Creative Portfolio - Katrin Tenim

Page 1

CREATIVE PORTFOLIO

KATRIN TENIM
CONTENTS 1 4-5 6-7 8-9 10-13 INDUSTRIAL Altron Warehouse Secunda Warehouse LINQ Modular Facilities 5 20 21 22-23 City Parks 4 MIXED-USE 18-19 2 University Hill EDUCATIONAL 14-15 3 Park Central RESIDENTIAL 16-17 Project 58 7 HOTEL&LEISURE 36-41 Swaziland Parliament 8 PARLIAMENT 42-43 The Global Institute of Genetics 9 MASTER’S DISSERTATION 44-45 Other Projects 10 FURTHER WORKS 46 MODULAR 6 24-25 26-27 28-31 32-33 34-35 Data Experience Centre Expo 2020 UK Product Range Modular Manufacturing Modular Hotel Concept Altron Head Office Waterfall Estate The Edge 4 Sandown Valley Crescent COMMERCIAL
PARKING LEVEL 3 OFFICE PARK MAIN ENTRANCE GUARD HOUSE OFFICE PARK MAIN ENTRANCE STAFF VEHICULAR ENTRANCE PARKING LEVEL 2 LIFT LOBBY 20 PARKING LEVEL 3 OFFICE PARK MAIN ENTRANCE GUARD HOUSE OFFICE PARK MAIN ENTRANCE RAMP UP FROM P3 STAFF VEHICULAR ENTRANCE STORE STORE LIFT LOBBY LIFT LOBBY PARKING LEVEL 2 LIFT LOBBY LIFT LOBBY 20 OFFICE PARK MAIN ENTRANCE STORE GYM LIFT LOBBY LIFT LOBBY KITCHEN WAREHOUSE LOADING BAY DELIVER TRUCK ROUTE GUARD HOUSE VISITORS VEHICULAR ENTRANCE OFFICE PARK MAIN ENTRANCE GUARD HOUSE VISITORS VEHICULAR ENTRANCE DROP-OFF PHASE BUILDING PHASE BUILDING PHASE BUILDING PARKING PARKING LEVEL 1 PARKING GROUND FLOOR LIFT LOBBY 21 OFFICE PARK MAIN ENTRANCE STORE GYM LIFT LOBBY LIFT LOBBY KITCHEN WAREHOUSE LOADING BAY DELIVER TRUCK ROUTE GUARD HOUSE VISITORS VEHICULAR ENTRANCE OFFICE PARK MAIN ENTRANCE GUARD HOUSE VISITORS VEHICULAR ENTRANCE DROP-OFF PHASE 1 BUILDING PHASE BUILDING PHASE BUILDING 1 PARKING PARKING LEVEL 1 PARKING GROUND FLOOR LIFT LOBBY 21 COMMERCIAL

Emphasizing and optimizing triangular site this 43000m2 commercial campus offers a flexible floor plates in order to future-proof, allow flexible space-planning, and future sub-division opportunities. The impressive outside spaces with planted areas are used as pause areas, work spaces and facilities for the staff. These facilities include courtyards, outdoor hot desks and yoga facilities with xeriscaped planted areas.

5
ALTRON HEADOFFICE Commercial 43 000m 2 INVOLVEMENT Design Lead Tenant presentations Facade design Landscape Design PROGRESS

This 55 000 square meter proposed development locates itself in Waterfall Estate. With views directly from the N1 highway between Johannesburg and Pretoria. Conceptually entrances offer multi volume spaces between the office plates with boardrooms located on ground floor and cantilevering into the atrium. Connections both visually and physically allow the internal and external spaces to become one in the same the ground floor is to be set in the landscape. The building orientates predominantly North/South to minimize heat gain into the office plates.

Internally, abundant natural light reaches all parts of the floor plates maximizing comfort within the building. Skylight cones in the atrium filter natural refracted light into the central space. Central cores and atrium space allow for multiple tenant divisibility’s with bridges that link floor plates for future efficiency purpose.

7 WATERFALL ESTATE Commercial 55 000m 2 INVOLVEMENT Design Lead Costings Tenant presentations Landscape design TYPICAL FLOOR PLAN GROUND FLOOR PLAN
Ground Floor_Floor Plans Basement Entrance Lifts Reception Upper Ground Floor _Floor Plans Lifts Atrium Third Floor _Floor Plans Floor Plate Lifts Atrium Eighth Floor _Floor Plans Executive Floor Plan Floor Plate Lifts Atrium

Conceptually, the building is oriented around a publicly accessible plaza that promotes pedestrian engagement with public space. Planted balconies overlooking the plaza soften the space by connecting landscaping from the horizontal plane into the vertical. Walkways around all three sides of the building further promote street interaction. Boardrooms, cafés and gardens fill the ground floor, with strong visual connections and finishes uniting internal and external spaces.

