Undergraduate Architectural Portfolio| 2017

Page 1

karan DALAL PORTFOLIO


This Portfolio is the property of the author and is merely loaned for reference purpose and that it will be never copied, produced, loaned or exhibited, nor used in any way permitted on written consent given by the author to the owner. c Copyright 2017, Karan A. Dalal, kdalal205@gmail.com


contents Curriculum Vitae Design What Is A School?

5-10

Plithos

11-18

Resourceful School

19-24

Rejuvination of Bandra

25-26

Technology Contemprory Museum

27-32

Long Span Structures

33-34

On Two Columns

35-38

Group Work

39-44


curriculum vitae Karan Amber Dalal kdalal205@gmail.com [m] +91 9619145088 105 2C Windermere, Off New Link Road, Andheri (West). Maharashtra, Mumbai-400053. 20th May, 1996. OBJECTIVE: Aspiring to seek a positon as an Intern Architect.

Education and Training 2014-2019 School of Environment and Architecture| University of Mumbai. Bachelor of Architecture Programme (B.Arch). 2012-2014 Narsee Monjee College of Commerce and Economics| Higher Secondary Certificate. Grade 11th and 12th (HSC). 2006-2012 Maneckji Cooper Education Trust School| Indian Certificate for Secondary Education. Grade 5th to 10th (I.C.S.E). 1999-2006 Cathedral and John Connon School| Indian Certificate for Secondary Education. Lower Kindergarten to Grade 5th (I.C.S.E)

Awards and Achievements 2015-2016 General Secretary of Student Council. 2014-2015 Best Performer in Architectural Design (1st Year B.Arch) Best Performer in History, Culture and Built Form (1st Year B. Arch) Stood Third and Second in Semester 1 and 2 Respectively. Sports Secretary of Students Council.

Organisational Skills 2016-2017 Organised the Annual Students Work Exhibitions held at School of Environment and Architecture. 2015-2016 Organised the Annual Students Work Exhibitions held at School of Environment and Architecture. 2014-2015 Organised the Annual Students Work Exhibitions held at School of Environment and Architecture.


Publications Aug 2016 Mumbai Modern| Volume 1| Design, Layout and Compilation. SEA Publication Apr 2016 Ground| Volume| Design, Layout and Compilation. SEA Publication Apr 2015 Car Study| Volume| Design, Layout and Compilation. SEA Publication Jan 2015 Study Trip to Murbad| Newsletter| Summary. SEA Publication

Voluntary Service and Aid Apr 2017 Helped in Interiors of Amber Dalals’ Residence| Free Lancing. May 2017 Volunteer at Sameep Padora and Associates, sPare, sP+a| Sameep Padora. Jun 2016 Service aided for the Painted of new West to East Bridge at Vile Parle Station| Rotary Club of Juhu. Dec 2016 Volunteer at Sameep Padora and Associates, sP+a| Sameep Padora. May 2015 Intern at Plan Arch Architects and Interior Designers| Sunil Thanawala. Mar 2015 Rammed Earth Workshop with Put Your Hands Together, PYHT| Azeer Attari. Jan 2015 Workshop for construction of playing amenities at Malvani with Anukriti|Martina Spies. Dec 2014 Design Workshop with Anagram Architects| Madhav Raman.

Skills AUTODESK AutoCAD| Revit Architecture ADOBE Photoshop| Illustrator| Indesign| Acrobat MICROSOFT Word| Excel| Powerpoint| Paint RHINO Rhinoceros| Grasshopper| Ladybug GOOGLE Sketchup RENDERING V-Ray TECHINAL SKILLS Hand Drafting| Inking| Sketching| Model Making| Measure Drawing VIRTUAL REALITY Unreal Engine

Languages English| Hindi| Gujarati| Marathi

Other Interests Football Table Tennis (Inter School and College) Squash Swimming Cricket Snooker Pool Amateur Photography Films Biking


5


What Is A School ? The project located at Malcolm Baug, Jogeshwari [West], questions the idea of a school. Malcolm Baug is a Parsi Colony located in the midst of a Muslim Dominant area of Jogeshwari. The colony is a gated community that allows ownership to those of the same religion [Parsi]. The colony is extremely beautiful with a steep contour. As one enters the colony the stark change can be noticed from the extremely busy Swami Vivekanand Road to the silence experianced in Malcolm Baug. Malcolm Baug has an abundance of trees and has its development mostly catering to the bungalow typology. It provides for all the acitivies required for the community to sustain itself, from pre primary schooling to recreational to community spaces. The project addresses towards rethinking the idea of schooling. The residents are highly educated, there is immense interaction within the community thus allowing for the residents to share their experinace with one another through educating the younger genration in aspects where government education fails. The Programmes and structure is designed in a way where the community can benefit from one another as well as allow the residents surrounding the colony. The location of the site within Malcolm Baug is towards the periphery thus not disturbing the silence within the community. The programme consists of a library, lecture rooms, exhibition spaces, adiministration and an office space. Semester 4| SEA. Location: Jogeshwari, Mumbai, Maharashtra Guide: Kalpit Ashar.

6


7


8

KARAN AMBER DALAL SY B.ARCH, SEA.


9


Renders of design 10


11


Plinthos Siddhpur, a small town located in the midst of Gujarat. Siddhpur is often known for its immensely intricate designs of art deco houses. This area is accessed by those either old, as an old age hometown or those whose family has a marriage in the near future. Most of the Owners of bungalows in Siddhpur are currently staying in different parts of the counrty and the world. They generally have a housekeeper who takes care of the house in their absense. Each Bungalow is noted by a family logo, mainly the initials of the owner. The design was derived through a series of expirments from the architectonics of Siddhpur. The domain selected was plinths. The plinths of Siddhpur fascinated me as they were of different types and catered to different functions within the built environment. Ranging from accessibilty to transitional, from a step up to non existential, were the functions of the plinth. 3 nodes were identified within Siddhpur where there would be a creation of an intervention. The node near the clock tower was designated to me for my intervention. This area had three abandoned structures, which were perviously used for a maternity clinic, now shifted down the road to the station. The intervention tries building itself around two of the three abandoned structures. The programme consists of a theatre for 50, cafeteria, gallery, office spaces and an archival room Semester 3| SEA Location: Siddhpur, Gujarat. Guide: Rupali Gupte, Samir Raut.

