Portfolio for UCL

Page 1

PORTPHOLIO Architecture Design

Jingkun Cao 2024/01/24


01

EDUCATIONAL BACKGROUND University of Nottingham Ningbo China BEng Hons in Architecture

09/2019-07/2023

ACADEMIC STUDY Game Creative Clutser Public Building Design

· GPA: First Class Hons · Core Modules: Architectural Design Studio, Architectural Humanities, Environmental Sciences for Architects, People Buildings Landscape, Architectural Drawing and Graphics, etc.

Individual Project

07/2023

PROJECT EXPERIENCE Horizontal Metropolitan Research Project Led by Prof Andrea Palmioli, Urban Innovation Lab

市井山水 Market · Well · Mountain · Water

01/2023-03/2023

Group Project

WORK EXPERIENCE Shangai, China 07/2023-present

NOTA Architects Architectural Design Intern

01/2023

02

Duties: · Assisted with landscape, architectural, and interior design projects, including but not limited to drawing preparation, production of working models and bidding documents, etc. Projects Engaged: · Participated in the PAC (Park Avenue Centre) Keppel project locates in Jingan District, Shanghai.The design scale is about Architecture in Detail II 90,000 square meters, including place-making, street design, landscape design and tour route design. I was engaged in producing bidding documents, conducting case analysis and research, conceptualising design concepts, completing design drawings, etc. · Involved in the design of Jiangshan Old House Space Renovation and Decoration project located in Quzhou City. The building base covers an area of about 180 square meters. I was mainly involved in the mid and late stages of design, including completing the drawing for review, construction drawings and model construction. · Engaged in the bidding of Wuhan Yifang South Pavilion L5 Indoor and Outdoor Public Space Design project, located in Wuhan, with a design scale of about 7,000 square meters. This project includes the scenario setting of the indoor atrium space and the outdoor terrace. I was tasked with the production of the bidding documents for this project.

Drawing labels

PERSONAL PROJECT Creativity Community Social Housing Project

Project 1. Zinc - cladding Individual metal roof Titanium zinc composite panel (black) 20mm Sheathing board 19mm Fleezing layer Cross - Laminated07/2022 �mber panel 175mm Fully threaded �mber screw PIR insula�on 80mm Polyester fiber sound-absorbing board 40mm Timber crossbeam 175*90mm Shenzhen, China Sunac Real Estate Group(Shenzhen) Timber studs 40*80mm PRACTICE EXPERIENCE Eleva�on (from river side) Game Industry 40*40mm Architectural Design Intern 06/2021-08/2021 2. Cross - Laminated �mber load bearing wall Duties: Cross - LaminatedJiangshan �mber panelVilla 175mm Exhibit Regeneration Project · Conducted case analysis, developed project documents and deliverables, and coordinated with the design Decora�ve plywood cladding 20mm Photographer Timber ba�ens Place-making for a Mixed-use 50*25mm team. Complex Writters Game Industry Compound water-proof coa�ngs Commercial Project Plaster 20mm Projects Engaged: Artists · Participated in the design of the Taishan Sea Banquet project located in Taishan City. This design covers 27km Game Industry Exhibit Filmmakers 3. Glazing Photographer of coastline and one luxury island. I was responsible for case analysis, research and report writing. 07/2023 - 03/2024 Aluminum alloy window frame 20*20mm Writters · Supported packaging of the effect drawings [u2]of the cultural tourism industry, including shopping malls, Exhibit Aluminum alloyPhotographer window sill commercial streets, snow world hotels. Sec�on 1:1500 Toughened glass panel 11mm Writters · Participated in the research and analysis of cultural tourism design projects, collected information and collated Artists Decora�ve oak frame 300*50mm Filmmakers key effect pictures for designers. Parge coat 10mm

Creativity

Game Industry Game Industry

Inn

s vity

Exhibit

Innovat

Creativity Exhibit

Drawing

Writing

TRPG

Reading

Vocaloid

OC

Photographer Adobe Illustrator

Photographer

Photoshop

Adobe Illustrator

Vray-for rhino

Ecotect Analysis

Innovation

INTERESTS

Innovation

IF

04

Innovation

Creativity

IF

Artists

2

03

IF

Creativity

1

TECHNICAL STUDIES

Filmmakers 4. Floor Timber flooring Construction Details 20mm Impact insula�onFrom layerJiangshan Villa & Academic Project 20mm & Individual Cross - LaminatedIntern �mber slabe Project 175mm Sealing 10mm Par�ally threaded �mber screw Pre - engineered L bracket Polyester fiber sound-absorbing board 40mm 07/2021 - NOW

5. Sliding door

3

4

5


- Game Creative Cluster Urban Divice

This project is aimed at discussing

about the theme of reprogramming towards this problem of 'Lost Space'. By researching deeply into the concept of 'Creative Economy', which is proposed by Western econogist as a solution for urban development under the circumstanced of deindustrialization, the project will focuses on how this concept will help in a particularly, the regeneration and the renewal of an urban area.

