Portfolio 2015

Page 1

Justin Jennings portfolio of creative works



Justin Jennings Portfolio of Creative Works 2015


4

Justin Jennings : Portfolio


Contents

Resume

Professional Work 01. Whittier Elementary School 02. Park Avenue and Laurel Grove Apartments 03. Villa San Pedro Apartments 04. Fairmeadow Elementary School 05. Novoshahktinsk Supportive Housing 06. Belleview BioFacade District 07. Hamad International Aiport

Student Work 08. Architectural Fictions of the Dispersed City 09. Wells-Lamson Art Hike 10. Adaptive Growth Hut 11. Magazine Beach Chicken Coop and Garden 12. Wave Ceiling Installation

Selected Artwork 13. Sculpture - Painting - Photography

5


6

Justin Jennings : Portfolio

education

Rhode Island School of Design, Providence, RI M.Arch. - 2012. Vassar College, Poughkeepsie, NY B.A. - Physics, Art - 2004

experience Gelfand Partners Architects, San Francisco, CA 06/2012 - 02/2015 (summer intern 2011)

Job Captain / Designer

Served as primary designer for multiple projects with responsibilities covering design, documentation, coordination, project management, and team supervision from programming through CDs. Developed socially consious and energy efficient designs while working under tight constraints of limited budgets, local planning ordinances and state regulations (DSA, CHPS). Performed Construction Administration for a K-5 school including reviewing submittals, answerings RFIs, and attending weekly contractor meetings. Served as a leader and mentor for 3D modeling and visualization. Led firmwide instructional courses and served as a resource for design software, including Revit, AutoCAD, Adobe CS, Sketchup and Rhino.

HOK, San Francisco, CA 01/2007 - 09/2009

Construction Administration Technician Coordinated construction administration between San Francisco office, Doha, Qatar job site, and numerous other locations. Developed automated processes in MS Excel to track thousands of pending items. Responsible for distribution of RFIs and submittals for review and coordination of responses.

Tsoi/Kobus & Associates, Cambridge, MA 01/2005 - 09/2006

Construction Administration Assistant / Archivist Managed CA documentation for multiple projects and assisted in submittal review and RFI responses, including development of responses and sketches. Produced models and graphics for presentations and drafted CDs under direction of Project Architect Responsible for firm’s drawing and document archive.


Resume

academic Rhode Island School of Design, Providence, RI 09/2009 - 06/2012

Teaching Assistant

Manual Representation (fall 2011), Digital Representation (spring 2011, 2012), Materials and Methods of Construction (fall 2010), Urban Design Principles Studio (fall - spring 2011)

Research/Design Assistant

Providence Urban Farming and Community Development Proposal, Prof. Hansy Better, (Fall 2010 Spring 2011) Low-cost Prototype for Faculty Office Space and Furniture, Prof. Chris Bardt., (Fall 2009-Spring 2010)

Project Manager

Adaptive Growth Hut - Providence, RI. Architectural Design studio, Fall 2009. Prof. Hansy Better Quichwa Cultural Museum - Tena, Ecuador. Travel Studio Design Build, Winter 2011. Prof. Olga Mesa

Coursework in Teaching

Studio Based Teaching and Learning: Developed a teaching portfolio focused on learning in the studio environment, including a teaching philosophy, sample courses and syllibi. - Spring 2010

skills

Software

Drafting : Revit, AutoCAD 3D: Rhino, Grasshopper, Sketchup, Maya Rendering: Vray, Kerkythea 2D: Adobe Illustrator, Photoshop, Indesign, Flash, Digital Fabrication experience with industrial-scale laser cutting and CNC routing.

Craft Hand drafting, sketching, model building, casting, woodworking, photography, welding and metal fabrication.

7


8

01

Justin Jennings : Portfolio

Whittier Greenleaf School Oakland, California

A full service community resource

Client: Oakland Unified School District Est. Completion: Fall 2017

Residents in this impoverished Oakland community face an uphill battle to keep their children in school. The Whittier Greenleaf expansion and modernization employs a holistic, community-building approach to education, providing integrated services for parents and students alike. It is a model for the district-wide goal of the “full-service community school� where the campus becomes an open and encouraging resource for the community. The school offers services far beyond typical classroom learning to strengthen families and the community. Adding four new buildings to a dense, urban site and modernizing the main 1920’s classroom building, this project completely reorganizes the campus and provides modern, energy-efficient and accessible learning environments for the students. A new 2-story classroom wing gives the campus a entrance and allows the central administration space to move to ground level adjacent to the double height lobby atrium. A library with personal, small group and classroom study spaces sits


Professional

Role: Job Captain Gelfand Partners Architects

9

above the administration area, where an open bridge allows a public connection while preserving secure access. A family resource center is adjacent to the main office, and serves as space for parents and groups to hold classes, do laundry, meet teachers and many other activities. The vacated cafeteria in the basement of the existing building is renovated into a suite of offices and small classrooms surrounding a flexible group learning space for the variety of special counseling, tutoring and social work needs in the school. A secondary heart to the community outreach program, the counseling suite is a space for students and parents to work through issues separately from the official administration.

Whittier Greenleaf School

01


10

Justin Jennings : Portfolio

Site Context

Existing Building

Context / Existing Conditions


Role: Job Captain Gelfand Partners Architects

Professional

11

Entry

Cafeteria

Library

Portable Classroom

Whittier Greenleaf School

01


2

1

S40° 16'27" E

1.1

Justin Jennings : Portfolio

12

267.80'

SIG

E

SIG

28' - 0"

28'-0" WIDE CONSTRUCTION ACCESS

CONSTRUCTION ACCESS FOR BUILDING C

SIG

C

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

SIG

B

DN CO

SIG E

E

E

E

62nd AVENUE

SIG

SIG

E

SIG

E

CO

SIG

E

E

E

CO

S, SS, FW, W, & G

SIG

E CO

E

E

E

E

DN

ELECTRICAL UTILITY BOX, TYP

CO

UTILITY CLEANOUT, TYP

DN

TEMPORARY (PHASE 1) POWER FROM TEMPORARY PANEL IN (E) MECHANICAL ROOM

DN

UP

300.65' (R)

CO

E

PROVIDE SPARE ELECTRICAL CONDUIT AS REQUIRED TO ACCOMMODATE NEW ELECTRICAL SERVICE/ TRANSFORMER

DN SIG

UP

S49° 43'33" W

E

300.84' (R)

300.65' (R)

SIG

E

S49° 43'33" W

300.84' (R)

N49° 43'33" E

E

N49° 43'33" E

SIG E E SIG

FW

300.55' (M)

S, SS, W, & G

G

APPROXIMATE LOCATION OF UTILITY STUB-OUTS FOR BUILDINGS A & B.

DN

E

APPROXIMATE LOCATION OF (N) FIRE HYDRANT

S, SS ,W ,&

E

DN

1

DN

1.1

DN

2

DN

S52° 16'04" W

A

62nd AVENUE

DN

DN

DN

DN

SIG

S, SS, FW, W, & G

DN

UP (E) MDF, FACP, ETC

DN

PROVIDE TEMPORARY CONNECTION OF SIGNAL, INTRUSION, FIRE ALARM, & OTHER MISC LOW VOLTAGE FROM (E) LOCATION TO FUTURE LOCATION - PHASE I

DN

SIG

DN

FUTURE ELECTRICAL SERVICE/ TRANSFORMER PHASE 2

UP

S, SS, FW, W, & G

CO

125.00' (R) N40° 21'48" W

1

(E) BACKFLOW PREVENTER TO REMAIN

CO

254.47' (R) N40° 21'48" W

CONSTRUCTION ACCESS FOR BUILDING B

SIG

125.00' (R) N40° 21'48" W

EAST 17th STREET

PHASE 1- SUMMER OF 2015 1/16" = 1'-0"

1

PHASE 1: SUMMER 2015

EA

PHASE 2 - 2015-2016 SCHOOL YEAR SCALE: 1/16" = 1'-0"

PHASE 2: SCHOOL YEAR 2015-20

E

SIG

267.80'

2

1

1.1

S40° 16'27" E

2

1

1.1

S40° 16'27" SIG

267.80' C

CONSTRUCTION ACCESS FOR BUILDING C

SIG

C

DN

DN

DN

DN

DN

B

SIG

B

DN

PROVIDE SPARE ELECTRICAL CONDUIT AS REQUIRED TO ACCOMMODATE NEW ELECTRICAL SERVICE/ TRANSFORMER

UP

SIG

DN

300.55' (M)

UP

DN

(E) MDF, FACP, ETC

300.65' (R)

S49° 43'33" W

300.84' (R)

NEW MDF AT FLOOR 1 DN

SIG

UP

DN

S52° 16'04" W

DN

DN

(N) BOILER AND HYDRONIC PIPING TO SUPPORT BUILDING B

N49° 43'33" E

DN

UP

DN

300.65' (R)

UTILITY CLEANOUT, TYP

DN

S49° 43'33" W

CO

TEMPORARY (PHASE 1) POWER FROM TEMPORARY PANEL IN (E) MECHANICAL ROOM

DN

DN

ELECTRICAL UTILITY BOX, TYP

300.84' (R)

E

N49° 43'33" E

E

62nd AVENUE

SIG

300.55' (M)

S, SS, W, & G

SIG E

1

CO

E

1.1

E

2

E

A

1

1.1

2

E E

SIG

S52° 16'04" W

A

E

APPROXIMATE LOCATION OF (N) FIRE HYDRANT FW

SIG

DN

62nd AVENUE

SIG

DN

UP

PROVIDE TEMPORARY CONNECTION OF SIGNAL, INTRUSION, FIRE ALARM, & OTHER MISC LOW VOLTAGE FROM (E) LOCATION TO FUTURE LOCATION - PHASE I

DN DN

SIG

DN

FUTURE ELECTRICAL SERVICE/ TRANSFORMER PHASE 2

UP

EVENTER

CONSTRUCTION ACCESS FOR BUILDING B

UP

125.00' (R) SIG

125.00' (R) N40° 21'48" W

254.47' (R) N40° 21'48" W

N40° 21'48" W

32' - 3"

254.47 N40° 21'48"

EAST 17th STR

1

PHASE 2 - 2015-2016 SCHOOL YEAR

EAST 17th STREET

SCALE: 1/16" = 1'-0"

PHASE 2: SCHOOL YEAR 2015-2016

Project Phasing and Construction Schedule

1

PHASE 3 - SUMMER OF 2016 SCALE: 1/16" = 1'-0"

PHASE 3: SUMMER 2016 - SUMMER


2

1

13

267.80' A

2

1

1.1

S40° 16'27" E

1.1

Role: Job Captain Gelfand Partners Architects

Professional

C

C B

DN

B

B A

A

300.65' (R)

S49° 43'33" W

300.84' (R)

N49° 43'33" E

DN

DN

UP

UP

300.55' (M)

DN

S52° 16'04" W

UP

DN

300.55' (M)

NEW MDF AT FLOOR 1

S52° 16'04" W

DN

DN

DN

1

DN

UP

1.1

2

1

1.1

2

(N) BOILER AND HYDRONIC PIPING TO SUPPORT BUILDING B

C

DN

62nd AVENUE

DN

DN DN

UP

DN

DN

DN DN

UP UP

125.00' (R) N40° 21'48" W

32' - 3"

32' - 3"

254.47' (R) N40° 21'48" W

EAST 17th STREET

1

PHASE 3 - SUMMER OF 2016 SCALE: 1/16" = 1'-0"

PHASE 3: SUMMER 2016 - SUMMER 2017 LEGEND BUILDING/ PORTABLE TO BE DEMOLISHED/ REMOVED THIS PHASE ASPHALT TO BE REMOVED WITH SUBGRADE PREPARATION BUILDING/ PORTABLE TO BE BUILT/ PLACED THIS PHASE

BUILDING A: FLOOR 2 MODERNIZED

BUILDING A: FLOOR 1 MODERNIZED

BUILDING A: BASEMENT MODERNIZED

STUDENT CIRCULATION

CONTRACTOR CIRCULATION/ LAY-DOWN

Greenleaf Elementary School 2014-09-30 - Site Committee Meeting

Whittier Greenleaf School

01


Justin Jennings : Portfolio

CODE ANALYSIS (N) COVERED WALK INDEPENDENT STRUCTURE

SHEET NOTES

ZONE 1:

1-HR FIRE RATED EXT. PARTITION - STRUCTURE RATED PER SECTION 705.11, EXCEPTION 4.1

BUILDING A:

20' - 0"

OCCUPANCY:

E 35,537 SF

CONSTRUCTION TYPE: TOTAL BUILDING AREA:

V-B (TO BE SPRINKLERED) 35,537 SF

BUILDING USE/ OCCUPANCY AND AREA NOT CHANGING - BUILDING ANALYSIS NOT REQUIRED NOTE #1: ZONES 1 & 2 SEPARATED BY 2 HOUR FIRE WALL PER 2013 CBC SECTION 706 & TABLE 706.4.

