“Architecture isn’t just for special occasions. Expectations need to change. Places for daily activities should be highly valued. People can have more than they think. We expect great qualities in buildings like museums; Shouldn’t we also expect them in places for everyday living? An individual’s self-image is based on the quality of his or her daily life.” __________________________________________________________________ Julie Eizenberg, Architect (2006)
KIER CALLUM
BOTHWELL _____________________________________
kierbothwell@hotmail.com // +27 (0)72 765 0999
Nationality: Irish // South African Current Address: 17 Eagle Close, During Road Honeydew Manor, 2170 Johannesburg Date of Birth: 02.10.1989 Gender: Male Marital Status: Single Languages: English // Afrikaans Irish Passport No.: PT3306905
EDUCATION University of the Witwatersrand Johannesburg 2013 // Master of Architecture (Professional) dissertation passed cum laude 2012 // Bachelor of Architectural Studies with Honours design studio passed cum laude 2010 // Bachelor of Architectural Studies architectural design & theory III passed cum laude St Stithians Boys’ College Johannesburg 2007 // Full Matric Exemption (Independent Examination Board)
CONTINUED EDUCATION 2011 // Student representative for the South African Council for the Architectural Profession (SACAP) accreditation for the University of Cape Town’s School of Architecture 2010 // Digital Design and Fabrication Workshop held in Johannesburg by Kristof Crolla & Jeroen van Ameijden from the Architectural Association School of Architecture in London
PROFESSIONAL EXPERIENCE Chapman Taylor London 2014-2017 // Architectural Assistant - Part II design development from concept / feasibility through to detailed technical documentation & delivery by means of revit, project coordination between contractors & subcontractors both on and off of site, CPD facilitator, BIM lead committee member, office technical practice induction facilitator
REFERENCES AVAILABLE UPON REQUEST
Hood Napier Architects Johannesburg 2014 // Candidate Architect (Part II equivalent) 2011/2012 // Intern (Part I equivalent) design development, 3d modelling & rendering in revit, autocad drafting & technical documentation, presentations, project management, site management & snagging, client / architect liaison
HONOURS + AWARDS DM Burton Prize The best graduand in the discipline of architecture // 2013 Saul Margo Memorial Prize The final year student whose performance over the entire curriculum for the degrees of architecture is judged to be the most meritorious // 2013 Frank Gordon McIntosh Prize in Architecture The Master of Architecture (Prof.) graduand who submitted the best architectural design and discourse on some aspect of architectural construction or the best set of drawings // 2013 Second Year Design Studio Tutor // 2013 The Everite Prize The best graduand in the Bachelor of Architectural Studies // 2010 Gauteng Institute for Architecture Award The Bachelor of Architecture Studies graduand who submits the most comprehensively resolved major project in the course ‘Architectural Theory & Design’ // 2010 MDS Architects Prize The student who submits the best design project for a commercial building in the final year of study for the Bachelor of Architectural Studies degree // 2010 Certificate of Merit // 2010 The Dean’s List Awarded to the top 10% of students in the faculty of the built environment // 2010/2012/2013 Member of the International Golden Key Society School Prefect // 2007 Academic Colours // 2007 Art Colours // 2007 Shirley Woodhouse Award for Art // 2007 School Art Prize // 2005/2006
SKILLSET Computer Autodesk Revit / AutoCAD / Adobe Photoshop / Adobe InDesign / Microsoft Suite Basic Knowledge: SketchUp Pro / Adobe Illustrator / Rhinoceros / Grasshopper Physical Model production / Hand drafting / Written & verbal communication
PROFESSIONAL
EXPERIENCE _____________________________________
_________________________________________________________
CHAPMAN TAYLOR INTERNATIONAL ARCHITECTS, MASTERPLANNERS, DESIGNERS
____________________________________________________ THE LEXICON
bracknell, england // 2015 - 2017 Re-development of an existing 1970s shopping precinct, as part of the wider town centre regeneration of Bracknell. The project accommodates 60,000m² of new retail and leisure space and comprises two integrated components: Charles Square – The scheme includes a new anchor store and associated shop units to provide 10,000m² of retail space, improved vertical circulation and linkages and associated public spaces. Northern Retail Quarter – The Northern Retail Quarter comprises 6 new-build blocks including major shop units for Marks & Spencer and Fenwick, as well as a new 12 auditoria cinema at first floor featuring a 4DX cinema for Cineworld and the conversion of an existing office tower into a residential tower. As block architect responsibilities included the delivery of GA drawings to technical details, the coordination of structure & services, sub-contractors, tenant & client across multiple blocks, including the cinema, while acting as project BIM lead. The Lexicon will be opening in Autumn 2017. RIBA work stages: 4+5 Cost: £240m Opposite Page (clockwise): Site Plan BDP Architects View East between Blocks 2 & 5: - Photograph prior to redevelopment BDP Architects - CGI of proposal BDP Architects - Site progress photograph - February 2017 Kier Bothwell View North towards Cineworld entrance BDP Architects
KEY PL 3 21-590 5-1
5-2 2000
5-3
1
5-4
5-6
2500
22-501
5-7
5300
5-8
3650
5-9
4150
5-10 5-12
4125
3675
5-14
1625
2
1
5-18
5-16
6175
7800
5-19
7800
5-20
7800
20-502
5-21
7800
7800
5-22
22-510
5-23
7800
7800
5-24
7800
5-26
5-27
2200
5600
5-28 4400
5-29 3400
5-30 7050
5-31
2245
21-520
E1
5-A 2200
N
5-B 2200
22-505 845
620
5-F
1
4280
5-C 5-E 5-D
UNIT 5G
UNIT 5H
UNIT 5J
UNIT 5K
UNIT 5KA
UNIT 5N
UNIT 5L
NEXT - UNIT 5P
7800
FOR BWIC TO ESCALATOR SEE TECHNO LIFT UK DRAWING: PQ61125
NOTES
THIS DRAWIN DIMENSIONS
5-G
UNIT 5Q
ALL DIMENSIO ANY DISCREP SHOULD BE R
AREAS INDIC THEY RELATE CURRENT ST THE BASIS OF VIABILITY, PR SHOULD INCL DECREASES BUILDING PR
5-H
© COPYRIGH
CON 7175
UNIT 5F
5-J 625 2250
5-K
FOR BWIC TO SUBSTATIONS SEE HLP DRAWING: HLP-05-0G-69-406
5550
FOR SETTING OUT OF PARASOL BASES SEE DESIGN LSM DRAWING L13 2782 01-01
UNIT 5R
FOR BWIC TO GOODS LIFT SEE TECHNO LIFT UK DRAWING PACKAGE: T4PO1500
5-L
UNIT 5T
775
5-M
SPKLR VLV RM
FOR BWIC TO PASSENGER LIFT SEE TECHNO LIFT UK DRAWING PACKAGE: 2PO1000
5-N 5425
5-Q
UTILITY TELE.
LL IT HUB
WC
UNIT 5U
GAS MANIFOLD METER ROOM
FOR BWIC TO GOODS LIFT SEE KONE DRAWING PACKAGE: 7400-BLK05-GL-01
E1
4800
21-521
SUBSTATION 03
WATER MANIFOLD
1600
5-P
UNIT 5E
1
22-545
UNIT 5D
5-R
E2 1
3000
FOR BWIC TO SUBSTATIONS SEE HLP DRAWING: HLP-05-0G-69-405
SUBSTATION 01
4120 CINEMA ELEC.
5-T 5-U
3180
5-V
UNIT 5V/W/X
500
WAITING INSTRUCTION ON PLASTERBOARD LINING TO BLOCKWORK WALL. MACE TO CONFIRM .
TENANT ELEC.
4145
E1
21-522
1
E2
21-522
22-523
FOR BWIC TO UNIT 5B PASSENGER LIFT SEE KONE DRAWING PACKAGE: 7400-BLK05-PL-02
UNIT 5B 3655
0
5-X 30
23
CINEMA FOYER
0
23
0
5 92 5 34
0
4800
0
75
15 70
ie
sin
k
11
15
70 47
80
11
0
23
60
n ow 23
n
17
70
tile
s
23
0
T 0,1.O.C 70 .
5
10
do
00
11
0
pa v in ing a frase ed dum t vil ge p ro lag be ck e c am e ob mb ble ed w de ith d ro ad
11
pd ste ow
n
D 18
pd
ll
34
10 11
00 10
5 11
0
wa
ie
re
0
ub
le
ga
rag
5
ow
12 5 W
re
8
23
75 into Ø rw me wa dp c sh ll u ha & p sin sed las g w ter ire
11
pd
11 6
0
0 fi
D 18
b
ste
23
5
5
re
tile s T 0,1.O.C 70 .
00
wh
10 in 0 Ø ac Duc OVP ce t w ss ith pa ne W ls
00
ste
wc
00
er
0
e
10 0
0 fi
re
23 0
wa
ll
sto
W
23
slid
20
wc
0
58
0
32
65 24 @
ath
5
23
9 85
b
0
23
m
28
wh
23
40
D
oo
5 ll
py
Th ri ch is dra ght: pe ange win co rmitte s to g is arc pied d w the in copy co hite or u ithou tern right re s c co mply t. A ed b t firs al o rese ll m y de r t w Ge s & ith th ate any confi externrved a b 75 Th nera uild e N rials othe rmin al s nd re g a into Ø rw de e arc l n ing s tion to be r part wit tructu ma in me wa dp c sc tails hite ote ocie al B SA y or h the re b s th sh ll u ha u a B ty of led, etc. cts s s: reg ildin S o othe arch y an e pro & p sin sed s th p g u ula g R r ag r d ite y o las w p all eir se hall ecif all ter ire tio eg ree esig ct. the erty us work resp figu take icati 90 plum N ns ula r o 0m b . tio men ner w o pa desig f the Co ed & to b ecti red d pre on, in ns t b m ing all ntr ap e c ve im fera str aw pip oa itho rt of n pa arch (S th p k e a p ut lu u a th to in AN rd e ay es n n c it rt m to loc tor lied m rried ds a sion ce to ction fr S 1 app perm is dra y w ect a to nb be a bin ill n 04 rov r re cc g a om w be Pro be re al bu to arr ust out nd s on the s, la 00 ed issio wing not y to alls gu ord bov m ha vide mov ildin ang be re in str co ly. A se d rger ) th . A n fr m be g e b n to inimu latio ing to e gro ra ll a s e e ic it a fo fe 10 ab nd d fr ins and rr t a ns se nm ap ll wo om th y be rm ma win cale the un we pli rk 10 d wo 400-O le ro ere om pecto en ed to ccord wit teria gs. d d ca to e r c 450 s ble on m laid 0Ø s ap rkm . T oms ct in the s rate ure usin an h SA l an The etail pro an he SA to app ite, . O tha g ce w BS d w se s dra to oil p necti m in s d m B a v b S o h t v n a m ip a ro o al rch e S ip all an ith sta rk raw win e n n ert c v in. e to lev Dra ttin of th . The itec prov ed p d ma omp req ufac arch nda man ing gs, fall sa el g o e b co t w ide os y n leti uire tu ite rds ship s a en he win of bs s ut, uild nstr ill no d wit ition ot b on o d in res p cts and to re n gine 1:4 ta the ight gs a ot ing uc , s f e h e t ri in e s b 0 nda o re pla tion be h natu stan use contr pecti nted struc pec e the to b rs fou con f pli rds pre xca d d e if o ti lev nda trac nths pare vati ns th of th eld re ral li ard as act, ns a instr ons icati bes rou e b sp ght arc fill, all re uc . M on t arc els d tions tor & num d fr on gh uil on an hite unle rub carr tion ate s, d s b d s ri an hite eem to b eng ber om s & s c c als c ite oun ing m ible fo ven ts no ss o ish a ied o . co d an t. A ed n e a m inee of ste urfa op cil. ay r th tilati tice therw nd ru ut b no rrecti y dis ll lev ece inim r on ps & ce e no o y xa era tifi cre els ss t c e qu n as boa ise bble o u sit om ali rd d Str ed at n. The pan , dim ary on m 50 e & c final fi mina tions me ty o set o . All irecte is c ti o nc f th ut Bu uctu the ti arc ies ensio site 0mm nfirm nishe on o d. ew e in ral me hitec are to ns, mus belo ed d gro f site SAN SA De ild in ith NS ou no of co t wil be buil t be w with un on S 1 Fo pth pre t d ly l d o te c th by unda f fou ast s: mme not b report ing li first e fin the a leve . De 040 re 0 n p rc nc ls e on eng tion nda pres ing he ed to es a port ishe hite to th o -G in s we dam eer. to b tion tress wo ld re th nd ed d gro cts be d f fou & F e o . to rk s n Pro ll co p pro Ne e se trenc ed c on pon arch ther and und Top eterm dati sills vide mpa of m w co t on hes oncre sit sib ite data ap . An of a in ons le ed e. c , fin & p app cted em ncre firm to be te li for t an to prov y ch ll by b ed ang dim d e be sp ished rovid rove fill. T ran te su supp a m ntels c n b e e e h e g ns ine ec y th s o rec cifie wit e v d dp op o DP rfac orta in o (SA ion er ke f h do e sid eive d. A 30 ertica c (g f co M (g e be ble g f 500 BS a fo l u m d n ns err r wit es. A bric ll bri m m l dp ndle cre unp to roun mm appro ors ite b te nu h eq ll sta kforc ckwo inim c.s to bric su las g e a d a belo ved if n no 10 mbe ual tr irs e ev rk to um all kgri rface reen minim d to w gro ) ab t p u o 0 r fin mm of ri ead nles ery c rec san chan or bed or e um be c und ve d e of ishe balu sers s 25 s oth ours eive ce ges quiv to b quiv of 1 hec lev all o pe de floo s mu ste exc 0mm erw e fo bric men of fl ale e a alen 5m ked el. nin gs all molit r finis st re r spa eed min ise r 3 c kforc t scre oor nt ) u min t) on pa 1 & co le . 0 d dim ion he m n o a cin five imu eta ours e e ed ve nde f 1 sa 0m firm Ro ensio of all s whe in cong acc & 1m m. P iled to es e very 4 unles ls. All r all w50mmnd bli m thic ed nd o ns wa n all co s o su h rov a h xte in k Ra of n s sta rd ote to be lls to b creed nt. c ing to igh to ide haave e nding urses therwrface s & w bove g on co fters ch ba ind NG ise be N 1m a nd qu e sis on req urse & tr SA ecked confirmlaid. tracto BR. T lconie rail a al rise pas ll ope deta ds to ow L. be uire s of usse r to he t9 rs t o nin ile be s on NS b ins twee d fla rick s to sit ed b tak FFL & la 00m 185 pen gs to d or 10 ep ys s mm ing e a at ndin m gri ulati n ro hing work be ti 40 rio tru h o cc c o e r to ctu 0ou han gs a eigh max n bo sc ll or on o f an s an . Pa d d ra n nt ree ce ve rap ow t g ord l L d ra o es d a wh imu th r dp dc e n d e ie
60 sh
25
23
all
T 0,0.O.C 00 .
00
wa
Co
D 18
ff r
5
15 7
ste
mm
17 0
30 fire min do solid or
re
CTL
34
00 10
s rooerve m r
n
ow
pd
10
0 fi
20M
k 0
12
0 28
77
s
23 0
we
11
rcl 5
1
ht mm
24 @ 11
23
re
tile
0
10
W
10 00
70 e slid
0 60 0 23 00
28 0 28 28 0
0 62 56 0
eh
23
5
sin
11
r
sto
00
2
COMPANY CODE
9
s
D 19
10
A199/BRCR
0
0
sta
00
11
wh b
D 11
w
k
11 15 D 11
do
sin
s
n
ile
ow
gu es t
pd
5
wc
36
85
ste
11
rcl
ery y
T -0,5.O.C 10 .
0
D 10
1:200 Scale Bar
23
y
tile
Sid an e sh co d flo owe an rrec or to r wa d w tly lls b ate sea e rpro led ofe d
D 11
23
JOB NUMBER
5-25
30
0
0 28 0 28 0 28 0 28 26
32
t/d
ull
s
dy
20 5
w/m
sc
tile
D 12 m
e
0
ins sta itu c 12 to irca ast 00 en se con gin ac cre ee co sta rs rdin te ris ir no de tails g tre ers @ te: lin ad eo s @ 17 f rc 0 28 mm bri 0m dg ea m bo ve
nc
fr
11
an tr
15
tra
tile
fr
5
0
s lin
51
5
en
3
s
11
ga
11 11
2
T 0,0.O.C 00 .
0
es
1
23
fin to al kit sp ch ec en ialis e kit t d lectr co chen 48 etails ical 00 lay to unte lay ou sp rs ou t ec an t d ga ialis d c eta s ex sto t d upb iling tra v eta oa , cto e ils rds ra bo ve
win
30 48
elv
27 0
sh
12
66 23
en
up
sta ris ir no tre ers @ te: ad s @ 17 0 30 mm 0m m
p/b
0
ch
slid
e
s
00
up
ht
tile
30 60
2
1
65
kit
0
s
T.O 0,0 .C 00 . 70
00
mm
ow n pd ste m
53
stu
tile
5
27
12
C
lle
10 cu to pb an spe oard sh d s cia s a elv pe lis nd es cif t jo sh ica in elv tio ery in ns de g tail ing
D
11
D 11
0
e
d/w
23
ga se s bo e d ttle eta sto il a ra nd ge no tes
0
11
23
s lin
D 13
s lin
e
23
0 ga
ht
el
mm
85
30
28
ht
0
n ste
05
m
mm
pd
ow 05
D 11
0m
0
28
0m fold
28
ce
ga
ing
s
80
28
W
5
3
0m
m
cu to pb an speoard d s cia s a pe lis nd cif t jo sh ica in elv tio ery in ns de g tail ga ing s fire
@
17
43 30 02 23
roo
17
23
din
tile
T -0,5.O.C 10 .
pla
pa v in ing a fras ed dum et vil ge p ro lag be ck e c am e ob mb ble ed w de ith d ro ad
35
@
17
0 23 70
ily
s
D
am
e
70
fam
tile
be
slid
41
D 21
T -0,6.O.C 80 .
14
am
0 46
be
12
0
0
0
00
23
23
23
48
30
3
bo un da sto ry re rm w ho gula wate all en les r inte r to gin ac ee cordrvalsdisch rs sp ing thro arge ec to ug a ific nb h t ati r a we on nd ep s
2
D
5-FF
5 39
W
00
sc laid reed to & ti a m les in fall
11
BLOCK GROU GENER
495
gu
4 1
0
ie
14
5
52
5
ium
0
23
atr
wa by ter fe sp ec ature ialis t
21-520
34
43
W
23
23
tio
82
e
E2
sta flo inle ho or le ss s all rizon vel teel all to s tal ruwith han & S balu pecia nn s/s b drail AN stra list ing alu @ S 1 de de ste ste 1m 01 s to tails el ro rs a hig 60 co ds nd h a bo mp ve ly wit hS AN S0 40 0
0
pa
2
5-EE
02
40
e
0
35
lac
DRAWING TIT
UNIT 5ZB
23
ng
s
rep
37
29 @ am
s fi
lou
red
be
ga
0
20
23
e
tile
ve
22-561 8
24 20
10 0 in Ø ac Duc OVP ce t w ss ith pa ne ls
30
mm 75
s
0
0 23
s lin
tile
46
C
ga ga s lin lo s bo e ac cate ttle se ces d be stora e d sib lo eta le fr w s ge il a om lab nd g & no ard tes en
34 ga
T -0,6.O.C 80 .
W
5
00
5
co
3
10
5
0
34
18
34
75 into Ø rw me wa dp c sh ll u ha & p sin sed las g w ter ire
12
e
0 0
23
46
30 02
7
72 3
37
014 23
10 str 0 x to uctu 100 to eng ral p mm ma . sp os ste el tch ec t win ., pa lin do inte w sla e of fra d b a can me bo tile ve ve red
slid
48
43
70
30
pro po pos wit sitio ed p h p n to oo l oo l s be c pum pe on p cia firm list ed
i
fold
d
raa
0
sb
0
1
ie
5 ga
23
5
tile s T -0,8.O.C 50 .
en
10 E Lon W2 Tel Fax
5-DD
00
12
12
ht
w
30
34
28
t
Cha Inte 00
ed to & ti a m les in fall
ialis
C
0
25
ec
Tel +
30
up
sc laid re
00
69
sp
CLIENT
23 red
13 41
ps
0
UNIT 5ZA
lin sla e of b a can bo tile ve ve
5
30
ol
DATE
ARCHITECT
42
18
28 87 0 24 17
ste
0 23
allo
65
12.06.1 09.06.1
www 19
23
90
73
fin de al nu wit term mbe h a ine r o rch d o f ste ite n s ps ct to b ite up efore and be co confi ns 1 tru rme cti d on 2
10 0 15 in Ø R 10 ac Duc WD ce t w ss ith P pa ne ls
sh
16
02 01
5-CC
53
2875
lan
03
15.12.1 24.11.1 20.11.1 19.10.1 03.11.1 31.07.1
06 05 04
00
4650
2
10.03.1 19.01.1 14.01.1
48
00
gro u scRevit ale nd fl 1:5 oor 0 p
07
7800
d
A
1
24.03.1 15.03.1 10.03.1
155 M Lond
ie
RW pro pip tec e to ted b fro e m loa
en
0
10
06.04.1
10 09 08
5-17
3
Level 0G - GA Plan
11
5-AA 5-BB
5
46
Block 05
10.05.1 11.04.1
UNIT 5Z 34
4
by
30
00
sta ris ir no tre ers @ te: ad s @ 17 0 35 mm 0m m
po
20 18
00
5-15
de
10
34
5-13
15
23
d
re
13 12
5-Z
55
5
5
5-11
all 90 plum 0m b m ing all a p to plum way ipes fr to nb be a bin r re cc g a om w be alls gu ord bov m to inimu latio ing to e gro ns se nm the un we d 10 r c 450 on m laid 0Ø s to oil p necti m in ve a m ip o n rt le in. e to ve fall sa l b of s 1:4 sta 0 nda rds
22.06.1
5-Y
25
34
all 90 plum 0m b m ing all a p to plum way ipes fr to nb be a bin r re cc g a om w be alls gu ord bov m to inimu latio ing to e gro ns se nm the un we d 10 r c 450 on m laid 0Ø s ne m to o2000 il cti inv a m pip on ert e in. to lev fall sa el of bs s 1:4 ta 0 nda rds
48
1940
ep
ie
04.07.1
14
5200
1
22-549
B
47
1
22-529
37
70
12
STAIR 53
1100
co po ntrac po sitio tor lin int o n of to co ea n s n cc site ewe firm re ord a r c ing nd a onn se 1,5m ly we dju ecti r c awa st on y fr sp on ne cti om on
05.07.1
15
2600
3550
5-5
27.07.1
16
PROJECT UNIT 5Y
700
co po ntrac po sitio tor lin int o n of to co e a n s se nfi cc ite we rm re ord an r c ing d a onn se 1,5m ly we dju ecti r c awa st on y fr sp on ne cti om on
34
5
FILM DROP
5
77
FOR BWIC TO CINEMA ESCALATORS SEE KONE DRAWING: 6331011-005-020-01
1800
5-Z
09.08.1 04.08.1
17
REV
11
00
23
02
NOTE: LAYOUT OF OPENINGS IN SERVICE YARD SLAB & BWIC WITH COMPACTOR TBC BY Hoare Lea / PINNACLE
10
5300
5-Y
23.09.1 12.08.1
19 18
STAIR 52
5-X
CINEMA LOBBY
29.09.1
20
5-U
CINEMA PLANT ROOM
UNIT 5C
5-W
21-521
04.11.1
21
44.40 m²
FOR BWIC TO CINEMA PASSENGER LIFT SEE KONE DRAWING PACKAGE: 7400-BLK05-PL-01
5-S
EXACT LOCATION OF SCISSOR LIFT TBC BY CMT; LIFT SIZE VARIES FROM ERs
FOR BWIC TO SCISSOR LIFT SEE KONE PROPOSAL: 16 / 5767461.4
22
5-2
5-1
5-3
5-5
5-4 2500
2000
5-6
1750
5-7
3550
5-8
3650
4150
5-9
5-10
4125
3675
5-11
1100
5-13
5-12
525
5-15
5-14
4235
1940
4800
5-17
5-16 3000
5-18
2000
5800
E13 5G_056
SUBSTATION 01
1390
635
1390
5G_068
CINEMA ELEC.
500
TENANT ELEC.
300
FG
LV (GATES)
CINEMA PLANT E15 5G_059 ROOM
910
E15
2200
5G_060
2035
E1 5G_061
815
815
1378
1490
FWP
BLK-501
35 CUBIC YARD CONTAINER
440
CINEMA GAS ROOM
+72.010 FFL +72.000 SSL
FWP
570
675 389 580
475
RWP
2087
10 71 5
FWP
UNIT 5B
BAL-812
AWAITING INSTRUCTION ON PLASTERBOARD LINING TO BLOCKWORK WALL. MACE TO CONFIRM .
BAL-812
1800
A12
DRG-121
5G_090
1800
A11 5G_006
A12
DRG-101
5G_089
CINEMA FOYER
BRK-102
EWG-152
1700
+72.000 FFL +72.000 SSL
D3 5G_062
RWP 551
223 2
BLK-302
1135
KEY PLAN
700
° .50 22
22 .50 °
637
22.50°
1800
DRG-101 DRG-101
300
2600
RWP
5-Y
5-Z
NWS
FILM DROP
FOR BWIC TO CINEMA ESCALATORS SEE KONE DRAWING: 6331011-005-020-01
CINEMA LOBBY +72.010 FFL +72.000 SSL
2625
BLK-302
1130
324
1163
5300
A11 5G_007
EWG-152
433 708
FWP
324
539
RWP
1154
BLK-303 BLK-302
324
522
00 26
2600
3655
5G_008
LV (GATES)
910
943 0
2060
4145
2600
5G_009
T6
5-X
9380
FOR BWIC TO UNIT 5B PASSENGER LIFT SEE KONE DRAWING PACKAGE: 7400-BLK05-PL-02
T6
5-W
FWP
1291
2719 725
FWP
2000
LV (COMPACTOR)
438
150
RWP
5-V
E29 5G_058
330
EQ
FWP
239
D2
1045
3180
FOR BWIC TO CINEMA PASSENGER LIFT SEE KONE DRAWING PACKAGE: 7400-BLK05-PL-01
FWP
UNIT 5C
EB
575 648
C6 5G_065
SHOPFRONT BY TENANT +72.000 FFL +71.925 SSL
D2
1376
1376
470
5G_067
EQ
5-T
EB 2810
580
1810
EB
750 FWP RWP
FWP
EB
COMPACTOR
2400
5G_066
BLK-501
EB
2810
E29 5G_057
2279
C6.v
1810
2028
4120
RWP
EB
114
350
80
FWP
EB
+72.000 FFL +72.000 SSL
MH
988
EB 361
RWP
5G_069
1065 FWP
BLK-302
FWP
C6
1810
EQ
3000
T6
BLK-111
1000 391
1539
FWP
FWP
5G_010
1217
BLK-303
FWP
124
1000
860
1065
1265
5-R
1835
FG
5-S
325
FG
FOR CONTINUATION REFER TO 1 / 20-501
5-U
BLK-302
175
UNIT 5D
22.50°
1800
1800
1800
A11
A11
5G_005
5G_004
1800
1800
1760
Façade Materials Legend
E1
RWP
5G_001
748 600
1135
1135
615
103
2035
103
2050
HANDSET BRICKWORK 673
BRK-102 BRK-103
SHOPFRONT HOARDING PANELS
E3
E3
5G_003
5G_002
1 6
BRK-101
SHOPFRONT BY MACE
BLK-111
323 FULL HOARDING BY MACE (SHOPFRONT BY TENANT)
CAN-201
N
DRG-101 DRM-111
Level 0G - GA Plan - Zone B
NOTES
DRM-201
THIS DRAWING MUST NOT BE SCA DIMENSIONS
DRM-161
ALL DIMENSIONS ARE TO BE VERIF ANY DISCREPANCIES THAT ARE, O SHOULD BE REPORTED TO CHAPM
ARUP TO RE
EWG-152 5-31
5-30
2245
5-29 7050
5-28 3400
5-27 4400
5-26 5600
5-24
2200
5-23 7800
5-22 7800
5-21 7800
5-20 7800
5-19 7800
5-18 7800
5-17 5-16 5800
2000
5-15 3000
5-14 5-13 4800
1940
5-12 4235
5-11 525 1100
5-10 3675
5-9
5-8 4125
5-7 4150
5-6 3650
5-5 3550
5-4
1750
AREAS INDICATED ARE APPROXIM THEY RELATE TO THE LIKELY AREA CURRENT STAGE OF DESIGN. ANY THE BASIS OF THESE PREDICTION VIABILITY, PRE-LETTING, LEASE AG SHOULD INCLUDE DUE ALLOWANC DECREASES INHERENT IN THE DES BUILDING PROCESS.
