Denny Sanford Premier Center / Sioux Falls, SD
Denny Sanford Premier Center / Sioux Falls, SD
Denny Sanford Premier Center / Sioux Falls, SD The Denny Sanford Premier Center is the single largest public building project in the city’s history. The venue is the region’s leading events facility, with an area of 303,000 s.f. and seating for up to 13,000 depending on the event. The Denny Sanford Premier Center made $1.1 million in six months of operation and generated $900,000 in sales tax revenue. The city’s revenue projections for the first year were in the $1.3 million range. First-year events included concerts, collegiate & high school basketball tournaments, hockey games, indoor football games, rodeo, monster truck events, Cirque du Soleil and trade shows. The design team faced challenges in meeting a tight budget, connecting and relating to the existing convention center, limiting the amount of glazing and stone used in the project, and breaking down the monumental scale of the facility.
Denny Sanford Premier Center / Sioux Falls, SD
Design features highlight the context and history of the Sioux Falls area, including a strong horizontal emphasis to complement the prairie geography, use of locally quarried quartzite stone, and natural materials throughout the interior. The horizontal striations alternatively take the form of reveals in the metal panels and precast concrete walls, stone inlays, and interior wood and metal trim. The exterior bands also speak to the glazed arches of the c.c. and contribute to a pedestrian scale for the building as visitors draw near. Carefully sized entrance canopies and the linear south canopy with integrated banners continue the effort to transition from monolithic to human scale. Sioux Quartzite is the traditional material for public buildings in the area dating back to the founding of the city. The stone was used here to reinforce the civic nature of the project and enhance key areas including the ticket windows and the south club. Extensive use of natural materials continues throughout the interior with wood ceiling clouds and wall panels, natural slate at the west club and kasota stone at the north club, and exposed quartzite aggregate in the polished concrete floors.
The north and south pairs of stair/ elevator cores are linked by mechanical rooms above the public floors, creating squared arches of precast concrete that express the building structure. The squared arches are repeated throughout the interior- at concessions stands, framing future graphic walls at restrooms, and casework in the suites. The facility was designed with extensive community input, with over two dozen public and citizen committee meetings. Citizen input was gathered and implemented on all aspects of the design, from the site selection through interior finishes. The “fan experience� was the priority and the lens through which all design decisions were considered. Public concourses feature simple, timeless finishes with clean graphics and tasteful integrated advertising to avoid the visual cacophony so often associated with this building type. Bids came in under budget, allowing the addition of amenities like high-end upholstered seats for the main bowl, a line array house speaker system, and full height tile finishes in the public restrooms. The lighting supplier provided LED sports lights at no additional cost, making this the first new construction arena project to have this technology in the nation. The bowl was designed around an NHL regulation rink, with no obstructed views from any seat for any center-floor event. Efficient planning both in plan and section resulted in top row seats that are 4 feet closer to center ice than the existing arena, with double the seating capacity. Flexibility was built in with masking curtains, telescopic seating and portable seating to accommodate any size or type of event from a trade show to a boxing match to a performance by Cirque du Soleil.
Denny Sanford Premier Center / Sioux Falls, SD
Denny Sanford Premier Center / Sioux Falls, SD
Denny Sanford Premier Center / Sioux Falls, SD
The main lobby soars to 60 feet and features a terrazzo floor matching the connected convention center. Glazing was limited to under 10% of the building skin for cost control. Careful placement of openings allows full daylighting of most public circulation with limited areas even extending into the bowl.
Denny Sanford Premier Center / Sioux Falls, SD
Denny Sanford Premier Center / Sioux Falls, SD
The Denny Sanford Premier Center is LEED Certified, one of under 50 arenas in the nation to achieve this standard. Sustainable features include: • LED sports lighting • Low-flow restroom fixtures • Local quartzite • Built with 80% local labor
Denny Sanford Premier Center / Sioux Falls, SD
The Premier Center provides world-class amenities for its users, including: • three unique clubs • 22 suites • 20 loge boxes • cutting edge LED center scoreboard • 360-degree video ribbon board • 100+ televisions • 12+ concession locations • 24+ portable concession carts The public floors offer 270- and 360-degree circulation around the bowl. The main concourse is broken into smaller-scale spaces for socializing before, during and after events. Clubs on the south, west and north sides offer unique environments to enhance the visitor experience. Along with concession stand themes that also vary from location to location, these ameneties encourage exploration and allow new experiences with each visit.