The design will based on the topic of 'Creative Economy', to form spaces which are reflected on and contribute to the progress, and try to activate the existing site during the process.


Urban Livability Cultural Activity Center

The existence of lost spaces in deed divide the compact city into several "islands", in which then amount of inhuman and unjustifiable public space will enmerge between those lost spaces. In this case, the positive spaces for people interaction will shrink gradually, result in declination of the the vitality of the city. According to Zhao (2018), loss usually refers to a kind of psychological feeling of people, while space is people's cognitive ability for the scope of space form and thoughts and emotions.

Tai Miao Square

Theme Analysis: Lost Space Figure on the right shows the situation of lost spaces on site, ranging from broken green spaces, wasteland, green belts fenced off from residents and parking lots with inadequent utilization.

Street

Plaza

0-17

18-34

Mountain

Theatre

Playing

Chessing

Playing Cards

School

Hiking

Gaming

Gaming

Tourists

38-59

60+

0-17

18-34

38-59

60+

0-17

18-34

38-59

60+

11% 37%

32%

37%

22% 24%

7%

24%

29%

36%

20%

21%

In consideration of the 'retirement-area problem', we narrow the topic into a Game Creative Center,not only attract young people bring in talents yet also contribute to tourism and city vitality.

The Site


Program Division - Creative Centre Working Area Working area forms as the most important program of the game creative centre, providing formal and official spaces for creative workers.

R&D Area Research and Development area act as supplement, providing technical supports to creative workers.

IF

Game Industry Exhibit

Creativity

Artists

Recreational Area

Innovation

Writters

Photographer

Filmmakers

Exhibition Area More welcomed to the public and open to the visitors. Here the creativity product will be exhibited and tested, under the pulic vision.

Recreational Area, or creative-recreational area, funtioned as a leisure places where peoples from different fields can meet, commuciate and get inspired.

Spatial Consideration

In consideration of the balance between public cluster and private working area, the project is designed with exhibition area at ground floor while co-working space at above. Meanwhile the two paths through the building towards the Wushan Hill gives the project a possibility to function as an Urban Device.


Floor Plan N

1

3

6

10

Design Development

Testing the initial volume to fit in the site.

Testing the initialTesting volumethe to fit initial in the volume site. to fit in the site.

1 Peripheral Product Exhibition 2 Creative Workshop 3 Theme Shop 4 Cafe 5 Auditorium 6 Lobby 7 Game Experience Hall 8 Broad Game Room 9 Storage 10 WC 11 Parking Lot Entry

Testing the initial volume to fit in the site.

Set-back the volume to fit in with the movement of the mountain, creating a centre courtyard.

Separate the two volume, creating a path going up to the hill that connect urban context and natural environment. Separate the two volume, creating a path going up to the hill that connect urban context and natural environment.

Connect the two separate Connect volume the two with separate a bridge volume cross-over, with a bridge cross-over, while testing the opennings. while testing the opennings.

Testing the initial volume to fit in the site. Set-back the volume to fit in with the movement of the mountain, creating a centre courtyard. Set-back the volume Set-back to fit in thewith volume the movement to fit in with of the themovemen mountain, creating mountain, a centre courtyard. creating a centre courtyard.

Connect the two separate volume with a bridge crossover, while testing the opennings.

Connect the two separate volume with a bridge cross-over, while testing the opennings.

Further design the Further urban design path upthe towards urbanthe path hill, up towards th

intergragate this idea intergragate with thethis building. idea with the building. Massing Model

Massing Model Massing Model Further design the urban path up towards the hill, intergragate this idea with the building.

Connect the two separate volume with a bridge cross-over, while testing the opennings.

Further design the urban path up towards the hill, intergragate this idea with the building.

2023/3/15

Final Version.

2023/3/15

Final Version. 2023/3/15

2023/4/10

2023/4/10

2023/4/25

2023/4/25

Elevations

Massing Model

2023/3/25

2023/3/25

1 Reception 2 Co-working Space 3 Meeting Room 4 Conference Room 5 Private working area 6 Pentry 7 Office 8 Motion Capture Room 9 Music Studio 10 Dubbing Room 11 Single office 12 Archive 13 Transitional Park

2023/3/15

2023/4/10

2023/3/25

2023/4/25

2023/3/25


Intergrated Design Roof

1

1:20

1 2

Glass Curtain Wall

1:20

3

2

4 3

4

5

6

7

8

15

9

10

11

Lables

Lables 5

1. Irrigation pipe 2. Coping 3. Vertical greenary container 320mm*300mm 4. Irrigation conduit 5. Titanium zinc composite panel 20mm 6. Screw 7. Drainage layer 20mm 8. Water memberane 9. Seperate layer 10mm 10. Vapor barrier 11. Composite steel floor deck 120mm 12. Steel beam 180mm*140mm 13. Plenum ject 14. Hanging vertical greenary 15. Acoustic insulation 40mm 16. Perforated ceiling panel 10mm