EWG-333
5-3
EWR-751
2500
EWR-901
© COPYRIGHT CHAPMAN TAYLOR
EWS-121
CONSTRUCT
LVR-131
Level 04 +90.820
RFH-411 EWR-221
Level 03 +86.950
RAL 8016
DARK
RAL 8025
LIGHT
RAL 8028
MEDIUM
Level 02 +81.250
Level 01 +76.425
1
22-510
Level 0G +71.925
1
22-504
North NORTH Elevation ELEVATION E1
1 : 200
1
22-502
1
22-500
10
19.12.16
DY
09
26.09.16
DY
08 07 06 05
16.09.16 31.08.16 12.08.16 01.08.16
DY KB DY KB
ERI 244 in added/omi Unit 5F Ca dimensions ERI 217 In Size & loca Dim's adde Precast pa accommod
CurtainCurt Wa 5-3
5-3
5-4 2500
5-3
5-4
2500
5-3 5-3 5-3
1750
5-4
2500
5-5
5-5
1750
3550
5-5 5-4 5-4 5-4 5-3 2500 2500 2500 1750
5-6
5-5 5-5 5-5 1750 1750 1750
2500
3550
5-6
5-7
3550
5-4
3650
5-6 3550 3550 1750 3550
5-5
2
5-6 5-6 5-6
22-548
2 22-548
5-8
3650
4150
5-7
2
22-548 3650
5-7
3650 3650 3650
3550
5-6
222
2 22-548
3650
5-Y
1800
5-85-7
22-548 22-548 22-548
5-Z
4150
5-7 5-7 5-7 4150
5-Z
5-8
4150 4150 4150
5-8 5-8 5-8
1800
5-Z
5-8
5-Y
Curtain Wa
5-Y 5-Z 5-Z 5-Z
5-Y 5-Y 5-Y
1800
4150
5-Z
1800 1800 1800
1800
+93.250 TOP
SHOPFRONT SHOPFRON HOARDIN
+92.980
SHOPFRO S
SHOPFRONT HOARDIN FULL HOA F
(SHOPFRO (S SHOPFRO
RFS-111 RFS-111
+89.480 TOP
FULL HOA (SHOPFRO
RFS-111 RFS-111 RFS-111 RFH-481 RFH-481 RFS-111
RFS-111
RFH-481
RFH-481
RFH-481 RFH-481 RFH-481
EWL-101 EWL-101
2
2
25 - 548 25 - 548
+89.210 EWR-901EWR-901 EWL-101 EWL-101 EWL-101 EWL-101
EWL-1012
222
25 - 548
2525 548 25 - -548 - 548
EWR-901 EWR-901 EWR-901 EWR-901 CINEMA SIGNAGE CINEMA SIGNAGE
EWR-901
CINEMA SIGNAGE CINEMA CINEMA SIGNAGE SIGNAGE CINEMA SIGNAGE
CINEMA SIGNAGE
25
OJECTION ECTION +86.950 LEVEL 03 - PROJECTION OJECTION
+85.710
EWG-152EWG-152
1
1
25 - 548 25 - 548
+85.440
EWG-152
EWG-152 EWG-152 EWG-152
EWG-152
1
111
25 - 548
2525 548 25 - -548 - 548
25
AMW-522AMW-522 +81.940 AMW-522
VEL 0202 EL 02 VEL
+81.670
+81.250 LEVEL 02
AMW-522 AMW-522 AMW-522
AMW-522
4
4
25 - 548 25 - 548 EWL-101 EWL-101
4
Y PY
444
25 - 548
EWR-901EWR-901 EWL-101
EWL-101 EWL-101 EWL-101
EWL-101
EWR-901
EWR-901 EWR-901 EWR-901
EWR-901
4
2525 548 25 - -548 - 548
25 - 5
+77.550 TOP OF CANOPY
+76.700
3
CAN-201 CAN-201
3
25 - 548 25 - 548 EWG-152EWG-152 CAN-201 CAN-201 CAN-201 CAN-201
CAN-201 3
333
25 - 548
+75.000 +74.500
EWG-152
EWG-152 EWG-152 EWG-152
EWG-152
DRG-101 DRG-101 DRG-101
DRG-101
3
2525 548 25 - -548 - 548
25 - 5
DRG-101 DRG-101
DRG-101
+71.925 LEVEL 0G
3
3
25 - 550 25 - 550
3
MA INEMA ENTRANCE ENTRANCE ELEVATION ELEVATION 50
MACINEMA ENTRANCE ELEVATION CINEMA ENTRANCE ELEVATION ELEVATION CINEMAENTRANCE ENTRANCE CINEMA ELEVATION ENTRANCE ELEVATION 111 111: :50 1 1 : 50 :50 50
333
25 - 550
3
2525 550 25 - -550 - 550
25 - 550
2
SECTION SECTION - ENTRANCE - ENTRANCE 12: 50 1 : 50
2
SECTION - ENTRANCE SECTION ENTRANCE SECTION ---ENTRANCE SECTION ENTRANCE SECTION - ENTRANCE 2 1 : 050 0.5 0 1 0.5 1 2 2 1 : 50 222 111: :50 :50 50 1:50 Scale1:50 BarScale Bar
1:50 Scale Bar
1:50 Scale Bar 1:50 Scale Bar 1:50 Scale Bar
0
0.5 0 0 0 20.5 0.5 1 1 1
0.5
1
22 2
2
1 : 50
RFS-411 RFS-411
5-5 5-5
5-4 5-4 2500 2500
5-6 5-6
1750 1750
5-7 5-7
3550 3550
4150 4150
2500
5-5
5-X
EWR-901 EWR-901
1750
5-5 5-5
5-4 5-4 2500 2500
5-6 5-6
1750 1750
3550 3550
2
EWL-101 EWL-101
5-4
1 : 50
5-3 5-3
5-8 5-8
3650 3650
22-548 22-548 5-X 5-X
ROOF
3
CAN-201
5-3 5-3
5-3
5-6
5-7
3550
22 22
KEY PLAN
2
1
5-8
3650
4150
6
2
3
5
4
22-548
AMW-521 BAL-812
BAL-812
8 7
N 5300 5300 5300
EWL-101 NOTES
DRG-121
THIS DRAWING MUST NOT BE SCALED. USE FIGURED DIMENSIONS
EWR-901
ALL DIMENSIONS ARE TO BE VERIFIED AND CHECKED ON SITE. ANY DISCREPANCIES THAT ARE, OR BECOME APPARENT SHOULD BE REPORTED TO CHAPMAN TAYLOR. AREAS INDICATED ARE APPROXIMATE GROSS INTERNAL AREA. THEY RELATE TO THE LIKELY AREAS OF THE BUILDING AT THE CURRENT STAGE OF DESIGN. ANY DECISIONS TO BE MADE ON THE BASIS OF THESE PREDICTIONS, WHETHER AS TO PROJECT VIABILITY, PRE-LETTING, LEASE AGREEMENTS, OR THE LIKE, SHOULD INCLUDE DUE ALLOWANCE FOR THE INCREASES AND DECREASES INHERENT IN THE DESIGN DEVELOPMENT AND BUILDING PROCESS.
DRG-101
5-Y 5-Y 5-Y
© COPYRIGHT CHAPMAN TAYLOR 2016
EWG-152 EWG-152
CONSTRUCTION ISSUE
1800 1800 1800
EWL-101 EWL-101 BLK-302
5-Z 5-Z 5-Z
DRG-101 EWR-901
1 2 3
LEVEL 0G
EWR-901 EWR-901
EWR-901 EWR-901
EWG-152
AMW-521
DRG-101
EWL-101 EWL-101 KEY PLAN
EWC-120
RFS-111
BRK-102 EWL-101
1 : 50
LEVEL 02
154
175
100
5-Z
50
1 : 50
16
154
175
ROOF
3
100
50
CAN-201 CAN-201
3D VIEW
4
5-Z 16
5-Z N
5-Z
NOTES
1 : 50
ROOF
THIS DRAWING MUST NO
ALL DIMENSIONS ARE TO DISCREPANCIES THAT AR REPORTED TO CHAPMAN
AREAS INDICATED ARE A RELATE TO THE LIKELY A STAGE OF DESIGN. ANY D THESE PREDICTIONS, WH PRE-LETTING, LEASE AGR DUE ALLOWANCE FOR TH THE DESIGN DEVELOPME
+ 81.940
+ 81.940
1 : 50
© COPYRIGHT CHAPMAN
+ 81.670
+ 81.670
+ 85.710
+ 81.250 SSL
+ 85.710
+ 81.250 SSL
+ 85.440
+ 85.440
5-X 5-X
KEY PLAN 01 22-548
04
5-Z
AMW-521 AMW-521
16
154
175
04.11.16
100
50
BAL-812 BAL-812
03 02 01 REV
6
DETAIL - 01
01
ERI 186 - Guardrails to tenant automatic doors 5-Z 12.05.16 KB Precast panel removed & internal curtain wall setting-out amended BAL-812 BAL-812 5-Z 02.02.16 KB Location of Kingspan cladding & callout references revised 03.07.15 KB 1.10 References amended 12.06.15 KB + 81.940 Issued for trade contractor design DATE
KB
INT'L
5
03
3DETAIL - 03
22-548
4
03 22-548
DETAIL - 03
LEF LEF
5-Z
NOTES THIS DRAWING MUST NOT BE SCALED. USE FIGURED DIMENSIONS
5-Z
5-Z
ALL DIMENSIONS ARE TO BE VERIFIED AND CHECKED ON SITE. ANY DISCREPANCIES THAT ARE, OR BECOME APPARENT SHOULD BE REPORTED TO CHAPMAN TAYLOR.
LEF LEF
DESCRIPTION
8 7
N
LEF
AREAS INDICATED ARE APPROXIMATE GROSS INTERNAL AREA. THEY RELATE TO THE LIKELY AREAS OF THE BUILDING AT THE CURRENT STAGE OF DESIGN. ANY DECISIONS TO BE MADE ON THE BASIS OF THESE PREDICTIONS, WHETHER AS TO PROJECT LIABILITY, PRE-LETTING, LEASE AGREEMENTS, OR THE LIKE, SHOULD INCLUDE DUE ALLOWANCE FOR THE INCREASES AND DECREASES INHERENT IN THE DESIGN DEVELOPMENT AND BUILDING PROCESS.
CHK
+ 77.550
PROJECT
2
1
DETAIL - 01 22-548
5300 5300
00
22.09.15
REV DATE
SS
F
IN'L
PROJECT
© COPYRIGHT CHAPMAN TAYLOR 2015
+ 81.670
+ 77.550
DRG-121 DRG-121 CLIENT
+ 85.710
155 Moorgate London EC2M 6
+ 81.250 SSL
Tel +44 (0)20 35
www.macegroup
DRG-101 DRG-101
ARCHITECT
+ 85.440
10 Eastbou London W2 t +44 (0)20 f +44 (0)20
CLIENT
www.chapm DRAWING TITLE
5-Y 5-Y 01 22-548
155 Moorgate London EC2M 6XB
DETAIL - 01
www.macegroup.com
22-548
04 22-548
BLOCK 05 ENVELOPE SOUTH FAC CINEMA EN
DETAIL - 03
DETAIL - 04
05 22-548
04 22-548
ARCHITECT
5-Z
Chapman Taylor LLP International Architects Masterplanners Designers
5-Z
+ 77.550
EWG-152 EWG-152
DRG-101 DRG-101
DRG-101 DRG-101
00
0
0.5
A199/BRCR
1
2
1 : 50 @A1
DETAIL - 04
CTL
5B
LEVEL
First issue
PH
CHK
DESCRIPTION
CLIENT
3D View 155 Moorgate London EC2M 6XB
Tel +44 (0)20 3522 3000 www.macegroup.com
ARCHITECT
DRAWN BY
FIRST ISSUE
Envelope Details
WM
08.05.2015
10 Eastbourne Terrace London W2 6LG t +44 (0)20 7371 3000 f +44 (0)20 7371 1949
3D VIEW
4Revit
www.chapmantaylor.com
DRAWING TITLE
BLOCK 05 ENVELOPE DETAILS SOUTH FACADE CINEMA ENTRANCE
5M COMPANY CODE BUILDING ZONE
04 22-548
SS
IN'L
Level 0G
BRK-102 BRK-102
1:50 Scale Bar
22.09.15
PROJECT
BLOCK 05 SOUTH FAÇADE AMW-521 AMW-521 TYPICAL BAY STUDY CINEMA ENTRANCE (2 OF 2) SCALE.
South Elevation Perimeter Section
DRAWING TITLE
JOB NUMBER
22-548
CATEGORY
99 22
05
22-548
DRAWING NO.
DETAIL - 04
549
REVISION. JOB NUMBER
SCALE
A199/BRCR 1:10@A1
04
DETAIL - 04
Cinema Entrance Bay Study: REV DATE
DRAWN BY
SS
COMPANY CODE BUILDING / ZONE LEVEL CATEGORY
CTL
5B
99 (25)
FIRST ISSUE
SEPTEMBER 2015
DRAWING No.
REVISION
582
00
SCALE
A199/BRCR 1:10@A
05
BLK-302 BLK-302
10 Eastbourne Terrace London W2 6LG Tel +44 (0)207 371 3000 Fax +44 (0)207 371 1949
JOB NUMBER
DETAIL - 04
DETAIL - 04
Chapman Taylor
5-Z 5-Z
LEVEL 0G 3D VIEW 4 1 1 : 50
03
Tel +44 (0)20 3522 3000
1800 1800
BLK-302
LEVEL 02
COMPANY CODE BUILDING /
CTL
5B
ATS
AUDITORIUM 06 193 SEATS
8 7
12.5mm GTEC Standard Board by Siniat 12.5mm GTEC Standard Board by Siniat
AUDITORIUM 07 98 SEATS
N - ALL BOARDS TO BE CUT & SEALED INTO WEBS OF STEELS - SECONDARY STEEL TO EDGE OF STADIA SEATING TO BE SFS STUD / BOX SECTIONS TO WITHSTAND A HORIZONTAL FORCE OF 3.0kN/m AS PER PART K OF THE BUILDING REGULATIONS
ARUP TO REVIEW STEELWORK TO REAR AUDITORIUM WALL AND SLAB EDGES NOTES RAMPS / ACOUSTIC FLOOR TO ACCOMMODATE
AUDITORIUM 08 82 SEATS
THIS DRAWING MUST NOT BE SCALED. USE FIGURED DIMENSIONS
GTEC 12.5mm dB Board by Siniat
WALL TYPE B - 310mm O/A
AUDITORIUM 05 137 SEATS CASH OFFICE
STORE MALE LOCKERS
WC
FEMALE LOCKERS
WC
AUDITORIUM 03 140 SEATS
STORE
STORE
AUDITORIUM 04 107 SEATS
AREAS INDICATED ARE APPROXIMATE GROSS INTERNAL AREA. THEY RELATE TO THE LIKELY AREAS OF THE BUILDING AT THE CURRENT STAGE OF DESIGN. ANY DECISIONS TO BE MADE ON THE BASIS OF THESE PREDICTIONS, WHETHER AS TO PROJECT VIABILITY, PRE-LETTING, LEASE AGREEMENTS, OR THE LIKE, SHOULD INCLUDE DUE ALLOWANCE FOR THE INCREASES AND DECREASES INHERENT IN THE DESIGN DEVELOPMENT AND BUILDING PROCESS.
100mm Acoustic Insulation
AUDITORIUM 07 98 SEATS
90mm C Studs @ 600 Centres
© COPYRIGHT CHAPMAN TAYLOR 2016
GTEC 12.5mm dB Board by Siniat
AUDITORIUM 08 82 SEATS
CONSTRUCTION ISSUE
GTEC 12.5mm dB Board by Siniat
WALL TYPE B - 310mm O/A
STORE
WALL TYPE C - 400mm O/A STORE
FEMALE WC
WC
MALE WC
5-W
WALL TYPE A - 3655 120mm O/A
90mm C Studs @ 600 Centres
AUDITORIUM 06 193 SEATS
5-X
ALL DIMENSIONS ARE TO BE VERIFIED AND CHECKED ON SITE. ANY DISCREPANCIES THAT ARE, OR BECOME APPARENT SHOULD BE REPORTED TO CHAPMAN TAYLOR.
GTEC 12.5mm dB Board by Siniat
GTEC 15mm dB Board by Siniat
STAFF ROOM
4DX PLANT
CASH OFFICE
CTRL MANAGER ROOM STORE
GTEC 15mm dB Board by Siniat MALE LOCKERS
WC
FEMALE LOCKERS
WC
90mm C Studs @ 600 Centres
STORE
STORE
STORE
5-5
AUDITORIUM 02 62 SEATS
GTEC 15mm dB Board by Siniat
193 SEATS 06 AUDITORIUM FEMALE WC193 SEATS
6
5
STORE
STORE
STORE
CONCESSIONS STORE
N MALE LOCKERS
WC
FEMALE LOCKERS
MALE LOCKERS
WC
FEMALE LOCKERS
MALE WC
GTEC 12.5mm dB Board by Siniat GTEC 12.5mm dB Board by Siniat STORE
WC
STORE
WC
STORE
90mm STORE C Studs @ 600 Centres FEMALE WC RWP FEMALE WC 100mm Acoustic Insulation ACCESS RWP ACCESS FEMALE WC
WC
90mm C Studs @ 600 Centres
CONCESSIONS
GTEC 12.5mm dB Board by Siniat
WALL TYPE G - 550mm O/A
4
8 7 WC WC
STORE
STORE
STORE
STORE
STORE
STAFF ROOM
STORE
STAFF ROOM
BACK-TO-BACK 146mm E Studs & G1 CS' 46/Y C Stud Independent framing
GTEC 15mm dB Board by Siniat GTEC 15mm dB Board by Siniat
AUDITORIUM 09 149 SEATS 09 AUDITORIUM 149 SEATS
GTEC 15mm dB Board by Siniat
KEY PLAN
CONCESSIONS STORE CONCESSIONS STORE
90mm C Studs @ 600 Centres GTEC 15mm dB Board by Siniat GTEC 15mm dB Board by Siniat GTEC 15mm dB Board by Siniat GTEC 15mm dB Board by Siniat
WC WC CONCESSIONS
FEMALE WC
AUDITORIUM 10 214 SEATS 10 AUDITORIUM 214 SEATS
WALL TYPE A C-2 -WALL 825mm O/AK - 196mm O/A TYPE WALL TYPE - 120mm O/A
1
12.5mm GTEC Standard Board by Siniat 12.5mm GTEC Standard Board byGTEC Standard Board by 12.5mm GTEC 15mm dB Board bySiniat Siniat CASH OFFICE Siniat 12.5mm GTEC Standard Board by 1mm Security mesh by others Siniat GTEC 15mm dB Board by Siniat
CASH OFFICE SIDE
1 : 200
eatherboard by
eatherboard by
90mm C Studs @ 600 Centres
2 5
3
WALL TYPE C - 400mm O/A WALL TYPE D - 550mm O/A
GTEC 15mm dB Board by Siniat GTEC GTEC 15mm 15mm dB dB Board Board by by Siniat Siniat GTEC 15mm by Siniat 90mm C StudsdB@Board 600 Centres 90mm C Studs @ 600 Centres
146mm E Studs & tud Independent framing
146mm E Studs & tud Independent framing
Board by Siniat
Board by Siniat
GTEC 15mm dB Board by Siniat
WALL TYPE C-2 - 825mm O/A
GTEC 15mm dB Board by Siniat GTEC 15mm dB Board by Siniat
ndard Board by
WALL TYPE F - 120mm O/A
90mm C Studs @ 600 Centres GTEC 15mm dB Board by Siniat GTEC 15mm dB Board by Siniat
KB
03
09.02.16
KB
02
16.11.15
KB
01 00
30.10.15 28.09.15
KB JRL
REV
DATE
INT'L
GTEC 15mm dB Boar GTEC 15mm dB Boar
AH
GTEC 15mm dB Boar 90mm C Studs @ 600
90mm C Studs @ 600
LEF
100mm Acoustic Insu 100mm Acoustic Insu
LEF
90mm C Studs @ 600
90mm C Studs @ 600 GTEC 15mm dB Boar
LEF LEF
GTEC 15mm dB Boar GTEC 15mm dB Boar
CHK
GTEC 15mm dB Boar
WALL TYPE C-2 - 825mm O/A WALL TYPE C-2 - 825mm O/A
1010
88
GTEC 15mm dB Board by Siniat
BACK-TO-BACK 146mm E Studs & ARCHITECT G1 CS' 46/Y C Stud Independent framing
GTEC 15mm dB Board by Siniat
Acoustic Insulation
100mm Acoustic Insu 100mm Acoustic Insu
Chapman Taylor
ACCESS BOX
Chapman Taylor LLP
International Architects Masterplanners Designers BACK-TO-BACK 146mm E Studs & Eastbourne Terrace G1 CS' 46/Y C Stud10Independent framing
90mm C Studs @ 600 Centres
London W2 6LG
25mm Coreboard
285
07
18.08.16
KB
Wall Type details revised as per
LEF
06
11.08.16
KB
Acoustic wall to north end / screen side of Aud. 01 revised Wall type spec. revised as per Siniat details Aud. Wall Type B located along perimeter revised to Wall Type C Wall Type G added, Wall Type K amended Portion of wall type A changed to wall type B Wall type E & legend revised Cinema Pack
LEF
Siniat comments © COPYRIGHT CHAPMAN TAYLOR 2016 received 17.08.16
02.08.16 KB CONSTRUCTION ISSUE 18.07.16
KB
09.02.16
KB
02
16.11.15
KB
01 00
30.10.15 28.09.15
KB JRL
REV
DATE
INT'L
DESCRIPTION
GTEC 15mm dB Boar
BLOCK 05 SECOND FLOOR PLAN CINEMA AUDITORIUM LEVEL GTEC 12.5mm Weatherboard by 12.5mm GTEC Standard WALL Board by TYPE D - 550mm O/A Siniat GTEC 12.5mm Weatherboard by WALL TYPES Siniat Siniat GTEC 12.5mm Weatherboard by 12.5mm GTEC Standard WALL Board by TYPE Siniat GTEC 12.5mm Weatherboard by Siniat
0
AH LEF LEF
CHK
JOB NUMBER
SCALE.
2
DRAWN BY
GTEC 15mm dB Boar
GTEC 15mm dB Boar GTEC 15mm dB Boar
FIRST ISSUE
GTEC 15mm 90mm C StudsdB@Boar 600
15.07.2015
90mm C Studs @ 600 DRAWING NO.
REVISION.
201
09
GTEC 15mm dB Board by Siniat GTEC 15mm dB Board by Siniat GTEC 15mm dB Board by Siniat GTEC 15mm dB Board by Siniat GTEC Standard Board by O/A GTEC 15mm dB Board by Siniat 12.5mm Siniat
2 layers 100mm Aco 2 layers 100mm Aco
90mm C Studs @ 600
90mm C Studs @ 600 GTEC 15mm dB Boar
GTEC 15mm dB Board by Siniat
WALL TYPE P - 150mm
GTEC 15mm dB Boar
D - 550mm O/A WALL TYPE F - 120mmGTEC O/A15mm dB Boar
1mm SecurityA199/BRCR mesh by others As indicated @A1 KB BACK-TO-BACK 146mm E Studs & Acoustic Insulation 25mm CS' 46/Y C Stud Independent framing 5 10 G1 20M BACK-TO-BACK 146mm E Studs & C Studs @ 600 Centres 90mm CODE BUILDING ZONE G1 CS' 46/Y C Stud Independent framing 12.5mm GTECCOMPANY Standard Board by LEVEL CATEGORY Acoustic Insulation CASH OFFICE SIDE Siniat Acoustic Insulation 12.5mm GTEC CTL Standard Board 05by 02 42 BACK-TO-BACK 146mm E Studs & Siniat G1 CS' 46/Y C Stud Independent BACK-TO-BACK 146mm E Studs framing & G1 CS' 46/Y C Stud Independent framing
LEF LEF LEF
Siniat
1:200 Scale Bar
PROJECT
1
AUDITORIUM 01 1 : 50
GTEC 15mm dB Boar GTEC 15mm dB Boar
GTEC 15mm dB Boar GTEC 15mm dB Boar
GTEC 15mm dB Boar
Wood - Sheathing - plywood
WALL TYPE K - 196mm O/A CASH OFFICE WALL TYPE K - 196mm O/A CASH OFFICE CLIENT
GTEC 15mm dB Boar GTEC 15mm dB Boar
1010
GTEC 15mm dB Board by Siniat
WALL TYPE K - 196mm O/A CASH OFFICE
90mm C Studs @ 600
90mm C Studs @ 600 GTEC 15mm dB Boar
Tel by +44Siniat (0)207 371 3000 GTEC 15mm dB Board
WALL TYPE G - 550mm O/A G - 550mm O/A
03
GTEC 15mm dB Boar 90mm C Studs @ 600
WALL TYPE D - 550mm O/A
GTEC 12.5mm Weatherboard by 155 Moorgate Siniat London EC2M 6XB
25mm Acoustic Insulation
ALL DIMENSIONS ARE TO BE VERIFIED AND CHECKED ON SITE. ANY DISCREPANCIES THAT ARE, OR BECOME APPARENT
04
GTEC 15mm dB Boar
GTEC 15mm dB Boar GTEC 15mm dB Boar
90mm C Studs @ 600
285
DRAWING TITLE
CASH OFFICE SIDE CASH OFFICE SIDE 155 Moorgate London EC2M 6XB
12.5mm GTEC Standard Board by SHS Posts @ 1200mm Centres with 90mm C Studs Siniat GTEC Standard Board by Wood - Sheathing - plywood 12.5mm 12.5mm WALL TYPE F - 120mm Siniat GTEC Standard Board by 12.5mm GTEC Standard Board by Siniat 12.5mm GTEC Standard Board by
Siniat Security mesh by others 1mm 25mmSecurity Acoustic Insulation 1mm mesh by others 90mm Studs @Insulation 600 Centres 25mm CAcoustic 12.5mm Standard Board by 90mm C GTEC Studs @ 600 Centres Siniat 12.5mm GTEC Standard Board by 12.5mm GTEC Standard Board by Siniat Siniat GTEC Standard Board by 12.5mm Siniat
Siniat
Tel +44 (0)20 3522 3000 www.macegroup.com
ARCHITECT
LEF
LEF
DESCRIPTION
GTEC 15mm dB Board by Siniat
GTEC 15mm dB Board by Siniat
Board by Siniat
KB
18.07.16
489
GTEC 15mm dB Boar
Fax +44 (0)207 371 1949
2 layers 100mm Acoustic Insulation 90mm C Studs @ 600 Centres GTEC 15mm dB Board by Siniat 90mm C Studs @ 600 Centres GTEC 15mm dB Board by Siniat GTEC 15mm dB Board by Siniat
02.08.16
04
www.macegroup.com
100mm Acoustic Insulation
EonBOARDS ACROSS CAVITY OF FLANK WALLS & INTO WEBS OF STEELS RDS TO BE CUT & SEALED INTO WEBS OF STEELS
05
Acoustic wall to north end / screen side of Aud. 01 revised Wall type spec. revised as per Siniat details Aud. Wall Type B located along perimeter revised to Wall Type C Wall Type G added, Wall Type K amended Portion of wall type A changed to wall type B Wall type E & legend revised Cinema Pack
Tel +44 (0)20 3522 3000
THIS DRAWING MUST NOT BE SCALED. USE FIGURED DIMENSIONS
05
KB
PROJECTION
LEF
GTEC 12.5mm Weatherboard by Siniat
4
THEY RELATE TO THE LIKELY AREAS OF THE BUILDING AT THE 90mm C Studs @ 600 Centres Wood - Sheathing - plywood CURRENT STAGE OF DESIGN. ANY DECISIONS TO BE MADE ON BASIS OF THESE PREDICTIONS, WHETHER AS TO PROJECT SHS Posts @ 1200mmTHE Centres with 90mm C Studs VIABILITY, PRE-LETTING, LEASE AGREEMENTS, OR THE LIKE, 100mm Acoustic Insulation SHOULD INCLUDE KB DUE ALLOWANCE FOR THE INCREASES AND LEF 09 11.01.17 Wall extent amended Wood - Sheathing - plywood DECREASES INHERENT THE DESIGNamended DEVELOPMENT AND 90mm C Studs @ 600 Centres 08 15.11.16 KB IN Wall thickness LEF 90mm C Studs @ 600 Centres BUILDING PROCESS. 12.5mm GTEC Standard Board by
GTEC 15mm dB Board by Siniat GTEC 12.5mm dB Board by Siniat
11.08.16
Wall extent amended
CLIENT
GTEC 15mm dB Board by Siniat
SHOULD 12.5mm BoardBE byREPORTED TO CHAPMAN TAYLOR. GTEC 12.5mm dB Board by Siniat GTEC Standard WALL TYPE Siniat AREAS INDICATED ARE APPROXIMATE GROSS INTERNAL AREA.
GTEC 15mm dB Board bySiniat Siniat GTEC 12.5mm dB Board by Siniat
06
2 layers 100mm Acoustic Insulation
NOTES
WALL TYPE B - 310mm O/A WALL TYPE P - 150mm O/A
KB
KB Wall thickness WALL TYPE Camended - 400mm O/A LEF KB Wall Type details revised as per WALL TYPE C -received 400mm O/A LEF Siniat comments 17.08.16
PROJECT
WALL TYPE G - 550mm O/AGTEC 15mm dB Board by Siniat
8 7
90mm CGTEC Studs Standard @ 600 Centres N 12.5mm Board 90mmby C Studs @ 600 Centres Siniat 12.5mm GTEC Standard Board by 12.5mm GTEC Standard Board Siniat by Siniat 12.5mm GTEC Standard Board by Siniat
GTEC 12.5mm dBInsulation Board by Siniat 100mm Acoustic
11.01.17 15.11.16 18.08.16
90mm C Studs @ 600 Centres
WALL TYPE F - 120mm O/A
25mm Acoustic Insulation 70mm C Studs @ 400mm Centres
CINEMA AUDITORIA WALL TYPES CINEMA AUDITORIA WALL TYPES 1 : 200
ndard Board by
1
CINEMA AUDITORIA WALL TYPES 1 : 200
09 08 07
GTEC 15mm dB Board by Siniat
6
FEMALE WC
CONCESSIONS
GTEC 15mm dB Board by Siniat
GTEC 15mm dB Board by Siniat GTEC 15mm dB Board by Siniat
100mm Acoustic Insu 100mm Acoustic Insu
GTEC 12.5mm dB Bo
GTEC 15mm dB Board by Siniat
GTEC 15mm dB Board by Siniat CHOC. STORE CHOC. STORE
90mm C Studs @ 600
GTEC 12.5mm dB Bo
WALL TYPE D - 550mm O/A
Acoustic Insulation
GTEC 12.5mm dB Bo 90mm C Studs @ 600
GTEC 12.5mm dB Bo WALL TYPE C-2 - 825mm O/A
© COPYRIGHT CHAPMAN TAYLOR 2016
AUDITORIUM 11 BACK-TO-BACK 146mm E Studs & 214 SEATS 11 AUDITORIUM G1 CS' 46/Y C Stud Independent framing 100mm Acoustic Insulation 214 SEATS
GTEC 12.5mm dB Bo GTEC 12.5mm dB Bo
90mm C Studs @ 600 GTEC 12.5mm dB Bo
90mm C Studs @ 600 Centres
AREAS INDICATED ARE APPROXIMATE GROSS INTERNAL AREA. THEY RELATE TO THE LIKELY AREAS OF THE BUILDING AT THE CURRENT STAGE OF DESIGN. ANY DECISIONS MALE WC TO BE MADE ON4DX PLANT WC THE BASIS OF THESE PREDICTIONS, WHETHER AS TO PROJECT MALE WC OR THE LIKE, 4DX PLANT VIABILITY, PRE-LETTING, LEASE AGREEMENTS, WC SHOULD INCLUDE DUE ALLOWANCE FOR THE INCREASES AND DECREASES INHERENT IN THE DESIGN DEVELOPMENT AND BUILDING PROCESS.
90mm C Studs @ 600 Centres
MALE WC
GTEC 12.5mm dB Bo
WALL TYPE B - 310mm O/A WALL TYPE B - 310mm O/A
100mm Acoustic Insulation AUDITORIUM 09 149 SEATS
CONSTRUCTION ISSUE
MALE WC
GTEC 15mm dB Board by Siniat
90mm C Studs120 @ 600 1010
ALL DIMENSIONS ARE TO BE VERIFIED AND CHECKED ON SITE. ANY DISCREPANCIES THAT ARE, OR BECOME APPARENT SHOULD BE REPORTED TO CHAPMAN TAYLOR.
GTEC 12.5mm Weatherboard by GTEC 12.5mm dB Board by Siniat Siniat
AUDITORIUM 12 148 SEATS 12 AUDITORIUM 148 SEATS
GTEC 15mm dB Board by Siniat
AUDITORIUM 10 214 SEATS
AUDITORIUM 11 214 SEATS
THIS DRAWING MUST NOT BE SCALED. USE FIGURED DIMENSIONS
GTEC 12.5mm Weatherboard by Siniat
WALL TYPE C - 400mm O/A
Siniat
WALL TYPE C-2 - 825mm O/AAUDITORIUM 08 82 SEATS 08 AUDITORIUM 82 SEATS
NOTES
AUDITORIUM 02 62 SEATS 02 AUDITORIUM 62 SEATS WALL TYPE B - 310mm O/A
12.5mm GTEC Standa 12.5mm GTEC Standa Siniat Siniat 12.5mm GTEC Standa
4DX PLANT
WC
715
STORE
70mm C Studs @ 400mm Centres 12.5mm Standard Board by CASH MANAGER CTRL GTEC OFFICE ROOM Siniat AUDITORIUM 12 CASH CTRL MANAGER 12.5mm GTEC Standard Board by OFFICE ROOM 148 SEATS Siniat
AUDITORIUM MALE WC 07
98 SEATS 07 3AUDITORIUM 98 SEATS
70mm C Studs @ 40 Siniat
70mm StudsStanda @ 40 WALL TYPE C - 400mm12.5mm O/ACGTEC Siniat
STAFF ROOM
90mm C Studs @ 600 Centres
12.5mm GTEC Standard Board by Siniat 12.5mm GTEC Standard Board by Siniat
STORE WALL TYPE A - 120mm O/A
AUDITORIUM 01 306 SEATS 01 AUDITORIUM 306 SEATS
2
1
STORE
FFL +86.950
AUDITORIUM 01 306 SEATS STORE
GTEC 15mm dB Board by Siniat
AUDITORIUM 06 KEY PLAN
12.5mm GTEC Standa Siniat GTEC Standa 12.5mm 12.5mm GTEC Standa Siniat Siniat 12.5mm GTEC Standa
STORE
FFL +86.960
AUDITORIUM 05 137 SEATS 05 AUDITORIUM STORE WC STORE 137 SEATS STORE AUDITORIUM 04 AUDITORIUM 09 STORE RWP 107 SEATS 04 149 SEATS AUDITORIUM ACCESS 107 SEATS AUDITORIUM 10 214 SEATS
CHOC. STORE
WALL TYPE A - 120mm O/A WALL TYPE A - 120mm O/A
1562
AUDITORIUM 03 AUDITORIUM 11 03 140 SEATS 214AUDITORIUM SEATS 140 SEATS
90mm C Studs @ 600 Centres
FFL +87.760
100mm Acoustic Insulation
WALL TYPE P - 150mm O/A
Chapman Taylor WALL TYPE P - 150mm O/A
12.5mm GTEC Standard Board by Siniat 12.5mm GTEC Standard Board by
O/A WALL TYPE F - 120mm O/A
1:200 Scale Ba GTEC 15mm dB Boar
GTEC 15mm dB Boar
0
2
GTEC dB Insu Boar 25mm15mm Acoustic
25mmCAcoustic 90mm Studs @Insu 600
90mm Studs @ 600 25mm C Coreboard 25mm Coreboard
5-V
5-W 4145
5-U
5-T
500
5-S
3180
5-R
4120
5-Q
3000
4800
5-P 1600
N
NO
TH DIM
5-4
237 10
3281 0
195 10
STEPS BY TENANT
©
182 10
36860
AR TH CU TH VIA SH DE BU
5300
35410
135 .00 °
300
224 10
34110
FFL +87.760
135 .00 °
90.00°
249 00
263 10
1200
3021 0
3151 0
276 10
2891 0
AL AN SH
AUDITORIUM 01 306 SEATS
SCREEN BY TENANT
7353
5-6
120
16525 (O/A WIDTH - MIN. FINISHED)
300 300 300 450
1300
1300
1300
FFL +83.110
FFL +82.660
FFL +82.210
FFL +82.060
1300
300
1300
1300
5556 FFL +81.460
1300
FFL +81.910
1300 FFL +83.560
1300 FFL +84.010
FFL +85.360
1300 FFL +84.460
FFL +85.810
1300 FFL +84.910
1300
1000
1:21
9 8 7 6
5-8
7353
1300
23-504
4150
1450 FFL +86.260
23575
5-7
1 14105
24206 (O/A LENGTH - MIN. FINISHED) 1500
489
3650
1:21
5 4 3 2 1
150
PRO
1900
HANDRAIL BY TENANT 690
460
400
400
1
CLI
23-503
3290 300
200
1500
1800
150
100
4125
2360
FFL +81.610
REV 20810
FFL +86.950
1010
5-9
ARC
RAMP 1:21 7350
2250
RAMP 1:13 1950
1
1
23-502
23-505
DR
A P B
RIUM 01 - PLAN VIEW Opposite Page: Level 02 Plan - Auditoria Acoustic Wall Types with Wall Type Key Above: Auditorium 01 Plan Revit
JOB
1:50 Scale Bar 0
0.5
1
A19
2
5M
COM
C
5-W
5-V 4145
5-U
5-T
500
5-S
3180
5-R
4120
5-Q
3000
5-P
4800
1600
O BE DEVELOPED BY SPECIALIST SUBCONTRACTOR ARE TO BE DEVELOPED BY SPECIALIST SUBCONTRACTOR FER TO THE ACOUSTIC REPORT S CAVITY OF FLANK WALLS & INTO WEBS OF STEELS SEALED INTO WEBS OF STEELS E OF STADIA SEATING TO BE SFS STUD / BOX SECTIONS TO L FORCE OF 3.0kN/m AS PER PART K OF THE BUILDING REGULATIONS
5-J
598
90
80
25
+ 87.760 FFL
80
90
25
45 METAL ANGLE & MINERAL WOOL INSULATION
FFL +86.960
100
4
1
REFER TO DRAWINGS: CTL-05-99-23-504 CTL-05-99-23-558 CTL-05-99-23-559
FFL +84.010
T2
PROJECTION ROOM
52_004
INTUMESCENT ACOUSTIC SEALANT
Level 02 +81.250
AUDITORIUM
REFER TO DRAWINGS: CTL-05-99-23-507 CTL-05-99-23-510 CAPPING BY TENANT CTL-05-99-23-512 CTL-05-99-23-515 CTL-05-99-23-517 CTL-05-99-23-520 FFL +81.610
+ 86.960 FFL
TIMBER SUPPORT TO ARUP DETAIL
RAMP 1:21 7350
3
METAL ANGLE & MINERAL WOOL INSULATION
RAMP 1:13 1950
2250
2
25-586
25-585 90
25
400 -THE ACOUSTIC FLOOR IS TO BE DEVELOPED BY SPECIALIST SUBCONTRACTOR -THE RAMPS WALL AND LANDINGS ARE TO BE DEVELOPED BY SPECIALIST SUBCONTRACTOR -FOR ACOUSTIC RATINGS REFER TO THE ACOUSTIC REPORT TYPE C -CONTINUE BOARDS ACROSS CAVITY OF FLANK WALLS & INTO WEBS OF STEELS -ALL BOARDS TO BE CUT & SEALED INTO WEBS OF STEELS -SECONDARY STEEL TO EDGE OF STADIA SEATING TO BE SFS STUD / BOX SECTIONS TO WITHSTAND A HORIZONTAL FORCE OF 3.0kN/m AS PER PART K OF THE BUILDING REGULATIONS
DETAIL 2 SSL Varies
DEFLECTION HEAD 159
90
170
90
25
+ BOH 87.760 FFL
25
WALL PROJECTION ROOM TYPE B
90
80
90
+ 87.750 SSL
80
90
25
25
INSULATION
275
25
90
SPLIT JOINT
METAL ANGLE TO SINIAT DETAIL WALL TYPE D METAL ANGLE & MINERAL WOOL INSULATION
275 280
90
45
SPLIT JOINT AUDITORIUM
SPLIT JOINT
METAL ANGLE TO SINIAT DETAIL
PROJECTION ROOM
100
100 100
AUDITORIUM
METAL ANGLE &
+ MINERAL 87.760 FFL BOH WOOL+ 87.750 SSL
550 159
45
WALL TYPE B
'RAFT' TAPE 2X50mm STRIPS SIDE BY SIDE AUDITORIUM SIDE TIMBER SUPPORT TO ARUP DETAIL INTUMESCENT ACOUSTIC SEALANT
105 310
METAL ANGLE & MINERAL WOOL INSULATION
310 METAL ANGLE & INTUMESCENT MINERAL WOOL ACOUSTIC INSULATION SEALANT
400
AUDITORIUM
25
DEFLECTION HEAD
DEFLECTION HEAD
AUDITORIUM
DETAIL 1 13 DETAIL 4 DETAIL REFER TO DRAWINGS: 4 CTL-05-99-23-504 REFER TO DRAWINGS: REFER TO DRAWINGS: CTL-05-99-23-558 CTL-05-99-23-504 CTL-05-99-23-503 CTL-05-99-23-559 CTL-05-99-23-534 CTL-05-99-23-539 CTL-05-99-23-558 AUDITORIUM CTL-05-99-23-559
5 PROJECTION ROOM
DETAIL 4 45 6 DETAIL DETAIL REFER TO DRAWINGS: 6 CTL-05-99-23-504 REFER TO DRAWINGS: REFER CTL-05-99-23-507 TO DRAWINGS: CTL-05-99-23-504 CTL-05-99-23-510 CTL-05-99-23-512 CTL-05-99-23-515 CTL-05-99-23-517 CTL-05-99-23-520
5-J
5-
8 7PROJECTION ROOM
SSL Varies
N
'RAFT' TAPE 2X50mm STRIPS SIDE BY SIDE AUDITORIUM SIDE
INTUMESCENT ACOUSTIC SEALANT 1. This drawing must not be scaled. Use figured dimensions. 2. All dimensions areMETAL to be verified and + site. 86.960 FFL ANGLE & checked on + 86.950 SSL 3. All assembly andMINERAL fixing details WOOLas shown on this drawing are INSULATION indicative and for design intent only. 4. These details are not to be taken as a final solution, and the 550 TIMBER SUPPORT Contractor is to develop appropriate fixing and support framing TO ARUP DETAIL details to suit the design intent and the interfaces with other building elements and services. 275
NOTE:125
SPLIT JOINT
45
DEFLECTION HEAD
90
280
90
METAL ANGLE 550 TO SINIAT DETAIL
SPLIT JOINT BULK HEAD
90
METAL ANGLE & MINERAL280 WOOL INSULATION
45
DEFLECTION HEAD
AUDITORIUM
TO SINIAT BOH DETAIL AUDITORIUM
7
275 90
WALL TYPE D
45
DETAIL67
1:50 0
SPLIT JOINT
WALL TYPE D
BOH
DEFLECTION DEFLECTION HEAD HEAD
METAL ANGLE & MINERAL WOOL INSULATION
275 SPLIT JOINT275 CONSTRUCTION ISSUEDEFLECTION HEAD 45
METAL ANGLE
AUDITORIUM
BOH
4
FRL Varies
90
25
90
INTUMESCENT ACOUSTIC SEALANT
5-W
100
'FARRATT' TAPE 60 FFL AUDITORIUM SIDE
25
80
WALL TYPE B
'RAFT' TAPE 2X50mm STRIPS SIDE BY SIDE AUDITORIUM SIDE
90 ANGLE 80 & 90 METAL MINERAL WOOL 25 25 INSULATION
WALL TYPE B
90
179
PROJECTION ROOM 310
AUDITORIUM
310
INTUMESCENT ACOUSTIC SEALANT
3
5
5-N
5-K
+ 86.250 SSL + 86.260 FFL SSL Varies
REFER TO DRAWINGS: CTL-05-99-23-503 WALL TYPE B
5-J
'RAFT' TAPE 2X50mm STRIPS SIDE BY SIDE AUDITORIUM SIDE
FRL Varies
2
1 6
AUDITORIUM 5-W
KEY PLAN
5-W
1 : 50
100
170
100
90
AUDITORIUM 01 - LEFT WALL ELEVATION
100
25
3
DEFLECTION HEAD
DETAIL 6
6
REFER TO DRAWINGS: CTL-05-99-23-504 2300 (MIN. CLEAR)
25-594
DETAIL 4
450
25-594
BULK HEAD
AUDITORIUM
800
450
1
DETAIL 1
AUDITORIUM
50 SSL
SPLIT JOINT
AUDITORIUM 01 306 SEATS
BOH
FFL +84.460
WALL TYPE D
45
SCREEN BY TENANT
DEFLECTION HEAD
DEFLECTION HEAD
450
FFL +85.810
FFL +84.910
2
90
METAL ANGLE TO SINIAT DETAIL
SPLIT JOINT
450
PROJECTION ROOM
FFL +85.360
1
275 280
SPLIT JOINT
AUDITORIUM
450
AUDITORIUM
DEFLECTION GENERAL NOTES HEAD
90
100
Level 03 +86.950
+ 86.950 SSL
692 275
FFL +86.260
1
550
159
310 WALL TYPE B
METAL ANGLE & MINERAL WOOL INSULATION
100
90
METAL ANGLE & MINERAL WOOL INSULATION
+ 87.750 SSL
1100
25
452
INTUMESCENT ACOUSTIC SEALANT
90
25
ACCESS BOX
598
'RAFT' TAPE 2X50mm STRIPS SIDE BY SIDE AUDITORIUM SIDE
CEILING BY TENANT310
METAL ANGLE & MINERAL WOOL INSULATION
DEFLECTION HEAD
SSL Varies
PROJECTION ROOM WALL TYPE B
FCL +91.960
748
Level 04 +90.820
FRL Varies
598 988
1440
Varies
798
642
5-W Mass Barrier Ceiling 3 x 15mm acoustic grade plasterboard (12kg/m²) on resiliant hangers, 100mm mineral wool insulation over
5-K
DETAIL 6
REFER TO DRAWINGS: CTL-05-99-23-507 REFER TO DRAWINGS: CTL-05-99-23-510 CTL-05-99-23-507 CTL-05-99-23-512 CTL-05-99-23-510 CTL-05-99-23-515 CTL-05-99-23-552 CTL-05-99-23-517 CTL-05-99-23-555 CTL-05-99-23-520
BULK HEAD DEFLECTION HEAD
AUDITORIUM
NOTES THIS DRAWING MUST NOT BE SCALED. USE FIGURED DIMENSIONS ALL DIMENSIONS ARE TO BE VERIFIED AND CHECKED ON SITE. ANY DISCREPANCIES THAT ARE, OR BECOME APPARENT SHOULD BE REPORTED TO CHAPMAN TAYLOR. AREAS INDICATED ARE APPROXIMATE GROSS INTERNAL AREA. THEY RELATE TO THE LIKELY AREAS OF THE BUILDING AT THE CURRENT STAGE OF DESIGN. ANY DECISIONS TO BE MADE ON 5-9OF THESE PREDICTIONS, WHETHER AS TO PROJECT THE BASIS VIABILITY, PRE-LETTING, LEASE AGREEMENTS, OR THE LIKE, SHOULD INCLUDE DUE ALLOWANCE FOR4125 THE INCREASES AND DECREASES INHERENT IN THE DESIGN DEVELOPMENT AND BUILDING PROCESS.
5-8
5-7
5-6
4150
5-5
3650
3550
5-4 1750
4
25-585
© COPYRIGHT CHAPMAN TAYLOR 2016
CONSTRUCTION ISSUE
KEY PLAN
UPSTAND LOCATION AS AGREED ON SITE, MACE / ARUP
2
1 6
FCL +91.960
3
25-588
200 25
WALL TYPE B
+ 86.950 SSL
90
80
25
90
1300 800
FFL +86.960
Level 03 +86.950
BOH
90
80
90
NOTE: 1. This drawing must not be scaled. Use figured dimensions. 2. All dimensions are to be verified and checked on site. 3. All assembly and fixing details as shown on this drawing are indicative and for design intent only. 4. These details are not to be taken as a final solution, and the Contractor is to develop appropriate fixing and support framing details to suit the design intent and the interfaces with other building elements and services.
AUDITORIUM 01 306 SEATS
AUDITORIUM
LIFT SHAFT
WALL TYPE B
16525 (O/A WIDTH - MIN FINISHED)
FFL +86.260
METAL ANGLE TO SINIAT DETAIL
CONSTRUCTION ISSUE
STEPS BY TENANT
ACOUSTIC SEALANT
25-586
METAL ANGLE 25-585 TO SINIAT DETAIL
1800
SLIP JOINT DEFLECTION HEAD
310
ENTRANCE DOORS BY TENANT
H9.v
H2
52_021
52_007
FFL +84.910
METAL ANGLE TO SINIAT DETAIL
FFL +84.460
SLIP JOINT
FFL
DEFLECTION +84.010 HEAD
DEFLECTION HEAD
DEFLECTION HEAD
310
FFL +83.560
6 5
30.08.16 16.08.16
4 3 2 1
14.12.15 28.09.15 20.07.15 28.05.15
4
150
150 450 450 450 450 450 450 450 450
FFL +85.360
1
KF KB
Detail callouts amended AH +83.110 LEF Detail callouts added.FFL Amendments made as per Siniat details & following 1500 150 acoustic review. FFL +82.660 LEF KB Balustrade & wall lining updated JRL Cinema Pack LEF KB Auditoria layouts amended FFLLEF +82.210 SCM Ramps amended LEF
DETAIL 4
5
REFER TO DRAWINGS: FFL +81.910 INT'L DESCRIPTION CHK HANDRAILREV DATE CTL-05-99-23-559 FFL +81.610 BY TENANT PROJECT CTL-05-99-23-558 FFL +81.460
DETAIL 5 REFER TO DRAWINGS: CTL-05-99-23-556
150150
FFL +85.810 INTUMESCENT
2
100
100
SECONDARY STEEL TO ARUP DETAIL 1150
FFL +87.760
AUDITORIUM
AUDITORIUM
25 25 CEILING BY TENANT
+ 86.950 SSL
AFFL
H9.v
53_015
8 7
N
110
600
EQ EQ
ACCESS BOX
TIMBER SUPPORT TO ARUP DETAIL
DEFLECTION HEAD
600 300 450 EQ EQ
600
25-585 105
SLIP JOINT
200
25-582
7353
3
84
2
INTUMESCENT ACOUSTIC SEALANT
110
'RAFT' TAPE 2X50mm STRIPS SIDE BY SIDE AUDITORIUM SIDE
100
25
4
5-S
BOH
'RAFT' TAPE 2X50mm STRIPS SIDE BY SIDE AUDITORIUM SIDE
AFFL
90
5-S
Level 04 +90.820
5
Mass Barrier Ceiling 3 x 15mm acoustic grade plasterboard (12kg/m²) on resiliant hangers, 50mm mineral wool insulation over
3
Level 02 +81.250 BY TENNANT
2
5-585
2
5
100x50mm SW TIMBER SUBFRAME
CLIENT
25-585
25-585
155 Moorgate London EC2M 6XB Tel +44 (0)20 3522 3000
AUDITORIUM 01 - BACK Chapman WALL ELEVATION Taylor
1060 OF STEP
ARCHITECT
℄
BY TENNANT
1 : 50
Chapman Taylor LLP International Architects Masterplanners Designers 10 Eastbourne Terrace London W2 6LG Tel +44 (0)207 371 3000 Fax +44 (0)207 371 1949
STRUCTURAL FRAME TO ARUP DETAIL
FROM
1
AUDITORIUM SEATING
www.macegroup.com
5-M
100x50mm SW TIMBER SUBFRAME
WALL TYPE P
DRAWING TITLE
FOH
'RAFT' TAPE 2X50mm STRIPS SIDE BY SIDE JOB NUMBER
1:50 Scale Bar 0
0.5
1
2
35
275
INTUMESCENT ACOUSTIC SEALANT
5M
A199/BRCR
DRAWN BY
1 : 50 @A1
SCM
+ 86.960 FFL
CTL
90
05
LEVEL
CATEGORY
90
KB
22.08.16
KF
00
22.08.16
KF
REV DATE
VOMITORY WALL STRUCTURE AMENDED TO SUIT TENANT REQUIREMENTS VOMITORY WALL STRUCTURE AMENDED AND NEW DETAIL ADDED FIRST ISSUE
IN'L
DESCRIPTION
AH AH AH
CHK
PROJECT
99 23
Clockwise:
28.04.2015 INTUMESCENT ACOUSTIC SEALANT DRAWING NO.
REVISION.
503
06
1:50 Scale Bar
Auditorium 01 Long Section through Entrance 0 0.5 BOH
80
AUDITORIUM ENTRANCE RAMP
12.09.16
01
TYPE P FIRST ISSUE
150
25
+ 83.160 FFL
02
WALL
SCALE.
