AR718 INTERGRATED ARCHITECTURAL DESIGN PROJECT
PORTFOLIO 06 SPORTS AND RECREATION
NEW NORMAL POST COVID
1001849363
PRE COVID
DESIGN STUDIO 06
JIA EN KHOR
PROJECT 01
PRE-COVID AND POST COVID STUDIES
PROJECT 01
THEME : SPORTS AND RECREATION ACTIVITIES
PROJECT 01 GROUP POSTER REIMAGINE
PRE COVID : LEFT POST COVID : RIGHT
PROJECT 01
PARK GARDEN MOVABLE PARTITION INTERVENTION
FREE COMBINATION TO CATER DIFFERENT AMOUNT OF USER EASILY PLUG IN AND REMOVE CREATING PARTITION ONLY WHEN NEEDED TO REMAIN THE PARK PUBLIC SPACE UNOCCUPIED AND FREE FOR SPORTS ACTIVITIES U TILIZE THE EXISTING LIGHT POLE AND TREES AS POLE FOR PARTITION TO REMOVE NUMBER OF COLUMN ON SITE
PARK INTERVENTION
ZONE CYCLING AND JOGGING
PROJECT 01
Playground
• Small size platform maximum ˛t up to 5 people restricted the gathering group size and yet allows them to carry out the recreation activities surrounded by the nature
• Multi platform playground allow Mu kids to still enjoy visual contact and verbal contact while play together but still stay safe without skin contact
Exercise Area
Jogging/Cycling
• Utilise the original presence landscape such as light pole and trees to create
• Creating marking reminder for social distancing that can be use
partition for sports activities
f rom day to night
• Flexible space planning to cater different Fl spatial needs by users according to users group size
• Planned new track into single Plan direction to reduce the risk of cross infection
Recreation Pod
Elevated Walkway
• Ensure social distancing between groups that are having Recreation activities
• Increase functional space by adding double volume space • Allow the park to accommodate higher volume of visitors with safe social distancing
PARK INTERVENTION
Islands Paradise
PROJECT 02A URBAN STRATEGIES
PROJECT 02 - URBAN STRATEGICS
S I T E A N A LYS I S
T H E O BVI O U S S E PE R AT I O N ZO N I N G O F S I T E VI A DA I LY ACT IVI T I E S TYPE O N S I T E
S I T E A N A LYS I S
PROJECT 02 - URBAN STRATEGICS
T H E I S O L AT E D ZO N E O N S I T E
SITE ANALYSIS
1.BLOCKING CIRCUL ATION ON SITE FROM ZONE TO ZONE 2 .L ACK OF COMMUNITY AND INTERACTION SPACE 3.HIGH TRAFFIC CONGESTION 4 .NO PROPER WALKWAY / NON PEDESTRIAN FRIENDLY
THE SWOT - ISSUE
PROJECT 02 - URBAN STRATEGICS
ISSUE :
SITE ANALYSIS
SENTUL PARK IS ONLY ACCESSIBLE AND CONNECT TO EACH OTHER WITH THESE EXISTING ROAD THE HIGH VOLUME OF TRAFFIC FROM RESIDENTS , COMMERCIAL TO EDUCATION USERS CAUSED SERIOUS CONGESTION ISSUE
THE SWOT - TRAFFIC CONGESTION ISSUE
PROJECT 02 - URBAN STRATEGICS
THE 4 ZONE FROM SURROUNDING
T H E E D U CAT I O N FAC I L I T I E S
T H E PU B L I C T R A N S P O RT A N D
THE SITE AS CENTER
CO M M E R C I A L ZO N I N G
CO N N ECT I N G P O I N T
T H E S WOT - ST R E N G T H A N D O PP O RTU N I T I E S M A PPI N G
PROJECT 02 - URBAN STRATEGICS
S I T E A N A LYS I S
T H E U N I Q U E B U I L D I N G I D E N T I TY
T H E S WOT
PROJECT 02 - URBAN STRATEGICS
S I T E A N A LYS I S
PROJECT 02 - URBAN STRATEGIES
FIRST VERSION
SECOND VERSION
THIRD VERSION
FORTH VERSION
FIFTH VERSION
ELEVATED TRACK DEVELOPMENT STAGES AND CONSIDERATION 01 .FIRST VERSION STARTED FROM THE PLACEMENT OF VARIOUS TYPE PUBLIC TRANSPORT STATION ON SITE AS ENTRANCE TO THE ELEVATED TRACK
04. FORTH VERSION TAKING CONSIDERATION ON CONTEXT OF SITE TO CONNECT PUBLIC AMENITIES ,PUBLIC T R A N S P O R T A T I O N , INSTITUTION,CULTURE/ RELIGIOUS,COMMERCIAL AND RESIDENTIALIN SENTUL SITE
02. SECOND VERSION DEVELOPED INTO CIRCULAR FORM FOR SMOOTHER BICYCLE ACTIVITIES AND FURTHER CALCULATE TO ESTIMATE BEST ROUTE FOR PEDESTRIAN ONLY WALKWAY
