1.83 OP W 5.35 3.76 1.391.84 3.05 4.30 VERANDAH DINING SITOUT UTILITYKITCHEN TOILET GUESTBED MASTERBED CHILDRENBED TOILET PASSAGE F.DUCT S.LIFT LIFT LOBBY P.A.DUCT 200SUNK 200SUNK 75thk.ledgewall 0.61 0.61 0.13 eq eq 1.55 2.45 0.20 0.13 0.61 0.71 3.15 0.13 0.13 0.61 0.81 approved quality pvc fins refer detail eqeq 1.53 2.45 eqeq TOILET 200SUNK 0.61 1.05 2.45 0.61 2.77 2.45 0.45 0.20 1.05 0.61 0.61 3.05 3.65 4.30 0.20 0.20 0.20 2.58 0.30 3.05 5.50 LIVINGROOM 5.33 0.160.16 1.88 0.34 1.22 1.55 LOBBY 2.35 2.66 1.50 1.57 1.83 D 200 SUNK D1 D1 D1 D2 D2 D2 V glassrailingas/detail W W W1 SD W2 liftopeningasper liftmanufacturer's specifications liftopeningasper liftmanufacturer's specifications V250x470 1.391.84 3.05 4.30 DINING SITOUT UTILITYKITCHEN TOILET GUESTBED MASTERBED CHILDRENBED TOILET PASSAGE 200SUNK 200SUNK 75thk.ledgewall 0.61 0.61 0.13 eq eq 1.55 2.45 0.20 0.13 0.61 0.71 3.15 0.13 0.13 0.61 0.81 approved quality pvc fins refer detail eqeq 1.53 2.45 eqeq TOILET 200SUNK 0.61 1.05 2.45 0.61 2.77 2.45 0.45 1.05 0.61 0.61 3.05 3.65 4.30 0.35 chajjaabove 0.20 0.20 0.20 2.58 2.08 0.30 3.05 5.50 LIVINGROOM 5.33 0.160.16 1.88 0.34 1.22 1.55 LOBBY 1.50 200 SUNK D D1 D1 D1 D2 D2 D2 OP glassrailingas/detail W W W W1 SD W2 V 0.810.601.20 1.83 VERANDAH FD 2.77 VERANDAH1.501.22 0.37 1.55 LOBBY D 1.37 0.20 2.45 0.61 2.78 1.05 OP UTILITY200 SUNKKITCHEN W2 W3 W3 5.33 1.88 SITOUT2.58 2.08 0.30 0.160.16 glassrailingas/detail SD 0.20 DINING LIVINGROOM CHILDRENBED 0.61 0.61 3.05 D1 W 3.65 0.45 0.61 0.56 3.05 4.23 D1 0.88 W MASTERBED 1.08 2.521.55 D2 TOILET 200SUNK 0.76 2.451.55TOILET 200SUNK D2 V 0.60 1.05 VERANDAH1.501.220.61 5.35 2.08 5.50 DUCT DUCT 0.35 chajjaabove glazingas/manufacturer's specification TREAD=250 RISER=161(18NOS) UP FIREE.STAIRCASE 1.50 0.75 1.50 1.500.601.50 3.60 RISER=171 (17NOS) 4 11108 12 14 15 17 0.83 0.76 0.82 3.55 ELEC.DUCT 0.15cutoutin 0.125 thk.parapet wall as per detail DN BLDG.'A'-5THFLOORPLAN 3BHK-501 P Q R S T U LOWERLEVELDUPLEX502 3BHK-504 2BHK-503 0.45 0.45 chajja above chajja above 0.45 0.20 0.45 0.45 chajja above chajja above 0.45 0.30 3.28 0.75 W3 0.30 3.28 0.75 0.75 maintenanceslab200sunk V X Z V W 0.30 W4 W4 W4 W5 W5 W5 2.57 maintainanceslabatbeambottom 0.46 0.610.980.610.39 0.25 0.46 0.610.980.610.39 0.25 0.25 0.45 1.080.25 0.35 4.22 0.23 7 1211109 13 14 15 16 17 18 UP1.50 1.25 1.50 4.32 1.500.501.50 3.60 0.55 DUCT 200 W.BEAM 200 W.BEAM 200 W.BEAM V O D slab VOID 150W.BEAM 150W.BEAM BEAMFRAMING REVISED SERVICEDUCTS REVISED BUILDINGA LIVINGROOM BALCONY LOBBY KITCHEN UTILITYC.TOILETGUESTTOILET GUESTROOM UP DINING maintenanceslab200sunk D PROJECT BREEZA (B+GR.+PODIUM+13FLOORS+RECREATIONALFL.) PROP.BLDG.LAYOUTONS.NO.59A/2B, C.T.S.NO.1811A(P)ATVILLAGE-MUNDHAWA, TALUKA-HAVELI,PUNE. DRAWINGTITLE: WORKINGDRAWINGS FLOORPLANS REVISIONS NOTES&LEGEND: OFWORK. #ALLWALLSARE0.125THK.UNLESSSPECIFIED. #SIZEOFCOLUMN,ORIENTATION&LOCATION SHOULDBECHECKEDBYRCCDESIGNERBEFORE EXECUTION.
DISCUSSEDWITHTHEARCHITECTBEFORE CASTING. #REFERCONSULTANTSDWGFORM-E-PSERVICES C01 LEDGEWALLASMENTIONED 200SUNK-TOILETS MAIN.SLABWITHRAILING SLABFORINVERTOR COLUMNNOS. LEVELDIFFERENCE 200THK.BK.WALL SCHEDULEOFOPENING: DOOR WIDTH LINTEL SCALE1:NTS ARCHITECTS PANDITJOSHI&ASSOCIATES 'AKSHAYSHREE',216NARAYANPETH, PUNE30. DEVELOPERS MR.ANANDTULSIDASKIRAD&OTHERS 114,ANANDPARK,AUNDH,PUNE. D D1 D2 FD SD 1.00 1.20 2.30 2.30 2.30 2.30 0.90 0.75 WINDOWWIDTHSILLLINTEL W W1 W3 W4 1.83 0.91 1.53 0.91 3.05 0.45 0.45 1.10 1.10 0.45 2.30 2.30 2.30 2.30 2.30 V 0.611.40 2.30 W51.831.10 2.30 75SUNK-SITOUT PRINTSISSUEDONSITE-02 W2 W3 W5 W7 W5 V 4.28 5.19 1.22 3.05 0.77 D2 0.58 D2 0.79 1.55 0.45 5.25 0.45 0.45 0.25 0.61 0.61 1.55 3.92 D2 0.61 4.23 1.03 0.61 1.08 1.68 1.13 3.32 0.50 2.58 0.13 0.30 1.55 2.37 0.45 1.16 D1 2.05 3.45 10 181716151413 C01 C02 C03 C04 C05 C06 C17 C19 C21 C22 C23 C24 C32 C33 C34 C35 C43 C45 C47 C48 C49 C50 C51 C52 2.441.10 2.30 W6 0.30 chajjaabove VV 0.68 0.20 2.110.45 2.30 W8 3.010.45 2.30 W9 chajjaabove chajjaabove 28.90 2.70 1.35 2.44 5.25 1.071.451.07 0.20 0.20 2.440.74 3.00 0.23 18.85 0.64 0.74 1.55 0.74 0.54 2.35 0.54 0.74 1.55 0.74 0.64 2.70 1.35 8.25 8.25 2.44 5.25 3.60 5.25 2.440.74 3.00 0.23 28.90-IN CONTINUATION WITH BUILDING 'B'1.55 0.91 TREAD=250 RISER=161(18NOS) 5.35 3.76 1.391.84 3.05 4.30 VERANDAH DINING SITOUT UTILITYKITCHEN TOILET GUESTBED MASTERBED CHILDRENBED TOILET PASSAGE F.DUCT S.LIFT LIFT LOBBY P.A.DUCT 200SUNK 200SUNK 75thk.ledgewall 0.61 0.61 0.13 eq eq 1.55 2.45 0.20 0.13 0.61 0.71 3.15 0.13 0.13 0.61 0.81 approved quality pvc fins refer detail eqeq 1.53 2.45 eqeq TOILET 200SUNK 0.61 1.05 2.45 0.61 2.77 2.45 0.45 0.20 1.05 0.61 0.61 3.05 3.65 4.30 0.20 0.20 0.20 2.58 0.30 3.05 5.50 LIVINGROOM 5.33 0.160.16 1.88 0.34 1.22 1.55 LOBBY 2.35 2.66 1.50 1.57 1.831.83 200 SUNK D D1 D1 D1 D2 D2 D2 OP V glassrailingas/detail W W W W1 W2 SD liftopeningasper liftmanufacturer's specifications liftopeningasper specifications Vcutout 250x470 1.391.84 3.05 4.30 DINING SITOUT UTILITYKITCHEN TOILET GUESTBED MASTERBED CHILDRENBED TOILET PASSAGE 200SUNK 200SUNK 75thk.ledgewall 0.61 0.61 0.13 eq eq 1.55 2.45 0.20 0.13 0.61 0.71 3.15 0.13 0.13 0.61 0.81 approved quality pvc fins refer detail eqeq 1.53 2.45 eqeq TOILET 200SUNK 0.61 1.05 2.45 0.61 2.77 2.45 0.45 1.05 0.61 0.61 3.05 3.65 4.30 0.35 chajjaabove 0.20 0.20 0.20 2.58 2.08 0.30 3.05 5.50 LIVINGROOM 5.33 0.160.16 1.88 0.34 1.22 1.55 LOBBY 1.50 200 SUNK D D1 D1 D1 D2 D2 D2 OP glassrailingas/detail W W W W1 SD W2 V250x470 0.810.601.20 1.83 VERANDAH FD 2.77 VERANDAH1.501.22 0.37 1.55 LOBBY D 1.37 0.20 2.45 0.61 2.78 1.05 OP UTILITY200 SUNKKITCHEN W2 W3 W3 5.33 1.88 SITOUT2.58 2.08 0.30 0.16 glassrailingas/detail SD 0.20 DINING LIVINGROOM CHILDRENBED 0.61 0.61 3.05 D1 W 3.65 0.45 0.61 0.56 3.05 4.23 D1 0.88 W MASTERBED 1.08 2.521.55 D2 TOILET 200SUNK 0.76 2.451.55TOILET 200SUNK D2 V 0.60 1.05 2.08 5.50 DUCT DUCT 0.35 chajjaabove glazingas/manufacturer's specification TREAD=250 RISER=161(18NOS) UP FIREE.STAIRCASE 1.50 0.75 1.50 1.500.601.50 3.60 TREAD=250 RISER=171 (17NOS) 124 8 14 16 17 0.83 0.76 0.82 3.55 ELEC.DUCT 0.15cutoutin 0.125 thk.parapet wall as per detail DN
3BHK-601 P Q R S T U UPPERLEVELDUPLEX-602 3BHK-604 2BHK-603 0.45 0.45 chajja above chajja above 0.45 0.20 0.45 0.45 chajja above chajja above 0.45 0.30 3.28 0.75 W3 0.30 3.28 0.75 0.75 maintenanceslab200sunk V X Z V W 0.30 W4 W4 W4 W5 W5 W5 2.57 maintainanceslabatbeambottom maintainanceslabatbeambottom 0.46 0.610.980.610.39 0.25 0.46 0.610.980.610.39 0.25 0.25 0.45 1.080.25 0.35 4.22 0.23 1 6 121110 13 14 15 16 17 18 UP1.50 1.25 1.50 4.32 1.500.501.50 3.60 0.55 DUCT 200 W.BEAM 200 W.BEAM 200 W.BEAM V O D slab VOID 150W.BEAM 150W.BEAM BEAMFRAMING REVISED SERVICEDUCTS REVISED BUILDINGA PROJECT BREEZA (B+GR.+PODIUM+13FLOORS+RECREATIONALFL.) PROP.BLDG.LAYOUTONS.NO.59A/2B, C.T.S.NO.1811A(P)ATVILLAGE-MUNDHAWA, TALUKAHAVELI,PUNE. DRAWINGTITLE: WORKINGDRAWINGS FLOORPLANS REVISIONS NOTES&LEGEND: #REFERR.C.C.DRAWINGBEFOREEXECUTION OFWORK. #ALLWALLSARE0.125THK.UNLESSSPECIFIED. #SIZEOFCOLUMN,ORIENTATION&LOCATION
DISCUSSEDWITHTHEARCHITECTBEFORE CASTING. #REFERCONSULTANTSDWGFORM-E-PSERVICES