12


Dixit Cards

Dixit Cards

PLINTHS The Dixit card was interpreted as, an enitity is trying to go towards a goal that is seen but cannot be achieved, similar to the plinths in Siddhpur. They can be seen from the outside, can be accessed from the inside, but no one allows that access. As if the plinths are hiding somehting from the public outside.

THEY ARE THE CREATORS, THEY ARE THE INITIATORS, THEY KEEP SECRETS, THEY HAVE CHANGED. Haiku

13


Domain| Plinths 14


The memory box tries to unveil the possiblity of a whole knew existential world within the plinths of Siddhpur.

15


16


Step 1

Step 2

Step 3

Step 4 17


18


19


Resourceful School The project oriented itself towards a design through the aspect of the embodied energy within a structure and self sufficiency. Suvidhya School, located in Malvani is a school divided into two perfectly identical halves. one half catering to an english vernacular schooling authority, and the other marathi. The resource audit of the entire school was done to summesrize its usage of water, electricity, embodied energy, food, light and ventilation. The School has been retrofitted with another built form adjoining it to cater to its new programme. The programme caters towrads designing a design school for graphic design, furniture design and product design. All the necessary steps have been taken to look after the embodied energy, water consumption, electrical usages to be minimal in nature, driving the project towards self sufficiency. Semester 3| SEA Location: Siddhpur, Gujarat. Guide: Sanjay Prakash, Chitra Viswanathan, Ravin dra Punde, Samir Raut.

20


21


22


SECTION EE'

SECTION FF'

SECTION GG'

SECTION HH'

23


SECTION AA'

SECTION BB'

SECTION CC'

SECTION DD'

24


25


Shadow Analysis

Programme

Path Iteration 1

Shadow Analysis

Cultivable Land

Path Iteration 2

24 Hour Sunlight

Market Zones

Path Iteration 3

Indirect Sunlight

Cafeteria

Design Diagram

Rejuvination of Bandra The Project positioned itself towards the connection the rich of bandra to the poor, staying in the slums behind the bandra fort. Total Shadow

Recreation Spaces

The design catered towards making an organic farm that would produced for the rich, thus loosening the rigid line between the two communities. Programmes

Crop Rotation Diagram

Storage for harvest

Enclosed Market

The farms are positioned according to the sun path that has been calulated for the year. The programmes consists of two rails meandering itself around the organic farm making spaces for recreation, storage, market spaces, and Cafes. 26


G E N E R A L

ARABIAN SEA

A

B

E

C

F

H

G

I

J

K

L M

GRASS ON TOP OF STEPS 8300

7500 16200

8000

3200

GRASS ON TOP OF STEPS

2550

2175

15100

7100

3500

3093

7900

500

2

1.0M

1250 2050

10 9 9150

; 1

730 2500

3000

14 15

D1

D2

E P

18

AHU

19 20

S

500

2000

500 500

1500

17

o

500 1700

1500

DRAINAGE DUCT 1500X660

5400

FREIGHT 2.9 X 2.6

3125

20

ELECTRICAL DUCT 2600X660

L

1950

2450

3100

1200

700

887

3500

16

1200

950 3500

7000

7750

1750

3875

21

1.0M

4622

WATER POOL 500 MM THK THROUGHOUT 0.5M

12 13

450

1900

3000

11

2000

4200

2000

2378

2000

4800

18 19

:

7850

2600

500

1750

2250

D4

0.9M

0.8M

0.7M

0.6M

0.5M

0.4M

0.3M

0.2M

17

21

2625

2000 5600

4793 2340

AHU D1 ELECTRICAL ROOM

3000

0.1M

16

S

8

500 5000

15

L

6

2000

2500

14

I

7

1187

4800

1750

13

FL 3 2.5 X 2.4

8973

2300

2500

12

A

9

1480

2443

ELECTRICAL DUCT 1800X800

11

D3

T

5

1200

JANITORS ROOM

10

1033

5550 7993

8

D4 500

DRAINAGE SHAFT 500X900

6 7 9

D3

E

4 FL 2 2.5 X 2.4

1.0M

1225

1200

FF SHAFT 500X900

5

3490

D

- FLOORING FOR ALL FLOORS SHOULD BE IPS OF MAYFAIR GREY COLOUR CODE EXCEPT BASEMENT AND GROUND FLOOR WHERE IT WOULD BE SPECIFIED. -LIN WILL BE PLACED INSIDE JANITORS ROOM

2625

6400

FL 1 2.5 X 2.4

5100 680

2768

3

KITCHEN

4400

SHOP

FAST FOOD RESTAURANT 128 SQ M 1.0M

1.0M

0.9M

0.8M

0.7M

0.6M

0.5M

0.4M

0.3M

0.2M

0.1M

4

7200

7993

3

3500

550

2007

2

N O T E S :

- ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. - DRAWINGS TO BE SEEN WITH RESPECT TO ALL OTHER DRAWINGS. - ALL DECISIONS REINFORCEMENT CALCULATIONS NEED TO BE TAKEN BY STRUCTURAL ENGINEER. - P.C.C IN THE RATIO OF 1:3:6 (CEMENT : SAND: COARSE AGGREGATE) -ALL LEVELS SPECIFIED IN METERS. -DO NOT SCALE THE DRAWING. -ALL MATERIALS SHALL BE DECIDED BY THE ARCHITECT. -ALL DISCREPANCIES SHALL BE BROUGHT TO NOTICE TO THE ARCHITECT BEFORE THE COMMENCEMENT OF ANY WORK. -RICHER CONCRETE MIX TO BE USED FOR THE FOUNDATION AND M:30 MIX TO BE USED FOR THE SUPER STRUCTURE, ALL MIXES SHALL BE SUGGESTED< EXAMINED AND APPROVED BY THE STRUCTURAL ENGINEER. -VERIFY FIELD CONDITIONS AND COORDINATION WITH THE PROJECT DOCUMENTS PRIOR TO PROCEEDING WITH THE WORK. -WORK WITHIN THE FIELD BOUNDARIES AS LOCATED IN THE PROJECT DOCUMENT AND COMPLY WITH ALL THE APPLICABLE BUILDING CODE, REGULATIONS AND ORDINANCE REQUIREMENTS. OCCUPANTS ON THE ADJACENCIES TO THE PROJECT AREA SHALL CONTINUE UNINTERRUPTED OCCUPANCY DURING THE CONSTRUCTION OF THE PROJECT.

