Latest CDM, VCU, CCX Monitor

Page 1

CARBON MONITOR INDIA CCX, CDM, VCU November 04 2010 Update


CDM STATUS (Source: UNEP RISO) CDM news: In October 98 new CDM projects entered the CDM Pipeline. The issuance of CERs in October was 10.2 MCERs. UNEP projection for the number of CERs issued until the end of 2012 decreased from 976 MCERs to 954 MCERs. Of the 114 MCERs on the issuance waiting list the 77 MCERs are from projects with issuance requests under various stages of completeness check by the UNFCCC Secretariat. The amount of CERs issued is now 450 Million CERs. The average issuance success is 96.2%. Only 802 out of the 2463 registered CDM projects have had issuance of CERs. The share of projects that have requested registration that is registered automatically is increasing, meaning that the time delay from the review cycle is decreasing. The CDM Pipeline now contains 5619 CDM projects after subtracting the 762 CDM projects where the DOEs terminated validation, the 162 where the DOEs gave a negative validation, the 173 projects rejected by the EB, and the 51 withdrawn projects. 207 are in the registration process. One new PoA was submitted in October, increasing the number of PoAs to 59: “Sichuan Rural PoorHousehold Biogas Development Programme� in China The data shows that the average approval time is 296 days for a full scale methodology, 188 days for a small-scale methodology, and 367 days for an A/R methodology.


Status of CDM projects At validation Request for registration Request for review Correction requested

Number 2949 95 60 28 24 207 51 173 162 762

Under review Total in the process of registration Withdrawn Rejected by EB Validation negative by DOE Validation terminated by DOE Registered, no issuance of CERs

1661 802 2463 6767

Registered. CER issued Total registered Total number of projects (incl. rejected & withdrawn) Types of CDM projects by status Type (rejected projects excluded) Afforestation Agriculture Biomass energy Cement CO2 usage Coal bed/mine methane Energy distribution EE households EE industry EE own generation EE service EE supply side Fossil fuel switch Fugitive Geothermal HFCs Hydro Landfill gas Methane avoidance N2O PFCs and SF6 Reforestation Solar Tidal Transport Wind Total

At validation Number 8 1 399 18 1 30 19 44 83 289 20 62 71 23 4 1 738 140 270 10 8 34 45 0 28 603 2949

kCERs 400 10 27214 3635 5 19028 5147 1465 3958 28695 249 27794 19342 7180 320 18 94255 15641 16104 2311 1747 3960 1552 0 3006 49477 332516

2012 kCERs 1839 18 85364 10732 17 58938 13265 3784 10388 91416 699 50014 54333 19094 1122 68 204859 42360 53195 6353 3882 9128 2890 0 7178 119146 850084

Request registration 2012 Number kCERs kCERs 0 0 0 0 0 0 12 973 2815 1 240 818 0 0 0 14 6386 18087 1 230 633 7 155 375 2 17 135 16 4284 12375 0 0 0 3 3475 600 6 3473 8771 2 1525 4026 2 1198 3529 0 0 0 65 8163 20018 9 1273 3390 9 349 854 0 0 0 1 155 350 0 0 0 1 23 57 0 0 0 1 218 491 55 6145 16451 207 38282 93775


Number of CDM projects in Asia by country South Korea 2%

Indonesia 2%

Pakistan 1% Philippines 2%

Sri Lanka 0.5%

Others 1%

Thailand 3% Vietnam 3%

China 50%

Malaysia 3% India 33%

Volume of CERs until 2012 in Asia by country

Indonesia 2%

South Korea 5%

Philippines 0.6%

Pakistan 1%

Top 20 CDM buyers EcoSecurities Tricorona Carbon Asset Management Sweden EDF Trading Vitol Mitsubishi RWE Carbon Resource Management AgCert CAMCO Danish Ministry of Climate & Energy Noble Carbon Trading Emissions Bunge Emissions Group MGM Carbon Portfolio Cargill International ENEL KfW Agrinergy Kommunalkredit Marubeni

