PORTFOLIO JUAN SEBASTIÁN RANGEL MEJÍA
tHE pHRaSE Arquitectura es cosa de arte, un fenómeno de emociones, que queda fuera y más allá de las cuestiones constructivas. El propósito de la construcción es mantener las cosas juntas y el de la arquitectura es deleitarnos. Le Corbusier Architecture it's an art thing, a phenomenon of emotion, which remains outside and issues beyond construction. The purpose of the construction is to keep things together and architecture's is to delight us. Le Corbusier L'architecture est une chose d'art, un phénomène de l'émotion, qui est à l'extérieur et questions au-delà de la construction. Le but de la construction est de garder les choses ensemble et l'architecture est un plaisir. Le Corbusier
.00
EdUCAtION
January 2007- December 2011
Pontificia Universidad Javeriana - Bogotá Facultad de Arquitectura y Diseño (Pontificia Universidad Javeriana - Bogotá Faculty of Architecture and Design )
August 1994 - June 2006
Skills Human
Technology Hand Drafting Sketching Communication Teamwork Craftmanship
Contact Info email: juserame@gmail.com / rangelj@javeriana.edu.co phone: (057)-(1)-703-6956 mobile: (057)-318-237-9736
Colegio San Juan Berchmans - Santiago de Cali (St. Juan Berchmans School)
AutoCad (2007 to 2012 ) Sketch Up Adobe PhotoShop CS3 Adobe Illustrator CS3 Corel DRAW X4 Microstation V8 Autodesk 3DMax (8 to 2010) Microsoft Word Microsoft Power Point Microsoft Excel
Open minded, intelligent, sociable, applied, responsible and idealistic, I consider myself as a person who proposes a different way of seeing the world change for the better and collaborate with its development. Coming from a family where the values are guaranteed, I intend to make them known to the world and make the best with them. I am interested in big architecture, I like working in big spaces and create big proportion things. Technology, progress and projections, characterize my wishes and empathy in my field.
.00
CONTENTS
biogrhaphy
Academic Works Digital Expresion p.02 p.05
Popular Housing
p.09
Urban Facilities
p.17
Architecture, Mobility and Public Space
Undergraduate Work / Thesis p.27 personal Works p.19
Ice Cream Shop
p.21
Multi-Family Housing
p.23
Heritage Building
.00
Digital Expresion
PROJECT: The Cristal House Location: Sao Paulo - Brazil Architect: Lina BoBardi
Daring to represent the idea of another.
Planimetry
3D
C
The Digital Expresion is one of the ways to represent an architectural proyect, being able to use different rendenring engines helps the student and the professional to express details that in 2D are difficult to represent. mmmmmmmm The Cristal House was part of the first fully analized proyects in college that showed me the simplicity and the complex of an architectural composition.
D
C
D
10
15
16
5
6
9 7
B
B
B
15
3
10
4 7
11 8
A
A
2
1
2
D
5
C
N 0
10 m
7
13
FLOOR PLANTS - LEVEL 2
FLOOR PLANTS - LEVEL 1
0
A
12
1
17
C
14
1
2
D
5
N
10 m
LEGEND 1. Entry 2. Library 3. Living Room 4. Clothes Yard 5. Living Room 6. Hall 7. Room 8. Closet 9. Kitchen 10. Service Room 11. Service Living Room 12. Dressing Room 13. Balcony 14. Yard 15. Deposit 16. Machine Room 17. Garage
NORTHEAST FACADE
0
1
2
5
SOUTHEAST FACADE
10 m
0
.01
1
2
5
10 m
.02
3D
PROJECT: The Cristal House kkkk Location: Sao Paulo - Brazil kkkkk Architect: Lina BoBardi kkkkkkkkk
The house was designed with a minimum of protection to take full advantage of the incredible view of the landscape that can be seen towards the kkkkkkkkkkkkkkkkkk city. At the same time that the house shelters its occupants properly against outdoors, users can live in close contact with nature and enjoy the sunrise and sunsets from inside the house.
.03
Digital Expresion
3D
Daring to represent the idea of another.