D3

22

22 1200

1235

STAFF OFFICE 128 SQ M 1.0M

8000

8000

PODIUM LEVEL 1.0M

R E V I S I O N NO.

23

T A B L E :

ISSUE DESCREPTION

YYYY/MM/DD

23 500

0.9M 0.8M

5301

0.7M 0.6M 0.5M 0.4M 0.3M 0.2M 0.1M

GRASS ON TOP OF STEPS

GROUND LEVEL 0.0M

SCALE 1:100 STAMP AND SIGNATURE:

SHEET CONTENTS :

GROUND FLOOR PLAN

ENTRY DEALT BY:

Karan Amber Dalal

APPROVED: CHECKED:

4900

15400

16125

SCALE:

1:100

DATE:

29th January, 2017.

DRAWING NO:

4200

7500

7800

A

B

700

8000

C

8000

E

F BJ ROAD

27

PROJECT NORTH

7800

G

H

A02

SCHOOL OF ENVIRONMENT SEAAND ARCHITECTURE

I

J

K

L M

CONSTRUCTION AND TECNOLOGY, THIRD YEAR B.ARCH ROLL NO. 06


Contemprory Museum The project aims towards making a complete working drawing set for the construction of a contemprory museum designed in Bandra Fort. The built form has to be in Reinforced cement Concrete. The total area of the project is 6000 sqm. The design of the museum is in exposed concrete with a glazed facade. There is a central courtyard and the structure is taken on stilts for the allowance of movment of public towards the sea making the ground plane free from any formal activity. The programme consists of a basement car park, necessary service rooms, exhibiton soaces artificially ventillated, confernece room, cafeteria, admin, storage, library for children and adults. The design was approached to maintain a visual and openess towards the connection of the Arabian Sea to the mainland. The exposed concrete allowed for the structure to be robust. Semester 6| SEA Location: Bandra, Mumbai, Maharashtra. Guide: Ravindra Punde, Dipti Bhaindarkar.

28


G E N E R A L

ARABIAN SEA A

B

E

C

F

H

G

I

J

K

L M N

O

39250 7500

8000

3200

2175

2768

7307

150

8300

1

1

7632

7632

500MM DRAIN THROUGHOUT

2

D

E

T

A

I

L

S

:

1

;

2768

9

2

N O T E S :

- ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. - DRAWINGS TO BE SEEN WITH RESPECT TO ALL OTHER DRAWINGS. - ALL DECISIONS REINFORCEMENT CALCULATIONS NEED TO BE TAKEN BY STRUCTURAL ENGINEER. - P.C.C IN THE RATIO OF 1:3:6 (CEMENT : SAND: COARSE AGGREGATE) -ALL LEVELS SPECIFIED IN METERS. -DO NOT SCALE THE DRAWING. -ALL MATERIALS SHALL BE DECIDED BY THE ARCHITECT. -ALL DISCREPANCIES SHALL BE BROUGHT TO NOTICE TO THE ARCHITECT BEFORE THE COMMENCEMENT OF ANY WORK. -RICHER CONCRETE MIX TO BE USED FOR THE FOUNDATION AND M:30 MIX TO BE USED FOR THE SUPER STRUCTURE, ALL MIXES SHALL BE SUGGESTED< EXAMINED AND APPROVED BY THE STRUCTURAL ENGINEER. -VERIFY FIELD CONDITIONS AND COORDINATION WITH THE PROJECT DOCUMENTS PRIOR TO PROCEEDING WITH THE WORK. -WORK WITHIN THE FIELD BOUNDARIES AS LOCATED IN THE PROJECT DOCUMENT AND COMPLY WITH ALL THE APPLICABLE BUILDING CODE, REGULATIONS AND ORDINANCE REQUIREMENTS. OCCUPANTS ON THE ADJACENCIES TO THE PROJECT AREA SHALL CONTINUE UNINTERRUPTED OCCUPANCY DURING THE CONSTRUCTION OF THE PROJECT.

7993

2600

O B A

3100

E

475

P

9150

2300

89

1100

14 4054

4250

1850 300

700

12 13

SUMP PUMP AND DRAIN AREA

15 16 17

ELECTRICAL DUCT 2600X660

200

18 19

2000

DRAINAGE DUCT 1500X660

5270

6200

21

18

PUMP ROOM 4 FIRE PUMPS 2 HYDRONEUMATIC PUMPS

19 20

1200

5400

FREIGHT 2.9 X 2.6

2925

20

11

4000 7900 2785

7750

17

1560

196

16

10

-6.5

2150

15

46270

2261

ELECTRICAL DUCT 1800X800

93

11

14

8 9

8000

2043

10

6 7

o

CHILLER ROOM 64 SQM

9

5

L

890

8

FL 3 2.5 X 2.4

3200

1168

DRAINAGE SHAFT 500X900

6 7

7900

S

1457

FF SHAFT 500X900

5

13

4

V

4

12

2625

FL 2 2.5 X 2.4

3

E

2625

FL 1 2.5 X 2.4

2600

3

- FLOORING FOR ALL FLOORS SHOULD BE IPS OF MAYFAIR GREY COLOUR CODE EXCEPT BASEMENT AND GROUND FLOOR WHERE IT WOULD BE SPECIFIED. -LIN WILL BE PLACED INSIDE JANITORS ROOM

21

1.0M

3875

-6.0 7300

22

22

8106

9276

10106

23

8000

MUNICIPAL WATER TANK

FIRE FIGTHING WATER TANK

STORAGE 128 SQM -5.0

-5.0

1681

3959

6655

8000

STORAGE AND CONSERVATION LAB 216 SQM

2800

2000

7600

R E V I S I O N NO.

T A B L E :

ISSUE DESCREPTION

YYYY/MM/DD

23 2645

1791

2106

2645

3959

TANKER WATER TANK

24 162

24

225 201

1950

1650

4200

500

7800

7500

475

1950

3200

8000

8000

125 1950

218

7800

8000

7307

150

7650

39250

STAMP AND SIGNATURE:

A

B

C

E

F

G

H

I

J

K

L M

N

O

BJ ROAD

GROUND LEVEL 0.0M

SHEET CONTENTS :

BASEMENT PLAN

DEALT BY:

Karan Amber Dalal

APPROVED: CHECKED: SCALE:

1:100

DATE:

29th January, 2017.

