Knauf BOOK

Page 1

THE VISION A PORTFOLIO OF OUR PAST & PRESENT PROJECTS

1




4


Contents from the md’s desk

7

United arab emirates

8-29

qatar

30-41

oman bahrain

kuwait

42-45

46-49

50-51

Saudi Arabia

52-53

india

54-57

5


6


From the MD’s Desk

To our Valued Customers, Greetings! Knauf is a family name and a corporate group of global dimensions at the same time synonymous with a type of corporate culture which has become rare. Knauf is a typical Family firm in spite of its size and this is precisely the reason for its amazing success. It is short and direct decision-making paths, the courage to tackle new ideas, innovations, investments and the wealth of ideas contributed by all Knauf employees that characterize the company. From its beginnings in gypsum processing, Knauf has expanded and diversified to become a corporation with worldwide activities, Knauf UAE has been active in the Middle East for more than a decade. Knauf shows its commitment not only in the GCC, headquarters in Dubai UAE, but also in the subcontinent.We have offices based in Saudi, Qatar and India to support the market and dealers.Knauf provides value-added products and services in the following fields: • Building materials and systems based on gypsum and gypsum-related products • ASTM certified products & systems • Multi- Purpose Joint compounds • Knauf Aquapanel interior and exterior wall systems • Knauf Insulations sustainable, high-performance, cost-effective insulation solutions • Knauf Heradesign’s acoustic designs for Interior and Exterior in ceiling & partition systems • Knauf Integral’s Knauf GIFA Floor, sheet-panelled access floors • Thermal and sound insulation materials • Value engineering and technical consultancy for architects and consultants to meet specified design requirements • On site hands-on training and supervision for contractors when installing drywall systems • Knauf systems are approved by Dubai, Abu Dhabi, Ras Al Khaimah and Qatar Civil Defense Sustainability is central to our vision of doing the right thing for our clients, our people and the communities in which we work. We maintain and provide certificates for individual products and designs to improve quality and performance. Knauf systems combine innovative products to realize speed of installation and warranted high performance-based systems as per ASTM, EN-BS and DIN Standards. Knauf is not only committed towards it Products and System but also towards it employees. Within the framework of its four key K-Values; Partnership, Commitment, Entrepreneurship and Menschlichkeit meaning human touch Knauf looks after its people and drives a sense of passion in all its staff. This is what makes Knauf Unique and special! Safety is something that Knauf does not compromise on again whether for its products or people and therefore all our products are tested and approved by Intertek to make sure that nothing leaves the plant which is not up to the mark.

Amer Bin Ahmed Managing Director Knauf GCC & India

7


8


United Arab Emirates

9


United Arab Emirates

BURJ KHALIFA Region: Dubai Knauf Systems used: D112 Main Contractor: Arabtec Year of Completion: 2009 10


HABTOOR PALACE – DUBAI Region: Dubai Knauf Systems used: EN-BS Partition & Ceilings Main Contractor: Habtoor Leighton Group Year of Completion: 2016

11


United Arab Emirates FAIRMONT HOTEL - ABU DHABI

Region: Abu Dhabi Knauf Systems used: ASTM Partition & Ceilings [Offered tailored made solution to meet the highest rated performance systems]. Main Contractor: Arabtec

SHARJAH MILITARY HOSPITAL Region: Sharjah Knauf Systems used: EN-BS Ceilings Sub Contractor: Vancouver Year of Completion: 2015

12


THE ADDRESS BOULEVARD - DUBAI

Region: Dubai Knauf Systems used: EN-BS Partition & Ceilings with special board PRO-HD Main Contractor: Brookfield Multiplex Year of Completion: 2016

AL AMAL PSYCHIATRIC HOSPITAL Region: Dubai Knauf Systems used: D112 Main Contractor: China State Construction Year of Completion: 2016

13


United Arab Emirates

DUBAI AUDI SHOWROOM Region: Dubai Knauf Systems used: Cleaneo Acoustic Ceiling Main Contractor: Al Sahel Contracting Year of Completion: 2014

14


LANDMARK TOWER

Region: Abu Dhabi Knauf Systems used: Knauf D112 Suspension Ceiling Systems, Knauf EN-BS Partition Systems + Knauf Aquapanel for wet areas Main Contractor: Arabtec / Al Habtoor Year of Completion: 2012

