Justin Jennings portfolio of creative works
Justin Jennings Portfolio of Creative Works 2015
4
Justin Jennings : Portfolio
Contents
Resume
Professional Work 01. Whittier Elementary School 02. Park Avenue and Laurel Grove Apartments 03. Villa San Pedro Apartments 04. Fairmeadow Elementary School 05. Novoshahktinsk Supportive Housing 06. Belleview BioFacade District 07. Hamad International Aiport
Student Work 08. Architectural Fictions of the Dispersed City 09. Wells-Lamson Art Hike 10. Adaptive Growth Hut 11. Magazine Beach Chicken Coop and Garden 12. Wave Ceiling Installation
Selected Artwork 13. Sculpture - Painting - Photography
5
6
Justin Jennings : Portfolio
education
Rhode Island School of Design, Providence, RI M.Arch. - 2012. Vassar College, Poughkeepsie, NY B.A. - Physics, Art - 2004
experience Gelfand Partners Architects, San Francisco, CA 06/2012 - 02/2015 (summer intern 2011)
Job Captain / Designer
Served as primary designer for multiple projects with responsibilities covering design, documentation, coordination, project management, and team supervision from programming through CDs. Developed socially consious and energy efficient designs while working under tight constraints of limited budgets, local planning ordinances and state regulations (DSA, CHPS). Performed Construction Administration for a K-5 school including reviewing submittals, answerings RFIs, and attending weekly contractor meetings. Served as a leader and mentor for 3D modeling and visualization. Led firmwide instructional courses and served as a resource for design software, including Revit, AutoCAD, Adobe CS, Sketchup and Rhino.
HOK, San Francisco, CA 01/2007 - 09/2009
Construction Administration Technician Coordinated construction administration between San Francisco office, Doha, Qatar job site, and numerous other locations. Developed automated processes in MS Excel to track thousands of pending items. Responsible for distribution of RFIs and submittals for review and coordination of responses.
Tsoi/Kobus & Associates, Cambridge, MA 01/2005 - 09/2006
Construction Administration Assistant / Archivist Managed CA documentation for multiple projects and assisted in submittal review and RFI responses, including development of responses and sketches. Produced models and graphics for presentations and drafted CDs under direction of Project Architect Responsible for firm’s drawing and document archive.
Resume
academic Rhode Island School of Design, Providence, RI 09/2009 - 06/2012
Teaching Assistant
Manual Representation (fall 2011), Digital Representation (spring 2011, 2012), Materials and Methods of Construction (fall 2010), Urban Design Principles Studio (fall - spring 2011)
Research/Design Assistant
Providence Urban Farming and Community Development Proposal, Prof. Hansy Better, (Fall 2010 Spring 2011) Low-cost Prototype for Faculty Office Space and Furniture, Prof. Chris Bardt., (Fall 2009-Spring 2010)
Project Manager
Adaptive Growth Hut - Providence, RI. Architectural Design studio, Fall 2009. Prof. Hansy Better Quichwa Cultural Museum - Tena, Ecuador. Travel Studio Design Build, Winter 2011. Prof. Olga Mesa
Coursework in Teaching
Studio Based Teaching and Learning: Developed a teaching portfolio focused on learning in the studio environment, including a teaching philosophy, sample courses and syllibi. - Spring 2010
skills
Software
Drafting : Revit, AutoCAD 3D: Rhino, Grasshopper, Sketchup, Maya Rendering: Vray, Kerkythea 2D: Adobe Illustrator, Photoshop, Indesign, Flash, Digital Fabrication experience with industrial-scale laser cutting and CNC routing.
Craft Hand drafting, sketching, model building, casting, woodworking, photography, welding and metal fabrication.
7
8
01
Justin Jennings : Portfolio
Whittier Greenleaf School Oakland, California
A full service community resource
Client: Oakland Unified School District Est. Completion: Fall 2017
Residents in this impoverished Oakland community face an uphill battle to keep their children in school. The Whittier Greenleaf expansion and modernization employs a holistic, community-building approach to education, providing integrated services for parents and students alike. It is a model for the district-wide goal of the “full-service community school� where the campus becomes an open and encouraging resource for the community. The school offers services far beyond typical classroom learning to strengthen families and the community. Adding four new buildings to a dense, urban site and modernizing the main 1920’s classroom building, this project completely reorganizes the campus and provides modern, energy-efficient and accessible learning environments for the students. A new 2-story classroom wing gives the campus a entrance and allows the central administration space to move to ground level adjacent to the double height lobby atrium. A library with personal, small group and classroom study spaces sits
Professional
Role: Job Captain Gelfand Partners Architects
9
above the administration area, where an open bridge allows a public connection while preserving secure access. A family resource center is adjacent to the main office, and serves as space for parents and groups to hold classes, do laundry, meet teachers and many other activities. The vacated cafeteria in the basement of the existing building is renovated into a suite of offices and small classrooms surrounding a flexible group learning space for the variety of special counseling, tutoring and social work needs in the school. A secondary heart to the community outreach program, the counseling suite is a space for students and parents to work through issues separately from the official administration.
Whittier Greenleaf School
01
10
Justin Jennings : Portfolio
Site Context
Existing Building
Context / Existing Conditions
Role: Job Captain Gelfand Partners Architects
Professional
11
Entry
Cafeteria
Library
Portable Classroom
Whittier Greenleaf School
01
2
1
S40° 16'27" E
1.1
Justin Jennings : Portfolio
12
267.80'
SIG
E
SIG
28' - 0"
28'-0" WIDE CONSTRUCTION ACCESS
CONSTRUCTION ACCESS FOR BUILDING C
SIG
C
DN
DN
DN
DN
DN
DN
DN
DN
DN
DN
DN
DN
DN
SIG
B
DN CO
SIG E
E
E
E
62nd AVENUE
SIG
SIG
E
SIG
E
CO
SIG
E
E
E
CO
S, SS, FW, W, & G
SIG
E CO
E
E
E
E
DN
ELECTRICAL UTILITY BOX, TYP
CO
UTILITY CLEANOUT, TYP
DN
TEMPORARY (PHASE 1) POWER FROM TEMPORARY PANEL IN (E) MECHANICAL ROOM
DN
UP
300.65' (R)
CO
E
PROVIDE SPARE ELECTRICAL CONDUIT AS REQUIRED TO ACCOMMODATE NEW ELECTRICAL SERVICE/ TRANSFORMER
DN SIG
UP
S49° 43'33" W
E
300.84' (R)
300.65' (R)
SIG
E
S49° 43'33" W
300.84' (R)
N49° 43'33" E
E
N49° 43'33" E
SIG E E SIG
FW
300.55' (M)
S, SS, W, & G
G
APPROXIMATE LOCATION OF UTILITY STUB-OUTS FOR BUILDINGS A & B.
DN
E
APPROXIMATE LOCATION OF (N) FIRE HYDRANT
S, SS ,W ,&
E
DN
1
DN
1.1
DN
2
DN
S52° 16'04" W
A
62nd AVENUE
DN
DN
DN
DN
SIG
S, SS, FW, W, & G
DN
UP (E) MDF, FACP, ETC
DN
PROVIDE TEMPORARY CONNECTION OF SIGNAL, INTRUSION, FIRE ALARM, & OTHER MISC LOW VOLTAGE FROM (E) LOCATION TO FUTURE LOCATION - PHASE I
DN
SIG
DN
FUTURE ELECTRICAL SERVICE/ TRANSFORMER PHASE 2
UP
S, SS, FW, W, & G
CO
125.00' (R) N40° 21'48" W
1
(E) BACKFLOW PREVENTER TO REMAIN
CO
254.47' (R) N40° 21'48" W
CONSTRUCTION ACCESS FOR BUILDING B
SIG
125.00' (R) N40° 21'48" W
EAST 17th STREET
PHASE 1- SUMMER OF 2015 1/16" = 1'-0"
1
PHASE 1: SUMMER 2015
EA
PHASE 2 - 2015-2016 SCHOOL YEAR SCALE: 1/16" = 1'-0"
PHASE 2: SCHOOL YEAR 2015-20
E
SIG
267.80'
2
1
1.1
S40° 16'27" E
2
1
1.1
S40° 16'27" SIG
267.80' C
CONSTRUCTION ACCESS FOR BUILDING C
SIG
C
DN
DN
DN
DN
DN
B
SIG
B
DN
PROVIDE SPARE ELECTRICAL CONDUIT AS REQUIRED TO ACCOMMODATE NEW ELECTRICAL SERVICE/ TRANSFORMER
UP
SIG
DN
300.55' (M)
UP
DN
(E) MDF, FACP, ETC
300.65' (R)
S49° 43'33" W
300.84' (R)
NEW MDF AT FLOOR 1 DN
SIG
UP
DN
S52° 16'04" W
DN
DN
(N) BOILER AND HYDRONIC PIPING TO SUPPORT BUILDING B
N49° 43'33" E
DN
UP
DN
300.65' (R)
UTILITY CLEANOUT, TYP
DN
S49° 43'33" W
CO
TEMPORARY (PHASE 1) POWER FROM TEMPORARY PANEL IN (E) MECHANICAL ROOM
DN
DN
ELECTRICAL UTILITY BOX, TYP
300.84' (R)
E
N49° 43'33" E
E
62nd AVENUE
SIG
300.55' (M)
S, SS, W, & G
SIG E
1
CO
E
1.1
E
2
E
A
1
1.1
2
E E
SIG
S52° 16'04" W
A
E
APPROXIMATE LOCATION OF (N) FIRE HYDRANT FW
SIG
DN
62nd AVENUE
SIG
DN
UP
PROVIDE TEMPORARY CONNECTION OF SIGNAL, INTRUSION, FIRE ALARM, & OTHER MISC LOW VOLTAGE FROM (E) LOCATION TO FUTURE LOCATION - PHASE I
DN DN
SIG
DN
FUTURE ELECTRICAL SERVICE/ TRANSFORMER PHASE 2
UP
EVENTER
CONSTRUCTION ACCESS FOR BUILDING B
UP
125.00' (R) SIG
125.00' (R) N40° 21'48" W
254.47' (R) N40° 21'48" W
N40° 21'48" W
32' - 3"
254.47 N40° 21'48"
EAST 17th STR
1
PHASE 2 - 2015-2016 SCHOOL YEAR
EAST 17th STREET
SCALE: 1/16" = 1'-0"
PHASE 2: SCHOOL YEAR 2015-2016
Project Phasing and Construction Schedule
1
PHASE 3 - SUMMER OF 2016 SCALE: 1/16" = 1'-0"
PHASE 3: SUMMER 2016 - SUMMER
2
1
13
267.80' A
2
1
1.1
S40° 16'27" E
1.1
Role: Job Captain Gelfand Partners Architects
Professional
C
C B
DN
B
B A
A
300.65' (R)
S49° 43'33" W
300.84' (R)
N49° 43'33" E
DN
DN
UP
UP
300.55' (M)
DN
S52° 16'04" W
UP
DN
300.55' (M)
NEW MDF AT FLOOR 1
S52° 16'04" W
DN
DN
DN
1
DN
UP
1.1
2
1
1.1
2
(N) BOILER AND HYDRONIC PIPING TO SUPPORT BUILDING B
C
DN
62nd AVENUE
DN
DN DN
UP
DN
DN
DN DN
UP UP
125.00' (R) N40° 21'48" W
32' - 3"
32' - 3"
254.47' (R) N40° 21'48" W
EAST 17th STREET
1
PHASE 3 - SUMMER OF 2016 SCALE: 1/16" = 1'-0"
PHASE 3: SUMMER 2016 - SUMMER 2017 LEGEND BUILDING/ PORTABLE TO BE DEMOLISHED/ REMOVED THIS PHASE ASPHALT TO BE REMOVED WITH SUBGRADE PREPARATION BUILDING/ PORTABLE TO BE BUILT/ PLACED THIS PHASE
BUILDING A: FLOOR 2 MODERNIZED
BUILDING A: FLOOR 1 MODERNIZED
BUILDING A: BASEMENT MODERNIZED
STUDENT CIRCULATION
CONTRACTOR CIRCULATION/ LAY-DOWN
Greenleaf Elementary School 2014-09-30 - Site Committee Meeting
Whittier Greenleaf School
01
Justin Jennings : Portfolio
CODE ANALYSIS (N) COVERED WALK INDEPENDENT STRUCTURE
SHEET NOTES
ZONE 1:
1-HR FIRE RATED EXT. PARTITION - STRUCTURE RATED PER SECTION 705.11, EXCEPTION 4.1
BUILDING A:
20' - 0"
OCCUPANCY:
E 35,537 SF
CONSTRUCTION TYPE: TOTAL BUILDING AREA:
V-B (TO BE SPRINKLERED) 35,537 SF
BUILDING USE/ OCCUPANCY AND AREA NOT CHANGING - BUILDING ANALYSIS NOT REQUIRED NOTE #1: ZONES 1 & 2 SEPARATED BY 2 HOUR FIRE WALL PER 2013 CBC SECTION 706 & TABLE 706.4.
