1 minute read
New Victory Theater | New York, NY
New Victory Theater New York, New York
Located in midtown Manhattan, the New Victory Theater is the first and only theater presenting works for children and family audiences year round. It was originally built by Oscar Hammerstein in 1902, and today it is the largest live performance provider for New York City schools. In 2017, the theater underwent a 7,000 GSF renovation of public spaces in order to accommodate the growing number of attendees.
Architect H3 Hardy Collaboration Architecture
This theater renovation included the box office, upper and lower level lobbies, relocation of the concessions, new restroom fixtures, and upgrades to the entrance of the theater. Kohler Ronan provided comprehensive MEP/FP engineering designs in support of these improvements to the public spaces and the lobby revitalization of this valuable cultural institution. Public Space Renovations