Kate Keightley Smith Portfolio

Page 1

PORTFOLIO Kate Keightley-Smith



CV

PERSONAL Kate Keightley-Smith

IT Skills

mobile: (+44) 7516138236 -UK Address: Flat 1, 16 Ainger Rd Primrose Hill NW3 3AS London, UK email: katiesksmith@gmail.com

Fluent - Revit 2014 (advanced Revit training completed 2013)

Date of Birth: 23-09-1986 Age : 27

- Autocad 2014

- Adobe CS Photoshop

- Adobe CS InDesign

- Microsoft Suite

Competent

Female

Basic knowledge - SketchUp Pro

South African Passport

Languages : English, Afrikaans

- Adobe CS Illustrator Interests

UK Work Permit : No (Will be in the UK from December 2013) Link to Full Portfolio -

ht t p: // i s s u u.c o m / k ate ke ig ht l ey - s m i t h /d o c s / k ate _ ke ig ht l ey - s m i t h _ p o r t fo li o Education 2012 - Masters in Architecture (professional) - University of the Witwatersrand (Riba Part 2). 2011 - Bachelor of Architectural Studies BAS) Honours - University of the Witwatersrand. 2007 - Bachelor of Architectural Studies(BAS) - University of the Witwatersrand (Riba Part 1). 2004 - Full Matric Exemption (IEB) A Aggregate (distinction). St Mary’s School for girls, Waverley. Work Experience 2012 - Present - Paragon Architects - Candidate Architect 2012 - TC Design Architects - Candidate Architect 2010 - Back Interior Design - Junior Architect 2009 - Daffonchio and Associate Architect - Junior Architect 2008 - Micheal Scholes and Associate Architect - Junior Architect

- Rhinoceros

- Grasshopper

- I have a meticulous yet creative eye (and hand) for painting, drawing and rendering. - I have an ever growing interest in photography and the method of manipulating images. - Urban design / designing within urban frameworks. - Graphics and book publishing, using InDesign. - Information design. - Furniture. - Hockey - am currently playing Women’s League Hockey - Running/ athletics socially

References: Employer

(Johannesburg) (Johannesburg) (Johannesburg) (Johannesburg) (Johannesburg)

Achievements 2005-2007 - Member of the Golden Key Association - University of the Witwatersrand. 2006-2007 - Dean’s List (top 10% students of faculty of the built environment) - University of the Witwatersrand. Continuous Education

2011 April - AZA C&CI MASTER CLASS, International Union of Architects. 2011 May - DIGITAL CONSTRUCTIIONS Masterclass : parametric modelling and algorithmic design, Cement and Concrete Institute. 2012 - 2013 - Revit Training (Modena South Africa) 2012 - 2013 - Registered Candidate of SACAP (South African Council for the Architectural Profession).

- Anthony Orelowitz - Paragon Architects / Henning Rasmuss - Paragon Architects anthonyo@paragon.co.za henningr@paragon.co.za (+27) 11 482 3781 http://www.paragon.co.za/work/

- Enrico Daffonchio - Daffonchio and Associates Architects Educational sadacc@iafrica.co.za (+27) 82 414 2331 - Hannah le Roux - Thesis supervisor - http://www.daffonchio.co.za/ University of the Witwatersrand hannah.leroux@wits.ac.za - Mark Pencharz - TC Design Architects markp@tcdesign.co.za - Elena Rocchi - Architect, Artist (+27) 11 784 3860 Universitat Intercional de Catalunya http://www.tcdesign.co.za/main.htm labrea_a@yahoo.it - Micheal Scholes - Micheal Scholes and - Jonathan Nobel - Professor at Associate Architects University of the Witwatersrand michael.scholes@msarch.co.za Jonathan.Noble@wits.ac.za (+27) 11 440 0772

- Krysia Back Back Interiors (+27) 82 4135223 / (+27) 11 6465387 krysia@backinteriordesign.co.za http://www.backinteriordesign.co.za/default.htm


Paragon Architects

FIRM WORK

Corlett Drive Offices, Johannesburg

Role • • • • • • • • • • • •

Conceptual massing Council submission Detailed technical documentation Service co-ordination using Revit Links Structural co-ordination Weekly site, project, client meetings Weekly client & tenant meetings Client presentation using Photoshop Quality reports Door schedules using Revit Revit information modelling (BIM) Cladding details

Topo da Mata, Rio de Janiero (competition) Role • Hand sketched design work in groups • Conceptual framework design (precinct) • Revit modelling • Photoshop • Presentation in Powerpoint size: unknown Work stage : RIBA equivalent 2 Cost : unknown

size: 4500m² / 48 438 ft² Work stage : RIBA equivalent 7 Cost : 62 000 000 ZAR

6 Sandown Valley Crescent, Johannesburg

Alexander Forbes, Johannesburg Role • • • • • • • • • • • • •

Unisa - Graduate Centre, Pretoria

size: 15 900m² / 171146 ft² Work stage : RIBA equivalent 4 & 5 Cost : 120 000 000 ZAR

Role • • • •

Role • • • • • • •

Core layout and design Council submission Detailed technical documentation Site inspection Weekly site & project meetings Weekly client & tenant meetings Client presentation using Photoshop Project administration Inspection and quality reports Door, room & finishing schedules Families within model Timber cladding details Revit information modelling (BIM)

General arrangement layouts Model massing within Revit Photoshop Presentation in Powerpoint size: 120 000m² / 1291670 ft² Work stage : RIBA equivalent 3 & 4 Cost : unknown

Vanity technical drawings Vanity and corian Workshops Joinery technical drawings Bridge Links Modelling using masses in Revit Tiling layouts Timber cubicle details size: 46 250m² / 497830 ft² Work stage : RIBA equivalent 7 Cost : unknown ZAR

Sasol Head Office, Johannesburg Role • General arrangement layouts • Revit to Photoshop for design • presentations Interior and exterior perspectives • Design presentation to client and developer in Powerpoint size: 166 751m² / 1794 892 ft² Work stage : RIBA equivalent 3 Cost : unknown ZAR


Paragon Architects Angola Offices, Luanda

Marsh - Standard Bank, Johannesburg Role • • • • • •

Role • Landscaping - technical detailing with landscape architect • Vanity technical drawings • Vanity and corian Workshops • Joinery technical drawings • Timber cladding details • Modelling using masses in Revit • Tiling layouts

Client briefing Gross and rentable area scheduling Conceptual Design Revit modelling using massing Revit to Photoshop. Presentation to client and devlpoers using powerpoint size: 24 760m² / 266 514.4 ft² Work stage : RIBA equivalent 3 Cost : unknown

size: 20 568m² / 221392 ft² Work stage : RIBA equivalent 7 Cost : unknown

Jellicoe, Johannesburg Role • General arrangement layouts • Concrete slab details and layouts • Model massing within Revit • Revit to Photoshop • Design of bathrooms - Presentation in Powerpoint

15 Fredman Drive, Johannesburg Role • Conceptual design based on client request/brief. • General arrangement layouts • Model massing within Revit • Revit to Photoshop • Presentation in Powerpoint • Presenting to Client (Property Holding Developer) size: 20 000m² / 215278.2 ft² Work stage : RIBA equivalent 2 Cost : unknown

size: 11 000m² / 118 403 ft² Work stage : RIBA equivalent 5 Cost : 120 000 000 ZAR

TC Design Architects Campus Centre Extention, Johannesburg

Role • Site Inspection - quality reports • Technical documentation • All break-out space joinery documentation and coordination with sub-contractor • Furniture kit out and layout working with tenants • Specification documentation and building manual size: 3800m² / 40902.8 ft² Work stage : RIBA equivalent 7 Cost : 9 000 000 ZAR


Back Interior Design

Enrico Daffonchio and Associate Architects

FIRM WORK

Arts on Main, Downtown Johannesburg

Role • Client/developer briefings and meetings • Tender documentation • Tender documentation • Technical drawings • Construction oversight • Photography • Revit information modelling (BIM) size: 4300m² / 46 284.8 ft² Work stage : RIBA equivalent 3 Cost : 5 000 000 ZAR

Main Street Life, Downtown Johannesburg

Role • • • • • • •

Model existing structure from site study Conceptual layout and design of units Conceptual roof design Measure site and existing building Technical documentation Revit information modelling (BIM) Client meetings

http://www.backinteriordesign.co.za/default.htm House Mayers, Johannesburg Role • 3D modelling of interior spaces • Medium sized kitchen joinery • Lobby furniture design and technical drawings/ specification of joinery • Timber specification • Paving and tiling layouts size: 2000m² / 21527.8 Work stage : RIBA equivalent 7 Cost : 2 000 000 ZAR

House Doorasamy

House Westcliff, Johannesburg Role • 3D perspectives of new exterior design • Interior furniture layout • Joinery documentation and detail drawings • Site meetings • Site inspection • Client meetings • Quality inspections

size: 21 500m² / 231 424 ft² Work stage : RIBA equivalent 7 Cost : 25 000 000 ZAR

size: 2500m² / 26 909.7ft² Work stage : RIBA equivalent 7 Cost : 3 500 000 ZAR

House Coci, Johannesburg

Role • • • • • • • •

Private Work Site study Sun study Weekly project/client meeting Technical drawings 3D views and modelling - client presentation Weekly site visit Council submission / Heritage submission to council Private work obtained from this client during post graduate studies size: 3800m² / 40 902.8ft² Work stage : RIBA equivalent 7 Cost : 3 000 000 ZAR

Low-Cost Church, Hamburg, Eastern Cape Role • • • • •

Design of a low-cost church Source local materials Site meeting Docuement how the church was used Drafting a manual from which locals could build the structure size: 300m² / 3229 ft² Work stage : RIBA equivalent 7 Cost : 8 000 ZAR


MIcheal Scholes and Associate Architects

Architectural Education

FIRM WORK

Woodlands Gatehouse, Grounds and Parking, Johannesburg

Parametric Master Class, Johannesburg Role • Client/developer briefings and meetings. • Tender documentation • Client brief and meetings • Technical drawings • Construction oversight • Photography

After completing a two day course in Rhinoceros and Grasshopper, we were tasked with using our newly acquired skills to design low-income housing. Grasshopper provides the user with the flexibility to modify any aspect of a design, which saves time and enhances the design process. Of particular interest are how the modular units which we designed fit together and how the parametric variables of each could be manipulated according to the degree of clustering and weather conditions.

size: 3000m² / 32 291.7ft² Work stage : RIBA equivalent 7 Cost : 1 000 000 ZAR

“On the edge” Master Class - Peter Rich / Elena Rocchi, Durban

House Woodhead, Hoedspruit

After visiting the city of Durban’s traditional market with architect Richard Dobson, we returned to a beach front studio where we conceptualized and proposed ideas relating to “edges”. Our ideas focused on the paradox posed by the area located between Durban’s pristine beach front and Warwick Junction. The studio produced works of art that dealt with the awakening of dead portions of the city.

Role • Model existing structure from site study • Conceptual layout and design of units • Conceptual roof design • Measure site and existing building • Technical documentation • Client meetings size: 1000m² / 10 763.9ft² Work stage : RIBA equivalent 7 Cost : 3 000 000 ZAR

Dry Port Support, Terrain Vague, Architectural Thesis M.Arch (Prof) Lebala Lodge, Waterberg size: 2500m² / 26 909.7ft² Work stage : RIBA equivalent 7 Cost : 8 000 000 ZAR

Role • Assisted sketch/design drawings • Physical model for client • Finishes, fit out and furniture layout • Project meetings / site visits • Bathroom design and fit outs

Architectural thesis in which I proposed a Support Centre for long distance truck drivers within Johannesburg. The framework set out to rejuvenate the “terrain vague”, a side-effect of container yards and mine-dumps in the south of the city of Johannesburg. The building was central to the varying scales of man to machine. The programme includes garages, re-fueling stations, health care, canteens and accomodation. Link to Full Thesis : http://issuu.com/katekeightley-smith/docs/dr y_ por t_suppor t_small


commercial

FIRM WORK

Paragon Architects Corlett Drive Johannesburg

size: 4500m² / 48 438 ft² Work stage : RIBA equivalent 7 Cost : 62 000 000 ZAR Period: May 2012 - October 2013

Role • • • • • • • • • • • •

Conceptual massing Council submission Detailed technical documentation Service co-ordination using Revit Links Structural co-ordination Weekly site, project, client meetings Weekly client & tenant meetings Client presentation using Photoshop Quality reports Door schedules using Revit Revit information modelling (BIM) Cladding details

Project Challenges: • • • • • • • • •

Site challenges - vehicle noise, shape, flood line/ water table, slope, security. Budget constraints - having to value engineer the structure. Material application to curved forms. Curved concrete forms. Steel forms of pods. Specialised programme and specific circulation. Access control/ security demands. Technical detailing to produce organic shapes. Quality inspection of glazing facade on high scaffolds using harnesses.

4

5

6

Above: Conceptual Mass as a Revit

Below: Steel Sub-contractor

family inserted into main model file

autocad model inserted into Architectural Revit model

7

8

9

AA

EE

10

Sim

CC

01 C601-02-A0

C

C

DD AA D

D

CC

E

E

DD

F

F 4

5

601-02_Ceiling Reference Plan

Ground Floor Plan SCALE: 1 : 200

Photos: Kate Keightley-Smith

6

7

8

9

10

EE






 



  









-

    

-

-

 First

F l o o r,

M i l p a r k,



 

 

 



   Section through Pod B (design) 





J o h a n n e s b u r g,

Tel

011 482 3781

Fax

This drawing is the property of Paragon Architects PTY. LTD. and is intended for the use only on site and for the project to which it relates. Copyright in this drawing is owned by Paragon Architects PTY. LTD. All work is to be carried out in accordance with SANS 10400 and other relevant SANS Standards. This drawing is not to be scaled. Figured dimensions to be used. All dimensions are in millimeters unless otherwise stated. All levels and dimensions to be checked on site by the contractor before work is carried out and any discrepancies to be reported to the Architect. The contractor shall in all aspects of the works comply with the provisions of the Occupational Health and Safety Act, 1993 (Act No 85 of 1993) and any regulations promulgated in terms of that Act or the Factories Machinery and Building Works Act of 1941. This drawing must be read in conjunction with all the relevant drawings, schedules and specifications from the Architect and all other consultants related to the project.

 

 



   







   



 



 PROJECT

 INFO

   

011 482 3784

CO



A v e n u e,

  

 

 

 





-

Stanley



   



-

41

 

 NOTES

Atrium

  





The

 





 









    



 



 







 

 

 











 













 

Interiors of Pod B - Revit and Photoshop  

Bathroom design, Revit to Photoshop







  



 

 

 





 

  



 











 

 

 





  

  

 

  















  













   

  

 

 



 









 









  

 







Interiors of Pod B - Photograph (myself) 



 







 

  







 





                      





 



 

  

   







  



- This drawing is the property of Paragon Architects PTY. LTD. and is intended for the use only on site and for the project to which it relates. - Copyright in this drawing is owned by Paragon Architects PTY. LTD. - All work is to be carried out in accordance with SANS 10400 and other relevant SANS Standards. - This drawing is not to be scaled. Figured dimensions to be used. All dimensions are in millimeters unless otherwise stated. - All levels and dimensions to be checked on site by the contractor before  work is carried out and any discrepancies to be reported to the Architect. - The contractor shall in all aspects of the works comply with the provisions of the Occupational Health and Safety Act, 1993 (Act No 85  of 1993) and any regulations promulgated in terms of that Act or the  Factories Machinery and Building Works Act of 1941. - This drawing must be read in conjunction with all the relevant drawings, schedules and specifications from the Architect and all other consultants related to the project.





