the forest from inside the hospital. Residential facilities has placed along this mountain trail.


Residential Care Facilities Residential facilities are located at the lower part Noseong-mountain. They are based on each level based on the ridge of mountain's 80 rate linear array . It is also closely connected with the hostital by a road that can directly in contact with hospital.

Commercial Facilities Commercial facilities deployed on the low plain and near major reservoirs. It is drawing water near the buildings so people can enjoy there.


Restaurant

2, 3 floors for the Dweller`s Life Community facilities and restaurant

A Double Room Type

Nursing Station

With the first floor health centers the workers and hospital in parallel with shift a nurse.

A Single Room Type 3rd Level

Guest Rooms

2nd Level

First Aid Center

room NUMBEr

Health care center

For 1 beds x 15 = 15 beds For 2 bed x 20 = 40 beds 35 beds x 6 Unites = 210beds

Total : 210 beds 1st Level

Residential Care Facilities Planning diagram Residential rooms and emergency treatment facilities will reside at the same time a nurse in an inpatient facility. The Community food for the first floor and sports facilities. Housing type is made up for a double and single room.



04 on the floor to the walls Pavilion in univercityt in Nam-Mountain Park April 2013

An architectural experience was compressed in the form of a cube. The pavilion can use wooden boards stacked stacked like stairs to climb up to the top floor from the enterance. Laminated wood stacked plates are often used as a chair. Also it was more clearly the changes in sunlight when dragging Pavilion of external light into the interior . The curves produced from the inside, creating a form of sky light that enters the void. The pavilion is located in the Nanshan. It is the function of the shelter in the middle of the mountains and is made of wood and natural materials to match .


inside of pavilion


Laminated Sectioning This is configured in such a way as to laminate the wood layer so it contains a variety of symptoms.





05 twist directional properity office building in Jungrang-gu May-July 2015

The economic and efficiency : What should be considered a priority of Office Building. It is natural to turn on the basic requirements. The recycling system to have the land to the value of or around cities to maximize the value of the building. This office smashed for jobs to residents and used by the Office of Commercial Facilities within the showrooms, shops have been deployed. Building's function is divided into greatly two. Office space for their work and are all available public space. The external commercial User's Low Floors Part of the ship was on the escalator. Because Two of the movement was separated, the building lobby is not the confusion when the time is rush hour. The building responds to the axis of the two. The one is Bordered on the axis of the building of the pillars as possible. This is a question of accessibility and perceptions of. With building space is easy to approach from the main street the first floor of the transition space. Another axis south of the pillars. Because this building is located between several tall buildings, so that needs consideration to the south. The mass can be satisfied with two axis and the Elevation of mass achieved so far to respond to it, too.


architecture scheme Title : Site : Site Area : Building Area : Total Floor Area : Building Coverage Ratio : Floor Area Ratio : Size : Main Use : Structure : Maximum Height : Parking Capacity :

Multi-Office Building Gongrung-dong, Nowon-gu, Seoul 1,930.9 m2 1,121.8 m2 18,052.52 m2 58.09% 626% Ground 17 Floors, Underground 3 Floors Office, Commercial SRC 65.8m (the legal restriction : 72m) 123 cars (the legal standards : over 120cars)


Residential

Commercial

Site use

Office School

Road Grid

Residence the others

Office use building

1

14

Topography

35 (Floor)

1930

1980

Decrepit degree

Building floor

Geographic Information To identify the geographical and administrative features of the surrounding plateau status for the sake of the people and analyse matters

2013 (Year)


Turing Direction

Spread the Building

Turned around and to adopt building, but fronting on a road

The building is wayward form in the direction of North and South SE

NE

Separating Circulation

Minimizing Calumns

The separting of the Circulation between Office users and external users

Enhancing the efficiency of the space to minimize the number of calumn

Worker

Visiter

Evacuation Mass

Effective Core placement

Offering space that public services through empting a mass inside the building

Turned around and to adopt building, but fronting on a road

Circulating Parking

Effective Mass Separation

Rotary type parking system securing the maximum number of a parking lot

Effective segregation maximizing economic benefits (A)

(B)

External public space

Wide View

Open to public users up into green space outside.

Inside in wide viewpoints that can take a wide view

Effective plans of the mass


People who worked in the skyscraper was rocked mainly using public space. There is a big hole in an east-west direction, in a highly users an open view and act accordingly to enjoy a commercial program and, at the same time, vertical linkages to be possible.

