Kaustav Gupta - Portfolio 2020

Page 1

Kaustav Gupta Selected Works



Kaustav Gupta Selected Works


Qualifications - Licensed Architect, COA, India - AIA International Associate, USA - LEED Accredited Professional, USA - Master of Architecture Emphasis on BIM & Sustainable Design The Pennsylvania State University, USA 2009 - Bachelor of Architecture Second in class, First Class with Honors, Jadavpur University, India 2006 Professional Experience - Senior Creative Designer, Scentre Group, Sydney 2018 - 2020 - Design Leader, Woods Bagot, Sydney 2016 - 2018 - Senior Designer, Grimshaw, Sydney 2015 - 2016 - Project Designer, HOK, Hong Kong 2013 - 2015 - Architect, Cannon Design, Mumbai/New York 2010 - 2013 - Design Intern, Burt Hill/Stantec, USA/India 2008 - Architect, Polaris Architects, Kolkata 2006 - 2007 - Design Intern, Kanvinde Rai & Chowdhury, New


As an architect with demonstrated experience in the building industry, I bring a global perspective and leadership in design. With 12 years of an international career spanning across Australasia, Asia, the Middle East, and America, I have a diverse portfolio of premium projects in multiple sectors including commercial, transport, education, hospitality, and mixed-use. Building on my exposure to cultural diversity, I promote a collaborative, flexible, and contextual approach to facilitate effective team management and the ability to deliver the client’s vision. In my recent roles I led the vision and architectural design for multiple project teams from early concept to detail design and documentation for complex, large scale projects across Australia and New Zealand. Prior to this, I have been instrumental in conceiving and delivering prestigious projects, working with leading international design firms. My experience in working across multiple sectors and markets allows me to engage effectively in complex and challenging projects in multiple stages, collaborating with multiple teams and stakeholders. I am passionate about placemaking, facade design, and sustainable design. My skills in integrating traditional and digital tools including sketching and BIM add measurable value in every stage of design and communication.


The following projects are examples of the design process and the thinking behind the outcome that I follow as a designer. Projects that come with complex challenges (program, planning, performance), and require collaboration across multiple disciplines, get me excited the most.



I am a firm believer in the workflows that take advantage of both traditional and digital tools, and the drawings here demonstrate my skills and passion for sketch and diagrams, which I believe are key to communicate an idea. The projects included here span a diverse typology, including Commercial, Mixed-Use, Retail, Education, Hospitality, etc. The experience I’ve gathered through exposure to a variety of projects has allowed me to become an all-round architect who can effectively contribute value to at any stage of design and delivery.


Green Spine: Design concept for new dining precinct


As Design Leader I was responsible for developing the design response to integrate the proposed Metro station and development above at Martin Place. I worked with the Design Director to co-develop the concept, which required careful approach, meeting all the development requirements in the heart of the city. I also led the team to deliver the required documentation, while coordinating with consultants and client. Phase: Concept Design & Stage 1 DA Client: Transport for NSW Program: Station Concourse, Office, Retail Size: 32,058m2 Status: Unbuilt

S


Over Station Development Sydney, Australia

Station Concourse

Image courtesy: Woods Bagot


0

Tower form finding and Urban Design parameters

01. METRO CONNECTION AND MASS ENVELOPE

02. OSD HEIGHT PLANE AND MASS ARTICULATION

03. OSD SETBACK ARTICULATION

PREFERRED OPTION D MASSING PRINCIPLES AND CONCLUSION 04. CHAMFER EDGE OF TOWER ENHANCING VIEWS OF MARTIN PLACE

05. OSD PROGRAM

06. OSD ACTIVATION AND VISUAL CONNECTION WITH MACQUARIE BANK BUILDING

LEGEND

METRO

RETAIL

COMMERCIAL

PUBLIC SPACE

agram y ope s of ew

on

nd

SOLAR ACCESS PLANE

PROTECTED VIEW PLANES

STREET WALL

Building height is within the solar access plane in accordance to SLEP 2012 and thus has no overshadowing impact

The highest building point is at RL165.42

Protected view lines to the GPO Clock Tower and Sydney Hospital are maintained

Podium is built to the extent of the boundary, reinforcing the street wall along Martin Place


4.10

PREFERRED OPTION D MASSING PRINCIPLES AND CONCLUSION

MARTIN PLACE CONTEXT

CASTLEREAGH STREET CONTEXT

ABOVE PODIUM PUBLIC DOMAIN

Podium height correlates to the heritage 50 Martin Place, complementing the building proportionally and in it's form, reinforcing the paired position of gateway buildings to both Martin Place east and west

Side street frontage and setbacks aligned with 60 Castlereagh Street

Recess above podium level allows opportunity to create public domain and visual connection with Macquaire Bank roof top.


Tower & Station design RL +21.240

RL +22.484

RL +21.970

SECURITY ROLLER SHUTTER DOOR

DIRECT ACCESS TO SUBSTATION

RL +22.300

FIRE BOOSTERS

SUBSTATION EQPT HATCH

RL +19.799

RL +21.530

STATION ENTRY

OSD EOT ENTRY

FIRE SERVICES RISER

A

RL + 22.100

ELEC DB C'BRD

SUBSTATION SUPPLY

HYD

HYD

B

RETAIL

PERSONNEL ACCESS HATCH

SKY LOBBY RL + 32.0

NLA 120m²

SUBSTATION EXHAUST

RL + 22.100

DB ELEC. CUPBOARD

B

9m TURNTABLE ELEC

BUILDING MANAGEMENT OFFICE

STAIR PRESS

MARTIN PLACE

ELEC

RL +22.000

E.O.T.

12500

12500

ENTRY

FIRE CONTROL ROOM

LOADING DOCK

SECURITY ROOM / DOCK MANAGER

MECH

A

COURIER

ø 90 00

ELEC. RISER

50 MARTIN PLACE MACQUARIE BANK HQ

13500

COURIER

OSD GOODS LIFT

OSD GOODS LIFT

EXHAUST AIR RISER

13500

COURIER

COURIER

LIFT CORE ABOVE GREASE ARRESTOR LIDS

COURIER

C

C

TRUCK BAY

LEVEL B1 MEZZANINE BELOW

TV 20m²

STAIR PRESS

STATION RISERS 19m²

TV 20m²

VOID

LIFT

STATION SERVICES 32m²

TV 20m²

D

SLOPING COLUMN

STATION RISERS 19m²

STAIR PRESS

TRUCK BAY

MECH SUPPLY AIR RISER

FIRE SERVISES ZONE

D

STATION GOODS LIFT

STORE

12500

12500

STATION GOODS LIFT

TV 20m²

STATION SERVICES

METRO EGRESS STAIRS

RL +22.184

TOTAL AREA 159m²

ELIZABETH ST.

3760 1

15000

15000

2

3

3760

Street level Date 1.12.2016 06.02.2017

Project Recent revision history Description # Status A ISSUED FOR INFORMATION B ISSUED FOR INFORMATION

Date MARTIN PLACE SOUTH SIDE OSD1.12.2016

IssuerNotes & Legend Contractor must verify all dimensions on site before commencing work or preparing shop drawings. Do not scale drawings.

06.02.2017

TM

© Woods Bagot Client

120832 Checked

Approver

Sheet size

B1

Project

Sheet title

Sheet number

A6003

Scale

1 : 100

MARTIN PL

Client

Revision

B

TFNSW

Status

C:\My Documents\Autodesk\Revit\RAC2016\120832_OSD Station Development_CENTRAL_AMENDED CORE & LOBBY__KG.rvt

A

SUPPLY/ MECH.

STAIR PRESS

UTILITY / STORE

FH

F

FIRE SERVISES RISER

13500

13500

LOW RISE PODIUM

HYD.

ELEC RISER

ACCESSIBLE WC

FH

ELEC RISER

NLA 1209m²

M

FIRE SERVISES ZONE

C

RETURN AIR

SUPPLY/ MECH.

TYPICAL HIGH RISE

ACCESSIBLE WC

UTILITY / STORE

STAIR PRESS

RETURN AIR

SUPPLY/ MECH.

12500

12500

STAIR PRESS

F

FH

FHR

C

SUPPLY/ MECH.

HYD.

50 MARTIN PLACE MACQUARIE BANK HQ

M M

FIRE SERVISES ZONE

RETURN AIR

FHR

B

ELEC RISER

FH

ELEC RISER

RETURN AIR

FHR

B

FHR

STAIR PRESS

ELEC RISER

12500

12500

A

FIRE SERVISES RISER

D

D

3760 1

15000 2

3760

15000 3

Date 1.12.2016 06.02.2017

Notes & Legend Contractor must verify all dimensions on site before commencing work or preparing shop drawings. Do not scale drawings.

15000

NOTE : STATION SERVICES ARE 1 2 NOT ENDORSED BY STATION DESIGN TEAM

4

Typical low rise level Recent revision history Description # Status A ISSUED FOR INFORMATION B ISSUED FOR INFORMATION

4

LEVEL GROUND (CASTLEREAGH ST)RL 22.00

25mm Approved

Checker Date generated 19-04-17 7:15:11 PM

C:\My Documents\Autodesk\Revit\RAC2016\120832_OSD Station Development_CENTRAL_AMENDED CORE & LOBBY__KG.rvt

Size check

Project number

TFNSW

Date generated 19-04-17 6:29:26 PM

15000 3

sky lobby level

Notes & Legend Contractor must verify all dimensions on site before commencing work or preparing shop drawings. Do not scale drawings.

ELEC RISER

Recent revision history Description # Status A ISSUED FOR INFORMATION B ISSUED FOR INFORMATION

15000

NOTE : STATION SERVICES ARE 1 2 NOT ENDORSED BY STATION DESIGN TEAM

4

15000 3

4

Typical high rise level Project Recent revision history Description # Status A ISSUED FOR INFORMATION B ISSUED FOR INFORMATION

Date MARTIN PLACE SOUTH SIDE OSD1.12.2016

IssuerNotes & Legend Contractor must verify all dimensions on site before commencing work or preparing shop drawings. Do not scale drawings.

06.02.2017

TM

Project

Sheet title

MARTIN PL

LEVEL 1

© Woods Bagot Client

TFNSW

Checked

Checker Date generated 19-04-17 6:30:54 PM

C:\My Documents\Autodesk\Revit\RAC2016\120832_OSD Station Development_CENTRAL_AMENDED CORE & LOBBY__KG.rvt

office stair concept

Date generated 19-04-17 6:32:20 PM

Size check

Project number

120832

Sheet number

A6007

25mm Approved

Approver

Sheet size

B1

Scale

1 : 100

Revision

B

Status

C:\My Documents\Autodesk\Revit\RAC2016\120832_OSD Station Development_CENTRAL_AMENDED CORE & LOBBY__KG.rvt

Station concourse & retail

Client

TFNSW


TOWER LEVELS

PODIUM LEVELS

ELIZABETH STREET LEVEL

CASTLEREAGH STREET LEVEL

B1 MEZZANINE

B2 CONCOURSE LEVEL

Sectional perspective showing tower-station relationship

Station and lobby relationship


Podium Facade Development


Tower Facade Development


Image courtesy: Scentre Group


Mixed Use Development Albany, New Zealand As one of the largest upcoming mixed-use development in New Zealand, this project is one of the flagships that truly embrace the concept of a ‘Living Centre’. My responsibilities were to lead the architecture team and deliver the project vision, master-planning (mixed-use and commercial), architectural design and development, and visualization. I collaborated with my peers and consultants including those involved in interior design, sustainability, and services. I was also instrumental in coordinating with client and management to ensure timely delivery, and to facilitate council approvals. Later, I collaborated with the project team to provide detailed design and documentation. Phase: Vision, Concept & Detail Design Client: Scentre Group/Westfield Program: Commercial offices, Retail, F&B, Entertainment, Wellness Size: 41,800m2 (Retail & Mixed Use), 15,800m2 (Commercial Phase 1) Cost: AUD $363 Million Status: Council Approval, Expected Construction commences 2021


Early Vision and Feasibility Studies In order to ensure that the vision and the development brief are well aligned from the very beginning for the proposed flagship centre in the Westfield NZ portfolio, a series of design workshops and reviews were held, with active participation from the client and other stakeholders. As a Creative Lead for the overall architecture and mixed use components, I worked closely with the Retail Planning Lead and Studio Director to study multiple scenarios that will not only seamlessly integrate the existing centre to the new, but also maximise the commercial outcome in short and long term and deliver a vibrant, sustainable experience for the local community.


Overall Design Narrative

Retail & Mixed-Use Precincts Westfield Albany sets the next generation of the ‘Living Centre’ concept within the Westfield portfolio. It has a strong integration of mixed-use programs with significant exposure to Civic Crescent. This necessitates a design approach that carefully embraces the co-existence of activities.

Connectivity and Arrivals The Location and Context for Westfield Albany allows the new development great opportunities to connect with the public realm, recent and upcoming developments. The design response identifies the arrival moments along the boundary of the centre as one of the key elements which emphasises integration with the surrounding context. The architecture curates a sense of ‘Welcome’ for both pedestrian and vehicular entries through the use of built form, materiality and landscape.