125THK.BK.WALL 200SUNK-TOILETS MAIN.SLABWITHRAILING SLABFORINVERTOR COLUMNNOS. LEVELDIFFERENCE 200THK.BK.WALL SCHEDULEOFOPENING: DOOR WIDTH LINTEL SCALE1:NTS ARCHITECTS PANDITJOSHI&ASSOCIATES 'AKSHAYSHREE',216NARAYANPETH, PUNE30. DEVELOPERS MR.ANANDTULSIDASKIRAD&OTHERS 114,ANANDPARK,AUNDH,PUNE. D D1 FD SD 1.00 1.83 2.30 1.20 2.30 2.30 2.30 0.90 WINDOWWIDTHSILLLINTEL W W2 W3 W4 1.83 1.53 0.91 3.05 0.45 1.10 1.10 0.45 2.30 2.30 2.30 2.30 W51.831.10 2.30 75SUNK-SITOUT PRINTSISSUEDONSITE-02 STUDY ROOM WALK-INWARDROBE& TOILET MASTERROOM BALCONY BALCONY TOILET UTILITY CHILDRENROOM FAMILYROOM DN 11 C02 C01 C04 C05 C03 C06 C17 C19 C21 C22 C23 C24 C32 C33 C34 C35 C43 C45 C47 C48 C49 C50 C51 C52 3.01 1.64 0.27 0.44 1.37 2.89 4.28 1.22 0.30 5.25 1.22 3.25 3.45 3.05 2.85 0.23 2.05 1.35 0.730.61 3.25 2.45 D1D2 D1 D2 D2 1.96 4.45 0.91 0.61 0.61 V V W2 W3 W5 W9 W6 2.45 0.340.790.77 1.68 0.49 1.30 1.55 0.45 0.45 0.45 0.25 0.20 4.23 3.05 5.250.45 2.30 W7 W6 1.10 2.30 0.75 1.99 1.08 1.55 1.83 1.09 1.55 0.61 1.38 2.22 2.31 0.89 0.92 3.00 1.25 2.23 2.110.45 2.30 W8 3.010.45 2.30 W9 chajjaabove chajjaabove 0.30 chajjaabove 3.18 2.44 3.00 W8 2.11 chajjaabove chajjaabove chajjaabove chajjaaboveIN CONTINUATION WITH BUILDING 'B' 18.85 0.64 0.74 1.55 0.74 0.54 2.35 0.54 0.74 1.55 0.74 0.64 2.70 1.35 8.25 8.25 2.44 5.25 3.60 5.25 2.440.74 3.00 28.90 5.25 28.90 2.70 1.35 2.44 5.25 1.071.451.07 2.440.74 3.00 RISER=161(18NOS) 5.35 1.84 SITOUT UTILITY PASSAGE S.LIFT 200SUNK 1.55 0.13 0.61 0.61 2.45 2.45 0.61 0.61 5.50 1.22 1.55 2.66 1.83 200 SUNK OP W 1.84 SITOUT UTILITY GUESTBED eq eq 1.55 0.20 0.61 2.45 2.45 5.50 LIVINGROOM 1.22 1.55 200 SUNK 0.60 1.83 2.77 1.22 1.552.45 OP UTILITY200 SUNK W3 SITOUT CHILDRENBED 0.61 0.61 MASTERBED 2.52 2.45 1.05 1.22 1.552.45 UTILITY200 SUNK 5.50 SITOUT 1.05 5.50 chajjaabove UP FIREE.STAIRCASE 1.50 0.75 1.50 DN BLDG.'A'-2ND,3RD,4TH&5THFLOORPLAN 0.75 Y C04 C21 C23 C35 C45 C52 W5 W5 2.57 0.25 16 UP1.50 1.25 1.50 4.32 0.55 200 W.BEAM 200 W.BEAM OP UTILITYKITCHEN W3 1.88 2.58 DINING CHILDRENBED 0.61 0.61 MASTERBED 1.552.52 2.45 1.05 LOBBY UTILITY 1.88 SITOUT2.58 LIVINGROOM 1.55 1.05 S.LIFT 1.83 2.57 1.83 OP KITCHENUTILITY W3 1.88 2.58 DINING CHILDRENBED 0.61 0.61 3.65 4.23 MASTERBED 2.521.55 2.451.55 0.60 LOBBY UTILITY200 SUNK 1.88 SITOUT2.58 LIVINGROOM 3.65 4.23 1.55 1.55 0.60 5.35 C07 C08 C09 C10 C25 C27 C28 C36 C37 C38 C57 1.50 0.75 1.50 3.75 FIREE.STAIRCASE BUILDINGB 0.83 0.76 0.83 3.55 BUILDINGA BUILDINGC UP TALUKAHAVELI,PUNE. #SIZEOFCOLUMN,ORIENTATIONLOCATION 'AKSHAYSHREE',216NARAYANPETH, DEVELOPERS 114,ANANDPARK,AUNDH,PUNE. BLDG.'B'-2ND,3RD,4TH&5THFLOORPLAN BLDG.'B'-INFUTURE SCALE1:200 SCALE1:400
#REFERSTAIRCASE,TOILET&RAILINGDETAIL. #DAYTODAYVISITISNOTPARTOFARCHITECTS DUTIES. #REFERELEVATION&SECTIONDWG. #ANYDISCREPANCYINTHISDWG.SHOULDBE
BLDG.'A'-6THFLOORPLAN
EXECUTION. #REFERSTAIRCASE,TOILET&RAILINGDETAIL. #DAYTODAYVISITISNOTPARTOFARCHITECTS DUTIES. #REFERELEVATION&SECTIONDWG. #ANYDISCREPANCYINTHISDWG.SHOULDBE
&SHALLBECHECKEDBYCONSULTANTS. LEDGEWALLASMENTIONED
1.37 VERANDAH1.501.220.61 LOWERLEVELDUPLEX-702 2.77 D 1.37 UPPERLEVELDUPLEX-802 2.77 maintenanceslab200sunk C24 C04 C05 C06 C23
1.83 UPPERLEVELDEUPLEX-903 maintenanceslab200sunk V W 4.32 0.55 W2 W3 P Q R S LOWERLEVELDUPLEX-1004 150W.BEAM P Q R S UPPERLEVELDEUPLEX-1104 150W.BEAM LIVINGROOM DINING C.TOILETTOILET KITCHEN SITOUT BEDROOM-01 12 3 4 5 UP W2 W3 0.790.77 1.08 0.97 0.73 1.72 2.45 2.221.04 1.55 0.38 3.83 3.39 0.63 1.81 0.75 2.05 3.07 0.901.38 0.60 0.84D2 D2 D1 V V 0.45 0.45 0.45 0.25 1.77 1.55 0.84 1.08 2.52 0.61 1.50 4.833.92 0.131.68 7.89 0.49 0.60 0.74 0.56 0.69 2.22 4.23 3.66 1.09 1.55 0.761.08 2.45 0.60 0.20 0.75 9876 10 11 12 0.90 W5 W5 2.08 chajjaabove chajjaabove chajjaaboveW10 W11 SITOUT FAMILYROOM BEDROOM-02 BEDROOM-03 TOILET C.TOILET STUDYROOM 121314 11 10 9 15 876 5 4 DN 0.63 1.49 1.22 0.37 0.13 2.58 0.613.830.790.77 1.50 0.30 2.40 3.65 3.05 2.14 0.61 0.61 1.26 0.14 3.18 0.61 0.56 4.23 3.05 2.22 1.80 0.13 1.90 1.41 0.90 2.05 0.95 1.09 3.07 1.55 1.68 1.08 1.77 0.76 1.55 V 1.55 0.84 0.45 V 1.08 W3 0.20 0.450.25 0.45 W2 0.75 VERANDAH D2 D D1 D1 D2 W5 W5 W10 0.11 0.20 5.25 3.11 0.20W11 3.18 TOILET TOILET WALK-INWARDROBE BEDROOM BEDROOM SITOUT FAMILY ROOM DN maintenanceslab200sunk 2.000.902.42 1.49 2.90 0.452.050.79 0.90 3.45 5.33 2.44 1.92 1.44 5.25 1.52 1 1.02 2 3 4 5 6 7 8910 13 14 15 11 chajjaabove chajjaabove chajjaabove 0.61 2.89 2.89 0.61 0.58 2.47 0.660.900.582.22 0.811.08 1.55 0.661.09 2.50 0.45 0.45 0.45 0.25 0.20 0.75 4.22 3.00 0.61 0.56 V1 0.87 2.45 0.901.77 0.79 W7 W5 W5 V TOILET LIVINGROOM DINING BEDROOM-01 BEDROOM-02 TOILETUTILITY KITCHEN LOBBY SITOUT POOJA UP 4.91 0.61 0.61 4.30 1.181.20 3.39 1.540.940.46 0.46 2.45 0.751.53 2.45 1.69 0.47 0.471.55 2.45 1.39 1.80 0.39 0.520.79 0.61 2.45 2.44 1.21 0.30 2.91 0.34 1.55 1.22 1.50 3.45 1.231.831.11 1.08 2.05 2.44 0.23 7.89 0.30 3.17 1.800.74 3.65 0.61 0.61 2.50 0.712.78 1.22 1.11 1.93 4.05 0.650.250.75 3.28 1 2 3 5 7891011 12 13 14 15 16 6 1.93 D D2D1 D1 D2 W W1 W v W v v D2 12 16 0.680.84 0.85 0.68 FAMILYROOM BEDROOM-03 BEDROOM-04 TOILET TOILET REFUGE AREA LOBBY4'6" W.PASSAGE WAITING TOILET SERVANT RM. SITOUT DN 6.01 1.00 0.47 0.25 0.81 0.61 0.61 4.30 3.39 3.05 0.88 1.540.940.460.61 0.751.68 2.45 2.45 0.47 0.47 1.69 1.55 0.61 0.71 2.50 2.78 1.22 3.65 0.61 4.913.15 1.800.74 5.57 2.44 0.20 2.18 2.08 2.40 4.50 1.25 2.45 0.24 0.52 0.30 1.80 1.54 1.20 0.61 0.18 0.13 2.583.02 0.371.38 2.05 4.80 0.20 0.85 0.85 0.68 0.84 D D1 D1 D1 D2 D2 D2 D W3 v v 0.650.25 3.28 0.75 maintainanceslabatbeambottom 0.20 0.74 0.74 0.64 0.20 1.35 0.610.20 0.13 1.21 W W 0.47v 0.25 0.81 W W1 W glassrailingas/detail 5.25 2.440.74 3.00 2.70 1.35 2.44 5.25 2.70 1.35 2.44 C04 C05 C06 C23 C34 C35 C50 C51 C52 C32 C43 C45 C47 C48 C49 C32 C43 C45 C47 C48 C49 0.13 0.13 5.25 2.440.74 3.00 5.25 2.440.74 3.00 W12 glassrailingas/detail TREAD=250 RISER=193(15NOS) TREAD=250 RISER=193(15NOS) TREAD=250 RISER=161(18NOS) TREAD=250 RISER=181(16NOS) TREAD=250 RISER=181(16NOS) 17 18 1.83 VERANDAH ELEC.DUCT0.82 LOWERLEVELDUPLEX-803 V W 4.32 0.55 C34 C35 C50 C51 C52 UTILITY LIVINGROOM LOBBY DINING BEDROOM TOILET UP 0.45 0.45 0.45 0.25 0.20 0.75 1 2 3 4 5 6 7 8910 12 13 14 15 16 1.49 1.22 0.37 D 2.38 0.50 4.67 3.41 0.61 0.600.62 W2 W3 0.30 chajjaabove 0.76 0.920.84 0.95 2.15 1.070.90 2.80 5.25 0.20 2.13 0.64 3.04 2.47 0.75 0.47 1.36 0.811.08 2.501.55 1.48 3.04 0.46 0.74 0.56 4.23 0.872.28 3.45 3.66 2.47 V maintenanceslab200sunk 11 W7 W5 chajjaabove chajjaabove D1 D2 W5 chajjaabove 5.25 2.440.74 3.00 TREAD=250 RISER=161(18NOS) 17 18 SCALE1:100
C24
BEDROOM-03 KITCHEN LIVING/DINING LOBBY 7.90X4.93 3.83X3.14 2.53X1.55 3.66X4.23 1.37X 1.55 VERANDAH 5'-0"X4'-0" BREAKFAST STORAGE TOILET POOJA ENCLOSEDBALCONY DINING T.V.UNIT SHOE RACK BEDROOM-02 MASTERBEDROOM-01 5.32X3.45 3.05X4.23 STUDY SITOUT 5.22X1.90 3.05X4.10 T.V.UNIT SIDE TABLE WARDROBE wetarea Dryarea LEGEND:CAMERA+VDP DISTRIBUTIONBOARD FAN900&1200mm CEILINGLIGHTPOINT
SPLITAC
WALLLIGHTPOINT
(2WAY)FAN1200mm 16ASWITCH+SOCKET BUZZER