COMPANY CODE BUILDING ZONE
WALL TYPE B
+ 83.150 SSL
760
AUDITORIUM 01 - (3 OF 5) LEFT WALL ELEVATION BLOCK AUDITORIUM 05
'FARRATT' TAPE AUDITORIUM SIDE
STRUCTURAL FRAME TO ARUP DETAIL
25
310
Auditorium 01 Short Section towards Rear Wall CLIENT
Vomitory Wall Detail 155 Moorgate London EC2M 6XB
Wall / Slab Detail
Tel +44 (0)20 3522 3000
+ 81.250 SSL
INTUMESCENT ACOUSTIC SEALANT
www.macegroup.com
Wall Head / Structure Detail ARCHITECT
DEFLECTION HEAD WALL TYPE B
25
90
80 310
90
25
Wall Head / Roof Detail 10 Eastbourne Terrace London W2 6LG t +44 (0)20 7371 3000 f +44 (0)20 7371 1949
www.chapmantaylor.com DRAWING TITLE
DETAIL 6
BLOCK 05 CINEMA PARTITION DETAILS
Revit
1
2
28
0 23
30 20 00 18
ie
m m m : te 70 m no 1 50 ir @ 3 sta ers s @ ris ead tr
5 34
3
75 53 00 48
d re ve le nti ca e of ov e ab lin b sla
4 5 10 15 DP RW ith ls Ø w ne 0 ct pa 10 Du ss in cce a
ed be firm on to con ucti tr ps d te n ns f s e a co r o sit re be n fo m d o be nu ine ect up it al up fin termarch ps de ith ste 1 w 2
0 46
00 30
by
ol
t lis ia ec sp
po
70 12
ow all sh
s ga
d en
ai bra
00 12
5 34
11
5 W 3
00 18
. s .C tile T.O,850 -0
5 34
s ll tile fa & in ed a m re sc id to la
0 23
5 w
e lin
5 34
s ga
ie
e lin
s ga
ve
d
W 2
un
D
e
2
D
21
riu
at
m
re atu list r fe ia te ec wa sp by
00
48
am
be de sli
70
41
@
m
W 1
ni
ht
D 4
ng
s
ga
D
e lin
. s .C 0 tile T.O,51 -0
di
m
05
28
ily
. .C 0 T.O,68 -0
m
s
tile
fa
0
23
13
an
0
23
0
53
om
0
23
ga
5
11
3
ud
ch
2
00
D
0
60
70
27
11 D 11
e
11
of
rc
3
0
23
e
dg
bri
ab
r
sh
fire
ll
wa
e
or
s
tile
st lid so in r m oo 30 re d fi
ll
ha
5
11
5
11
ry 85
36
wn
do
er
0
23
ath
we
11
D 11
k
sin
y
lle
W
00
5
b
wh
e
or
6
. .C 0 s tile T.O,17 0
W
15 11 rit be ge wc
0
D
ll
wa
18
fire
s
tile
0
23
le
W 7
ed e as ir ch g w dp sin r rw u ste Ø all pla 75 to w & in esh m
ge
ra
ga
C
0
23
30
12
ll or fa do 1% ed tt to sla id y la ll or nta Flo zo ri ho al on cti l se ve d le ate or m flo to ge au ra ht m ga iu m ht in m to m m 25 up alu 21 65m p m ra l @ 24 l@ rc rc
ed e as ir ch g w dp sin r rw u ste d Ø all pla re 75 to w & ve le in esh nti m ca e of ov e ab lin b sla
. .C 0 T.O,17 0
ub
do
23
00
20
0
23
0
23
g g in ilin elv eta sh d d ery an in s jo ns rd st tio oa iali ica pb ec cif cu sp spe 0 to and
23
r
nte
pla
15
11
0
42
19
A
rs
ve
pa
dr
23
0
00
y
C
ed e as ir ch g w dp sin r rw u ste Ø all pla 75 to w & in esh m
58
wa
ive
ed e as ir ch g w dp sin r rw u ste Ø all pla 75 to w & in esh m
70
17
h d wit roa le d bb de co ed ge mb g villa k e vin et roc pa as p am fr m in du e be a dg e
70
17
00
60
B
0
23
1 R
E
b ce r & in t p ic y f cla hitec una val o pecif f an eer ne settin reof sett not the a Dis arc lt of pro all s ng o engin thing the s the rrect may d to p f ti t e u th res d a ce. wri ith very g o es inco lien orte a ne en in d w & e kin ectn m r/c rep sig mm ed rme ce hec orr fro cto ot co rm fi n . c r c se tra rs n n ta fo in co sis ked ity fo y ari con rro be as ec ibil ma the r e all ch ns at m. s o be spo s th su ncie re ork act pe w ntr cre co dis of
60
64
30
st 0
23
70
17 80
11
5
11
00
10 ed
ap
sc
nd
la
5
11
12
10 5 30
02
23
00
10
70
00 11
re
5
11
23
wn VP O ith ls Ø w ne 0 ct pa 10 Du ss in cce a
ie
60
39
40
20
wn
do
wc
p
ste
0 gu
60
21
do p 52
0
wh
0
23
40
25
D 1
5
11
15 11 D
k
sin
ie
85
36
5
5
0
23
10
0
23
D
e
t/d
p
ste
15
51
11
23
0
le
ul
D
m
12
0m
17
35
30
90
26
5
23 . s .C 0 tile T.O,51 -0
sc
w/m
fr
nc
tra
en
fr
. s .C 0 tile T.O,00 0
e
lin
d/w
s
ga
15 51 5 11
11
0
23
34
11
00
10
lls wa er e ow b led d sh r to a fe e oo se roo Sid nd fl ctly terp a rre wa co nd a
2
lin
00 12 te re g nc in s co ord il st cc eta ca a d u se rs sit a ee irc gin m m m : sta en te 70 m to no 1 80 ir @ 2 sta ers s @ ris ead tr e ov
in
up
1
D
es
elv
65
16
35
14
ge s ra ote sto d n n ttle a bo il s eta ga e d se
0
23
75
y
1
up
s ga xtr e
m m m : te 70 m no 1 00 ir @ 3 sta ers s @ ris ead tr
e lin
sh
ut yo l la ica ctr s ele tail g, in s en de ch st 00 tail ard kit iali 48 de bo al ec ut up s fin sp yo c il la nd deta to en a st ch ters li e kit un ecia ov co sp ve ab to stoctor a
s
n
la
h d wit roa le d bb de co ed ge mb g villa k e vin et roc pa as p am fr m in du e be a dg e
ga
en
p/b
30
. s .C 0 T.O,00 0
tile
st
5
11
00
12
s
tile
kit
g g in in tail elv e sh y d d r e an in s s jo on rd st ati oa iali ific ce pb ec ec cu sp sp pla to nd fire s a
ro
0
p or flo nd :50 ou 1 gr ale sc
p at ee ge w ar gh d ll ch rou r an wa dis th nb ons ry to ls ti da ter rva g toica in if wa inte rd ec rm lar cco sp sto gu s a ers re ole ine h ng
D
3
e ov ab h hig 00 1m and 04 il @ rs s NS ra ste d SA nd alu l ro ith ha b tee el s/s g s ils ly w ste ith in ta mp ss w nn de co le el ru t in lev tal lis s to sta oor on ecia de 60 fl oriz sp stra 01 h to lu 1 all ll ba NS a SA &
ge
5 34
un
s tile
tio
lo
pa
0 23
s ll tile fa & in ed a m re sc id to la
30 12
bo
2
10
60 0
VP O ith els Ø w n 0 ct pa 10 Du ss in cce a
ce pla fire
re
ed e as ir ch g w dp sin r rw u ste Ø all pla 75 to w & in esh m
. s .C 0 tile T.O,68 -0
co
40 35
ge & en ra lab rd sto w s ga tes ttle elo om no bo d b le fr nd s a ga cate ssibtail lo cce de a ee s
s ga
0 el d ste te e m t in am 0m os pa fr 10 l p ec., ow x d 0 tura sp in d 10 truc ng. h w re s e atc ve le to m nti to ca e of ov e ab lin b sla
re
1
14 23
34
0 23 00
00 24
58
10 hig
ll
70 de
ste 23
0
0 23
0
wa
37 sli 00
5
w tile
00
23 32
60 0
11 do in ve
lw s
tile
g
le
5 11
ue s
p 0 23
h
12
23 2 l@
c
0
15
0
fire 23 ht m
wn
26
ht
m
ste
do
p
10
77
32
m 00
m m 65 24 l@ rc 27
rc
w st b wh
0
0m
00 10 23
17 11
5
5 46
ry 0
0
00
66 de
t an 23
23
10
23 sli
0 23 30
0 0
25 2 0
0 0
12 48
30 0
28 28 p
56 m
ld
30 0
34
14 0
28 28 0
28 28 28 80
28 0 ld
18 37 m
ht m
62 wn
fo be to lls d a es w un ro pip m l g fro e g e ve bin ay bov th le s to m w rt a a ard g ing ve plu m in nd bin ord ns all 0m m sta 90 plum acc tio 0m tion la bs 0 45 nec all e gu sa 1:4 b to r re unm con e to of nb ip fall im er in w il p . m se so min to 0Ø a 10 id to la
de
05
5 ie
be sli
wn p
28 @ am
do ste m 0m 17
er rv seoom r 0
23
43 0
12 do ste 0m 17 30 02 23
82
46 0
fo 70 43
23
@ am 00
10 15
87
5
55 25
17
48 p d m e pu firm ol on t po c lis d be ia se to ec po ion l sp pro sit poo po ith
75 29
5 34
73
23 be 12
m m 01
ad be lo to m e fro pip ted c RW te pro
0
0 47
90
34 on cti rm ne sp nfi on st co er c dju a r to w d to se an ac of e ly m ntr ion sit ing co sit on ord fro n po int cc ay tio aw ec po e a m onn lin 1,5 r c re we se
B
0
d en
23
0 23
on cti rm ne sp nfi on st co er c dju a r to w d to se an ac of e ly m ntr ion sit ing co sit on ord fro n po int cc ay tio aw ec po e a m onn lin 1,5 r c re we se
0 24
00 28 70
30 00
15 69 43
5 70
ht 23
23 0 46
30 02 7
23 47 37
be to alls d es w un pip m gro l g fro e e ve bin ay bov th le s to m aw rt a g ard g ve plu m in in nd bin ord ns all 0m m sta 90 plum acc tio 0m tion la bs 0 45 nec all be gu sa :4 to r re unm con e to of 1 nb ip fall im er in w il p . m se so min to 0Ø a 10 id to la
ep de
A
30 48
34 12
02 23 10
77
0
23
0
5 34
92
5
V
13
4
A
01
.2
.6 D
T
E
la
ra
n
h
d
k
o
ic
o
n
a
p
ie
r
9 9 1 N n 4 io 2 IO 0 iss T 9 a 2 bm 2 IP 6 8 .z su R 4 0 o C cil 7 S 6 .c un r E 6 co 2 D ie 3 3 p a 5 8 . a 1 0 .z .A n x o d g .I.B c o a o r. .R b h ie .I.A 9 te p M 01 a @ a a h. 7 v n rc o a r d ri N l o p B.A eg. il. 7 a 17 h o R 9 1 06 @ 6 e-m e 02 ST c k it 2 No n i u s on 26 g. il. t t Re a 7 e s 1 e-m o n a n 0 1 p ry 6 b 6 8 0 x. Fa
P
R
O
J
E
C
T
A
IN
G
A
W
d
IN
n ou
W
gr
R
R
N
O
flo
G
A
02 D
T
J
O
B
N
O
S
A
L
E
.1
4
50
1:
05
2.
C
.2
IL W
14
5.
.0
22
E
r fo e 4 us 31 ho F w ne si f ER ed ko o 24 os N n 1 xt. op n io E pr lso rt n o i W n P dow an o an pl S or
D
D
ilW
R
E
V
1
ORCHID CENTRE didcot, england // 2014 - 2017
With a vision to expand and develop the existing Orchard Centre, Hammerson PLC (the client), in collaboration with the District Council, hope to give a greater sense of identity to Didcot by means of creating a town centre. A key element of the design is the longterm desire to create a ‘plaza’ at the heart of the future Didcot town centre, surrounded by mixed-use facilities. This has informed the decision to extend the existing pedestrianised Orchard Street in an easterly direction to the limit of the site and then northwards in order to enclose the area currently occupied by a Sainsbury’s car park. To ensure commercial viability an anchor store (M&S) is located at the northern extremity, terminating the pedes trianised street; a route flanked by retail units and restaurants. Footfall and visibility are maximised by the provi sion of a number of pedestrian links into the centre, strategically located to deliver the public into the main public spaces ensuring that these spaces are well used and passively secured. The proposed scheme satisfied the requirement of all investors and was granted planning permission by the Council. RIBA work stage: 2 Cost: £60m
Opposite Page: Site Plan Aerial & pedestrian view CGIs Top to Bottom: Block Elevation Perimeter Section & Elevation Material palette Long Elevation Revit & Photoshop
T1 aerial view prior to demolition staff travel distance
demolition plan
HEATHROW AIRPORT TERMINAL 1
london, england // 2014 - 2015 Chapman Taylor were appointed with the task of designing, co-ordinating and implementing the closure and demolition phasing strategy of the Heathrow Terminal 1 MSCP, piers & various linkages. This is in preparation for the continued expansion and improvement of Heathrow Airport.
hoUSe 01 poortview, jhb 2014 - 2016 + + + + + + + + + +
client brief conceptual design & feasibility Design development technical documentation council submission technical detailing tender documentation contractor appointment On-going project management Snagging
Area: 430m2 RIBA work stages: 1-5 Cost: Unknown
0
46 7
37
0
23 47
01
23
1 2
10
la
p or flo nd :50 ou 1 gr ale sc
above: conceptual sketches right: Ground Floor Design Plan AutoCAD to Photoshop Opposite page: council submission: West elevation, Short Section & Ground Floor Plan AutoCAD Photographs: View towards the entrance View towards the North elevation
grill or ceramic tiles on durbigum (sp4) waterproofing to specialist details, on 50mm screed to falls to downpipe on 170 and/or 255mm concrete slab to engineers details. design & specifications downpipes to be chased into walls & plastered using wire mesh & plaster at a min size of 75Ø
sible height
ximum permis
8,5 meters ma
Corobrik NFX sealed with silicone spray mild steel handrail @ 1m high above floor level with mild steel balusters and horizontal running steel cables all to specialist details all balustrades to comply with SANS 0400 & SANS 10160
"silver-blue" chromadek cliplok roofing fixed to "alumaz" system on slatex waterproof membrane on 50 x 75mm purlins @ 900mm centres on roof trusses to engineers detail @ 1400mm centres. roof pitch @ 37°
t.o. chimney 7,225
50 x 75mm 'Jarrah' timber slats or similarly approved by architect @ 190mm centres
aluminium vent aluminium vent u/s RC lintel u/s RC lintel 5,185 5,015
u/s RC lintel 5,185
re
west elevation scale 1:100
37°
85mm smoothtimber internal doors polished insitu
dpc
concrete foundation to be founded on supportable soil with min. size to be 750mm x 250mm final details, depth and spec. to be determined & confirmed by engineer
paving
on supportable soil with min. size to be 750mm x 250mm final details, depth and spec. to be determined & confirmed by engineer
228 x 52 profiled rafters to engineers detail
internal wall finish to be 1x smooth plaster coat & paint finish
450 fridge
polished concrete shelving to specialist joinery detailing and specifications
400
4270 gas stove with extractor fan over
line
W 2
line of cantilevered roof slab above to eng. detail
up
170mm step
stair note: risers @ 170mm
sump
all storm water to be directed away from house as indicated on engineers storm water drawing
1200
D 1 425
230
650
lintel above
230mm fire wall
@ 2465mm ht
door
re
ie
3170
230
230
down
115
W 6 ng
ie
3655
7910
1200
3700
3775 230 750
lintel @ 2465 high
side shower walls and floor to be correctly sealed and waterproofed
Disclaimer:
115
115
115
4840
the architect will not be held responsible for any discrepancies which may arise as a result of unapproved plans by local authority and owner. please note that the signed approval of this plan by owner must be obtained before construction can commence. all specifications by developer overides plans. the architect must be informed in writing of any changes to these plans. sewer and water connection to be confirmed with engineer before building commences the contractor shall provide all assistance & everything necessary to enable the accuracy of the setting out to be checked. checking of the setting out shall not relieve the contractor of his responsibility for correctness thereof & the contractor shall rectify any errors in the works that may arise from incorrect setting out without any adjustment to the contract sum. the contractor/client may not claim against the architect as a result of discrepencies or errors not reported to the architect before construction
bath
walk in shower
en-suite
5
D 9
tile
ie gibret wc
W 15
all storm water to be directed away from house as indicated on engineers storm water drawing
retaining wall to eng. details and specifications
W 12
vanity
100 Ø OVP in Duct with access panels
retaining wall ie
230
1200
5070
115
3885
230
5775
600
700
retaining wall to eng. details and specifications
DATE
x DESCRIPTION
retaining wall
to be all storm water from house directed away engineers on as indicated drawing storm water
hood
nick
napier
0832667462 Reg. No ST 0617 e-mail. n i c k @ h o o d n a p i e r . c o . z a ponet suite 697 private bag x153 bryanston 2021 Fax.
all plumbing above ground to be according to the nbr regulations
stove
lara
0866101726
PROJECT
proposed new house for Nigel & Sheridan Bothwell on erf 198 Sugarbush Gardens Estate Poortview Ext. 22
ie
minimunm 450mm invert level to sewer connection 100Ø soil pipe to sabs standards laid to a min. fall of 1:40
DRAWING
ground floor plan 230
DRAWING NO
3850
115
re
A
x
REV
C
10310
15886
1
B.Arch. M.I.A. R.I.B.A. 0829024199 Reg. No 7019 e-mail. l a r a @ h o o d n a p i e r . c o . z a
W 7
counter @ 900 ffl high above
line of roof overha
1830
230
all plumbing pipes to be 900mm away from walls
gulley
D 11
Water reticulation:
D 5
indigenously landscaped garden
D 11
sink
115
970
100 Ø OVP in Duct with access panels
high
trelli door by specialist
3885
10845
staff room
1,105
345
4060
230
4
RC cantilevered staircase to project through exterior wall surface according to engineers details
smooth concrete detail
all storm water to be directed away from house as indicated on engineers storm water drawing
1,105
high lintel @ 2125
horizontally slatted ted sectional
@ 2465mm ht lintel above @ 2125mm ht lintel above
ation and specific ers details sump to engine
aluminium automa
1515
3600
W 20
D 2
whb
w/t
sump to engineers details and specification
tile
weather step
W 4
vanity
230
1400
D 11
silicon sealed corner joint
cupboards and shelving to specialist joinery detailing and specifications
b.i.c
seat @ 400 high 115
All hot water circulation pipes, and all externally exposed pipes to be insulated along their entire length with 25mm canvas wrapped fibre insulation and sealed with sealer paint. All externally exposed pipes to be covered in weatherproof GMS jacket.
3660
230
230
W 5
230
230
600
905
600
800
600
230 370 230
W 5 self closing & self locking gate by speciliast
30min solid fire door
lintel @ 2125
wc
100 Ø OVP in Duct with access panels
2
85mm step down
shower
3
6460
3605
1,020
line of RC roof slab above
970
tile
230mm fire wall
up 3
workshop D 14
side shower walls and floor to be correctly sealed and waterproofed
line of roof overhang
230
920
stair note: 1 risers @ 170mm treads @ 280mm
1200
built-in seat
guest wc
0,510
D 5
230
All electrical work to be done by licenced electrician and all work and to be carried out according to SABS standards. Contractor to ensure a 3 phase supply & adequate circuit breakers provided. Electrician to provide compliance certificate.
230
1% fall Floor laid to
3005
2700
7060
6460
6000
1,020
b.i.c
D 3
6000
tile
1315
planter
high level window
niche
1
1:50
Electrical notes:
b.i.c
lintel @ 2465 high slide
3
drain, provide such with purpose made marked cover plates at finished ground level. All sanitary fittings to be provided with 65mm reseal traps and air valve (AV). SCALE provide 50 Ø anti siphon pipe where vertical drop exceeds 1200mm. Drains shall have minimum fall 1:60 or maximum fall 1:5. Where drains pass under building, provide adequate protection to ensure no load is transferred to drain from building. Drains must have straight runs where passing beneath buildings. Pipes to have re's at either end. All ie & re,s to be accessible. To all wash hand basins & vanity basins provide 32 Ømm waste pipes. To all sinks, baths, showers, laundry trough and urinals provide 38Ømm waste pipes. To all wc's provide 100 Ømm waste pipes. all vents shall finish 900mm minimum above any roof finish. provide overflow gully at lowest point of drainage system include gully to pool if at lowest point.
13.04.14
b.i.c
2
115
W 13
carpet
1
2
fold
high
gibret wc
30min solid fire door
fridge
ledge 1200mm
double volume
W 8
1650
115
up
engineered timber
RC cantilevered staircase according to engineers details
1
@ 450mm high retaining wall to eng. details ations and specific
1% fall
double garage
2085
stair note: risers @ 170mm treads @ 280mm up 1
425 3460
study
drawers
2110
535
230
230 Floor laid to
D 13
D 7B
4725
DATE
dresser
stair note: risers @ 170mm treads @ 300mm up
0,000
W 1
0,340
230
D 5
desk and shelving to specialist joinery detailing and specifications
beam @ 2465mm high
weather step down 8535 16330
entrance hall
F.F.L 0,170
W 11
230
2
polished concrete
345
230
230
115
800
planter
700
W 9
1 D 15
facebrick g wall finish to retainin
230
6000
4410 drainage pipe under building to be protected from load
600
2750
down
insitu cast concrete floor with movement joints
5045
1
1570
fridge
slide
6575
345
230 2440 stair note: risers @ 170mm up treads @ 400mm
cupboards and shelving to specialist joinery detailing and specifications
outlet
5250
230 350
W 10
Drainage - SANS 10400-P
R Eto V all bends, Provide inspection eyes (ie) at all junctions and rodding eyes (re)
Bot-04 changes in direction and ramps. Provide ie at every 24 meters along straight run of bot-13.04.14
ie
B
gas
-0,510
sump to engineers details and specification
shelves
13270
details. design & specifications downpipes to be chased into walls & plastered using wire mesh & plaster at a min size of 75Ø DRAWING NO JOB NO
b.i.c
230
pantry
engineered timber exposed trusses above
Rafters & trusses to be tied down with galvanized hoop iron threaded through four courses of brickwork. Parapet walls to min of 300mm above roof level. Provide all
grill or ceramic tiles on durbigum (sp4) waterproofing to specialist details, on 50mm sections screed to falls to downpipe on 170 and/or 255mm concrete slab to engineers
100 Ø OVP in Duct with access panels
thickened plaster 'shadow line'
morso fireplace
suspended ceiling above kitchen island by specialist to later detail
5000
ng
3700
p/b
kitchen
1:100
flashings and counter flashings at changes in roof levels. Abutments D Rrequired AWING between roof and parapet walls, chimneys, roof valleys & ridges. Provide approved insulation over all ceilings. Flat rooves to have 50mm chip stone on raised mesh
W 14
cupboards and shelving to specialist joinery detailing and specifications
outlet
exposed trusses above
napier
Poortview Ext.10400 22 - L Roof notes - SANS
700
all storm water to be directed away from house as indicated on engineers storm water drawing
hood
nick
proposed new house for Nigel & Sheridan Bothwell on erf 198 Sugarbush Gardens Estate
5200 concrete foundation to be founded on supportable soil with min. size
beam @ 2465mm high
timber exposed trusses above
0,000
13.04.14
W to be 750mm x 250mm 14 final details, depth and spec. to be determined & confirmed by engineer
indigenously landscaped garden
lounge
engineered timber
SCALE
lara
230
115
dining
smooth finish concrete worktop @ 900 high above ffl
tech. station
2600
fold
D 7A
170mm step down
230
kitchen island to specialist details caesar stone worktop @ 1100 high above ffl
kitchen layout detailing, counters and cupboards to specialist details
slide
screed laid to a min fall
bot-13.04.14
pantry drying yard main bedroom
trelli door by specialist
final kitchen electrical layout to specialist details
230
570
3
line of roof overha
or similar sandstone cobble on 40mm "Smartstone" to fall paving laid cted soil, & approved d on well compa iller lay clean riversan approved weedk treat soil with a mixture of nted and wash laying brick butt-joi t into joints after cemen and sand
kitchen
slide
W 4
230
2
stair detail to later detail and specification
345
F.F.L -0,170
JOB NO
Bot-05
DATE
3925
230
D 10
DRAWING NO
385
0,000
insitu cast concrete floor with movement joints
setting out point
composite decking
gas line
drainage pipe under building to be protected from load
D 2
polished concrete
facebrick stair risers
115
deep end
slide
retaining wall
drainage pipe under building to be protected from load
elevations & details
C
370
gas line
230
1185
B
trelli door by specialist
D 6
170mm step down
400
F.F.L -0,170
-0,170 concrete foundation to be founded on supportable soil with min. size to be 750mm x 250mm final details, depth and spec. to be fold determined & confirmed by engineer
planter
sump
dark charcoal grey
I-beams and all other pool safety to be external maintained by fence steel work around to council regulations
25 Cement screed on 75mm surface bed to eng. specification on 250 micron USB green DPM on compacted and poisoned fill all to eng. specification
polished concrete
5135
final scullery electrical layout to specialist details
scullery
planter
planter
paint
smooth plaster finish on reinforced retaining walls & on 100mm reinforced concrete slab to engineers specifications on well compacted hardcore ground fill - all detailing by pool specialists
510 sink
scullery layout detailing, counters and cupboards to specialist details
w/m
D 4
fold
covered patio
dpc
345
stair note: risers @ 170mm
230
concrete foundation to be founded on supportable soil with min. size to be 750mm x 250mm final details, depth and spec. to be determined & confirmed by engineer counter
sink
t/d
gulley
line
trelli door by specialist
drying yard
dpc
screed laid
25 Cement screedto ona75mm min fall surface bed to eng. specification on 250 micron USB green DPM on compacted and poisoned fill all to eng. specification smooth finish concrete worktop @ 900 high above ffl
beam @ 2465mm high to eng. detalil W 3
weather step down
3835 5710
pavers laid to a min fall
4
grey
This drawing is copyright reserved and remains the propertymust of the commence. all specifications by developer overides plans. the architect bearchitect any DRA W Iinformed N G in writing 230 changes to changes the internal or external by water any other design party will not be of any to these plans.structure sewer and connection to
5200
without first building confirming with the architect. No part of provide this drawing may be be confirmedpermitted with engineer before commences the contractor shall all assistance copied & everything necessary to enable accuracy of the settingpermission out to or used by any other partythe or other designer without from the be checked. architect. checking of settingto out not the contractor of his All the materials beshall SABS orrelieve agreement board approved. All work to contractor to confirm responsibility for correctness thereof & the contractor shall rectify any errorsthe in the comply with the National Building Regulations (SANS 10400) applicable SABS position of sewer connection arise & from incorrect setting out without any adjustment to the codes building society regulations. point on site and adjust sp works that may contract sum.General the contractor/client line accordingly notes: may not claim against the architect as a result of discrepencies or errors not reported to the architect before construction The architects specification, instructions, larger scaled details drawings, engineers re 1,5m away from details etc. shall take preferance to these drawings. These drawings are not to be sewer connection scaled, use figured dimensions only. All material and workmanship to be the best of their respective kinds and to conform with SABS standards and specifications, all plumbing pipes to be all work to be carried out in strict accordance with architects instructions. Materials 900mm away from walls used & applied must be referred to using manufactures printed instructions. Contractor to arrange and ensure that all required inspections are carried out by all plumbing above ground the local building inspectorate. On completion of contract, all rubbish and rubble is to be according to the to be removed from the site, and may not be used as fill, unless otherwise directed. nbr regulations final number of steps to be Provide and erect in approved position, standard architects notice board. All determined on site and habitable rooms to be provided with natural light and ventilation as set out in SANS line of confirmed with architect/client minimunm 450mm invert level shading device 10400-O. The architect will not be held responsible for the quality of the to sewer connection before construction above to later detail workmanship. The construction of the building may not commence without stair note: approval of the building plans through council. 100Ø soil pipe to sabs standards up risers @ 170mm Setting out, excavation & site operations - SANS 10400-G & F laid to a min. fall of 1:40 treads @ 400mm 26.05.2014 HOA & council submission 1 Drawings are prepared from surface examination of site only. Depth of foundations, 1 height of plinths number of steps & final finished ground levels to be determined by 5775 1x coat rhinolight plaster D Acontractor TE D E Son C site R I P&T confirmed ION REV the & engineer with the architects. Top of all on ceiling board on final number of steps to be 100mm thick extruded polystyrene foundations to be a minimum 500mm below the finished ground. Any changes of 38x38 timber battens 2 to accommodate energy determined on site and levels deemed necessary on site must be first reported to and approved by the efficiency requirements confirmed with architect/client architect. All levels, dimensions, building lines and other data to be checked on site before construction beam @ 2465mm 3 and any discrepancies are to be reported to the architect and engineer for B.Arch. M.I.A. R.I.B.A. to eng. detail 0 8 2 9 0 for 2 4 dimensional 199 correction. TheReg. architect will not be held responsible errors if not 85mm pc 85mm pc 3 2 1 stair note: No 7019 lintel lintel risers @ 170mm notified at thee-mail. time ofl commencing work on site. slide ara @hoodnapier.co.za 345 treads @ 300mm trelli door Structural notes: by specialist up 75x75mm shelving structural steel post Build in precast prestressed concrete lintels (SABS 0 8 3 approved) 2 6 6 7 4 6 2 above all openings. painted to later spec.detailing with steel to specialist joinery Depth of foundation 300 300 D Reg. Notrenches ST 0617 to be a min of 500mm below ground level. carry above to eng. details and plate specifications Foundations toe-mail. be setnon and 8 i cfirm k @ supportable h o o d n a pground ier.co . z ato be checked & confirmed by engineer. New concrete surface bed to be a minimum of 15mpa 100mm thick p o n e t s uDPM i t e (gunplas 6 9 7 p r i green v a t eorb equivalent) a g x 1 5 3 on sand blinding on on damp proof membrane r yTop a n of sto n 2 0 2 1surface bed to be a min of 150mm above NGL. well compactedbfill. concrete dpc 0 8dpc 6 6 1(gundle 0 1 7 2 6brickgrip or equivalent ) under all walls & window Provide approved Fax. sills & provide vertical dpc.s to all changes of floor levels. All surface beds to be timber screen internal wall finish to be finished with 30mm minimum sand cement screed unless otherwise detailed or to later detail 370 1x smooth plaster coat 120mm high specified. All brickwork to receive brickforce every 4 courses all openings to & paint finish meranti skirting carpet every course for 3 courses extending 1m past opening on both P Rreceive O J E C brickforce T sides. All stairs unless otherwise detailed to have equal risers 185mm maximum -0,510 with equal treads 250mm minimum. Provide handrail at 900mm height where 850 230 600 230 number of risers exceed five & 1m high to balconies & landings and a min of 100mm baluster spacing according to NBR. The FFL at changes between floor dpc dpc dpc cantilievered floor slab gas fireplace finishes must remain constant. contractor to take account of differences in depths 25 Cement screed on 75mm 25 Cement to engineer's detail and specification to later speci. &screed detail on 75mm of floor finishes when screed is laid. surface bed to eng. specification on surface bed to eng. specification on demolition of all walls to be confirmed by structural engineer 250 micron USB green DPM on 250 micron USB green DPM on gas line all dimensions to be checked on site prior to ordering or installing all windows & doors compacted and poisoned fill all to compacted and poisoned fill all to5085 eng. specification eng. specification
internal wall finish to be @ 2635mm I-beam to engineer's specifications Corobrik NFX
& paint finish 14350
dpc
fridge
gas
pavers
230
self closing & self locking gate by speciliast
dpc
dpc
outlet
d/w
stormwater to discharge at regular intervals through weep holes according to nbr and engineers specifications
gas bottle storage see detail and notes
drying line
outlet
vertical dpc
caesar stone worktop @ 900 high above ffl
section b-b scale 1:50
up
dark charcoal grey
marbelite
345
2575
2465
345 230 350 1330
1330 9510
230
to the gas facility is by authorized persons only foundation to be founded all building work to complyconcrete with SABS 0400 on supportable soil with min. size all electrical work to comply with SABS 0108 to be 750mm x 250mm final details, depth and spec. to be determined & confirmed by engineer e all storm water to be 700 s lin directed away from house ga as indicated on engineers storm water drawing 75x75mm structural steel post painted to later spec. with steel carry plate above to eng. details 2100mm high screen wall 103
mild steel painted
N/A
to match house colour
dining room
I-beam to to be internalcolumn wall finish engineer's 1x smoothspecifications plaster coat
in-situ cast RC stairs to engineer's detail
e
s lin
ga
gas notes dpc all sizes and safety distances to be checked on site t.o.c. main en-suite level with SABS 100B7 Part 1 standards and must be in accordance -0,510 25 Cement screed on 75mm this installation is subject to local authority approval all mandatory fire equipment to be present and maintainedsurface bed to eng. specification on 250 micron USB green DPM on area around gas cage to be kept clear of all combustible materials compacted and poisoned fill all to all safety and warning notices to be displayed as per SABS 1186 line of roof overhang it is to be ensured that the gas cage is lockable and access eng. specification
1
gates
4725
outlet
I-beam to engineer's specifications 6410
family room
I-beam to engineer's specifications @ 2635mm
RC cantilievered stairs to I-beam engineer's detailto column engineer's specifications
gas braai
2465
1200 2470
t.o.c. ground floor level 0,000
120mm high meranti skirting 230 500
2330
paint
by specialist
85mm pc lintel
2 3
indigenously landscaped garden
internal wall finish to be 1x smooth plaster coat & paint/tile finish
N/A
115
the architect will not be held responsible for any discrepancies which may arise as a result of unapproved plans by local authority and owner. please note that the Copy right: signed approval of this plan by owner must be obtained before construction can
5775
duct cover
115
shallow end
1
line of roof overhang
Disclaimer:
dark charcoal grey 4725
115
infinity pool pool
1200
up
shadow line
2975
2720
2465
main en-suite
3230
345
u/s RC lintel 1,955
shadow line
1x coat rhinolight plaster to u/s of slab
85mm pc lintel
255
concrete floor slab to engineers details shadow line u/s RC lintel 2,465
mild steel
stone
345
stair note: risers @ 170mm treads @ 400mm
400
5015
730
balustrade 27060
Water reticulation:
N/A
4800
final number of steps to be mild steel handrail @ 1m high above determined onmild site and floor level with steel balusters and confirmedrunning with architect/client horizontal steel cables before construction all to specialist details all balustrades to comply with SANS 0400 5976 & SANS 10160
1000
internal wall finish to be 1x smooth plaster coat & paint finish
t.o.c. first floor 2,720
smooth concrete
Electrical notes:
All electrical work to be done by licenced electrician and all work and to be carried out according to SABS standards. Contractor to ensure a 3 phase supply & adequate circuit breakers provided. Electrician to provide compliance certificate. All hot water circulation pipes, and all externally exposed pipes to be insulated along their entire length with 25mm canvas wrapped fibre insulation and sealed with sealer paint. All externally exposed pipes to be covered in weatherproof GMS jacket.