03.THIRD VERSION IDEA OF ADDING FUNCTIONAL PLATFORM AS COMMUNITY ENGAGEMENT AND RESTING SPACE FOR USERS
05. FIFTH VERSION PLANNING ON TAKING CONSIDER OF NATURE LANDSCAPE TO MINIMISE THE DESTROY OF NATURE BEAUTY IN EXISTING SENTUL PARK AND ENHANCE ON THE BEAUTY OF NATURE VIEW
FINAL VERSION OF ELEVATED TRACK
PROJECT 02 - URBAN STRATEGIES PROPOSED SOLUTION
U S E R G R O U P F U N CT I O N A N D T I M E L I N E
Students 02. RESIDENTIAL Children House Wife Elderly Workin g Adults 03.COMMERCIAL Children Comm ercial area Workers 04. OUTSIDERS Event Par ticipants Traveller
INTERACTION BETWEEN INDIVIDUAL . FRIENDS . FAMILY . COMMUNITY
01 .INSTITUTION
B I CYC L E PA R K I N G LO C K B I CYC L E R E N T I N G
SCAN , RENT AND PARK FOR BIKE AT EVERY ENTRANCE OF ELEVATED TRACK THE FREQUENT USE OF QR CODE AND E-WALLET NOWADAYS IS PREPARING THE PUBLIC TO GET USED TO THIS TYPE OF RENTING SYSTEM PROVIDING MINIMUM HUMAN CONTACT AND ALLOWING AUTO SANITATION IN PARKING TENT AFTER EVERY USE. THIS PROTECTED EVERY USER WE SANITISED CLEAN AND SAFE BICYCLE TO USE DAILY YET SECURE THE BICYCLE PROPERTY BECAUSE THE E-WALLET HAS BEEN OFFICIAL VERIFIED AND CANBE TRACE BACK EASILY
S I T E A N A LYS I S
TREES BELOW 13M
TREES ABOVE 13M
PROJECT 02 - URBAN STRATEGICS
T H E R I C H B I O D IVE R S I TY O F G R E E N S A N D WAT E R F E ATU R E S
T H E F I N A L R O UT E O UTCO M E FO R A L L TYPE ACC E S S
PROJECT 02 - URBAN STRATEGICS
S I T E A N A LYS I S
S I T E A N A LYS I S
PROJECT 02 - URBAN STRATEGICS
M A ST E R PL A N N I N G
PROJECT 01
FOREST WAY
THE JOGGING PATH IN THE GREENS PRESERVING THE LOCAL EXISTING TREES AS A BUFFER FOR NATURE SPORTS LOVER IN THEIR LITTLE PARADISE
THE COMMUNITY GARDEN AND PICNIC AREA A SPOT NEAR AND DIRECTLY ACCESSIBLE FROM THE RESIDENTIAL ZONE PROVIDING SPACE FOR THEM TO INTERACT WHILE PROFITING THE COMMUNITY.THEY PLANT, WORK HARD AND CAN ENJOY THE HAPPINESS OF HARVESTING FOR COMMUNITY PICNIC DURING WEEKENDS
THE CULTURE BAZAAR
LOCATED SURROUNDED BY COMMERCIAL ZONE OF DIFFERENT COMMUNITY HOPING TO PROVIDE A INTERSECTION POINT OF DIFFERENT CULTURE COMMUNITY TO BE BRING IN AND ABLE TO SHARE TO EVERYONE
FURTHER EXTENSION OF MY ELEVATED BICYLE PATHWAY TO BRING IN MORE FUN AND EXCITING FEATURES TO THE BIKE LOVERS
PARK INTERVENTION
SKATE PARK / BMX PARK
PROJECT 02B BUILDINGS STRATEGIES
B U I L D I N G F U N CT I O N I N S PI R E D A N D C H A R ACT E R I ST I CS
ACT IVE S P O RTS C E N T R E
PROJECT 02 - BUILDING STRATEGICS
User Experience : Active Lively
Energetic
Open wall reduce the number of solid wall and courtyard type centre hollow roof structure allowing nature ventilation
Courtyard type centre hollow roof structure allowing nature ventilation and nature daylight
Existing greenery remained as maximum as possible creating a Ëœow ventilated and green building enviroment
B U I L D I N G F U N CT I O N I N S PI R E D A N D C H A R ACT E R I ST I CS
A DA PT IVE R E U S E - Q U I T E S P O RTS User Experience : Relaxed Peaceful
Full of history memories
Quite exercise such as yoga wheel , hanging yoga placed here high enough for nice view and comfortable enviroment
Adaptive reuse add on building to existing building maximize the nice view of sun rise and sun set
FULL OF HISTORY Locomotive Railway History building 2 historical exisiting train track creating unique experience for jogging cycling or even historical gallery
Indoor relaxing park with alot of greenerys is remained for public use as a interior gardr
Utilising the high ceiling volume of the old Sentul Depot Block B to create different level height gathering pod
PROJECT 02 - BUILDING STRATEGICS
The existing building consists of 3 parts, can serve different function f rom watch, walk, rest and cycle to interesting exhibition area