15


United Arab Emirates BAB AL QASR HOTEL & SERVICED APARTMENTS – ABU DHABI Region: Abu Dhabi Knauf Systems used: EN-BS Partition & Ceilings Main Contractor: Nurol Year of Completion: 2015

16


IRANIAN HOSPITAL EXPANSION PROJECT DUBAI: Region: Dubai Knauf Systems used: EN-BS Partition & Ceilings Main Contractor: Al Sahel Contracting Year of Completion: 2013

17


United Arab Emirates

GHAYATHI HOSPITAL Region: Abu Dhabi Knauf Systems used: ASTM Ceilings Main Contractor: Al Amana Contracting Year of Completion: 2015

18


SILA hospital Region: Abu Dhabi Knauf Systems used: ASTM Main Contractor: Al Fara’a Contracting Year of Completion: 2015

19


United Arab Emirates AL HILAL bank

Region: Abu Dhabi Knauf Systems used: ENBS Ceiling/Partitions Main Contractor: Al Fara’a Contracting Year of Completion: 2013

20


AL MUNEERA

Region: Abu Dhabi Knauf Systems used: EN-BS Partition D112 Ceilings (One of the biggest Aquapanel project) Main Contractor: Al Futtaim Carillion Year of Completion: 2011

21


United Arab Emirates

CONRAD HILTON

Region: Dubai Knauf Systems used: EN-BS Partition & Ceilings Main Contractor: Arabtec Year of Completion: 2011

AL BUSTAN COMPLEX

Region: Abu Dhabi Knauf Systems used: EN-BS Partition & Ceilings Main Contractor: Habtoor Leighton Group Year of Completion: 2012

22


ARZANAH MEDICAL CENTER Region: Abu Dhabi Knauf Systems used: EN-BS Partition & Ceilings Main Contractor: Habtoor Leighton Group Year of Completion: 2012

NATION TOWERS

Region: Abu Dhabi Knauf Systems used: EN-BS Partition & Ceilings + Knauf Cinema Systems Main Contractor: Arabtec & NPC Year of Completion: 2012

JW MARRIOTT MARQUIS Region: Dubai Knauf Systems used: EN-BS Main Contractor: Brookfield Multiplex Year of Completion: 2012

23


United Arab Emirates Index Tower

REgion: DIFC Dubai System Used: Knauf GIFAFloor Year : June 2011

YAS MALL

Region: Abu Dhabi Knauf Systems used: EN-BS Ceilings Main Contractor: Six Construct Year of Completion: 2014

24


FOUR SEASONS HOTEL

Region: Abu Dhabi Knauf Systems used: EN-BS Partition & Ceilings Main Contractor: Al Futtaim Carillion Year of Completion: 2015

25


United Arab Emirates DRAGON MART EXPANSION & Cinema’s Region: Dubai Knauf Systems used: EN-BS Ceilings &Cinema System Main Contractor: UNEC Year of Completion: 2015

IMG THEME PARK Biggest indoor theme park in the world Region: Dubai Knauf Systems used: EN-BS Partition & Ceilings + Cinema System. (High walls) Main Contractor: Simplex Infrastructure Year of Completion: 2016

26


Jumeirah Park Villa

Knauf System used: Knauf D112 Ceiling Systems Main Contractor: S.S.Lootah Completion: 2015

CITY WALK RESIDENTIAL BUILDINGS

Region: Dubai Knauf Systems used: Knauf Wall Lining 611 + Knauf Aquapanel Exterior Solution Main Contractor: Al Shafar Contg. Year of Completion: 2016

Al shaam Hospital – Ras Al khaimah Knauf System used: EN-BS Partition & Ceiling Systems Main Contractor: Ali Moosa & Sons Completion: 2015

27


United Arab Emirates Paddock Club “Formula Race VIP club“

Region : Abu Dhabi-UAE Systems/Products Used : Aquapanel Exterior wall Main Contractor : ISG Year of Completion : 2014

Masdar City

Region : Abu Dhabi-UAE Systems/Products Used : Aquapanel Exterior wall Main Contractor : Brookfield Multiplex Year of Completion : 2013-2014 28


