Karishma Goradia Work Experience Portfolio

Page 1

Karishma. G

Intern Architect, LEED GA

PORTFOLIO

TABLE OF CONTENT Contents Work Experience at Fielding International October 2016 - Ongoing 01. Eden Park Elementary School 02. NUN Academy K-4 School 03. Fedossevskaya Secondary School 04. Horace Greely Library and Media Center Work Experience Summer 2016 01. Bathroom Renovation
Work Experience at de.Sign Studio LLC Summer 2013 01. Platina Commercial Complex 02. EXO Luxury Condos Experience at A-Squared LLC Renovation
CONTENT

Eden Park Elementary School

FIELDING INTERNATIONAL

This project was part of my work experience at Fielding International. I was involved in the designing of spatial and furniture layouts, DD and CD drawings, and detailing casework.

W est 3 - 4 W est 16'W es Founda -2'W est 23' -
Furniture Layout Overlayed on Rendered Flooring Plan LEGEND 1. Learning Commons 2. Learning Studio 3. Small Group Room 4. Speacialist Room 5. Active Lab 6. Sensory Room 7. Seminar Room 8. Teacher Collaborative Room 9. WC
Key Plan 1 2 2 2 2 2 8 5 6 7 4 3 3 9
W ing Ground Floor " W ing Roof 11 1/2" t W ing oundation 2" A B C D D.1 D.2 E F W ing Attic 0" C.5 1 A-2.1 2 A-2.1 1 A-2.2 A-3.0 2 Sim ff A3 S2 BUILT- N CASEW ORK BU LT- N CASEW ORK BUILT-IN CAB NET W / S NK LEARNING STUDIO 118 A LEARNING COMMONS 115 A LEARNING STUDIO 116 A 129-A BASE CABINET W / S NK
the
a
Transformation of
Hallway into
Learning community
Section showing the transformation of the Hallway
INTERNATIONAL

Eden Park Elementary School

FIELDING INTERNATIONAL

The Learning Community is a collection of exible and multi-use spaces with a centralized Learning Commons. The adjacencies of these spaces, and their visual connections, supports varied learning modalities.

