THE WHEELER'S PARADISE - SENTUL WEST FUTURE CYCLING CITY SEM06 PORTFOLIO

Page 1

AR718 INTERGRATED ARCHITECTURAL DESIGN PROJECT

PORTFOLIO 06 SPORTS AND RECREATION

NEW NORMAL POST COVID

1001849363

PRE COVID

DESIGN STUDIO 06

JIA EN KHOR




PROJECT 01

PRE-COVID AND POST COVID STUDIES


PROJECT 01

THEME : SPORTS AND RECREATION ACTIVITIES






PROJECT 01 GROUP POSTER REIMAGINE

PRE COVID : LEFT POST COVID : RIGHT


PROJECT 01

PARK GARDEN MOVABLE PARTITION INTERVENTION

FREE COMBINATION TO CATER DIFFERENT AMOUNT OF USER EASILY PLUG IN AND REMOVE CREATING PARTITION ONLY WHEN NEEDED TO REMAIN THE PARK PUBLIC SPACE UNOCCUPIED AND FREE FOR SPORTS ACTIVITIES U TILIZE THE EXISTING LIGHT POLE AND TREES AS POLE FOR PARTITION TO REMOVE NUMBER OF COLUMN ON SITE

PARK INTERVENTION


ZONE CYCLING AND JOGGING


PROJECT 01

Playground

• Small size platform maximum ˛t up to 5 people restricted the gathering group size and yet allows them to carry out the recreation activities surrounded by the nature

• Multi platform playground allow Mu kids to still enjoy visual contact and verbal contact while play together but still stay safe without skin contact

Exercise Area

Jogging/Cycling

• Utilise the original presence landscape such as light pole and trees to create

• Creating marking reminder for social distancing that can be use

partition for sports activities

f rom day to night

• Flexible space planning to cater different Fl spatial needs by users according to users group size

• Planned new track into single Plan direction to reduce the risk of cross infection

Recreation Pod

Elevated Walkway

• Ensure social distancing between groups that are having Recreation activities

• Increase functional space by adding double volume space • Allow the park to accommodate higher volume of visitors with safe social distancing

PARK INTERVENTION

Islands Paradise



PROJECT 02A URBAN STRATEGIES


PROJECT 02 - URBAN STRATEGICS

S I T E A N A LYS I S

T H E O BVI O U S S E PE R AT I O N ZO N I N G O F S I T E VI A DA I LY ACT IVI T I E S TYPE O N S I T E


S I T E A N A LYS I S

PROJECT 02 - URBAN STRATEGICS

T H E I S O L AT E D ZO N E O N S I T E


SITE ANALYSIS

1.BLOCKING CIRCUL ATION ON SITE FROM ZONE TO ZONE 2 .L ACK OF COMMUNITY AND INTERACTION SPACE 3.HIGH TRAFFIC CONGESTION 4 .NO PROPER WALKWAY / NON PEDESTRIAN FRIENDLY

THE SWOT - ISSUE

PROJECT 02 - URBAN STRATEGICS

ISSUE :


SITE ANALYSIS

SENTUL PARK IS ONLY ACCESSIBLE AND CONNECT TO EACH OTHER WITH THESE EXISTING ROAD THE HIGH VOLUME OF TRAFFIC FROM RESIDENTS , COMMERCIAL TO EDUCATION USERS CAUSED SERIOUS CONGESTION ISSUE

THE SWOT - TRAFFIC CONGESTION ISSUE

PROJECT 02 - URBAN STRATEGICS

THE 4 ZONE FROM SURROUNDING


T H E E D U CAT I O N FAC I L I T I E S

T H E PU B L I C T R A N S P O RT A N D

THE SITE AS CENTER

CO M M E R C I A L ZO N I N G

CO N N ECT I N G P O I N T

T H E S WOT - ST R E N G T H A N D O PP O RTU N I T I E S M A PPI N G

PROJECT 02 - URBAN STRATEGICS

S I T E A N A LYS I S


T H E U N I Q U E B U I L D I N G I D E N T I TY

T H E S WOT

PROJECT 02 - URBAN STRATEGICS

S I T E A N A LYS I S


PROJECT 02 - URBAN STRATEGIES

FIRST VERSION

SECOND VERSION

THIRD VERSION

FORTH VERSION

FIFTH VERSION


ELEVATED TRACK DEVELOPMENT STAGES AND CONSIDERATION 01 .FIRST VERSION STARTED FROM THE PLACEMENT OF VARIOUS TYPE PUBLIC TRANSPORT STATION ON SITE AS ENTRANCE TO THE ELEVATED TRACK

04. FORTH VERSION TAKING CONSIDERATION ON CONTEXT OF SITE TO CONNECT PUBLIC AMENITIES ,PUBLIC T R A N S P O R T A T I O N , INSTITUTION,CULTURE/ RELIGIOUS,COMMERCIAL AND RESIDENTIALIN SENTUL SITE

02. SECOND VERSION DEVELOPED INTO CIRCULAR FORM FOR SMOOTHER BICYCLE ACTIVITIES AND FURTHER CALCULATE TO ESTIMATE BEST ROUTE FOR PEDESTRIAN ONLY WALKWAY