ZONE 2: (N) BLDG D DSA APPLICATION: 01-114524 CLASSROOMS OCCUPANCY E TYPE V-B NON-SPRINKLERED 1 STORY 2,600 SF

(N) BUILDING C MULTIPURPOSE OCCUPANCY A-3 TYPE V-B - SPRINKLERED 1 STORY 10,653 SF

BUILDING B:

(N) BLDG E DSA APPLICATION: 01-114524 CLASSROOMS OCCUPANCY E TYPE V-B SPRINKLERED 1 STORY 2,950 SF

OCCUPANCY:

E (14,636 SF)

CONSTRUCTION TYPE: TOTAL BUILDING AREA:

V-B (TO BE SPRINKLERED) 15,047 SF

TOTAL BUILDING HEIGHT:

34'-8" (2-STORIES)

TOTAL ALLOWABLE HEIGHT WITH AUTOMATIC FIRE SPRINKLER SYSTEM PER 2013 CBC SECTION 504.2:

60'-0" (2 STORIES MAXIMUM)

TOTAL ALLOWABLE AREA WITH AUTOMATIC FIRE SPRINKLER SYSTEM PER 2013 CBC SECTION 504.2:

9,500 S.F. PER STORY (19,000 S.F. TOTAL)*

* PER 2013 CBC TABLE 503 (E OCCUPANCY, TYPE V-B CONSTRUCTION 14,636 < 19,000 - COMPLIES

ZONE 3: BUILDING C OCCUPANCIES:

ZONE 3

ZONE 4

CONSTRUCTION TYPE: TOTAL BUILDING AREA:

ZONE 2

A-3 - 9,602 SFBLDG C E - 1331 BLDG C (>10% A-3 OCCUPANCY USED PER 2013

CBC 508.3.2)

ZONE 1

BASE ALLOWABLE AREA:

V-B (SPRINKLERED) 10,653 SF 6000 SF

*BUILDING AREA INCREASE: +200% PER 2013 CBC SECTION 506.1 = +12,000 S.F. (N) COVERED WALK

TOTAL ALLOWABLE AREA = 6,000 + 12,000 = 18,000/STORY

KEYNOTES

10,653 < 18,000 - COMPLIES ZONE 4: BUILDINGS D,E OCCUPANCIES: CONSTRUCTION TYPE: TOTAL BUILDING AREA: (N) BLDG B CLASSROOMS, LIBRARY AND ADMINISTRATION OCCUPANCY A-3, B, E TYPE V-B SPRINKLERED 2 STORIES 1F - 7,495SF 2F - 7,141 SF

ELEVATOR DSA APPLICATION #61330

(E) BUILDING A DSA APPLICATONS #14561 (1956) #01-108437 (2007) OCCUPANCY E TYPE V-B SPRINKLERED 2 STORIES OVER BASEMENT B- 12,092 SF 1F - 11,353 SF 2F - 12,092 SF

BASE ALLOWABLE AREA:

E- 5,550 SF V-B (NOT SPRINKLERED) 5,550 SF 9,500 SF

5,550 < 9,500 - COMPLIES

RAMP ADDED IN DSA APPLICATION 01-114524

2-HOUR FIRE WALL SEE NOTE #1 IN CODE ANALYSIS

DN

ZONE 2

ZONE 1

N

UP

1

CODE ANALYSIS AND ACCESS

LEGEND

SCALE: 1/16" = 1'-0"

1 HOUR FIRE RATED EXT. WALL INTERIOR LOT LINE PROPERTY LINE

AREA OF NEW CONSTRUCTION

AREA OF MODERNIZATION

3/5/2015 5:35:06 PM

14

All ideas, design arrangements and plans indicated or represented by this drawing are owned by, and are the property of Gelfand Partners Architects, Incorporated and were created, evolved, and developed for use on and in connection with this project. None of such ideas, arrangements, or plans shall be used by or disclosed to any person, firm, or corporation for any purpose whatsoever without the written permission of Gelfand Partners Architects Incorporated.Filing of these drawings or specifications with any public agency is not a publication of the same. No reproduction is therefore permissible without the written consent of Gelfand Partners Architects.

Site Code Analysis


Role: Job Captain Gelfand Partners Architects

Professional

DN

15

DN DN

DN

4 A1.12

6 A1.13

5

2

A1.12

A1.12 6

02.02

TYP

A1.12

3 A1.12

(E) PLAYSTRUCTURE DSA APPL 01-114524

UP

1 A1.13

EXISTING TRANSFORMER TO REMAIN

2 A1.13

DN

UP

1 A1.14

Site Plan

Whittier Greenleaf School

01


Justin Jennings : Portfolio

B.1 ?

B.2 ?

B.3 ?

6' - 5 1/4"

B.4 ?

17' - 3 3/4"

B.5 ?

17' - 3 3/4"

Architect

Gelfand Part

B.6 ?

9' - 1"

A R C H I T E

25' - 0 1/4"

P

165 Tenth St San Francisco Tel. 41 Fax 41 www. gelfand

G

2 A4.25

B.A ?

5

28' - 7 3/4"

8

STAIR

CIVIL ENGINEERING:

A-2

6

A7.21

CLASSROOM

193 SF

A-210

929 SF

733 SF

B201A

CARROLL ENGINEERING 1101 SOUTH WINCHESTER BLVD., SUITE H-184 SAN JOSE, CA 95128-3903 Tel (408) 261-9800

CLASSROOM

7

B-201

STRUCTURAL:

15.38

28' - 7 3/4"

4

2

A7.22

JANITOR

CLASSROOM

B-213

3

67 SF

B213A

ELEC

CLASSROOM A-202

A-203

722 SF

704 SF

182 SF

10.39

B-204 11 SF

B204A

CLASSROOM CORRIDOR

W2

A-211

D

736 SF

IDENTIFICATION ST DIV. OF THE STATE ARC

A208

08.24

FILE# APPL #

1564 SF

B203A

B-203

HYT CORPORATION 3498 CLAYTON ROAD, SUITE 101 CONCORD, CA 94519 Tel (925) 681-2731

A-208

1564 SF

CLASSROOM

A-201 730 SF

B.C ?

CLASSROOM

YEI ENGINEERS, INC 7700 EDGEWATER DRIVE, SUITE 128 OAKLAND, CA 94621 Tel (510) 383-1050 Fax (510) 383-1057

TOILET

48 SF

A208

888 SF

W2

A-207

CORRIDOR

1

3

TYP

FIRE PROTECTION:

CLASSROOM

A6.20

TYP

15.08

JANITOR

4

B-202

TYP

15.09

MECHANICAL/ELECTRICAL/PLUMBING:

B202A A6.20

15.39

KPW STRUCTURAL ENGINEERS 130 WEBSTER ST, SUITE 200 OAKLAND, CA Tel (510) 208-3300 Fax (510) 208-3303

DN

B.B ?

1096 SF

AC DATE

3

28' - 7 3/4"

A6.22 5 8

DN

CLASSROOM

6

A7.22 7

A-204

CORRIDOR

Sim

1 A5.20

752 SF

B-218

CLASSROOM

FLS

CLASSROOM

A-205

A-206

774 SF

D

725 SF

C

1119 SF B.D ?

21' - 0 1/4"

UP

B206A

2

B-219

2

A6.22

A6.21

15.39

CLASSROOM

TYP

A-212

A

B

746 SF

B219A

B.E ?

B-210

B-209

100 SF

B209A

D

B208A

COMPUTER ROOM

B208B

LIBRARY OFFICE 16' - 3 3/4"

2 A4.23

126 SF

B207A

STAIR 243 SF

77 SF

141 SF

B-207

50 SF

94 SF B205A

A-209

BOYS TOILET

B-206

B-205

2 A5.23

TOILET

TOILET

GIRLS TOILET

1 A6.22

1

W9

B211A

4

LIBRARY GROUP 2

A7.27

W3

Issues/Submission DESIGN DEVELOPMENT DSA SUBMISSION

B-211 333 SF

3

W3

3 A6.21

OPEN TO BELOW

LIBRARY

B.F ?

B-208 1355 SF 12' - 11 3/4"

W3

1

1 A5.26

A6.21

B.G ?

1

2

A6.20

W3

A6.20

N

1

BUILDINGS A & B - 2ND FLOOR SCALE: 1/8" = 1'-0"

B.5 ?

B.6 ?

9' - 1"

(N) WALL

25' - 0 1/4"

002

B.A ?

28' - 7 3/4"

W1

1 A4.24

3

932 SF

CIVIL ENGINEERING:

A-107

1101 SOUTH WINCHESTE SAN JOSE, CA 95128-390 Tel (408) 261-9800

705 SF

2

A7.20

N IA

BUILDINGS SECOND FLOOR CARROLL ENGINEERING

CLASSROOM 1 4

B-101

R

6328 East 17th St, O

DOOR TAG

2 A4.11

CLASSROOM

Architect O

Gelfan

F CA L I

G

(N) DOOR

2 A4.25

OF

I

P

1 A4.25

NO. C17265 REN. 5-31-15

A RELEME C H GREENLEAF AT W PHA

(E) DOOR 1 A4.23

E

D A R CH

LISA JAY GELFAND

CT

B.4 ? 17' - 3 3/4"

SE

TE

B.3 ? 17' - 3 3/4"

T

B.2 ? 6' - 5 1/4"

(E) WALL

A

B.1 ?

SMOKE DOOR ON ELECTRIC HOLD OPEN - SEE FA DRAWINGS SEISMIC JOINT AT SLAB AND WALLS TOILET - SPD URINAL - SPD CUSTODIAL SINK PROVIDE FAUCET TO (E) SINK

ST

2. SEE DOOR SCHEDULE ON A8.10 FOR SIGN TYPES & LOCATIONS.

Architect

LEGEND

EN

KEYNOTES 08.24 10.39 15.08 15.09 15.38 15.39

L IC

SHEET NOTES 1. SEE A9.01 FOR TYPICAL WALL TYPES.

3/5/2015 5:43:32 PM

A2

STRUCTURAL:

1 A4.12

KPW STRUCTURAL ENGI 130 WEBSTER ST, SUITE OAKLAND, CA Tel (510) 208-3300 Fax (5

B101A

C:\Revit Projects\1407_Whittier\1407_Whittier_Build

MECHANICAL/ELECTRIC

All ideas, design arrangements and plans indicated or represented by this drawing are owned by, and are the property of Gelfand Partners Architects, Incorporated and were created, evolved, and developed for use on and in connection with this project. None of such ideas, arrangements, or plans shall be used by or disclosed to any person, firm, or corporation for any purpose whatsoever without the written permission of Gelfand Partners Architects Incorporated.Filing of these drawings or specifications with any public agency is not a publication of the same. No reproduction is therefore permissible without the written consent of Gelfand Partners Architects.

B118A

B.B ?

YEI ENGINEERS, INC 7700 EDGEWATER DRIVE OAKLAND, CA 94621 Tel (510) 383-1050 Fax (

W1

FIRE PROTECTION: 4

B102A

A6.20

CLASSROOM

28' - 7 3/4"

W2

8

B-102

A7.20

887 SF

3 A6.20

CLASSROOM

3 A9.02

6

ELEV +/- 33.58' S.C.D.