9 THE EDGE Commercial Space INVOLVEMENT Concept development Interior Design
This proposed A-grade office development, offering 20,000m 2 of lettable area over 12 storey’s, is located on the gateway to the Sandton Summit Precinct, fronting directly onto Rivonia Road, Empire Place and Discovery Place.
PROGRESS
EXISTING
COMPLETE
11-- -----–SCALE: indicated Investec Property 1641-01 Sandown Valley Crescent Waterproofing Sandown Valley Crescent C560-02-A0 G 1586 1724------–Investec Property 1641-01 Sandown Valley Crescent Atrium Planters Sandown Valley Crescent C560-01-A0 560.001_Planter Section 560.001_Planter Section 560.001_Planter Section 560.001_Planter Section 560.001_Planter Section 560.001_Planter Section 560.001_Planter Section 560.001_Planter Section 560.001_Planter Section 560.001_Planter Section 560.001_Planter Section 560.001_Planter Section 560.001_Planter Section WATERPROOF TANKING TYPICAL DETAIL -560.001_Planter Section NOTE: FOR SOP'S AND DIMS FOR BRICKWORK PLANTERS REFER TO SHEET C560-02-A0
4 SANDOWN VALLEY CRESCENT Commercial Refurbishment 7 000m 2 INVOLVEMENT Design Lead Construction documentation PROGRESS
RENDERS
NEW LIFT SHAFT 1 2 3 4 5 6 7 8 9 10 B C D E F G H J K L A 11 5 6 G H B m² Lift Shaft 2500 SHAFT DEPTH 1800 Line of transfer beam on B1 soffit TBC by engineer 2800 1800 2800 POSITION STRUC. OF LIFT SHAFT TBC BY ENGINEER POSITION & STRUC. OF LIFT SHAFT TBC BY ENGINEER 7400 5000 BASEMENT 3 2hr fire rated Stainless steel emergency access lift doors to fire consultants spec. & architects approval. Brickwork walls and conc. struc. to engineers design and detail. 230 230 450 1360 450 450 1360 450 Door Opening Lift shaft recieve plaster & paint to interanl extanal faces 2hr fire rated brickwork be adiquatly sealed junctions to slabs columns. Brickwork to extend underside slab Sim Sim C501-02-A0 Sim C501-02-A0 900x400mm opening @ 750mm eight from FFL u/s opening as per installers request 5 6 G H B Line of transfer beam on B1 soffit TBC engineer 2800 1800 2800 1250 2500 1250 7400 BASEMENT POSITION & STRUC. OF LIFT SHAFT TBC BY ENGINEER POSITION STRUC. OF LIFT SHAFT TBC BY ENGINEER Brickwork walls and conc. struc. engineers design and detail. Lift shaft to receive 2x plaster paint to internal external faces 450 1360 450 230 2500 230 230 2500 230 450 1360 450 2hr fire rated brickwork to be adequately sealed junctions slabs columns. Brickwork extend to underside of slab Sim Sim C501-02-A0 Sim 1275 1225 5 6 7 F G H 7400 7400 Glass lift doors architects approval. Steel frame struc. engineers design and detail. Glass walls and steel frame struc. to comply with fire regulation fire. all joints, seals materials to fire consultants spec. Lift call button fixed pedistal to architects approval. Line transfer beam on B1 soffit TBC by engineer Line transfer beam on B1 soffit TBC by engineer 7400 7400 1250 2500 1250 POSITION OF LIFT SHAFT TBC BY ENGINEER POSITION OF LIFT SHAFT TBC BY ENGINEER 5000 5000 7500 700 700 1275 1225 00 Ground Floor 01 First Floor P1 Parking Level P2 Parking Level P3 Parking Level P4 Parking Level 1587200 G H B B 2635 460 2240 460 2240 265 2900 300 VISITORS LIFT SHAFT BASEMENT BASEMENT BASEMENT BASEMENT GROUND FLOOR LIFT PIT Glass lift doors to architects approval. Lift pit to suppliers spec engineers design and detail. 2hr fire rated Stainless steel emergency access lift doors to fire consultants spec. architects approval. Brickwork walls and conc. struc. engineers design and detail. Glass lift doors to architects approval. Glass walls and steel frame struc. engineers design and detail. Steel frame struc. to engineers design and detail. Glass walls and steel frame struc. to comply with fire regulation to fire. joints, seals materials to fire consultants spec. Glass walls and steel frame struc. to comply with fire regulation to fire. joints, seals materials to fire consultants spec. Steel frame struc. to engineers design and detail. Plastered Painted Lift shaft receive 2x plaster & paint internal external faces 2hr fire rated brickwork adequately sealed junctions slabs columns. Brickwork to extend underside slab Brickwork walls and conc. struc. engineers design and detail. Lift shaft receive 2x plaster & paint internal external faces 2hr fire rated brickwork adequately sealed junctions slabs columns. Brickwork to extend underside slab Brickwork walls and conc. struc. engineers design and detail. Lift shaft receive 2x plaster & paint internal external faces 2hr fire rated brickwork adequately sealed junctions slabs columns. Brickwork to extend underside slab Sim Sim Sim Sim Sim Sim Sim Sim Glass roof on steel frame struc. to engineers design and detail. 3260 2700 2650 2700 1450 75 1200 900 700 50 400 900x400mm opening @ 750mm eight from FFL u/s opening as per installers request 00 Ground Floor 01 First Floor P1 Parking Level P2 Parking Level P3 Parking Level P4 Parking Level 1587200 C501-01-A0 1200 200 2435 265 2435 265 2435 265 2900 300 VISITORS LIFT SHAFT BASEMENT 2 BASEMENT 3 BASEMENT 4 BASEMENT 1 GROUND FLOOR LIFT PIT Glass walls and steel fram struc. engineers design and detail. Glass walls and steel fram struc. engineers design and detail. Glass walls and steel frame struc. to comply with fire regulation to fire. joints, seals materials to fire consultants spec. Stainless steel architrave around glass lift doors to architects approval. Glass lift doors architects approval. 2hr fire rated Stainless steel emergency access lift doors fire consultants spec. architects approval. Brickwork walls and conc. struc. to engineers design and detail. Glass walls and steel frame struc. to comply with fire regulation to fire. joints, seals materials to fire consultants spec. Steel frame struc. engineers design and detail. Plastered Painted Lift shaft receive 2x plaster & paint internal external faces 2hr fire rated brickwork adequately sealed junctions slabs columns. Brickwork to extend underside slab Brickwork walls and conc. struc. to engineers design and detail. Lift shaft receive 2x plaster & paint internal external faces 2hr fire rated brickwork adequately sealed junctions slabs columns. Brickwork to extend underside slab Brickwork walls and conc. struc. to engineers design and detail. Lift shaft receive 2x plaster & paint internal external faces 2hr fire rated brickwork adequately sealed junctions slabs columns. Brickwork to extend underside slab Sim Sim Sim C501-02-A0 Sim D Sim Sim Lift pit suppliers spec engineers design and detail. Glass roof on steel frame struc. engineers design and detail. 60 196 75 NOTE: DIMENSION TO BE CONFIRMED BY SUPPLIER CONTROL PANEL LOCATION AS PER ARCHITECTS' INSTRUCTION ALL LIFT CAR FINISHES FIXTURES SUBJECT TO ARCHITECTS' APPROVAL & SELECTION ALLOW 32MM FLOOR RECESS AT ALL CARS, FOR CUSTOM FLOOR FINISHES TO ARCHITECTS' SPECIFICATION LIFT SHAFT LIFT CARFLOOR EXTENTS OVER No. OF FLOORS BOTTOM FLOOR TOP FLOOR VISITORSVISITORS 04 B4 Ground Floor P4 to Ground Floor VISITORS LIFT NOTES: -Two freestanding call buttons on pedestals architects approval on Ground floor and B4 -All exposed steelwork be painted to architect's specification including counterweights -All conduits to be cast into pit -Stainless steel fascia to all exposed floor slab edges, by supplier -Motor-roomless lift installation ( please confirm overrun dimensions) -Control panels to be mounted on internal lift stee beams. No control panels to be mounted on exterior glazed wall aces -All electrical wiring and equipment be conceale Lift car lands on floors: B4 & Ground, with emergency doors on B3 Note: Lift over run and any/all equipment to stay with in the max height limitation Note: Visitors lift to be a scenic/glass lift details to be finalized later Note: Mechanical & fire engineer to confirm glazing joint gap requirements required for ventilation and mechanical regulatory requirements. ELECTRICAL NOTES Electrical Engineer to confirm electrical requirements GENERAL NOTES Shop Drawings Required for approval by architect and any other levant consultant: 1. Shaft layouts. 2. Shaft entrance, sill, header, and door equipment layout, required. 3. Elevator Cab layout. 4. Signal Operating Fixture Details. Doors 1. 1000w 2200h opening preferred possible 2. Full-length splayed Architrave hairline stainless steel match door 3. Architrave to have 60mm return allow for nish. Car Finishes 1. 2400mm high car –to underside of ceiling 2. Floor Tiling –allow for 32mm recess 3. Digital position indicator all COPs 4. Hairline stainless steel COP 5. Lift buttons accordance with EN 81 6. Hairline stainless steel Cab Enclosure 7. Wall mounted stainless steel handrails Hall Data 1. Floor Marks: B4, B3, B2, B1, -TBC 2. LED/LCD Hall lantern and position indicators on B4 Ground TBC. Shafts provided 1. Shaft Dimensions 1800 2500mm 2. Headroom 4000mm from Ground floor FFL-TBC by supplier 3. 1400mm pit depth -TBC by supplier Other 1. Lift Control panel to be located on level B3 or in cabinet separated from the lift doors on the uppermost floor. Sub-contractor to confirm 2. All conduits to be concealed, no visible electrical wiring permitted 3. All exposed steel/counter weights be painted to architects spec 4. Pedestals be provided by lift suplier where ndicated. Note: All specifications and details to be confirmed by structural engineer and lift consultant 5 6 7 F G H 7400 7400 Lift Shaft 12 m² B4 Basement Lobby Glass lift doors architects approval. Steel frame struc. engineers design and detail. Glass walls and steel frame struc. comply with fire regulation fire. all joints, seals & materials to fire consultants spec. Lift call button fixed pedistal to architects approval. Line transfer beam on B1 soffit TBC by engineer Line transfer beam on B1 soffit TBC by engineer 7400 2800 1800 2800 1250 2500 1250 POSITION OF LIFT SHAFT TBC BY ENGINEER POSITION OF LIFT SHAFT TBC BY ENGINEER 2500 SHAFT DEPTH 1800 1225 1275 1 2 3 4 5 6 7 8 9 10 B B C C D D E E F G H J K L A A 11 ENCLOSED VISITORS LIFT B1&B2 1 2 3 4 5 6 7 8 9 10 B C D E F G H J K L A 11 ENCLOSED VISITORS LIFT WITH EMEGENCY DOOR B3 1 2 3 4 5 6 7 8 9 10 B C D E F G H I J K L A 11 GLASS ENCLOSED VISITORS LIFT & LOBBY FOR DRAWN BY: INFO TENDER CONSTRUCTION PROJECT DATE:1st Floor, 33 Fricker Road, Illovo Boulevard, Tel 11 482 3781, Fax 011 482 3784, info@paragon.co.za NOTES---COUNCIL This drawing the property of Paragon Architects PTY. LTD. and intended for the use only on site and for the proje to which relates. Copyright this drawing is owned by Paragon Architects PTY. LTD. All work is to be carried out in accordance with SANS 10400 and other relevant SANS Standards. This drawing not to be scaled. Figured dimension be used. All dimensions are in millimeters unless otherwise stated. All levels and dimensions to be checked on site by the contractor before work carried out and any discrepancies be reported to the Architect. The contractor shall in all aspects the works comply with the provisions of the Occupational Health and Safety Ac 1993 (Act No 85 of 1993) and any regulations promulgated in term that Act or the Factories Machinery and Building Works Act of 941. This drawing must be read conjunction with all he relevant drawings, schedules and specifications from the Architect and all other consultants related to the project. COPYRIGHT NOTICE Copyright © – Paragon Architects (Pty) Ltd Copyright subsists this drawing. The person or entity, whose name appears in the title block of this drawing, is hereby granted a nonexclusive license use, display, print, and/or reproduce this drawing the extent necessary to carry out and complete the project described in the title block of this drawing. This license respect of the copyright expressly limited as aforesaid and the person and/or entity referred to above shal not be entitled to grant sub-licenses respect the copyright his drawing to any other entity. This license confers no ownership rights in the copyright vesting in the drawing and this drawing and the copyright subsisting therein will, at all times, remain the property of Paragon Architects (Pty) Ltd Any unauthorized reproduction, publication, transmission, adaptation and/or inclusion this drawing in cinematograph film television broadcast an act of copyright infringement which will render the doer of the act liable for civil law copyright infringement and may in certain circumstances render the doer liable to criminal prosecution. Requests and enquiries concerning this drawing and the right subsisting therein should be addressed to the copyright owner. ACTS OF PARLIAMENT All Contractors shall ensure that, before any work put hand, they comply with all the necessary Acts of Parliament of the Republic of South Africa. A0-L C:\_KAT\4 sandown\190107_PA-1641-01_4 Sandown Valley Cres ent_LOCAL FILE.rvt 13/02/2020 09:30:14 PM SCALE: As indicated 4 13/02/2020 09:30:14 PM Investec Property 1641-01 Author 04/24/18 4 Sandown Valley Crescent Visitors Lift 4 Sandown Valley Crescent C501-01-A0A0 SCALE: 500 501.001_00 Ground Floor Ref Plan SCALE: 50 501.001_P3 Parking Level 3 Plan SCALE: 50 501.001_Typ. B1 & B2 Plan SCALE: 50 501.001_00 Ground Floor Plan SCALE: 50 501.001_Section A SCALE: 50 501.001_Section B SCALE: 501.001_Shuttle Lift 3D Cutaway SCALE: 501_Visitors Lift Notes SCALE: 50 501.001_P4 Parking Level 4 Plan REFER TO ENG. DRAWINGS FOR CONC. AND STEEL LAYOUTS & DETAILS AND ALL TO BE CONSTRUCTED APPROVED SHOP DRAWINGS ONLY. SCALE: 500 501.001_TYP. P1 & P2 Parking Level Ref Plan SCALE: 500 501.001_P3 Parking Level Ref Plan SCALE: 500 501.001_P4 Parking Level Ref Plan REVDATE DRAW DESCRIPTION A180511JBIssued for information B180516JBIssued for Tender C180531JBTender Progress D180628JBIssued for Information 1180820JBISSUED FOR CONSTRUCTION 2180821JBStructure revised per Eng. drawings 3180919JBLift power position as clouded 4181106JBBrick work opening as clouded

