Construction Documents Various projects
---
Client: Touch of Nature Contact: Alan Teska p: 618.453.1121 e: ateska@siu.edu
8' - 0"
3' - 7 3/4"
Instructor | Architect: Chad Schwartz School of Architecture p: 618.453.1228 e: chad.schwartz@siu.edu
3' - 11 1/4"
Building Tech
Camp Beach I
Spring 2015
Touch of Nature
3' - 11 1/4"
001
1
8' - 0"
2
1 2
A105
4' - 0 3/4"
-
1
---
ELOO Restroom Facilities Project
3/22/2015
1 A110
GROUP 6
P2
3/24/15
1
Floor Plan 1/2" = 1'-0"
1
3/22/2015
Project Status
A104 Floor Plan
A101
---
Client: Touch of Nature Contact: Alan Teska p: 618.453.1121 e: ateska@siu.edu Instructor | Architect: Chad Schwartz School of Architecture p: 618.453.1228 e: chad.schwartz@siu.edu
4x4 Stud
Building Tech
Camp Beach I
Spring 2015
1 A105
2x8 Roof Rafters
2x4 Bridging
---
ELOO Restroom Facilities Project
Touch of Nature
Corrugated Metal
3/22/2015
1 A110
GROUP 6
1
P2
3/24/15
3/22/2015
A104 Project Status
1
Roof 1/2" = 1'-0"
Reflected Ceiling Plan
A111
1' - 11 5/32"
---
8' - 7 1/2"
---
1' - 5 11/32" 12' 6"
Wire Mesh
2X8 Boards 9' - 11"
2X8 Boards 9' - 11"
Client: Touch of Nature Contact: Alan Teska p: 618.453.1121 e: ateska@siu.edu Instructor | Architect: Chad Schwartz School of Architecture p: 618.453.1228 e: chad.schwartz@siu.edu
Building Tech
Camp Beach I
Spring 2015
Wire Mesh
Corrugated Metal
Corrugated Metal
2x8 Wood Studs
8' 4x4 wood stud
8' 4x4 wooden studs 4" Thicke Concrete Slab 4" Thick Concrete Slab
Grade 0' - 0"
1
East 1/2" = 1'-0"
ELOO Restroom Facilities Project
Roof 8' - 1"
Touch of Nature
Roof 8' - 1"
3/22/2015
Grade 0' - 0"
2
West 1/2" = 1'-0"
GROUP 6
P2
3/24/15
3/22/2015
Project Status Exterior Elevations
A103
2X8 Boards 9' - 11" Client: Touch of Nature Contact: Alan Teska p: 618.453.1121 e: ateska@siu.edu
Corrugated Metal Sheet
Instructor | Architect: Chad Schwartz School of Architecture p: 618.453.1228 e: chad.schwartz@siu.edu
Roof 8' - 1"
Building Tech
Camp Beach I
Spring 2015
3/22/2015
Hand Sanitizer 1 A110
3'-3" Metal Grab Bar
(22) 2x4x4 wood studs
Compost Toilet
ELOO Restroom Facilities Project
Touch of Nature
Corrugated Metal Interior Wall
Anchor Bolt 1/2"
2x4 Sill Plate
1' thick concrete slab
Grade 0' - 0"
GROUP 6
P2
3/24/15
3/22/2015
Project Status
1 A105
1
West 3/4" = 1'-0"
Building Sections
A104
1 A110 --1 A104
2X8 Boards 9' - 11"
Client: Touch of Nature Contact: Alan Teska p: 618.453.1121 e: ateska@siu.edu
3/4" cut into channel in 2x8
1 A109
Instructor | Architect: Chad Schwartz School of Architecture p: 618.453.1228 e: chad.schwartz@siu.edu
Building Tech
Roof 8' - 1"
Camp Beach I
Spring 2015
Corrugated Metal
Touch of Nature
2x4 Bridging
2' Metal Grab Bar
Wood Stud Wall
Urinal
Compost Toilet
ELOO Restroom Facilities Project
3/22/2015
1"-1/2" x 2"-1/2" Sill Plate
Grade 0' - 0"
GROUP 6
P2
3/24/15
3/22/2015
Project Status Building Sections
1
South 3/4" = 1'-0"
A105
Client: Touch of Nature Contact: Alan Teska p: 618.453.1121 e: ateska@siu.edu Instructor | Architect: Chad Schwartz School of Architecture p: 618.453.1228 e: chad.schwartz@siu.edu
Building Tech
Camp Beach I
Spring 2015
0' - 4"
Touch of Nature
0' - 3 17/32"
Roof 8' - 1"
ELOO Restroom Facilities Project
3/4" channel for notching
3/22/2015
3/8" carriage bolts
GROUP 6
Connection @ rafter 1 3" = 1'-0"
P2
3/24/15
3/22/2015
Project Status Carriage Bolt Callout Detail
A108
1' - 3 1/2"
2X8 Boards 9' - 11" Client: Touch of Nature Contact: Alan Teska p: 618.453.1121 e: ateska@siu.edu
1 A108
Instructor | Architect: Chad Schwartz School of Architecture p: 618.453.1228 e: chad.schwartz@siu.edu
Roof 8' - 1"
Building Tech
Camp Beach I
Spring 2015
3/22/2015
nut bolts/ flat washers every 24 vertically"
9' - 11"
Touch of Nature
26" Corrugated panels
2' ADA handrail
3' - 7" 1' - 0 1/8"
4' - 0"
2x4 Horizontal Stud Wall
ELOO Restroom Facilities Project
4' - 0"
panels have 1" overlap
2x4 Vertical Wood Stud
Grade 0' - 0" GROUP 6
P2
3/24/15
1
Detailed Wall Section 3/4" = 1'-0"
3/22/2015
Project Status Detailed Wall Section
A110
11"
ISOLATION JOINT
1/2" X 16" BOLT WITH SLEEVE ANCHOR @ 6' - 0" O.C.
IN.