  



 

 

 







     

    





 

3D cross-section through ceiling bulk-head (reception) 





   





 

Section through Pod B (technical)

  

NOTES











 

 



  





   

Vanity design

  



    

 

     

  





  



  



  

 

 



 





  








ROOF LEVEL 





 







 

SECOND FLOOR

 



 

  

 

RECEPTION

 



FIRST FLOOR

 

   

 





   



  

   

 

 

TRAINING







 

  



   

 

AA

WAREHOUSE

AA

PARKING LEVEL 01

 



PARKING LEVEL 02 PARKING LEVEL 03

Section AA

Ground Floor Plan  

Photos: Andrew Bell for Paragon

Photos: Kate Keightley-Smith

PRIVATE OFFICE


FOR URGENT COMMENT Vertical steel post

USB Green Waterproofing Membrane to be lapped over galvanised flashing

Galvanised sheeting flashing above window Drywalling

FOR URGENT COMMENT Aluminium window frame Rigid insulation Vertical steel post

Plasterboard window reveal

Plasterboard window reveal

 

Galvanised sheeting USB Green Waterproofing Membrane to be lappedside overflashing galvanised flashing Vertical steel post



Vertical steel post

Galvanised sheeting flashing above window



   

 

 



   

 

Drywalling

Galvanised sheeting side flashing Rigid insulation

 Drywalling  Rigid insulation 

Aluminium Plasterboard window reveal window frame

Plasterboard window reveal Galvanised sheeting side flashing

USB Green Waterproofing Membrane to be lapped over galvanised flashing

Vertical steel post

Cementitious waterproofing to be dressed up steel columns



Aluminium window frame



 



Galvanised sheeting flashing

Vertical steel post

Vertical steel post



Cementitious waterproofing to plastered wall

 

Galvanised sheeting side flashing



   

 Aluminium window frame

Drywalling Waterproofing to Windows

USB Green Waterproofing Membrane to be lapped over galvanised flashing Cementitious waterproofing to be dressed up steel columns 9th

F l o o r,

15 Alice



Galvanised sheeting flashing

Corlett Drive FOR



Buffshelf 20 Trust

Vertical steel post

 

Rigid insulation

SCALE:

L a n e,

S a n d o w n,

S a n d t o n,

T e l 0 1 1 4 8 2 3 7 8 1,

F a x 0 1 1 4 8 2 3 7 8 4,

info@paragon.co .za

Copyright © 2/1/2013 9:21:36 AM

– Paragon Architects (Pty) Ltd

Cementitious waterproofing to plastered wall

   



 



 



 





Waterproofing to Windows



SCALE:

Corlett Drive FOR

Buffshelf 20 Trust 15 Alice

L a n e,

S a n d o w n,

S a n d t o n,

T e l 0 1 1 4 8 2 3 7 8 1,

F a x 0 1 1 4 8 2 3 7 8 4,

info@paragon.co .za

Copyright © 2/1/2013 9:21:36 AM

– Paragon Architects (Pty) Ltd

3D representation of waterproofing, glazing and cladding.

 Building corporate signage 



F l o o r,



NOTES - This drawing is the property of Paragon Architects PTY. LTD. and is intended for the use only on site and for the project to which it relates. - Copyright in this drawing is owned by Paragon Architects PTY. LTD. - All work is to be carried out in accordance with SANS 10400 and other relevant SANS Standards. - This drawing is not to be scaled. Figured dimensions to be used. All dimensions are in millimeters unless otherwise stated. - All levels and dimensions to be checked on site by the contractor before work is carried out and any discrepancies to be reported to the Architect. - The contractor shall in all aspects of the works comply with the provisions of the Occupational Health and Safety Act, 1993 (Act No 85 of 1993) and any regulations promulgated in terms of that Act or the Factories Machinery and Building Works Act of 1941. - This drawing must be read in conjunction with all the relevant drawings, schedules and specifications from the Architect and all other consultants related to the project. The

A t ri u m

41

St a nl e y

A v e n u e,

F i rst

F l o o r,

M i l p a r k,

J o h a n n e s b u r g,

Tel

0 1 1 48 2 3 7 81

Fax

0 11 48 2 3 7 84

 

 

   







  

 PROJECT

 INFO

DISCIPLINE / SERIES / FORMAT

REVISION

 COUNCIL

TENDER

DATE:

DRAWN BY:





CO P Y R I G H T

RESERVED

CONSTRUCTION



9th

©

Photos: Kate Keightley-Smith




Paragon Architects J

2800

1600578 S

01 First Floor

19304

6 Sandown Valley Crescent 2800

1466

1334

AE

AE

2800

5195

2909

Johannesburg

AE

AE

AE 800

size: 15 900m² / 171146 ft² Work stage : RIBA equivalent 4 & 5 Cost : 120 000 000 ZAR

1597227 S

1700

900

TOP OF CONCRETE UPSTAND DOTTED BEHIND

AF

00 Ground Floor

BOTTOM OF SLAB DOTTED BEHIND

BASEMENT FACADE PANEL TYPE KEY TOP OF CONCRETE UPSTAND DOTTED BEHIND

1593900 S

PRECAST CONCRETE PANEL AS PER SCHEDULE

Parking Level 1

GALVANISED STEEL MESH WITH PLANTING BEYOND

BOTTOM OF SLAB DOTTED BEHIND

LOUVRES

3

Parkade Facade 6 - North Elevation SCALE: 1 : 100

855

1945

2800 SOP

AA

AA

1597227 S

AA 800

AA

AAA

AAA

AAA

1593900 S

2230

300

AAA

1400

1127

CA

AAA

1591370 S

AAA 299

AAA

2551

CC

1588520 S

12 Core layout and design Council submission Detailed technical documentation Site inspection Weekly site & project meetings Weekly client & tenant meetings Client presentation using Photoshop Project administration Inspection and quality reports Door, room & finishing schedules Families within model Timber cladding details Revit information modelling (BIM)

2

1600578 S

3089

PRECAST CONCRETE COPING TO SPECIALIST'S APPROVED DETAIL WITH MIN 1:100 SLOPE TOWARDS PODIUM. COPING OVER LOUVRE AND MESH PLANTING AREAS ONLY SOP

2800

289

4516

01 First Floor

2940

TOP OF CONCRETE UPSTAND DOTTED BEHIND

AE

1597227 S

AF

00 Ground Floor

BOTTOM OF SLAB DOTTED BEHIND

3327

2800

900

MAKE UP

2800

PRECAST CONCRETE COPING TO SPECIALIST'S APPROVED DETAIL WITH MIN 1:100 SLOPE TOWARDS PODIUM. COPING OVER LOUVRE AND MESH PLANTING AREAS ONLY

Role • • • • 00 Ground Floor • • • Parking Level 1 • • • Parking Level 2 • • Parking Level • 3 01 First Floor

TOP OF CONCRETE UPSTAND DOTTED BEHIND

1593900 S

AAA

Parking Level 1

BOTTOM OF SLAB DOTTED BEHIND

1530

2800

1600578 S

TOP OF CONCRETE UPSTAND DOTTED BEHIND

1000

603

12

1591370 S

Parking Level 2

BOTTOM OF SLAB DOTTED BEHIND

CD

2850

11

9607

commercial

FIRM WORK

K PRECAST CONCRETE COPING TO SPECIALIST'S APPROVED DETAIL WITH MIN 1:100 SLOPE TOWARDS PODIUM. COPING OVER LOUVRE AND MESH PLANTING AREAS ONLY

1588520 S

Parking Level 3

Parkade Facade 7 - East Elevation

Parkade Facade 2 - West Elevation

SCALE: 1 : 100

SCALE: 1 : 100

A

B

C

Basement facade D

E

F

G

H

J

K

74082 2800

2080

720

2800

2800

1683

1117

2800

1697

2800

2800

MAKE UP

SOP

2800

2800

171

2629

2800

2800

173

2627

2800

1775

1025

2800

2800

578

1806

144

2656

2800

546

2254

PRECAST CONCRETE COPING TO SPECIALIST'S APPROVED DETAIL WITH MIN 1:100 SLOPE TOWARDS PODIUM. COPING OVER LOUVRE AND MESH PLANTING AREAS ONLY

SOP

2800

248

2552

AA

AA

AA

AA

AA

AA

AA

AA

AA

AA

AA

AA

AA

AA

AA

AA

AB

AA

AA

AA

1600578 S

01 First Floor

1597227 S

00 Ground Floor

2800

SOP 8400

900

7297

2800

PRECAST CONCRETE COPING TO SPECIALIST'S APPROVED DETAIL WITH MIN 1:100 SLOPE TOWARDS PODIUM. COPING OVER LOUVRE AND MESH PLANTING AREAS ONLY

AA

3327

PLEASE ALLOW FOR SIDE FIXING ON PANELS AC AND AD TO THE CONCRETE UPSTAND BEHIND AAA

AAA

AAA

AAA

AAA

BA

AAA

BA

BA

BA

BC

AAA

AAA

AAA

AAA

AAA

AAA

AG

AAA

BD

BA

BA

BC

AAA

AAA

AAA

AAA

AAA

BD

BA

BA

BB

BA

BA

BC

AAA

AAA

AC

AD

1593900 S

Parking Level 1

AAA

1591370 S

Parking Level 2

1588520 S

Parking Level 3

BE

BA

BA

BA

BC

AAA

2850

CC

PARKADE ENTRANCE

Parkade Facade 1_South East Elevation SCALE: 1 : 100

NOTES -

-

COPYRIGHT NOTICE Copyright © 2013/10/07 09:25:17 AM Paragon Architects (Pty) Ltd

9th

F l o o r,

15 Alice

L a n e,

S a n d o w n,

S a n d t o n,

T e l 0 1 1 4 8 2 3 7 8 1,

F a x 0 1 1 4 8 2 3 7 8 4,

Professional renders for Paragon Architects

REV B C D E F

DATE 130531 130604 130606 130715 130829

DRAWN MB MB MB MB MB

G 1

131001 131003

MB MB

2

131004

MB

DESCRIPTION ISSUED FOR TENDER ISSUED FOR INFORMATION UPDATED WITH SPECIALISTS INPUT COPING DETAIL AND EXTENT INDICATED PLANTERS REMOVED WHERE THERE IS NO ACCESS + REPLACED WITH LOUVRES UPDATED DESIGN + ISSUED FOR INFORMATION DRAWING NUMBER + SHEET SIZE CHANGED. ISSUED FOR CONSTRUCTION WEST BASEMENT FACADE AMENDED, CONCRETE UPSTAND ADDED AT P1 ABLUTIONS, SIDE FIXING OF PANELS REQUIRED. NEW PANEL TYPES AG + BE

6 SVC

Basement Facade - PCP Elevations

FOR

ZENPROP 2013-02-15 PORTION 6 OF ERF 81 SANDOWN TOWNSHIP 6 SANDOWN VALLEY CRESCENT

SCALE: As indicated PROJECT NUMBER

1135 INFO

STAGE / SERIES / SIZE

REVISION

2

C570-02-A1 COUNCIL

TENDER

DATE:

DRAWN BY:

130222

MB

info@paragon.co.za

Copyright subsists in this drawing. The person or entity, whose name appears in the title block of this drawing, is hereby granted a non-exclusive license to use, display, print, and/or reproduce this drawing to the extent necessary to carry out and complete the project described in the title block of this drawing.

photograph: Andrew Bell for Paragon Architects

This drawing is the property of Paragon Architects (Pty) Ltd. and is intended for the use only on site and for the project to which it relates. Copyright in this drawing is owned by Paragon Architects (Pty) Ltd. All work is to be carried out in accordance with SANS 10400 and other relevant SANS Standards. This drawing is not to be scaled. Figured dimensions to be used. All dimensions are in millimeters unless otherwise stated. All levels and dimensions to be checked on site by the contractor before work is carried out and any discrepancies to be reported to the Architect. The contractor shall in all aspects of the works comply with the provisions of the Occupational Health and Safety Act, 1993 (Act No 85 of 1993) and any regulations promulgated in terms of that Act or the Factories Machinery and Building Works Act of 1941. This drawing must be read in conjunction with all the relevant drawings, schedules and specifications from the Architect and all other consultants related to the project.

This license in respect of the copyright is expressly limited as aforesaid and the person and/or entity referred to above shall not be entitled to grant sub-licenses in respect of the copyright in this drawing to any other entity. This license confers no ownership rights in the copyright vesting in the drawing and this drawing and the copyright subsisting therein will, at all times, remain the property of Paragon Architects (Pty) Ltd. Any unauthorized reproduction, publication, transmission, adaptation and/or inclusion of this drawing in a cinematograph film or television broadcast is an act of copyright infringement which will render the doer of the act liable for civil law copyright infringement and may in certain circumstances render the doer liable to criminal prosecution. Requests and enquiries concerning this drawing and the rights subsisting therein should be addressed to the copyright owner.

Glazing installation in December 2013 Photographs : Kate Keightley-Smith

ACTS OF PARLIAMENT All Contractors shall ensure that, before any work is put in hand, they comply with all the necessary Acts of Parliament of the Republic of South Africa.

CONSTRUCTION

2013/10/07 09:25:17 AM

PLEASE ALLOW FOR SIDE FIXING ON PANEL 'BE' TO THE CONCRETE UPSTAND BEHIND

C:\Mila\Local Files\131004_PA_1135_6SVC_CENTRAL_Mila Bolon.rvt

2530

CB


C590-01-A0

C590-01-A0

45 46

5

45 46

5

SS CLA

B

SS CLA

914

C:\Mila\Local Files\130529_PA_1135_6SVC Refurb_CENTRAL_Mila Bolon.rvt

C590-01-A0

46 45

46 45

3

3

Novelis panels after being cut by cnc in Alania factory

Various patterns were done in the process

C590-01-A0

C590-01-A0

4

4

C590-01-A0

C590-01-A0

Typical Plan

Typical Plan

SCALE: 1 : 50

SCALE: 1 : 50

NOTES -

7195 7190

-

627

-

-

S a n d o w n,

S a n d t o n,

T e l 0 1 1 4 8 2 3 7 8 1,

F a x 0 1 1 4 8 2 3 7 8 4,

552

4546 7195 7190 1169 1169

1169 4185 1169

SCALE:

ZENPROP 2013-02-15 1169 1169

423 3010 1169

PORTION 6 OF ERF42381 SANDOWN 1169 TOWNSHIP 6 SANDOWN VALLEY CRESCENT

627

4546

PROJECT NUMBER

552

STAGE / SERIES / SIZE

4546 1169

INFO

REVISION

1169 D590-77-A1

1135

1169

1169

COUNCIL

1169

552

TENDER

DATE:

DRAWN BY:

130222

Author

4546

423

CONSTRUCTION

423 4546

1169

1169

1169

552

info@paragon.co.za

Copyright subsists in this drawing. The person or entity, whose name appears in the title block of this drawing, is hereby granted a non-exclusive license to use, display, print, and/or reproduce this drawing to the extent necessary to carry out and complete the project described in the title block of this drawing.

1618231 S

06 _Roof

1614381 S

05_Fifth Floor

1610631 S

04 Fourth Floor

1607291 S

03 Third Floor

1603911 S

02 Second Floor

1600578 S

01 First Floor

1597227 S

00 Ground Floor

1618231 S

S 06 _Roof

1618231

1614381 S

S Floor 05_Fifth 05_Fifth Floor

1610631 S

S 04 Fourth Floor 04 Fourth Floor

1607291 S

S Floor 03 Third 03 Third Floor

1603911 S

S 02 Second Floor 02 Second Floor

1600578 S

S Floor 01 First 01 First Floor

1597227 S

S 00 Ground Floor 00 Ground Floor

ACTS OF PARLIAMENT All Contractors shall ensure that, before any work is put in hand, they comply with all the necessary Acts of Parliament of the Republic of South Africa.

This license in respect of the copyright is expressly limited as aforesaid and the person and/or entity referred to above shall not be entitled to grant sub-licenses in respect of the copyright in this drawing to any other entity. This license confers no ownership rights in the copyright vesting in the drawing and this drawing and the copyright subsisting therein will, at all times, remain the property of Paragon Architects (Pty) Ltd. Any unauthorized reproduction, publication, transmission, adaptation and/or inclusion of this drawing in a cinematograph film or television broadcast is an act of copyright infringement which will render the doer of the act liable for civil law copyright infringement and may in certain circumstances render the doer liable to criminal prosecution. Requests and enquiries concerning this drawing and the rights subsisting therein should be addressed to the copyright owner.

1618231 S

06 _Roof

1618231 S

06 _Roof

1614381 S

05_Fifth Floor

1614381 S

05_Fifth Floor

1610631 S

04 Fourth Floor

1610631 S

04 Fourth Floor

1607291 S

03 Third Floor

1607291 S

03 Third Floor

1603911 S

02 Second Floor

1603911 S

02 Second Floor

1600578 S

01 First Floor

1600578 S

01 First Floor

1597227 S

00 Ground Floor

1597227 S

00 Ground Floor

1618231 S

06 _Roof

1618231 S

06 _Roof

1614381 S

05_Fifth Floor

1614381 S

05_Fifth Floor

1610631 S

04 Fourth Floor

1610631 S

04 Fourth Flo

1607291 S

03 Third Floor

1607291 S

03 Third Floo

1603911 S

02 Second Floor

1603911 S

02 Second Flo

1600578 S

01 First Floor

1600578 S

01 First Floor

1597227 S

00 Ground Floor

1597227 S

00 Ground Flo

2368 2368 3750

2368

2368

1614381

2368

2368

2368

2368

3850

06 _Roof

2232

L a n e,

1169

Autodesk of a single unique panel for cnc cutting

400

15 Alice

Perforation Pattern - Option H (Full Dispersing)

FOR

627

2232

F l o o r,

6 SVC

DESCRIPTION

2232

9th

2232

COPYRIGHT NOTICE Copyright Š 2013/06/04 02:32:36 PM Paragon Architects (Pty) Ltd

This drawing is the property of Paragon Architects (Pty) Ltd. and is intended for the use only on site and for the project to which it relates. Copyright in this drawing is owned by Paragon Architects (Pty) Ltd. All work is to be carried out in accordance with SANS 10400 and other relevant SANS Standards. This drawing is not to be scaled. Figured dimensions to be used. All dimensions are in millimeters unless otherwise stated. All levels and dimensions to be checked on site by the contractor before work is carried out and any discrepancies to be reported to the Architect. The contractor shall in all aspects of the works comply with the provisions of the Occupational Health and Safety Act, 1993 (Act No 85 of 1993) and any regulations promulgated in terms of that Act or the Factories Machinery and Building Works Act of 1941. This drawing must be read in conjunction with all the relevant drawings, schedules and specifications from the Architect and all other consultants related to the project.

DRAWN

2368

3010 1169

DATE

2368

1169

2232

1169

2232

4185 1169

2368

1169

2368

627

REV

2013/06/04 02:32:36 PM

2

C590-01-A0

95 71

95 71

2

B

914

21304

21304

21304

2368 2368

3380

2368 2368

1600578

Design in Photoshop

SCALE: 1 : 50

Detail:2

Screen Elevation Screen- West Elevation - North

Design into Revit

SCALE: 1 : 50

SCALE: 1 : 50

Detail:2

Detail:5

2368

2368

2368

1597227

100

First glazing panels on site along with cladding sample above Screen Elevation - West

2368

2368

883

2368

1505

1828

2368

21304

21304

21304

21304

2368

21304

21304

2368 2368

2368 2368

2368

1603911

2368

2368

2368 2368 2368

21304

2368

1607291

2368

2368 2368 2368

2368

21304

2368 2368

2368

21304

3340

2368

2368

2368

2368

2368

2368

1610631

Screen Screen Elevation Elevation - North - South

Section

Screen Elevation - South

SCALE:SCALE: 1 : 50 1 : 50

SCALE: 1 : 50

SCALE: 1 : 50

Detail:5Detail:3

Detail:3






 

   



 







 

   



 

 

   





      

 







 

    















  

 

  





 



   



   

   

   

 

 

   

  

 





 

 



  

   









  NOTES



 -



 

-

NOTES

-

-

S a n d t o n,

T e l 0 1 1 4 8 2 3 7 8 1,

F a x 0 1 1 4 8 2 3 7 8 4,

inf o@p arag on .co. za

9th COPYRIGHT NOTICE Copyright ©  Paragon Architects (Pty) Ltd

F l o o r,

15 Alice

L a n e,

S a n d o w n,

S a n d t o n,

T e l 0 1 1 4 8 2 3 7 8 1,

F a x 0 1 1 4 8 2 3 7 8 4,

  

 



   



inf o@p arag on .co. za

Copyright subsists in this drawing. The person or entity, whose name appears in the title block of this drawing, is hereby granted a non-exclusive license to use, display, print, and/or reproduce this drawing to the extent necessary to carry out and complete the project described in the title block of this drawing.



  

This license in respect of the copyright is expressly limited as aforesaid and the person and/or entity referred to above shall not be entitled to grant sub-licenses in respect of the copyright in this drawing to any other entity. This license confers no ownership rights in the copyright vesting in the drawing and this drawing and the copyright subsisting therein will, at all times, remain the property of Paragon Architects (Pty) Ltd. Any unauthorized reproduction, publication, transmission, adaptation and/or inclusion of this drawing in a cinematograph film or television broadcast is an act of copyright infringement which will render the doer of the act liable for civil law copyright infringement and may in certain circumstances render the doer liable to criminal prosecution. Requests and enquiries concerning this drawing and the rights subsisting therein should be addressed to the copyright owner.







 



 



   

INFO

 COUNCIL

TENDER

DATE:

DRAWN BY:





 CONSTRUCTION









PROJECT NUMBER



  



This license in respect of the copyright is expressly limited as aforesaid and the person and/or entity referred to above shall not be entitled to grant sub-licenses in respect of the copyright in this drawing to any other entity. This license confers no ownership rights in the copyright vesting in the drawing and this drawing and the copyright subsisting therein will, at all times, remain the property of Paragon Architects (Pty) Ltd. Any unauthorized reproduction, publication, transmission, adaptation and/or inclusion of this drawing in a cinematograph film or television broadcast is an act of copyright infringement which will render the doer of the act liable for civil law copyright infringement PROJECT NUMBER STAGE / SERIES / SIZE REVISION and may in certain circumstances render the doer liable to criminal prosecution. Requests and enquiries concerning this drawing and the rights subsisting therein should be addressed to the copyright owner.



 





INFO



DRAWN BY:





 CONSTRUCTION

ACTS OF PARLIAMENT All Contractors shall ensure that, before any work is put in hand, they comply with all the necessary Acts of Parliament of the Republic of South Africa.

   



 



 

Timber lobby panelling - Revit to Photoshop

REVISION

TENDER

ACTS OF PARLIAMENT All Contractors shall ensure that, before any work is put in hand, they comply with all the necessary Acts of Parliament of the Republic of South Africa.



  

STAGE / SERIES / SIZE



COUNCIL DATE:



S a n d o w n,

The person or entity, whose name appears in the title block of this drawing, is hereby granted a non-exclusive license to use, s drawing to the extent necessary to carry out and complete the project described in the title block of this drawing.

This drawing is the property of Paragon Architects (Pty) Ltd. and is intended for the use only on site and for the project to which it relates. Copyright in this drawing is owned by Paragon Architects (Pty) Ltd. All work is to be carried out in accordance with SANS 10400 and other relevant SANS Standards. This drawing is not to be scaled. Figured dimensions to be used. All dimensions are in millimeters unless otherwise stated. All levels and dimensions to be checked on site by the contractor before work is carried out and any discrepancies to be reported to the Architect. The contractor shall in all aspects of the works comply with the provisions of the Occupational Health and Safety Act, 1993 (Act No 85 of 1993) and any regulations promulgated in terms of that Act or the Factories Machinery and Building Works Act of 1941. This drawing must be read in conjunction with all the relevant drawings, schedules and specifications from the Architect and all other consultants related to the project.

This drawing is the property of Paragon Architects (Pty) Ltd. and is intended for the use only on site and for the project to which it relates. Copyright in this drawing is owned by Paragon Architects (Pty) Ltd. All work is to be carried out in accordance with SANS 10400 and other relevant SANS Standards. This drawing is not to be scaled. Figured dimensions to be used. All dimensions are in millimeters unless otherwise stated. All levels and dimensions to be checked on site by the contractor before work is carried out and any discrepancies to be reported to the Architect. The contractor shall in all aspects of the works comply with the provisions of the Occupational Health and Safety Act, 1993 (Act No 85 of 1993) and any regulations promulgated in terms of that Act or the Factories Machinery and Building Works Act of 1941. This drawing must be read in conjunction with all the relevant drawings, schedules and specifications from the Architect and all other consultants related to the project.

     -

-





 

-



   



a n e,

 









 



   





The type of timber was chosen based on a series of workshops with a specialist       joiner who made various sample of timber   cladding. The timber lobby cladding was   further workshopped with our electrical   engineer to achieve a back-lit effect.   









 

timber cubicle doors. Various client and  subsequently tenant presentations were    done using Revit modelling taken into    Photoshop.



     







 





    

  









My responsibility for the interior detailing of each floor’s lobby saw the   design of specialized joinery, applied  wall finishes,architrave details, tiling  layouts, fittings and fixtures within the bathrooms as well as detailed veneered  



 

  

  

            

Timber lobby panelling and architrave detailing - Revit to Photoshop

in this drawing to any other entity. This license confers no ownership rights in the copyright vesting in the drawing and this drawing and the copyright subsisting therein will, at all times, remain the property of Paragon Architects (Pty) Ltd. Any unauthorized reproduction, publication, transmission, adaptation and/or inclusion of this drawing in a cinematograph film or television broadcast is an act of copyright infringement which will render the doer of the act liable for civil law copyright infringement the copyright owner.

  

  PROJECT NUMBER

STAGE / SERIES / SIZE





INFO

COUNCIL

REVISION

TENDER

DATE:

DRAWN BY:





 CONSTRUCTION





   



 

Timber Veneer Doors - Revit to Photoshop

ACTS OF PARLIAMENT All Contractors shall ensure that, before any work is put in hand, they comply with all the necessary Acts of Parliament of the Republic of South Africa.


21 68

301 29

41 47

J

7

H

²m 62.91

48

G

75 06 003 0

CW elameF

4

8

8 31

12 86

31 21 11 01

4

REQUIRED SAMPLE

AL C B

1

8

7

CW ²m

8

61 71

9

31

2

8

3 8

2

78

Based on the perforation design of the external fire escapes, the design of a unitized vanity to receive a powder-coated aluminium ‘skirt’ was also embellished with a leaf-like pattern running across a flat surface. Design, detailing and the components related to the vanity was procured based on a close work environment with sundry metal speciliast and granite craftsman. Lighting was designed to sit within the vanity in order for light to flush from within the enclosure and wash out from the leaf shaped perforations.

49

31

19.26 m²

14 74

SS

51 41

103

Female WC

31

5 30 760 00

9

31

8

EXTERNAL VANITY 'SKIRT' TO BE MADE FROM ALUMINIUM SHEET METAL WITH SEAMLESS JOINTS AND AUTOMOTIVE PAINT FINISH

R

4 29

31

INTERNAL VANITY TO MADE FROM 12MM LG WHITE C650.07-A0

6

81

3

5

4

49

3

2

81

DOWN

10 06 42

42 06

3

CL

81

110

AS

Male WC

B 81 3

491

15 14

S

21.20 m²

VANITY SUBSTRUCTURE TO SUBCONTRACTOR'S APPROVED DETAIL

81

3

3

2

16 17

1

81

6

3

7

8

9

roolF ht5

13 12 11 10

5

753

4

11

MIXER AS PER SANITARY SCHEDULE

Key Plan: Ground to 5th Floor

140 X 140MM STEEL SHELF FOR TRANSFORMER, SUPPORTED FROM VANITY SUBSTRUCTURE TO SUBCONTRACTOR'S DETAIL - POSITIONED AS SHOWN

SCALE: 1 : 100

MIXER AS PER SANITARY SCHEDULE

528 148

380

IN WALL WASTE TO SANITARY SCHEDULE

3MM EDGE TO RUN CONSISTANTLY ALONG TOP SURFACE OF VANITY

12

12MM LG WHITE TO ARCHITECT'S APPROVAL

411

20

18.82°

35

DOWN

1009

12MM LG WHITE TO ARCHITECT'S APPROVAL

3

CONTINUOUS SHADOWLINEON ALL 3 SIDES OF VANITY WITH LG WHITE WEDGE FILLER AS SHOWN

CONTINUOUS SHADOWLINEON ALL 3 SIDES OF VANITY WITH LG WHITE WEDGE FILLER AS SHOWN

12MM LG WHITE TO ARCHITECT'S APPROVAL

ALUMINIUM SHEET METAL PEDESTAL, SEAMLESS JOINTS WITH AUTOMOTIVE PAINT FINISH EXTERNALLY. LASER CUT PATTERN TO ARCHITECT'S DETAIL

110

ALUMINIUM SHEET METAL PEDESTAL, SEAMLESS JOINTS WITH AUTOMOTIVE PAINT FINISH EXTERNALLY. LASER CUT PATTERN TO ARCHITECT'S DETAIL

PERFORATED STAINLESS STEEL GRATING

20

SUBCONTRACTOR TO ADVISE ON JOINTS WITHIN STONE

300

PERFORATED STAINLESS STEEL GRATING

269

STAINLESS STEEL GUTTER TO VANITY MANUFACTURER, SLOPING AT MIN 1:100 TO OUTLETS TO WRAP UNDER VANITY SURFACE

F

STAINLESS STEEL GUTTER TO VANITY MANUFACTURER, SLOPING AT MIN 1:100 TO OUTLETS VANITY SUBSTRUCTURE TO SUBCONTRACTOR'S APPROVED DETAIL

VANITY SUBSTRUCTURE TO SUBCONTRACTOR'S APPROVED DETAIL

C650.07-A0

1480

3000

IN WALL WASTE TO SANITARY SCHEDULE MIXER AS PER SANITARY SCHEDULE

TRANSFORMER FOR ELECTRONIC MIXER 120 X 120MM 140 X 140MM STEEL SHELF FOR TRANSFORMER, SUPPORTED FROM VANITY SUBSTRUCTURE TO SUBCONTRACTOR'S DETAIL - POSITIONED AS SHOWN

20

140 X 140MM STEEL SHELF FOR TRANSFORMER, SUPPORTED FROM VANITY SUBSTRUCTURE TO SUBCONTRACTOR'S DETAIL - POSITIONED AS SHOWN

140

ALUMINIUM BONDED TO FRAME WITH STRUCTURAL SICLICON AND NORTOM TAPE

ALUMINIUM BONDED TO FRAME WITH STRUCTURAL SICLICON AND NORTOM TAPE

1 C650.07-A0

Left Elevation

Right Elevation

Detail A

SCALE: 1 : 5

SCALE: 1 : 5

SCALE: 1 : 2

VANITY SUBSTRUCTURE TO SUBCONTRACTOR'S APPROVED DETAIL

Detail B Detail:A

767

995

1480

505

12MM LG WHITE TO ARCHITECT'S APPROVAL

425

Self-closing veneered timber cubicle doorsB:liateD

753

995 160

421

1009 421

160

Detail:B

SCALE: 1 : 2

1 C650.07-A0

491

421

421

160

411

DOWN

G

H

J

A C650.07-A0

WALL FINISH AS PER FINISHING SCHEDULE MIXER AS PER SANITARY SCHEDULE 12MM LG WHITE TO ARCHITECT'S APPROVAL

MIXER AS PER SANITARY SCHEDULE

A 0A-70.056C

REQUIRED SAMPLE

IN WALL WASTE TO SANITARY SCHEDULE

12MM LG WHITE TO ARCHITECT'S APPROVAL

300

VANITY SUBSTRUCTURE TO SUBCONTRACTOR'S APPROVED DETAIL

STAINLESS STEEL GUTTER TO VANITY MANUFACTURER, SLOPING AT MIN 1:100 TO OUTLETS

767

140 X 140MM STEEL SHELF FOR TRANSFORMER, SUPPORTED FROM VANITY SUBSTRUCTURE TO SUBCONTRACTOR'S DETAIL - POSITIONED AS SHOWN

TRANSFORMER FOR ELECTRONIC MIXER 120 X 120MM

OT ETIHW GL MM21 LAVORPPA S'TCETIHCRA

VANITY SUBSTRUCTURE TO SUBCONTRACTOR'S APPROVED DETAIL 140 X 140MM STEEL SHELF FOR TRANSFORMER, SUPPORTED FROM VANITY SUBSTRUCTURE TO SUBCONTRACTOR'S DETAIL - POSITIONED AS SHOWN

5 30 760 00

900

VANITY SUBSTRUCTURE TO SUBCONTRACTOR'S APPROVED DETAIL

505

585

103

19.26 m²

LATEM TEEHS MUINIMULA STNIOJ SSELMAES ,LATSEDEP TNIAP EVITOM92OTUA HTIW 4 RESAL .YLLANRETXE HSINIF NRETTAP TUC OT ETSAW LLAW NI ELUDEHCS YRATINAS

9

VANITY SUBSTRUCTURE TO SUBCONTRACTOR'S APPROVED DETAIL

IN WALL WASTE TO SANITARY SCHEDULE

RETTUG LEETS SSELNIATS YTINAV OT GNIPOLS ,RERUTCAFUNAM STELTUO OT 001:1 NIM TA

Female WC

ALUMINIUM SHEET METAL PEDESTAL, SEAMLESS JOINTS WITH AUTOMOTIVE PAINT FINISH EXTERNALLY. LASER CUT PATTERN

MIRROR DOTTED OVER

DOWN

ALUMINIUM SHEET METAL PEDESTAL, SEAMLESS JOINTS WITH AUTOMOTIVE PAINT FINISH EXTERNALLY. LASER CUT PATTERN

IN WALL WASTE TO SANITARY SCHEDULE

12 86

MIXER AS PER SANITARY SCHEDULE

STAINLESS STEEL GUTTER TO VANITY MANUFACTURER, SLOPING AT MIN 1:100 TO OUTLETS

REP SA REXIM ELUDEHCS YRATINAS

14 74 78 4

C:\Mila\Local Files\131004_PA_1135_6SVC_CENTRAL_Mila Bolon.rvt

380

L

81 3

528

10

C650.07-A0

42 06

81

3

3

131004

KS

4

131010

MB

81 3

The

Atrium

41

Stanley

A v e n u e,

First

F l o o r,

M i l p a r k,

J o h a n n e s b u r g,

Tel

011 482 3781

Fax

011 482 3784

Unitized, perforated vanity - Revit to Photoshop

6 SVC

DESCRIPTION 16 ISSUED FOR INFORMATION 17 ISSUED FOR TENDER ADDITIONAL DETAIL ADDED SHEET NUMBER REVISED FROM 650-01TO 650-07 ISSUED FOR CONSTRUCTION CORIAN EDGES EXPRESSED, VANITY SIDES TO 1 SLOPE INWARDS VANITY DETAIL REVISED. 2 NOTES REVISED AS INDICATED. 3 FRONT, LEFT AND RIGHT ELEVATIONS UPDATED WITH VANITY PATTERN

3

21.20 m²

DRAWN MB MB MB KS MB FM

81

2. SHOP DRAWINGS TO BE SUBMITTED AND APPROVED PRIOR TO MANUFACTUER

B

-

*NOTE: 1. ALL WORK TO BE DONE ON A DESIGN, SUPPLY AND INSTALL BASIS

DATE 130516 130611 130612 130808 130913 130926

4

6

Detail:1

15 14

SS

-

This drawing is the property of Paragon Architects PTY. LTD. and is intended for the use only on site and for the project to which it relates. Copyright in this drawing is owned by Paragon Architects PTY. LTD. All work is to be carried out in accordance with SANS 10400 and other relevant SANS Standards. This drawing is not to be scaled. Figured dimensions to be used. All dimensions are in millimeters unless otherwise stated. All levels and dimensions to be checked on site by the contractor before work is carried out and any discrepancies to be reported to the Architect. The contractor shall in all aspects of the works comply with the provisions of the Occupational Health and Safety Act, 1993 (Act No 85 of 1993) and any regulations promulgated in terms of that Act or the Factories Machinery and Building Works Act of 1941. This drawing must be read in conjunction with all the relevant drawings, schedules and specifications from the Architect and all other consultants related to the project.

