Kara Skul
Interior Design Professional Portfolio
Project included the demolition of the existing 1922 High School and rebuilding a new 22,000SF facility. Involvement included finish and furniture selections, presentations, interior details, and construction documents of interior elevations, reflected ceiling plans, and finish floor plans.
Delavan High School
BEFORE Project included renovation of interior finishes, furniture, window treatments, artwork, lighting, and beauty salon equipment for a beauty salon located in a senior living facility. Interior renderings using Revit were completed, as well as working directly with a salon manufacturing company to design custom pieces to meet senior living standards.
Sedgebrook Beauty Salon
AFTER
RENDERING
BEFORE Project included the interior renovation of a student health center. Involvement included the redesign of the nurse’s check in station with HIPPA and patient privacy as a main design priority, as well as the redesign of the waiting area into two separate private wait rooms. Finishes, casework, and furniture were included.
IWU Student Health Clinic
BEFORE Project included the renovation of a large manufacturing plant into a worship center. Involvement included Revit modeling, interior design, and specifications to work with the church on creating a state of the art and engaging facility while incorporating the existing industrial finishes.
Willow Creek Crystal Lake
AFTER
RENDERING