BASE FLASHING AND DRIP EDGE
4" COMTINUOUS CANT STRIP FELTS ADHERED WITH COALTAR
MASONRY NAILS @ 2' -0" O.C.
(2) 5" X 5"X 1/4" STEEL PLATESFOR DOUBLE TEE ANCHORAGE 11" THIN BRICK INSULATED LOAD BEARING PRECAST CONCRETE PANEL
4" FACE BRICK 2" RIGID INSULATION 4" FACE BRICK
VAPOR BARRIER 4" GRAVEL FILL
2" LIGHTWEIGHT INSULATED CONCRETE ON 6" RIGID INSULATION ON 8" HOLLOW CORE
2" RIGID INSULATION
6"
9' - 4"
2"
HORIZONTAL REINFORCING @ 8" O.C. VERTICALLY
BEARING PAD PRECAST CONCRETE DOUBLE- TEE JOIST
A-3
11"
COLUMN CENTERLINE 1"
2"
4" FACE BRICK 2" RIGID INSULATION 4" FACE BRICK
2' - 8"
SHIM SPACE WITH CAULKING SCREW ALUMINUM STOREFRONT WINDOW SYSTEM WITH INSULATED GLASS PANEL
HEAD 1' - 0" 3/4"
2"
5 5/8"
5' - 11 1/2"
10' - 0"
11' - 4"
10' - 8"
6' - 0" M.O.
RUNNER CHANNELS @16" O.C.
ALUMINUM STOREFRONT WINDOW SYSTEM WITH INSULATED GLASS PANELS FOR DETAIL SEE DWG 8/A-3
4" FACE BRICK 2" RIGID INSULATION 6" CMU
8' - 0"
6' - 0" M.O.
7/8" METAL FURRING STRIPS @ 16" O.C. 13' - 4"
12' - 8" 10' - 0"
6' - 0" M.O.
12' - 8"
12' - 0"
FLASHING AND WEEP HOLES
2' - 8"
F.F SLAB 100'-0"
ALUMINUM STOREFRONT WINDOW SYSTEM WITH INSULATED GLASS PANEL
4"
6"
6"
SCREW WITH EXPANSION SHEILD
6"
ISOLATION JOINT
ISOLATION JOINT
5"
7" 3"
5' - 0"
2' - 8"
2" RIGID INSULATION
3' - 4"
4' - 0"
3' - 6"
5' - 0"
3' - 8"
3' - 6"
5' - 0"
3' - 0"
FLOOR REGISTER
ISOLATION JOINT
1 1/2"
2" RIGID INSULATION 4" GRAVEL
4"
FLASHING 1/2"
4"
4" STAINED CONCRETE SLAB ON VAPOR BARRIER AND 4" GRAVEL
ISOLATION JOINT 2" RIGID INSULATION
ALUMINUM STOREFRONT WINDOW SYSTEM WITH INSULATED GLASS PANEL
JAMB
FLASHING AND WEEP HOLES @ 2' -0" 4"
F.F SLAB 100'-0"
SCREW WITH EXPANSION SHEILD
4"
FLASHING AND WEEP HOLES @ 2'-0" O.C.
4"
F.F SLAB 100'-0"
CERAMIC TILE ON 4" CONCRETE SLAB ON VAPOR BARRIER ON THICKEND SLAB SEE DWG 6d/A-1
SHIM SPACE WITH CAULKING
5' - 11 1/2"
PRECAST CONCRETE SILL WITH DRIP EDGE
6"
4" STAINED CONCRETE SLAB ON VAPOR BARRIER AND 4" GRAVEL
6' - 0" M.O.
HORIZONTAL WIRE REINFORCING AT 16" O.C. VERTICALLY 4" FACE BRICK 2" RIGID INSULATION 4" FACE BRICK 8" PLUMBING WALL GAP 4" GLAZED CMU
FLASHING AND WEEP HOLES @ 2'-0" O.C.
VERTICAL REINFORCING 2 #4 REBAR SOLDIER COURSE
6"
2' - 0" 6"
6"
6" POLISHED CONCRETE SLAB ON VAPOR BARRIER AND 4" GRAVEL
4' - 0"
BLOCKING
CONCRETE WAFFLE SLAB
METAL EDGE TRIM
HORIZONTAL WIRE REINFORCING AT 16" O.C. VERTICALLY
6"
3' - 4"
1/4" CONTINUOUS BEARING PAD WITH BACKER ROD AND CAULKING
5' - 0"
FLASHING AND WEEP HOLES @ 2' - 0" O.C.
ROD ANCHOR @ 2' - 0" FLASHING AND WEEP HOLES 4" FACE BRICK ON 2" RIGID INSULATION 6" CMU
5/8" GYP BOARD DROP CEILING SCREWED INTO FURRING STRIP
PRECAST CONCRETE SILL WITH DRIP EDGE
2 X 4 TREATED WOOD NAILER SHIMMED AND CALULKED INTO PLACE
F.F SLAB 100'-0"
STEEL ANGLE 3" X 3 1/2" X 1/4"
3 5/8"
CEILING HANGERS GROUTED INTO HOLLOW CORE JOINTS @ 16" O.C.
ALUMINUM STOREFRONT WINDOW WITH INSULATED GLASS PANELS
CHAMFERED EDGE
FOR ISOMETRIC DETAIL OF CONNECTION SEE DWG 2/A-3
4" FACE BRICK 2" RIGID INSULATION 6" CMU
PRECAST 8" HOLLOW CORE CEILING
WINDOW HEAD ANCHORED WITH 3" SCREW INTO WOOD NAILER
11" THIN BRICK INSULATED LOAD BEARING PRECAST CONCRETE PANEL
2"
8"
8"
6" CMU BOND BEAM
ALUMINUM FRAME FIXED WINDOW WITH INSULATED GLASS PANELS 6' - 0" R.O.