A CL

-

REV A B C D 1 2

tvr.noloB aliM_LARTNEC_CVS6_5311_AP_400131\

-

3

-

81

-

Section SCALE: 1 : 5

110

Male WC

NOTES

3

SCALE: 1 : 5

81

Front Elevation

SCALE: 1 : 5

06 42

Plan

49 2

BC650.07-A0 ---

Vanity

FOR

SCALE: As indicated

ZENPROP 2013-02-15

7

8

9

13 12 11 PORTION 10

PROJECT

6 OF ERF 81 SANDOWN TOWNSHIP 6 SANDOWN VALLEY CRESCENT

1135 INFO

DISCIPLINE / SERIES / FORMAT

1:liateD

4

TENDER DRAWN BY:

130222

MB

COPYRIGHT

5

REVISION

C650.07-A0 COUNCIL DATE:

RESERVED

CONSTRUCTION

©

noitceS

5 : 1 :ELACS

2013/10/11 11:59:19 AM

148




competition

FIRM WORK

Paragon Architects UNISA - Graduate Centre Pretoria

size: 20 000m² Work stage : RIBA equivalent 3 & 4 Cost : unknown

Role • • • •

Perspective for presentation - Revit to Photoshop

General arrangement layouts Model massing within Revit Photoshop Presentation in Powerpoint

Perspective for presentation Revit to Photoshop


Lower Ground Floor

Upper Ground Floor Plan

Typical Student Level Floor Plan

Typical Professor Level Floor Plan

Professional renders for Paragon Architects

Upper Levels

Section though Auditorium


competition

FIRM WORK

Paragon Architects Topo da Mata

Role within project:

Project Challenges:

size: unknown Work stage : RIBA equivalent 2 Cost : unknown Period: June 2012 - July 2012

I was one of 6 who made up the team to design the conceptual ‘Topo da Mata’, which would later be realised if Paragon were to come first amongst other firms. Each of us designed a component to the scheme and then designed the interweaving of the precinct as a whole. Later, I was one of 2 who had the responsibility to Photoshop the project into a more convincing scenario. Paragon’s Brazilian office was able to acquire Paragon as being one of 5 architectural firms to propose a scheme within competition constraints for a Brazilian company who wished for a scheme, designed within the protected Brazilian forest of Rio de Janiero. The precinct included a platform of circulation running through the dense thicket of trees - an ode to wilderness awareness in an era where information is available everywhere. Our design involved training centres, hanging sleeping pods, canteen and food spaces, a funicular, fire pits and a museum for readily available information.

Rio de Janeiro

Photoshop from Revit model

Photoshop from Revit model

• •

Working closely with a team of designers where everyone wished for their ideas to be heard. An abstract and esoteric brief. Creating realistic impressions of complex structures.


Scheme Layout

Photoshop: Kate Keightley-Smith


400

15

16 80

Powder-coated aluminium cover plate over brackets to specification (refer to titleblock for spec.)

270

100

700

C651.5-A1

800

800

222

Ground Floor 1612250

651.5_Type 4_Elevation 1 - Frontal

CL

655

3 C651.5-A1

3267

Electronic mixer by plumber, refer to sanitary schedule

6

180 40

214

350 40

DN

16

75

210 370

Ridge to underside

105

655

20mm opening in fascia with fixed stainless steel perforated plate along length of opening aligned to inside face by sub-contractor

75

Powder-coated aluminium cover plate over brackets to specification (refer to titleblock for spec.)

221

2

651.5_Type 4_Section A

VANITY BRACKET NOTES

3710

C651.5-A1

1

1

1:5

BRACKETS ARE AS PER OHLHORST'S DESIGN, SIZING AND SPECIFICATION.

C651.5-A1

3

651.5_Type 4_Vanity Plan of Top

1 : 10

341

C651.5-A1

100x75 Stainless steel gutter by sub-contractor

Power supply to electronic mixer by Electrical Eng.

POWDER-COAT COLOUR FOR BRACKET COVER PLATES

Hans Grohe Chrome trap by plumber, refer to sanitary schedule

1000 800

2

800

Mixer 1

CODE: QYL 216 800 RANGE: INTERPON D2525 FINISH: MATT COLOUR: ANTHRACITE GREY RAL7016

3 C651.5-A1

Mixer 2

Mixer 3 2970 - 20mm vertical fascia opening

210

73

Steel support frame designed and fabricated by sub-contractor. Painted black and fixed to 230 THK RC upstand.

C651.5-A1

1 : 10

C651.5-A1

70

120

80

2970 - 20mm vertical fascia opening

50

11 3°

16

1612250

1000 DN

Ridge to underside

Ground Floor

100

429

148°

775 GUTTER

1000

20mm opening in fascia with fixed perforated stainless steel plate along length of opening aligned to inside face by sub-contractor. Refer to Detail A.

834

100x75 Stainless steel gutter by sub-contractor with slopes

100

2651 Sloping powder-coated aluminium cover plate

40

1. VANITY TO BE CAESARSTONE QUARTZ SURFACE "PURE WHITE" - TO ARCHITECT'S APPROVAL S/S gutterTHICK below by MATERIAL, sub-contractor 2. DRAWINGS SHOWN AS 16mm SUB-CONTRACTOR TO SIZE WHAT HE CONSIDERS APPROPRIATE THICKNESS 3. SUB-CONTRACTOR TO PRICE FOR DESIGN, SUPPLY AND INSTALL 775 GUTTER 4. SUB-CONTRACTOR TO SIZE DN AND PRICE FOR SUPPORT STEELWORK TO ARCHITECT'S + ENG APPROVALS 5. SUB-CONTRACTOR TO PRICE FOR STAINLESS STEEL GUTTER AS PART OF SCOPE 6. ANY DEVIATIONS NEED TO BE CONSULTED AND APPROVED BY THE ARCHITECT 800 7. ALL EXPOSED EDGES OF CAESARSTONE TO HAVE 2mm BEVEL TO PREVENT CHIPPING

Hot/cold water supply by plumber

Mixer 4

775 GUTTER

210

Full height wall tile to tiling layout details

Solid black powder-coated plate fixed behind perforated stainless steel plate where gutter does not occur to achieve continuous 20mm opening. Refer to Detail B.

Hans Grohe Chrome trap by plumber

100

250

100

Side fascias Steel bracket fixed to RC upstand. Refer to Section

90

90

90

90

Isolator by Elec. Eng Mixer 2 transformer to mains

755 100

90

100

50

100

270

100x75 Stainless steel gutter by sub-contractor with slopes 700

651.5_Type 4_Vanity View

Job:

Stand No.

651.5_Type 4_Section A 1:5

ERF 532 SANDOWN EXT 44 Vanity - Type 4

Drawing Title

Revision 20

20mm opening in fascia with fixed perforated stainless steel plate along length of opening aligned to inside face by sub-contractor.

Zenprop Property Holdings (Pty) Ltd

Alexander Forbes, Sandton

3410

Drawing No.

Solid black powder-coated plate fixed behind perforated stainless steel plate where gutter does not occur to achieve continuous 20mm opening.

1 : 10

Ground Floor 1612250

Client:

STAINLESS STEEL PERFORATED PLATE DETAIL B SECTION 1:2

1612250

1612250

Tel:(+2711)482 3781 Fax:(+2711)482 3784 amirl@paragon.co.za

C651.5-A1

20mm opening in fascia with fixed perforated stainless steel plate along length of opening aligned to inside face by sub-contractor. 75

1 : 10

Ground Floor

100

The Atrium, Stanley Road, Milpark Johannesburg, Gauteng, South Africa

3

651.5_Type 4_Elevation 1 - Frontal

Hans Grohe Chrome trap by plumber

800

100

2651 Sloping powder-coated aluminium cover plate 100x75 Stainless steel gutter by sub-contractor

C651.5-A1

90

Mixer 4 transformer to mains

Steel bracket fixed to RC upstand. Refer to Section

STAINLESS STEEL PERFORATED PLATE 60 DETAIL A SECTION 1:2

700

90

Mixer 3 transformer to mains

Hans Grohe Chrome trap by plumber 800

600

90

Mixer 1 transformer to mains

2

Ground Floor

651.5_Type 4_Elevation 2 - Side

20 80

104

Steel bracket fixed to RC upstand. Refer to Section

A

B

00

AO / HR

Drawn by Date

AL November 2010

Scale

As indicated AO

Copyright Issued For Info / Council Issued For Tender

Issued For Construction

C

120

104

16

Checked by

C651.5-A1

01

Architect

2012/03/05 07:44:44 PM

Powder-coated aluminium cover plate over brackets to specification (refer to titleblock)

Solid black powder-coated plate fixed behind perforated stainless steel plate where gutter does not occur to achieve continuous 20mm opening. Refer to Detail B

20

100x75 Stainless steel gutter by sub-contractor with slopes to trap

850 TOP OF COUNTER FROM FFL

Side fascias

655

120

104

16

850 TOP OF COUNTER FROM FFL

120

16

Steel bracket fixed to RC upstand. Refer to Section

850 TOP OF COUNTER FROM FFL

50

75

180

10

Hans Grohe Chrome trap by plumber

800

100

775 GUTTER

° 90

700

2

S/S gutter below by sub-contractor 210 DN

370

795

Steel bracket fixed to RC upstand. Refer to Section

20

Hans Grohe Chrome trap by plumber 800 60

100

3° 11

Mixer 4 transformer to mains

Steel bracket fixed to RC upstand. Refer to Section

17

34mm DIAM hole for mixer

70

755

Mixer 3 transformer to mains

90

20mm opening on vanity fascia (refer to elevations)

40

VANITY NOTES

380

655

90

430 400

2852

2° 12

Mixer 2 transformer to mains

Mixer 1 transformer to mains

90

380

90

Isolator by Elec. Eng

460

90

70

90

600

Steel bracket fixed to RC upstand. Refer to Section

162°

140

250

100

Side fascias

90

1855

40

400

438

350

100

20 80

120

104

90

430

° 67

850 TOP OF COUNTER FROM FFL

Steel bracket fixed to RC upstand. Refer to Section

RC upstand at +1000 TOC

CL

Full height wall tile to 40tiling layout details

Steel bracket fixed to RC upstand. Refer to Section

429

3

C651.5-A1

Hot/cold water supply by plumber

795

16mm Vertical faces below (refer to elevations)

16

Steel bracket fixed to RC upstand. Refer to Section

40

Solid black powder-coated plate fixed behind perforated stainless steel plate where gutter does not occur to achieve continuous 20mm opening. Refer to Detail B.

755

210

105

775 GUTTER

2011.10.26

1. Brackets + gutters revised 2012.03.05 2. Bracket note added 3. Bracket cover plate revised+colour added 4. Powder-coat colour note added 5. Perforated plate details added 6. All views revised - check all

17

1000

75

775 GUTTER

350

2970 - 20mm vertical fascia opening 210

Hans Grohe Chrome trap by plumber, refer to sanitary schedule

1855

Mixer 4

834

1000

Mixer 3

75

Mixer 2

105

Mixer 1

Power supply to electronic mixer by Electrical Eng. 2 C651.5-A1 20mm opening in fascia with fixed perforated stainless steel plate along length of opening aligned to inside face by sub-contractor. Refer to Detail A.

800

C651.5-A1

Date

ISSUED FOR CONSTRUCTION -Vanity notes revised

01 850 TOP OF COUNTER FROM FFL

3

800

755

800

2

Description

00

Steel support frame designed and fabricated by sub-contractor. Painted black and fixed to 230 THK RC upstand.

C651.5-A1

1 : 10

Rev

100x75 Stainless steel gutter by sub-contractor

73

40

341

100

1 C651.5-A1

3

17

C651.5-A1

Solid black powder-coated plate fixed behind perforated stainless steel plate where gutter does not occur to achieve continuous 20mm opening. Refer to Detail B

20mm opening in fascia with fixed stainless steel perforated plate along length of opening aligned to inside face by sub-contractor

75

221

180

105

655

3710

40

100

180

67 °

800

3267

C651.5-A1

DRAINAGE NOTES : RE's to all changes in direction of drains IE's to all bends and junctions. Reseal traps to all waste fittings. Waste pipes to be fully accessible along entire length. Bends and junctions not to be under building. Soil pipes under building to be protected from load All work to comply with Local Authority by-laws. Pipe Sizes : Soil -100 mm dim. whb - 38 mm dia. OVP -100 mm dim. sink - 38 mm dim. Waste shower - 50 mm dim. wm - 38 mm dim. bath - 38 mm dim. - 50 mm dim. dw

20

332

Ridge to underside

40

800

70

120

16

370

40

DN

70

800

350 40

230

75

268

17

105

17

75

75

180 214

75

210

DN

350

380

70

775 GUTTER

2970 - 20mm vertical fascia opening

CL

655

222

2

C651.5-A1

17

105 75

140

180

10

350

Ridge to underside

1

1000

DN

Electronic mixer by plumber, refer to sanitary schedule

6

40

380

460

775 GUTTER

50

11 3°

115

429

148°

S/S gutter below by sub-contractor

210

DN

370

S/S gutter below by sub-contractor

Vanity technical drawings Vanity and corian Workshops Joinery technical drawings Bridge Links Modelling using masses in Revit Tiling layouts Timber cubicle details

3° 11

2° 12

Role • • • • • 651.5_Type 4_Vanity Plan • of Top •

34mm DIAM hole for mixer

75

Steel bracket fixed to RC upstand. Refer to Section

2852

20mm opening on vanity fascia (refer to elevations)

17

15

40

268

795

332

40

230

430

400

162°

° 90

new build

40

438

° 67

FIRM WORK

430

Steel bracket fixed to RC upstand. Refer to Section

429

size: 46 250m² / 497830 ft² Work stage : RIBA equivalent 7 Cost : unknown Period: July 2012 - December 2012

40

1855

115

795

16mm Vertical faces below (refer to elevations)

Johannesburg

All dimensions to be checked on site and on drawings, any discrepancies to be reported to the architect before work is put in hand. Only figured dimensioned are to be taken. The drawing is the property of Paragon Architects Copyright is reserved by them and the drawing is issued on the condition that it is not copied, reproduced ,retained or disclosed to any authorised person ,either wholly or in part without the written consent of Paragon Architects. All levels to be checked on site and on drawings, any discrepancies to be reported to the Architect before any work is put in hand. All levels shown are finished floor levels. All structural work is to be checked by an Engineer. Soil conditions to be approved by a Soil Engineer. All work is to be in accordance with SABS-0400

RC upstand at +1000 TOC

40

Alexander Forbes

NOTES :

3 C651.5-A1

CL

1855

67 °

2 C651.5-A1

17

Paragon Architects

Side fascias

Hans Grohe Chrome trap by plumber

STAINLESS STEEL PERFORATED PLA DETAIL A SECTION 1

100x75 Stainless steel gutter by sub-contractor

20

Powder-coated aluminium cover plate over brackets to specification (refer to titleblock)

850 TOP OF COUNTER FROM FFL

100x75 Stainless steel gutter by sub-contractor with slopes to trap

20mm opening in fascia with fixed perforated stainless steel plate along length of opening aligned to inside face by sub-contractor. 75

Ground Floor

STAINLESS STEEL PERFORATED PLA DETAIL B SECTION 1

1612250

651.5_Type 4_Elevation 2 - Side

Solid black powder-coated plate fixed behind perforated stainless steel plate where gutter does not occur to achieve continuous 20mm opening. 20

1 : 10

651.5_Type 4_Vanity View

20mm opening in fascia with fixed perforated stainless steel plate along length of opening aligned to inside face by sub-contractor.

photograph: Andrew Bell model for Paragon Architects Photoshop from Revit

Photograph of vanity


2511

2747

3194

S.O.P. 1

R

04 14 00 12

92°

3186

3239

200

93 °

300

398

173

114 °

3312 CONE

3297 SHELF

1523 SHELF

456 SHELF 2323 CONE

442 CONE

3257 CONE

3218 SHELF

1562 CONE

3415 SHELF

2418 CONE

2432 SHELF 2511

1

2023 CONE

2027 SHELF

3186

3304

8400 8400

1137

J.T A.T

B.T

1 : 75

1602

4402 CONE

4407 SHELF

Job:

108 CONE

2631 CONE

S.O.P. 1

3198 SHELF

3054

S.O.P. 1 K.B

L.B

LEVEL 0

S.O.P. 2

A.B

C.B

B.B

S.O.P. 1 J.B

D.B

3750

3490

3750

3750

3701

LEVEL 0

S.O.P. 2

A.B

B.B

C.B

TOP OF CONE PRIOR TO ELEVATION CUT-OUT TOP OF CONE PRIOR TO ELEVATION CUT-OUT

601

112

113 °

° 131

0

72°

74°

° 125

3876

2600

116°

24

260

3432

3342

42°

48°

TOP OF CONE AFTER ELEVATION CUT-OUT (FINAL TOP OF CONE)

436

387

283

ELEVATION CUT-OUT OF SKYLIGHT CONE TO ACHIEVE FINAL SHAPE

TOP OF CONE AFTER ELEVATION CUT-OUT (FINAL TOP OF CONE) ELEVATION CUT-OUT OF SKYLIGHT CONE TO ACHIEVE FINAL SHAPE

S.O.P. 2 S.O.P. 2 S.O.P. 1

S.O.P. 1

S.O.P. 1 S.O.P. 1

S.O.P. 2

S.O.P. 2 S.O.P. 1

S.O.P. 1

1. ALL NOTES APPLY FOR CONES A + B UNLESS OTHERWISE STATED

5. ALL DIMENSIONS ARE TO TAKEN TO INNER FACE OF CONES. APPROPRIATE THICKNESS AND STIFFENING TO BE DESIGNED BY SUB-CONTRACTOR

2. DRAWING TO BE READ IN CONJUNCTION WITH 3410C602.5-A0-CEILINGS_NORTH_SEVENTH AND 3410C602.7-A0-CEILINGS_SOUTH_SEVENTH FOR S.O.P. 1 AND S.O.P. 2 POSITIONS IN ATRIA.