.04
the initial Pulse for social work
Urban Localization
Working with the topography and a social problematic, overcrowding, as the main design parameters, the New Bolonia Urbanization is planned to supply the basic needs of the Bolonia zone, one of the poorest areas in Bogotรก. kkkkkkkkkkkkkkkkkkkkkkkkkk
N+2.20
N 0.00
N-0.60
N 0.00
Section B-1
1m
2m
3m
4m
N-0.60 Escala Grรกfica
Section A-2
1m
Corte A-2
2m
3m
4m
Escala Grรกfica
N+2.80
N+2.20
N 0.00
N-0.60
Section A-2 1m
2m
3m
Escala Grรกfica
4m
Corte A-1
Level 1
Right Facade
Left Facade
Perspectives
Proposing as an economic alternative of earnings, urban agriculture, and a cheap mixed building system, Dura Panel and Lightweight Masonry, this popular housing project represents a great solution for people in the area and an excellent proposal for the architectural requirements of the course.
Floor Plants type a Houses
N+2.80
Volumetries
Popular Housing .05
PROJECT: New Bolonia Urbanization Location: Bolonia, Usme, Bogota DC.kk Architects: Juan Sebastiรกn Rangel and Katherine Mora kkkkkkkkkkkkkk
Level 2
Roof Level
.06
the initial Pulse for social work
Urban Proposal
PENDIENTE DE LOSA INCLINADA 15 %
PENDIENTE DE LOSA INCLINADA 15 % 2.60
1.70 1.20
0.90 2.83
2.60
0.90
The environmental system recovery through ecological corridors to connect main roads with Entrenubes Park in East-West direction, as well walks and bike paths that connect and passing through the area from north to south is the main objective of the proposal to generate a mesh suitable for mobility p e d e s t r i a n , c yc l i s t a n d ve h i c l e .
0.50
1.20
5.72
0.90
2.10 2.77
2.63
1.09
3m
1.82
0.90
2.00
1.60
0.70
0.70
0.90
0.90
2.10 2.77
8.47 8.00
0.70
0.70
1.82
0.90
0.90
2.00
0.90 1.60
C D E 2m
0.90
0.15
H
8.00
1m
2.60
1.12
8.47
B
5.81
0.50
1.20
07 06 05 04 03 02 01
1.51
07 06 05 04 03 02 01
2.60
15 14 13 12 11 10 09 08
0.90
15 14 13 12 11 10 09 08
5.81
H
E D C
B
J
Section AB
4m
Escala Gráfica
LOSA INCLINADA CUBIERTA CON TEJA DE BARRO RECOCIDO 0.15 0.10
LOSA INCLINADA CUBIERTA CON TEJA DE BARRO RECOCIDO
0.10 0.50
0.15 0.10
0.10
0.50
2.60 1.90
2.60 1.90
0.20
5.55 0.10
0.10
14 13 12
0.20
11
N+ 1.44 N+ 1.26
06
5.55 0.10
13
09 2.60
0.10
14
10
2.60
12
08
11
07
10 09
05
08
04
07
03
N+ 1.44 N+ 1.26
02
2.60
06
2.60
05
01
04 03 02 01 0.25
2.43
2.43
1.00 6.00
2.43
URBAN PROGRAM AREAS AREA (m2)
Growing Area
Urban Culture Public
Equipamiento de Bienestar Social
Training - Storage
Linear Park
Entertainment Public
1
4.300
Multiple Fields
Sports - Public
2
330 (each one)
Gym
Sports - Public
1
600
1
2.400
Entertainment - Public For children under 13
Reading Zone
Education
4
Resting Zone Type "A" Houses
Relaxation - Public Housing
3 72
Type "B" Houses
Housing
60
1
TOTAL AREA OF THE PROJECT (m2)
1.000
3 5
Space for the gardening managed by the inhabitants of Bolonia, and the Ubanization New Bolonia.
Training Zone: 80 Storage Equipment for the training of the people of Bolonia and New Zone: 50 Complete Bolonia Urbanization on the use of plantations; has a storage Construction: 960
3 1m
area of the output of the crop.