B U I L D I N G F U N CT I O N I N S PI R E D A N D C H A R ACT E R I ST I CS
ACCO M O DAT I O N B U I L D I N G
PROJECT 02 - BUILDING STRATEGICS
Playing with new level build above existing building
Allow greens/ vegetation grow out in between to act as nature noise barier for accomodation room
Existing building f rame remained to create unique identity of accomodation and attract outsiders to stay
S I T E C H A R ACT E R I ST I CS EXPLO R E I N S PI R AT I O N
PROJECT 02 - BUILDING STRATEGICS
S E N TU L D E P OT B U I L D I N G VI EWS
NORTH VIEWS KLPAC brings a nice KL combination of modern concrete with exisiting historical building immerse in sentul park ‘s greenary and the lake water feature
EAST VIEWS The Fannel unique form and modern KTM Station creates a new stylish skyline view of Sentul combining with the far high rise
SOUTH VIEWS T he group of Colonial buildings preserve by YTL creates another different ambiance now gave visitors coming in f rom main car entrance a sense of time travel back to the old colonial time
S I T E C H A R ACT E R I ST I CS EXPLO R E I N S PI R AT I O N
L I N E A R A R R A N G E M E N TS
PROJECT 02 - BUILDING STRATEGICS
From existing roof alignment to nature tree trunk, tree skin on site, the linear arrangement looks similar and inspired me to remain this harmony arrangement in while adding in new building to existing building
MA S S I N GR LO CAT N PL S I T E C H A R ACT E R I ST I CS EXPLO E IN S PII O R AT I OA NN
H O R I ZO N TA L ST R I P E L E M E N TS The horizontal strip elements is one of the f requent elements that can be found around the site easily on site especially the elements of train track and repair factory roof pro˛le, warehouse column and roof pro˛le. The horizontal strips elements is one of the key to help future new building to blend themselves into the building full of the sentul old time glory
PROJECT 02 - BUILDING STRATEGICS
M A S S I N G LO CAT I O N PL A N
M A S S I N G S I T E PL A N
The 3 seperated different function building is always connected together and will be accessible internally ACCO M O DAT I O N
A DA PT IVE R E U S E
ACT IVE S P O RT
PROJECT 02 - BUILDING STRATEGICS
T he building also located in the mist of existing building and some outside of the building giving people visiting there chance to experience the view f rom inside of existing building an to exterior of the and building
PROJECT 03 DESIGN DEVELOPMENT
PRIMARY FORM
LINEAR / SHARP EDGES / CLEAR LINE EDGES
CONTEXT
2 1
DESIGN DEVELOPMENT
FUNCTION
3
WHEEL INSPIRED SPORTS ( BICYCLE TYPE / GYM TYPE / YOGA TYPE / HYMNASTIC TYPE ) PROJECT 03
PRIMARY FORM
1
CURVY FORM HIDDEN IN SQUARE OUTER
2 REDUCE SHARP EDGES
3 CURVE AS CONNECTOPN FOR SQUARE INTERSECTING
DESIGN DEVELOPMENT PROJECT 03
PRIMARY FORM
AFTER A SERIES OF DEVELOPMENT, COMBINATION OF THE DIFFERENT APPLICATION METHOD FOR INTERSECTION BETWEEN SHARP EDGES AND CURVY EDGES IS MUCH BETTER TO REDUCE THE BULKYNESS OF BUILDING
DESIGN DEVELOPMENT PROJECT 03
CONNECTIVITY FROM OUTSIDE TO INSIDE STUDY MODEL STUDYING CONNECTION FROM EXTERIOR TO INTERIOR
EXISTING BUILDING
DESIGN DEVELOPMENT
COMMUNITY AREA
RESIDENTIAL ZONE
TRYING TO CREATE CONNECTION FROM COMMUNITY AREA TO EXISTING BUILDING VIA DESIGNED LANDSCAPE PATH ON GROUND FLOOR
PROJECT 03
CONNECTION TO MAIN
INTERCONNECTION
PROJECT 02A URBAN STRATEGIES
INTERCONNECTED BETWEEN DIFFERENT BUILDING
DESIGN DEVELOPMENT
CONNECTING THE PROPOSED NEW BUILDING AND 3 DIFFERENT BUILDING INTERNALLY VIA DIFFERENT FLOOR WALKWAY PROVIDE ACCESS TO ALL BUILDING WITHOUT AND DIFFERENT ELEVATED VIEWS.