03.THIRD VERSION IDEA OF ADDING FUNCTIONAL PLATFORM AS COMMUNITY ENGAGEMENT AND RESTING SPACE FOR USERS

05. FIFTH VERSION PLANNING ON TAKING CONSIDER OF NATURE LANDSCAPE TO MINIMISE THE DESTROY OF NATURE BEAUTY IN EXISTING SENTUL PARK AND ENHANCE ON THE BEAUTY OF NATURE VIEW

FINAL VERSION OF ELEVATED TRACK


PROJECT 02 - URBAN STRATEGIES PROPOSED SOLUTION


U S E R G R O U P F U N CT I O N A N D T I M E L I N E

Students 02. RESIDENTIAL Children House Wife Elderly Workin g Adults 03.COMMERCIAL Children Comm ercial area Workers 04. OUTSIDERS Event Par ticipants Traveller

INTERACTION BETWEEN INDIVIDUAL . FRIENDS . FAMILY . COMMUNITY

01 .INSTITUTION


B I CYC L E PA R K I N G LO C K B I CYC L E R E N T I N G


SCAN , RENT AND PARK FOR BIKE AT EVERY ENTRANCE OF ELEVATED TRACK THE FREQUENT USE OF QR CODE AND E-WALLET NOWADAYS IS PREPARING THE PUBLIC TO GET USED TO THIS TYPE OF RENTING SYSTEM PROVIDING MINIMUM HUMAN CONTACT AND ALLOWING AUTO SANITATION IN PARKING TENT AFTER EVERY USE. THIS PROTECTED EVERY USER WE SANITISED CLEAN AND SAFE BICYCLE TO USE DAILY YET SECURE THE BICYCLE PROPERTY BECAUSE THE E-WALLET HAS BEEN OFFICIAL VERIFIED AND CANBE TRACE BACK EASILY


S I T E A N A LYS I S

TREES BELOW 13M

TREES ABOVE 13M

PROJECT 02 - URBAN STRATEGICS

T H E R I C H B I O D IVE R S I TY O F G R E E N S A N D WAT E R F E ATU R E S


T H E F I N A L R O UT E O UTCO M E FO R A L L TYPE ACC E S S

PROJECT 02 - URBAN STRATEGICS

S I T E A N A LYS I S


S I T E A N A LYS I S

PROJECT 02 - URBAN STRATEGICS

M A ST E R PL A N N I N G


PROJECT 01

FOREST WAY

THE JOGGING PATH IN THE GREENS PRESERVING THE LOCAL EXISTING TREES AS A BUFFER FOR NATURE SPORTS LOVER IN THEIR LITTLE PARADISE

THE COMMUNITY GARDEN AND PICNIC AREA A SPOT NEAR AND DIRECTLY ACCESSIBLE FROM THE RESIDENTIAL ZONE PROVIDING SPACE FOR THEM TO INTERACT WHILE PROFITING THE COMMUNITY.THEY PLANT, WORK HARD AND CAN ENJOY THE HAPPINESS OF HARVESTING FOR COMMUNITY PICNIC DURING WEEKENDS

THE CULTURE BAZAAR

LOCATED SURROUNDED BY COMMERCIAL ZONE OF DIFFERENT COMMUNITY HOPING TO PROVIDE A INTERSECTION POINT OF DIFFERENT CULTURE COMMUNITY TO BE BRING IN AND ABLE TO SHARE TO EVERYONE

FURTHER EXTENSION OF MY ELEVATED BICYLE PATHWAY TO BRING IN MORE FUN AND EXCITING FEATURES TO THE BIKE LOVERS

PARK INTERVENTION

SKATE PARK / BMX PARK



PROJECT 02B BUILDINGS STRATEGIES


B U I L D I N G F U N CT I O N I N S PI R E D A N D C H A R ACT E R I ST I CS

ACT IVE S P O RTS C E N T R E

PROJECT 02 - BUILDING STRATEGICS

User Experience : Active Lively

Energetic

Open wall reduce the number of solid wall and courtyard type centre hollow roof structure allowing nature ventilation

Courtyard type centre hollow roof structure allowing nature ventilation and nature daylight

Existing greenery remained as maximum as possible creating a Ëœow ventilated and green building enviroment


B U I L D I N G F U N CT I O N I N S PI R E D A N D C H A R ACT E R I ST I CS

A DA PT IVE R E U S E - Q U I T E S P O RTS User Experience : Relaxed Peaceful

Full of history memories

Quite exercise such as yoga wheel , hanging yoga placed here high enough for nice view and comfortable enviroment

Adaptive reuse add on building to existing building maximize the nice view of sun rise and sun set

FULL OF HISTORY Locomotive Railway History building 2 historical exisiting train track creating unique experience for jogging cycling or even historical gallery

Indoor relaxing park with alot of greenerys is remained for public use as a interior gardr

Utilising the high ceiling volume of the old Sentul Depot Block B to create different level height gathering pod

PROJECT 02 - BUILDING STRATEGICS

The existing building consists of 3 parts, can serve different function f rom watch, walk, rest and cycle to interesting exhibition area


