Why should you make the big shift to bim modeling

Page 1

Why Should You Make the Big Shift to BIM Modeling? Almost everything about a construction project these days are based on computer generated information. Yes, there are still blueprints, drawings and all, but most of these information were produced by software, whose purpose is solely to provide engineers, architects, and every other individual really good information on how to approach a project, build it according to specifications, and make sure that they are completed on time. However, the information that is usually furnished by software, such as standalone CAD software, can only provide so much. The most that engineers would have to do is to figure out for themselves the materials, the cost, the timeframe, and make changes to the specifications, whenever one aspect of the project encountered some issues. This can still be taxing on the part of engineers and architects, right? How? Well, the answer is BIM Modeling or Building Information Modeling. This is a more comprehensive technology that allows the integration of the various facets of construction projects right in the 3D models. It can provide you with all data that you need in order for you to make the right decisions and come up with a good structural design and an effective plan on how to go about a particular construction project. What BIM Offers Now If you take a look at how construction projects are carried out a decade ago, you will find a huge difference. 2D design illustrations required a lengthy time to execute and implement since it would require engineers to rack their brains to come up with a good construction plan. Then there came 3D CAD services, which somehow has alleviated and eased the burden of engineers. But there was still something missing with the latter. All that it does was to provide a representation, and that’s it. You would still need to figure out other aspects on your own. Comes BIM Modeling and the previous woes of project managers were definitely lightened. BIM paved the way for the integration of two more aspects into CAD services. It added two intangible aspects – time and cost. So aside from merely being able to see the width, the height and the depth, BIM made it possible for engineers to include information on the quantities of materials to be used, along with the specifications, the costs for such materials and the time schedule. With all the necessary information integrated in one, project managers and supervisors, would now have a complete overview of the entire project. They will be able to create a solid structural design, a good exterior and interior view of the building, architectural 3D modeling, and other intangible information that are equally important for the completion of the project. It establishes relationships to all the factors involved in the building process and changes in one factor, creates a change in other factors depending on the parameters provided.


These clearly are advantages that one could not just dismiss. Yes, architectural CAD designs are valuable, but BIM is taking those designs to the next level, helping you get hold of information that will make project completion faster and easier. For More Information about Structural Design Visit Elmasry.com.au Original Article Source Scribd.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.