M PT-1 PT-1 100-A 100-B CEIL NG CLOUD SEE SCHEDULE STRUCTURE ABOVE 7 - 3 7 - 3 13 - 1 1 2 CLG-6 55" SCREEN WLC-2 O.F.O .) PT-1 WB-1 CASEWORK PT-1 STRUCTURE ABOVE CEIL NG CLOUD SEE SCHEDULE K-13 SPRAY INSULATION ON STRUCTURE ABOVE SEE RCP 100-B 9 - 10 1 2 8'5" 3'3" 7'9" SEE RCP PDRA4 CLG-6 N1 5'0" 100-C PT-1 WB-1 BALL ST C GLASS: SEE W NDOW SCHEDULE hh K-13 SPRAY NSULAT ON ON STRUCTURE ABOVE SEE RCP BU LT- N CASEWORK 7 - 2 1 2 0'8" 3'4" 0'6" SEE RCP PDRA4 PDRA4 CLG-6 PT-1 WB-1 PT-1 K-13 SPRAY INSULAT ON ON STRUCTURE ABOVE: SEE RCP 100-A 8 - 4 13 - 2 1/2 7'9" SEE RCP PDRA4 CLG-6 CLG-6 5 WLC-2 O.F.O .) CASEWORK hh BALL ST C GLASS SEE W NDOW SCHEDULE PENDANT L GHTS SEE RCP 5 - 9 8 3'4" 6 PD1 PD1 PD1 CLG-6 PDRA4 PT-1 WB-1 100B-B 7'4" PT-1 PT-1 WB-1 BAS S OF DES GN FOR MILDER OFFICE FFE TEM 8 - 0 1 - 9 1 2" 5 PT-1 BAS S OF DES GN FOR MILDER OFF CE FFE ITEM PENDANT L GHT: SEE RCP 2'7" 1 - 9 1 2" hh PD1 5 119-A 115C-C ee bb-2 WLC-1 O.F.O .) PT-1 PT-1 WB-1 9 - 6 7 - 0 WINDOW TREATMENT W NDOW TREATMENT S2 B-1 115B-A C E-1 A D-1 BAS S OF DESIGN FOR HOLLMAN LOCKERS FFE TEM 24 X 36" ACCESS PANEL 9 - 4 1'4" 3'2" S NK CAB NET L GHT NG SEE RCP ACOUST C BAFFLES SEE RCP W NDOW TREATMENT PDR4 PDR4 ACOUSTIC BAFFLES SEE RCP. 5 OPEN TO BEYOND PT-1 WB-1 WLP-1 PT-1 WLC-1 (O.F.O .) PT-1 WB-1 BAS S OF DES GN FOR HOLLMAN LOCKERS FFE TEM BASE CAB NET & S NK WATER FOUNTA N 8 - 6" 9 - 4 5'2" 3'7" TECH L GHT NG SEE RCP ACOUST C BAFFLES SEE RCP PD1 PD1 CLG-2 PDR4 PDR4 5 OPEN TO BEYOND 120A-A 121-B dd-1 bb-1 WLC-1 (O.F.O I.) WB-1 WB-1 PT-1 BAS S OF DESIGN FOR HOLLMAN LOCKERS FFE ITEM WATER FOUNTA N 9 - 4 6 - 11 6 - 11 7 - 2 12 - 8 3'7" 9'6" L GHT NG SEE RCP L GHT NG SEE RCP ACOUS C BAF LES SEE RCP SEE WALL SCHEDULE N5 W NDOW TREATMENT 0 - 4 1 2 PD1 TH TH TH TH TH TH TH CLG-2 BUILT- N STAGE O.F.O EQ EQ SPEAKERS ENS ONED SCREEN 4'0" 5' - 8 5' - 8 5 S2 5 N6 BUTTON CONTRO AV DWGS CL TENS ONED SCREEN AV DWG 5 5 5 5 5 5 5 5 5 5 123-A 7'3" 124C-A 124B-A 115A-A BU LT-IN CASEWORK PT-1 WB-1 WATER FOUNTA N 7 - 3 PT-1 WLP-1 WB-1 WATER FOUNTA N BAS S OF DESIGN FOR HOLLMAN LOCKERS FFE TEM BAS S OF DES GN FOR HOLLMAN LOCKERS FFE ITEM 12 24" X 36" ACCESS PANEL 5 - 4 5 5 OPEN TO BEYOND 122A-A 122B-A BU LT-IN CASEWORK WB-1 PT-1 WATER FOUNTA N BAS S OF DES GN FOR HOLLMAN LOCKERS FFE TEM 7 - 3 5 1/4" 1 -0" 1 SECURE LOBBY - N 1 4" 1 -0" 2 SECURE LOBBY - E 1/4" 1 -0" 3 SECURE LOBBY - S 1 4" 1 -0" 4 SECURE LOBBY - W 1 4 = 1 -0 5 SECUR TY DESK - N 1 4 = 1 -0 6 SECUR TY DESK - E 1 4 = 1 -0 7 SECUR TY DESK - S 1 4 = 1 -0 8 SECURITY DESK - W 1/4" 1 -0" 9 LEARNING COMMONS 115 B - N 1 4 = 1 -0 10 LEARN NG COMMONS 115 B - W 1/4 = 1 -0 11 LEARNING COMMONS 115 B - S 1 4" 1 -0" 12 LEARN NG COMMONS 115 B - E 1/4" = 1 -0" 13 HALL - N 1/4" = 1 -0" 14 HALL - E 1 4" = 1 -0" 15 HALL - S 1 4" = 1 -0" 16 HALL -W 5 5
Interior Elevations Learning Secure

INTERNATIONAL

Learning Studio with Break-out Spaces Learning Commons Secure Bullet-proof yet Welcoming Entryway

Eden Park Elementary School

FIELDING INTERNATIONAL

The new facade at Eden Park school consists of multi-colored ber cement panels. The facade is designed to be playful while complementing the surrounding context.

Proposed Elevation
W est W ing Ground Floor 3' - 4" W est W ing Roof 16 - 11 1/2" W est W ng Foundat on -2' - 2" 2 3 4 5.1 6 7 8 0.1 1 9 2.8 10 W est W ing Attic 23 - 0" 4.1 5.0 H B-1 A E-1 C B-1 B-1 A C D-2 E-2 G B-2 J K J D-1 ROOF ACCESS LADDER ROOF ACCESS L SCUPP 8.6 2.7 3.9 3.7 1/8" = 1'-0" 1 Exterior Elevation - W est W ng - W est 2' - 1 1/2" FC-6 FC-3 FC-6 FC-5 FC-6 FC-3 FC-6 FC-5 FC-5 FC-3 FC-6 FC-6 FC-5 FC-6 FC-6 FC-5 FC-3 FC-5 3 - 8" 1 - 1" 3 '0 " 0 '6 " 30 " 5 - 6" 1 '6 " 1/8" = 1 -0" 2 Exterior Realistic Elevation - W est W ing W est
Under Construction INTERNATIONAL 10 ADDER SCUPPER & DOWNSPOUT FC-1 S40 - NATURAL FC-2 S41 - CHAMPAGNE FC-3 S40 - CAME FC-4 S41 - RASPBERRY FC-5 S40 - DAYBREAK FC-6 S41 - CAR BBEAN F BER CEMENT LEGEND SVK COLORMAT SW SS PEARL CEM-5 MARK PRODUCT ZENOR 15015 GREY ZENOR 23057 YELLOW REFLEX 9272 GOLD REFLEX 9231 CR MSON CARAT 7052 JADE REFLEX 9241 COBALT B UE CEMBR T SOL D S-282 S-515 S-525 S-353 S-606 S-757 CEMBR T F NAL COLOR SELECT ON PEND NG RECE PT OF PHYS CAL COLOR SAMPLES NOT F BER CEMENT PANEL GENERAL NOTE THESE DRAW NGS REPRESENT THE AESTHET C NTENT & TO BEST UT L ZE THE 4 x 8 F BER CEMENT PANEL THE NSTALLER & OR FABR CATOR SHOULD BETTER OPT M ZE THE F NA LAYOUT TO REDUCE THE F BER CEMENT PANEL WASTE
Built Photos