Kids Games
2.43
1.00 6.00
CHARACTERISTICS
2
2m
3m
2 4m
1
Level 1
Section CD
CANAL DE DESAGUE HIERROS DE REFUERZO D=1cm
Escala Gráfica
Linear park with presented for the residents of the Urbanization and from the neighborhood in general. Spaces for the sport practicing. Volleball, basketball and soccer can be played on them. Space located in the linear park for the training of the New Bolonia Urbanization's people and Bolonia neighborhood Space designated for the children in the sector.
180 Spaces dedicated to reading and relaxation, are located along the linear park. 141 Public spaces for resting and relaxation. Each one: 72 Popular Housing. In total (144): Each one: 60 Popular Housing. In total (14): 840
33.220,20
2.00
1.00 PRIMERA CAPA DE MORTERO
0.04
CAPA CONCRETO
0.10 0.35
SEGUNDA CAPA DE MORTERO
HIERROS DE REFUERZO D=1cm
0.15 VIGA - DINTEL Hierros D=1'
1.16
0.02
PESTAÑA DESAGUE Pen=20°
MALLA ELECTROSOLDADA
0.90 NÚCLEO ONDULADO DE POLIESTILENO
0.05
0.50 0.20
REGISTRO SANITARIO
REGISTRO SANITARIO
TUBERIA con 2% de pendiente
Back Facade
Left Facade
Roof Level
Level 2
PENDIENTE DE LOSA INCLINADA 15 %
0.10
0.15
PLACA DE CONCRETO SIMPLE F´C = 100 KG / CM2
Volumetries
USE
1
Perspectives
PLACE
QUANTITY IN PROJECT 1
Section Through Facade Detail
The proposal is given from an axis primary and dominant natural of the Planning Unit Zonal (UPZ) Gran Yomasa which is the Quebrada Santa Librada, and which in this case also takes Quebrada Bologna, generating connection between individual proposals and generating a large space that allows eco-tourism to this location.
LOSA DE CIMENTACION DE 10 CMS DE ESPESOR Contratrabe de losa de cimentacion de 20 x 25 cms.
.07
Floor Plants type b Houses
0.91
1.70 0.91
Sections
Popular Housing
PROJECT: New Bolonia Urbanization Location: Bolonia, Usme, Bogota DC.kk Architects: Juan Sebastián Rangel and Katherine Mora kkkkkkkkkkkkkk
PLACA DE CONCRETO SIMPLE F´C = 100 KG / CM2
.08
Urban Facilities
Solar Study
.09
PROJECT: Technical School with Emphasis on Industrial Production of Wood kkkkkkkkkk Location: Centro Suba, Suba, Bogota DC.kk Architects: Juan Sebastiรกn Rangel
Complexity of the simplicity
3dS
Ground Floor Plan
Located in a popular area in the west of Bogotรก, the school tries to help young people to get an appropriate academic formation and creates new alternatives of generating some earnings for their own and, with the colaboration of the district, be able to create their own work based on the wood's manufacture and wood's industrial treatment and production. The design of the school is focused on the prominent topography of the area and in a simple combination of the basic geometrical forms used in architechture; the addition and subtraction of volumes taking notice of the principal axes and tensions of the proper ty and it's boundaries are the design paremeters used on this project. kkkkkkkkkkkkkkkkkkk
Dec 21st 8h
Dec 21st 12h
Dec 21st 16h
Jun 21st 8h
Jun 21st 12h
Jun 21st 16h
Mar 21st 8h
Mar 21st 12h
Jun 21st 16h
Sep 21st 8h
Sep 21st 12h
Sep 21st 16h
.10
Urban Facilities
Complexity of the simplicity
Urban INTERVENTION
West Facade
1m
2m
3m
Technical School with Emphasis on Industrial Production of Wood
4m Escala Gráfica
Fachadas Occidentales Colegio Técnico con Énfasis en Producción Industrial de Madera (Edificios Talleres y Salones) Esc: 1.100 1m
2m
3m
4m Escala Gráfica
The view and the properties of the location made this project an excellent proposal for the public space treatment (it's proposes a circuit of parks and public squares) and a razonal work with the land making it an economic solution for the education and public equipment problem in the area. The Urban Proposal it's based on the reduction of the social, economic, movility and ambiental problematics that affects the population of the zone. The urban equipments aren't enought for the needs of the people in Suba, including education equipments; one of the biggest shortcomings. kkkkkkkkkkkkkkkkk