16

12

13 14

Foundation 17

1. XPS insulation 100mm 2. ALC 140mm 3. Fishers 4. Joint (window) 70 mm*100 mm 5. Double glazed window 30 mm 6. Rammed earth cladding 30mm 7. Screw 8. Plaster 10mm 9. Sheathing board 10mm

1:20

Lables

18

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

1. External terrace 100mm 2. Cement and sand screed 60mm 3. Vertical greenary container 60mm 4. Back filled earth 5. Coarse gravel 6. Metal mashes 7. Lean concrete 20mm 8. Drainage pipe 9. Irrigation pipe 10. Seepage board 10mm 11. Timber flooring 10mm 12. Screed 60mm 13. Concrete floor slab 100mm 14. Sound insulation 40mm 15. Protective memberane 10 mm 16. Pad foundation 520 mm*240 mm 17. Ground-base vertical greenary 18. Supporting metal mesh 10mm

Section

Canlitiver GI

Intergration

+9.0m

+4.8m +4.0m

+0.0m


山水

Shangcheng District owns a special location with Wu shan nearby and historical canels beside. However during the process of urbanization, the identity of 'Mountain' and 'Water' is losing. As a result, the project is trying to bring the ideas back to the town By using the metaphor of water capilarity and transitional green belt, we achieve the concept of reprogramming and natrualization.

Mountain · Water

市井

Dama Lane is considered now the final street market in Hangzhou. In this circumstances, the project focuses on the two important street as axis, while redesign the street, renovation the small spaces behind as pocket program by embeding the identity of 'wells'. Market · Well

- Mountain · Water · Market · Well 市井山水 This project is a masterplan project locates in Shangcheng District, Hangzhou, China. With the mian theme of 'reprogramming' and 'renaturalization', the design aimed at explore the posibility of the commensalism between the urbanization and old city memory.

Group Work Jingkun Cao Chendou Zhu Tian Chen Zhejian Zhang Widaad Hosanee

Group Work Indication The leader of this group work, with the role in : 1. Design Vision 100% 2. Activity analysis (partly) 30% 3. Design Concept Development 50% 4. Reprogramming Strategy 100% 5. Design Development 80% 6. Master plan drawing 80% 7. Axonometric drawing 100% 8. Detailed axonometric drawing 30% 9. Digital model & Physical model 50% 10. Review presentation 100%


Urban Context

Historical Background

SOUTH SONG (1127 - 1279)

YUAN (1271 - 1368)

MING (1368 - 1644)

Activities & Issue

ZIYANG COMMUNITY, SHANGCHENG, HANGZHOU, CHINA

QING (1644 - 1911)

REPUBLIC OF CHINA (1912 - 1949)

PEOPLE REPUBLIC OF CHINA (1949)


Envrionmental Consideration

Permeable Pavement

1

-Reduce car lane size -Add cycling lane size -Add green spaces -Add seating arrangement on sideroads

4 A

2 3

Urban Farming

B -Reduce car lane size -Add cycling lane size

2

3

4

D

C 1

-Reduce car lane size -Add cycling lane size

4

Open Green Spaces

Photovoltaic Rooftops

Green Roofs

Rain Garden

-Reduce car lane size -Add cycling lane size -Add green spaces

Precedents Research A Ramp square

B Cross space

C

- Shishimskaya Park

- White Tangram

- Pocket Park on Xinhua Road

Pocket space

D Commercial pedestrain street

- Shishimskaya Gorka


StrategyDevelopment 1: Reprogramming of historical alley Concept A "Well +" Space Wells themselves are small elements, however, when they are connected with the urban life, they'll create a scenario, a gathering space.

① Public space + Community garden /Planting area

tegy 1: Reprogramming of historical alley

+ Performace space /Pocket stage + Gallery space

mming of historical alley

① Public space

② Linear space + Community garden /Planting area

① Public space ① Transitional Park

storical alley Well Location

+ Play ground & Fountain (redesigning the wells) ② Two Axis ③ Wells Capilarity + Performace space- Water Choosing next two axis: the main road /PocketEmbeding the concept/identity of wells: Choosing first axis: the edge between the stage + Community garden + Gallery space & Greenary cross through the city to become the main the wells are the places where people daily hill and the city, functioned as a transitional /Planting area ② Two Axis ② Two Axis ② Two Axis ③space Wells - ③ Water WellsCapilarity -/Community Water ③ Wells Capilarity - Water Capilarity ① Transitional ① Transitional Park① Transitional Park Park garden + Gallerygathered, focuses. communicating and doing activities. green belt. Choosing first Choosing axis: the first Choosing edge axis:between the first edge axis: the between the hilledge andthe between hill andthe hill and Choosing next Choosing two axis: next Choosing the twomain axis: next road the two main cross axis:road through the cross main road through cross through Embeding the Embeding conceptthe of Embeding wells: concept the the ofwells wells: concept are the the of wells places wells: arethe where thewells places arewhere the places where + Performace space people dailypeople gathered, daily communicating people gathered, daily communicating gathered, and doing communicating activities. andPavilion doing activities. and doing activities. the city, functioned the city, functioned as the a transitional city, functioned as a transitional greenasbelt. a transitional green belt.green belt. the city to the become city tothe become themain city focuses. to the become main focuses. the main focuses. + Bicycle parking area & /Pocket stage (rest space) + Gallery space