7

10 SF

A-103 708 SF

A-115 1897 SF

B104A

CORRIDOR

CLASSROOM

1 A4.21

4

B-103

F APP

3

CLASSROOM

A106A

A105A

A6.22

2

A7.21 3

4

A4.26

3

W5 1 A5.20

8

2

A7.10

CLASSROOM

CORRIDOR

CLASSROOM

A-104

A-105

775 SF

791 SF

A7.10

746 SF

6 4

A7.11

7 3

2

CLASSROOM A-106

JANITOR

1392 SF

B.D ?

1 A5.23

GIRLS TOILET

21' - 0 1/4"

5 A8.20

1

B-105

A6.22

95 SF

STORAGE

A-117

A-116

92 SF

110 SF

C

BOYS TOILET

STAFF TOILET

B-107

B-106

126 SF

50 SF B105A

3 A4.12 15.38

769 SF

B-118

F

AC DATE

A-109

5

1

1

1094 SF

1

IDE DIV. OF

ELEV 37.61'

1897 SF

DN

B103A 1

W1

A-115

3 A9.02

W9

28' - 7 3/4"

CORRIDOR

CLASSROOM

A-102 742 SF

B-104

B103B

W2

Room

A-101 735 SF

215 SF

ELEC

W1

B.C ?

HYT CORPORATION 3498 CLAYTON ROAD, SU CONCORD, CA 94519 Tel (925) 681-2731

MDF A-108

5

B106A

W1

B107A UP

1

UP

A4.27

B.E ?

B-119

A6.22

B111A

B109A

B113A

MDF

16' - 3 3/4"

B-109

27 SF

B-113

TOILET

412 SF

B114A

1 A5.25

B.G ?

Sim

COMM. OUTREACH

NURSE

ASST. PRINCIPLE

PRINCIPLE

B-110

B-114

B-115

B-116

B-117

81 SF

89 SF

85 SF

85 SF

W1

1 A6.20

2 1

A4.26

W1

A6.21

1 A4.11 1 A4.20

N

BUILDINGS A & B - FIRST & GROUND FLOOR SCALE: 1/8" = 1'-0"

KEYNOTES 15.38

Architect

LEGEND

EN

SHEET NOTES 1. SEE A9.01 FOR TYPICAL WALL TYPES.

CUSTODIAL SINK

(E) WALL

Academic Building Addition and Renovation

(N) DOOR 002

E

T

(E) DOOR

A

(N) WALL

ST

2. SEE DOOR SCHEDULE ON A8.10 FOR SIGN TYPES & LOCATIONS.

L IC

1

B117A

240 SF

2

A6.21

6' - 1" B116A

MEETING

A6.20

Issues/Su DESIGN DEVELOP DSA SUBMISSION

3

599 SF 1 A5.22

B115A

2 A4.12

2 A4.27

3

B-108

52 SF B109B

B110A

2

A7.23

837 SF

2 A4.24

LOBBY

B-112

292 SF W1

4

A-111

2 A6.21

1

ADMIN

B-111 FAMILY RESOURCE CENTER

B.F ?

ELEV +/- 31.96' S.C.D.

2

B119A

238 SF

B

CLASSROOM

W6

STAIR B119B

12' - 11 3/4"

16

SE

D A R CH

LISA JAY GELFAND

I

NO. C17265 REN. 5-31-15

OF

F CA L I

GREENLEA

DOOR TAG

6328 Ea


Role: Job Captain Gelfand Partners Architects

Professional

17

Architect

Gelfand Partne

A R C H I T E C T

P

G

165 Tenth Street Suit San Francisco, CA 9 Tel. 415. 346 . Fax 415. 346 . www. gelfand-partner

Consu

CIVIL ENGINEERING:

CARROLL ENGINEERING 1101 SOUTH WINCHESTER BLVD., SUITE H-184 SAN JOSE, CA 95128-3903 Tel (408) 261-9800

STAFF WORK A-018 726 SF

STRUCTURAL:

KPW STRUCTURAL ENGINEERS 130 WEBSTER ST, SUITE 200 OAKLAND, CA Tel (510) 208-3300 Fax (510) 208-3303

15.09

TYP

15.39

TYP

15.08

MECHANICAL/ELECTRICAL/PLUMBING:

STAIR

TYP

15.08

15.39

TYP

YEI ENGINEERS, INC 7700 EDGEWATER DRIVE, SUITE 128 OAKLAND, CA 94621 Tel (510) 383-1050 Fax (510) 383-1057

A-017

TYP

234 SF

FIRE PROTECTION:

HYT CORPORATION 3498 CLAYTON ROAD, SUITE 101 CONCORD, CA 94519 Tel (925) 681-2731

1 4

A7.12

BOY'S TOILET

2

DN

4

JANITOR CLOSET

A7.17

2

BOILER ROOM

224 SF

A-019

GIRL'S TOILET

A-025 252 SF

3

A-002

A001A

1

CORRIDOR

3

A-001 413 SF

STAFF LOUNGE

A-004

CUSTODIAL

320 SF

A-029

549 SF CORRIDOR

33 SF

A-003

1

A-028

4

329 SF

A7.16

742 SF

2

3

A011B

CORRIDOR

MS INT.

A011A

READING INT.

A-013

A-026

A-014

146 SF

457 SF

126 SF

A006A

A005A

1

COUNSELOR WAITING COUNSELING

A-006

COUNSELING

A-007

94 SF

A-008

137 SF

A007A

A008A A009A

4

143 SF

STORAGE A-030

BOOK ROOM A-005

A010A

358 SF

A-009

3

2

A-011 1147 SF

A030A

A015A

A-017 A017A

4

57 SF

DSA Appli

IDENTIFICATION STAMP DIV. OF THE STATE ARCHITECT FILE# APPL # FLS

AC DATE

SS

480 SF

Ke

2

A022A

SPEECH

RSP

A-016

A-015

251 SF 1

194 SF

29 SF

45 SF

A7.14 3

A012A

A-012

A-010

A-021

58 SF

CORRIDOR

A028A

A016A

1

27 SF

TOILET

A-020

A-027

STORAGE

MECH

MECH

A014A

A011C

44 SF

COUNSELING 186 SF

A7.13

A013A

FLEX

TOILET

STORAGE A-024

4

A7.15

2

A024A 3

117 SF

RESOURSE SPECIALIST A-022 756 SF

Drawing R Issues/Submission DESIGN DEVELOPMENT DSA SUBMISSION

Dat 10/15/1 3/6/1

STORAGE A-023 256 SF

N

BUILDING A - BASEMENT PLAN SCALE: 1/8" = 1'-0"

D A R CH

I

CT

LISA JAY GELFAND

01

NO. C17265 REN. 5-31-15

N IA

SE

TE

(E) WALL

A

(E) DOOR

(N) DOOR

E

OF

R

Whittier Greenleaf School GREENLEAF ELEMENTA (N) WALL

T

Academic Building Addition and Renovation

Architect

LEGEND

ST

TOILET - SPD URINAL - SPD PROVIDE FAUCET TO (E) SINK

EN

KEYNOTES 15.08 15.09 15.39

L IC

1

F CA L I

O

P

AT WHITT


18

Justin Jennings : Portfolio

Library


Role: Job Captain Gelfand Partners Architects

Professional

19

COMPUTER/MEDIA SPACE WITH PIVOTING GLASS WALL PANELS. PROJECTION SCREEN AT COMPUTER AREA FOR GROUP VIEWING

LECTURE / GROUPWORK SPACE WITH MOVABLE TABLES

MAIN ENTRANCE AND CIRCULATION DESK

SECURE LIBRARY OFFICE

GROUP WORK SPACE WITH WHITE BOARD AND STUDY CARRELS FOR INDIVIDUAL AND ONE-ON-ONE WORK AT BRIDGE

ELECTRONIC CATALOG

BOOK STORAGE AROUND PERIMETER 720 L.F. OF STORAGE PROVIDED

STORY SPACE WITH FLOOR SEATING FOR YOUNG STUDENTS

Greenleaf Elementary School 2014-09-30 - Site Committee Meeting

GREENLEAF LIBRARY B.1 ?

B.2 ?

B.3 ?

B.4 ?

B.5 ?

SHEET NOTES

B.6 ?

Architect

Gelfand Partners A R C H I T E C T S

P

TOP OF HIGH ROOF 72.33'

G

TOP OF PARAPET 70.68'

165 Tenth Street Suite 100 San Francisco, CA 94103 Tel. 415. 346 . 4040 Fax 415. 346 . 4103 www. gelfand-partners.com

Consultants

CIVIL ENGINEERING:

CARROLL ENGINEERING 1101 SOUTH WINCHESTER BLVD., SUITE H-184 SAN JOSE, CA 95128-3903 Tel (408) 261-9800 STRUCTURAL:

KPW STRUCTURAL ENGINEERS 130 WEBSTER ST, SUITE 200 OAKLAND, CA Tel (510) 208-3300 Fax (510) 208-3303 MECHANICAL/ELECTRICAL/PLUMBING:

YEI ENGINEERS, INC 7700 EDGEWATER DRIVE, SUITE 128 OAKLAND, CA 94621 Tel (510) 383-1050 Fax (510) 383-1057 FIRE PROTECTION:

HYT CORPORATION 3498 CLAYTON ROAD, SUITE 101 CONCORD, CA 94519 Tel (925) 681-2731

2ND FLOOR 50.67'

DSA Application

IDENTIFICATION STAMP DIV. OF THE STATE ARCHITECT FILE# 1-29 APPL # 01-114727 FLS

AC DATE

1ST FLOOR AT (E) ELEVATOR 33.58'

SS

Key Plan

1ST FLOOR AT ADMIN/ LOBBY 32.00' ADJACENT (E) SIDEWALK +/- 29.70'

KEYNOTES

2

BUILDING B SECTION 05

A.1 ?

SCALE: 1/4" = 1'-0"

B.1 ?

B.2 ?

B.3 ?

B.4 ?

B.5 ?

A.2 ?

B.6 ?

TOP OF HIGH ROOF 72.33'

Drawing Record Issues/Submission DESIGN DEVELOPMENT DSA SUBMISSION BID SET

TOP OF PARAPET 70.83'

Date 10/15/14 3/6/15 3/30/15

2ND FLOOR 50.67'

Architect

N IA

A

T

OF

I

R

L IC

D A R CH

LISA JAY GELFAND

NO. C17265 REN. 5-31-15

CT

ST E

SE

TE

EN

LEGEND

F CA L I

O

Project

GREENLEAF ELEMENTARY AT WHITTIER PHASE 2 & 3

1ST FLOOR AT (E) ELEVATOR 33.58'

6328 East 17th St, Oakland, CA

1ST FLOOR AT ADMIN/ LOBBY 32.00'

1407.00

Sheet

ADJACENT (E) SIDEWALK +/- 29.70'

3/31/2015 2:02:47 PM

03.01

1

TYP

BUILDING B - BUILDING SECTIONS

A4.27

BUILDING B SECTION 04 SCALE: 1/4" = 1'-0"

C:\Revit Projects\1407_Whittier\1407_Whittier_BuildingA_anne.rvt

All ideas, design arrangements and plans indicated or represented by this drawing are owned by, and are the property of Gelfand Partners Architects, Incorporated and were created, evolved, and developed for use on and in connection with this project. None of such ideas, arrangements, or plans shall be used by or disclosed to any person, firm, or corporation for any purpose whatsoever without the written permission of Gelfand Partners Architects Incorporated.Filing of these drawings or specifications with any public agency is not a publication of the same. No reproduction is therefore permissible without the written consent of Gelfand Partners Architects.