Built Form Taking inspiration from the vast exposure to the Civic Cresent and Don Mcinon Drive, the podium embraces the horizontality and allows the centre to rise in a series of ‘ribbons’ that mimic the surrounding landscape. These ribbons curve in to create punctuations along the perimeter, which signify the key arrival areas. The restaurant pavilions and the towers rise as a series of cubic volumes, creating strong visual contrast, and bring in a sense of vertical rhythm. These volumes also are carefully located to allow for both visual and physical porosity, which is aimed to blur the distinction between indoors and outdoor.


Integration of Commercial tower & Dining Precincts, and street activation

Terrace Dining


Design study sketches


Commercial Tower design

Image courtesy: Scentre Group


Commercial core integration and alignment with dining and retail programs

Commercial drop off and lobby


Skylight Design Development

DOUBLE GLAZED PERFORMANCE GLASS PANELS

STEEL SECONDARY BEAMS

INTERNAL BULKHEAD CLADDING

GLULAM/LVL TIMBER PRIMARY BEAMS WITH STEEL CONNECTIONS

DOUBLE GLAZED PERFORMANCE GLASS PANELS (PARTIALLY OPERABLE)

Design options


Skylight design

Passive design approach to bring outdoors inside the mall

Secondary Steel Structure

Primary Timber (LVL) Structure

Double Glazed Performance Glass Panel


Retail facade - detail design MT05

2

CON 03/04

CP_50.0005

2

8800 1000

1000

4 A

CP_50.0051

SFL 53.418 L2M

SFL 53.418 L2M

5900

SFL 56.020 L3

Precast Panel (CON03/04)

RETAIL

SFL 50.120 L2

5900

4500

5000

2400

SFL 56.020 L3

1500

1000

1500

1000

SFL 50.120 L2

Illuminated Slot with Metal Cladding (MT05)

2 5 B

CP_50.0051

3 6 C

CP_50.0051

RETAIL

SFL 44.320 L1

SFL 47.253 L1M

5800

5800

SFL 47.253 L1M

SFL 44.320 L1

MT01

3600

3600

Metal Mesh Screen (MT01)

SFL 40.720 B1

SFL 40.720 B1

SFL 38.560 B2

SFL 38.560 B2

SFL 36.180 B3 1450

SFL 36.180 B3

ELEVATION - DM 1A

2

1 : 50

DD2 DWG #: 02.9900 REV: C PAGE #: 18

LOADING

SECTION - DM1 1 : 50

a

VARIES REFER STRUCTURAL DRAWINGS

METAL COPING

METAL COPING

150

150

DON MCKN. DRIVE | FACADE | PRECAST METAL CLAD SLOT (MT05)

Prec

1500

1500

PRECAST PANEL (CON 03/04)

A L B A N Y

LED STRIP (REFER CONSULTANT DRAWING)

A

EAST FACADE 40% GLAZED

A

VARIES

VARIES

REFER STRUCTURAL DRAWINGS 250

REFER STRUCTURAL DRAWINGS

Illum Clad

150

150

METAL CLAD SLOT (MT05)

PRECAST PANEL (CON 03/04)

PRECAST PANEL (CON 03/04)

B

B

SOUTH FACADE 75% GLAZED

VARIES

VARIES

REFER STRUCTURAL DRAWINGS

REFER STRUCTURAL DRAWINGS250

METAL CLAD SLOT (MT05)

300

300

PRECAST PANEL (CON 03/04)

170

4

Precast Panel (CON05)

5900

4540

CON 05

METAL FLASHING

METAL FLASHING

PERFORATED METAL MESH SCREEN (MT 01)

PERFORATED METAL MESH SCREEN (MT 01)

C

DETAIL: TYPICAL PRECAST SCALE 1:20 @A0

C

DETAIL: LIGHT SLOTS SCALE 1:20 @A0

NOTES: - STRUCTURE INDICATIVE ONLY, REFER STRUCTURAL DRAWINGS FOR DETAILS - PRECAST CONNECTION INDICATIVE - REFER CONSULTANT DRAWINGS FOR LIGHT FIXTURE DETAILS

Prec


Tower facade - detail design

2

GL04A

CP_50.0009

GL04 B

MT03

Aluminium extrusion (MT07)

MT07 2000

250

12000 1500

1500

1500

1500

1500

1500

1500

1500

MT07

600

SFL 93.820 L12

GL04A

TBC 3600

---

Vision glass (GL04A)

Vision glass (GL04B) SFL 89.620 L11

---

600

B-

SFL 89.620 L11

Shadowbox(GL05)

TBC

4200

SFL 93.820 L12

A-

MT03

SFL 85.420 L10

SFL 85.420 L10

ELEVATION - TOWER 1 - TYPICAL FACADE

2

1 : 50

3600

3000

Metal Panel (MT03)

SECTION - TOWER 1 FACADE 1 : 50

CP_50.0009

1 2 CP_50.0009

12000

LOOKING NORTH WEST - L14 1500

1500

1500

1500

1500

1500

1500

1500

PLAN - TOWER 1 - TYPICAL FACADE 1 : 50 SOUTH FACADE 90% GLAZED

LOOKING NORTH WEST - L9

WEST FACADE 60% GLAZED

LOOKING NORTH WEST - L4


For this winning bid for the international competition, I led the design package for the proposed East-West concourse (Central Walk) that will connect the new Metro concourse with existing train platforms, and the new entrance pm Chalmers & Elizabeth Street. This 16 week design exercise included not only development of design concept, but critical services coordination, detail design, material selection, and visualization. The design process required constant co-ordination with engineering consultants to navigate complex design and construction requirements. Phase: Concept Design (Winning Entry) Client: Laing O’Rourke on behalf of Sydney Metro Program: Station Concourse, Entrance, Canopy Cost: AUD $955 Million Status: Under Construction

Image courtesy: Woods Bagot


Central Metro Station & Concourse Sydney, Australia


Overall Design Concept

Organisational Principles

Daylight & Orientation

The proposed concept rationalises the current fragmented circulation patterns within Central Station, through a fundamental shift of people flow due to the introduction of the metro concourse and Central Walk. At key nodes and thresholds, in particular the Northern Concourse, Eastern Entry and Metro Concourse, create significant new volumetric spaces. These are generous, calm spaces allowing users to orientate themselves, providing clear, intuitive, safe uncongested and legible circulation routes.

The proposal seeks to maximise the use of natural light in our proposals, particularly in the subterranean elements of the scheme, to enhance the user experience. All key thresholds, have elements of natural light introduced and this also aids in orientation and intuitive wayfinding around the station. The natural and artificial lighting design also seeks to highlight key architectural features such as the textured walls in creating a striking feature in key spaces, and further enhancing the environment for users of the station.

NORTH WEST HERITAGE

NORTH EAST CITY FRINGE

SOUTH WEST EDUCATION + ARTS

SOUTH EAST CREATIVE PRECINCT

Illustration showing the 4 station zones once the centre of circulation within the station is moved by the introduction of the Metro Station and Central Walk.


Sandstone Excavations

Arch Geometry of New Interventions

The proposals take interest in the counterpoint between the historic sandstone station building above ground and the new Metro station box below ground, effectively excavated from the very same sandstone. The proposals incorporate a series of north south “cuts’ much like archaeological excavations, that delineate key areas of transition. These vertical slots are expressed in a profiled masonry material that reinterprets the historic sandstone facade, in particular their texture, layering and craft. This adds to the legibility of circulation and the intuitive navigation through the station environment.

The team developed the design of the new interventions so that they are perceived as a family of related geometric forms. These are based on the geometry of the flattened arch which is a dominant feature of the historic station and the approaching viaduct elements. This creates a harmonious composition where new and existing elements are distinct, but also establishes a clear and respectful relationship of the new elements to the heritage context.


Central Walk Design Development

2

K

9000

3

J

10500

I

11000

4

H

9355

G

5

6

F

17009

E

17049

1

17079

Typ.

3117

SUBURBAN PLATFORMS

P16

BAN PLATFORMS

P17

P18

P19

P20

RSE LEVEL

COURSE

RSE

L1

L2

L3

M

CL:04 SF:01

CD:04 RETAIL KIOSK

SERVICE TUNNEL


TYPICAL MODULE

7

8

9

10

11

12 KEY PLAN

NTS

TRANSITION MODULE

A

B

COMPLETE MODEULE

D

C

16269

17820

B

A

19337

EE_3

EE_2

8150

8150

EE_1

C

FUTURE OSD DEVELOPMENT

D 1

3122

PROPOSED LIGHT RAIL STOP BY OTHERS

CL:05

CE:01 CD:05

P21

P22

32.000 FFL ROOF LEVEL

25.000 FFL RANDLE LANE

P23

22.500 FFL CHALMERS STREET 19.800 FFL MID-LANDING

CD:06 CD:04

CD:04 RETAIL KIOSK

ESR CONCOURSE

CL:05

EASTERN ENTRY

GHOST PLATFORMS

SERVICE TRENCH

FUTURE CONNECTION 12.400 FFL VERTICAL TRANSFER PITS

ESL PLATFORMS

Section through Central Walk and Chalmers Street Entry

19-09-17 6:06:57 PM

RANDLE LANE

Time

CHALMERS STREET

LIFT TO PLATFORM

File Plotted C:\My Documents\Autodesk\Revit\RAC2016\121024_CSM-METRO MASTER_FINAL_sydmaf.rvt

PROPERTY LINE

E

F

G


Eastern Entry Design Development

1

2

3

4

5

6

7

A

B

EE_3

EE_2

EE_1

8150

C

2

REF

4009

REF FUTURE OVER STATON DEVELOPMENT

4009

1

4

8150

RF:06 REF

32.000 FFL ROOF LEVEL

MC:01

4009 GL:07

LV

CL:05

AIR INTAKE

GL:04

D

GL:02

REF

CE:01

RANDLE LANE

6500

CD:05

3

LV:01

25.000 FFL RANDLE LANE

4009 SF:01

CHALMERS STREET

CL:05

22.500 FFL CHALMERS STREET

CD:04

SF:01

E

CD:05

CD:08

CL:05

EAST EN

3

EAST EN

19.800 FFL MID-LANDING

CD:04

4000

CL:05

2

FUTURE CONNECTION

SF:01

14.200 FFL METRO CONCOURSE

F

1

CENTRAL WALK - EAST ENTRANCE_100

G

IN-SCOPE COLOR LEGEND UNPAID AREA

H

PAID AREA BACK OF HOUSE

N

0

GLAZING

ISSUED FOR TENDER SUBMISSION

AMD

DESCRIPTION

CO-ORDINATE SYSTEM: MGA GDA94

1

2

3

4

HEIGHT DATUM: AHD

5

Section & Axonometric showing integrated design for Central Walk & Chalmers Street Entry

15.09.17 DESIGNER SIGN./DATE

15.09.17 VERIFIED SIGN./DATE

15.09.17 APPROVED SIGN./DATE

SCALE: 1 : 100

6

7


Image courtesy: Woods Bagot


CENTRAL WALK

Design Development & Coordination

SKETCH Axonometric showing Structure & MEP coordination

Sketch for coordination of architectural and service elements


1

2

3

4

5

1

6

2

3

7

4

5

6

8

7

1

8

9

9

10

10

11

12

11

13

14

15

12

16

3131

2

A

A

2220

B

B A RL14.200

RL17.373 19337

EASTERN ENTRY

SOUTHERN CONCOURSE

ESR CONCOURSE

1

3137

RL17.373 B

FALL 1:22

RL14.935

17820

RL18.386

C

C

16269

C

F1101 D

DEVONSHIRE STREE T TUNNEL

D E

17009

F

E 1

G

1

EDDY AVENUE FORECOURT

1

3133

RL16.916

SKYLIGHT ABOVE EDDY AVENUE ENTRY

SKYLIGHT ABOVE

SKYLIGHT ABOVE

9355

3135

NORTHERN CONCOURSE

RL+16.965

RL+16.915

3132

METRO CONCOURSE

H

RL+14.200

1

11000

EXTENT OF VOID ABOVE SKYLIGHT ABOVE

4026

SKYLIGHT ABOVE

I 10500

SKYLIGHT ABOVE

F

J

File Plotted C:\My Documents\Autodesk\Revit\RAC2016\121024_CSM-METRO MASTER_FINAL_sydmaf.rvt

RL+14.200

17049

D

17079

CENTRAL WALK EAST

RL16.916

E

F

19-09-17 6:00:54 PM

FUTURE EXTENSION CENTRAL WALK WEST

G

Plot Date & Time

G

DRAWN

PAID AREA

N

0

GLAZING

ISSUED FOR TENDER SUBMISSION

AMD

15.09.17 DESIGNER SIGN./DATE

DESCRIPTION

CO-ORDINATE SYSTEM: MGA GDA94

HEIGHT DATUM: AHD

15.09.17

15.09.17 VERIFIED SIGN./DATE

FILE No. STATUS: RFT

DRG CHECK

APPROVED SIGN./DATE

AURECON/GHD INFRASTRUCTURE

SCALE: 1 : 500

CENTRAL STATION MAJOR WORKS ARCHITECTURE

PLAN - CONCOURSE - NORTHERN CONCOURSE AND CENTRAL WALK EAST

DESIGNED

BACK OF HOUSE

DESIGN CHECK

DRG No.

