PORTPHOLIO Architecture Design
Jingkun Cao 2024/01/24
01
EDUCATIONAL BACKGROUND University of Nottingham Ningbo China BEng Hons in Architecture
09/2019-07/2023
ACADEMIC STUDY Game Creative Clutser Public Building Design
· GPA: First Class Hons · Core Modules: Architectural Design Studio, Architectural Humanities, Environmental Sciences for Architects, People Buildings Landscape, Architectural Drawing and Graphics, etc.
Individual Project
07/2023
PROJECT EXPERIENCE Horizontal Metropolitan Research Project Led by Prof Andrea Palmioli, Urban Innovation Lab
市井山水 Market · Well · Mountain · Water
01/2023-03/2023
Group Project
WORK EXPERIENCE Shangai, China 07/2023-present
NOTA Architects Architectural Design Intern
01/2023
02
Duties: · Assisted with landscape, architectural, and interior design projects, including but not limited to drawing preparation, production of working models and bidding documents, etc. Projects Engaged: · Participated in the PAC (Park Avenue Centre) Keppel project locates in Jingan District, Shanghai.The design scale is about Architecture in Detail II 90,000 square meters, including place-making, street design, landscape design and tour route design. I was engaged in producing bidding documents, conducting case analysis and research, conceptualising design concepts, completing design drawings, etc. · Involved in the design of Jiangshan Old House Space Renovation and Decoration project located in Quzhou City. The building base covers an area of about 180 square meters. I was mainly involved in the mid and late stages of design, including completing the drawing for review, construction drawings and model construction. · Engaged in the bidding of Wuhan Yifang South Pavilion L5 Indoor and Outdoor Public Space Design project, located in Wuhan, with a design scale of about 7,000 square meters. This project includes the scenario setting of the indoor atrium space and the outdoor terrace. I was tasked with the production of the bidding documents for this project.
Drawing labels
PERSONAL PROJECT Creativity Community Social Housing Project
Project 1. Zinc - cladding Individual metal roof Titanium zinc composite panel (black) 20mm Sheathing board 19mm Fleezing layer Cross - Laminated07/2022 �mber panel 175mm Fully threaded �mber screw PIR insula�on 80mm Polyester fiber sound-absorbing board 40mm Timber crossbeam 175*90mm Shenzhen, China Sunac Real Estate Group(Shenzhen) Timber studs 40*80mm PRACTICE EXPERIENCE Eleva�on (from river side) Game Industry 40*40mm Architectural Design Intern 06/2021-08/2021 2. Cross - Laminated �mber load bearing wall Duties: Cross - LaminatedJiangshan �mber panelVilla 175mm Exhibit Regeneration Project · Conducted case analysis, developed project documents and deliverables, and coordinated with the design Decora�ve plywood cladding 20mm Photographer Timber ba�ens Place-making for a Mixed-use 50*25mm team. Complex Writters Game Industry Compound water-proof coa�ngs Commercial Project Plaster 20mm Projects Engaged: Artists · Participated in the design of the Taishan Sea Banquet project located in Taishan City. This design covers 27km Game Industry Exhibit Filmmakers 3. Glazing Photographer of coastline and one luxury island. I was responsible for case analysis, research and report writing. 07/2023 - 03/2024 Aluminum alloy window frame 20*20mm Writters · Supported packaging of the effect drawings [u2]of the cultural tourism industry, including shopping malls, Exhibit Aluminum alloyPhotographer window sill commercial streets, snow world hotels. Sec�on 1:1500 Toughened glass panel 11mm Writters · Participated in the research and analysis of cultural tourism design projects, collected information and collated Artists Decora�ve oak frame 300*50mm Filmmakers key effect pictures for designers. Parge coat 10mm
Creativity
Game Industry Game Industry
Inn
s vity
Exhibit
Innovat
Creativity Exhibit
Drawing
Writing
TRPG
Reading
Vocaloid
OC
Photographer Adobe Illustrator
Photographer
Photoshop
Adobe Illustrator
Vray-for rhino
Ecotect Analysis
Innovation
INTERESTS
Innovation
IF
04
Innovation
Creativity
IF
Artists
2
03
IF
Creativity
1
TECHNICAL STUDIES
Filmmakers 4. Floor Timber flooring Construction Details 20mm Impact insula�onFrom layerJiangshan Villa & Academic Project 20mm & Individual Cross - LaminatedIntern �mber slabe Project 175mm Sealing 10mm Par�ally threaded �mber screw Pre - engineered L bracket Polyester fiber sound-absorbing board 40mm 07/2021 - NOW
5. Sliding door
3
4
5
- Game Creative Cluster Urban Divice
This project is aimed at discussing
about the theme of reprogramming towards this problem of 'Lost Space'. By researching deeply into the concept of 'Creative Economy', which is proposed by Western econogist as a solution for urban development under the circumstanced of deindustrialization, the project will focuses on how this concept will help in a particularly, the regeneration and the renewal of an urban area.