PROJECT 03
INTERCONNECTION
POD MODEL DESIGN
PROJECT 03
THE LONG CORRIDOR WALKWAY IS SEPERATED TO PEDESTRIAN USE AND BICYCLE USE. tHE PEDESTRIAN USERS HAVE OPTION OF WALKING ON PLATFORM BESIDE CYCLNG ROUTE, POD WALKWAY OR EVEN THE HISTORICAL PARK GALLERY
DESIGN DEVELOPMENT
INTERCONNECTED FROM SOUTH ( FRONT PART )TO NORTH (BACK PART ) THE LONG WAREHOUSE IS DESIGN AND ACT AS COVERED BUT OPEN TRANSITION SPACE WITH INDOOR GARDEN / PARK AMBIENCE.
PROJECT 03 SPORTS AND RECREATION
THE BICYCLE HUB AND COMMUNITY CENTRE
BUILDING PLACEMENT IN COMPARE TO EXISTING BUILDING
NEW BUILDING : NEW ACCOMODATION BUILDING BUILD ABOVE EXISTING BUILDING NEW BUILDING : ACTIVE SPORTS BUILDING STRUCTURELY NEW BUT PARTIALLY PASSING THRU EXISTING BUILDING SRUCTURE
NEW BUILDING : ADDITION NEW FLOOR ADDED ON TOP OF EXISTING BUILDING STRUCTURE
EXISTING BUILDING
F I R ST F LO O R PL A N
1 O PE N G YM R O O M 2 H U M A N H A M ST E R WH E E L 3 O UT D O O R H U M A N H A M ST E R WH E E N 4 S PI N N I N G R O O M 5 O PE N S PI N N I N G R O O M 6 B A BY C H A N G I N G R O O M 7 F E M A L E TO I L E T 8 F E M A L E S AU N A R O O M 9 G YM O F F I C E R O O M 1 0 L A N D I N G PL AT FO R M 1 1 VE LO D R O M E O F F I C E 1 2 O KU TO I L E T 1 4 M A L E S AU N A R O O M 1 5 I N D O O R B I CYC L E VR G A M E R O O M 1 6 U N I CYC L E T R A I N I N G S PAC E 1 7 STO R AG E R O O M 1 8 T R A I N I N G R E ST R O O M FO R VE LO D R O M E 1 9 M E E T I N G R O O M FO R VE LO D R O M E 2 0 T R A I N I N G R E ST R O O M FO R VE LO D R O M E 2 1 STO R AG E R O O M FO R VE LO D R O M E CO M PE RT I T I O N
FLOOR PLAN
1 3 M A L E TO I L EY
2 2 F I R ST A I D R O O M 2 3 ACCO M O DAT I O N PR I VAT E PA R K I N G S PAC E WI T H S E C U R I TY 24 ACCO M O DAT I O N LO U N G E A R E A 2 5 L I F T LO B BY 2 7 ACCO M O DAT I O N B A LCO N Y 2 8 I N T E R N A L CO N N E CT I O N CO N N E CT I N G 3 EXI ST I N G B U I L D I N G A N D T H E N EW B U I L D I N G S . 2 9 E L EVAT E D G AT H E R I N G P O D
PROJECT 03
26 RISER ROOM
FLOOR PLAN
F I R ST M E Z Z A N I N E F LO O R PL A N
1 DOUBLE VOLUME OPEN GYM AREA 2 CONNECTION FROM ELEVATED TRACK 4 AUDIENCE / SUPPORTER DECK 5 VELODROME TRACK 6 L ANDING PL ATFORM 7 ACCOMODATION 8 ELEVATED PATHWAY INTER CONNECTING ROUTE 9 MIRRORED RHYTJMIC GYMNASTICS TRAINING ROOM 10 INDOOR RHYTHMIC GYMNASTICS TRAINING ROOM
PROJECT 03
3 VELODROME RECEPTION AND STORAGE RENTING
1 OPEN AREA RHYTHMIC GYMNASTIC TRAINING ROOM 2 PROFESSIONAL BICYCLE STIMUL ATOR TRAINING ROOM
FLOOR PLAN
S ECO N D F LO O R PL A N
3 PROFESSIONAL BICYCLE TRAINING FACILITIES 4 PROFESSIONAL BICYCLE TRAINING PANTRY AND RECEPTION AREA 5 OPEN ROOF TOP GARDEN 6 ACCOMODATION FLOOR 8 RISER ROOM 9 ACCOMODATION DECKING BALCONY 10 INDOOR TRAINING ROOM 1 11 INDOOR EXERCISE ROOM 2 12 YOGA ROOM 01 13 YOGA ROOM 2 14 CONNECTION TO KTM STATION
PROJECT 03
7 LIF T LOBBY
T H I R D F LO O R PL A N FO RT H F LO O R PL A N
1
1 ACCOMODATION
PROJECT 03
FLOOR PLAN
Q
PROJECT 03
MATERIALS STUDIES
MATERIAL STUDIES
CORTEN STEEL FACADE LOCALISE MATERIAL TEXTURE غ COLOUR TONE AND GIVE BRIGHT ATTRACTION FOR PEOPLE TO NOTICE FROM FAR
TIMBER TEXTURED STEEL RAILING LOCAL MATERIAL ON SITE
FARBRIC COATED STEEL MESH GIVEN TRANSPARENT VIEW TO GIVE VISIBILTITY TO EXISITNG BUILDING AND MAXIMUM VENTILATION