REFURB TO ABLUTIONS, NEW VISITORS LOBBY & NEW COFFEE BAR

13
1 2 3 4 5 6 7 8 9 10 B C D E F G H J K L A 11 5 6 7 F G H I A A 274 2338 2280 8086 2365 15343 16775 482 2914 3118 7029 1800 15343 1800 5047 3179 5639 1111 1410 855 2400 2400 50 50 50 2585 4325 2829 4800 50 2800 50 2829 2138 80 82 80 82 622 162 EXST. CEILING INSIDE LOBBY TO BE PATCHED AND PAINTED NEW FLUSH PLASTER CEILING LIGHT THROUGH SOFFIT TO BE SKIMMED AND PAINTED LIGHT COVE AS PER DETAIL RECESSED LED STRIP LIGHT RECESSED LED STRIP LIGHT BULKHEAD CEILING UPSTAND AS PER DETAIL RECESSED LED STRIP LIGHT RECESSED LED STRIP LIGHT RECESSED LED STRIP LIGHT RECESSED LED STRIP LIGHT BULKHEAD CEILING UPSTAND AS PER DETAIL BULKHEAD CEILING UPSTAND AS PER DETAIL BULKHEAD CEILING UPSTAND AS PER DETAIL BULKHEAD CEILING UPSTAND AS PER DETAIL 25mm SHADOWLINE TRIM AROUND ALL COLUMNS AS PER DETAIL 25mm SHADOWLINE TRIM AROUND ALL COLUMNS AS PER DETAIL 25mm SHADOWLINE TRIM AROUND ALL COLUMNS AS PER DETAIL 25mm SHADOWLINE TRIM AROUND ALL COLUMNS AS PER DETAIL EXST. VOID IN CONCRETE SLAB ABOVE EXST. VOID IN CONCRETE SLAB ABOVE EXST. VOID IN CONCRETE SLAB ABOVE 25mm SHADOWLINE TRIM AROUND ALL SHOPFRONTS AS PER DETAIL 25mm SHADOWLINE TRIM AROUND ALL COLUMNS AS PER DETAIL 25mm SHADOWLINE TRIM AROUND ALL COLUMNS AS PER DETAIL 25mm SHADOWLINE TRIM AROUND ALL SHOPFRONTS AS PER DETAIL 25mm SHADOWLINE TRIM AROUND ALL SHOPFRONTS AS PER DETAIL EXST. RC COLUMN EXST. RC COLUMN EXST. RC COLUMN EXST. RC COLUMN EXST. RC COLUMN EXST. RC COLUMN EXST. CEILING TO BE DEMOLISHED SOP SOP SOP SOP SOP SOP SOP SOP SOP SOP R 1 R3600 R100 R 600 3600 3204 517 2797 2265 1343 478 2473 431 2013 1105 1369 734 1369 2534 1038 2534 169 2344 1622 851 1929 2228 4169 4029 1626 971 131 2800 1352 1034 1034 PORTION OF EXST. CEILING TO REMAIN & TO BE PATCHED AND PAINTED 17800 1500 1500 300 300 POSITION OF EXST. SERVICES LIGHTS TBC ON SITE C900-001-A0 C900-001-A0 C900-001-A0 C900-001-A0 C900-001-A0 14 1 23 4600 3 00 1352 13 2 399 400 3 4 5 6 7 8 9 C D E F G H J K P3 Parking Level P4 Parking Level 1587200 5 6 7 A A EXST. RC SLAB Lobby glazing by others New suspended flush plaster ceiling. New suspended flush plaster ceiling. New suspended flush plaster ceiling with light trough @ lift doors. Soffit to be skimmed and painted Lobby glazing by others 235 160 75 160 75 2200 C900-001-A0 C900-001-A0 235 P3 Parking Level P4 Parking Level F G H 235 2200 75 160 EXST. RC SLAB Lobby glazing by others New suspended flush plaster ceiling. New suspended flush plaster ceiling. New suspended flush plaster ceiling with light trough @ lift doors. Soffit to be skimmed and painted B 02 Second Floor 03 Third Floor K D D 2265 EXST. CEILING TO BE PATCHED AND PAINTED RECESSED LED STRIP LIGHT BULKHEAD AND LIGHT COVE AS PER DETAIL EXST. BULKHEAD TO BE DEMOLISHED 25mm SHADOWLINE TRIM @ BULK HEAD AND WALL AS PER DETAIL 02 Second Floor 03 Third Floor C C EXST. CEILING TO BE PATCHED AND PAINTED BULKHEAD AND LIGHT COVE AS PER DETAIL EXST. BULKHEAD TO BE DEMOLISHED 2265 100 200 02 Second Floor 1606455 03 Third Floor F F EXST. CEILING TO BE PATCHED AND PAINTED RECESSED LED STRIP LIGHT BULKHEAD AND LIGHT COVE AS PER DETAIL EXST. BULKHEAD TO BE DEMOLISHED 25mm SHADOWLINE TRIM @ BULK HEAD AND WALL AS PER DETAIL 2265 100 200 2565 02 Second Floor 1606455 03 Third Floor K E E EXST. CEILING TO BE PATCHED AND PAINTED BULKHEAD AND LIGHT COVE AS PER DETAIL EXST. BULKHEAD TO BE DEMOLISHED 200 100 2265 2565 C900-001-A0 5 6 7 J K C C150-01-A0 C D E F F C150-01-A0 EXST. CEILING TO BE PATCHED AND PAINTED EXST. CEILING TO BE PATCHED AND PAINTED EXST. CEILING TO BE PATCHED AND PAINTED EXST. CEILING TO BE PATCHED AND PAINTED EXST. CEILING TO BE PATCHED AND PAINTED RECESSED LED STRIP LIGHT BULKHEAD AND LIGHT COVE AS PER DETAIL EXST. CEILING TO BE PATCHED AND PAINTED EXST. BULKHEAD TO BE DEMOLISHED 1057 2800 2200 2800 475 25mm SHADOWLINE TRIM @ BULK HEAD AND WALL AS PER DETAIL EXST. LIGHTS TO BE REPLACED WITH LED DOWNLIGHTS EXST. LIGHTS TO BE REPLACED WITH LED DOWNLIGHTS EXST. LIGHTS TO BE REPLACED WITH LED DOWNLIGHTS EXST. LIGHTS TO BE REPLACED WITH LED DOWNLIGHTS EXST. LIGHTS TO BE REPLACED WITH LED DOWNLIGHTS 500 EXST. BULKHEAD TO BE DEMOLISHED 2000 50 575 1494 2600 1006 RECESSED LED STRIP LIGHT BULKHEAD AND LIGHT COVE AS PER DETAIL 25mm SHADOWLINE TRIM @ BULK HEAD AND WALL AS PER DETAIL EXST. CEILING TO JOIN WITH NEW. LEVEL AND FINISEHS TO MATCH EXST. CEILING TO JOIN WITH NEW. LEVEL AND FINISEHS TO MATCH EXST. LIGHTS TO BE REPLACED WITH LED DOWNLIGHTS 75 Note: All light fitting positions and quantities be confirmed on site. Samples mock-up provided ceiling types approval. Heights taken from finished floor level on access floor All ceiling tees and shadowline perimeter trims be prepainted site. Ceiling paint adhere the following GreenSta -Interior semi gloss / interior low sheen / interio flat washable maximum TVOC 16g/l -Interior flat maximum TVOC 14g/l -Trim -gloss (enamel), semi gloss, saton maximum OC 75g/l -Interior latex undercoat / interior sealer maximum 65g/l Final placement, specification and amounts ceiling fittings to confirmed by applicable consultants. Cut outs for light fittings be electric engineers details. SETTING OUT TO BE CONFIRMED WITH ARCHITECT PRIOR TO LAYING AND FIXING CEILING BOARDS. PAINTING OF ALL FINISHED SLAB EDGES TO BE NO SHADOWLINES, CEILINGS OR PART THERE OF, TO WAY Refer relevant consultants drawings description specification 2nd items. CEILING KEY CEILING TYPES TYPE FLUSH PLASTERED GYPSUM CEILING Gypsum flush plastered ceiling 9.5mm thick with ered edge, screwed screw up ceiling with drywall screws spaced 150m centers, with main res. All suspended with 25 25mm galvanised angles and not exceeding 1200mm centers fixed centers. Joints covered with tape xed over joints (double over butt joints) then plastered with 6mm thick skim-plaster and skim applied manufacturer’s instructions. Final inish paint as per finishing schedule. To heights shown on RCP SOFFIT FINISH PLASTERED, SKIMMED AND PAINTED SOFFIT slab soffit and edge plastered, skimmed and pain per finishing schedule, extent as shown. CEILING TRIMS FLUSH PLASTERED, GYPSUM CEILING SHADOWLINE Sigma plaster trim satin black epoxy-coated aluminium shadowline imilar approved by Architect. FLUSH PLASTERED, GYPSUM FLEXIBLE CEILING TRIM Capco Trim-tex archway 90° bead external 35mm Capco Trim-tex archway 90° bead inside 25mm. Installed per manufacturer similar approved Architect. FLUSH PLASTERED, GYPSUM CEILING EXP. JOINT Capco Trim-tex white PVC expansion joint trim fixed manufacturer's instructions. Or