6. FIXING DETAILS TO ROOF TO BE DESIGNED BY SUB-CONTRACTOR

3. ALL PLAN DIMENSIONS TAKEN ON "LEVEL 0"

7. QUANTITIES:

CONE A: x5

CONE B: x5

4. SETTING OUT OF POINTS OF CONES TO BE TAKEN FROM 6220x7820mm RECTANGLE FOR CONE A AND 6000x7430mm RECTANGLE FOR CONE B. 5. CONE A: POINTS ON LEVEL 0 = A.B, B.B, C.B, D.B, E.B, F.B, G.B, H.B, I.B, J.B, K.B, L.B(bottom) POINTS ON LEVEL +3750 = A.T, B.T, C.T, D.T, E.T, F.T, G.T, H.T, I.T, J.T, K.T, L.T(top)

NOTES : All dimensions to be checked on site and on drawings, any discrepancies to be reported to the architect before work is put in hand. Only figured dimensioned are to be taken. The drawing is the property of Paragon Architects Copyright is reserved by them and the drawing is issued on the condition that it is not copied, reproduced ,retained or disclosed to any authorised person ,either wholly or in part without the written consent of Paragon Architects. All levels to be checked on site and on drawings, any discrepancies to be reported to the Architect before any work is put in hand. All levels shown are finished floor levels. All structural work is to be checked by an Engineer. Soil conditions to be approved by a Soil Engineer. All work is to be in accordance with SABS-0400

CONE B: POINTS ON LEVEL 0 = A.B, B.B, C.B, D.B, E.B, F.B, G.B, H.B, I.B, J.B(bottom) POINTS ON LEVEL +3750 = A.T, B.T, C.T, D.T, E.T, F.T, G.T, H.T, I.T, J.T(top)

DRAINAGE NOTES : RE's to all changes in direction of drains IE's to all bends and junctions. Reseal traps to all waste fittings. Waste pipes to be fully accessible along entire length. Bends and junctions not to be under building. Soil pipes under building to be protected from load All work to comply with Local Authority by-laws. Pipe Sizes : Soil whb -100 mmØ - 38 mmØ OVP sink -100 mmØ - 38 mmØ Waste shower wm - 50 mmØ - 38 mmØ dw bath - 50 mmØ - 38 mmØ

Revisions List: No. 00

Photograph of sky lights

Description ISSUED FOR CONSTRUCTION

Stand No. Date 2011.06.13

Drawing Title

ERF 532 SANDOWN EXT 44

Client: Zenprop Property Holdings (Pty) Ltd

Ceilings_Skylight Cones

Job:

Drawing No.

3410

Revision

00

Architect Drawn by Date Scale Checked by

Alexander Forbes, Sandton

C604.1-A1

AO / HR

AL Copyright November 2010 Issued For Info/Council As indicated AO

Issued For Tender Issued For Construction

C The Atrium, Stanley Road, Milpark Johannesburg, Gauteng, South Africa Tel:(+2711)482 3781 Fax:(+2711)482 3784 email: amirl@paragon.co.za

2011/06/13 05:56:51 AM

AO

Issued For Tender Issued For Construction

The Atrium, Stanley Road, Milpark Johannesburg, Gauteng, South Africa Tel:(+2711)482 3781 Fax:(+2711)482 3784 email: amirl@paragon.co.za

92

As indicated

C

55

Scale Checked by

AO / HR

AL Copyright November 2010 Issued For Info/Council

696

Drawn by Date

49

Architect

Alexander Forbes, Sandton

506

00

7

Revision

67

Job:

C604.1-A1

3750

Client: Zenprop Property Holdings (Pty) Ltd

Ceilings_Skylight Cones

3410

3195

ERF 532 SANDOWN EXT 44

Drawing No.

555

Drawing Title

1:50

Stand No. Date 2011.06.13

ELEVATIONS

Description ISSUED FOR CONSTRUCTION

1:25

00

1:100

No.

2011/06/13 05:56:51 AM

Revisions List:

ELEVATION CUT-OUT

DRAINAGE NOTES : RE's to all changes in direction of drains IE's to all bends and junctions. Reseal traps to all waste fittings. Waste pipes to be fully accessible along entire length. Bends and junctions not to be under building. Soil pipes under building to be protected from load All work to comply with Local Authority by-laws. Pipe Sizes : Soil whb -100 mmØ - 38 mmØ OVP sink -100 mmØ - 38 mmØ Waste shower wm - 50 mmØ - 38 mmØ dw bath - 50 mmØ - 38 mmØ

3Ds

All dimensions to be checked on site and on drawings, any discrepancies to be reported to the architect before work is put in hand. Only figured dimensioned are to be taken. The drawing is the property of Paragon Architects Copyright is reserved by them and the drawing is issued on the condition that it is not copied, reproduced ,retained or disclosed to any authorised person ,either wholly or in part without the written consent of Paragon Architects. All levels to be checked on site and on drawings, any discrepancies to be reported to the Architect before any work is put in hand. All levels shown are finished floor levels. All structural work is to be checked by an Engineer. Soil conditions to be approved by a Soil Engineer. All work is to be in accordance with SABS-0400

Revision Architect

Date

Photograph of sky lights in production

00

AO / H

AL Novembe

1

Scale Checked by

1490

C.T

341

Drawing No.

Drawn by 3157 CONE

CONE B: POINTS ON LEVEL 0 = A.B, B.B, C.B, D.B, E.B, F.B, G.B, H.B, I.B, J.B(bottom) POINTS ON LEVEL +3750 = A.T, B.T, C.T, D.T, E.T, F.T, G.T, H.T, I.T, J.T(top)

NOTES

NOTES :

ERF 5

2681 SHELF

102 SHELF

1383 CONE

757 CONE

Drawing Title Ceilings_C

4. SETTING OUT OF POINTS OF CONES TO BE TAKEN FROM 6220x7820mm RECTANGLE FOR CONE A AND 6000x7430mm RECTANGLE FOR CONE B. 5. CONE A: POINTS ON LEVEL 0 = A.B, B.B, C.B, D.B, E.B, F.B, G.B, H.B, I.B, J.B, K.B, L.B(bottom) POINTS ON LEVEL +3750 = A.T, B.T, C.T, D.T, E.T, F.T, G.T, H.T, I.T, J.T, K.T, L.T(top)

Zenprop Pro

Alexander

Stand No.

1372 SHELF

2149 CONE

2177 SHELF

S.O.P. 1

1099 CONE

4151 SHELF

S.O.P. 2

Client:

3144 SHELF

1434 SHELF

966 CONE

806 SHELF

4180 CONE 1071 SHELF

331 CONE

S.O.P. 1 1146 SHELF

372 SHELF

195 CONE

201 SHELF

S.O.P. 2

1187 CONE

22

604.2_7th Floor_Reflected Ceiling Plan

ELEVATION CUT-OUT TAKEN FROM THIS ELEVATION THROUGH (SEE DETAIL BELOW)

3228 2626

LEVEL +3750

2046 CONE

3206 CONE 94°

7430 1785

3094 CONE

S.O.P. 2

K

1761

4440 CONE

4452 SHELF

4308 SHELF

4314 CONE

2829

3882 3152 1499

S.O.P. 2 2075 SHELF

3255 SHELF

4

D.B

ELEVATION CUT-OUT TAKEN FROM THIS ELEVATION THROUGH (SEE DETAIL BELOW) B.T C.T D.T

The Atrium,

Johannesburg

S.O.P. 2

1385 CONE

1920

R 1500

1623

1758 426

1200

K.T L.T A.T

2466 SHELF

2469 CONE

1270

394

R 400

3249 R 1500

155 1903

2211

2

1903

2647

1:25

2216

SKYLIGHT 12 CONE TYPE B LIGHT SHELF TYPE B

Tel:(+2711)482 amirl@

1007 SHELF

225

C604.1-A1

7820

LEVEL +3750

SKYLIGHT 11 CONE TYPE A LIGHT SHELF TYPE A

S.O.P. 1

S.O.P. 1

2484 2313

E.B

242

350

7430

399

1598

R 400

394

249

3351

3168 678

1914

00 R

12

1559

PLANS

767

B9

CONE B: x5

CONE TYPE B LIGHT SHELF TYPE B

2743 CONE

2222

E.B

0° 10

98°

1717

CONE TYPE A LIGHT SHELF TYPE A

2793 SHELF

979

C.B

D.B

SKYLIGHT 9

CONE TYPE B LIGHT SHELF TYPE B

2126

94°

1238

0 120

7. QUANTITIES: CONE A: x5

313

93 ° 1293

319

R

2554

1565

7

R

1570

J

SKYLIGHT 10

SKYLIGHT 8

601

D.T

3

2270

775

C.T 535

1754

2408

1500

209

326

8

11

J

2437

2743

E.T

R 1500

190

2412

399

60 7

3918

7820

431

0 40

00 12 R

944

0

2604

6. FIXING DETAILS TO ROOF TO BE DESIGNED BY SUB-CONTRACTOR

3239

4001

620

752

2646

268 319

118°

118°

R 400

0° 10

478

5. ALL DIMENSIONS ARE TO TAKEN TO INNER FACE OF CONES. APPROPRIATE THICKNESS AND STIFFENING TO BE DESIGNED BY SUB-CONTRACTOR

3. ALL PLAN DIMENSIONS TAKEN ON "LEVEL 0"

3458

4041 350

2011

0 40

388

558

R

0 120

138

R

400

E.T

1565

S.O.P. 1

2. DRAWING TO BE READ IN CONJUNCTION WITH 3410C602.5-A0-CEILINGS_NORTH_SEVENTH AND 3410C602.7-A0-CEILINGS_SOUTH_SEVENTH FOR S.O.P. 1 AND S.O.P. 2 POSITIONS IN ATRIA.

1374 CONE

1390 SHELF

3112 CONE

823 1498 1609

3281

3680

295

2

3154

2513

3834 186

131 ° 309

260 436

696

92

0

74 °

49 506

266

131 °

1041

400

R 400

R 572

523

98°

284

388

400

B.T 1723

R 1500

DRAWING TO BE READ IN -3410C604.1-A1 - Ceiling -3410C604.3-A1 - Ceiling

S.O.P. 1

2468

F.T

1705

S.O.P. 2 B.B

3

357

17

A C604.1-A1

S.O.P. 2

R 400

3048

F.B

D.T 116

1273

2463

R 400

TOP OF CONE AFTER ELEVATION CUT-OUT

1201

1201 CONE

F.B 2741

G.T

ELEVATION CUT-OUT REFER TO ELEVATION BELOW

G.B 15

2607

353

S.O.P. 1

2897

G.T

F.T

6

5

C.B

S.O.P. 1

1251 SHELF 72

H.T

357

139°

R

° 135

° 135

S.O.P. 2 S.O.P. 2

S.O.P. 2

R 1500

463

R 400

400

TOP OF CONE PRIOR TO ELEVATION CUT-OUT

2894

761

315

127

50

3

608

232

°

C.T

I.T

798

R 400

1705

H.T

R 400

400

R 1200

A.T

R 400

° 147

1516

7

3108

3010

R 400

2964

0

R 400

B.T R 400

1164

139°

66 14 40

395

1200

S.O.P. 1

1540 271

114 °

2084

246

J.T

R

1912

S.O.P. 2

S.O.P. 1

1186

297

I.T

1155

0

1490 CONE

0

H.B

6

1065

296

400

R 150

3119 R 1200

400

67

J.T

R

42

1:25

0

R 1200

B.B

1. ALL NOTES APPLY FOR CONES A + B UNLESS OTHERWISE STATED

0

40

R 400

ELEVATION CUT-OUT REFER TO ELEVATION BELOW TOP OF CONE AFTER ELEVATION CUT-OUT

1540 SHELF

G.B 3

R

00 12

537

A.T

ELEVATION CUT-OUT OF SKYLIGHT CONE TO ACHIEVE FINAL SHAPE

S.O.P. 1

189

R

TOP OF CONE PRIOR TO ELEVATION CUT-OUT

TOP OF CONE AFTER ELEVATION CUT-OUT (FINAL TOP OF CONE)

S.O.P. 2

SKYLIGHT 7 CONE TYPE B LIGHT SHELF TYPE B

268

K.T L.T 346

0

1295

40

11 3°

3342

ELEVATION CUT-OUT OF SKYLIGHT CONE TO ACHIEVE FINAL SHAPE

2390

° 151

638

R 1200

112

283

55

° 48

TOP OF CONE AFTER ELEVATION CUT-OUT (FINAL TOP OF CONE)

697

S.O.P. 1 R

2600

° 131

72° 3876

I

200 573

1155

5° 12

S.O.P. 1 R 1500

1705 SHELF

0

I.B

359

1257

601

0

1500

92°

1200

116°

24

A.B

541

0

C.B

TOP OF CONE PRIOR TO ELEVATION CUT-OUT TOP OF CONE PRIOR TO ELEVATION CUT-OUT 3432

555

3078 SHELF

93 ° 22 77

802

2747

3194

1050

H.B R 150

3238

1:50

1150 CONE

S.O.P. 1

2469

1657 CONE

00

2350

1848

2760

2722

3750

2760

3054

3490

3750

3750

3701

12

R 1500

B.B

4

A.B

989 SHELF

5

R 1500

R

28 26

3195

00

3750

12

S.O.P. 2

0 120

J.B

D.B

ISSUED FO

0

I.B

R

S.O.P. 1

140

C.B

B.B

00

941 CONE

8400

2113

J.B

2301

4

L.B

LEVEL 0

S.O.P. 2

Rev

SKYLIGHT 5 CONE TYPE B LIGHT SHELF TYPE B

S.O.P. 2

CONE TYPE A LIGHT SHELF TYPE A

6000 B9 C604.1-A1

K.B

J.B

238

R

ELEVATIONS

1116 SHELF

3428 CONE

6220

A.B

ELEVATION CUT-OUT

CONE TYPE A LIGHT SHELF TYPE A

SKYLIGHT 6

SKYLIGHT CONE TYPE B

1490

420

S.O.P. 1 A.B

3Ds

2306 SHELF

2798 CONE

SKYLIGHT CONE TYPE A

1602

C.T

1421

1:100

2770 SHELF

1137

B.T

111

242

8400

1499

R 1500

22

J.T A.T

2233

NOTES

401 CONE

2829

3882 3152 1920

1758 426

1200

2626

LEVEL +3750

A

387

SKYLIGHT 4

CONE TYPE B LIGHT SHELF TYPE B

MAIN ATRIUM

C604.1-A1

L.B

SKYLIGHT 3

7430

ELEVATION CUT-OUT TAKEN FROM THIS ELEVATION THROUGH (SEE DETAIL BELOW)

3228

1761

DRAINAGE NOTES : RE's to all changes in IE's to all bends and ju Reseal traps to all was Waste pipes to be fully length. Bends and junctions n Soil pipes under buildi from load All work to comply with Pipe Sizes : Soil -10 OVP -10 Waste shower - 50 bath - 50