B U I L D I N G F U N CT I O N I N S PI R E D A N D C H A R ACT E R I ST I CS

ACCO M O DAT I O N B U I L D I N G

PROJECT 02 - BUILDING STRATEGICS

Playing with new level build above existing building

Allow greens/ vegetation grow out in between to act as nature noise barier for accomodation room

Existing building f rame remained to create unique identity of accomodation and attract outsiders to stay


S I T E C H A R ACT E R I ST I CS EXPLO R E I N S PI R AT I O N

PROJECT 02 - BUILDING STRATEGICS

S E N TU L D E P OT B U I L D I N G VI EWS

NORTH VIEWS KLPAC brings a nice KL combination of modern concrete with exisiting historical building immerse in sentul park ‘s greenary and the lake water feature

EAST VIEWS The Fannel unique form and modern KTM Station creates a new stylish skyline view of Sentul combining with the far high rise

SOUTH VIEWS T he group of Colonial buildings preserve by YTL creates another different ambiance now gave visitors coming in f rom main car entrance a sense of time travel back to the old colonial time


S I T E C H A R ACT E R I ST I CS EXPLO R E I N S PI R AT I O N

L I N E A R A R R A N G E M E N TS

PROJECT 02 - BUILDING STRATEGICS

From existing roof alignment to nature tree trunk, tree skin on site, the linear arrangement looks similar and inspired me to remain this harmony arrangement in while adding in new building to existing building


MA S S I N GR LO CAT N PL S I T E C H A R ACT E R I ST I CS EXPLO E IN S PII O R AT I OA NN

H O R I ZO N TA L ST R I P E L E M E N TS The horizontal strip elements is one of the f requent elements that can be found around the site easily on site especially the elements of train track and repair factory roof pro˛le, warehouse column and roof pro˛le. The horizontal strips elements is one of the key to help future new building to blend themselves into the building full of the sentul old time glory

PROJECT 02 - BUILDING STRATEGICS


M A S S I N G LO CAT I O N PL A N

M A S S I N G S I T E PL A N

The 3 seperated different function building is always connected together and will be accessible internally ACCO M O DAT I O N

A DA PT IVE R E U S E

ACT IVE S P O RT

PROJECT 02 - BUILDING STRATEGICS

T he building also located in the mist of existing building and some outside of the building giving people visiting there chance to experience the view f rom inside of existing building an to exterior of the and building


PROJECT 03 DESIGN DEVELOPMENT


PRIMARY FORM

LINEAR / SHARP EDGES / CLEAR LINE EDGES

CONTEXT

2 1

DESIGN DEVELOPMENT

FUNCTION

3

WHEEL INSPIRED SPORTS ( BICYCLE TYPE / GYM TYPE / YOGA TYPE / HYMNASTIC TYPE ) PROJECT 03


PRIMARY FORM

1

CURVY FORM HIDDEN IN SQUARE OUTER

2 REDUCE SHARP EDGES

3 CURVE AS CONNECTOPN FOR SQUARE INTERSECTING

DESIGN DEVELOPMENT PROJECT 03


PRIMARY FORM

AFTER A SERIES OF DEVELOPMENT, COMBINATION OF THE DIFFERENT APPLICATION METHOD FOR INTERSECTION BETWEEN SHARP EDGES AND CURVY EDGES IS MUCH BETTER TO REDUCE THE BULKYNESS OF BUILDING

DESIGN DEVELOPMENT PROJECT 03


CONNECTIVITY FROM OUTSIDE TO INSIDE STUDY MODEL STUDYING CONNECTION FROM EXTERIOR TO INTERIOR

EXISTING BUILDING

DESIGN DEVELOPMENT

COMMUNITY AREA

RESIDENTIAL ZONE

TRYING TO CREATE CONNECTION FROM COMMUNITY AREA TO EXISTING BUILDING VIA DESIGNED LANDSCAPE PATH ON GROUND FLOOR

PROJECT 03

CONNECTION TO MAIN


INTERCONNECTION

PROJECT 02A URBAN STRATEGIES

INTERCONNECTED BETWEEN DIFFERENT BUILDING

DESIGN DEVELOPMENT

CONNECTING THE PROPOSED NEW BUILDING AND 3 DIFFERENT BUILDING INTERNALLY VIA DIFFERENT FLOOR WALKWAY PROVIDE ACCESS TO ALL BUILDING WITHOUT AND DIFFERENT ELEVATED VIEWS.

PROJECT 03


INTERCONNECTION

POD MODEL DESIGN

PROJECT 03

THE LONG CORRIDOR WALKWAY IS SEPERATED TO PEDESTRIAN USE AND BICYCLE USE. tHE PEDESTRIAN USERS HAVE OPTION OF WALKING ON PLATFORM BESIDE CYCLNG ROUTE, POD WALKWAY OR EVEN THE HISTORICAL PARK GALLERY

DESIGN DEVELOPMENT

INTERCONNECTED FROM SOUTH ( FRONT PART )TO NORTH (BACK PART ) THE LONG WAREHOUSE IS DESIGN AND ACT AS COVERED BUT OPEN TRANSITION SPACE WITH INDOOR GARDEN / PARK AMBIENCE.