FIELDING INTERNATIONAL NUN Academy K-4 School

This K-4 school is part of a 4000 student campus in Jeddah,KSA by Sweden’s Kunskapsskolan group. I worked on the SD, DD, CD and Interior and furniture designing.

Furniture on Rendered Key Plan Building Exterior screen inspired by the traditional islamic screens.

Layout Overlayed

Rendered Flooring Plan

INTERNATIONAL
Cafeteria Break-out space Art studio

FIELDING INTERNATIONAL Fedossevskaya Secondary School

The Fedossevskaya School is a model of best practices in education and holistic childhood development, as well as the front-runner for the whole system of education in Tatarstan. I was part of the architectural and interior design team from SD through CD phase.

Learning Commons with large gathering space Flexible Group Space Learning Studio Breakout Space Plan and
INTERNATIONAL
Satellite Library Commons Materials Palette Plan rendered with finishes and furniture.

FIELDING INTERNATIONAL Fedossevskaya Secondary School

Fedossevskaya School uses a learning community model as the basis of design. Each floor contains a single Learning Community consisting of a Learning Commons, a set of interconnected Learning Studios, and other enrichment spaces.

Reflected Ceiling Plan

INTERNATIONAL
Learning Studio Breakout Space STEAM zone in the Learning Commons Breakout Space

FIELDING INTERNATIONAL Fedossevskaya Secondary School

This atrium at the Fedossevskaya consists of a the cafeterium, break-out space and an Amphitheater. I was involved in the picking finishes, designing ceiling, flooring layouts, SD and DD drawings, and detailing amphitheater casework.

Plan
Reflected Ceiling
Plan rendered with finishes and furniture. Ceiling Design studies Amphitheater 3d Studies
INTERNATIONAL

Horace Greely Library and Media Center

Team Size: 3

FIELDING INTERNATIONAL

This project was part of my work experience at Fielding International. I was involved in the picking finishes, designing ceiling and flooring layouts, DD and CD drawings, and detailing casework.

Furniture Layout Overlayed on Rendered Flooring Plan SMALL GROUP ROOMS SMALL GROUP CONFERENCE ROOM MEETING ROOM LEARNING STUDIO RESEARCH ROOM LIBRARY STACKS & FOCUSED STUDY INDIVIDUAL STUDY SMALL GROUP SPACE BOOTH SEATING FILM/ GREEN-SCREEN ROOM RECORDING ROOM CONTROL ROOM VESTIBULE CIRCULATION DESK Space and Furniture Designed to Support Multiple Learning Modalities. After
INTERNATIONAL Support After Before

After

Spatial Layout and Curriculum Geared towards Aiding Student-Autonomy and Agency

Horace Greely Library and Media Center

Team Size: 3

FIELDING INTERNATIONAL

The interior design and renovation of this 7500 SF high school library and Media center was completed in 2017. The idea was to create a space for students to feel comfortable and which enables them to pursue Independent, research-based study.