similar approved by Architect. As per 900 _CEILING DETAIL SHEET CONTRACTOR CONFIRM AND ALLOW FOR, EXPANSION JOINT REQUIREMENTS, FOR TENDERING AND INSTALLA PURPOSES. FLUSH PLASTERED, GYPSUM CEILING SHADOWLINE LIGHT TROUGH Sigma plaster trim 20mm (wide) satin white epoxy ated aluminium shadowline cornice with 25mm anchors 450mm centres. Installation per specification provided detail drawings. similar approved by Architect. FLUSH PLASTERED, GYPSUM NON FLEXIBLE CEILING TRIM Capco Trim-tex rigid corner bead 90° external 35mm Capco Trim-tex corner bead 90° inside 25mm. Installed per manufacturer similar approved Architect. REFER TO DRAWING 900_CEILING DETAILS F-PLASTERED CEILING FASCIA -PLASTERBOARD UPSTAND AT LIGHT COVES Capco Trim-tex rigid corner beads Capco Trim-tex chway 90° bead. As per layouts details. Installed as per manufacturers approved Architect. TYPE FLUSH PLASTERED PERFORATED GYPSUM CEILING 50mm Thick glasswool acoustic insulation (47.5 kg/m³ fixed soffit extent slab above Pod/Soffit cladding with LED STRIP LIGHT COVE LED STRIP LIGHT DIFFUSER FLUSH PLASTERED, GYPSUM CEILING SHADOWLINE Sigma plaster trim 25mm black epoxy coated aluminium shadowline Architect. LIGHTING SCHEDULE LIGHT FITTINGS LINEAR STRIP LIGHTS: LIGHT FRAME 55 RECESSED -WHITE CODE: PL/LF55 COLOUR:4000K SUPPLIER: PROVINCE LIGHTING TBC LED COVE LIGHTS: LIGHT FRAME -WHITE CODE: PL/LF5/700LM COLOUR: 4000K SUPPLIER: PROVINCE LIGHTING TBC ABLUTION DOWNLIGHTS: CODE: EN-PL12B/40 COLOUR: 4000K SUPPLIER: APEX TO CONFIRM LOCATION: 2ND FLR FEMALE MALE ABLUTIONS QUANTITY: 22 LOCATION: B4 LOBBY 2ND FLR FEMALE MALE ABLUTIONS QUANTITY: 10m TBC LOCATION: LOBBY & 2ND FLR FEMALE MALE ABLUTIONS QUANTITY: 25m COFFEE BAR PENDANT LIGHTS: MYRA CODE: 8567.5.30 COLOUR: BLACK SUPPLIER: QS TO CONFIRM LOCATION: GF COFFEE BAR CANOPY QUANTITY: NOTE: ALL QUANTITIES TBC BY QS 3 4 5 6 7 8 9 C D E F G H I J K D E 812 EQ EQ EQ EQ 346 1200 1200 1200 1 2 0 0 5 6 9 1384 EQ EQ E Q EQ EQ G G U/S LIGHT 750mm FROM U/S TIMBER CANOPY SLATS U/S LIGHT 950mm FROM U/S TIMBER CANOPY SLATS U/S LIGHT 550mm FROM U/S TIMBER CANOPY SLATS U/S LIGHT 750mm FROM U/S TIMBER CANOPY SLATS U/S LIGHT 550mm FROM U/S TIMBER CANOPY SLATS U/S LIGHT 750mm FROM U/S TIMBER CANOPY SLATS U/S LIGHT 550mm FROM U/S TIMBER CANOPY SLATS U/S LIGHT 950mm FROM U/S TIMBER CANOPY SLATS 00 Ground Floor 750 950 550 750 550 750 950 FOR DRAWN BY: INFO TENDER CONSTRUCTION PROJECT DATE:1st Floor, Fricker Road, Illovo Boulevard, Tel 11 482 3781, Fax 011 482 3784, info@paragon.co.za NOTES---COUNCIL This drawing is the property Paragon Architects PTY. LTD. and is intended for the use only on site and for the project which relates. Copyright in this drawing owned by Paragon Architects PTY. LTD. All work to be carried out in accordance with SANS 10400 and other relevant SANS Standards. This drawing is not to be scaled. Figured dimension to be used. All dimensions are in millimeters unless otherwise stated. All levels and dimensions be checked on site by the contractor before work is carried out and any discrepancies to be reported to the Architect. The contractor shall in all aspects of the works comply with the provisions of the Occupational Health and Safety Act, 1993 (Act No 85 of 1993) and any regulations promulgated in term of that Act or the Factories Machinery and Building Works Act of 1941. This drawing must be read in conjunction with all he relevant drawings, schedules and specifications from the Architect and all other consultants related to the project. COPYRIGHT NOTICE Copyright – Paragon Architects (Pty) Ltd Copyright subsists in this drawing. The person or ntity, whose name appears the title block of this drawing, is hereby granted nonexclusive license to use, display, print, and/or reproduce this drawing to the extent necessary carry out and complete the project described in the title block of this drawing. This license in respect of the copyright is expressly limited as aforesaid and the person and/or entity referred above shal not be entitled grant sub-licenses in respect of the copyright his drawing to any other entity. This license confers no ownership rights in the copyright vesting the drawing and this drawing and the copyright subsisting therein will, at all times, remain the property of Paragon Architects (Pty) Ltd Any unauthorized reproduction, publication, transmission, adaptation and/or inclusion of this drawing cinematograph film television broadcast is an act of copyright infringement which will render the doer of the act liable for civil law copyright infringement and may certain circumstances render the doer liable criminal prosecution. Requests and enquiries concerning this drawing and the right subsisting therein should be addressed to the copyright owner. ACTS OF PARLIAMENT All Contractors shall ensure that, before any work put in hand, they comply with all the necessary Acts Parliament of the Republic of South Africa. A0C:\_KAT\4 sandown\190107_PA-1641-01_4 Sandown Valley Cres ent_LOCAL FILE.rvt 13/02/2020 09:31:54 PM SCALE: As indicated 5 13/02/2020 09:31:54 PM Investec Property 1641-01 JB 05/25/18 4 Sandown Valley Crescent Ceilings 4 Sandown Valley Crescent C150-01-A0 SCALE: 500 150.001.P4 Parking Level Ceiling Reference Plan SCALE: 50 150.001_P4 Parking Level Celing Plan SCALE: 500 150.001.Upper Level Ceilings Reference Plan SCALE: 50 150.001_Section SCALE: 50 150.001_Section SCALE: 50 150.001_Section C SCALE: 50 150.001_Section SCALE: 50 150.001_Section E SCALE: 50 150.001_Section SCALE: 50 150.001.02 Second Floor Ceiling Plan REVDATE DRAW N DESCRIPTION A180531JBIssued for Tender 1180820JBISSUED FOR CONSTRUCTION 2180903JBCeilings revised as clouded 3180921JBLights revised as clouded 4181017JBAdditional information as clouded 5190128JBRevised as clouded SCALE: 500 150.001_00 Ground Floor Coffee Bar Canopy Reference Plan LIGHTING SCHEDULE AWAITNG APPROVAL SCALE: 25 150.001_00 Ground Floor_Coffee Bar Canopy Lights Layout SCALE: 50 150.001_Section G 4 SANDOWN VALLEY CRESCENT | CONTINUED
Level Level 2
127
RENDER
RENDER
EDUCATIONAL
BIRDS EYE VIEW
120
15 BUILDING COMPOSITION BUILDING COMPOSITION UNIVERSITY HILL Educational 47 000m 2 Second in-charge Space-planning RESI UNIT MATRIX 74 RESI UNIT MATRIX 74 SPORTS courtyard PERFORMANCE courtyard SOCIAL courtyard SPINE TO BRIDGE & SPORTS CAMPUS TO MAIN CAMPUS QUIET courtyard Adaptable learning spaces & structural grid Social spaces/ alternative lecture rooms Study spaces Individual Study pods SPINE THE CAMPUS ADMIN BUILDING LECTURE BUILDINGS RESIDENTIAL BUILDINGS PROGRESS

