Architecture Portfolio - DS3 Faceted Hagane

Page 1

Architecture Portfolio Desgin Studio 3 Long Jiyang 1001849977



content Project 1A - spatial operation study Project 1B - precedent studies Project 2A - site analysis + user profile Project 2B - adaptation to context Project 3 - co-space

00



PROJECT 01A SPATIAL OPERATION STUDY

Find an object/ phenomenon that relate to this spatial operation: ENVELOPE. Analyse this object to understand how with this volumetric manipulation, this object shall result in a new function and value.

02



04


PROJECT 01B PRECEDENT STUDIES As a group, produce a series of architectural diagram and model of the selected precedent studies, analysing spatial operation & condition, and investigate the formal and spatial characteristic of each work to illustrate and communicate architectural spatial qualities.


06



08



10



12



PROJECT 02A SITE ANALYSIS + USER PROFILE Various aspect of site study, then determine the best 1250sqm within site for building demarcation.



16



18



20



22



PROJECT 02A USER PROFILE Interview two students from chosen faculty or school within the UCSI campus to generate TWO student profile to analyse things in common and differences.


PROJECT 02B ADAPTATION TO CONTEXT The art of building is not only forms and shapes but to look at how to design a building that adapts to the topography of site through its depths, how to create space that allow you to experience the environment, how to design for the present with awareness from the past.


26


O P E R AT I V E D E S I G N

B a s i c fo r m

CONDITIONAL DESIGN

S PAT I A L Q U A L I T Y


O P E R AT I V E D E S I G N C i r c u l a r b a s i c fo r m i s c h o s e n t o m a x i m i z e v i ew f ro m i n s i d e o f t h e b u i l d i n g.

B a s i c fo r m Plan

M e r g i n g fo r m s t o c o n n e c t b u i l d i n g with eac h other and to ensure building is within setback.

M e r ge Plan

C a r v i n g o u t o p e n i n g s t o a l l ow h u m a n access into the building and also c r e a t e s a n o p p o r t u n i t y t o h a ve g r e e n s c a p e w i t h i n b u i l d i n g.

C a r ve d Plan

B u i l d i n g fo r m i s o n c e a ga i n b e i n g c a r ve d t o c r e a t e l e ve l s a n d p r i va c y. C a r ve d E a s t E l e va t i o n Blocks are shifted to further emphasize on l e ve l s a n d p r i va c y.

Shift

E a s t E l e va t i o n

CONDITIONAL DESIGN

OPEN: O p e n i n g s a r e c r e a t e d t o a l l ow n a t u ra l l i g h t a n d n a t u ra l ve n t i l a t i o n e n t e r t h e b u i l d i n g. S o m e o p e n i n g s a r e c r e a t e d fo r a c c e s s p u r p o s e.

C O N N E C T: Stairs is use to connect d i f f e r e n t l e ve l s b l o c k s w i t h i n b u i l d i n g.

GROUND: B u i l d i n g i s g ro u n d e d i n t o fo l l ow i n g c o u n t o u r o f t h e s i t e.

S PAT I A L Q U A L I T Y

Tra n s p a r e n t b u i l d i n g. B u i l d i n g h a s n u m e ro u s l a r ge o p e n i n g s a n d w i n d ow s t o m a x i m i z e t ra n s p a r e n c y o f b u i l d i n g. T h i s a l l ow p e o p l e f ro m i n s i d e t o ge t g o o d v i ew s o f o u t s i d e. Pe o p l e f ro m o u t s i d e a l s o h a s t h e o p p o r t u n i t y t o e n j oy t h e s t u d e n t ’s f a s h i o n wo r k t h ro u g h g l a s s e s w i t h o u t b e i n g i n s i d e t h e b u i l d i n g.

28


O P E R AT I V E D E S I G N C u b o i d s a r e c r e a t e d fo l l ow i n g c o u n t o u r o f t h e s i t e.

B a s i c fo r m

Plan

The block is notc hed to respond to the sun. Building is able to self sustain t h ro u g h s o l a r e n e r gy by a d d i n g s o l a r p a n e l s o n t h e a n g l e d ro o f.