(4) 20AM 4 US N (4) 20AMP POWER OUTL 4) USB OUTLETS NTE INTO CUSTOM FURN PROVIDE H CONNEC FLOOR OUT FURN
425 SF Mee ing Room H113 305 SF Film Room H111 337 SF Recording Studio H108 653 SF Learning S udio H115 97 SF Control Room H110 870 SF ndependen S udy H114 829 SF Research Room H105 79 SF SG 1 H114A 94 SF SG 2 H114B 94 SF SG 3 H114C 93 SF SG 4 H114D 175 SF Seminar Room-2 H114H 91 SF SG 8 H114J 92 SF SG 9 H114K 181 SF Sem nar Room-1 H106 48 SF Storage-1 H102 Boy s Bathroom Gi l's Ba hroom 126 SF Office H103 178 SF Vestibu e C H112 96 SF Vestibu e B H109 101 SF Vestibule A H101 204 SF Storage-2 H116 50 SF Data C oset H104 4758 SF Library H107 (4 20AMP POWER OUTLETS AND (4 USB OUTLETS NTEGRATED INTO ERG PARMA TABLE #PRML3096 PROV DE HARDWIRE CONNECT ONS (4) 20AMP POWER OUTLETS AND (4) USB OUTLETS NTEGRATED NTO ERG PARMA TABLE #PRML3096 PROVIDE HARDW RE CONNECTIONS 4 20AMP POWER OUTLETS 2 USB OUTLETS AND (1) DATA OUTLET NTEGRATED NTO CUSTOM FURN TURE; PROV DE HARDW RE CONNECT ONS P POWER OUTLETS AND B OUTLETS INTEGRATED TO CUSTOM FURN TURE PROV DE HARDW RE CONNECT ONS (4) 20AMP POWER OUTLETS AND (4) USB OUTLETS INTEGRATED NTO CUSTOM FURNITURE; PROV DE HARDW RE CONNECT ONS (4) 20AMP POWER OUTLETS AND (4) USB OUTLETS INTEGRATED NTO CUSTOM FURNITURE; PROV DE HARDW RE CONNECT ONS ETS AND GRATED URNITURE; ARDW RE NNECTIONS (8) 20AMP POWER OUTLETS (2) USB OUTLETS AND 2) DATA OUTLETS NTEGRATED INTO CUSTOM FURN TURE PROV DE HARDW RE CONNECT ONS P D P D (4) 20AMP POWER OUTLETS AND 2 USB OUTLETS (1) DATA OUTLET NTEGRATED INTO CUSTOM FURN TURE PROV DE HARDWIRE CONNECT ONS P D OUTLETS TO POWER ROBOREEL CEIL NG-MOUNTED POWER CORD SYSTEM P P P P P P P P 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 PROV DE FLOOR OUTLET PROV DE FLOOR OUTLET 2 PROVIDE FLOOR OUTLETS PROVIDE FLOOR OUTLETS OUTLET LOCATIONS UPDATED TO COORDINATE W TH DES GN CHANGES ROBO REEL UN TS ADDED TO DES GN N ACCORDANCE W TH ROOM PROGRAM CHANGE TO SC ENCE RESEARCH ROOM DATA AND POWER LOCATIONS ADDED FOR TECHNOLOGY COORD NATION PROV DE WALL OUTLET LETS RELOCATED/ADDED TO COORD NATE W TH TURE LAYOUT CHANGES PROV DE POWER AND DATA PROV DE POWER AND DATA HARDWIRED POWER LOCATIONS CHANGED TO COORDINATE W TH FURNITURE LAYOUT CHANGES P P 2 HARDW RED POWER LOCAT ONS CHANGED TO COORD NATE W TH FURN TURE LAYOUT CHANGES 40" A F F 40 A F F 40 A F F OUTLET LOCATIONS RELOCATED TO COORD NATE WITH TECHNOLOGY PROV DE FLOOR OUTLET N L EU OF WALL OUTLET ABOVE COUNTER GF OUTLETS ADDED BELOW COUNTER OUTLET ADDED TO ACCOMMODATE MIN -FR DGE 40 A F.F 40 A F.F DATA OUTLET ADDED OUTLETS ADDED OUTLETS ADDED OUTLETS ADDED 40 A F.F 40" A F.F 40 A F.F 40 A F.F 40 A F.F 40 A F.F 40 A F.F 40" A F.F 36 A F F 36 A F F 36 A F F 40 A F.F 40 A F.F 40 A F.F 40 A F.F 40 A F.F 40 A F.F 40 A F.F 40 A F.F 40 A F.F ELECTRICAL SYMBOLS KEY DESCR PTION DATA RECEPTACLE MOUNTED @ 18" A F F UNLESS OTHERW SE NOTED DUPLEX RECESSED CE L NG RECEPTACLE DUPLEX RECEPTACLE MOUNTED @ 18 A F F UNLESS OTHERW SE NOTED DUPLEX RECESSED FLOOR RECEPTACLE 2 POWER 2 USB *NOTE ELECTR C AN TO SCHEDULE COORD NAT ON MEET NG W TH ARCH TECT TO VER FY LOCATION OF ALL FLOOR OUTLETS GF DUPLEX RECEPTACLE MOUNTED @ 18 A F F UNLESS OTHERW SE NOTED P D HARDW RED POWER LOCATION *NOTE ELECTR C AN TO SCHEDULE COORD NATION MEET NG W TH ARCH TECT TO VER FY HARDW RE LOCAT ONS FOR POWER- NTEGRATED FURN TURE HARDW RED DATA LOCAT ON ** NOTE: ALL POWER OUTLETS TO BE 20AMP UNLESS OTHERWISE NOTED
INTERNATIONAL Electrical Plan

Horace Greely Library and Media Center

Team Size: 3

FIELDING INTERNATIONAL

The flooring finishes, ceiling materials and clouds, furniture finishes, etc. are selected to provide for better acoustics in the space.