The design will based on the topic of 'Creative Economy', to form spaces which are reflected on and contribute to the progress, and try to activate the existing site during the process.
Urban Livability Cultural Activity Center
The existence of lost spaces in deed divide the compact city into several "islands", in which then amount of inhuman and unjustifiable public space will enmerge between those lost spaces. In this case, the positive spaces for people interaction will shrink gradually, result in declination of the the vitality of the city. According to Zhao (2018), loss usually refers to a kind of psychological feeling of people, while space is people's cognitive ability for the scope of space form and thoughts and emotions.
Tai Miao Square
Theme Analysis: Lost Space Figure on the right shows the situation of lost spaces on site, ranging from broken green spaces, wasteland, green belts fenced off from residents and parking lots with inadequent utilization.
Street
Plaza
0-17
18-34
Mountain
Theatre
Playing
Chessing
Playing Cards
School
Hiking
Gaming
Gaming
Tourists
38-59
60+
0-17
18-34
38-59
60+
0-17
18-34
38-59
60+
11% 37%
32%
37%
22% 24%
7%
24%
29%
36%
20%
21%
In consideration of the 'retirement-area problem', we narrow the topic into a Game Creative Center,not only attract young people bring in talents yet also contribute to tourism and city vitality.
The Site
Program Division - Creative Centre Working Area Working area forms as the most important program of the game creative centre, providing formal and official spaces for creative workers.
R&D Area Research and Development area act as supplement, providing technical supports to creative workers.
IF
Game Industry Exhibit
Creativity
Artists
Recreational Area
Innovation
Writters
Photographer
Filmmakers
Exhibition Area More welcomed to the public and open to the visitors. Here the creativity product will be exhibited and tested, under the pulic vision.
Recreational Area, or creative-recreational area, funtioned as a leisure places where peoples from different fields can meet, commuciate and get inspired.
Spatial Consideration
In consideration of the balance between public cluster and private working area, the project is designed with exhibition area at ground floor while co-working space at above. Meanwhile the two paths through the building towards the Wushan Hill gives the project a possibility to function as an Urban Device.
Floor Plan N
1
3
6
10
Design Development
Testing the initial volume to fit in the site.
Testing the initialTesting volumethe to fit initial in the volume site. to fit in the site.
1 Peripheral Product Exhibition 2 Creative Workshop 3 Theme Shop 4 Cafe 5 Auditorium 6 Lobby 7 Game Experience Hall 8 Broad Game Room 9 Storage 10 WC 11 Parking Lot Entry
Testing the initial volume to fit in the site.
Set-back the volume to fit in with the movement of the mountain, creating a centre courtyard.
Separate the two volume, creating a path going up to the hill that connect urban context and natural environment. Separate the two volume, creating a path going up to the hill that connect urban context and natural environment.
Connect the two separate Connect volume the two with separate a bridge volume cross-over, with a bridge cross-over, while testing the opennings. while testing the opennings.
Testing the initial volume to fit in the site. Set-back the volume to fit in with the movement of the mountain, creating a centre courtyard. Set-back the volume Set-back to fit in thewith volume the movement to fit in with of the themovemen mountain, creating mountain, a centre courtyard. creating a centre courtyard.
Connect the two separate volume with a bridge crossover, while testing the opennings.
Connect the two separate volume with a bridge cross-over, while testing the opennings.
Further design the Further urban design path upthe towards urbanthe path hill, up towards th
intergragate this idea intergragate with thethis building. idea with the building. Massing Model
Massing Model Massing Model Further design the urban path up towards the hill, intergragate this idea with the building.
Connect the two separate volume with a bridge cross-over, while testing the opennings.
Further design the urban path up towards the hill, intergragate this idea with the building.
2023/3/15
Final Version.
2023/3/15
Final Version. 2023/3/15
2023/4/10
2023/4/10
2023/4/25
2023/4/25
Elevations
Massing Model
2023/3/25
2023/3/25
1 Reception 2 Co-working Space 3 Meeting Room 4 Conference Room 5 Private working area 6 Pentry 7 Office 8 Motion Capture Room 9 Music Studio 10 Dubbing Room 11 Single office 12 Archive 13 Transitional Park
2023/3/15
2023/4/10
2023/3/25
2023/4/25
2023/3/25
Intergrated Design Roof
1
1:20
1 2
Glass Curtain Wall
1:20
3
2
4 3
4
5
6
7
8
15
9
10
11
Lables
Lables 5
1. Irrigation pipe 2. Coping 3. Vertical greenary container 320mm*300mm 4. Irrigation conduit 5. Titanium zinc composite panel 20mm 6. Screw 7. Drainage layer 20mm 8. Water memberane 9. Seperate layer 10mm 10. Vapor barrier 11. Composite steel floor deck 120mm 12. Steel beam 180mm*140mm 13. Plenum ject 14. Hanging vertical greenary 15. Acoustic insulation 40mm 16. Perforated ceiling panel 10mm
16
12
13 14
Foundation 17
1. XPS insulation 100mm 2. ALC 140mm 3. Fishers 4. Joint (window) 70 mm*100 mm 5. Double glazed window 30 mm 6. Rammed earth cladding 30mm 7. Screw 8. Plaster 10mm 9. Sheathing board 10mm
1:20
Lables
18
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
1. External terrace 100mm 2. Cement and sand screed 60mm 3. Vertical greenary container 60mm 4. Back filled earth 5. Coarse gravel 6. Metal mashes 7. Lean concrete 20mm 8. Drainage pipe 9. Irrigation pipe 10. Seepage board 10mm 11. Timber flooring 10mm 12. Screed 60mm 13. Concrete floor slab 100mm 14. Sound insulation 40mm 15. Protective memberane 10 mm 16. Pad foundation 520 mm*240 mm 17. Ground-base vertical greenary 18. Supporting metal mesh 10mm
Section
Canlitiver GI
Intergration
+9.0m
+4.8m +4.0m
+0.0m
山水
Shangcheng District owns a special location with Wu shan nearby and historical canels beside. However during the process of urbanization, the identity of 'Mountain' and 'Water' is losing. As a result, the project is trying to bring the ideas back to the town By using the metaphor of water capilarity and transitional green belt, we achieve the concept of reprogramming and natrualization.