N o r t h E l e va t i o n Notc h

B l o c k i s ex p a n d e d u pwa r d s t o a c t a s b u f f e r t o c r e a t e p r i va c y. N o r t h E l e va t i o n Expand

T h e b i g ge s t b l o c k i s s p l i t i n t o a f ew b l o c k s t o a l l ow i n d i v i d u a l s h a v i n g t h e i r ow n wo r k s p a c e. Split

Plan

B l o c k i s t a p e r e d t o c r e a t e h i e ra c hy a n d t o c r e a t e a u n i q u e fo r m t o t h a t can act as a monument or an icon to t h e b u i l d i n g. I t c a n a l s o b e a l a n d m a r k t o t h e s i t e. N o r t h E l e va t i o n

Ta p e r

CONDITIONAL DESIGN OPEN: Openings are created t o a l l ow n a t u ra l l i g h t a n d n a t u ra l ve n t i l a t i o n e n t e r t h e b u i l d i n g. Some openings are c r e a t e d fo r a c c e s s p u r p o s e.

C O N N E C T: A corridor is use to c o n n e c t d i f f e r e n t l e ve l s b l o c k s w i t h i n b u i l d i n g.

GROUND: B u i l d i n g i s g ro u n d e d i n t o fo l l ow i n g c o u n t o u r o f t h e s i t e.

S PAT I A L Q U A L I T Y B u i l d i n g i s c r e a t e d by c o m b i n i n g s e ve ra l u n i q u e a n d ex p r e s s i ve fo r m s t o r e p r e s e n t t h e c r e a t i v i t y o f f a s h i o n d e s i g n s t u d e n t s. A t a l l m o n u m e n t i s a l s o a va i l a b l e t o e n s u r e v i ew f ro m o u t s i d e i s a l s o t a ke n c a r e o f.


O P E R AT I V E D E S I G N

B a s i c fo r m

Plan

C u b o i d s a r e a r ra n ge d i n t h i s m a n n e r i s c r e a t e a c e n t ra l i z e d p r i va c y b u i l d i n g. T h i s a r ra n ge m e n t a l s o i n vo l ve d t h e p r i n c i p l e o f e n ve l o p e.

B l o c k s a r e b e n d e d t o i m p ro ve v i ew o f i n d i v i d u a l f ro m i n s i d e o f t h e b u i l d i n g. Bend Plan B l o c k i s ex p a n d e d u pwa r d s t o a c t a s b u f f e r t o c r e a t e p r i va c y.

Expand

Ta p e r

We s t E l e va t i o n

We s t E l e va t i o n

B l o c k i s t a p e r e d t o c r e a t e h i e ra c hy a n d t o c r e a t e a u n i q u e fo r m t o t h a t can act as a monument or an icon to t h e b u i l d i n g. I t c a n a l s o b e a l a n d m a r k t o t h e s i t e.

T h e m o n u m e n t i s s p l i t i n t o a f ew t o t o c r e a t e i n d i v i d u a l s p a c e s fo r e a c h r e s p e c t i ve s t u d e n t s fo r p r i va c y p u r p o s e.

Split

N o r t h E l e va t i o n

CONDITIONAL DESIGN

OPEN: O p e n i n g s a r e c r e a t e d t o a l l ow n a t u ra l l i g h t a n d n a t u ra l ve n t i l a t i o n e n t e r t h e b u i l d i n g. S o m e o p e n i n g s a r e c r e a t e d fo r a c c e s s p u r p o s e.

C O N N E C T: A corridor is use to c o n n e c t d i f f e r e n t l e ve l s b l o c k s w i t h i n b u i l d i n g.

GROUND: B u i l d i n g i s g ro u n d e d i n t o fo l l ow i n g c o u n t o u r o f t h e s i t e.

S PAT I A L Q U A L I T Y

B u i l d i n g i s c r e a t e d by c o m b i n i n g s e ve ra l u n i q u e a n d ex p r e s s i ve fo r m s t o r e p r e s e n t t h e c r e a t i v i t y o f f a s h i o n d e s i g n s t u d e n t s. T h e m o n u m e n t s a l s o a c t s l i ke a h i n t o f t h e b u i l d i n g, a t t ra c t i n g a n d h i n t i n g p e o p l e t o ex p l o r e t h e r e s t o f t h e b u i l d i n g.

30



PROJECT 03 CO_SPACE Design is not about beautifying an object but to observe, analyse and understand the underlying issue, solve the problem with creativity. Develop your own design process and technical skills with greater selfassurance and individuality, as well as articulate ideas with greater clarity and conviction.


FACETED-HAGANE

By remaining most of the landscape elements (the vegetations and the exisiting contours) and seeking inspiration from origami fashion to replicate the contour and a mountain-like building to have a relationship to Bukit Besi, this carefully thought intricate building is born.


34


SITE ANALYSIS

DESIGN INTENTION + STRATEGY



OPERATIVE DESIGN

DESIGN PROCESS


38



40


PERSPECTIVES


42


MODEL PICTURES


44


FINAL BOARD LAYOUT


THANK YOU


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.