② Linear space ① Public space

③ Semi-public space + Play ground & Fountain

(redesigning the wells) + Tea house & Community centre (Chess and Mahjong) + Gallery space & Greenary /Community garden + Cafe & Convenience store

② Linear space + Community garden /Planting area + Performace space /Pocket stage + Gallery space

+ Play ground & Fountain (redesigning the wells)

+ + Bicycle parking area & Pavilion (rest space) + Newstand & Pocket library (communicate & reading space )

+ Gallery space & Greenary /Community garden + Bicycle parking area & Pavilion (rest space)

③ Semi-public space

② Linear space

④ Road-side space + Tea house & Community centre (Chess and Mahjong)

② Mixed space (community & public)

+ Recycling station + Play1 ground & + Recycling station ④ Perculation ④ Perculation - Naturalization: ④ Perculation - Naturalization: Phase - Naturalization: Phase Phasespace 1 Fountain ④ Perculation ④ Perculation - Naturalization: ④ Perculation - Naturalization: Phase - Naturalization: 2 Phase 2 + Phase 2 Convenience ④ Perculation - Naturalization: ④- Perculation - Naturalization: Phase - Naturalization: 3 station Phase 3 Phase ③1- Semi-public Cafe & store Perculation - Naturalization: Phase 2 ④ ⑥Perculation Perculation Naturalization: Phase 3 3 /Garbage collection ④ Perculation Naturalization: Phase 1 ⑤ (redesigning wells) & Express station Metaphor:Metaphor: liken the circulation Metaphor: liken the circulation of liken people the circulation in of the people city in ofthe people city the in the cityProgressing: Progressing: redisgning Progressing: redisgning and reprogramming redisgning and reprogramming the andcity, reprogramming the city, the city, Achieving Achieving the final vision the Achieving final of activating vision the final of activating the vision town, of the with activating town, with the town, with + Tea house & Community centre &people communicating areathe town, +Achieving redisgn and reprogram city, the final vision of activating Metaphor: circulation of people to the process to the ofprocess water to the perculation. of process watercompare perculation. of water the perculation. to achieveProgressing: to this achieve progress to thisachieve of progress waterthis capilarity. of progress water capilarity. of water the capilarity. people people + Gallery space & Greenary (Chess and Mahjong) to achieve this progress of water capilarity. with people ‘flowing’ all around the town. + Cloth washing space in the city to the process of water perculation. Gallery space & Community garden + Newstand & Pocket library /Community garden + Express station (with wells besides) (communicate & reading space ) Playground & Community garden + Cafe & Convenience store /Delivery locker + Bicycle parking area & Pavilion Cafe/Convenient store & Community space + + Community centre & communicating area Newstand/Pocket library & reading space (rest space) & Tea house Pocket stage/Performace space + Newstand & Pocket library + Cloth washing space Recycling station/Express station/Washing area (communicate & reading space ) ④ Road-side space + Newstand & Pocket library ② Mixed space (community & public) ④ Road-side space & Seating space (with wells besides) ① space (reading space ) ①Public Public space Tea house & Community centre & communicating area ① Public space ③ Semi-public space Community garden & Planting area + Recycling station + Gallery space & Cafe + Community garden + Community garden + Recycling station + Tea house & Community centre /Garbage collection station Gallery space & Community garden + /Planting area ① space Bicycle parking area & Pavilion/Planting area & Express station + Public Community garden ②& Mixed space (community & public) space (Chess and Mahjong) + Community garden ④ Road-side communicating area + /Planting area + Performace space + Performace space area Connection/Walkway + Bicycle parking area Playground & Community garden /Planting + Community garden + Cloth washing space + Community garden /Pocket stage y space & Community garden /Pocket stage + Cafe & Convenience store (rest space) /Planting area + Recycling station + Express station (with wells besides) store & Community /Plantingspace area + Community garden + Recycling station + Performace space Cafe/Convenient + Performace space + ound & Community garden +/Planting Gallery space + Gallery space /Garbage collection station /Delivery locker Newstand/Pocket library & reading space Express station + Performace spacestage /Pocket stage area /Pocket Recycling station/Garbage collection station & communicating & area Convenient store & Community space & +communicating area + Community centre & communicating area /Pocket stage + Newstand & Pocket library Pocket stage/Performace space Performace space and/Pocket library & reading+ space + Express station/Delivery locker & communicating area + Community garden/Planting area & Performance space/Pocket stage & Tea house + Cloth washing space (communicate & reading space ) + space Gallery/Pocket space stage + space Gallery space t stage/Performace + Cloth washing space (with wells besides) & communicating area + Gallery + Gallery space Recycling station/Express station/Washing area + Express station (with wells besides) eing station/Express ② Linear station/Washing area + Bicycle parking area (rest space)+ Cloth washing space +space Gallery space + Newstand & Pocket & Seating space library /Delivery locker ting space (with wells besides) (reading ) Community centre ouse & Community centre + Community centre & communicating area Teaspace house & & communicating area + Play ground & Fountain + Play ground & Fountain & Tea house munity garden & ② Planting area ②Mixed Mixed space && public) Linear space the wells) ④ Road-side space (redesigning (redesigning the wells) + GalleryCommunity space & garden Cafe & Planting area ⑤ space(community (community public) ②Linear Linear space ② space + Cloth washing space + e parking area & Pavilion + Newstand & Pocket library + Gallery space & Greenary + Gallery space & Greenary + parking area & Pavilion (with wells besides) + /Community Play ground & Fountain + Recycling station /Community garden garden (reading space ) Bicycle + Recycling station ection/Walkway + Bicycle parking area (redesigning the wells) & Fountain & communicating area /Garbage collection station + Community garden + Play ground + Play ground & Fountain + Play ground & Fountain & Express station (rest space) +(redesigning Bicycle parking + Bicycle parking area & Pavilion the area wells)& Pavilion & communicating area (redesigning the wells) /Planting area Connection/Walkway + Gallery space & Cafe (redesigning the wells) + (rest Gallery space & Greenary (rest space) space) + + Cloth washing space /Community garden + Gallery space & Greenary + + Gallery space & Greenary + Gallery space & Greenary + Express station (with wells besides) /Community garden + Bicycle parking area + Bicycle parking area & Pavilion /Community garden /Delivery locker /Community garden + Community garden (rest space) + Bicycle parking area & Pavilion (rest space) + Community centre & communicating area /Planting area space ③ Semi-public space (rest space) + Bicycle parking area & Pavilion + Bicycle +parking area & Pavilion & Tea house + Recycling station & Express station & Cloth washing space (with wells besides) house &&Community + Tea house & Community + PlayTea ground Fountain centre (redesigning wells) centre (rest the space) (rest space) (Chess and Mahjong) (Chess and Mahjong) + Community centre & Tea house & Newstand & Pocket Library (reading space) + Cloth washing space + Gallery space & Greenary/Community gardem + Newstand & Pocket library + Gallery space & Cafe & Community garden / Planting area (with wells besides) ③ Semi-public space + Bicycle parking area store & Pavilion (rest space) store (reading space ) + Cafe & Convenience + Cafe & Convenience & communicating area + Tea house & Community centre space + + + Gallery space & Cafe + Tea house & Community centre(Chess and Mahjong) + Newstand & Pocket library+ Newstand & Pocket library + (Chess and Mahjong) ③ ③Semi-public Semi-public spacespace (communicate space & reading ) & Convenience & reading space ) +(communicate Cafe store + + Tea house & Community centre + Bicycle parking area + + Cafe & Convenience store + Tea house & Community centre + Community garden (Chess and Mahjong) (rest space) + + Newstand & Pocket library (Chess and Mahjong) /Planting area (communicate & reading space ) + Newstandspace & Pocket library Mixed space (community ② Mixed & public) space (community & public) pace ④ Road-side +②Cafe & Convenience store (communicate & store reading space ) + Cafe & Convenience + + Tea house & Community centre (Chess and Mahjong) + Recycling station + Recycling station + + Recycling station + Recycling station + Cafe & Convenience store /Garbage collection station /Garbage collection& station + Newstand Pocket library & Express station station ② Mixed space (community&&Express public) ④ Road-side space + Newstand Pocket library && communicating area & communicating area + Newstand & Pocket library (communicate & reading space) & reading space ) ②(communicate Mixed space (community public) pace (communicate & reading space ) +& Cloth washing space + Cloth washing space