ZONE 2: (N) BLDG D DSA APPLICATION: 01-114524 CLASSROOMS OCCUPANCY E TYPE V-B NON-SPRINKLERED 1 STORY 2,600 SF
(N) BUILDING C MULTIPURPOSE OCCUPANCY A-3 TYPE V-B - SPRINKLERED 1 STORY 10,653 SF
BUILDING B:
(N) BLDG E DSA APPLICATION: 01-114524 CLASSROOMS OCCUPANCY E TYPE V-B SPRINKLERED 1 STORY 2,950 SF
OCCUPANCY:
E (14,636 SF)
CONSTRUCTION TYPE: TOTAL BUILDING AREA:
V-B (TO BE SPRINKLERED) 15,047 SF
TOTAL BUILDING HEIGHT:
34'-8" (2-STORIES)
TOTAL ALLOWABLE HEIGHT WITH AUTOMATIC FIRE SPRINKLER SYSTEM PER 2013 CBC SECTION 504.2:
60'-0" (2 STORIES MAXIMUM)
TOTAL ALLOWABLE AREA WITH AUTOMATIC FIRE SPRINKLER SYSTEM PER 2013 CBC SECTION 504.2:
9,500 S.F. PER STORY (19,000 S.F. TOTAL)*
* PER 2013 CBC TABLE 503 (E OCCUPANCY, TYPE V-B CONSTRUCTION 14,636 < 19,000 - COMPLIES
ZONE 3: BUILDING C OCCUPANCIES:
ZONE 3
ZONE 4
CONSTRUCTION TYPE: TOTAL BUILDING AREA:
ZONE 2
A-3 - 9,602 SFBLDG C E - 1331 BLDG C (>10% A-3 OCCUPANCY USED PER 2013
CBC 508.3.2)
ZONE 1
BASE ALLOWABLE AREA:
V-B (SPRINKLERED) 10,653 SF 6000 SF
*BUILDING AREA INCREASE: +200% PER 2013 CBC SECTION 506.1 = +12,000 S.F. (N) COVERED WALK
TOTAL ALLOWABLE AREA = 6,000 + 12,000 = 18,000/STORY
KEYNOTES
10,653 < 18,000 - COMPLIES ZONE 4: BUILDINGS D,E OCCUPANCIES: CONSTRUCTION TYPE: TOTAL BUILDING AREA: (N) BLDG B CLASSROOMS, LIBRARY AND ADMINISTRATION OCCUPANCY A-3, B, E TYPE V-B SPRINKLERED 2 STORIES 1F - 7,495SF 2F - 7,141 SF
ELEVATOR DSA APPLICATION #61330
(E) BUILDING A DSA APPLICATONS #14561 (1956) #01-108437 (2007) OCCUPANCY E TYPE V-B SPRINKLERED 2 STORIES OVER BASEMENT B- 12,092 SF 1F - 11,353 SF 2F - 12,092 SF
BASE ALLOWABLE AREA:
E- 5,550 SF V-B (NOT SPRINKLERED) 5,550 SF 9,500 SF
5,550 < 9,500 - COMPLIES
RAMP ADDED IN DSA APPLICATION 01-114524
2-HOUR FIRE WALL SEE NOTE #1 IN CODE ANALYSIS
DN
ZONE 2
ZONE 1
N
UP
1
CODE ANALYSIS AND ACCESS
LEGEND
SCALE: 1/16" = 1'-0"
1 HOUR FIRE RATED EXT. WALL INTERIOR LOT LINE PROPERTY LINE
AREA OF NEW CONSTRUCTION
AREA OF MODERNIZATION
3/5/2015 5:35:06 PM
14
All ideas, design arrangements and plans indicated or represented by this drawing are owned by, and are the property of Gelfand Partners Architects, Incorporated and were created, evolved, and developed for use on and in connection with this project. None of such ideas, arrangements, or plans shall be used by or disclosed to any person, firm, or corporation for any purpose whatsoever without the written permission of Gelfand Partners Architects Incorporated.Filing of these drawings or specifications with any public agency is not a publication of the same. No reproduction is therefore permissible without the written consent of Gelfand Partners Architects.
Site Code Analysis
Role: Job Captain Gelfand Partners Architects
Professional
DN
15
DN DN
DN
4 A1.12
6 A1.13
5
2
A1.12
A1.12 6
02.02
TYP
A1.12
3 A1.12
(E) PLAYSTRUCTURE DSA APPL 01-114524
UP
1 A1.13
EXISTING TRANSFORMER TO REMAIN
2 A1.13
DN
UP
1 A1.14
Site Plan
Whittier Greenleaf School
01
Justin Jennings : Portfolio
B.1 ?
B.2 ?
B.3 ?
6' - 5 1/4"
B.4 ?
17' - 3 3/4"
B.5 ?
17' - 3 3/4"
Architect
Gelfand Part
B.6 ?
9' - 1"
A R C H I T E
25' - 0 1/4"
P
165 Tenth St San Francisco Tel. 41 Fax 41 www. gelfand
G
2 A4.25
B.A ?
5
28' - 7 3/4"
8
STAIR
CIVIL ENGINEERING:
A-2
6
A7.21
CLASSROOM
193 SF
A-210
929 SF
733 SF
B201A
CARROLL ENGINEERING 1101 SOUTH WINCHESTER BLVD., SUITE H-184 SAN JOSE, CA 95128-3903 Tel (408) 261-9800
CLASSROOM
7
B-201
STRUCTURAL:
15.38
28' - 7 3/4"
4
2
A7.22
JANITOR
CLASSROOM
B-213
3
67 SF
B213A
ELEC
CLASSROOM A-202
A-203
722 SF
704 SF
182 SF
10.39
B-204 11 SF
B204A
CLASSROOM CORRIDOR
W2
A-211
D
736 SF
IDENTIFICATION ST DIV. OF THE STATE ARC
A208
08.24
FILE# APPL #
1564 SF
B203A
B-203
HYT CORPORATION 3498 CLAYTON ROAD, SUITE 101 CONCORD, CA 94519 Tel (925) 681-2731
A-208
1564 SF
CLASSROOM
A-201 730 SF
B.C ?
CLASSROOM
YEI ENGINEERS, INC 7700 EDGEWATER DRIVE, SUITE 128 OAKLAND, CA 94621 Tel (510) 383-1050 Fax (510) 383-1057
TOILET
48 SF
A208
888 SF
W2
A-207
CORRIDOR
1
3
TYP
FIRE PROTECTION:
CLASSROOM
A6.20
TYP
15.08
JANITOR
4
B-202
TYP
15.09
MECHANICAL/ELECTRICAL/PLUMBING:
B202A A6.20
15.39
KPW STRUCTURAL ENGINEERS 130 WEBSTER ST, SUITE 200 OAKLAND, CA Tel (510) 208-3300 Fax (510) 208-3303
DN
B.B ?
1096 SF
AC DATE
3
28' - 7 3/4"
A6.22 5 8
DN
CLASSROOM
6
A7.22 7
A-204
CORRIDOR
Sim
1 A5.20
752 SF
B-218
CLASSROOM
FLS
CLASSROOM
A-205
A-206
774 SF
D
725 SF
C
1119 SF B.D ?
21' - 0 1/4"
UP
B206A
2
B-219
2
A6.22
A6.21
15.39
CLASSROOM
TYP
A-212
A
B
746 SF
B219A
B.E ?
B-210
B-209
100 SF
B209A
D
B208A
COMPUTER ROOM
B208B
LIBRARY OFFICE 16' - 3 3/4"
2 A4.23
126 SF
B207A
STAIR 243 SF
77 SF
141 SF
B-207
50 SF
94 SF B205A
A-209
BOYS TOILET
B-206
B-205
2 A5.23
TOILET
TOILET
GIRLS TOILET
1 A6.22
1
W9
B211A
4
LIBRARY GROUP 2
A7.27
W3
Issues/Submission DESIGN DEVELOPMENT DSA SUBMISSION
B-211 333 SF
3
W3
3 A6.21
OPEN TO BELOW
LIBRARY
B.F ?
B-208 1355 SF 12' - 11 3/4"
W3
1
1 A5.26
A6.21
B.G ?
1
2
A6.20
W3
A6.20
N
1
BUILDINGS A & B - 2ND FLOOR SCALE: 1/8" = 1'-0"
B.5 ?
B.6 ?
9' - 1"
(N) WALL
25' - 0 1/4"
002
B.A ?
28' - 7 3/4"
W1
1 A4.24
3
932 SF
CIVIL ENGINEERING:
A-107
1101 SOUTH WINCHESTE SAN JOSE, CA 95128-390 Tel (408) 261-9800
705 SF
2
A7.20
N IA
BUILDINGS SECOND FLOOR CARROLL ENGINEERING
CLASSROOM 1 4
B-101
R
6328 East 17th St, O
DOOR TAG
2 A4.11
CLASSROOM
Architect O
Gelfan
F CA L I
G
(N) DOOR
2 A4.25
OF
I
P
1 A4.25
NO. C17265 REN. 5-31-15
A RELEME C H GREENLEAF AT W PHA
(E) DOOR 1 A4.23
E
D A R CH
LISA JAY GELFAND
CT
B.4 ? 17' - 3 3/4"
SE
TE
B.3 ? 17' - 3 3/4"
T
B.2 ? 6' - 5 1/4"
(E) WALL
A
B.1 ?
SMOKE DOOR ON ELECTRIC HOLD OPEN - SEE FA DRAWINGS SEISMIC JOINT AT SLAB AND WALLS TOILET - SPD URINAL - SPD CUSTODIAL SINK PROVIDE FAUCET TO (E) SINK
ST
2. SEE DOOR SCHEDULE ON A8.10 FOR SIGN TYPES & LOCATIONS.
Architect
LEGEND
EN
KEYNOTES 08.24 10.39 15.08 15.09 15.38 15.39
L IC
SHEET NOTES 1. SEE A9.01 FOR TYPICAL WALL TYPES.
3/5/2015 5:43:32 PM
A2
STRUCTURAL:
1 A4.12
KPW STRUCTURAL ENGI 130 WEBSTER ST, SUITE OAKLAND, CA Tel (510) 208-3300 Fax (5
B101A
C:\Revit Projects\1407_Whittier\1407_Whittier_Build
MECHANICAL/ELECTRIC
All ideas, design arrangements and plans indicated or represented by this drawing are owned by, and are the property of Gelfand Partners Architects, Incorporated and were created, evolved, and developed for use on and in connection with this project. None of such ideas, arrangements, or plans shall be used by or disclosed to any person, firm, or corporation for any purpose whatsoever without the written permission of Gelfand Partners Architects Incorporated.Filing of these drawings or specifications with any public agency is not a publication of the same. No reproduction is therefore permissible without the written consent of Gelfand Partners Architects.
B118A
B.B ?
YEI ENGINEERS, INC 7700 EDGEWATER DRIVE OAKLAND, CA 94621 Tel (510) 383-1050 Fax (
W1
FIRE PROTECTION: 4
B102A
A6.20
CLASSROOM
28' - 7 3/4"
W2
8
B-102
A7.20
887 SF
3 A6.20
CLASSROOM
3 A9.02
6
ELEV +/- 33.58' S.C.D.