Urban Problematics
.11
PROJECT: Technical School with Emphasis on Industrial Production of Wood kkkkkkkkkk Location: Centro Suba, Suba, Bogota DC.kk Architects: Juan Sebastián Rangel
SCN
SCN
SCN
N
East Facade
Project Location
Local and Zonal Analysis SOLARAFECTATION EFFECT SOLAR
LAND USES
Fachada Oriental Edif. Talleres y Laboratorios Esc: 1.100 1m
2m
3m
Technical School with Emphasis on Industrial Production of Wood Ángulos Solares - Altura Diciembre
Junio Altura
4m Escala Gráfica
SOCIAL AND ECONOMIC PROBLEMS
2pm=56
90°
4pm=31
10am=56 8am=31
0°
0°
Septiembre-Marzo 2
Septiembre-Marzo 1 Altura
Altura 90°
0°
HOUSING IN AREAS OF HIGH RISK OF MASS REMOVAL
WIND'S DIRECTION
PUBLIC SPACES
GREEN SYSTEM
VIAL MESH
90°
0°
0°
0°
BLOCK'S FORMS
Section A-A Section of the zone of the Street 150A from the Cali City Avenue to the highest point of the Cerros de Suba INVASION OF PROTECTED AREAS
DEFICIT AND PUBLIC SPACE INVASION
CONCENTRATION OF LOCAL FACILITIES
.12
.13
PROJECT: Technical School with Emphasis on Industrial Production of Wood kkkkkkkkkk Location: Centro Suba, Suba, Bogota DC.kk Architects: Juan Sebastiรกn Rangel
Section a-1
Complexity of the simplicity
Plans
2nd Level - Classrooms and Administration Building
The Plans are distribuited in the best way according to the topography and the conditions of the lote. The Administration and Workshops Building (developed in 4 upper floor plans) is localited so that it can take the most out of daylight and natural ve n t i l a t i o n t h a t t h e s e c t o r o f f e r s .
3rd Level - Classrooms and Administration Building
The Lower Floor of the Classroom Building, is distributed so that is a light volume that "fits" in the field, it exploits the visuals that the location has and deals with the field's form presenting an economic solution in saving work and reducing the waste on the excavations for this building. kkkkkkkkkkkkkkkkk
4th Level - Classrooms and Administration Building
2nd Level - Workshops and Laboratories Building
3rd Level - Workshops and Laboratories Building
4th Level - Workshops and Laboratories Building
Roof - Workshops and Laboratories Building (Rotated)
Urban Facilities
Section c-1
.14
Complexity of the simplicity
Details - Sections Detail Sanding Workshop 1m
2m
3m
0,12 0,03
4m
0,4
0,07
Armadura Muro
Armadura Muro NO Portante
Escala Gráfica
Corte A-1 Esc: 1.150 1m
2m
3m
Section a-1
4m Escala Gráfica
Loza Maciza 0,01
0,3
0,4
3: Sanding
Area (45m 2)
Material elástico de 5 mm de espesor entre placas de hormigón para evitar roces y desprendimientos.
0,08
Workshop
Viga
Armadura Losa Maciza
Cuña de Cambio de Dirección
Vacío Techo Falso Instalaciones
0,06
The level of detail required for the project included the design of spaces to understand the direct relations with the use of the space and the relation between the user and the space. kkkkkkkkkkkkkkkkkkkkkkkkkk
45°
Terreno
4,44
Steel Structure Window Tied To The Wall
Extractor de Aire
4,31
2,12
Cristal - 4mm
Tied Window Frames
Armadura Muro de Contención
Ducto Ventilación
Horizontal Siding AluZinc Panel
Armadura Muro
Aluminum Rails Sliding Window
0,04
Enchape Muro (1mm)
0,3
Esco Esp pleadora igad ora
Concrete Column 0.4m X 0.4m
0,3
Understand the construction of the project was another objective of the course. Sections and details worked together to analyze the building from a very detailed scale.
Disk S Belt ander San d Port able er San ders
Tongue and Groove System (Panel Link)
Cuña de Cambio de Dirección
Facade Detail Section Cutting - Section D-1 Retaining Wall 1m
2m
3m
4m Escala Gráfica
Concrete Tile with Expansion Joint of 1.5cm.