230
2295
bic
details
400
2975
5400
cupboards and shelving to specialist joinery detailing and specifications
de hoop red
6000
& housing to be determined by client according to specialists aluminum details & specifications flashing & counter flashing safety fence around pool @ 1,1m high gates to pool to be self closing & self locking
3300
covered patio threshold detail 3 bedroom 3 scale 1:5 u/s RC roof slab 5,015
corobrik NFX sealed with silicone spray
115
parapet wall concrete roof slab to engineers details
chimneys
smooth plaster finish on reinforced retaining walls & on 100mm reinforced concrete slab to engineers specifications on well compacted hardcore ground fill below all detailing by pool specialists
3460
profile gutter with facia board
shadow line
concrete pool foundations
specialist details 4-AEG -toHemp
aluminum strip to edge of pool runover to control water level to specialist details
4300
shadow line
1x coat rhinolight plaster on ceiling board on 38x38 timber battens
profile gutter with facia board
pool rim flow to pool specialist detail
pool to discharge into municipal sewer pool fence gate to be self closing & locking
"Midas" paint
PROJECT
proposed new house for Nigel & Sheridan Bothwell on erf 198 Sugarbush Gardens Estate Poortview Ext. 22 ngl
to specialist details
walls
"silver-blue" chromadek cliplok roofing fixed to "alumaz" system on slatex waterproof membrane on 50 x 75mm purlins @ 840mm centres on roof trusses to engineers detail @ 1400mm centres. roof pitch @ 37° 50 x 228mm profiled rafters to engineers detail
A
1200
37°
shadow line u/s wall plate 5,695
ie
37°
85mm floor slab step down
slab construction - reinforced concrete slab to engineers detail on loadbearing brick walls, 16560 slab waterproofed with approved membrane such as derbigum (sp4 or equal and approved) 13270 laid to manufacturers spec. with falls and outlets as shown on plan, waterproofing taken up parapets, acrylic sheeting over tops of parapets, use fillets in corners to prevent cracks proposed pool pump position to be confirmed with pool specialist 75mm thick mineral wool to accommodate energy pool pump to discharge into sewer system with position efficiency requirements
"silver-blue" chromadek cliplok roofing fixed to "alumaz" system on slatex waterproof membrane on 50 x 75mm purlins @ 840mm centres on roof trusses to engineers detail @ 1400mm centres. roof pitch @ 37° 50 x 228mm profiled rafters engineers detail contractor totoconfirm position of sewer connection point on site 100mm and adjust spextruded polystyrene thick line accordingly to accommodate energy efficiency requirements re 1,5m away from sewer connection 600mm roof overhang
115
170 255
re 600mm roof overhang
2600
concrete foundation to be founded on supportable soil with min. size to be 750mm x 250mm final details, depth and spec. to be determined & confirmed by engineer
Provide inspection eyes (ie) at all junctions and rodding eyes (re) to all bends, changes in direction and ramps. Provide ie at every 24 meters along straight run of drain, provide such with purpose made marked cover plates at finished ground level. All sanitary fittings to be provided with 65mm reseal traps and air valve (AV). provide 50 Ø anti siphon pipe where vertical drop exceeds 1200mm. Drains shall have minimum fall 1:60 or maximum fall 1:5. Where drains pass under building, provide adequate protection to ensure no load is transferred to drain from building. Drains must have straight runs where passing beneath buildings. Pipes to have re's at either end. All ie & re,s to be accessible. To all wash hand basins & vanity basins provide 32 Ømm waste pipes. To all sinks, baths, showers, laundry trough and urinals provide 38Ømm waste pipes. To all wc's provide 100 Ømm waste pipes. all vents shall finish 900mm minimum above any roof finish. provide overflow gully at lowest point of drainage system include gully to pool if at lowest point.
400
8,5 meters maximum permissible height
pool
N/A
400
section a-a scale 1:50
230
sandstone to sample
compacted and poisoned fill all to eng. specification
plaster bagwashed plaster concrete foundation to be founded
t.o.c. patio level -0,170
0866101726
Drainage - SANS 10400-P
by specialist
infraset village cobbledpcwith a 25dump rock embedded road Cement screed on 75mm surface bed to eng. specification on edge beam 250 micron USB green DPM on
dpc
ponet suite 697 private bag x153 bryanston 2021
Fax.
t.o.c. ground floor level 0,000
matt slick grey composite decking
3500
screed laid to fall
vertical dpc
25 Cement screed on 75mm surface bed to eng. specification on 250 micron USB green DPM on compacted and poisoned fill all to eng. specification
napier
Rafters & trusses to be tied down with galvanized hoop iron threaded through four courses of brickwork. Parapet walls to min of 300mm above roof level. Provide all required flashings and counter flashings at changes in roof levels. Abutments between roof and parapet walls, chimneys, roof valleys & ridges. Provide approved insulation over all ceilings. Flat rooves to have 50mm chip stone on raised mesh grill or ceramic tiles on durbigum (sp4) waterproofing to specialist details, on 50mm screed to falls to downpipe on 170 and/or 255mm concrete slab to engineers details. design & specifications downpipes to be chased into walls & plastered using wire mesh & plaster at a min size of 75Ø
t.o.c. entrance hall 0,340
aluminium horizontal slatted 75mm brick plinth
900
25 Cement screed on 75mm surface bed to eng. specification on 250 micron USB green DPM on compacted and poisoned fill all to eng. specification
concrete foundation to be founded on supportable soil with min. size to be 750mm x 250mm final details, depth and spec. to be determined & confirmed by engineer
painted to spec.
patio
cast conc. counter
garage door
vertical dpc
dpc
345
75mm concrete surface bed
vertical dpc
nick
Roof notes - SANS 10400 - Ln e-mail.
600
concrete foundation to be founded on supportable soil with min. size to be 750mm x 250mm final details, depth and spec. to be determined & confirmed by engineer
dpc
hood
0832667462 Reg. No ST 0617 ick@hoodnapier.co.za
u/s RC lintel 2,465
dark charcoal grey
lara
B.Arch. M.I.A. R.I.B.A. 0829024199 Reg. No 7019 e-mail. l a r a @ h o o d n a p i e r . c o . z a
dark charcoal grey
steel I-beam to eng. detail
smooth concrete detail surround
115
120mm high meranti skirting
vertical dpc 25 Cement screed on 75mm surface bed to eng. specification on 250 micron USB green DPM on compacted and poisoned fill all to eng. specification
dpc
t.o.c. guest wc 0,510
internal wall finish to be 1x smooth plaster coat & paint finish
aluminium
DESCRIPTION
Build in precast prestressed concrete lintels (SABS approved) above all openings. Depth of foundation trenches to be a min of 500mm below ground level. Foundations to be set on firm supportable ground and to be checked & confirmed by engineer. New concrete surface bed to be a minimum of 15mpa 100mm thick on damp proof membrane DPM (gunplas green or equivalent) on sand blinding on well compacted fill. Top of concrete surface bed to be a min of 150mm above NGL. Provide approved dpc (gundle brickgrip or equivalent ) under all walls & window sills & provide vertical dpc.s to all changes of floor levels. All surface beds to be finished with 30mm minimum sand cement screed unless otherwise detailed or specified. All brickwork to receive brickforce every 4 courses all openings to receive brickforce every course for 3 courses extending 1m past opening on both sides. All stairs unless otherwise detailed to have equal risers 185mm maximum with equal treads 250mm minimum. Provide handrail at 900mm height where number of risers exceed five & 1m high to balconies & landings and a min of 100mm baluster spacing according to NBR. The FFL at changes between floor finishes must remain constant. contractor to take account of differences in depths of floor finishes when screed is laid. demolition of all walls to be confirmed by structural engineer all dimensions to be checked on site prior to ordering or installing all windows & doors
u/s wall plate 3,655 u/s RC roof slab 2,890
profile gutter with facia board
aluminium
255mm RC beam to eng. detail
kitchen external doors
internal wall finish to be 1x smooth plaster coat & paint finish
painted gray to suite roof
345
polished screed @ angle 75mm brick plinth to fall
t.o.c. staff room 1,105
powder coated aluminium
windows
floor finish entrance hall 25mm cement scredd
internal wall finish to be 1x smooth plaster coat & paint finish
DATE
Structural notes:
slide
staff room
dpc
2550
85mm smooth polished insitu cast conc. counter
REV
levels deemed necessary on site must be first reported to and approved by the architect. All levels, dimensions, building lines and other data to be checked on site and any discrepancies are to be reported to the architect and engineer for correction. The architect will not be held responsible for dimensional errors if not notified at the time of commencing work on site.
2550
RC upstand beam to engineer's details
26.05.2014 foundations to be a minimum 500mmHOA below the ground. Any changes of &finished council submission
N/A
600mm roof
gutters
Drawings are prepared from surface examination of site only. Depth of foundations, height of plinths number of steps & final finished ground levels to be determined by the contractor & engineer on site & confirmed with the architects. Top of all
1
"silver-blue" chromadek cliplok roofing fixed to "alumaz" system on slatex waterproof membrane on 38 x 38mm brandering @ 900mm centres on roof trusses to engineers detail @ 1400mm centres. roof pitch @ 5°
overhang barge board N/A
12mm brass weather strip
120mm deep concrete coping
painted gray to suite roof
by architect @ 190mm centres
2130
parapet wall
concrete roof slab to engineers details
N/A
50 x 75mm 'Jarrah' timber fascia boards fibre cement slats or similarly approved
aluminum flashing & counter flashing
Setting out, excavation & site operations - SANS 10400-G & F
dark dolphin gray
jarrah timber
Corobrik NFX sealed with silicone spray
400mm deep suspended bulkhead abover kitchen island counter by specialist with 1 x coat rhinolite plaster & paint finish
t.o. chimney 7,225
colour
chromadek cliplock
roof
roof overhang
external wall thermally recess shadow broken line aluminium door frame
shadow line
1x coat rhinolight plaster on ceiling board on 38x38 timber battens
finish
120mm deep concrete coping
smooth concrete detail surround
230
shadow line
cornice
1x coat rhinolight plaster on ceiling board on 38x38 timber battens
85mm pc lintel
The architects specification, instructions, larger scaled details drawings, engineers details etc. shall take preferance to these drawings. These drawings are not to be scaled, use figured dimensions only. All material and workmanship to be the best of their respective kinds and to conform with SABS standards and specifications, all work to be carried out in strict accordance with architects instructions. Materials used & applied must be referred to using manufactures printed instructions. Contractor to arrange and ensure that all required inspections are carried out by the local building inspectorate. On completion of contract, all rubbish and rubble is to be removed from the site, and may not be used as fill, unless otherwise directed. Provide and erect in approved position, standard architects notice board. All habitable rooms to be provided with natural light and ventilation as set out in SANS 10400-O. The architect will not be held responsible for the quality of the workmanship. The construction of the building may not commence without approval of the building plans through council.
2465
item
600mm roof overhang
37°
cornice
General notes:
all finishes to owners & H.O.A final approval of samples on site
37°
37°
800mm roof overhang
2720
finishes
height
sisalation board to accommodate energy efficiency requirements
800mm roof overhang
u/s wall plate 3,825
2125
permissible
slab construction - reinforced concrete slab to engineers detail on loadbearing brick walls, slab waterproofed with approved membrane such as derbigum (sp4 or equal and approved) laid to manufacturers spec. with falls and outlets as shown on plan, waterproofing taken up parapets, acrylic sheeting over tops of parapets, use fillets in corners to prevent cracks
50 x 75mm 'Jarrah' timber slats or similarly approved by architect @ 190mm centres
1
maximum
75mm thick mineral wool to accommodate energy efficiency requirements
100mm thick extruded polystyrene to accommodate energy efficiency requirements
103
8,5 meters
"silver-blue" chromadek cliplok roofing fixed to "alumaz" system on slatex waterproof membrane on 50 x 75mm purlins @ 840mm centres on roof trusses to engineers detail @ 1400mm centres. roof pitch @ 37° 50 x 228mm profiled rafters to engineers detail
"silver-blue" chromadek cliplok roofing fixed to "alumaz" system on slatex waterproof membrane on 50 x 75mm purlins @ 900mm centres on roof trusses to engineers detail @ 1400mm centres. roof pitch @ 37° 50 x 228mm profiled rafters to engineers detail
u/s RC lintel 3,230
Copy right: This drawing is copyright reserved and remains the property of the architect any changes to the internal or external structure by any other design party will not be permitted without first confirming with the architect. No part of this drawing may be copied or used by any other party or other designer without permission from the architect. All materials to be SABS or agreement board approved. All work to comply with the National Building Regulations (SANS 10400) the applicable SABS codes & building society regulations.
pool rim flow to pool specialist detail
4
ngl
the architect will not be held responsible for any discrepancies which may arise as a result of unapproved plans by local authority and owner. please note that the signed approval of this plan by owner must be obtained before construction can commence. all specifications by developer overides plans. the architect must be informed in writing of any changes to these plans. sewer and water connection to be confirmed with engineer before building commences the contractor shall provide all assistance & everything necessary to enable the accuracy of the setting out to be checked. checking of the setting out shall not relieve the contractor of his responsibility for correctness thereof & the contractor shall rectify any errors in the works that may arise from incorrect setting out without any adjustment to the contract sum. the contractor/client may not claim against the architect as a result of discrepencies or errors not reported to the architect before construction
100Ø soil pipe to sabs standards laid to a min. fall of 1:40
201
ngl
Disclaimer:
t.o.c. garage 1,020
gulley ie
t.o.c. patio -0,170
ngl
u/s RC lintel 3,145
wm
dw
170
t.o.c. main bedroom level -0,510
recess
parapet wall
sink
t.o.c. ground floor level 0,000
t.o.c. ground floor level 0,000
All hot water circulation pipes, and all externally exposed pipes to be insulated along their entire length with 25mm canvas wrapped fibre insulation and sealed with sealer paint. All externally exposed pipes to be covered in weatherproof GMS jacket.
u/s RC lintel 3,485
facebrick
u/s RC lintel 2,465 steel I-beam and timber shading to detail
170
u/s RC lintel 1,955
u/s RC lintel 2,465
Water reticulation:
bagwashed plaster and paint finish bagwashed plaster and paint finish
u/s RC roof slab 2,890
t.o.c. first floor level 2,720
Electrical notes:
All electrical work to be done by licenced electrician and all work and to be carried out according to SABS standards. Contractor to ensure a 3 phase supply & adequate circuit breakers provided. Electrician to provide compliance certificate.
parapet wall
12795
120mm deep concrete coping
Provide inspection eyes (ie) at all junctions and rodding eyes (re) to all bends, changes in direction and ramps. Provide ie at every 24 meters along straight run of drain, provide such with purpose made marked cover plates at finished ground level. All sanitary fittings to be provided with 65mm reseal traps and air valve (AV). provide 50 Ø anti siphon pipe where vertical drop exceeds 1200mm. Drains shall have minimum fall 1:60 or maximum fall 1:5. Where drains pass under building, provide adequate protection to ensure no load is transferred to drain from building. Drains must have straight runs where passing beneath buildings. Pipes to have re's at either end. All ie & re,s to be accessible. To all wash hand basins & vanity basins provide 32 Ømm waste pipes. To all sinks, baths, showers, laundry trough and urinals provide 38Ømm waste pipes. To all wc's provide 100 Ømm waste pipes. all vents shall finish 900mm minimum above any roof finish. provide overflow gully at lowest point of drainage system include gully to pool if at lowest point.
345
t.o. chimney 9,095
t.o. chimney 9,095
Drainage - SANS 10400-P
"silver-blue" chromadek cliplok roofing fixed to "alumaz" system on slatex waterproof membrane on 50 x 75mm purlins @ 840mm centres on roof trusses to engineers detail @ 1400mm centres. roof pitch @ 37°
1 102
ground floor plan scale 1:50
Bot-02 DATE
13.04.14
JOB NO
bot-13.04.14 SCALE
1:50
REV
1
HOOD NAPIER
ARCHITECTS
____________________________________________________ HOUSE NKOSI sandown, jhb // 2014 - 2016 + + + + + + + +
Client brief Conceptual design / feasibility Design development Revit modelling & rendering Client presentation Technical documentation Council submission Project administration
Area: 460m2 RIBA work stages: 2-4 Cost: ZAR 5mil
Opposite Page: Client presentation renderings Revit
19420 2555 230
470
2030
345
1510
230
5375
1800
345
3000
4800
230
2480
3000
460
2020
230
520 115
C
contractor to confirm position of sewer connection point on site and adjust sp line accordingly re 1,5m away from sewer connection
ie ie
ie
gulley
shallow end
345
4800
12620
D 2
dining
1200
3
1 up
2366
up 1
2
3
230 230
230 t/d
230 230
3685
115
1000
115 sink
D 12
230
rcl @ 2465mm ht
1115
1232 115
aluminium automated sectional ho rcl @ 2125mm ht rcl @ 2465mm ht
230
ramp up to garage floor 75Ø rwdp chased into wall using wire mesh & plaster line of cantilevered slab above
geberit wc 230 230
D 11
T.O.C. -0,510
shelves
1180
tiles
tiles
115 115
pantry
scullery
2700
gas line gas fireplace
115
Floor laid to 1% fa
230
W 6
tiles
w/m
1770
2400
whb
115
d/w
D 11
230
high level window
rcl @ 2465mm ht
gas stove extractor above
cupboards and shelving to specialist joinery detailing and specifications
gas line
T.O.C. 0,170
weather step down
115
1115 D 11
guest wc
kitchen layout detailing, counters and cupboards to specialist details
115 115
tiles
230
paving infraset village cobble wit a dump rock embedded r edge beam
cupboards and shelving 230 to specialist joinery detailing and specifications
sink
driveway
230
boundary wall gas bottle storage see detail and notes
170mm step down gulley
C
100 Ø OVP in Duct with 230 230 access panels
W 5
ie
ie
pavers
landscaped planter
re
1000
paving infraset village cobble with a dump rock embedded road edge beam
230
stormwater to discharge at regular intervals through weep holes according to nbr and engineers specifications
4770 tiles
230
tiles
family room T.O.C. -0,680
2540
30min solid fire door
double g D 1
fr final kitchen electrical layout to specialist details 4800
3226
170mm step down
p/b
kitchen
530
slide slide
4370
D 21
re
3960
230
230
_____________________________________________________
460
100Ø soil pipe to sabs standards laid to a min. fall of 1:40
230147230 230 230
377
D 13
4830
line of cantilevered slab above
minimunm 450mm invert level to sewer connection
D 10
T.O.C. 0,000
fr
4170
tiles
230
5800
fold 230 230
4370
4830
1230
1000
entrance hall
beam @ 2805mm ht
all plumbing above ground to be according to the nbr regulations ie
230
store
tiles
stair note: risers @ 170mm treads @ 300mm
all plumbing pipes to be 900mm away from walls
B
stair note: risers @ 170mm treads @ 280mm
2
D 3
460
1200
75Ø rwdp chased into wall using wire mesh & plaster
230
100 x 100mm steel structural post to eng. spec., painted to match window frame
re 1,5m away from sewer connection
1200
insitu cast concrete staircase according to engineers details
line of rc bridge above
gas line
slide
contractor to confirm position of sewer connection point on site and adjust sp line accordingly
600
T.O.C. -0,510
screed & tiles laid to a min fall
proposed pool pump position to be confirmed with pool specialist
3770
3000 230
tiles
A
230 fire wall
D 11
560
beam @ 2805mm ht
T.O.C. -0,680
beam @ 2975mm ht
T.O.C. -0,850
D 11
230
fold tiles
tiles
by specialist
17240
3540
covered patio 8243
pool
345
115
Side shower walls and floor to be correctly sealed and waterproofed
230
gas line
170mm step down
6928
9073
8728
1200
2770
345
screed & tiles laid to a min fall
3000
slide
tiles
1200
deep end
300 300
lounge
345
100 Ø RWDP in Duct with access panels
1575
1800
T.O.C. 0,000
115
1000
230
tiles
230 115
230 fire wall
1510
W 1
7710
460
study
230
5
gas bottle storage located below slab & accessible from garden see detail and notes
3718
gas braai
D 4
water feature by specialist
server room
345
4
280 280 280 280 280 280 280 280 280
RW pipe to be protected from load
W 2 gas line
485
345
3
atrium
gas fireplace
345
steps up
1425
1270
2
shelves
W 10
cupboards and shelving to specialist joinery detailing and specifications
600
W 3
1
stainless steel handrail @ 1m high above floor level with s/s balusters and horizontal running steel rods all to specialist details all balustrades to comply with SANS 0400 & SANS 10160
100 Ø OVP in Duct with access panels
345 230
final number of steps to be determined on site and confirmed with architect before construction up
115
stair note: risers @ 170mm treads @ 350mm
925
1270
line of cantilevered slab above
1500
100Ø soil pipe to sabs standards laid to a min. fall of 1:40
170mm step down
minimunm 450mm invert level to sewer connection
770
230
all plumbing above ground to be according to the nbr regulations
345
1000
230 230
all plumbing pipes to be 900mm away from walls
1
102
Above:
1435
230
2690
1665
ground floor plan scale 1:50 Design development
3035
3685
115
1000
115
5260
Ground Floor Plan
Opposite page: Technical Ground Floor Plan Technical Section A-A
1115 1230
19420
Autocad to Photoshop
Revit
115 115
230
1770 1770
230
6000 6460
Copy right:
19420 2555 230
470
2030
345
1510
230
5375
1800
345
3000
4800
230
2480
3000
460
This drawing is copyright r changes to the internal or permitted without first conf copied or used by any othe architect. All materials to b comply with the National B codes & building society re
3980
2020
230
520 115
2885
230
General notes:
C
contractor to confirm position of sewer connection point on site and adjust sp line accordingly
The architects specificatio details etc. shall take prefe scaled, use figured dimen of their respective kinds a all work to be carried out i used & applied must be re Contractor to arrange and the local building inspecto to be removed from the si Provide and erect in appro habitable rooms to be prov 10400-O. The architect wi workmanship. The constru approval of the building pl
C
re 1,5m away from sewer connection ie
230
115
sink
D 12
rcl @ 2465mm ht
230
115 115 230
230 230
paving infraset village cobble with a dump rock embedded road edge beam
C
driveway
C
100 Ø OVP in Duct with 230 230 access panels
W 5
ie
1000 230 5800
B
cupboards and shelving 230 to specialist joinery detailing and specifications
1000
gulley
ie
1435
230
230
2690
1665
115 115
1
13.6.2014
REV
DATE
pavers
landscaped planter
re
F
PROJECT
propos Wilson on Port Sandow
3960
230
230
1000 115
step down
line of cantilevered slab above
230 170mm step down
gas bottle storage see detail and notes
75Ø rwdp chased into wall using wire mesh & plaster
ramp up to garage floor level 75Ø rwdp chased into wall using wire mesh & plaster
1000
paving infraset village cobble with a dump rock embedded road edge beam
345
rcl @ 2125mm ht
W 6
sink
boundary wall stormwater to discharge at regular intervals through weep holes according to nbr and engineers specifications
230
230 fire wall
115
aluminium automated sectional horizontally slatted door 345
1232
230
1230
115
1770
1180
tiles
3685
230
230
geberit wc
115
shelves
1115
Floor laid to 1% fall
230
115 115
230 230
D 11
2700
tiles
T.O.C. -0,510
gas line
Disclaimer:
the architect will not be he a result of unapproved pla signed approval of this pla commence. all specificatio informed in writing of any c be confirmed with enginee all assistance & everything be checked. checking of t responsibility for correctne works that may arise from contract sum. the contract of discrepencies or errors
75Ø rwdp chased into wall using wire mesh & plaster
2140
t/d
1115 D 11
tiles
w/m
scullery
gas fireplace
re
Water reticulation:
All hot water circulation pip along their entire length wi with sealer paint. All extern jacket.
W 7
230 whb
115
4830
d/w
pantry
230
Electrical notes:
T.O.C. 0,170
2400
115
rcl @ 2465mm ht
kitchen layout detailing, counters and cupboards to specialist details
Provide inspection eyes (ie changes in direction and ra drain, provide such with pu level. All sanitary fittings to provide 50 Ø anti siphon pi have minimum fall 1:60 or provide adequate protectio Drains must have straight r at either end. All ie & re,s t basins provide 32 Ømm wa showers, laundry trough an To all wc's provide 100 Øm all vents shall finish 900mm provide overflow gully at lo pool if at lowest point.
