1 minute read

ACC Rule of the Month ARCHITECTURAL CONTROL APPLICATION SUBMITTAL PROCESS

All exterior improvements to your property must be submitted to the Architectural Control Committee (ACC) in the form of an application for review. Work cannot commence until you have received approval for your project from the ACC.

The following is an outline of the submittal process.

1. Application is submitted to the ACC for consideration.

2. TKPOA Front Desk Staff collects all necessary review fees and compliance deposits and confirms that all necessary documents are signed by the property owner.

3. Architectural Control Department (ACD) Staff conducts a field inspection and photographic records are taken to include with the submittal.

4. The proposed project is then added to the ACC meeting agenda.

5. After ACC has reviewed the submittal during a regularly scheduled meeting, staff generates an approval/denial letter.

6. A digital copy of the processed application is recorded and the original application including all related documents is then filed in the owner’s property lot file.

The City of South Lake Tahoe (CSLT) Building Department requires approval from TKPOA for issuance of a building permit.

ACC applications are available at the TKPOA pavilion front desk located at 356 Ala Wai Blvd., South Lake Tahoe, California or on the TKPOA website, www.tkpoa.com . You may also call the ACD office at 530 542-6444 extension 240 and we will be happy to email one to you.

Linda Callahan Architectural Control Dept. Manager, Ext. 239

Vacant Facilities Director, Ext. 241 Security (530) 545-0847

Water Company (530) 318-4268

Kristine Lebo

Water Quality Manager, Ext. 275

Desk Attendant Dial 0

2021–2023 BOARD OF DIRECTORS

Dave Peterson, PRESIDENT

Peter Grant, VICE PRESIDENT

Ken Silveira, TREASURER

Michelle Pandori, SECRETARY

Joby Cefalu, DIRECTOR

Jim Siegfried, DIRECTOR

Pete Wolcott, DIRECTOR

This article is from: