Leading architect of the team ( Setting project goals; Creation of technical tasks; Design drawings and working models validation ); Design development of projects, from concept to the stage of working documentation; Preparation of technical tasks for related engineering sections; Engineering sections review and approvement; Managing communication between Architect and Engineers; Shvets & Partners (Ukraine/Lviv) May.2014 - Sep.2021

About me. I'm an architect 7+ years of design experience. My experience includes: - Residential architecture; - Public buildings (offices, hotels, restaurants); - Educational institutions (schools, kindergartens);

Architect Design development of projects, from concept to completion; Design development of 3D project models; Preparation of technical tasks for related engineering sections; Review and approval of related engineering sections; Managing communication between Architect and Engineers; Broox (Ukraine/Lviv)

Nov.2014 - Present

Co-Founder, Designer Co-founder of the company; Design development of subject products; Selection of materials for subject design products; Participation in working meetings with sub-consultants;

Skills. Autodesk Revit

Education. Lviv Polytechnic National University

Bachelor Of Architecture

AutoCAD Architecture

Design of Architectural Environment

Google SketchUP

Lviv Polytechnic National University

Adobe Photoshop

2008 - 2012

Master Of Architecture Design of Architectural Environment

2012 - 2013


KASHCHUK IVAN

2

Leading Architect Subject Designer Licenses & certifications. Certificate of Completion - Revit Architecture

2017

Autodesk Certificate No - 13354245T6 Certificate of Completion - Autodesk 3DS Max

2011

3D aRTquarium +38 (068) 577 64 31 kashchuk32@gmail.com

Languages.

Ukraine, Lviv

Ukrainian (Native) English (Limited working proficiency) Polish (Elementary proficiency)

About me. Architecture for me is not just a science or the art of design, it is emotions, inspiration and an opportunity for self-fulfillment. A special place in my life is occupied by subject design, it is my hobby and opportunity for self-expression.

Social. Linkedin - www.linkedin.com/in/ivan-kashchuk-80791280/ Facebook - www.facebook.com/ivan.kashchuk/

Always open to new challenges!


The project development started back in 2007. Primarily it was supposed to be an office building of the definite client. The construction began but was paused for a few years due to the economic crisis. Later on a concept was changed – an unfinished building had to be transformed into the hotel of the Ibis Styles network. The facades architectural solution remained the same – mirror dynamic surface of the biased floors simultaneously remaining in contrast with the surrounding historic buildings and underlining them through the reflection. The vertical grey space of the stares and elevator section adds statics to the building.

- Development of 3d model; - Work on architectural drawings; - Development and modeling of all facade signs; - Modeling of additional metal structures;

IBIS STYLES LVIV CENTER HOTEL Set in operation

2 0 1 4


The main task while planning the project was to create a building harmonizing with the existing environment as from the point of view of volume, as of the facades architecture at the same time providing the clients requirements. Therefore, the object was planned positioned according to the existing buildings line with the preservation of existing scale of windows and balconies, whereas the upper floors are designed with the indent from the buildings line in order to visually decrease their size. The apartments planning solution is made with maximum comfort for the residents. Despite the building’s adjoining to the neighboring objects and a necessity of two blind walls projecting all the rooms and kitchens have the natural lighting and the apartments are provided with normal daylight. Besides during planning the particular attention was paid to the necessity of premises correct shape provision, especially the close-tosquare shape of the rooms, which is the most efficient during exploitation. The courtyard contains the recreation zone for residents and a playground, green area and other small decorative elements.

- Modeling of the design object and surrounding buildings; - Search for architectural facade solutions (materials, colors) - Development of working drawings; - Change planning of floor plans according to customer needs;

APARTMENT BUILDING IN KULISHA STR., LVIV, UKRAINE Set in operation

2 0 1 4


The idea of the object was in the aspiration of adding dynamics and contrast to the shaped environment of Sykhiv district in Lviv. To achieve this a non-standard shape of the building was selected with the similar plan with the oblique angles and the dynamic composition of windows and façade colors. As a result, the object does not have the floors monotony effect (typical to the neighborhood buildings) which serves as a qualitative solvent for the surrounding architecture. This is enhanced as well by the land plot position on the crossing of main district avenues. The apartments planning was traditionally made with maximum comfort and transformability. All the rooms are of close-to-square shape and provided with the natural daylight through reasonable windows which are not shaded by the surrounding buildings. The underground floors contain the reasonable two storey car park. As a result, the general quantity of parking places answers the residents demand. The parking area is significantly bigger than the on-ground part which allows to situate the auxiliary areas above the parking.

