Syracuse Architecture Spring 2018 ARC 108 Portfolio Junzhi Deng

Page 1

JUNZHI DENG

FOLIO

PORT

SPRING 2018 SYRACUSE ARCHITECTURE ARC 108


THE ANALYSIS OF A CITY AND SYRACUSE ITS ARCHITECTURE THE ANALYSIS OF URBAN BUILDINGS AND THEIR FACADES

1

DESIGNING AN ONONDAGA URBAN BUILDING (FROM OUTSIDE IN AND INSIDE OUT)

racuse in 2007

nesee Turnpike, Seneca Turnpick & Salina & Chenango Turnpick built

2

E


Popula�on

2

300000 250000 200000

150000 OF URBAN ANALYSIS: EX1 TOPIC HISTORY AND FUTURE OF THE CITY OF SYRACUSE 100000

50000

3

0 EX2 ANALYSIS: 1800 URBAN BUILDING 1850 1900

Year: 2007 Population: 138,912 1950

2000

POETRY FOUNDATION ANALYSIS Years EX3.1: Onondaga County Popula�on Syracuse Popula�on PROCESSING PRECEDENT EX3.2: DEVELOPING THE URBAN SURFACE EX3.3: THE INSIDE STRIKES BACK


History of Syracuse 1 GEDDES

Syracuse flourished in the past with the help of new infrastructure such as the Erie Canal and the implementation of the railroad. However, it is the infrastructure that led to its downfall: with I-81 being built, it divided the heart of Syracuse’s Central Business District and led to its decline. Syracuse is still making efforts to revitalize the city. Perhaps by focusing on the central nodes of the city, it may bring back its former glory.

SYRACUSE

The exercise in collaboration with Anna Wu, Ifeoluwa Areugun, and Yang Yang


Highway: I-81, I-690, I-481, I-90 was built 1950 1850 Auburn . Branch Railroad & Syracuse . Utica Railroad was built

astructures Timeline

Erie Canal & Oswego Canal was built 1830 1810 Genesee Turnpike, Seneca Turnpike & Salina & Chenango Turnpike was built


History of Syracuse’s infrastructure

1810 500000 450000

ONONDAGA

400000 LAKE

350000

SALINA

& CHEN

GENESEE

Popula�on

SALINA

GEDDES

GENESEE TURNPIKE

ANGO

TURNP

IKE

E NPIK

TUR

250000 200000

Year: 1810 Population: 25,987

150000

IKE TURNP

CA SENE

ONONDAGA VALLEY

300000

100000 50000 0 1800

SENE

CA T URN

1850

1900

1950

2000

Years

PIKE

Onondaga County Popula�on

Syracuse Popula�on

1830

Syracuse in 1810

Genesee Turnpike, Seneca Turnpike & Salina & Chenango Turnpike was built

500000

ARC 108

O EG SW

O

DOWNTOWN SYRACUSE ANALYSIS: HISTORY : The Rise and Fall of Syracuse 450000 Anna Wu, Ifeoluwa Areogun, Junzhi Deng, Yang Yang

Spring 2018 Shanks

Professor

C

AN

400000

AL

350000

SALINA

SYRACUSE VILLAGE

GEDDES

ERIE CANAL

Popula�on

ERIE CANAL

300000 250000 200000

Year: 1830 Population: 58,973

150000 100000 50000 ONONDAGA VALLEY

0 1800

1850

1900

1950

Years Onondaga County Popula�on

The exercise in collaboration with Anna Wu, Ifeoluwa Areugun, and Yang Yang Syracuse in 1830

Erie Canal & Oswego Canal was built

Syracuse Popula�on

2000


1850 500000 450000 400000

CITY OF SYRACUSE AUBURN . BRANCH RAIILROAD

USE

C SYRA

. UTIC

A

Popula�on

350000 D ROA RAIL

GEDDES

300000 250000

Year: 1850 Population: 85,890

200000 150000 100000

Year: 1850 Population: 22,271

50000 ONONDAGA VALLEY

0 1800

1850

1900

1950

2000

Years Onondaga County Popula�on

Syracuse in 1850

90

Auburn . Branch Railroad & Syracuse . Utica Railroad was built

Syracuse Popula�on

1950

81

500000

ARC 108

DOWNTOWN SYRACUSE ANALYSIS: HISTORY : The Rise and Fall of Syracuse 450000 90 Anna Wu, Ifeoluwa Areogun, Junzhi Deng, Yang Yang 400000