APPROVED

SHEET: 1

OF 1 C

CSM-WB-DRG-AR- 1203

0

EDMS No. DF 801*554

3

4

5

6

7

8

9 EA

10 EB

11 EC

12 ED

10SQM DUCT FROM RANDLE LANE

3 SQM EXHAUST DUCT TO CHALMERS ST 4SQM INTAKE DUCT

6SQM INTAKE DUCT

3700

2

3000

1

1980 1500

H

Concourse Level

SYDNEY METRO CITY & SOUTHWEST

TRANSFORMER MOVEMENT

Sectional Study

19-09-17 6:00:54 PM

UNPAID AREA

Plotted by

This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any purpose other than the purpose intended by Transport for NSW. Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express written permission of Transport for NSW.

IN-SCOPE COLOR LEGEND

H


Living Centre concept sketch The Western end is perceived as a Hospitality destination, with a multi-level food destination, and a 200 keys hotel with amenities. An rooftop Urban Farm compliments the programs and unlocks new potentials. Western End design development


Mixed Use Development Sydney, Australia The proposed expansion of the existing Shopping Centre aspires to become a new destination for the Sydneysiders and visitors alike. My role was to develop the brief and then create a strong vision that would set the course of the design process. The success of this relied on the identification of unique potential and resulting program mix on either end of the retail mall, which was further demonstrated in the architectural concept. Later, I collaborated with Architectus Urban Design team to develop the Urban Planning Proposal. Phase: Vision, Concept Design & Urban Planning Proposal Client: Scentre Group/Westfield Program: Commercial offices, Hotel, Retail, F&B, Entertainment, Wellness Status: Urban Planning Proposal submitted

The Food Story


Eastern End design development

The Eastern end is more civic in nature, with commercial offices offering spaces for co-working, and flexible tenancies. The existing bus interchange is re-configured to have seamless connections below, and create a public plaza at grade. Vertical transportation provided between Levels 1 and 2 will link the two levels of the bus terminus, and retains operating efficiency for both North and South bound buses. Landscaped light-wells drop daylight into the lower level.

The Master Plan - East Precinct

Indicative Sections

Section 1

Vertical transportation provided between Levels 1 and 2 will link the two levels of the bus terminus, and retains operating efficiency for both North and South bound buses. Landscaped light-wells drop daylight into the lower level.

.4 (70 metres)

a

RL 93.26

RL 94.4 (70 metres)

Tower A Future built form

Tower C Existing commercial area reconfigured

Proposed commercial area

Provision for RTA 2002 ratio carparking

Future built form

Tower C Existing commercial area reconfigured Proposed civic plaza Existing retail

Proposed civic plaza

Existing retail Upgraded bus interchange

Upgraded bus interchange


an active publicly accessible

be open with high The Master Planto- the Eastsky Precinct civic landscaping, plaza. Thisandplaza will quality be integrated new sky shared be openwith toathe with high street and upgraded bus qualityproviding landscaping, terminus improved and be access to the centre. integrated with a new shared tern end Ramp up from bus

A Existing Retail Area Reconfigured

Existing lift core relocated and replaced with void to improve the arrival experience and sight lines

street and upgraded bus interchange Master Plan providesproviding a Ramp down to terminus improved Wentworth Avenue magined address fronting Ramp to basement access to on the centre. nerong Road, centred parking and tower A

Wen

twor

th

Av

e

C

A

C up from bus Ramp interchange B Ramp down to Wentworth Avenue

S2

Proposed commercial area

Current Planning Proposal Future Planning Stage Existing trees retained Proposed feature tree planting Shrub and ground cover

nero

ng R

o ad

Key Plan

Proposed commercial area

B

Future built form

Future built form

Level 2 (street leve B un

B

Existing trees retained

nero

o ad 1:750 ng R

0

7.5

B un

nero

ng R

o ad

Key Plan

Proposed feature tree planting Shrub and ground cover Feature plaza paving

Feature plaza paving Shared zone / vehicle drop off / pick up

Shared zone / vehicle drop off / pick up

Level 2 (street level) 0

7.5

15.0

22.5

30M

Urban Design in collaboration with Architectus 1:750

Urban Context Report | Westfield Eastgardens | Architectus

40

Image courtesy: Scentre Group

15.0

22.5

Urban Context Report | Westfield Eastgardens | Archite

ue

Future Planning Stage

th Aven

Current Planning Proposal 40

B un

or Wentw

Legend

Shared zone / vehicle drop off / pick up

Future built form above existing carpark

C

S2

g Rd

B

e

Rd

Existing Retail Area Reconfigured

B

nu e

Av

ng

Proposed commercial area above reconstructed existing carpark

Ramp to basement parking and tower

B paving th

ero

Ramp to basement parking and tower

rth Ave

twor

nn

Future built form

Ramp down to Proposed area Wentworth Avenuecommercial A

B

Feature plaza

Wen

Bu

Future built form

o Wentw

eron

ue

nn

th Aven

Bu

C

S2

or Wentw

Ave

Proposed feature tree planting Shrub and ground cover

A

C

Proposed commercial area above reconstructed existing carpark Ramp up from bus interchange

g Rd

B

Existing trees retained

C

eron

C

Future Planning Wen twor Stage th

A

nn

B

Current Planning Proposal

A

Bu

C

Existing Retail Area Reconfigured

Westfield Drive

active publicly accessible c plaza. This plaza will A open to the sky with high ity landscaping, and be grated with a new shared et and upgraded bus minus providing improved ess to theLegend centre.

Westfield Drive

Proposed commercial area above reconstructed S1 carpark existing

Future built form above existing carpark

A

C


SCHEME 28

CONCEPT SKETCHES

The Green Loop has the potential to extend vertically in the developments above, which enables the design to come at forefront of sustainability, smart building, and healthy living.

Architecture Concept Sketches

DONCASTER MASTERPLAN STUDIES | SCH 28

SCHEME 28

MAY 2018

ROGRAM LEASABLE OFFICE: 20-30 FLOORS @1200-1500 SQM NLA PER FL GROSS NLA: 25,000 SQM - 35,000 SQM, CAN BE BUILT IN PHASES BUSINESS CENTRE CO - WORK SPACE, COMPANY HQ (GOOGLE/SAMSUNG) 6-12 FLOORS @2000-2500 SQM NLA PER FL

LUXURY HOTEL: 10-15 FLOORS, 200 KEYS SERVICE APARTMENTS: 5 FLOORS 70-100 KEYS SHARED AMENITIES AT L3/L4

SCULPTURAL CANOPY/SKYLIGHT

FLAGSHIP RETAIL : FASHION/AUTOMOTIVE/TECH WELLNESS: ATHLEISURE/FITNESS/ F&B 500-1000 SQM EACH

GREEN LOOP: OUTDOOR DINING, POP UP, JOGGING TRACK, CHILDREN’S AREA JEWEL: BRAND SPACE, EVENT HOSTING ARENA MOVIE HALLS, RETAIL, CONNECTION TO GREEN LOOP SCOPE TO EXPAND RETAIL ABOVE GROUND

PROMENADE AT L3: POP UP, CASUAL DINING, EVENT SPACE, GARDEN BUS INTERCHANGE AT L2

DONCASTER MASTERPLAN STUDIES | SCH 28 MAY 2018


Mixed Use Development Melbourne, Australia As an example of early design vision and feasibility studies, the proposed development is aimed at unlocking the future potential for this centre to become a destination for Commercial, Retail, Hospitality and Residential activities. Apart from study of different development scenarios, a strong sustainable design agenda was also imparted in the master plan. 28 to On next page, a further detailed study shows integration of newSCHEME programs DIAGRAMS existing site through a series of plans, keeping the original vision embedded in.

HOTEL

CO-WORK

HOTEL & MALL SHARED COURT

07. CANOPY: SHADE, ENHANCE LOOP

02. T1: LUXURY HOTEL+ SERVICE APARTMENTS

03. T2: CO-WORK/ COMPANY HQ/START UPS

Phase: Vision & Feasibility Study Client: Scentre Group/Westfield Program: Commercial offices, Hotel, Retail, F&B, Entertainment

OFFICE: 30-40 FLOORS

OFFICE: 20 FLOORS

04. T3: COMMERCIAL LEASABLE OFFICE

SCHEME 28

05. POSSIBLE VERTICAL GROWTH

PERSPECTIVE - BASE COMMERCIAL TOWER

DONCASTER MASTERPLAN STUDIES | SCH 28 MAY 2018

H

C O

DONCASTER MASTERPLAN STUDIES | SCH 28 MAY 2018


OPTION 2 TOWER FOOTPRINT

Planning and architecture concept design study

EOT

OPTION 2 - LEVEL 1

OPTION 2 - LEVEL 2

Integration of retail, commercial and hotel program DONCASTER TOWERS MASTERPLAN STUDIES | SCH 31

DONCASTER TOWERS MASTERPLAN STUDIES | SCH 31

12

OCTOBER 2019

OCTOBER 2019

Hotel - Rooms 13 x Studio 35sqm

Moutain view 42%

1 x larger 70sqm

Street view 58%

Total 14 keys per floor

10 floors = 140 keys

20m

53m

11m 9m

9m

GYM

RES/BAR

11m

Commercial

Hotel - Skylobby

GBA - 1700sqm

Restaurants

GFA - 1445sqm @85%eff

Gym 100sqm

NLA - 1300sqm @90%eff

Restaurant/bar 400sqm Kitchen/admin 220sqm

Upper levels - Commercial & Hotel

DONCASTER TOWERS


OPTION 2 TOWER FOOTPRINT

OPTION 2 - LEVEL 3

13

DONCASTER TOWERS MASTERPLAN STUDIES | SCH 31 OCTOBER 2019

14


This ambitious masterplan proposal is based on the background of the development of Western Sydney Airport, the Aerotropolis, Metro & Rail network, and related urban development. The World Trade Centre complex, as the focus of the mixed use development in the 300 acre site, perceived as an possible integrated development for business and innovation that reaches out to the university complex next door. My responsibility was to lead the design team to develop the overall masterplan, and the architectural language of the WTC complex. This was finally published as an investment proposal to NSW government. Phase: Concept Design Client: The Aerotropolis Group

Image courtesy: Woods Bagot


World Trade Centre Complex Western Sydney, Australia


Section through site

1

2

3

5 4

1. GREEN ROOF WITH SOLAR PANELS 2. ATRIUM GARDENS 3. SMART FACADE SYSTEM 4. RAINWATER HARVESTING POOLS 5. URBAN FARMING


World Trade Centre & Arrival Plaza

Master Plan

Image courtesy: Woods Bagot


5

4

3

6

8

7 1 4

2

9

Master Plan LEGEND 1. Central Park 2. Stage 1 Commercial Building (government occupied 25,000m2) 3. Future Commercial Development (optional government occupation 30,000m2) 4. Future Education Campus 5. Future Community Centre (C) 6. Arbour Structure 7. Goodman Site 8. TPG Site 9. Station Exit


Commercial Building Sydney, Australia I led the design process for this development proposal for a Office building at Waterloo. The design concept respected the original Masterplan which I was involved in as well, explored the views toward the central open ground. The central atrium spaces were interconnected with stairs, offering flexible lease options that allowed multiple floors for a single tenant. The lower level was treated as a mixed use zone for business and retail opportunities, tapping into the semi covered pedestrian corridor. Phase: Concept Design Client: Confidential Program: Commercial office Size: 30,000m2 Status: Concept Submission

Image courtesy: Woods Bagot


6m

68% A-GRADE LIGHTING

1. Efficiency

2. Adaptability

3. Circulation

4. Community

Central Core and Floor Plate Edge Circulation

Flexible floor plates to accommodate the needs and growth of future tenants

Inter-tenancy Floor Access

Visual Connectivity and Engagement

WOODSBAGOT.COM

45-61 Waterloo Road March 2017 Page 30

Ground level


6m

6m

68% A-GRADE LIGHTING

6m

68% A-GRADE LIGHTING

6m

68% A-GRADE LIGHTING

68% A-GRADE LIGHTING

5. Heat Load Reduction

6. Ventilation

7. Light Levels

8. Biophilic

Maximise North & South Facades and Minimise East & West to reduce heat loads

Vernacular Design Night Purge of Heat

6m Perimeter of Natural Lighting

Integrated Landscapes

WOODSBAGOT.COM

45-61 Waterloo Road March 2017 Page 31

OFFICE

OFFICE

GOODS LIFT

MECH

1

GOODS LIFT

MECH

1

M

000

M

3000 ACCESSIBLE TOILET

ACCESSIBLE TOILET

CLEANER

CLEANER

F

F

MECH

MECH

1

Podium level

1

3002

Typical level

3002

LEGEND: RETAIL OFFICE MIXED USE PAVILION EOT BOH/ SERVICES/ AMENITIES

0

Project

45-61 Waterloo Road, Macquarie Park

Sheet title

Client

LEVEL 1

Owner TM

Project number 121023 Sheet number 2203

Project Scale

Sheet size

5

10m

© Woods Bagot

A1 1 : 200 45-61 Waterloo Road, Revision Date Macquarie Park

Sheet title

TYPICAL FLOORS - LEVEL 4,6,7,8,10,11,13,14


I developed architectural design concepts for this 1.2 kilometer long convention centre along the Northern end of the Dubai Expo site. This included concept inception, and development of major public areas like the station arrival plaza per-function, retail, and outdoor exhibition spaces. The ‘Landform’ option (this page) was my concept to transform the entire development as an integrated public area, which will be accessible to the people even when no formal events are taking place. This option had been selected by client for further development. Phase: Concept Design Client: COEX Program: Convention Centre, Retail, Public Domain Size: 180,000m2 Status: Concept Approved

Design concept sketch - Landform


Convention Centre Dubai Expo, UAE


Design concept - Technology

Pre-funtion area

Function level



The new addition to the existing shopping centre required careful consideration of the relationship to existing civic building and public space. I led the revised architectural design response to address concerns over previous DA proposal. The new design responded to existing buildings which surround the Mondo, and incorporates a ‘finer grain’ which would contribute more-positively to ‘place-making’ as well as complementing pedestrian amenity via improved daylighting and sun-shading above the primary pathways. The proposal received full support from Urban Design Panel that led to the approval for the DA application. Phase: Concept, DA Client: Westfield/Scentre Group Program: F&B, Retail, Public Space Size: 1,456m2 Cost: AUD $10.5 Million Status: DA

Image courtesy: Scentre Group


Dining & Entertainment Precinct Penrith, Australia

Architecture Concept Sketches for New activated entry & dining


New Dining & Entertainment Precinct on Riley Street

E JAN

PROPOSED ENTERTAINMENT PROPOSED MAJOR PROPOSED SERVICES / AMENITIES

Along Riley Street a proposal to develop a new JANE STREET

RL.26.700 entertainment precinct was conceived, which will include new restaurants overlooking the street, and additional screens to the existing cinema, with a formal entry and loung space.