CONCRETE FLOORING
LOCAL MATERIAL ON SITE
BRICK WALL LOCAL MATERIAL ON SITE
FABRIC COATED STEEL MESH FACADE
BRICK WALL
CORTEN STEEL FACADE
CONCRETE FLOORING
ACCO M O DAT I O N
DOUBLE ROOM - 4 TWI N R O O M - 4 T R I PL E T R O O M - 2 FA M I LY R O O M - 2
S ECO N D F LO O R R O O M TYPE DOUBLE ROOM - 4 TWI N R O O M - 4 T R I PL E T R O O M - 2 FA M I LY R O O M - 2
F I R ST F LO O R R O O M TYPE
EVE RY R O O M EQ U I PE D WI T H OWN B A LCO N Y FO R D I F F E R N T I N T E R E ST I N G VI EW FROM ALL SURROUNDING OF WA R E H O U S E BUILDING
D O U B L E R O O M - 2 PAX TWI N R O O M - 2 PAX T R I PL E T R O O M - 4 PAX FA M I LY R O O M - 4 PAX
ROOM LAYOUT
T H I R D F LO O R R O O M TYPE
PROJECT 03
DOUBLE ROOM - 2 TWI N R O O M - 3 T R I PL E T R O O M - 1 FA M I LY R O O M - 4
EXT E R I O R :
PERSPECTIVE LAYOUT
ACCO M O DAT I O N
INTERIOR B R I C K WA L L S L I D I N G D O O R FO R ACC E S S TO EXT E R I O R B A LCO N Y T I M B E R PA N E L F LO O R I N G
PROJECT 03
B R I C K WA L L CO R U G AT E D S H E E T CO RT E N ST E L L FACA D E CO N C R E T E F LO O R I N G
PROJECT 03 THE WHEELER’S PLAYGROUND
THE WHEELERS PLAYGROUND
THE COMBINATION OF FARBRIC COATED STEEL MESH FACADE GAVE PARTIALLY TRANSPARENT EFFECT ALLOWING THE THE VIEW OF NEW BUILDING WHILE HAVING VIEWS OF THE EXISTING BUILDING CREATS A HARMONISE BLEND IN BUILDING WITHOUT BLOCKING THE BEAUTY OF THE EXISTING BUILDING
INTERIOR PERSPECTIVES THE ENTRANCE RAMP TO VELODROME BUILDING
THE COMMUNITY SPACE AND TRANSITION SPACE OF THE BUILDING AS THE CENTRE CONNECTING POINTS OF 4 DIFFERENT BUILDINGS WHERE AT THIS POINT PEOPLE CAN CHOOSE TO ACCESS TO THEIR DESTINATED SPACE OR REMAIN AT THIS OPEN AREA SURROUNDED BY THE BUILDINGS AND GREENARY TO PLAY, SPORTS, GATHER OR RELAX IN THIS OPEN COMPOUND
THE VELODROME BUILDING DESIGN WITH DIFFERENT LEVELING AND VOID ALLOW ALL WHEELS SPORT TYPE TO PLAY AT THE FLAT LANDING PLATFORM OF THE VELODROME BUILDING GOING UP AND DOWN USING THE RAMP CONNECTING EVERY FLOORS
THE VELODROME BUILDING IS A NEW BUILDING BUT INTERGRATED ITS TRACK TO BE CYCLE PASS THE EXISITING BUILDING STRUCTURE GIVING A DIFFERENT VISUAL EFFECT WHILE CYCLING UNDERNEATH THE COMBINATION OF NEW BUILDING AND EXISTING BUILDING IS BLEND IN BY SHARING THE SAME COLOUR TONE ELEMENTS ON THE RAILING.
INTERIOR PERSPECTIVES VELODROME AND THE EXISTING BUILDING
THE VELODROME BUILDING USES ALOT OF STRIP COLUMN AND RAILING TO FORM WALL REPLACING THE USUAL SOLID WALL TO ACHIEVE MAXIMUM VENTILATION FOR THE ACTIVE SPORTS ACTIVITIES HAPPENING IN
INTERIOR PERSPECTIVES HISTORICAL GARDEN
INTERIOR PERSPECTIVES HISTORICAL GARDEN Historical building combined with greenery that grows naturally after the abandoned use of the repair workshop is remained to be in its naturally beauty form and provides a shaded garden for the community to play and gather in this memorable space. The garden is seperated into gallery space, garden space and a series of pods for gatherinig in different height allowing different community engagement to take place. The story and precious memory of this building and site can be passed down and share to the next generation and allow them to experienced the glory of locomotive train, gears and steam operation.