Mountain · Water
市井
Dama Lane is considered now the final street market in Hangzhou. In this circumstances, the project focuses on the two important street as axis, while redesign the street, renovation the small spaces behind as pocket program by embeding the identity of 'wells'. Market · Well
- Mountain · Water · Market · Well 市井山水 This project is a masterplan project locates in Shangcheng District, Hangzhou, China. With the mian theme of 'reprogramming' and 'renaturalization', the design aimed at explore the posibility of the commensalism between the urbanization and old city memory.
Group Work Jingkun Cao Chendou Zhu Tian Chen Zhejian Zhang Widaad Hosanee
Group Work Indication The leader of this group work, with the role in : 1. Design Vision 100% 2. Activity analysis (partly) 30% 3. Design Concept Development 50% 4. Reprogramming Strategy 100% 5. Design Development 80% 6. Master plan drawing 80% 7. Axonometric drawing 100% 8. Detailed axonometric drawing 30% 9. Digital model & Physical model 50% 10. Review presentation 100%
Urban Context
Historical Background
SOUTH SONG (1127 - 1279)
YUAN (1271 - 1368)
MING (1368 - 1644)
Activities & Issue
ZIYANG COMMUNITY, SHANGCHENG, HANGZHOU, CHINA
QING (1644 - 1911)
REPUBLIC OF CHINA (1912 - 1949)
PEOPLE REPUBLIC OF CHINA (1949)
Envrionmental Consideration
Permeable Pavement
1
-Reduce car lane size -Add cycling lane size -Add green spaces -Add seating arrangement on sideroads
4 A
2 3
Urban Farming
B -Reduce car lane size -Add cycling lane size
2
3
4
D
C 1
-Reduce car lane size -Add cycling lane size
4
Open Green Spaces
Photovoltaic Rooftops
Green Roofs
Rain Garden
-Reduce car lane size -Add cycling lane size -Add green spaces
Precedents Research A Ramp square
B Cross space
C
- Shishimskaya Park
- White Tangram
- Pocket Park on Xinhua Road
Pocket space
D Commercial pedestrain street
- Shishimskaya Gorka
StrategyDevelopment 1: Reprogramming of historical alley Concept A "Well +" Space Wells themselves are small elements, however, when they are connected with the urban life, they'll create a scenario, a gathering space.
① Public space + Community garden /Planting area
tegy 1: Reprogramming of historical alley
+ Performace space /Pocket stage + Gallery space
mming of historical alley
① Public space
② Linear space + Community garden /Planting area
① Public space ① Transitional Park
storical alley Well Location
+ Play ground & Fountain (redesigning the wells) ② Two Axis ③ Wells Capilarity + Performace space- Water Choosing next two axis: the main road /PocketEmbeding the concept/identity of wells: Choosing first axis: the edge between the stage + Community garden + Gallery space & Greenary cross through the city to become the main the wells are the places where people daily hill and the city, functioned as a transitional /Planting area ② Two Axis ② Two Axis ② Two Axis ③space Wells - ③ Water WellsCapilarity -/Community Water ③ Wells Capilarity - Water Capilarity ① Transitional ① Transitional Park① Transitional Park Park garden + Gallerygathered, focuses. communicating and doing activities. green belt. Choosing first Choosing axis: the first Choosing edge axis:between the first edge axis: the between the hilledge andthe between hill andthe hill and Choosing next Choosing two axis: next Choosing the twomain axis: next road the two main cross axis:road through the cross main road through cross through Embeding the Embeding conceptthe of Embeding wells: concept the the ofwells wells: concept are the the of wells places wells: arethe where thewells places arewhere the places where + Performace space people dailypeople gathered, daily communicating people gathered, daily communicating gathered, and doing communicating activities. andPavilion doing activities. and doing activities. the city, functioned the city, functioned as the a transitional city, functioned as a transitional greenasbelt. a transitional green belt.green belt. the city to the become city tothe become themain city focuses. to the become main focuses. the main focuses. + Bicycle parking area & /Pocket stage (rest space) + Gallery space
② Linear space ① Public space
③ Semi-public space + Play ground & Fountain
(redesigning the wells) + Tea house & Community centre (Chess and Mahjong) + Gallery space & Greenary /Community garden + Cafe & Convenience store
