1 minute read
introduction & framework....7
Chapters executive summary...............5 long range vision..................6 1: introduction & framework....7 2: planned land uses.................11 3: housing element...................19 4: circulation element...............27
List of Figures
Advertisement
Figure 1.1- Regional Location Figure 2.1- 2017 Existing Land Use Figure 2.2- 2035 Planned Land Use Figure 2.3- Land Use Implementation Diagram Figure 3.1- 2035 Planned Housing
8 13 14 18 22
Figure 3.2- Housing Implementation Diagram
26
Figure 4.1- 2035 Roadway Classification in Kearny Mesa 29 Figure 4.2 - 2035 Planned Rail Transit in Kearny Mesa 32 Figure 4.3 - Mobility Hub Elements 33 Figure 4.4 - 2035 Planned Bus Transit in Kearny Mesa 34 Figure 4.5- 2035 Planned Bicycle Facilities in Kearny Mesa 36 Figure 4.6 - 2035 Planned Pedestrian Circulation in Kearny Mesa 38 Figure 4.7 - Active Street Frontage 39 Figure 4.8- Active Transit Implementation Diagram 41 Figure 4.9- Active Transit Implementation Elevations 42
List of Tables
Table 2.1- Land Use Distribution
13
Table 3.1- Housing Summary Statistics 21 Table 4.1-Existing Problem Roadway Segments in 2035 30 Table 4.2- Community Pedestrian Infrastructure Inventory 31
executive summary
long range vision
Kearny Mesa remains as San Diego’s central employment hub transitioning from a city of manufacturing to a city of new technology industry. To support this economic growth, Kearny Mesa aims to develop into a lively community with amenities that meet the needs of its diverse employment sector. Known for its diverse regional cuisine, the Convoy Business District in Kearny Mesa will experience reactivation of cultural identity. In an effort to support these businesses, Kearny Mesa will develop active transit districts and attractive urban design elements to enhance the user experience. Public plazas that are centrally located amongst businesses will be equipped with amenities such as seating and shade for an outdoor dining experience. Through the City of Villages strategy, Kearny Mesa intends to increase it’s residential capacity through the implementation of three new multipleuse villages and one new residential land use. Kearny Mesa’s circulation infrastructure will also be revitalized into multi-modalities. The reduced streetways will allocate space for active transit and vibrant street interface. Implementation of complete streets in Kearny Mesa allows for transportation diversity while reducing the city’s greenhouse gas emissions and improving air quality.
image source: RCH Studios