All electrical work to be do out according to SABS sta adequate circuit breakers p
A
weather step down
115
Drainage - SANS 10
75Ø rwdp chased into wall using wire mesh & plaster
double garage
high level window
115
rcl @ 2465mm ht
fr final kitchen electrical layout to specialist details 4800
gas stove extractor above
gas line
100Ø soil pipe to sabs standards laid to a min. fall of 1:40
230
tiles
guest wc
slide
tiles
cupboards and shelving to specialist joinery detailing and specifications
minimunm 450mm invert level to sewer connection
D 18
2000
230 fire wall
230
kitchen
530
D 11
all plumbing above ground to be according to the nbr regulations
30min solid fire door
D 1
tiles
T.O.C. -0,680
tiles T.O.C. 0,170
Roof notes - SANS 1
Rafters & trusses to be tied courses of brickwork. Para required flashings and cou between roof and parapet insulation over all ceilings. grill or ceramic tiles on dur screed to falls to downpipe details. design & specificat using wire mesh & plaster
17240
D 10
T.O.C. 0,000
3226
170mm step down
p/b
all plumbing pipes to be 900mm away from walls
230147230 230 230
3685
3035
115
1000
115
5260
1115
230
1770
1230
230
6000
1770
230
6460 DRAWING
19420
1 102
ground floor plan scale 1:50
ground DRAWING NO
Copy rig
slab construction - reinforced concrete slab to engineers detail on loadbearing brick walls slab waterproofed with approved membrane such as derbigum (sp4 or equal and approved) laid to manufacturers spec with falls and outlets as shown on plan waterproofing taken up parapets acrylic sheeting over tops of parapets use fillets in corners to prevent cracks
t.o. chimney 7,990
Wil-02 This drawi
slab construction - reinforced concrete slab to engineers detail on loadbearing brick walls slab waterproofed with approved membrane such as derbigum (sp4 or equal and approved) laid to manufacturers spec with falls and outlets as shown on plan waterproofing taken up parapets acrylic sheeting over tops of parapets use fillets in corners to prevent cracks
changes to permitted w DATE copied or u architect. A comply wit codes & b
22.05.14
General
The archit details etc scaled, us of their res all work to used & ap Contracto the local b to be remo Provide an habitable 10400-O. workmans approval o
75 x 75mm structural steel post to eng. details plaster and paint finish
40mm thick extruded polystyrene
40mm thick extruded polystyrene
overhang waterproofed to fall
drip detail
shadow line
RC downstand beam to eng. details
to specialist details
concrete pool foundations to specialist details
1
section A-A
170
170
2890
pajama lounge
internal wall finish to be 1x smooth plaster coat & paint finish
Structur
255 shadow line
1x coat rhinolight plaster finish to under side of slab
internal wall finish to be 1x smooth plaster coat & paint finish
gas braai by specialist
510
dpm dpm
concrete foundation to be founded' on supportable soil with min size to be 750mmx250mm final details, depth and spec to be determined & confirmed by engineer
concrete foundation to be founded' on supportable soil with min size to be 750mmx250mm final details, depth and spec to be determined & confirmed by engineer
dpm 25 Cement screed on 75mm surface bed to eng. specification on 250 micron USB green DPM on compacted and poisoned fill all to eng. specification
shadow line
shelving to specialist joinery detailing and specifications
85mm pc lintel
garage
dpc
internal wall finish to be 1x smooth plaster coat & paint finish
stair note: 170mm riser 280mm tread stair note: 170mm riser 300mm tread
25 Cement screed on 75mm surface bed to eng. specification on 250 micron USB green DPM on compacted and poisoned fill all to eng. specification
concrete floor slab to engineers details 1x coat rhinolight plaster finish to under side of slab
2465
lounge
170
pool
Drawings height of p the contra foundation levels dee architect. A and any d correction notified at
1000
2890
2465
internal wall finish to be 1x smooth plaster coat & paint finish
covered patio
vertical dpm
ngl
shadow line
Setting
concrete floor slab to engineers details 1x coat rhinolight plaster finish to under side of slab
t.o.c. entrance hall floor level 0,000
vertical dpm
concrete roof slab to engineers details 1x coat rhinolight plaster finish to under side of slab
shadow line
plaster and paint finish
t.o.c. lounge floor level -0,510
parapet wall
vertical dpm 25 Cement screed on 75mm surface bed to eng. specification on 250 micron USB green DPM on compacted and poisoned fill all to eng. specification
concrete foundation to be founded' on supportable soil with min size to be 750mmx250mm final details, depth and spec to be determined & confirmed by engineer
ngl
Build in pre Depth of fo Foundation by enginee on damp p well comp Provide ap sills & prov finished w specified. receive bri sides. All s with equal number of 100mm ba finishes m of floor fini demolition all dimensi
Roof no dpm
dpm
concrete foundation to be founded' on supportable soil with min size to be 750mmx250mm final details, depth and spec to be determined & confirmed by engineer
170
RC downstand beam to eng. details
parapet wall
stainless steel handrail @ 1m high above floor level with s/s balusters and horizontal running s/s rods all to specialist details all balustrades to comply with SANS 0400 & SANS 10160
b.i.c
1000
t.o.c. first floor level 2,890
2890
bedroom 2
u/s RC slab 5,355
balcony slab construction - reinforced concrete slab to engineers detail on loadbearing brick walls slab waterproofed with approved membrane such as derbigum (sp4 or equal and approved) laid to manufacturers spec with tiles laid on top with falls and outlets as shown on plan
shadow line
1x coat rhinolight plaster finish to under side of slab
rc beam to eng. spec.
drip detail
230
concrete roof slab to engineers details shadow line
340
stainless steel handrail @ 1m high above floor level with s/s balusters and horizontal running s/s rods all to specialist details all balustrades to comply with SANS 0400 & SANS 10160
510
parapet wall
u/s RC slab 5,780
3400
460 377
D 13
family room
slide
4370
D 21
230
5800
fold 230
230
line of cantilevered slab above
store
2540
tiles
fr
4170
tiles
whb
paving infraset village cobble with a dump rock embedded road edge beam
2370
3
stair note: risers @ 170mm treads @ 300mm
beam @ 2805mm ht
230
4370
4830
1230
100 x 100mm steel structural post to eng. spec., painted to match window frame
store 230
230
step down
230
2366
2
1000
D 18
entrance hall
up 1
wc
230
up
D 3
460
1200
75Ø rwdp chased into wall using wire mesh & plaster
slide
ie
7710
1
line of rc bridge above
gas line
proposed pool pump position to be confirmed with pool specialist
B
stair note: risers @ 170mm treads @ 280mm
2
T.O.C. -0,510
screed & tiles laid to a min fall
re 1,5m away from sewer connection
230
insitu cast concrete staircase according to engineers details
3
tiles
A
contractor to confirm position of sewer connection point on site and adjust sp line accordingly
1200
re
W 8
1460
dining
600
server room
1200
170mm step down
D 2
3000 230
wc
2000
230 fire wall
D 11
560
12620
170mm step down
T.O.C. -0,680
beam @ 2975mm ht
shallow end
4800
1000
slide whb
1575
280 280 280 280 280 280 280 280 280
fold tiles
T.O.C. -0,850
345
covered patio
tiles
by specialist
17240
3540
beam @ 2805mm ht
pool
345
8243
6928
9073
8728
1200
100 Ø OVP in Duct with access panels
1000
115
D 19
230
3000
ie
2885
shr
Side shower walls and floor to be correctly sealed and waterproofed
D 11
3460
3460
4770 115
115
gas line
Structural notes:
Build in precast prestresse Depth of foundation trench Foundations to be set on f by engineer. New concrete on damp proof membrane well compacted fill. Top of Provide approved dpc (gun sills & provide vertical dpc finished with 30mm minim specified. All brickwork to receive brickforce every co sides. All stairs unless oth with equal treads 250mm m number of risers exceed fiv 100mm baluster spacing a finishes must remain cons of floor finishes when scre demolition of all walls to be all dimensions to be checke
13410
3770 slide
230 2770
115
1200
tiles
screed & tiles laid to a min fall
230 230
300 300 W 1
lounge
345
100 Ø RWDP in Duct with access panels
deep end
T.O.C. 0,000 230 115
1000
1800
100Ø soil pipe to sabs standards laid to a min. fall of 1:40
115
230
study
minimunm 450mm invert level to sewer connection
W 9
1000
1510
T.O.C. 0,000
tiles
all plumbing above ground to be according to the nbr regulations
staff room
D 4
230
5
gas bottle storage located below slab & accessible from garden see detail and notes
Drawings are prepared fro height of plinths number o the contractor & engineer foundations to be a minim levels deemed necessary architect. All levels, dimen and any discrepancies are correction. The architect w notified at the time of comm
all plumbing pipes to be 900mm away from walls
tiles
water feature by specialist
gas line
3718
gas braai
atrium
W 2
345
345
4
460
345
steps up
3
Setting out, excavati
1000
1270
2
RW pipe to be protected from load
gas fireplace
1425
1
re
75Ø rwdp chased into wall using wire mesh & plaster
D 18
sink
shelves
W 10
cupboards and shelving to specialist joinery detailing and specifications
600
W 3
stainless steel handrail @ 1m high above floor level with s/s balusters and horizontal running steel rods all to specialist details all balustrades to comply with SANS 0400 & SANS 10160
100 Ø OVP in Duct with access panels
345 230
115
stair note: risers @ 170mm treads @ 350mm
925
1270
line of cantilevered slab above final number of steps to be determined on site and confirmed with architect before construction up
1500
100Ø soil pipe to sabs standards laid to a min. fall of 1:40
485
230
230 230 770
minimunm 450mm invert level to sewer connection
345
1000
all plumbing above ground to be according to the nbr regulations
ie
W 9
gulley
230
ie
ie all plumbing pipes to be 900mm away from walls
dpm 25 Cement screed on 75mm surface bed to eng. specification on 250 micron USB green DPM on compacted and poisoned fill all to eng. specification concrete foundation to be founded' on supportable soil with min size to be 750mmx250mm final details, depth and spec to be determined & confirmed by engineer
Rafters & t courses of required fla between ro insulation o grill or cera screed to f details. de using wire
Drainag
Provide ins changes in drain, prov level. All sa provide 50 have minim provide ad Drains mus at either en basins pro showers, la To all wc's all vents sh provide ov pool if at lo
10
15
0
23
30
20 00
18
5
34
3
00
48
d
re
ve le nti ca e of ov e ab lin b sla
4 5 10 15 DP RW ith ls Ø w ne 0 ct pa 10 Du ss in cce a
ed be firm on to con ucti tr ps d te n ns f s e a co r o sit re be n fo m d o be nu ine ect up it al up fin termarch ps de ith ste 1 w 2
0
46
t
lis
ol ia
ec
sp
70
12
s
ga
0
23
ai
bra
5
34
11
5 W 3
00
18
5
. s .C tile T.O,850 -0
34
s ll tile fa & in ed a m re sc id to la
00
12
d
en
s
ga
5
34
lin
e
ie
e
lin
s
ga
W 2
D 2
S nd alu l ro ith ha b tee el s/s g s ils ly w ste ith in ta mp ss w nn de co le el ru t in lev tal lis s to sta oor on ecia de 60 fl oriz sp stra 01 h to lu 1 all ll ba NS a SA &
ge
5
34
un
s
tile
lo
tio
pa
D 3
m
riu
at re atu list r fe ia te ec wa sp by
00
48
am
be de
sli
70
41
@
W 1
4
30 s ga
D
lin
e
ng ni
di
ht
. s .C 0 T.O,51 -0
tile
m
m
05
28
ily
. .C 0 T.O,68 -0
m
s
tile
fa
13
0
0
23
de 23
0
53
om ro
5
11 5
11
00 12
s
tile
kit
3 2 1
D
7 27
11
up
1
D 11
00
10
w er e ow b led d sh r to a fe e oo se roo Sid nd fl ctly terp a rre wa co nd a
e
lin
2
rc of
3
m m m : te 70 m no 1 00 ir @ 3 sta ers s @ ris ead tr
up
bri
11
0 23
ov
ab
fr
w/m
fr
0 23
t/d
ll
s
wa
tile
lid so in r m oo 30 re d fi
85 36
wn
l
l ha
5
11
5
11
do
ry le
p ste
. .C 0 T.O,51 -0
12
m 0m
15 11 D
35
1
40
k
11
sin
ie
23
0
er
ste
0 ath
we
5
11
D
25
15
e or st
fire
10
0
23
D
D
ul sc s tile
. s .C 0 tile T.O,00 0
e
lin
d/w
s ga
15 51 11 15 1
17
75
30
90 26
D 11
k sin
p
y lle gu
wn
do
W
5
15 51 11
5
0
e or
6
0
23
fire
tile
ll
wa
s
e
bl
. .C 0 T.O,17 0
u do
m
ge ra
ga
rc
in m
34
5
C
5 11
W 7
0
15
42 19
11
0 23
30 12
ll or fa do d 1% tte to sla id la lly ta or on Flo riz ho al on cti l se ve d le ate or m flo to ge au ra ht m ga iu m ht m to m 25 up 21 65m p m ra l @ 24 l@ rc
alu
r nte pla
ed e as ir ch g w dp sin r rw u ste d Ø all pla re 75 to w & ve le in esh nti m ca e of ov e ab lin b sla
ed ap sc nd la
00 10
A
70
pa
rs
ve
23
0
ed e as ir ch g w dp sin r rw u ste Ø all pla 75 to w & in esh m
C
y wa ive dr
ed e as ir ch g w dp sin r rw u ste Ø all pla 75 to w & in esh m
70 17
h d wit roa le d bb de co ed ge mb g villa k e vin et roc pa as p am fr m in du e be a dg e
17
00 60
5
B
34 60 64
o
30 12 0 23
a c n at m. s be spo s th su ncie re ork act pe w ntr cre co dis f
70
60
00
20
0
23
0
23
30 02 23
g g in ilin elv eta sh d d ery an in s jo ns rd st tio oa iali ica pb ec cif cu sp spe 0 to and 23
re
5 11
23
. .C 0 s tile T.O,17 0
W
15 11 rit be ge wc
00 10
60
VP O ith ls Ø w ne 0 ct pa 10 Du ss in cce a
ie
39
60 52
21
st
70
23
17 80
11
5
11
11
00 85
0
0 36
40
23 58
0
e nc tra en
e dg
00 12 te re g nc in s 00 co ord il 30 st cc eta ca a d 0 u se rs 60 sit a ee in irc gin m m m : sta en te 70 m to no 1 80 ir @ 2 sta ers s @ ris ead tr e
p/b
D
es elv sh
ut yo l la ica ctr s ele tail g, in s en de ch st 00 tail ard kit iali 48 de bo al ec ut up s fin sp yo c il la nd deta to en a st ch ters li e kit un ecia ov co sp ve ab to sto r s cto ga xtra e
e lin
en ch
s ga
ll
VP O ith els Ø w n 0 ct pa 10 Du ss in cce a
ce
pla
fire
ge & en ra lab rd sto w s ga tes ttle elo om no bo d b le fr nd s a ga cate ssibtail lo cce de a ee s
s
ga
d
re
40
35
ve
co . s .C 0 tile T.O,68 -0
s ll tile fa & in ed a m re sc id to la
0
23
D
0
g g in in tail elv e sh y d d er an in s s jo on rd st ati oa iali ific ce pb ec ec cu sp sp pla to nd fire s a ga
0 23
14 0 23
55
ie
m m m : te 70 m no 1 50 ir @ 3 sta ers s @ ris ead tr d
a be lo to m e fro pip ted c RW te pro
00
30
by
po ow
all
sh ed e as ir ch g w dp sin r rw u ste Ø all pla 75 to w & in esh m
30
12 21
ge s ra ote sto d n n ttle a bo il s eta ga e d se
65 16
35 14
30
4 p d m e pu firm ol on t po c lis d be ia se to ec po ion l sp pro sit poo po ith w
0
23
0 23
w
wa fire 0
sli 00
h d wit roa le d bb de co ed ge mb g villa k e vin et roc pa as p am fr m in du e be a dg e
n la
00
25
p or flo nd :50 ou 1 gr ale sc
p at ee ge w ar gh d ll ch rou r an wa dis th nb ons ry to ls ti da ter rva g toica in if wa inte rd ec rm lar cco sp sto gu s a ers re ole ine h ng e un bo
be to alls d es w un ro pip m l g fro ve g e ve th o bin ay le s m aw rt ab g to ard g ve plu m in in in nd all 0m mb ord ns m sta 90 plu acc tio 0m tion la bs 0 45 nec all be gu sa 1:4 to r re unm con e to of nb ip fall im er in w il p . m se so min to 0Ø a 10 id to la
re
2 10
02 23
do in
0 l@
60 0
1 24 h
le
ve
gu 23
hig
23 32 b
lw s
5 11 s
tile 0
tile
12
23 rc
wc t es wh
0
23 ht
23 ht m
wn
26
5m 00
m m 65 24 l@ rc 27
m
ste
do
p
10
77
32
6 24
try 0
0
00
0
0m
00 10 23
17 11
5
fo el d ste te e m in am t 0m os pa fr 10 l p c., ow e x d 0 tura sp in d 10 truc ng. h w re s e atc ve le to m nti to ca e of ov e ab lin b sla
ie
1
de
n pa 23
23
10
66 sli
0 23 30
23
12 48
5 34
14 0 28 0 0
0 0 28 0 28 p
56 m
ld
3 0
28 28 0 28 0 28
28 0 ld
28 62 wn
m
85 on cti rm ne sp nfi on st co er c dju a r to w d to se an ac of e ly m ntr ion sit ing co sit on ord fro n po int cc ay tio aw ec po e a m onn lin 1,5 r c re we se
B
b sli
18 37 wn
ht m 05 28 @
do p ste m 0m 17
5
28
34
25
87
er rv seoom r 0 23
43 0
34
1
12 do ste 0m 17 30 02 23
82
46 0
fo 70 43
23
0
73
0 am 00
47
90
5
0
0
23 be 12
m m 75 29 @
m ea de
Level -01
d
0
23
Site Panoramic
0
en
23
23
on cti rm ne sp nfi on st co er c dju a r to w d to se an ac of e ly m ntr ion sit ing co sit on ord fro n po int cc ay tio aw ec po e a m onn lin 1,5 r c re we se
4 72
00 28 70
02
30 00
15 69 43
3 12
ht 301 2
23 0 46
30 02 7
23 47 37
be to lls d a es w un ro pip m l g fro e g e ve bin ay bov th le s to m w rt a a ard g ing ve plu m in nd bin ord ns all 0m m sta 90 plum acc tio 0m tion la bs 0 45 nec all e gu sa :4 b to r re unm con e to of 1 nb ip fall im er in w il p . m se so min to 0Ø a 10 id to la
ep
de
A
30 48
45 70
23 10
77
0
23
0
34
5
92
5
1 R
E
V
4
A
01
D
.2 .6 13
T
E
un co
Level 00
PETER PLACE SHOPPING CENTRE bryanston, jhb // 2014 + Client brief + Design concept + Area schedules + Diagrams in Photoshop + Client presentation Area: 7,760m RIBA work stage: 1+2 Cost: ZAR 65mil AutoCAD to Photoshop
Level 01
HOUSE HENKEL fourways, jhb // 2013 - 2014 + Council submission + Technical details + Bathroom details in Revit + Electrical layouts + Tiling layouts + Project management + Regular site meetings with clients & contractors Area: 650m2 RIBA work stages: 4+5 Cost: ZAR 4,2mil
DUCT
Above: Section through staircase Middle: Fireplace detail in plan Below: Fireplace detail in elevation AutoCAD Opposite page: Photographs tracking construction progress on site Photographs by Kier Bothwell
heated towel rail
power point to towel rail
900
400
C
500
gibret wc
500
1715
bath
C
745 mixer
2630
final position of bath to be determined on site
860
C 1836
shower 860
500
1530
power point to heated towel rail
400 high seat 500
MAIN EN - SUITE
BATHROOMS FOR FOURWAYS GARDENS
rose
330
600
vanity
DWG: DWG #: SCALE: REV:
mixer
MAIN EN-SUITE 17/02/2014 1:20 C
rose
350 seat
mixer
lara
hood
nick
n a p i e r+ 2 7 8 3 2 6 6 7 4 6 2
+27829024199
B.Arch. M.I.A. R.I.B.A. Reg. No 5132 Reg. No ST 0617
Main bathroom en-suite design renderings & sanitary ware layout Revit & AutoCAD
CLUB HOUSE
cedar creek, jhb // 2014
+ Client brief + Site study + Concept design & feasibility + Revit to Photoshop + Diagrammatic representation + Graphical presentation for client
Area: 900m2 RIBA work stage: 1+2 Cost: Unknown
Client presentation renderings Revit to Photoshop
Ground and First Floor Plan AutoCAD to Photoshop
Photographs tracking progress on site Photographs by Kier Bothwell
__________________________________________________________________________________________________
SANDTON OFFICE sandton, jhb // 2009 - 2011 + Technical documentation + Water feature, window sill, boundary wall & sign board detailing + Weekly site meetings + Regular client/tenant meetings + Water feature detailing + Project management + Site inspections & snagging Area: 900m2 RIBA work stages: 4-6 Cost: Unknown
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
90
73
0
34
55 25 5
10 15
23
0
20
30 18
00
ie
34
5
0
3
46
t ialis ec
sp
4
d ere v tile an fc e e o ov lin b ab sla
00 12
tile
s
5 10 15 DP RW ith ls 0 Ø t w ne 10 Duc s pa in ces ac
d en
0 23
sb
00 48
70
75 53
12
ga
i raa
s tile fall d & min ree a sc to laid
5 34
. .C T.O,850 -0
5 34
00 18
s
W 3
. .C T.O,680 -0
5
42 19
0
s lin ga
e
0
23
0
ie
30
00 30
D
2
e
@
C
W 2
mm 05 28
ht
0 46
00 48
ga
80 24
s
20 20
ture fea list ter cia wa spe by
atr
. .C T.O,510 -0
e
53
s lin
D 13
m
0
s
tile
0 23
W 1
p/b
0 52
0 23
5
4
11
D
D 11
12
80 39
ie gu
85 28
y lle
30 2
1
5
5 11
11
2
up
w/m
s
3
C
. .C T.O,000 0
W 9
70 27
dy
es elv sh
s
tile
D 11
f rc eo
85
ie
ve bo
23
k sin
an
0
d
s tile
st
all rw we be ho e s or to ale Sid d flo y se ro an rrectl terp co wa
D 11
23
0
10
00
eh nc
k sin
15 51 11
y
fr
. .C T.O,000 0
tra
ea dg bri
s
tile
en
fr
t/d
36
r lle
n ow pd
. .C T.O,510 -0
u sc
ste
35
m
30
90 26
0m
D 12
tile
lin
00 12 te 00 re 30 g nc co ordin ils st 0 ca acc deta 60 itu se ins ca eers ir sta engin : to mm ote 170 mm ir n 80 sta ers @@ 2 ris ads tre
0 23
1
stu
g ing W lvin il 10 he deta d s ry an ine s rds t jo on oa lis ati pb cia ic cu spe pecif to d s an
00
3
up
: mm ote 170 mm ir n 00 sta ers @@ 3 ris ads tre
d/w
e s lin ga
5
15 51 11
11
17
ut yo l la ica ctr ele ils en deta ch g, kit list 00 ilin s ia al 48 deta oard fin spec t b ou up to lay d c ils en an t deta ch rs kit unte ialis e co spec e ov to tov ab s s tor ga trac ex
n
es elv sh
he c kit
ing din tile
ium
ve bo ha hig 1m d 0 @ an 40 rail stersds S0 nd AN ha alu l ro el /s b stee hS ste h s wit ss wit ning tails ply inle vel run de om sta or le ntal list to c flo rizo pecia des ho to s stra 160 all balu S 10 all SAN &
am be slid
70
e
0 23
e rag tes sto d no le ott an s b tail ga e de se
s lin ga
h wit road le bb ed co dd ge mbe g villa e vin pa set rock a p infr dum beam a ge ed
65
35 16
14
0
00
3
41
roo
re
s fi
ga
g ing lvin il he deta d s ry an ine s rds t jo on oa lis ati pb cia ic cu spe pecif to d s ce pla an
ily s . tile .C T.O,680 -0
fam
D
e ng
P OV ith ls 0 Ø t w ne 10 Duc s pa in ces ac
s
tile
lou
5 34
e lac rep s fi ga
o ati
s tile fall d & min ree a sc to laid
D 21
0 23
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
30 12
ed as e ch g wir dp rw usin ter ll Ø s 75 wa pla into sh & me
el ste d m 0m st inte e 10 l po pa fram 0 x ra c., w 10 uctu . spe indo str eng h w to matc red ve to tile an fc e e o ov lin b ab sla
la
23
dp
e rag b & en sto sla rd le w ga ott elo m tes s b b fro no ga atedsible and loc ces etail ac e d se
e s lin ga
35
40
34
5
re ve co tile
11 be to lls a es d pip m w un ing fro gro ve e mb ay bo th plu m aw el g a to all lev m in 0 ing ert 90 s mb rd s inv ard plu cco on m nd all be a ulati 0m on sta 45 cti to r reg bs 0 m ne sa nb un on to f 1:4 im er c ipe ll o min sew il p fa to so in. 0Ø a m 10 to id
0 23
5
5 11
11
y
1 D 11
W 5
D 11
k sin
lle gu
t
ed be to onfirm tion c ps uc ste nd str of ite a con s er mb on fore nu ed t be in c al fin term hite up de h arc wit up 1 ps ste 2
be load e to om pip d fr RW tecte pro
00
30
by
ol po
w allo sh
ie
t p e a ee arg h w ll ch ug nd wa dis ro a ry to ls th nbr s da un ter a to tion bo wa terv ing ica rm r in rd cif sto gula acco spe re les eers ho gin en
lan rp loo df un :50 gro ale 1 sc
00
7 37 e slid
70 24
1000
0
AutoCAD 0
47 m 0m 17
n ht m m 65
@ rcl
0
30
p d um rme lp oo onfi d p be c list se ia po n to ec pro sitio ol sp po h po wit
n tio rm ec p nfi nn co co st s to er dju tor ew a ac of s and ntr e co sition n sit ingly m po int o cord fro po e ac ay on aw ecti lin n m 1,5 con re wer se
B
re
2 10
1
10
r rve seoom ste
pd
ow 10
77 00 27 230
0
02 26
23 00
Cross Section B-B 60
23 32
5 11
0 0
30 23
66
12 0
23
28 0 28
0 0 e
0
25
Sign board detail in plan 28 0 28 28 slid
37 fold
30 56
0
0
28
0 28 28 0 0 62
28 o pd ste m 0m 17 30
wn
12 48
18
Above: 5
Ground Floor Plan mm
ht 05 28
n ow
pd
m
ste 0m
@ am be
00
0 43
15
23 fold 82
e
5
14 0 23
0
34 5
34 slid
2 @ am be
28
47
d en
70 43
0
ep
30
23
0
Opposite page (clockwise): 30
n tio rm ec p nfi nn co r co just s to e d tor ew a ac of s and ntr e co sition n sit ingly m po int o cord fro po e ac ay on aw ecti lin n m 1,5 con re wer se
23
: mm ote 170 mm ir n 50 sta ers @@ 3 ris ads tre
de
48
30 00
48 mm
ht 5 97 00 12
34
5 1
02 23 10
Window sill details 02 23
46 0 23
17 70
43
be to lls a es d pip m w un ing fro gro ve e mb ay bo th plu aw el g a g to all mm lev in 0 in ert 90 s mb rd s inv ard plu cco on m nd all be a ulati 0m on sta 45 cti to r reg bs 0 m ne sa nb un on to f 1:4 im er c ipe ll o min sew il p fa to so in. 0Ø a m 10 to laid
A
0 0 46 7
28 0
69 23
23 30 02 014
3 72 37
87 24 17
77 0 27
0
23
0
34
5
92
5
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
UCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
HOUSE MKHARI bryanston, jhb // 2010 - 2011 + + + +
Daily on-site project management Technical detailing Bathroom details / tile layouts Weekly client / subcontractor meetings + Quality control & snagging + Handover & closeout Area: 930m2 RIBA work stage: 4-6 Cost: ZAR 9,5mil Photographs by Kier Bothwell
EDUCATIONAL
EXPERIENCE _____________________________________
_________________________________________________________
ROTTEN POTATOES
Redefining Perceptions and Integrating the Police Station in City and Suburban _____________________________________________________________________________________________________ master of architecture (professional) design & theory dissertation city & suburban, jhb // 2013 The dissertation proposes a hybrid Police Station which comprises a police museum and library, located in the historical Three Castles Cigarette Factory, a lecture hall, retail space, a youth zone, police dormitory in the former Nugget Hotel and a public square. Through this diverse programmatic approach and careful design considerations for the police’s specific requirements to operate, hierarchies of circulation, the celebration of old and new, materials inspired by the context, use of light and shadow, water and sound, vegetation and visual connections, this new Police Station challenges negative perceptions associated with policing in South Africa and begins to integrate the people and the state’s strong-arm of power; redefining perceptions from the past. Please follow link for complete thesis: http://issuu.com/kierbothwell/docs/kier_c._bothwell_-_rotten_potatoes_
Towards the Three Castles Cigarette Factory and the Police Station’s Main Entrance Revit to Photoshop
24
A
30
de
bo
1
to nd a
30 02
pa
23
flo nd ou 1 gr ale sc
0
23
2 10
p at ee ge w ar gh d ll ch rou r an wa dis th b ns ry r to als to natio da rv g ic un wate te rdin cif e in rm lar cco sp sto gu s a ers re ole ine h ng e
be to alls d es w un ro pip m l g fro e g e ve bin ay bov th le s m aw rt a g to ard g ve plu m in in in nd all 0m mb ord ns m sta 90 lu cc tio 0m tion p a la bs 0 45 nec all be gu sa 1:4 to r re unm con e to of nb ip fall im er in w il p . m se so min to 0Ø a 10 id to la
d ste te e m t in am 0m os pa fr 10 l p ec., ow x d 0 tura sp in d 10 truc ng. h w re s e atc ve le to m nti to ca e of ov e ab lin b sla
ie
re
Ground Floor Plan
w
on cti rm ne sp nfi on st co er c dju a r to w d to se an ac of e ly m ntr ion sit ing co sit on ord fro n po int cc ay tio aw ec po e a m onn lin 1,5 r c re we se
0
sli
AutoCAD
B
01 23
23 0 46
30 02 7
23 47 37
70 48
0 17
23
0
43
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
cc cc
16,830 15,980
16,830 15,980
12,240 12,240
12,240
dd dd
12,240
8,160
7,650 8,160
7,650 4,420
3,570
4,420 3,570 0,510
0,000
0,510
0,000
-3,400 -3,400
Top of page: North Elevation Above: Longitudinal Section through Police Station AutoCAD
50mm layer of river rounded stones; no geotextile sheet required external wall to be smoothly plastered & painted with one coat universal undercoat & two coats 'white' PVA
80mm polyurethane insulation panels bonded to slab with 100mm spacings between panels by specialist 3mm profiled aluminium sheet powder coated cementitious bandage
TO PARAPET 12,155
935
10 year warranty, torch on bituminous waterproofing with 75mm side laps & 100mm end laps under 250 micron plastic sheeting with 50mm laps, loose laid as protection layer in accordance with manufacturer
TOC ROOF 11,220
255
min. 35mm screed laid to min. falls 1:50 to 100mm Ø FBO set min. 20mm below slab on a 255mm RC slab with down-stand beams to eng. spec.