Programmatic Diagram

AXONOMETRIC OF BUILDING ZONING

APARTMENT CONFIGURATION CONCEPT

EXECUTIVE FLOOR 4TH TO 12TH FLOOR GROUND TO 3RD FLOOR PARKADE COMMUNAL AREAS
RESIDENTIAL
tudy for the sky Gardens
APARTMENT - UNIT 3.3 GARDEN APARTMENT - UNIT 3.3

Park Central Apartments is a high end residential development, offering a wide range of apartment types. The building is located on a site vacated previously six-storey Sasol building situated next to the Rosebank Library Park, within walking distance of the Gautrain Rosebank Station. The apartments have stunning views of the city, and boldly shaped sky gardens will provide some added green space to the urban environment.

Using the concept developed by Le Corbusier in the 1950s, one public internal passage will service three residential floors, with apartments spread over two floors to create a sense of space and light.

17 PARK CENTRAL APARTMENTS Residential INVOLVEMENT Concept development Facade design Unit design
PROGRESS
BUILDING PRINCIPLES STRUCTURE EXISTING CANOPY ZONING VISION GREEN SPACES COMMUNAL SPACES FIRE ESCAPE STAIRS MIXED-USE

This design competition located in the heart of Cape Town’s City Centre across an open park, demonstrates the design considerations of a mixed-use scheme. Between sloping city blocks all lower levels engaged with street interfaces and draw inspiration from local practices namely the ‘stoep’ found in and around the ‘Bo-Kaap’ area, retail areas with individual entrances off all four streets are sheltered by a canopy. The facade fragments through the Centre of the tower opening itself up to a green landscaped belt through the building. Above the retail zone we maintained the existing parking floors and proposed ways for these to have counter-cyclical uses. 8000 square meters of office space with a central atrium provides advantages divisibility options allowing single tenancy or multiple tenancy options.

The residential component of this proposal consisted of two typologies; ‘The Courtyard’ consisting of single level apartments ranging from 45-90 square meters. These apartments offer both a ‘stoep’ condition and a central landscaped courtyard with a range of amenities. The ‘Tower’ typology consisting of double-level apartments with double volume spaces facing both North and South frame views onto Table Mountain as well as the ocean.