Library

Whittier Greenleaf School

01


20

Justin Jennings : Portfolio

Multipurpose Building


Professional

Role: Job Captain Gelfand Partners Architects

21

The large communal space is central to many aspects of the school’s function, from daily lunch and physical education to annual performances or academic events. Whittier’s small site amplifies the program requirements placed upon the single large space on the campus, accomodating varied, and sometimes simultaneous activities, while allowing as open access as possible to the rest of the site. The multipurpose building is conceived as one large space encompassing several small rooms with flexible dividers. The central multipurpose room shares connections to the elevated stage and music classroom to one side, and is open through overhead doors to the circulation space to another side. In a larger event, the building can be used in a fully open configuration, allowing for circulation through and about all rooms as type of convention hall. During a typical school day, the spaces can be divided allowing students to eat lunch in the main room, while the music room and stage are utilized for indoor play space. The resulting space is a fluid and changing configuration, open to students and the community in a variety of ways, while maintaining the required security and access control.

Whittier Greenleaf School

01


22

Justin Jennings : Portfolio

STAGE FUNCTIONS AS PERFORMANCE SPACE WITH FLEX ROOM AS BACKSTAGE SUPPORT AREA

LARGE, FLEXIBLE MULTIUSE SPACES ALLOW OPEN CONNECTIONS FOR LARGE EVENTS

OPERABLE PARTITIONS SEPARATE GYM FROM STAGE AND FLEX SPACE, CREATING TWO INDOOR PLAY AREAS

KITCHEN SERVES MULTIPURPOSE THROUGH A LARGE OVERHEAD DOOR OPENING

Greenleaf Elementary School 2014-09-30 - Site Committee Meeting

Multipurpose Building


Professional

flex classroom

Role: Job Captain Gelfand Partners Architects

23

lunch service

CAFETERIA SPACE

PHYSICAL EDUCATION / INDOOR PLAY SPACE

convention

performance

INTERCONNECTED EVENT SPACE

!"#$$#%&'()%*%+$,&-'./"00) 1234526517'5'.8'9%:#%;

Whittier Greenleaf School CONCERT / PERFORMANCE

01


24

Justin Jennings : Portfolio

C.1 C.1 ?

C.2 C.2 ?

C.3 C.3 ?

C.4 C.4 ?

1

C.5 C.5 ?

1 A4.31

2

A6.30

1 A5.33

C.6 C.6 ?

C.7 C.7 ?

C.8C.8 ?

1

A6.30

C.9 C.9 ?

1 A5.34

A4.33

C.A ? C.A DN

DN

1 4

1

STAGE

A7.36

C-103

2

DN

8

A7.32

3

C-104 992 SF

984 SF

3

FLEX / MUSIC 2

A6.30

DN

7

STORAGE C-102 283 SF C102A

C.B ? C.B

C104A

C103A

1 A4.30

1 4

1

2

A6.31

A6.31

OFFICE

2

A7.34

5 8

C-105

C105A

3

C.C ? C.C

C106A

OFFICE

6

A7.34

96 SF

C-106 82 SF

7

C.D ? C.D

1 3

2

A6.33

2

C107A

2 A5.32

STAFF

1 A4.32

C-107

1

C.E ? C.E

57 SF MULTIPURPOSE

1 A4.36

C-101

C101B

4474 SF C.F ? C.F W1

2 A6.33

CUSTODIAL C-108

C108A

46 SF

C.G ? C.G

C109A

1 A6.33

ELECTRICAL CLOSET C-109

C115B

C.H ? C.H

C122A

C122B

C122C

C122D

C111B

BOYS TOILET C-112

CORRIDOR

FP RISER

159 SF

5

C-115

C-110

WARMING KITCHEN6 8

3 SF

A7.35

115 SF

C112A

C-122

A7.34

598 SF7 C.I ? C.I

13

TRASH ROOM

16

C.J ? C.J

C114A

1

A7.34

C-111 GIRLS TOILET

C121B 4

C-116 14

A7.35

1

LOBBY

C113A

C121A 5' - 6"

C115A

29 SF

C110A

2

201 SF C111A

C-113 179 SF

3 15

C116A

Room

STORAGE

C-121A

C-121

38 SF

115 SF

1 A5.32

KITCHEN STAFF TOILET

2

C-114

A6.32

59 SF

1 A5.30

1 A4.35

1

GROUND FLOOR PLAN SCALE: 1/8" = 1'-0"

All ideas, design arrangements and plans indicated or represented by this drawing are owned by, and are the property of Gelfand Partners Architects, Incorporated and were created, evolved, and developed for use on and in connection with this project. None of such ideas, arrangements, or plans shall be used by or disclosed to any person, firm, or corporation for any purpose whatsoever without the written permission of Gelfand Partners Architects Incorporated.Filing of these drawings or specifications with any public agency is not a publication of the same. No reproduction is therefore permissible without the written consent of Gelfand Partners Architects.

Floor Plan

A6.32


A R C H

25 G

P

Professional

Gelfan

Role: Job Captain Gelfand Partners Architects

CIVIL ENGINEERING:

CARROLL ENGINEERING 1101 SOUTH WINCHESTER SAN JOSE, CA 95128-3903 Tel (408) 261-9800 STRUCTURAL:

KPW STRUCTURAL ENGIN 130 WEBSTER ST, SUITE 2 OAKLAND, CA Tel (510) 208-3300 Fax (51

MECHANICAL/ELECTRICA

YEI ENGINEERS, INC 7700 EDGEWATER DRIVE, OAKLAND, CA 94621 Fax (5

ArchitectTel (510) 383-1050

FIRE PROTECTION: Gelfand Part

HYT CORPORATION

A R 3498 C CLAYTON H I ROAD, T E SU

P

CONCORD,165 CA 94519 Tenth Stre Tel (925) 681-2731 San Francisco,

G

Tel. 415 Fax 415 www. gelfand-

CIVIL ENGINEERING:

CARROLL ENGINEERING 1101 SOUTH WINCHESTER BLVD., SUITE H-184 SAN JOSE, CA 95128-3903 Tel (408) 261-9800 STRUCTURAL:

KPW STRUCTURAL ENGINEERS 130 WEBSTER ST, SUITE 200 OAKLAND, CA Tel (510) 208-3300 Fax (510) 208-3303 MECHANICAL/ELECTRICAL/PLUMBING:

IDE DIV. OF

YEI ENGINEERS, INC 7700 EDGEWATER DRIVE, SUITE 128 OAKLAND, CA 94621 Tel (510) 383-1050 Fax (510) 383-1057 FIRE PROTECTION:

HYT CORPORATION 3498 CLAYTON ROAD, SUITE 101 CONCORD, CA 94519 Tel (925) 681-2731

FI APPL

F

AC DATE

PECTIVE VIEW

DS

IDENTIFICATION STA DIV. OF THE STATE ARCH FILE# APPL # AC DATE

1

FLS

S

MULTIPURPOSE BUILDING PERSPECTIVE VIEW SCALE:

Issues/Sub DESIGN DEVELOPM DSA SUBMISSION

D Issues/Submission DESIGN DEVELOPMENT DSA SUBMISSION

L IC

SE

D A R CH

LISA JAY GELFAND

I

TE

EN

Architect

D A R CH

N IA

O

LISA JAY GELFAND

I

T

F CA L I

L IC

T

SE

R

A

OF

EN

ST E

CT

Architect

NO. C17265 REN. 5-31-15

ST

GREENLEAF ELEME NO. C17265 REN. 5-31-15 AT WH E FO O F PHAS CA L I A

T

6328 East 17th St, O

GREENLEA 2

BUILDING C - EXT PERSPEC

MULTIPURPOSE PERSPECTIVE VIEW SCALE:

A4.

3/2/2015 10:51:14 AM

6328 Ea

C:\Revit Projects\1407_Whittier\1407_Whittier_Multi_a All ideas, design arrangements and plans indicated or represented by this drawing are owned by, and are the property of Gelfand Partners Architects, Incorporated and were created, evolved, and developed for use on and in connection with this project. None of such ideas, arrangements, or plans shall be used by or disclosed to any person, firm, or corporation for any purpose whatsoever without the written permission of Gelfand Partners Architects Incorporated.Filing of these drawings or specifications with any public agency is not a publication of the same. No reproduction is therefore permissible without the written consent of Gelfand Partners Architects.

2

BUILDING P

MULTIPURPOSE PERSPECTIVE VIEW SCALE:

C:\Revit Projects\1407_Whi

s, arrangements, or plans shall be used by or disclosed to any person, firm, or corporation for any purpose whatsoever without the written permission of Gelfand Partners Architects Incorporated.Filing of these drawings or specifications with any public agency is not a publication of the same. No reproduction is therefore permissible without the written consent of Gelfand Partners Architects.

Revit Model Perspectives

Whittier Greenleaf School

01


26

02

Justin Jennings : Portfolio

Park Avenue and Laurel Grove Apartments San Jose, CA

Two affordable developments sharing community

Client: Housing Authority of the County of Santa Clara Est. Completion: 2017

The Housing Authority of the County of Santa Clara saw opportunity in the recent economic decline and began purchasing properties throughout San Jose for the future development of affordable communities. This particular site sits on the outer edge of downtown San Jose, and affords access to a variety of mass-transit options, a rarity in the car-centric culture of Silicon Valley. The large site is split into two properities with separate developments, one with housing for families, the other for senior citizens. In order to create the most socially constructive housing possible, both developments are inclusive of services for the residents (social workers, professional assistance, etc) that extend the mission of social housing beyond merely providing shelter. The two buildings share a central community building and courtyard, offering spaces for events and neighborly gatherings, while each possesses their own unique massing, street front character and unit types to fit their program and localized context.


Professional

Senior Housing Perspective

Role: Designer Gelfand Partners Architects

Laurel Grove and Park Avenue Apartments

27

02


28

Justin Jennings : Portfolio

+54'-0" ROOF STAIR

Solar PV and Thermal

Solar PV and Thermal

+46'-6" PARAPET

60'-0" STAIR ROOF

50'-0" ROOF

+45'-0" ROOF 40'-0" 4TH FLOOR +35'-0" 4TH FLOOR

Units Units

Units

30'-0" 3RD FLOOR

Balconies

+25'-0" 3RD FLOOR

20'-0" 2ND FLOOR +15'-0" 2ND FLOOR

Units

Patio

Landscaped Podium

Patio

10'-0" MEZZANINE

Units

+5'-0" PODIUM

Street

Courtyard

+0'-0" GRADE

Family Parking

Senior Parking 0'-0" GRADE

6% Slope Family Parking

1

FLOOR PLAN - PARKING SCALE: 3/32" = 1'-0"

Architect

Gelfand Partners

A R C H I T E C T S

165 Tenth Street, Suite 100 San Francisco, CA 94103 Tel. 415. 346 . 4040 Fax 415. 346 . 4103 www. gelfand-partners.com

Site Section Through Family Parking Park Avenue Senior Housing and Laurel Grove Family Housing

All ideas, design arrangements and plans indicated or represented by this drawing are owned by, and are the property of Gelfand Partners Architects, Incorporated and were created, evolved, and developed for use on and in connection with this project. None of such ideas, arrangements, or plans shall be used by or disclosed to any person, firm, or corporation for any purpose whatsoever without the written permission of Gelfand Partners Architects Incorporated.Filing of these drawings or specifications with any public agency is not a publication of the same. No reproduction is therefore permissible without the written consent of Gelfand Partners Architects.