DRAWING NO:

PROJECT NORTH

A01

SCHOOL OF ENVIRONMENT SEAAND ARCHITECTURE CONSTRUCTION AND TECNOLOGY, THIRD YEAR B.ARCH ROLL NO. 06

29


150MM HIGH SKIRTING TOUNGUE AND GROOVE JOINT 2000X100X20 WOODEN FLOORING PANEL

INSULATION SCREWS DOVE TAIL CUT

CEMENT FINISHED TILES (WET CLADDED)

TEAK WOOD SECTION 600 MM DEEP BEAM DAYLIGHT LED 230 WIDE BK WALL DETAIL B SCALE 1:8

G E N E R A L

DETAIL A SCALE 1:20 ELECTRICALS

NEGATIVE CAPS

ISOMETRIC VIEW

HANDRAIL OF 150X120 TEAK WOOD WITH LED LIGHT

150MM TK RCC FOLDED PLATE STAIRCASE RISER= 150

DETAIL A

SCALE 1:10

TREAD=300

300MM TK RCC COLUMN, EFFECTIVE TK 150 MM

20 MM TOUGHENED GLASS DETAIL C

100 X 100 BOX SECTION

4500

DETAIL B

2 HOUR RATED DOUBLE PANEL PUSH PANIC DOOR

S T A I R

W E L L

L A N D I N G

SCALE 1:5 ROOF

D

E

T

A

I

L

S

:

DOWN 2000 MM WIDE +4.50 +8.25

DETAIL C

+10.35 +10.20 +10.05 +9.90 +9.75 +9.60 +9.45 +9.30 +9.15 +9.00 +8.85 +8.70 +8.55 +8.40

SCALE 1:50

+10.50 +6.00

STAIRCASE SECTION BB'

M I D

10 MM INSULATION

1500 MM WIDE +6.15 +6.30 +6.45 +6.60 +6.75 +6.90 +7.05 +7.20 +7.35 +7.50 +7.65 +7.80 +7.95 +8.10

20 MM WATERPROOFING LAYER 5MM TK L SECTION 150MM TEAK SCALE 1:20 DETAIL A FOR DRIP MOULD WOOD SKIRTHING AND HAND SKIRTING RAIL TURN ASSEMBLY 150 MM TK RCC SLAB DETAIL A SCALE 1:10

N O T E S :

- ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. - DRAWINGS TO BE SEEN WITH RESPECT TO ALL OTHER DRAWINGS. - ALL DECISIONS REINFORCEMENT CALCULATIONS NEED TO BE TAKEN BY STRUCTURAL ENGINEER. - P.C.C IN THE RATIO OF 1:3:6 (CEMENT : SAND: COARSE AGGREGATE) -ALL LEVELS SPECIFIED IN METERS. -DO NOT SCALE THE DRAWING. -ALL MATERIALS SHALL BE DECIDED BY THE ARCHITECT. -ALL DISCREPANCIES SHALL BE BROUGHT TO NOTICE TO THE ARCHITECT BEFORE THE COMMENCEMENT OF ANY WORK. -RICHER CONCRETE MIX TO BE USED FOR THE FOUNDATION AND M:30 MIX TO BE USED FOR THE SUPER STRUCTURE, ALL MIXES SHALL BE SUGGESTED< EXAMINED AND APPROVED BY THE STRUCTURAL ENGINEER. -VERIFY FIELD CONDITIONS AND COORDINATION WITH THE PROJECT DOCUMENTS PRIOR TO PROCEEDING WITH THE WORK. -WORK WITHIN THE FIELD BOUNDARIES AS LOCATED IN THE PROJECT DOCUMENT AND COMPLY WITH ALL THE APPLICABLE BUILDING CODE, REGULATIONS AND ORDINANCE REQUIREMENTS. OCCUPANTS ON THE ADJACENCIES TO THE PROJECT AREA SHALL CONTINUE UNINTERRUPTED OCCUPANCY DURING THE CONSTRUCTION OF THE PROJECT.

UP

SCALE 1:50

PLAN AT 10500 MM

+5.85 +5.70 +5.55 +5.40 +5.25 +5.10 +4.95 +4.80 +4.65

3RD FLOOR

UP

SCALE 1:50

PLAN AT 6000 MM

M.S RAILING

+4.50

W E L L

DOWN 2000 MM WIDE

S T A I R

1900

+6.00

4500

MID LANDING

M I D

+2.40 +2.55 +2.70 +2.85 +3.00 +3.15 +3.30 +3.45 +3.60 +3.75 +3.90 +4.05 +4.20 +4.35

M.S RAILING DETAIL A

L A N D I N G

4TH FLOOR DETAIL A

MID LANDING

4500

L A N D I N G

W E L L

+2.10 +1.95 +1.80 +1.65 +1.50 +1.35 +1.20 +1.05 +0.90 +0.75 +0.60 +0.45 +0.30 +0.15

M.S RAILING

S T A I R

DOWN 2000 MM WIDE +0.00 +4.50

+2.25

2ND FLOOR

M I D

+2.40 +2.55 +2.70 +2.85 +3.00 +3.15 +3.30 +3.45 +3.60 +3.75 +3.90 +4.05 +4.20 +4.35

4500

MID LANDING

NO.

ISSUE DESCREPTION

YYYY/MM/DD

UP

SCALE 1:50

PLAN AT 4500 MM

W E L L +0.00

-4.35 -4.20 -4.05 -3.90 -3.75 -3.60

M I D

6000

S T A I R

STAMP AND SIGNATURE:

-2.25

L A N D I N G -4.50 +0.00

DOWN

+0.90 +0.75 +0.60 +0.45 +0.30 +0.15

M.S RAILING MID LANDING

-0.15 -0.30 -0.45 -0.60 -0.75 -0.90 -1.05 -1.20 -1.35 -1.50 -1.65 -1.80 -1.95 -2.10

1ST FLOOR

UP

SHEET CONTENTS :

STAIRCASE STAIRCASE DETAILS

M.S RAILING 2000

PLAN AT 0 MM

GROUND FLOOR

8500

M.S RAILING

-4.65 -4.80 -4.95 S T A I R

W E L L

SCALE 1:50

SCALE:

AS SPECIFIED

DATE:

29th January, 2017.