Pocket Program

Recycling station + Express station ++Express station /Garbagelocker collection station /Delivery station locker /Delivery + Recycling communicating area area & communicating /Garbage collectionarea station &&communicating

(with wells besides)

+ Recycling station + Community centre & Express station & Tea house

wellsstation besides) + (with Recycling & Express station + Community centre & Tea washing house space + Cloth


Masterplan N

28

0

10

20

50

22 21

23 25

20

22 17

19

24

17

18

27

16

15 14

26 13

17 AXONOMETRIC DIAGRAM - Dama Lane Market Street The 'Wells'

3

— mini program embeded in the neighborhood

1. Community Greenhouse 2. Cafe 3. Refined Shops 4. Playground 5. Pocket Square 6. Opera Stage 7. Pocket Park 8. Linear Gallery 9. Bookstore 10. Pocket Tea House

13 URBAN SECTION

13 URBAN SECTION

12

1 Residential 2 Community Centre 3 Commercial Street 4 Open Market 5 Load Station 6 Heritage Park 7 Multi-function Museum 8 Tourist Centre 9 Cafe with Transitional Park 10 Primary School with Kindergarten 11 Pocket Programs 12 Transitional Park 13 Sports Centre 14 Elderly Centre 15 Gymnasium 16 Recycling Centre 17 The Theatre 18 Tea & Opera House 19 Library (origin) 20 Gallery Space 21 Tea & Opera House 22 Studio 23 Shops & Cafe 24 Office Building for the Theatre 25 Stuff Accomodation 26 Year 2 Housing Project 27 Community Greenhouse 28 Historical Buildings on Hill Mini Program Path Transitional Park