Corte C-1 Esc: 1.150 1m
2m
3m
Section c-1
4m
C ep il Reg ladora rues ador a
Escala Gráfica
0,2
Urban Facilities
PROJECT: Technical School with Emphasis on Industrial Production of Wood kkkkkkkkkk Location: Centro Suba, Suba, Bogota DC.kk A rc h i te ct s : Ju a n Se ba s t i á n R a n g e l
Tup í
0,4
Reinforced Concrete Wall 20cm and 1cm Thick Veneer
Metal with Glass Sliding Door
4
Save Brooms (1cm from the plating of the wall)
Metal with Glass Sliding Door
0,4
.15
.16
PROJECT: Outdoors Teatre kkkkkkkkkkkkkkk Location: Fusagasugรก, Cundinamarca, Col. Architects: Juan Sebastiรกn Rangel,
Model
Corte A-1
fLOOR pLAN - lEVEL 1
Planta Bรกsica General - Primer Piso
In this case, the course was about working with the expression of different spaces and situations. Digital skills where proved here and the level of graphic expression too.
23
15
22
14
21
20 13 19
18 12 17
16 11 15
10
14 7 12
13 6 12
11 5 10
9
4
8
7
3
6
4
5
3
2
1
2
3
1
2
4
5
7
6
1
The Outdoor Teatre located in the foot of a mountain, was an example where different exact type of lines (layers) were applied for the 2D model's expression, then, a hand-made model was done using different types of boards, following a line of "sobriety" in this manual three-dimensional expression excercise.
8
9
10
11
12
13
7 8 9 12 13 12 14 15 16 17 18 19 20 21
4
3
2
5 6 11
1
9
10
Architecture, Mobility and Public Space
Natalia Pedraza, Silvia Cerรณn, Jose M. Arango.
The Basis of Expression
22 23
.17
.18
Multi-Family Housing Solutions
PROJECT: Pottes - Daza - Mejía House kkkkkkkkkkkkkkkkkkkkkkk Location: San Fernando, kkkkkkkk Cali, Colombia. kkkkkkkkkkkkkkkk Architect: Juan Sebastián Rangel.
Floor Plans
Second Level (Modificated) / Without Modifications Third Level (Modificated) / Without Modifications Fourth Level (Modificated) / Without Modifications 3,28
0,88
0,98
1,03
2,5 2
2
Bestier H.P. 1,5
3,28
1,35
0,8
1,35
0,8
0,8
0,7
0,7
Oratorio 15 14 13 12 11 10 9
0,93
5
8
2,43
8
2,13
2,13
2,43
5,35
Sala
1,35
5,35
5,35
Sala
0,7
Habitación Principal
0,95
5
4,65
0,93
Habitación Principal
0,95
5
6,14
15 14 13 12 11 10 9
0,7
0,7 0,7
3,93
2,43
3,73
2,95
Balcón Habitación Principal
Ducto de Ventilación
2,59 0,7 0,7
1,78
2 0,8
0,98
1,78
Habitación Principal
3,28
W.C.
1,51
1,51
1,51
1,98
1,98
1,98
Comedor
1
0,8
0,93
5,28
Cuarto de Ropas
Bestier H.P.
1 2 3 4 5 6 7
Balcón Habitación Principal
1,85
1,5
3,28
0,8
Balcón Sala
Balcón Sala
1,2
W.C.
1,78
N
Habitación Servicios
2,5
Comedor 1 1,85
Bestier H.P.
Sala
Balcón Habitación Principal
8
Estudio
1,28
1,35
0,95
Habitación Principal Sala
Cuarto de Ropas
W.C.
1,5
3,28
1 Oratorio 15 2 14 3 13 4 12 5 11 6 10 7 9
1,8 Closet
W.C. Servicios
0,75
Oratorio
2,5
Comedor
0,88
0,8 Balcón Sala
1,2
W.C.
Bestier H.P.