Site Plan and Section

777 PARK AVENUE SAN JOSE, CA 95126 [GPA PROJECT #1111]

FILE #PAS13-003537

Sheet

Drawing Record Issue/ Submission PD Permit Submittal

Date Issue/ Submission 10/30/14

Date

Site

A3


Professional

Role: Designer Gelfand Partners Architects

29

T

Plan with Units

Laurel Grove and Park Avenue Apartments

02


30

Justin Jennings : Portfolio

Site Views


Professional

Role: Designer Gelfand Partners Architects

31

Family Housing - North Elevation (Laurel Grove)

Laurel Grove and Park Avenue Apartments

02


32

Justin Jennings : Portfolio

Family Housing Perspective


Professional

Role: Designer Gelfand Partners Architects

Laurel Grove and Park Avenue Apartments

33

02


34

03

Justin Jennings : Portfolio

Villa San Pedro Apartments San Jose, CA

An update to a community of 100 affordable homes

Existing Units

Client: Housing Authority of the County of Santa Clara Completion: 2015


Professional

Role: Designer Gelfand Partners Architects

Villa San Pedro Apartments

35

03


Justin Jennings : Portfolio

36

(N) DUMPSTER ENCLOSURE

1 A6.23

5 A6.20

06.22

1

TYP

SITE FENCE PLAN

06.22

A2.06D

1 A6.20

1 A2.07D

1

06.22

A2.08D

(N) DUMPSTER ENCLOSURE AND MAINTENANCE SHED

BUILDING 7C

06.22

16 PARKING SPACES

20 PARKING SPACES

BUILDING 6C

BUILDING 8E

1

BUILDING 4B

NEW PLANTING AREA

A2.09D

1 A2.04D

1 A2.05D

BUILDING 5E

ENTRANCE PLANTING AREA/TRELLIS DANZE DRIVE

9 A6.20 1 A6.62

HC 2 A10.11

1 1

A2.14D

A2.01D

HC

BUILDING 9D

(N) DUMPSTER ENCLOSURE

15 PARKING SPACES

06.21

TYP

38 PARKING SPACES COMMUNITY BUILDING

06.22

BUILDING 3A

16 PARKING SPACES

MEDIAN PLANTING

1 A2.13D

1 A2.10D

1

NEW PLANTING AREA

A2.03D

1 A2.02D

06.22

06.22

HC

HC 1 A10.11

HC BUILDING 13C

14' - 10 1/4"

12 PARKING SPACES

10 PARKING SPACES

69' - 0"

BUILDING 2A

HC BUILDING 10E

13 PARKING SPACES 10 PARKING SPACES

1 A10.11

BUILDING 12D

PV CANOPY ABOVE

9 A6.20

1

BUILDING 11D

1

A2.12D

A2.11D

PARKING LOT TO REMAIN AS IS (N) DUMPSTER ENCLOSURE

Site Plan - New SCALE: 1" = 20'-0"

6/3/2013 11:41:23 AM

1

BENDORF DRIVE

All ideas, design arrangements and plans indicated or represented by this drawing are owned by, and are the property of Gelfand Partners Architects, Incorporated and were created, evolved, and developed for use on and in connection with this project. None of such ideas, arrangements, or plans shall be used by or disclosed to any person, firm, or corporation for any purpose whatsoever without the written permission of Gelfand Partners Architects Incorporated.Filing of these drawings or specifications with any public agency is not a publication of the same. No reproduction is therefore permissible without the written consent of Gelfand Partners Architects.

Site Plan: Ground

CARRYBACK AVENUE

BUILDING 1A


Role: Designer Gelfand Partners Architects

Professional

37 Architect

Keynotes 05.22

Gelfand Partners

METAL TRELLIS WITH POST BELOW METAL TRELLIS SUNSHADE SINGLE PLY PVC ROOFING AREA OF NEW PHOTOVOLTAIC PANEL ARRAY - SED SOLAR PV AND SOLAR THERMAL ARRAY MOUNTED ON NEW METAL TRELLIS - SED

16.21

A R C H I T E C T S

P

05.28 06.25 07.23 16.20

G

165 Tenth Street Suite 100 San Francisco, CA 94103 Tel. 415. 346 . 4040 Fax 415. 346 . 4103 www. gelfand-partners.com

Consultants

LANDSCAPE DESIGN:

CIVIL ENGINEERING: 1

1 07.23

A2.06

A2.07

1 A2.08

07.23

ELECTRICAL:

BUILDING 7C 06.25

TYP 07.23

BUILDING 6C

MECHANICAL/ PLUMBING:

BUILDING 8E

BUILDING 4B 06.25

TYP

1

STRUCTURAL:

A2.09

1 A2.04

1 A2.05 BUILDING 5E

07.23 BUILDING 9D

2 A6.62

Key Plan 06.25 16.21

1

07.23

05.28

A2.14

1 A2.01 05.28

07.23

16.21 16.20

16.21

05.28 COMMUNITY BUILDING

BUILDING 3A

05.28

BUILDING 1A

A3.01 2

SHEET NOTE

TYP

1. PAINT ALL INTERIOR

06.25

16.20

2. FINISHES ARE SCHED

2 A6.50

1 A2.13

3. SEE A9.01 FOR WALL Drawing Record PERMIT SET BID SET

1 A2.10

1 A2.03

05-07-13 06-03-13

1

07.23

A2.02

4. SEE WALL TYPE W10 BETWEEN ALL UNITS.

5. SEE FLOOR TYPE F2 SECOND FLOOR THROU

07.23

6. PROVIDE (2) FIXED M OPPOSITE WALLS AT A 16.21

BUILDING 2A

7. PATCH EXTERIOR ST INSTALLATIONS- MATCH

BUILDING 10E

07.23

BUILDING 12D

BUILDING 11D

07.23

8. PROVIDE 2x10 WOOD TOWEL BAR LOCATION BAR AND TOWEL BAR.

Architect 07.23

A

E

NO. C17265 REN. 5-31-13

T

1 A2.11

OF

CT

ST

1 A2.12

D A R CH SE I LISA JAY GELFAND

TE

16.20

EN

1

L IC

A3.01

07.23

05.22

N IA

BUILDING 13C

R

07.23

F CA L I

O

Project

Villa San Pedro 282 Danze Drive San Jose, CA

1/4" : 12" MIN. SLOPE- TYP 07.26

TYP

Project Number

Sheet

07.07

6/3/2013 11:41:38 AM

1

TYP

VILLA SAN PEDRO NEW ROOF PLAN

4

NEW ROOF PLAN 1" = 20'-0"

3

A1.04

A3.01

BLDG 1A - ROOF - NEW 1/8" = 1'-0"

C:\Revit projects\VSP\1221_Villa San Pedro_Site_cheryl.rvt

All ideas, design arrangements and plans indicated or represented by this drawing are owned by, and are the property of Gelfand Partners Architects, Incorporated and were created, evolved, and developed for use on and in connection with this project. None of such ideas, arrangements, or plans shall be used by or disclosed to any person, firm, or corporation for any purpose whatsoever without the written permission of Gelfand Partners Architects Incorporated.Filing of these drawings or specifications with any public agency is not a publication of the same. No reproduction is therefore permissible without the written consent of Gelfand Partners Architects.

4B

09.34

REF.

REF.

3 A6.50

TYP

TYPE IA KITCHEN- 7/A6.03 BATHROOM- 2/A6.

4B

12

12

BEDROOM-1

DN

UNIT

UNIT

1

224

240

1

11

UNIT

11

REF.

233

LIVING ROOM

BEDROOM-1

A

BEDROOM-2

A

13

BEDROOM-2 BEDROOM-1

15

UNIT

4A

LIVING ROOM 18

8

8

4C

4A

4B

4A 4C

4B

4B

4B

4B

4C

4C

REF.

215

11

TYPE IIA 1

12

4B

4A

DINING ROOM

4A

1

LIVING ROOM

DN E

8

4A

4B

4B

4A

BEDROOM-1 BEDROOM-2

18

11

4A

DN

A

TYP

TYP

REF.

PROVIDE FINISH PER W11 AT WALLS ADJACENT TO (N) . SHEAR PANELS TYP

UP

UNIT

A

05.31

BEDROOM-1

TYP

07.23 07.26 09.34 15.32

01.67

TYP

TYP

A

A

REF.

8

BATH.

KIT.

13

BEDROOM-2

BEDROOM-2

BEDROOM-1

5

11

KIT.

18 DW

BATH. 11

4A

17 11

BEDROOM

UNIT

KIT.

1

4C

LIVING ROOM

4B

8

4B

4C 4A

BATH.

BATH.

BATH.

BATH.

CLOSET CLOSET 4B

4B

4B

8

4B

8

KIT.

13

1

11

KIT.

UNIT

241

12

12

BEDROOM-1

BEDROOM-2

BEDROOM-2

BEDROOM-1

A

A

A

A

DINING ROOM

245

11

11

1

1

A

5

4C

4A

4B

A

12

LIVING ROOM

E

13

05.24

UP 1 A6.25 1 A6.21

LEGEND

BEDROOM

UP

WATER HEATER CLOSET

M

UNIT

BATH.

17

TYPE IIA

4A

LIVING ROOM

246

TYPE I

UNIT

REF.

A

4A

TYPE IA

KIT.

18

4C 4A

1

11

DW

1

LIVING ROOM

E

8

4A

11

REF.

REF.

237 TYPE IIA

4B

4B

REF.

TYPE I

4C

4A

4C

REF.

KIT.

233

4B

LIVING ROOM

11

TYPE IIA

5

12

BEDROOM

4C

UNIT 242

TYPE IIA

1

5

6/3/2013 11:20:48 AM

07.08

TYP

UP

A

4A

UNIT

12

TYP

TYP

238 1

UNIT 234 TYPE IA

1

TYP

8

A

05.26

PROVIDE METAL R STAIR METAL RAILINGS METAL RAILING A METAL TRELLIS STEEL TRELLIS CO COMPOSITE LUMB SHEAR PLY- SSDROOF HATCH RAIN WATER LEAD CONNECTION SINGLE PLY PVC R SCUPPER & COLL PATCH CEILING A HEAT PUMP- SMD

1 A6.50

LIVING ROOM

A

05.26

8

LIVING ROOM

05.24 05.26 05.28 05.31 06.30 06.43 07.07 07.08

E

1 A6.24

13

M

01.67

12

1

REF.

4C

KEYNOTES A

4A

11

1

TYP

DINING ROOM

BEDROOM

LIVING ROOM

06.30

KIT.

BEDROOM

A

13 05.26

13 A

TYPE IIA KITCHEN- 7/A6.03 BATHROOM- 6/A6.

5

4C

BLDG 1A - 2nd FLOOR - NEW 1/8" = 1'-0"

8

LIVING ROOM

UNIT 222 TYPE IA

UNIT

BEDROOM-2 BEDROOM-1

A

TYP

4A

227

214

4A 12

05.26

BATH.

11

REF.

TYPE IIA

12

A

12

1

11

UNIT

REF.

A

BEDROOM

4C

TYPE I

13

05.24

1

8

UNIT 11

BEDROOM

4A 4C

06.43

DN

221 TYPE IIA

TYPE I 5

2

LIVING ROOM

15

TYPE IIA

TYPE IA

A

A

8

LIVING ROOM

13

A

13 8

REF.

4C 4A

REF.

A

APARTMENT EN

TYPE I KITCHEN- 10/A6.03 BATHROOM- 1/A6.

TYP

TYP

05.24

N

BLDG 1A - 1st FLOOR - NEW 1/8" = 1'-0"

All ideas, design arrangements and plans indicated or represented by this drawing are owned by, and are the property of Gelfand Partners Architects, Incorporated and were created, evolved, and developed for use on and in connection with this project. None of such ideas, arrangements, or plans shall be used by or disclosed to any person, firm, or corporation for any purpose whatsoever without the written permission of Gelfand Partners Architects Incorporated.Filing of these drawings or specifications with any public agency is not a publication of the same. No reproduction is therefore permissible without the written consent of Gelfand Partners Architects.

Site Plan: Roof / Typical Apartment Plan

Villa San Pedro Apartments

03


Justin Jennings : Portfolio

38

2 A6.08

4 A6.06 1' - 7 1/4"

2' - 4"

3' - 6"

TYP

0

06.41 W9 8' - 0"

24

34C

8' - 0"

5' - 5 1/4"

05.32

06.16 06.41 24

UP

3' - 6"

06.44

06.16

34A

34A

34A 06.44

07.26 06.41

R

24

24

4' - 11 1/4"

4' - 11 1/4"

06.41

3' - 6"

06.16 B J

W9

3' - 6"

3' - 6"

8' - 0"

05.32

05.32

W9

8' - 0"

EW

6

W9

TYP

10' - 0"

3 BR TOWNHOME - 2ND FLOOR - NEW 1/4" = 1'-0"

4 A6.07

4

4 BR TOWNHOME 1/4" = 1'-0"

4 A6.06

06.42 PROVIDE - 4

33

DW

05.32

ABOVE

05.32

REF.