Amenity floors offer gyms, walkways, gourmet kitchens, braai areas and many more lifestyle facilities. On the upper-most level a sky-bar with 360deg views of Cape Town offers viewing decks over the entire city.

19
CITY PARKS Mixed-use competition 43 000m 2 INVOLVEMENT Complete design competition Presentation Costings PROGRESS

A design proposal for a 30 000m2

This revised proposal looked to value-engineer the facades in order to achieve a lower rental rate for the tenant yet still achieve a favorable yield.

SITE PLAN ALTRON WAREHOUSE Industrial 30 000m 2 INVOLVEMENT Design Lead Tenant presentations Facade design Costings INDUSTRIAL HIGHWAY VIEW HIGHWAY VIEW
distribution warehouse located in Midrand, along th N1 highway between Johannesburg and Pretoria. The design brief was to create a statement along the primary highway connecting two major nodes and become a billboard for the company.
21 SNC LAVALIN | SECUNDA JUNE 2017 OFFICES TRAINING WORKSHOP CANTEEN WORKSHOP LAYDOWN AREA LAYDOWN AREA ASSETS + LAYDOWN AREA ROLL-UP DOORS ROLL-UP DOORS ROLL-UP DOORS ROLL-UP DOORS WORKSHOP WORKSHOP TRAINING ASSESSMENT OUTDOOR DECK COVERED WALKWAY COVERED WALKWAY OUTDOOR DECK GARDENS ENTRANCE GARDENS STAFF PARKING ADDITIONAL PARKING OFFICE CHANGEROOMS AND ABLUTIONS CHANGEROOMS AND ABLUTIONS SNC LAVALIN | SECUNDA JUNE 2017 10 Kgroup SECTION A-A SNC LAVALIN | SECUNDA JUNE 2017 11 Kgroup SECTION B-B CROSS SECTION GROUND FLOOR PLAN LONGITUDINAL SECTION SECUNDA WAREHOUSE Industrial 30 000m 2 INVOLVEMENT Design Lead Costings Tenant presentations Facade design
INDUSTRIAL
23
LINQ FACILITIES Commercial & Industrial 31 000m 2 INVOLVEMENT Design Lead (Schematic - Handover)
Modular manufacturing facility refurbishment, over a plot of 31 000m2 Facilities include three steel portal framed buildings together with its Main Office building as well as production offices.
Coordinator

Pre-fabricated liquid immersion solution experience centre for ALEC Data Centre Solutions. Conversion of a ISO accredited shipping container into an experience centre showcasing state of the art technology. The experience centre is designed to be a temporary building that can be moved with simple craneage methods as required.

DATA
MODULAR
CENTRES
25 EXPERIENCE CENTRE 30m 2 INVOLVEMENT Design Lead & Coordinator Entrance ElectricalRmCoffeeStationMeetingTableSmartPodEntrance Hardscaping can be added to connect LINQ Outdoor Entertainment Area Entrance Electrical Rm Coffee Station Meeting Table Smart Pod Entrance LINQ Outdoor Entertainment Area

The ICD Pavilion, which hosted the LINQ Modular House, is an impressive display of design innovation that features an array of configurations using 8 modules. It is manufactured off-site under strict quality control measures, exhibiting state-of-theart construction methods with unparalleled build quality and a wide range of finishes and layouts. Notably, this remarkable pavilion was achieved through a collaboration between LW Designs and LINQ Modular

MODULAR Living Room Vinyl Floor WC Tiles Kitchen/Dining Vinyl Floor 1234567 Master Bedroom Vinyl Floor En-suite Vinyl Bathroom Tiles Corridor Vinyl Floor Bedroom 2 Vinyl Floor Bedroom Vinyl Floor Boiler Geyser Cabinet BIC BIC BIC 345678910111213141516 Ground Storey -Three Bedroom House SCALE: 1 50 First Storey -Three Bedroom House Kitchen/Dining/Living Vinyl Floor Bedroom Vinyl Floor Bathroom Vinyl DRESSING TABLE BIC SHWR KITCHEN FR SCALE: 1 50 One Bedroom Apartment Bathroom Vinyl Floor Studio Apartment Vinyl Floor SHWR KITCHEN BIC SCALE: 1 50 Studio Apartment Plan 27m 2 42m 2 108m 2 Three Bedroom Home One Bedroom Apartment Studio Apartment
27 ICD EXPO 2020 PAVILION Modular Residential 215m 2 INVOLVEMENT Design Lead & Coordinator

Fully UK NDSS compliant product range of Homes & Apartments designed with maximum manufacturing efficiencies to follow DFMA principles with considerations of all logistics and installation requirements. The product range allows multiple modules to be used across unit types for maximum repeatability and reduced wastage. Products have a variety of finishes and performance selections to offer.

MODULAR PRODUCT RANGE - UK
Ground Floor First Floor Performance Specification Finish Specification Baseline • • Silver • • Gold • •
2B4P 83m² Ground Floor First Floor Performance Specification Finish Specification Baseline • • Silver • • Gold • •
UK HOMES .
UK HOMES .
29 MODULAR PRODUCT RANGE HOUSES
Lead Ground Floor . First Floor . Second Floor . 2B4P 83m² 3B4P 87m² 3B5P 97m² 3B5P 101m² 3B6P 127m² 4B7P 127m² 5B7P 127m²
INVOLVEMENT Design

Fully UK NDSS compliant product range of Homes & Apartments designed with maximum manufacturing efficiencies to follow DFMA principles with considerations of all logistics and installation requirements. The product range allows multiple modules to be used across unit types for maximum repeatability and reduced wastage. Products have a variety of finishes and performance selections to offer.

MODULAR PRODUCT RANGE - UK UK
. Performance Specification Finish Specification Baseline • • Silver • • Gold • • Studio 38m2 1B2P 50m2 UK
. Performance Specification Finish Specification Baseline • • Silver • • Gold • • Studio 38m2 1B2P 50m2 2B4P TYPE 1 75m2 2B4P TYPE 2 75m2
APARTMENTS
APARTMENTS
31
PRODUCT RANGE APARTMENTS
MODULAR
INVOLVEMENT Design Lead
2B4P TYPE 1 75m2 2B4P TYPE 2 75m2 3B6P TYPE 1 100m2 3B6P TYPE 2 100m2