Denny Sanford Premier Center / Sioux Falls, SD
Denny Sanford Premier Center / Sioux Falls, SD
Event Level | Level 1
Denny Sanford Premier Center / Sioux Falls, SD
Main Concourse | Level 2
Denny Sanford Premier Center / Sioux Falls, SD
Suite Level | Level 3
Denny Sanford Premier Center / Sioux Falls, SD
Upper Concourse | Level 4
Denny Sanford Premier Center / Sioux Falls, SD
North Elevation
East Elevation
South Elevation
West Elevation
Denny Sanford Premier Center / Sioux Falls, SD
Lobby Section (East-West)
Main Transverse Section (East-West)
Main Longitudinal Section (North-South)
Denny Sanford Premier Center / Sioux Falls, SD LOADING
LOADING
T
TRASH
T
T
T
T
ICE COOLING TOWER
TRASH
GENERATOR
COOLING TOWER
IT
UP
ICE COOLING TOWER
STAIR
UP U P
GENERATOR
ELEC.
ELEC.
STAIR
AY
IT
SEC/FCC
OCD
OCD
AY
OCD OCD
DISPL OCD
EXTERIOR
DISPL
IT
ELEC.
CIRCULATION
ELEC. SUITE 2
AY
OCD
OCD
AY
CANOPY BELOW
SEC/FCC
OCD
OCD
VEST.
STAIR
UP OPEN TO BELOW
IT BALCONY WITH GUARDRAIL
DISPL DISPL
SUITE 5
SUITE 6
SUITE 7
FUTURE GREASE DUCT LOCATION
SUITE 8
SUITE 9
SUITE 10
SUITE 11 PANTRY
OCD
MEN
LOGE 18 OCD
EXTERIOR
WOMEN
LOGE 17
T CAR
OCD
VEST.
SUITE 4 SUITE 3
SUITE 1
DISPLAY
T COOLING TOWER
LOGE 16 OCD
FAM.
A/V
WOMEN
A/V EQUIP.
OCD
PRESS LOGE 14
WASHER / DRYER HOOKUP
MEN LOGE 13
WASHER / DRYER HOOKUP
COMMISSARY CONNECTION
COMMISSARY CONNECTION
JAN.
PANTRY SHOW POWER
LOGE 11 EDGE OF PRECAST SEATING ABOVE
CARTS
SHOW POWER
EDGE OF PRECAST SEATING ABOVE
CIRCULATION LOGE
OCD
CONVENTION CONNECTION
DAS CELL ROOM
SW ENTRY
FAM.
EDGE OF PRECAST SEATING ABOVE
RR 1
PARTITION DIVIDER WALL
OCD
SUPPORT
TICKETS
TICKETS
SW ENTRY
(180) 10'-0"x10'-0" ADA ACCESSIBLE BOOTHS
PARTITION DIVIDER WALL
SUPPORT
CONVENTION CONNECTION ACTIO N STA TIONS
DAS CELL ROOM
RR 2
FAM.
LIFT
RR 2
RR 1
LOGE 8 ROADIE / CATERING SHOW POWER
ROADIE / CATERING
WOMEN
LOGE 7
PANTRY
SHOW POWER
MEN
EDGE OF PRECAST SEATING ABOVE
WOMEN MEN LOGE 6
JAN.
MEN
MEETING ROOM
CORRIDOR
LOGE 5
JAN. D OC
FAM. SHOP
LOBBY
PANTRY SHOP
LOBBY
P-SS
MP-2
D-M
D-O
B-OM
MEN SW ENTRY
SUPPORT
DISPL
BALCONY ABOVE
D-M
ELEC.
AY
BALCONY ABOVE
ELEC
DISPLAY
DISPLAY
IT
BALCONY WITH GUARDRAIL
SE ENTRY
BALCONY WITH GUARDRAIL
IT
IT
OPEN TO BELOW
CONTROL
ELEC. OPEN TO BELOW
UP UP
UP
UP
DN
DISPLAY
WOMENS
WOMENS UP
SUITE 8
SUITE 9
UP
ELEC.
UP
IT BALCONY WITH GUARDRAIL
CANOPY BELOW
U P
ELEC.
ELEC.
SUITE 11
SUITE 5
BALCONY WITH GUARDRAIL
SUITE 6
SUITE 7
SUITE 8
SUITE 9
FUTURE GREASE DUCT LOCATION
SUITE 10
SUITE 1
SUITE 11 PANTRY
MEN
IT
ELEC.