Material Palette

A m tron Soun sc pe Sh pe #5 43 C e TEM CODE SI CEIL NG TREATMENT SCHEDULE 8" x (n m KEY PRODUCT ACT A x2 Op ma Ve or Ce lin T e m # 900 nd P e ude 15/ 6" Su pen on y em 24 C G CD F 1 C A L GHT NG SYMBOL SCHEDULE KEY DESCRIPT ON L THON A GHT NG 8 GRAD NEAR PENDANT GRD-LSL-8FT-MS 8-80CR -35K- D80 LMF-8 20-M SC -F1A-12F-C210 L THON A GHT NG 4 GRAD NEAR PENDANT SEE CUT SHEETS OR SPECS SPECTRUM L GHT NG HOBOKEN PENDANT CYO40 LEDXT- 0L-3 HK-FACY4-HM-BA GOTHAM ARCH TECTURAL L GHT NG 6 EVO DO EVO-3 10-GWR-WD- S-120-TRW C DELRAY GHT NG NC CYL NDRO III LED W TH OP 6 05_S_W35_BD M-W2_SCR R1 LUMENWERX SQUERO COMB NAT ONS RECESS W BAFFLES SQUCOMR-BFO-XXX-80- 50-3 - EDLENGTH AS ND CATED ON RCP LF LLUM NAT ON PALLA AD USTAB E TRACKHE TRACK MOUNTED ON CE L NG *NOTE AL HANG NG L GHT F XTURES TO BE NSTA LED AT 8 0" A F F UNLESS OTHERW LUMENWERX SQUERO COMB NAT ONS RECESS SQUCOMR-BFO-XXX-80- 50-3 -LED-1 0-XXX-D1LENGTH AS ND CATED ON RCP C C3 B1 C C C A1 A1 C5 C 5 B1 B1 B1 B1 B1 C C1 C1 C C1 C1 B B1 C5 C5 C1 C1 C1 C1 C1 C1 8 - 7 8 - 7 7 - 6 C3 C3 C3 C3 7 - 6 C3 C3 C3 C3 8 - 7 A1 A1 ACT A 8 - 7 8 - 7 9 - 0" 13' - 3 13' - 3 9 - 0 9 - 0 Ex s ng Soff o Rema n 8 - 7" 8 - 7 8 - 7 8 - 7 8 - 7 8 - 7 8 - 7 8 - 7 8 - 7 8 - 7 7 - 6 8 - 7 C3 C3 C1 C1 8 - 7 NO WORK R1 AUTOMAT C DEV CES COMPANY FLEX-I-TRACK 132 SER ES MOUNTED TO CE L NG AS RECOMMENDED BY MANUFACTURER FLOOR LENGTH CURTAIN ATTACHED RB CLOTH N C K GREEN Exis ng So to Rema n C C5 ACT "A" ACT "A ACT "A" EX ST NG CE L NG TO REMAIN 9 - 0 9 - 0" 8 - 6" 8 - 0" 8 - 6 9 - 6" 8 - 6 9 - 6 8 - 6" 9 - 0 7 - 6 8 - 0 8 - 0 8 - 6 9 - 0 9 - 6 8 - 6 9 - 0 8 - 0 8 - 6 9 - 0 8 - 0 9 - 6 9 - 0 8 - 6 9 - 0 8 - 0 8 - 6 9 - 6 8 - 6 A BOTTOM OF F XTURE 8' 0 A F.F BOTTOM OF F XTURE 8' 0 A F.F BOTTOM OF F XTURE 8 0" A F.F 8 - 6 9 - 0 8 - 0 8 - 6 8 - 6 9 - 0 8 - 0 8 - 6 8 - 6 9 - 6 9 - 0 8 - 6 B B1 B B1 B B1 B B B1 B B B1 R1 R1 B1 B1 B1 B B B1 B B1 B C1 C1 B1 B1 B1 B1 B1 B1 C C C C1 C1 C1 C1 C1 C1 C C C C1 C1 C1 C C C1 C1 C C C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C C C C C C C B1 B1 B1 B A A1 A1 A1 C1 C B B1 B B1 B1 B B1 B1 B1 B1 A1 8 - 7 8 - 7 8 - 7 ROBOREEL CEIL NG-MOUNTED POWER CORD SYSTEM ROBOREEL CEIL NG-MOUNTED POWER CORD SYSTEM (SK (WH) (SK (SK (SK) (SK (SK (SK (SK) (SK (SK (SK) (SK (SK (SK (SK) (SK (SK) (SK) (SK) (SK (SK (SK (SK) (SK) (SK (WH) (WH) (WH) (WH) (WH) (WH) (WH) (WH) WH WH (WH) WH (WH) (WH) (WH) (WH) C3 C1 C1 C1 C1 ACT "A" ACT A ACT A ACT A C1 C1 C1 C1 C C C1 C1 B1 B B1 B1 B1 B1 B1 C C C C1 C C1 C1 6' 6 A.F F. 6' 6 A.F F. 6' 6 A.F F. 7 0 A F F 7 0 A F F 7 0 A F F 7 0 A F F 7' 0 A.F F. 7' 0 A.F F. 7' 0" A.F F. ACT "A ACT "A" ACT "A" ACT "A ACT "A C C1 C1 C1 C1 C1 C1 C1 C1 C 7' 6 A.F F. 7' 6 A.F F. 7' 6 A.F F. 6' 6 A.F F. 6' 6 A.F F. 7' 6 A.F F. 7 6 A F F 7' 6 A.F F. 7' 6 A.F F. 7' 6" A.F F. 7' 6" A.F F. 7' 6 A.F F. 7' 6" A.F F. 7' 6" A.F F. 7 6 A F F 7 6 A F F ACT A ACT A ACT A ACT A 7' 6 A.F F. 7' 0" A.F F. 7' 6 A.F F. 7' 6 A.F F. 7 6 A F F 7' 6 A.F F. 7' 6 A.F F. 7 6 A F F 7' 6 A.F F. 7' 6 A.F F. 7' 0 A.F F. 7 6 A F F 7' 0 A.F F. 7 6 A F F 7' 6 A.F F. 7 6 A F F B 7' 6 A.F F. 7' 6 A.F F. 7' 6 A.F F. 7 6 A F F B1 7' 6 A.F F. 7' 0 A.F F. 7' 6 A.F F. 7' 6 A.F F. 7' 0 A.F F. 7' 0 A.F F. 2 2 2 2 2 2 2 2 2 2 TRACK AND GREEN SCREEN SPEC F ED PENDANT LIGHTS CHANGED TO TRACK L GHT NG PENDANT L GHTS CHANGED TO TRACK L GHT NG L GHT OR ENTAT ON AND L GHT TYPE CHANGED L GHT TYPE CHANGED L GHT N LAYOUT CHANGED DUE TO CHANGE N FURN TURE SELECT ONS LAYOUT L GHT TYPE CHANGED LIGHT TYPE CHANGED L GHT TYPE CHANGED CEIL NG CLOUD AND L GHTING CHANGED DUE TO CHANGE N PLAN LAYOUT AND TO REDUCE COSTS C5 LIGHT F XTURES CHANGED TO HAVE BAFFLES RCP and Schedule