② Linear space + Community garden /Planting area + Performace space /Pocket stage + Gallery space
+ Play ground & Fountain (redesigning the wells)
+ + Bicycle parking area & Pavilion (rest space) + Newstand & Pocket library (communicate & reading space )
+ Gallery space & Greenary /Community garden + Bicycle parking area & Pavilion (rest space)
③ Semi-public space
② Linear space
④ Road-side space + Tea house & Community centre (Chess and Mahjong)
② Mixed space (community & public)
+ Recycling station + Play1 ground & + Recycling station ④ Perculation ④ Perculation - Naturalization: ④ Perculation - Naturalization: Phase - Naturalization: Phase Phasespace 1 Fountain ④ Perculation ④ Perculation - Naturalization: ④ Perculation - Naturalization: Phase - Naturalization: 2 Phase 2 + Phase 2 Convenience ④ Perculation - Naturalization: ④- Perculation - Naturalization: Phase - Naturalization: 3 station Phase 3 Phase ③1- Semi-public Cafe & store Perculation - Naturalization: Phase 2 ④ ⑥Perculation Perculation Naturalization: Phase 3 3 /Garbage collection ④ Perculation Naturalization: Phase 1 ⑤ (redesigning wells) & Express station Metaphor:Metaphor: liken the circulation Metaphor: liken the circulation of liken people the circulation in of the people city in ofthe people city the in the cityProgressing: Progressing: redisgning Progressing: redisgning and reprogramming redisgning and reprogramming the andcity, reprogramming the city, the city, Achieving Achieving the final vision the Achieving final of activating vision the final of activating the vision town, of the with activating town, with the town, with + Tea house & Community centre &people communicating areathe town, +Achieving redisgn and reprogram city, the final vision of activating Metaphor: circulation of people to the process to the ofprocess water to the perculation. of process watercompare perculation. of water the perculation. to achieveProgressing: to this achieve progress to thisachieve of progress waterthis capilarity. of progress water capilarity. of water the capilarity. people people + Gallery space & Greenary (Chess and Mahjong) to achieve this progress of water capilarity. with people ‘flowing’ all around the town. + Cloth washing space in the city to the process of water perculation. Gallery space & Community garden + Newstand & Pocket library /Community garden + Express station (with wells besides) (communicate & reading space ) Playground & Community garden + Cafe & Convenience store /Delivery locker + Bicycle parking area & Pavilion Cafe/Convenient store & Community space + + Community centre & communicating area Newstand/Pocket library & reading space (rest space) & Tea house Pocket stage/Performace space + Newstand & Pocket library + Cloth washing space Recycling station/Express station/Washing area (communicate & reading space ) ④ Road-side space + Newstand & Pocket library ② Mixed space (community & public) ④ Road-side space & Seating space (with wells besides) ① space (reading space ) ①Public Public space Tea house & Community centre & communicating area ① Public space ③ Semi-public space Community garden & Planting area + Recycling station + Gallery space & Cafe + Community garden + Community garden + Recycling station + Tea house & Community centre /Garbage collection station Gallery space & Community garden + /Planting area ① space Bicycle parking area & Pavilion/Planting area & Express station + Public Community garden ②& Mixed space (community & public) space (Chess and Mahjong) + Community garden ④ Road-side communicating area + /Planting area + Performace space + Performace space area Connection/Walkway + Bicycle parking area Playground & Community garden /Planting + Community garden + Cloth washing space + Community garden /Pocket stage y space & Community garden /Pocket stage + Cafe & Convenience store (rest space) /Planting area + Recycling station + Express station (with wells besides) store & Community /Plantingspace area + Community garden + Recycling station + Performace space Cafe/Convenient + Performace space + ound & Community garden +/Planting Gallery space + Gallery space /Garbage collection station /Delivery locker Newstand/Pocket library & reading space Express station + Performace