7
10 SF
A-103 708 SF
A-115 1897 SF
B104A
CORRIDOR
CLASSROOM
1 A4.21
4
B-103
F APP
3
CLASSROOM
A106A
A105A
A6.22
2
A7.21 3
4
A4.26
3
W5 1 A5.20
8
2
A7.10
CLASSROOM
CORRIDOR
CLASSROOM
A-104
A-105
775 SF
791 SF
A7.10
746 SF
6 4
A7.11
7 3
2
CLASSROOM A-106
JANITOR
1392 SF
B.D ?
1 A5.23
GIRLS TOILET
21' - 0 1/4"
5 A8.20
1
B-105
A6.22
95 SF
STORAGE
A-117
A-116
92 SF
110 SF
C
BOYS TOILET
STAFF TOILET
B-107
B-106
126 SF
50 SF B105A
3 A4.12 15.38
769 SF
B-118
F
AC DATE
A-109
5
1
1
1094 SF
1
IDE DIV. OF
ELEV 37.61'
1897 SF
DN
B103A 1
W1
A-115
3 A9.02
W9
28' - 7 3/4"
CORRIDOR
CLASSROOM
A-102 742 SF
B-104
B103B
W2
Room
A-101 735 SF
215 SF
ELEC
W1
B.C ?
HYT CORPORATION 3498 CLAYTON ROAD, SU CONCORD, CA 94519 Tel (925) 681-2731
MDF A-108
5
B106A
W1
B107A UP
1
UP
A4.27
B.E ?
B-119
A6.22
B111A
B109A
B113A
MDF
16' - 3 3/4"
B-109
27 SF
B-113
TOILET
412 SF
B114A
1 A5.25
B.G ?
Sim
COMM. OUTREACH
NURSE
ASST. PRINCIPLE
PRINCIPLE
B-110
B-114
B-115
B-116
B-117
81 SF
89 SF
85 SF
85 SF
W1
1 A6.20
2 1
A4.26
W1
A6.21
1 A4.11 1 A4.20
N
BUILDINGS A & B - FIRST & GROUND FLOOR SCALE: 1/8" = 1'-0"
KEYNOTES 15.38
Architect
LEGEND
EN
SHEET NOTES 1. SEE A9.01 FOR TYPICAL WALL TYPES.
CUSTODIAL SINK
(E) WALL
Academic Building Addition and Renovation
(N) DOOR 002
E
T
(E) DOOR
A
(N) WALL
ST
2. SEE DOOR SCHEDULE ON A8.10 FOR SIGN TYPES & LOCATIONS.
L IC
1
B117A
240 SF
2
A6.21
6' - 1" B116A
MEETING
A6.20
Issues/Su DESIGN DEVELOP DSA SUBMISSION
3
599 SF 1 A5.22
B115A
2 A4.12
2 A4.27
3
B-108
52 SF B109B
B110A
2
A7.23
837 SF
2 A4.24
LOBBY
B-112
292 SF W1
4
A-111
2 A6.21
1
ADMIN
B-111 FAMILY RESOURCE CENTER
B.F ?
ELEV +/- 31.96' S.C.D.
2
B119A
238 SF
B
CLASSROOM
W6
STAIR B119B
12' - 11 3/4"
16
SE
D A R CH
LISA JAY GELFAND
I
NO. C17265 REN. 5-31-15
OF
F CA L I
GREENLEA
DOOR TAG
6328 Ea
Role: Job Captain Gelfand Partners Architects
Professional
17
Architect
Gelfand Partne
A R C H I T E C T
P
G
165 Tenth Street Suit San Francisco, CA 9 Tel. 415. 346 . Fax 415. 346 . www. gelfand-partner
Consu
CIVIL ENGINEERING:
CARROLL ENGINEERING 1101 SOUTH WINCHESTER BLVD., SUITE H-184 SAN JOSE, CA 95128-3903 Tel (408) 261-9800
STAFF WORK A-018 726 SF
STRUCTURAL:
KPW STRUCTURAL ENGINEERS 130 WEBSTER ST, SUITE 200 OAKLAND, CA Tel (510) 208-3300 Fax (510) 208-3303
15.09
TYP
15.39
TYP
15.08
MECHANICAL/ELECTRICAL/PLUMBING:
STAIR
TYP
15.08
15.39
TYP
YEI ENGINEERS, INC 7700 EDGEWATER DRIVE, SUITE 128 OAKLAND, CA 94621 Tel (510) 383-1050 Fax (510) 383-1057
A-017
TYP
234 SF
FIRE PROTECTION:
HYT CORPORATION 3498 CLAYTON ROAD, SUITE 101 CONCORD, CA 94519 Tel (925) 681-2731
1 4
A7.12
BOY'S TOILET
2
DN
4
JANITOR CLOSET
A7.17
2
BOILER ROOM
224 SF
A-019
GIRL'S TOILET
A-025 252 SF
3
A-002
A001A
1
CORRIDOR
3
A-001 413 SF
STAFF LOUNGE
A-004
CUSTODIAL
320 SF
A-029
549 SF CORRIDOR
33 SF
A-003
1
A-028
4
329 SF
A7.16
742 SF
2
3
A011B
CORRIDOR
MS INT.
A011A
READING INT.
A-013
A-026
A-014
146 SF
457 SF
126 SF
A006A
A005A
1
COUNSELOR WAITING COUNSELING
A-006
COUNSELING
A-007
94 SF
A-008
137 SF
A007A
A008A A009A
4
143 SF
STORAGE A-030
BOOK ROOM A-005
A010A
358 SF
A-009
3
2
A-011 1147 SF
A030A
A015A
A-017 A017A
4
57 SF
DSA Appli
IDENTIFICATION STAMP DIV. OF THE STATE ARCHITECT FILE# APPL # FLS
AC DATE
SS
480 SF
Ke
2
A022A
SPEECH
RSP
A-016
A-015
251 SF 1
194 SF
29 SF
45 SF
A7.14 3
A012A
A-012
A-010
A-021
58 SF
CORRIDOR
A028A
A016A
1
27 SF
TOILET
A-020
A-027
STORAGE
MECH
MECH
A014A
A011C
44 SF
COUNSELING 186 SF
A7.13
A013A
FLEX
TOILET
STORAGE A-024
4
A7.15
2
A024A 3
117 SF
RESOURSE SPECIALIST A-022 756 SF
Drawing R Issues/Submission DESIGN DEVELOPMENT DSA SUBMISSION
Dat 10/15/1 3/6/1
STORAGE A-023 256 SF
N
BUILDING A - BASEMENT PLAN SCALE: 1/8" = 1'-0"
D A R CH
I
CT
LISA JAY GELFAND
01
NO. C17265 REN. 5-31-15
N IA
SE
TE
(E) WALL
A
(E) DOOR
(N) DOOR
E
OF
R
Whittier Greenleaf School GREENLEAF ELEMENTA (N) WALL
T
Academic Building Addition and Renovation
Architect
LEGEND
ST
TOILET - SPD URINAL - SPD PROVIDE FAUCET TO (E) SINK
EN
KEYNOTES 15.08 15.09 15.39
L IC
1
F CA L I
O
P
AT WHITT
18
Justin Jennings : Portfolio
Library
Role: Job Captain Gelfand Partners Architects
Professional
19
COMPUTER/MEDIA SPACE WITH PIVOTING GLASS WALL PANELS. PROJECTION SCREEN AT COMPUTER AREA FOR GROUP VIEWING
LECTURE / GROUPWORK SPACE WITH MOVABLE TABLES
MAIN ENTRANCE AND CIRCULATION DESK
SECURE LIBRARY OFFICE
GROUP WORK SPACE WITH WHITE BOARD AND STUDY CARRELS FOR INDIVIDUAL AND ONE-ON-ONE WORK AT BRIDGE
ELECTRONIC CATALOG
BOOK STORAGE AROUND PERIMETER 720 L.F. OF STORAGE PROVIDED
STORY SPACE WITH FLOOR SEATING FOR YOUNG STUDENTS
Greenleaf Elementary School 2014-09-30 - Site Committee Meeting
GREENLEAF LIBRARY B.1 ?
B.2 ?
B.3 ?
B.4 ?
B.5 ?
SHEET NOTES
B.6 ?
Architect
Gelfand Partners A R C H I T E C T S
P
TOP OF HIGH ROOF 72.33'
G
TOP OF PARAPET 70.68'
165 Tenth Street Suite 100 San Francisco, CA 94103 Tel. 415. 346 . 4040 Fax 415. 346 . 4103 www. gelfand-partners.com
Consultants
CIVIL ENGINEERING:
CARROLL ENGINEERING 1101 SOUTH WINCHESTER BLVD., SUITE H-184 SAN JOSE, CA 95128-3903 Tel (408) 261-9800 STRUCTURAL:
KPW STRUCTURAL ENGINEERS 130 WEBSTER ST, SUITE 200 OAKLAND, CA Tel (510) 208-3300 Fax (510) 208-3303 MECHANICAL/ELECTRICAL/PLUMBING:
YEI ENGINEERS, INC 7700 EDGEWATER DRIVE, SUITE 128 OAKLAND, CA 94621 Tel (510) 383-1050 Fax (510) 383-1057 FIRE PROTECTION:
HYT CORPORATION 3498 CLAYTON ROAD, SUITE 101 CONCORD, CA 94519 Tel (925) 681-2731
2ND FLOOR 50.67'
DSA Application
IDENTIFICATION STAMP DIV. OF THE STATE ARCHITECT FILE# 1-29 APPL # 01-114727 FLS
AC DATE
1ST FLOOR AT (E) ELEVATOR 33.58'
SS
Key Plan
1ST FLOOR AT ADMIN/ LOBBY 32.00' ADJACENT (E) SIDEWALK +/- 29.70'
KEYNOTES
2
BUILDING B SECTION 05
A.1 ?
SCALE: 1/4" = 1'-0"
B.1 ?
B.2 ?
B.3 ?
B.4 ?
B.5 ?
A.2 ?
B.6 ?
TOP OF HIGH ROOF 72.33'
Drawing Record Issues/Submission DESIGN DEVELOPMENT DSA SUBMISSION BID SET
TOP OF PARAPET 70.83'
Date 10/15/14 3/6/15 3/30/15
2ND FLOOR 50.67'
Architect
N IA
A
T
OF
I
R
L IC
D A R CH
LISA JAY GELFAND
NO. C17265 REN. 5-31-15
CT
ST E
SE
TE
EN
LEGEND
F CA L I
O
Project
GREENLEAF ELEMENTARY AT WHITTIER PHASE 2 & 3
1ST FLOOR AT (E) ELEVATOR 33.58'
6328 East 17th St, Oakland, CA
1ST FLOOR AT ADMIN/ LOBBY 32.00'
1407.00
Sheet
ADJACENT (E) SIDEWALK +/- 29.70'
3/31/2015 2:02:47 PM
03.01
1
TYP
BUILDING B - BUILDING SECTIONS
A4.27
BUILDING B SECTION 04 SCALE: 1/4" = 1'-0"
C:\Revit Projects\1407_Whittier\1407_Whittier_BuildingA_anne.rvt
All ideas, design arrangements and plans indicated or represented by this drawing are owned by, and are the property of Gelfand Partners Architects, Incorporated and were created, evolved, and developed for use on and in connection with this project. None of such ideas, arrangements, or plans shall be used by or disclosed to any person, firm, or corporation for any purpose whatsoever without the written permission of Gelfand Partners Architects Incorporated.Filing of these drawings or specifications with any public agency is not a publication of the same. No reproduction is therefore permissible without the written consent of Gelfand Partners Architects.
