Kiko construction1 cover

Page 1

THE GENERAL CONTRACTOR SHALL CHECK AND VERIFY ALL INFORMATION SHOWN HEREIN AND SHALL REPORT ERRORS AND OMISSIONS TO THE DESIGNER. THIS DRAWING IS THE PROPERTY OF CENTENNIAL COLLEGE AND SHALL NOT BE REPRODUCED WITHOUT WRITTEN AUTHORIZATION. THIS DRAWING MUST NOT BE SCALED.

ABV. BH BLDG B/0 B/C BC CB CL CL CLG CONC COL. CP C/W CPRT CT DET DN 2R DW E EXT EX. (EXIST) F.D. FIN FLR FIN. FLR. ELEV. (F.F.E.) F.G. GWB G.W.G. INV. L M N. N.I.C. N.T.S. PRO. OPP. R RH RWL S S. SAN. SIM SL SL/DR ST ST. ST. STM. T/C T/O TYP UP 2R U/S VB VCT W W/

ABOVE BOREHOLE BUILDING BOTTOM OF BOTTOM OF CURB BROOM CLOSET CATCH BASIN CLOSET CENTERLINE CEILING CONCRETE COLUMN COVERED PORCH COMPLETE WITH CARPET CERAMIC TILE DETAIL DOWN 2 RISERS DISHWASHER EAST EXTERIOR EXISTING FLOOR DRAIN FINISH FLOOR FINISH FLOOR ELEVATION FIXED GLAZING GYPSUM WALL BOARD GEORGIAN WIRED GLASS INVERT LINEN CLOSET METRES NORTH NOT IN CONTRACT NOT TO SCALE PROPOSED OPPOSITE REFRIGERATOR ROOF HUB RAIN WATER LEADER STOVE SOUTH SANITARY SIMILAR SLOPE SLOPE TO DRAIN STEEL STAINLESS STEEL STORM TOP OF CURB TOP OF TYPICAL UP 2 RISERS UNDERSIDE VAPOUR BARRIER VINYL COMPOSITE TILE WEST WITH

ISSUED

DATE

PROJECT NAME:

INDUSTRIAL BUILDING 525 COCHRANE DRIVE MARKHAM, TORONTO, ON DRAWING NAME:

COVER PAGE

PROJECT NO:

ASSIGNMENT 3 DRAWN BY:

CHECKED BY:

JINGXUETONG

LUCY

DATE:

SCALE:

FEB 24

1:400

DRAWING NO:

A1.01 H:\WINTER 2016\ARCH\kiki\kiko construction1.dwg, 4/11/2016 7:14:57 AM, 300812418, DWG To PDF.pc3, 1:58.8722


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.