S.O.P. 2 788 SHELF

H

Technical documentation of sky lights

1785

ELEVATION CUT-OUT TAKEN FROM THIS ELEVATION THROUGH (SEE DETAIL BELOW) B.T C.T D.T

1510 SHELF

S.O.P. 1

° 94

92°

K.B

CONE TYPE A LIGHT SHELF TYPE A

54 22

D.B

1874

LEVEL 0

430 SHELF

1270

3249 R 1500

1903

155

2

1903 2211

1914

00 12 R 350

7430

399

60 7

118 °

3 129

3351

3168 678

2647

2554

1565

1559

1:25

K.T L.T A.T

SKYLIGHT 2

4

2270

2408

175

2313

7820 2604

SKYLIGHT 1

2484

E.B

All dimensions to be c drawings, any discrep the architect before wo Only figured dimensio The drawing is the pro Copyright is reserved issued on the conditio reproduced ,retained o authorised person ,eith the written consent of All levels to be checke any discrepancies to b before any work is put All levels shown are fin All structural work is to Engineer. Soil conditions to be a All work is to be in acc

2039 CONE

3101 SHELF

CONE TYPE B LIGHT SHELF TYPE B

C604.1-A1

2216

NOTES :

2086 SHELF 3061 CONE

B9

LEVEL +3750

741 CONE 788 SHELF

S.O.P. 1

S.O.P. 2 767

00

98°

1717

1865 CONE

740 CONE

2222

C.B

D.B

G

E.B

0° 10

12

1570

1913 SHELF

3517 CONE

S.O.P. 2 S.O.P. 2

6

979

1238

R

1565

PLANS

212

° 94

9

8400

3549 SHELF

1478 CONE

1233 CONE

S.O.P. 2

2743

E.T

D.T

535

93 20

8

2412

11

S.O.P. 1

1 60

R 1500

67 32

190

17

1500

394

R

319

00 12 R

0° 10

0

523

98°

R 400 775

C.T

R 400

40

0

8 55

40

944

357

388

R 400

249

0 40

3918

752

431

00

R

1598

2011

319

118 °

12

R 1500

0

63

1273

S.O.P. 1

1270 SHELF 840 SHELF

2437

1723

B.B 478

8

8400

S.O.P. 1

799 CONE

R

° 135

11

E.T

7

8400

3016 CONE

400

B.T

S.O.P. 2 F.B

572

6

8400

3053 SHELF

F.T

1705

2607

5

D.T

5

2468

388

TOP OF CONE AFTER ELEVATION CUT-OUT

R

138

R 400

3048

76 12

50

C.B

C604.1-A1

0

° 135

C.T

353

A

40

R 1200

1200

R 400

ELEVATION CUT-OUT REFER TO ELEVATION BELOW

G.B 15

1201

2463

284

R

315

B.B

2897

G.T

F.T

8400

F.B 2741

G.T 139°

761

R 400

400

4

72

H.T

357

400

TOP OF CONE PRIOR TO ELEVATION CUT-OUT

2894

B.T R 400

1164

R 1500

463

R 400

608

395

I.T

798

R 400

1705

H.T

R 400

1516

° 147

R 400

A.T

R 400

3108

232

268

J.T

4

3010

0

R 1200

S.O.P. 2

13 27

11 4°

2084

246

66 14 296

7820

309

350

1186

139°

0

R

40

1912

1155

0

1540 1065

40

296

297

I.T

ELEVATION CUT-OUT REFER TO ELEVATION BELOW

0

H.B

R 400

400

TOP OF CONE PRIOR TO ELEVATION CUT-OUT

TOP OF CONE AFTER ELEVATION CUT-OUT

G.B R 150

3119 R 1200

R

A.T

1155

00 12

6

1623

0

J.T

399

0

537

R 400

186

40

83 26

R

40

131 °

R

R

K.T 6 L.T 34

620

638

7

1295

° 151

697

573

125

2646

4001

I.B

359

R 1200

394

1200

S.O.P. 1

266

0

A.B

31 31

1

541

104

131 °

4041

3458

3281

3238

3834

2390

3304

R 1500 3680

29 52

0

0

A.B

1500

L.B

189

3154

2513

272

2760

2760 420

AO




new build

FIRM WORK

Paragon Architects Sasol Head Office Johannesburg

size: 166 751m² / 1794 892 ft² Work stage : RIBA equivalent 3 Cost : unknown

Role • • • •

General arrangement layouts Revit to Photoshop for design presentations - Interior and exterior perspectives Design presentation to client and developer in Powerpoint

Lower Ground Floor Plan

Professional renders


Lower Ground Floor Plan - Areas

Lower Ground Floor Plan - Space Planning


commercial

FIRM WORK

Paragon Architects Angola Offices Luanda

size: 24 760m² / 266 514.4 ft² Work stage : RIBA equivalent 3 Cost : unknown Period: July 2012 Role: • Translating client brief into programmed spaces. • Massing building based on gross and rentable floor area • Forming the mass and shape of the building. • Modelling using masses in Revit and attached curtain walls. • Client presentation using Revit and Photoshop

Luanda’s density and city structure make for an incredibly difficult task in building high-spec, technically advanced structures. We were also restricted by building lines and a site area of 2000m² for a 27000m² building area. The client’s brief included over 200 parking bays, on a site where earthworks would be extremely difficult. We managed to design for 4 levels of basement parking, restricted hugely by a spiralling ramp, allowing 250 bays. The 14 varying floor plates included lift shafts, fire escapes and a 10th floor garden. The ground floor, with a much larger floor to soffit height, is programmed as mixed-use with two receptions proving multi- tenanted upper levels. A single atrium runs 10 floors of the structure in section creating the illusion that the structure two buildings, cutting up the mass as to result in an elegant and expressive form. The south face of the building comprises horizontal silver louvre blades, providing protection from harsh sunlight

Professional renders

onto a typical office floor plate. The east and west ends form an a hour-glass shaped silhouette, mimicking two androgenous forms in a back to back stance. This allows circulation space to run in an east-west direction, maximising floor plate space and gross rentable area. These facade ends were designed to be constructed from steel frame, clad in an aluminium sheet material. The glazed regions on these faces are sunk into the building space with enough overhang shading to allow a comfortable working environment.


Ground Floor

First Floor

10th Floor with garden

Typical Office Level

• • • • •

14th Floor

Complete structure

Challenges: Short time frame for design and presentation Allocating client’s brief / area within tight constraints of the site. Designing media-orientated spaces with specific lighting conditions. Designing and producing presentations and concepts without a team/others.

10th Floor Photos: Kate Keightley-Smith


02

C766-01_TRUE ELEVATION a SCALE: 1 : 50

FACADE JOINT

FACADE JOINT

FACADE JOINT

FACADE JOINT

FACADE JOINT

FACADE JOINT

FACADE JOINT

FACADE JOINT

25mm Ø HOLE IN CENTER PANEL FOR SIGNAGE POWER RETICULATION. HOLE TO BE SEALED BY FACADE CONTRACTOR

FACADE JOINT

1400

FACADE JOINT

CL

FACADE JOINT

4200

1440

INDIVIDUALLY CUT STAINLESS STEEL LETTERS - EACH LETTER INDIVIDUALLY BACK LIT AND FIXED DIRECTLY ONTO FACADE AS PER TENANT SPEC

1440

1633750 S

FACADE JOINT

1634050 S

07 SEVENTH FLOOR

1440

07 SEVENTH FLOOR_ D

FACADE JOINT

C766-01_A0

C

FACADE JOINT

a

Paragon Architects

2100

2100 669

1929

1389

CL

FACADE JOINT 100

1929

1400 3600

1200

SIGNAGE BRACKET FIXED INTO CURTAIN WALL FACADE AS PER FACADE ENG.

CL

2578

SIGNAGE BRACKET FIXED INTO CURTAIN WALL FACADE AS PER FACADE ENG.

1200

CL 690

1599500 S

58

1220

600

PARKING LEVEL 02

25mm Ø HOLE IN CENTER PANEL FOR SIGNAGE POWER RETICULATION. HOLE TO BE SEALED BY FACADE CONTRACTOR

60

FACADE JOINT CORPORATE SIGNAGE FIXED TO FACADE AS PER SPECIALIST DETAIL TO ARCH AND CLIENT APPROVAL

1200

1630000 S

600

06 SIXTH FLOOR

Standard Bank Marsh (11 Alice Lane Phase 1)

SIGNAGE BRACKET FIXED INTO CURTAIN WALL FACADE AS PER FACADE ENG.

FLUSH GLAZED WINDOW

900

800

5500

750

60

FACADE JOINT

2578

Johannesburg

FLUSH GLAZED WINDOW 1400 3600

1200

58

1198

58

CL

SIGNAGE BRACKET FIXED INTO CURTAIN WALL FACADE AS PER FACADE ENG.

1320

690

1200

SCALE: 1 : 50

1200

690 1200

CL

1200

C766-01_SIGNAGE BASEMENT WEST

size: 20 568m² Work stage : RIBA equivalent 7 Cost : unknown

25mm Ø HOLE IN CENTER PANEL FOR SIGNAGE POWER RETICULATION. HOLE TO BE SEALED BY FACADE CONTRACTOR

60

FACADE JOINT

1200

1626250 S

58

05 FITH FLOOR

60

FACADE JOINT

1320

FLUSH GLAZED WINDOW 3600 1400

1200

25mm Ø HOLE IN CENTER PANEL FOR SIGNAGE POWER RETICULATION. HOLE TO BE SEALED BY FACADE CONTRACTOR

1200

1200

690

60

FACADE JOINT

58

58

1198

1200

CL

SIGNAGE BRACKET FIXED INTO CURTAIN WALL FACADE AS PER FACADE ENG.

690

1200

CL

1200

1622500 S

58

04 FOURTH FLOOR

60

FACADE JOINT 1800

C766-01_A0

1618750 S

1800

300

1261

a

03 THIRD FLOOR

3600

FLUSH GLAZED WINDOW 300

FACADE FOLD

Role • Landscaping - technical detailing with landscape architect • Vanity technical drawings • Vanity and corian Workshops • Joinery technical drawings • Timber cladding details • Modelling using masses in Revit • Tiling layouts C766-01_SECTION a SCALE: 1 : 50

A

B

C

D

E

F

C

G

H

I

J

B

K

C766-02_NE PERSPECTIVE

C766-01_NW PERSPECTIVE

L

FACADE JOINT

FACADE JOINT

FACADE JOINT

FACADE JOINT

FACADE JOINT

FACADE JOINT

4500

195

1389

1440 669

690

60 1200

1198

58 1200

690 60

ACCESS INTO BASEMENT

NGL

FACADE JOINT

CL

58

ACCESS INTO BASEMENT

3600

690

1593650 S

SIGNAGE BRACKET FIXED INTO CURTAIN WALL FACADE AS PER FACADE ENG. FACADE JOINT

25mm Ø HOLE IN CENTER PANEL FOR SIGNAGE POWER RETICULATION. HOLE TO BE SEALED BY FACADE CONTRACTOR

1198

1596750 S

PARKING LEVEL 04

25mm Ø HOLE IN CENTER PANEL FOR SIGNAGE POWER RETICULATION. HOLE TO BE SEALED BY FACADE CONTRACTOR

CL

FLUSH GLAZED WINDOW

60

PARKING LEVEL 03

MIRROR GLASS FIXED UNDER SOFFIT

7

C766-01_A0

1200

PARKING LEVEL 02

1602250 S 1600850 S 1599500 S

NGL

SIGNAGE BRACKET FIXED INTO CURTAIN WALL FACADE AS PER FACADE ENG.

CL

1200

690

C766-01_SIGNAGE WEST BASEMENT option 01

FACADE JOINT

60

SCALE: 1 : 200

FLUSH GLAZED WINDOW

3600

A v e n u e,

First

F l o o r,

M i l p a r k,

J o h a n n e s b u r g,

Tel

011 482 3781

Fax

02

03

04

05

06

07

1200

13-03-13

4 5

13-04-04 13-04-15

6

13-04-16

7 8

13-04-18 13-10-07

011 482 3784

SIGNAGE - CORPORATE WEST EXTERNAL

FOR

SCALE: As indicated

Abland

PROJECT

08

BACK LIT AND FIXED DIRECTLY ONTO COUNCIL FACADEINFO AS PER TENANT SPEC DATE:

DRAWN BY:

DS

RESERVED

REVISION

8

TENDER

2013-09-25

COPYRIGHT

CONSTRUCTION

©

1800

300

1800

3600

PARKING LEVEL 01

300

1602250 S

1800

03

FACADE FOLD

5500

1600850 S

600

VA UPPER

C766-02_TRUE ELEVATION b

B

DISCIPLINE / SERIES / FORMAT

INDIVIDUALLY CUT STAINLESS STEEL

PA_1133 C766-01_A0 LETTERS - EACH LETTER INDIVIDUALLY

PORTION 1 OF ERF 241 SANDHURST EXTENSION 3

FACADE JOINT

FLUSH GLAZED WINDOW

02

B

Alice Lane Precinct - Building A

DRAWN DESCRIPTION DS ISSUED FOR CONSTRUCTION DS POWER RETICULATION POINTS ADDED FOR FACADE SIGNAGE DS SIGNAGE FOR STD BANK, VIRGIN AND BLOOMBERG INCREASED TO 1m x 3m, BRACKETS FOR FIXING INDICATED DS SIGNAGE ON-HOLD OMITTED DS ADDITIONAL MARSH SIGN ADDED ADDED ABOVE STANDARD BANK SIGN DS 2 BLANK SIGNS ADDED TO BOTTOM OF FACADE, FACADE SPACING REVISED DS 2 BOTTOM SIGNS FOR RETROFIT DS CORPORATE SIGNAGE SIZES REVISED

1200

01

DATE 12-11-06 12-11-29

3

600

Stanley

25mm Ø HOLE IN CENTER PANEL FOR SIGNAGE POWER RETICULATION. HOLE TO BE SEALED BY FACADE CONTRACTOR SIGNAGE BRACKET FIXED INTO CURTAIN WALL FACADE AS PER FACADE ENG.

60

41

CL

CL

690

-

1198

-

58

-

1200

-

Atrium

This drawing is the property of Paragon Architects PTY. LTD. and is intended for the use only on site and for the project to which it relates. Copyright in this drawing is owned by Paragon Architects PTY. LTD. All work is to be carried out in accordance with SANS 10400 and other relevant SANS Standards. This drawing is not to be scaled. Figured dimensions to be used. All dimensions are in millimeters unless otherwise stated. All levels and dimensions to be checked on site by the contractor before work is carried out and any discrepancies to be reported to the Architect. The contractor shall in all aspects of the works comply with the provisions of the Occupational Health and Safety Act, 1993 (Act No 85 of 1993) and any regulations promulgated in terms of that Act or the Factories Machinery and Building Works Act of 1941. This drawing must be read in conjunction with all the relevant drawings, schedules and specifications from the Architect and all other consultants related to the project.

FOR DISCUSSION ONLY I was placed on this project for a short period of time during completion stages. The landscape package involved designing the landscaping of exterior and interior spaces. I worked with various consultants including a landscape architect, plumbing specialist and green building consultant in order to produce various finishing schedules and technical drawings. -

The

REV 1 2

690

-

FACADE JOINT

60

NOTES

2013/10/07 10:50:50 AM

VA UPPER

CL

MIRROR GLASS

FLUSH GLAZED CURTAIN WALL TO SPECIALIST DETAILS

PARKING LEVEL 01

FACADE JOINT

C:\Dewald_Move\2013 PARAGON\PA_1133_ALICE LANE A\LOCAL FILES\PA_1133_C_ALICE LANE BUILDING A_130903_DewaldS.rvt

FLUSH GLAZED CURTAIN WALL TO SPECIALIST DETAILS

4500

1605750 S

3750

1606250 S

PIAZZA LEVEL

3750

1611250 S

00 GROUND FLOOR

3750

1615000 S

01 FIRST FLOOR

3750

02 SECOND FLOOR

SIGNAGE BRACKET FIXED INTO CURTAIN WALL FACADE AS PER FACADE ENG.