690

481

SYRACUSE

Year: 1950 Population: 341,719

350000

Popula�on

690

Spring 2018 Shanks

Professor

300000 250000 200000 150000 100000

481

50000 0 1800

Year: 1950 Population: 220,583 1850

1900

81 Onondaga County Popula�on

Syracuse in 1950

Highway: I-81, I-690, I-481, I-90 was built

1950

Years Syracuse Popula�on

2000


2007

Population Population Density Density in Syracuse in Syracuse CBD (people per square mile)

500000

Year: 2007 Population: 452,944

450000 400000 350000

Popula�on

300000 250000 200000 150000 100000 50000

Year: 2007 Population: 138,912

0 1800

1850

1900

1950

2000

Syracuse Syracuse CBD

Years Onondaga County Popula�on

Syracuse Popula�on 2014 Population Density in Syracuse

2007

SALINA

ANALYSIS: HISTORY : The Rise and Fall of Syracuse nzhi Deng, Yang Yang

Population Density in Syracuse CBD (people per square mile)

DOWNTOWN SYRACUSE ANALYSIS: HISTORY : The Rise and Fall of Syracuse Anna Wu, Ifeoluwa500000 Areogun, Junzhi Deng, Yang Yang Year: 2007 Spring 2018 Professor Shanks

A

Population: 452,944

450000

ARC 108

400000 350000

GEDDES

SYRACUSE

Popula�on

CUSE

Syracuse’s Present Population

300000 250000 200000 150000 100000 50000 0 1800

Year: 2007 Population: 138,912 1850

1900

1950

2000

Years ONONDAGA

Onondaga County Popula�on

Syracuse Popula�on

2014 Population Density in Syracuse CBD The exercise in collaboration with Anna Wu, Ifeoluwa Areugun, and Yang Yang

Syracuse in 2007

DOWNTOWN SYRACUSE ANALYSIS: HISTORY : The Rise and Fall of Syracuse

ARC

Sp


Future of Syracuse

Perseverance Park Current plan and view of the park; grounds were painted blue and white during an art installation in 2014.

Perseverance Park Current plan and view of the park; grounds were painted blue and white during an art installation in 2014. Perseverance Park Perseverance Park Current plan and view of the park; grounds were painted blue and white during an art installation in 2014. Current plan and view of the park; grounds were painted blue and white during an art installation in 2014.

Perseverance Park Revitilization Plan New design for the park, floor plan and rendering; originally supposed to be buiilt by late 2017, project estimated to be built sometime in 2018. Perseverance Park Revitilization Plan New design for the park, floor plan and rendering; originally supposed to be buiilt by late 2017, project estimated to be built sometime in 2018. Perseverance Park Revitilization Plan Perseverance Park Revitilization Plan New design for the park, floor plan and rendering; originally supposed to be buiilt by late 2017, project estimated to be built sometime in 2018. New design for the park, floor plan and rendering; originally supposed to be buiilt by late 2017, project estimated to be built sometime in 2018.

ARC 108 DOWNTOWN SYRACUSE ANALYSIS: HISTORY : The Present and Future of Syracuse Spring 2018 ARC 108 Professor Shanks DOWNTOWN ANALYSIS: HISTORY : The AnnaSYRACUSE Wu, Ifeoluwa Areogun, Junzhi Deng, Yang YangPresent and Future of Syracuse Spring 2018 ARC 108 DOWNTOWN : The Present and Future of SyracuseProfessor Shanks Anna Wu, Ifeoluwa Areogun,SYRACUSE Junzhi Deng,ANALYSIS: Yang Yang HISTORY ARC 108 DOWNTOWN SYRACUSE ANALYSIS: HISTORY : The Present and Future of Syracuse Spring 2018 Spring 2018 Professor Shanks Anna Wu, Ifeoluwa Areogun, Junzhi Deng, Yang Yang Professor Shanks Anna Wu, Ifeoluwa Areogun, Junzhi Deng, Yang Yang

Future Timeline Key dates for the future.


2 ------ Poetry Foundation

BUILDING ANALYSIS

John Ronan 2011 Chicago, IL

As described by John Ronan, the Poetry Foundation “is conceived as a series of layers that visitors move through and between. Layers of zinc, glass, and wood peel back like pages of a book to define various programmatic zones.” Therefore, based on the architect’s statement and our further exploration, different layers of façade define different privacy zones. However, the zones are defined not only by each material’s characteristic but also are defined by the structures, feelings, and functions of the respective materials.