1,88
Habitación Servicios
1,28
1
Comedor
1,9
1,91
Habitación Principal
Ducto de Ventilación
Cuarto de Ropas
1,28
1,85
1,28
8
Estudio
0,75
Balcón Habitación Principal
3,45
0,75
Oratorio
1,03
Ducto de Ventilación
1,03
Ducto de Ventilación
3,45
Balcón Sala
1,2
Cuarto de Ropas
Sala
Estudio
Habitación Servicios
Estudio Habitación Servicios
4,78
2,2
15 14 13 12 11 10 9
Habitación 3
0,7
0,98
0,88
1 2 3 4 5 6 7
1,8 Closet
W.C. Servicios
3,28
1,85
Bestier H.P.
Sala
Two independent appartments are located on the first level, on the second level, an appartment for a retired person and in the third level an appartment for a couple with one kid. k
Closet 1,8 W.C.
1,9
0,7
0,7
Habitación Principal
Closet W.C. Servicios
Habitación 2
Cuarto de Ropas Comedor
1,91
1,8
W.C. Servicios
Oratorio
2,59
2,59 0,7
4,78
2,2
1,28
Estudio Habitación Servicios
Habitación 3
0,8
0,98
Closet
3,28
1,85
Bestier H.P.
0,8
0,98
W.C.
1,9
1,91
0,88
Closet 1,8 Comedor
Ducto de Ventilación
W.C. Servicios
Habitación 2
Cuarto de Ropas
Habitación 3
Habitación 3
Closet
Closet
0,7
4,78
Oratorio
0,7
1,85
2,2
3,28 1,28
Estudio Habitación Servicios
Habitación 2
3,28
Habitación 3
2,59
Ducto de Ventilación
2,59 0,7
1,8
0,98
0,88
Closet
0,88
2,59
W.C. Servicios
Balcón Trasero
Balcón 1,85 Trasero
Closet
Closet
Habitación 2
1
Habitación 2
3,28
0,85
1,85
1
2,15
Balcón Trasero
Balcón 1,85 Trasero
Habitación 3
2,95
.19
3,28
0,85
Habitación 2
3,28
Closet
The project consist in the remodelation of an existing house and the modification of interior spaces for 2 families so they were able to live in the existing s t r u c t u re b u t w i t h a d i f fe re n t distribution on each floor, according to the wishes of each family. kkkkkkkkkk
6,14
Housing
1,85
1,85
1,85
2,15
3,28
3,45
/ Without Modifications
6,14
First Level (Modificated)
1,35
Balcón Sala
5,28
Balcón Habitación Principal
3,28
Balcón Sala
5,28
Balcón Habitación Principal
3,28
.20
The taste of the Simple Design
Model
fLOOR pLANs and Elevations
ROOF PLAN 3
FLOOR PLAN 2m
0,9
2
As one of the individual works done during my college studies, a small shop is the idea to be represented. The location it's quite small, the budget is not too big and the time was the biggest constraint . kkkkkkkkkkkkkkkkkkkk
0,1
Escala Grรกfica
0,8
2,3
LOW WALL. Height Above Ground = 0.9m
0,1
0,7
0,1
0,1
Service Desk Height From Floor: 0.9m
3,7
0,3
0,64
0,78
Service Desk Height From Floor: 0.9m
0,3
0,3
0,3
Service Desk - Cupboard Height From Floor: = 0.9m
2,3
0,9
0,35
0,6
0,62
LOW WALL. Height Above Ground = 0.9m
0,9
0,5
FRONT ELEVATION 1,4
LEFT ELEVATION 3
3,7
2,3
2,3
Price List 0.6m X 0.5m
0,9
Ad Space - Point of Sale Logo 1.9m X 0.4m
0,4
Ad Space - Point of Sale Logo 1.9m X 0.4m
0,6
0,6
Price List 0.6m X 0.5m
.21
2,8 2,3
2,05
0,9
0,9
2,3
2,8
Using light weight materials and a simple distribution, the 2-Cold Ice-Cream Shop represents the productivity of simplicity and development effectively and efficiently for a rapid implementation project.
