SNM Hospital , Leh Ladakh A competition entry for concept design for upgradation of existing SNM hospital .

Worked on the exterior elevation , concept development of floor plans , HVAC mechanism .


Site Planning Orientation: The longer sides of the buildings face the North-South direction, allowing in optimum daylight. The floor-plate depths have been optimized to ensure 100% daylight in all regularly occupied spaces.

WEEKENDS: 00:00 - 24:00 Hrs POSITION:

80

%

60

80

40

60

20

40

0 %

PASSIVE SOLAR HEATING

20 Jan Feb Mar AprMayJun Jul AugSepOctNovDecYear 0 NATURAL VENTILATION

Jan Feb Mar AprMayJun Jul AugSepOctNovDecYear

80

%

60

Building Shadow

Comfort Percentages

NAME: Sundernagar LOCATION: INDSundernagar NAME: WEEKDAYS: 00:00 -IND 24:00 Hrs LOCATION: WEEKENDS: 00:00 - 24:00 Hrs WEEKDAYS: 00:00 - 24:00 Hrs POSITION:

PASSIVE SOLAR HEATING

Building Shadow

Comfort Percentages

Placement of blocks The buildings blocks are designed such that the south facing elevation does not get shade from the adjacent buildings and is compactly designed.

Building Shadow

%

Passive Solar Heating Using a combination of Passive Solar architectural features in the academic buildings, it is possible to achieve nearly 100% indoor thermal comfort and Passive Solar Heating in the winters, using well-designed windows` and shading devices, makes it possible to reduce heating demand by more than 80%

Landscape strategy Minimum cement based landscape. Water percolation techniques are to be employed in the landscape

NATURAL VENTILATION

Material strategies: Solar Passive Strategies: 80 40 Insulated walls & roofs along with high-performance Thermal Mass: Highly effective during the summer. 60 20 glazing, meeting ECBC standards, are proposed to Passive Solar heating: Effective during the winter 0 maintain the indoor thermal comfort conditions. 40 months. Jan Feb Mar AprMayJun Jul AugSepOctNovDecYear %

THERMAL MASS EFFECTS

Before

After

80

20

%

THERMAL MASS EFFECTS

Before 60 After

40

%

20

80

20

0

60

0

Jan Feb Mar AprMayJun Jul AugSepOctNovDecYear 40 Building with N-S orientation EXPOSED MASS + NIGHT-PURGE VENTILATION % Building without N-S orientation 20 60 40 20

0 XPSJan Insulation Feb Mar AprMayJun Jul AugSepOctNovDecYear

80

60

80

DIRECT EVAPORATIVE COOLING

0

40

DIRECT EVAPORATIVE COOLING % Wall 80 Insulation Adobe Walls 60

Jan Feb Mar AprMayJun Jul AugSepOctNovDecYear

40

%

INDIRECT EVAPORATIVE COOLING

80 60 Jan Feb Mar AprMayJun Jul AugSepOctNovDecYear

40 EXPOSED MASS + NIGHT-PURGE VENTILATION % 20

20

0

Jan Feb Mar AprMayJun Jul AugSepOctNovDecYear

Contours Planning The proposal takes care of minimum cut and fill of contours at site level by providing stilt like spaces for utilities and parking, reducing the risk of flash floods.

Architectural and Structural Planning – Site Planning %

INDIRECT EVAPORATIVE COOLING


Placement of building blocks as per solar incidence Deriving from the concept of local street. The building can be placed parallel. The Planning must ensure that the south façade of every building block remain exposed to the direct sunlight throughout the year. Hence the min. street width is not less that 7.6 m to achieve the desired planning.