DRAWING NO:

PROJECT NORTH

DOWN

BASEMENT STAIRCASE SECTION AA'

Karan Amber Dalal

APPROVED: CHECKED:

-2.25 -5.00

5000

5000

MID LANDING

DEALT BY:

-4.35 -4.20 -4.05 -3.90 -3.75 -3.60 -3.45 -3.30 -3.15 -3.00 -2.85 -2.70 -2.55 -2.40

M.S RAILING

-4.50 M I D L A N D I N G 2000 MM WIDE

PLINTH LEVEL

2000

SCALE 1:50

PLAN AT -2750MM

SCALE 1:50

A16

SCHOOL OF ENVIRONMENT SEAAND ARCHITECTURE CONSTRUCTION AND TECNOLOGY, SECOND YEAR ROLL NO. 06

30


G E N E R A L

NON ACCESSIBLE ROOF, CONCRETE INSITU CAST +24 ROOF LEVEL

IPS FLOORING MILD GREY 25 MM WATERPROOFING LAYER

150MM THICK RCC SLAB DETAIL A

+24 ROOF LEVEL BOLTED CHANNEL PLATE

4505

STEEL BOX SECTION CHANNEL 100 X 100 RUBBER INSULATION

4347

DRIP MOULD L ANGLE WELDED CONNECTION INSULATION

DETAIL B

+19.5 4th FLOOR

4500

D

E

T

A

I

L

S

:

- FLOORING FOR ALL FLOORS SHOULD BE IPS OF MAYFAIR GREY COLOUR CODE EXCEPT BASEMENT AND GROUND FLOOR WHERE IT WOULD BE SPECIFIED. -LIN WILL BE PLACED INSIDE JANITORS ROOM -IPS FLOORING TO BE DONE IN THE SPACES SPECIFIES AROUND FRTW. IPS OF COLOUR CODE MILD GREY SHOULD BE USED.

4350

10 MM THICK GLASS

N O T E S :

- ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. - DRAWINGS TO BE SEEN WITH RESPECT TO ALL OTHER DRAWINGS. - ALL DECISIONS REINFORCEMENT CALCULATIONS NEED TO BE TAKEN BY STRUCTURAL ENGINEER. - P.C.C IN THE RATIO OF 1:3:6 (CEMENT : SAND: COARSE AGGREGATE) -ALL LEVELS SPECIFIED IN METERS. -DO NOT SCALE THE DRAWING. -ALL MATERIALS SHALL BE DECIDED BY THE ARCHITECT. -ALL DISCREPANCIES SHALL BE BROUGHT TO NOTICE TO THE ARCHITECT BEFORE THE COMMENCEMENT OF ANY WORK. -RICHER CONCRETE MIX TO BE USED FOR THE FOUNDATION AND M:30 MIX TO BE USED FOR THE SUPER STRUCTURE, ALL MIXES SHALL BE SUGGESTED< EXAMINED AND APPROVED BY THE STRUCTURAL ENGINEER. -VERIFY FIELD CONDITIONS AND COORDINATION WITH THE PROJECT DOCUMENTS PRIOR TO PROCEEDING WITH THE WORK. -WORK WITHIN THE FIELD BOUNDARIES AS LOCATED IN THE PROJECT DOCUMENT AND COMPLY WITH ALL THE APPLICABLE BUILDING CODE, REGULATIONS AND ORDINANCE REQUIREMENTS. OCCUPANTS ON THE ADJACENCIES TO THE PROJECT AREA SHALL CONTINUE UNINTERRUPTED OCCUPANCY DURING THE CONSTRUCTION OF THE PROJECT.

10 MM THICK GLASS

RUBBER INSULATION

+15 3rd FLOOR

STEEL BOX SECTION CHANNEL 100 X 100

IPS FLOORING MILD GREY

4500

DRIP MOULD L ANGLE WELDED CONNECTION INSULATION

4350

150MM THICK RCC SLAB

4500

+19.5 4th FLOOR

4350

L ANGLE WELDED CONNECTION INSULATION WATERPROOFING

BOLTED CHANNEL PLATE +10.5 2nd FLOOR

STEEL BOX SECTION CHANNEL 100 X 100 RUBBER INSULATION 10 MM THICK GLASS SCALE 1:5 IPS FLOORING MILD GREY 25MM THICK WHITE MARBLE TILE

+1.25 PODIUM LEVEL

WATERPROOFING LAYER 25 MM THICK 1:100 SLOPE

DRIP MOULD

+6.0 1st FLOOR

450 X 300 RCC BEAM

T A B L E :

ISSUE DESCREPTION

5957

PAVEMENT OF PRECAST CONCRETE BLOCKS

R E V I S I O N

15 MM MORTAR LAYER 25MM THICK SHAHBAD STONE ALUMINIUM WINDOW VENTILATOR

YYYY/MM/DD

6000

DRIP MOULD

MORTAR LAYER 25 MM THICK WATER PROOFING LAYER BRICK BAT KOBA 1:100 SLOPE 0.0 G.L +1.25 PODIUM LEVEL

0.0 G.L

STAMP AND SIGNATURE:

4800

1245

300 THICK RCC RETAINING WALL

DETAIL C

DETAIL D SHEET CONTENTS :

EXTERNAL WALL SECTION 1

-4.0 M BASEMENT LEVEL 300 THICK RCC RETAINING WALL

FIREFIGHTING DRAIN

DEALT BY:

Karan Amber Dalal

APPROVED: CHECKED:

500 MM THICK RCC BASMENT SLAB

SCALE:

AS SPECIFIED

DATE:

29th January, 2017.

EXTERNAL WALL SECTION SCALE 1:50

DRAWING NO:

PROJECT NORTH

SCALE 1:10 DETAILS

A17

SCHOOL OF ENVIRONMENT SEAAND ARCHITECTURE CONSTRUCTION AND TECNOLOGY, THIRD YEAR B.ARCH ROLL NO. 06

31


G E N E R A L

A

B

D E

C

F

H

G

I

J

K

L M N

O

39250 7500

8000

3200

2175

2768

7307

150

8300

1

RW1

S1

S2

C1

C2

2768

b

2

C5

B34

B35

B36

B7

B8

S8

B9

S9

S10

S1

B40

15 16 17 18

C13

C14

C16

C18

C17 SW3

3875

22

B47

C23

C24

8000 2645

S32

C26

22

B55

B56

B27 S30

S31

B60

S36

B31

ISSUE DESCREPTION

YYYY/MM/DD

23

C32 S35

B30

NO.