Library
Whittier Greenleaf School
01
20
Justin Jennings : Portfolio
Multipurpose Building
Professional
Role: Job Captain Gelfand Partners Architects
21
The large communal space is central to many aspects of the schoolâ&#x20AC;&#x2122;s function, from daily lunch and physical education to annual performances or academic events. Whittierâ&#x20AC;&#x2122;s small site amplifies the program requirements placed upon the single large space on the campus, accomodating varied, and sometimes simultaneous activities, while allowing as open access as possible to the rest of the site. The multipurpose building is conceived as one large space encompassing several small rooms with flexible dividers. The central multipurpose room shares connections to the elevated stage and music classroom to one side, and is open through overhead doors to the circulation space to another side. In a larger event, the building can be used in a fully open configuration, allowing for circulation through and about all rooms as type of convention hall. During a typical school day, the spaces can be divided allowing students to eat lunch in the main room, while the music room and stage are utilized for indoor play space. The resulting space is a fluid and changing configuration, open to students and the community in a variety of ways, while maintaining the required security and access control.
Whittier Greenleaf School
01
22
Justin Jennings : Portfolio
STAGE FUNCTIONS AS PERFORMANCE SPACE WITH FLEX ROOM AS BACKSTAGE SUPPORT AREA
LARGE, FLEXIBLE MULTIUSE SPACES ALLOW OPEN CONNECTIONS FOR LARGE EVENTS
OPERABLE PARTITIONS SEPARATE GYM FROM STAGE AND FLEX SPACE, CREATING TWO INDOOR PLAY AREAS
KITCHEN SERVES MULTIPURPOSE THROUGH A LARGE OVERHEAD DOOR OPENING
Greenleaf Elementary School 2014-09-30 - Site Committee Meeting
Multipurpose Building
Professional
flex classroom
Role: Job Captain Gelfand Partners Architects
23
lunch service
CAFETERIA SPACE
PHYSICAL EDUCATION / INDOOR PLAY SPACE
convention
performance
INTERCONNECTED EVENT SPACE
!"#$$#%&'()%*%+$,&-'./"00) 1234526517'5'.8'9%:#%;
Whittier Greenleaf School CONCERT / PERFORMANCE
01
24
Justin Jennings : Portfolio
C.1 C.1 ?
C.2 C.2 ?
C.3 C.3 ?
C.4 C.4 ?
1
C.5 C.5 ?
1 A4.31
2
A6.30
1 A5.33
C.6 C.6 ?
C.7 C.7 ?
C.8C.8 ?
1
A6.30
C.9 C.9 ?
1 A5.34
A4.33
C.A ? C.A DN
DN
1 4
1
STAGE
A7.36
C-103
2
DN
8
A7.32
3
C-104 992 SF
984 SF
3
FLEX / MUSIC 2
A6.30
DN
7
STORAGE C-102 283 SF C102A
C.B ? C.B
C104A
C103A
1 A4.30
1 4
1
2
A6.31
A6.31
OFFICE
2
A7.34
5 8
C-105
C105A
3
C.C ? C.C
C106A
OFFICE
6
A7.34
96 SF
C-106 82 SF
7
C.D ? C.D
1 3
2
A6.33
2
C107A
2 A5.32
STAFF
1 A4.32
C-107
1
C.E ? C.E
57 SF MULTIPURPOSE
1 A4.36
C-101
C101B
4474 SF C.F ? C.F W1
2 A6.33
CUSTODIAL C-108
C108A
46 SF
C.G ? C.G
C109A
1 A6.33
ELECTRICAL CLOSET C-109
C115B
C.H ? C.H
C122A
C122B
C122C
C122D
C111B
BOYS TOILET C-112
CORRIDOR
FP RISER
159 SF
5
C-115
C-110
WARMING KITCHEN6 8
3 SF
A7.35
115 SF
C112A
C-122
A7.34
598 SF7 C.I ? C.I
13
TRASH ROOM
16
C.J ? C.J
C114A
1
A7.34
C-111 GIRLS TOILET
C121B 4
C-116 14
A7.35
1
LOBBY
C113A
C121A 5' - 6"
C115A
29 SF
C110A
2
201 SF C111A
C-113 179 SF
3 15
C116A
Room
STORAGE
C-121A
C-121
38 SF
115 SF
1 A5.32
KITCHEN STAFF TOILET
2
C-114
A6.32
59 SF
1 A5.30
1 A4.35
1
GROUND FLOOR PLAN SCALE: 1/8" = 1'-0"
All ideas, design arrangements and plans indicated or represented by this drawing are owned by, and are the property of Gelfand Partners Architects, Incorporated and were created, evolved, and developed for use on and in connection with this project. None of such ideas, arrangements, or plans shall be used by or disclosed to any person, firm, or corporation for any purpose whatsoever without the written permission of Gelfand Partners Architects Incorporated.Filing of these drawings or specifications with any public agency is not a publication of the same. No reproduction is therefore permissible without the written consent of Gelfand Partners Architects.
Floor Plan
A6.32
A R C H
25 G
P
Professional
Gelfan
Role: Job Captain Gelfand Partners Architects
CIVIL ENGINEERING:
CARROLL ENGINEERING 1101 SOUTH WINCHESTER SAN JOSE, CA 95128-3903 Tel (408) 261-9800 STRUCTURAL:
KPW STRUCTURAL ENGIN 130 WEBSTER ST, SUITE 2 OAKLAND, CA Tel (510) 208-3300 Fax (51
MECHANICAL/ELECTRICA
YEI ENGINEERS, INC 7700 EDGEWATER DRIVE, OAKLAND, CA 94621 Fax (5
ArchitectTel (510) 383-1050
FIRE PROTECTION: Gelfand Part
HYT CORPORATION
A R 3498 C CLAYTON H I ROAD, T E SU
P
CONCORD,165 CA 94519 Tenth Stre Tel (925) 681-2731 San Francisco,
G
Tel. 415 Fax 415 www. gelfand-
CIVIL ENGINEERING:
CARROLL ENGINEERING 1101 SOUTH WINCHESTER BLVD., SUITE H-184 SAN JOSE, CA 95128-3903 Tel (408) 261-9800 STRUCTURAL:
KPW STRUCTURAL ENGINEERS 130 WEBSTER ST, SUITE 200 OAKLAND, CA Tel (510) 208-3300 Fax (510) 208-3303 MECHANICAL/ELECTRICAL/PLUMBING:
IDE DIV. OF
YEI ENGINEERS, INC 7700 EDGEWATER DRIVE, SUITE 128 OAKLAND, CA 94621 Tel (510) 383-1050 Fax (510) 383-1057 FIRE PROTECTION:
HYT CORPORATION 3498 CLAYTON ROAD, SUITE 101 CONCORD, CA 94519 Tel (925) 681-2731
FI APPL
F
AC DATE
PECTIVE VIEW
DS
IDENTIFICATION STA DIV. OF THE STATE ARCH FILE# APPL # AC DATE
1
FLS
S
MULTIPURPOSE BUILDING PERSPECTIVE VIEW SCALE:
Issues/Sub DESIGN DEVELOPM DSA SUBMISSION
D Issues/Submission DESIGN DEVELOPMENT DSA SUBMISSION
L IC
SE
D A R CH
LISA JAY GELFAND
I
TE
EN
Architect
D A R CH
N IA
O
LISA JAY GELFAND
I
T
F CA L I
L IC
T
SE
R
A
OF
EN
ST E
CT
Architect
NO. C17265 REN. 5-31-15
ST
GREENLEAF ELEME NO. C17265 REN. 5-31-15 AT WH E FO O F PHAS CA L I A
T
6328 East 17th St, O
GREENLEA 2
BUILDING C - EXT PERSPEC
MULTIPURPOSE PERSPECTIVE VIEW SCALE:
A4.
3/2/2015 10:51:14 AM
6328 Ea
C:\Revit Projects\1407_Whittier\1407_Whittier_Multi_a All ideas, design arrangements and plans indicated or represented by this drawing are owned by, and are the property of Gelfand Partners Architects, Incorporated and were created, evolved, and developed for use on and in connection with this project. None of such ideas, arrangements, or plans shall be used by or disclosed to any person, firm, or corporation for any purpose whatsoever without the written permission of Gelfand Partners Architects Incorporated.Filing of these drawings or specifications with any public agency is not a publication of the same. No reproduction is therefore permissible without the written consent of Gelfand Partners Architects.
2
BUILDING P
MULTIPURPOSE PERSPECTIVE VIEW SCALE:
C:\Revit Projects\1407_Whi
s, arrangements, or plans shall be used by or disclosed to any person, firm, or corporation for any purpose whatsoever without the written permission of Gelfand Partners Architects Incorporated.Filing of these drawings or specifications with any public agency is not a publication of the same. No reproduction is therefore permissible without the written consent of Gelfand Partners Architects.
Revit Model Perspectives
Whittier Greenleaf School
01
26
02
Justin Jennings : Portfolio
Park Avenue and Laurel Grove Apartments San Jose, CA
Two affordable developments sharing community
Client: Housing Authority of the County of Santa Clara Est. Completion: 2017
The Housing Authority of the County of Santa Clara saw opportunity in the recent economic decline and began purchasing properties throughout San Jose for the future development of affordable communities. This particular site sits on the outer edge of downtown San Jose, and affords access to a variety of mass-transit options, a rarity in the car-centric culture of Silicon Valley. The large site is split into two properities with separate developments, one with housing for families, the other for senior citizens. In order to create the most socially constructive housing possible, both developments are inclusive of services for the residents (social workers, professional assistance, etc) that extend the mission of social housing beyond merely providing shelter. The two buildings share a central community building and courtyard, offering spaces for events and neighborly gatherings, while each possesses their own unique massing, street front character and unit types to fit their program and localized context.
Professional
Senior Housing Perspective
Role: Designer Gelfand Partners Architects
Laurel Grove and Park Avenue Apartments
27
02
28
Justin Jennings : Portfolio
+54'-0" ROOF STAIR
Solar PV and Thermal
Solar PV and Thermal
+46'-6" PARAPET
60'-0" STAIR ROOF
50'-0" ROOF
+45'-0" ROOF 40'-0" 4TH FLOOR +35'-0" 4TH FLOOR
Units Units
Units
30'-0" 3RD FLOOR
Balconies
+25'-0" 3RD FLOOR
20'-0" 2ND FLOOR +15'-0" 2ND FLOOR
Units
Patio
Landscaped Podium
Patio
10'-0" MEZZANINE
Units
+5'-0" PODIUM
Street
Courtyard
+0'-0" GRADE
Family Parking
Senior Parking 0'-0" GRADE
6% Slope Family Parking
1
FLOOR PLAN - PARKING SCALE: 3/32" = 1'-0"
Architect
Gelfand Partners
A R C H I T E C T S
165 Tenth Street, Suite 100 San Francisco, CA 94103 Tel. 415. 346 . 4040 Fax 415. 346 . 4103 www. gelfand-partners.com
Site Section Through Family Parking Park Avenue Senior Housing and Laurel Grove Family Housing
All ideas, design arrangements and plans indicated or represented by this drawing are owned by, and are the property of Gelfand Partners Architects, Incorporated and were created, evolved, and developed for use on and in connection with this project. None of such ideas, arrangements, or plans shall be used by or disclosed to any person, firm, or corporation for any purpose whatsoever without the written permission of Gelfand Partners Architects Incorporated.Filing of these drawings or specifications with any public agency is not a publication of the same. No reproduction is therefore permissible without the written consent of Gelfand Partners Architects.