Section through common court

Architectural and Structural Planning – Site Planning

19200

19500

Street- not less than 18m


South facing rooms

North facing corridor

N

Road Section Option 6 – Stilt + G +5 In this option, the configuration of the building is G+5 with stilt. The distance between the buildings is 33.5 m such that the shadow of the building does not shade the other building

33.5 m Entry/Eit

Existing block

Entry/Exit

Stilt parking

Facility for 250 beds Ground coverage- 1145 sqm Built-up area – 6870 sqm Area per bed- 27.5 sqm Car Parking (Basement)- 138 nos. (2 ECS/100 sqm)

Facilities for 250 beds

Site plan

Building Configuration- Option 6


South facing rooms

North facing corridor

33..5 m

Dec 21st at 2pm

N

Shadow

Road Section Option 6 – Stilt + G +5 with future expansion In this option, the configuration of the building is G+5 with stilt. The distance between the buildings is 33.5 m such that the shadow of the building does not shade the other building.

33.5 m Entry/Exit

33.5 m

Existing block

Entry/Exit

Stilt parking Ward for 250 beds

Entry/Exit

Site plan

Blocks for future expansion

Facility for 250 beds Ground coverage- 1145 sqm Built-up area – 6870 sqm Area per bed- 27.5 sqm Car Parking (Basement)- 138 nos. (2 ECS/100 sqm) Future expansion Ground coverage- 1200 sqm Built-up area – 7200 sqm Car Parking (Basement)- 144 nos. (2 ECS/100 sqm)

Building Configuration- Option 6


N

Stilt entry/exit

Stilt entry/exit

Legend Facilities for 250 beds Basement for car parking Core

Building Configuration- Option 6 (with future expansion)


N

Stilt entry/exit

Stilt entry/exit

Legend Facilities for 250 beds Stilt entry/exit

Future expansion Basement for car parking Core

Building Configuration- Option 6 (with future expansion)


Corridor

Ward

Lobby Toilet

Corridor

Ward

Core

Core

Doctor’s room

Utility area

Office

Core

Ward

Lobby

Ward

Toilet

Legend Circulation Toilet Core Office area Wards ( Total no. of beds per room =10)

Typical Floor Plan


S+G+5 structure Metal decking slab : Lesser concrete used, Speedy construction Tile Concrete Chicken mesh

Profile sheet decking

Steel section for column and beam

Steel sections Deck slab

Construction technology – Metal deck slab


Inside

Outside

200mm thk – Adobe bricks(Manufactured locally ) 150mm thk –XPS insulation

Shinshuk casted in R.C.C

200mm thk – Adobe bricks(Manufactured locally )

Openable DGU windows Thermal Blinds to prevent heat loss at night Trombe wall section to provide convected heat during night time Glass panel to trap solar heat

Trombe Wall section Trombe Wall


Shaft for services (hospital services) Life saving medical equipments connected to hospital services

Active radiant pipes

Trombe wall Provides convected heat at night

Treated humidified fresh air, controlled through BMS for acceptable indoor air quality DOAS unit

Fresh air intake

Floor radiant pipes – sandwiched between tile and slab for passive heating

DOAS unit

Fresh air intake

Ward (10 beds ) - axonometric view


Shaft for services (hospital services)

Active radiant panel

Treated humidified fresh air, controlled through BMS for acceptable indoor air quality

DOAS ( Dedicated outdoor air system)

150mm XPS insulation preventing thermal heat loss

Floor radiant pipes – sandwiched between tile and slab for passive heating

Section through ward

Fresh air intake


Trombe wall section to provide convected heat at night time

Active radiant panels

Treated humidified fresh air, controlled through BMS for acceptable indoor air quality

Section through ward


Electricity generated from solar panels used to heat water inside boiler room Heated water( From boiler and geothermal source ) is circulated throughout the building through radiant pipes

Cooled water is circulated back for storage in water tank SOLAR PANEL

AHU AHU AHU AHU AHU AHU

STILT LEVEL PARKING WATER TANK

BOILER ROOM

STORAGE OF ELECTRICITY

STILT LEVEL PARKING

GEOTHERMAL ENERGY

Building section


3D views – S+G+5 (2 blocks)


3D views – S+G+5


3D views – S+G+5


3D views – S+G+5


3D views – S+G+5


AFPL OFFICE , Bhuvneshwar A combination of high rise and low rise office building .

Worked on the landscape plan , floor plans, interior design development.