4m
3m
0,4
1m
LOW WALL. Height Above Ground = 0.9m
Ice-Cream Shop
PROJECT: 2-Cold Ice-Cream Shopkkkkkkkkkk Location: El Bosque University, Bogotรก.kkkkk Architects: Juan Sebastiรกn Rangel. kkkkkkkk
.22
Heritage Building
Historical Digital Expression
PROJECT: Facades and Sections of San Francisco Palace kkkkkkkkkkkkkkkkkkkkkkkk Location: Jimenez Avenue, Down-Town Bogotรก. Architect: Juan Sebastiรกn Rangel kkkkkkkkkkk.
Sections & Facades
In this case, the project was about the digitalization of the facades and a few sections of the San Francisco Palace, an important heritage building in Bogota's historical down-town. kkkkkkkkkkkkkkkkkkkkkkkkkkkkk The client is asking for full detail drawings and a very specific level of expression, by this, this building will be analyzed for future studies and investigations. kkkkkkkkkkkkkkkkkkkkkkkkkkkk
Section 2B - San Francisco Palace A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
1 2 3 4
5
6
Detail 1C - Principal Acces - San Francisco Palace
7
8
9
.23
Left Facade - San Francisco Palace
.24
Heritage Building
PROJECT: Facades and Sections of San Francisco Palace kkkkkkkkkkkkkkkkkkkkkkkk Location: Jimenez Avenue, Down-Town Bogotรก. Architect: Juan Sebastiรกn Rangel kkkkkkkkkkk.
Historical Digital Expression
Facades
Main Facade - San Francisco Palace
The Convent - Palace covered two city blocks and had three two-story cloisters. The cloisters, however, disappeared when built in its place the Estate Hall. Finally, in recent years the church was stripped of its white exterior and their covers were altered to the point that the only original temple historical documents that survive are the main facade, tower and chancel. kkkkkkkkkkkkkkkkkkkkkkkkkkkk
1m
2m
3m
4m Escala Grรกfica
.25
.26
Location: Nuqui City. Tribugá Cove. Chocókkkkk Architect: Juan Sebastián Rangel Mejiakkkkk The current situatiion of transport infrastructure in the country, along with the centralization of air transport, are an obstacle to regional development in Colombia.kkkkkkkkkkkkkkkkkkkkkkkkkkkk
Letting the knowledge... Fly
GROUND FLOOR PLAN
Nuquí's Inventory and Diagnosis
URBAN INTERVENTION
Aerial Views of Nuquí and The Tribugá Cove
Population Beneficted wiht The Project
Road Infraestructure
Air Infraestructure
The Intermodal Port works with 3 different main infraestrcutres: kkkkkkkkk - Air Infraestrcuture kkkkkkkkkkkkkkkkk - Land Infraestructure kkkkkkkkkkkkkkk - Port Infraestructure kkkkkkkkkkkkkkkk
Railway Infraestructure
The Urban Intervention seeks to connect the Nuqui City with the Intermodal Port creating a new highway that let transport all cargo and port elements that go to the rest of the country by road. kkkkkkkkkkkk
Transport Infraestructure: Current Situation in Colombia Port Infraestructure
The intermodal Port, seeks to locate Colombian Pacific Region where the world economy and globalization are demanding. kkkkkkkkkkkkkkkkkk
Location
Thesis Undergraduate Work / .27
PROJECT: Intermodal Terminal Tribuga Cove. kkk Nuqui Bay. Choco. kkkkkkkkkkkkkkkkkkkkkkkkkk (Terminal Intermodal Ensenada de Tribugá)kkkkkkkkkkkkkkkkkkkk kkk
.28
Thesis Undergraduate Work / .29
Letting the knowledge... Fly
PROJECT: Intermodal Terminal Tribuga Cove. kkk Nuqui Bay. Choco. kkkkkkkkkkkkkkkkkkkkkkkkkk (Terminal Intermodal Ensenada de Tribugá)kkkkkkkkkkkkkkkkkkkk kkk
FLOOR PLANs
Location: Nuqui City. Tribugá Cove. Chocókkkkk Architect: Juan Sebastián Rangel Mejiakkkkk The main objetctive of the proyect is to locate Colombia and it´s pacific coast as a Area Chart: regional development center allowing to complement the economic activities in the area and exploiting the potential of the region that has not been tapped yet
PLANTA PRIMER PISO EDIFICIO ADMINISTRATIVO ESPACIO ÁREA m2 Nivel Plataforma 1500 (estacionamientos) Planta Primer Piso
Servicios Empleados Servicios de AeroCivil Admon Aeroportuaria Servicios de Pista Circulaciones Servicios Metereológicos Torre de Ascensores
Talking about the interior distribution of the airport, the arrangement of the plans is defined by the fluid movement of passengers within the terminal. Corridors are free of obstacles and have interior gardens that allows a visual link between the outdoor´s tropical enviroment and the dynamics inside the airport. kkkkkkkkkkkkkkkkkkkkkkkkkkk k k k k k k k k k k k k k k k k k k k k kkkkkkkkkkkkkkkkkkkkkkkkkk
Planta Fuste (Control Tráfico Aéreo) Planta Descanso Planta Equipos Planta Cubierta (Terraza) TOTAL:
1st Level: Main Hall, Counters, International and Domestic Departures, Departure Gates.