MODULAR MANUFACTURING

3D Revit models prepared with high level of accuracy to ensure all parts are included for the manufacturing process to complete works in minimum amount of days.
33 UK SHOW HOME 112m 2 INVOLVEMENT Design Lead MEP Team Lead Coordinator 3150 Pr_25_71_97_86 WBP ply board Floor Finish TBD Pr_25_71_97_86 WBP ply board Pr_25_71_97_86 WBP ply board Pr_25_71_57_60 Double layer Fire board Pr_20_76_71_81 Shadow gap trim Pr_25_71_57_60 Acoustic plasterboard suspended ceiling Pr_25_71_57_60 Fire sealant Temporary Waterproofing membrane Pr_25_57_10_94 Breather membrane Pr_25_57_65_60 EPDM lapped over by Breather Membrane UNIT UNIT Intumescent cavity Closer Pr_25_57_65_60 Vapour control layer to outer face of plasterboard Floor Finish TBD Pr_25_71_97_86 WBP ply board Pr_25_71_97_86 WBP ply board Pr_25_71_57_60 Double layer Fire board Pr_25_71_57_60 Acoustic plasterboard suspended ceiling Intumescent cavity Closer Temporary Waterproofing membrane Pr_25_71_97_86 WBP ply board Pr_25_71_57_60 Double layer Fire board Pr_25_57_65_60 Vapour control layer to outer face of plasterboard varies nearest track Pr_25_71_97_86 WBP ply board Floor Finish TBD Pr_25_71_97_86 WBP ply board Pr_25_71_97_86 WBP ply board Pr_25_71_57_60 Double layer Fire board Pr_20_76_71_81 Shadow gap trim Pr_25_71_57_60 Acoustic plasterboard suspended ceiling Pr_25_71_57_60 Fire sealant Temporary Waterproofing membrane Pr_25_57_10_94 Breather membrane Intumescent cavity Closer Pr_25_71_57_60 Double layer Fire board Pr_25_57_65_60 Vapour control layer to outer face of plasterboard UNIT CORRIDOR SHAFT Pr_25_71_97_86 WBP ply board -UNIT UNIT Ss_25_25_95_28 Sheathing board Pr_25_57_10_94 Breather membrane Pr_25_57_65_60 EPDM lapped over by Breather Membrane Intumescent cavity Closer Pr_25_57_65_60 Vapour control layer to outer face of plasterboard Pr_25_71_57_60 Double layer Fire board EXTERNAL SCALE: Typical Detail 01-External Module Wall SCALE: Typical Detail 02-Module to Module Internal Zip joint SCALE: Typical Detail 03-Shaft Wall FOR DRAWN BY: DATE:CHECKED BY: 2802 Marina Plaza, Dubai, UAE, P.O.Box 27639, Dubai UAE +971 429 0599--Conforms BS8888 All dimensions millimeters unless otherwise stated. All cut dimensions +-1mm unless otherwise stated. All assembly dimensions +-2mm unless otherwise stated. Do not scale drawings All work be carried out in accordance with Building Regulations 2010 for England and other relevant UK Standards COPYRIGHT NOTICE: This drawing property LINQ odular L.L.C. Copyright© -LINQ Modular L.L.C. NOTES LEGEND: C 1 5 @ R 2022-02-15 9:26:55 AM N 0 0 K LINQ System 6 m T a D - 0 y D RC 0 - NQ- Z- Z-DR- F- 0 C 1 REV DESCRIPTION DATEDRAWN SCALE: 1 Typical Detail 04 -Module to Module Plan UNIT CORRIDOR UNIT CORRIDOR Pr_25_71_97_86 WBP ply board Floor Finish TBD Pr_25_71_97_86 WBP ply board Pr_25_71_97_86 WBP ply board Pr_25_71_57_60 Double layer Fire board Pr_20_76_71_81 Shadow gap trim Pr_25_71_57_60 Acoustic plasterboard suspended ceiling Pr_25_71_57_60 Fire sealant Temporary Waterproofing membrane Pr_25_71_57_60 Double layer Fire board Insultated Gyplyner system or similar 12.5 25 15 100 Intumescent cavity Closer Pr_25_57_65_60 Vapour control layer to outer face of plasterboard UNIT CORRIDOR UNIT CORRIDOR Pr_20_76_71_81 Shadow gap trim Pr_25_71_97_86 WBP ply board Floor Finish TBD Pr_25_71_97_86 WBP ply board Pr_25_71_97_86 WBP ply board Pr_25_71_57_60 Double layer Fire board Pr_25_71_57_60 Acoustic plasterboard suspended ceiling Pr_25_71_57_60 Fire sealant Temporary Waterproofing membrane Intumescent cavity Closer Pr_25_57_65_60 Vapour control layer to outer face of plasterboard 15 100 12.5 12.5 100 15 LVL 3150 Pr_25_71_97_86 WBP ply board Floor Finish TBD Pr_25_71_97_86 WBP ply board Pr_25_71_97_86 WBP ply board Pr_25_71_57_60 Double layer Fire board Pr_20_76_71_81 Shadow gap trim Pr_25_71_57_60 Acoustic plasterboard suspended ceiling Pr_25_71_57_60 Fire sealant Temporary Waterproofing membrane Pr_25_57_10_94 Breather membrane UNIT UNIT Intumescent cavity Closer Pr_25_57_65_60 Vapour control layer to outer face of plasterboard UNIT CORRIDOR UNIT CORRIDOR Pr_25_71_97_86 WBP ply board Floor Finish TBD Pr_25_71_97_86 WBP ply board Pr_25_71_97_86 WBP ply board Pr_25_71_57_60 Double layer Fire board Pr_20_76_71_81 Shadow gap trim Pr_25_71_57_60 Acoustic plasterboard suspended ceiling Pr_25_71_57_60 Fire sealant Temporary Waterproofing membrane Intumescent cavity Closer Pr_25_71_57_60 Double layer Fire board 15 15 Pr_25_57_65_60 Vapour control layer to outer face of plasterboard SCALE: 1 Party wall -Module to Corridor 01 SCALE: 1 Party wall -Module to Corridor 03 SCALE: 1 Party wall -Module to Module SCALE: 1 Party wall -Module to Corridor 02 FOR PROJECT NUMBER DRAWN BY: DATE: SERIES - PAGE NO. CHECKED BY: 2802 Marina Plaza, Dubai, UAE, P.O.Box 27639, Dubai UAE +971 429 0599--All dimensions millimeters unless otherwise stated. All cut dimensions +-1mm unless otherwise stated. All assembly dimensions +-2mm unless otherwise stated. Do not scale drawings All work to be carried out in accordance with Building Regulations 2010 for England and other relevant UK Standards unless otherwise stated. COPYRIGHT NOTICE: This drawing property LINQ odular L.L.C. Copyright© -LINQ Modular L.L.C. NOTES LEGEND: C 5 @ R 2022-02-15 9:26:56 AM N 0 0 K LINQ System 6 m T a D - 0 y D RC 0 - NQ- Z- Z-DR- F- 0 C 1 REV DESCRIPTION DATEDRAWN Pr_25_71_97_86 WBP ply board Floor Finish TBD Pr_25_71_97_86 WBP ply board Pr_25_71_97_86 WBP ply board Pr_25_71_57_60 Double layer Fire board Pr_20_76_71_81 Shadow gap trim Pr_25_71_57_60 Acoustic plasterboard suspended ceiling Pr_25_71_57_60 Fire sealant Temporary Waterproofing membrane Pr_25_57_10_94 Breather membrane Pr_25_57_65_60 EPDM lapped over by Breather Membrane UNIT UNIT Intumescent cavity Closer Pr_25_57_65_60 Vapour control layer to outer face of plasterboard Facade Zone -UNIT UNIT Ss_25_25_95_28 Sheathing board Pr_25_57_10_94 Breather membrane Pr_25_57_65_60 EPDM lapped over by Breather Membrane Intumescent cavity Closer Pr_25_57_65_60 Vapour control layer to outer face of plasterboard Pr_25_71_57_60 Double layer Fire board EXTERNAL Facade Zone 200x100 RHS. Note: 100x100 SHS Used where possible. UNIT EXTERNAL Pr_25_71_97_86 WBP ply board Pr_25_71_57_60 Double layer Fire board Pr_25_71_57_60 Fire sealant Pr_25_57_10_94 Breather membrane Facade TBD Pr_25_57_65_60 Vapour control layer to outer face of plasterboard Precase Foundation Footing -Site Specific 50mm Blinding Layer 50mm Blinding Layer DPM Layer Precast Beam Cavity Tray Thermal Break Floor Finish TBD Facade Zone PROJECT NUMBER DRAWN BY: DATE: SERIES - PAGE NO. CHECKED BY: 2802 Marina Plaza, Dubai, UAE, P.O.Box 27639, Dubai UAE +971 429 0599 NOTE:--Conforms BS8888 dimensions millimeters unless otherwise stated. cut dimensions +-1mm unless otherwise stated. assembly dimensions +-2mm unless otherwise stated. not scale drawings work is be carried out accordance with Building Regulations 2010 for England and other relevant UK Standards unless otherwise stated. COPYRIGHT NOTICE: This drawing property LINQ M Copyright© -LINQ Modular L.L.C. NOTES LEGEND: SC L 5 @ R1 2022-02-18 10:14:36 AM L Q 0 0 LINQ System T p c M d e D a s y a D a A C0 0-LNQ- Z- Z- R-D -1 2 A REV DESCRIPTION DATEDRAWN R1Issued For Information 220215KT SCALE: 5 Typical Module Detail 01-External Module Wall SCALE: 5 Typical Module Detail 03 -Module to Module Plan SCALE: 5 Typical Module Detail 02 -Ground Connection Detail
MODULAR
200-Key Modular Hotel Design concept, developed in as a proof of concept proposal. This design showcases the potential of delivering a modular hotel solution without compromising on design aesthetics and flexibility.
35 MODULAR HOTEL CONCEPT INVOLVEMENT Architectural Design Module Design Facade design Landscape Design PROGRESS 9 11 10 Restaurant Lounge Pool Park Restaurant Gardens Pool Bar Conferencing Toilets Outdoor break away areas Ablutions Hoist Kitchen Bar AA - - - 1-BB CC DD EE FF GG -600 8 400 800 400 8 400 400 200 400 600 400 400 600 Double Volume SCALE: 100 00 Ground Storey Podium PODIUM LOOK & FEEL 9 11 10 146 m² Common 190 m² Useable 119 m² Useable Common FES m² Useable FES m² FES 39 600 400 400 400 400 400 400 400 000 800 000 m² Services 30 600 AA - - - 1-BB CC DD EE FF GG -SCALE: 1 100 Typical Floor CORRIDOR LOOK & FEEL GARDEN GARDEN 00 Ground Storey -4 Module Garden 00 Ground Storey -2 Module Garden 2 Module Garden Option 4 Module Garden Option TYPICAL FLOOR PLAN GROUND FLOOR PLAN