PROJECT 03 SPORTS AND RECREATION

THE BICYCLE HUB AND COMMUNITY CENTRE



BUILDING PLACEMENT IN COMPARE TO EXISTING BUILDING

NEW BUILDING : NEW ACCOMODATION BUILDING BUILD ABOVE EXISTING BUILDING NEW BUILDING : ACTIVE SPORTS BUILDING STRUCTURELY NEW BUT PARTIALLY PASSING THRU EXISTING BUILDING SRUCTURE

NEW BUILDING : ADDITION NEW FLOOR ADDED ON TOP OF EXISTING BUILDING STRUCTURE

EXISTING BUILDING



F I R ST F LO O R PL A N

1 O PE N G YM R O O M 2 H U M A N H A M ST E R WH E E L 3 O UT D O O R H U M A N H A M ST E R WH E E N 4 S PI N N I N G R O O M 5 O PE N S PI N N I N G R O O M 6 B A BY C H A N G I N G R O O M 7 F E M A L E TO I L E T 8 F E M A L E S AU N A R O O M 9 G YM O F F I C E R O O M 1 0 L A N D I N G PL AT FO R M 1 1 VE LO D R O M E O F F I C E 1 2 O KU TO I L E T 1 4 M A L E S AU N A R O O M 1 5 I N D O O R B I CYC L E VR G A M E R O O M 1 6 U N I CYC L E T R A I N I N G S PAC E 1 7 STO R AG E R O O M 1 8 T R A I N I N G R E ST R O O M FO R VE LO D R O M E 1 9 M E E T I N G R O O M FO R VE LO D R O M E 2 0 T R A I N I N G R E ST R O O M FO R VE LO D R O M E 2 1 STO R AG E R O O M FO R VE LO D R O M E CO M PE RT I T I O N

FLOOR PLAN

1 3 M A L E TO I L EY

2 2 F I R ST A I D R O O M 2 3 ACCO M O DAT I O N PR I VAT E PA R K I N G S PAC E WI T H S E C U R I TY 24 ACCO M O DAT I O N LO U N G E A R E A 2 5 L I F T LO B BY 2 7 ACCO M O DAT I O N B A LCO N Y 2 8 I N T E R N A L CO N N E CT I O N CO N N E CT I N G 3 EXI ST I N G B U I L D I N G A N D T H E N EW B U I L D I N G S . 2 9 E L EVAT E D G AT H E R I N G P O D

PROJECT 03

26 RISER ROOM


FLOOR PLAN

F I R ST M E Z Z A N I N E F LO O R PL A N

1 DOUBLE VOLUME OPEN GYM AREA 2 CONNECTION FROM ELEVATED TRACK 4 AUDIENCE / SUPPORTER DECK 5 VELODROME TRACK 6 L ANDING PL ATFORM 7 ACCOMODATION 8 ELEVATED PATHWAY INTER CONNECTING ROUTE 9 MIRRORED RHYTJMIC GYMNASTICS TRAINING ROOM 10 INDOOR RHYTHMIC GYMNASTICS TRAINING ROOM

PROJECT 03

3 VELODROME RECEPTION AND STORAGE RENTING


1 OPEN AREA RHYTHMIC GYMNASTIC TRAINING ROOM 2 PROFESSIONAL BICYCLE STIMUL ATOR TRAINING ROOM

FLOOR PLAN

S ECO N D F LO O R PL A N

3 PROFESSIONAL BICYCLE TRAINING FACILITIES 4 PROFESSIONAL BICYCLE TRAINING PANTRY AND RECEPTION AREA 5 OPEN ROOF TOP GARDEN 6 ACCOMODATION FLOOR 8 RISER ROOM 9 ACCOMODATION DECKING BALCONY 10 INDOOR TRAINING ROOM 1 11 INDOOR EXERCISE ROOM 2 12 YOGA ROOM 01 13 YOGA ROOM 2 14 CONNECTION TO KTM STATION

PROJECT 03

7 LIF T LOBBY


T H I R D F LO O R PL A N FO RT H F LO O R PL A N

1

1 ACCOMODATION

PROJECT 03

FLOOR PLAN

Q


PROJECT 03

MATERIALS STUDIES


MATERIAL STUDIES

CORTEN STEEL FACADE LOCALISE MATERIAL TEXTURE ‫غ‬ COLOUR TONE AND GIVE BRIGHT ATTRACTION FOR PEOPLE TO NOTICE FROM FAR

TIMBER TEXTURED STEEL RAILING LOCAL MATERIAL ON SITE

FARBRIC COATED STEEL MESH GIVEN TRANSPARENT VIEW TO GIVE VISIBILTITY TO EXISITNG BUILDING AND MAXIMUM VENTILATION

CONCRETE FLOORING

LOCAL MATERIAL ON SITE

BRICK WALL LOCAL MATERIAL ON SITE


FABRIC COATED STEEL MESH FACADE

BRICK WALL

CORTEN STEEL FACADE

CONCRETE FLOORING


ACCO M O DAT I O N

DOUBLE ROOM - 4 TWI N R O O M - 4 T R I PL E T R O O M - 2 FA M I LY R O O M - 2

S ECO N D F LO O R R O O M TYPE DOUBLE ROOM - 4 TWI N R O O M - 4 T R I PL E T R O O M - 2 FA M I LY R O O M - 2

F I R ST F LO O R R O O M TYPE

EVE RY R O O M EQ U I PE D WI T H OWN B A LCO N Y FO R D I F F E R N T I N T E R E ST I N G VI EW FROM ALL SURROUNDING OF WA R E H O U S E BUILDING