U/S CEILING 10,965
flush plastered ceiling with 12 x 10mm recessed joint to slab at corner of soffit: 'shadowline' exposed cable trays anodised aluminium transom with pressure & drainage opening to specialist spec. powder coated 'charcoal grey'
350 x 80mm SA pine light boxes bolted to the u/s of slab to reduce sound reverberation
fixed glazing: 6mm float glass, 12mm argon-filled cavity, 12mm float glass by manufacturer
5143
internal wall to be smoothly plastered & painted with one coat universal undercoat & two coats 'white' PVA
6mm suspended gypsum ceiling board painted with one coat universal undercoat & two coats 'white' PVA, suspended by aluminium T-section runners powder coated 'white' at 600mm c/c spacings
youth passively surveying Port Plein Park
40mm polished screed, pigmented 'burnt orange', with 40 x 10mm recessed joint to slab at corner of soffit ('shadowline') on min. 255mm RC slab with up-stand beams to eng. spec. 380 x 25mm SA pine board to be bonded to RC up-stand beam
295
FFL YOUTH ZONE 5,820
U/S CEILING 5,525
935
80mm polyurethane insulation cushion behind 6mm float glass 150 x 150 x 5mm MS angle fixed to RC down-stand beam with rawl bolts; painted with one coat red lead primer, one coat universal undercoat & two coats enamel
internal wall to be smoothly plastered & painted with one coat universal undercoat & two coats 'white' PVA
U/S RCL 4,590
plastered drip detail RC lintel to eng. spec.
riser: 170mm tread: 330mm
6mm toughened glass bonded to soft joints on MS IPE 140 beams 5485
1000
125 x 75mm galvanized C-channel gutter
50mm hardwood timber treads suspended & fixed with stainless steel rope to eng. spec. 50mm Ø stainless steel hand rail at 1m above ffl
NGL
850
FFL 0,040 340
precast concrete kerb
400 x 30mm SA pine board to be bonded to top of low brick wall 1000
brick pavers laid to fall away from building on min. 25mm bedding sand on min. 50mm level compacted aggregate on min. 25mm layers of compacted earth
dpm
polished cast-in-situ concrete reception desk with chamfered corners
agricultural drain to eng. detail 35mm screed
2970
85mm step in slab min. 35mm screed laid to min. falls 1:50 to 50mm Ø RWO set min. 20mm below slab on a 170mm RC slab to eng. spec.
FFL LOBBY 0,040
40mm polished screedwith 40 x 10mm recessed joint to slab at corner of soffit ('shadowline') on min. 255mm RC slab to eng. spec.
FFL BASEMENT -2,930 dpm
Perimeter Section through Main Entrance AutoCAD
RC foundation to eng. spec.
Lobby View Revit to Photoshop
CNC laser cut model
23
0
1
90
73
87
28
HER
___________________________________________________________________________
MAGISTRATES COURT
R
d
a be lo to m e fro pip ted c te
W pro
2 3 4
0
46
70
s
ga
0
d
ai
bra
00
12
00
18
5
. s .C tile T.O,850 -0
34
s ll tile fa & in ed a m re sc id to la
23
en
34
5
e
lin
s
40
35
. .C 0 T.O,68 -0
d re ve
ttle elo om no bo d b le fr nd s a ga cate ssibtail lo cce de a ee s
s
ga
tile
co
t
io
t pa
5
34
s ll tile fa & in ed a m re sc id to la
0 23
D 2
D
3
21
00
48
am
@
s
tile
ht
D
lin
e
g in
s ga
. .C 0 T.O,51 -0
n di
m m 05 28
ily . s .C 0 tile T.O,68 -0
m fa
de
be sli
70 41
0 28 0
12
ow
5 10 15 DP RW ith ls Ø w ne 0 ct pa 10 Du ss in cce a
t
lis
ol ia
ec
sp
all
30 D
13
2
0 53
om ro
tile
s
3
p/b
2 1
up
up
1
lin
2
e
of
rc
3
m m m : te 70 m no 1 00 ir @ 3 sta ers s @ ris ead tr
n
e
lin
D
11
es elv sh
e
dg
bri
a
tile
s
e lin
. .C 0 T.O,00 0
fr
0
e nc
fr
s
t/d
h
1
11
lle
p ste
. .C 0 T.O,51 -0
12
m 0m 17
D
u sc
w/m
23
tile
tra en
s
15 5 11
51 11
ga
d/w
ut yo l la ica ctr s ele tail g, in s en de ch st 00 tail ard kit li 8 de bo ia 4 al ec ut up s fin sp yo c il la nd deta to en a st ch ters li e kit un ecia ov co sp ve ab to sto r s cto ga xtra e
s
ga
e ch kit
g g in in il ta elv e sh y d d er an in s s jo on rd st ati oa iali ific ce pb ec ec cu sp sp pla to nd fire s a ga
ge s ra ote sto d n n ttle a bo il s eta ga e d se
65 16
35 14
ht
ed be firm on to con ucti tr ps d te n ns f s e a co r o sit re be n fo m d o be nu ine ect up it al up fin termarch ps de ith ste 1 w
d
00
30
po sh
ed e as ir ch g w dp sin r rw u ste Ø all pla 75 to w & in esh m
12
0
23
0 23
26
5 p d m e pu firm ol on t po c lis d be ia se to ec po ion l sp pro sit poo po ith w
el d ste te e m in am t 0m os pa fr 10 l p c., ow e x d 0 tura sp in d 10 truc ng. h w re s e atc ve le to m nti to ca e of ov e ab lin b sla
0
h d wit roa le d bb de co ed ge mb g villa k e vin et roc pa as p am fr m in du e be a dg e
n
32
fo be to alls d es w un ro pip m l g fro ve g e ve th o bin ay le s m aw rt ab g to ard g ve plu m in in in nd all 0m mb ord ns m sta 90 plu acc tio 0m tion la bs 0 45 nec all be gu sa 1:4 to r re unm con e to of nb ip fall im er in w il p . m se so min to 0Ø a 10 id to la
p at ee ge w ar gh d ll ch rou r an wa dis th nb ons ry to ls ti da ter rva g toica a te din cif un bo rmw r in cor spe la c sto gu s a ers re ole ine h ng e
66
la
23
0 28
28 0 28 0 28
p or flo nd :50 ou 1 gr ale sc
11
5
23 de sli
Working Concept Models Polystyrene
0 2
30
ld re
ld
5
28 10
48
0
Concept Model Hardwood Timbers
m
ht m 05
48 on cti rm ne sp nfi on st co er c dju a r to w d to se an ac of e ly m ntr n sit ing io co sit on ord fro n po int cc ay tio aw ec po e a m onn lin 1,5 r c re we se
ie
s
wn do p
28 wn
@
28 m
34
2 0 1
0 23
0
12 do p
56 m
ste
0m 17 30
02
23
en
0
m m m : te 70 m no 1 50 ir @ 3 sta ers s @ ris ead tr
ep
23
on cti rm ne sp nfi on st co er c dju a r to w d to se an ac of e ly m ntr ion sit ing co sit on ord fro n po int cc ay tio aw ec po e a m onn lin 1,5 r c re we se
40
0 62
Concept Diagrams Photoshop
ht m 75 29 @ am 0
m a be e lid
Opposite page:
be 0 12
ste 0m 17
Site Plan AutoCAD
43
82
46 0
fo 70
43
23
Left:
30
30
00
00 28 70
02
23
10
15 69 43
5 34
77
0
34
5
92
5
Since the end of Apartheid the identity of public service buildings has not significantly changed. As a result, the people are unable to identify with the state and vice versa. 0 27
m 01 23
B
02 0 46
23 7
0 23 47 37
by
30 48
be to lls d a es w un ro pip m l g fro e g e ve bin ay bov th le s to m w rt a a ard g ing ve plu m in nd bin rd ns all 0m m o sta 90 plum acc tio 0m tion la bs 0 45 nec all be gu sa :4 to r re unm con e to of 1 nb ip fall im er in w il p . m se so min to 0Ø a 10 id to la
de
A
The Magistrates Court proposed stands in opposition to the courts which exist across the South African landscape today. Celebrating transparency, movement and light, this Court building is an extension of the street domain, encouraging the people to partake in the judicial system by which their lives are governed. 2 17
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
bas honours design studio randburg cbd, jhb // october 2012 BRAM FISC
100°
__________________________________________________________________________________________________________________________________________________________
refuse store
d-d
b-b
d-d
b-b
d-d
b-b
d-d
accused drop-off area
magistrate's basement entrance
saps office 1
magistrate's basement below intenet cafe magistrates office
magistrates office
snr. prosecutor
regional prosecutor
regional prosecutor
up
basement entrance coffee bar 'chill' area
law library snack shop consul. room
kitchen
a-a
a-a
a-a
snr. prosecutor
a-a
court room
a-a
public passage
c-c
c-c
a-a
cafeteria 1
public atrium -1,360
c-c
a-a
a-a
c-c
c-c
c-c
c-c
c-c
court cell magistrates bridge magistrates office
magistrates office
cash hall cafeteria 2 building manager's store kitchen
BRAM FISCHER ROAD
regional prosecutor
play room
child protection 4,250 8,330
supervisor's office
regional prosecutor
witness room
11,390
7,990 11,220
15,470
access control security
building manager's office
server room
1,360 strong room
10,880
family counc.
estate officer
0,680
media center/library 0,000
record room (current)
tea room
maintenance investigator
estate officer reception 7,480
typist's
maintenance officer's
record room
conferece room
interdict clerks
b-b
b-b
d-d
d-d
interpreter's area
1,190
drop-off
archive
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
lobby 0,000
d-d
regional prosecutor
outdoor amphitheater
Ground Floor Plan (left)
street court
Third Floor Plan (above) PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
toc roof 22,185
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
toc fifth floor 18,530
toc fifth floor 18,360
toc fourth floor 15,470
toc fourth floor 15,130
toc third floor 11,390
toc third floor 11,220
toc second floor 8,330
toc second floor 7,990
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
toc roof 23,205
toc first floor 4,250
toc first floor 4,080
ngl
toc ground floor 0,000
lower ground floor -1,360
ngl
Cross Section through Court Rooms
West Elevation
PRODUCED BY AN toc roof 23,205
toc fifth floor 18,360
child protection
toc fourth floor 15,470
witness prep.
toc third floor 11,220
building manager
toc second floor 8,330
court cell
toc first floor 4,080
court room
holding cells
Revit to Photoshop
witness prep.
server room
strong room
security room
lower ground floor -1,360
Interior Atrium and Court Room Views
cleaners room
record room (current)
archive
be
D
70 43 D
g g in in tail elv e sh y d d er an in s s t jo tion d r s a oa iali ific ce pb ec ec cu sp sp pla to nd fire a as
s
nt
ry m
pa
s tile
ste
wn
ie
do
90
26
35
30
35
14
ry
0 0 46 23 30 02 23 47 01 23 7 37
1
2
10
or flo 0 d n :5 ou 1 gr ale sc
0
23
Ground Floor Plan
First Floor Plan
West Elevation
an
pl
15
51
11
da
re
15
11
5
11
39
65
16
60
52
0
42
19
30
12
5
11 0
60
g
70
17 0
23
0 10
85
0
0
23
0
7 17
re
36
23
pla
5
e
h d wit roa le d bb de co ed ge b la em vil k vin et roc pa as p am fr m in du e be a dg e
ed
ap
sc
nd
la
y
ge s ra ote sto d n n ttle a bo il s eta ga e d se
p at ee ge w ar gh d ll ch rou r an wa dis th nb ons r to als to ati te rv ing ific wa inte ord pec rm lar cc s sto gu s a ers re ole ine h ng e
30
lle
gu
12
0m
17
s
23
ie
lin
30 02 23 0
k
sin
W
D
5 11 5 11
p
ga
sin
85
36
e
lin
lve
e sh
g
23
un
ie
s
ga
5 11
be to alls d es w un ro pip m l g fro e g e ve bin ay bov th le s m aw rt a g to ard g ve plu m in in in nd all 0m mb ord ns m sta 90 plu acc tio 0m tion s la ab :40 45 nec all be gu s 1 to r re unm con e to of ll nb ip im wer fa in il p . m se so min to 0Ă˜ a 10 id to la
bo
B
tile
21
de sli
el d ste te e m t in am 0m os pa fr 10 l p ec., ow x d 0 tura sp in d 10 truc ng. h w re s e atc ve le to m nti to a c e of ov e ab lin b sla
on cti rm ne sp nfi on st co er c dju a r to w d to se an ac of e ly m ntr ion n sit ing o o it c s o ord fr n po int cc ay tio aw ec po e a m onn lin 1,5 r c re we se
. .C 0 T.O,68 -0
s
30
12
om
ro
k
. .C 0 T.O,51 -0
r
nte
VP O ith ls Ă˜ w ne 0 ct pa 10 Du ss in cce a
0 23
0 46 0 23
m
fa
0
23 p d m e pu firm ol on t po c lis d be ia se to ec po ion l sp ro o it p s po po ith w
ily
2 00
5
11
60
64
C
10
11
0 23
00 12
41
00
60
g g in ilin elv eta sh d d ery an in s t jo ons ard lis ati bo cia cific p e cu sp spe to d 30 an
02
l ul
tile
70
ed e as ir ch g w dp sin r rw u ste Ă˜ all pla 75 to w & in esh m
30 48
en
y er
sc
11
s
d
ow
all
D
d/w
de
sh
t/d w/m
sli
rit be ge wc
0 23
s
tile
0
53
de sli
p ste
@
kit
13
m
am
ht
0m 17
3
m
m
05
28
wn do
D
D
00 10
ht
ll
fa
1
11 5
11
n
e ch
m m 75 29 @
s tile & in ed a m re sc id to la
am be
. .C tile T.O,850 -0 s
el tail g, in s en de ch st 00 tail ard kit iali 48 de bo al ec ut up s fin sp yo c il la nd deta to en a st ch nters iali e it c k u e ov co sp ve ab to sto r s cto ga xtra e
0
p/b
23
lin
5 11
s
ga
00 27
.C 0 T.O,68 -0
ld fo
s
tile
5
34 00
12
DELVERS STREET INTERVENTION
A Inner City Vegetable Nursery _________________________________________________________________________________ bas honours design studio elective johannesburg cbd // march 2012 Delvers Street is a melting pot within the Johannesburg inner city, recognised for the considerably varying social conditions across the four districts which define it. Conceived as a vegetable nursery, the steel structure supports the sustainable production of vegetables through the use of recycled Coca-Cola bottles, rain water harvesting, and education. Attempting to bridge the divides between diverse groups of people who occupy Delvers Street and the greater Johannesburg inner city, the structure allows for the nursery to adapt to the changing needs of the city’s dwellers and in particular those of the informal vegetable traders.
Revit to Photoshop
Hand drawn site observation (above)
0 23
ny t a be e b ec ot hit ill n ay e arc y w g m th e th art win om to ABS of p ra fr y ign is d ion ork le S rt s pe des f th is All w cab rs pro er rt o perm d. ppli ee in be e a t ve a th oth p ng to st s ny No hou pro the e , , e ot p 0) it ain a t. gs n e b ns ls m by c r w a 0 re re hite ne oard 104 win are e th atio ria d ig dra gs b ific ate an uctu arc es nt b NS y ils win ip to pec s. M s. ed l str the er d me (SA ta ra h s n n ut b le is d. rv a e h o o o de d ns d se rn wit r oth gre ons d ese ma an ucti ucti d rubb ecte re te ti a le g o s str tr rrie d ir h rk a ht ex in y or ula NS sc . T wo ard in ins ca an e d ll g rig or rm art S is A SA h er gs d nd ts d : py al nfi r p B Re rg win an sta itec nte are bis erw . in ht co rn co e SA g s. , la dra rial S rch pri ons rub oth oard out s rig g is e inte first y oth be uildinlation B a s ti n te re ec all ss ce b set e t tio se a SA h py win th out y an ls to l B gu F uc the ll m ith wit ctu sp ct, nle oti as f th hou o it Co dra es to with ed b teria tiona ty re str to . A w ce ufa d in ntra ll, u n on & on w is g d s a a ie , in nce nly rm an an uire co s fi ects lati ality ce G ati Th an itte r u ll m e N oc n o nfo rd m q of a it ti u n o 0- und ed ch rm d o t. A th g s : ati fera ns co cco ing re n ed rch ven e q me 40 f fo rmin pe pie ec with ildin es cific pre nsio to t a us t all letio us rd a nd r th om 10 o te ll e a a fo c t e d ic to a p e co hit ly bu S epth e de of a ha no ts sp take dim s an in str ed re th com not b tand ght ible not arc mp s & N l rr li A . D to b Top y c co de era itec hall red kind out fe nsu On ay n, s ral ons may - S onlyvels cts. . An ved co en rch . s figu ve d e re d e te. d m itio atu sp g G he a s etcuse ecti carrie ust b e an tora , an pos ith n ld re uildin cil. ions f site d le hite und ppro ch o un arc gro a be sp e T tail d, m ng ec site ed w he e b un at d de ale ir re to b lied rra insp e rov ided t be f th h co er tion gro the ed an to gin sc the rk pp to a g m th app rov no n o ug op ina ed h ish to ata en of wo & a tor ildin fro in e p will tio thro ite xam nish wit e fin rted er d and nsio c ll d t u d s c fi t d b e c a e a lb e e th po oth ct ime l c tru ns us ontr ca mov ere s to hite ons pla n & ace fina firm w t re nd hite r d C e lo re and om arc e c g io urf & con elo firs a rc fo ro he Th ildin vat m s ps & m b be nes e a ible th be e li id th s te e le t u o . T v a n s m it to b fr f ip s 0 us g to o c ab . Pro bit 0-O nsh the ex red r o on 50 m ildin ed sp ite. p ha 40 ma l of ap t, pa be er um site bu ort re n s S b 10 ork va ou pre um ine im n s, p eld o AB m g are s n eng min ry o sion be re be h ork w pro (S m a ap ttin gs linth r & e a ssa en to not g w ls 00 d te f 5 n Se win t of p acto to b nece , dim s are will encin lin o rou m te min le g e a Dra igh ontr ons ed vels ncie ect mm re b nc e a ab to ree he e c ati em ll le pa hit co g co b ort d th und de t. A cre arc of d to pp be s e fo vels ec dis The me s: se s u e pla ac e es he s ac un rf le hit ny n. e ti ot str enc firm urf (g su p o arc d a ctio at th l n pre tr on s M te gri an rre ed ra st on et rete DP cre ck an co tifi tu ca ati e s nc ne con bri ch no ruc pre und b co bra of dle all nd c n St ild in of fo ons to Newmem . Top (gu c.s to sa e m iv c ll Bu epth dati eer. of d fi dp l dp imu ce e D un gin pro cte ved ica in to re urs Fo en mp pa ro vert m m rk co rw by da com app ide 0m wo ery the 3 rick ev s o m v on ell e h w vid pro wit ll b rce les mm ro & n A P ls ed . kfo s u 250 eed sil ish ified bric ir ds xc ed e fin ec e ll sta ea rs e pac as ir ch g w sp ceiv . A al tr se r s a be dp sin r re es equ of ri ste m to alls rw u ste nd sid ith er balu st re s Ø wall pla es w u 5 ro & w mb m mu he 7 to pip m l g y fro ve g e in esh nu 0m es nis f a ve in th a o b le m s 10 ish or fi n o n m aw rt ab to fin flo litio sio ard g ing ve plu m d in in ll n of mo en a 0m mb ord ns m sta de dim 90 plu acc tio 0m tion s 0 n la b c 5 all 4 ne of all be gu sa 1:4 to r re unm con e to of Ro fte nb ip fall im er in w Ra il p in. m se o s m co to 0Ø to a 0 1 id la
0
23
80
re
85
39
60 34
28
ie
C 5
11
0
52
0
00 10 0
00 10
00 10
2 3 12
5 11
rc
s
0 23 30 02 23
01
23 47 7
00 10
23
0
85
36
15
90
26
35
30
23 35
14 0
65
16
a pl Second or lf o nd :50 ou 1Left: gr ale sc
Floor Plan
Ground Floor Plan Opposite page: West Elevation AutoCAD
0 23
0
0 23
39
51
23
5
24
ve le
00
10 5
11
60
11
Above: n
37
h
s
tile
ie
2
wn
do
60
52
0
42
19
30
12
1
y
lle
gu
ste
re
2
0
23 15
11
ge s ra ote sto d n n ttle a bo il s eta ga e d se
ry
10
hig
pa 0 23
re
15
e
da
pla
ie
lin
h d wit roa le d bb de co ed ge b la em vil k vin et roc pa as p am fr m in du e be a dg e
ed
ap
sc
nd
la
5
0
1
00
w do in lw
es s
tile
w
ry nt 00 27 k
sin
g
p at ee ge w ar gh d ll ch rou r an wa dis th nb ons r to als to ati te rv ing ific wa inte ord pec rm lar cc s sto gu s a ers re ole ine h ng e
r
23
30
30 48
02 23 0
23
be to alls d es w un ro pip m l g fro e g e ve bin ay bov th le s m aw rt a g to ard g ve plu m in in in nd all 0m mb ord ns m sta 90 plu acc tio 0m tion s la ab :40 45 nec all be gu s 1 to r re unm con e to of ll nb ip im wer fa in il p . m se so min to 0Ø a 10 id to la
0m
17
s
lve
ga
sin
85
36
C
nte
30
02
12 p
e sh
l
ve
le
2
VP O ith ls Ø w ne 0 ct pa 10 Du ss in cce a
W
m
or
flo
0 00
5
e
D
ga
v
g g in ilin elv eta sh d d ery an in s t jo ons ard lis ati bo cia cific p e cu sp spe to d 30 an
11
lin
15 51 5 11
ge
ra
to
pa
1
11
k
. .C 0 T.O,51 -0
11
g g in in tail elv e sh y d d er an in s s t jo tion d r s a oa iali ific ce pb ec ec cu sp sp pla to nd fire s a ga
gu
hb
3 5 11
de
0m
r
30
sli
de
21
s
ga
2 65m p m ra l @ 24 l@ rc
up
0
23
rit be ge wc
23
70 43 D
el d ste te e m t in am 0m os pa fr 10 l p ec., ow x d 0 tura sp in d 10 truc ng. h w re s e atc ve to m tile to an e c of ov e ab lin b sla
48
. .C 0 T.O,68 -0
y er
l
ul
sc
ht
6
c tw
6 22
D
17
0 46 0 23 30
ie
ily
m
tile
m oo
00 10
p ste
fire 0 23 0 23 ht m
m
65
l@
24 2
l@ rc
W
w/m d/w
11
0 41 13
5 11
wn do
ll wa m m 5 46
11
t/d
tile
s
un
0
p ste
ste m 0m 17 ht
D
1
sli
p
53
D
fa
bo
B
5
1 11
0 23
12
ed e as ir ch g w dp sin r rw u ste Ø all pla 75 to w & in esh m
12
on cti rm ne sp nfi on st co er c dju a r to w d to se an ac of e ly m ntr ion n sit ing o o it c s o ord fr n po int cc ay tio aw ec po e a m onn lin 1,5 r c re we se
46
wn do 58
00
n
p
0
do
wn
ch
m
ed e as ir ch g w dp sin r rw u ste d Ø all pla re 75 to w & ve le in esh nti m ca e of ov e ab lin b sla
80
11
0 23
15
s
h
0
70
17
11
tile
m
m
5 12
al
on
cti
se
ht
sla
23
wn
do
p
ste
15
en
kit
13
ste
75 29 @ m 00
0 24 17
A
70
5
11
s
0
43
5
ut yo l la ica ctr s ele tail g, in s en de ch st 00 tail ard kit ciali 48 de bo t p e u u s fi sp yo c il la nd deta to en a st ch ters li e kit un ecia ov co sp ve ab to sto r s cto ga xtra e
de
41
23
30
28
70
p d m e pu firm ol on t po c lis d be ia se to ec po ion l sp pro sit poo po ith w
er
l na
sli
en
s
0
@
ht
be
d
ow
23
66
0
ld am
m
m
05
3
sp
28 87
23
23
ht m m
wn
05
do p
ste
D
D
ll ha
5
11
be
p/b
m m
69
ga
s ll tile fa & in ed a m re sc id to la
t
90
e
lin
s
a be
28
5 34
by
1
17
0m
m
82
. .C 0 T.O,68 -0
ate
m
z ori
rc
11
fr
lis
ia ec
alu
D
fr
iu
in
m
au
do
d
tte
lly
ta
on
m
or
ll
fa
1%
to
d
. .C 0 T.O,00 0
2
5 92
12
5 34
o po
m m m : te 70 m no 1 00 ir @ 3 sta ers s @ ris ead tr
. .C 0 T.O,51 -0
id
la
to
ath
ht
0 77
. s .C tile T.O,850 -0
10
l
00
e nc
28
pa
. .C 0 T.O,17 0
ll
we
m
02 23
00
2
fo
tile
d
e er
D
s
tile
ha
@
tio
43
co
5
34
30
w do
0
1 77
s
tile
le
ub
do
ge
ra
ga
34
1 0 28 28 0 56 0
fo
ld
di
5
12
10
1
up
g
n ni
34
s
d
en
00
lid so in r m oo 30 re d fi
am
0
46
s
tile
3
62
e
lin
s ll tile fa & in ed a m re sc id to la
DP RW ith ls Ø w ne 0 ct pa 10 Du ss in cce a
en
0 s
ga
0
23 0
1 15
10
75
70 37
0 30 0 60 2
48
v
30
W 7 0
or
28 0 00
00
18
4 5
40
25
Flo
0
bra
e
tra
28
5 48 s
ga
40
73
0
0 28 0 28
5
ai
up
d
p
0
23
5 34 ps
ste
3
a be lo to m e fro pip ted c RW te pro
e de
0 28
tile
34
35
70
de sli
0 30
18 37 s
12
m
u
lo
n
80
15
70
12
2
m m : te 70 m no 1 50 ir @ 3 sta ers s @ ris ead tr
&
e ng
0
e
g e ra lab rd sto w s ga tes ttle elo om no bo d b le fr nd s a ga cate ssibtail lo cce de a ee s
5
34
ed on
be firm to con ucti tr ps d te n ns f s e a co r o sit re be on efo um ed t b l n in itec up a fin termarch de ith 1 w
e
lin
28
s ga
00
ie
0
er rv seoom r
23 5 34 5 W 3
d
re
ve tile e
n ca of ov e ab lin b sla
ll
wa
23
D
te re g nc in s 00 co ord il 30 st cc eta ca a d 0 u se rs 60 sit a ee in irc gin m : 0m m sta en te 7 m to no 1 80 ir @ 2 sta ers s @ 00 ris ead 12 tr e ov ab e 3 dg bri 2 rc of e 1 lin up
ed e as ir ch g w dp sin r rw u ste Ø all pla 75 to w & in esh m
0
23
18
fire
0
23
0 23
or
0
00
12
00
20
. .C 0 s tile T.O,17 0
s
11
3 0
47
st
tile
11
23
fire
D
e or
wa
st
11
ce
23
23
23
pla
s
ga
00
fire
0
5
D
wh
ll
11
18
b
wa er e ow b led d sh r to a fe e oo se roo Sid nd fl ctly terp a rre wa co nd a
11
D
2
20 wc
23
00
10
be to alls d es w un ro pip m l g fro e g e ve bin ay bov th le s m aw rt a g to ard g ve plu m in in in nd all 0m mb ord ns m n 0 o sta c 9 plu ac lati 50m ctio bs 0 4 ne all be gu sa 1:4 n m to of to r re un co e nb ip fall im wer p . in il m se so min to 0Ø a 10 id to la
r
0
23 D
00
sh
10
15
on cti rm ne sp nfi on st co er c dju a r to ew nd cto of s e a ly a m ntr ion sit ing co sit on ord fro n po int cc ay tio aw ec po e a m onn lin 1,5 r c re we se
70
27
0 20
W
45
0
0
23
b
wh
0
W 1
18
0
55
ri
00
23
25
5
sli
19
lls
5
re atu list r fe ia te ec wa sp by
0
20
um
at
VP O ith els Ø w n 0 ct pa 10 Du ss in cce a
5
34 30
4
D 11
. .C 0 T.O,00 0
s
tile
23
ie
st
25
4
D
14
0 80
y
ud
e ov ab h hig 00 1m and 04 il @ ters ds NS SA dra lus ro h an ba el it h te el s/s g s ils ly w ste ith nin eta mp ss w n d co le el ru t in lev tal lis s to sta oor on ecia de 60 fl oriz sp stra 01 h to lu 1 all ll ba NS a SA &
5
wc
de
28
h d wit roa le d bb de co ed ge mb g villa k e vin et roc s p am a fr m in du e be a dg e
8
pa
23
0
23
85
70 47
1
7 53
W
W 10
00 10
g
g in in tail elv e sh y d d er an in s s jo on rd list ati a ic o ia if pb ec ec cu sp sp to nd a
C
5 11
30
re VP O ith els Ø w n 0 ct pa 10 Du ss in cce a
2
. .C 0 T.O,00 0
s
tile
0
a
ie
30
00 10
00
ff
st
es
elv
sh
9
5 11
30 02 23 00
0
ro
23
sin
ll
5 11
W
om
k
ey
gu
2 94
18
15
0
46
30
D
9
0
W
ie
23
20
20
60 34
80
24
5 11
0 23
5 11
23
i
CONSTRUCTION
___________________________________________________________________________ bas honours advanced theory & practice of construction johannesburg cbd // may 2012
The major project for the Advanced Theory and Practice of Construction Honours course required groups of four students to explore inter-systems performance in design and construction through re-conceptualising the design of an existing, dated inner city building. With the primary focus being on sustainability, the proposed design needed to facilitate bio-physical, socio-economic, socio-political and socio-cultural issues specific to the context. Individuals were then required to design relevant details.