A' B'

4

3

1

3 5

Detailed Axnometric

6

2

A'

B'

11 A B

7

A B

AA' (1:500) SectionSection AA' (1:500)

1

2

Recycling Center Recycling Center

Theater

Theater

Transitional Art Town park

Art Town

Transitional park 10

The "Wells"

— mini programs embeded in the neighborhood 1. Community Greenhouse 2. Café 3. Refined Shops 4. Playground 5. Pocket Square 6. Opera Stage 7. Pocket Park 8. Linear Gallery C' 9. Bookstore 10. Pocket Tea House

C

C

3 2

C'

4

9

3

Section BB' (1:500)

Section BB' (1:500)

Sports Center

Senior Center

Sports Center

Opera Tea House

Senior Center

Transitional Park

Opera Tea House

Transitional Park

Urban Sections

6

1

8

1

5

8

Transitional Park

7 10

Long Section (1:1000)

9

Transitional Park

Residential Buildings

Residential Buildings

Shops Market Dama Lane Market Street

Section CC' (1:500)

Heritage Park

Shops Market Dama Lane Market Street

Section CC' (1:500)

Heritage Park

Pedestrian Path Car Path

Long Section (1:1000)

Highway Mini Program Greenary/Community Garden

Transitional Park

Museum

Market

Shops Dama Lane Market Street

Hotel

Residential Buildings

Street Corner Plaza

Ramp Square

Senior Center

Transitional Park Opera Tea House


- Creativity Community The Promenade

This housing project is located at Old bund, Ningbo, surrounded by modern buildings, heritages and empty streets. The design tried to achieve a creative community, extend the park and bring vitality back to the Old bund.

Architecture Drawing Section AA’

1:200

1

2

3

4

5

'City banding can be defined as a combination of city ecotope, humanity culture, urban sp irits and etc, which, distinguish the city from other‘competitors’ . ——Yuanpu Jin, 2021

Section BB’

1:200

1

2

3

4

5

B


Design Strategy 1

Ground Floor Plan

0

Unit Catalogue

5 3

10

N

A

Type A. 60m2

6

Type B. 80m2 7

8

4

3

1

Type C. 120m2

9

2 5

B F D C

1 Reception 2 Delivery Locker 3 Bookstore

4 Coffee Shop 5 Waiting Area 6 Reception (for art gallery)

7 Exhibition Hall 1 8 Exhibition Hall 2 9 Art Studio

E

Spatial - Biophilia A. Urban Farming

B. Reading Centre

C. Courtyard

E. Art Gallery

F. Cafe & Relax Area

F. Cafe & Relax Area


- Jiangshan Villa Regeneration Project

The project locates at Xi Di new Street, Jiangshan City, Quzhou, with farmland surrounded and a river flows on south. The client requires the house to be regenerated from From increasing the space, improving the indoor and outdoor environment, to incorporating energy saving and environmental protection technology. Conducted by: Nota Architects Web: http://www.notaarchitects.com/index.php

Intern Work Indication The intern of the studio, with the role in : 1. Precedents study 30% 2. Timber frame structural study 30% 3. Design proposal development 20% 4. Architectual Drawings 50% 5. Construction Drawings 40% 6. Physical model testing 100% Site Origin (Before Regeneration)


Design Proposal

50㎡

2F建筑面积

81㎡

合计建筑面积

194㎡

183㎡

占地面积

183㎡

170.78 171.89 1:100@A3

N

1

5m

0

2

171.70

2023-12-08

171.89

171.71

Jiangshan Villa 江山度假屋

NOTA ARCHITECTS

172.14

160㎡

354㎡

总计建筑面积

图号

图名

0201

1

一层方案平面图

1:100@A3

0

N

172.14

5m

NOTA ARCHITECTS

2

2023-12-08

171.26

1 171.69

170.34

4 5

3

2

6

11920 160

3650

7

8

7330

4570

3700

171.53

360

9

1

100

160

1600

100

4 5

6

11920

100

3500

3

2

8500

5730

4800

171.71

3650

7

8

7330

4570

3700

360

9 8500

5730

1600

100

100

3500

4800

100

171.52

171.44 171.50

A

2.500

160

160

A

UP 17 上17级

B

100

171.62

B

100

Guest 客房1 Room

下17级17 DOWN

Central 堂屋Room

171.93

3.350 8910

8910

0.450

C

苦楝

Guest 客房3 Room

8910

0.250 8910

Master 主卧 Bedroom

3730

Second 次卧 Bedroom

3730

洗衣 Washing

3.150

C

苦楝

Guest 客房2 Room

0.450

E

7700

2.800

E

3.000

Before 改造前

0.000

Terrace 露台

Original Building Original Building 原堂屋建筑 原堂屋建筑

New-built 新建木屋

Woodhouse 新建柴房

113㎡

70㎡

40㎡

81㎡

50㎡

Total floor area

194㎡

183㎡

合计建筑面积

Gross floor area

143㎡

172.55

171.60 172.14

160㎡

183㎡

183㎡

171.70 171.89

171.71 图号

0201

图名

一层方案平面图

1

1:100@A3

0

5m 2

N

Jiangshan Villa 江山度假屋

Terrace (not include) 露台面积(不计容)