spacestage /Pocket stage area /Pocket Recycling station/Garbage collection station & communicating & area Convenient store & Community space & +communicating area + Community centre & communicating area /Pocket stage + Newstand & Pocket library Pocket stage/Performace space Performace space and/Pocket library & reading+ space + Express station/Delivery locker & communicating area + Community garden/Planting area & Performance space/Pocket stage & Tea house + Cloth washing space (communicate & reading space ) + space Gallery/Pocket space stage + space Gallery space t stage/Performace + Cloth washing space (with wells besides) & communicating area + Gallery + Gallery space Recycling station/Express station/Washing area + Express station (with wells besides) eing station/Express ② Linear station/Washing area + Bicycle parking area (rest space)+ Cloth washing space +space Gallery space + Newstand & Pocket & Seating space library /Delivery locker ting space (with wells besides) (reading ) Community centre ouse & Community centre + Community centre & communicating area Teaspace house & & communicating area + Play ground & Fountain + Play ground & Fountain & Tea house munity garden & ② Planting area ②Mixed Mixed space && public) Linear space the wells) ④ Road-side space (redesigning (redesigning the wells) + GalleryCommunity space & garden Cafe & Planting area ⑤ space(community (community public) ②Linear Linear space ② space + Cloth washing space + e parking area & Pavilion + Newstand & Pocket library + Gallery space & Greenary + Gallery space & Greenary + parking area & Pavilion (with wells besides) + /Community Play ground & Fountain + Recycling station /Community garden garden (reading space ) Bicycle + Recycling station ection/Walkway + Bicycle parking area (redesigning the wells) & Fountain & communicating area /Garbage collection station + Community garden + Play ground + Play ground & Fountain + Play ground & Fountain & Express station (rest space) +(redesigning Bicycle parking + Bicycle parking area & Pavilion the area wells)& Pavilion & communicating area (redesigning the wells) /Planting area Connection/Walkway + Gallery space & Cafe (redesigning the wells) + (rest Gallery space & Greenary (rest space) space) + + Cloth washing space /Community garden + Gallery space & Greenary + + Gallery space & Greenary + Gallery space & Greenary + Express station (with wells besides) /Community garden + Bicycle parking area + Bicycle parking area & Pavilion /Community garden /Delivery locker /Community garden + Community garden (rest space) + Bicycle parking area & Pavilion (rest space) + Community centre & communicating area /Planting area space ③ Semi-public space (rest space) + Bicycle parking area & Pavilion + Bicycle +parking area & Pavilion & Tea house + Recycling station & Express station & Cloth washing space (with wells besides) house &&Community + Tea house & Community + PlayTea ground Fountain centre (redesigning wells) centre (rest the space) (rest space) (Chess and Mahjong) (Chess and Mahjong) + Community centre & Tea house & Newstand & Pocket Library (reading space) + Cloth washing space + Gallery space & Greenary/Community gardem + Newstand & Pocket library + Gallery space & Cafe & Community garden / Planting area (with wells besides) ③ Semi-public space + Bicycle parking area store & Pavilion (rest space) store (reading space ) + Cafe & Convenience + Cafe & Convenience & communicating area + Tea house & Community centre space + + + Gallery space & Cafe + Tea house & Community centre(Chess and Mahjong) + Newstand & Pocket library+ Newstand & Pocket library + (Chess and Mahjong) ③ ③Semi-public Semi-public spacespace (communicate space & reading ) & Convenience & reading space ) +(communicate Cafe store + + Tea house & Community centre + Bicycle parking area + + Cafe & Convenience store + Tea house & Community centre + Community garden (Chess and Mahjong) (rest space) + + Newstand & Pocket library (Chess and Mahjong) /Planting area (communicate & reading space ) + Newstandspace & Pocket library Mixed space (community ② Mixed & public) space (community & public) pace ④ Road-side +②Cafe & Convenience store (communicate & store reading space ) + Cafe & Convenience + + Tea house & Community centre (Chess and Mahjong) + Recycling station + Recycling station + + Recycling station + Recycling station + Cafe & Convenience store /Garbage collection station /Garbage collection& station + Newstand Pocket library & Express station station ② Mixed space (community&&Express public) ④ Road-side space + Newstand Pocket library && communicating area & communicating area + Newstand & Pocket library (communicate & reading space) & reading space ) ②(communicate Mixed space (community public) pace (communicate & reading space ) +& Cloth washing space + Cloth washing space