RL.27.390

1586.5 m²

5030.5 m²

ET TRE

A

N

E

S

T

R

E

E

T

100.0 m²

AC T I VAT I O N O P P O R T U N I T T Y

ET TRE

PROPOSED MALL

S ANE

RL27.250

PROPOSED RETAIL FOOD

RL27.250

ST RE ET

J

PROPOSED MINI MAJOR

S ANE

J

RI LE Y

RILEY STREET

The architectural respose was aimed to create a new identity for the precinct, with particular RL.25.750 attention to the corner treatment as a beacon to the centre, visible from the train station. 152 CARS RL27.100 Customer journey from street level upward and he visual activation and interaction along the streetscape were key driving factors.

Street level

RL.27.070 RL.27.400

J

Y

NR

4

1

HE

LUX 10

EX CINEMA RETAINED BELOW

5

2

PROPOSED ENTERTAINMENT / CINEMA

R I L E Y S T AC T I VAT I O N HOYTS ARRIVAL & LOB

JANE STREET

ARS

ET

RE

ST

NOTES: · ·

This document describes a Design Intent only. Written dimensions take precedence over scaling and are to be

checked on site.

·

Refer to all project documentation before commencing work.

·

Refer any discrepancies to the Project Design Manager

·

Copyright is retained by Scentre Design and Construction.

·

Written authority is required for any reproduction.

521.4 m²

295 CARS RL 32.500

.500

RL 36.150

8 MED

LUX BAR

RL.26.900

RL.27.100

7

EXT SCR

LUX LOUNGE AMENITIES TIX + CANDY

.75

138.6 m²

ST.

RL

32

MALL ACTIVATION 171.4 m²

LUX 9 AMNTS

RL 38.100

RILEY STREET

261.0 m²

3 6 SML

0

880.0 m²

RILEY STREET

RL27.100

RILEY STREET

Scentre Design and Construction Pty Limited 85 Castlereagh Street. Sydney NSW 2000 Phone (02) 9358 7000 Fax (02) 9028 8500 GPO Box 4004 Sydney NSW 2001 ACN 000 267 265

Title

PROPOSED LEVEL 1 STAGE 1

Centre

WESTFIELD PENRITH

RL.26.540

Dining levelRL 32.750RL. 26.690

DEVELOPMENT APPLICATION

Cinema level

RL32.450 26.630 RL

0

PRELIMINARY Existing and proposed cinema arriv

Project No.

Drawing No.

6913

Revision

1.22

Drawing Scale

1:500 @A1 Plot Date

16.12.2019

DP SS

\\WFDESIGN\ACTIVE\PENRITH\D6913 PENRITH MAJOR EXPANSION\01 CONCEPTS\02 DESIGN\01 CAD\ACTIVE\SCH11\2019-01-17 - SCHEME 11 STAGE 1\2019-12-11 - DRAWINGS FOR CINEMA PRESENTATION\PE-STAGE1_1.22-PRO L1.DWG

Y

NR

HE

ET

RE

ST

NOTES: · ·

Written dimensions take precedence over scaling and are to be Refer to all project documentation before commencing work. Refer any discrepancies to the Project Design Manager

·

Copyright is retained by Scentre Design and Construction.

·

Written authority is required for any reproduction.

Y

NR

This document describes a Design Intent only.

HE

checked on site.

· ·

ET

RE

ST

NOTES: · ·

This document describes a Design Intent only. Written dimensions take precedence over scaling and are to be

checked on site.

·

Refer to all project documentation before commencing work.

·

Refer any discrepancies to the Project Design Manager

·

Copyright is retained by Scentre Design and Construction.

·

Written authority is required for any reproduction.

RILEY ST ACT HOYTS ARRIV

Scentre Design and Construction Pty Limited 85 Castlereagh Street. Sydney NSW 2000 Phone (02) 9358 7000 Fax (02) 9028 8500 GPO Box 4004 Sydney NSW 2001 ACN 000 267 265

Title

PROPOSED LEVEL 2 STAGE 1

Centre

WESTFIELD PENRITH

RILEY STREET

177 CARS

RILEY STREET

S

EET

STR

Scentre Design and Construction Pty Limited 85 Castlereagh Street. Sydney NSW 2000 Phone (02) 9358 7000 Fax (02) 9028 8500 GPO Box 4004 Sydney NSW 2001 ACN 000 267 265

Title

PROPOSED LEVEL 3 STAGE 1

Centre

WESTFIELD PENRITH

DEVELOPMENT APPLICATION PRELIMINARY Project No.

6913 Drawing Scale

1:500@A1 Plot Date

Drawing No.

DEVELOPMENT APPLICATION PRELIMINARY Revision

1.24

16/12/2019 \\WFDESIGN\ACTIVE\PENRITH\D6913 PENRITH MAJOR EXPANSION\01 CONCEPTS\02 DESIGN\01 CAD\ACTIVE\SCH11\2019-01-17 - SCHEME 11 STAGE 1\2019-12-11 - DRAWINGS FOR CINEMA PRESENTATION\PE-STAGE1_1.24-PRO L2.DWG

Project No.

6913 Drawing Scale

1:500@A1 Plot Date

Drawing No.

Revision

1.26

16/12/2019 \\WFDESIGN\ACTIVE\PENRITH\D6913 PENRITH MAJOR EXPANSION\01 CONCEPTS\02 DESIGN\01 CAD\ACTIVE\SCH11\2019-01-17 - SCHEME 11 STAGE 1\2019-12-11 - DRAWINGS FOR CINEMA PRESENTATION\PE-STAGE1_1.26-PRO L3.DWG


RI LE Y

ST RE ET

J

AC T I VAT I O N O P P O R T U N I T T Y

JAN

LUX 9 AMNTS

LUX LOUNGE

4

1 EX CINEMA RETAINED BELOW

2

3

TIX + CANDY

RL 38.100

Y

NR

HE

ET

RE

ST

NOTES: · ·

This document describes a Design Intent only. Written dimensions take precedence over scaling and are to be

checked on site.

·

Refer to all project documentation before commencing work.

·

Refer any discrepancies to the Project Design Manager

·

Copyright is retained by Scentre Design and Construction.

·

Written authority is required for any reproduction.

R I L E Y S T AC T I VAT I O N E N T E R TA I N M E N T & D I N N I N G

LUX 10 5

8 MED

6 SML

LUX 9 AMNTS LUX BAR

295 CARS

7

EXT SCR

LUX LOUNGE AMENITIES TIX + CANDY ST.

RL 38.100

Y

NR

HE Scentre Design and Construction Pty Limited

ET

RE

ST

NOTES: · ·

This document describes a Design Intent only. Written dimensions take precedence over scaling and are to be

checked on site.

·

Refer to all project documentation before commencing work.

·

Refer any discrepancies to the Project Design Manager

·

Copyright is retained by Scentre Design and Construction.

·

Written authority is required for any reproduction.

85 Castlereagh Street. Sydney NSW 2000 Phone (02) 9358 7000 Fax (02) 9028 8500 GPO Box 4004 Sydney NSW 2001 ACN 000 267 265

Title

PROPOSED LEVEL 3 STAGE 1

Centre

177 CARS

WESTFIELD PENRITH

RILEY STREET

RILEY STREET

177 CARS

T I VAT I O N VAL & LOBBY

PROPOSED ENTERTAINMENT / CINEMA

JANE STREET

RILEY STREET

8 MED

AMENITIES

ST.

val

T

REE

E ST

EXISTING CONDITION

LUX 10

LUX BAR

BBY

T

RL 36.150

RL 36.150

3

EXT SCR

S

E

5

6 SML

7

E

E

RILEY STREET

EX CINEMA RETAINED BELOW

N

R

PROPOSED ENTERTAINMENT / CINEMA

4

1

2

295 CARS

T

REE

E ST

JAN

E X I S T I N G C O N D I T I OJANE NSTREET

A

T

DEVELOPMENT APPLICATION PRELIMINARY Project No.

6913 Drawing Scale

1:500@A1 Plot Date

Drawing No.

Revision

1.26

16/12/2019 \\WFDESIGN\ACTIVE\PENRITH\D6913 PENRITH MAJOR EXPANSION\01 CONCEPTS\02 DESIGN\01 CAD\ACTIVE\SCH11\2019-01-17 - SCHEME 11 STAGE 1\2019-12-11 - DRAWINGS FOR CINEMA PRESENTATION\PE-STAGE1_1.26-PRO L3.DWG

Scentre Design and Construction Pty Limited 85 Castlereagh Street. Sydney NSW 2000 Phone (02) 9358 7000 Fax (02) 9028 8500 GPO Box 4004 Sydney NSW 2001 ACN 000 267 265

Title

PROPOSED LEVEL 3 STAGE 1

Centre

WESTFIELD PENRITH DEVELOPMENT APPLICATION PRELIMINARY Project No.

6913 Drawing Scale

1:500@A1 Plot Date

Drawing No.

Revision

1.26

16/12/2019 \\WFDESIGN\ACTIVE\PENRITH\D6913 PENRITH MAJOR EXPANSION\01 CONCEPTS\02 DESIGN\01 CAD\ACTIVE\SCH11\2019-01-17 - SCHEME 11 STAGE 1\2019-12-11 - DRAWINGS FOR CINEMA PRESENTATION\PE-STAGE1_1.26-PRO L3.DWG

Existing and proposed dining & cinema lounge

R I L E Y S T AC T I VAT I O N E N T E R TA I N M E N T & D I N N I N G


This was a collaboration project between Cannon Design Mumbai and Los Angeles studio. I Was responsible for developing the Sky Garden and facade packages during the schematic and detail design stages. As a core team member, I provided design studies, visualization, made client presentations and ran consultant co-ordination. I also led a large team based in the two locations to manage the BIM model and documentation. Phase: Schematic & Detail Design Client: TATA Consultancy Services Program: Office complex with amenities Size: 195,096m2 Cost: USD $189 Million Status: Completed

Image courtesy: Cannon Design


Commercial Complex Kolkata, India


I 28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

H

G

LEGEND

46

PERFORATED METAL PANEL

SEZ CAMPUS A RAJARHAT, KOLKA

TRANSLUCENT GLASS LOUVERS AS PER SPECIFICATION

METAL PANEL AS PER SPECIFICATION

GLAZING AS PER SPECIFICATION

4

ROOF 68.55

ROOF 68.55

LEVEL 15 64.65

LEVEL 15 64.65

LEVEL 14 60.75

LEVEL 14 60.75

LEVEL 13 56.85

LEVEL 13 56.85

LEVEL 12 52.95

LEVEL 12 52.95

LEVEL 11 49.05

LEVEL 11 49.05

LEVEL 10 45.15

LEVEL 10 45.15

LEVEL 9 41.25

LEVEL 9 41.25

LEVEL 8 37.35

LEVEL 8 37.35

LEVEL 7 33.45

LEVEL 7 33.45

06/21 , 3rd Floor, Grants Building, Arthur Bu Colaba, Mumbai 400005, India

LEVEL 6 29.55

LEVEL 6 29.55

LEVEL 5 25.65

LEVEL 5 25.65

Chicago ■ Baltimore ■ Boston ■ Buffalo ■ Houston ■ Los Angeles ■ Mumbai ■ New Yo St. Louis ■ San Francisco ■ Shanghai ■ Vancouver ■ Victoria ■ Washington