NOTA ARCHITECTS 2023-12-08

Jiangshan Villa 江山度假屋

图号

0202

图名

二层方案平面图

1

1:100@A3

Model Testing

Conceptual Section

0

5m 2

N

170.78

苦楝

354㎡

总计建筑面积

Floor area 占地面积

F

After Regeneration 改造后

Area of second floor 2F建筑面积

Area of first floor 1F建筑面积

0.450

100

171.79

100

苦楝

Total area ( ㎡ )

2400

2400

E

5.690

160 1460

Woodhouse 柴房

3.000

1300

7700

D

100

1460

Hallway

100

E

5300

Frame House 木屋 玄关

160

D

1300

171.73

Guest 客房4 Room

上17级 UP 17

儿童活动间 Playroom

171.38

5300

下17级

NOTA ARCHITECTS 2023-12-08

F


- Mixed-use Complex Place - making The project aimed at transfer public space into living space to maximize the value of places, improve the quality and effectiveness of the operation, enhance the connection between people and places, integrating communities into places for motivating commercial vitality and find out distinctive identities of the complex as hot topics and propagation effects spreading among the city. In consideration of confidentiality, other details will not be provided. Conducted by: Nota Architects Web: http://www.notaarchitects.com/index.php

Intern Work Indication The intern of the studio, with the role in : 1. Precedents study 2. Installation design 3. Design proposal development 4. Conceptual masterplan 6. Digital model testing

Communicational Viewports

Communicational Viewports

to the Lift

Elevator volume transformed into Branding Box

Thermal wood Deck

Pop-up Cafe powered by different tenants to other terraces

to the Forest

30% 50% 20% 50% 30%


- Research Internship Horizontal Metropolitan


Drawing Drawing labelslabels

1

20mm20mm 19mm19mm 175mm 175mm

2

This part includes the Intergrated design consideration among different projects, form 3

academic works to internship experience.

3

20*20mm 20*20mm

A

B

Project: Jiangshan Villa 沥青瓦

A

沥青

1407

欧松板 900

50mm厚椽条

50mm厚椽条

200mm厚椽条内填保温岩棉

200mm厚椽条内填保温岩棉

01

基层板

基层板

室内完成面

铝合金断桥采光天窗

80

室内完成面

390

1039 820 730 280

1050

280

2000 900

2120

2130

1030

80

270

290 2160

0.450

300 160 200

300

105 300 145

450

450 300

65 300 185

15

2710

800

210

1050

210

70

800

2700

320

320

1050

1630

800

40 200

0.000

1039 120

840

60

580

1050

570

100

270

300

1030

基层板

80

70

300

4.985

760 800

320

70 2250

580

780 60 120 40 20

120

2023-11-24

900

450 65 300 185

450 70

0.450 0.000 320

15

60 145

200

混凝土地基 0.250 30

120

轻质龙骨

300

高强度水泥板

320

0.000

02

900

细石混凝土找平层

Cut away from west Cut away sec�on fromsec�on west eleva�on of eleva�on entrance of entrance

270

天窗详图01 1:20

Skylight detail 1:20 NOTA ARCHITECTS

5m

2

地面完成面

105

0

570

300

570 1

1:50@A3

2160

建筑剖立面图

1030

Roof detail 1:20 图名

3.150

290

Floor detail 1:20

270

地面详图02 1:20

1050

100

40

屋面详图01 1:20

840

150

1830

200

120

840

300

115

40 50

30

240

60

建筑A-A剖面图 1:50 立面窗详见0501 50

40 20

D

80

2700

2200

800

1039

800

2764

70

115

210

8910

2000

1050

1030

210

40

145

70

800

300

15

60

200

2710

A

0401

Interior ground finish

0.000

390

50

290

200

图号

Thick rafters are filled with insulation rock wool

Base plate

室内完成面

40

200

65

300

70

2023-11-24

Thick rafter 50mm

50mm厚椽条

铝合金断桥采光天窗

NOTA ARCHITECTS

5m

Oriented strand board

0.450

Interior ground finish

300 185

450

混凝土地基 Concrete foundation

60

30

轻质龙骨 Light keel

室内完成面

Pitch

200mm厚椽条内填保温岩棉

200mm厚椽条内填保温岩棉 Thick rafters are filled with insulation rock wool 01 基层板 Base plate