B61

C31 S34

B29

21

S26

C27

B54

B59

S33

B28

S25

B26

C30

17 19

B22

S29

B58 C29

16 18

B50

B21 S24

B25

B57

15

20

C25

S28

12 14

S1

S20

C21 B49

B53

B24

B23

C28

B17

S19 C20

S23

B52

S27

23

S16

13

B16

B20

S22

B51

RW6

c'

EXCAVATION AND PCC SCREED LINE

S21

C22

B46

SW4

C19

B19 B18

c

B48

21 RW5

11

C15

S18

9 10

B45

B15 S17

8

S15

B14

RW4

:

6

9150 46270

2261

S14 B44

B43

SW2

2925

20

C12

C11

B12

S13

B42

B13

19

B11

S12 RW3

S

7

4054 4250

14

1850 89

13

2150 700 200 196 300

46270

93

11

B10

7750

10

L

2600

B41 C10

SW1

I

5

C9

B39

3100

C8

B38

2043

9

12

C7

1457

8

A

4

S11 SW5

890 1168

6 7

T

3

S7

C6

E

8000

5

D

B37

b'

B6

a'

S6

475

2625

B5

a

S5

2600

4

S4

C4

B33

3 RW2

S3

C3

B32

B4

2645

2

B3

7632

B2

2625 7993

7632

B1

8000

1

N O T E S :

- ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. - DRAWINGS TO BE SEEN WITH RESPECT TO ALL OTHER DRAWINGS. - ALL DECISIONS REINFORCEMENT CALCULATIONS NEED TO BE TAKEN BY STRUCTURAL ENGINEER. SHORING LINE 2000MM AWAY - P.C.C IN THE RATIO OF 1:3:6 (CEMENT : SAND: FROM BUILDING LINE COARSE AGGREGATE) -ALL LEVELS SPECIFIED IN METERS. -DO NOT SCALE THE DRAWING. -ALL MATERIALS SHALL BE DECIDED BY THE ARCHITECT. -ALL DISCREPANCIES SHALL BE BROUGHT TO NOTICE TO THE ARCHITECT BEFORE THE COMMENCEMENT OF ANY WORK. -RICHER CONCRETE MIX TO BE USED FOR THE FOUNDATION AND M:30 MIX TO BE USED FOR THE SUPER STRUCTURE, ALL MIXES SHALL BE SUGGESTED< EXAMINED AND APPROVED BY THE STRUCTURAL ENGINEER. -VERIFY FIELD CONDITIONS AND COORDINATION WITH THE PROJECT DOCUMENTS PRIOR TO PROCEEDING WITH THE WORK. -WORK WITHIN THE FIELD BOUNDARIES AS LOCATED IN THE PROJECT DOCUMENT AND COMPLY WITH ALL THE APPLICABLE BUILDING CODE, REGULATIONS AND ORDINANCE REQUIREMENTS. OCCUPANTS ON THE ADJACENCIES TO THE PROJECT AREA SHALL CONTINUE UNINTERRUPTED OCCUPANCY DURING THE CONSTRUCTION OF THE PROJECT.

B32

24 162

24

225 201

1950

4200

1650

500

7800

7500

1950

3200

8000

8000

8000

475

125 1950

218

7800

7307

150

7650

39250

A

B

G.L

C

D E

F

SCALE 1:100

G

400MM THICK RETAINING WALL (RW1) WATER PROOFING WITH SHAHBAD TILES 100MM INCLUDING 20MM MORTAR

H

I

J

K

L M N

STAMP AND SIGNATURE:

O

C2 400 X 800 MM SW4 (SHEAR WALL) HOLLOW CORE RW1 (RETAINING WALL 1)

RAMMED EARTH AT EVERY METER

ELEVATION LINES FOR B32 AND B33 OF BEAM DEPTH, WATER PROOFING AND PCC SCREED RESPECTIVELY

SHORING TO ALLOW FOR SHUTTERING OF RETAINING WALL

SHEET CONTENTS :

FOUNDATION PLAN. FOUNDATION DETAILS.

BASE BEAM 400 X 1000 MM (B17)

BASE BEAM 400 X 1000 MM (B5), (B6) BOTTOM SLAB 250MM THICK

BOTTOM SLAB 250MM THICK

WATER PROOFING WITH SHAHBAD TILES 100MM INCLUDING 20MM MORTAR

WATER PROOFING WITH SHAHBAD TILES 100MM INCLUDING 20MM MORTAR

200MM PCC SCREED 200MM AGGREGATE 200MM RAMMED EARTH 200MM PCC SCREED

200MM PCC SCREED 200MM AGGREGATE 200MM RAMMED EARTH 200MM PCC SCREED

CELLULAR FOOTING

CELLULAR FOOTING

200MM PCC SCREED HARD STRATA

200MM PCC SCREED HARD STRATA

DEALT BY:

Karan Amber Dalal

APPROVED: CHECKED: SCALE:

AS SPECIFIED

DATE:

29th January, 2017.

DRAWING NO:

PROJECT NORTH

SECTION aa'

SECTION bb'

S01

SCHOOL OF ENVIRONMENT SEAAND ARCHITECTURE CONSTRUCTION AND TECNOLOGY, THIRD YEAR B.ARCH ROLL NO. 06

SECTION cc'

SCALE 1:50

32


Block Plan ABOVE

210

BELOW

920

500

200

80

FOUNDATION DETAIL PLAN 921

PINNED JOINT ASSEMBLY DETAIL

PLAN

SCALE;

1:25

1601 400

500X400 BOX SECTION 172

700

500X500 ARCHED BOX SECTION

980

1480

150

500

1510

1.5M DEEP TRUSS

400

1610

KINETIC PANELS 0->45 DEG

500

172

10 MM GLASS

PILE CAP

390

350

STEEL SEAT ANCHOR BOLTS

250

500X500 FABRICATED BOX SECTION

PILE FOUNDATION ELEVATION

SCALE;

1:25

SECTION

SCALE;

1:25

BOLTED CONNECTIONS A

TILE AND GLASS CLADDING

A'

STEEL SEAT WITH ANCHOR BOLT PILE CAP PILE FOUNDATION ELEVATION

33

PLAN

SCALE;

SCALE;

PINNED JOINT DETAIL ABOVE PLAN

1:5

PINNED JOINT DETAIL BELOW

1:25

1:25

SCALE;

PLAN

SCALE;

100X100 BOX SECTION

1:5

WELDED PLATES FOR PINNED JOINT

SECTION

SCALE;

1:15


# 9 5 2

1

# 9 6 3

SHEET CONTENTS :

PLAN AT BALCONY LEVEL

*

9

8

4

0

0

7

2

*

5

6

8

2

1

5

4

8

7

0

1

3

4

#

7

6

*

3

Plan

DEALT BY:

Karan Amber Dalal

APPROVED: CHECKED: SCALE:

1:200

DATE:

21ST OCTOBER, 2016.

