March 2013 Production Schedule for _____________________________ Mon
Tue
Wed
Thu
Fri
Sat
Sun
1
2
3
4
5
6
7
8
9
10
11
12 Pre-Prod Deadline @ 3.20pm
13 Start designing our film title’s typography
14 Create our production company name and logo
15 Make our production credits (Film4 logo, distributor, rogue pictures, etc)
16 Filming shoots 8-21 ( see shooting script for further details)
17 Filing shoots 22– 28 ( see shooting script for further details)
18 -Upload footage and also Start designing graphics for cast
19 Finish designing graphics for cast and crew
20 Edit film footage
21 Edit film footage
22 Edit film footage
23
24
25 Edit film footage
26 Edit film footage
27 Filming/Editing (draft edit as mov at end of lesson)
28
29
30
31
April 2013 Production Schedule for _____________________________ Mon
Tue
Wed
Thu
Fri
Sat
Sun
1 Make any changes required
2 Make any changes required
3 Make any changes required
4 Make any changes required
5 Make any changes required
6 - Keep this date free just incase anything needs to be refilmed.
7 - Keep this date free just incase anything needs to be refilmed.
8 Make any changes required
9 Make any changes required
10 Add sounds/ music
11 Add sounds/ music
12 Make sure added sounds and music is all perfect.
13
14
15 Check the opening sequence and add finishing touches
16 Check the opening sequence and add finishing touches
17 18 19 Final late night edit- Final Prod Deadline ing session @ 3.20pm
20
21