14' - 0"
DRIP EDGE
1/8" THICK CONTINUOUS BEARING PAD
2' - 0"
WINDOW HEAD ANCHORED WITH 3" SCREW INTO WOOD NAILER
6" 6"
2" 6" CHAMFERED EDGE
DOVETAIL @ 32" O.C.
REBAR GROUTED IN SLEEVE
6" CMU BOND BEAM REBAR GROUTED IN SLEEVE
2' - 8"
2 X 4 TREATED WOOD NAILER SHIMMED AND CALULKED INTO PLACE
5 5/8"
T.O. WAFFLE SLAB 111'-4"
T.O. HOLLOW CORE 110'-8"
T.O. HOLLOW CORE 110'-8" PRECAST 8" HOLLOW CORE CEILING
BUILT UP ROOFING
FOR PARAPET WALL DETAIL SEE DWG 3/A-3
2"
2' - 0"
LIGHT COLORED GRAVEL ON 3 LAYERS OF FELTS ADHERED TOGETHER WITH COALTAR ON 2" LIGHT WEIGHT TOPPING ON 6" RIGID INSULATION SLOPED TO DRAIN
2"
1' - 4"
1" 2' - 0"
4' - 8" 26' - 0"
1/2" BEARING PAD
1' - 4"
LIGHT COLORED GRAVEL ON 3 LAYERS OF FELTS ADHERED TOGETHER WITH COALTAR ON 2" LIGHT WEIGHT TOPPING ON 6" RIGID INSULATION SLOPED TO DRAIN
3/4"
11"
11"
DOUBLE TEE SYSTEM 5"
3 5/8"
FOUNDATION WALL ISOMETRIC DETAIL 1" = 1'-0"
1' - 0"
1"
A-3
3" = 1'-0"
1
1' - 4"
1" = 1'-0"
2"
2' - 0"
(2) 5" X 5" X1/4" STEEL PLATES @ 4'-0" O.C.
DOUBLE TEE ISOMETRIC DETAIL
2' - 0"
A-3
2
2"
1
1' - 4"
T.O. DOUBLE TEE 114"-0"
PARAPET WALL DETAIL 3
3
4" FACE BRICK 2" RIGID INSULATION 6" CMU
3" 10"
2" RIGID INSULATION
1' - 0"
1' - 0"
1' - 0"
1' - 0"
1' - 0"
1' - 0"
T.O. FOOTING 96'-6" 1' - 0"
T.O. FOOTING 96'-6"
T.O. FOOTING 96'-6"
T.O. FOOTING 96'-6"
PRECAST CONCRETE SILL WITH DRIP EDGE FLASHING AND WEEP HOLES
SILL 6"
1' - 0"
5"
6"
A-3
SHOP WALL SECTION 3/4" = 1'-0"
5"
5"
5 A-3
LOUNGE WALL SECTION 3/4" = 1'-0"
10"
6"
5"
6 A-3
TOILET WALL SECTION 3/4" = 1'-0"
1' - 0"
3 5/8"
3/4"
2"
7 A-3
OFFICE WALL SECTION
6"
3/4" = 1'-0"
8 A-3
OFFICE WINDOW DETAILS 3" = 1'-0"
5 5/8"
SHEET NO.
1' - 0"
2' - 0"
1' - 8"
1' - 8"
2' - 0" 4
10"
3"
SCHOOL OF ARCHITECTURE SOUTHERN ILLINOIS UNIVERSITY BUILDING TECHNOLOGY ARC 341 SECTION 001
11' - 4"
2" RIGID INSULATION
SHEET TITLE
12' - 0"
1/2" BEARING PAD
LIGHT COLORED GRAVEL
PROJECT-NAME-LOCATION-OWNER: STUDENT: KEVIN VAZQUEZ INSTRUCTOR: NORM LACH CENTRAL ILLINOIS MASONARY DRAWN BY: CHECKED BY: NL JOB NO. : CHAMPAIGN, IL 61820 KCV LYNN VASQUEZ
5"
6" POLISHED CONCRETE SLAB
SET NO.
CONTINUOUS REGLET
9"
FOR ISOMETRIC DETAIL OF CONNECTION SEE DWG 1/A-3
BACKER ROD AND SEALANT
2' - 0"
LIGHT COLORED GRAVEL ON 3 LAYERS OF FELTS ADHERED TOGETHER WITH COALTAR ON 2" LIGHT WEIGHT TOPPING ON 6" RIGID INSULATION SLOPED TO DRAIN
6" RIGID INSULATION
(2) 2 X 10 BLOCKING
11/12/15
T.O. DOUBLE TEE 125' -4"
CONTINUOUS BEARING PAD
WALL SECTION DETAILS
6"
CAP FLASHING
2" LIGHT WEIGHT INSULATED TOPPING
COLUMN CENTERLINE
DATE
1/2"
2" RIGID INSULATION
1' - 4"
10"
CANT STRIP
2"
CONTINUOUS REGLET
2"
1' - 6"
2"
3 LAYERSOF FELTS ADHERED WITH COALTAR
COPING WITH 10" FACIA OVER WATERPROOF MEMBRANE
SLEEVE FILLED WITH GROUT AT 4'- 0" O.C.