Infinity Tower

Region : Dubai-UAE Systems/Products Used : Aquapanel Exterior cladding in semi exposed areas Main Contractor : Arabtec

Dubai International Airport Terminal 3

Region – City and Country : Dubai-UAE Systems/Products Used : Aquapanel Exterior ceiling Main Contractor : Alec Year of Completion : 2010 29


30


qatar A PORTFOLIO OF OUR PAST & PRESENT PROJECTS

31


qatar Barzan Camp

Region: Doha Knauf System used: EN-BS Ceilings D112 Main Contractor: REDCO AlMana Year of Completion: 2015

Falcon Tower

Region: Doha Knauf System used: BN-BS Ceilings & Aquapanel Main Contractor: Tuscana Year of Completion: 2015 32

&

Access Panels


World Trade Center Region: Doha Knauf System used: ASTM System Main Contractor: BluuGulf Year of Completion: 2015

42 Government Schools for ASHGHAL Region: Doha Knauf System used: Heradesign Main Contractor: JTC/AMANA/ITC/Hassanesco/Alsyraia/Tadmur/ITCC/AlDarwish Year of Completion: 2014 & 2015

33


qatar Qatar Mall

Region: Doha Knauf System used: ASTM & EN-BS Ceilings Main Contractor: KCT / UCC Year of Completion: 2016

Aspire zone extension

Region: Doha Knauf System used: EN-BS Ceilings Main Contractor: SEG Year of Completion: 2015 34


ISF Camp

Region: Doha Knauf System used: EN-BS Systems, Hatfurring & Aquapanel Main Contractor: QD-SBG Year of Completion: 2016

Male & Female Classrooms Qatar University Region: Doha Knauf System used: EN-BS Systems & Cleaneo D126 Main Contractor: Commodore Co. Year of Completion: 2016

Oxygen Park Qatar Foundation

Region: Doha Knauf System used: EN-BS Systems & Aquapanel Main Contractor: Man Enterprises Year of Completion: 2014

35


qatar Sheraton Hotel Renovation

Region: Doha Knauf System used: EN-BS System Main Contractor: KCT Year of Completed: 2015

Banana Island (Anantra) Region: Doha Knauf System used: EN-BS Ceiling & Aquapanel Main Contractor: UCC Year of Completed: 2014

Al Wajba Palace

Region: Doha Knauf System used: EN-BS System & Aquapanel Main Contractor: UCC Year of Completed: 2014 36


Qatalum

Region: Doha Knauf System used: D112 system Main Contractor: Dicotech Year of Completed: 2014

Hilton Double Tree Region: Doha Knauf System used: EN-BS System Main Contractor: Derwin Year of Completed: 2015

AlSadd Multipurpose Hall

Region: Doha Knauf System used: EN-BS System & Aquapanel Main Contractor: AKTOR Year of Completed: 2014 37


qatar

Ministry of Interior - Head Quaters Region: Doha Knauf System used: D112 system & Cleaneo Main Contractor: WCT Year of Completed: 2015

Communication & Media College Qatar Foundation

Region: Doha Knauf System used: Ceiling/Parition & Aquapnel Main Contractor: HBK JV REC Year of Completed: 2015 38


Development & Research Center Qatar Foundation Region: Doha Knauf System used: ASTM Ceiling/Parition & Aquapnel Main Contractor: REDCO Al Manaa Year of Completed: 2014

Sidra Medical & Research Center

Region: Doha Knauf System used: EN-BS Ceiling/Parition Aquapanel & Alurevo access panel Main Contractor: Midmac Year of Completed: 2015

Qatar National Museum Region: Doha Knauf System used: EN-BS Curve Drywall & Heradesign Main Contractor: Hyundai Year of Completed: 2013 completion 2016 end

39


qatar

Barwa Finance District Region: Doha Knauf System used: EN-BS Ceiling/Parition Main Contractor: Promer Qatar Year of Completed: 2013

Public works Authority ASHGHAL Tower 3 Region: Doha Knauf System used: EN-BS Ceilings Main Contractor: Promer Qatar Year of Completed: 2013