ROOF TOP GARDEN

20F RESTAURANT

18+19F SPORTS CENTER

16+17F BOOK CAFE

Officetel

Amco Towns

16f : 480.5m2 17f : 498.7m2

}

5F~15F office unite : 655m2 X 10

CORE 1121.8m2 Taereung Station

4F showroom 654.3m2

2F+3F Shop 2f : 630.5m2 3f : 582.7m2

1F public 1121.8m2

Function Overview Axonometric This office smashed for jobs to residents and used by the Office of Commercial Facilities within the showrooms, shops have been deployed. Building's function is divided into greatly two. Office space for their work and are all available public space. Ministry of from ambulatory to separate, to people outside the highrise peubeullik can reach without any problems in the space.


Inside for external users Free Dirextion Bracket Glass constituting the spherical shape are connected to each pipe and the spider .

vertical circulation for external users The external commercial User's Low Floors Part of the ship was on the escalator. Because Two of the movement was separated, the building lobby is not the confusion when the time is rush hour.


5

6

2

1

8 7

3

4

+0.2m Plan level 1 - Public space

0

1. Hall 2. Core 3. Cafe 4. Showroom 5. Restaurant 6. Shop 7, Office 8. Imformation

+0.2m - 1st Floor Plan

1

2

5

10 (m)


7

Finish Panel

OFFICE

Deck Plate

+8000

Ceiling

Triple Glazing with Low-e

OFFICE

Opaque Insulated Panel

+4000

White Stion Panel

Insulating Material _ THK 150

Section Detail Perspective View


Connecting Elevatioan + Section Detail + Plan

Typical Floor Detail Plan for Elevation A flat , section , elevation, as shown in connection with one another to refine the design of the facade . The drawings show how to meet each application. The details and the pioneer in studying the actual material.


Elevation drawing The glass windows and frame of the facade are designed to take into account the view to the south.

basement Plan + Structure plan Planning of Office Building is maximizing efficiency.


4

2

1

4

3

4

level 5 -level 15 typical floor plan - office room space

0

1. Hall 2. Core 3. Meeting room 4. Office room

Typical Floor Plan

1

2

5

10 (m)


View

View

View

View South

Sunlight

Sunlight

Sunlight


Office inside inside Open all day the facade into the South is dragging the underlying skylight into the office rooms. Office rooms can use the of the affordable light all day when workers is in the building.



06 moving, sharing, changing chaires Pavilion in DDP in Dongdeamoon Design Plaza June 2015 Team Project

Pavilion is located inside the DDP eight roads to meet the large square . In the square it is a place where many people gather several acts taking place . But there was no room to breathe and moderate shade. The pavilion has a role of a sculpture and at the same time the functions of the chair . When people are sometimes used as a chair is not in use and will be exhibited as a sculpture in the square . Appearance of the sculptures are always changing move and react to people. It decided that this is where the pavilion exhibition of the pavilion , but the module is scattered sporadically DDP inside .





Pavilion in DDP Square Constantly changing pavilion that functions as a sculpture and chairs


Rounding Shape

Ground Pattern

Punched Metal

Design for ddp To blend well with the surroundings by using design elements that have ddp Design

Wood Texture Not sensitive to temperature

Varnish Painting Gesso MDF

Flexibility angle

Styroform

Square Timber Supports All Directions

MDF Varnish Painting Gesso

Structure & Texture Applying a safe structural system in various directions in consideration of the usability of the chair. Available in choice of materials and external to safety


Designed by Grasshoper

Production process MDF is fabricated to the desired size using a cnc machine. They are waterproof and painting with varnish. Laying the structure of the chair is fixedly attached inside the joint.


Chair

Table

Bench

Object

Movability

Play Ground

Various usability Glass constituting the spherical shape are connected to each pipe and the spider . Each Spider connects to the wire is fixed to one of the four Spider- glass panels .


Used in events at the plaza

Used in street performances



07 common image association share housing in Mangwal-dong, Hanam-city October 2014

House place where most people spend a lot of time. The role of the home affects their memory as well as their physical protection. People instinctively often conditioned by watching. After the last time are memories in her head of people to enjoy it. Environmental landscape is particularly young children grow older, see, feel important. The image Attempt to identify whether they think about their homes. The housing project is in the words "imagery" which made it to focus. Community of Apartment Housing to inculcate a big role to can have. This joint representation using the housing boom of the subject matter by the water. The site has a lot of water because it is located close to a town where it is closely related.


Housing Number 180,000

180,000

Nowon-gu

110

160,000

Sungdong-gu Gwangjin-gu Sungdong-gu

105

160,000

Ganseo-gu Yongsan-gu

140,000 140,000

100

Mapo-gu Sudeamoon-gu Dobong-gu Jungrang-gu

120,000

95

120,000 Dondeamoon-gu Guro-gu

100,000 100,000

90

80,000

Household Number

80,000

60,000

40,000

Yungdungpo-gu Gwanak-gu

60,000 Gwanak-gu Gangbuk-gu 40,000 Gumchun-gu

Diffusion ratio of house

45 40 35 30 25

four-person

20

two-person one-person three-person

15 10 0 1985

five or more 1990

1995

2000

2005

Geographic Information Increase in one-person households

2010

2015

Diffusion ratio of house

Enpung-gu

85

80

75


Private Space Module

Third Floor Private Spaces

Second Floor Private Spaces

2-3 LevelCommon Space

1,2,3 Level Common Space

Integration

Share House System Residential module consists of six doubles as the home of the one.


