Advanced IBM C4070 622 Certification Exam

Page 1

Vendor

: IBM

Exam Code : C4070-622

Version: Demo

Cheat-Test, help you pass any IT exam!


Cheat-Test.com - The Worldwide Renowned IT Certification Material Provider! The safer, easier way to help you pass any IT Certification exams.

We provide high quality IT Certification exams practice questions and answers (Q&A). Especially Cisco, Microsoft, HP, IBM, Oracle, CompTIA, Adobe, Apple, Citrix, EMC, Isaca, Avaya, SAP and so on. And help you pass an IT Certification exams at the first try.

Cheat-Test product Features: •

Verified Answers Researched by Industry Experts

Questions updated on regular basis

Like actual certification exams our product is in multiple-choice questions (MCQs).

Our questions and answers are backed by our GUARANTEE.

7x24 online customer service: contact@cheat-test.com

Click Here to get more Free Cheat-Test Certification exams!

http://www.Cheat-Test.com


Q: 1 In a GDPS/Active-Active solution using stand-by mode what can be done to verify an IMS application will continue to run at the secondary location? A. Schedule regular fail over tests. B. Keep software maintenance current. C. Schedule regular application stress tests. D. Verify that data is consistent between locations. Answer: A Q: 2 For a financial company, what is a key element that drives a strong Business Resilience plan? A. Avoiding business driven risks and failure to meet IT standards. B. Preparing for audits and compliance with regulatory requirements. C. Preparing for natural disasters, power outages, acts of war, and economic downturns. D. Recovering from virus attacks, data corruption, disk failure, application outages and network problems. Answer: B Q: 3 After discussing a customer’s current Disaster Recovery implementation and a reported procedural error that caused their last test to fail, IBM proposed a GDPS/PPRC based solution. Which of the following are reasons to support this? A. Synchronous replication Parallel sysplex at primary site Automated failover B. Asynchronous replication Single CEO at each site Geographically separated data centers C. Synchronous replication Basic sysplex at each site Manual failover D. Asynchronous replication Parallel sysplex at primary site Automated failover Answer: A Q: 4 A customer has a VSAM application that requires High Availability. An evaluation of the application and environment should discover which base components? A. GRS Ring Coupling Facility Server Time Protocol Application Owning Regions B. Parallel Sysplex Function Shipping Server Time Protocol Record Level Sharing C. GRS Star Parallel Sysplex


Coupling Facility Server Time Protocol Record Level Sharing D. Lock Structures Parallel Sysplex Coupling Facility Cache Structures Server Time Protocol Answer: B Q: 5 A customer is debating which platform to choose to run their new application workload. Which of the following will assist customer to confirm their platform of choice? A. CP3000 study B. Fit for Purpose (FFP) study C. High Availability assessment D. Application design review workshop Answer: B