7"
CANT STRIP
7"
10"
BASE FLASHING
1"
11" THIN BRICK INSULATED LOAD BEARING PRECAST CONCRETE PANEL
REVISION & DATE
1
CAP FLASHING
A-3 8 OF_____SHEETS
T.O. DOUBLE TEE 125' - 4"
FOR HANDRAIL DETAILS SEE DWG ?/A-4
8' - 0"
1' - 0"
DOUBLE TEE
8a
DOOR JAMB 8" CMU
3" X 3" - 10 X 1/4" METAL NON-SLIP NOSING ANCHORED WITH WING NUT
6"
5"
3" = 1'-0" 3
4' - 0" 8b A-4
3
7k
HOLLOW METAL DOOR
7h 11"
1/4" = 1'-0"
CONTINUOUS REGLET 1/2"
CANT STRIP
1/2"
CAP FLASHING FOR ISOMETRIC DETAIL OF CONNECTION SEE DWG 1/A-3
7' - 0"
WAFFLE SLAB
3 1/2" 1/2"
2"
2"
F.F SLAB 100'-0"
T.O. DOUBLE TEE 125' -4"
T.O. DOUBLE TEE 114"-0"
DOUBLE TEE SYSTEM 1/2" BEARING PAD CANT STRIP
104
SECRETARY AREA
6' - 0"
3' - 6"
6" 6"
MENS TOILET 109
4
16' - 0"
3' - 4"
7 5/8"
DISPLAY AREA
ENLARGED SECOND FLOOR STAIRWAY 1
1 1/2" = 1'-0"
A-4
1/4" = 1'-0"
PRECAST HOLLOW CORE CEILING
DOUBLE TEE DISPLAY AREA 201
FOR CONNECTION DETAIL SEE DWG 6/A-4
WOMENS TOILET DROP GYP BOARD CEILING
8"
110
T.O. DOUBLE TEE 125'-4"
LOUNGE
SHOP 109
111 112
FOR TYPICAL SHOP WALL SECTION SEE DWG 4/A-3
T.O. DOUBLE TEE 114"-0"
109
110
7 5/8"
COLUMN FTG C
2" ROUND STEEL HANDRAIL 3' - 0" ABOVE NOSING BRACKET ANCHORED TO HANDRAILL WITH SCREWS
BRACKET ANCHORED TO CMU WALL WITH TOGGLE BOLT
A-4
2 9 A4 A1 PRECAST CONCRETE
2
1
1/2" = 1'-0"
T.O. FOOTING 96'-6"
6" GLAZED CMU THICKENED SLAB DETAIL SEE DWG 6A/ A-1
3
T.O. DOUBLE TEE 125'-4"
11"
1' - 0"
1
FACE BRICK
ALUMINUM STOREFRONT WINDOW SYSTEM
25' - 0"
FACE BRICK
COLUMN CENTERLINE 8" CAST-IN-PLACE CONCETE WALL
FOR PARAPET WALL DETAIL SEE DWG 3/A-3
26' - 0"
7 5/8"
T.O. DOUBLE TEE 114"-0"
7 5/8"
T.O. WAFFLE SLAB 111'-4"
T.O. HOLLOW CORE 111'-4"
13' - 0"
4b
14' - 0"
BUR
FOR FOOTING SIZES SEE DWG ?/A-1
CONCRETE WAFFLE SLAB
4c
COLUMN FTG C 6 A-4
OFFICE TO LOUNGE ROOF
12
SOUTH BUILDING ELEVATION
1/2" = 1'-0"
A-4
1/8" = 1'-0"
COLUMN FTG B
RETAINING WALL COLUMN FTG C
5' - 0"
8" CMU WALL
4' - 0"
HOLLOW CORE
HANDRAIL DETAILS 1" = 1'-0"
1/8" = 1'-0"
4" STAINED CONCRETE SLAB
6" GLAZED CMU ON 4" BRICK
LOUNGE TO SHOP ROOF
5
2" ROUND STEEL HANDRAIL 3' - 0" ABOVE NOSING BRACKET ANCHORED TO HANDRAILL WITH SCREWS
A-4
THICKENED SLAB DETAIL SEE DWG 6A/ A-1
COLUMN FTG C
CERAMIC MOSAIC TILE
4a
BRACKET ANCHORED TO HANDRAILL WITH SCREWS BRACKET ANCHORED TO CAST-IN-PLACE CONCRETE WALL WITH SCREW AND 2" 2" EXPANSION SHIELD
SOUTH BUILDING SECTION
2"
BRACKET ANCHORED TO PRECAST CONCRETE WALL WITH SCREW AND EXPANSION SHIELD 2" 2" 2" ROUND STEEL HANDRAIL 3' - 0" ABOVE NOSING
PRECAST CONCRETE WALL
11
COLUMN FTG B
6" GLAZED CMU
1' - 0"
4" POLISHED CONCRETE SLAB
F.F SLAB 100'-0"
F.F SLAB 100'-0" T.O. FOOTING 96'-6"
SCHOOL OF ARCHITECTURE SOUTHERN ILLINOIS UNIVERSITY BUILDING TECHNOLOGY ARC 341 SECTION 001
1/4" = 1'-0"
2" 2"
A-4
1' - 0"
5"
T.O. HOLLOW CORE 110'-8"
4
4' - 0"
2' - 6"
WAFFEL SLAB
9
A4 A1
201
1' - 0"
A-4
WHITEBOARD DETAIL
DISPLAY AREA
2
1' - 0" 11' - 0"
3
T.O. OF WAFFEL SLAB 111"- 4" FOR TYPICAL OFFICE WALL SECTION SEE DWG 7/A-3
3" X 3" - 10" NONSLIP METAL NOSING ANCHORED WITH WING NUT TO CONCRETE STAIRS
10
FOR PARAPET DETAIL SEE DWG 3/A-3
FOR CONNECTION DETAIL SEE DWG 6/A-4
CAST-IN-PLACE CONCRETE WALL
12R @ 7" = 7' - 0" 12T @ 11" = 11' - 0"
201 FOR PARAPET DETAIL SEE DWG 3/A-3
8" CMU
20' - 0"
3
2
1' - 0" 4' - 0"
12R @ 7" = 7' - 0"
2" ROUND STEEL HANDRAIL ANCHORED TO 8" CMU WALL WITH BRACKERS AND SCREWS WITH TOGGLE BOLT SEE DWG DETAIL 4c/A-4
THICKENED SLAB SEE DWG 6a/ A-1
8d
1' - 0" THIN BRICK INSULATED LOAD BEARING PRECAST CONCRETE PANEL
11T @ 11" = 10' - 0"
TYPICAL STAIR CONDITION
A-4
1
(2) 5" X 5" X1/4" STEEL PLATES @ 4'-0" O.C.