Site Plan and Section
777 PARK AVENUE SAN JOSE, CA 95126 [GPA PROJECT #1111]
FILE #PAS13-003537
Sheet
Drawing Record Issue/ Submission PD Permit Submittal
Date Issue/ Submission 10/30/14
Date
Site
A3
Professional
Role: Designer Gelfand Partners Architects
29
T
Plan with Units
Laurel Grove and Park Avenue Apartments
02
30
Justin Jennings : Portfolio
Site Views
Professional
Role: Designer Gelfand Partners Architects
31
Family Housing - North Elevation (Laurel Grove)
Laurel Grove and Park Avenue Apartments
02
32
Justin Jennings : Portfolio
Family Housing Perspective
Professional
Role: Designer Gelfand Partners Architects
Laurel Grove and Park Avenue Apartments
33
02
34
03
Justin Jennings : Portfolio
Villa San Pedro Apartments San Jose, CA
An update to a community of 100 affordable homes
Existing Units
Client: Housing Authority of the County of Santa Clara Completion: 2015
Professional
Role: Designer Gelfand Partners Architects
Villa San Pedro Apartments
35
03
Justin Jennings : Portfolio
36
(N) DUMPSTER ENCLOSURE
1 A6.23
5 A6.20
06.22
1
TYP
SITE FENCE PLAN
06.22
A2.06D
1 A6.20
1 A2.07D
1
06.22
A2.08D
(N) DUMPSTER ENCLOSURE AND MAINTENANCE SHED
BUILDING 7C
06.22
16 PARKING SPACES
20 PARKING SPACES
BUILDING 6C
BUILDING 8E
1
BUILDING 4B
NEW PLANTING AREA
A2.09D
1 A2.04D
1 A2.05D
BUILDING 5E
ENTRANCE PLANTING AREA/TRELLIS DANZE DRIVE
9 A6.20 1 A6.62
HC 2 A10.11
1 1
A2.14D
A2.01D
HC
BUILDING 9D
(N) DUMPSTER ENCLOSURE
15 PARKING SPACES
06.21
TYP
38 PARKING SPACES COMMUNITY BUILDING
06.22
BUILDING 3A
16 PARKING SPACES
MEDIAN PLANTING
1 A2.13D
1 A2.10D
1
NEW PLANTING AREA
A2.03D
1 A2.02D
06.22
06.22
HC
HC 1 A10.11
HC BUILDING 13C
14' - 10 1/4"
12 PARKING SPACES
10 PARKING SPACES
69' - 0"
BUILDING 2A
HC BUILDING 10E
13 PARKING SPACES 10 PARKING SPACES
1 A10.11
BUILDING 12D
PV CANOPY ABOVE
9 A6.20
1
BUILDING 11D
1
A2.12D
A2.11D
PARKING LOT TO REMAIN AS IS (N) DUMPSTER ENCLOSURE
Site Plan - New SCALE: 1" = 20'-0"
6/3/2013 11:41:23 AM
1
BENDORF DRIVE
All ideas, design arrangements and plans indicated or represented by this drawing are owned by, and are the property of Gelfand Partners Architects, Incorporated and were created, evolved, and developed for use on and in connection with this project. None of such ideas, arrangements, or plans shall be used by or disclosed to any person, firm, or corporation for any purpose whatsoever without the written permission of Gelfand Partners Architects Incorporated.Filing of these drawings or specifications with any public agency is not a publication of the same. No reproduction is therefore permissible without the written consent of Gelfand Partners Architects.
Site Plan: Ground
CARRYBACK AVENUE
BUILDING 1A
Role: Designer Gelfand Partners Architects
Professional
37 Architect
Keynotes 05.22
Gelfand Partners
METAL TRELLIS WITH POST BELOW METAL TRELLIS SUNSHADE SINGLE PLY PVC ROOFING AREA OF NEW PHOTOVOLTAIC PANEL ARRAY - SED SOLAR PV AND SOLAR THERMAL ARRAY MOUNTED ON NEW METAL TRELLIS - SED
16.21
A R C H I T E C T S
P
05.28 06.25 07.23 16.20
G
165 Tenth Street Suite 100 San Francisco, CA 94103 Tel. 415. 346 . 4040 Fax 415. 346 . 4103 www. gelfand-partners.com
Consultants
LANDSCAPE DESIGN:
CIVIL ENGINEERING: 1
1 07.23
A2.06
A2.07
1 A2.08
07.23
ELECTRICAL:
BUILDING 7C 06.25
TYP 07.23
BUILDING 6C
MECHANICAL/ PLUMBING:
BUILDING 8E
BUILDING 4B 06.25
TYP
1
STRUCTURAL:
A2.09
1 A2.04
1 A2.05 BUILDING 5E
07.23 BUILDING 9D
2 A6.62
Key Plan 06.25 16.21
1
07.23
05.28
A2.14
1 A2.01 05.28
07.23
16.21 16.20
16.21
05.28 COMMUNITY BUILDING
BUILDING 3A
05.28
BUILDING 1A
A3.01 2
SHEET NOTE
TYP
1. PAINT ALL INTERIOR
06.25
16.20
2. FINISHES ARE SCHED
2 A6.50
1 A2.13
3. SEE A9.01 FOR WALL Drawing Record PERMIT SET BID SET
1 A2.10
1 A2.03
05-07-13 06-03-13
1
07.23
A2.02
4. SEE WALL TYPE W10 BETWEEN ALL UNITS.
5. SEE FLOOR TYPE F2 SECOND FLOOR THROU
07.23
6. PROVIDE (2) FIXED M OPPOSITE WALLS AT A 16.21
BUILDING 2A
7. PATCH EXTERIOR ST INSTALLATIONS- MATCH
BUILDING 10E
07.23
BUILDING 12D
BUILDING 11D
07.23
8. PROVIDE 2x10 WOOD TOWEL BAR LOCATION BAR AND TOWEL BAR.
Architect 07.23
A
E
NO. C17265 REN. 5-31-13
T
1 A2.11
OF
CT
ST
1 A2.12
D A R CH SE I LISA JAY GELFAND
TE
16.20
EN
1
L IC
A3.01
07.23
05.22
N IA
BUILDING 13C
R
07.23
F CA L I
O
Project
Villa San Pedro 282 Danze Drive San Jose, CA
1/4" : 12" MIN. SLOPE- TYP 07.26
TYP
Project Number
Sheet
07.07
6/3/2013 11:41:38 AM
1
TYP
VILLA SAN PEDRO NEW ROOF PLAN
4
NEW ROOF PLAN 1" = 20'-0"
3
A1.04
A3.01
BLDG 1A - ROOF - NEW 1/8" = 1'-0"
C:\Revit projects\VSP\1221_Villa San Pedro_Site_cheryl.rvt
All ideas, design arrangements and plans indicated or represented by this drawing are owned by, and are the property of Gelfand Partners Architects, Incorporated and were created, evolved, and developed for use on and in connection with this project. None of such ideas, arrangements, or plans shall be used by or disclosed to any person, firm, or corporation for any purpose whatsoever without the written permission of Gelfand Partners Architects Incorporated.Filing of these drawings or specifications with any public agency is not a publication of the same. No reproduction is therefore permissible without the written consent of Gelfand Partners Architects.
4B
09.34
REF.
REF.
3 A6.50
TYP
TYPE IA KITCHEN- 7/A6.03 BATHROOM- 2/A6.
4B
12
12
BEDROOM-1
DN
UNIT
UNIT
1
224
240
1
11
UNIT
11
REF.
233
LIVING ROOM
BEDROOM-1
A
BEDROOM-2
A
13
BEDROOM-2 BEDROOM-1
15
UNIT
4A
LIVING ROOM 18
8
8
4C
4A
4B
4A 4C
4B
4B
4B
4B
4C
4C
REF.
215
11
TYPE IIA 1
12
4B
4A
DINING ROOM
4A
1
LIVING ROOM
DN E
8
4A
4B
4B
4A
BEDROOM-1 BEDROOM-2
18
11
4A
DN
A
TYP
TYP
REF.
PROVIDE FINISH PER W11 AT WALLS ADJACENT TO (N) . SHEAR PANELS TYP
UP
UNIT
A
05.31
BEDROOM-1
TYP
07.23 07.26 09.34 15.32
01.67
TYP
TYP
A
A
REF.
8
BATH.
KIT.
13
BEDROOM-2
BEDROOM-2
BEDROOM-1
5
11
KIT.
18 DW
BATH. 11
4A
17 11
BEDROOM
UNIT
KIT.
1
4C
LIVING ROOM
4B
8
4B
4C 4A
BATH.
BATH.
BATH.
BATH.
CLOSET CLOSET 4B
4B
4B
8
4B
8
KIT.
13
1
11
KIT.
UNIT
241
12
12
BEDROOM-1
BEDROOM-2
BEDROOM-2
BEDROOM-1
A
A
A
A
DINING ROOM
245
11
11
1
1
A
5
4C
4A
4B
A
12
LIVING ROOM
E
13
05.24
UP 1 A6.25 1 A6.21
LEGEND
BEDROOM
UP
WATER HEATER CLOSET
M
UNIT
BATH.
17
TYPE IIA
4A
LIVING ROOM
246
TYPE I
UNIT
REF.
A
4A
TYPE IA
KIT.
18
4C 4A
1
11
DW
1
LIVING ROOM
E
8
4A
11
REF.
REF.
237 TYPE IIA
4B
4B
REF.
TYPE I
4C
4A
4C
REF.
KIT.
233
4B
LIVING ROOM
11
TYPE IIA
5
12
BEDROOM
4C
UNIT 242
TYPE IIA
1
5
6/3/2013 11:20:48 AM
07.08
TYP
UP
A
4A
UNIT
12
TYP
TYP
238 1
UNIT 234 TYPE IA
1
TYP
8
A
05.26
PROVIDE METAL R STAIR METAL RAILINGS METAL RAILING A METAL TRELLIS STEEL TRELLIS CO COMPOSITE LUMB SHEAR PLY- SSDROOF HATCH RAIN WATER LEAD CONNECTION SINGLE PLY PVC R SCUPPER & COLL PATCH CEILING A HEAT PUMP- SMD
1 A6.50
LIVING ROOM
A
05.26
8
LIVING ROOM
05.24 05.26 05.28 05.31 06.30 06.43 07.07 07.08
E
1 A6.24
13
M
01.67
12
1
REF.
4C
KEYNOTES A
4A
11
1
TYP
DINING ROOM
BEDROOM
LIVING ROOM
06.30
KIT.
BEDROOM
A
13 05.26
13 A
TYPE IIA KITCHEN- 7/A6.03 BATHROOM- 6/A6.
5
4C
BLDG 1A - 2nd FLOOR - NEW 1/8" = 1'-0"
8
LIVING ROOM
UNIT 222 TYPE IA
UNIT
BEDROOM-2 BEDROOM-1
A
TYP
4A
227
214
4A 12
05.26
BATH.
11
REF.
TYPE IIA
12
A
12
1
11
UNIT
REF.
A
BEDROOM
4C
TYPE I
13
05.24
1
8
UNIT 11
BEDROOM
4A 4C
06.43
DN
221 TYPE IIA
TYPE I 5
2
LIVING ROOM
15
TYPE IIA
TYPE IA
A
A
8
LIVING ROOM
13
A
13 8
REF.
4C 4A
REF.
A
APARTMENT EN
TYPE I KITCHEN- 10/A6.03 BATHROOM- 1/A6.
TYP
TYP
05.24
N
BLDG 1A - 1st FLOOR - NEW 1/8" = 1'-0"
All ideas, design arrangements and plans indicated or represented by this drawing are owned by, and are the property of Gelfand Partners Architects, Incorporated and were created, evolved, and developed for use on and in connection with this project. None of such ideas, arrangements, or plans shall be used by or disclosed to any person, firm, or corporation for any purpose whatsoever without the written permission of Gelfand Partners Architects Incorporated.Filing of these drawings or specifications with any public agency is not a publication of the same. No reproduction is therefore permissible without the written consent of Gelfand Partners Architects.
Site Plan: Roof / Typical Apartment Plan
Villa San Pedro Apartments
03
Justin Jennings : Portfolio
38
2 A6.08
4 A6.06 1' - 7 1/4"
2' - 4"
3' - 6"
TYP
0
06.41 W9 8' - 0"
24
34C
8' - 0"
5' - 5 1/4"
05.32
06.16 06.41 24
UP
3' - 6"
06.44
06.16
34A
34A
34A 06.44
07.26 06.41
R
24
24
4' - 11 1/4"
4' - 11 1/4"
06.41
3' - 6"
06.16 B J
W9
3' - 6"
3' - 6"
8' - 0"
05.32
05.32
W9
8' - 0"
EW
6
W9
TYP
10' - 0"
3 BR TOWNHOME - 2ND FLOOR - NEW 1/4" = 1'-0"
4 A6.07
4
4 BR TOWNHOME 1/4" = 1'-0"
4 A6.06
06.42 PROVIDE - 4
33
DW
05.32
ABOVE
05.32
REF.