6ASWITCHSOCKETHALFPOINT NO. SWITCHBOARD+HALFPOINT 02 DESCRIPTION SYM 01 05 08 03 04 06 11 09 07 10 13 14 12 15 16 6ASWITCHSOCKETFULLPOINT 18 17 20 21 19 Ø75MMPVCSLEEVEFORAC OUTDOORUNIT OUTDOORUNIT SMOKEDETECTOR HEATDETECTOR 22 23 OUTDOORUNIT OUTDOORUNIT OUTDOORUNIT OUTDOORUNIT OUTDOORUNIT OUTDOORUNIT LIFT 123 4 5 6 7 8 1211109 13 14 15 16 17 18 TREAD=250 RISER=161(18NOS) UP LIFT 123 4 5 6 7 8 1211109 13 14 15 16 17 18 TREAD=250 RISER=161(18NOS) UP 1.831.83 liftopeningasper liftmanufacturer's specifications UPPERLEVEL903 LOWERLEVEL803 1.831.83 liftopeningasper liftmanufacturer's specifications N ELECTRICALPOINTLAYOUTFOR PROPOSEDDUPLEX803+903AT MUNDHWA,PUNE UP R=0.1705 6.71" 1 2 3 4 5 6 78910 11 12 13 14 15 16 17 1 2 3 4 5 6 78910 11 12 13 14 15 16 17 @0.75HT 5AMP @0.75HT 5AMP @2.20HT DB @0.90HT @0.75HT @UPPERFLOOR CEILING R=0.1705 6.71" ALTSWITCH ABOVE&BELOW FAMILYROOM TOILET 2.53X1.55 @2.20HT @0.90HT SWITCHSOCKET 16AMP @0.90HT DOWN @2.20HT @2.20HT @2.20HT 1.30 2.621.30 0.86 1.72 0.79 1.02 0.37 1.07 0.17 0.611.220.460.61 1.03 1.64 1.06 1.06 0.96 1.22 1.52 1.32 0.98 0.98 0.82 1.47 1.16 0.60 1.28 2.62 1.30 0.91 2.65 1.73 2.61 1.42 2.20 VERANDAH VERANDAH VERANDAH VERANDAH approved quality pvc fins refer detail main.slababove glassrailingas/detail approved quality pvc fins refer detail forallfloors glassrailingas/detail cutout 200 SUNK glassrailingas/detail main.slababoveforallfloors 75SUNK glassrailingas/detail main.slababoveforallfloors 200 SUNK 75SUNK glassrailingas/detail 200SUNK 200SUNK main.slababoveforallfloors 200 SUNK 75SUNK glassrailingas/detail 200SUNK 200SUNK main.slababoveforallfloors liftopeningasper liftmanufacturer's specifications liftopeningasper liftmanufacturer's specifications 200 SUNK 75SUNK glassrailingas/detail 200SUNK main.slababoveforallfloors 200 SUNK 75SUNK glassrailingas/detail 200SUNK main.slababoveforallfloors glazingas/manufacturer's specification glazingas/manufacturer's specification 0.15cutout B-BUILDING 0.68 0.05 0.68 0.10 0.95 ELECTRICALDUCT WITHSERVICESLAB SCALE1:100 SCALE1:200
6ASWITCH (2WAY)WALLLIGHTPOINT 16ASOCKET EXHAUSTPOINT TVPOINT 16ASWITCH TELEPHONEPOINT/INTERCOM
E.LOBBY 1.67X1.68 LIVINGDINING 3.65X6.68 SITOUT 2.00X5.00 G.BEDROOM 3.35X3.20 M.BEDROOM 3.35X3.97 C.BEDROOM 3.22X3.97 1.52X2.44 TOILET 1.90X1.52 KITCHEN 2.73X3.20 D.BALC. 1.29X2.20 1.83X1.68 KITCHEN 2.73X3.20 D.BALC. 1.29X LIVING/DINING 4.56X6.68 SITOUT 2.56X5.00 G.BEDROOM TOILET 1.90X1.52 M.BEDROOM 3.35X3.97TOILET 1.52X2.44 TOILET 1.52X2.44 C.BEDROOM 3.22X3.94 E.LOBBY 1.83X1.50 G.BEDROOM 4.27X3.35 TOILET LIVINGDINING 3.91X5.60 SITOUT 2.00X5.60 KITCHEN 3.73X3.04 D.BALC. 2.73X1.05 TOILET 1.52X2.43 C.BEDROOM 3.10X3.04 M.BEDROOM 4.00X3.20 TOILET 1.52X2.44 2.30 V V VV W1 W1 D2 D2 W1 W3 V D2 D2 D1 D1D1 FD W2 DUCT 3.06X3.19 2.80X3.20 FD W1 W1 W1 W1 D2 D1 D1 D1 D 1ST,2ND,3RDFLOORPLAN 1.21 VV W1 W1 D2 D2 W1 W3 V D2 D2 D1 D1D1 FD W2 VV D2 D2 W1 W3 V D D2 D1 D1D1 FD W2 VV D2 D2 W1 W3 V D D2 D1 D1D1 FD W2 DUCT 3.06X3.19 1.67X1.68 KITCHEN 2.73X3.20LIVING/DINING 3.65X6.68 SITOUT 2.00X5.00 G.BEDROOM TOILET 1.90X1.52 M.BEDROOM 1.52TOILET3.35X3.97 X2.44 TOILET 1.52X2.44 C.BEDROOM 3.22X3.94 D.BALC. 1.29X 2.30 LIVINGDINING 4.56X6.68 G.BEDROOM 3.35X3.20 M.BEDROOM 3.35X3.97 C.BEDROOM 3.22X3.97 1.52X2.44 TOILET 1.90X1.52 KITCHEN 2.73X3.20 D.BALC. 1.29X2.20 1.52X2.44 DUCT 2.80X3.20 VOID 1.290.90 VOID 1.29X0.90 E.LOBBY 1.83X1.68 3.60 3.16 6.80 3.16 3.60 3.47 7.54 5.00 3.60 3.16 6.80 3.16 3.60 3.47 0.33 0.33 0.33 0.33 29.99 40.91 E.LOBBY 1.83X1.68 LIVINGDINING 3.65X6.68 SITOUT 2.00X5.00 G.BEDROOM 3.35X3.20 M.BEDROOM 3.35X3.97 C.BEDROOM 3.22X3.97 1.52X2.44 TOILET 1.90X1.52 KITCHEN 2.73X3.20 D.BALC. 1.29X2.20 E.LOBBY 1.83X1.50 LIVINGDINING 3.91X5.60 SITOUT 2.00X5.60 KITCHEN 3.73X3.04 D.BALC. 2.73X1.05 TOILET 1.52X2.43 C.BEDROOM 3.10X3.04 M.BEDROOM 4.00X3.20 TOILET 1.52X2.44 DUCT 3.06X3.19 2.80X3.20 W1 FOURTHFLOORPLAN 1.50 [4'-11"] VV W1 W1 D2 D2 W1 W3 V D2 D2 D1 D1D1 FD W2 D VV D2 D2 W1 W3 V D D2 D1 D1D1 FD W2 DUCT 3.06X3.19 1.83X1.68 KITCHEN 2.73X3.20LIVING/DINING SITOUT 2.00X5.00 G.BEDROOM TOILET 1.90X1.52 M.BEDROOM 1.52TOILET3.35X3.97 X2.44 TOILET 1.52X2.44 C.BEDROOM 3.22X3.94 D.BALC. 1.29X 2.30 DUCT 2.80X3.20 VOID 1.29X0.90 LOBBY 3.16 3.60 3.47[11'-5"] 7.54 5.00 3.16 3.60 3.47[11'-5"] 7.54 0.33 29.510.33 40.91 V FD W1 W1 W1 D2 D1 D1 D NON ACCESSIBLEFORMED TERRACE 10.11 12.54 TERRACE 10.10 16.02 [52'-7"] SITOUT 2.56X5.00 PROECT ARCHITECT PANDITOSHIANDASSO. 216,NARAYANPETH,PUNE411030ARCHITECTSSIGN. PROPOSEDRESI.BUILDINGON P.NO.B,S.NO.37/1/1(P),BANER,PUNE. DATE12102023 4/6 106206306 107207307 105205305 104204304 103203303 407 405 403 D NAMESIGNATUREOFOWNERP.A.H. 5627,SHIVAINAGAR,PUNE-5 MR.SAMEERDILIPBAFANAOTHERS BUILDERSDEVELOPERS AURAGROUP 76713,PHADEPATH,DECCANGYMKHANA,PUNE04 G.BEDROOM KITCHEN 3.70X3.05 1.60X2.451.53X2.453.35X3.95 M.BEDROOM 4.27X3.95 LIFT 6'0"X9'3" 6'0"X6'3" LIFT DRY.BALC.1.22 X 3.05 3.10X1.43 DINING 3.65X3.18 LIVING 5.50X4.25 TOILET 1.52X2.45 TOILET 1.60X2.45 3.35X3.95 M.BEDROOM SITOUT2.28 7.43 LOBBY 2.07X1.52 6'0"X6'3" LIFT S.ROOM TOI. UP UP DN 1.17X1.18 TOILET 8'0"X5'0" P.A.DUCT W1 VV W1 W1 VV V V W2 W2 W2 G.BEDROOM KITCHEN 3.70X3.05 1.60X2.451.53X2.453.35X3.95 M.BEDROOM 4.27X3.95 LIFT 6'0"X9'3" 6'0"X6'3" LIFT DRY.BALC.1.22 X 3.05 3.10X1.43 DINING 3.65X3.18 LIVING 5.50X4.25 TOILET 1.52X2.45 TOILET 1.60X2.45 C.BEDROOM 3.35X3.95 M.BEDROOM SITOUT2.28 7.43 LOBBY 2.07X1.52 6'0"X6'3" LIFT S.ROOM TOI. UP UP DN 1.17X1.18 TOILET 8'0"X5'0" P.A.DUCT VV W1 VV V V W2 W2 W2 5.00 3.35 3.25 4.53 4.20 7.42 4.20 0.35 [1'-2"] 3.46 7.54 5.00 3.35 3.25 4.53 4.20 7.42 4.20 1.83 M WIDE PASSAGE 1.83 M WIDE PASSAGE FIRE DUCT. ELEC. DUCT 1.83 M WIDE PASSAGE 1.83 M WIDE PASSAGE FIRE DUCT. ELEC. DUCT FD V1 V1 W1 V1 D2 D2 OP D2 D2 D1 D1D1 D2 D2 D2 OP OP FD D2 D2 D1 D2 OP D2 D1D1 D D2 OP W1 PODIUMPARKINGLVL02 (TOTALNOOFCARS=18NOS) 5 M. WIDE DRIVE WAY 5M.WIDEDRIVEWAY 5M.WIDEDRIVEWAY DN TOTALNOOFCARS=28NOS) 4.60M. WIDE DRIVE WAY 5.0M.WIDEDRIVEWAY PODIUMPARKINGLVL01 5.0M.WIDEDRIVEWAY 6.00[19'-8"] 42.38 [139'-1"] 0.76 [2'-6"] 22.30[73'-2"] 4.71[15'-5"] 3.39[11'-1"] 14.31[47'-0"] 20.08[65'-11"] 23.77 [78'-0"] 45.52 0.76 [2'-6"] 22.30 4.71[15'-5"] 21.30[69'-11"] 21.52 3.41 1.58 23.30 A A A A RAMP DN TO PODIUM PARKING LVL 01 SLOPE 1 DN RAMP DN TO GROUND PARKING SLOPE 8 6.00 6.00[19'-8"] GR.LVL. 1.60 4.71 14.83 6'0"X9'3" 6'0"X6'0"6'0"X6'0" UP DN DN 6'0"X9'3" 6'0"X6'0"6'0"X6'0" UP DN DN 1 8 9 14 16 20 28 24 21 23 15 47° 0.94[3'-1"] 8 21 15 50° 89° 1 7 14 20
DESCRIPTION
SCHEDULEOFOPENING
NOTES
PRINTS ISSUEDTONO.S 0.100MTHKWALL 0.230MTHKWALL 10012019 0.125MTHKWALL 02SITEMAILTORCC
REFERR.C.C.DRAWINGBEFOREEXECUTIONOFWORK.
REFERELEVATIONSECTIONDRG. ALLWALLSARE0.125THICKUNLESSSPECIFIED.
CHECKEDBYRCCDESIGNERBEFOREEXECUTION SIZEOFCOLUMN,ORIENTATIONLOCATIONSHOULDBE OFWORK
ANYDISCREPANCYINTHISDRG.SHOULDBE REFERSTAIRCASE,TOILETRAILINGDETAIL DAYTODAYVISITISNOTPARTOFARCHITECTDUTIES. DRG.SEPERATELY. DISCUSSEDWITHTHEARCHITECTBEFORECASTING.
REVISION DATE DATE AMENITYBLDG DRAWINGTITLE
SCALE=NTS
PROECT ONS.NO.2982A(P),ATLOHEGAON,PUNE. PROPOSEDGROUPHOUSINGSCHEME
DEVELOPERS GOLDENBRICKSDEVELOPERS
1.80 M. W. PASSAGE LIFTLIFT 1.8001.8001.8001.8001.800 W22.080 e e 0.200 P P 1.80 M. W. PASSAGE LIFTLIFT 1.8001.8001.8001.8001.800 W2 1.875 UP 12345612 789 13 14 0.450 1.500 1.500 0.100 0.125 2.1252.5001.5000.325 0.125 123456789 2018161412 1917151311 10 1.500 1.500 0.100 T=0.250 R=0.166 T=0.250 R=0.152 C10 C50 C4 C49 2.08WIDELOBBY C10 C50 C4 C49 P P PLANATFIRSTFL.LVL. SECTIONONPP T=0.250 R=0.166 T=0.250 R=0.152
N
GOLDENWIND
BY NAMRATA DATE 100123
PLANATTYP.FL.LVL.