LEVEL 4 21.75

LEVEL 4 21.75

LEVEL 3 17.85

LEVEL 3 17.85

LEVEL 2 13.95

LEVEL 2 13.95

LEVEL 1 10.05

LEVEL 1 10.05

GROUND FLOOR 4.65 GROUND LEVEL 4.20

GROUND FLOOR 4.65

EAST BUILDING - SOUTH ELEVATION 1 : 250

46

45

44

42

41

40

39

38

37

36

35

34

33

32

31

30

29

TATA REALTY AND INFRASTRUCTURE LT 5th Floor, Gitanil Building, Hutatma Chowk Fort Mumbai 400 001 Tel: +91 22 66291600

TATA CONSULTING ENGINEERS LTD. 4th Floor, Tower A, 247 Park, L B S Marg Vikhroli (W) Mumbai 400 083 Tel: +91 22 61148181 Fax: + 91 22 61148282 DESIGN CONSULTANT:

PROJECT CONSULTANT CIVIL & ARCHITECTURAL DIVISION AD - 222 , SECTOR - I, SALT LAKE CITY , K 064 DIAL : 2337-2367 (OFFICE ) FAX : (033) 233 REGD NO- 82 E-mail : civil consultants @ vsnl.net civilconsultants.80@gmail.com civil_consultants80@yahoo.in

GROUND LEVEL 4.20

2

43

OPERABLE SMOKE VENT

28

MEP CONSULTANT SPECTRAL SERVICES CONSULTANTS PV B-306-308 CLASSIQUE CENTRE 26, MAHAL INDUSTRIAL ESTATE OFF MAHAKALI CAVES ROAD, ANDHERI ( MUMBAI 400 093 DIAL : +91 22 4099 5300 (OFFICE ) FAX : +91 22 4099 5310 WEB: www. spectralservices.net

EAST BUILDING - WEST ELEVATION 1 : 250

G

H

FACADE CONSULTANT MEINHARDT FACADE TECHNOLOGY (IND No.22, Anna Salai, 1st Floor, Standard House. Little Mount, S Chennai 600 015, INDIA Tel: +91 44 2235 1333 Fax: +91 44 2235 1332 E: deena@mfacade.in W: mfacade.com

I

NOTES: 1. ALL DIMENSIONS ARE IN MM

2. ALL LEVELS INDICATED ARE IN METER

LOUVERS AS PER SPECIFICATION

GLAZING AS PER SPECIFICATION

1-3

25-09-2011 20:16:04

© Cannon Design 2010 All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by The Cannon Corporation.

A350

3

EAST BUILDING - NORTH ELEVATION 1 : 250

ROOF 68.55

ROOF 68.55

LEVEL 15 64.65

LEVEL 15 64.65

LEVEL 14 60.75

LEVEL 14 60.75

LEVEL 13 56.85

LEVEL 13 56.85

LEVEL 12 52.95

LEVEL 12 52.95

LEVEL 11 49.05

LEVEL 11 49.05

LEVEL 10 45.15

LEVEL 10 45.15

LEVEL 9 41.25

LEVEL 9 41.25

LEVEL 8 37.35

LEVEL 8 37.35

LEVEL 7 33.45

LEVEL 7 33.45

LEVEL 6 29.55

LEVEL 6 29.55

LEVEL 5 25.65

LEVEL 5 25.65

LEVEL 4 21.75

LEVEL 4 21.75

LEVEL 3 17.85

LEVEL 3 17.85

LEVEL 2 13.95

LEVEL 2 13.95

LEVEL 1 10.05

LEVEL 1 10.05

GROUND FLOOR 4.65 GROUND LEVEL 4.20

GROUND FLOOR 4.65 GROUND LEVEL 4.20

1

EAST BUILDING - EAST ELEVATION 1 : 250

3. DIMENSIONS / LEVELS INDICATED ARE UNLESS OTHER SPECIFIED

4. ONLY WRITTEN DIMENSIONS TO BE FO NOT SCALE THE DRAWING

5. ELEVATION LEVELS SHOWN TO BE VE SITE BEFORE COMMENCEMENT OF WOR DISCREPANCIES, IF NOTED, SHOULD BE THE ATTENTION OF ARCHITECT PRIOR T COMMENCEMENT OF WORK.

6. ALL LEVELS SHOWN ARE TO TOP OF S SLAB, FINISH TO BE ADDED.

7. PLEASE SEE A500 SERIES FOR OVERA ELEVATIONS / SECTIONS KEY PLAN

N

D

E A

NOTE: LIST OF REVISIONS POST TENDER ISSUE. All The revisions issued as per Amendment 1-4 holds good ,any discrepancy in the drawing from those to be brought to the notice of ER/PMC.Major revisions are as noted below. Block -A to L 1) Toilet core design modified for all cores at all levels. 2) In the Basement level layout of substation and electrical room profile modified. Parking affected due to this change isupdated..Additional stairs 3 nos added close to substation for direct exit to ground level. 3) Workstation layout modified in all ODC, additional meeting rooms and cabin added. 4)Layout of Administration zone on 1st level block 'F' modified. 5) UPS room Layout on 1st Level block 'B' modified. 6) EDR internal layout modified with reduction in the table size. 7) Block 'I' fire staircase location modified. 8) ODC's indicated at level 4 of block 'B' and block 'D'. 9) Fire Staircase at grid 25 and grid 43 extended to the south facade as per Fire Department requirements. 10)Smoke exhaust shaft introduced in all ODC blocks at all levels. 11)Epoxy paint over concrete surface proposed instead of Kota stone slab for all fire staircase tread and risers except in guest house and Auditorium block.MS angle protectors considered for treads. 12) Vitrified flooring at all locations to be of size 2' x 2' . UTILITY BLOCK 1) Layout plan of Utility block revised. GUEST HOUSE 1) Toilets layouts modified for individual guest rooms and the overall layout of guest block modified to accommodate this change. 2) East and West facade of Guest block modified. SITE PLAN 1) overall site plan edited to update utility block revisions and parking layoyt modified as per NKDA requirement.

B C1

C

D3

REVISION AS PER AMMENDMENT 1-4

D2

RELEASED AS REVISED 100% DD

D1

RELEASED AS 100% DD

D0

RELEASED AS 50% DD

Drawing Title:

BUILDING B EAS BUILDING ELEVAT Scale:

1 : 250

Issue Date: 02/11/11 Drawn by:

LA/KG

Checked

Project No.: 062005.00

A508

© C


Detail design and documentation


As Project Designer, I collaborated with the design team to develop concept, schematic and finally detail design. Apart from workplace planning and architecture concept, I also developed detailed facade systems that corresponds to the extreme climate of Mongolia, and incorporated various display systems required by the client.

9000

1

TDB New Headquarters

A

2 9000

Project

3 9000

4

5

6500

12000

6 6500

7 9000

8 9000

Trade and Development Bank

Contract No

18500

HOK 22/F, 183 Queen's Road Central Hong Kong

HOK 22/F, 183 Qu Hong Kong

S

t +852 3197 6115 f +852 2534 0099

t +852 3197 f +852 2534

VIP

UP

B

All reproduction & intellectual property rights reserved © 2014

4500

4500

Juulchin Stre Toiruu-12

Prepared for

Trade a

PAU 70.86 m²

14.28030.00

Mech. 135.09 m²

C

TDB Ne

A

Prepared for /

Contract No. /

B

Project

Juulchin Street-7, Baga Toiruu-12

18500

8

Phase: Concept, Schematic & Detail Design Client: TDB Group Program: Bank HQ and Commercial office Size: 65,602m2 Status: Construction Drawings

Key Plan

C

All reproduc reserved © Key Plan

LETTABLE OFFICE 161.15 m²

9000

D 3

LETTABLE OFFICE 125.58 m²

N

No. Description

Date

LETTABLE OFFICE 165.59 m²

P A N T R Y

D LETTABLE OFFICE 177.58 m²

LETTABLE OFFICE 178.13 m²

A903

LETTABLE OFFICE 221.34 m²

9000

FICE

9000

9000

at L04 only

E

No. Desc

E

1

CEO OFFICE 56.57 m²

TE

F

Drawn by: JMP Project No:

TE

TE

TE

2

Reviewed by: Checker

A701

14.28030.00

PREVIOUS STUDIES

FLOOR PLAN LEVEL 04 - TENANT OFFICE

Form finding study 2014.07.29

Original drawing is A3. Do not scale this drawing. Sheet Number

A107

11/9/2014 5:11:31 PM

Sheet Title :

25

23.00 m

CEO OFFICE 59.60 m²

A701

PROJECT HISTORY

LETTABLE OFFICE 208.20 m²

2014.08.01

TDB Headquarters | 2014-09-02

1

10500

10500

LETTABLE OFFICE 220.77 m²

CEO OFFICE 59.33 m²

F

Typical level

LEVEL 05 - TENANT TYPICAL OFFICE 2014.08.08

Project No:

Sheet Title :

SCALE: 1 : 300

2014.08.04

Drawn by: J

2014.08.13

FLOO LEVE TYPIC

Original draw

Sheet Numb

TDB Headquarters | 2014-11-12

26

45


Bank Headquarter & Offices Ulanbataar, Mongolia

Image courtesy: HOK


Image courtesy: HOK

Bank lobby Entrance


1061

1061

1061

1043

1043

1061

1061

1061

1061

2 GL02

LEVEL 04 18.5

LEVEL 04 18.5

A807

MT02

1500

1061

MT02

750

Project / 项目名称

TDB New Hea

750

MT01

MT01

Juulchin Street-7, Bag

Prepared For / 业主

GL03

Trade and Dev Bank

ALUMINUM SUSPENDED CEILING

ALUMINUM COLUMN COVER

Contract No / 合约编号:

GL03

HOK 22/F, 183 Queen's Roa Hong Kong

香港中环皇后大道中183号 LEVEL 02 6.5

t +852 3197 6115 f +852 2534 0099

LEVEL 02 6.5

3000

2500

GL03

All reproduction & intellectual pr

In Association with / 其他顾问单

Aurecon

GL03

Structural Engineer Suite 2205-6, 22/F Islan 510 Kings's Road, Nort

GL04

Aurecon

6000

GL03

6000

GL03

Mechanical and Electrical En Suite 2205-6, 22/F Islan 510 Kings's Road, Nort

3

Key Plan:

68.9 1°

1000

GL03

A902

3500

3000

3 A807

ST 02

LEVEL 0-GROUND 0

1

LEVEL 01 0.5

500

500

LEVEL 01 0.5

ENLARGED ELEVATION - SLANTED FACADE SCALE: 1 : 50

7

F

A807

6

ENLARGED SECTION - SLANTED FACADE

2

5

2

E

LEVEL 0-GROUND 0

7

8

F

SCALE: 1 : 50

No.

8

1

A902

12000

105 00

2600 500

2100

500

2100

2364

2100

500

0.50 m

2100

1200

Description DD - 100%

00 105

13.51 m

1

335

2800 ø

3 MT01

3000 0.50 m

GL03 1061

DIFFUSERS

1061

1061

1061

2086

GL03 1061

1061

1061

NOT TO BE USED FO

DOWN LIGHT

1061

Drawn by: Project No.:

3000

UP

METAL PANEL CEILING

0.00 m

0.50 m

1

7

2/16/2015 7:53:46 PM

3

FIRE CURTAIN SHUUTER

ENLARGED PLAN - BANKING HALL LOBBY ENTRANCE

3 194 0 150

GL03

2

0 150

E

Reflected Ceiling Plan

5

12000 2600 335

1200

2100

500

2100

500

2100

500

2100

1200

1

335

200

4

1600

12000

3

DIFFUSERS

3000

750

100

DOWN LIGHT

FIRE SHUTTER METAL

3000

PANEL CEILING

1

METAL PANEL CEILING

2

LAMINATED FIRE CURTAIN GLASS WALL SHUUTER

COMPOSITE PANEL CLADDING

2

3 F

STONE FLOOR

Interior Elevation

Reflected Ceiling Plan

5

Section

4 12000

800

METAL PANEL CEILING LAMINATED GLASS WALL

2

COMPOSITE PANEL CLADDING

1400

3000

11

FIRE SHUTTER

M Ulaanbaatar Mongolia Bank Office

3

800

STONE FLOOR

Interior Elevation

Section

Elevator lobby design May 7, 2015 8:43 PM 14.28030.00 MUTO Ulaanbaatar Mongolia Bank Office

Sheet Title:

纸的原尺寸为A1。不建议缩放图纸的比例

SCALE:

Elevator Lobby 4

R

14.280

Original drawing is A1. Do not sc

F

3D VIEW - GEOMETRY DIAGRAM - SLANTED FACADE

F

Bank lobby facade detail design

Author

COMPONENT S WALL TYPE 03 HALL ENTRY

150 0

8

5

SCALE: 1 : 50

2650

1200

1061

11

Sheet Number / 图号:

A


The competition brief required a signature building form for the new campus. The efficiency of space, yet remained a crucial aspect of design like any IT office space. Facilitating effective collaboration between the design teams in Shanghai and Mumbai, I provided overall design and management expertise, and also developed the facade concept. Given the unique monolithic shape, the facade design had to take in account the constantly varying angle of the surface from the Sun. Hence, the shading element of the facade had to be adaptable, yet somewhat modular. To optimize the system, different depth, width, and frequency of shading fins were tested across the surface.

