Building Environments for Adaptive Reuse & Historical Spaces

Page 1

BUILDING ENVIRONMENTS

FOR ADAPTIVE REUSE & HISTORICAL SPACES



KINSLEY IS A MODERN DAY MASTER BUILDER WITH FAMILY ROOTS What started as a small subcontracting business in 1963 has grown into a nationally-recognized construction firm serving clients in the Mid-Atlantic. We put quality first, meet schedules, work with a sense of urgency, take ownership and produce results.



WE RAISE THE BAR From conversions to renovations, our expertise in the delivery of complex, multi-phase projects on occupied sites allows us to safely construct quality adaptive reuse and historical spaces.

3+ MILLION SQUARE FEET RENOVATED FOR ADAPTIVE REUSE


YORK COLLEGE ENGINEERING CENTER




YOUR PARTNERS IN » Preconstruction » Feasibility and site selection » Cost estimating/conceptual budgeting » Logistics plans and phasing » Project schedule development » Value engineering » Construction Management » Design-Build » Opportunities for value-based decisions

» General Contracting » Building Information Modeling » Project visualization/sequencing » Clash detection » MEP Coordination » Building commissioning » LEED Consulting » Project evaluations and checklists


OUR EXPERIENCE


COMMITTED TO DELIVERING A BETTER PROJECT Whether you’re transforming a former brewery into suites or bringing life back into a historic landmark, our preconstruction expertise ensures a better design and development plan before construction begins. From detailed building investigation with 3-D scanning, to cost-to-value analysis and assistance with historic tax credits – we ensure every project is delivered efficiently, without surprises.


520 PARK APARTMENTS



EDUCATION


YORK ACADEMY REGIONAL CHARTER SCHOOL, YORK, PA

YORK COLLEGE OF PENNSYLVANIA ENGINEERING CENTER, YORK, PA

Renovations to transform a historical ironworks building into a charter school with a 27,000-square-foot, three-story addition. Our team took extensive measures to match new elements with the building’s historical features and showcase its original timber and brick construction.

Conversion of a former fabrics building into a new Engineering Center including metal and wood fabrication areas, laboratories and a student community space. We also installed a large mural and artifacts to connect history with state-of-the-artengineering.


RESIDENTIAL

THE GUNTHER AT BREWERS HILL, BALTIMORE, MD

KREIDER COMMONS, LEBANON, PA

Transformation of a 19th-century brewery complex into a contemporary apartment community. Our team went above and beyond to match original construction details to meet National Park Service and Maryland Historic Trust requirements.

Transformation of a six-story industrial facility into one- and two-bedroom senior living apartments. Initially exceeding budget, we worked with the architect to provide value engineering allowing us to reduce the overall cost.


MILL NO. 1, BALTIMORE, MD

520 PARK, BALTIMORE, MD

Transformation of cotton sail manufacturing buildings into a modern apartment complex. With Jones Falls waterway running through the site, we carefully planned all work to protect the environment during construction.

Renovations to transform a historic warehouse into an upscale, urban environment. Our preconstruction services included extensive value engineering and constructability reviews, which helped save the project over $1 million.


CULTURAL


APPELL CENTER FOR THE PERFORMING ARTS, YORK, PA

GETTYSBURG MUSEUM + VISITORS CENTER, GETTYSBURG, PA

Renovations to modernize aspects of the historic theater as well as combining six structures to expand the main lobby, box office, stage house and the proscenium. Our team also restored the walls, ceiling, ornamental plaster and paintings throughout the space.

Conservation and relocation of the historic Battle of Gettysburg painting. All 26 painted sections were removed and placed on custom-built work tables, where world-class conservators meticulously cleaned and refurbished each panel before it was placed in its new location.


WAREHAUS OFFICE



OFFICE

MCHENRY ROW, BALTIMORE, MD

M.C. DEAN, BALTIMORE, MD

Conversion of a food production facility into an office space. Despite late and major scope changes, our team was able to selfperform the structural steel fabrication and erection to expedite the work.

Transformation of a 100-year-old warehouse into a new office space. Many of the building’s original architectural features were saved as decorative elements in the interior design, including restored brick walls and an interior skylight.


THINK LOUD HEADQUARTERS, YORK, PA

WAREHAUS, YORK, PA

Renovations to the 110-year-old building for the rock band ‘Live.’ The historic nature of the building required that all exterior paint was hand-scraped and windows removed and custom-milled to create historically accurate replicas.

Conversion of a former warehouse into an office space, including masonry restoration and roof repairs. We included features like sustainable materials and highly-efficient building systems to meet the client’s sustainability goals.


HOSPITALITY


GETTYSBURG HOTEL, GETTYSBURG, PA

HOTEL INDIGO, BALTIMORE, MD

Renovations to this 150-year-old hotel including 119 guest rooms, a ball room, lobby, and tavern interior. Our original 10-month schedule was compressed to 4 months and we were able to successfully complete renovations in time for the Battle of Gettysburg anniversary.

Interior and exterior renovations to a historical building to create a new hotel including 162 guest rooms, meeting and board rooms, and a new full-service restaurant and bar. Preconstruction planning and coordination allowed our team to meet the partial occupancy needs of the client with minimal disruptions to their daily operations.



SELF-PERFORMANCE Our in-house services keep clients’ best interests in the forefront. Projects benefit from our ability to supplement labor forces quickly and efficiently should unforeseen issues occur, and self-performing capabilities keep costs competitive. Reduce risks and gain peace of mind knowing that your project will continue on time and on budget. » Steel Fabrication & Erection » Rough Carpentry » Concrete

» Site Utilities » Excavation » Paving


KREIDER COMMONS APARTMENTS




RELATIONSHIPS ARE AT THE CORE OF OUR COMPANY CULTURE Revitalizing an older building comes with challenges and complexities that can affect your design or stall the schedule. With our preconstruction services, construction expertise, commitment to quality and ability to deliver sustainable projects, we’ve become a trusted resource for adaptive reuse and historical preservation work. That’s why 70% of our clients call on us time-and-time again to deliver in every respect.


REV. 1 - MAY. 2019