Pocket Program
Recycling station + Express station ++Express station /Garbagelocker collection station /Delivery station locker /Delivery + Recycling communicating area area & communicating /Garbage collectionarea station &&communicating
(with wells besides)
+ Recycling station + Community centre & Express station & Tea house
wellsstation besides) + (with Recycling & Express station + Community centre & Tea washing house space + Cloth
Masterplan N
28
0
10
20
50
22 21
23 25
20
22 17
19
24
17
18
27
16
15 14
26 13
17 AXONOMETRIC DIAGRAM - Dama Lane Market Street The 'Wells'
3
— mini program embeded in the neighborhood
1. Community Greenhouse 2. Cafe 3. Refined Shops 4. Playground 5. Pocket Square 6. Opera Stage 7. Pocket Park 8. Linear Gallery 9. Bookstore 10. Pocket Tea House
13 URBAN SECTION
13 URBAN SECTION
12
1 Residential 2 Community Centre 3 Commercial Street 4 Open Market 5 Load Station 6 Heritage Park 7 Multi-function Museum 8 Tourist Centre 9 Cafe with Transitional Park 10 Primary School with Kindergarten 11 Pocket Programs 12 Transitional Park 13 Sports Centre 14 Elderly Centre 15 Gymnasium 16 Recycling Centre 17 The Theatre 18 Tea & Opera House 19 Library (origin) 20 Gallery Space 21 Tea & Opera House 22 Studio 23 Shops & Cafe 24 Office Building for the Theatre 25 Stuff Accomodation 26 Year 2 Housing Project 27 Community Greenhouse 28 Historical Buildings on Hill Mini Program Path Transitional Park
A' B'
4
3
1
3 5
Detailed Axnometric
6
2
A'
B'
11 A B
7
A B
AA' (1:500) SectionSection AA' (1:500)
1
2
Recycling Center Recycling Center
Theater
Theater
Transitional Art Town park
Art Town
Transitional park 10
The "Wells"
— mini programs embeded in the neighborhood 1. Community Greenhouse 2. Café 3. Refined Shops 4. Playground 5. Pocket Square 6. Opera Stage 7. Pocket Park 8. Linear Gallery C' 9. Bookstore 10. Pocket Tea House
C
C
3 2
C'
4
9
3
Section BB' (1:500)
Section BB' (1:500)
Sports Center
Senior Center
Sports Center
Opera Tea House
Senior Center
Transitional Park
Opera Tea House
Transitional Park
Urban Sections
6
1
8
1
5
8
Transitional Park
7 10
Long Section (1:1000)
9
Transitional Park
Residential Buildings
Residential Buildings
Shops Market Dama Lane Market Street
Section CC' (1:500)
Heritage Park
Shops Market Dama Lane Market Street
Section CC' (1:500)
Heritage Park
Pedestrian Path Car Path
Long Section (1:1000)
Highway Mini Program Greenary/Community Garden
Transitional Park
Museum
Market
Shops Dama Lane Market Street
Hotel
Residential Buildings
Street Corner Plaza
Ramp Square
Senior Center
Transitional Park Opera Tea House
- Creativity Community The Promenade
This housing project is located at Old bund, Ningbo, surrounded by modern buildings, heritages and empty streets. The design tried to achieve a creative community, extend the park and bring vitality back to the Old bund.
Architecture Drawing Section AA’
1:200
1
2
3
4
5
'City banding can be defined as a combination of city ecotope, humanity culture, urban sp irits and etc, which, distinguish the city from other‘competitors’ . ——Yuanpu Jin, 2021
Section BB’
1:200
1
2
3
4
5
B
Design Strategy 1
Ground Floor Plan
0
Unit Catalogue
5 3
10
N
A
Type A. 60m2
6
Type B. 80m2 7
8
4
3
1
Type C. 120m2
9
2 5
B F D C
1 Reception 2 Delivery Locker 3 Bookstore
4 Coffee Shop 5 Waiting Area 6 Reception (for art gallery)
7 Exhibition Hall 1 8 Exhibition Hall 2 9 Art Studio
E
Spatial - Biophilia A. Urban Farming
B. Reading Centre
C. Courtyard
E. Art Gallery
F. Cafe & Relax Area
F. Cafe & Relax Area
- Jiangshan Villa Regeneration Project
