3 minute read
5.1. Space Standards and data
5. Space Program and Zoning
5.1. Space Standards and data Space Data standard
Advertisement
stores Definition A space for the display and sale of each zone of finishes and constructions building Materials in the market.
Components:
1. display area 2. information desk 3. administration 4. services and storage
Design Guide
Area: surface area is (1.40 to 4.00) m2 person. Entrance: should separate entrance door from exit door of store Location: should organize into zones, each zone with purpose. From: should have display partition on the Elevation (Rectangle shape is preferred) Parking: 4 parking slots per 100 square meters of commercial floor space .
Source: Neufert, n.d
Exhibition
Definition
A hall or building for the display or sale of finishes and constructions building Materials.
Function:
The main function of to promote all suppliers of the Market.
Components:
1. Exhibit area 2. lobby 3. information sales 4. workroom
Design Guide
Area: surface area is (1.6 to 2.6) m2 person. Corridor: min. passage width (1.20 to 1.40) meter. Location: many options are acceptable, but the best is at the main entrance. From: it should be flexible enough to host maximum number of supplies (Rectangle shape is preferred) Lighting: natural light is preferable but should not Be direct sun light.
Source: Neufert, n.d
Multipurpose hall
Definition
A space used for different types of activities conferences and events involving a lot of people.
Uses
For Main events and international conferences to Meet and present all updates of buildings materials around world
Design Guide
Area: surface area is (1.8 to 2.4) m2 person. Corridor: min. passage width 1 meter for each 60 persons. Extensions: kitchenette preparation rooms for visitors accompanying toilet facilities lockers stores and must have a foyer at the main entrance. Location: many options are acceptable, but the best is at the main entrance. From: it should be flexible enough to host many activities (Rectangle shape is preferred)
Special Requirement
Acoustic must be sound proofed to avoid noise leakage. Ventilation: Adequate temperature and continuous ventilation. Lighting: should have the option to darken for performances.
Conclusion
Should be placed at the entrance of the project to hold all important buildings’ events. Can have high – technologies and new technologies to attract people and suppliers coming from all the world to go visit must be flexible enough to host many different topic events.
Source: Neufert, n.d
Parking 1- Multi proposal hall: Parking slot for each seat. 2- stores: 4 parking spaces per 100 square meters of commercial floor space . - Restaurant : 3 Parking slots for every 100 square meters of the total dining hall space. 3
Source: Egyptian Building code