RESTAURANT

Farm-to-table Restaurant: 58 will host an organic restaurant with two very different dining experiences that sources only from local farmers as well as from the agro-ecological farm found on 58. The first, immerses the visitor in a dining experience amongst freshly grown produce which will be served at the restaurant. The second engages and demonstrates the preparation and storage of the produce and food as an important aspect of nourishment as a dining experience. An existing structure is converted into a very tactile and enlightening restaurant seating 75 diners which demonstrates best practices around nourishment, wellbeing and mindfulness.

HOTEL & LEISURE
RESTAURANT PLAN RESTAURANT ENTRANCE VIEW RESTAURANT AERIAL VIEW

Boutique Hotel: 35 premium rooms filled with serenity and thoughtfulness will offer private space to immerse in and make genuine connections. Engaging with three of the different yet connected biomes of the rich multilayered landscape, the hotel adapts itself to its environment and offers a unique experience within each microecology. These three experiences include: Building on the characteristics of the lush fault line the rooms situated in the Ravine allow for introspection and solitude. A series of rooms carefully positioned on a platform overlooking the dam connect and add to water and the energy to holds, the platform allows for possibilities of communal areas around a water-scape. The forest rooms are nestled between the indigenous trees of the cradle whilst allowing for a vantage point to view over 58 and the surrounding valley.

37 Dam Units Ravine Units Forest Units
PROJECT 58 Retreat / Hospitality 8 000m 2 Www. 58 .life INVOLVEMENT
Architect Complete design & layout Client Interface Local Authority submission PROGRESS
HOTEL Ravine Dam Forest
Project
CENTRE
HEALING
THE SOURCE 2. SCENT ROOM 3. THE WELL 4. ICE HOUSE 5. HOT ROOM 6. SAUNA 7. CHANTING HOUSE 8. FLOTATION 9. TREATMENT ROOM 10. EN-SUITE TREATMENT ROOM 11. OUTDOOR TREATMENT VIEWING DECK 12. TEA HOUSE 13. MEDICINAL GARDENS 14. THE SPACE GROUP HEALING 15. ENTRANCE 16. CHANGE ROOMS HEALING CENTRE PLAN 1. 2.
4. 5. 6. 9. 9. 9. 9. 10. 11. 12. 13. 14. 15. 16. 7. 8.
Healing through the sensual engagement 1.
3.
2.SCENT
3.THE
4.THE
5.THE
6.THE
7.CHANTING
8.FLOTATION
1.THE SOURCE ROOM WELL ICE HOUSE HOT ROOM SAUNA HOUSE TANKS

The Healing Centre aims to treat both those engaging with the space as well as the land where it is situated. Allowing for an individual journey as well as engaged treatment within the space, experiences are created to address all aspects of life, overall wellbeing and mindfulness. The space developed for guests to experience the benefits of water therapy and introspection. The use of monolithic forms with emphasis on light and shadow, allowance of views and restriction thereof, open and contained space, makes for a highly sensuous and therapeutic experience, allowing focus greater physical and emotional well-being to create overall balance.

The journey through the healing Centre entails exploration through a restorative landscape which connects everything; Individual treatment rooms, a Tea House, Flotation Therapy and a Chanting House are some of the treatments that can be experienced on the journey.

39
THE SAUNA
PROJECT 58 | CONTINUED
THE TEA HOUSE

Re-use of existing structures

RESIDENCY
AERIAL VIEW
AERIAL VIEW
RESIDENCY PLAN
41 PROJECT 58 | CONTINUED COMMUNAL COURTYARD ACCESS TO ROOF CANOPY COMMUNAL ENTERTAINMENT AREA PRIVATE GARDENS COMMUNAL ENTERTAINMENT AREA ENTRANCE VIEW

PARLIAMENT BUILDING

PARLIAMENT
Design Competition comprising of a Parliamentary wing, Government wing, Banqueting hall, VVIP residences as well as Royal residences.
43 SWAZILAND PARLIAMENT Parliament 96 000m 2 INVOLVEMENT Concept design Presentation Costings PROGRESS

THE GLOBAL INSTITUTE OF GENETICS

This project and research interests this year have been centered on the body in two distinct ways: the body as the site of human origins (genetics) and the body as the site of history (settlement). My Major Design Project is entitled The Global Institute of Genetics and it is located at the first point of known human occupation in Cape Verde, the island’s first inhabited city: Ribeira Grande, which is also the earliest known European settlement in the tropics.

The Institute is located at the intersection of a number of different conditions: between the river Ribeira Grande and the town of the same name; at a point where ocean meets land; Salt water and freshwater converge; the old dock/ quay where the first human genome appeared in the form of sailors who landed ashore.

Cape Verde is one of the world’s most diverse creole cultures. Its genetic makeup is said to be 52% European in the male line, and 48% African in the female line. I see the islands as a microcosm of an increasingly global situation; the growing genetic diversity of the human race. This project explores issues of identity, territory and hybridization in an architectural and landscape proposal, using the fields of biology, microbiology, genetics and material studies as its own base DNA. Understanding skin as another territory that holds an identity, history and culture within it rather than simply an envelope separating the body from environment.

Conceptual exploration of alternative facades and building materials is explored in this project, the future of construction as we know it is in flux and thus our thinking thereof needs to be adapting to the ever-changing built environment. Buildings as organisms and an extension of place is explored.

Full version of this thesis can be viewed in the link below: Https://ujcontent.uj.ac.za/vital/access/services/Download/uj:22863/

SOURCE1?view=true

180
MASTER’S WORK
45 MASTER’S WORKS THE GLOBAL INSTITUTE OF GENETICS
[Structure: Entry Chamber] [Material composition: Entry Chamber]

FURTHER PROJECTS

37 COMMERCE CRESCENT Https://paragon.co.za/content/commerce-crescent

39 COMMERCE CRESCENT In construction

110 OXFORD Https://paragon.co.za/content/110-oxford-road

1 PARK LANE Https://paragon.co.za/content/katherine-street-towers

MAIL katrintenim@gmail.com CONTACT +971 506987509

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.