The project locates at Xi Di new Street, Jiangshan City, Quzhou, with farmland surrounded and a river flows on south. The client requires the house to be regenerated from From increasing the space, improving the indoor and outdoor environment, to incorporating energy saving and environmental protection technology. Conducted by: Nota Architects Web: http://www.notaarchitects.com/index.php
Intern Work Indication The intern of the studio, with the role in : 1. Precedents study 30% 2. Timber frame structural study 30% 3. Design proposal development 20% 4. Architectual Drawings 50% 5. Construction Drawings 40% 6. Physical model testing 100% Site Origin (Before Regeneration)
Design Proposal
50㎡
2F建筑面积
81㎡
合计建筑面积
194㎡
183㎡
占地面积
183㎡
170.78 171.89 1:100@A3
N
1
5m
0
2
171.70
2023-12-08
171.89
171.71
Jiangshan Villa 江山度假屋
NOTA ARCHITECTS
172.14
160㎡
354㎡
总计建筑面积
图号
图名
0201
1
一层方案平面图
1:100@A3
0
N
172.14
5m
NOTA ARCHITECTS
2
2023-12-08
171.26
1 171.69
170.34
4 5
3
2
6
11920 160
3650
7
8
7330
4570
3700
171.53
360
9
1
100
160
1600
100
4 5
6
11920
100
3500
3
2
8500
5730
4800
171.71
3650
7
8
7330
4570
3700
360
9 8500
5730
1600
100
100
3500
4800
100
171.52
171.44 171.50
A
2.500
160
160
A
UP 17 上17级
B
100
171.62
B
100
Guest 客房1 Room
下17级17 DOWN
Central 堂屋Room
171.93
3.350 8910
8910
0.450
C
苦楝
Guest 客房3 Room
8910
0.250 8910
Master 主卧 Bedroom
3730
Second 次卧 Bedroom
3730
洗衣 Washing
3.150
C
苦楝
Guest 客房2 Room
0.450
E
7700
2.800
E
3.000
Before 改造前
0.000
Terrace 露台
Original Building Original Building 原堂屋建筑 原堂屋建筑
New-built 新建木屋
Woodhouse 新建柴房
113㎡
70㎡
40㎡
81㎡
50㎡
Total floor area
194㎡
183㎡
合计建筑面积
Gross floor area
143㎡
172.55
171.60 172.14
160㎡
183㎡
183㎡
171.70 171.89
171.71 图号
0201
图名
一层方案平面图
1
1:100@A3
0
5m 2
N
Jiangshan Villa 江山度假屋
Terrace (not include) 露台面积(不计容)
NOTA ARCHITECTS 2023-12-08
Jiangshan Villa 江山度假屋
图号
0202
图名
二层方案平面图
1
1:100@A3
Model Testing
Conceptual Section
0
5m 2
N
170.78
苦楝
354㎡
总计建筑面积
Floor area 占地面积
F
After Regeneration 改造后
Area of second floor 2F建筑面积
Area of first floor 1F建筑面积
0.450
100
171.79
100
苦楝
Total area ( ㎡ )
2400
2400
E
5.690
160 1460
Woodhouse 柴房
3.000
1300
7700
D
100
1460
Hallway
100
E
5300
Frame House 木屋 玄关
160
D
1300
171.73
Guest 客房4 Room
上17级 UP 17
儿童活动间 Playroom
171.38
5300
下17级
NOTA ARCHITECTS 2023-12-08
F
- Mixed-use Complex Place - making The project aimed at transfer public space into living space to maximize the value of places, improve the quality and effectiveness of the operation, enhance the connection between people and places, integrating communities into places for motivating commercial vitality and find out distinctive identities of the complex as hot topics and propagation effects spreading among the city. In consideration of confidentiality, other details will not be provided. Conducted by: Nota Architects Web: http://www.notaarchitects.com/index.php
Intern Work Indication The intern of the studio, with the role in : 1. Precedents study 2. Installation design 3. Design proposal development 4. Conceptual masterplan 6. Digital model testing
Communicational Viewports
Communicational Viewports
to the Lift
Elevator volume transformed into Branding Box
Thermal wood Deck
Pop-up Cafe powered by different tenants to other terraces
to the Forest
30% 50% 20% 50% 30%
- Research Internship Horizontal Metropolitan
Drawing Drawing labelslabels
1
20mm20mm 19mm19mm 175mm 175mm
2
This part includes the Intergrated design consideration among different projects, form 3
academic works to internship experience.
3
20*20mm 20*20mm
A
B
Project: Jiangshan Villa 沥青瓦
A
沥青
1407
欧松板 900
50mm厚椽条
50mm厚椽条
200mm厚椽条内填保温岩棉
200mm厚椽条内填保温岩棉
01
基层板
基层板
室内完成面
铝合金断桥采光天窗
80
室内完成面
390
1039 820 730 280
1050
280
2000 900
2120
2130
1030
80
270
290 2160
0.450
300 160 200
300
105 300 145
450
450 300
65 300 185
15
2710
800
210
1050
210
70
800
2700
320
320
1050
1630
800
40 200
0.000
1039 120
840
60
580
1050
570
100
270
300
1030
基层板
80
70
300
4.985
760 800
320
70 2250
580
780 60 120 40 20
120
2023-11-24
900
450 65 300 185
450 70
0.450 0.000 320
15
60 145
200
混凝土地基 0.250 30
120
轻质龙骨
300
高强度水泥板
320
0.000
02
900
细石混凝土找平层
Cut away from west Cut away sec�on fromsec�on west eleva�on of eleva�on entrance of entrance
270
天窗详图01 1:20
Skylight detail 1:20 NOTA ARCHITECTS
5m
2
地面完成面
105
0
570
300
570 1
1:50@A3
2160
建筑剖立面图
1030
Roof detail 1:20 图名
3.150
290
Floor detail 1:20
270
地面详图02 1:20
1050
100
40
屋面详图01 1:20
840
150
1830
200
120
840
300
115
40 50
30
240
60
建筑A-A剖面图 1:50 立面窗详见0501 50
40 20
D
80
2700
2200
800
1039
800