3600

3750

1618750 S

FACADE JOINT

3750

03 THIRD FLOOR

25mm Ø HOLE IN CENTER PANEL FOR SIGNAGE POWER RETICULATION. HOLE TO BE SEALED BY FACADE CONTRACTOR

2100

FLUSH GLAZED WINDOW

5000

1622500 S

6750

04 FOURTH FLOOR

4200

CL

2100

2750

1626250 S

3100

1630000 S

05 FITH FLOOR

CL FACADE JOINT

1633750 S

06 SIXTH FLOOR

FACADE JOINT

1634050 S

07 SEVENTH FLOOR

FACADE JOINT

07 SEVENTH FLOOR_

FACADE JOINT

1638250 S

FACADE JOINT

ROOF

FACADE JOINT

1642750 S

Top of Building

FACADE JOINT

commercial

FIRM WORK

2000

668

1600850 S

1200

1602250 S

VA UPPER

1200

PARKING LEVEL 01

SCALE: 1 : 50

1.3

C823-01_A0

C766-02_TRUE ELEVATION c

I 1642750 S

ROOF

1638250 S

H

G

F

E

D

C

B

SCALE: 1 : 50

A

08

07 4200

06

05

8400

8400

04 8400

03 8400

02 8400

01 4200

4500

Top of Building

-

900

900

-

G

-

900

3200

-

The

Atrium

41

Stanley

A v e n u e,

First

F l o o r,

M i l p a r k,

J o h a n n e s b u r g,

Tel

011 482 3781

Fax

1000

1.2 876

H

F

3200

2985

1000

Tenant entry points

04

05

06

07

08

1390

03

Landscaped layout based on reception 1.3

circluation and entry points

C823-01_A0

02

3750 3750 3750 3750 3750 5000

1.2 C823-01_A0

600

02

1602250 S 1600850 S 1599500 S

PARKING LEVEL 03

1596750 S

PARKING LEVEL 04

1593650 S

PARKING LEVEL 05

1590900 S

4000

REV 1 2

DATE 12-11-06 12-11-29

3

13-03-13

4 5

13-04-04 13-04-15

6

13-04-16

7 8

13-04-18 13-10-07

DRAWN DESCRIPTION DS ISSUED FOR CONSTRUCTION DS POWER RETICULATION POINTS ADDED FOR FACADE SIGNAGE DS SIGNAGE FOR STD BANK, VIRGIN AND BLOOMBERG INCREASED TO 1m x 3m, BRACKETS FOR FIXING INDICATED DS SIGNAGE ON-HOLD OMITTED DS ADDITIONAL MARSH SIGN ADDED ADDED ABOVE STANDARD BANK SIGN DS 2 BLANK SIGNS ADDED TO BOTTOM OF FACADE, FACADE SPACING REVISED DS 2 BOTTOM SIGNS FOR RETROFIT DS CORPORATE SIGNAGE SIZES REVISED

Alice Lane Precinct - Building A FOR

Abland PORTION 1 OF ERF 241 SANDHURST EXTENSION 3

NGL

SIGNAGE - CORPORATE NORTH & EAST EXTERNAL SCALE: As indicated

FOR DISCUSSION ONLY PROJECT

PA_1133 INFO

DISCIPLINE / SERIES / FORMAT

03

TENDER DRAWN BY:

DS RESERVED

REVISION

8

C766-02_A0

COUNCIL DATE:

2013-09-25 COPYRIGHT

1000

01

3750

36500

SCALE: 1 : 200

F

I

1605750 S

PARKING LEVEL 02

C766-02_SIGNAGE NORTH ELEVATION

1000

I

1606250 S

PIAZZA LEVEL

VA UPPER NGL

NGL

C823-01_A0

H

1611250 S

00 GROUND FLOOR

PARKING LEVEL 01

NGL

This drawing is the property of Paragon Architects PTY. LTD. and is intended for the use only on site and for the project to which it relates. Copyright in this drawing is owned by Paragon Architects PTY. LTD. All work is to be carried out in accordance with SANS 10400 and other relevant SANS Standards. This drawing is not to be scaled. Figured dimensions to be used. All dimensions are in millimeters unless otherwise stated. All levels and dimensions to be checked on site by the contractor before work is carried out and any discrepancies to be reported to the Architect. The contractor shall in all aspects of the works comply with the provisions of the Occupational Health and Safety Act, 1993 (Act No 85 of 1993) and any regulations promulgated in terms of that Act or the Factories Machinery and Building Works Act of 1941. This drawing must be read in conjunction with all the relevant drawings, schedules and specifications from the Architect and all other consultants related to the project.

011 482 3784

4500

4500 3750

C766-02_ SIGNAGE EAST ELEVATION

NOTES

1613

3750 3750

F

G

1615000 S

01 FIRST FLOOR

C:\Dewald_Move\2013 PARAGON\PA_1133_ALICE LANE A\LOCAL FILES\PA_1133_C_ALICE LANE BUILDING A_130903_DewaldS.rvt

F

1618750 S

©

CONSTRUCTION

2013/10/07 11:02:31 AM

1596750 S

1622500 S

03 THIRD FLOOR

2750

PARKING LEVEL 03

3206

C823-01_A0

04 FOURTH FLOOR

02 SECOND FLOOR

2750

1602250 S 1600850 S 1599500 S

VA UPPER

1626250 S

3100

PARKING LEVEL 02

PARKING LEVEL 01

1.1

1630000 S

05 FITH FLOOR

2750

1605750 S

E

3750

PIAZZA LEVEL

1633750 S

06 SIXTH FLOOR

3750

00 GROUND FLOOR

1606250 S

E

1634050 S

07 SEVENTH FLOOR

3750

01 FIRST FLOOR

1611250 S

07 SEVENTH FLOOR_

5000

1615000 S

6750

1618750 S

3194

1613

E

E

03 THIRD FLOOR

02 SECOND FLOOR

C766-02_A0

2750

1622500 S

900

D

GLAZED SCREEN FIXED TO SUPPORTING STEEL FRAME @ 3200mm AS PER ENG'S DESIGN

D04 FOURTH FLOOR

600

GLAZING AS PER SPECIALIST TO LATER SPEC. ALL GLAZING TO LINE UP WITH TOP OF DOOR FRAME

900

1626250 S

58 1200 58 1320 1200 1200 1200

1630000 S

05 FITH FLOOR

2578

1633750 S

06 SIXTH FLOOR

1200

1634050 S

07 SEVENTH FLOOR

1929

07 SEVENTH FLOOR_

1440

762

b

1560

C

1415

C



Paragon Architects

GLASS ON 36MM MDF BACKING ON STEEL SUBFRAME

Sim

ALUMINIUM BRACKETS AT 100MM FROM MIRROR FRAME EDGE, POWDERCOATED BLACK

Johannesburg size: 11 000m² / 118 403 ft² Work stage : RIBA equivalent 6 Cost : 120 000 000 ZAR

600 16 50

General arrangement layouts Concrete slab details and layouts Model massing within Revit Revit to Photoshop Design of bathrooms - Presentation in Powerpoint

386

568

16

50

C650-04-A1

568

50

200

Sim

A

600

16

500

16

500

50

19526

Jellicoe

commercial

200 CL

T5 TRIMLINE LIGHT ,MOUNTED ON STEEL C-CHANNEL SUBFRAME WITH VENT HOLES FOR HEAT DISSIPATION TO MANUFACTURERS DETAIL POWDERCOATED ALUMINIUM C-CHANNEL SUBFRAMES; TWO CHANNELS OF DIFFERENT SIZES AS INDICATED; COLOUR: BLACK

Mirror detailing

Typical Plan_Mirror SCALE: 1 : 10

ALUMINIUM BRACKETS AT 100MM FROM MIRROR FRAME EDGE, POWDERCOATED BLACK

4 C840-04-A0

10

A Powdercoated Mild Steel Louvre to Architect's Detail

F

C

C904-01-A0

3850

4200

A

Double Flush Glazing to Architect's Sepcification

4 C904-02-A0

1

13

T5 TRIMLINE LIGHT ,MOUNTED ON STEEL U-CHANNEL SUBFRAME AND FIXED TO BACK OF MDF WITH BRACKETS

4

C904-02-A0

C904-02-A0

1000

1706800 S

05 Fifth Floor

05 Fifth Floor

05 Fifth Floor

CL

Brickwork and 1 Coat Versus applied finish

CL

1706800 S

CL

1706800 S

05 Fifth Floor

170

1706800 S

550

05 Fifth Floor

16MM SUPAWOOD BACKING FRAME IN LSHAPE AS PER SHOPFITTING DETAILS WITH WALNUT VENEER FINISH TO ARCHITECT'S APPROVAL

High quality Off-Shutter Concrete Soffit to later detail

Double Flush Glazing to Architect's Sepcification

C904-01-A0

A

610

1205

170

1035

Cladding to Specialist Detail on Concrete Soffit

4 C904-02-A0

1706800 S

06 Roof

550

2 C904-03-A0

Planting to Landscape Architect's Specification

4

3850

3850

A

3 C904-01-A0

High quality OffShutter Concrete Soffit to later detail

Double Flush Glazing to Architect's Sepcification

4500

4500

4200

A

1711300 S

06 Roof

4030

CL

350 CL

3

High quality Off-Shutter Concrete Soffit to later detail

Double Flush Glazing to Architect's Sepcification

C904-02-A0

ALUMINIUM C-CHANNEL 10 x 10MM AS MIRROR SUBFRAME FITTED TO WALL WITH BRACKETS; POWDERCOATED BLACK

13

1711300 S

06 Roof

High quality Off-Shutter Concrete Soffit to later detail

4200

1711300 S

06 Roof

350

1711300 S

06 Roof

5 C904-03-A0

A

E

3 C904-01-A0

1711300 S

CL

3 C904-01-A0

4500

B

350

FIRM WORK

C650-04-A1

Role • • • • •

MIN 50 50

B

16MM SUPAWOOD BACKING FRAME IN L-SHAPE AS PER SHOPFITTING DETAILS WITH WALNUT VENEER FINISH TO ARCHITECT'S APPROVAL

GLASS ON 36MM MDF BACKING 10MM ON STEEL SUBFRAME

600

04 Fourth Floor 720

Powdercoated Mild Steel Louvre to Architect's Detail

6

Double Flush Glazing to Architect's Sepcification

C904-02-A0

1275

B

3920

Double Flush Glazing to Architect's Sepcification

16MM SUPAWOOD BACKING FRAME IN L-SHAPE AS PER SHOPFITTING DETAILS WITH WALNUT VENEER FINISH TO ARCHITECT'S APPROVAL

C

Sim

ALUMINIUM BRACKETS AT 100MM FROM MIRROR FRAME EDGE, POWDERCOATED BLACK

C650-04-A1

A

3200

3750

A

3750

A

3200

3200

04 Fourth Floor

Double Flush Glazing to Architect's Sepcification

Double Flush Glazing to Architect's Sepcification

3750

1703050 S

3750

600 03 Third Floor

1691800 S

01 First Floor

03 Third Floor

1691800 S

01 First Floor

386

568

50

16

500

600 16

50

50

568 500

5

550

1699300 S

CL

CL

CL

1691800 S

01 First Floor

CL

CL

350

4

CL

350

550

01 First Floor 1050

CL

1691800 S

1220

01 First Floor

03 Third Floor

C904-02-A0

20110

03 Third Floor

1691800 S

1699300 S

12

2 C904-01-A0

1699300 S

16

850

1699300 S

03 Third Floor

550

1699300 S

550

Spray-painted Glazing Support Beams to Eng's detail Cladding to Specialist Detail on Brickwork Wall to Eng's Detail

SHADOWLINE

04 Fourth Floor

CL

550 CL

CL

1703050 S

CL

1703050 S

04 Fourth Floor

CL

1703050 S

04 Fourth Floor

550

1703050 S

1 C904-02-A0

C904-01-A0

CL

3 C904-03-A0

200

1687300 S

1687300 S

G Ground Floor

3 C904-02-A0

1687300 S

G Ground Floor

4500

3

3

C904-02-A0

C904-02-A0

Landscaped Podium to Landscape Contractor's Detail 1687300 S

G Ground Floor

G Ground Floor

1330

North Facade Section Detail:A

SCALE: 1 : 50

North Elevation

-

L a n e,

S a n d o w n,

S a n d t o n,

T e l 0 1 1 4 8 2 3 7 8 1,

F a x 0 1 1 4 8 2 3 7 8 4,

SCALE: 1 : 50

SCALE: 1 : 50

Detail:B

Copyright © 2013/06/19 02:25:54 – Paragon Architects (Pty) Ltd PM Copyright subsists in this drawing. The person or entity, whose name appears in the title block of this drawing, is hereby granted a non-exclusive license to use, display, print, and/or reproduce this drawing to the extent necessary to carry out and complete the project described in the title block of this drawing.

-

15 Alice

SCALE: 1 : 50

COPYRIGHT NOTICE

-

F l o o r,

Typical South Facade Section

-

-

9th

Typical North, East + West Facade Section

NOTES

-

COPYRIGHT NOTICE Copyright © 2013/06/19 02:25:54 PM Paragon Architects (Pty) Ltd

Typical Reception East + West Facade Section

This drawing is the property of Paragon Architects (Pty) Ltd. and is intended for the use only on site and for the project to which it relates. Copyright in this drawing is owned by Paragon Architects (Pty) Ltd. All work is to be carried out in accordance with SANS 10400 and other relevant SANS Standards. This drawing is not to be scaled. Figured dimensions to be used. All dimensions are in millimeters unless otherwise stated. All levels and dimensions to be checked on site by the contractor before work is carried out and any discrepancies to be reported to the Architect. The contractor shall in all aspects of the works comply with the provisions of the Occupational Health and Safety Act, 1993 (Act No 85 of 1993) and any regulations promulgated in terms of that Act or the Factories Machinery and Building Works Act of 1941. This drawing must be read in conjunction with all the relevant drawings, schedules and specifications from the Architect and all other consultants related to the project.

This license in respect of the copyright is expressly limited as aforesaid and the person and/or entity referred to above shall not be entitled to grant sub-licenses in respect of the copyright in this drawing to any other entity.

NOTE: ALL DRAWINGS TO BE READ IN CONJUNCTION WITH GLAZING PERFORMANCE SPECIFICATION

Detail:C

Slab edge scheduling Typical Staircase East + West Facade Section

Detail:D

SCALE: 1 : 50

REV A 1

DATE 120805 130110

2 3

130507 130619

DRAWN DESCRIPTION DR Issued For Information AM Issued for Construction and Drawing Number Changed AB Updated facade Details AB Details Updated + New Details Added

Detail:E

30 JELLICOE

Facade Sections

FOR

ACTS OF PARLIAMENT

POWDERCOATED ALUMINIUM C-CHANNEL 75 x 50MM COLOUR: BLACK

T5 TRIMLINE LIGHT ,MOUNTED ONSUBFRAME, STEEL C-CHANNEL SUBFRAME WITH VENT HOLES FOR HEAT DISSIPATION TO MANUFACTURERS DETAIL

POWDERCOATED ALUMINIUM C-CHANNEL ALUMINIUM BRACKETS AT 100MM SUBFRAMES; TWO CHANNELS OF DIFFERENT FROM MIRROR FRAME EDGE, SIZES AS INDICATED; COLOUR: BLACK

POWDERCOATED BLACK TO ALIGN WITH TILE

Typical Plan_Mirror

Vanity detailing

SCALE: 1 : 10

SCALE: 1 : 50

INVESTEC PROPERTY

PROJECT NUMBER

5910

ERF 33 30 JELLICOE AVENUE ROSEBANK

This license confers no ownership rights in the copyright vesting in the drawing and this drawing and the copyright subsisting therein will, at all times, remain the property of Paragon Architects (Pty) Ltd. Any unauthorized reproduction, publication, transmission, adaptation and/or inclusion of this drawing in a cinematograph film or television broadcast is an act of copyright infringement which will render the doer of the act liable for civil law copyright infringement and may in certain circumstances render the doer liable to criminal prosecution. Requests and enquiries concerning this drawing and the rights subsisting therein should be addressed to the copyright owner.

200 CL

3950

4200

3850

A A

C:\Andrew Bell\Local Files\PA_5910_ROSEBANK_30 JELLICOE\130524_PA_5910_30 JELLICOE_LOCAL_BELLA.rvt

Landscaped Podium to Landscape Contractor's Detail

C904-02-A0

Landscaped Podium to Landscape Contractor's Detail

G Ground Floor

4500 3450

4200

3

3 C904-02-A0

1687300 S

Double Flush Glazing to Architect's Sepcification

Glass Balustrade to later detail

Landscaped Podium to Landscape Contractor's Detail

INFO

All Contractors shall ensure that, before any work is put in hand, they comply with all the necessary Acts of Parliament of the Republic of South Africa.

STAGE / SERIES / SIZE

REVISION

3

C220-04-A0 COUNCIL

TENDER

DATE:

DRAWN BY:

111101

DAR

CONSTRUCTION

2013/06/19 02:25:54 PM

Stainless Steel Balustrade to later detail

3850

3450

3 C904-02-A0

Double Flush Glazing to Architect's Sepcification

Double Flush Glazing to Architect's Sepcification

A

3450

Landscaped Podium to Landscape Contractor's Detail

4500

4500

Double Flush Glazing to Architect's Sepcification

A

info@paragon.co.za

Copyright subsists in this drawing. The person or entity, whose name appears in the title block of this drawing, is hereby granted a non-exclusive license to use, display, print, and/or reproduce this drawing to the extent necessary to carry out and complete the project described in the title block of this drawing.

This license in respect of the copyright is expressly limited as aforesaid and the person and/or entity referred to above shall not be entitled to grant sub-licenses in respect of the copyright in this drawing to any other entity. This license confers no ownership rights in the copyright vesting in the drawing and this drawing and the copyright subsisting therein will, at all times, remain the property of Paragon Architects (Pty) Ltd. Any unauthorized reproduction, publication, transmission, adaptation and/or inclusion of this drawing in a cinematograph film or television broadcast is an act of copyright infringement which will render the doer of the act liable for civil law copyright infringement and may in certain circumstances render the doer liable to criminal prosecution. Requests and enquiries concerning this drawing and the rights subsisting therein should be addressed to the copyright owner.

ACTS OF PARLIAMENT All Contractors shall ensure that, before any work is put in hand, they comply with all the necessary Acts of Parliament of the Republic of South Africa.