NOTES: DRAWING NO:

5

SOLAR SENSITIVE PANELS

NORTH - ALL DIMENSIONS ARE INPROJECT MILLIMETERS UNLESS OTHERWISE SPECIFIED. SCHOOL OF ENVIRONMENT AND ARCHITECTURE - DRAWINGS TO BE SEEN WITH RESPECT TO CONSTRUCTION AND TECNOLOGY, ALL OTHER DRAWINGS. SECOND YEAR ROLL NO. 06 - ALL DECISIONS TO BE TAKEN BY STRUC. ENG - P.C.C IN THE RATIO OF 1:3:6 (CEMENT : SAND: COARSE AGGREGATE) -ALL LEVELS SPECIFIED IN METERS.

HYDRAULIC HINGE RUBBER TO CREATE VACUM IN ARRESTED POSITION

Long Span Structures

ARRESTED POSITION

The project is situated in Bueno Aires, the capital of Argentina.

100X100 BOX SECTION BEAMS WASHER AND NUT TO ALLOW FREE MOVEMENT

The design process included immense usage of radiation analysis, psychometric charts, wind rose diagrams, temperature range and use and designing of new technology and study of long span structures, as 30m by 50m column free space was required.

ROLLER CHANNEL

100X100 VERTICAL TRUSS MEMBER

STOPPER STEEL SEAT FOR ALLOWING ALL MEMBERS TO JOIN PINNED JOINT

HYDRAULIC GAS HINGE MECHANIZED TO ALLOW MOVEMENT BETWEEN 0 DEG AND 45 DEG ATTACHED TO A ROLLER CHANNEL ALLOWING FOR THE MOVEMENT. THE TOP OF THE PANEL HAS SOLAR SENSITIVE CELLS THAT REACT ACCORDING TO THE CODING AND SUN ANGLE DURING THE DAY TO ALLOW MAXIMUM VENTILATION AND SUNLIGHT. EACH PANEL IS TRIANGULAR TO MAXIMIZE THE SPEED VELOCITY TO DECREASE THE HUMIDITY IN THE SURROUNDINGS

To acquire such a large span, architecturally exposed structural steel was utilised as its principal structural system. a space frame with 1.7m deep girders was used to attain the required area.

THE ROOF AFTER HALL 1 IS CLADDED REFLECTIVE TILES AND OPAQUE GLASS TO ALLOW HEAT TO TRANSFER DURING THE THE WINTER MONTHS THUS DECREASING THE DEMAND FOR HEATERS INSIDE THE SECOND HALL

The roof of the project was sensitive to direct sunlight, this would allowed it to open within the azimuth and altitude, thus allow indirect sunlight from one direction. the other triangle of the roofing panel was open for ventilation and diffused south light.

100X 100 STEEL BOX SECTION STEEL PLATE BOLTER WITH DIA 10MM BOLTS

SCALE;

1:5

SHEET CONTENTS :

DETAILS

RUBBER ADHESIVE TO PREVENT WATER TO SEEP

DEALT BY:

SOLAR SENSITIVE PANELS

The programme consists of theatre design, office design, exhibition spaces and common meeting lounge.

Karan Amber Dalal

APPROVED: CHECKED:

TILE CLADDING JOINT WITH STEEL STUDS

SCALE:

VARIES

DATE:

21ST OCTOBER, 2016.

DRAWING NO:

PROJECT NORTH

SCALE;

1:10

1

SCHOOL OF ENVIRONMENT AND ARCHITECTURE

Semester 5| SEA Location: Bueno Aires, Argentina. Guide: Ravindra Punde, Dipti Bhaindarkar, Chaitan ya Mehta, Abhilasha Porwal.

CONSTRUCTION AND TECNOLOGY, SECOND YEAR ROLL NO. 06

Details

34


- ALL DIMEN UNLESS OT - DRAWINGS ALL OTHER - ALL DECISI - P.C.C IN TH COARSE A -ALL LEVELS

B

A

943

C

1034

D

1062

F

E

1015

977

977

H

G

1015

I

1015

J

1390

1 646

1

2688

1a

4500

4500

2

9875

2

3

2688

3

646

4a

4

4

SHEET C

SECTIO PLAN

9427

DEALT B

A

B

C

D

E

F

G

H

I

J

APPROV

CHECKE

CUT PLAN AA' AT DECK LEVEL 4700MM

SCALE: DATE:

SCHO ARCH

CONSTR SECON ROLL NO

35


On two Columns The project is situated besides a river, to allow for a visual deck for viewing a boat race. The motive of the design was to make the structure architecturally exposed in structural steel, develope details for junctions and allow it to stand on two columns using valid load pattern calculations to derive section sizes. Semester 4| SEA Location: Guide: Ravindra Punde, Dipti Bhaindarkar, Chaitan ya Mehta.

36


DETAIL A

100

688

DETAIL B

200

DETAIL C

200

DETAIL D

DETAIL E

DETAIL F

G.L

K E Y SCALE; 1:50

D E T A I L C SCALE; 1:10

ISMB 250 MILD STEEL I SECTION

103

50

101

WELDED CONNECTION TO THE BOX SECTION

SHAR BOLT CONNECTION DIA 18MM

GUSSET PLATE 130*235 WELDED TO TAPERING BOX SECTION WITH A 12MM WELD. 18

PINNED SUPPORT SYSTEM TO ATTACH THE STRUTS OF BOX SECTION 50*50

74

74 74

SHAR BOLT CONNECTION DIA 18MM

74

WELDED CONNECTION TO THE BOX SECTION

ISMB 250 MILD STEEL I SECTION

FABRICATED MILD STEEL TAPERING BOX SECTION 150*100 AT END THICKNESS OF CROSS SECTION 50MM

74

235

74

GUSSET PLATE 130*235 WELDED TO TAPERING BOX SECTION WITH A 12MM WELD.