40


National Library Qatar Foundation Region: Doha Knauf System used: EN-BS Ceilings Main Contractor: Brookfield Multiplex Year of Completed: 2015

Qatar Airways Crew Housing Region: Doha Knauf System used: EN-BS Ceilings Main Contractor: REDCO Year of Completed: 2014

41


42


oman A PORTFOLIO OF OUR PAST & PRESENT PROJECTS

43


OMAN

GUtech University, Muscat 2014/ BS Partitions and DIN ceilings/ 40K sqr mtrs Main Contractor: L&T

Ras AL Hamra Development, Muscat 2016/ DIN ceilings/ 95K sqrmtrs Main Contractor: Al Turki Enterprise

44


Saray Bander Jissa, Muscat

Ongoing/ BS ceilings, partitions and Wall linings/ 35K sqr mtrs Main Contractor: Habtoor Leighton Group

Kempinski Hotel, Muscat On going/ BS ceilings/ 30K sqr mtrs Main Contractor: Carillion-Alawi

Buraimi University, Buraimi 2015/ BS partitons and ceilings/ 25K sqr mtrs Main Contractor: L&T

45


46


bahrain A PORTFOLIO OF OUR PAST & PRESENT PROJECTS

47


bahrain Baraka Bank HQ Type: Commerial System used: EN-BS Product used: Gypsum drywall & ceilings Year completed: 2014 Main Contractor: ALYUSUF Decor Location: Bahrain

48


Dragon City AlMuhraq Type: Commerial System used: EN-BS Product used: Hat Furring EN-BS Year completed: 2015 Location: Bahrain

Four Seasons Hotel

Region – City and Country : Bahrain Systems/Products Used : Aquapanel interior walls Main Contractor : Sixo Year of Completion : 2014 49


kuwait A PORTFOLIO OF OUR PAST & PRESENT PROJECTS

50


kuwait

Ministry of Education

Type: Government System used: EN-BS /ASTM Product used: D112 & ASTM 12.7mm Year completed: 2015 Main Contractor: AlKharafi Location: Kuwait

51


saudi arabia A PORTFOLIO OF OUR PAST & PRESENT PROJECTS

52


saudi arabia

Clock Tower mecca

One of the largest building projects in the Arab countries, the new Clock Tower at Mecca has been under construction for 18 months. It is the central building of the unique complex that forms the holiest of all Muslim sites. When finished, the 76-floor tower will be one of the largest in the world, built at a cost of USD 1.6 billion. The first shipment of Knauf building materials for this project 80,000 square meters of gypsum fiber boards were sent to the site in 2009. With a strong presence in countries across the Arab world, Knauf is ideally situated to add value to this prestigious project, offering innovative building solutions through the technical competence, logistics and consulting services and high-quality system technology of individual Knauf partners.

53


54


india A PORTFOLIO OF OUR PAST & PRESENT PROJECTS

55


india Oberoi Esquire

Region: India Systems Used: Knauf EN- BS Partition & Ceiling Systems Main Contractor: Oberoi Realty Year Completion: on-going

Ritz Carlton Mumbai, India

Region: India Systems Used: Knauf ENBS & ASTM Partition, Ceilings & Shaft wall systems with 3 layers of PRO – HD + Knauf Aquapanel Interior Solutions Main Contractor: Samsung Year of Completion : On-going , Expected completion 2018

56


Shivandra Ashram Uttarkashi

Knauf Systems Used: Knauf EN-BS Partition systems + Knauf Aquapanel Exterior Solutions Year: 2013

Bosch Headquarters – Bangalore India Region: India Main Contractor: Bosch System Used: Knauf EN- BS Partition & Ceiling Systems Completion: On going , expected completion 2016

57


58


59


Knauf LLC, PO BOX 112871 Dubai, UAE Tel: +971 4 337 7170 Fax: +971 4 334 9659

Knauf RAK Plant PO BOX 50006 Ras Al Khaimah, UAE Tel: +971 7 221 5300 Fax: +971 7 221 5301

Knauf Qatar, PO BOX 27111 Doha, State of Qatar Tel: +974 4452 8191 Fax: +974 4452 8181

Website : www.knauf.ae | E-Mail : info@knauf.ae


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.