2.58 M. W. PLATFORMUP UP LIFTLIFT +96.45 C10 C50 C4 C49 261.500 1.500 0.100 T=0.250 R=0.173 2.08WIDELOBBY P P PLANATGR.FL.LVL. 123456781011912 13 14 24 23 22 21 20 19 18 17 1615 25 0.355 0.325 26 24 23 22 21 20 19 18 17 1615 25 +96.00 PUMPROOM4.050 0.450+92.40 0.450 +95.70 +96.00 23,625lit GR.FL. GR.LVL.0.450 PLATFORM Domestic TRAPDOOR 0.750 T=0.250 R=0.173 T=0.250 R=0.160 T=0.250 R=0.160 T=0.250 R=0.160 T=0.250 R=0.160 4.500 3.200 3.200 3.200 3.200 PASSAGE PASSAGE PASSAGE PASSAGE 1STFL. 2NDFL. 3RDFL. 4THFL. TERR. 4.500 3.200 3.200 3.200 3.200 1.422 1.600 1.000 1.600 1.0000.585 1.600 1.0000.585 1.600 0.845 1.000 1.500 2.245 2 3 4 5 6 10 11 1413 15 16 17 18 19 23 24 25 26 23 4 10 11 13 14 15 17 18 20 0.325 1.50X1.50M 22 23 4 10 11 14 15 17 18 20 22 23 4 10 11 13 14 15 17 18 20 22 23 4 10 11 14 15 17 18 20 22 27 21 22 1.67WIDELOBBY KITCHEN 3.00X2.29 TOILET 1.37X BEDROOM 3.32X3.20 DINING 2.68X2.44 LIVING 3.18X3.93 SITOUT 3.18X1.93 STUDY 3.17X3.20 2.13X1.37 TOILET LIFT 1.80X1.80 1.19 W.D. 1.37W.ENC.BALC. 1.15 M. W.ENCL.BALC. BALC. 2.15 KITCHEN 3.00X2.29 TOILET 1.37X BEDROOM 3.32X3.20 LIVING 3.18X3.93 SITOUT 3.18X1.93 STUDY 3.17X3.20 2.13X1.37 TOILET 1.37W.ENC.BALC. 2.15 1.19 W.D.BALC. DINING 1.152.68X2.44 M. W.ENCL.BALC. 1ST,2ND,3RD,4TH,5TH,6THFLOORPLAN C2 C4 C5 C10 C11 C12 C26 C27 C30 C31 C35 C38 C41 C42 C43 C44 C45 C46 C47 C48 C49 12.00MWIDEROAD SERVICES AD A. BUILDING D ATRIUM 1.80 M. W. PASSAGE 1.80 M. W. PASSAGE 1.80M.W.PASSAGE 1.80M.W.PASSAGE LIFT TOI TOI TOI TOI(L) 1STFLOORPLAN D1 W UP DN W W W W W W W3 DATE DOORS DATE AMENITYBLDG DRAWINGTITLE NOTES OFWORK WINDOWS W=2.40X1.50M W1=1.80X1.50M PRINTS ISSUEDTONO.S 0.100MTHKWALL D10.91X2.45M D1.00X2.45M SCALENTS RS2=1.43X2.45M GOLDENBRICKSDEVELOPERS ONS.NO.2982A(P),ATLOHEGAON,PUNE. PROPOSEDGROUPHOUSINGSCHEME N 216NARAYANPETH,PUNE30 GOLDENWIND ARCHITECT PANDITOSHIASSOCIATES RS2.45X2.45M W3=1.20X1.50M FLOORPLANS THISDWGSUPERSEEDSPREVIOUSDWGS REFERR.C.C.DRAWINGBEFOREEXECUTIONOFWORK. 01122022 02SITEENGINEER UPDN CANOPYBELOW D4 D4 D3 D3 D3 D4 V1=0.45X0.90M D31.20X2.45M ROOM TOI TOI 114 101 102 103 104 105 106 107 108 109 110 113 112 111 1.1501.150 0.373 0.3130.775 3.425 1.975 0.450 0.450 0.600 2.4631.150 0.1700.9900.305 0.341 2.4631.150 0.341 0.2610.1700.946 0.170 2.4631.150 0.644 0.644 0.9460.261 0.333 1.640 1.640 1.640 1.2031.150 0.600 1.800 2.938 0.2130.2560.2560.2480.2800.2710.2710.2710.2710.2800.2480.2560.2560.213 1.800 2.093 1.8001.8001.8301.8301.830 2.093 2.0932.0932.093 2.938 0.325 0.8250.600 0.355 0.856 0.569 1.085 1.085 0.569 0.3110.8561.085 0.569 0.8250.3550.8561.085 0.3250.6001.0850.600 1.2031.150 1.1500.946 0.261 0.333 0.6440.644 0.600 2.463 1.640 2.463 1.6401.1500.946 0.438 2.463 1.640 0.4381.1500.990 0.600 0.578 0.5460.5460.6850.5350.535 1.240 1.728 1.120 0.300 TOI(G) 1.5382.2500.150 0.900 0.900 0.900 0.900 0.938 1.040 0.100 1.375 0.750 0.163 0.4750.6000.475 0.225 0.305 0.385 0.385 0.261 0.0730.068EE 0.3850.618 0.3850.6180.3850.249 0.750 2.203 0.15 0.45 0.15 0.45 2.993 1.433 1.848 1.283 3.955 0.300 0.300 11.760 13.790 0.300 0.300 0.955 1.433 1.848 1.283 3.955 0.7500.225 0.9000.225 2.3750.288 1.0500.225 2.338 12.060 1.0581.088 0.075 2.4902.2982.0401.675 4.688 A E B C B A D D E ROOM ROOM ROOM ROOM ROOM UP2.203 0.750 OTTA G G GROUNDFLOORPLAN SHOP26 SHOP13 UP RS LOFT ABOVE LOFT ABOVE SHOP22SHOP23 PLATFORM RS RS D2 1.525 1.525 1.160 LOFT ABOVE PLINTHLVL LOFT ABOVE SHOP SHOP2 SHOP5 SHOP3 SHOP SHOP6 SHOP7 SHOP8 SHOP9 SHOP10SHOP12SHOP14 SHOP15 SHOP16SHOP17 SHOP20SHOP21 NURSERY SHOP27 SHOP28 UP PLATFORM PLATFORM 2.07M.W.PLATFORM 12.0M.W.INTERNALROAD ATRIUM OPENTOSKY 13.200 11.460 RS1 RS RS1 RS RS RS RS RS D2D2D2 TOI.(G)TOI.(L) UP +96.45 1.525 0.550 0.125 1.160 0.125 4.054 0.125 0.550 0.125 1.640 1.975 1.640 1.640 C2 C3 C11 C12 C18 C19 C23 C24 C26 C31 C34 C36 C37 C38 C41 C42 C43 C48 C50 C49 1.3701.800 1.3701.800 0.900 1.800 1.3701.800 1.370 1.8001.8001.8301.8301.830 1.370 1.370 1.370 1.370 1.370 1.370 1.370 1.370 0.2870.2870.2870.2870.3020.3020.3020.3020.3020.3020.2870.2870.2870.287 0.900 1.370 1.5251.525 0.550 0.963 1.5251.525 0.438 0.207 0.1641.640 1.640 1.640 0.164 0.164 0.164 0.207 1.5251.525 0.500 0.963 PLATFORM 0.963 0.963 0.9001.040 0.900 0.900 0.963 2.250 1.538 0.600 0.5460.5460.5350.535 0.685 1.2401.7280.578 0.685C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C14 C23 C31 C34 C35 C36 C37 C38 C39 C41 C42 C44 C48 C50 +96.45 PLINTHLVL +96.45 PLINTHLVL +95.70 UP UP CAP=23,625+75,000ltr(f.f) SIZE=6.17X6.95X2.40M. 3.690 4.083 1.0001.000 3.063 0.375 1.000 0.203 0.375 0.203 1.000 LOBBY UP C3 0.300 0.610 0.2501.035 A E REVISION DATE AMENITYBLDG SCHEDULEOFOPENING NOTES REFERSTAIRCASE,TOILETRAILINGDETAIL DESCRIPTION SIZEOFCOLUMN,ORIENTATIONLOCATIONSHOULDBE W1=1.80X1.50M 0.230MTHKWALL 01122022 0.125MTHKWALL 02 D10.91X2.45M D20.76X2.45M SITEENGINEER DEVELOPERS GOLDENBRICKSDEVELOPERS PROECT ONS.NO.2982A(P),ATLOHEGAON,PUNE. PROPOSEDGROUPHOUSINGSCHEME N 216NARAYANPETH,PUNE30 GOLDENWIND ARCHITECT PANDITOSHIASSOCIATES DEALTSIGNATURE BY NAMRATA RS1=1.67X2.45M DATE RS3=2.75X2.45M W4=1.20X1.20M 011222 B C B A D FLOORPLANS E D REFERCONSULTANTDWGSFORFIRETOILET 0.900 1.550 0.207 0.207 0.207 0.207 0.207 0.207 0.535 0.150 0.300 0.300 0.850 0.300 0.300 0.4250.725 0.4250.725 0.300 1.800 0.600 0.685 0.685 0.600 0.685 0.685 0.7630.763 0.7630.763 2.038 0.763 0.763 1.8630.7630.763 0.900 0.9001.863 3.085 3.478 1.000 0.375 PROP.PUMPRM. TRAPDOOR PLUMBINGDRAINAGEDETAILS 0.225 0.2870.3020.2590.2590.2590.2590.302 0.287 0.155 0.164 0.164 0.164 0.164 0.207 0.600 0.125 0.62 0.39 1.80 M. W. PASSAGE 1.80 M. W. PASSAGE 1.80M.W.PASSAGE 1.80M.W.PASSAGE LIFT TOI TOI TOI V V V V V VV TOI TOI(L) OPENTOSKY TYP1ST2NDFLOORPLAN D2D2D2D2 D3 W1 W1 W2 W3 DN C1 C6 C7 C8 C9 C13 C14 C17 C18 C20 C23 C25 C32 C33 C36 C37 C39 C40 TOITOI TOITOI W3 W3 REVISION DOORS AMENITYBLDG SCHEDULEOFOPENING REFERSTAIRCASE,TOILETRAILINGDETAIL DESCRIPTION SIZEOFCOLUMN,ORIENTATIONLOCATIONSHOULDBE WINDOWS W=2.40X1.50M W2=1.50X1.20M V=0.60X0.90M 0.230MTHKWALL 0.125MTHKWALL D20.76X2.45M D1.00X2.45M DEVELOPERS GOLDENBRICKSDEVELOPERS PROECT ONS.NO.2982A(P),ATLOHEGAON,PUNE. PROPOSEDGROUPHOUSINGSCHEME N 216NARAYANPETH,PUNE30 GOLDENWIND ARCHITECT PANDITOSHIASSOCIATES DEALTSIGNATURE BY AR.SUMEDHA RS1=1.67X2.45M DATE RS3=2.75X2.45M FLOORPLANS REFERCONSULTANTDWGSFORFIRETOILET PLUMBINGDRAINAGEDETAILS 01122022 02SITEENGINEER 250823 UPDN D4 D4 D41.05X2.45M OFFICEOFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE TOI TOI TOI TOI TOI 114 214 101 201 102 202 204 205 206 207 208 209 110 210 213 112 1.1501.150 0.373 0.3130.775 3.425 1.975 0.450 0.450 0.600 2.4631.150 0.1700.9900.305 0.341 2.4631.150 0.341 0.2610.1700.946 0.170 2.4631.150 0.644 0.644 0.9460.261 0.333 1.640 1.640 1.640 1.2031.150 0.600 1.800 2.938 0.2130.2560.2560.2480.2800.2710.2710.2710.2710.2800.2480.2560.2560.213 1.800 2.093 1.8001.8001.8301.8301.830 2.093 2.0932.0932.093 2.938 0.325 0.8250.600 0.355 0.856 0.569 1.085 1.085 0.569 0.3110.8561.085 0.569 0.8250.3550.8561.085 0.3250.6001.0850.600 1.2031.150 1.1500.946 0.261 0.333 0.6440.644 0.600 2.463 1.640 2.463 1.6401.1500.9460.438 2.463 1.640 0.4381.1500.990 0.600 0.578 0.5460.5460.6850.5350.535 1.240 1.728 1.120 0.300 TOI(G) 1.5382.2500.150 0.900 0.900 0.900 0.900 0.938 1.040 0.100 1.375 0.750 0.163 0.4750.6000.475 0.225 0.305 0.385 0.385 0.261 0.0730.068EE 0.3850.618 0.3850.6180.3850.249 0.750 2.203 0.15 0.45 0.15 0.45 2.993 1.433 1.848 1.283 3.955 0.300 0.300 11.760 13.790 0.300 0.300 0.955 1.433 1.848 1.283 3.955 0.7500.225 0.9000.225 2.3750.288 1.0500.225 2.338 12.060 1.0581.088 0.075 2.4902.2982.0401.675 4.688 A E B C B A D D E
216NARAYANPETH,PUNE30
ARCHITECT PANDITOSHIASSOCIATES DEALTSIGNATURE
MAINSTAIRCASEDETAIL
REVISEDMAINSTAIRCASE
WORKINGDRAWINGMHADAFLATSFORPROJECTATMUNDHAWA
3.17 3.50 3.00 07 06 05 04 11 12 SC01 SC02 SC03 SC10 SC09 SC08 NORTH PARKINGPLAN PROP.24.0M.WIDEROAD 4.50 2.86 REVISEDO.SPACE 444SQM. 2.86WIDEDRIVEWAY UP 1.67 2.75 1.25 1 2 3 4 5 6789101112 13 14 15 16 17 1.25 1.27 1.27 1.25 1.05 2.90 T=0.25 R=0.161 3.50 WIDE DRIVEWAY C4 C3 C1 C2 C5 C6 C9 C10 C7 C8 C11 C12 C13 C14 C15 C16 C17 C18 C22 C23 C24 C25 C26 C19 C20 C21 LW1 LW3 LW2LIFTSHAFT 1.80X1.80 13.25 3.17 WIDE DRIVEWAY 13.92 4.20 1.27 1.27 LOBBY liftopeningasperlift manufacturer's specification4.05 0.92 0.92 2.29 3.02 3.15 3.15 3.05 2.29 2.37 3.01 2.44 1.51 0.301.661.30 1.301.660.30 18 BEDROOM TOILETBEDROOM TOILET STAIRCASE STAIRCASE PARKING PARKING BEDROOM TOILETBEDROOM TOILET STAIRCASE BEDROOM TOILETBEDROOM TOILET STAIRCASE BEDROOM TOILETBEDROOM TOILET STAIRCASE BEDROOM TOILETBEDROOM TOILET STAIRCASE BEDROOM TOILETBEDROOM TOILET STAIRCASE TERRACE TERRACE SECTIONBB' SECTIONAA' BEDROOM KITCHENDININGTOILETBEDROOM BEDROOM KITCHENDININGTOILETBEDROOM BEDROOM KITCHENDININGTOILETBEDROOM BEDROOM KITCHENDININGTOILETBEDROOM
KITCHENDININGTOILETBEDROOM BEDROOM KITCHENDININGTOILETBEDROOM PARKING PARKING 2.90 1.20 1.20 TYPEROOMCARPET SQ.M. SQ.M. SITOUT SQ.M. TOTALUSABLEAREA SQ.FT. 2BHK49.9316.4666.39715.00
BEDROOM
TYP.1ST,2ND,3RD,4TH,5TH&6THFL.