R

68

Phase: Concept Design Client: Cognizant Program: Commercial Offices Size: 276,640m2 Status: Unbuilt

R 68

R3

BU

G

AT

38 S AY

ON

E

LE

4B

68

IN

R

ILD

30

M

0

YS BA

4

6K

R

+

VE

L

m

30

R

8

m

68

R

R 30

R6

Program Parameters 4 Bay Office Module, 214,652 SQM

Best Fit To Site

10 Floors To Provide Total Above Grade Program Area

Form Finding CORPORATE OFFICES

KITCHEN

MULTI PURPOSE HALL SHARED

IT OFFICE

LIBRARY

TIER 3 DATA

DINING

AUDITORIUM

Program allocation

GYM

RECRUITMENT/ ADMIN


Commercial Complex Chennai, India

Image courtesy: Cannon Design

Lift Archways To Provide Entries And Views

PARKING

Lift And Lower Mass Tops To Adapt To Program

Add Kitchen And Auditorium To Maximize 40% Site Coverage

SERVICE

Adjust Massing To Optimize Program Area Requirements

RECEPTION

TRAINING

DORMITORY


Passive approach to form and facade design Shading Device Analysis NORTH H: 8000 w: 8000 D: 1000 (both horizontal and vertical)

Base module for Shading device optimization: H(height): 8000 W(width): 8000/4000 D(depth): 1500

South West Facade: Optimized Module: May 12pm-5pm H: 8000 W: 4000 D: 2785

South Facade: Optimized Module: March-October 10am-5pm H: 8000 W: 8000/4000 D: 2223

WEST H: 8000 w: 4000 D: 2000 (both horizontal and vertical)

SOUTH WEST H: 8000 w: 4000 D: 2500 (horizontal)

West Facade: Optimized Module: May 2pm-4pm H: 8000 W: 4000-8000 D: 2000

EAST H: 8000 w: 8000 D: 1000 (both horizontal and vertical)

SOUTH H: 8000 w: 8000/4000 D: 2200 (horizontal) Verticals can be less deep and random

East Facade: Optimized Module: March-October 10am-12pm H: 8000 W: 4000-to any length D: 1000

North Facade: Optimized Module: March-October 10am-12pm H: 8000 W: 8000 D: 750

Shading optimization - Envelope Given the unique monolithic shape, the facade design had to take in account the constantly varying angle of the surface from the Sun. Hence, the shading element of the facade had to be adaptable, yet somewhat modular. To optimize the system, different depth, width, and frequency of shading fins placements were tested across the surface that dictates the final design outcome.

Aftenoon Sun from West

Outdoor Covered Terrace

Interiror Dining Zone

Outdoor Dining Zone

Core

N

N

Shading optimization - Built form


West

South

East

North

Shading Device Design

Option 1: Perforated Screen Panels

Option 2: Phenolic Panels

The vertical panels are oriented based on the analysis result following the Sun path to provide optimum shading to the glazing. The continuous horizontal bands provide necessary shade to the South and West facade

Option 1: Wood/Clay Louver/Slats Panels

Parking

Offices and Public Spaces

ptions Clay Slats

Wood Louvers

Phenolic Panels

Metal Perforation

Shading

Daylighting

Parking


As a core design team member, I was responsible for developing a context-specific, robust, yet modern design concept for the new campus in Dubai. The built form is the result of an intersection of two sets of clearly defined volumes. The outer volume, that encased the formal classrooms needed to be opaque and more robust. In contrast, the inner volume needed to be more transparent, as it housed the collaboration and amenities areas. The outer volume creates a protective barrier from the harsh climate. Shaded courtyards were structured out of the intersections. Phase: Concept Design Client: Amity Group Program: University Campus Size: 33,445m2 Status: Completed

Image courtesy: Cannon Design


University Campus Dubai, UAE


CANNON DESIGN / 43

17

16

n entrance ndary entrance ic plaza ts area er field on school ness school nity bar ts bar dential building s and activities puter labs ary bation center n lobby mming pool ts hall

14

15

13

12

11

10

9

3

7

5

8

4 6

1

1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17.

Main entrance Secondary entrance Public plaza Sports area Soccer field Fusion school Business school Amenity bar Sports bar Residential building Clubs and activities Computer labs Library Incubation center Main lobby Swimming pool Sports hall

2

Design concept diagram

South-East Elevation

4

Section showing internal courts

PROGRAM OVERVIEW


Image courtesy: Cannon Design



University Campus Navi Mumbai, India I co-developed the architectural concept for the new 24/7 campus in Navi Mumbai. I focused on developing the massing of the primary education blocks, and auditorium, and later developing the facade. I was also responsible for the BIM model management, and visualization. Phase: Concept & Schematic Design Client: Amity Group Program: University Campus Size: 97,760m2 Status: Phase 1 completed


Massing and facade design study

Courtyard above podium


Stage 1 from playground

School

Residential

Academic stage 1

Amenities Auditorium stage 2

Site plan

Stage 1 construction

Academic - stage 2

Playground


For the Second phase Expansion of the hospital, I worked closely with the Design Leader and the team developing the design concept with focus on the architecture and interior lobby areas. Phase: Concept & Schematic Design Client: TATA Group Program: Cancer Hospital & Research Facility Size: 20,982 m2 Status: Completed

Image courtesy: Cannon Design


Cancer Hospital Extension Kolkata, India


Image courtesy: Cannon Design


Architecture concept study

Level 1


eA

8128

eB

eD

8128

eF

8128

eH

8128

eK

8128

eL

8128

eM

8128

eN

8128

eO

8128

eP

8128

eQ

8128

eR

8128

CAMPUS BOUNDARY

RL 57000

RL 57500

FH

FHR

RL 56500 RL 56500

Description CONCEPT DESIGN ISSUE ISSUED FOR INFORMATION ISSUED FOR INFORMATION ISSUED FOR INFORMATION ISSUED FOR INFORMATION ISSUED FOR INFORMATION ISSUED FOR INFORMATION ISSUED FOR INFORMATION ISSUED FOR INFORMATION ISSUED FOR INFORMATION

Date 11/05/16 13/05/16 19/05/16 01/06/16 15/06/16 29/06/16 01/07/16 05/07/16 12/07/16 13/07/16

Notes & Legend Contractor must verify all dimensions on site before commencing work or preparing shop drawings. Do not scale drawings.

DOCUMENT REVIEW

Brookfield Multiplex Constructions Pty Ltd

RL 57000

A - Acceptable for Construction

FHR

RL 57000

Recent revision history # Status 5 6 7 8 9 10 11 12 13 14

eS

8128

C27 WALLACE WURTH BUILDING (EXISTING)

B - Acceptable for Construction subject to comments. Correct and Resubmit

STORE 79 m²

FEMALE WC 6 m² STAIR 23 m²

MALE WC 8 m²

OFFICE 11 m²

PLANT 6 m²

COMMS 10 m²

PLANT 68 m²

1

RL 57571 eA

eB

eD

eF

eH

COMPUTER LAB

COMMS. 11 m²

BEES / BABS FIRST YEAR (BIOLOGY) 329 m²

CIRCULATION 62 m²

e3

PREP 29 m²

These documents have been reviewed for conformity with design intent. Acceptance does not mean approval of dimensions, sizes or weights nor does it relieve the Subcontractor and/or the Consultant from responsibility for errors, omissions or compliance with his obligations and/or requirements of the Contract and/or Subconract.

Department Legend AMENITIES CIRCULATION

BOTANY

8131

e2

CIRCULATION 18 m²

EXISTING PLANT PLANT RESEARCH RETAIL SERVICE

HATCHED AREA DENOTES "NO PENETRATIONS' ZONE DUE TO SUBSTATION BELOW

MECH PLANT 42 m²

STAGE 1 WORKS SUPPORT SUPPORT - RESTRICTED

1232

PLANT 42 m²

MEETING 10 m²

GOODS LIFT PLANT 5 m² 8 m²

HYD.

ELEC 6 m²

HYD PLANT 20 m²

FHR

UAT 9 m²

PLANT 5 m²

HYD.

POTENTIAL PREP 61 m²

STAIR PRESS 11 m²

RISER 3 m²

CIRCULATION 16 m²

e2

LOBBY 109 m²

CAFE RETAIL 123 m²

BEES / BABS FIRST YEAR (GEO) 195 m²

PREP 118 m²

Reviewed ............................................................. Date ...............................

e1

GAS METER 15 m²

4 DEG. C. 11 m²

STUDENT CENTRE 79 m²

D - Drawing on Hold

8105

RL 57571

e1

LEARNING ENVIRONMENT 155 m²

RL 57570

D26 - STAGE 2 (PROPOSED REFURBISHMENT)

FIP (EXISTING)

CAFE SEATING OUTDOOR

TEACHING DRY

e3

TEACHING WET

1

WORKPLACE

ENTRY SPACE FOYER

eK

eL

eM

eN

eO LIFT

COMPUTER LAB(FUTURE)

eP

LIFT

eQ

eR

CIRCULATION

COMPUTER LAB(FUTURE) CLEANERS

INFORMAL LEARNING AREA

TERRACE

Electrical / ICT / AV

STORE FHR

UAT

LAWN

FIRST AID

WC-F

STORE LIFT

STAIR TEACHING LAB 01 (449)

Calculating... Hydraulic / Fire

LIFT

FHR

WC-M

DASHED OUTLINE DENOTES EXTENT OF STAGE 2 WORKS INCLUDING LANDSCAPE

eS

WAR MR

TEACHING LAB 02 (402)

MECH.

OOM COLD

GARDEN BED

ROO M

EXTENT OF BUILDING ABOVE

Canopy Above Shown Dashed RL 57571

STREET

C - Unacceptable for Construction. Correct and Resubmit for Review

Mechanical / Gases / VT

Structure / Civil

SWITCH BOARD

BIOLINK BUILDING (EXISTING)

FUME

FUME

FHR

COMM

WORKPLACE

STAIR 02

COMPACTUS

TEAC HIN G LA B 03

PREP

UTILITY ROOM

Landscape

(401 )

TEAC HIN G LA B 04

MECH.

Architect

(G01 ) TM

Project Manager

SERVICE ROAD

Builder

MEC H.

STAI R 01 Project

BIOLOGICAL SCIENCES PROJECT

E26 - STAGE 1 (IN CONSTRUCTION)

Botany Street Kensington Campus NSW 2052

LAWN

Client

UNSW Australia

GATE 11

© Woods Bagot Size check

Project number

120277

25mm

Checked

F25 SAMUELS BUILDING (EXISTING)

Typical Level

Approved

JN

Sheet size

A1

Scale

1 : 200

Sheet title

FURNITURE PLANS GROUND LEVEL Sheet number

BS2-WB-AR- 26010

Revision

14

Status

PRELIMINARY

eF

eH

8128

8128

eK

eL

8128

eM

8128

eN

8128

eO

8128

eP

8128

eQ

eR 8128 C27 WALLACE WURTH BUILDING (EXISTING)

8128

Recent revision history # Status 5 6 7 8 9 10 11 12 13 14

eS

8128

SU

SU

ew/ss

FSP

chb

hwb

SU

FSP

8128

chb

CB

chb

Description CONCEPT DESIGN ISSUE ISSUED FOR INFORMATION ISSUED FOR INFORMATION ISSUED FOR INFORMATION ISSUED FOR INFORMATION ISSUED FOR INFORMATION ISSUED FOR INFORMATION ISSUED FOR INFORMATION ISSUED FOR INFORMATION ISSUED FOR INFORMATION

Date 11/05/16 13/05/16 19/05/16 01/06/16 15/06/16 29/06/16 01/07/16 05/07/16 12/07/16 13/07/16

Notes & Legend Contractor must verify all dimensions on site before commencing work or preparing shop drawings. Do not scale drawings.