SITE

Administrative District

Water Road

Real Width Road

Residential Use Areas

Industrial Use Areas

Commercial Use Areas

Building status

Green Land Use Areas

Subway line

Geographic Information To identify the geographical and administrative features of the surrounding plateau status for the sake of the people and analyse matters


Public Commercial Facilities

Water Walk Way

Park

Coffee shop

Multi-shop

Display Space

+0.2m Plan level 1 - Public + commercial Facilities

0

Site Plan Users of Residential Facilities and Commercial Facilities can stay in that place is always required to by placed the space that is full of water.

1

2

5

10 (m)


1540mm 800mm

Roof The two private ensuite room and living room located on each floor

4th Floor

3rd Floor 1150mm

150mm

2nd Floor

2100mm

Section Detail Perspertive View Borrowed the concept of a share house second floor public space, 3rd, 4th floor are made by wood frame building that is divided into a living space bridge that connects the copper used in each corridor. The first floor is commercial space that can be used by people living in each household to give him space and in the form of floating on the water to the residents of the image imprinted on the water.


Wo o d Fr a m e Sy s t e m Structure

180mm

Balcony

1100mm

Second Living Room

Facade

320mm

1400mm

Living Room

Corridor Bridge

Public Commercial Facilities


A UNIT

B UNIT

Total _405.84m2 Commercial Facilities _ 1st Floor Area : 80.5m2 House Space _2nd Floor Area : 110.2m2 3rd Floor Area : 90.34m2 4th Floor Area : 124.8m2

Total _406.04m2 Commercial Facilities _ 1st Floor Area : 80.5m2 House Space _2nd Floor Area : 109.8m2 3rd Floor Area : 88.54m2 4th Floor Area : 127.2m2

A total of six private room. The first level of Housing has the common room and kitchen.

A total of six private room. The first level of Housing has the common room and kitchen.

UNIT CONFIGURATION The each voids of a home can recognize the whole space to users. The residents of this house can recognize and use not a single room house but like the whole house,.


+11.2m Plan level 4

0

0.5

1

2.5

5 (m)

+7.7m Plan level 3

0

0.5

1

2.5

5 (m)

+4.2m Plan level 2

0

0.5

1

2.5

5 (m)

UNIT CONFIGURATION The plan is similar in Apartment Housing two of the module. The connecting all modules through the horizontal sami -interior of Bridge is a community of citizens.


A

B

C

A - UNIT behavior This is top floor's the view of A unit. This includes each of the private sector and semi- living room on each floor. The living room is placed at the south direction. The voids of each slabs are available for horizontal communication.

D


F

G

H

I

B - UNIT behavior The each voids of a home can recognize the whole space to users. The residents of this house can recognize and use not a single room house but like the whole house,.


sami - interior Bridge The plan is similar in Apartment Housing two of the module. The connecting all modules through the horizontal sami -interior of Bridge is a community of citizens.


The view of facade Configuration of building does not have the first floor's the water space but also have the facade as well as free of a curve that is a feature of the water.

Forcusing on imagery to users The housing project is in the words "imagery" which made it to focus. Community of Apartment Housing to inculcate a big role to can have. This joint representation using the housing boom of the subject matter by the water. The site has a lot of water because it is located close to a town where it is closely related.



08 Infinite Human Chain memorial station in Latvia January 2016 Team Project

Saltic states get independence with nonviolence protest. It showed just how effctive nonviolent protest can be. We want to make Memorial which remind people that moment like a time machine. we want that they can see the moment beyond it. Remembering is thinking from specific part of moment. we set human chain & song of freedom as part. The parallel two mirrors reflect one people infinitely. The water which not stop but flow-ahead make sound. each thing can reflect human chain& song of freedom.