Projects 295

Sri Lanka 0%

Thailand 1% Vietnam 1%

Others 0%

Malaysia 2% India 20%

China 67%

Top 20 PDD consultants EcoSecurities Beijing Tianqing Power International CDM Consulting AgCert PricewaterhouseCoopers CasperVanderTak WB-CF CAMCO Carbon Resource Management CWEME Ecoinvest Agrinergy Mitsubishi UFJ Securities Tsinghua University Zenith Energy Services Easy Carbon AGET Econergy Hunan CDM Project Service Center Senergy Global MGM

175 136 124 105 99 99 96 84 72 70 67 65 64 62 61 58 58 57 56


Days

Jun/05 Aug/05 Oct/05 Dec/05 Feb/06 Apr/06 Jun/06 Aug/06 Oct/06 Dec/06 Feb/07 Apr/07 Jun/07 Aug/07 Oct/07 Dec/07 Feb/08 Apr/08 Jun/08 Aug/08 Oct/08 Dec/08 Feb/09 Apr/09 Jun/09 Aug/09 Oct/09 Dec/09 Feb/10 Apr/10

Days

Time used for Completeness Check

180

160

140

120

100

80

60

40

20

0

The average time to get a new methodology approved or rejected

400

350

300

250

200

Rejected

150

Approved

100

50

0

Large-scale

Small-scale

A/R




RETIRED VOLUNTARY CARBON CREDITS (VCS) FROM INDIA From Vintage

To Vintage

VCU Quantity

Project ID

April-09

September-09

100

93

April-09

September-09

150

93

January-09

October-09

33000

404

June-08

November-08

148

51

June-08

November-08

11

51

April-08

June-08

10

93

April-08

June-08

9

93

April-08

June-08

2

93

April-08

June-08

1150

93

January-08

May-08

352

109

January-08

December-08

3427

404

January-08

October-08

30037

145

January-08

March-08

20264

127

January-08

March-08

2

127

January-08

December-08

1019

429

January-08

June-08

20769

37

Project Name 86 MW Hydro Project in Himachal Pradesh 86 MW Hydro Project in Himachal Pradesh Bundled Wind Power project in Tamil Nadu managed by Enercon India Limited – II 29.70 MW Wind Power project in Karnataka India 29.70 MW Wind Power project in Karnataka India 86 MW Hydro Project in Himachal Pradesh 86 MW Hydro Project in Himachal Pradesh 86 MW Hydro Project in Himachal Pradesh 86 MW Hydro Project in Himachal Pradesh 8.25 MW Bundled Wind Power Project Bundled Wind Power project in Tamil Nadu managed by Enercon India Limited – II Enercon Bundled Wind power projects (2004 Policy) in Rajasthan Fuel switchover from higher carbon intensive fuels to Natural Gas (NG) at Indian Farmers Fertiliser Cooperative Ltd (IFFCO) in Phulpur Village, Allahabad, Uttar Pradesh by M/s Indian Farmers Fertiliser Cooperative Ltd (IFFCO) Fuel switchover from higher carbon intensive fuels to Natural Gas (NG) at Indian Farmers Fertiliser Cooperative Ltd (IFFCO) in Phulpur Village, Allahabad, Uttar Pradesh by M/s Indian Farmers Fertiliser Cooperative Ltd (IFFCO) Grouped Wind Power Project in India ISLWASTE HEAT RECOVERY PROJECT

Issuing Registry Caisse des Depots Caisse des Depots

APX APX APX Caisse des Depots Caisse des Depots Caisse des Depots Caisse des Depots APX