INTERNATIONAL

7'0 " 6 - 0" 7'0 " 6 - 0" 7'0 " 3 - 0" 7'0 " 3' - 0" 6' - 0" 7'0 " 6 - 0 7'0 " 3 - 0" DOOR SCHEDULE MARK HT WI ELEV OPERATION DOOR MATERIAL DOOR EXT FINISH DOOR INT FINISH FRAME FIN FIRE RATING MANUFACTURE R COMMENTS H101-A 7' - 0" 6 - 0" FG-2B Sw ng A uminum Aluminum Aluminum Aluminum -2B Dbl. Acting Swing Wood, Glass Natural Maple Na ural Maple Natural Maple FG-1B Swing Wood Natural Maple Natural Maple Natural Maple num Alum ass G Swing G-1 num Alum ass G Swing G-1 SG-2A Slid ng Wood Glass N atural Maple Natural Maple Natural Maple -2A Sliding Wood, Glass Natural Maple Natural Maple Natural Maple FG-1A Sw ng Wood Natu ral Maple Natural Maple Natural Maple FG-1A Sw ng Aluminum Al 45+ ng Rat STC num Alum num um A num um FG-1B Sw ng Aluminum Al 45+ ng Rat STC num Alum num um A uminum FG-1A Sw ng Aluminum Al 45+ ng Rat STC num Alum num um A uminum FG-1B Sw ng Aluminum Al 45+ ng Rat STC num um A num um A uminum -2B Dbl. Acting Swing Wood, Glass Natural Maple Natural Maple Natural Maple 2A Sw ng A uminum Aluminum Aluminum Aluminum H112-C 7' - 0 6 - 0 SG-2B Slid ng Wood, Glass Natural Maple Natural Maple Natural Maple num Alum ass G Swing CG-1 0" - 3 0" - 7 H114-A num Alum ass G Swing CG-1 0" - 3 0" - 7 H114-B num Alum ass G Swing CG-1 0" - 3 0" - 7 H114-C num Alum ass G Swing CG-1 0" - 3 0" - 7 H114-D num Alum ass G Swing CG-1 0 - 3 0 - 7 H114-E Aluminum ass G Swing CG-1 0" - 3 0" - 7 H114-F Aluminum ass G Swing CG-1 0" - 3 0" - 7' H114-G num Alum ass G Swing CG-1 0" - 3 0" - 7 H114-H num Alum ass G Swing CG-1 0" - 3 0" - 7 H114-J num Alum ass G Swing CG-1 0 - 3 0 - 7 H114-K H117 7' - 0" 3 - 0" FG-1B Swing Wood Natural Maple Natural Maple Natural Maple FG-2B SG-2A FG-1A FG-1B CG-1 FG-2A SG-2B 2 CHANGED DOOR TO BATHROOM 2 DOOR PROPERTIES UPDATED 2 DOORS TO RECORDING AND FILM STUDIOS TO HAVE STC RATINGS AS SHOWN ZE COLOR x 8" na 24 Wh Sky SK); Wh WH ee plan o lo a n o o s N1-ZT- 20WNL GHT OPAL ACRYL C D FFUSER ED L NEAR LED -120-XXX-D1-TB 5-W D TRA 0B -1 L-80 0-W-BB SE NOTED ED NEAR LED W BAFFLES B -W
Types and Door Schedule
Door