NORTH TYPICALFLOORPLAN(P+6FL.) TOTALFSI=167.66X6=1005.96SQM. WD UP 2.27 3.32 0.69 0.69 3.29 LIFTSHAFT 1.80X1.80 LOBBY1.67 0.62 2.75 1.25 1 2 3 4 5 68910 13 14 15 16 17 1.25 1.27 1.27 1.25 1.05 0.62 2.75 3.49 0.42 0.76 0.76 0.46 2.38 0.46 1.65 2.29 13.92 1.25 3.95 0.39 0.39 2.10 2.10 SCHEDULEOFOPENINGS D 0.62 0.83 0.90 0.74 0.84 3.18 1.35 1.81 2.26 3.20 0.67 0.67 0.79 0.79 3.83 0.50 4.82 3.18 3.18 0.13 2.27 3.32 0.69 0.69 3.29 3.49 0.76 0.76 0.46 2.38 0.46 1.65 2.29 3.95 2.10 2.10 0.62 0.83 0.90 0.74 0.84 3.18 1.35 1.81 2.26 3.20 0.67 0.67 0.79 0.79 3.83 0.50 4.82 TOILET 1.37X2.15 BEDROOM 3.32X3.20 KITCHEN 3.00X2.29 DINING 2.68X2.44 LIVING 3.18X3.93 BEDROOM 3.17X3.20 TOILET 2.13X1.37 SITOUT 3.18X1.81 2.29D.BALC. X 1.09 1.42 1.42 liftopeningasper liftmanufacturer's specification 5.04 D1 D2 SYMBOLWIDTHHEIGHTLINTEL LVL. SILL LVL. SD W W1 W2 W3 V 1.002.202.200.900.751.831.831.451.00 1.52 1.82 1.013.41 0.600.902.451.85 D2 D D1 SD D1 D2 W W1 V W2 W4 V 1.00 1.00 T=0.25 R=0.161 W3 W41.014.38 1.45 1.45 TOILET 1.37X2.15 BEDROOM 3.32X3.20 KITCHEN 3.00X2.29 DINING 2.68X2.44 LIVING 3.18X3.93 BEDROOM 3.17X3.20 TOILET 2.13X1.37 SITOUT 3.18X1.81 D.BALC.2.29 X 1.09 D2 D D1 SD D1 D2 W W1 V W2 V 1.96 2.93 1.45 1.45 0.81 0.81 13.32 6.49 3.42 3.42 13.25 0.81 0.81 1.05HIGH4"THKRCCPARDIWITH 1.05 HIGH 4" THK RCC PARDI WITH 1.05 HIGH 4" THK RCC PARDI WITH FLATNO.101,201,301,401,501,601 FLATNO.102,202,302,402,502,602 1.64 3.93 1.04 1.04 3.93 3.80 C4 C3 C1 C2 C5 C6 C9 C10 C7 C8 C11 C12 C13 C14 C15 C16 C17 C18 C22 C23 C24 C25 C26 C19 C20 C21 LW1 LW3 LW2 18 2.202.20 2.202.20 2.202.20 2.20 2.20 2.20
DRAWINGTITLE: TYPICALFLOORPLAN NOTES:
*REFERR.C.C.DRAWINGBEFOREEXECUTION
*SIZEOFCOLUMN,ORIENTATION&LOCATION SHOULDBECHECKEDBYRCCDESIGNER BEFOREEXECUTIONOFWORK
*REFERSTAIRCASE,TOILET&RAILINGDETAIL
*DAYTODAYVISITISNOTPARTOFARCHITECT DRG.SEPARATELY.
*REFERELEVATION&SECTIONDRG.
*ANYDISCREPANCYINTHISDRG.SHOULDBE
DISCUSSEDWITHTHEARCHITECTBEFORE
*ALLWALLSEXT.WALLSARE0.15THICK UNLESSSPECIFIED. REVISIONS
PRINTS DATEISSUEDTONOS PROJECT
DEVELOPERS THECONSTRUCTION
DRAWINGTITLE: FIRSTFLOORPLAN NOTES:
*REFERR.C.C.DRAWINGBEFOREEXECUTION
*SIZEOFCOLUMN,ORIENTATION&LOCATION SHOULDBECHECKEDBYRCCDESIGNER BEFOREEXECUTIONOFWORK
*REFERSTAIRCASE,TOILET&RAILINGDETAIL
*REFERELEVATION&SECTIONDRG.
*ANYDISCREPANCYINTHISDRG.SHOULDBE
*DAYTODAYVISITISNOTPARTOFARCHITECT DRG.SEPARATELY. DISCUSSEDWITHTHEARCHITECTBEFORE
PRINTS DATEISSUEDTONOS
*ALLWALLSEXT.WALLSARE0.15THICK UNLESSSPECIFIED. REVISIONS
PROJECT:
DEVELOPERS THECONSTRUCTION
TCGGARDENIA
DATE 10/10/2023
building line
'G'BLDG
TCGGARDENIA DATE 10/10/2023 NORTH 1:75 SCALE OFWORK. N DUTIES. 02 CASTING. SITEMAIL-GFCISSUED LAYOUTOFRESI.BUILDINGS ONS.NO.24(P),KATRAJ,PUNE.
W=1.52X1.25 DOORS SCHEDULEFOROPENINGS WINDOWS D=1.00X2.20 D1=0.90X2.20 D2=0.76X2.20 SD=1.52X2.20 DESCRIPTION W1=1.35X0.95 V=0.60X0.95 W3=1.22X1.22 W2=0.75X0.95 NO.DATE 'G'BUILDING ADVANCECOPY R1 R2 LIVINGROOM KITCHEN/DINING BALCONY SUNK75 CHILDRENBED MASTERBED M.TOILET SUNK200 M.TOILET SUNK200 DRY BALC.SUNK 200 LIVINGROOM KITCHEN/DINING BALCONY SUNK75 CHILDRENBED MASTERBED DRY BALC.SUNK 200 M.TOILET SUNK200 M.TOILET SUNK200 LIVINGROOM KITCHEN/DINING BALCONY SUNK75 CHILDRENBED MASTERBED M.TOILET SUNK200 M.TOILET SUNK200 DRY BALC.SUNK 200 LIVINGROOM KITCHEN/DINING BALCONY SUNK75 CHILDRENBED MASTERBED DRY BALC.SUNK 200 M.TOILET SUNK200 M.TOILET SUNK200 DUCT DUCT 1.80x1.60 LIFT 1.85X2.55 LIFT 1.85X1.85 DUCT 1.80x1.60 FLATNO.201,301,401,501, 701,801,901,1001,1101 FLATNO.202,302,402,502, 702,802,902,1002,1102 FLATNO.203,303,403,503, 703,803,903,1003,1103 FLATNO.204,304,404,504, 704,804,904,1004,1104 FIRESTAIRCASE1.50 1.501.50 0.30 1.25 1.071.221.01 4.65 0.20 1.85 3.10 liftopeningasperlift manufacturer's specification liftopeningasperlift manufacturer's specification 0.5ØM.S.HANDRAILAT1.2MHT. 1.05HIGH4"THKRCCPARDIWITH 1.25 2.25 2.25 1.25 1.250.801.25 1.25 1.003.50 1.071.221.01 D D D D D2 D2 D2D2 D2D2 D2D2 D1 D1 D1 D1 D1 D1 D1 D1 D2 SD SD SD SD D2 D2 D2 W W W1 W1 W1 W1 W W W W VV VV VV VV W W 0.154.26 0.30 0.20 1.201.801.06 2.15 3.65 0.46 1.38 3.20 0.76 0.76 3.05 2.14 3.20 2.29 0.37 0.75 0.89 1.55 1.52 1.040.80 1.521.52 1.60 1.20 0.85 0.100.91 0.600.47 0.76 0.64 1.052.29 2.90 0.75 0.60 2.00 1.75 1.00 1.50 0.15 3.15 0.84 0.84 1.02 0.90 0.84 0.84 1.12 0.46 0.15 2.14 0.73 0.154.26 0.30 0.20 1.201.801.06 2.15 3.65 0.46 1.33 3.20 0.76 0.76 3.05 3.20 2.29 0.89 1.10 1.52 1.040.80 1.521.52 1.60 1.20 0.91 0.76 0.64 1.052.29 2.90 0.75 0.60 1.55 0.55 1.50 0.15 3.15 0.84 0.84 1.02 0.90 0.84 0.84 0.46 0.15 1.85 1.85 3.20 3.20 0.59 2.14 4.260.15 0.30 0.20 1.061.801.20 2.15 3.65 0.46 1.33 3.20 0.76 0.76 3.05 3.20 2.29 1.10 1.52 0.801.04 1.521.52 1.60 1.20 0.91 0.76 0.64 2.291.05 2.90 0.75 0.60 1.55 0.55 1.50 0.15 3.15 0.84 0.84 1.02 0.90 0.84 0.84 0.46 0.15 1.85 3.20 0.59 4.260.15 0.30 0.20 1.061.801.20 1.70 4.11 2.74 0.76 0.76 3.05 2.14 3.20 2.29 0.99 1.55 1.52 0.801.04 1.521.52 1.60 1.20 0.85 0.91 0.60 0.76 0.64 2.291.05 2.90 0.75 0.60 2.00 1.75 1.00 1.50 0.15 3.15 0.84 0.84 1.02 0.90 0.84 0.84 1.12 0.46 0.15 0.73 1.85 3.20 1.05 HIGH 4" THK RCC PARDI WITH 0.05Ø M.S. HANDRAIL AT 1.2M HT. 1.05 HIGH 4" THK RCC PARDI WITH 0.05Ø M.S. HANDRAIL AT 1.2M HT. 0.46 1.10 0.37 0.10 0.99 1.10 0.37 0.10 3.35 4.99 23.30 0.15 1.522.35 0.10 0.66 3.20 0.30 0.96 0.91 3.25 0.30 0.66 0.101.520.10 1.520.10 0.821.521.68 4.15 1.20 3.01 1.87 0.75 6.83 4.15 6.08 0.75 0.75 6.08 17.81 23.15 W3 W3 GLASSRAILINGTODETAIL GLASSRAILINGTODETAIL GLASSRAILINGTODETAIL GLASSRAILINGTODETAIL MAINTENANCESLAB SLABATBEAMBOTTOM MAINTENANCESLAB SLABATBEAMBOTTOM MAINTENANCESLAB SLABATBEAMBOTTOM MAINTENANCESLAB SLABATBEAMBOTTOM 0.05ØM.S.HANDRAILAT1.05MHT. 0.05ØM.S.HANDRAILAT1.05MHT. 0.05ØM.S.HANDRAILAT1.05MHT. 0.05ØM.S.HANDRAILAT1.05MHT. MASTERBED DUCT DUCT DUCT 0.30 0.30 0.30 0.30 0.40 0.100.10 0.40 0.301.422.30 0.100.10 0.40 0.61 0.96 0.100.10 0.40 0.96 3.55 3.550.61 0.720.100.100.82 0.40 1.521.000.68 T=250 R=172 T=250 R=172 UP 1 2 3 4 5 6 789 10 11 12 13 14 15 181716 UP 1 2 3 4 56789 10 11 12 13 1817161514
DEVELOPMENTCO.