- Development of 3d model; - Search for architectural facade solutions (materials, colors) - Development of working drawings; - Work with related engineers (constructors);

APARTMENT BUILDING IN 37, CHERVONOI KALYNY AVE., LVIV, UKRAINE Set in operation

2 0 1 5


The project consists of a two-storey sports complex, with built-in public facilities, underground parking, eightstorey apartment building, and fourstorey educational institution. The project was developed as a continuation of the construction of a large residential complex and should be the final part. Several project options have been developed. Because from the very beginning of the development it was chosen to design a kindergarten, not a school.

- Modeling of the design object and surrounding buildings; - Search for architectural facade solutions (materials, colors) - Development of working drawings (school); - Change planning of floor plans according to customer needs;

O.STEPANIVNY STR. RESIDENTIAL COMPLEX WITH SCHOOL. LVIV, UKRAINE Under construction

2 0 1 5


The building is a fusion of reconstruction of the existing two storey historical building and a construction of the new six storey complex. This is a vivid example of the modern architecture connection to the historical environment. Among the materials for a new building decoration wood, glass and stone were used in order to add an organic and light image. The frame scheme of both new building and reconstructed one allows to easily connect different functions of the floors with the office buildings and apartments above them. The offices are designed to provide a maximum open transformable planning, whereas the apartments are traditionally designed with the close-to-square premises and optimal general use areas. The building will contain an underground parking. The utility areas are available for the residents within the object territory.

- Modeling of the design object and surrounding buildings; - Change planning of floor plans according to customer needs (change of functional purpose); - Search for architectural facade solutions (materials, colors) - Development of working drawings; - Work with related engineers (constructors);

APPARTMENT AND OFFICE BUILDING IN 57, PEKARSKA STR., LVIV, UKRAINE Set in operation

2 0 1 6


Project of a residential building with a separate covered parking lot. All rights to this project were transferred to another company, which continued to work on the project. The facility is completed and put into operation.

- Modeling of the design object ; - Search for architectural facade solutions (materials, colors) - Development of working drawings;

CHEREMSHYNY STR. RESIDENTIAL COMPLEX. LVIV, UKRAINE Set in operation

2 0 1 6


The complex is located in the suburbs of Lviv among the forest-park zone. The idea is to build small houses with a height of 3-5 floors, to create the most comfortable environment for a inhabitant. In addition, all indoor areas between buildings are free of parking and are completely pedestrianfriendly zone with children's and adults's playgrounds and sports grounds. There is a separate two-level ground parking in the northern part of the plot for storing the inhabitants' cars. There is also a set of infrastructure objects - a store, a cafe, a pharmacy, administrative part. The architecture of houses is minimalistic with dynamic elements in the form of a change in the location of windows and balconies on different floors. Planning of apartments is as transformable as possible due to the use of monolithic - frame construction.

- Development of 3d model; - Search for architectural facade solutions (materials, colors) - Development of working drawings; - Work with related engineers (constructors);

NADIYNA STR. RESIDENTIAL COMPLEX, NEAR LVIV, UKRAINE Under construction

2 0 1 6


The project was developed taking into account the need to ensure the possibility of dividing the building into construction queues so that the

P.MYRNOHO STR. OFFICE CENTRE. LVIV, UKRAINE

construction of subsequent queues does not disrupt the functioning of the previously constructed part. Accordingly, the designed object is divided into three modules, which can be built separately and modified depending on market needs. The first module is a seven-storey office building with a built-in cafe and ancillary facilities. The second module is a six-storey office building with a built-in fitness center and ancillary facilities. This section is located in the depth of the site on the side of the existing residential buildings. The third module - a two-level garage, can be performed together with the first stage of construction, and with the second, or as a separate third stage. In this module it is offered to execute the underground closed garage, ground open type with a covering. The cover is proposed to be used as an additional recreational covered terrace for employees of the office building. The main facades of the building are proposed to be solved in a modern minimalist style using a modular system.

- Development of 3d model; - Search for architectural facade solutions (materials, colors); - Development of working drawings;

Competitive project

2 0 1 6


The main task of the project was the integration of modern buildings into the environment. The idea was to create new building (campus), as well as the construction of the assembly hall. The existing main building of the center was restored and the surrounding space was reorganized (additional sports grounds and recreation areas). The architecture of the facades is made in a minimalist style, with the use of natural facade materials (wood) for a better combination with the surrounding nature.