高强度水泥板 High strength cement board

0.250

沥青 2

50mm厚椽条 Thick rafter 50mm

2160

Fine stone concrete 02 screed

1 0

欧松板

Oriented strand board

Asphalt shingle

沥青瓦

B

1:50@A3

沥青 Pitch

Ground finish

细石混凝土找平层

建筑剖立面图

2023-11-24

900

2

NOTA ARCHITECTS 图号沥青瓦0402 图名 Asphalt shingle

900

地面完成面

320

Jiangshan Villa 江山度假屋

D

建筑B-B剖面图 1:50

450

0

5m

欧松板

120

110

Section B-B 1:50

1039

1:50@A3

A

0.000

200 240

3.150

建筑剖立面图

1

290

图名

150

1830

Jiangshan Villa 江山度假屋 270

0401

B

115

2250

840

120

120

570

30

240

屋面详图01 1:20

1030

50

800

1039

40

地面详图02 1:20

2530

4.985

A

D

800

建筑A-A剖面图 1:50

115

300

390

50

A

800

8910

8910

60

145

290

70

立面窗详见0501

图号

135

2200 150

570

300

570 270 450 300

0.000

01

基层板

A

6

120 60

室内完成面

60

30

200mm厚椽条内填保温岩棉

Section A-A 1:50

Jiangshan Villa 江山度假屋

1070

0.450

0.250

200

2*11mm 2*11mm

天窗详图01 1:20

沥青 欧松板

70

混凝土地基

0.000

120 60

50mm厚椽条

轻质龙骨

120

3.150

3.150

40 20

1030

02

900

A

细石混凝土找平层 高强度水泥板

320

6

780

沥青瓦 地面完成面

2764

40 20 1050

430

120

40

5

60

580

200

5

40mm40mm

115

2250 150

1830

100

840

120

40 50

A

120

60

30

240

1039

1039 115

40

760

70

2200

200

800

840

50

800

立面窗详见0501 50

4.985

4.985 70

屋面详图01 1:20

6. Founda�on 6. Founda�on Cement and screed sand screed Cement and sand 60mm60mm Concrete fouda�on 800*600mm Concrete fouda�on 800*600mm concrete ean Lean concrete 50mm50mm and protec�on coa�ng WaterWater proofproof layer layer and protec�on coa�ng Wooden terrace (exterior) 150mm Wooden terrace (exterior) 150mm Drainage Drainage pipe pipe Caorse gravel, Geotex�le, Granular backfill and Rammed Caorse gravel, Geotex�le, Granular backfill and Rammed earthearth

01

沥青瓦

B

沥青 欧松板

4

450

4

300

20mm20mm 20mm20mm 175mm 175mm 10mm10mm

120

11mm11mm 300*50mm 300*50mm 10mm10mm

40

5. Sliding 5. Sliding door door Aluminum alloy cill Aluminum alloy cill Double toughened Double layer layer toughened glass glass panelpanel Double sealing Double sealing

Construction Details

60

4. Floor 4. Floor imber Timber flooring flooring mpact Impact insula�on insula�on layer layer CrossCross - Laminated - Laminated �mber �mber slabe slabe ealing Sealing Par�ally Par�ally threaded threaded �mber �mber screwscrew Pre - engineered Pre - engineered L bracket L bracket Polyester fiber sound-absorbing Polyester fiber sound-absorbing boardboard

2

- Techical Studies -

80mm80mm 40mm40mm 175*90mm 175*90mm 40*80mm 40*80mm 40*40mm 40*40mm 2. Cross 2. Cross - Laminated - Laminated �mber �mber load bearing load bearing wall wall CrossCross - Laminated - Laminated �mber �mber panelpanel 175mm 175mm Decora�ve Decora�ve plywood plywood cladding cladding 20mm20mm imber Timber ba�ens ba�ens 50*25mm 50*25mm Compound Compound water-proof water-proof coa�ngs coa�ngs Plaster Plaster 20mm20mm

3. Glazing 3. Glazing Aluminum Aluminum alloy window alloy window frameframe Aluminum Aluminum alloy window alloy window sill sill oughened Toughened glass glass panelpanel Decora�ve Decora�ve oak frame oak frame PargeParge coat coat

1

200

1. Zinc1.- Zinc cladding - cladding metalmetal roof roof itanium Titanium zinc composite zinc composite panelpanel (black) (black) heathing Sheathing boardboard leezing Fleezing layer layer CrossCross - Laminated - Laminated �mber �mber panelpanel ully threaded Fully threaded �mber �mber screwscrew PIR insula�on PIR insula�on Polyester Polyester fiber sound-absorbing fiber sound-absorbing boardboard imber Timber crossbeam crossbeam imber Timber studsstuds

290

2710

800

70

210

1050

8910

210

70

800

2700

320

A

1050

1630


Technical Research Research study: Heyi Deco research centre

Project: Game Creative Cluster

Lables

12.2m

1

1. Parapet and roof 2. Steel frame structure + ALC 3. Skylight 4. DCV system 5. Floor slab 6. Hanging vertical greenay 7. Fixed shaped glass curtain wall 8. Ground-base vertical greenary 9. Concrete partition 10. Retaining wall

2

3

8.2m

4

5

6

4.4m

7

9

10

8 0.2m


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.