ABOVE
UP
W2
W1
TYP UON 03.02
DINING
4B
06.41
3' - 9 3/4"
G
LIVING
R - NEW
6' - 5 1/4"
Z
1
G 05.32 ABOVE
05.32
10' - 3 7/8"
ABOVE
17' - 3 97/256"
05.32
W
14
5
10' - 2"
B
ABOVE
10' - 4 225/256"
N
2
3 BR TOWNHOME- 1ST FLOOR - NEW 1/4" = 1'-0"
N
KEYNOTES 02.61 03.02 05.32 06.16 06.24 06.41 06.42 06.44
EXISTING CONCRETE PATIO, PRIVATE OPEN SPACE TO REMAIN CONCRETE SLAB ON GRADE - SSD METAL AWNING - SEE A11/A10.12 & SSD PLYWOOD DECK - SSD WINDOW SEAT EXTENSION ROD AND SHELF W/ 1x4 LEDGER SUPPORT SHELVES W/ 1x4 LEDGER SUPPORT FIBER CEMENT ENCLOSURE @ SOLAR PIPES - TYP
Typical 3 BR Townhouse Plan
1
4 BR TOWNHO 1/4" = 1'-0"
Professional
Role: Designer Gelfand Partners Architects
Villa San Pedro Apartments
39
03
Justin Jennings : Portfolio
40
A
B
C
D
E
F
G
A
B
C
1
2
2
A3.25
A3.25
A3.25
A3.14
ELEC.
1
1
1
STORAGE
ELECTRICAL 1C 01.90
P
FIXED GUSSET Y
2
2D
SOCIAL SERVICES OFFICE
0' - 8"
KITCHEN 5
S-1
W1
W6
3
7
A8.02
W2
WINDOW ABOVE
S6
4
2A PT-1
PT-1
W
3 RT 2E
7' - 3"
6' - 2"
*
2B
1P
W
WINDOW ABOVE
S6
S4
X
WINDOW ABOVE
7' - 4 3/4"
RT
4
W2
2.5
WINDOW ABOVE
S5
W
*
NEW LANDING SSD
W6
OFFICE-1
6
REF.
W6
A3.15
2.5
X
Y
DW
X 1
0' - 9 3/4"
2
COMMUNITY ROOM
PT-1 W6
OFFICE-2
W2
4
DN
ROLL DOWN DOOR
RT W6
9
FIXED GUSSET
5
12
COMPUTER
A3.14
A-3 OCCUPANCY
10
A8.01
W9
W6
4
2J
6 MELAMINE SHELVES ON SURFACE MOUNTED TRACK
W6
3
W6
W6
*
G RIN VE CO
2
B OCCUP
RT
X
12
A6.15
4 5
-2 PT
10.46
MENS TOILET
(N) ROOF HATCH ABOVE
7 10
A6.15
PT-1
LO
(N) H PER D __/__
SPECIAL WALL COVERING #1 1 A6.15
A8.02 11
9
12
PT-1
DN
RT
ZZ
*
W1
8
A6.15
1L
3
6
8 *
TOILET
PT-2
PT-1
13
RT
" 3/4 '-3 12
S-3
14
1M
A8.03
UP
RT
B OCCUPANCY
3
RT 2H
BULLETIN BOARD
LOBBY
LOBBY 1 A6.14
WOMENS TOILET
*
2G
W6
1' - 9 1/2"
A3.14
11
R
8
8 2
2F
*
1N
W1
2 A6.15
4' - 2"
ALIGN OPENING W/ WALL OF BATHROOM BELOW
4 W2
#2
-2 PT
LL WA IAL EC SP
V.I.F.
2C
7' - 3"
A8.02
" 1/4 '-5 10
2
2
A3.14
W
R
1
A8.03
W6
OFFICE-3
5
11
1 3
7' - 3 1/4"
LINE OF STAIR ABOVE
FIXED SHELF
± 51" CLR
S-2
FLOOR ABOVE
X
ROOF ABOVE
9
1A
9 10.43
ZZ
14.09
1 A10.14
01.91
6' X 6' WALK OFF MAT
(N) HANDRAIL
TYP 10.43
10.43
14.09
Architect
3
Gelfand Partners
(E) STAIR
A3.14
F
G
A
B
C
1 A3.25
2
A3.14 1
A R C H I T E C T S
D
E
F
P
E
G
G
1
2
A3.25
COMMUNITY BLDG -A3.25 2nd FLOOR - NEW 1/4" = 1'-0"
A3.14
ELEC. MAIN
1
1
SHEET NOTES
01.90 01.91 02.67 02.68 10.43 10.46 14.09
GLASS ROLL UP DOOR - TRACK TO BE MOUNTED PARALLEL TO CEILING SLOPE
1C P
3.DEMO ALL (E) INT. GYP BD / PLASTER AT ALL WALLS & CEILING - U.O.N
2
1D
4. DEMO ALL (E) FLOORING FINISH BACK TO SUBFLOOR - TYP 5. DEMO ALL INT. WINDOW TRIM DOOR TRIM & BASEBOARDS
P
1T
3
8. DEMO ALL DOWNSPOUTS, SCUPPERS, AND SPLASH BLOCKS
1P
0' - 9 3/4"
12. DEMO ALL (E) BATHROOMX FIXTURES & ACCESSORIES.
1F
P
W6
7' - 4 3/4"
13. SEE MECH DWGS FOR EQUIPMENT REMOVAL 6/3/2013 11:21:47 AM
P
1
REC ROOM
11. DEMO ALL (E) KITCHEN CABINETS, FIXTURES & APPLIANCES. WINDOW ABOVE
P
P
3
S4
(E) ROOF LADDER TO REMAIN (E) SHAFT TO REMAIN (E) CLAY TILE ROOFING TO REMAIN (E) PIPE COLUMN TO REMAIN 2" PAINTED HIGHLIGHT STRIP, 1" FROM NOSING, AT ALL TREADS MEDICINE CABINET WITH MIRROR (E) ELEVATOR TO REMAIN - PROVIDE NEW FLOORING
2
10. SEE DEMO EXTERIOR ELEVATIONS DRAWINGS FOR DEMO OF AWNINGS & EXTERIOR PLASTER W
A8.01
W2
9. 2.5 DEMO ALL INTERIOR DOORS AND TRIM
WINDOW ABOVE
S5
P
4
W6
OFFICE-1
7. DEMO ALL ROOF FLASHING
1E
0' - 8"
X 6. DEMO ALL ROOFING BACK TO SUBSTRATE
W
A-3 OCCUPANCY
02.67 02.68
OFFICE-2
P
W2
14. 4PROVIDE (2) FIXED METAL LOUVERS, MINIMUM 8" x 12" AT OPPOSITE WALLS AT ALL FLAT ROOFWALL JOIST SPECIAL AREAS. COVERING #2
P
15. PROVIDE 2x10 WOOD BLOCKING AT ALL GRAB BAR AND ALL TOWEL BAR LOCATIONS, EXTEND 6" 7' - 3 1/4" 7' - 3" LINE OF STAIR BEYOND ABOVE EBD IF EACH GRAB BAR AND TOWEL BAR.
7' - 4 3/4"
6 MELAMINE SHELVES ON SUFRACE MOUNTED TRACK
All ideas, design arrangements and plans indicated or represented by this drawing are owned by, and are the property of Gelfand Partners Architects, Incorporated and were created, evolved, and developed for use on and in connection with this project. None of such ideas, arrangements, or plans shall be used by or disclosed to any person, firm, or corporation for any purpose whatsoever without the written permission of Gelfand Partners Architects Incorporated.Filing of these drawings or specifications with P any public agency is not a publication of the same. No reproduction is therefore permissible without the written consent of Gelfand Partners Architects.
5 6 MELAMINE SHELVES ON SURFACE MOUNTED TRACK
W6
A3.14
4
3
2 A6.15
WOMENS TOILET
-2 PT
*
14
X
12
PT-1
RT 10.46
(N) ROOF HATCH ABOVE
7 10
A6.15
± 51" CLR
MENS TOILET
PT-2
5
A6.15
1Q PT-1
P
*
PT-1
LOBBY
SPECIAL WALL COVERING #1
BULLETIN BOARD
10.43
1 A6.15
W
W
TYP
ELEVATOR EQUIPMENT ROOM
1J
1G
6
PT-1
A8.01
(E)
P
D
D
FIXED GUSSET BELOW
10.46
(E)
(E) 1H
MAINTENANCE RT
A3.14
8
7 D
FIXED PLASTIC LAMINATE COUNTERTOP - SEE 9/A10.03
RT
12
1A
2
36" WIDE ACCESSIBLE COUNTER - 34" AFF MAX
PT-1 UP
*
D
Key Plan
W
STACKED WASHERS
STACKED DRYERS
W2
PT-1
FLOOR ABOVE
W
D
1K
A8.02 11
X
W
LAUNDRY
3' - 4 1/4"
(N) HANDRAIL PER DETAIL __/__
W1
9
W
BENCH
W6
5
*
3
8
1S
CLOSET W6
SPECIAL WALL COVERING #2
" 11
-2 PT
1L
W6
1'
8 *
TOILET
6
RT
E) STAIR
9 10.43
01.91
6' X 6' WALK OFF MAT
(N) HANDRAIL 10.43
1 A10.14
14.09
H
TYP
Drawing Record
H
PERMIT SET
3
(E) STAIR
A3.14
1 KEYNOTES
COMMUNITY BLDG - 1st FLOOR - NEW 1/4" = 1'-0"
Community Building
LEGEND
Architect SE
D A R CH
I
T
N
2H
4
13
10
B OCCUPANCY
RT
UP
A6.15
A8.02
1M
A8.03 2
11
W6
1R
9 8
W2 A3.14
02.68
*
1N
W1
W 2
2G
W6
OFFICE-3
2' - 5"
A-3 OCCUPANCY
- 1st FLOOR - NEW
1/4" = 1'-0"
LANDSCAPE DESIGN:
2. DEMO ALL (E) WOOD EXT. WINDOW SILL, JAMB, HEAD TRIM.
WINDOW ABOVE
1
KEYNOTES ELECTRICAL
1. DEMO ALL (E) WINDOWS.
S6
165 Tenth Street Suite 100 San Francisco, CA 94103 Tel. 415. 346 . 4040 Fax 415. 346 . 4103 COMMUNITY BLDG www. gelfand-partners.com
05-07-13
Role: Designer Gelfand Partners Architects
Professional
41 Architect
Gelfand Partners A R C H I T E C T S
P
G
165 Tenth Street Suite 100 San Francisco, CA 94103 Tel. 415. 346 . 4040 Fax 415. 346 . 4103 www. gelfand-partners.com
LANDSCAPE DESIGN:
4
3
2.5
2
1
TO BOTTOM OF EXISTING CEILING ON ROOF STRUCTURE
5
9
8
5
4
3
2.5
2
1
Key Plan
9' - 0"
8
1 A3.15
9' - 0"
9
1 A3.15
9' - 0"
9' - 0"
9' - 6 1/2"
GROUND FLOOR 0"
GROUND FLOOR 0"
Drawing Record PERMIT SET
05-07-13
COMMUNITY BUILDING SECTION A 1/4" = 1'-0"
KEYNOTES
LEGEND
Architect
L IC
D A R CH
LISA JAY GELFAND
A
NO. C17265 REN. 5-31-13
T
OF
I
CT
ST E
SE
TE
EN
SHEET NOTES
1
N IA
COMMUNITY BUILDING SECTION B 1/4" = 1'-0"
R
2
F CA L I
O
Project
Villa San Pedro 282 Danze Drive San Jose, CA Project Number
Sheet
COMMUNITY BUILDING SECTIONS 6/3/2013 11:24:35 AM
A3.25 C:\Users\jonathan\Documents\1221_Villa San Pedro_Apartments_CENTRAL_jonathan.rvt All ideas, design arrangements and plans indicated or represented by this drawing are owned by, and are the property of Gelfand Partners Architects, Incorporated and were created, evolved, and developed for use on and in connection with this project. None of such ideas, arrangements, or plans shall be used by or disclosed to any person, firm, or corporation for any purpose whatsoever without the written permission of Gelfand Partners Architects Incorporated.Filing of these drawings or specifications with any public agency is not a publication of the same. No reproduction is therefore permissible without the written consent of Gelfand Partners Architects.