INTERIOR PERSPECTIVES HISTORICAL GALLERY WALKWAY
INTERIOR PERSPECTIVES GATHERING PLATFORM
SECTIONAL PERSPECTIVES 01
SECTIONAL PERSPECTIVES 02
LEFT ELEVATION
SECTION 01
FARBRIC COATED STEEL MESH WALL FACADE
THE EXISTING STRUCTURE AND ADDITIONAL NEW STRUCTURE TOPPED ON TO OF THE EXISTING BUILDING
OPEN WALL VELODROME BUILDING
OPEN ENVIROMENT COMMUNITY AREA AND RETAIL AREA
ªׇׁ X yÀ0ªJª À0( ª!RX À0!ÀǪ m (0²X Jy §ª h0!À
À0!RyX ! m ª0§ ªÀ ²§ ªÀ² y( ª0!ª0 ÀX y
y0à y ªw m § ²À ! ßX (
ׁ ׁ׀׀ ׃׆׃ׄ
§ª0 ! ßX (
(0²X Jy ²ÀÇ(X ׆׀
hX 0y jR ª
²Çy § ÀR ڕ ªX 0yÀ ÀX y
w
ׁ ׁ w
ׁ §w
§׃w
§׆w
Jª00y ²§ !0²
ß0yÀX m ÀX y
IX ª0 0²! §0 ²À X ª² m ! ÀX y
ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ
ٌ
ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌٌ ٌ ٌ ٌ
ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ
ׂ
ׂ
ׂׅ
ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ
ׂׄ ׃ׂ
ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ
ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ
ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ
ٌ
ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ
׆ׂ ׇׂ
ٌ
ٌ
ٌ
ٌ
ٌ
ٌ
ٌ
ٌ
ٌ
ٌ
ׁ
׀ׂ
ٌ
ׁ ׁׂ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ
ׁ ׅ ׁ ׄ ׁ ׃
ׁ ׂ ׁ ׁ
ׁ ׀
ׂ
ׄ ׅ
ׇ
׃
׆ ׁ
ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ
ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ
ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ
ׁ ׆
ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ
ׁ ׇ
ׂׂ
IX ª²À Im ª §m y IX ª0 0²! §0 ²À X ª² m ! ÀX y
²! m0 ׁ ب ׀ׇׅ
ٌ
ׇ
ٌ
׆
ׁ
ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ
IX ª²À w0ðð yX y0 Im ª §m y
ׄ ׅ
IX ª0 0²! §0 ²À X ª² m ! ÀX y
²! m0 ׁ ب ׀ׇׅ
ׁ ׀
ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ
׃ ׂ
ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ
ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ
ׇ
ٌ ٌ ٌ ٌ
ٌ
ٌ
ٌ
ٌ
ٌ
ٌ ٌ ٌ ٌ ٌ ٌ
ٌ ٌ
ٌ
ٌ
ٌ
ٌ
ٌ
ٌ
ٌ
ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ
׆
ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ
ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ
ׁ ׀ ׁ ׁ ׇ
ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ
ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ׅ
ׁ ׂ
ׁ ׃ ׁ ׄ
ٌ
ٌ
ٌ
ׁ
ٌ
ׄ
ٌ
׃
ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ
ׂ
²0! y( Im ª §m y ²! m0 ׁ ب ׀ׇׅ
IX ª0 0²! §0 ²À X ª² m ! ÀX y
ٌ ٌ ٌ ٌ
ٌ
ٌ
ٌ
ٌ
ٌ
ٌ ٌ ٌ ٌ ٌ ٌ
ٌ ٌ
ٌ
ٌ
ٌ
ٌ
ٌ
ٌ
ٌ
ٌ ٌ ٌ ٌ ٌ ٌ ٌ ٌ
ÀRX ª( Im ª §m y ²! m0 ׁ ب ׀ׇׅ
IX ª0 0²! §0 ²À X ª² m ! ÀX y
WB
WB
WB
WC 01 FT
OUTDOOR LOUNGE AREA TO ROAD SIDE DRAIN
FT
KITCHEN AREA
FT
FT
WB
WC 03
WC 02 BD FT
WB
BD FT
WC 04 FT
BD
FT
FT
FT
FT
MALE ABLUTION AREA
FEMALE ABLUTION AREA
FEMALE PUBLIC TOILET
FT
FT
FT
WC OKU
WC 05 BD
FT
BD
MALE PUBLIC TOILET
FT
FT
BD
OKU TOILET TO ROAD SIDE DRAIN
DRAIN
sc WC WB SHR
WB
DRAIN
WB
WB