The exercise in collaboration with Wentao Liu


Context Analysis

W Superior

Pharmacy

Pharmacy

N Dearborn St

SPA JewelSelling SPA Poetry Foundation

JewelSelling

Resident Building Business Building

Poetry Foundation

Retail Store

Poetry Foundation

Resident Building

Resident Building

Business Building

Business Building

Retail Store

Retail Store


m

Program and Circulation Analysis a

b

b

c

c

d

d a

aa

bb

Conference

Confe

Others

Othe

dd

Gallary/Profoming/Reseption Galla

a

cc

b

b

a

c

c

d

d b

aa

aa

a

b

c

c

d

d a

Reading/Library

Read

Listening/Isolation/Work

Listen

Mechanical/Electrical/StorageMech Others

Othe

Garden

Gard

bb

bb

ARC 108 dd

Spring 2018 Professor Shanks dd

cc

cc

THE POETRYJohn FOUNDATION, John Ronan Architect: Program THE POETRY FOUNDATION, Ronan Architect: Program Junzhi Junzhi Deng, Wentao Liu Deng, Wentao Liu

The exercise in collaboration with Wentao Liu


Garden Garden

ce

Activite Activite Space Space

ARC 108 hitect: Circulation

Spring 2018

Professor Shanks

ARC 108 THETHE POETRY FOUNDATION, JohnJohn Ronan Architect: Circula POETRY FOUNDATION, Ronan Architect: Cir Spring 2018 Professor Shanks Liu JunzhiJunzhi Deng,Deng, Wentao Wentao Liu


Materiality Layers and Structure Analysis

THE POETRY FOUNDATION, John Ronan Architect: Building’s Structure Junzhi Deng, Wentao Liu

Wood

Wood

Glass

Glass

Zinc

Zinc

The exercise in collaboration with Wentao Liu

THE POETRY FOUNDATION, John Ronan Architect: Building’s Structure


Wood Wood

Glass

Glass

Zinc

Zinc

ARC 108

ATION, John Ronan Architect: Material Language ARC 108

Spring 2018

Professor Shanks

Spring 2018

Professor Shanks

Wood Glass Zinc THE POETRY FOUNDATION, John Ronan Architect: Building’s Structure Junzhi Deng, Wentao Liu

ARC 108

Spring 2018

Professor Shanks

THE POETRY FOUNDATION, John Ronan Architect Junzhi Deng, Wentao Liu

ARC 108

Spring 2018

Professor Shanks

THE POETRY FOUNDATION, John Ronan Architect: Building’s Structure

ARC 108

Spring 2018


Materiality Layers and Structure Analysis

The exercise in collaboration with Wentao Liu


Relationship Between Light and Transparency of Materials


Privacy Analysis

Wood Glass Zinc The exercise in collaboration with Wentao Liu


e

Public

Public

Public Private Public Private Half Public and Privete Private Half Public and Privete

Private Half Public and Privete

Half Public and Privete

ARC 108

THE POETRY FOUNDATION, Spring 2018 John Ronan Architect: Public & Private


3 ------ Slash

BUILDING DESIGN This building uses different zones to define public, semi-public, and private spaces in two directions: horizontally (the screen, building, and backyard), and vertically (glass box, stair room, archive). It also creates an angle that reflects S. Warren St. To emphasis the angle and the view, the interior of the building uses columns, and the interior and exterior wall’s shapes indicate the view to the courtyard.


Facade Study ------ Learning from Poetry Foundation and Syracuse’s Urban Form

Private Half & Half Public


Front Facade Study 1

-----Wall Sections and Plans

Back Facade Study 1

-----Wall Sections and Plans

S Warren St


Front Facade Study 2 ------ Wall Plans

Front Facade Study 2 ------ Wall Sections

Private Half & Half Public 1’ = 1/4’’

1’ = 1/4’’


Elevation Front

Front Facade Elevation Final

Elevation Front

Back Facade Elevation Final

Elevation Back


Elevation Back

Final Sections and Plans

5th Floor Plan

Section A

4th Floor Plan

3rd Floor Plan

Section B

1st Floor Plan


Program and Circulation Diagram Reading/Meeting Office Books Maps/ Rare Books/ Scanner Lecture Hall Exhibition/Lobby/Reseption Class/Meeting Room Cafe Shop Stairs Bathroom/Elevator/EmergencyStairs Screen Basic Circulation


3D Render


Model ------ Front View


Model ------ Detail Views


Model ------ Side View


Model ------ Detail Views


Model ------ Back View


Model ------ Detail Views



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.