Bathroom Renovation

Team Size: 2

A SQUARED

At A2 LLC, I was working on a project to redesign and remodel a bathroom at a high-end comercial office. I worked on renderings and construction drawings set.

Construction Drawings

L1 L1 L1 L1 L1 L1 H V MR TP WC SC TR FT TR GB TYPE SYMBOL LIGHT TYPE QUANTITY LOCATION COLOR: NOTES: 6 WHITE L1 SIX-INCH LED RECESSED DOWNLIGHT RESPONSIBILITY: L1 CEILING GC TO PROVIDE LIGHT FIXTR AND INSTALL 4 1/2" = 1'-0" REFLECTED CEILING PLAN AND LIGHTING SCHEDULE 3 1/2" = 1'-0" FIXTURE PLAN AND SCHEDULE LIGHTING SCHEDULE TYPE SPECIFICATION FLOATING VANITY MANFR: PORCELANOSA, LOUNGE 100179945 N199999305 / 100143790 N199999465 / POLISHED CHROME 100179956 - N199999304 48'X35" LIGHTED MIRROR HARMONY https://www.ibmirror.com/ V FT MR TP WC SC MANFR: PORCELANOSA, ARQUITECT TOILETS, WALL MTD TOILET, 100144090 N390000046 / White. IN-WALL TANK,FLUSH CONTRLS MANFR: PORCELANOSA, MODEL: PORTAPAPEL QUATRO S/TAPA CROMO CODES: 100042528 - N641111601 MANFR: PORCELANOSA, SHOWER COLUMN WITH JETS & HANDHELD. S232200013 COLUMNA LAUS USA TERM INOX TR MANFR: PORCELANOSA, MODEL: JABONERA RINCON HOTELS CODES: 100103946 - N643000031 MANFR: PORCELANOSA, HOTELS: GRAB RAIL W/ SOAP BASKET Size17-11/16". Product Code N643000014-100103941, Chrome MANFR: PORCELANOSA, MODEL: TOALLERO QUATRO 45CM CROMO CODES: 100042525 - N641050901 MANFR: PORCELANOSA, MODEL: COLGADOR QUATRO DOBLE CROMO CODES: 100042524 N64102000 GB TWL H TYPE SPECIFICATION
Renderings