- Development of 3d model; - Modeling of existing buildings - Search for architectural facade solutions (materials, colors); - Development of working drawings;

CATHOLIC CENTER, BRIUKHOVYCHI. LVIV REGION OF UKRAINE Under construction

2 0 1 7


This project consists of three buildings of different functional purposes and will be located in the park area, next to the local university. The residential complex consists of three sections of six, seven and nine floors, with built-in public spaces. Office center six floors high, with builtin public facilities (cafe and dining room). An underground parking lot is designed under the residential complex and the office center. The third object is an educational institution for the senior age category, with a gym, assembly hall, dining room and library. On the territory of this project there is an existing parking lot for use by residents of the residential complex, as well as for employees of the office and educational institution.

- Development of 3d model; - Search for architectural facade solutions (materials, colors); - Development of working drawings; - Work with related engineers; - Leading architect at the stage of working design;

KOZELNYTSKA STR. RESIDENTIAL COMPLEX WITH OFFICE CENTRE AND SCHOOL. LVIV, UKRAINE Under construction

2 0 1 7


The main idea of the project was to design a comfortable 8-storey residential building with built-in public spaces and roofs at different levels. The main task was to properly land the house in the area, with the installation of underground parking. Despite all the restrictions, we also managed to design a playground and recreation areas for the residents of this residential building within the courtyard.

- Development of 3d model; - Search for architectural facade solutions (materials, colors); - Development of working drawings; - Work with related engineers; - Leading architect at the stage of working design;

APARTMENT BUILDING IN BATURYNSKA STR. LVIV, UKRAINE Set in operation

2 0 1 8


The idea of the project is revitalization of industrial areas within the city of Lviv. The site, which once was a dairy factory, is now re-profiled to a residential quarter with infrastructure objects. Functionally, the complex is divided into three zones: the area of ​houses with smart-apartments, a residential area with ordinary apartments and a kindergarten area. In order to form a comfortable environment for the residents, it was decided to abandon traffic for cars and parking areas within the quarter. The entire inter-bay space is used for sidewalks, green areas, sports and recreation areas. The idea is to maximize the socialization of the inhabitants of the complex by creating an environment around the houses where people will be delighted to spend time. Underground car parks are provided for inhabitants of the quarter.

- Development of 3d model; - Search for architectural facade solutions (materials, colors); - Development of working drawings; - Work with related engineers;

RUDNENSKA STR. RESIDENTIAL COMPLEX. LVIV, UKRAINE Under construction

2 0 1 9


These projects were developed in different periods. The photo below shows the project of the office center, with built-in public spaces. On the top right, a project of a residential complex in a forest area. From the bottom of the project office center with a hotel and underground parking, near the local airport. All these projects have been frozen at the concept stage.

- Development of 3d model; - Search for architectural facade solutions (materials, colors); - Development of working drawings;

PROJECTS CONCEPT OF APARTMENTS, OFFICE AND HOTEL COMPLEXES Project proposal

2 0 1 9


This object is designed with certain restrictions from different sides (railway and gas station). Based on these restrictions, the idea was to develop an apartment with built-in public spaces and a three-story parking lot that separated the housing from the gas station.

- Development of 3d model; - Modeling of existing buildings - Search for architectural facade solutions (materials, colors); - Development of working drawings;

KLEPARIVSKA STR. RESIDENTIAL COMPLEX. LVIV, UKRAINE Project proposal

2 0 2 0


This facility is located in a park area. The main task of the project was to create a premium-class housing, where residents of this complex could feel comfortable without leaving it. The project was divided into three separate complexes, each of which had its own interior space (recreation and playgrounds), which were closed to outsiders. The sections have built-in public spaces for various purposes (supermarket, cafe, beauty salon, fitness room, children's rooms, pet store). The underground car park is designed in such a way that the flow of people and cars does not intersect. And the exits from the parking lots were straight to the residential sections.

- Development of 3d model; - Search for architectural facade solutions (materials, colors); - Development of working drawings; - Work with related engineers; - Leading architect at the stage of working design;

LYPOVA ALEYA STR. RESIDENTIAL COMPLEX. LVIV, UKRAINE Project proposal

2 0 2 1


Examples of objects of subject design and their application in the

SUBJECT DESIGN

interiors of public institutions and housing of various designers.

Implemented projects