Density

Human Chain

It was not easy for baltic states to make human chain because they had few people than other similar size nations and traffic was not developed well. Including public bus, many cars was too busy to move people. Dispite of military threat of Soviet Union, they finally gather together at appointed time pm 7:00 and sing song of freedom. How much time marched on while all people go back home ? strength which make gradation. With mirror and water, this can be public park at the same time. It has sky-garden on the roof. the exhibition space, souvenir shop, cafe is undder it. people can stop by there befor or after hilight area

Time


Human Chain

Ceremony

Reflection

Water

It was not easy for baltic states to make human chain because they had few people than other similar size nations and traffic was not developed well. Including public bus, many cars was too busy to move people. Dispite of military threat of Soviet Union, they finally gather together at appointed time pm 7:00 and sing song of freedom. How much time marched on while all people go back home ? There was physical and political difficulty on baltic states. Nevertheless, they made proud moment. we decide to contain this effort into memorial. the long axis of site can be time line and middle of it can be hilight point. Long way can be not weakness but strength which make gradation. With mirror and water, this can be public park at the same time. It has sky-garden on the roof. the exhibition space, souvenir shop, cafe is undder it. people can stop by there befor or after hilight area


1. Set Circulation

2. Divide Area

Main experience way, two cross pass

Folded way make dividing area and avoid trees

3. Up & Triangle cut

4. Extrude

Make mirror wall and cut by vertical triangle

Make mass with green roof

5. Make trasition point

6. Water flow

Calculate angle that people see specially through

Water cause interest and make sound when people walk or not

Design Process an abstract soundtrack of the human voice – somewhere in the ambiguous zone between exercise and sexual pleasure will complete this spectacle, whose aim is to shock people into an aware


Inner View

Outside View

Coating Glass

Special glaze

Parallel special glass mirror We choose mirror coated with special glaze. through this mirror, people can see outside at inside but surface reflect the light from outside. when people walk waterside they meet infinite human chain. on the other hand, when they are in cafe they can see the effect on the mirror in which they are. it will give them see the same eexperience with different view.

UNIT CONFIGURATION an abstract soundtrack of the human voice – somewhere in the ambiguous zone between exercise and sexual pleasure will complete this spectacle, whose aim is to shock people into an aware


4.2m 0.0m

Elevation Drawing

Calculated angle Specific event will be offered to change area mood before people go to hilight area. walking throught the bridge, they can see the tree. there is mirror door on the bridge so people can not only go to in but also see the various, anomalous views. At the access point, they can see the bridge, mirror door and waterfall.

Door & Park

Cross pass

Original parking area is will be used. It just be removed at someplace for door

Outside of site is way for cross pass.

18m

20m Pass Area

28m Introduction Area

24m Development Area

25m HighLight Area

20m Development Area

46m Introduction Area

24m Pass Area

UNIT CONFIGURATION an abstract soundtrack of the human voice – somewhere in the ambiguous zone between exercise and sexual pleasure will complete this spectacle, whose aim is to shock people into an aware


Waterfall & Gravels At the highlight area, people walk not on stepping-stones, but gravels. wading across shoal, make sound as their foos step. If they don’t, there is white noise from small waterfall beyong the mirror.

7.4m

3.5m

7.0m

3.2m

2.8m

0.0m

Water circulation The water cleaner and pump which is under the basement care water circulation. roof-garden support to gather rain. water level and distrivution avoid original trees. people should walk on stepping-stones but in the hilight area, they can go on without it because water level is low enough.


09 01_ waffle spinning chair in Dongack-gu September 2015 Team Project in "Urbangraound"

The project was started at the request of the operating ward . The chairs are placed in the park of the local people were employed. This chair is a reinterpretation of the work of Thmoas Heatherwick Studio's top chairs moving in the design of different ways.


Spinning Chair Project Process 1. Design Plan 2. CNC Cutting 3. Assembly 4. Painting and Waterproofing 5. Fixing the joints

Waffle Form Structure V1

V2

V3

V4

V5

V6

V7

V6'

V5'

V4'

V3'

V2' V1'

H1

H2

H3

H4

H5

H6

H7

H6'

H5'

H4'

H3'

H2' H1'


09 02_ Up-cycle Christmas tree in Coex December 2015 Team Project in "Urbangraound"

This project is intended once again to save the value of being abandoned in the city and begin with. We have the function and value, not reuse can be more to the up-cycle of the concept into a "up" thought. In addition a new type of design into an abandoned bicycle wheels made a Christmas tree.


Project Process 1. Collecting abandoned wheels 2. Removing the tire 3. Painting 4. Set up the structure for supporting wheels 5. Fixing the joints 6. Decorating

Abandoned bicycles' wheels

Type1 : Lever 1-3

Type2 : Lever 4-6

Type3 : Lever 7-9

Type4: Lever 10-12

Type5: Lever 13

Composition Method

Broadcast Shootings The broadcasters interested in filming the process activities of our activities.


10

Extra architecture sketch 2012 - 2016


Architectural drawing is a way to contain sudden inspiration. It is one of the architectural records that continuously draws the line and puts the thought. Drawing should be simple and convenient whenever and wherever. The architectural inspiration I have drawn so far and the drawings that express it are gathered here.



Phone : +82. 10. 9649. 7576 E-mail : than_x@naver.com Instargram.com/jungyoura


Phone : +82. 10. 9649. 7576 E-mail : than_x@naver.com Instargram.com/jungyoura


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.