Áreas Comerciales Punto Fijo Counters
376
8300 330
7910
Restaurante
1000
Locales Comerciales Baños
2000
Control Aduana Control Policial Circulaciones
Muelle Internacional Restaurante Locales Comerciales Baños Control Aduana Control Pasaportes Control Policial
TOTAL:
Punto Fijo Oficinas Aerolíneas Almacenamiento y Distribución de Equipaje Circulaciones Baños
Muelle Nacional
Circulaciones
Muelle Internacional Puestos Control Inmigración Baños Locales Comerciales Circulaciones
TOTAL:
Punto Fijo Locales Comerciales Restaurante Circulaciones
7200
5890
Servicios Alimentarios Locales Comerciales Baños
1200 290 100 4300
6070
Baños
Hotel
23902
1300 2200 80 200 300 200 4200
27904
300 500 500 3700 145
3049 Habitaciones Restaurante Baños Admon Hotel Lavandería Circulaciones
TOTAL:
330 100 440 5200
80 165 165 4500
8480
EDIFICIO TERMINAL PASAJEROS ESPACIO ÁREA m2 Hall Principal 5145
300 600
3500 342
300 700 1284
Circulaciones Baños
Circulaciones
EDIFICIO TERMINAL PASAJEROS ESPACIO ÁREA m2 Hall Principal 11942
Roof Plan
600
Almacenamiento y distribución de Equipaje
Muelle Nacional
337
350 250 300 200 6600
Platform Level: Domestic and international passenger arrival, baggage delivery. 2nd Level: Lodgind and waiting room.
EDIFICIO TERMINAL PASAJEROS ESPACIO ÁREA m2 Hall Principal 11514
4000 518,2 1240 840 368 320,8
URBAN INTERVENTION
ÁREA TOTAL
1100 110 55 30 64 1690
8194
60000
Project Intentions:
Panoramic View (South - North) Panoramic View (Northeast - Southwest)
Intermodal Geospatial Connections
Panoramic Views of the Intermodal Terminal
.30
Thesis Undergraduate Work / .31
Letting the knowledge... Fly
PROJECT: Intermodal Terminal Tribuga Cove. kkk Nuqui Bay. Choco. kkkkkkkkkkkkkkkkkkkkkkkkkk (Terminal Intermodal Ensenada de Tribugรก)kkkkkkkkkkkkkkkkkkkk kkk Location: Nuqui City. Tribugรก Cove. Chocรณkkkkk Architect: Juan Sebastiรกn Rangel Mejiakkkkk
SECTIONS AND RENDERS
Main Facade Passengers Terminal
Main Facade Cargo Terminal
Section C1
The main reference of the airport, according to the form, was the dorsal fin of the Humpback Whale, which, in two annual seasons, visit the Pacific coast of Colombia. The height plays an important role in the project: allows to keep the hot air at the top of the building letting the fresh air that enters, stay concentrated in the lower levels. The use of solar panels on the roof modules allows an efficient energy consumption, while it is generated by the cells. The modules in the roof, are automated, so they move to control the entry of air into the terminal.
Section TC-1 Section F1
The existence of slopes in the plants allows the enrichment of the flow of the activities inside the airport. This, mixed with internal gardens visually and esthetically link the interior with the exterior.
Section B1
.32