LLC A SQUARED

SQUARED
EL. 0'-0" FINISH F. L. EL. 8'-5 1/8" AFF B.O. GWB CLG 4'-0" 6" 3'-11 1 8 T-1 T-2 T-3 T-4 PT-1 T-5 8'-5 1 8 " EL. 0'-0" FINISH F. L. EL. 8'-5 1/8" AFF B.O. GWB CLG 4'-0" 6" 3'-11 1 8 " 8'-5 1 8 " T-3 T-4 T-5 T-3 1'-6" 2'-10" BENCH BUILD-OUT IN MATCHING TILES AS WALL. GROUT LINE ON BENCH TO MATCH SEAMLESSLY WITH WALL GROUT LINES 7'-0" EL. 0'-0" FINISH F. L. EL. 8'-5 1/8" AFF B.O. GWB CLG 4'-0" 6" 3'-11 1 8 " 8'-5 1 8 " 1'-0" 1'-7" 1'-6" 2'-11" 7'-0" T-1 T-2 PT-1 T-5 4'-0" EL. 0'-0" FINISH F. L. EL. 8'-5 1/8" AFF B.O. GWB CLG 4'-0" 6" 3'-11 1 8 " 8'-5 1 8 EL. 0'-0" FINISH F. L. EL. 8'-5 1/8" AFF B.O. GWB CLG GLASS SWING DOOR (29") WITH SLEEK S.S. HANDLES AND HINGES GLASS SIDE PANELS EXISTING 5" CURB WITH NEW TILES, MATCHING TO SHOWER FLOOR TILE 8'-5 1 " EL. 0'-0" FINISH F. L. EL. 8'-5 1/8" AFF B.O. GWB CLG 8'-5 1 8 " 7'-0" 7'-0" 5" 3'-1" 2'-5" 1'-6" GLASS SWING DOOR (29") WITH SLEEK S.S. HANDLES AND HINGES GLASS SIDE PANELS EXISTING 5" CURB WITH NEW TILES, MATCHING TO SHOWER FLOOR TILE 1 1/2" = 1'-0" A-102.00 REFLECTED 3ELEVATION ELEVATION a-Squared Architecture 3312 SEAL & SIGNATURE NEW 623 (BETWEEN REVIEWED SHEET NO. PROJECT DRAWN BY: DATE: SCALE: SPACE NO. SHEET TITLE: AREA: PROJECT DATE HCL 08.30.16 PAGE NYC DOB# 2 1/2" = 1'-0" ELEVATION 6 1/2" = 1'-0" ELEVATION 5 1/2" = 1'-0" GLASS PARTITION AND DOOR ELEVATION 4 NOT USED 7 NOT USED 8 NOT USED 9 NOT USED NEW WALL TILES AS SCHEDULED TO 48" AFF NEW FLOOR TILES AS SCHEDULED NEW VANITY AND WC AS SCHEDULED SHOWER AREA: NEW WALL TILES AS SCHEDULED TO UNDERSIDE OF GWB CEILING EXISTING DOOR AND FRAME TO REMAIN, GC TO PAINT AS NEEDED EXISTING SWITCHES TO REMAIN, GC TO PROTECT DURING DEMO AND CONSTRUCTION, TYP. NEW LATICRETE 9235 WATERPROOFING MEMBRANE, CONTINUOUS WATERPROOF MEMBRANE TO 6" ABOVE VERTICAL WALL IN DRY AREAS AND UP TO CEILING IN SHOWER AREA. CONTINUOUS MEMBRANE OVER EXISTING CURB 100 REST RM EXISTING DRAIN TO REMAIN IN SAME LOCATION DEMO ALL EXISTING TILES DEMO ALL EXISTING TILES AND FAUCETS, GLASS DOOR AND PARTITION REMOVE EXISTING LIGHT FIXTURES, PREP FOR NEW LIGHT FIXTURE, COORDINATE SPEC OF NEW LIGHT FIXTURE WITH RCP. REMOVE EXISTING VANITY, MIRROR, AND FIXTURES. PLUMBING RISERS AND SERVICE TO OTHER TENANTS TO REMAIN UN-AFFECTED AND TO REMAIN INTACT. EXISTING SWITCHES TO REMAIN, GC TO PROTECT DURING DEMO GC TO PROTECT EXISTING HVAC LINEAR DUCT DIFFUSERS IN CEILING DURING DEMO AND CONSTRUCTION 1 A102 3 2 6, 5 1 X 100 SALES 1 X X 3 A200 2A 1 1/2" = 1'-0" NEW WORK PLAN 1 1/2" = 1'-0" DEMOLITION PLAN TYPE SYMBOL TILE TYPE SIZE LOCATION COLOR: NOTES: TBD SIBILITY: WALL IN DRY AREA UPTO 48" AFF ON MAIN WALLS FLOOR IN DRY AREA SHOWER AREA FLOOR RM# RM NAME WALL FLOOR CEILING BASE T-1 T-2 T-3 T-4 T-5 PT-1 T-1 T-2 T-3 T-4 T-5 PT-1 6 1/2" = 1'-0" FINISH PLAN RESPONTBD UP TO CEILING IN SHOWER AREA TBD SHOWER WALL ALL 4 WALL AT 48" AFF, FINISHED WITH CHROME TRIM TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD ALL 3 WALLS IN DRY AREA PT-2 PT-2 CEILING T-1 T-1 T-1 T-1 T-2 T-3 T-4 100 REST RM PT-1 T-1/PT-1 PT-1 T-1

Platina Commercial Complex

Team Size: 2

DE.SIGN STUDIO

At de.Sign studio, we designed a facade system for Platina commercial Complex featuring perforated aluminium tubular sun screenpanels. The rails were designed to change angles at every level so as to exaggerate the perspective of the building. The

Renderings
Tubrise Detail Section Tubrise Detail Plan North Elevation

STUDIO LLC DE.SIGN

Key Plan

EXO Luxury Condos

Team Size: 3

DE.SIGN STUDIO

This was part of my work experience at de.Sign studio. I was involved in spatial layouts of the condos and amenities, car parking layouts, along with 3D massing

Section of Tower B
Floor Plan of Tower B

STUDIO LLC DE.SIGN

Tower B Tower A
Site Plan

EXO Luxury Condos

Team Size: 3

DE.SIGN STUDIO

EXO Condos gets its name from the building’s ‘exoskeletal’ structural system which enabled us to have large column-free spaces. The 3D massing of the building was designed to be faceted so as to create

Second Floor Plan of Tower B - Amenities Area

STUDIO LLC DE.SIGN

Basement Plan
K G karishmagoradia@gmail.com (416) - 358 7594 linkedin.com/karishmaag Intern Architect, LEED GA Karishma. G

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.