D O U B L E R O O M - 2 PAX TWI N R O O M - 2 PAX T R I PL E T R O O M - 4 PAX FA M I LY R O O M - 4 PAX

ROOM LAYOUT

T H I R D F LO O R R O O M TYPE

PROJECT 03

DOUBLE ROOM - 2 TWI N R O O M - 3 T R I PL E T R O O M - 1 FA M I LY R O O M - 4


EXT E R I O R :

PERSPECTIVE LAYOUT

ACCO M O DAT I O N

INTERIOR B R I C K WA L L S L I D I N G D O O R FO R ACC E S S TO EXT E R I O R B A LCO N Y T I M B E R PA N E L F LO O R I N G

PROJECT 03

B R I C K WA L L CO R U G AT E D S H E E T CO RT E N ST E L L FACA D E CO N C R E T E F LO O R I N G



PROJECT 03 THE WHEELER’S PLAYGROUND


THE WHEELERS PLAYGROUND



THE COMBINATION OF FARBRIC COATED STEEL MESH FACADE GAVE PARTIALLY TRANSPARENT EFFECT ALLOWING THE THE VIEW OF NEW BUILDING WHILE HAVING VIEWS OF THE EXISTING BUILDING CREATS A HARMONISE BLEND IN BUILDING WITHOUT BLOCKING THE BEAUTY OF THE EXISTING BUILDING


INTERIOR PERSPECTIVES THE ENTRANCE RAMP TO VELODROME BUILDING


THE COMMUNITY SPACE AND TRANSITION SPACE OF THE BUILDING AS THE CENTRE CONNECTING POINTS OF 4 DIFFERENT BUILDINGS WHERE AT THIS POINT PEOPLE CAN CHOOSE TO ACCESS TO THEIR DESTINATED SPACE OR REMAIN AT THIS OPEN AREA SURROUNDED BY THE BUILDINGS AND GREENARY TO PLAY, SPORTS, GATHER OR RELAX IN THIS OPEN COMPOUND



THE VELODROME BUILDING DESIGN WITH DIFFERENT LEVELING AND VOID ALLOW ALL WHEELS SPORT TYPE TO PLAY AT THE FLAT LANDING PLATFORM OF THE VELODROME BUILDING GOING UP AND DOWN USING THE RAMP CONNECTING EVERY FLOORS


THE VELODROME BUILDING IS A NEW BUILDING BUT INTERGRATED ITS TRACK TO BE CYCLE PASS THE EXISITING BUILDING STRUCTURE GIVING A DIFFERENT VISUAL EFFECT WHILE CYCLING UNDERNEATH THE COMBINATION OF NEW BUILDING AND EXISTING BUILDING IS BLEND IN BY SHARING THE SAME COLOUR TONE ELEMENTS ON THE RAILING.

INTERIOR PERSPECTIVES VELODROME AND THE EXISTING BUILDING

THE VELODROME BUILDING USES ALOT OF STRIP COLUMN AND RAILING TO FORM WALL REPLACING THE USUAL SOLID WALL TO ACHIEVE MAXIMUM VENTILATION FOR THE ACTIVE SPORTS ACTIVITIES HAPPENING IN






INTERIOR PERSPECTIVES HISTORICAL GARDEN


INTERIOR PERSPECTIVES HISTORICAL GARDEN Historical building combined with greenery that grows naturally after the abandoned use of the repair workshop is remained to be in its naturally beauty form and provides a shaded garden for the community to play and gather in this memorable space. The garden is seperated into gallery space, garden space and a series of pods for gatherinig in different height allowing different community engagement to take place. The story and precious memory of this building and site can be passed down and share to the next generation and allow them to experienced the glory of locomotive train, gears and steam operation.


INTERIOR PERSPECTIVES HISTORICAL GALLERY WALKWAY


INTERIOR PERSPECTIVES GATHERING PLATFORM


SECTIONAL PERSPECTIVES 01


SECTIONAL PERSPECTIVES 02




LEFT ELEVATION



SECTION 01


FARBRIC COATED STEEL MESH WALL FACADE

THE EXISTING STRUCTURE AND ADDITIONAL NEW STRUCTURE TOPPED ON TO OF THE EXISTING BUILDING

OPEN WALL VELODROME BUILDING

OPEN ENVIROMENT COMMUNITY AREA AND RETAIL AREA




ª‫ׇׁ‬ ‫ ׈‬ X yÀ0ªJª À0( ª!RX À0!ÀǪ m (0²X Jy §ª h0!À

À0!RyX ! m ª0§ ªÀ ²§ ªÀ² y( ª0!ª0 ÀX y

y0à y ªw m § ²À ! ßX (

ׁ ‫ׁ׀׀‬ ‫׃׆׃׉ׄ׈‬

§ª0 ! ßX (

(0²X Jy ²ÀÇ(X ‫׆׀‬

hX 0y jR ª


²Çy § ÀR ‫ ڕ‬ ªX 0yÀ ÀX y

‫ ׉‬w

ׁ ׁ w

ׁ §w

‫§׃‬w

‫§׆‬w


Jª00y ²§ !0²


ß0yÀX m ÀX y



IX ª0 0²! §0 ²À X ª² m ! ÀX y


‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬

‫ٌ‬

‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ​ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬

‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬

‫׉ׂ‬

‫׈ׂ‬

‫ׂׅ‬

‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬

‫ׂׄ‬ ‫׃ׂ‬

‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬

‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬

‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬

‫ٌ‬

‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬

‫׆ׂ ׇׂ‬

‫ٌ‬

‫ٌ‬

‫ٌ‬

‫ٌ‬

‫ٌ‬

‫ٌ‬

‫ٌ‬

‫ٌ‬

‫ٌ‬

‫ٌ‬

‫ׁ‬ ‫׉‬

‫׀ׂ‬

‫ٌ‬

‫ׁ‬ ‫׈‬ ‫ׁׂ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬

‫ׁ‬ ‫ׅ‬ ‫ׁ‬ ‫ׄ‬ ‫ׁ‬ ‫׃‬

‫ׁ‬ ‫ׂ‬ ‫ׁ‬ ‫ׁ‬

‫ׁ‬ ‫׀‬

‫׉‬

‫ׂ‬

‫ׄ‬ ‫ׅ‬

‫ׇ‬ ‫׈‬

‫׃‬

‫׆‬ ‫ׁ‬

‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬

‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬

‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬

‫ׁ‬ ‫׆‬

‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬ ‫ٌ‬

‫ׁ‬ ‫ׇ‬

‫ׂ​ׂ‬

‫‪IX‬‬ ‫ ‪ª²À‬‬ ‫ ‪Im ª‬‬ ‫‪§m y‬‬ ‫‪IX‬‬ ‫ ‪ª0‬‬ ‫ ‪0²! §0‬‬ ‫‪²À X‬‬ ‫ ‪ª²‬‬ ‫‪m ! ÀX‬‬ ‫‪ y‬‬

‫ ‪²! m0‬‬ ‫ׁ‬ ‫ب‬ ‫׀ׇׅ‬


ٌ

‫ׇ‬

ٌ

‫׆‬

ׁ

ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ

IX ª²À w0ðð yX y0 Im ª §m y

ׄ ‫ׅ‬

IX ª0 0²! §0 ²À X ª² m ! ÀX y

²! m0 ׁ ‫ب‬ ‫׀ׇׅ‬

ׁ ‫׀‬

ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ​ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ

‫׃‬ ׂ

‫׉‬ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ

‫׈‬

ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ


‫ׇ‬

ٌ ٌ ٌ ٌ

ٌ

ٌ

ٌ

ٌ

ٌ

ٌ ٌ ٌ ٌ ٌ ٌ

ٌ ٌ

ٌ

ٌ

ٌ

ٌ

ٌ

ٌ

ٌ

ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ

‫׆‬

ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ

‫׈‬

ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ

‫׉‬

ׁ ‫׀‬ ׁ ׁ ‫ׇ‬

ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ

ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ‫ׅ‬

ׁ ׂ

ׁ ‫׃‬ ׁ ׄ

ٌ

ٌ

ٌ

ׁ

ٌ

ׄ

ٌ

‫׃‬

ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ

ׂ

²0! y( Im ª §m y ²! m0 ׁ ‫ب‬ ‫׀ׇׅ‬

IX ª0 0²! §0 ²À X ª² m ! ÀX y


ٌ ٌ ٌ ٌ

ٌ

ٌ

ٌ

ٌ

ٌ

ٌ ٌ ٌ ٌ ٌ ٌ

ٌ ٌ

ٌ

ٌ

ٌ

ٌ

ٌ

ٌ

ٌ

ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ

ÀRX ª( Im ª §m y ²! m0 ׁ ‫ب‬ ‫׀ׇׅ‬

IX ª0 0²! §0 ²À X ª² m ! ÀX y


WB

WB

WB

WC 01 FT

OUTDOOR LOUNGE AREA TO ROAD SIDE DRAIN

FT

KITCHEN AREA

FT

FT

WB

WC 03

WC 02 BD FT

WB

BD FT

WC 04 FT

BD

FT

FT

FT

FT

MALE ABLUTION AREA

FEMALE ABLUTION AREA

FEMALE PUBLIC TOILET

FT

FT

FT

WC OKU

WC 05 BD

FT

BD

MALE PUBLIC TOILET

FT

FT

BD

OKU TOILET TO ROAD SIDE DRAIN

DRAIN

sc WC WB SHR

WB

DRAIN


WB

WB

WB

WC 01 FT

OUTDOOR LOUNGE AREA

TO ROAD SIDE DRAIN

FT

FT

BD

WB

WB

WC 03

WC 02 BD FT

FEMALE PUBLIC TOILET

WC 04

BD FT

FT

FT

FEMALE ABLUTION AREA

FT

FT

FT

MALE ABLUTION AREA

FT

FT

WC OKU

WC 05

BD

BD

FT

MALE PUBLIC TOILET

FT

BD

FT

OKU TOILET TO ROAD SIDE DRAIN

DRAIN

sc WC WB SHR

WB

DRAIN


WB

WB

WB

WB

WB

WB SHR

WB

WB

WB

SHR

SHR

WB WC 01

FT

FT

FT

FT

FT

WB

WB

WB

WB

SHR

WB

FT

FT BD

WC 01 FT BD

FEMALE TOILET AND CHANGING ROOM

WC 01 FT BD

WC 02 FTBD

WC OKU

WC 03

FT BD

FT

FT

BABY CHANGING ROOM

WB

WC OKU

BD

FT BD

WC OKU

WB

WC OKU

BD FT

OKU TOILET 04 OKU TOILET 02 OKU TOILET 01 OKU TOILET 03

FT

OUTDOOR DROP OFF TO ROAD SIDE DRAIN

sc WC WB SHR

WB

WB

WB

WB

WB

SHR

SHR

FT

FT

SHR

WB WC 01

BD FT

FT

FT

FT

FT

WC 01 BD

FT

MALE TOILET AND CHANGING ROOM

WC 01 BD

BDFT

FT


sc

sc

sc

sc sc

sc

sc

sc sc

sc

sc

WB

sc

WB

WC 01

WB

WC 03

WC 02

WB

WC 04

WC OKU

WC 05

water meter

BD

sc

Main Water Supply

gate valve

OUTDOOR LOUNGE AREA

KITCHEN AREA

BD

BD

BD

FEMALE PUBLIC TOILET

MALE ABLUTION AREA

FEMALE ABLUTION AREA

sc WC WB SHR

WB

BD

MALE PUBLIC TOILET

BD

OKU TOILET


sc sc sc

sc

sc

sc sc

sc

sc

WB

sc

WB

WC 01

WB

WC 03

WC 02

WB

WC 04

WC OKU

WC 05

water meter

BD

sc

Main Water Supply

gate valve

OUTDOOR LOUNGE AREA

FEMALE PUBLIC TOILET

BD

BD

BD

FEMALE ABLUTION AREA

MALE ABLUTION AREA

sc WC WB SHR

WB

BD

MALE PUBLIC TOILET

BD

OKU TOILET


sc

sc

sc

sc

sc sc sc sc

sc

sc

WB

WB

WB

WB

WB

WB

WB

WB

WB

WB

SHR

SHR

SHR

WC OKU

SHR

WC 01

WC 01 BD

WC 01 BD

BD

BD

BD

WC OKU

WC OKU

BD

BD

BD

BD

BABY CHANGING ROOM

OKU TOILET 04 OKU TOILET 02 OKU TOILET 01 OKU TOILET 03

sc gate valve

WB

WB

WB

WB

WB

WB

SHR

SHR

SHR

WC 01

WC 01 BD

water meter

Main Water Supply

WB

WB

sc

FEMALE TOILET AND CHANGING ROOM

WC 03

WC 02

WC OKU

OUTDOOR DROP OFF

sc WC WB SHR

WB

WC 01 BD

BD

MALE TOILET AND CHANGING ROOM


WB

WB

WB

WC 01 FT

OUTDOOR LOUNGE AREA

FT

KITCHEN AREA

FT

FT

WB

WC 03

WC 02 BD FT

WB

BD FT

WC 04

FT

BD

FT

FT

FT

sc WC WB SHR

FT

MALE ABLUTION AREA

FEMALE ABLUTION AREA

FEMALE PUBLIC TOILET

FT

WB

FT

FT

WC OKU

WC 05

BD

FT

BD

MALE PUBLIC TOILET

FT

FT

BD

OKU TOILET


WB

WB

WB

WC 01 FT

OUTDOOR LOUNGE AREA

FT

FT

WC 02 BD

WB

WB

WC 03

BD FT

FEMALE PUBLIC TOILET

WC 04 BD FT

FT

FT

FEMALE ABLUTION AREA

FT

FT

FT

MALE ABLUTION AREA

sc WC WB SHR

WB

FT

FT

WC OKU

WC 05 BD

BD

FT

MALE PUBLIC TOILET

FT

BD

OKU TOILET

FT


WB

WB

WB

WB

WB

WB SHR

WB

WB

WB

SHR

SHR

WB WC 01

FT

FT

FT

FT

FT

WB

WB

WB

WB

SHR

WB

FT

FT BD

WC 01 FT BD

FEMALE TOILET AND CHANGING ROOM

WC 01 FT BD

WC 02 FTBD

WC OKU

WC 03

FT BD

FT

FT

BABY CHANGING ROOM

WB

WC OKU

BD

FT BD

WC OKU

WB

WC OKU

BD FT

OKU TOILET 04 OKU TOILET 02 OKU TOILET 01 OKU TOILET 03

FT

OUTDOOR DROP OFF

sc WC WB SHR

WB

WB

WB

WB

WB

SHR

SHR

FT

FT

SHR

WB WC 01

BD FT

FT

FT

FT

FT

WC 01 BD

FT

MALE TOILET AND CHANGING ROOM

WC 01 BD

BDFT

FT


1$0( .+25 , $ (1 678'(17 , '