Cross Section A-A (left) Concept Diagram (above)
Balcony planter / screen detail (left) Concept Diagram (above)
MEYER STREET INTERVENTION
A Mixed-Use Development __________________________________________________________________________________________________ architectural design & theory 3 germiston, jhb // august 2010 Part of Germiston’s urban renewal scheme, Meyer Street is being established as the district’s ‘high street’. With an allocated site along Meyer Street the proposed intervention comprises an art gallery, small preparatory school and three residences. An internal programmed courtyard acts as the unifying space; a safe, pause space. Security, orientation and surrounding activities were the primary informants for the programmatic arrangement while the decision to employ a concrete framed structure was influenced by surrounding structures, sociocultural and socioeconomic conditions.
Concept models
VICTORIA STREET
conference room
sick room
waiting area
atrium kitchenette
gardeners storage
reception/ secretary
school foyer
bition
vertical garden
'ma
st
hi ers ex
JACK STREET
co po ntrac sit to
10
ie
fin de al nu wit term mbe h a ine r o rch d o f ste ite n s ct it ps b e a to up efore nd c be co onfi ns 1 tru rmed cti on 2 ste
17 24
0
ps
4
12
00 34
5
0 28 28 0
din
fold
1 23 66 sta ris ir no tre ers @ te: ad s @ 170 30 mm 0m m
m
36
85
ery
D
we
11
ath
5
23 0
ht
1
m
11 15 D 11
er
23
0
ste
32
@ rcl
ull
5
65 m
5
pd
ow
n
12
s
T -0,5.O.C 10 .
11
11
t/d
11 11 5
tile
D 12
0m
sc
nc
fr
rcl
5
e
s
c
11
17
s lin
15
tra
tile
fr
w/m
ga 51
en
3
T.O 0,0 .C 00 .
32 2
fin to al kit sp ch ec en ialis ele kit t d ctr co chen 48 etails ical lay to unte layo 00 ou sp rs t ec an ut de ga ia list d cu taili ex s sto de pbo ng, tra v tails ard cto e ra s bo ve
d/w
11
2
23
en
1
0
p/b
24
slid e
0 48 3
ch
D 11
es
li
up
kit s
elv
up
24 65 m
0
tw
53
11 5
ga se s bo e d ttle eta sto il a ra nd ge no tes
2 e
D 13
s lin
sh
23
s lin
ht
tile
ce
e
ing
s
pla
ga
28 0
00
tile
ga
28 0
48
D
28 0
2
6
m
5 28
0
5
n
mm
pd ow
roo
cu to pbo an spe ards d s cia a pe list nd cif jo sh ica ine elv tio ry ing ns de tail ga ing s fire
05
ste
s
28
17 0m m
ily
tile
@
34 5
34
82 43
ow n ste pd 17 0m m
be am
46 0
fam
e
28 0
29 75 m @ be am
tio
23 0 70 43
23 0
MEYER STREET
23 0 0
am
70
D 21
T -0,6.O.C 80 .
pa v infr ing a ase ed dum t vil ge p ro lag be ck e c am e ob mb ble ed w de ith d ro ad
23
pa
T -0,5.O.C 10 .
27 00
gro sc und ale flo 1:5 or 0 p
D
be
e
41
0
40
28 0
m 2
0
slid
23
Ground Floor Plan 1
10
23
3
ng
s
35
sc laid reed to & ti a m les in fall
23 0
bo un da sto ry wa re rm ll ho gula wate en les r inte r to gin ac d ee cordrvals isch rs a sp ing thro rge ec to ug at ific nb h w ati r a ee on nd p s
lou
red
30
e
re
all 90 plum 0m bin m all a gp to plum way ipes fro to nb be a bing m b r re cc wa e gu ordinabov lls min lati g eg to imu se nm ons to th roun we e d 10 r c 450 on m laid 0Ø s m n ec to oil p tio inve a m ipe n rt le in. to ve fall sab l of s s 1:4 tan 0 da rds
12
slid
ie
10 str 0 x to uctu 100m to eng. ral p m s ma sp os te el tch ec t win ., pa lin do inte w sla e of fra d b a can me bo tile ve ve red
75 into Ø rw me wa dp c sh ll u has & p sin e las g w d ter ire
g
tile
ve
s
T -0,6.O.C 80 .
e
28 0
co
tile
atrium
12 00
0 48 3
43 70
30 30 2
723 02
37 7
46 0
B
pro po pos wit sition ed p o hp oo to be ol pu ls pe con mp cia firm list ed
5
s lin
@
d
W
ht
tile s T -0,8.O.C 50 .
en
ht
w
3
ga ga s lin lo s bo e ac cate ttle se cess d be stora e d ib low g eta le fr s e il a om lab nd g & no ard tes en
34 ga
gallery reception
wh b
allo
5
00
ht
sh
34
18
fold
t
i
56 0
ialis
raa
05 mm
23 0
8
ol
sb
0
28
ec
70
ga
23
@
sp
69 2
covered entrance
po
by
00
foyer
co po ntrac po sition tor to lin int o of s co e a n s e nfi cc ite wer rm ord an c re ing d a onn se 1,5m ly dju ecti we st o r c awa sp n on y frentrance covered ne cti om on
12
security control room
sc laid reed & visitors lockers to a m tiles in fall
30
red
5
10 0 15 in Ø R 10 ac Duct WD ce ss with P pa ne ls
A
lin sla e of b a can bo tile ve ve
up
15 00
3
0
30
00
d
46
20 18
to d fr be om loa
d
15
0
RW pro pip tec e te
en
55
5
0
90 73 87 28
ep
25
34
23
sta ris ir no tre ers @ te: ad s @ 170 35 mm 0m m
de
0
m
gallery exhibition ramp entrance
47
12 62
5 34 70 12 5 92 5 34
security desk
0
cafe kitchen
all 90 plum 0m bin m all a gp to plum way ipes fro to nb be a bing m b r re cc wa e gu ordinabov lls min lati e g kitchen gcafe to imu se nm ons to th roun we e d 10 r c 450 0 on m laid Ø s ne m to oil p cti inv on ert a m ipe lev in. to el fall sab s of 1:4 stan 0 da rds
courtyard entrance
23
11
p
o ion r to lin int o of s co e a n s ew nfi rm cc ite ord an er co re ing d a nn se 1,5m ly dju ecti we st o r c awa sp n on y fr ne cti om on
48 5
77
0
10
00
23
02
30
23
0
bus stop; school drop off & collection
23 014
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
ram
p'
auditorium
W
80
17
70 23
0
West Elevation (above)
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
ODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Cross Section through School (below)
North Elevation
Conceptual Drawings
0
0 23
30 20
0 0 18
3
00 48
20 4 19
ai bra
5 34
0 23
W
00 18
3
e lin
5 34
s ga
s
tile
00 30
s ga
ed
C
pa
0
20 20
0 23
0 52
5 11
m re atu list r fe ia te ec wa y sp b
30
riu at
3
21
00 48
de
am be sli
70 41
@
80 39
W
1
4
ll gu
C
ey
s
W s 10 d an i s jo rd list a oa ia ific pb ec ec cu sp sp to nd a
ie
85 28
D
lin
D
e
ng
s ga
. .C 0 T.O,51 -0
ni s tile
di
ht
13
0 23
0 23
0 53
m o ro
s d an i s jo rd list a oa ia ific pb ec ec cu sp sp to nd a
p
fl nd ou 1 gr ale sc
. .C 0 T.O,68 -0
ily
m m 05 28
s tile
m fa
0 23
30 70 37 de
8 24
2
2
D
D
0 23
0
0 46
W
D
e ov ab h hig 00 d 1m an 04 NS il @ rs s ra ste d SA nd alu l ro h ha b tee wit el s/s g s ils ly ste ith nin eta mp ss l w n d co le e ru t in lev tal ialis s to sta oor zon ec ade 60 fl ori sp str 01 h ll to alu S 1 a ll b N a SA &
5 34
ge un s tile
tio
lo
VP O ith els Ø w n 0 uct pa 10 D ess in cc a
ce pla fire
0 4 35
. .C 0 T.O,68 -0
s ll tile fa & in ed a m re sc id to la
0 23
e
30
sli 0
00 30
ie
e lin
0 ge & en ra lab ard sto w s g tes m ttle elo o no bo d b le fr nd s ib a ga cate ss tail lo cce de a ee s
s ga
23
r ve co
ed e as ir ch g w dp sin r rw u ste Ø all pla 75 to w h & in es m
30 12
el d ste te e m in am t 0m os pa fr 10 l p c., dow e x 0 tura sp in d 10 truc ng. h w re s e atc ve le to m nti to ca e of ov e ab lin b sla
0
p at ee ge w ar gh nd ll ch rou r a wa dis th nb ons ry r to als to ati da te rv ing ific wa inte rd ec rm lar cco sp stoegu s a ers r ole ine h ng un
bo
25 2 10
60 0 56
18 37
0 28 0
75 53
d re
0 7 12
s ga
0 23
s ll tile fa & in ed a m re sc id to la
5 34
. s .C 0 tile T.O,85 -0
ld be to alls d un es w ro pip m o l g g fr e e ve le ov th bin ay s rt m aw ab to ard ve g ing plu m in nd bin rd ns all m m n 0 o m sta 90 plu acc latio 0m ctio bs 0 5 sa :4 all be gu m 4 nne to of 1 to br re un co e ip ll n im er in w oil p in. fa m se s m to 0Ø a 10 id to la
re
1
0 2 0 28 0 28
ve le nti ca e of ov e ab lin b sla
4 5 10 15 DP RW ith els Ø w n 0 ct pa 10 Du ess in cc a
0 0 12
d en
fo
14 0
28 0 28 0 28 28 80 0 2 26
5 34
2
0 46
t lis cia e sp
ow
43
28 ld
1 15
ie
ad be lo to m e fro pip ted c RWrote p
by
ol po 00 30
all sh
p d m e pu firm ol on t po c lis d be ia se to ec po ion l sp pro osit poo p ith w
on cti rm ne sp nfi on st co er c dju a r to ew d to f s an ac o e ly m ntr ion sit ing fro n co osit t on ord ay tio p oin acc aw ec p e m onn lin 1,5 r c re we
ie
de
m 05
5 48
5
B
sli
m
ht wn do p
1 wn do p ste m 0m
@
28 m
m a be
5
23
2
82
0
0 fo 70
43
17 30 2 30
0
46
ste
0m
17
Ground Floor Plan
23
34
55 25
28
5 am 00
5 34
87
11 se
75
0
0
ed be firm tion to con uc ps d str te an on c fs e r o sit re be n efo m do tb nu ine ec up al up hit fin term arc ps de ith ste 1 w
d en
0
47
73
34 be 12
m
m
ht 3 02 7
23 47 37
0
@
29 01 23
3 02 0 46
70
m m m : te 70 m no 1 50 ir @ 3 sta sers s @ ri ead tr
p e de
A
23
0 23
on cti rm ne sp nfi on st co er c dju a r to ew d to f s an ac o e ly m ntr ion sit ing fro n co osit t on ord ay tio p oin acc aw ec p e m onn lin 1,5 r c re we se
90
00 69 43
5 70
30 00
15 28 30 48
be to alls d un es w pip om gro l g fr e e ve v le bin ay bo to th s rt m aw a g ard ve g plu m in in in nd all 00m mb ord ons m sta m on lu cc ti 9 p bs 0 a la 50 cti sa :4 all be gu m 4 nne to of 1 to br re un co e ip ll n im er in w oil p in. fa m se s m to 0Ø a 10 id to la
24 17
34 12
02 23 10
77
0
23
0
5 34
92
5
JUTA STREET STUDENT HOUSING
________________________________________________________________________ bas third year design studio braamfontein, jhb // may 2010 The project brief was to design a multi- storey building on a tight site in Braamfontein which would offer variations of student housing to the University of the Witwatersrand. Further programmes required included shared recreational and kitchen/dining spaces, a rooftop swimming pool, a lecture hall and offices for visiting lecturers.
Working Model
Residential Floor Plan
be All All En So All
0 year warranty, SP4 stick on bituminous waterproofing with 75mm side laps & 100mm end laps under 250 micron lastic sheeting with 50mm laps, loose laid as protection ayer in accordance with manufacturer: 'derbigum'
ementitious bandage
0mm polystyrene insulation
0 x 85mm timber forming a slope towards the roof
nodised aluminium transom with pressure & rainage opening to specialist spec.
mm aluminium sheet powder coated with profiled 'clip'
nodised aluminium transom 'face' with pressure & rainage opening, joined to transom by alloy-steel op rivet to specialist spec.
EE1
100mm polystyrene insulation panels glued to slab with 100mm gaps between panels
mm MS plate fixed to RC parapet with rawl bolts, painted with ne coat red lead primer, one coat universal undercoat & wo coats enamel
neig
3mm profiled aluminium sheet powder coated
350 x 80mm precast conc. coping
cementitious bandage
drip
cementitious bandage
T.O Parapet 53 442
10 year warranty, SP4 stick on bituminous waterproofing with 75mm side laps & 100mm end laps under 250 micron plastic sheeting with 50mm laps, loose laid as protection layer in accordance with manufacturer: 'derbigum'
luminium sheet bolted to inside of RC upstand beam
min. 35mm screed laid to min. falls 1:50 to 100mmØ FBO set min. 20mm below slab on min. 170mm RC slab with T-beam to eng. spec. 150 x 150 x 5mm MS angle iron fixed to RC downstand beam with rawl bolts, painted with one coat red lead primer, one coat universal undercoat & two coats enamel
fixed glazing: 6mm float glass, 12mm argon-filled cavity, 12mm float glass by manufacturer
mm MS infill bracket painted with one coat ed lead primer, one coat universal undercoat & two coats enamel
3mm stick on bituminous waterproofing
anodised aluminium transom with pressure & drainage opening to specialist spec. with aluminium finish
2485
min. 35mm screed laid to min. falls 1:50 to 100mm Ø BO on insulation on min. 170 RC T-beam to eng. spec.
smoothly plaster & paint with one coat universal undercoat & two coats PVA
fixed glazing: 6mm float glass, 12mm argon-filled cavity, 12mm float glass by manufacturer
chamfered edge in conc.
fixed glazing: 6mm safety glass, 12mm argon-filled cavity, 12mm safety glass by manufacturer
acrylic bandage flashing
440 x 440mm ceramic tile with 3mm spacing on min. 35mm screed on min. 255mm RC downstand beam to eng. spec.
1000
00mm polystyrene insulation panels glued to ab with 100mm gaps between panels
U/S downstand beam 52 415
80mm polystyrene insulation behind 6mm tinted float glass
anodised aluminium transom with pressure & drainage opening to specialist spec. with aluminium finish
50 x 150 x 5mm MS angle iron fixed RC downstand eam with rawl bolts, painted with one coat red ead primer, one coat universal undercoat & wo coats enamel
TOC 52 800 U/S ceiling 52 630
2274
0mm polystyrene insulation behind mm tinted float glass to specialist spec.
740 x 40mm galvanized grate with a 50 x 50mm grid bolted to the top of the galvanized C- channel forming a window cleaning ledge
5mm MS plate fixed to conc. with rawl bolts, painted with one coat red lead primer, one coat universal undercoat & two coats enamel
MAINTAINENCE LEVEL
840 x 150 x 8mm galvanized plate welded to a 200 x 8mm galvanized plate at a 90 ° angle & bolted to the RC downstand beam with rawl bolts to eng spec.
FFL 50 315
DPC
50mm galvanized grate with a 50 x 50mm grid bolted with rawl bolts to the side of the 840 x 150 x 8mm galvanized plate forming the sun shading device HVAC 80mm polystyrene insulation behind 6mm tinted float glass
840 x 150 x 8mm MS plate welded to a 200 x 8mm galvanized plate at a 90° angle & bolted to the RC downstand beam with rawl bolts to eng spec.
U/S downstand beam 2 675 U/S ceiling 10 826
2mm sheet steel 'smoke stop' bolted to underside of RC downstand beam & joined to transom 6mm suspended gypsum ceiling board painted with one coat universal undercoat & two coats PVA suspended by white powder coated aluminium T-section runners at 800mm c/c
smoothly plaster & paint with one coat universal undercoat & two coats PVA
500mm ceiling void fixed glazing: 6mm float glass, 12mm argon-filled cavity, 12mm float glass by manufacturer
50mm layer of river rounded stones, no geotextile sheet required
2537
3400
300 x 75mm aluminium angle white powder coated & bolted to the RC downstand beam
anodised aluminium transom with pressure & drainage opening to specialist spec.
100mm polystyrene insulation panels glued to slab with 100mm gaps between panels
fixed glazing: 6mm safety glass, 12mm argon-filled cavity, 12mm safety glass by manufacturer
FF1
7 x 100mm tongue & groove laminate meranti timber floor boarding on 15mm foam on min. 35mm screed on min. 255mm RC slab with downstand beam to eng. spec.
1000
10 year warranty, SP4 stick on bituminous waterproofing with 75mm side laps & 100mm end laps under 250 micron plastic sheeting with 50mm laps, loose laid as protection layerin accordance with manufacturer: 'derbigum' 700 x 700 x 80mm galvanized expanded metal containment
5mm MS plate fixed to conc. with rawl bolts, painted with one coat red lead primer, one coat universal undercoat & two coats enamel
LOUNGE
350 x 80mm precast conc. coping cementitious bandage
FFL 8 187
80mm polystyrene insulation behind 6mm tinted float glass
min. 50mm screed on bituminous waterproofing on min. 35mm screed laid to min. falls 1:50 to 100mmØ FBO set min. 20mm below slab on min. 170mm RC slab with T-beam to eng. spec.
DPC
6mm gypsum ceiling board nailed to 38 x 38mm brandering to form a 200 x 400mm bulkhead, smoothly plastered & painted with one coat universal undercoat & two coats PVA
U/S ceiling 7 865
10mm 'neoprene' soft joint; movement joint 10mm 'neoprene' soft joint; movement joint
'V' joint
U/S downstand beam 7 445
10mm 'neoprene' soft joint; movement joint
3060
300mm masonry cavity wall with galvanized steel brickforce every 4th course internal leaf: 'red clay' facebrick with flush mortar joint external leaf: stock brick, smoothly plastered & painted with one coat universal undercoat & two coats PVA 75 x 75mm polystyrene cornice painted with one coat primer & two coats PVA
smoothly plaster & paint with one coat universal undercoat & two coats PVA
900mm stainless steel balustrading with 50mmØ handrail & 10mmØ bar infills by manufacturer: 'aquarius'
80mm polystyrene insulation
1000
10 year warranty, CG3 & CG4 torch on bituminous waterproofing with 75mm side laps & 100mm end laps under 250 micron plastic sheeting with 50mm laps, loose laid as protection layerin accordance with manufacturer: 'derbigum' 280 x 50mm precast conc. coping
300mm masonry cavity wall with galvanized steel brickforce every 4th course internal leaf: stock brick, smoothly plastered, painted with one coat universal undercoat & two coats PVA external leaf: 'red clay' facebrick with recessed mortar joint
2733
flush plastered ceiling with 12 x 10mm recessed joint to slab at junction of wall & downstand beam, 'shadowline'
flush plastered ceiling with 12 x 10mm recessed joint to slab at corner of soffit, 'shadowline'
80mm polystyrene insulation 150 x 15mm supawood skirting painted with one coat primer & two coats PVA
cementitious bandage GALLERY
min. 35mm screed laid to min. falls 1:50 to 75mmØ FBO set min. 20mm below slab on min. 170mm RC slab with upstand beam to eng. spec.
7 x 100mm tongue & groove laminate meranti timber floor boarding on 15mm foam on min. 35mm screed on min. 255mm RC slab with downstand beam to eng. spec.
'V' joint
U/S ceiling 5 245
10mm 'neoprene' soft joint; movement joint
10mm 'neoprene' soft joint; movement joint
10mm 'neoprene' soft joint; movement joint
smoothly plaster & paint with one coat universal undercoat & two coats PVA
230mm masonry wall with galvanized steel brickforce every 4th course internal & external leaf: stock brick, smoothly plastered & painted with one coat universal undercoat & two coats PVA
GARDENERS STORAGE
section y-y
FFL 5 510
LOUNGE
smoothly plaster & paint with one coat universal undercoat & two coats PVA
flush plastered ceiling with 12 x 10mm recessed joint to slab at junction of wall & downstand beam, 'shadowline' flush plastered ceiling with 12 x 10mm recessed joint to slab at corner of soffit, 'shadowline'
JOB U/S downstand beam 4 820
CLIEN
STAN
TOW
1:20
PROJ
DRAW
REVI ARC DRA DATE SCAL CHEC
PRODUCED BY AN AUTODESK EDUCATIONAL PRO
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
10 year warranty, SP4 stick on bituminous waterproofing with 75mm side laps & 100mm end laps under 250 micron plastic sheeting with 50mm laps, loose laid as protection layer in accordance with manufacturer: 'derbigum' cementitious bandage 80mm polystyrene insulation
7 x 100mm tongue & groove laminate meranti timber floor boarding on 15mm PE foam on min. 35mm screed on min. 255mm RC slab to eng. spec.
5mm MS plate fixed to conc. with rawl bolts, painted with one coat red lead primer, one coat universal undercoat & two coats enamel
anodized aluminium transom with pressure & drainage opening, joined to transom by alloy-steel pop rivet to specialist spec.
80mm polystyrene insulation behind 6mm tinted float glass to specialist spec.
70 x 85mm timber forming a slope towards the roof anodised aluminium transom with pressure & drainage opening to specialist spec.
3mm MS infill bracket painted with one coat red lead primer, one coat universal undercoat & two coats enamel
3mm aluminium sheet powder coated with profiled 'clip' anodised aluminium transom 'face' with pressure & drainage opening, joined to transom by alloy-steel pop rivet to specialist spec.
100mm polystyrene insulation panels glued to slab with 100mm gaps between panels 350 x 80mm precast conc. coping
5mm MS plate fixed to RC parapet with rawl bolts, painted with one coat red lead primer, one coat universal undercoat & two coats enamel
150 x 150 x 5mm MS angle iron fixed RC downstand beam with rawl bolts, painted with one coat red lead primer, one coat universal undercoat & two coats enamel drip
cementitious bandage
silicone sealant joint
aluminium sheet bolted to inside of RC upstand beam
80mm polystyrene insulation behind 6mm tinted float glass to specialist spec.
10mm 'neoprene' soft joint; movement joint fixed glazing: 6mm float glass, 12mm argon-filled cavity, 12mm float glass by manufacturer
3mm MS infill bracket painted with one coat red lead primer, one coat universal undercoat & two coats enamel
3mm stick on bituminous waterproofing
gundle brickgrip DPC 375 damp proof course, type B with min. 150mm overlaps anodised aluminium transom with pressure & drainage opening to specialist spec. with aluminium finish
150 x 150 x 5mm MS angle iron fixed RC downstand beam with rawl bolts, painted with one coat red lead primer, one coat universal undercoat & two coats enamel
min. 35mm screed laid to min. falls 1:50 to 100mm Ø FBO on insulation on min. 170 RC T-beam to eng. spec.
chamfered edge in conc.
2485
RC downstand beam to eng. spec.
10mm 'neoprene' soft joint; movement joint
acrylic bandage flashing
100mm polystyrene insulation panels glued to slab with 100mm gaps between panels
detail EE1 1:5
740 x 40mm galvanized grate with a 50 x 50mm grid bolted to the top of the galvanized C- channel forming a window cleaning ledge
detail FF1 1:5
840 x 150 x 8mm galvanized plate welded to a 200 x 8mm galvanized plate at a 90 ° angle & bolted to the RC downstand beam with rawl bolts to eng spec.
50mm galvanized grate with a 50 x 50mm grid bolted with rawl bolts to the side of the 840 x 150 x 8mm galvanized plate forming the sun shading device
Curtain Wall Details
300mm masonry cavity wall with galvanized steel brickforce every 4th course internal leaf: smoothly plastered & painted with one coat universal undercoat & two coats PVA external leaf: 'red clay' facebrick with recessed mortar joint
DPC flush plastered ceiling with 12 x 10mm recessed joint at corner of soffit; shadowline
HVAC 840 x 150 x 8mm MS plate welded to a 200 x 8mm galvanized plate at a 90° angle & bolted to the RC downstand beam with rawl bolts to eng spec. 300 x 75mm aluminium angle white powder coated & bolted to the RC downstand beam
3400
7 x 100mm tongue & groove laminate meranti timber floor boarding on 15mm PE foam on min. 35mm screed on min. 255mm RC slab to eng. spec.
5mm MS plate fixed to conc. with rawl bolts, painted with one coat red lead primer, one coat universal undercoat & two coats enamel
anodized aluminium transom with pressure & drainage opening, joined to transom by alloy-steel pop rivet to specialist spec.
80mm polystyrene insulation behind 6mm tinted float glass to specialist spec.
50mm layer of river rounded stones, no geotextile sheet required 100mm polystyrene insulation panels glued to slab with 100mm gaps between panels 10 year warranty, SP4 stick on bituminous waterproofing with 75mm side laps & 100mm end laps under 250 micron plastic sheeting with 50mm laps, loose laid as protection layerin accordance with manufacturer: 'derbigum' 700 x 700 x 80mm galvanized expanded metal containment 350 x 80mm precast conc. coping
3mm MS infill bracket painted with one coat red lead primer, one coat universal undercoat & two coats enamel
cementitious bandage min. 50mm screed on bituminous waterproofing on min. 35mm screed laid to min. falls 1:50 to 100mmØ FBO set min. 20mm below slab on min. 170mm RC slab with T-beam to eng. spec.
150 x 150 x 5mm MS angle iron fixed RC downstand beam with rawl bolts, painted with one coat red lead primer, one coat universal undercoat & two coats enamel
6mm gypsum ceiling board nailed to 38 x 38mm brandering to form a 200 x 400mm bulkhead, smoothly plastered & painted with one coat universal undercoat & two coats PVA 'V' joint 10mm 'neoprene' soft joint; movement joint
10mm 'neoprene' soft joint; movement joint
300mm masonry cavity wall with galvanized steel brickforce every 4th course internal leaf: 'red clay' facebrick with flush mortar joint external leaf: stock brick, smoothly plastered & painted with one coat universal undercoat & two coats PVA
3060
silicone sealant joint
75 x 75mm polystyrene cornice painted with one coat primer & two coats PVA 80mm polystyrene insulation
RC downstand beam to eng. spec.
South Elevation detail FF1 1:5
10 year warranty, CG3 & CG4 torch on bituminous waterproofing with 75mm side laps & 100mm end laps under 250 micron plastic sheeting with 50mm laps, loose laid as protection layerin accordance with manufacturer: 'derbigum'
1000
gundle brickgrip DPC 375 damp proof course, type B with min. 150mm overlaps
280 x 50mm precast conc. coping cementitious bandage
10mm 'neoprene' soft joint; movement joint
300mm masonry cavity wall with galvanized steel brickforce every 4th course internal leaf: smoothly plastered & painted with one coat universal undercoat & two coats PVA external leaf: 'red clay' facebrick with recessed mortar joint
min. 35mm screed laid to min. falls 1:50 to 75mmØ FBO set min. 20mm below slab on min. 170mm RC slab with upstand beam to eng. spec. 'V' joint 10mm 'neoprene' soft joint; movement joint 230mm masonry wall with galvanized
900mm stainless steel balustrading with 50mmØ handrail & 10mmØ bar infills by manufacturer: 'aquarius'
10mm 'neoprene' soft joint; movement joint smoothly plaster
biDVeSt witS SoCCer ACADeMY
_______________________________________________________________ bas third year design studio forest town, jhb // march 2010 Bidvest Wits has become the natural place for talented young South african soccer players to go to if they wish to make a career out of football. the project brief was to design a permanent ‘home’ for the club’s Youth Programme. the site was a steep slope adjacent to the University’s under utilized sport fields in Forest Town which offers spectacular views towards the leafy green Northern Suburbs of Johannesburg. the building needed to accommodate 30 youngsters, offering them dining, recreational, training, medical, dormitory and educational facilities as well as a Caretaker’s flat and an Academy Managers office.
THANK YOU
_____________________________________
KIER BOTHWELL
kierbothwell@hotmail.com // +27 (0)72 765 0999