DOCUMENT REVIEW

FSP

SU

CB

AP-09 hwb/ew

CAMPUS BOUNDARY

eD

8128

Brookfield Multiplex Constructions Pty Ltd

CB

eB

AS/ab

8128

AS/ab

eA

A - Acceptable for Construction B - Acceptable for Construction subject to comments. Correct and Resubmit SU

hwb

D - Drawing on Hold

CB

SU

C - Unacceptable for Construction. Correct and Resubmit for Review

AS/ab

ELECTRO- SPINNER 7 m²

COMMS 10 m²

WORKPLACE 263 m²

340

357A 26m2

342

11m2

26m2

eD

eF

360 6m2

eH

eK

343

343D

347A

343C

343A

8m2

11m2

7m2

14m2

OFFICE 8 OFFICE 9

LIFT

QUIET 4 m²

eP LIFT

eQ

8131

SUPPORT SUPPORT - RESTRICTED TEACHING DRY

e3

TEACHING WET

1

WORKPLACE Calculating...

eR

eS Hydraulic / Fire

STAIR 04

LIFT

STAGE 1 WORKS

ATRIUM

OFFICE 10 OFFICE 11 OFFICE 12 OFFICE 13 OFFICE 14 OFFICE 15

Structure / Civil

FREE ZER S

CIR CULA TIO N Landscape

OPE N LA BOR ATO RY

RISER

EQU IPM ENT

PLANT STAIR 02

TISS UE CULT URE

10m2

RAD IOIS OT

48m2

349D

RAD IOIS OT

6m2

INST RUM ENT

349C

349

DIR TY/N OIS Y

7m2

EQU IPM ENT

6m2

STORAGE

349A 349B

9m2

WASTE INSTRUMENT

2m2

TISSUE CULTURE

3Q10

TISSUE CULTURE

3Q8 19m2

FREE ZER S

COMM

EQU IPM ENT

FUME

OPEN LABORATORY

EQU IPM ENT

WC-F CLNR

DUCT

FUME

FHR

3Q7

SWITCH BOARD

350 45m2

LIFT

WC-M

5m2

10m2 7m2

350C

TEA POINT

UAT

347 150m2

6m2

350D

WORKPLACE Mechanical / Gases / VT

346 30m2

MEETING 12P UTILITY

CIRCULATION

345

352

Electrical / ICT / AV

MEETING 4P

OFFICE 1

3Q6 68m2

353

10m2

OFFICE 7

WORKPLACE

8m2

4m2

22m2

350A

OFFICE 6

eO

344

355 3Q9 8m2

11m2

eN

OFFICE 2

354A

350B

OFFICE 5

QUIET 4 m²

CIRCULATION

eM OFFICE 4

SERVICE

CIRCULATION

356 84m2

BIOLINK BUILDING (EXISTING)

eL OFFICE 3

88m2

11m2

VOID

CIRCULATION

EQUIPMENT FREEZERS

eB

341

5m2

RETAIL

DASHED OUTLINE DENOTES EXTENT OF STAGE 2 WORKS

OFFICE 13 m²

CIRCULATION 143 m²

1

RESEARCH

OFFICE 12 m²

TEAPOINT 11 m²

COMMS 10 m²

PLANT

e2

OFFICE 12 m²

UTILITY 10 m²

EXISTING PLANT

8105

PLANT 36 m²

Align

CB/ab

INSTRUMENT 20 m²

ROBOTS 20 m²

PROTEIN 20 m²

PURIFICATION 20 m²

MALE WC 8 m² FEMALE WC 6 m²

STAIR 23 m²

PLANT 47 m²

OFFICE 12 m²

eA

PLANT 8 m²

ELEC 5 m²

LASER 11 m²

AMENITIES CIRCULATION

OFFICE 12 m²

1232

TEA POINT 12 m²

PLANT 33 m² RISERS

OPEN LAB 306 m²

TISSUE CULTURE

e3

GOODS LIFT 8 m²

CONTROL 6 m²

STORES 18 m²

ELEC 6 m²

FERMENTATION 40 m²

Department Legend

OFFICE 13 m²

INC UBA TOR S

OFFICE 12 m²

STAIR 23 m²

INSTRUMENT ROOM 20 m²

AP-03

UTILITY 12 m²

RISERS

XRD 13 m²

These documents have been reviewed for conformity with design intent. Acceptance does not mean approval of dimensions, sizes or weights nor does it relieve the Subcontractor and/or the Consultant from responsibility for errors, omissions or compliance with his obligations and/or requirements of the Contract and/or Subconract.

e1

UAT+SH 9 m²

TISS UE CULT URE

OFFICE 12 m²

PLANT 31 m²

EQUIPMENT 20 m²

EQUIPMENT 20 m²

MICROSCOPE

e2

WORKPLACE 180 m²

UAT+SH 9 m² CLNR C'BRD 1 m² CIRCULATION 75 m²

COLD ROOM 11 m²

CLNR 4 m²

TISSUE CULTURE 20 m²

PLANT 15 m²

OFFICE 12 m²

FEMALE WC 18 m²

MEETING 23 m²

OFFICE 13 m²

MALE WC 18 m²

e1

Reviewed ............................................................. Date ...............................

SU

D26 - STAGE 2 (PROPOSED REFURBISHMENT)

Architect

RIS ER

WC -M TM

Project Manager

WC-F

Builder

PLAN T STAI R 01 Project

E26 - STAGE 1 (IN CONSTRUCTION)

BIOLOGICAL SCIENCES PROJECT Botany Street Kensington Campus NSW 2052 Client

UNSW Australia

© Woods Bagot Size check

Project number

120277 F25 SAMUELS BUILDING (EXISTING)

Ground Level

Checked

JN

25mm Approved

Sheet size

A1

Scale

1 : 200

Sheet title

FURNITURE PLANS LEVEL 03 Sheet number

BS2-WB-AR- 26300 Status

PRELIMINARY

Revision

14


D26 Building Sydney, Australia I provided design documentation and BIM skills to deliver the design package for the new expansion of the existing Biological Sciences building with additional lab and supporting facilities. This also included new facade design to the existing building. Phase: Schematic Design Client: UNSW, Sydney Program: Lab and research facilities Size: 17,151m2 Status: Complete Image courtesy: Woods Bagot

1

BIO SCIENCE E26 STAGE 1 BUILDING

e3

e2

Recent revision history # Status D 1 IS 2 IS

e1

BIO SCIENCE STAGE 2 D26 BUILDING

EXISTING C27 WALLACE WURTH BUILDING

RL 90000 LEVEL 08

Notes & Legend Contractor must verify all d or preparing shop drawing

DO

4100

3960

3960

3960

3960

3960

3960

3870

4800

Brookfield

A - Acceptable for Cons

RL 85200 LEVEL 07 RL 81330 LEVEL 06

B - Acceptable for Const

C - Unacceptable for Co D - Drawing on Hold

Reviewed ............................

These documents have been revi mean approval of dimensions, siz Consultant from responsibility for requirements of the Contract and/

RL 77370 LEVEL 05 RL 73410 LEVEL 04 RL 69450 LEVEL 03 RL 65490 LEVEL 02 RL 61530 LEVEL 01 RL 57570 GROUND

RL 53470 LOWER GROUND

Hydraulic / Fire

Electrical / ICT / AV

1 eS

EXISTING C27 WALLACE WURTH BUILDING

eR

eQ

EAST ELEVATION SCALE 1 : 200 eP

eO

eN

eM

eL

eK

eH

eF

eD

eB

Mechanical / Gases / VT

eA

Structure / Civil

BIO SCIENCE STAGE 2 D26 BUILDING

Landscape

4100

3960

3960

3960

3960

3960

3960

3870

4800

RL 90000 LEVEL 08

2

NORTH ELEVATION SCALE 1 : 200

Architect

RL 85200 LEVEL 07 RL 81330 LEVEL 06 RL 77370 LEVEL 05 RL 73410 LEVEL 04 RL 69450 LEVEL 03 RL 65490 LEVEL 02 RL 61530 LEVEL 01 RL 57570 GROUND

Project Manager

Builder

Project

BIOLOGICAL

Botany Street Kensington Campu NSW 2052 Client

UNSW Austra

© Woods Bagot Project number

120277 Checked

JN

Approve

Sheet title

RL 53470 LOWER GROUND

OVERALL EL EAST + NORT Sheet number

BS2-WB-ARStatus

PRELIMINAR

Elevations


For this invited competition entry, I collaborated with Lab & Educational planners and led the architectural design. The final proposal was a result of a process focused on design response that is respectful of the site conditions, program, and climate, and added value to the overall experience for the users. Phase: Competition Entry Client: Instem Bangalore Program: Research Labs, Education Campus Size: 40,000m2

Design concept development

Study of the relationship of open spaces and buildings

Relate building mass to existing scale and formation

Best Orientation

Summer Solstice

Create connections between spaces

Dialogue between existing and new forms creating a gateway to the campus

Create connections within buildings

Set hierarchy of open and enclosed spaces

Articulate form to appreciate existing and new lush greenery

Create a distinct identity and street presence

Sun-path Study

Shaded courts in Summer

Facade Insolation in Summer

Autumn Equinox

Winter Solstice

Spring Solstice


The Institute for Stem Cell Biology and Regenerative Medicine Bangalore, India


I was responsible for the planning component for the hotel for the proposed mixed-use development. The 5 star hotel complex included banquet halls, all day and specialty dining, swimming pool and other amenities. The design took advantage of the sloping site, maximizing the floor space area. Phase: Concept Design Client: Hualuxe Group Program: Luxury Hotel and Banquet Size: 20,000m2 Status: Concept Approved

Image courtesy: HOK


Hotel & Commercial Complex Nanning, China


SITE PLAN

4 .02 总平面图

Residential Use 住宅用地

123.00 123.00

109.00

3F H=15m

ad Ro iu 路 ex 秀 Yu 越

Hotel Podium 酒店裙房 4F H=20m

118.00

Retail Semi-Basement 商业半地下室 Tower B 办公塔楼 B 21F H=89.8m

113.00 (±0.00)

22F H=86.8m Hotel Tower 酒店 19F 22F H=76m H=90m

Tower A 办公塔楼A Helipad 直升机停机坪 21F H=89.8m

2F H=10m

110.00

110.00 (±0.00)

106.00

110.00 (±0.00)

113.00 113.00 109.00

110.00

Legend 图例 Property Line 项目实际用地红线

Exhibition Road 会展路

Building Control Line 建筑控制线 Building Entrance 建筑入口 Outdoor Elevation 室外地坪高度

113.00

Indoor Elevation 室内高度

110.00 (±0.00)

南宁凯悦国际酒店及办公楼项目 NANNING KAI YUE INTERNATIONAL HOTEL & OFFICE PROJECT | 2014-07-14

Site plan

Hotel floor plans

SCALE 1 : 1000

0

10

20

50M

N

Convention & Exhibition Use 会展用地

Residential Use 住宅用地


Image courtesy: HOK

Hotel lobby, banquet and tower from arrival court


The brief from the client required a vernacular and context friendly design solution for the Convention Centre, Club House, and sport and accommodation facilities supporting the sport event at the cricket stadium next door, and convention events for rest of the year. As a codesigner, I maintained the balance between the client vision and the modernist aspirations from the Design Lead. Phase: Concept Design Client: IL & FS Program: Convention Center, Club House, Indoor Sports Hall, Restaurant, Guest Rooms, & Villas Size: 16,650m2 Status: Concept

View from the pool

TRUSS ROOF WITH CLAY TILES GUEST ROOMS CONVENTION HALLS

LEVEL 37 ENTRY PLAZA LEVEL 32

RECEPTION LOUNGE

LEVEL 27 KITCHEN RESTAURANT YOGA SERVICE JUICE BAR LEVEL 22

Site Section

LEVEL 21

PO


OOL

Convention Centre & Club House Kerala, India

Image courtesy: Cannon Design

SECTIONÂ 1

Guest house and amenities


Site plan The Villas rest on the steep slope of the site, overlooking the seasonal stream. A simple planning is chosen to complement the architecture of the rest of the campus.

Villas with Stadium as backdrop

1.

Indoor games

2.

Guest House (Tower)

3.

Guest House (Villas)

4.

Convention Centre

5.

Dormitories

6.

Swimming Pool

7.

Central plaza/Outdoor Banquet

8.

Bridge Connection

9.

Visitor’s parking

10.

North Pavilion

11.

South Pavilion

12.

Service Block

13.

Exhibition Ground

14.

Tennis Courts


Image courtesy: Cannon Design

Villa unit floor plan and section


I was involved in the design development stage for this project, where I focused on the detail design for the fixed link bridges, which required great communication with the design team, and individual consultants. I was also responsible for the BIM model and final documentation. Phase: Detail Design Client: Airport Authority of Thailand Program: Airport Terminal & Bridges Size: 12,537 m2 Status: Unbuilt

เจ้ าของโครงการ :

บริษัท ท่ าอากาศยานไทย จํากัด (มหาช

333 หมู่ 7 ถนนเชิดวุฒากาศ แขวงสีกัน เขตดอนเมือง กรุ งเทพฯ โทรศัพท์ : 66(0) 2535-1111 โทรสาร : 66(0) 2535-4061, 66(0) 25 WEBSITE : http://www.airportthai.co.th , E-mail : aatbia@airportt

EPM Consortium

SUVARNABHUMI AIRPORT

ที่ปรึกษาบริหารจัดการโครงการ PMC

บริษัท พีซีบีเค อินเตอร์ เนชั่นแนล จํากัด บริษัท โชติจนิ ดา มูเชล คอนซัลแตนท์ จํากัด บริษัท เอพซิลอน จํากัด ORIENTAL CONSULTANTS CO., LTD.

ที่ปรึกษาออกแบบ (Design Consultan

บริษัท เอ็ม เอ เอ คอนซัลแตนท์ จํากัด

บริษัท ดีไซน์ 103 อินเตอร์ เนชั่นแนล จ HOK,inc.

NACO,Netherlands Airport Consultant BNP Associates, inc. บริษัท ไวส โปรเจ็ค คอนซัลติง้ จํากัด

PROJECT TITLE :

โครงการพัฒนาท่ าอากาศยานสุวรรณภ

( ปี งบประมาณ 2554 - 2560 ) SUVARNABHUMI AIRPORT EXPANSION PRO ( FISCAL YEAR - )

PACKAGE-

อาคารเทียบเครื่องบินรองหลังท แบบงานสถาปั ตยกรรม D-

REVISIONS NO

DATE

DESCRIPTION

ORIGINATOR

DESIGNER NAME วิเชียร วงษ์ นิมมาน LICENSE ว-สถ 536 SIGNATURE DESIGNER CHECKER NAME กิตติ อธิสขุ LICENSE ส-สถ 1065 SIGNATURE PROJECT MANAGER NAME สุวิช ลิม่ ทอง LICENSE วย. 950 SIGNATURE

SCALE DATE

DATE DATE

(A)  :  (A)

มกราคม 2557

DRAWING NO. SHEET NO.