2764
70
115
210
8910
2000
1050
1030
210
40
145
70
800
300
15
60
200
2710
A
0401
Interior ground finish
0.000
390
50
290
200
图号
Thick rafters are filled with insulation rock wool
Base plate
室内完成面
40
200
65
300
70
2023-11-24
Thick rafter 50mm
50mm厚椽条
铝合金断桥采光天窗
NOTA ARCHITECTS
5m
Oriented strand board
0.450
Interior ground finish
300 185
450
混凝土地基 Concrete foundation
60
30
轻质龙骨 Light keel
室内完成面
Pitch
200mm厚椽条内填保温岩棉
200mm厚椽条内填保温岩棉 Thick rafters are filled with insulation rock wool 01 基层板 Base plate
高强度水泥板 High strength cement board
0.250
沥青 2
50mm厚椽条 Thick rafter 50mm
2160
Fine stone concrete 02 screed
1 0
欧松板
Oriented strand board
Asphalt shingle
沥青瓦
B
1:50@A3
沥青 Pitch
Ground finish
细石混凝土找平层
建筑剖立面图
2023-11-24
900
2
NOTA ARCHITECTS 图号沥青瓦0402 图名 Asphalt shingle
900
地面完成面
320
Jiangshan Villa 江山度假屋
D
建筑B-B剖面图 1:50
450
0
5m
欧松板
120
110
Section B-B 1:50
1039
1:50@A3
A
0.000
200 240
3.150
建筑剖立面图
1
290
图名
150
1830
Jiangshan Villa 江山度假屋 270
0401
B
115
2250
840
120
120
570
30
240
屋面详图01 1:20
1030
50
800
1039
40
地面详图02 1:20
2530
4.985
A
D
800
建筑A-A剖面图 1:50
115
300
390
50
A
800
8910
8910
60
145
290
70
立面窗详见0501
图号
135
2200 150
570
300
570 270 450 300
0.000
01
基层板
A
6
120 60
室内完成面
60
30
200mm厚椽条内填保温岩棉
Section A-A 1:50
Jiangshan Villa 江山度假屋
1070
0.450
0.250
200
2*11mm 2*11mm
天窗详图01 1:20
沥青 欧松板
70
混凝土地基
0.000
120 60
50mm厚椽条
轻质龙骨
120
3.150
3.150
40 20
1030
02
900
A
细石混凝土找平层 高强度水泥板
320
6
780
沥青瓦 地面完成面
2764
40 20 1050
430
120
40
5
60
580
200
5
40mm40mm
115
2250 150
1830
100
840
120
40 50
A
120
60
30
240
1039
1039 115
40
760
70
2200
200
800
840
50
800
立面窗详见0501 50
4.985
4.985 70
屋面详图01 1:20
6. Founda�on 6. Founda�on Cement and screed sand screed Cement and sand 60mm60mm Concrete fouda�on 800*600mm Concrete fouda�on 800*600mm concrete ean Lean concrete 50mm50mm and protec�on coa�ng WaterWater proofproof layer layer and protec�on coa�ng Wooden terrace (exterior) 150mm Wooden terrace (exterior) 150mm Drainage Drainage pipe pipe Caorse gravel, Geotex�le, Granular backfill and Rammed Caorse gravel, Geotex�le, Granular backfill and Rammed earthearth
01
沥青瓦
B
沥青 欧松板
4
450
4
300
20mm20mm 20mm20mm 175mm 175mm 10mm10mm
120
11mm11mm 300*50mm 300*50mm 10mm10mm
40
5. Sliding 5. Sliding door door Aluminum alloy cill Aluminum alloy cill Double toughened Double layer layer toughened glass glass panelpanel Double sealing Double sealing
Construction Details
60
4. Floor 4. Floor imber Timber flooring flooring mpact Impact insula�on insula�on layer layer CrossCross - Laminated - Laminated �mber �mber slabe slabe ealing Sealing Par�ally Par�ally threaded threaded �mber �mber screwscrew Pre - engineered Pre - engineered L bracket L bracket Polyester fiber sound-absorbing Polyester fiber sound-absorbing boardboard
2
- Techical Studies -
80mm80mm 40mm40mm 175*90mm 175*90mm 40*80mm 40*80mm 40*40mm 40*40mm 2. Cross 2. Cross - Laminated - Laminated �mber �mber load bearing load bearing wall wall CrossCross - Laminated - Laminated �mber �mber panelpanel 175mm 175mm Decora�ve Decora�ve plywood plywood cladding cladding 20mm20mm imber Timber ba�ens ba�ens 50*25mm 50*25mm Compound Compound water-proof water-proof coa�ngs coa�ngs Plaster Plaster 20mm20mm
3. Glazing 3. Glazing Aluminum Aluminum alloy window alloy window frameframe Aluminum Aluminum alloy window alloy window sill sill oughened Toughened glass glass panelpanel Decora�ve Decora�ve oak frame oak frame PargeParge coat coat
1
200
1. Zinc1.- Zinc cladding - cladding metalmetal roof roof itanium Titanium zinc composite zinc composite panelpanel (black) (black) heathing Sheathing boardboard leezing Fleezing layer layer CrossCross - Laminated - Laminated �mber �mber panelpanel ully threaded Fully threaded �mber �mber screwscrew PIR insula�on PIR insula�on Polyester Polyester fiber sound-absorbing fiber sound-absorbing boardboard imber Timber crossbeam crossbeam imber Timber studsstuds
290
2710
800
70
210
1050
8910
210
70
800
2700
320
A
1050
1630
Technical Research Research study: Heyi Deco research centre
Project: Game Creative Cluster
Lables
12.2m
1
1. Parapet and roof 2. Steel frame structure + ALC 3. Skylight 4. DCV system 5. Floor slab 6. Hanging vertical greenay 7. Fixed shaped glass curtain wall 8. Ground-base vertical greenary 9. Concrete partition 10. Retaining wall
2
3
8.2m
4
5
6
4.4m
7
9
10
8 0.2m