APX

APX

APX

APX TZ1 Limited APX


January-08

June-08

4492

37

January-08

June-08

2597

37

January-08

May-08

7226

346

September07

June-09

4268

292

May-07

May-08

10508

285

May-07

December-07

11754

37

April-07

December-07

15445

136

April-07

April-09

25453

306

April-07 February07

March-08

9123

93

December-07

29649

346

January-07

October-07

100

1

January-07

December-07

4239

109

January-07

March-07

1625

93

January-07

March-07

3035

93

January-07

March-07

5340

93

January-07

December-07

31616

145

January-07

April-07

4744

43

January-07

December-07

79734

127

January-07

December-07

725

2

January-07

December-07

12015

2

October-06

December-06

2902

145

ISLWASTE HEAT RECOVERY PROJECT ISLWASTE HEAT RECOVERY PROJECT Wind power project by GFL in Gudhepanchgani 150 MW grid connected Wind Power based electricity generation project in Gujarat, India. Rice husk based Co generation project at Dujana unit of KRBL Limited ISLWASTE HEAT RECOVERY PROJECT Tungabhadra Wind Power Project. 8.5 MW Wind Energy Project by KS Oils Limited, India 86 MW Hydro Project in Himachal Pradesh Wind power project by GFL in Gudhepanchgani 7.25 MW wind energy project of Aruppukottai Sri Jayavilas Ltd 8.25 MW Bundled Wind Power Project 86 MW Hydro Project in Himachal Pradesh 86 MW Hydro Project in Himachal Pradesh 86 MW Hydro Project in Himachal Pradesh Enercon Bundled Wind power projects (2004 Policy) in Rajasthan Fuel Switch from fossil fuel to renewable biomass for thermal energy applications in Rajasthan Fuel switchover from higher carbon intensive fuels to Natural Gas (NG) at Indian Farmers Fertiliser Cooperative Ltd (IFFCO) in Phulpur Village, Allahabad, Uttar Pradesh by M/s Indian Farmers Fertiliser Cooperative Ltd (IFFCO) LITL's Wind Power Project at Tamilnadu LITL's Wind Power Project at Tamilnadu Enercon Bundled Wind power projects (2004

APX APX TZ1 Limited

APX Caisse des Depots APX APX

APX Caisse des Depots TZ1 Limited

APX APX Caisse des Depots Caisse des Depots Caisse des Depots

APX

TZ1 Limited

APX TZ1 Limited TZ1 Limited APX


September06

December-06

1260

2

July-06

September-08

19964

132

April-06

December-09

550

423

April-06

November-08

30171

170

April-06

November-08

31041

170

April-06

December-08

5322

134

April-06

December-08

926

134

April-06

December-08

866

134

April-06

December-08

207

134

April-06

December-08

448

134

April-06

December-06

1

147

April-06

March-07

21222

101

April-06

December-07

14281

429

March-06

June-08

1

297

March-06

June-08

7466

297

March-06

June-08

80

297

March-06

June-08

88

297

Policy) in Rajasthan LITL's Wind Power Project at Tamilnadu 9 MW Neria Hyrdroelectric project, Karnataka, India 2.225 MW wind power project in Tamil Nadu, India. 22.5 MW grid connected wind farm project by RSMMLin Jaisalmer,India 22.5 MW grid connected wind farm project by RSMMLin Jaisalmer,India 3.9 MW Bundled renewable energy project in Tamil Nadu, India 3.9 MW Bundled renewable energy project in Tamil Nadu, India 3.9 MW Bundled renewable energy project in Tamil Nadu, India 3.9 MW Bundled renewable energy project in Tamil Nadu, India 3.9 MW Bundled renewable energy project in Tamil Nadu, India 9.75 MW WIND POWER PROJECT AT CHITRADURGA, KARNATAKA, INDIA BY ESWARI GROUP. Bagasse based Cogeneration Power Project at Khatauli Grouped Wind Power Project in India Generation of Electricity from 3.2 MW Capacity Wind Mills by Gujarat JHM Hotels Ltd at Bhambarwadi, Maharashtra Generation of Electricity from 3.2 MW Capacity Wind Mills by Gujarat JHM Hotels Ltd at Bhambarwadi, Maharashtra Generation of Electricity from 3.2 MW Capacity Wind Mills by Gujarat JHM Hotels Ltd at Bhambarwadi, Maharashtra Generation of Electricity from 3.2 MW Capacity Wind Mills by