1/2" GYP BOARD ON 2X4 STUD WALL ON 1/2" GYP BOARD
8
1/4" = 1'-0"
2" ROUND STEEL HANDRAIL ANCHORED TO CAST-IN-PLACE CONCRETE WALL 5" POLISHED WITH BARCKETS AND SCREWS CONCRETEWITH EXPANSION SHIELDS SEE DWG DETAIL 4b/A-4 SLAB
FOR PARAPET DETAIL SEE DWG 1/A-3
14' - 0"
4' - 0" 3' - 0"
TOP OF BOARD ANCHORED TO 2X4 STUD WALL WITH SCREWS @ 2' - 0" O.C.
3" X 3" - 10 X 1/4" METAL NON-SLIP NOSING ANCHORED WITH WING NUT
#4 REBAR @ 1' - 0" RUNNIG BOTH DIRECTIONS
ISOLATION JOINT
STAIR SECTION
2" ROUND STEEL HANDRAIL ANCHORED TO PRECAST CONCRETE WALL WITH SCREW AND EXPANSION SHIELD SEE DWG DETAIL 4a/A-4
F.F SLAB 100'-0"
1 1/2" = 1'-0"
A-4
LIGHT COLORED GRAVEL ON 3 LAYERS OF FELTS ADHERED TOGETHER WITH COALTAR ON 2" LIGHT WEIGHT TOPPING ON 6" RIGID INSULATION SLOPED TO DRAIN
2X4 STUD SCREWED INTO NOTCHED 2X4 STUD WALL
A-4
STOREFRONT DETAILS
7
1 1/2"
TOP OF BOARD ANCHORED TO 2X4 STUD WALL WITH SCREWS @ 2' - 0" O.C.
ISOLATION JOINT
9
8c
8d A-4
2' - 0"
HAUNCH
1' - 0" THIN BRICK INSULATED LOAD BEARING PRECAST CONCRETE PANEL
23T @ 11"= 10' - 0"
2' - 0"
7"
4" STAINED CONCRETE
4" STAINED CONCRETE
T.O. FOOTING 96'-6"
ALUMINUM THRESHOLD WITH WEATHERSTRIPPING ANCHORED WITH SCREW WITH EXPANSION SHIELD F.F SLAB 100'-0"
7f
4"
A-4
ELEVATION OF MAIN ENTRANCE 2 1/2"
2
7i
6"
THICKENED SLAB
2' - 0"
T.O.F.F SLAB 100'-0"
ALUMINUM WINDOW SILL WITH WEATHERSTRIPPING ANCHORED WITH SCREW WITH EXPANSION SHIELD
ALUMINUM DOOR HEAD AND TRANSOM SILL
F.F SLAB 100'-0"
5"
7i A-4
7f A-4
ALUMINUM INTERMEDIATE VERTICAL MULLION
2"
2' - 5"
1e A-4
4"
1d A-4
5 1/16"
1c A-4
WEDGE INSERT BOLTED TO SHELF ANGLE 5 1/2" X 3" 1/4" ON 1/4" BEARING PAD WITH BACKER ROD AND SEALANT
7g
7' - 2"
4" STAMPED CONCRETE SLAB
1b A-4
9' -11 3/4"
1a A-4
7j A-4
10' - 0" M.O.
ALUMINUM STOREFRONT WINDOW SYSTEM
7g A-4
WEDGE INSERT BOLTED TO SHELF ANGLE 5 1/2" X 3" 1/4" ON 1/4" BEARING PAD WITH BACKER ROD AND SEALANT
2"
9' - 11 1.2"
10' - 0" M.O.
14' - 0"
4" FACE BRICK 2" RIGID INSULATION 6" CMU
7j
6' - 1/2"
1738
7h A-4
9' -11 1/2"
1' - 0" PARAPET WALL
10' - 0" M.O.
3' - 0"
T.O. WAFFLE SLAB 111'-4" 7k A-4
FLASHING AND WEEP HOLES @ 2' - 0" O.C.
FLASHING AND WEEP HOLES @ 2' - 0" O.C.
12' - 0"
11' - 11 1/2"
1' - 0"
8' - 8"
6"
12' - 0" M.O.
3"
1' - 0"
4' - 8"
8c A-4
8b
7"
25' - 4"
HAUNCH
5"
C
ALUMINUM TRANSOM HEAD ANCHORED TO SHEL ANGLE WITH 2" BOLT
3"
ALUMINUM TRANSOM HEAD ANCHORED TO SHEL ANGLE WITH 2" BOLT
2" ROUND STEEL HANDRAIL 3' - 0" FROM T.O. NOSING ANCHORED TO CAST-IN-PLACE CONCRETE WALL WITH BRACKETS & SCREWS WITH EXPANSION SHIELDS @ 4' - 0" O.C.
1' - 0"
A-4
3' - 6"
1e
11' - 11 1/2"
CONSTRUCTION AND FASTENING
1
1d
BUILDING DETAILS
1c
9' - 0"
1b
T.O. DOUBLE TEE 114"-0"
24R @ 7"= 14' - 0"
1a
WINDOW JAMB ANCHORED WITH SCREW AND EXPANSION SHIELD
7"
WINDOW JAMB ANCHORED WITH SCREW AND EXPANSION SHIELD
PRECAST DOUBLE TEE
12' - 0"
DOOR OPENING
4" STAINED CONCRETE
12' - 0"
DOOR JAMB
8a A-4 26' - 0"
3"
SOILDER COURSE
CAST -IN-PLACE CONCRETE WALL
3' - 6"
SOILDER COURSE
8" CMU
SET NO.
VESTIBULE
12/10/15
5" POLISHED CONCRETE SLAB
5"
4 5/8"
CAST-IN -PLACE CONCRETE WALL
T.O. DOUBLE TEE 125'-4"
REVISION & DATE
3" X 3" - 10 X 1/4"METAL NON-SLIP NOSING ANCHORED WITH WING NUT
BUR ON 2" INSILATED LIGHTWEIGHT TOOPING 4" RIGID INSULATION SLOPED TO DRAIN FOR ENLARGED STAIR DETAIL SEE DWG ?/A-4
IN.