NORTH 1:75 SCALE
N
02
DESCRIPTION W1=1.35X0.95 V=0.60X0.95 W3=1.22X1.22 W2=0.75X0.95 NO.DATE 'G'BUILDING ADVANCECOPY R1 R2 'G'BLDG building line LIVINGROOM KITCHEN/DINING BALCONY SUNK75 CHILDRENBED MASTERBED M.TOILET SUNK200 M.TOILET SUNK200 DRY BALC.SUNK 200 LIVINGROOM KITCHEN/DINING BALCONY SUNK75 CHILDRENBED MASTERBED DRY BALC.SUNK 200 M.TOILET SUNK200 M.TOILET SUNK200 LIVINGROOM KITCHEN/DINING BALCONY SUNK75 CHILDRENBED MASTERBED M.TOILET SUNK200 M.TOILET SUNK200 DRY BALC.SUNK 200 LIVINGROOM KITCHEN/DINING BALCONY SUNK75 CHILDRENBED MASTERBED DRY BALC.SUNK 200 M.TOILET SUNK200 M.TOILET SUNK200 DUCT DUCT 1.80x1.60 LIFT 1.85X2.55 LIFT 1.85X1.85 DUCT 1.80x1.60 FLATNO.201,301,401,501, 701,801,901,1001,1101 FLATNO.202,302,402,502, 702,802,902,1002,1102 FLATNO.203,303,403,503, 703,803,903,1003,1103 FLATNO.204,304,404,504, 704,804,904,1004,1104 FIRESTAIRCASE1.50 1.501.50 0.30 1.25 1.071.221.01 4.65 0.20 1.85 3.10 liftopeningasperlift manufacturer's specification liftopeningasperlift manufacturer's specification 0.5ØM.S.HANDRAILAT1.2MHT. 1.05HIGH4"THKRCCPARDIWITH 1.25 2.25 2.25 1.25 1.250.801.25 1.25 1.003.50 1.071.221.01 D D D D D2 D2 D2D2 D2D2 D2D2 D1 D1 D1 D1 D1 D1 D1 D1 D2 SD SD SD SD D2 D2 D2 W W W1 W1 W1 W1 W W W W VV VV VV VV W W 0.154.26 0.30 0.20 1.201.801.06 2.15 3.65 0.46 1.38 3.20 0.76 0.76 3.05 2.14 3.20 2.29 0.37 0.75 0.89 1.55 1.52 1.040.80 1.521.52 1.60 1.20 0.85 0.100.91 0.600.47 0.76 0.64 1.052.29 2.90 0.75 0.60 2.00 1.75 1.00 1.50 0.15 3.15 0.84 0.84 1.02 0.90 0.84 0.84 1.12 0.46 0.15 2.14 0.73 0.154.26 0.30 0.20 1.201.801.06 2.15 3.65 0.46 1.33 3.20 0.76 0.76 3.05 3.20 2.29 0.89 1.10 1.52 1.040.80 1.521.52 1.60 1.20 0.91 0.76 0.64 1.052.29 2.90 0.75 0.60 1.55 0.55 1.50 0.15 3.15 0.84 0.84 1.02 0.90 0.84 0.84 0.46 0.15 1.85 1.97 3.20 0.59 2.14 4.260.15 0.30 0.20 1.061.801.20 2.15 3.65 0.46 1.33 3.20 0.76 0.76 3.05 3.20 2.29 1.10 1.52 0.801.04 1.521.52 1.60 1.20 0.91 0.76 0.64 2.291.05 2.90 0.75 0.60 1.55 0.55 1.50 0.15 3.15 0.84 0.84 1.02 0.90 0.84 0.84 0.46 0.15 1.85 3.20 0.59 4.260.15 0.30 0.20 1.061.801.20 1.70 4.11 2.74 0.76 0.76 3.05 2.14 3.20 2.29 0.99 1.55 1.52 0.801.04 1.521.52 1.60 1.20 0.85 0.91 0.60 0.76 0.64 2.291.05 2.90 0.75 0.60 2.00 1.75 1.00 1.50 0.15 3.15 0.84 0.84 1.02 0.90 0.84 0.84 1.12 0.46 0.15 0.73 1.97 1.05 HIGH 4" THK RCC PARDI WITH 0.05Ø M.S. HANDRAIL AT 1.2M HT. 1.05 HIGH 4" THK RCC PARDI WITH 0.05Ø M.S. HANDRAIL AT 1.2M HT. 0.46 1.10 0.37 0.10 0.99 1.10 0.37 0.10 3.35 4.99 23.30 0.15 1.522.35 0.10 0.66 0.30 0.96 0.91 0.30 0.66 0.101.520.10 1.520.10 0.821.521.68 4.15 1.20 3.01 1.87 0.75 6.83 4.15 6.08 0.75 0.75 6.08 17.81 23.15 W3 W3 GLASSRAILINGTODETAIL GLASSRAILINGTODETAIL GLASSRAILINGTODETAIL GLASSRAILINGTODETAIL MAINTENANCESLAB SLABATBEAMBOTTOM MAINTENANCESLAB SLABATBEAMBOTTOM MAINTENANCESLAB SLABATBEAMBOTTOM MAINTENANCESLAB SLABATBEAMBOTTOM 0.05ØM.S.HANDRAILAT1.05MHT.
0.05ØM.S.HANDRAILAT1.05MHT. 0.05ØM.S.HANDRAILAT1.05MHT. MASTERBED DUCT DUCT DUCT 0.30 0.30 0.30 0.30 0.40 0.100.10 0.40 0.301.422.30 0.100.10 0.40 0.61 0.96 0.100.10 0.40 0.96 3.55 3.550.61 0.720.100.100.82 0.40 1.521.000.68 T=250 R=172 T=250 R=172 UP 1 2 3 4 5 6 789 10 11 12 13 14 15 181716 UP 1 2 3 4 56789 10 11 12 13 1817161514 0.15 9.45 0.69 0.68 A B C A B C
OFWORK.
DUTIES.
CASTING. SITEMAIL-GFCISSUED LAYOUTOFRESI.BUILDINGS ONS.NO.24(P),KATRAJ,PUNE. DEVELOPMENTCO. W=1.52X1.25 DOORS SCHEDULEFOROPENINGS WINDOWS D=1.00X2.20 D1=0.90X2.20 D2=0.76X2.20 SD=1.52X2.20
0.05ØM.S.HANDRAILAT1.05MHT.
'G'BLDG
DRAWINGTITLE: TERRACEFLOORPLAN NOTES:
*REFERR.C.C.DRAWINGBEFOREEXECUTION
*ALLWALLSEXT.WALLSARE0.15THICK UNLESSSPECIFIED.
*SIZEOFCOLUMN,ORIENTATION&LOCATION SHOULDBECHECKEDBYRCCDESIGNER BEFOREEXECUTIONOFWORK
*ANYDISCREPANCYINTHISDRG.SHOULDBE *REFERSTAIRCASE,TOILET&RAILINGDETAIL
*REFERELEVATION&SECTIONDRG.
PRINTS DATEISSUEDTONOS
REVISIONS
PROJECT
DEVELOPERS:
DRAWINGTITLE: REFUGEFLOORPLAN NOTES:
*REFERR.C.C.DRAWINGBEFOREEXECUTION
*SIZEOFCOLUMN,ORIENTATION&LOCATION SHOULDBECHECKEDBYRCCDESIGNER BEFOREEXECUTIONOFWORK
*REFERELEVATION&SECTIONDRG.
*ANYDISCREPANCYINTHISDRG.SHOULDBE
*ALLWALLSEXT.WALLSARE0.15THICK UNLESSSPECIFIED. REVISIONS PRINTS DATEISSUEDTONOS PROJECT DEVELOPERS: THECONSTRUCTION
*REFERSTAIRCASE,TOILET&RAILINGDETAIL *DAYTODAYVISITISNOTPARTOFARCHITECT DRG.SEPARATELY. DISCUSSEDWITHTHEARCHITECTBEFORE
'G'BLDG building line
TCGGARDENIA DATE 10/10/2023 NORTH 1:75 SCALE OFWORK. N DUTIES. 02 CASTING. SITEMAIL-GFCISSUED LAYOUTOFRESI.BUILDINGS ONS.NO.24(P),KATRAJ,PUNE. DEVELOPMENTCO. W=1.52X1.25
V=0.60X0.95 W3=1.22X1.22 W2=0.75X0.95 NO.DATE 'G'BUILDING ADVANCECOPY R1 R2 LIVINGROOM KITCHEN/DINING BALCONY SUNK75 CHILDRENBED MASTERBED M.TOILET SUNK200 M.TOILET SUNK200 DRY BALC.SUNK 200 REFUGEAREA DUCT LIVINGROOM KITCHEN/DINING BALCONY SUNK75 CHILDRENBED MASTERBED M.TOILET SUNK200 M.TOILET SUNK200 DRY BALC.SUNK 200 LIVINGROOM KITCHEN/DINING BALCONY SUNK75 CHILDRENBED MASTERBED DRY BALC.SUNK 200 M.TOILET SUNK200 M.TOILET SUNK200 DUCT DUCT 1.80x1.60 LIFT 1.85X2.55 LIFT 1.85X1.85 DUCT 1.80x1.60 FLATNO.602 FLATNO.603 FLATNO.604 FIRESTAIRCASE1.50 1.501.50 0.30 1.25 1.071.221.01 4.65 0.20 1.85 3.10 liftopeningasperlift manufacturer's specification liftopeningasperlift manufacturer's specification 0.5ØM.S.HANDRAILAT1.2MHT. 1.05HIGH4"THKRCCPARDIWITH 1.25 2.25 2.25 1.25 1.250.801.25 1.25 1.003.50 1.071.221.01 D D D D2 D2 D2D2 D2D2 D1 D1 D1 D1 D1 D1 D2 SD SD SD D2 D2 W W W1 W1 W1 W W W W VV VV VV 0.154.26 0.30 0.20 1.201.801.06 2.15 3.65 0.46 1.38 3.20 0.76 0.76 3.05 2.14 3.20 2.29 0.37 0.75 0.89 1.55 1.52 1.040.80 1.521.52 1.60 1.20 0.85 0.100.91 0.600.47 0.76 0.64 1.052.29 2.90 0.75 0.60 2.00 1.75 1.00 1.50 0.15 3.15 0.84 0.84 1.02 0.90 0.84 0.84 1.12 0.46 0.15 2.14 0.73 0.154.26 0.30 0.20 1.201.801.06 2.15 3.65 0.46 1.33 3.20 0.76 0.76 3.05 3.20 2.29 0.89 1.10 1.52 1.040.80 1.521.52 1.60 1.20 0.91 0.76 0.64 1.052.29 2.90 0.75 0.60 1.55 0.55 1.50 0.15 3.15 0.84 0.84 1.02 0.90 0.84 0.84 0.46 0.15 1.85 1.85 3.20 3.20 0.59 4.260.15 0.30 0.20 1.061.801.20 4.260.15 0.30 0.20 1.061.801.20 1.70 4.11 2.74 0.76 0.76 3.05 2.14 3.20 2.29 0.99 1.55 1.52 0.801.04 1.521.52 1.60 1.20 0.85 0.91 0.60 0.76 0.64 2.291.05 2.90 0.75 0.60 2.00 1.75 1.00 1.50 0.15 3.15 0.84 0.84 1.02 0.90 0.84 0.84 1.12 0.46 0.15 0.73 1.85 3.20 1.05 HIGH 4" THK RCC PARDI WITH 0.05Ø M.S. HANDRAIL AT 1.2M HT. 1.05 HIGH 4" THK RCC PARDI WITH 0.05Ø M.S. HANDRAIL AT 1.2M HT. 0.46 1.10 0.37 0.10 3.35 4.99 23.30 0.15 1.522.35 0.10 0.66 3.20 0.30 0.96 0.91 3.25 0.30 0.66 0.101.520.10 1.520.10 0.821.521.68 4.15 1.20 3.01 1.87 0.75 6.83 4.15 6.08 0.75 0.75 6.08 17.81 W3 W3 GLASSRAILINGTODETAIL GLASSRAILINGTODETAIL GLASSRAILINGTODETAIL MAINTENANCESLAB SLABATBEAMBOTTOM MAINTENANCESLAB SLABATBEAMBOTTOM MAINTENANCESLAB SLABATBEAMBOTTOM MAINTENANCESLAB SLABATBEAMBOTTOM 0.05ØM.S.HANDRAILAT1.05MHT. 0.05ØM.S.HANDRAILAT1.05MHT. 0.05ØM.S.HANDRAILAT1.05MHT. 0.05ØM.S.HANDRAILAT1.05MHT. MASTERBED DUCT DUCT DUCT 0.30 0.30 0.30 0.40 0.100.10 0.40 0.301.422.30 0.100.10 0.40 0.61 0.96 0.100.10 0.40 0.96 3.55 1.05HIGH4"THK.PARDIWITH0.05ØM.S.HANDRAILAT1.2MHT. SUNK75 0.56 6.53 1.00 1.75 1.20 3.49 2.75 0.15 3.76 1.67 0.60 4.26 9.60
DOORS SCHEDULEFOROPENINGS WINDOWS D=1.00X2.20 D1=0.90X2.20 D2=0.76X2.20 SD=1.52X2.20 DESCRIPTION W1=1.35X0.95
*DAYTODAYVISITISNOTPARTOFARCHITECT DRG.SEPARATELY.
DISCUSSEDWITHTHEARCHITECTBEFORE
THECONSTRUCTION TCGGARDENIA DATE 10/10/2023 NORTH 1:75 SCALE OFWORK. N DUTIES. 02 CASTING. SITEMAIL-GFCISSUED LAYOUTOFRESI.BUILDINGS
W=1.52X1.25 DOORS SCHEDULEFOROPENINGS WINDOWS D=1.00X2.20 D1=0.90X2.20 D2=0.76X2.20 SD=1.52X2.20 DESCRIPTION W1=1.35X0.95 V=0.60X0.95 W3=1.22X1.22 W2=0.75X0.95 NO.DATE 'G'BUILDING ADVANCECOPY R1 R2
ONS.NO.24(P),KATRAJ,PUNE. DEVELOPMENTCO.