CIRCULATION
SUITE 4
SUITE 3
SUITE 5
SUITE 6
SUITE 7
SUITE 8
SUITE 9
FUTURE GREASE DUCT LOCATION
SUITE 10
SUITE 1
MEN
LOGE 18
PANTRY LOGE 18
SUITE 11 PANTRY
LOGE 18
MEN
LOGE 17
LOGE 17 T CAR
WOMEN
T CAR
LOGE 17
SUITE 2 CANOPY BELOW
STAIR
UP OPEN TO BELOW
IT
CIRCULATION
SUITE 4
SUITE 3
UP
STAIR
UP OPEN TO BELOW
IT
SUITE 2
FUTURE GREASE DUCT LOCATION
SUITE 10
DISP LAY
SUITE 7
DISPLAY
UP
SUITE 6
SUITE 3
WOMEN
T CAR
WOMEN A/V
LOGE 16 A/V
LOGE 16
FAM.
WOMEN
DISPLAY
UP
LOGE 16
FAM.
WOMEN
A/V EQUIP.
A/V EQUIP.
FAM.
A/V
WOMEN
A/V EQUIP.
PRESS LOGE 14
LOGE 14
PRESS
MEN
PRESS
MEN
LOGE 14
MEN
FUTURE GREASE DUCT LOCATION
VESTIBULE
ELEC.
IT
SUITE 5
JAN.
SUITE 12
STAIR
DISPLAY
CIRCULATION
SUITE 4
SUITE 13
DISPLAY
STAIR
UP OPEN TO BELOW
BALCONY WITH GUARDRAIL
SUITE 2
SUITE 14
SUITE 15
DISPLAY
UP U P
SUITE 16
SUITE 17
CIRCULATION
OPEN TO BELOW
IT
VESTIBULE
IT
SUITE 18
DISPLAY
DISPLAY
SUITE 1
SUITE 19
UP
ELEC.
STAIR DISPLAY
ELEC.
SUITE 20
AY
DISPLAY
CANOPY BELOW
SUITE 21
TICKETS
SE ENTRY
STAIR
DISPLAY
ELEC
DISPLAY
IT
DISPLAY
DISPLAY
IT
MEN
SUITE 22
CANOPY BELOW
MEN
COUNT
G-SS
BALCONY WITH GUARDRAIL DISPL
ELEC.
OFFICE
T CAR
PREP
AY
B-OM
D-O
VEST.
AY
STAIR
FAM.
STORAGE
TICKETS
WOMEN LOGE 1
JAN
COUNT
G-SS
LOGE 2
SEC ELEC A-GM
SUPPORT OFFICE
CAR T
JAN
VEST.
DISPL
LOGE 3
MP-2
STORAGE
DISPL
WOMEN
SEC ELEC A-GM OCD
OCD
PREP SW ENTRY
LOGE 4
FAM.
P-SS
304 10 PERSON TABLES + HEAD TABLE = 3060 OCCUPANTS ALL TABLES MEET ADA REQUIREMENTS
MEETING ROOM
CORRIDOR
DISPLAY
D OC
FAM. FAM.
LOGE 13
LOGE 13
LOGE 13 JAN.
JAN.
JAN. PANTRY
FENCE
PANTRY
ALLEYS
LOGE 11 PANTRY
LOGE 11
CIRCULATION
BARRELS
LOGE
ACTION STATIONS
ACTION STATIONS
ACTION STATIONS
LOGE 8
CENTER GATE
SCORLINE
STAGE
LOGE
ICE FLOOR
CIRCULATION
LOGE
CARTS
CIRCULATION
CARTS
CARTS
LOGE 11
LOGE 8
LOGE 8
LOGE 7
PANTRY
LOGE 7
PANTRY
LOGE 7
PANTRY
LOGE 6 LOGE 6
LOGE 6
MEN
MEN LOGE 5
MEN
LOGE 5
LOGE 5 LOGE 4
LOGE 4
PANTRY
PANTRY
LOGE 4 PANTRY WOMEN
WOMEN
LOGE 3
LOGE 3
FAM.
LOGE 3
LOGE 2
CAR T
WOMEN
FAM.
LOGE 2
WOMEN
CAR T
FAM. LOGE 2
WOMEN
CAR T
WOMEN
LOGE 1
LOGE 1
LOGE 1
SUITE 18
SUITE 17
SUITE 16
SUITE 15
SUITE 12
SUITE 13
SUITE 14
MEN
SUITE 21
SUITE 20
ELEC.
IT
SUITE 18
SUITE 19
CIRCULATION
BALCONY WITH GUARDRAIL
DISP LAY
BALCONY WITH GUARDRAIL
IT
OPEN TO BELOW
ELEC.
SUITE 13
SUITE 14
JAN.
