1 minute read
Electricity and service strike
from Big Six Handbook
by Keltbray
“As with everything we do, it is essential that everyone follows the simple rule of ‘if it’s not safe, we don’t do it’. Also, if anyone has a particular interest or experience in this area they are more than welcome to join the working group. They can just speak to their line manager or send me an email direct.”
Lead Liam McMyler Operations director Electricity and service strikes are a high risk on construction sites, particularly without proper management and planning. The term includes striking electricity cables, water and gas pipes, all of which have the potential to cause serious harm or damage.
Below are a few examples that can reduce the risks:
– Effective permit systems – Insulated tools and equipment – Clear on concise drawings and surveys – Specific training and detection techniques – Agreed handover and acceptance procedures