WB
WC 01 FT
OUTDOOR LOUNGE AREA
TO ROAD SIDE DRAIN
FT
FT
BD
WB
WB
WC 03
WC 02 BD FT
FEMALE PUBLIC TOILET
WC 04
BD FT
FT
FT
FEMALE ABLUTION AREA
FT
FT
FT
MALE ABLUTION AREA
FT
FT
WC OKU
WC 05
BD
BD
FT
MALE PUBLIC TOILET
FT
BD
FT
OKU TOILET TO ROAD SIDE DRAIN
DRAIN
sc WC WB SHR
WB
DRAIN
WB
WB
WB
WB
WB
WB SHR
WB
WB
WB
SHR
SHR
WB WC 01
FT
FT
FT
FT
FT
WB
WB
WB
WB
SHR
WB
FT
FT BD
WC 01 FT BD
FEMALE TOILET AND CHANGING ROOM
WC 01 FT BD
WC 02 FTBD
WC OKU
WC 03
FT BD
FT
FT
BABY CHANGING ROOM
WB
WC OKU
BD
FT BD
WC OKU
WB
WC OKU
BD FT
OKU TOILET 04 OKU TOILET 02 OKU TOILET 01 OKU TOILET 03
FT
OUTDOOR DROP OFF TO ROAD SIDE DRAIN
sc WC WB SHR
WB
WB
WB
WB
WB
SHR
SHR
FT
FT
SHR
WB WC 01
BD FT
FT
FT
FT
FT
WC 01 BD
FT
MALE TOILET AND CHANGING ROOM
WC 01 BD
BDFT
FT
sc
sc
sc
sc sc
sc
sc
sc sc
sc
sc
WB
sc
WB
WC 01
WB
WC 03
WC 02
WB
WC 04
WC OKU
WC 05
water meter
BD
sc
Main Water Supply
gate valve
OUTDOOR LOUNGE AREA
KITCHEN AREA
BD
BD
BD
FEMALE PUBLIC TOILET
MALE ABLUTION AREA
FEMALE ABLUTION AREA
sc WC WB SHR
WB
BD
MALE PUBLIC TOILET
BD
OKU TOILET
sc sc sc
sc
sc
sc sc
sc
sc
WB
sc
WB
WC 01
WB
WC 03
WC 02
WB
WC 04
WC OKU
WC 05
water meter
BD
sc
Main Water Supply
gate valve
OUTDOOR LOUNGE AREA
FEMALE PUBLIC TOILET
BD
BD
BD
FEMALE ABLUTION AREA
MALE ABLUTION AREA
sc WC WB SHR
WB
BD
MALE PUBLIC TOILET
BD
OKU TOILET
sc
sc
sc
sc
sc sc sc sc
sc
sc
WB
WB
WB
WB
WB
WB
WB
WB
WB
WB
SHR
SHR
SHR
WC OKU
SHR
WC 01
WC 01 BD
WC 01 BD
BD
BD
BD
WC OKU
WC OKU
BD
BD
BD
BD
BABY CHANGING ROOM
OKU TOILET 04 OKU TOILET 02 OKU TOILET 01 OKU TOILET 03
sc gate valve
WB
WB
WB
WB
WB
WB
SHR
SHR
SHR
WC 01
WC 01 BD
water meter
Main Water Supply
WB
WB
sc
FEMALE TOILET AND CHANGING ROOM
WC 03
WC 02
WC OKU
OUTDOOR DROP OFF
sc WC WB SHR
WB
WC 01 BD
BD
MALE TOILET AND CHANGING ROOM
WB
WB
WB
WC 01 FT
OUTDOOR LOUNGE AREA
FT
KITCHEN AREA
FT
FT
WB
WC 03
WC 02 BD FT
WB
BD FT
WC 04
FT
BD
FT
FT
FT
sc WC WB SHR
FT
MALE ABLUTION AREA
FEMALE ABLUTION AREA
FEMALE PUBLIC TOILET
FT
WB
FT
FT
WC OKU
WC 05
BD
FT
BD
MALE PUBLIC TOILET
FT
FT
BD
OKU TOILET
WB
WB
WB
WC 01 FT
OUTDOOR LOUNGE AREA
FT
FT
WC 02 BD
WB
WB
WC 03
BD FT
FEMALE PUBLIC TOILET
WC 04 BD FT
FT
FT
FEMALE ABLUTION AREA
FT
FT
FT
MALE ABLUTION AREA
sc WC WB SHR
WB
FT
FT
WC OKU
WC 05 BD
BD
FT
MALE PUBLIC TOILET
FT
BD
OKU TOILET
FT
WB
WB
WB
WB
WB
WB SHR
WB
WB
WB
SHR
SHR
WB WC 01
FT
FT
FT
FT
FT
WB
WB
WB
WB
SHR
WB
FT
FT BD
WC 01 FT BD
FEMALE TOILET AND CHANGING ROOM
WC 01 FT BD
WC 02 FTBD
WC OKU
WC 03
FT BD
FT
FT
BABY CHANGING ROOM
WB
WC OKU
BD
FT BD
WC OKU
WB
WC OKU
BD FT
OKU TOILET 04 OKU TOILET 02 OKU TOILET 01 OKU TOILET 03
FT
OUTDOOR DROP OFF
sc WC WB SHR
WB
WB
WB
WB
WB
SHR
SHR
FT
FT
SHR
WB WC 01
BD FT
FT
FT
FT
FT
WC 01 BD
FT
MALE TOILET AND CHANGING ROOM
WC 01 BD
BDFT
FT
1$0( .+25 , $ (1 678'(17 , '