ABOVE

UP

W2

W1

TYP UON 03.02

DINING

4B

06.41

3' - 9 3/4"

G

LIVING

R - NEW

6' - 5 1/4"

Z

1

G 05.32 ABOVE

05.32

10' - 3 7/8"

ABOVE

17' - 3 97/256"

05.32

W

14

5

10' - 2"

B

ABOVE

10' - 4 225/256"

N

2

3 BR TOWNHOME- 1ST FLOOR - NEW 1/4" = 1'-0"

N

KEYNOTES 02.61 03.02 05.32 06.16 06.24 06.41 06.42 06.44

EXISTING CONCRETE PATIO, PRIVATE OPEN SPACE TO REMAIN CONCRETE SLAB ON GRADE - SSD METAL AWNING - SEE A11/A10.12 & SSD PLYWOOD DECK - SSD WINDOW SEAT EXTENSION ROD AND SHELF W/ 1x4 LEDGER SUPPORT SHELVES W/ 1x4 LEDGER SUPPORT FIBER CEMENT ENCLOSURE @ SOLAR PIPES - TYP

Typical 3 BR Townhouse Plan

1

4 BR TOWNHO 1/4" = 1'-0"


Professional

Role: Designer Gelfand Partners Architects

Villa San Pedro Apartments

39

03


Justin Jennings : Portfolio

40

A

B

C

D

E

F

G

A

B

C

1

2

2

A3.25

A3.25

A3.25

A3.14

ELEC.

1

1

1

STORAGE

ELECTRICAL 1C 01.90

P

FIXED GUSSET Y

2

2D

SOCIAL SERVICES OFFICE

0' - 8"

KITCHEN 5

S-1

W1

W6

3

7

A8.02

W2

WINDOW ABOVE

S6

4

2A PT-1

PT-1

W

3 RT 2E

7' - 3"

6' - 2"

*

2B

1P

W

WINDOW ABOVE

S6

S4

X

WINDOW ABOVE

7' - 4 3/4"

RT

4

W2

2.5

WINDOW ABOVE

S5

W

*

NEW LANDING SSD

W6

OFFICE-1

6

REF.

W6

A3.15

2.5

X

Y

DW

X 1

0' - 9 3/4"

2

COMMUNITY ROOM

PT-1 W6

OFFICE-2

W2

4

DN

ROLL DOWN DOOR

RT W6

9

FIXED GUSSET

5

12

COMPUTER

A3.14

A-3 OCCUPANCY

10

A8.01

W9

W6

4

2J

6 MELAMINE SHELVES ON SURFACE MOUNTED TRACK

W6

3

W6

W6

*

G RIN VE CO

2

B OCCUP

RT

X

12

A6.15

4 5

-2 PT

10.46

MENS TOILET

(N) ROOF HATCH ABOVE

7 10

A6.15

PT-1

LO

(N) H PER D __/__

SPECIAL WALL COVERING #1 1 A6.15

A8.02 11

9

12

PT-1

DN

RT

ZZ

*

W1

8

A6.15

1L

3

6

8 *

TOILET

PT-2

PT-1

13

RT

" 3/4 '-3 12

S-3

14

1M

A8.03

UP

RT

B OCCUPANCY

3

RT 2H

BULLETIN BOARD

LOBBY

LOBBY 1 A6.14

WOMENS TOILET

*

2G

W6

1' - 9 1/2"

A3.14

11

R

8

8 2

2F

*

1N

W1

2 A6.15

4' - 2"

ALIGN OPENING W/ WALL OF BATHROOM BELOW

4 W2

#2

-2 PT

LL WA IAL EC SP

V.I.F.

2C

7' - 3"

A8.02

" 1/4 '-5 10

2

2

A3.14

W

R

1

A8.03

W6

OFFICE-3

5

11

1 3

7' - 3 1/4"

LINE OF STAIR ABOVE

FIXED SHELF

± 51" CLR

S-2

FLOOR ABOVE

X

ROOF ABOVE

9

1A

9 10.43

ZZ

14.09

1 A10.14

01.91

6' X 6' WALK OFF MAT

(N) HANDRAIL

TYP 10.43

10.43

14.09

Architect

3

Gelfand Partners

(E) STAIR

A3.14

F

G

A

B

C

1 A3.25

2

A3.14 1

A R C H I T E C T S

D

E

F

P

E

G

G

1

2

A3.25

COMMUNITY BLDG -A3.25 2nd FLOOR - NEW 1/4" = 1'-0"

A3.14

ELEC. MAIN

1

1

SHEET NOTES

01.90 01.91 02.67 02.68 10.43 10.46 14.09

GLASS ROLL UP DOOR - TRACK TO BE MOUNTED PARALLEL TO CEILING SLOPE

1C P

3.DEMO ALL (E) INT. GYP BD / PLASTER AT ALL WALLS & CEILING - U.O.N

2

1D

4. DEMO ALL (E) FLOORING FINISH BACK TO SUBFLOOR - TYP 5. DEMO ALL INT. WINDOW TRIM DOOR TRIM & BASEBOARDS

P

1T

3

8. DEMO ALL DOWNSPOUTS, SCUPPERS, AND SPLASH BLOCKS

1P

0' - 9 3/4"

12. DEMO ALL (E) BATHROOMX FIXTURES & ACCESSORIES.

1F

P

W6

7' - 4 3/4"

13. SEE MECH DWGS FOR EQUIPMENT REMOVAL 6/3/2013 11:21:47 AM

P

1

REC ROOM

11. DEMO ALL (E) KITCHEN CABINETS, FIXTURES & APPLIANCES. WINDOW ABOVE

P

P

3

S4

(E) ROOF LADDER TO REMAIN (E) SHAFT TO REMAIN (E) CLAY TILE ROOFING TO REMAIN (E) PIPE COLUMN TO REMAIN 2" PAINTED HIGHLIGHT STRIP, 1" FROM NOSING, AT ALL TREADS MEDICINE CABINET WITH MIRROR (E) ELEVATOR TO REMAIN - PROVIDE NEW FLOORING

2

10. SEE DEMO EXTERIOR ELEVATIONS DRAWINGS FOR DEMO OF AWNINGS & EXTERIOR PLASTER W

A8.01

W2

9. 2.5 DEMO ALL INTERIOR DOORS AND TRIM

WINDOW ABOVE

S5

P

4

W6

OFFICE-1

7. DEMO ALL ROOF FLASHING

1E

0' - 8"

X 6. DEMO ALL ROOFING BACK TO SUBSTRATE

W

A-3 OCCUPANCY

02.67 02.68

OFFICE-2

P

W2

14. 4PROVIDE (2) FIXED METAL LOUVERS, MINIMUM 8" x 12" AT OPPOSITE WALLS AT ALL FLAT ROOFWALL JOIST SPECIAL AREAS. COVERING #2

P

15. PROVIDE 2x10 WOOD BLOCKING AT ALL GRAB BAR AND ALL TOWEL BAR LOCATIONS, EXTEND 6" 7' - 3 1/4" 7' - 3" LINE OF STAIR BEYOND ABOVE EBD IF EACH GRAB BAR AND TOWEL BAR.

7' - 4 3/4"

6 MELAMINE SHELVES ON SUFRACE MOUNTED TRACK

All ideas, design arrangements and plans indicated or represented by this drawing are owned by, and are the property of Gelfand Partners Architects, Incorporated and were created, evolved, and developed for use on and in connection with this project. None of such ideas, arrangements, or plans shall be used by or disclosed to any person, firm, or corporation for any purpose whatsoever without the written permission of Gelfand Partners Architects Incorporated.Filing of these drawings or specifications with P any public agency is not a publication of the same. No reproduction is therefore permissible without the written consent of Gelfand Partners Architects.

5 6 MELAMINE SHELVES ON SURFACE MOUNTED TRACK

W6

A3.14

4

3

2 A6.15

WOMENS TOILET

-2 PT

*

14

X

12

PT-1

RT 10.46

(N) ROOF HATCH ABOVE

7 10

A6.15

± 51" CLR

MENS TOILET

PT-2

5

A6.15

1Q PT-1

P

*

PT-1

LOBBY

SPECIAL WALL COVERING #1

BULLETIN BOARD

10.43

1 A6.15

W

W

TYP

ELEVATOR EQUIPMENT ROOM

1J

1G

6

PT-1

A8.01

(E)

P

D

D

FIXED GUSSET BELOW

10.46

(E)

(E) 1H

MAINTENANCE RT

A3.14

8

7 D

FIXED PLASTIC LAMINATE COUNTERTOP - SEE 9/A10.03

RT

12

1A

2

36" WIDE ACCESSIBLE COUNTER - 34" AFF MAX

PT-1 UP

*

D

Key Plan

W

STACKED WASHERS

STACKED DRYERS

W2

PT-1

FLOOR ABOVE

W

D

1K

A8.02 11

X

W

LAUNDRY

3' - 4 1/4"

(N) HANDRAIL PER DETAIL __/__

W1

9

W

BENCH

W6

5

*

3

8

1S

CLOSET W6

SPECIAL WALL COVERING #2

" 11

-2 PT

1L

W6

1'

8 *

TOILET

6

RT

E) STAIR

9 10.43

01.91

6' X 6' WALK OFF MAT

(N) HANDRAIL 10.43

1 A10.14

14.09

H

TYP

Drawing Record

H

PERMIT SET

3

(E) STAIR

A3.14

1 KEYNOTES

COMMUNITY BLDG - 1st FLOOR - NEW 1/4" = 1'-0"

Community Building

LEGEND

Architect SE

D A R CH

I

T

N

2H

4

13

10

B OCCUPANCY

RT

UP

A6.15

A8.02

1M

A8.03 2

11

W6

1R

9 8

W2 A3.14

02.68

*

1N

W1

W 2

2G

W6

OFFICE-3

2' - 5"

A-3 OCCUPANCY

- 1st FLOOR - NEW

1/4" = 1'-0"

LANDSCAPE DESIGN:

2. DEMO ALL (E) WOOD EXT. WINDOW SILL, JAMB, HEAD TRIM.

WINDOW ABOVE

1

KEYNOTES ELECTRICAL

1. DEMO ALL (E) WINDOWS.

S6

165 Tenth Street Suite 100 San Francisco, CA 94103 Tel. 415. 346 . 4040 Fax 415. 346 . 4103 COMMUNITY BLDG www. gelfand-partners.com

05-07-13


Role: Designer Gelfand Partners Architects

Professional

41 Architect

Gelfand Partners A R C H I T E C T S

P

G

165 Tenth Street Suite 100 San Francisco, CA 94103 Tel. 415. 346 . 4040 Fax 415. 346 . 4103 www. gelfand-partners.com

LANDSCAPE DESIGN:

4

3

2.5

2

1

TO BOTTOM OF EXISTING CEILING ON ROOF STRUCTURE

5

9

8

5

4

3

2.5

2

1

Key Plan

9' - 0"

8

1 A3.15

9' - 0"

9

1 A3.15

9' - 0"

9' - 0"

9' - 6 1/2"

GROUND FLOOR 0"

GROUND FLOOR 0"

Drawing Record PERMIT SET

05-07-13

COMMUNITY BUILDING SECTION A 1/4" = 1'-0"

KEYNOTES

LEGEND

Architect

L IC

D A R CH

LISA JAY GELFAND

A

NO. C17265 REN. 5-31-13

T

OF

I

CT

ST E

SE

TE

EN

SHEET NOTES

1

N IA

COMMUNITY BUILDING SECTION B 1/4" = 1'-0"

R

2

F CA L I

O

Project

Villa San Pedro 282 Danze Drive San Jose, CA Project Number

Sheet

COMMUNITY BUILDING SECTIONS 6/3/2013 11:24:35 AM

A3.25 C:\Users\jonathan\Documents\1221_Villa San Pedro_Apartments_CENTRAL_jonathan.rvt All ideas, design arrangements and plans indicated or represented by this drawing are owned by, and are the property of Gelfand Partners Architects, Incorporated and were created, evolved, and developed for use on and in connection with this project. None of such ideas, arrangements, or plans shall be used by or disclosed to any person, firm, or corporation for any purpose whatsoever without the written permission of Gelfand Partners Architects Incorporated.Filing of these drawings or specifications with any public agency is not a publication of the same. No reproduction is therefore permissible without the written consent of Gelfand Partners Architects.