2"
2' - 8"
DATE
2"
6' - 4"
SHEET TITLE
2"
2' - 8"
PROJECT-NAME-LOCATION-OWNER: STUDENT: KEVIN VAZQUEZ INSTRUCTOR: NORM LACH CENTRAL ILLINOIS MASONARY DRAWN BY: CHECKED BY: NL JOB NO. : CHAMPAIGN, IL 61820 KCV LYNN VASQUEZ
2"
2' - 0"
4" FACE BRICK ON 2" RIGID INSULATION 6" CMU
SHEET NO.
A-4 8 OF_____SHEETS
2
2
1
1
ISOLATED POCKET @ CONNECTION, FILL POCKET W/ ELASTOMERIC SEALANT
STUD WELD REBAR
DATE
Level 5 60' - 0"
BEARING PAD
Level 4 45' - 0"
SLAB TO BEAM COLUMN CONNECTION 1" = 1'-0"
Level 3 30' - 0"
SHEET TITLE
3
D
SET NO.
2
05/12/17
3
LIBRARY BUILDING SECTION/ELEVATION
3
REVISION & DATE
3
IN.
4
0' - 2 1/2"
ANCHOR BOLTS
Level 1 0' - 0" D
4
WEST ELEVATION 1/8" = 1'-0"
3
4
3
3
2
2
2
2
ANCHOR BOLT
1
NUT PL. WASHER
GROUT SOLID TO FOOTING
Level 5 64' - 0" STEEL SHIM PACK 2
BASE PLATE
COLUMN DETIAL 1" = 1'-0"
PRESIDENTIAL SUITE
THIN BRICK INSULATED LOAD BEARING PRECAST CONCRETE PANEL
Level 4 48' - 0"
HOLLOW CORE
2" RIGID INSULATION
PRECAST CONCETE WALL
SLEEVE FILLED WITH GROUT AT 4'- 0" O.C. CONTINUOUS BEARING PAD
OBAMA FOUNDATION OFFICES
BACKER ROD AND SEALANT ISOLATION JOINT
Level 3 32' - 0"
6" POLISHED CONCRETE SLAB SLAB TO BEAM CONNECTION SEE DWG A-3/1
LIBRARY
VAPOR BARRIER 4" GRAVEL FILL
Level 2 16' - 0"
2" RIGID INSULATION
CONCRETE BEAM
COMMUNITY CENTER SERVICES
Level 1 0' - 0"
SHEET NO.
CONCRETE FOOTIN
5
WEST BUILDING SECTION 1/8" = 1'-0"
SCHOOL OF ARCHITECTURE SOUTHERN ILLINOIS UNIVERSITY ARC 452 DESIGN VI: INTERGRATION STUDIO NORM
0' - 9 1/2"
0' - 9 1/2"
2' - 0"
3
Level 2 15' - 0"
0' - 9 1/2"
0' - 9 1/2"
0' - 2 1/2"
PROJECT NAME-LOCATION-OWNER: STUDENT: KEVIN VAZQUEZ INSTRUCTOR: NORM LACH OBAMA CENTER JOB NO. : DRAWN BY: CHECKED BY: JACKSON PARK,IL KCV OBAMA FOUNDATION
1
2' - 0"
1
WALL FOOTING ISOMETRIC 1" = 1'-0"
A-2 8 OF_____SHEETS
5 A-2
M
S6
0"
C
33' - 11 "
E
D
05/12/17
24 '-
DATE
3' -
0" 4' -
0"
IN.
F
- 8" 25'
SET NO.
B
4
REVISION & DATE
A
STAIR 3' 0"
UP
12' -0
S6
23' 26' 0
"
6' - 0
8"
50 '-
8"
3' - 0 "
"
163' - 4" " 3' - 0"
23' - 8"
14' - 0"
3' - 0" 6' - 0" 3' - 0"
2HR FIRE RATED CMU WALLS
43 '-
28' - 4" 10' - 0"
3' - 0"
" 0" 3' - 0 3' - 0" 6' -
8' - 0"
8' - 0"
3' - 0"
0" 10' -
S3
STAIR
" 3' - 0
3
S3
UP
0"
49' - 0"
1
49' - 0"
49' - 0"
SHEET TITLE
49' 0"
EL
OR AT EV EL
EV AT OR S
2HR FIRE RATED CMU WALLS 49'
3
4" 25' -
- 6"
118
- 8" 33'
20X20 PRECAST CONC. COLUMN
54' - 0"
33' -
20' - 0"
MAINTENACE
0"
PROJECT NAME-LOCATION-OWNER: STUDENT: KEVIN VAZQUEZ INSTRUCTOR: NORM LACH OBAMA CENTER JOB NO. : DRAWN BY: CHECKED BY: JACKSON PARK,IL KCV OBAMA FOUNDATION
Library Lobby 45' - 10 "
34' -
144 32' - 5 "
6"
35' - 5 "
144
144
2
149
13' - 0"
13' - 0"
18' - 0"
48' - 5"
48' - 5"
149 48' - 5"
147
5"
A.H.U ROOM
COMMUNICATION ELECTRONICS ROOM 148
16' - 0"
Community Center Services
HEATING/COOLING & PLUMBING SHAFT
ELEVATORS
20X20 PRECAST CONC. COLUMN
20X20 PRECAST CONC. COLUMN
48'
48' 5"
148 147
121
S4
- 8" 41'
STAIR 4
S4 6 UP
A-1
8" 41' -
143
" -8
STAIR
1
5
42' - 8"
41' - 0"
S5
1' - 0"
UP
26' 8"
36' - 0"
MENS RESTROOMS
WOMENS RESTROOMS
50' - 0"
0"
146
50' - 0"
14' 0"
50'
455
146
145 50' - 0"
143
- 0" 18'
0 3' -
27' - 0"
3' -
15' 15' 0"
7' - 0 "
3' - 0 "
50' 0"
20X20 PRECAST CONC. COLUMN
5' - 0"
3' - 0"
10' - 0 "
3' - 0"
8' - 0"
3' - 0"
8' - 0"
3' - 0"
12' - 0"
"
- 0" 12' 143
3' - 0 "
" -0 14'
2HR FIRE RATED CMU WALLS
8' - 0"
10' - 0"
9' - 0" 4' - 0"
50' 0"
27' - 0" 4' - 0"
2HR FIRE RATED CMU WALLS
SCHOOL OF ARCHITECTURE SOUTHERN ILLINOIS UNIVERSITY ARC 452 DESIGN VI: INTERGRATION STUDIO NORM
S5
26'
41' 10"
OBAMA CENTER FIRST FLLOR PLAN
6
3' - 0" 4' - 0" 3' - 0" 4' - 0" 3' - 0" 4' - 0" 3' - 0" 4' - 0" 3' - 0" 4' - 0" 3' - 0"
10' - 0"
3' - 0"
12' - 0"
3' - 0"
7' - 0"
3' - 0"
8' - 0"
" 3' - 0
0" 10' -
- 0" 50'
0"
- 0"
- 0" " 3' 0 ' " 5 3' - 0
0" 50' -
50' - 0"
50' - 0"
250' - 0"
SHEET NO.