Mirror 3D

Typic

SCALE:

SCALE

South Elevation NOTES

NS Elevations

SCALE: 1 : 330

-

30 JELLICOE

-

FOR

INVESTEC PROPERTY 9th

F l o o r,

1 5 Al i c e

L a n e,

S a n d o w n,

S a n d t o n,

T e l 0 1 1 4 8 2 3 7 8 1,

F a x 0 1 1 4 8 2 3 7 8 4,

info@paragon.co.za

-

Copyright © 2012/09/27 05:12:41 PM – Paragon Architects (Pty) Ltd

-

-

COPYRIGHT NOTICE Copyright © 2013/10/17 01:31:39 PM Paragon Architects (Pty) Ltd

North facade facing Jellicoe Avenue

9th

F l o o r,

15 Alice

L a n e,

S a n d o w n,

S a n d t o n,

T e l 0 1 1 4 8 2 3 7 8 1,

F a x 0 1 1 4 8 2 3 7 8 4,

This drawing is the property of Paragon Architects (Pty) Ltd. and is intended for the use only on site and for the project to which it relates. Copyright in this drawing is owned by Paragon Architects (Pty) Ltd. All work is to be carried out in accordance with SANS 10400 and other relevant SANS Standards. This drawing is not to be scaled. Figured dimensions to be used. All dimensions are in millimeters unless otherwise stated. All levels and dimensions to be checked on site by the contractor before work is carried out and any discrepancies to be reported to the Architect. The contractor shall in all aspects of the works comply with the provisions of the Occupational Health and Safety Act, 1993 (Act No 85 of 1993) and any regulations promulgated in terms of that Act or the Factories Machinery and Building Works Act of 1941. This drawing must be read in conjunction with all the relevant drawings, schedules and specifications from the Architect and all other consultants related to the project.

*NO •

info@paragon.co.za

Copyright subsists in this drawing. The person or entity, whose name appears in the title block of this drawing, is hereby granted a non-exclusive license to use, display, print, and/or reproduce this drawing to the extent necessary to carry out and complete the project described in the title block of this drawing.

Free-standing vanity design

This license in respect of the copyright is expressly limited as aforesaid and the person and/or entity referred to above shall not be entitled to grant sub-licenses in res reproduction, publication, transmission, adaptation and/or inclusion of this drawing in a cinematograph film or television broadcast is an act of copyright infringement w



education

FIRM WORK

TC Design Architects Campus Centre Extension University of the Witwatersrand, Johannesburg size: 3800m² / 40902.8 ft² Work stage : RIBA equivalent 7 Cost : 9 000 000 ZAR Period: January 2012 - March 2012

Role: • Site Inspection - Quality Reports • Technical documentation • All break-out space joinery documentation and co-ordination with sub-contractor • Furniture kit out and layout - working with tenants

The University of Witwatersrand’s undertaking to increase its annual intake of students has brought about the need for a larger teaching and academic space. Campus Centre Extension makes up a portion of the university’s master plan of support facilities for the intake of desperately required new staff. This addition to the main Campus Centre Administration Building compiles two floors, added to an existing 80’s style concrete structure which houses up to 90 new and present staff, including formal boardrooms, informal meetings areas and kitchenette nodes. The second floor features an open and covered, hard-landscaped garden, ‘villa savoye’ like, pushing the bygone enclosed and insular office type spaces, into an outside environment. The building was to be designed with the blind and paraplegic in mind, featuring ramps, elevators and paraplegic grab rails within breakouts spaces. The structure ties into an existing ramp system which runs throughout the campus.

The brief entailed low to no maintenance areas while ensuring a level of respecttowards the existing antiquated structures in its surroundings. Most campus buildings were designed during the explosion of precast innovation where a certain mechanical harshness became the standard. The buildings cubic rigidity hints at this style, however the newness of the yellow and white spandrels reveal its youth. The elevated concrete box hovers above a parking lot with fire escapes on either end, a simple look out platform enclosed in an off-shutter wrapping. A glazed curtain wall featuring yellow and white spandrel panels slots within the concrete frame. Each stairwell end is clad in 9 galvanised steel grids where a diagonal strut mimics each flight of stair.

Project Challenges: • • •

• Specification documentation and building manual Sanitary and tile layout & design Statutory requirements /local authority requirements

This landmark office complex overlooks the M1 freeway running through central Johannesburg. The concrete structure features a two storey office structure with curved gable ends. The building comprises: 1. Three levels of basement parking with 1480m² storage facilities. The fire department required the warehouse storage to be compensated with a 300m² water storage tank, positioned in basement 3. 2. An external ground floor podium floating at highway level with three organic pod shaped volumes, used for reception and waiting area, training rooms and office and meeting rooms, all lying amongst an indigenous landscaped garden. 3. Office spaces include a first and second floor of 1560m² each.

Access and inspect state of the concrete from shutter work through to scrub down. Helping staff of the university decide and workshop their interior needs ( with low budget restrictions). Ensuring a maintenance-free building is achieved.

photographs: Kate Keightley-Smith


4. Roof top - entertainment area with full canteen and landscaped deck amongst and within three organic pods of the same cladding layers ad ground floor. The Revit mass which was linked into a central Revit file where materials where attached to the organic faces, producing an accurate method to detail and measure the skin of the ‘pod’ forms. Each gable end facade was cast from 3 different shutters. Once stripped each shutter would rotate vertically and be used a second time on the opposite end of structure. Vertical boxed-out sections of the concrete shutter created east and west facing fenestration openings, where later, laminated solar curved glazing would be inserted from scaffolds. The east and west concrete facades were originally designed to receive a high-class timber plank textured shutter, but was later replaced with a smooth steel shutter due to budget constraints.

Built-in furniture and joinery - 2D Revit

Furniture chosen from locally avaliable industries.


commercial

FIRM WORK

Daffonchio and Associates Architects Arts on Main - Nirox Studio Johannesburg CBD

size: 4300m² / 46284.8 ft² Work stage : RIBA equivalent 3 Cost : 5 000 000 ZAR Period: July 2009 - January 2010

Role: • Client/developer briefings and meetings. • Tender documentation • Constrcution technical drawings • Site management • Photography

Internal views of gallery, photographs: Kate Keightley-Smith

In 1911, a mere 25 years after Johannesburg began developing, Arts on Main was originally built. It began as a bonded Liquor store and a construction company. In the 1960’s a new architectural phenomenon began in New York City, in the SoHo district, which saw the conversion of old industrial warehouses into domestic and work spaces. Originally favored by artists due to their need for space, the artistic lifestyle became synonymous with these conversions. This became one of the important tendencies in architecture and brought about a change in the direction of migration, from suburban areas to the city centers, creating a new urban awareness. Side effects of such phenomenon and highly controversial, is the process of gentrification. A supported of inner city rejuvenation, I was well aware during the process of this project and Main Street Lift of the women who work in sweat shops and the migrant labour who were driven out of these regions due to the capitalizing of developers.

Nevertheless, what was once formerly associated with industrial warehouses, represents not only abodes for artists and bohemians but also hot properties desired by urban professionals and creative businesses. This is what Arts on Main has today become. The conversion at Arts on Main honours the building’s history highlighting features such as the double volume ceilings, concrete floors and over sized windows, while incorporating more contemporary elements to reflect the creativity and innovation the space promotes. Nirox Studios was commissioned by Benji Lieberman who allows artists a residency within his studios in order for work to be produced. The space thus requires a sleeping area with bathrooms facilities for a single person. It also requires water and storage within the studio space.


PRODUCED BY AN AUTODE    

new drywalling flush with new storeroom door

 

REMOVE SLAB PANELS - L/V DOWNLIGHTS PLACED IN BETWEEN LINTOLS

spacer fixed to ex. brick wall attached to new drywall

   

160

use a GYPSUM BEADING or similar to obtain a square & straight flush joint



ceiling void

Arts on Main

160

340

 

recess for light

electrical conduits run through ceiling void from DB board

plaster board ceiling

Unit 12

225

300

1050

300

ALUMINIUM SHADOW LINE STRAIGHTEN ADJACENT PLASTER IF NECESSARY

ceiling brandering support for light recess



plaster board ceiling box to make recess in ceiling for low voltage dowlnlighter low voltage downlighter mounted into recess

U/S CEILING FLUSH WITH U/S LINTOL OF DOOR TO ATRIUM

CENTER LINE

CEILING DETAILS Sections



SECTION AA Scale 1:20



 REMOVE SLAB PANELS - L/V DOWNLIGHTS PLACED IN BETWEEN LINTOLS

REMOVE SLAB PANELS - L/V DOWNLIGHTS PLACED IN BETWEEN LINTOLS

170

150

120

160

160

160

electrical conduits run through ceiling void from DB board

120

120

ceiling void

340



340



U/S CEILING FLUSH WITH U/S LINTOL OF SLIDING DOOR TO ATRIUM

ALUMINIUM SHADOW LINE STRAIGHTEN ADJACENT PLASTER IF NECESSARY ceiling brandering to support light recess box



beneath Mezzanine 2

wall uplighters & triple volume track

 DOOR OPENING

alarm keypad

ALUMINIUM SHADOW LINE STRAIGHTEN ADJACENT PLASTER IF NECESSARY

plaster board ceiling box allows recess in ceiling for electrical fitting

beneath Mezzanine 1 - circuit 1 & circuit 2

low voltage downlighter mounted into recess

1100 mm









GROUND FLOOR

floor finish - polished screed

SECTION GG Scale 1:20

0000 mm

Flush-plastered ceiling detais

W

09-08-25

M



01





1 : 20

1100

   

  

CENTER LINE

2 way dimmer 2 way dimmer dimmer



AOM

PRODUCED BY AN AUTODESK STUDENT PRODUCT

 

PRODUCED BY AN AUTODESK STUDENT PRODUCT

First stages of construction

PRODUCED BY AN AUTODESK STUDENT PRODUCT

After works completion

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRODUCED BY AN AUTODESK STUDENT PRODUCT



ENT PRODUCT

  

PRODUCED BY AN AUTODESK STUDENT PRODUCT



PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRODUCED BY AN AUTODESK STUDENT PRODUCT

2009 _ Daffonchio & Associate Architects

PRODUCED BY AN AUTODESK STUDENT PRODUCT

work _

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRODUCED BY AN AUTODESK STUDENT PRODUCT

photographs: Kate Keightley-Smith


commercial

FIRM WORK

Daffonchio and Associates Architects Main Street Life - (Hastem House) Johannesburg CBD

size: 21 500m² / 231 424 ft² Work stage : RIBA equivalent 7 Cost : 25 000 000 ZAR Period: July 2009 - January 2010

Role: • Site investigation. (measure and find existing drawings) • Model complete existing structure in Revit based on findings on site. • Demolition drawings. • Proposal to developer. Presentation using Revit and Photoshop. • Construction and technical drawings in Revit and CAD • Design of furniture within units. • GLA and rentable plans. • Working with artists who were to design “12 Decades Hotel.” • Site meetings. • Design of roof top bar • Council Submission

Internal views of gallery, photographs: Kate Keightley-Smith

Main Street Life is part of the on-going Maboneng Precinct project, which began with the hugely successful Arts on Main. The space is an eclectic mix of art galleries, advertising agencies, artists’ studios, retail spaces and restaurants. The property developer worked closely myself and Enrico Daffonchio, in transforming this industria common building into a modern, but functional complex showcasing small apartments to penthouses, shops to restaurants, creative workspaces to a roof venue with a stunning 360º view over the city. The top floor is home to the 12 Decades Johannesburg Arts Hotel. This self-catering boutique hotel embodies a unique concept The developer commissioned some of South Africa’s best-known designers and artists to take the 12 rooms of the hotel and have them represent Johannesburg’s past 12 decades.

Project Challenges: • • •

Site investigation - finding that the existing tenants were various sweat shops which were overcrowded and dirty. Deciphering the existing structure from very old plans Demanding client/developer who was very involved in the design process.


The units in Main Street Life vary from 33 square meters to 120 square meters. The furniture in the smaller units was designed with Adriaan Hugo from Doktor and Misses; modular pieces. These units were aimed at students living in the inner city. The large units had more bespoke furniture pieces designed my myslef (see left on castor wheels). These units were all open plan with a very industrial atmosphere while still miantaining a level of high-spec within the large apartments. Common spaces are avaliable on each floor, surrounding the lift core and lobby, where a lounge environmnet was designed with free Wifi. Teh culture of the precinct abides to the idea of fere eliving withhin tight city constrainst.

One of the artists of the 12 Decades Hotel with whom we worked was Marcus Neustetter. Neustetter produced pen-ink drawings of telescopes in a city landscape. When designed the roof space at Main Street Life, Neustetter was commissioned to design a large scale steel structure to take an oversized cone shaped telescope. The roof scape was thus designed around this icon, the telescope, central to the communal out door area where residents and hotel guests came to eat and drink and watch the city. The area was littered with glass enclosures with soft bedding for comfort. The design incorporated concealing the large ducts from the waste pipes of the units.

Below: Basic Isometric views of the Revit model. Each unit was linked into the central file for ease of use.

Below Left Marcus Neustetter ‘ telescope’ done for Jonathan Liebermann and Enrico Daffonchio.

Below: Renders done for developer and client presentation; the communal roof space including the telescope cage. work _

2009 _ Daffonchio & Associate Architects

Revit and photoshop perspectives


ARCHITECTURAL EDUCATION

Master Class “ on the edge” Durban April 2011

Myself and three other students embarked on a journey to Durban for a four day workshop from 14 to 17 April 2011. After visiting Warwick Junction, Durban City by Richard Dobson Architect, we returned to a beach front studio where we conceptualized and then proposed ideas relating to “edges”. The paradox with which we were presented, was that between a pristine beach front and Warwick Junction. Similar to Kwa Mai Mai cultural market in Johannesburg, this space allows traders to sell traditional healing and medical goods as well as merchandise to people passing through an urban link. This intervention was designed around the economies and dynamics of informality. (Knipe 2008:88). The success of Warwick Junction lies in that trade capitalizes upon peoples’ routes. This opens new opportunities for proposed programmed spaces. Boys playing pool, people shopping, traders awaiting transport all at close proximity to a main arterials underlines the importance of activities at the “edge”. This edge provides promise for activities to be fulfilled owing to the nature of one’s everyday journey.

Parametric Master Class Johannesburg July 2011

From 8 to 17 July I participated in a digital constructions, parametric modelling design workshop. Although not directly related to my thesis topic which was underway, it did allow my current trajectory to widen. After a two day crash computer course in Rhinoceros its plug-in Grasshopper we were to use our newly acquired skills to design low-income housing which would be affected by changing parameters. Grasshoper allows one too change any aspect of the design so to better suite the user. ie weather conditions, sun angles, roof overhang lengths, all to aid and speed up design process. What was of interest was how modular units (in this case social housing enclosures) fit together and how the parametric variables of each could be manipulated according to the proximity of clustering and weather conditions. Similar to containers and their ability to fit together and lock into place, myself and 6 others designed a unit which was driven by the notion of clustering. Shack housing in informal settlements congests to extremities owing to space shortages. Regarding space efficiency, we designed each unit the target that four units could back into each other creating a group. This also allows for a privacy threshold as well as demarcated circulation routes when laid out linearly.


ARCHITECTURAL EDUCATION


ARCHITECTURAL EDUCATION

The Foreign Office BAS Honours design Studio 2010

Foreign people, living in Yeoville, and particularly their stories as asylum seekers, is a base point to which my design was central. Rockey/Raleigh Street is alive with trade, communication and emotional tensions experienced by refugees. Instead of a destitute xenophobic suffering community, a strength and specificity lies prevalent in the way foreigners in Yeoville live their lives. Their technological abilities and methods allowing communication with families back home riffles any computer corporate. The initial reason of interest was in the architectural manner in which they used their space. Rockey/ Raleigh street is layered with a language difficult to comprehend initially. When one goes beyond the prelude, a new sediment of space transpires. The courtyard, the ally, the services, the void. These spaces are manifest through necessity rather than through a cut-copy projected colonial or perhaps “contemporary” structure This necessity is from where a certain language arises. The built environment suddenly becomes a space constructed from reason instead of ideal. Cutting through Rockey Street at various points, and drawing from the section, the spaces behind the street front emerge as the ‘belly’, a defensive space, away from street tensions, roaming police and vehicular traffic. The possibility lies in that what if this defensive space were to cater for these very anxieties and hardships felt by a foreigner. What if this space was as architecturally advanced as modern day technology proves to be? ‘Sugar bags’ are cheap bags which street vendors use to transport goods. After photographing sugar bags, they became the compartment from which a temporary nomadic tent structure would expand, providing a secure structure out of which people would operate. Entrepreneurs could also use such a space, constructing it from anywhere, into any void space. This intervention sees the meeting of hi-technology and low materiality, providing a defensive place, flexible in size but specific in programme.


Kate Keightley-Smith mobile: (+44) 7516138236 -UK Address: Flat 1, 16 Ainger Rd Primrose Hill NW3 3AS London, UK email: katiesksmith@gmail.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.