TZ1 Limited APX

APX

APX APX

APX

APX

APX APX

APX

APX APX TZ1 Limited

Caisse des Depots

Caisse des Depots

Caisse des Depots Caisse des Depots


March-06

June-08

30

297

March-06

June-08

11219

431

March-06

December-06

1020

43

March-06

December-06

12574

43

January-06

December-06

2561

109

January-06

December-06

2910

128

October-05

March-06

12220

101

August-05

December-05

1495

68

August-05

December-05

722

68

August-05

December-05

5

68

August-05

December-05

1000

68

August-05

December-05

695

68

May-05

July-07

16500

387

Gujarat JHM Hotels Ltd at Bhambarwadi, Maharashtra Generation of Electricity from 3.2 MW Capacity Wind Mills by Gujarat JHM Hotels Ltd at Bhambarwadi, Maharashtra 6.2 MW Bundled Wind Power Project in India Fuel Switch from fossil fuel to renewable biomass for thermal energy applications in Rajasthan Fuel Switch from fossil fuel to renewable biomass for thermal energy applications in Rajasthan 8.25 MW Bundled Wind Power Project Promotion of Low cost Irrigation Device in Eastern States of India Bagasse based Cogeneration Power Project at Khatauli 119.8 MW Natural Gas based Combined Cycle Power Plant, at Tanjavur, Tamilnadu by M/s Aban Power Company Limited 119.8 MW Natural Gas based Combined Cycle Power Plant, at Tanjavur, Tamilnadu by M/s Aban Power Company Limited 119.8 MW Natural Gas based Combined Cycle Power Plant, at Tanjavur, Tamilnadu by M/s Aban Power Company Limited 119.8 MW Natural Gas based Combined Cycle Power Plant, at Tanjavur, Tamilnadu by M/s Aban Power Company Limited 119.8 MW Natural Gas based Combined Cycle Power Plant, at Tanjavur, Tamilnadu by M/s Aban Power Company Limited Electricity generation by utilization of waste heat from calcined petroleum

Caisse des Depots TZ1 Limited

TZ1 Limited

TZ1 Limited APX

APX

APX

TZ1 Limited

TZ1 Limited

TZ1 Limited

TZ1 Limited

TZ1 Limited APX


January-05

December-05

1404

364

January-05

December-05

1054

128

January-04

December-06

15000

469

January-02

December-02

4000

93

July-01

December-01

35

93

July-01

December-01

80

93

July-01

December-01

5

93

July-01

December-01

22000

93

coke production process Bundled 15 MW Wind Power Project in India Promotion of Low cost Irrigation Device in Eastern States of India Installation of Low Green House Gases (GHG) Emitting Rolling stock cars in Metro System 86 MW Hydro Project in Himachal Pradesh 86 MW Hydro Project in Himachal Pradesh 86 MW Hydro Project in Himachal Pradesh 86 MW Hydro Project in Himachal Pradesh 86 MW Hydro Project in Himachal Pradesh

TZ1 Limited

APX

APX Caisse des Depots Caisse des Depots Caisse des Depots Caisse des Depots Caisse des Depots


CHICAGO CLIMATE EXCHANGE

Qty

Price

Trade Date

Vintage

(contracts)

(per metric ton)

Type of Transaction

10/01/10

2010

4

$5.00

Non-Platform

10/01/10

2009

19

$5.00

Non-Platform

10/01/10

2009

1

$5.00

Non-Platform

10/01/10

2009

3

$5.00

Non-Platform

10/01/10

2009

12

$5.00

Non-Platform

10/01/10

2009

5

$5.00

Non-Platform

10/01/10

2009

16

$5.00

Non-Platform

10/01/10

2010

5

$5.00

Non-Platform

10/01/10

2009

15

$5.00

Non-Platform

10/01/10

2005

35

$0.10

Non-Platform

10/08/10

2009

3

$2.75

Non-Platform

10/15/10

2009

14

$2.75

Non-Platform

TOTAL

132

CFI Delivered USA Agricultural Methane USA Agricultural Methane USA Agricultural Methane USA Agricultural Methane USA Agricultural Methane USA Agricultural Methane USA Agricultural Methane USA Agricultural Methane USA Agricultural Methane Allowance USA Agricultural Methane USA Agricultural Methane


KEY DATA