241' - 0"
1
A-3
OBAMA CENTER FIRST FLOOR 1" = 10'-0"
0 20
50
8 OF_____SHEETS
0' - 7"
STEEL CURTAIN WALL MEMBER FIELD WELD ANCHOR BOLT
T.O. HOLLOWCORE 16'-0"
8" CMU
PL 3/8"x6"x10" w/ 6x 1/2"4" STUD w/ANGLE 1/2"x4"6"
CLAMPING FOOT
0'
0' - 6"
" -5
VERTICAL WEATHER STRIP
FIRESTOP
0' - 11"
2
12" HOLLOW CORE
DROPPED CEILING (ACUSTIC) ANCHORED TO HOLLOW CORE
LOCKING SCREW VERTICAL COVER CAP
PRESSURE PLATE
RUNNER CHANNELS @16" O.C. 5/8" GYP BOARD DROP CEILING SCREWED INTO FURRING STRIP
PL 3/8"x2"x6" w/ 2x RECTANGULAR STUDS
64' - 0"
0' - 7"
SGG FIRE RATED GLAZING
3" X 3" - 10 X 1/4" METAL NON-SLIP NOSING ANCHORED WITH WING NUT
IN.
12" HOLLOW CORE SLAB
7/8" METAL FURRING STRIPS @ 16" O.C. METAL EDGE TRIM
MULLION SECTION AT STEEL BEAM 3" = 1'-0"
4
BATT INSULATION
3/4" WOOD FLOOR FINISH 2" CONCRETE TOPPING
SGG FIRE RATED GLAZING METAL BACK PAN
0' - 6"
1' - 1"
LIBRARY CURTAIN WALL SEE DWG 5/HEAD DETAIL T.O. HOLLOWCORE 16'-0"
HEAD DETAIL
T.O. HOLLOWCORE 16'-0"
12" HOLLOW CORE WELD ANCHOR STEEL BEAM
3' - 10"
SGG FIRE RATED GLAZING
HAUNCH
MULLION ANCHOR TO STEAL BEAM DETAIL SEE DWG 2/A-1 MULLION SECTION AT STEEL BEAM
2 A-1
ANCHOR BOLTS LIBRARY CURTAIN WALL SEE DWG 4/A-1 MULLION DETAIL AT STEEL BEAM DROPPED CEILING ANCHORED TO HOLLOW CORE SLAB
ANCHOR ASSEMBLY
8c
MULLION ANCHOR TO STEEL BEAM DETAIL SEE DWG 2/A-1
0' - 7"
DRIP EDGE
16' - 0"
STEEL CURTAIN WALL MEMBER
2 X 4 TREATED WOOD NAILER SHIMMED AND CALULKED INTO PLACE WINDOW HEAD ANCHORED WITH 3" SCREW INTO WOOD NAILER
STEEL CURTAIN WALL VERTICAL MEMBER
4" STAINED CONCRETE
ANCHORS
STEEL CURTAIN WALL MEMBER
HAUNCH
F.F SLAB 0'-0"
STEEL CURTAIN WALL VERTICAL MEMBER
LIBRARY CURTAIN WALL SEE DWG 5/SILL DETAIL
STEEL CURTAIN WALL MEMBER SETTING BLOCK HARDWOOD BLOCK SHIM FIRE STOP & SMOKE SEAL
2" ROUND STEEL HANDRAIL 3' - 0" FROM T.O. NOSING ANCHORED TO CAST-IN-PLACE CONCRETE WALL WITH BRACKETS & SCREWS WITH EXPANSION SHIELDS @ 4' - 0" O.C.