$5 : 25., 1* '5$: , 1* '(7$, /6 '5$: , 1* .+25 -, $ (1
$ : +((/ 632576 $1' &20081, 7< &(175(
DRAWING LIST
JIAEN/2020/07/CD/200/001
1:200 @ A1
JIAEN
0
KEY PLAN , LOCATION PLAN , SITE PLAN
JIAEN/2020/07/CD/200/002
1:200 @ A1
JIAEN
0
GROUND FLOOR PLAN
JIAEN/2020/07/CD/200/003
1:200 @ A1
JIAEN
0
GROUND FLOOR PLAN PART
JIAEN/2020/07/CD/200/004
1:200 @ A1
JIAEN
0
JIAEN/2020/07/CD/300/001
1:100 @ A1
JIAEN
0
ELEVATION
9
ELEVATION A SECTION
10
SECTION X-X
JIAEN/2020/07/CD/400/001
1:100 @ A1
JIAEN
0
11
SECTION Y-Y
JIAEN/2020/07/CD/400/002
1:100 @ A1
JIAEN
0
12
SECTION A-A
JIAEN/2020/07/CD/400/003
1:100 @ A3
JIAEN
0
13
SECTION B-B
JIAEN/2020/07/CD/400/004
1:100 @ A3
JIAEN
0
___________________________ LEMBAGA ARKITEK MALAYSIA
DETAIL DRAWING
14
SLAB TO ROOF DETAILS
JIAEN/2020/07/CD/500/001 AS SHOWN @ A3
JIAEN
0
15
SLAB TO WALL DETAILS
JIAEN/2020/07/CD/500/002 AS SHOWN @ A3
JIAEN
0
16
WALL TO CEILINGS DETAILS
JIAEN/2020/07/CD/500/003 AS SHOWN @ A3
JIAEN
0
17
WALL TO ROOF DETAILS
JIAEN/2020/07/CD/500/004 AS SHOWN @ A3
JIAEN
0
18
ACCOMMODATION PLAN TYPE A
JIAEN/2020/07/CD/500/005 AS SHOWN @ A3
JIAEN
0
19
ACCOMMODATION PLAN TYPE B
JIAEN/2020/07/CD/500/006 AS SHOWN @ A3
JIAEN
0
20
ACCOMMODATION GREEN WALL SECTION JIAEN/2020/07/CD/500/007 AS SHOWN @ A3
JIAEN
0
21
GREEN ROOF DETAILED SECTION
JIAEN/2020/07/CD/500/008 AS SHOWN @ A3
JIAEN
0
22
FACADE DETAILS
JIAEN/2020/07/CD/500/009 AS SHOWN @ A3
JIAEN
0
SW
___________________________
23
MISCELLANEOUS DETAIL (CONCRETE SUPPORTING SYSTEM )
JIAEN/2020/07/CD/500/009 AS SHOWN @ A3
JIAEN
0
24
MISCELLANEOUS DETAIL ( VELODROME VIEWING SEAT DETAILS )
JIAEN/2020/07/CD/500/009 AS SHOWN @ A3
JIAEN
0
25
MISCELLANEOUS DETAIL ( BUILT IN CONCRETE PLANTER BOX )
JIAEN/2020/07/CD/500/009 AS SHOWN @ A3
JIAEN
0
26
MISCELLANEOUS DETAIL (SUNKEN AMPHETHEATRE SEATING)
JIAEN/2020/07/CD/500/009 AS SHOWN @ A3
JIAEN
0
27
MISCELLANEOUS DETAIL ( VELODROME TRACK DETAILS )
JIAEN/2020/07/CD/500/009
AS SHOWN @ A3
JIAEN
0
28
AXONOMETRIC
JIAEN/2020/07/CD/500/009 AS SHOWN @ A3
JIAEN
0
KKL
___________________________
'* /$ *)° +' ) ) / .
& 4° +' ) ) / .
.$ /° +' )
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
TAP
BP
CR
GC
BP
TP
GC
BP
TP
BP
CR
GC
BP
CR
BP
BR
GC
BP
BR
___________________________ LEMBAGA ARKITEK MALAYSIA BP
BR
GC
BP
TP
GC
BP
CR
SW
___________________________ BP
BR
GC
BP
CR TP
KKL
___________________________
BP
GC
GC
BP
TP
CR
GC
TP
BR
___________________________ LEMBAGA ARKITEK MALAYSIA
SW
___________________________
KKL
___________________________
___________________________ LEMBAGA ARKITEK MALAYSIA
SW
___________________________
KKL
___________________________
___________________________ LEMBAGA ARKITEK MALAYSIA
SW
___________________________
KKL
___________________________