LIFT 1.85X2.55 LIFT 1.85X1.85 FIRESTAIRCASE1.50 1.501.50 0.30 1.25 1.071.221.01 4.65 0.20 1.85 3.10 liftopeningasperlift manufacturer's specification liftopeningasperlift manufacturer's specification 0.5ØM.S.HANDRAILAT1.2MHT. 1.05HIGH4"THKRCCPARDIWITH 1.25 2.25 2.25 1.25 1.250.801.25 1.25 1.003.50 1.071.221.01 1.00 1.50 0.73 0.55 1.50 3.58 1.00 1.50 3.15 1.12 0.73 4.99 0.30 0.96 0.91 0.30 W3 W3 0.100.10 0.96 0.100.10 0.40 0.960.56 DUCT 1.80x1.60 DUCT 1.80x1.60 1.2MHIGHPARAPETWALL 1.2MHIGHPARAPETWALL 1.00 1.00 1.00 1.00 1.2MHIGHPARAPETWALL 1.2MHIGHPARAPETWALL 1.2MHIGHPARAPETWALL 1.2MHIGHPARAPETWALL 1.2MHIGHPARAPETWALL 1.2M HIGH PARAPET WALL 1.2M HIGH PARAPET WALL 1.2M HIGH PARAPET WALL 1.2M HIGH PARAPET WALL 1.2M HIGH PARAPET WALL WATERPROOFINGLAIDTOSLOPE WATERPROOFINGLAIDTOSLOPE WATERPROOFINGLAIDTOSLOPE WATERPROOFINGLAIDTOSLOPE MAINTENANCESLABBELOW MAINTENANCESLABBELOW MAINTENANCESLABBELOW MAINTENANCESLABBELOW 9.75 3.90 9.65 6.08 0.75 4.15 0.75 6.08 9.65 3.90 9.60 6.08 0.75 4.15 0.75 6.08 4.41 4.41 4.56 4.41 0.40 1.72 0.72 3.55 3.55 0.721.720.40 0.401.720.72 3.20 3.25 0.721.720.40 T=250 R=172 T=250 R=172 T=250 R=172 T=250 R=172 UP 1 2 3 4 5 6 789 10 11 12 13 14 15 181716 UP 1 2 3 4 56789 10 11 12 13 1817161514 DOWN DOWN MASTERBED1.2M HIGH PARAPET WALL A B C A B C
SIZEOFCOLUMN,ORIENTATION&LOCATION SHOULDBECHECKEDBYRCCDESIGNER BEFOREEXECUTIONOFWORK ALLWALLSEXT.WALLSARE0.15THICK
DRG.SEPERATELY.
REFERELEVATION&SECTIONDRG.
DISCUSSEDWITHTHEARCHITECTBEFORE
DRAWINGTITLE: ELEVATION
NOTES:
*REFERR.C.C.DRAWINGBEFOREEXECUTION
*ALLWALLSEXT.WALLSARE0.15THICK UNLESSSPECIFIED.
*SIZEOFCOLUMN,ORIENTATION&LOCATION SHOULDBECHECKEDBYRCCDESIGNER BEFOREEXECUTIONOFWORK
*REFERSTAIRCASE,TOILET&RAILINGDETAIL
*DAYTODAYVISITISNOTPARTOFARCHITECT DRG.SEPERATELY.
*REFERELEVATION&SECTIONDRG.
*ANYDISCREPANCYINTHISDRG.SHOULDBE
DISCUSSEDWITHTHEARCHITECTBEFORE
PRINTS DATEISSUEDTONOS
14/12/2022
SITE/MAIL-GFCISSUED02
REVISIONS
NO.DESCRIPTION DATE R217032023PROJECTIONFORCBED WINDOWATCILLLVL AT1STFLR. R204042023REFUGEAREASHOWN
DOORS SCHEDULEFOROPENINGS WINDOWS
D=1.00X2.20 D1=0.90X2.20 D2=0.76X2.20 SD=1.52X2.20 W=1.52X1.25 W1=1.35X0.95 V=0.60X0.95
PROJECT:
LAYOUTOFRESI.BUILDINGS ONS.NO.24(P),KATRAJ,PUNE.
DEVELOPMENTCO.
DEVELOPERS: THECONSTRUCTION TCGGARDENIA
DATE 31102022 NORTH SCALE 1:100 N OFWORK. DUTIES. CASTING.
W3=1.22X1.25 W4=0.95X1.25
GFC
AT6THFLOOR +0.72 +0.72 +0.40 +0.30 20MMGROOVES +0.40 +0.30 ±0.00 +0.40 +0.30 20MMGROOVES 20MMGROOVES 20MMGROOVES 20MMGROOVES 20MMGROOVES 20MMGROOVES 20MMGROOVES 20MMGROOVES ±0.00 ±0.00 ±0.00 ±0.00 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.72 +0.72 +0.72 +0.72 +0.72 +0.72 +0.72 +0.72 +0.72 +0.40 +0.40 +0.40 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 ±0.00 ±0.00 ±0.00 ±0.00 ±0.00 ±0.00 ±0.00 ±0.00 ±0.00 ±0.00 ±0.00 +0.40 +0.40 +0.40 +0.40 +0.40 +0.40 ±0.00 ±0.00 -4.41 -4.41 -4.41 -4.41 -4.41 SOUTHSIDEELEVATION EASTSIDEELEVATION +0.72 20MMGROOVES +0.30 +0.30 +0.30
NOTES
'G'BUILDING
DRAWINGTITLE:SECTIONS
*REFERR.C.C.DRAWINGBEFOREEXECUTION ANYDISCREPANCYINTHISDRG.SHOULDBE
REFERSTAIRCASE,TOILET&RAILINGDETAIL DAYTODAYVISITISNOTPARTOFARCHITECT
REVISIONS PRINTS DATEISSUEDTONOS PROJECT DEVELOPERS THECONSTRUCTION TCGGARDENIA DATE 31102020 SCALE 1:100
LAYOUTOFRESI.BUILDINGS ONS.NO.24(P),KATRAJ,PUNE. DEVELOPMENTCO. DOORS SCHEDULEFOROPENINGS WINDOWS D=1.00X2.20 D1=0.90X2.20 D2=0.76X2.20 SD=1.52X2.20 W=1.52X1.25 W1=1.35X0.95 V=0.60X0.95 W3=1.22X1.25 W4=0.95X1.25 NO.DESCRIPTION R1 RCCPARDIHTFOR1STFLOORCHANGED DATE 09.02.2021 BLDG'G' PODIUM1 PODIUM2 1STFLOOR 2NDFLOOR 4THFLOOR 5THFLOOR 6THFLOOR 7THFLOOR 8THFLOOR 9THFLOOR 10THFLOOR TERRACE 3RDFLOOR 11THFLOOR SD SD SD SD SD SD WATERPROOFINGLAIDTOSLOPE LIVING OPENBAL. 0.155 1.15 LIVING 75SUNK OPENBAL. 0.155 LIVING 75SUNK OPENBAL. 0.155 LIVING 75SUNK OPENBAL. 0.155 LIVING 75SUNK OPENBAL. 0.155 LIVING 1.15 1.15 2.202.90 2.202.90 2.202.90 PARKING 2.202.90 TODETAIL TODETAIL GLASSRAILING 1.30 1.15 2.90 2.90 2.202.90 2.202.90 2.202.90 2.20 2.90 2.202.90 2.20 2.20 0.90 A.R.C.JALIWITH PARKING 0.155 0.95 0.155 0.95 1.25 0.95 1.25 0.95 1.25 0.155 0.95 1.25 0.95 1.25 0.155 0.95 1.25 0.95 1.25 1.20 W W W W 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 3.10 3.00 0.90 0.95 W M.BEDROOM M.BEDROOM M.BEDROOM M.BEDROOM M.BEDROOM M.BEDROOM SECTIONA-A SECTIONC-C SECTIONB-B 0.95 W 0.155 0.95 1.252.90 1.25 0.95W1 KITCHEN 1.25 0.95 DRYBAL. 1.25DRYBAL. 0.05ØM.S.HANDRAILAT1.05MHT. VV 1.25 0.95 DRYBAL. 1.25 0.95W1 KITCHEN 1.25 0.95 DRYBAL. 0.05ØM.S.HANDRAILAT1.05MHT. VV 0.05ØM.S.HANDRAILAT1.05MHT. 1.25 0.95W1 KITCHEN 1.25 0.95 DRYBAL. 1.25 0.95W1 KITCHEN VV 0.05ØM.S.HANDRAILAT1.05MHT. VV 1.20 1.25 0.95W1 KITCHEN VV PARKING SECTIONC-C 1.05 0.15 1.05 1.05 1.05 0.15 1.05 1.05 0.15 1.05 1.05 0.15 1.05 1.05 0.15 1.25 W1 KITCHEN VV 1.05 0.15 A.R.C.JALIWITH +0.72 +0.72 ±0.00 +1.24 ±0.00 +0.40 +1.13 +0.72 +0.72 +0.72 +0.72 +0.72 +0.72 +0.72 +0.72 +0.72 +0.40 +0.40 +0.40 +0.40 +0.40 +0.40 +0.40 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 +0.30 ±0.00 ±0.00 ±0.00 ±0.00 ±0.00 ±0.00 ±0.00 ±0.00 NORTHSIDEELEVATION +0.30 +0.72 +0.40 ±0.00+0.30 +0.30 +0.83 +0.83 +0.83 +0.83 +0.83 +0.83 +0.83 +0.83 +0.83 +0.83 +0.83 +0.83 +1.13 +1.13 +1.13 +1.13 +1.13 +1.13 +1.13 +1.13 +1.13 +1.13 +1.13 +1.13 +1.13 +0.83 +0.83 +0.83 +0.83 ±0.00 ±0.00 ±0.00 +0.45 +0.45
UNLESSSPECIFIED.
DUTIES. CASTING.
4THFLOORPLAN
FLATNO.101,201,301
3'2"W.BALCONY BATH WC TOILET KIT./DIN. 3'2"W.UTILITY BEDROOM WC BATH LIVINGROOM KIT./DIN. UTILITY 4'1"W.PASSAGE LIFT UP 3'2"W.BALCONY LIVINGROOM 13'3"X9'3" KIT./DIN. 14'4"X12'9" WC 3'X4'BATH 3'6"X5'10" TYPICAL1ST/2ND/3RDFLOORPLAN
FLATNO.102,202,302 BEDROOM 9'11"X9'4" FLATNO.103,203,303 BEDROOM E.LOBBY LIVINGROOM BEDROOM BEDROOM PROPOSEDSTATEMENTFORCOMMERCIALANDRESIDENTIAL COMPLEXATC.S.NO.2323,OFMIRAJ. 2'1"W.S.A.BALC. PUJA PUJA UTILITY 10'6"X2'4" R4:28-08-2023 R3:25-08-2023 10'8"X10'3" 7'X4'9" 4'X3'2" 7'X4' 10'9"X13'8" 9'9"X10'7" 4'2"X3'6" 5'X4' 11'X10'1" 14'5"X11'4" 4'7"X4'7" 9'9"X9'8" 4'4"X4'1" 10'9"X16'8" 10'8"X10'6" PUJA R2:24-08-2023 BEDROOM WC BATH LIVINGROOM KIT./DIN. UTILITY UP FLATNO.401 FLATNO.402 LIFT
PROPOSEDSTATEMENTFORCOMMERCIALANDRESIDENTIAL COMPLEXATC.S.NO.2323,OFMIRAJ. 17-08-2023 E.LOBBY BEDROOM TOILET TERRACEFORFLATNO.402 37'3"X21'9" PUJA R3:25-08-2023 R4:28-08-2023 PUJA 3'2"W.BALCONY LIVINGROOM 13'3"X9'3" KIT./DIN. 14'4"X12'9" WC 3'X4'BATH 3'6"X5'10" BEDROOM 9'11"X9'4" UTILITY 10'6"X2'4" 9'9"X12'3" 4'2"X3'6" 5'X4' 14'2"X19'2" 11'X10'1" 4'7"X4'4" 5'2"X5'7" 6'5"X4'1" 9'9"X13' 6'8"X4'11" R2:24-08-2023 NORTH EAST SOUTH WEST NORTH EAST NORTH WEST SOUTH EAST SOUTH WEST 5'2"X5'7" NORTH EAST SOUTH WEST NORTH EAST NORTH SOUTH WEST