F.F SLAB
LOCKING SCREW COVER CAP FINISH SEALANT
FOR ISOMETRIC DETAIL OF CONNECTION SEE DWG 2/A-3 F.F SLAB 0'-0"
0'-0"
PRESSURE PLATE
ISOLATION JOINT
A/C DUCT
2" GRAY THIN BRICK INSULATED LOAD BEARING PRECAST CONCRETE PANEL
3' - 0"
3' - 6"
8b A-4
TREATED WOOD NAILER
3' - 0"
8c A-4
SGG FIRE RATED GLAZING
4' - 0"
3' - 6"
4' - 0"
3/4" WOOD FLOOR FINISH 2" CONCRETE TOPPING 6" CONCRETE SLAB ON VAPOR BARRIER AND 4" GRAVEL
ALUMINUM STOOL
JAMB DETAIL
3' - 4"
FIRE STOP & SMOKE SEAL FINISH SEALANT FIRE RESISTANT LOOSE INSULATION
1/4" CONTINUOUS BEARING PAD WITH BACKER ROD AND CAULKING 3/4" WOOD FLOOR FINISH 2" CONCRETE TOPPING 6" CONCRETE SLAB ON VAPOR BARRIER AND 4" GRAVEL 0' - 4" 0' - 6" 0' - 2"
PRESSURE PLATE LOCKING SCREW COVER CAP
CAST -IN-PLACE CONCRETE WALL
ISOLATION JOINT
2" RIGID INSULATION
4' - 0"
3' - 6"
8a A-4
WINDOW HEAD ANCHORED WITH 3" SCREW INTO WOOD NAILER 2 X 4 TREATED WOOD NAILER SHIMMED AND CALULKED INTO PLACE
SGG FIRE RATED GLAZING
FOR HANDRAIL DETAILS SEE DWG ?/A-4
T.O. HOLLOWCORE 16'-0"
6' - 0" M.O.
VERTICAL MULLION DETAIL
FOR ENLARGED STAIR DETAIL SEE DWG ?/A-4
ALUMINUM FRAME FIXED WINDOW WITH INSULATED GLASS PANELS
8' - 0"
T.O. HOLLOW CORE 64'-0"
24R @ 7"= 14' - 0"
METAL EDGE TRIM
SGG FIRE RATED GLAZING
GRAVEL INSILATED LIGHTWEIGHT TOOPING 4" RIGID INSULATION SLOPED TO DRAIN 12" HOLLOW CORE
6' - 0"
7/8" METAL FURRING STRIPS @ 16" O.C.
DROPPED CEILING (ACUSTIC) ANCHORED TO HOLLOW CORE
7/8" METAL FURRING STRIPS @ 16" O.C.
LIBRARY CURTAIN WALL SEE DWG 5/VERTICAL MULLION DETAIL
SETTING BLOCK PRESSURE PLATE LOCKING SCREW COVER CAP
LIBRARY STAIR CONDITIONS 1 1/2" = 1'-0"
HAUNCH
PL 3/8"x2"x6" w/ 2x RECTANGULAR STUDS
4' - 2"
STEEL CURTAIN WALL VERTICAL MEMBER
16' - 0"
THICKENED SLAB SEE DWG 6a/ A-1
8d
#4 REBAR @ 1' - 0" RUNNIG BOTH DIRECTIONS
5
MULLION DETAIL AT STEEL BEAM
0' - 5"
F.F SLAB 0'-0"
5/8" GYP BOARD DROP CEILING SCREWED INTO FURRING STRIP
5/8" GYP BOARD DROP CEILING SCREWED INTO FURRING STRIP
16' - 0"
-5 0'
5" POLISHED CONCRETE SLAB
RUNNER CHANNELS @16" O.C.
PL 3/8"x6"x10" w/ 6x 1/2"4" STUD w/ANGLE 1/2"x4"6"
RUNNER CHANNELS @16" O.C.
DRAPERY POCKET SEE DETAIL DWG 1/A-6
"
3" X 3" - 10 X 1/4" METAL NON-SLIP NOSING ANCHORED WITH WING NUT
12" HOLLOWCORE FLOOR SLAB
STEEL FIREPROOFING: SPRAY
6' - 8"
0' - 6"
1' - 0" THIN BRICK INSULATED LOAD BEARING PRECAST CONCRETE PANEL
1
8b
WALL SECTION DETAILS
VAPOUR CONTROL LAYER
8a
ANCHOR
SCHOOL OF ARCHITECTURE SOUTHERN ILLINOIS UNIVERSITY ARC 452 DESIGN VI: INTERGRATION STUDIO NORM
PRESSURE PLATE LOCKING SCREW COVER CAP
SET NO.
ANCHOR ASSEMBLY
DATE
THERMAZONE INSULATION
CONT. GMS CHANNEL (W. DRIP EDGE)
LIGHT COLORED GRAVEL ON 3 LAYERS OF FELTS ADHERED TOGETHER WITH COALTAR ON 2" LIGHT WEIGHT TOPPING ON 6" RIGID INSULATION SLOPED TO DRAIN
SHEET TITLE
BATT FILL CAVITY INSULATION
T.O. HOLLOW CORE 64'-0"
PROJECT NAME-LOCATION-OWNER: STUDENT: KEVIN VAZQUEZ INSTRUCTOR: NORM LACH OBAMA CENTER JOB NO. : DRAWN BY: CHECKED BY: JACKSON PARK,IL KCV OBAMA FOUNDATION
T.O. DOUBLE TEE 125' - 4"
CANT STRIP
05/12/17
DRAINING GRAVEL BORDER MONARPLAN FIXING BAR / MECHANICAL FASTENERS DRAINAGE BOARD w/ FILTER FLEECE HOT AIR WELD
5" POLISHED CONCRETE SLAB
REVISION & DATE
STEEL BEAM
1' - 6"
CAST-IN -PLACE CONCRETE WALL
4 0' - 2"
3" X 3" - 10 X 1/4"METAL NON-SLIP NOSING ANCHORED WITH WING NUT
4
0' - 2"
METAL CAP FLASHING
2" RIGID INSULATION
THICKENED SLAB
SHEET NO.
8d A-4
0' - 6"
2' - 0"
LIBRARY STAIR SECTION 1/4" = 1'-0"
4
LIBRARY CURTAIN WALL 3" = 1'-0"
1' - 0"
0' - 6"
0' - 6"
2' - 0"
SILL DETAIL 6
1' - 0"
1' - 0"
23T @ 11"= 10' - 0"
3
LIBRARY IST FLOOR TO GREEN ROOF 3/4" = 1'-0"
1' - 0" 2' - 0"
1
LIBRARY FULL BUILDING SECTION 3/4" = 1'-0"
0' - 6"
A-1 8 OF_____SHEETS