PINNED SUPPORT SYSTEM TO ATTACH THE STRUTS OF BOX SECTION 50*50

BOLTS c/c DISTANCE 74MM

74 FABRICATED MILD STEEL TAPERING BOX SECTION 150*100 AT END THICKNESS OF CROSS SECTION 50MM

74

130

D E T A I L A SCALE; 1:10

TENSILE ROD BOLTED TO THE METAL SHEET WITH AN 8MM DIA BOLT

FABRICATED MILD STEEL TENSILE ROOF ATTACHER, BOLTED AT VARIOUS POINTS

D E T A I L SCALE; 1:1 FABRICATED MILD STEEL TAPERING BOX SECTION 250*100 AT END THICKNESS OF CROSS SECTION 50MM

107

25

10 MM DIA TENSILE ROD FOR THE TENSILE ROOF

75*100 MILD STEEL BOX SECTION

75*100 MILD STEEL BOX SECTION 100

TENSILE ROOF

249

10 MM DIA TENSILE ROD FOR THE TENSILE ROOF

75

FABRICATED MILD STEEL TENSILE ROOF ATTACHER, BOLTED AT VARIOUS POINTS

102

15 30

FABRICATED MILD STEEL TAPERING BOX SECTION 150*100 AT END THICKNESS OF CROSS SECTION 50MM

10 MM DIA TENSILE ROD FOR THE TENSILE ROOF

120 PINNED SUPPORT FOR THE BOX SECTION STRUT

TENSILE ROD BOLTED TO THE METAL SHEET WITH AN 8MM DIA BOLT

FABRICATED MILD STEEL TAPERING BOX SECTION 250*100 AT END THICKNESS OF CROSS SECTION 50MM

104

50*50 BOX SECTION STRUT

FABRICATED MILD STEEL TENSILE ROOF ATTACHER, BOLTED AT VARIOUS POINTS

100 MM THICK FOUNDATION PLATE

D E T A I L B SCALE; 1:10

10 MM DIA TENSILE ROD FOR THE TENSILE ROOF CABLE DIRECTOR BOLTED AND WELDED TO THE BOX SECTION, REQUIRED TO CHANGE THE DIRECTION OF THE CABLE.

61 GUSSET PLATE 95*110 WELDED TO TAPERING BOX SECTION WITH A 10MM WELD.

FABRICATED MILD STEEL TAPERING BOX SECTION 250*100 AT END THICKNESS OF CROSS SECTION 50MM

11

75*100 MILD STEEL BOX SECTION

75*100 MILD STEEL BOX SECTION

110

100

145

FABRICATED MILD STEEL TAPERING BOX SECTION 150*100 AT END THICKNESS OF CROSS SECTION 50MM

75

TENSILE ROOF

95 165

10 MM DIA TENSILE ROD FOR THE TENSILE ROOF

FABRICATED MILD STEEL TAPERING BOX SECTION 150*100 AT END THICKNESS OF CROSS SECTION 50MM

37

10 MM DIA TENSILE ROD FOR THE TENSILE ROOF

TENSILE ROD BOLTED TO THE METAL SHEET WITH AN 8MM DIA BOLT FABRICATED MILD STEEL TENSILE ROOF ATTACHER, BOLTED AT VARIOUS POINTS

100 MM THICK FOUNDATION PLATE


NOTES:

FABRICATED MILD STEEL TAPERING BOX SECTION 300*100 AT END THICKNESS OF CROSS SECTION 50MM.

544

344

500

FABRICATED MILD STEEL TAPERING BOX SECTION 150*100 AT END THICKNESS OF CROSS SECTION 50MM PLATE WELDED TO THE BOX SECTION

1487

- ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. - DRAWINGS TO BE SEEN WITH RESPECT TO ALL OTHER DRAWINGS. - ALL DECISIONS TO BE TAKEN BY STRUC. ENG - P.C.C IN THE RATIO OF 1:3:6 (CEMENT : SAND: COARSE AGGREGATE) -ALL LEVELS SPECIFIED IN METERS.

715

334

444

PINNED SUPPORT SYSTEM. SHEAR BOLT DIA 140MM

BOLTS AT C/C DISTANCE 200 MM

200

200

200

200

200

200

200

200

200

200

200

200

200

200

D E T A I L E SCALE; 1:20

PINNED SUPPORT SYSTEM. SHEAR BOLT DIA 140MM

BOLTS AT C/C DISTANCE 200 MM

D E T A I L E SCALE; 1:20

FABRICATED MILD STEEL TAPERING BOX SECTION 150*100 AT END THICKNESS OF CROSS SECTION 50MM

PINNED SUPPORT SYSTEM. SHEAR BOLT DIA 140MM IS PASSES THROUGH BOTH THE BOX SECTIONS TO DEVELOPE THE PINNED JOINT.

100

200

602

200

202

200

FABRICATED MILD STEEL TAPERING BOX SECTION 300*100 AT END THICKNESS OF CROSS SECTION 50MM.

100

200

462

200

148

F 10

SHEET CONTENTS :

DETAILS FABRICATED MILD STEEL TAPERING BOX SECTION 150*100 AT END THICKNESS OF CROSS SECTION 50MM

PINNED SUPPORT SYSTEM. SHEAR BOLT DIA 140MM

DEALT BY:

Karan Amber Dalal

148

APPROVED: CHECKED: SCALE:

VARIES

DATE:

3RD APRIL, 2016.

FABRICATED MILD STEEL TAPERING BOX SECTION 300*100 AT END THICKNESS OF CROSS SECTION 50MM.

DRAWING NO:

PROJECT NORTH

5

SCHOOL OF ENVIRONMENT AND ARCHITECTURE

D E T A I L D SCALE; 1:20

CONSTRUCTION AND TECNOLOGY, SECOND YEAR ROLL NO. 06

38


Murbad Narrative| Team: Karan Dalal, Rutu Kelekar, Divya Gyanchandani, Sitanshu Rawal, Trisha Salvi. 39


Measure Drawing| Dean D’Cruz’ Office and Residence. Team: Karan Dalal, Nishi Shah, Sandeep Saive, Prachi Kosadia, Aditya Panchal. 40


Retrofit and Analysis| Shree Krishna Niwas Team: Karan Dalal, Prajyot Mulye, Shreyansh Gupta, Sitanshu Rawal, Rushabh Dedhia, Deep Shah. 41


Jaisalmer City and Fort Water Report| Team: Karan Dalal, Prajyot Mulye, Divya Gyanchandani, Nishi Shah, Vinisha Kuckian, Dimple Mistry. 42


43


Tridha School Resource Audit| Team: Karan Dalal, Rutu Kelekar, Shivani Dave, Shrushti Jain, Trisha Salvi.

44



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.