Villa San Pedro Apartments
03
Justin Jennings : Portfolio
2
1
A6.53
A6.53
Architect
SHEET NOTES
Gelfand Partners A R C H I T E C T S
P
1. SIMILAR TO TRELLIS 1A - SEE SHEET A6.50 AND A 6.51 FOR NOTES, DIMENSIONS, AND DETAIL CALLOUTS
PATCH AT RELOCATED SCUPPER TO MATCH EXISTING TYP
SOLAR THERMAL PANELS - SMD
G
165 Tenth Street Suite 100 San Francisco, CA 94103 Tel. 415. 346 . 4040 Fax 415. 346 . 4103 www. gelfand-partners.com
19' - 3" VIF
ALIGN WITH (E) ROOF DIAPRAGM - SSD
LANDSCAPE DESIGN:
4
BLDG 2A - SOUTH ELEVATION - NEW 1/4" = 1'-0" 2 A6.53
RELOCATE COLLECTOR HEAD AND SCUPPER TO AVOID CONFLICT WITH TRELLIS BEAM TYP.
05.41
16.23
Key Plan 1 A6.53
KEYNOTES 02.61 05.01 05.23 05.24 05.31 05.41 06.22 16.23 (E) FACE OF BUILDING 2
EXISTING CONCRETE PATIO, PRIVATE OPEN SPACE TO REMAIN STEEL BEAM – SSD NEW METAL RAILINGS AT BALCONY METAL RAILINGS & METAL RISERS AT (E) STAIRS PER A6.25 STEEL TRELLIS COLUMN & FOOTING- SSD TS PURLIN NEW 6'-0" COMPOSITE LUMBER FENCE SOLAR PV PANEL- SED
05.01
TRELLIS 2A - ROOF 1/4" = 1'-0" 2 A6.53
Drawing Record
RELOCATED DOWNSPOUT TYP.
1
PERMIT SET
A6.53
05.23
05-07-13
TYP
COMPOSITE LUMBER DECKING (N) GUARDRAIL PER 8/A10.12
Architect D A R CH
LISA JAY GELFAND
NO. C17265 REN. 5-31-13
OF
I
N IA
EN
L IC
E
T
3 A6.25
A
2 A6.25
A6.53
SE
CT
2
TE
ST
TRELLIS 2A - 2ND FLOOR 1/4" = 1'-0"
R
LEGEND 3
F CA L I
O
Project
Villa San Pedro 282 Danze Drive San Jose, CA
1 A6.53
SIM. TO TRELLIS 1A - SEE SHEET A6.51 FOR COLUMN LOCATIONS
Project Number 05.31
6/3/2013 11:26:23 AM
1
Sheet
TYP
TRELLIS 2A - 1ST FLOOR VIEW 1/4" = 1'-0"
06.22
TYP
02.61
TYP
TRELLIS 2A 05.24
A6.52
TYP
PATCH CONCRETE AT REMOVED CONC. TYP.
C:\Users\jonathan\Documents\1221_Villa San Pedro_Apartments_CENTRAL_jonathan.rvt All ideas, design arrangements and plans indicated or represented by this drawing are owned by, and are the property of Gelfand Partners Architects, Incorporated and were created, evolved, and developed for use on and in connection with this project. None of such ideas, arrangements, or plans shall be used by or disclosed to any person, firm, or corporation for any purpose whatsoever without the written permission of Gelfand Partners Architects Incorporated.Filing of these drawings or specifications with any public agency is not a publication of the same. No reproduction is therefore permissible without the written consent of Gelfand Partners Architects.
Architect
Gelfand Partners A R C H I T E C T S
P
(E) ROOF DIAPHRAGM
(E) ROOF DIAPHRAGM
(E) PARAPET
(E) PARAPET
SOLAR THEMAL PANELS SMD
SOLAR THEMAL PANELS SMD
SUPPORT STRCTURE FOR PANELS BY SOLAR PANEL PROVIDER
SUPPORT STRCTURE FOR PANELS BY SOLAR PANEL PROVIDER
POLYCARBONITE PANEL
POLYCARBONITE PANEL
TS PURLIN
TS PURLIN
G
165 Tenth Street Suite 100 San Francisco, CA 94103 Tel. 415. 346 . 4040 Fax 415. 346 . 4103 www. gelfand-partners.com
LANDSCAPE DESIGN:
NEW METAL TRELLIS STRUCTURE SSD
NEW METAL TRELLIS STRUCTURE SSD
MTL GUARDRAIL AT (E) BALCONY
(E) STL BALCONY SUPPORT
Key Plan COMPOSITE LUMBER PATIO FENCE
CONC FOOTING SSD
Drawing Record PERMIT SET
3
05-07-13
TRELLIS 2A - PERSPECTIVE
KEYNOTES
LEGEND
Architect
L IC
A
T
E
SE
D A R CH
LISA JAY GELFAND
NO. C17265 REN. 5-31-13
OF
I
CT
ST
1. SIMILAR TO TRELLIS 1A -SEE A6.50 AND A6.51 FOR NOTES, DIMENSIONS AND DETAIL CALLOUTS
TE
EN
SHEET NOTES
2
TRELLIS 2A - SECTION B 1/2" = 1'-0"
N IA
TRELLIS 2A - SECTION A 1/2" = 1'-0"
R
1
F CA L I
O
Project
Villa San Pedro 282 Danze Drive San Jose, CA Project Number
Sheet
TRELLIS 2A SECTIONS
6/3/2013 11:26:48 AM
42
Solar Shade Structures
All ideas, design arrangements and plans indicated or represented by this drawing are owned by, and are the property of Gelfand Partners Architects, Incorporated and were created, evolved, and developed for use on and in connection with this project. None of such ideas, arrangements, or plans shall be used by or disclosed to any person, firm, or corporation for any purpose whatsoever without the written permission of Gelfand Partners Architects Incorporated.Filing of these drawings or specifications with any public agency is not a publication of the same. No reproduction is therefore permissible without the written consent of Gelfand Partners Architects.
A6.53 C:\Users\jonathan\Documents\1221_Villa San Pedro_Apartments_CENTRAL_jonathan.rvt
Role: Designer Gelfand Partners Architects
Professional
SHEET NOTES
43
Architect
Gelfand Partners A R C H I T E C T S
P
G
165 Tenth Street Suite 100 San Francisco, CA 94103 Tel. 415. 346 . 4040 Fax 415. 346 . 4103 www. gelfand-partners.com
Consultants
LANDSCAPE DESIGN:
CIVIL ENGINEERING:
ELECTRICAL:
MECHANICAL/ PLUMBING:
STRUCTURAL:
Key Plan
KEYNOTES 03.01 05.01 05.02 05.33
2 A6.61
3
PARKING PV CANOPY PERSPECTIVE
CONCRETE FOOTING - SSD STEEL BEAM – SSD STEEL COLUMN – SSD STEEL PV SUPPORT STRUCTURE -SSD
1 A6.61
SOLAR PV PANELS - SED ATTACHMENT TO HSS RUNNERS BY PROVIDER
05.33
TYP
05.01
TYP
8' - 0 1/2"
HSS RUNNER - SSD 3' - 11 1/4"
1' - 2 1/4"
1' - 11 1/4"
Drawing Record W8 GIRDER - SSD
05.01
PERMIT SET BID SET
05-07-13 06-03-13
TYP
WELD TS PURLIN TO FLANGE OF BEAM TYP
12' - 8 3/4"
Architect D A R CH
LISA JAY GELFAND
I
CT
L IC
SE
TE
EN
LEGEND TYP
ST A
T
E
NO. C17265 REN. 5-31-13
OF
N IA
03.01
R
TYP
12' - 0"
05.02
11' - 4 1/2"
OPEN TYP
F CA L I
O
Project
Villa San Pedro 282 Danze Drive San Jose, CA Project Number 2
PARKING PV CANOPY SECTION B 1/2" = 1'-0"
1
PARKING PV CANOPY SECTION A 1/2" = 1'-0"
Sheet
PARKING PV CANOPY SECTIONS
6/3/2013 11:43:09 AM
A6.61 C:\Revit projects\VSP\1221_Villa San Pedro_Site_cheryl.rvt All ideas, design arrangements and plans indicated or represented by this drawing are owned by, and are the property of Gelfand Partners Architects, Incorporated and were created, evolved, and developed for use on and in connection with this project. None of such ideas, arrangements, or plans shall be used by or disclosed to any person, firm, or corporation for any purpose whatsoever without the written permission of Gelfand Partners Architects Incorporated.Filing of these drawings or specifications with any public agency is not a publication of the same. No reproduction is therefore permissible without the written consent of Gelfand Partners Architects.
Villa San Pedro Apartments
03
Justin Jennings : Portfolio SHEET NOTES
EXTENT OF TRELLIS ABOVE
9 A6.63 11
(E) TREE TO REMAIN
A6.63 11 A6.63
2' RADIUS AROUND CENTER OF TRUNK
8 A6.63
7 A6.63
EQ
EQ EQ
6 A6.63
EQ
95' - 5 121/128"
130.00째
EQ
R 42' - 0"
R 49' -
KEYNOTES 0"
EQ
5
EQ
A6.63
1
1
A6.63
A6.63 EQ
4 A6.63
3 A6.63
10
10
A6.63
A6.63 2 A6.63
LEGEND
2
ENTRY TRELLIS - ROOF 1/4" = 1'-0"
Entry Trellis - Ground 1/4" = 1'-0"
1
Architect
Gelfand Partners A R C H I T E C T S
P
G
6/3/2013 11:43:29 AM
All ideas, design arrangements and plans indicated or represented by this drawing are owned by, and are the property of Gelfand Partners Architects, Incorporated and were created, evolved, and developed for use on and in connection with this project. None of such ideas, arrangements, or plans shall be used by or disclosed to any person, firm, or corporation for any purpose whatsoever without the written permission of Gelfand Partners Architects Incorporated.Filing of these drawings or specifications with any public agency is not a publication of the same. No reproduction is therefore permissible without the written consent of Gelfand Partners Architects.
