Existing WC removed and link opened up to connect choir vestry with re-open north west porch Existing door replaced with new window with bench and storage under, and south wall of link fitted out full height cupboards for choir music storage
NOTE: 'COMMUNITY' PHASE FOR NEW NORTH EXTENSION AND ASSOCIATED CHURCHYARD LANDSCAPING WORKS TO FOLLOW AS SEPARATE PROJECT
DO NOT SCALE FROM THIS DRAWING
Existing fibreglass opaque glazing to choir vestry/ education room replaced with new clear safety glass
New north porch as per application ref.xx.xx
Choir vestry roof to be re-newed externally to combat existing leaks and failure. Internally upper parts of attractive roof structure to be re-exposed and redecorated
N
DRAWING TO BE READ IN CONJUNCTION WITH ALL OTHER ARCHITECT'S AND ENGINEER'S CONTRACT DRAWING & SPECIFICATIONS. ANY DISCREPANCIES MUST BE BROUGHT TO THE ATTENTION OF THE ARCHITECT IMMEDIATELY. THE CONTRACTOR MUST VERIFY ALL DIMENSIONS BY SITE MEASUREMENT BEFORE ORDERING MATERIALS OR MANUFACTURING COMPONENTS. SUBSTITUTE MATERIALS & PRODUCTS TO THOSE NAMED WILL BE ACCEPTABLE IF PROVEN TO BE OF EQUAL OR HIGHER PERFORMANCE AND NOT IN CONFLICT WITH OTHER ELEMENTS. NOTES
Existing raised dais under crossing removed. Floor leveled and font repositioned on centre point of crossing
Rebuild of north wall of existing electrican's cupboard with new door. Church boiler plant to be relocated in store, subject to confirmation by services engineer
Relocation of altar enables Holy Trinity Chapel to be re-established as area of private prayer
RO 23-29
1500
Boiler plant relocated and north porch reopened
650
NORTH PORCH +8.17
WC
CHOIR VESTRY/ EDUCATION ROOM NEW +8.17
NORTH PORCH NEW +8.25
ELECTRICS CUPBOARD
STORAGE NEW +8.17
Wheel chair accessible and single WC provided in former store area, accessed via new opening in west wall of porch
NORTH AISLE
1500
930
EXTG STORE
EXTG STORE
NORTH TRANSEPT NEW +8.26
ORGAN
HOLY TRINITY CHAPEL
CUP'D
VICAR'S VESTRY
Surviving C19th pulpit fragments reconfigured to form new reduced pulpit to suit reordered layout CROSSING NEW +8.26
ALTAR WEST PORCH NEW +8.24
NAVE
NEW +8.24
Existing concrete slab at east end replaced with new stone flooring. Flooring pattern to be agreed
CHOIR NEW +8.25 OLD SANCTUARY EXISTG+8.26 RO 21-22
CUP'D
Existing internal glazed screen remodeled as possible new painted softwood porch to enable axial view through crossing and enhance appearance of openness to outside. Porch size determined by Building Control recommendations and panelling module
Proposed new iron screens to enable east end to be enclosed and better defined. Screen in front of sanctuary to be able to fold back to enable clear route through
1500
930
SOUTH TRANSEPT NEW +8.26
SOUTH AISLE
East end of church redefined as more coherent space, enabling more flexible use and also independent use from Nave if required
KITCHENETTE 386
600
STORAGE NEW +8.25
SOUTH PORCH NEW +8.25
VICAR'S BURIAL GROUND
RO 12-15 RO 30 DESCRIPTION
CHECKED BY
A
06/01/12
RIBA STAGE E DRAWING ISSUE
PD
B
06/02/12
WEST END CUPBOARDS, PORCHES, KITCHEN/SERVERY, SEATING LAYOUT, CHOIR BENCHES AND WCS UPDATED
PD
REV DATE
Altar relocated to centre of nave to enable improved sight lines and involvement with congregation Existing internal porch remodeled to enable axial view through crossing and enhance appearance of openness to outside. Porch size determined by Building Control recommendations 0 SCALE
1m
2m
3m
4m
5m
6m
7m
8m
9m
10m
RO 16-20
FOR iNFORMATION JOB TITLE
ALL SAINTS CHURCH KINGSTON UPON THAMES DRAWING TITLE
CHURCH GROUND FLOOR PLAN AS PROPOSED JOB No
KUT
REV
DWG No
RO-D02
DRAWN BY
CHECKED BY
HVF
KR
B SCALE SCALE @A1 @ A3
100 200
DATE
07/10
Ptolemy Dean Architects C A L V E R T S
B U I L D I N G S
TEL: 020 7378 7714 FAX: 020 7407 9440 E - M A I L : ADMIN@PTOLEMYDEAN.CO.UK