Villa San Pedro Apartments

03


Justin Jennings : Portfolio

2

1

A6.53

A6.53

Architect

SHEET NOTES

Gelfand Partners A R C H I T E C T S

P

1. SIMILAR TO TRELLIS 1A - SEE SHEET A6.50 AND A 6.51 FOR NOTES, DIMENSIONS, AND DETAIL CALLOUTS

PATCH AT RELOCATED SCUPPER TO MATCH EXISTING TYP

SOLAR THERMAL PANELS - SMD

G

165 Tenth Street Suite 100 San Francisco, CA 94103 Tel. 415. 346 . 4040 Fax 415. 346 . 4103 www. gelfand-partners.com

19' - 3" VIF

ALIGN WITH (E) ROOF DIAPRAGM - SSD

LANDSCAPE DESIGN:

4

BLDG 2A - SOUTH ELEVATION - NEW 1/4" = 1'-0" 2 A6.53

RELOCATE COLLECTOR HEAD AND SCUPPER TO AVOID CONFLICT WITH TRELLIS BEAM TYP.

05.41

16.23

Key Plan 1 A6.53

KEYNOTES 02.61 05.01 05.23 05.24 05.31 05.41 06.22 16.23 (E) FACE OF BUILDING 2

EXISTING CONCRETE PATIO, PRIVATE OPEN SPACE TO REMAIN STEEL BEAM – SSD NEW METAL RAILINGS AT BALCONY METAL RAILINGS & METAL RISERS AT (E) STAIRS PER A6.25 STEEL TRELLIS COLUMN & FOOTING- SSD TS PURLIN NEW 6'-0" COMPOSITE LUMBER FENCE SOLAR PV PANEL- SED

05.01

TRELLIS 2A - ROOF 1/4" = 1'-0" 2 A6.53

Drawing Record

RELOCATED DOWNSPOUT TYP.

1

PERMIT SET

A6.53

05.23

05-07-13

TYP

COMPOSITE LUMBER DECKING (N) GUARDRAIL PER 8/A10.12

Architect D A R CH

LISA JAY GELFAND

NO. C17265 REN. 5-31-13

OF

I

N IA

EN

L IC

E

T

3 A6.25

A

2 A6.25

A6.53

SE

CT

2

TE

ST

TRELLIS 2A - 2ND FLOOR 1/4" = 1'-0"

R

LEGEND 3

F CA L I

O

Project

Villa San Pedro 282 Danze Drive San Jose, CA

1 A6.53

SIM. TO TRELLIS 1A - SEE SHEET A6.51 FOR COLUMN LOCATIONS

Project Number 05.31

6/3/2013 11:26:23 AM

1

Sheet

TYP

TRELLIS 2A - 1ST FLOOR VIEW 1/4" = 1'-0"

06.22

TYP

02.61

TYP

TRELLIS 2A 05.24

A6.52

TYP

PATCH CONCRETE AT REMOVED CONC. TYP.

C:\Users\jonathan\Documents\1221_Villa San Pedro_Apartments_CENTRAL_jonathan.rvt All ideas, design arrangements and plans indicated or represented by this drawing are owned by, and are the property of Gelfand Partners Architects, Incorporated and were created, evolved, and developed for use on and in connection with this project. None of such ideas, arrangements, or plans shall be used by or disclosed to any person, firm, or corporation for any purpose whatsoever without the written permission of Gelfand Partners Architects Incorporated.Filing of these drawings or specifications with any public agency is not a publication of the same. No reproduction is therefore permissible without the written consent of Gelfand Partners Architects.

Architect

Gelfand Partners A R C H I T E C T S

P

(E) ROOF DIAPHRAGM

(E) ROOF DIAPHRAGM

(E) PARAPET

(E) PARAPET

SOLAR THEMAL PANELS SMD

SOLAR THEMAL PANELS SMD

SUPPORT STRCTURE FOR PANELS BY SOLAR PANEL PROVIDER

SUPPORT STRCTURE FOR PANELS BY SOLAR PANEL PROVIDER

POLYCARBONITE PANEL

POLYCARBONITE PANEL

TS PURLIN

TS PURLIN

G

165 Tenth Street Suite 100 San Francisco, CA 94103 Tel. 415. 346 . 4040 Fax 415. 346 . 4103 www. gelfand-partners.com

LANDSCAPE DESIGN:

NEW METAL TRELLIS STRUCTURE SSD

NEW METAL TRELLIS STRUCTURE SSD

MTL GUARDRAIL AT (E) BALCONY

(E) STL BALCONY SUPPORT

Key Plan COMPOSITE LUMBER PATIO FENCE

CONC FOOTING SSD

Drawing Record PERMIT SET

3

05-07-13

TRELLIS 2A - PERSPECTIVE

KEYNOTES

LEGEND

Architect

L IC

A

T

E

SE

D A R CH

LISA JAY GELFAND

NO. C17265 REN. 5-31-13

OF

I

CT

ST

1. SIMILAR TO TRELLIS 1A -SEE A6.50 AND A6.51 FOR NOTES, DIMENSIONS AND DETAIL CALLOUTS

TE

EN

SHEET NOTES

2

TRELLIS 2A - SECTION B 1/2" = 1'-0"

N IA

TRELLIS 2A - SECTION A 1/2" = 1'-0"

R

1

F CA L I

O

Project

Villa San Pedro 282 Danze Drive San Jose, CA Project Number

Sheet

TRELLIS 2A SECTIONS

6/3/2013 11:26:48 AM

42

Solar Shade Structures

All ideas, design arrangements and plans indicated or represented by this drawing are owned by, and are the property of Gelfand Partners Architects, Incorporated and were created, evolved, and developed for use on and in connection with this project. None of such ideas, arrangements, or plans shall be used by or disclosed to any person, firm, or corporation for any purpose whatsoever without the written permission of Gelfand Partners Architects Incorporated.Filing of these drawings or specifications with any public agency is not a publication of the same. No reproduction is therefore permissible without the written consent of Gelfand Partners Architects.

A6.53 C:\Users\jonathan\Documents\1221_Villa San Pedro_Apartments_CENTRAL_jonathan.rvt


Role: Designer Gelfand Partners Architects

Professional

SHEET NOTES

43

Architect

Gelfand Partners A R C H I T E C T S

P

G

165 Tenth Street Suite 100 San Francisco, CA 94103 Tel. 415. 346 . 4040 Fax 415. 346 . 4103 www. gelfand-partners.com

Consultants

LANDSCAPE DESIGN:

CIVIL ENGINEERING:

ELECTRICAL:

MECHANICAL/ PLUMBING:

STRUCTURAL:

Key Plan

KEYNOTES 03.01 05.01 05.02 05.33

2 A6.61

3

PARKING PV CANOPY PERSPECTIVE

CONCRETE FOOTING - SSD STEEL BEAM – SSD STEEL COLUMN – SSD STEEL PV SUPPORT STRUCTURE -SSD

1 A6.61

SOLAR PV PANELS - SED ATTACHMENT TO HSS RUNNERS BY PROVIDER

05.33

TYP

05.01

TYP

8' - 0 1/2"

HSS RUNNER - SSD 3' - 11 1/4"

1' - 2 1/4"

1' - 11 1/4"

Drawing Record W8 GIRDER - SSD

05.01

PERMIT SET BID SET

05-07-13 06-03-13

TYP

WELD TS PURLIN TO FLANGE OF BEAM TYP

12' - 8 3/4"

Architect D A R CH

LISA JAY GELFAND

I

CT

L IC

SE

TE

EN

LEGEND TYP

ST A

T

E

NO. C17265 REN. 5-31-13

OF

N IA

03.01

R

TYP

12' - 0"

05.02

11' - 4 1/2"

OPEN TYP

F CA L I

O

Project

Villa San Pedro 282 Danze Drive San Jose, CA Project Number 2

PARKING PV CANOPY SECTION B 1/2" = 1'-0"

1

PARKING PV CANOPY SECTION A 1/2" = 1'-0"

Sheet

PARKING PV CANOPY SECTIONS

6/3/2013 11:43:09 AM

A6.61 C:\Revit projects\VSP\1221_Villa San Pedro_Site_cheryl.rvt All ideas, design arrangements and plans indicated or represented by this drawing are owned by, and are the property of Gelfand Partners Architects, Incorporated and were created, evolved, and developed for use on and in connection with this project. None of such ideas, arrangements, or plans shall be used by or disclosed to any person, firm, or corporation for any purpose whatsoever without the written permission of Gelfand Partners Architects Incorporated.Filing of these drawings or specifications with any public agency is not a publication of the same. No reproduction is therefore permissible without the written consent of Gelfand Partners Architects.

Villa San Pedro Apartments

03


Justin Jennings : Portfolio SHEET NOTES

EXTENT OF TRELLIS ABOVE

9 A6.63 11

(E) TREE TO REMAIN

A6.63 11 A6.63

2' RADIUS AROUND CENTER OF TRUNK

8 A6.63

7 A6.63

EQ

EQ EQ

6 A6.63

EQ

95' - 5 121/128"

130.00째

EQ

R 42' - 0"

R 49' -

KEYNOTES 0"

EQ

5

EQ

A6.63

1

1

A6.63

A6.63 EQ

4 A6.63

3 A6.63

10

10

A6.63

A6.63 2 A6.63

LEGEND

2

ENTRY TRELLIS - ROOF 1/4" = 1'-0"

Entry Trellis - Ground 1/4" = 1'-0"

1

Architect

Gelfand Partners A R C H I T E C T S

P

G

6/3/2013 11:43:29 AM

All ideas, design arrangements and plans indicated or represented by this drawing are owned by, and are the property of Gelfand Partners Architects, Incorporated and were created, evolved, and developed for use on and in connection with this project. None of such ideas, arrangements, or plans shall be used by or disclosed to any person, firm, or corporation for any purpose whatsoever without the written permission of Gelfand Partners Architects Incorporated.Filing of these drawings or specifications with any public agency is not a publication of the same. No reproduction is therefore permissible without the written consent of Gelfand Partners Architects.

165 Tenth Street Suite 100 San Francisco, CA 94103 Tel. 415. 346 . 4040 Fax 415. 346 . 4103 www. gelfand-partners.com

Consultants

LANDSCAPE DESIGN:

CIVIL ENGINEERING:

18

16

A10.13

7' - 11 3/4"

A10.13

ELECTRICAL:

17 A10.13

4' - 6 3/4"

MECHANICAL/ PLUMBING:

7 A10.12

SIM STRUCTURAL:

9

Entry Trellis Elev 1 1/4" = 1'-0"

8

Entry Trellis Elev 2 1/4" = 1'-0"

7

Entry Trellis Elev 3 1/4" = 1'-0"

6

Entry Trellis Elev 4 1/4" = 1'-0"

5

Entry Trellis Elev 5 1/4" = 1'-0"

4

Entry Trellis Elev 6 1/4" = 1'-0"

3

Entry Trellis Elevation 7 1/4" = 1'-0"

2

Entry Trellis Elev 8 1/4" = 1'-0"

7' - 0"

EQ

EQ

EQ

EQ

EQ

EQ

EQ

TS PURLIN - TYP

TS PURLIN SSD

Key Plan Entry Trellis - Top 12' - 0"

STEEL TRELLIS - SSD STEEL ANGLE SUPPORT FRAME FOR STEEL MESH PANEL

3' - 7 1/4"

1" X 8" FENCING SLAT

(E) CONCRETE SIDEWALK 1X SEATING TOP

0' - 7"

Date

0' - 5"

0' - 7 1/2"

Issues/Submission

Section 11 1/2" = 1'-0"

LEGEND

Architect D A R CH

LISA JAY GELFAND

NO. C17265 REN. 5-31-13

T

OF

I

CT

A

E

SE

TE

ST

Entry Trellis

10

Drawing Record

2" X 8" BENCH SUPPORT

N IA

KEYNOTES

TRELLIS FRAME ELEVATION 1/2" = 1'-0"