UP
BALCONY WITH GUARDRAIL
IT
OPEN TO BELOW
CONTROL
SUITE 19
SUITE 18
SUITE 17
SUITE 16
SUITE 15
SUITE 14
SUITE 12
SUITE 13
MEN
JAN. FUTURE GREASE DUCT LOCATION
ELEC.
BALCONY WITH GUARDRAIL
OPEN TO BELOW
UP
IT
OPEN TO BELOW
CONTROL
ELEC.
OPEN TO BELOW
UP
UP UP
BALCONY WITH GUARDRAIL
IT
OPEN TO BELOW
UP
DN
UP
CIRCULATION
BALCONY WITH GUARDRAIL
ELEC.
UP
UP
OPEN TO BELOW UP
U P
SUITE 15
BALCONY WITH GUARDRAIL
IT
ELEC.
OPEN TO BELOW
CONTROL
UP
SUITE 16
SUITE 20
FUTURE GREASE DUCT LOCATION
BALCONY WITH GUARDRAIL
OPEN TO BELOW
UP
SUITE 17
JAN. FUTURE GREASE DUCT LOCATION
CIRCULATION
SUITE 21
UP
UP DN
D N
CANOPY BELOW
UP
UP U P
IT BALCONY WITH GUARDRAIL
SUITE 2
ELEVATOR OVERRUN
ELEC.
CIRCULATION
SUITE 4
SUITE 3
SUITE 5
SUITE 6
SUITE 7
SUITE 8
ELEVATOR OVERRUN
STAIR
UP OPEN TO BELOW
IT
SUITE 9
FUTURE GREASE DUCT LOCATION
SUITE 10
SUITE 1
SUITE 11 PANTRY
MEN
LOGE 18
CANOPY BELOW
CANOPY BELOW
LOGE 17
MECHANICAL
MECHANICAL
DISP LAY
ELEC.
CANOPY BELOW
T CAR
WOMEN
A/V
LOGE 16
ROOF
FAM.
WOMEN
ROOF
A/V EQUIP.
PRESS LOGE 14 MEN LOGE 13
JAN.
PANTRY
LOGE 11
CARTS
LIFT
LOGE
CIRCULATION
ACTION STATIONS
LOGE 8
LOGE 7
PANTRY
LOGE 6 MEN LOGE 5
LOGE 4
WOMEN
PANTRY
LOGE 3 FAM. LOGE 2
ROOF
CAR T
WOMEN
ROOF
LOGE 1
CANOPY BELOW
SUITE 21
SUITE 20
SUITE 18
SUITE 19
SUITE 17
SUITE 16
SUITE 14
SUITE 15
SUITE 12
SUITE 13
T CAR
SUITE 22
MEN
JAN.
BALCONY WITH GUARDRAIL
CIRCULATION
OPEN TO BELOW
IT
OPEN TO BELOW
CONTROL
CANOPY BELOW
CANOPY BELOW
ELEC. OPEN TO BELOW
UP
UP UP
BALCONY WITH GUARDRAIL
IT
DISPLAY
FUTURE GREASE DUCT LOCATION
BALCONY WITH GUARDRAIL
ELEC.
UP
UP DN
CANOPY BELOW
MECHANICAL MECHANICAL
DISPLAY
SUITE 19
BALCONY WITH GUARDRAIL
SUITE 22
CANOPY BELOW
DISPLAY
SUITE 20
MEN
T CAR
SUITE 21
SUITE 12
T CAR
SUITE 22
T CAR
CANOPY BELOW
SUITE 22
CANOPY BELOW
Denny Sanford Premier Center / Sioux Falls, SD
Denny Sanford Premier Center / Sioux Falls, SD
The Sioux Falls Stampede set a United States Hockey League single season attendance record in 2014-15, drawing 191,280 fans for an average of 6,376 per-game in 30 home dates at the Denny Sanford Premier Center.
Denny Sanford Premier Center / Sioux Falls, SD
Accolades. The Denny Sanford Premier Center was awarded the 2014 Outstanding Engineering Achievement Award by the South Dakota Engineering Society, which acknowledges the accomplishments of the engineering profession in South Dakota. The Denny Sanford Premier Center was in the running for the best new major concert venue in the world. The Premier Center was nominated for Pollstar’s annual awards, along with the Forum in Inglewod, Calif., PPL Center in Allentown, Penn., and The SSE Hydro in Glasgow, Scotland.
Jason Aldean performs to a sold out crowd on October 3, 2014 at the grand opening concert for the Denny Sanford Premier Center.
Denny Sanford Premier Center / Sioux Falls, SD