Site Area = 38x 106 m = 4028 sq.m 9 and 6 m Setback Allowed Ground Coverage = 40% (1611sq.m) Allowed Height= 27 and 15 m No. of floors = B + LG+7 and B+LG +4 Floor to Floor Height = 3.6m

Building footprint analysis


B

B

Key Plan

TEMPLE

VIP DROP OFF

RECREATIONAL AREA

+27 M LVL

TERRACE WORKSTATION

+23.4 M LVL

WORKSTATION

+19.8 M LVL

WORKSTATION

+16.2 M LVL

ATRIUM WORKSTATION

+12.6 M LVL CORE

TOP MANAGEMENT +9 M LVL

WORKSTATION CORE

WORKSTATION

CORE

WORKSTATION

CORE

MEETING ROOM

WORKSTATION RECREATION SPACE RECREATION SPACE BASEMENT PARKING

BASEMENT PARKING

Site circulation

+5.4 M LVL

RECEPTION

+1.8 M LVL


N

Vehicular Drop off LVL -1200

Vehicular Entry/Exit

Client /visitor’s Entry

(North side)

Toilet

Entry

Entry

Toilet

Basement entry LVL -5700

VIP drop off

Block B (LG+7) LVL -1800

(East side)

Core Core

Block A (G+3) LVL +300

LVL -600 Central courtyard with temple

PARKING

Core

Main Road

LVL 00 Core

Semi open corridor

LVL -1200

Site plan – circulation

Pedestrian entry/exit (South side) Client /visitor’s Exit


Floor Plan - Lower / ground floor – Option a

Floor Plan – Upper Ground / First floor

Floor Plan –First/ Second floor

Floor Plan –Second / Third floor

Floor Plan –Fourth/ terrace floor Floor plans


c

B

Building Elevation - C


A

Key Plan

Building Section - AA

C

A

28


B

31

B

31

Key Plan

+27 M LVL +23.4 M LVL

+19.8 M LVL

+16.2 M LVL +12.6 M LVL

+9 M LVL

+5.4 M LVL

+1.8 M LVL

Building Section - BB

29


iii

Exposed Ceiling

iii

Central atrium(for daylight and ventilation) Central staircase

iii

Terracotta cladding on iii

column

Glass Railing around the atrium 1500 mm high

iii

Metal frames with traditional Fabric Panels

iii

Workstation

iii

Office Floor plate with workstations and a view looking across the atrium

View 1 30


Central Atrium with Solar panels on roof

iii

Terracotta cladding on iii

iii

iii

column

Metal frames with traditional Fabric Panels

4.7 x 18 m wide central atrium

View of the Central Atrium and workstations on both sides

View 2 31


Central Atrium with Solar panels on roof

iii

Terracotta

iii

cladding on column

Lift Lobby

iii

Wall painted with traditional Patterns iii

Metal frames with traditional Fabric Panels

iii

Glass Railing around the atrium 1500 mm high

iii

Central staircase iii

View of the Central Staircase and Lift Lobby

View 3 32


Client /visitor’s Entry

Vehicular Entry/Exit (North side)

Key Plan

Water fountain Pedestrian

Parking

walkway

VIP drop off

Main road

(East side) LVL 00

Water fountain

Pedestrian walkway

Pedestrian entry/exit Client /visitor’s Exit

Front courtyard 33


Vehicular Drop off LVL -1200 Key Plan

Entry

Entry

Core

Core

Temple

Waterbody

LVL -600 Central courtyard with temple

LVL -1800

Central courtyard


Terra-cotta pots with ferrocement louvers

Fabric panels sandwiched between glass

Brick laid in patterns inspired by traditional Orissa crafts

Terracotta Jail

Metal jail

Fabric sandwiched between terracotta panels

Metal Jali

Metal Jali

Construction Technology

35


Ekamra Vatika , Bhuvneshwar A kindergarten design.

Worked from the initial design development till the start of execution on site.