1" X 8" SEATING FASCIA 0' - 7 1/4"

0' - 7 1/4"

1

0' - 7 1/4"

CONCRETE FOOTING - SSD

EN

14 A10.13

R

SHEET NOTES

Section 6 1/2" = 1'-0"

15 A10.13

PERFORATED GSM PANEL WITH CUTOUT SIGNAGE STEEL ANGLE SUPPORT FOR MESH PANEL

L IC

11

8X FENCE SLAT

0' - 2 1/4"

PERFORATED GSM PANEL

STEEL TRELLIS FRAME - SSD

0' - 11 1/4"

0' 0' - 4" - 7 1/4"

8X FENCE SLAT

2' - 2 3/4"

SHAPED 4X4 WOOD POST

0' 0' - 4" - 7 0' 1/4" - 7 0' 1/4" - 7 0' 1/4" - 7 1/4" 1' - 2 1/2"0' - 10 1/4"

44

F CA L I

O

Project


Professional

Role: Designer Gelfand Partners Architects

45

Arch

Ge A

G

LAND

CIVIL

ELEC

MECH

STRU

FIRE

3

Entry Trellis Perspective 3

L IC

EN

Archi

ST

Entry Trellis Perspective

03 A

Villa San Pedro Apartments

E

T

1

S


46

04

Justin Jennings : Portfolio

Fairmeadow Elementary School Palo Alto, CA

A high performance addition and renovation

Client: Palo Alto Unified School District Completed: 2012


Professional

Role: Construction Administration Gelfand Partners Architects

Fairmeadow Elementary

47

04


48

05

Justin Jennings : Portfolio

Novoshahktinsk Supportive Housing Novoshahktinsk, Russia

A model for supportive housing in Russia

Client: Gloria Jeans Charity Foundation Two week workshop - Fall 2013

Fore-Court Perspective (above)


Professional

Site Conext (below)

Role: Designer Gelfand Partners Architects

Novoshahktinsk Social Housing

49

05


50

Justin Jennings : Portfolio

Interior Communal Courtyard


Professional

Plan

Role: Designer Gelfand Partners Architects

Novoshahktinsk Social Housing

51

05


52

Justin Jennings : Portfolio

Solar PV Electric Panels Solar Thermal Preheating System

Infrastructure Canopy as Arcade at Pedestrian Level

Interstitial Mechanical Level Accepts Connections to Urban Systems Vertical Glass Algae Tube Facade

South Facing WIndows Shaded by Algae Tubes and Support Structure Radiant Heating/Cooling

Algae Collection Tank Concrete Structure with Passive House Construction

Biodiesel Electric Generator CO Emissions Captured and Pumped through Algae Water

Canopy Pulls Public Space through Ground Level into Courtyard

Heat Exchanger and Hydronic Pump Algae Tubes on South Facing Facades

Energy Generation:

Assumed Demand Load: 1,855,000 kWh/yr

Solar Production: 19.64 (kWh/yr/sf in Merced) x [(114,000 sf of total roof space) x (70% coverage of PV panels)] = 1,572,530 kWh/yr

06

Belleview BioFacade Net-Zero District

Algae Production: (131,000 sf of southern facing facade) x (3,750 gallons biodiesel/acre) (43,560 sf/acre) = 11,278 gallons biodiesel/year

Buildings Step Down to Allow Solar Coverage on Algae Facade and Provide Roof Garden

Davis, CA

11,278 gallons biodiesel x (34.98 kWh/gallon) = 394,456 kWh/yr

Housing Forms Frame Smaller Courtyard Spaces

Total Energy Production = 1,572,530 + 395,456 = 1,967,986 kWh/yr

Architecture at Zero 2012

An Algea-fueled net zero energy campus plan

Larger Urban Scale Maintained at Exterior of Block

Student Housing Site Plan Algae Tubes on South Facing Facades

Study

Buildings Step Down to Allow Solar Coverage on Algae Facade and Provide Roof Garden

Roof Garden

Typical Single Loaded Module Upperclass Suites

Housing Forms Frame Smaller Courtyard Spaces

Lounge

Underclass Dorm Rooms Upperclass Dorms

Larger Urban Scale Maintained at Exterior of Block

Typical Upper Floor Plan

Typical Double Loaded Module

Student Housing Site Plan

March 21

Study

Roof Garden

Student Building 9AM

June 21

December 21

Canopy Below


Professional

Site Master Plan Board

Role: Designer Gelfand Partners Architects

Belleview BioFacade District

53

06


54

07

Justin Jennings : Portfolio

Hamad International Airport Doha, Qatar

A new hub for an ambitious middle east city

Client: New Doha International Airport Completed: 2014


Professional

Role: Construction Administration HOK

Hamad International Airport

55

07


56

08

Justin Jennings : Portfolio

Architectural Fictions of the Dispersed City Master’s Thesis

De-objectifying the American Suburb

Thesis, Spring 2012 San Jose, CA

Set in the culture of the economic meltdown and subsequent housing crisis, this project explores methods of discomforting and re-spatializing the suburban setting of San Jose, CA. Through the building of a series of architectural analogs that focused on the dissolution of the object within the field, the project sought ways to create an interactive and empowering urbanism within the linear, dispersed city. The sprawling mazes of houses, streets, feeders and highways offers a comforting sense of security, but casts a dark gloom of isolation and disconnection. This project seeks to override that disconnection by breaking up the disorienting pattern of maze-like streets and objective primacy of the single family home by proposing redevelopment methods that allow for new pedestrian pathways to local transit hubs, rezoning to allow for small businesses within the cul-de-sacs, and public park spaces with orientation towers built into the unused spaces of back and side yards. Struggling home owners can refinance their homes to affordable levels by selling portions of their land to a public entity that overseas the creation of the new park-ways.


Student

Rhode Island School of Design Critic: Almin Prsic

57

As an exploration of the architectural process, this project finds a space between an analytical planning exercise and that of an art practice, producing a series of objects that move from purely sculptural toward the architecturally representative model. It looks for ways to find ideas through the intuition of making and experimenting, then presents the process as the finished product, with each experiment carrying the equal weight of a final solution. It states that architecture is not just in the final building, but in the collection of artifacts throughout the design process.

Architectural Fictions of the Dispersed City

08


58

Justin Jennings : Portfolio

Y

Y

X

Open Cartesian Spatial Grid Direct Proximities

X

Open Urban Spatial Grid Indirect Proximities

Y

Y

X

X

Subdivided Urban Spatial Grid Indirect Proximities

Subdivided Urban Spatial Grid Limited Access Proximities

Linearization of travel space


Student

Rhode Island School of Design Critic: Almin Prsic

59

Y

Y

X

X

Subdivided Suburban Spatial Grid Linear Fixed-Route Proximities

Subdivided Suburban Spatial Grid Linear Fixed-Route Transverse Proximities

j

c(t) Unfolded Linear Path Space Travel Space and Transverse Proximities

Architectural Fictions of the Dispersed City

08


60

Justin Jennings : Portfolio

San Jose


Student

Rhode Island School of Design Critic: Almin Prsic

Architectural Fictions of the Dispersed City

61

08


62

Justin Jennings : Portfolio

Analog Models


Student

Rhode Island School of Design Critic: Almin Prsic

Architectural Fictions of the Dispersed City

63

08


64

Justin Jennings : Portfolio

Nodal Intervention and Pedestrian Pathway


Student

Rhode Island School of Design Critic: Almin Prsic

Architectural Fictions of the Dispersed City

65

08


66

Justin Jennings : Portfolio


Student

Rhode Island School of Design Critic: Almin Prsic

Architectural Fictions of the Dispersed City

67

08


68

09

Justin Jennings : Portfolio

Wells-Lamson Art Hike Advanced Studio Project

A campus for artists cut into an abandoned quarry

Breaking Ground Advanced Studio, Fall 2011 Barre, VT

Answering a competition brief for an artist-in-residency program to be established at the site of an abandoned quarry in Barre, VT, this project cuts a hiking path into the hills around the site and positions four studio-residences along the hike. The act of travelling through the site builds a connection to the environment and immerses visitors and artists into the rich experience of place in the Vermont mountains, while forming a relationship with the massive void of the quarry pit. A wooded walkway perched along a hillside cuts into the landscape, exposing the hillside granite as retaining wall, and expands in width to accomodate the studio buildings. The artists’ studio reside within the path, merging the visitors’ experience of the natural landscape along the hike with that of the studio visit. At the studio, the path splits levels to allow hikers to ascend into the studio space, or bypass downward and around.


Student

Rhode Island School of Design Critic: Silvia Acosta

69

Sense of place builds through the long, slow walk in the woods, giving hints of the site’s geology by occupying the excavated granite’s space, and immersion in the local environment, offering heavilly secluded areas of wildnerness and overlooking vistas of the whole area. Also, a sense of place is understood historically and culturally as the path visits relics of the non-operational quarry and the abandoned railway that traverses the site. Ultimately the artist and visitors come to understand the creative process within the context of natural and geographic timelines.

Wells Lamson Art Hike

09


70

Justin Jennings : Portfolio

landscape artist

performance artist

Site Plan and Unfolded Section


Rhode Island School of Design Critic: Silvia Acosta

Student

71

visitor center

literary artist

visual artist

Wells Lamson Art Hike

09


72

Justin Jennings : Portfolio

Visual Artist Studio Plan


Student

Rhode Island School of Design Critic: Silvia Acosta

Wells Lamson Art Hike

73

09


74

Justin Jennings : Portfolio


Student

Rhode Island School of Design Critic: Silvia Acosta

Wells Lamson Art Hike

75

09


76

10

Justin Jennings : Portfolio

Adaptive Growth Hut

Core Studio Design Build

A community garden prototype

Architectural Design, Spring 2010 Providence RI


Student

Rhode Island School of Design Critic: Hansy Better

Adaptive Growth Hut

77

10


78

Justin Jennings : Portfolio Spring Planting

Summer Planting

Return

Harvest

Growth Late Stage

Growth Mid Stage

Growth Early Stage

Planting

Fertilization

Fall Planting

11

Magazine Beach Chicken Coup and Garden Advanced Studio Project

An ephemeral connection to a history of agriculture

The Ephemeral and the Everlasting, Spring 2011 Boston, MA

A moving chicken coop worms along the banks over the course of a growing season. The fencing and building expand to open views during the day and contract to protect the inabitants at night. The slow movement down the Charles leaves a fertilized garden in its wake, planted with seasonal-appropriate vegetables and plantings, recording the passage of the year and creating a garden path for visitors to the river. The project recalls the Charles earlier times as support for agriculture and then as a home for a large number of slaughter houses.


Student

Rhode Island School of Design Critic: Pari Riahi

Magazine Beach Chicken Coup and Garden

79

11


80

12

Justin Jennings : Portfolio

Wave Ceiling Installation A canopy of interfering wave patterns This installation in RISD’s Bayard Ewing Building’s gallery was conceived from interfering wave patterns. Mulitple wave functions were written and analyzed using Microsoft Excel, which were then imported to Rhino to create a 3D surface. The invented surface was placed within the gallery to divide the space into into a circulation zone and a discussion zone. The surface was then cut according to local constraints, such as sprinkler pipes or ceiling conditions. The resulting form was built from laser cut OSB ribs and coated with fiberglass on a portion of the surface.

Digital Constructs, Fall 2010 Providence, RI


Student

Rhode Island School of Design Critic: Pari Riahi

Wave Ceiling Installation

81

12


82

Justin Jennings : Portfolio

Aurora Borealis


Student

Vassar College Sculpture

83

Selected Artwork

13


84

Justin Jennings : Portfolio

Rebar Hand Installation


Vassar College Sculpture

Student

Snow Path

85

Selected Artwork

13


86

Justin Jennings : Portfolio


Student

Vassar College Painting

87

Selected Artwork

13


88

Justin Jennings : Portfolio


Personal

Photography

89

Selected Artwork

13


90

Justin Jennings : Portfolio

Sutro Tower


91




Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.