LOCATION AND BACKGROUND
SITE CONSIDERATIONS
STREET FRAMEWORK
Key Map
Nagle PI (Connect to Light Rail Station)
VISION PLAN PHASE 1- CREATIVE CORRIDOR
Carl Anderson Park
Pine St 10
1
2
N 6
3
4
9
PHASE 2- MULTI-FUNCTIONAL PLAZA
Pike St
PHASE 3-
11
ECOLOGICAL CORRIDOR
12
E Union St
8
11th Ave
N
5
10th Ave
Broadway Ave
7
0
25
50
100 ft
1. Atmosphere Lighting / Mist 2. Terraced Platform / Stage for Street Concert 3. Dry Plaza / Fountain 4. Outdoor Sitting Area 5. Green Wall / Screen for Amphitheater 6. Bike Station 7. Rain Garden 8. Vertical Pollinator Corridor 9. Plugging furniture 10. Food Truck Parking 11. Parking Lot / Space for Temporary Event 12. Outdoor Cafe
CORE AREA Nagle PI (Connect to Light Rail Station)
Carl Anderson Park
Pine St
9
1
N 2
6
10
0
25
50 ft
1. Atmosphere Lighting / Mist 2. Terraced Platform / Stage for Street Concert 3. Dry Plaza / Fountain 4. Outdoor Sitting Area 5. Green Wall / Screen for Amphitheater 6. Bike Station 7. Rain Garden 8. Plugging furniture 9. Food Truck Parking 10. Outdoor Cafe
11th Ave
10th Ave
3
4
7
8 5
PROGRAM THE COMMUNITY
URBAN PLAY PLAZA WEEKDAY 3:00PM
FARMERS MARKET WEEKEND 10:00 AM
OUTDOOR CONCERT WEEKDAY 9:00PM
AMPHITHEATER WEEKEND 7:00 PM
MULTI-FUNCTIONAL FURNITURE PLUGGING FURNITURE +
=
Neon Light
Mist
Colored mist will change with different types of music
ATMOSPHERE LIGHTING FACILITY - 10TH AVE New Development
Average Composition of Construction and Demolition Waste
Main Construction Waste
Outdoor Sitting
Material Upcycling Play Facility
Unified Width
Plugging Furniture Terraced Seating
Top
Top (Frame) Honeysuckle
Hops
Kiwi
VERTICAL POLLINATOR FACILITY - 11TH AVE
Front
Plugging Furniture Detail (Scale: 1”= 1’-0”)
Front (Frame)
Left (Frame)
Pollinator Pathway
Edible Landscape
10TH AVE DAYTIME
10TH AVE NIGHTTIME