PORTFOLIO
ARCHITECTURE
PUBLIC INTEREST
documentation
CONCEPTUAL
PUBLIC INTEREST
CURRENT USAGE
Hands + Face + Mouth
Drink + Fill up bottle
Bathes + Wash clothes at the same time
PROTOTYPE USAGE & SUGGESTIONS
Mirror for shaving
Feet cleaning
Cup for medicine
Timed faucet
Curtains
SAN FRANCISCO, CALIFORNIA clean water stations ongoing since April 2012 $2000 initial budget 6,500+ people reach goal needs assessment, piloting, + prototyping of clean water access wash stations for Mid Market + Tenderloin neighborhoods organised + implemented outreach day strategised with various stakeholders + community members created project plan with budget + fundraising goals
ARTISTIC WIND SCREEN @ FENCE
MISSION BAY BLVD (N) TREES
SECURE FENCE; MEMBER ONLY KEY ACCESS
FUN ACTIVITY ZONE
PRESENTATION AREA
4" (LPW) TAPPED WL + DEDICATED WATER METER w/ backflow preventer
GARDEN ENTRY
FUTURE GARDEN EXPANSION
MULCH GROUND COVER
FUN ACTIVITY ZONE
PAVED AREA
Compost station RS
GARDEN TROUGHS
RS RAINWATER STORAGE (RS)
TOOL STOR.
Rinse //////////////////////////////////////////////////////////////////////////////////////////////// /////////////////////////////////////////////////////////////////////////////////////////////// station
ARTIST DECORATED shipping containers (FACADE facing MB Blvd (S) with shed roof
- semi permanent - above ground - transportable - reusable / recycled
SAN FRANCISCO, CALIFORNIA mobile community garden ongoing since June 2010 $20,000 budget 150 families reach goal mobile community garden in response to demand for resident garden space + lack of Mission Bay community gathering spaces design, planning, fundraising, + non-profit organisation set-up crowdfunding campaign manager
farming observation
interviews + documentation
ISLAND OF IDJWI, DR CONGO subsistence farming, water access + pygmy population integration ongoing since October 2011 budget TBD 2,000+ families reach goal needs assessment, programming + planning for initiatives in subsistence farming, water access, + pygmy population integration assistance with identifying funding sources, grant writing, + crowdfunding campaign
MORENA, ARGENTINA Architecture for Humanity competition for a community football complex team proposal focused on views, locally-sourced materials, and optimizing building and field orientation with sun’s path
PITTSBURG, CALIFORNIA non-profit housing agency + community arts building completed 2012 $12,500 pro-bono consultation services 10,000 square feet programming + feasability studies for non-profit housing agency + community arts program damaged by fire
SAN FRANCISCO, CALIFORNIA temporary parklet completed 2012 $0 budget 180 square feet design, construction + participation of Urban Matters, 5M Project + HUB SF parklet displaying collaborative + flexible workspace
ARCHITECTURE
SAN FRANCISCO, CALIFORNIA 11-story commercial + retail renovation + addition completed Fall 2009 $50 million construction cost 131,000 square feet performed construction administration with project manager designed roof terrace organised + established construction documents for ground floor lobby designed by Iwamoto Scott Architects
SAN FRANCISCO, CALIFORNIA lobby renovation completed Fall 2009 $300K construction cost 1,000 square feet design thru construction administration of lobby remodel existing conditions and budget restraints resulted in an emphasis on key focal points from the street - rear wall and walls adjacent to storefront
SAN FRANCISCO, CALIFORNIA 2-unit residences in Russian Hill completed Winter 2012 $1.9 million construction cost 6,500 square feet residential development working within site constraints and incorporating Russian Hill’s facade typology interior design and material palette to meet market clientele
SAN FRANCISCO, CALIFORNIA multi-use renovation + addition phase one completed Fall 2012 $15 million construction cost 75,000 square feet schematic design and design development for multi-use office and residential brick + timber building in SOMA neighbourhood
SAN FRANCISCO, CALIFORNIA 26-unit 8-story condominum building completion January 2012 $15.2 million construction cost 48,000 square feet construction documents and construction administration interior design and coordination marketing plans and material boards
EAST HAMPTON, NEW YORK residential addition 1,200 square foot addition glass entry and garage with guest rooms and bathroom influenced by the existing home’s geometries
a roof top energy harvesting system utilizes sun-light for both photovoltaic electricity generation and a hot water/preheating system. this green roof top system is a modular unit itself.
green walls screen living area balconies, providing privacy and a literal connection of the lower level gardens to the garden roofs
a great common room
5th level floor plan
component study for PRATT GRADUATE HOUSING: exploded view of assembly of a floor level potable water
component study for PRATT GRADUA exploded view
Roof Garden
Rooftop Garden Roof Garden
BROOKLYN, NEW YORK graduate student housing competition modular building + renewable energy systems designs
Terraced Garden
Covered Porch blackwater graywater
Sunken Garden
Sunken Garden
(Phase One)
(Phase Two)
coat hooks
draped fabric
meridian storage
cappucino finish
world map
photo collage
cork tiles white walls maple finish
accent wall champagne finish
everywhere tables
flor carpet tiles
Universal Giving Office Furniture Layout : Scheme 1 Material Palette www.urbanmattersdesign.com
6/19/2012 9:52:32 PM
SAN FRANCISCO, CALIFORNIA
2-story office space completion October 2012 $65,000 furniture cost 15,000 square feet interior design, space planning + project management for collaborative workspace renovation of 21 offices and 2 large open workspaces interviewed office tenants + designed each office to fit needs and within budget constraints
FFFF
SAN FRANCISCO, CALIFORNIA 2-story office space completion October 2012 $65,000 furniture cost 15,000 square feet
interior design, space planning + project management for collaborative workspace renovation interviewed office tenants + designed each office to fit needs and within budget constraints
SAN FRANCISCO, CALIFORNIA
interior design, space planning + project management for collaborative workspace renovation interviewed office tenants + designed each office to fit needs and within budget constraints
2-story office space completion October 2012 $65,000 furniture cost 15,000 square feet
CONCEPTUAL
fiberglass hollow core ceiling structure structure frame beam
bath
wood mooring pier
kitchen
entrance dining
floor joist
entrance
bath
kitchen
structure frame beam
bedroom
dining
living
compost waste bin bedroom
bedroom
living
outdoor deck
structure tie fiberglass hollow core floor structure
foam filled hollow core ceiling structure
fibergl ceiling
structure frame beam
structu
steel d moorin
steel mooring pier floor joist
floor jo
structure frame beam
structu
hvac + plumbing space
compo
structure tie
structu
fiberglass hollow core floor structure
fibergl floor s
ground girder
groun
MONTEREY, CALIFORNIA A Permanent State of Transience: Fluidity Between Architecture + Landscape studying + designing how buildings + communities can adapt, rather than resist, the changes between land and water with the rising sea levels
KATIE CREPEAU LICENSED ARCHITECT • LEED AP BD+C London, E1 5AE • +44 (0)773 954 1950 kcrepeau@gmail.com • designaffects.com