DATE

A /


Subarnabhumi Airport Midfield Terminal Bangkok, Thailand

เจ้ าของโครง

E60

B20

.0

B19

.00

E59

E60

B20

B19

.0

.0

.00

E59

E60

B20

B19

.0

.0

.00

E60

E59

.0

.0

1 577

B19

.00

E59

บริษัท ท่ า

 หมู่ 7 ถนนเช โทรศัพท์ : 66() 25 WEBSITE : http://w

.0

J

J

VARIES

J 5.30

B20

ที่ปรึกษ

บริษัท พีซ บริษัท โชต บริษัท เอพ ORIENTAL

CURTAIN WAL TYPE 4 STRUCTURAL TRUSS, REFER TO STRUCTURAL DRAWINGS

ROOF ACCESS HATCH

564

564

564

1 564

DN

2

55

DN

DN

3

1 564

564

2

55

10.50

3

1

564

564

บริษัท

VARIES AS PER BRIDGE LOCATION

3

ที่ปรึกษา 11.00

VARIES AS PER BRIDGE LOCATION

5.30

1

VARIES AS PER BRIDGE LOCATION

2

55 3

CURTAIN WALL MODULE TO BE EQUALLY DIVIDED. REFER TO INDIVIDUAL BRIDGE FOR EXACT NUMBER OF MODULE

LINE OF ALUMINUM SUNSHADE BELOW

ALIGN CENTER OF CURTAIN WALL MODULE TO CENTER OF TRUSS MEMEBER INTERSECTION, TYP.

บริษัท

HOK

NACO BNP

GUTTER HIGH POINT

บริษัท

ROOF HIGH POINT

PROJECT T

GUTTER 4.80

5

DN

GLAZED LIFT LOBBY -0.20

5

54

BR2

UP

BR3

5

9.50 1 571

DN

54

BR2

1

.

BR1

1

55

55

BR2

BR1

OPEN STAIR LINE OF CURB

564

DATE

2

564

4

564

4

54

REVISIONS NO

2

564

4

BR1

3 577

2

54

1

ENLARG S

55

BR1

PLB ROTUNDA CENTRE

2

55

55

PACKAG

9.00

55

(ป SUVARNABH (

อาคารเท

9.00

ALUMINUM HONEYCOMB PANEL

METAL SCREEN WALL

9.00

55

4.50

4.50

54

VOID

9.00

6 577

BR2

-0.20

UP

BR3 UP

0.00

5

54

BR3

UP

9.00

9.00

BR3

METAL SCREEN WALL

โครงการ

ROOF ASSEMBLY TYPE 2

.0

9.00

.00

10.00

9.00

.0

UP

4

54

54

ORIGINATO

1

562

BRIDGE TYPE 1 - GF

SCALE

1 : 200

2

562

BRIDGE TYPE 1-2F

SCALE

1 : 200

3

562

BRIDGE TYPE 1 - 3F

SCALE

1 : 200

4

562

BRIDGE TYPE 1 - ROOF

SCALE

1 : 200

DESIGNER NAME LICENSE SIGNATURE DESIGNER CHE NAME LICENSE SIGNATURE PROJECT MANA NAME LICENSE SIGNATURE

SCALE DATE


BR1

BR2

BR3

G

ALUMINUM COMPOSITE METAL PANEL

ROOF ASSEMBLY TYPE 2

CURTAIN WALL TYPE 4 WITH GLAZING TYPE 5

L E V E L E R U T R A0 P0 E. D1 1 + F 3

0.0 . . . . . . . . 0.

L E V E L F O O R4 E1 . 4 G1 D+ I R B ︳

L E V E L L A V I R 0 R3 A. 5 + F 2 ︳

L E V E L D N U O0 R2 G. 0 + F 1

ALUMINIUM COMPOSITE METAL PANEL

CURTAIN WALL TYPE 6

-0.20

ALUMINUM COMPOSITE METAL PANEL

1

564

ELEVATION WEST- BRIDGE TYPE 1

SCALE

1 : 200 G

BR3

BR1

ALUMINUM COMPOSITE METAL PANEL

ROOF ASSEMBLY TYPE 2

L E V E L F O O R4 1 E. G4 D1 I+ R B

EXTERIOR WALL ASSEMBLY TYPE 3

-0.20

ELEVATION EAST- BRIDGE TYPE 1

SCALE

L E V E L D N U O0 R2 . G0 + F 1

3

564

L E V E L L A V I R 0 R3 . A5 + F 2

ALUMINIUM COMPOSITE PANEL

L E V E L E R U T R A0 P0 E. 1 D1 + F 3

0.0 . . . . . . . . 0.

CURTAIN WALL TYPE 4 WITH GLAZING TYPE 5

BR2

FIRE RATED WALL AT ALUM COMPOSITE METAL PANEL

1 : 200

G

BR3 VARIES AS PER BRIDGE LOCATION

BR2 9.00

BR1 9.00

L E V E L F O O R4 1 E. G4 D1 I+ R B

.

L E V E L E R U T R A0 P0 E. 1 D1 + F 3

3.0

.

4

564

SECTION 1 - BRIDGE TYPE 1

SCALE

1 : 200

L E V E L D N U O0 R2 . G0 + F 1

-0.20

L E V E L L A V I R 0 R3 . A5 + F 2

3.0

9.50

.0


เจ้ าของโครงการ : E60

B20

B19

E59 ALUMINIUM CAP PIECE WITH PVDF COATING TO MATCH CURTAINWALL

0.0

 หมู่ 7 ถนนเชิดวุฒากาศ แขวงสีกนั เขตดอนเมือง กรุงเทพฯ 121 โทรสาร : 66() 255-461, 66() 254-846 200 X 100 STEEL TUBE WEBSITE : http://www.airportthai.co.th , E-mail : aatbia@airportthai.co.th 0. 0.

L E V E L E R U T R A0 P0 E. 1 D1 + F 3

ALUMINIUM CAP PIECE WITH PVDF COATING TO MATCH CURTAINWALL

ALUMINIUM COMPOSITE PANEL โทรศัพท์ : 66() 255-1111

EXTERIOR GLAZING REFER TO ELEVATION FOR TYPE

TAPERED INSULATION METAL DECK

14.14 EPM Consortium

SUVARNABHUMI AIRPORT

STRUCTURAL BEAM, REFER STRUCTURAL DRAWINGS

SHADOW BOX PANEL

0.0

L E V E L L A V I R0 R3 . A5 + F 2

ALUMINIUM COMPOSITE PANEL

SHEET METAL DRIP EDGE

0.0

L E V E L F O O R4 1 E. G4 D1 I+ R B

ROOF ASSEMBLY TYPE 2

INTUMES M FIREPROOF ALL EXP STRUC ME

15 MM BOARD

บริษัท ท่ าอากาศยานไทย จํากัด (มหาชน)

ROOF OVERFLOW

ที่ปรึกษาบริหารจัดการโครงการ PMC

ALUMINIUM SUNSHADE

L E V E L D N U O0 R2 . G0 + F 1 ︳

2

564

บริษัท พีซีบีเค อินเตอร์ เนชั่นแนล จํากัด บริษัท โชติจนิ ดา มูเชล คอนซัลแตนท์ จํากัด บริษัท เอพซิลอน จํากัด 0.00 ORIENTAL CONSULTANTS CO., LTD.

PERFORATED ALUMINIUM CEILING

ที่ปรึกษาออกแบบ (Design Consultant)

BRIDGE PARAPET 01

1

ELEVATION NORTH- BRIDGE TYPE 1

SCALE

SPRAYED FIRE-RESISTIVE MATERIAL AT CONCEALED AREAS

2

ม เอ เอ คอนซั แตนท์ จํากัด 1 :ล10 SCALE 576บริษัท เอ็

1 : 200

576

บริษัท ดีไซน์  อินเตอร์ เนชั่นแนล จํากัด HOK

0.

0.

NACO,Netherlands Airport Consultants B.V.

EXTERIOR GLAZING REFER TO ELEVATION FOR TYPE

0.0

0.0

VERTICAL CURTAIN WALL SUPPORT

BNP Associates, inc.

ALUMINIUM CAP PIECE WITH PVDF COATING TO MATCH CURTAINWALL

STRUCTURAL DIAGONAL MEMBER, REFER TO STRUCTURAL DRAWINGS

METAL STUD FRAMING

STAINLESS STEEL PANEL COVER

ALUMINIUM COMPOSITE METAL PANEL WALL

บริษัท ไวส โปรเจ็ค คอนซัลติง้ จํากัด

โครงการพัฒนาท่ าอากาศยานสุวรรณภูมิ

.0

( ปี งบประมาณ 2554 - 256 ) ALUMINIUM COMPOSITE SUVARNABHUMI AIRPORT EXPANSION PROJECT METAL PANEL WALL ( FISCAL YEAR 0-0 )

PACKAGE-1

METAL STUD FRAMING

อาคารเทียบเครื่องบินรองหลังที่ 

ALUMINIUM COMPOSITE METAL PANEL WALL

แบบงานสถาปั ตยกรรม ENLARGED ELEVATIONS & SECTIONS 0.0 FIXED BRIDGE TYPE 1 B20

.0

B19

.00

5.30

CARPET FINISH

EXTERIOR SEATHING

EXTERNAL MAINTENANCE LIFT (2)

E60

STAINLESS STEEL PANEL SKIRTING

0.

PROJECT TITLE :

200 x 150 STEEL TUBE STEEL PLATE ANCHOR

4

E59

NO

DATE

STRUCTURAL BEAM, REFER TO STRUCTURAL DRAWINGS

ELECTRICAL BUS DUCT

576

DESCRIPTION

15MM ROOF BOARD

L E V E L E R U T R A0 P0 E. 1 D1 + F 3

.0 3.0

L E V E L L A V I R0 R3 A. 5 + F 2 L E V E L D N U O0 R2 G. 0 + F 1

5 577

INSULATION, TAPERED WHERE REQUIRED 15MM THICK ROOF BOARD

DESIGNER วิเชียร วงษ์ นิมมาน NAME LICENSE ว-สถ 36 DATE SIGNATURE DESIGNER CHECKER NAME กิตติ อธิสขุ LICENSE ส-สถ 06 DATE SIGNATURE PROJECT MANAGER NAME สุวชิ ลิROOF ม่ ทอง ASSEMBLY TYPE 3 LICENSE วย. 0 DATE SIGNATURE

SCALE DATE

5

564

SECTION 2 - BRIDGE TYPE 1

SCALE

1 : 200

VAPOR RETARDER

ORIGINATOR

7

576

DRAWING NO.

METAL DECKING

13/03/57

13/03/57

13/03/57

ROOF AT BRIDGE 1 : 200DETAIL (A1)

: 10 SCALE1 : 400 1(A3)

มีนาคม 

SAE/DC1/2MP/ARC.00/3133/05601.00 SHEET NO.

564 / 901

ELECTRICAL BUS DUCT

5

1 : 10

L E V E L F O O R4 E1 . G4 D1 I+ R B ︳

SPRAYED FIRE-RESISTIVE MATERIAL AT CONCEALED AREAS

EXTERIOR METAL PANEL SOFFIT WITH HANGER SUPPORT

SBS-MODIFIED BITUMINOUS MEMBRANE BUILT-UP ROOFING

4 577

CARPET FINISH

STRUCTURAL SLAB REFER TO STRUCTURAL DRAWINGS

SPRAYED FIRE-RESISTIVE MATERIAL AT CONCEALED AREAS

BRIDGE SOFFIT DETAIL 01

SCALE 576 REVISIONS

.0

STRUCTURAL SLAB, REFER TO STRUCTURAL DRAWINGS

STAINLESS STEEL PANEL SKIRTING


Sustainable Design Concepts OPTION C (STRAIGHT ASCENDANCY) Energy re-Generation A number of energy regenerative strategies can be incorporated along the route for natural energy harvesting and for public education use; Green systems shall be designed to manifest process

Micro Wind Turbine

Solar Chimney

Regenerative Lift

Kinetic Energy Generation

Water Spray Cooling

Landscape Lighting

BIPV canopy

OPTION C (STRAIGHT ASCENDANCY) Light and Wind Permeability Taking advantage of the predominately south-facing orientation, the landscape strips are strategically planned to create an interplay of various quality of light and shade with minimum impact to site wind environment

BIPV canopy

User experience through a new public domain

Electronic Device Charging

Irrigation


Green Connection Hong Kong I played a dual role for this project. It involved developing an innovative design approach to the functional requirement from client to physically connect the higher ground of the park with an walkway, and turn it a multi level public platform. I also worked with the sustainability team to develop passive sustainable features integrated in the design. Phase: Concept Design Client: Hong Kong Department of Recreation Program: Pedestrian Bridge, Public Platforms Status: Concept Submission


All copyrights reserved. E: kaustav.gupta@gmail.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.