Site 1. Site Dimensions : 103’ x 106’ (31.4 x 32.3M) 2. Site Area : 10918 sqft (1014.3 sq.m )

N

Site Approach


Existing Site Pictures 38


Massing of built form


26-08-2020


Option 01 – Front view

Option 02 – Front view

Option 03 – Front view

Option 3 :Massing 3D – Aerial View 41


09-09-2020


Option 4 : Ground floor plan


First floor plan

Second floor plan

Third floor plan

Terrace floor plan

Option 4 : Ground floor plan


Option 4 : Second floor plan

Option 4 : Terrace floor plan


Basement section


19-09-2020


N

Ground floor plan :Option 6 48


First floor plan

Second floor plan

Third floor plan

Terrace floor plan

N

Option 6 49


N

Basement Floor Plan: Option 6 50


Building sections for approval


First floor plan

Second floor plan

Third floor plan

Terrace floor plan

N

furniture list 52


21-10-2020


AREA STATEMENT 10918 sqft

SITE PLAN

1014.3 sqm GROUND COVERAGE 1

2

3

5188.2 sqft 482 sqm

NO. OF FLOORS

B + G+ 3

LEGEND

7 4

5

6

Site Plan

1 2 3 4 5 6 7

MEDICAL ROOM - 23 sqm OFFICE ROOM – 30 sqm BUILDING STAIRCASE COMMON TOILET PRINCIPAL ROOM – 28 sqm CAFÉ CUM LIBRARY – 67 sqm BASEMENT STAIRCASE


LEGEND: Group-Work Area Formal Learning Area Sleeping Area Kid’s Cave Area Toilet

LEGEND: 1 Lockers 2 Classroom (90 sq.m.) 3 Toilet (6 sq.m.)

4 Washbasin

Interior layout


2

WALL ART

2

KIDS DISPLAY AREA PLAYFUL

FURNITURE

KIDS WASHING AREA

1

Kids Washing Area

WINDOW PAINTING

Playful Furniture* 4

1

3

Animal Flooring Patterns

WALL ART

Identity 56


Interior – 3D views 57


Interior – 3D views 58


Interior – 3D views 59


Interior – 3D views 60


KEY PLAN

Section – Detail


Various design permutations


KEY PLAN

West Elevation


KEY PLAN

North Elevation


KEY PLAN

East Elevation


KEY PLAN

South Elevation


Daylight inside the classroom 67


Building – 3D views


INTERIOR DRAWING SET


Principal room


Admin room


Canteen room


Canteen room


Medical room


Staff room


WORKING DRAWING SET


Ground floor

First floor

Second floor

Building floor plans Third floor

Terrace floor


Second floor Electrical plan


Building elevation


Building sections Building sections


Building sections


Building sections


Building sections


Building sections


Building sections


Building sections


Building sections


Central staircase


window schedule


15-02-2021 LANDSCAPE DESIGN


1 6

LEGEND 4

3

6

7

5

5 4 1

1 2 3 4 5 6 7

Guard room Canteen room Principal room Building management room Service room Trustee room Admin room

7

Student circulation Staff circulation 3 8

SITE ACTIVITIES

2

9 1

2

1 2 3 4 5 6 7 8 9

Sandpit Alphabetical stones Wall climbing Pottery area Wall drawing Wall painting play area Outdoor learning area Pick up area

ROAD

N

Stilt floor Plan


Landscape details


Double height entrance

Play area

Central Courtyard

Alphabetical stones 93


Pottery and wall drawing

Pedestrian gate

94


LEGEND 1 First floor play area 2 Second floor play area 3 Third floor play area

First floor Plan

Second floor Plan

Third floor Plan Building section


Second floor play area

Third floor play area

96


LEGEND 1

2

M2

1 2 3 4 5 6

M1

4

Concealed shaft External VRF units Sensory marking Play areas Toilet Lift shaft

M2

5

3

1

1

M1

Kota stone

M2

China mosaic

M3

IPS flooring

6 1

M3 M2

4

Terrace floor Plan 97


Terrace play area

Terrace play area


ELEVATION DESIGN


Site study and visit to study different


Sketching elevations with different patterns and materials


Elevation R1


Grit finish

Laterite cladding

Elevation R2


Grit finish

Laterite cladding

Elevation R3


Finalised elevation


Grit design permutation

Finalised elevation


WORK ON SITE


New plan Old plan

Change in plan


New plan Old plan

Change in plan


Work on site


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.