GROUNDFLOOR BASEMENTFLOOR 1STFLOOR 3RDFLOOR 2NDFLOOR 4THFLOOR 6THFLOOR TERRACE GROUNDLVL. 5THFLOOR CLASSROOM3 MECHANICALCAR PARKING LIFT SHAFT LIFT SHAFT STAIRCASE UP STAIRCASE UP STAIRCASE UP STAIRCASE UP STAIRCASE UP STAIRCASE UP STAIRCASE UP STAIRCASE UP PARKINGAREA CLASSROOM3 CLASSROOM3 CLASSROOM3 CLASSROOM3 CLASSROOM3 LOBBY LOBBY LOBBY LOBBY LOBBY LOBBY SCOOTERPARKING OPENTOSKY TERRACE RAMPDOWNTO BASEMENT 3.60 3.60 3.60 3.60 3.60 3.60 3.60 4.50 MACHINE ROOM 26.10 3.55 1.47 PASSAGE SECTIONDD' BASEMENTSTORE ENTRANCELOBBY LOBBY LOBBY LOBBY LIFTMACHINEROOM 3.15 3.60 3.60 3.60 3.60 4.35 2.55 CARPORCH 5.83 LOBBY 3.60 LOBBY 3.60 22.65 SECTIONAA' PARKING EXISTING 15.00 M. W I D E road EXISTING6.00M.WIDEROAD UNDERGROUND WATERTANK 6.25X4.00X3.20HT. CAP.80,000LTS. 138'-11" [42.35] 322'-11"[98.45] PLOTBOUNDARY PLOTBOUNDARY PLOT BOUNDARY PLOT BOUNDARY UNDERGROUND FIREFIGHTING 1.67X4.00X3.20HT. CAP.20,000LTS. TO GANESHKHIND ROAD 172'-2"[52.50] 7.67 m. GATE GATE OPENSPACE 423.20SQ.M. WATER LINE DRAINAGE LINE F.P. NO. 439/A CTSNO.1082 F.P.NO.434 CTSNO.1081 T T T T T T PROPOSED LAYOUTPLAN 43.24M. 4.50M WIDENING ROAD AREA = 224.27 SQ.M PROPOSED 24.00M. W I D E D.P.ROAD 6.36 19.42 14.35 17.70 25.47 PARKINGSCOOTERS DOWN RAMPGOINGDOWNTOBASEMENT 1:10 PURCHASE DEPT. 26'6" 66'10" 8.08 20.37 25'0" 29'3"ASSIGNMENTS DEPT. 48'0" 40'0" MAIL DISPATCH SPOT CONFERENCE 25'0" 29'7"STUDENT CARE DEPT. 25'0" 15'0" 25'0"ENROLLMENT 19'3" WAITER GENTS LADIES TOILET UP DOWN 7.62 4.58 M. 7.62 9.02 M. 7.62 5.87 M. UP 1.521.49 1.521.49 1.521.07 M 1.87 1.82 1.87 1.82 D1 44.36 18.29 ENTRY GATE BLDG BS1+GR/STILT+6THFLOOR HT=26.10M BLDG BS1+GR/STILT+5THFLOOR HT=22.65M 18.29 54.00 32.15 51.61 32.06 PROP.U.G. WATERTANK 2.40X4.00X3.20HT. CAP.30,000LTS. MEN'S TOILET LIFT-2 LADIESTOILET SCOOTERPARKING 1 20 SCOOTERPARKING SCOOTERPARKING SCOOTERPARKING 19 12.30 LIFT-1 A A' E E'
1STFLOOR 3RDFLOOR 2NDFLOOR 4THFLOOR 6THFLOOR TERRACE 5THFLOOR GROUNDFLOOR BASEMENTFLOOR STAIRCASE UP STAIRCASE UP STAIRCASE UP STAIRCASE UP STAIRCASE UP STAIRCASE UP STAIRCASE UP 3.60 3.60 3.60 3.60 3.60 3.60 PARKINGAREA PARKINGAREA RAMPDOWNTO BASEMENT SCOOTERPARKING CARPARKING SPOT CONFERENCE ENROLLMENT MAILDISPATCH& ASSIGNMENTDEPT DATAENTRY DY.DIRECTOR'S ROOM EXAMINATION DEPARTMENT CALL OPERATION LIBRARY TERRACE CLASSROOM3 CLASSROOM3 CLASSROOM3 CLASSROOM3 CLASSROOM3 CLASSROOM3 OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OPENTOSKY TERRACE SECTIONEE' FRONTELEVATION BASEMENTSTORE ENROLLMENT DATAENTRY EXAMINATION CLASSROOM 3.15 3.60 3.60 3.60 3.60 SECTIONCC' 3.60 CLASSROOM 3.60 22.65 TERRACE CLASSROOM OVERHEADTANK 2.25 2.25 W.C.GENTSTOILET W.C.GENTSTOILET W.C.GENTSTOILET W.C.GENTSTOILET W.C.GENTSTOILET W.C.GENTSTOILET 2.25 0.45 0.45 0.831.05 SYMBIOSISBHAVAN JOBNO. 1:100 DRG.NO.SCALEDRAWNBYCHECKEDBY 216,AKSHAYCHEMBERS,N.C.KELKARROAD, NARAYANPETH,PUNE-411030 PANDITJOSHIANDASSO. ATF.P.NO.439/B,C.T.S.NO.1065B,SHIVAJINAGAR,PUNE411016 PROPOSEDEXTENSIONBUILDINGONSYMBIOSISBHAVAN SAMEER -INWARDNO. DATE:-26-09-2023 SHEETNO. CA/77/3917 -- -PROJECT: ARCHITECT: ARCHITECT'SSIGN: N S W E OWNER'SNAME&SIGN: DR.SWATIMUJUMDAR PRINCIPALDIRECTOR SYMBIOSISOPENEDUCATIONSOCIETY SYMBIOSISBHAVAN,F.P.NO.439/B,CTS.NO.1065B,SHIVAJINAGAR,PUNE-411016
SECTIONAT'E'
DRAWINGTITLE:
PRINTS
DATEISSUEDTONO.S
NOTES:
REFERR.C.C.DRAWINGBEFOREEXECUTIONOFWORK. *ALLWALLSARE0.15THICKUNLESSSPECIFIED.
SCHEDULEOFOPENING DOORSWINDOWS
*SIZEOFCOLUMN,ORIENTATION&LOCATIONSHOULDBE OFWORK
CHECKEDBYRCCDESIGNERBEFOREEXECUTION
REFERSTAIRCASE,TOILET&RAILINGDETAIL DAYTODAYVISITISNOTPARTOFARCHITECTDUTIES. DRG.SEPERATELY.
REFERELEVATION&SECTIONDRG.
DISCUSSEDWITHTHEARCHITECTBEFORECASTING.
ANYDISCREPANCYINTHISDRG.SHOULDBE
SECTIONAT'D'
PROJECT
WORKINGDRAWING DEVELOPERS: ELEVATIONDETAIL
SURESHDHARMAVAT&ASSOCIATES
SCALE=NTS
OFWORK SURESHDHARMAVAT&ASSOCIATES
PROPOSEDBLDG.'D9'ATS.NO.17(P) WADGAONKH.,PUNE N 200MMTHKWALL
TERRWITHWPC 1.07 0.09 0.18 0.15 0.09 0.09 TERR.FLR0.32
1.07 TERRWITHWPC TERR.FLR 0.09 0.18 0.15 0.09 0.09 2.00 0.32 0.60
SECTIONAT'C'
WADGAONKH.,PUNE
200MMTHKWALL
04/06/2021MAILTORCC 13/08/2021MAILTORCC BLDG'D9' ADVANCEDCOPY DETAILAT'P' 05/10/2021SITE 02 W11.83X1.25 W21.22X1.25 W30.91X1.25 V10.61X0.91 W40.61X0.91 D1.00X2.25 D10.91X2.25 0.76X2.25 SD1.83X2.25 OP0.91X2.25 OP10.99X2.25 D2 TERRWITHWPC 1.22 4.10 0.50 3.60 TERRACEFLR 0.32 0.09 0.18 0.15 0.09 0.09 0.60 ARCH3 ARCH1&6 ARCH2&5 ARCH4 TERR.FLR ARCHTOP LVL. ARCHBOTTOM LVL. 2.46 1.39 2.79 1234 TERR.FLR TERR.FLR TERR.FLR ARCHTOP LVL. ARCHBOTTOM LVL. 0.250.250.250.250.250.250.250.250.250.25 0.15 0.15 5678910111213 0.300.300.300.300.300.300.300.300.300.30 0.30 0.30 0.620.971.181.301.371.391.371.301.180.970.62 1.84 3.57 2.46 0.640.961.161.301.371.391.371.301.160.960.64 1 1323456789101112 ARCHTOP LVL. ARCHBOTTOM LVL. ARCHTOP LVL. ARCHBOTTOM LVL. 1.78 12345678910111213 0.300.300.300.300.300.300.300.300.300.30 0.24 0.24 3.48 2.46 0.580.941.161.301.381.391.160.94 1.381.30 0.58 1.38 0.250.250.250.250.250.250.250.250.250.25 0.13 0.13 2.76 0.600.971.171.301.371.391.371.301.170.970.60 1 1323456789101112 2.46 1.07 0.69 0.63 1.08 12THFLR 13THFLR TERR.FLR PLASTERPATTI PLASTERPATTI PLASTERPATTI GROOVES 0.09 0.06 0.03 1.07 2.90 1.05 5.37 3.05 0.610.970.97 0.15 0.15 0.420.77 1.07 2.60 0.15 1.41 2.90 0.10 5.37 3.05 1.07 1.53 2.60 1.05 0.09 0.09 0.06 0.03 2.82 0.50 0.15 0.15 0.38 2.82 3.63 0.383.53 0.38 0.383.53 0.38 2.82 0.38 0.77 1.07 1.77 0.810.81 0.510.810.81 R1.39 R1.78 0.69 0.10 R1.84 0.63 0.10 1.08 0.69 1.07 C D E ARC 1 ARC 2 ARC 3 ARC 4 ARC 5 ARC 6 12THFLR 13THFLR TERR.FLR PLASTERPATTI PLASTERPATTI PLASTERPATTI GROOVES 0.09 0.06 0.03 0.03 1.43 0.10 1.07 2.90 1.05 5.37 3.05 0.610.970.97 0.15 0.15 0.420.77 1.07 2.60 0.15 1.82 1.41 2.90 0.10 0.10 0.10 5.37 3.05 1.07 1.53 2.60 1.05 0.09 0.09 0.06 0.03 0.03 2.82 0.50 0.15 0.15 0.15 0.15 0.38 0.38 2.82 3.63 0.38 0.383.53 0.38 0.383.53 0.38 2.82 0.38 0.77 0.15 0.09 1.07 1.77 0.810.81 0.510.810.81 1.76 R1.39 R1.78 0.69 0.10 R1.84 0.63 0.10 R1.38 1.08 R1.78 0.69 R1.39 1.07 C D E ARC 1 ARC 2 ARC 3 ARC 4 ARC 5 ARC 6 TERRWITHWPC 1.07 0.09 0.18 0.15 0.09 0.09 TERR.FLR0.32 SECTIONAT'C' 1.07 TERRWITHWPC TERR.FLR 0.09 0.18 0.15 0.09 0.09 2.00 0.32 0.60 SECTIONAT'D' SECTIONAT'E' PROJECT
DRAWINGTITLE: WORKINGDRAWING DEVELOPERS: ELEVATIONDETAIL SCHEDULEOFOPENING DOORSWINDOWS REFERELEVATION&SECTIONDRG. REFERR.C.C.DRAWINGBEFOREEXECUTIONOFWORK. *ALLWALLSARE0.15THICKUNLESSSPECIFIED. ANYDISCREPANCYINTHISDRG.SHOULDBE REFERSTAIRCASE,TOILET&RAILINGDETAIL
PROPOSEDBLDG.'D9'ATS.NO.17(P)
N
BLDG'D9'
NOTES: CHECKEDBYRCCDESIGNERBEFOREEXECUTION
DAYTODAYVISITISNOTPARTOFARCHITECTDUTIES. DRG.SEPERATELY. DISCUSSEDWITHTHEARCHITECTBEFORECASTING. PRINTS DATEISSUEDTONO.S SCALE=NTS *SIZEOFCOLUMN,ORIENTATION&LOCATIONSHOULDBE
BLDG'D9' 04/06/2021MAILTORCC 13/08/2021MAILTORCC BLDG'D9' ADVANCEDCOPY DETAILAT'P' 05/10/2021SITE 02 W11.83X1.25 W21.22X1.25 W30.91X1.25 V10.61X0.91 W40.61X0.91 D1.00X2.25 D10.91X2.25 0.76X2.25 SD1.83X2.25 OP0.91X2.25 OP10.99X2.25 D2 TERRWITHWPC 1.22 4.10 0.50 3.60 TERRACEFLR 0.32 0.09 0.18 0.15 0.09 0.09 0.60 ARCH3 ARCH1&6 ARCH2&5 ARCH4 TERR.FLR ARCHTOP LVL. ARCHBOTTOM LVL. 2.73 1.39 2.79 1234 TERR.FLR TERR.FLR TERR.FLR ARCHTOP LVL. ARCHBOTTOM LVL. 0.15 0.15 5678910111213 0.300.300.300.300.300.300.300.300.300.30 0.30 0.30 0.620.971.181.301.371.391.371.301.180.970.62 1.84 3.57 2.73 0.640.961.161.301.371.391.371.301.160.960.64 1 1323456789101112 ARCHTOP LVL. ARCHBOTTOM LVL. ARCHTOP LVL. ARCHBOTTOM LVL. 1.78 12345678910111213 0.300.300.300.300.300.300.300.300.300.30 0.24 0.24 3.48 2.79 0.580.941.161.301.381.391.160.94 1.381.30 0.58 1.38 0.13 0.13 2.76 0.600.971.171.301.371.391.371.301.170.970.60 1 1323456789101112 2.73 1.34 1.02 0.89 1.35
G.A.BHILARECONSULTANTSPVT.LTD. JOBNO. 1420/2018 BUILDINGTYPESHEETNOSREVISION D91/2R0 STAMPPHASE-IVBUILDING-D9 ARCHITECT'SAPPROVAL ADVANCECOPYONLYFOR M/SA.BHILARECONSULTANTSPVT.LTD.PUNETHISDRAWINGISPROPERTYOF ANDSHALLNOTBEREPRODUCEDORUSEDWITHOUTEXPLICITPERMISSIONOFTHISOFFICE 1420/2018 PrakashGANESHTHORATGAB PARTICULARS CLIENT SURESHDHARMAVATASSOCIATES D92/2R0PHASE-IVBUILDING-D9 ARCHITECT'SAPPROVAL ADVANCECOPYONLYFOR KEYELEVATION WEIGHT SIPOREX BRICK MASONRY (DENSITY=750kg/m3) ALL EXTERNAL & INTERNAL WALLS =150 THK. LIGHT KEYELEVATION WEIGHT SIPOREX BRICK MASONRY (DENSITY=750kg/m3) ALL EXTERNAL INTERNAL WALLS =150 THK. LIGHT BUILDING-D9
16 17 18 19 20 21 22 23 24 25 OFFICE 26 27 28 29 30 OFFICE 31 32 33 10 11 12 13 14 15 6 5 7 8 9 1 4