165 Tenth Street Suite 100 San Francisco, CA 94103 Tel. 415. 346 . 4040 Fax 415. 346 . 4103 www. gelfand-partners.com
Consultants
LANDSCAPE DESIGN:
CIVIL ENGINEERING:
18
16
A10.13
7' - 11 3/4"
A10.13
ELECTRICAL:
17 A10.13
4' - 6 3/4"
MECHANICAL/ PLUMBING:
7 A10.12
SIM STRUCTURAL:
9
Entry Trellis Elev 1 1/4" = 1'-0"
8
Entry Trellis Elev 2 1/4" = 1'-0"
7
Entry Trellis Elev 3 1/4" = 1'-0"
6
Entry Trellis Elev 4 1/4" = 1'-0"
5
Entry Trellis Elev 5 1/4" = 1'-0"
4
Entry Trellis Elev 6 1/4" = 1'-0"
3
Entry Trellis Elevation 7 1/4" = 1'-0"
2
Entry Trellis Elev 8 1/4" = 1'-0"
7' - 0"
EQ
EQ
EQ
EQ
EQ
EQ
EQ
TS PURLIN - TYP
TS PURLIN SSD
Key Plan Entry Trellis - Top 12' - 0"
STEEL TRELLIS - SSD STEEL ANGLE SUPPORT FRAME FOR STEEL MESH PANEL
3' - 7 1/4"
1" X 8" FENCING SLAT
(E) CONCRETE SIDEWALK 1X SEATING TOP
0' - 7"
Date
0' - 5"
0' - 7 1/2"
Issues/Submission
Section 11 1/2" = 1'-0"
LEGEND
Architect D A R CH
LISA JAY GELFAND
NO. C17265 REN. 5-31-13
T
OF
I
CT
A
E
SE
TE
ST
Entry Trellis
10
Drawing Record
2" X 8" BENCH SUPPORT
N IA
KEYNOTES
TRELLIS FRAME ELEVATION 1/2" = 1'-0"
1" X 8" SEATING FASCIA 0' - 7 1/4"
0' - 7 1/4"
1
0' - 7 1/4"
CONCRETE FOOTING - SSD
EN
14 A10.13
R
SHEET NOTES
Section 6 1/2" = 1'-0"
15 A10.13
PERFORATED GSM PANEL WITH CUTOUT SIGNAGE STEEL ANGLE SUPPORT FOR MESH PANEL
L IC
11
8X FENCE SLAT
0' - 2 1/4"
PERFORATED GSM PANEL
STEEL TRELLIS FRAME - SSD
0' - 11 1/4"
0' 0' - 4" - 7 1/4"
8X FENCE SLAT
2' - 2 3/4"
SHAPED 4X4 WOOD POST
0' 0' - 4" - 7 0' 1/4" - 7 0' 1/4" - 7 0' 1/4" - 7 1/4" 1' - 2 1/2"0' - 10 1/4"
44
F CA L I
O
Project
Professional
Role: Designer Gelfand Partners Architects
45
Arch
Ge A
G
LAND
CIVIL
ELEC
MECH
STRU
FIRE
3
Entry Trellis Perspective 3
L IC
EN
Archi
ST
Entry Trellis Perspective
03 A
Villa San Pedro Apartments
E
T
1
S
46
04
Justin Jennings : Portfolio
Fairmeadow Elementary School Palo Alto, CA
A high performance addition and renovation
Client: Palo Alto Unified School District Completed: 2012
Professional
Role: Construction Administration Gelfand Partners Architects
Fairmeadow Elementary
47
04
48
05
Justin Jennings : Portfolio
Novoshahktinsk Supportive Housing Novoshahktinsk, Russia
A model for supportive housing in Russia
Client: Gloria Jeans Charity Foundation Two week workshop - Fall 2013
Fore-Court Perspective (above)
Professional
Site Conext (below)
Role: Designer Gelfand Partners Architects
Novoshahktinsk Social Housing
49
05
50
Justin Jennings : Portfolio
Interior Communal Courtyard
Professional
Plan
Role: Designer Gelfand Partners Architects
Novoshahktinsk Social Housing
51
05
52
Justin Jennings : Portfolio
Solar PV Electric Panels Solar Thermal Preheating System
Infrastructure Canopy as Arcade at Pedestrian Level
Interstitial Mechanical Level Accepts Connections to Urban Systems Vertical Glass Algae Tube Facade
South Facing WIndows Shaded by Algae Tubes and Support Structure Radiant Heating/Cooling
Algae Collection Tank Concrete Structure with Passive House Construction
Biodiesel Electric Generator CO Emissions Captured and Pumped through Algae Water
Canopy Pulls Public Space through Ground Level into Courtyard
Heat Exchanger and Hydronic Pump Algae Tubes on South Facing Facades
Energy Generation:
Assumed Demand Load: 1,855,000 kWh/yr
Solar Production: 19.64 (kWh/yr/sf in Merced) x [(114,000 sf of total roof space) x (70% coverage of PV panels)] = 1,572,530 kWh/yr
06
Belleview BioFacade Net-Zero District
Algae Production: (131,000 sf of southern facing facade) x (3,750 gallons biodiesel/acre) (43,560 sf/acre) = 11,278 gallons biodiesel/year
Buildings Step Down to Allow Solar Coverage on Algae Facade and Provide Roof Garden
Davis, CA
11,278 gallons biodiesel x (34.98 kWh/gallon) = 394,456 kWh/yr
Housing Forms Frame Smaller Courtyard Spaces
Total Energy Production = 1,572,530 + 395,456 = 1,967,986 kWh/yr
Architecture at Zero 2012
An Algea-fueled net zero energy campus plan
Larger Urban Scale Maintained at Exterior of Block
Student Housing Site Plan Algae Tubes on South Facing Facades
Study
Buildings Step Down to Allow Solar Coverage on Algae Facade and Provide Roof Garden
Roof Garden
Typical Single Loaded Module Upperclass Suites
Housing Forms Frame Smaller Courtyard Spaces
Lounge
Underclass Dorm Rooms Upperclass Dorms
Larger Urban Scale Maintained at Exterior of Block
Typical Upper Floor Plan
Typical Double Loaded Module
Student Housing Site Plan
March 21
Study
Roof Garden
Student Building 9AM
June 21
December 21
Canopy Below
Professional
Site Master Plan Board
Role: Designer Gelfand Partners Architects
Belleview BioFacade District
53
06
54
07
Justin Jennings : Portfolio
Hamad International Airport Doha, Qatar
A new hub for an ambitious middle east city
Client: New Doha International Airport Completed: 2014
Professional
Role: Construction Administration HOK
Hamad International Airport
55
07
56
08
Justin Jennings : Portfolio
Architectural Fictions of the Dispersed City Masterâ&#x20AC;&#x2122;s Thesis
De-objectifying the American Suburb
Thesis, Spring 2012 San Jose, CA
Set in the culture of the economic meltdown and subsequent housing crisis, this project explores methods of discomforting and re-spatializing the suburban setting of San Jose, CA. Through the building of a series of architectural analogs that focused on the dissolution of the object within the field, the project sought ways to create an interactive and empowering urbanism within the linear, dispersed city. The sprawling mazes of houses, streets, feeders and highways offers a comforting sense of security, but casts a dark gloom of isolation and disconnection. This project seeks to override that disconnection by breaking up the disorienting pattern of maze-like streets and objective primacy of the single family home by proposing redevelopment methods that allow for new pedestrian pathways to local transit hubs, rezoning to allow for small businesses within the cul-de-sacs, and public park spaces with orientation towers built into the unused spaces of back and side yards. Struggling home owners can refinance their homes to affordable levels by selling portions of their land to a public entity that overseas the creation of the new park-ways.
Student
Rhode Island School of Design Critic: Almin Prsic
57
As an exploration of the architectural process, this project finds a space between an analytical planning exercise and that of an art practice, producing a series of objects that move from purely sculptural toward the architecturally representative model. It looks for ways to find ideas through the intuition of making and experimenting, then presents the process as the finished product, with each experiment carrying the equal weight of a final solution. It states that architecture is not just in the final building, but in the collection of artifacts throughout the design process.
Architectural Fictions of the Dispersed City
08
58
Justin Jennings : Portfolio
Y
Y
X
Open Cartesian Spatial Grid Direct Proximities
X
Open Urban Spatial Grid Indirect Proximities
Y
Y
X
X
Subdivided Urban Spatial Grid Indirect Proximities
Subdivided Urban Spatial Grid Limited Access Proximities
Linearization of travel space
Student
Rhode Island School of Design Critic: Almin Prsic
59
Y
Y
X
X
Subdivided Suburban Spatial Grid Linear Fixed-Route Proximities
Subdivided Suburban Spatial Grid Linear Fixed-Route Transverse Proximities
j
c(t) Unfolded Linear Path Space Travel Space and Transverse Proximities
Architectural Fictions of the Dispersed City
08
60
Justin Jennings : Portfolio
San Jose
Student
Rhode Island School of Design Critic: Almin Prsic
Architectural Fictions of the Dispersed City
61
08
62
Justin Jennings : Portfolio
Analog Models
Student
Rhode Island School of Design Critic: Almin Prsic
Architectural Fictions of the Dispersed City
63
08
64
Justin Jennings : Portfolio
Nodal Intervention and Pedestrian Pathway
Student
Rhode Island School of Design Critic: Almin Prsic
Architectural Fictions of the Dispersed City
65
08
66
Justin Jennings : Portfolio
Student
Rhode Island School of Design Critic: Almin Prsic
Architectural Fictions of the Dispersed City
67
08
68
09
Justin Jennings : Portfolio
Wells-Lamson Art Hike Advanced Studio Project
A campus for artists cut into an abandoned quarry
Breaking Ground Advanced Studio, Fall 2011 Barre, VT
Answering a competition brief for an artist-in-residency program to be established at the site of an abandoned quarry in Barre, VT, this project cuts a hiking path into the hills around the site and positions four studio-residences along the hike. The act of travelling through the site builds a connection to the environment and immerses visitors and artists into the rich experience of place in the Vermont mountains, while forming a relationship with the massive void of the quarry pit. A wooded walkway perched along a hillside cuts into the landscape, exposing the hillside granite as retaining wall, and expands in width to accomodate the studio buildings. The artistsâ&#x20AC;&#x2122; studio reside within the path, merging the visitorsâ&#x20AC;&#x2122; experience of the natural landscape along the hike with that of the studio visit. At the studio, the path splits levels to allow hikers to ascend into the studio space, or bypass downward and around.
Student
Rhode Island School of Design Critic: Silvia Acosta
69
Sense of place builds through the long, slow walk in the woods, giving hints of the siteâ&#x20AC;&#x2122;s geology by occupying the excavated graniteâ&#x20AC;&#x2122;s space, and immersion in the local environment, offering heavilly secluded areas of wildnerness and overlooking vistas of the whole area. Also, a sense of place is understood historically and culturally as the path visits relics of the non-operational quarry and the abandoned railway that traverses the site. Ultimately the artist and visitors come to understand the creative process within the context of natural and geographic timelines.
Wells Lamson Art Hike
09
70
Justin Jennings : Portfolio
landscape artist
performance artist
Site Plan and Unfolded Section
Rhode Island School of Design Critic: Silvia Acosta
Student
71
visitor center
literary artist
visual artist
Wells Lamson Art Hike
09
72
Justin Jennings : Portfolio
Visual Artist Studio Plan
Student
Rhode Island School of Design Critic: Silvia Acosta
Wells Lamson Art Hike
73
09
74
Justin Jennings : Portfolio
Student
Rhode Island School of Design Critic: Silvia Acosta
Wells Lamson Art Hike
75
09
76
10
Justin Jennings : Portfolio
Adaptive Growth Hut
Core Studio Design Build
A community garden prototype
Architectural Design, Spring 2010 Providence RI
Student
Rhode Island School of Design Critic: Hansy Better
Adaptive Growth Hut
77
10
78
Justin Jennings : Portfolio Spring Planting
Summer Planting
Return
Harvest
Growth Late Stage
Growth Mid Stage
Growth Early Stage
Planting
Fertilization
Fall Planting
11
Magazine Beach Chicken Coup and Garden Advanced Studio Project
An ephemeral connection to a history of agriculture
The Ephemeral and the Everlasting, Spring 2011 Boston, MA
A moving chicken coop worms along the banks over the course of a growing season. The fencing and building expand to open views during the day and contract to protect the inabitants at night. The slow movement down the Charles leaves a fertilized garden in its wake, planted with seasonal-appropriate vegetables and plantings, recording the passage of the year and creating a garden path for visitors to the river. The project recalls the Charles earlier times as support for agriculture and then as a home for a large number of slaughter houses.
Student
Rhode Island School of Design Critic: Pari Riahi
Magazine Beach Chicken Coup and Garden
79
11
80
12
Justin Jennings : Portfolio
Wave Ceiling Installation A canopy of interfering wave patterns This installation in RISDâ&#x20AC;&#x2122;s Bayard Ewing Buildingâ&#x20AC;&#x2122;s gallery was conceived from interfering wave patterns. Mulitple wave functions were written and analyzed using Microsoft Excel, which were then imported to Rhino to create a 3D surface. The invented surface was placed within the gallery to divide the space into into a circulation zone and a discussion zone. The surface was then cut according to local constraints, such as sprinkler pipes or ceiling conditions. The resulting form was built from laser cut OSB ribs and coated with fiberglass on a portion of the surface.
Digital Constructs, Fall 2010 Providence, RI
Student
Rhode Island School of Design Critic: Pari Riahi
Wave Ceiling Installation
81
12
82
Justin Jennings : Portfolio
Aurora Borealis
Student
Vassar College Sculpture
83
Selected Artwork
13
84
Justin Jennings : Portfolio
Rebar Hand Installation
Vassar College Sculpture
Student
Snow Path
85
Selected Artwork
13
86
Justin Jennings : Portfolio
Student
Vassar College Painting
87
Selected Artwork
13
88
Justin Jennings : Portfolio
Personal
Photography
89
Selected Artwork
13
90
Justin Jennings : Portfolio
Sutro Tower
91