$5 : 25., 1* '5$: , 1* '(7$, /6 '5$: , 1* .+25 -, $ (1


$ : +((/ 632576 $1' &20081, 7< &(175(


DRAWING LIST

JIAEN/2020/07/CD/200/001

1:200 @ A1

JIAEN

0

KEY PLAN , LOCATION PLAN , SITE PLAN

JIAEN/2020/07/CD/200/002

1:200 @ A1

JIAEN

0

GROUND FLOOR PLAN

JIAEN/2020/07/CD/200/003

1:200 @ A1

JIAEN

0

GROUND FLOOR PLAN PART

JIAEN/2020/07/CD/200/004

1:200 @ A1

JIAEN

0

JIAEN/2020/07/CD/300/001

1:100 @ A1

JIAEN

0

ELEVATION

9

ELEVATION A SECTION

10

SECTION X-X

JIAEN/2020/07/CD/400/001

1:100 @ A1

JIAEN

0

11

SECTION Y-Y

JIAEN/2020/07/CD/400/002

1:100 @ A1

JIAEN

0

12

SECTION A-A

JIAEN/2020/07/CD/400/003

1:100 @ A3

JIAEN

0

13

SECTION B-B

JIAEN/2020/07/CD/400/004

1:100 @ A3

JIAEN

0

___________________________ LEMBAGA ARKITEK MALAYSIA

DETAIL DRAWING

14

SLAB TO ROOF DETAILS

JIAEN/2020/07/CD/500/001 AS SHOWN @ A3

JIAEN

0

15

SLAB TO WALL DETAILS

JIAEN/2020/07/CD/500/002 AS SHOWN @ A3

JIAEN

0

16

WALL TO CEILINGS DETAILS

JIAEN/2020/07/CD/500/003 AS SHOWN @ A3

JIAEN

0

17

WALL TO ROOF DETAILS

JIAEN/2020/07/CD/500/004 AS SHOWN @ A3

JIAEN

0

18

ACCOMMODATION PLAN TYPE A

JIAEN/2020/07/CD/500/005 AS SHOWN @ A3

JIAEN

0

19

ACCOMMODATION PLAN TYPE B

JIAEN/2020/07/CD/500/006 AS SHOWN @ A3

JIAEN

0

20

ACCOMMODATION GREEN WALL SECTION JIAEN/2020/07/CD/500/007 AS SHOWN @ A3

JIAEN

0

21

GREEN ROOF DETAILED SECTION

JIAEN/2020/07/CD/500/008 AS SHOWN @ A3

JIAEN

0

22

FACADE DETAILS

JIAEN/2020/07/CD/500/009 AS SHOWN @ A3

JIAEN

0

SW

___________________________

23

MISCELLANEOUS DETAIL (CONCRETE SUPPORTING SYSTEM )

JIAEN/2020/07/CD/500/009 AS SHOWN @ A3

JIAEN

0

24

MISCELLANEOUS DETAIL ( VELODROME VIEWING SEAT DETAILS )

JIAEN/2020/07/CD/500/009 AS SHOWN @ A3

JIAEN

0

25

MISCELLANEOUS DETAIL ( BUILT IN CONCRETE PLANTER BOX )

JIAEN/2020/07/CD/500/009 AS SHOWN @ A3

JIAEN

0

26

MISCELLANEOUS DETAIL (SUNKEN AMPHETHEATRE SEATING)

JIAEN/2020/07/CD/500/009 AS SHOWN @ A3

JIAEN

0

27

MISCELLANEOUS DETAIL ( VELODROME TRACK DETAILS )

JIAEN/2020/07/CD/500/009

AS SHOWN @ A3

JIAEN

0

28

AXONOMETRIC

JIAEN/2020/07/CD/500/009 AS SHOWN @ A3

JIAEN

0

KKL

___________________________


'* /$ *)° +' ) ) / .

& 4° +' ) ) / .

.$ /° +' )



TAP

TAP

TAP

TAP

TAP

TAP

TAP

TAP

TAP

BP

CR

GC

BP

TP

GC

BP

TP

BP

CR

GC

BP

CR

BP

BR

GC

BP

BR

___________________________ LEMBAGA ARKITEK MALAYSIA BP

BR

GC

BP

TP

GC

BP

CR

SW

___________________________ BP

BR

GC

BP

CR TP

KKL

___________________________

BP

GC

GC

BP

TP

CR

GC

TP

BR


___________________________ LEMBAGA ARKITEK MALAYSIA

SW

___________________________

KKL

___________________________


___________________________ LEMBAGA ARKITEK MALAYSIA

SW

___________________________

KKL

___________________________


___________________________ LEMBAGA ARKITEK MALAYSIA

SW

___________________________

KKL

___________________________



















Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.